Commitments, Guarantees and Contingencies
6 Months Ended
Jun. 30, 2014
Commitments, Guarantees and Contingencies
COMMITMENTS, GUARANTEES AND CONTINGENCIES

We are subject to certain claims and legal actions arising in our ordinary course of business.  In addition, our business activities are subject to extensive governmental regulation related to public health and the environment.  The ultimate outcome of such pending or potential litigation against us cannot be predicted.  For current proceedings not specifically discussed below, management does not anticipate that the liabilities, if any, arising from such proceedings would have a material effect on our financial statements.  The Commitments, Guarantees and Contingencies note within our 2013 Annual Report should be read in conjunction with this report.

GUARANTEES

We record liabilities for guarantees in accordance with the accounting guidance for “Guarantees.”  There is no collateral held in relation to any guarantees.  In the event any guarantee is drawn, there is no recourse to third parties unless specified below.

Letters of Credit

We enter into standby letters of credit with third parties.  As Parent, we issue all of these letters of credit in our ordinary course of business on behalf of our subsidiaries.  These letters of credit cover items such as gas and electricity risk management contracts, construction contracts, insurance programs, security deposits and debt service reserves.

We have two revolving credit facilities totaling $3.5 billion, under which we may issue up to $1.2 billion as letters of credit.  As of June 30, 2014, the maximum future payments for letters of credit issued under the revolving credit facilities were $49 million with maturities ranging from August 2014 to June 2015.

In January 2014, we issued letters of credit under an $85 million uncommitted facility signed in October 2013. As of June 30, 2014, the maximum future payment for letters of credit issued under the uncommitted facility was $69 million with a maturity in January 2015. An uncommitted facility gives the issuer of the facility the right to accept or decline each request we make under the facility.

We have $477 million of variable rate Pollution Control Bonds supported by bilateral letters of credit for $483 million.  The letters of credit have maturities ranging from March 2015 to July 2017.

Guarantees of Third-Party Obligations

SWEPCo

As part of the process to receive a renewal of a Texas Railroad Commission permit for lignite mining, SWEPCo provides guarantees of mine reclamation of $115 million.  Since SWEPCo uses self-bonding, the guarantee provides for SWEPCo to commit to use its resources to complete the reclamation in the event the work is not completed by Sabine.  This guarantee ends upon depletion of reserves and completion of final reclamation.  Based on the latest study completed in 2010, we estimate the reserves will be depleted in 2036 with final reclamation completed by 2046 at an estimated cost of approximately $58 million.  Actual reclamation costs could vary due to period inflation and any changes to actual mine reclamation.  As of June 30, 2014, SWEPCo has collected approximately $63 million through a rider for final mine closure and reclamation costs, of which $16 million is recorded in Deferred Credits and Other Noncurrent Liabilities and $47 million is recorded in Asset Retirement Obligations on our condensed balance sheets.

Sabine charges SWEPCo, its only customer, all of its costs.  SWEPCo passes these costs to customers through its fuel clause.


Indemnifications and Other Guarantees

Contracts

We enter into certain types of contracts which require indemnifications.  Typically these contracts include, but are not limited to, sale agreements, lease agreements, purchase agreements and financing agreements.  Generally, these agreements may include, but are not limited to, indemnifications around certain tax, contractual and environmental matters.  With respect to sale agreements, our exposure generally does not exceed the sale price.  As of June 30, 2014, there were no material liabilities recorded for any indemnifications.

Master Lease Agreements

We lease certain equipment under master lease agreements.  Under the lease agreements, the lessor is guaranteed a residual value up to a stated percentage of either the unamortized balance or the equipment cost at the end of the lease term.  If the actual fair value of the leased equipment is below the guaranteed residual value at the end of the lease term, we are committed to pay the difference between the actual fair value and the residual value guarantee.  Historically, at the end of the lease term the fair value has been in excess of the unamortized balance.  As of June 30, 2014, the maximum potential loss for these lease agreements was approximately $21 million assuming the fair value of the equipment is zero at the end of the lease term.

Railcar Lease

In June 2003, AEP Transportation LLC (AEP Transportation), a subsidiary of AEP, entered into an agreement with BTM Capital Corporation, as lessor, to lease 875 coal-transporting aluminum railcars.  The lease is accounted for as an operating lease.  In January 2008, AEP Transportation assigned the remaining 848 railcars under the original lease agreement to I&M (390 railcars) and SWEPCo (458 railcars).  The assignments are accounted for as operating leases for I&M and SWEPCo.  The initial lease term was five years with three consecutive five-year renewal periods for a maximum lease term of twenty years.  I&M and SWEPCo intend to renew these leases for the full lease term of twenty years via the renewal options.  The future minimum lease obligations are $12 million and $14 million for I&M and SWEPCo, respectively, for the remaining railcars as of June 30, 2014.

Under the lease agreement, the lessor is guaranteed that the sale proceeds under a return-and-sale option will equal at least a lessee obligation amount specified in the lease, which declines from approximately 83% under the current five year lease term to 77% at the end of the 20-year term of the projected fair value of the equipment.  I&M and SWEPCo have assumed the guarantee under the return-and-sale option.  The maximum potential losses related to the guarantee are approximately $9 million and $10 million for I&M and SWEPCo, respectively, assuming the fair value of the equipment is zero at the end of the current five-year lease term.  However, we believe that the fair value would produce a sufficient sales price to avoid any loss.

ENVIRONMENTAL CONTINGENCIES

The Comprehensive Environmental Response Compensation and Liability Act (Superfund) and State Remediation

By-products from the generation of electricity include materials such as ash, slag, sludge, low-level radioactive waste and SNF.  Coal combustion by-products, which constitute the overwhelming percentage of these materials, are typically treated and deposited in captive disposal facilities or are beneficially utilized.  In addition, our generation plants and transmission and distribution facilities have used asbestos, polychlorinated biphenyls and other hazardous and nonhazardous materials.  We currently incur costs to dispose of these substances safely.

In 2008, I&M received a letter from the Michigan Department of Environmental Quality (MDEQ) concerning conditions at a site under state law and requesting I&M take voluntary action necessary to prevent and/or mitigate public harm.  I&M started remediation work in accordance with a plan approved by MDEQ.  I&M’s reserve is approximately $7 million.  As the remediation work is completed, I&M’s cost may change as new information becomes available concerning either the level of contamination at the site or changes in the scope of remediation required by the MDEQ.  We cannot predict the amount of additional cost, if any.

NUCLEAR CONTINGENCIES

I&M owns and operates the two-unit 2,191 MW Cook Plant under licenses granted by the Nuclear Regulatory Commission.  We have a significant future financial commitment to dispose of SNF and to safely decommission and decontaminate the plant.  The licenses to operate the two nuclear units at the Cook Plant expire in 2034 and 2037.  The operation of a nuclear facility also involves special risks, potential liabilities and specific regulatory and safety requirements.  By agreement, I&M is partially liable, together with all other electric utility companies that own nuclear generation units, for a nuclear power plant incident at any nuclear plant in the U.S.  Should a nuclear incident occur at any nuclear power plant in the U.S., the resultant liability could be substantial.

OPERATIONAL CONTINGENCIES

Rockport Plant Litigation

In July 2013, the Wilmington Trust Company filed a complaint in U.S. District Court for the Southern District of New York against AEGCo and I&M alleging that it will be unlawfully burdened by the terms of the modified NSR consent decree after the Rockport Plant, Unit 2 lease expiration in December 2022.  The terms of the consent decree allow the installation of environmental emission control equipment, repowering or retirement of the unit.  The plaintiff further alleges that the defendants’ actions constitute breach of the lease and participation agreement.  The plaintiff seeks a judgment declaring that the defendants breached the lease, must satisfy obligations related to installation of emission control equipment and indemnify the plaintiff. The New York court granted our motion to transfer this case to the U.S. District Court for the Southern District of Ohio. Our motion to dismiss the case, filed in October 2013, is pending. We will continue to defend against the claims. We are unable to determine a range of potential losses that are reasonably possible of occurring.

Natural Gas Markets Lawsuits

In 2002, the Lieutenant Governor of California filed a lawsuit in Los Angeles County California Superior Court against numerous energy companies, including AEP, alleging violations of California law through alleged fraudulent reporting of false natural gas price and volume information with an intent to affect the market price of natural gas and electricity.  AEP was dismissed from the case.  A number of similar cases were also filed in California and in state and federal courts in several states making essentially the same allegations under federal or state laws against the same companies.  AEP (or a subsidiary) is among the companies named as defendants in some of these cases.  We settled, received summary judgment or were dismissed from all of these cases.  The plaintiffs appealed the Nevada federal district court's dismissal of several cases involving AEP companies to the U.S. Court of Appeals for the Ninth Circuit.  In April 2013, the appellate court reversed in part, and affirmed in part, the district court's orders in these cases.  The appellate court reversed the district court's holding that the state antitrust claims were preempted by the Natural Gas Act and the order dismissing AEP from two of the cases on personal jurisdiction grounds and affirmed the decision denying leave to the plaintiffs to amend their complaints in two of the cases.  Defendants in these cases, including AEP, previously filed a petition seeking further review with the U.S. Supreme Court on the preemption issue. In June 2014, AEP filed a petition with the U.S. Supreme Court seeking review of the personal jurisdiction issue. In July 2014, the U.S. Supreme Court granted the defendants' previously filed petition for further review with the U.S. Supreme Court on the preemption issue.  We will continue to defend the cases.  We believe the provision we have is adequate. We are unable to determine a range of potential losses that are reasonably possible of occurring.

Wage and Hours Lawsuit

In August 2013, PSO received an amended complaint filed in the U.S. District Court for the Northern District of Oklahoma by 36 current and former line and warehouse employees alleging that they have been denied overtime pay in violation of the Fair Labor Standards Act.  Plaintiffs claim that they are entitled to overtime pay for “on call” time. They allege that restrictions placed on them during on call hours are burdensome enough that they are entitled to compensation for these hours as hours worked.  Plaintiffs also filed a motion to conditionally certify this action as a class action, claiming there are an additional 70 individuals similarly situated to plaintiffs.  Plaintiffs seek damages in the amount of unpaid overtime over a three-year period and liquidated damages in the same amount.

In March 2014, the federal court granted plaintiffs’ motion to conditionally certify the action as a class action.  Notice was given to all class members and an additional 44 individuals opted in to the class, bringing the plaintiff class to 80 current and former employees. We will continue to defend the case. We are unable to determine a range of potential losses that are reasonably possible of occurring.

National Do Not Call Registry Lawsuit

In May 2014, AEP Energy was served with a complaint filed in the U.S. District Court for the Northern District of Illinois, alleging violations of the Telephone Consumer Protection Act (TCPA). The plaintiff alleges that he received telemarketing calls on behalf of AEP Energy despite having registered his telephone number on the National Do Not Call Registry. Plaintiff seeks to represent a class of persons who allegedly received such calls. Plaintiff seeks statutory damages under the TCPA on behalf of himself and the alleged class as well as injunctive relief. We will continue to defend this case. We are unable to determine a range of potential losses that are reasonably possible of occurring.

Appalachian Power Co [Member]
 
Commitments, Guarantees and Contingencies
COMMITMENTS, GUARANTEES AND CONTINGENCIES

The Registrant Subsidiaries are subject to certain claims and legal actions arising in their ordinary course of business.  In addition, their business activities are subject to extensive governmental regulation related to public health and the environment.  The ultimate outcome of such pending or potential litigation cannot be predicted.  For current proceedings not specifically discussed below, management does not anticipate that the liabilities, if any, arising from such proceedings would have a material effect on the financial statements.  The Commitments, Guarantees and Contingencies note within the 2013 Annual Report should be read in conjunction with this report.

GUARANTEES

Liabilities for guarantees are recorded in accordance with the accounting guidance for “Guarantees.”  There is no collateral held in relation to any guarantees.  In the event any guarantee is drawn, there is no recourse to third parties unless specified below.

Letters of Credit – Affecting APCo, I&M and OPCo

Certain Registrant Subsidiaries enter into standby letters of credit with third parties.  These letters of credit are issued in the ordinary course of business and cover items such as insurance programs, security deposits and debt service reserves.

AEP has two revolving credit facilities totaling $3.5 billion, under which up to $1.2 billion may be issued as letters of credit.  As of June 30, 2014, the maximum future payments for letters of credit issued under the revolving credit facilities were as follows:
Company
 
Amount
 
Maturity
 
 
(in thousands)
 
 
I&M
 
$
150

 
March 2015
OPCo
 
4,200

 
June 2015


The Registrant Subsidiaries have $307 million of variable rate Pollution Control Bonds supported by bilateral letters of credit for $310 million as follows:
Company
 
Pollution
Control Bonds
 
Bilateral Letters
of Credit
 
Maturity of Bilateral
Letters of Credit
 
 
(in thousands)
 
 
APCo
 
$
229,650

 
$
232,293

 
March 2016 to March 2017 
I&M
 
77,000

 
77,886

 
March 2015


Guarantees of Third-Party Obligations – Affecting SWEPCo

As part of the process to receive a renewal of a Texas Railroad Commission permit for lignite mining, SWEPCo provides guarantees of mine reclamation of $115 million.  Since SWEPCo uses self-bonding, the guarantee provides for SWEPCo to commit to use its resources to complete the reclamation in the event the work is not completed by Sabine.  This guarantee ends upon depletion of reserves and completion of final reclamation.  Based on the latest study completed in 2010, it is estimated the reserves will be depleted in 2036 with final reclamation completed by 2046 at an estimated cost of approximately $58 million.  Actual reclamation costs could vary due to period inflation and any changes to actual mine reclamation.  As of June 30, 2014, SWEPCo has collected approximately $63 million through a rider for final mine closure and reclamation costs, of which $16 million is recorded in Deferred Credits and Other Noncurrent Liabilities and $47 million is recorded in Asset Retirement Obligations on SWEPCo’s condensed balance sheets.

Sabine charges SWEPCo, its only customer, all of its costs.  SWEPCo passes these costs to customers through its fuel clause.

Indemnifications and Other Guarantees – Affecting APCo, I&M, OPCo, PSO and SWEPCo

Contracts

The Registrant Subsidiaries enter into certain types of contracts which require indemnifications.  Typically these contracts include, but are not limited to, sale agreements, lease agreements, purchase agreements and financing agreements.  Generally, these agreements may include, but are not limited to, indemnifications around certain tax, contractual and environmental matters.  With respect to sale agreements, exposure generally does not exceed the sale price.  As of June 30, 2014, there were no material liabilities recorded for any indemnifications.

APCo, I&M and OPCo are jointly and severally liable for activity conducted by AEPSC on behalf of the AEP East Companies related to power purchase and sale activity pursuant to the SIA.  PSO and SWEPCo are jointly and severally liable for activity conducted by AEPSC on behalf of PSO and SWEPCo related to power purchase and sale activity pursuant to the SIA.

Master Lease Agreements

The Registrant Subsidiaries lease certain equipment under master lease agreements.  Under the lease agreements, the lessor is guaranteed a residual value up to a stated percentage of either the unamortized balance or the equipment cost at the end of the lease term.  If the actual fair value of the leased equipment is below the guaranteed residual value at the end of the lease term, the Registrant Subsidiaries are committed to pay the difference between the actual fair value and the residual value guarantee.  Historically, at the end of the lease term the fair value has been in excess of the unamortized balance.  As of June 30, 2014, the maximum potential loss by Registrant Subsidiary for these lease agreements assuming the fair value of the equipment is zero at the end of the lease term was as follows:
Company
 
Maximum
Potential Loss
 
 
(in thousands)
APCo
 
$
3,671

I&M
 
2,618

OPCo
 
4,161

PSO
 
1,505

SWEPCo
 
2,438



Railcar Lease

In June 2003, AEP Transportation LLC (AEP Transportation), a subsidiary of AEP, entered into an agreement with BTM Capital Corporation, as lessor, to lease 875 coal-transporting aluminum railcars.  The lease is accounted for as an operating lease.  In January 2008, AEP Transportation assigned the remaining 848 railcars under the original lease agreement to I&M (390 railcars) and SWEPCo (458 railcars).  The assignments are accounted for as operating leases for I&M and SWEPCo.  The initial lease term was five years with three consecutive five-year renewal periods for a maximum lease term of twenty years.  I&M and SWEPCo intend to renew these leases for the full lease term of twenty years via the renewal options.  The future minimum lease obligations are $12 million and $14 million for I&M and SWEPCo, respectively, for the remaining railcars as of June 30, 2014.

Under the lease agreement, the lessor is guaranteed that the sale proceeds under a return-and-sale option will equal at least a lessee obligation amount specified in the lease, which declines from approximately 83% under the current five year lease term to 77% at the end of the 20-year term of the projected fair value of the equipment.  I&M and SWEPCo have assumed the guarantee under the return-and-sale option.  The maximum potential losses related to the guarantee are approximately $9 million and $10 million for I&M and SWEPCo, respectively, assuming the fair value of the equipment is zero at the end of the current five-year lease term.  However, management believes that the fair value would produce a sufficient sales price to avoid any loss.

ENVIRONMENTAL CONTINGENCIES

The Comprehensive Environmental Response Compensation and Liability Act (Superfund) and State Remediation – Affecting I&M
 
By-products from the generation of electricity include materials such as ash, slag, sludge, low-level radioactive waste and SNF.  Coal combustion by-products, which constitute the overwhelming percentage of these materials, are typically treated and deposited in captive disposal facilities or are beneficially utilized.  In addition, the generation plants and transmission and distribution facilities have used asbestos, polychlorinated biphenyls and other hazardous and nonhazardous materials.  The Registrant Subsidiaries currently incur costs to dispose of these substances safely.

In 2008, I&M received a letter from the Michigan Department of Environmental Quality (MDEQ) concerning conditions at a site under state law and requesting I&M take voluntary action necessary to prevent and/or mitigate public harm.  I&M started remediation work in accordance with a plan approved by MDEQ.  I&M’s reserve is approximately $7 million.  As the remediation work is completed, I&M’s cost may change as new information becomes available concerning either the level of contamination at the site or changes in the scope of remediation required by the MDEQ.  Management cannot predict the amount of additional cost, if any.

NUCLEAR CONTINGENCIES – AFFECTING I&M

I&M owns and operates the two-unit 2,191 MW Cook Plant under licenses granted by the Nuclear Regulatory Commission.  I&M has a significant future financial commitment to dispose of SNF and to safely decommission and decontaminate the plant.  The licenses to operate the two nuclear units at the Cook Plant expire in 2034 and 2037.  The operation of a nuclear facility also involves special risks, potential liabilities and specific regulatory and safety requirements.  By agreement, I&M is partially liable, together with all other electric utility companies that own nuclear generation units, for a nuclear power plant incident at any nuclear plant in the U.S.  Should a nuclear incident occur at any nuclear power plant in the U.S., the resultant liability could be substantial.

OPERATIONAL CONTINGENCIES

Rockport Plant Litigation – Affecting I&M

In July 2013, the Wilmington Trust Company filed a complaint in U.S. District Court for the Southern District of New York against AEGCo and I&M alleging that it will be unlawfully burdened by the terms of the modified NSR consent decree after the Rockport Plant, Unit 2 lease expiration in December 2022.  The terms of the consent decree allow the installation of environmental emission control equipment, repowering or retirement of the unit.  The plaintiff further alleges that the defendants’ actions constitute breach of the lease and participation agreement.  The plaintiff seeks a judgment declaring that the defendants breached the lease, must satisfy obligations related to installation of emission control equipment and indemnify the plaintiff. The New York court granted a motion to transfer this case to the U.S. District Court for the Southern District of Ohio. AEGCo’s and I&M’s motion to dismiss the case, filed in October 2013, is pending. Management will continue to defend against the claims. Management is unable to determine a range of potential losses that are reasonably possible of occurring.

Wage and Hours Lawsuit – Affecting PSO

In August 2013, PSO received an amended complaint filed in the U.S. District Court for the Northern District of Oklahoma by 36 current and former line and warehouse employees alleging that they have been denied overtime pay in violation of the Fair Labor Standards Act.  Plaintiffs claim that they are entitled to overtime pay for “on call” time. They allege that restrictions placed on them during on call hours are burdensome enough that they are entitled to compensation for these hours as hours worked.  Plaintiffs also filed a motion to conditionally certify this action as a class action, claiming there are an additional 70 individuals similarly situated to plaintiffs.  Plaintiffs seek damages in the amount of unpaid overtime over a three-year period and liquidated damages in the same amount.

In March 2014, the federal court granted plaintiffs’ motion to conditionally certify the action as a class action.  Notice was given to all class members and an additional 44 individuals opted in to the class, bringing the plaintiff class to 80 current and former employees. Management will continue to defend the case. Management is unable to determine a range of potential losses that are reasonably possible of occurring.
Indiana Michigan Power Co [Member]
 
Commitments, Guarantees and Contingencies
COMMITMENTS, GUARANTEES AND CONTINGENCIES

The Registrant Subsidiaries are subject to certain claims and legal actions arising in their ordinary course of business.  In addition, their business activities are subject to extensive governmental regulation related to public health and the environment.  The ultimate outcome of such pending or potential litigation cannot be predicted.  For current proceedings not specifically discussed below, management does not anticipate that the liabilities, if any, arising from such proceedings would have a material effect on the financial statements.  The Commitments, Guarantees and Contingencies note within the 2013 Annual Report should be read in conjunction with this report.

GUARANTEES

Liabilities for guarantees are recorded in accordance with the accounting guidance for “Guarantees.”  There is no collateral held in relation to any guarantees.  In the event any guarantee is drawn, there is no recourse to third parties unless specified below.

Letters of Credit – Affecting APCo, I&M and OPCo

Certain Registrant Subsidiaries enter into standby letters of credit with third parties.  These letters of credit are issued in the ordinary course of business and cover items such as insurance programs, security deposits and debt service reserves.

AEP has two revolving credit facilities totaling $3.5 billion, under which up to $1.2 billion may be issued as letters of credit.  As of June 30, 2014, the maximum future payments for letters of credit issued under the revolving credit facilities were as follows:
Company
 
Amount
 
Maturity
 
 
(in thousands)
 
 
I&M
 
$
150

 
March 2015
OPCo
 
4,200

 
June 2015


The Registrant Subsidiaries have $307 million of variable rate Pollution Control Bonds supported by bilateral letters of credit for $310 million as follows:
Company
 
Pollution
Control Bonds
 
Bilateral Letters
of Credit
 
Maturity of Bilateral
Letters of Credit
 
 
(in thousands)
 
 
APCo
 
$
229,650

 
$
232,293

 
March 2016 to March 2017 
I&M
 
77,000

 
77,886

 
March 2015


Guarantees of Third-Party Obligations – Affecting SWEPCo

As part of the process to receive a renewal of a Texas Railroad Commission permit for lignite mining, SWEPCo provides guarantees of mine reclamation of $115 million.  Since SWEPCo uses self-bonding, the guarantee provides for SWEPCo to commit to use its resources to complete the reclamation in the event the work is not completed by Sabine.  This guarantee ends upon depletion of reserves and completion of final reclamation.  Based on the latest study completed in 2010, it is estimated the reserves will be depleted in 2036 with final reclamation completed by 2046 at an estimated cost of approximately $58 million.  Actual reclamation costs could vary due to period inflation and any changes to actual mine reclamation.  As of June 30, 2014, SWEPCo has collected approximately $63 million through a rider for final mine closure and reclamation costs, of which $16 million is recorded in Deferred Credits and Other Noncurrent Liabilities and $47 million is recorded in Asset Retirement Obligations on SWEPCo’s condensed balance sheets.

Sabine charges SWEPCo, its only customer, all of its costs.  SWEPCo passes these costs to customers through its fuel clause.

Indemnifications and Other Guarantees – Affecting APCo, I&M, OPCo, PSO and SWEPCo

Contracts

The Registrant Subsidiaries enter into certain types of contracts which require indemnifications.  Typically these contracts include, but are not limited to, sale agreements, lease agreements, purchase agreements and financing agreements.  Generally, these agreements may include, but are not limited to, indemnifications around certain tax, contractual and environmental matters.  With respect to sale agreements, exposure generally does not exceed the sale price.  As of June 30, 2014, there were no material liabilities recorded for any indemnifications.

APCo, I&M and OPCo are jointly and severally liable for activity conducted by AEPSC on behalf of the AEP East Companies related to power purchase and sale activity pursuant to the SIA.  PSO and SWEPCo are jointly and severally liable for activity conducted by AEPSC on behalf of PSO and SWEPCo related to power purchase and sale activity pursuant to the SIA.

Master Lease Agreements

The Registrant Subsidiaries lease certain equipment under master lease agreements.  Under the lease agreements, the lessor is guaranteed a residual value up to a stated percentage of either the unamortized balance or the equipment cost at the end of the lease term.  If the actual fair value of the leased equipment is below the guaranteed residual value at the end of the lease term, the Registrant Subsidiaries are committed to pay the difference between the actual fair value and the residual value guarantee.  Historically, at the end of the lease term the fair value has been in excess of the unamortized balance.  As of June 30, 2014, the maximum potential loss by Registrant Subsidiary for these lease agreements assuming the fair value of the equipment is zero at the end of the lease term was as follows:
Company
 
Maximum
Potential Loss
 
 
(in thousands)
APCo
 
$
3,671

I&M
 
2,618

OPCo
 
4,161

PSO
 
1,505

SWEPCo
 
2,438



Railcar Lease

In June 2003, AEP Transportation LLC (AEP Transportation), a subsidiary of AEP, entered into an agreement with BTM Capital Corporation, as lessor, to lease 875 coal-transporting aluminum railcars.  The lease is accounted for as an operating lease.  In January 2008, AEP Transportation assigned the remaining 848 railcars under the original lease agreement to I&M (390 railcars) and SWEPCo (458 railcars).  The assignments are accounted for as operating leases for I&M and SWEPCo.  The initial lease term was five years with three consecutive five-year renewal periods for a maximum lease term of twenty years.  I&M and SWEPCo intend to renew these leases for the full lease term of twenty years via the renewal options.  The future minimum lease obligations are $12 million and $14 million for I&M and SWEPCo, respectively, for the remaining railcars as of June 30, 2014.

Under the lease agreement, the lessor is guaranteed that the sale proceeds under a return-and-sale option will equal at least a lessee obligation amount specified in the lease, which declines from approximately 83% under the current five year lease term to 77% at the end of the 20-year term of the projected fair value of the equipment.  I&M and SWEPCo have assumed the guarantee under the return-and-sale option.  The maximum potential losses related to the guarantee are approximately $9 million and $10 million for I&M and SWEPCo, respectively, assuming the fair value of the equipment is zero at the end of the current five-year lease term.  However, management believes that the fair value would produce a sufficient sales price to avoid any loss.

ENVIRONMENTAL CONTINGENCIES

The Comprehensive Environmental Response Compensation and Liability Act (Superfund) and State Remediation – Affecting I&M
 
By-products from the generation of electricity include materials such as ash, slag, sludge, low-level radioactive waste and SNF.  Coal combustion by-products, which constitute the overwhelming percentage of these materials, are typically treated and deposited in captive disposal facilities or are beneficially utilized.  In addition, the generation plants and transmission and distribution facilities have used asbestos, polychlorinated biphenyls and other hazardous and nonhazardous materials.  The Registrant Subsidiaries currently incur costs to dispose of these substances safely.

In 2008, I&M received a letter from the Michigan Department of Environmental Quality (MDEQ) concerning conditions at a site under state law and requesting I&M take voluntary action necessary to prevent and/or mitigate public harm.  I&M started remediation work in accordance with a plan approved by MDEQ.  I&M’s reserve is approximately $7 million.  As the remediation work is completed, I&M’s cost may change as new information becomes available concerning either the level of contamination at the site or changes in the scope of remediation required by the MDEQ.  Management cannot predict the amount of additional cost, if any.

NUCLEAR CONTINGENCIES – AFFECTING I&M

I&M owns and operates the two-unit 2,191 MW Cook Plant under licenses granted by the Nuclear Regulatory Commission.  I&M has a significant future financial commitment to dispose of SNF and to safely decommission and decontaminate the plant.  The licenses to operate the two nuclear units at the Cook Plant expire in 2034 and 2037.  The operation of a nuclear facility also involves special risks, potential liabilities and specific regulatory and safety requirements.  By agreement, I&M is partially liable, together with all other electric utility companies that own nuclear generation units, for a nuclear power plant incident at any nuclear plant in the U.S.  Should a nuclear incident occur at any nuclear power plant in the U.S., the resultant liability could be substantial.

OPERATIONAL CONTINGENCIES

Rockport Plant Litigation – Affecting I&M

In July 2013, the Wilmington Trust Company filed a complaint in U.S. District Court for the Southern District of New York against AEGCo and I&M alleging that it will be unlawfully burdened by the terms of the modified NSR consent decree after the Rockport Plant, Unit 2 lease expiration in December 2022.  The terms of the consent decree allow the installation of environmental emission control equipment, repowering or retirement of the unit.  The plaintiff further alleges that the defendants’ actions constitute breach of the lease and participation agreement.  The plaintiff seeks a judgment declaring that the defendants breached the lease, must satisfy obligations related to installation of emission control equipment and indemnify the plaintiff. The New York court granted a motion to transfer this case to the U.S. District Court for the Southern District of Ohio. AEGCo’s and I&M’s motion to dismiss the case, filed in October 2013, is pending. Management will continue to defend against the claims. Management is unable to determine a range of potential losses that are reasonably possible of occurring.

Wage and Hours Lawsuit – Affecting PSO

In August 2013, PSO received an amended complaint filed in the U.S. District Court for the Northern District of Oklahoma by 36 current and former line and warehouse employees alleging that they have been denied overtime pay in violation of the Fair Labor Standards Act.  Plaintiffs claim that they are entitled to overtime pay for “on call” time. They allege that restrictions placed on them during on call hours are burdensome enough that they are entitled to compensation for these hours as hours worked.  Plaintiffs also filed a motion to conditionally certify this action as a class action, claiming there are an additional 70 individuals similarly situated to plaintiffs.  Plaintiffs seek damages in the amount of unpaid overtime over a three-year period and liquidated damages in the same amount.

In March 2014, the federal court granted plaintiffs’ motion to conditionally certify the action as a class action.  Notice was given to all class members and an additional 44 individuals opted in to the class, bringing the plaintiff class to 80 current and former employees. Management will continue to defend the case. Management is unable to determine a range of potential losses that are reasonably possible of occurring.
Ohio Power Co [Member]
 
Commitments, Guarantees and Contingencies
COMMITMENTS, GUARANTEES AND CONTINGENCIES

The Registrant Subsidiaries are subject to certain claims and legal actions arising in their ordinary course of business.  In addition, their business activities are subject to extensive governmental regulation related to public health and the environment.  The ultimate outcome of such pending or potential litigation cannot be predicted.  For current proceedings not specifically discussed below, management does not anticipate that the liabilities, if any, arising from such proceedings would have a material effect on the financial statements.  The Commitments, Guarantees and Contingencies note within the 2013 Annual Report should be read in conjunction with this report.

GUARANTEES

Liabilities for guarantees are recorded in accordance with the accounting guidance for “Guarantees.”  There is no collateral held in relation to any guarantees.  In the event any guarantee is drawn, there is no recourse to third parties unless specified below.

Letters of Credit – Affecting APCo, I&M and OPCo

Certain Registrant Subsidiaries enter into standby letters of credit with third parties.  These letters of credit are issued in the ordinary course of business and cover items such as insurance programs, security deposits and debt service reserves.

AEP has two revolving credit facilities totaling $3.5 billion, under which up to $1.2 billion may be issued as letters of credit.  As of June 30, 2014, the maximum future payments for letters of credit issued under the revolving credit facilities were as follows:
Company
 
Amount
 
Maturity
 
 
(in thousands)
 
 
I&M
 
$
150

 
March 2015
OPCo
 
4,200

 
June 2015


The Registrant Subsidiaries have $307 million of variable rate Pollution Control Bonds supported by bilateral letters of credit for $310 million as follows:
Company
 
Pollution
Control Bonds
 
Bilateral Letters
of Credit
 
Maturity of Bilateral
Letters of Credit
 
 
(in thousands)
 
 
APCo
 
$
229,650

 
$
232,293

 
March 2016 to March 2017 
I&M
 
77,000

 
77,886

 
March 2015


Guarantees of Third-Party Obligations – Affecting SWEPCo

As part of the process to receive a renewal of a Texas Railroad Commission permit for lignite mining, SWEPCo provides guarantees of mine reclamation of $115 million.  Since SWEPCo uses self-bonding, the guarantee provides for SWEPCo to commit to use its resources to complete the reclamation in the event the work is not completed by Sabine.  This guarantee ends upon depletion of reserves and completion of final reclamation.  Based on the latest study completed in 2010, it is estimated the reserves will be depleted in 2036 with final reclamation completed by 2046 at an estimated cost of approximately $58 million.  Actual reclamation costs could vary due to period inflation and any changes to actual mine reclamation.  As of June 30, 2014, SWEPCo has collected approximately $63 million through a rider for final mine closure and reclamation costs, of which $16 million is recorded in Deferred Credits and Other Noncurrent Liabilities and $47 million is recorded in Asset Retirement Obligations on SWEPCo’s condensed balance sheets.

Sabine charges SWEPCo, its only customer, all of its costs.  SWEPCo passes these costs to customers through its fuel clause.

Indemnifications and Other Guarantees – Affecting APCo, I&M, OPCo, PSO and SWEPCo

Contracts

The Registrant Subsidiaries enter into certain types of contracts which require indemnifications.  Typically these contracts include, but are not limited to, sale agreements, lease agreements, purchase agreements and financing agreements.  Generally, these agreements may include, but are not limited to, indemnifications around certain tax, contractual and environmental matters.  With respect to sale agreements, exposure generally does not exceed the sale price.  As of June 30, 2014, there were no material liabilities recorded for any indemnifications.

APCo, I&M and OPCo are jointly and severally liable for activity conducted by AEPSC on behalf of the AEP East Companies related to power purchase and sale activity pursuant to the SIA.  PSO and SWEPCo are jointly and severally liable for activity conducted by AEPSC on behalf of PSO and SWEPCo related to power purchase and sale activity pursuant to the SIA.

Master Lease Agreements

The Registrant Subsidiaries lease certain equipment under master lease agreements.  Under the lease agreements, the lessor is guaranteed a residual value up to a stated percentage of either the unamortized balance or the equipment cost at the end of the lease term.  If the actual fair value of the leased equipment is below the guaranteed residual value at the end of the lease term, the Registrant Subsidiaries are committed to pay the difference between the actual fair value and the residual value guarantee.  Historically, at the end of the lease term the fair value has been in excess of the unamortized balance.  As of June 30, 2014, the maximum potential loss by Registrant Subsidiary for these lease agreements assuming the fair value of the equipment is zero at the end of the lease term was as follows:
Company
 
Maximum
Potential Loss
 
 
(in thousands)
APCo
 
$
3,671

I&M
 
2,618

OPCo
 
4,161

PSO
 
1,505

SWEPCo
 
2,438



Railcar Lease

In June 2003, AEP Transportation LLC (AEP Transportation), a subsidiary of AEP, entered into an agreement with BTM Capital Corporation, as lessor, to lease 875 coal-transporting aluminum railcars.  The lease is accounted for as an operating lease.  In January 2008, AEP Transportation assigned the remaining 848 railcars under the original lease agreement to I&M (390 railcars) and SWEPCo (458 railcars).  The assignments are accounted for as operating leases for I&M and SWEPCo.  The initial lease term was five years with three consecutive five-year renewal periods for a maximum lease term of twenty years.  I&M and SWEPCo intend to renew these leases for the full lease term of twenty years via the renewal options.  The future minimum lease obligations are $12 million and $14 million for I&M and SWEPCo, respectively, for the remaining railcars as of June 30, 2014.

Under the lease agreement, the lessor is guaranteed that the sale proceeds under a return-and-sale option will equal at least a lessee obligation amount specified in the lease, which declines from approximately 83% under the current five year lease term to 77% at the end of the 20-year term of the projected fair value of the equipment.  I&M and SWEPCo have assumed the guarantee under the return-and-sale option.  The maximum potential losses related to the guarantee are approximately $9 million and $10 million for I&M and SWEPCo, respectively, assuming the fair value of the equipment is zero at the end of the current five-year lease term.  However, management believes that the fair value would produce a sufficient sales price to avoid any loss.

ENVIRONMENTAL CONTINGENCIES

The Comprehensive Environmental Response Compensation and Liability Act (Superfund) and State Remediation – Affecting I&M
 
By-products from the generation of electricity include materials such as ash, slag, sludge, low-level radioactive waste and SNF.  Coal combustion by-products, which constitute the overwhelming percentage of these materials, are typically treated and deposited in captive disposal facilities or are beneficially utilized.  In addition, the generation plants and transmission and distribution facilities have used asbestos, polychlorinated biphenyls and other hazardous and nonhazardous materials.  The Registrant Subsidiaries currently incur costs to dispose of these substances safely.

In 2008, I&M received a letter from the Michigan Department of Environmental Quality (MDEQ) concerning conditions at a site under state law and requesting I&M take voluntary action necessary to prevent and/or mitigate public harm.  I&M started remediation work in accordance with a plan approved by MDEQ.  I&M’s reserve is approximately $7 million.  As the remediation work is completed, I&M’s cost may change as new information becomes available concerning either the level of contamination at the site or changes in the scope of remediation required by the MDEQ.  Management cannot predict the amount of additional cost, if any.

NUCLEAR CONTINGENCIES – AFFECTING I&M

I&M owns and operates the two-unit 2,191 MW Cook Plant under licenses granted by the Nuclear Regulatory Commission.  I&M has a significant future financial commitment to dispose of SNF and to safely decommission and decontaminate the plant.  The licenses to operate the two nuclear units at the Cook Plant expire in 2034 and 2037.  The operation of a nuclear facility also involves special risks, potential liabilities and specific regulatory and safety requirements.  By agreement, I&M is partially liable, together with all other electric utility companies that own nuclear generation units, for a nuclear power plant incident at any nuclear plant in the U.S.  Should a nuclear incident occur at any nuclear power plant in the U.S., the resultant liability could be substantial.

OPERATIONAL CONTINGENCIES

Rockport Plant Litigation – Affecting I&M

In July 2013, the Wilmington Trust Company filed a complaint in U.S. District Court for the Southern District of New York against AEGCo and I&M alleging that it will be unlawfully burdened by the terms of the modified NSR consent decree after the Rockport Plant, Unit 2 lease expiration in December 2022.  The terms of the consent decree allow the installation of environmental emission control equipment, repowering or retirement of the unit.  The plaintiff further alleges that the defendants’ actions constitute breach of the lease and participation agreement.  The plaintiff seeks a judgment declaring that the defendants breached the lease, must satisfy obligations related to installation of emission control equipment and indemnify the plaintiff. The New York court granted a motion to transfer this case to the U.S. District Court for the Southern District of Ohio. AEGCo’s and I&M’s motion to dismiss the case, filed in October 2013, is pending. Management will continue to defend against the claims. Management is unable to determine a range of potential losses that are reasonably possible of occurring.

Wage and Hours Lawsuit – Affecting PSO

In August 2013, PSO received an amended complaint filed in the U.S. District Court for the Northern District of Oklahoma by 36 current and former line and warehouse employees alleging that they have been denied overtime pay in violation of the Fair Labor Standards Act.  Plaintiffs claim that they are entitled to overtime pay for “on call” time. They allege that restrictions placed on them during on call hours are burdensome enough that they are entitled to compensation for these hours as hours worked.  Plaintiffs also filed a motion to conditionally certify this action as a class action, claiming there are an additional 70 individuals similarly situated to plaintiffs.  Plaintiffs seek damages in the amount of unpaid overtime over a three-year period and liquidated damages in the same amount.

In March 2014, the federal court granted plaintiffs’ motion to conditionally certify the action as a class action.  Notice was given to all class members and an additional 44 individuals opted in to the class, bringing the plaintiff class to 80 current and former employees. Management will continue to defend the case. Management is unable to determine a range of potential losses that are reasonably possible of occurring.
Public Service Co Of Oklahoma [Member]
 
Commitments, Guarantees and Contingencies
COMMITMENTS, GUARANTEES AND CONTINGENCIES

The Registrant Subsidiaries are subject to certain claims and legal actions arising in their ordinary course of business.  In addition, their business activities are subject to extensive governmental regulation related to public health and the environment.  The ultimate outcome of such pending or potential litigation cannot be predicted.  For current proceedings not specifically discussed below, management does not anticipate that the liabilities, if any, arising from such proceedings would have a material effect on the financial statements.  The Commitments, Guarantees and Contingencies note within the 2013 Annual Report should be read in conjunction with this report.

GUARANTEES

Liabilities for guarantees are recorded in accordance with the accounting guidance for “Guarantees.”  There is no collateral held in relation to any guarantees.  In the event any guarantee is drawn, there is no recourse to third parties unless specified below.

Letters of Credit – Affecting APCo, I&M and OPCo

Certain Registrant Subsidiaries enter into standby letters of credit with third parties.  These letters of credit are issued in the ordinary course of business and cover items such as insurance programs, security deposits and debt service reserves.

AEP has two revolving credit facilities totaling $3.5 billion, under which up to $1.2 billion may be issued as letters of credit.  As of June 30, 2014, the maximum future payments for letters of credit issued under the revolving credit facilities were as follows:
Company
 
Amount
 
Maturity
 
 
(in thousands)
 
 
I&M
 
$
150

 
March 2015
OPCo
 
4,200

 
June 2015


The Registrant Subsidiaries have $307 million of variable rate Pollution Control Bonds supported by bilateral letters of credit for $310 million as follows:
Company
 
Pollution
Control Bonds
 
Bilateral Letters
of Credit
 
Maturity of Bilateral
Letters of Credit
 
 
(in thousands)
 
 
APCo
 
$
229,650

 
$
232,293

 
March 2016 to March 2017 
I&M
 
77,000

 
77,886

 
March 2015


Guarantees of Third-Party Obligations – Affecting SWEPCo

As part of the process to receive a renewal of a Texas Railroad Commission permit for lignite mining, SWEPCo provides guarantees of mine reclamation of $115 million.  Since SWEPCo uses self-bonding, the guarantee provides for SWEPCo to commit to use its resources to complete the reclamation in the event the work is not completed by Sabine.  This guarantee ends upon depletion of reserves and completion of final reclamation.  Based on the latest study completed in 2010, it is estimated the reserves will be depleted in 2036 with final reclamation completed by 2046 at an estimated cost of approximately $58 million.  Actual reclamation costs could vary due to period inflation and any changes to actual mine reclamation.  As of June 30, 2014, SWEPCo has collected approximately $63 million through a rider for final mine closure and reclamation costs, of which $16 million is recorded in Deferred Credits and Other Noncurrent Liabilities and $47 million is recorded in Asset Retirement Obligations on SWEPCo’s condensed balance sheets.

Sabine charges SWEPCo, its only customer, all of its costs.  SWEPCo passes these costs to customers through its fuel clause.

Indemnifications and Other Guarantees – Affecting APCo, I&M, OPCo, PSO and SWEPCo

Contracts

The Registrant Subsidiaries enter into certain types of contracts which require indemnifications.  Typically these contracts include, but are not limited to, sale agreements, lease agreements, purchase agreements and financing agreements.  Generally, these agreements may include, but are not limited to, indemnifications around certain tax, contractual and environmental matters.  With respect to sale agreements, exposure generally does not exceed the sale price.  As of June 30, 2014, there were no material liabilities recorded for any indemnifications.

APCo, I&M and OPCo are jointly and severally liable for activity conducted by AEPSC on behalf of the AEP East Companies related to power purchase and sale activity pursuant to the SIA.  PSO and SWEPCo are jointly and severally liable for activity conducted by AEPSC on behalf of PSO and SWEPCo related to power purchase and sale activity pursuant to the SIA.

Master Lease Agreements

The Registrant Subsidiaries lease certain equipment under master lease agreements.  Under the lease agreements, the lessor is guaranteed a residual value up to a stated percentage of either the unamortized balance or the equipment cost at the end of the lease term.  If the actual fair value of the leased equipment is below the guaranteed residual value at the end of the lease term, the Registrant Subsidiaries are committed to pay the difference between the actual fair value and the residual value guarantee.  Historically, at the end of the lease term the fair value has been in excess of the unamortized balance.  As of June 30, 2014, the maximum potential loss by Registrant Subsidiary for these lease agreements assuming the fair value of the equipment is zero at the end of the lease term was as follows:
Company
 
Maximum
Potential Loss
 
 
(in thousands)
APCo
 
$
3,671

I&M
 
2,618

OPCo
 
4,161

PSO
 
1,505

SWEPCo
 
2,438



Railcar Lease

In June 2003, AEP Transportation LLC (AEP Transportation), a subsidiary of AEP, entered into an agreement with BTM Capital Corporation, as lessor, to lease 875 coal-transporting aluminum railcars.  The lease is accounted for as an operating lease.  In January 2008, AEP Transportation assigned the remaining 848 railcars under the original lease agreement to I&M (390 railcars) and SWEPCo (458 railcars).  The assignments are accounted for as operating leases for I&M and SWEPCo.  The initial lease term was five years with three consecutive five-year renewal periods for a maximum lease term of twenty years.  I&M and SWEPCo intend to renew these leases for the full lease term of twenty years via the renewal options.  The future minimum lease obligations are $12 million and $14 million for I&M and SWEPCo, respectively, for the remaining railcars as of June 30, 2014.

Under the lease agreement, the lessor is guaranteed that the sale proceeds under a return-and-sale option will equal at least a lessee obligation amount specified in the lease, which declines from approximately 83% under the current five year lease term to 77% at the end of the 20-year term of the projected fair value of the equipment.  I&M and SWEPCo have assumed the guarantee under the return-and-sale option.  The maximum potential losses related to the guarantee are approximately $9 million and $10 million for I&M and SWEPCo, respectively, assuming the fair value of the equipment is zero at the end of the current five-year lease term.  However, management believes that the fair value would produce a sufficient sales price to avoid any loss.

ENVIRONMENTAL CONTINGENCIES

The Comprehensive Environmental Response Compensation and Liability Act (Superfund) and State Remediation – Affecting I&M
 
By-products from the generation of electricity include materials such as ash, slag, sludge, low-level radioactive waste and SNF.  Coal combustion by-products, which constitute the overwhelming percentage of these materials, are typically treated and deposited in captive disposal facilities or are beneficially utilized.  In addition, the generation plants and transmission and distribution facilities have used asbestos, polychlorinated biphenyls and other hazardous and nonhazardous materials.  The Registrant Subsidiaries currently incur costs to dispose of these substances safely.

In 2008, I&M received a letter from the Michigan Department of Environmental Quality (MDEQ) concerning conditions at a site under state law and requesting I&M take voluntary action necessary to prevent and/or mitigate public harm.  I&M started remediation work in accordance with a plan approved by MDEQ.  I&M’s reserve is approximately $7 million.  As the remediation work is completed, I&M’s cost may change as new information becomes available concerning either the level of contamination at the site or changes in the scope of remediation required by the MDEQ.  Management cannot predict the amount of additional cost, if any.

NUCLEAR CONTINGENCIES – AFFECTING I&M

I&M owns and operates the two-unit 2,191 MW Cook Plant under licenses granted by the Nuclear Regulatory Commission.  I&M has a significant future financial commitment to dispose of SNF and to safely decommission and decontaminate the plant.  The licenses to operate the two nuclear units at the Cook Plant expire in 2034 and 2037.  The operation of a nuclear facility also involves special risks, potential liabilities and specific regulatory and safety requirements.  By agreement, I&M is partially liable, together with all other electric utility companies that own nuclear generation units, for a nuclear power plant incident at any nuclear plant in the U.S.  Should a nuclear incident occur at any nuclear power plant in the U.S., the resultant liability could be substantial.

OPERATIONAL CONTINGENCIES

Rockport Plant Litigation – Affecting I&M

In July 2013, the Wilmington Trust Company filed a complaint in U.S. District Court for the Southern District of New York against AEGCo and I&M alleging that it will be unlawfully burdened by the terms of the modified NSR consent decree after the Rockport Plant, Unit 2 lease expiration in December 2022.  The terms of the consent decree allow the installation of environmental emission control equipment, repowering or retirement of the unit.  The plaintiff further alleges that the defendants’ actions constitute breach of the lease and participation agreement.  The plaintiff seeks a judgment declaring that the defendants breached the lease, must satisfy obligations related to installation of emission control equipment and indemnify the plaintiff. The New York court granted a motion to transfer this case to the U.S. District Court for the Southern District of Ohio. AEGCo’s and I&M’s motion to dismiss the case, filed in October 2013, is pending. Management will continue to defend against the claims. Management is unable to determine a range of potential losses that are reasonably possible of occurring.

Wage and Hours Lawsuit – Affecting PSO

In August 2013, PSO received an amended complaint filed in the U.S. District Court for the Northern District of Oklahoma by 36 current and former line and warehouse employees alleging that they have been denied overtime pay in violation of the Fair Labor Standards Act.  Plaintiffs claim that they are entitled to overtime pay for “on call” time. They allege that restrictions placed on them during on call hours are burdensome enough that they are entitled to compensation for these hours as hours worked.  Plaintiffs also filed a motion to conditionally certify this action as a class action, claiming there are an additional 70 individuals similarly situated to plaintiffs.  Plaintiffs seek damages in the amount of unpaid overtime over a three-year period and liquidated damages in the same amount.

In March 2014, the federal court granted plaintiffs’ motion to conditionally certify the action as a class action.  Notice was given to all class members and an additional 44 individuals opted in to the class, bringing the plaintiff class to 80 current and former employees. Management will continue to defend the case. Management is unable to determine a range of potential losses that are reasonably possible of occurring.
Southwestern Electric Power Co [Member]
 
Commitments, Guarantees and Contingencies
COMMITMENTS, GUARANTEES AND CONTINGENCIES

The Registrant Subsidiaries are subject to certain claims and legal actions arising in their ordinary course of business.  In addition, their business activities are subject to extensive governmental regulation related to public health and the environment.  The ultimate outcome of such pending or potential litigation cannot be predicted.  For current proceedings not specifically discussed below, management does not anticipate that the liabilities, if any, arising from such proceedings would have a material effect on the financial statements.  The Commitments, Guarantees and Contingencies note within the 2013 Annual Report should be read in conjunction with this report.

GUARANTEES

Liabilities for guarantees are recorded in accordance with the accounting guidance for “Guarantees.”  There is no collateral held in relation to any guarantees.  In the event any guarantee is drawn, there is no recourse to third parties unless specified below.

Letters of Credit – Affecting APCo, I&M and OPCo

Certain Registrant Subsidiaries enter into standby letters of credit with third parties.  These letters of credit are issued in the ordinary course of business and cover items such as insurance programs, security deposits and debt service reserves.

AEP has two revolving credit facilities totaling $3.5 billion, under which up to $1.2 billion may be issued as letters of credit.  As of June 30, 2014, the maximum future payments for letters of credit issued under the revolving credit facilities were as follows:
Company
 
Amount
 
Maturity
 
 
(in thousands)
 
 
I&M
 
$
150

 
March 2015
OPCo
 
4,200

 
June 2015


The Registrant Subsidiaries have $307 million of variable rate Pollution Control Bonds supported by bilateral letters of credit for $310 million as follows:
Company
 
Pollution
Control Bonds
 
Bilateral Letters
of Credit
 
Maturity of Bilateral
Letters of Credit
 
 
(in thousands)
 
 
APCo
 
$
229,650

 
$
232,293

 
March 2016 to March 2017 
I&M
 
77,000

 
77,886

 
March 2015


Guarantees of Third-Party Obligations – Affecting SWEPCo

As part of the process to receive a renewal of a Texas Railroad Commission permit for lignite mining, SWEPCo provides guarantees of mine reclamation of $115 million.  Since SWEPCo uses self-bonding, the guarantee provides for SWEPCo to commit to use its resources to complete the reclamation in the event the work is not completed by Sabine.  This guarantee ends upon depletion of reserves and completion of final reclamation.  Based on the latest study completed in 2010, it is estimated the reserves will be depleted in 2036 with final reclamation completed by 2046 at an estimated cost of approximately $58 million.  Actual reclamation costs could vary due to period inflation and any changes to actual mine reclamation.  As of June 30, 2014, SWEPCo has collected approximately $63 million through a rider for final mine closure and reclamation costs, of which $16 million is recorded in Deferred Credits and Other Noncurrent Liabilities and $47 million is recorded in Asset Retirement Obligations on SWEPCo’s condensed balance sheets.

Sabine charges SWEPCo, its only customer, all of its costs.  SWEPCo passes these costs to customers through its fuel clause.

Indemnifications and Other Guarantees – Affecting APCo, I&M, OPCo, PSO and SWEPCo

Contracts

The Registrant Subsidiaries enter into certain types of contracts which require indemnifications.  Typically these contracts include, but are not limited to, sale agreements, lease agreements, purchase agreements and financing agreements.  Generally, these agreements may include, but are not limited to, indemnifications around certain tax, contractual and environmental matters.  With respect to sale agreements, exposure generally does not exceed the sale price.  As of June 30, 2014, there were no material liabilities recorded for any indemnifications.

APCo, I&M and OPCo are jointly and severally liable for activity conducted by AEPSC on behalf of the AEP East Companies related to power purchase and sale activity pursuant to the SIA.  PSO and SWEPCo are jointly and severally liable for activity conducted by AEPSC on behalf of PSO and SWEPCo related to power purchase and sale activity pursuant to the SIA.

Master Lease Agreements

The Registrant Subsidiaries lease certain equipment under master lease agreements.  Under the lease agreements, the lessor is guaranteed a residual value up to a stated percentage of either the unamortized balance or the equipment cost at the end of the lease term.  If the actual fair value of the leased equipment is below the guaranteed residual value at the end of the lease term, the Registrant Subsidiaries are committed to pay the difference between the actual fair value and the residual value guarantee.  Historically, at the end of the lease term the fair value has been in excess of the unamortized balance.  As of June 30, 2014, the maximum potential loss by Registrant Subsidiary for these lease agreements assuming the fair value of the equipment is zero at the end of the lease term was as follows:
Company
 
Maximum
Potential Loss
 
 
(in thousands)
APCo
 
$
3,671

I&M
 
2,618

OPCo
 
4,161

PSO
 
1,505

SWEPCo
 
2,438



Railcar Lease

In June 2003, AEP Transportation LLC (AEP Transportation), a subsidiary of AEP, entered into an agreement with BTM Capital Corporation, as lessor, to lease 875 coal-transporting aluminum railcars.  The lease is accounted for as an operating lease.  In January 2008, AEP Transportation assigned the remaining 848 railcars under the original lease agreement to I&M (390 railcars) and SWEPCo (458 railcars).  The assignments are accounted for as operating leases for I&M and SWEPCo.  The initial lease term was five years with three consecutive five-year renewal periods for a maximum lease term of twenty years.  I&M and SWEPCo intend to renew these leases for the full lease term of twenty years via the renewal options.  The future minimum lease obligations are $12 million and $14 million for I&M and SWEPCo, respectively, for the remaining railcars as of June 30, 2014.

Under the lease agreement, the lessor is guaranteed that the sale proceeds under a return-and-sale option will equal at least a lessee obligation amount specified in the lease, which declines from approximately 83% under the current five year lease term to 77% at the end of the 20-year term of the projected fair value of the equipment.  I&M and SWEPCo have assumed the guarantee under the return-and-sale option.  The maximum potential losses related to the guarantee are approximately $9 million and $10 million for I&M and SWEPCo, respectively, assuming the fair value of the equipment is zero at the end of the current five-year lease term.  However, management believes that the fair value would produce a sufficient sales price to avoid any loss.

ENVIRONMENTAL CONTINGENCIES

The Comprehensive Environmental Response Compensation and Liability Act (Superfund) and State Remediation – Affecting I&M
 
By-products from the generation of electricity include materials such as ash, slag, sludge, low-level radioactive waste and SNF.  Coal combustion by-products, which constitute the overwhelming percentage of these materials, are typically treated and deposited in captive disposal facilities or are beneficially utilized.  In addition, the generation plants and transmission and distribution facilities have used asbestos, polychlorinated biphenyls and other hazardous and nonhazardous materials.  The Registrant Subsidiaries currently incur costs to dispose of these substances safely.

In 2008, I&M received a letter from the Michigan Department of Environmental Quality (MDEQ) concerning conditions at a site under state law and requesting I&M take voluntary action necessary to prevent and/or mitigate public harm.  I&M started remediation work in accordance with a plan approved by MDEQ.  I&M’s reserve is approximately $7 million.  As the remediation work is completed, I&M’s cost may change as new information becomes available concerning either the level of contamination at the site or changes in the scope of remediation required by the MDEQ.  Management cannot predict the amount of additional cost, if any.

NUCLEAR CONTINGENCIES – AFFECTING I&M

I&M owns and operates the two-unit 2,191 MW Cook Plant under licenses granted by the Nuclear Regulatory Commission.  I&M has a significant future financial commitment to dispose of SNF and to safely decommission and decontaminate the plant.  The licenses to operate the two nuclear units at the Cook Plant expire in 2034 and 2037.  The operation of a nuclear facility also involves special risks, potential liabilities and specific regulatory and safety requirements.  By agreement, I&M is partially liable, together with all other electric utility companies that own nuclear generation units, for a nuclear power plant incident at any nuclear plant in the U.S.  Should a nuclear incident occur at any nuclear power plant in the U.S., the resultant liability could be substantial.

OPERATIONAL CONTINGENCIES

Rockport Plant Litigation – Affecting I&M

In July 2013, the Wilmington Trust Company filed a complaint in U.S. District Court for the Southern District of New York against AEGCo and I&M alleging that it will be unlawfully burdened by the terms of the modified NSR consent decree after the Rockport Plant, Unit 2 lease expiration in December 2022.  The terms of the consent decree allow the installation of environmental emission control equipment, repowering or retirement of the unit.  The plaintiff further alleges that the defendants’ actions constitute breach of the lease and participation agreement.  The plaintiff seeks a judgment declaring that the defendants breached the lease, must satisfy obligations related to installation of emission control equipment and indemnify the plaintiff. The New York court granted a motion to transfer this case to the U.S. District Court for the Southern District of Ohio. AEGCo’s and I&M’s motion to dismiss the case, filed in October 2013, is pending. Management will continue to defend against the claims. Management is unable to determine a range of potential losses that are reasonably possible of occurring.

Wage and Hours Lawsuit – Affecting PSO

In August 2013, PSO received an amended complaint filed in the U.S. District Court for the Northern District of Oklahoma by 36 current and former line and warehouse employees alleging that they have been denied overtime pay in violation of the Fair Labor Standards Act.  Plaintiffs claim that they are entitled to overtime pay for “on call” time. They allege that restrictions placed on them during on call hours are burdensome enough that they are entitled to compensation for these hours as hours worked.  Plaintiffs also filed a motion to conditionally certify this action as a class action, claiming there are an additional 70 individuals similarly situated to plaintiffs.  Plaintiffs seek damages in the amount of unpaid overtime over a three-year period and liquidated damages in the same amount.

In March 2014, the federal court granted plaintiffs’ motion to conditionally certify the action as a class action.  Notice was given to all class members and an additional 44 individuals opted in to the class, bringing the plaintiff class to 80 current and former employees. Management will continue to defend the case. Management is unable to determine a range of potential losses that are reasonably possible of occurring.