XML 45 R33.htm IDEA: XBRL DOCUMENT v3.3.0.814
Rate Matters (Tables)
9 Months Ended
Sep. 30, 2015
Regulatory Assets Pending Final Regulatory Approval
Regulatory Assets Pending Final Regulatory Approval
 
 
September 30,
 
December 31,
 
 
2015
 
2014
 Noncurrent Regulatory Assets
 
(in millions)
 
 
 
 
 
Regulatory Assets Currently Earning a Return
 
 
 
 
Storm Related Costs
 
$
24

 
$
20

Material and Supplies Related to Retired Plants
 
20

 

West Virginia Vegetation Management Program
 

 
20

Regulatory Assets Currently Not Earning a Return
 
 

 
 

Asset Retirement Obligation Costs Related to Retired Plants
 
59

 

Virginia Peak Demand Reduction/Energy Efficiency
 
12

 
9

Ormet Special Rate Recovery Mechanism
 
10

 
10

Storm Related Costs
 
7

 
100

Carbon Capture and Storage Product Validation Facility
 

 
13

IGCC Pre-Construction Costs
 

 
11

Other Regulatory Assets Pending Final Regulatory Approval
 
27

 
43

Total Regulatory Assets Pending Final Regulatory Approval
$
159

 
$
226

Appalachian Power Co [Member]  
Regulatory Assets Pending Final Regulatory Approval
Regulatory Assets Pending Final Regulatory Approval
 
 
APCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Earning a Return
 
 
 
 
Materials and Supplies Related to Retired Plants
 
$
8,592

 
$

Vegetation Management Program  West Virginia
 

 
19,089

Regulatory Assets Currently Not Earning a Return
 
 
 
 
Asset Retirement Obligation Costs Related to Retired Plants
 
32,128

 

Peak Demand Reduction/Energy Efficiency – Virginia
 
11,650

 
8,791

Amos Plant Transfer Costs – West Virginia
 
1,950

 
1,377

Deferred Permit Fees Related to Retired Plants – West Virginia
 
617

 

Storm Related Costs  West Virginia
 

 
65,206

Carbon Capture and Storage Product Validation Facility – West Virginia, FERC
 

 
13,264

IGCC Pre-Construction Costs  West Virginia, FERC
 

 
10,838

Expanded Net Energy Charge  Coal Inventory – West Virginia
 

 
3,421

Expanded Net Energy Charge  Construction Surcharge – West Virginia
 

 
2,307

Carbon Capture and Storage Commercial Scale Facility  West Virginia, FERC
 

 
1,287

Other Regulatory Assets Pending Final Regulatory Approval
 

 
168

Total Regulatory Assets Pending Final Regulatory Approval
 
$
54,937

 
$
125,748

 
 
I&M
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Earning a Return
 
 
 
 
Materials and Supplies Related to Retired Plants
 
$
11,652

 
$

Regulatory Assets Currently Not Earning a Return
 
 
 
 
Asset Retirement Obligation Costs Related to Retired Plants
 
27,079

 

Cook Plant Turbine
 
8,955

 
6,596

Stranded Costs on Abandoned Plants
 
3,897

 
3,897

Deferred Cook Plant Life Cycle Management Project Costs  Michigan
 
3,445

 
1,222

Rockport Dry Sorbent Injection System
 
1,865

 
148

Storm Related Costs  Indiana
 

 
1,074

Other Regulatory Assets Pending Final Regulatory Approval
 
11

 
712

Total Regulatory Assets Pending Final Regulatory Approval
 
$
56,904

 
$
13,649

 
 
OPCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 

 
 

Ormet Special Rate Recovery Mechanism
 
$
10,483

 
$
10,483

Total Regulatory Assets Pending Final Regulatory Approval
 
$
10,483

 
$
10,483

 
 
PSO
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 

 
 

Storm Related Costs
 
$

 
$
16,614

Other Regulatory Assets Pending Final Regulatory Approval
 

 
1,079

Total Regulatory Assets Pending Final Regulatory Approval
 
$

 
$
17,693

 
 
SWEPCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 
 
 
Shipe Road Transmission Project
 
$
3,031

 
$
2,287

Asset Retirement Obligation
 
1,516

 
1,144

Rate Case Expenses
 

 
8,126

Other Regulatory Assets Pending Final Regulatory Approval
 
695

 
558

Total Regulatory Assets Pending Final Regulatory Approval
 
$
5,242

 
$
12,115

Indiana Michigan Power Co [Member]  
Regulatory Assets Pending Final Regulatory Approval
Regulatory Assets Pending Final Regulatory Approval
 
 
APCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Earning a Return
 
 
 
 
Materials and Supplies Related to Retired Plants
 
$
8,592

 
$

Vegetation Management Program  West Virginia
 

 
19,089

Regulatory Assets Currently Not Earning a Return
 
 
 
 
Asset Retirement Obligation Costs Related to Retired Plants
 
32,128

 

Peak Demand Reduction/Energy Efficiency – Virginia
 
11,650

 
8,791

Amos Plant Transfer Costs – West Virginia
 
1,950

 
1,377

Deferred Permit Fees Related to Retired Plants – West Virginia
 
617

 

Storm Related Costs  West Virginia
 

 
65,206

Carbon Capture and Storage Product Validation Facility – West Virginia, FERC
 

 
13,264

IGCC Pre-Construction Costs  West Virginia, FERC
 

 
10,838

Expanded Net Energy Charge  Coal Inventory – West Virginia
 

 
3,421

Expanded Net Energy Charge  Construction Surcharge – West Virginia
 

 
2,307

Carbon Capture and Storage Commercial Scale Facility  West Virginia, FERC
 

 
1,287

Other Regulatory Assets Pending Final Regulatory Approval
 

 
168

Total Regulatory Assets Pending Final Regulatory Approval
 
$
54,937

 
$
125,748

 
 
I&M
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Earning a Return
 
 
 
 
Materials and Supplies Related to Retired Plants
 
$
11,652

 
$

Regulatory Assets Currently Not Earning a Return
 
 
 
 
Asset Retirement Obligation Costs Related to Retired Plants
 
27,079

 

Cook Plant Turbine
 
8,955

 
6,596

Stranded Costs on Abandoned Plants
 
3,897

 
3,897

Deferred Cook Plant Life Cycle Management Project Costs  Michigan
 
3,445

 
1,222

Rockport Dry Sorbent Injection System
 
1,865

 
148

Storm Related Costs  Indiana
 

 
1,074

Other Regulatory Assets Pending Final Regulatory Approval
 
11

 
712

Total Regulatory Assets Pending Final Regulatory Approval
 
$
56,904

 
$
13,649

 
 
OPCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 

 
 

Ormet Special Rate Recovery Mechanism
 
$
10,483

 
$
10,483

Total Regulatory Assets Pending Final Regulatory Approval
 
$
10,483

 
$
10,483

 
 
PSO
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 

 
 

Storm Related Costs
 
$

 
$
16,614

Other Regulatory Assets Pending Final Regulatory Approval
 

 
1,079

Total Regulatory Assets Pending Final Regulatory Approval
 
$

 
$
17,693

 
 
SWEPCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 
 
 
Shipe Road Transmission Project
 
$
3,031

 
$
2,287

Asset Retirement Obligation
 
1,516

 
1,144

Rate Case Expenses
 

 
8,126

Other Regulatory Assets Pending Final Regulatory Approval
 
695

 
558

Total Regulatory Assets Pending Final Regulatory Approval
 
$
5,242

 
$
12,115

Ohio Power Co [Member]  
Regulatory Assets Pending Final Regulatory Approval
Regulatory Assets Pending Final Regulatory Approval
 
 
APCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Earning a Return
 
 
 
 
Materials and Supplies Related to Retired Plants
 
$
8,592

 
$

Vegetation Management Program  West Virginia
 

 
19,089

Regulatory Assets Currently Not Earning a Return
 
 
 
 
Asset Retirement Obligation Costs Related to Retired Plants
 
32,128

 

Peak Demand Reduction/Energy Efficiency – Virginia
 
11,650

 
8,791

Amos Plant Transfer Costs – West Virginia
 
1,950

 
1,377

Deferred Permit Fees Related to Retired Plants – West Virginia
 
617

 

Storm Related Costs  West Virginia
 

 
65,206

Carbon Capture and Storage Product Validation Facility – West Virginia, FERC
 

 
13,264

IGCC Pre-Construction Costs  West Virginia, FERC
 

 
10,838

Expanded Net Energy Charge  Coal Inventory – West Virginia
 

 
3,421

Expanded Net Energy Charge  Construction Surcharge – West Virginia
 

 
2,307

Carbon Capture and Storage Commercial Scale Facility  West Virginia, FERC
 

 
1,287

Other Regulatory Assets Pending Final Regulatory Approval
 

 
168

Total Regulatory Assets Pending Final Regulatory Approval
 
$
54,937

 
$
125,748

 
 
I&M
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Earning a Return
 
 
 
 
Materials and Supplies Related to Retired Plants
 
$
11,652

 
$

Regulatory Assets Currently Not Earning a Return
 
 
 
 
Asset Retirement Obligation Costs Related to Retired Plants
 
27,079

 

Cook Plant Turbine
 
8,955

 
6,596

Stranded Costs on Abandoned Plants
 
3,897

 
3,897

Deferred Cook Plant Life Cycle Management Project Costs  Michigan
 
3,445

 
1,222

Rockport Dry Sorbent Injection System
 
1,865

 
148

Storm Related Costs  Indiana
 

 
1,074

Other Regulatory Assets Pending Final Regulatory Approval
 
11

 
712

Total Regulatory Assets Pending Final Regulatory Approval
 
$
56,904

 
$
13,649

 
 
OPCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 

 
 

Ormet Special Rate Recovery Mechanism
 
$
10,483

 
$
10,483

Total Regulatory Assets Pending Final Regulatory Approval
 
$
10,483

 
$
10,483

 
 
PSO
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 

 
 

Storm Related Costs
 
$

 
$
16,614

Other Regulatory Assets Pending Final Regulatory Approval
 

 
1,079

Total Regulatory Assets Pending Final Regulatory Approval
 
$

 
$
17,693

 
 
SWEPCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 
 
 
Shipe Road Transmission Project
 
$
3,031

 
$
2,287

Asset Retirement Obligation
 
1,516

 
1,144

Rate Case Expenses
 

 
8,126

Other Regulatory Assets Pending Final Regulatory Approval
 
695

 
558

Total Regulatory Assets Pending Final Regulatory Approval
 
$
5,242

 
$
12,115

Public Service Co Of Oklahoma [Member]  
Regulatory Assets Pending Final Regulatory Approval
Regulatory Assets Pending Final Regulatory Approval
 
 
APCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Earning a Return
 
 
 
 
Materials and Supplies Related to Retired Plants
 
$
8,592

 
$

Vegetation Management Program  West Virginia
 

 
19,089

Regulatory Assets Currently Not Earning a Return
 
 
 
 
Asset Retirement Obligation Costs Related to Retired Plants
 
32,128

 

Peak Demand Reduction/Energy Efficiency – Virginia
 
11,650

 
8,791

Amos Plant Transfer Costs – West Virginia
 
1,950

 
1,377

Deferred Permit Fees Related to Retired Plants – West Virginia
 
617

 

Storm Related Costs  West Virginia
 

 
65,206

Carbon Capture and Storage Product Validation Facility – West Virginia, FERC
 

 
13,264

IGCC Pre-Construction Costs  West Virginia, FERC
 

 
10,838

Expanded Net Energy Charge  Coal Inventory – West Virginia
 

 
3,421

Expanded Net Energy Charge  Construction Surcharge – West Virginia
 

 
2,307

Carbon Capture and Storage Commercial Scale Facility  West Virginia, FERC
 

 
1,287

Other Regulatory Assets Pending Final Regulatory Approval
 

 
168

Total Regulatory Assets Pending Final Regulatory Approval
 
$
54,937

 
$
125,748

 
 
I&M
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Earning a Return
 
 
 
 
Materials and Supplies Related to Retired Plants
 
$
11,652

 
$

Regulatory Assets Currently Not Earning a Return
 
 
 
 
Asset Retirement Obligation Costs Related to Retired Plants
 
27,079

 

Cook Plant Turbine
 
8,955

 
6,596

Stranded Costs on Abandoned Plants
 
3,897

 
3,897

Deferred Cook Plant Life Cycle Management Project Costs  Michigan
 
3,445

 
1,222

Rockport Dry Sorbent Injection System
 
1,865

 
148

Storm Related Costs  Indiana
 

 
1,074

Other Regulatory Assets Pending Final Regulatory Approval
 
11

 
712

Total Regulatory Assets Pending Final Regulatory Approval
 
$
56,904

 
$
13,649

 
 
OPCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 

 
 

Ormet Special Rate Recovery Mechanism
 
$
10,483

 
$
10,483

Total Regulatory Assets Pending Final Regulatory Approval
 
$
10,483

 
$
10,483

 
 
PSO
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 

 
 

Storm Related Costs
 
$

 
$
16,614

Other Regulatory Assets Pending Final Regulatory Approval
 

 
1,079

Total Regulatory Assets Pending Final Regulatory Approval
 
$

 
$
17,693

 
 
SWEPCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 
 
 
Shipe Road Transmission Project
 
$
3,031

 
$
2,287

Asset Retirement Obligation
 
1,516

 
1,144

Rate Case Expenses
 

 
8,126

Other Regulatory Assets Pending Final Regulatory Approval
 
695

 
558

Total Regulatory Assets Pending Final Regulatory Approval
 
$
5,242

 
$
12,115

Southwestern Electric Power Co [Member]  
Regulatory Assets Pending Final Regulatory Approval
Regulatory Assets Pending Final Regulatory Approval
 
 
APCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Earning a Return
 
 
 
 
Materials and Supplies Related to Retired Plants
 
$
8,592

 
$

Vegetation Management Program  West Virginia
 

 
19,089

Regulatory Assets Currently Not Earning a Return
 
 
 
 
Asset Retirement Obligation Costs Related to Retired Plants
 
32,128

 

Peak Demand Reduction/Energy Efficiency – Virginia
 
11,650

 
8,791

Amos Plant Transfer Costs – West Virginia
 
1,950

 
1,377

Deferred Permit Fees Related to Retired Plants – West Virginia
 
617

 

Storm Related Costs  West Virginia
 

 
65,206

Carbon Capture and Storage Product Validation Facility – West Virginia, FERC
 

 
13,264

IGCC Pre-Construction Costs  West Virginia, FERC
 

 
10,838

Expanded Net Energy Charge  Coal Inventory – West Virginia
 

 
3,421

Expanded Net Energy Charge  Construction Surcharge – West Virginia
 

 
2,307

Carbon Capture and Storage Commercial Scale Facility  West Virginia, FERC
 

 
1,287

Other Regulatory Assets Pending Final Regulatory Approval
 

 
168

Total Regulatory Assets Pending Final Regulatory Approval
 
$
54,937

 
$
125,748

 
 
I&M
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Earning a Return
 
 
 
 
Materials and Supplies Related to Retired Plants
 
$
11,652

 
$

Regulatory Assets Currently Not Earning a Return
 
 
 
 
Asset Retirement Obligation Costs Related to Retired Plants
 
27,079

 

Cook Plant Turbine
 
8,955

 
6,596

Stranded Costs on Abandoned Plants
 
3,897

 
3,897

Deferred Cook Plant Life Cycle Management Project Costs  Michigan
 
3,445

 
1,222

Rockport Dry Sorbent Injection System
 
1,865

 
148

Storm Related Costs  Indiana
 

 
1,074

Other Regulatory Assets Pending Final Regulatory Approval
 
11

 
712

Total Regulatory Assets Pending Final Regulatory Approval
 
$
56,904

 
$
13,649

 
 
OPCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 

 
 

Ormet Special Rate Recovery Mechanism
 
$
10,483

 
$
10,483

Total Regulatory Assets Pending Final Regulatory Approval
 
$
10,483

 
$
10,483

 
 
PSO
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 

 
 

Storm Related Costs
 
$

 
$
16,614

Other Regulatory Assets Pending Final Regulatory Approval
 

 
1,079

Total Regulatory Assets Pending Final Regulatory Approval
 
$

 
$
17,693

 
 
SWEPCo
 
 
September 30,
 
December 31,
 
 
2015
 
2014
Noncurrent Regulatory Assets
 
(in thousands)
 
 
 
 
 
Regulatory Assets Currently Not Earning a Return
 
 
 
 
Shipe Road Transmission Project
 
$
3,031

 
$
2,287

Asset Retirement Obligation
 
1,516

 
1,144

Rate Case Expenses
 

 
8,126

Other Regulatory Assets Pending Final Regulatory Approval
 
695

 
558

Total Regulatory Assets Pending Final Regulatory Approval
 
$
5,242

 
$
12,115