Commitments and Contingencies
12 Months Ended
Dec. 31, 2012
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Commitments and Contingencies
Macondo well incident
Overview. The semisubmersible drilling rig, Deepwater Horizon, sank on April 22, 2010 after an explosion and fire onboard the rig that began on April 20, 2010. The Deepwater Horizon was owned by Transocean Ltd. and had been drilling the Macondo exploration well in Mississippi Canyon Block 252 in the Gulf of Mexico for the lease operator, BP Exploration & Production, Inc. (BP Exploration), an indirect wholly owned subsidiary of BP p.l.c. We performed a variety of services for BP Exploration, including cementing, mud logging, directional drilling, measurement-while-drilling, and rig data acquisition services. Crude oil flowing from the well site spread across thousands of square miles of the Gulf of Mexico and reached the United States Gulf Coast. Efforts to contain the flow of hydrocarbons from the well were led by the United States government and by BP p.l.c., BP Exploration, and their affiliates (collectively, BP). The flow of hydrocarbons from the well ceased on July 15, 2010, and the well was permanently capped on September 19, 2010. Numerous attempts at estimating the volume of oil spilled have been made by various groups, and on August 2, 2010 the federal government published an estimate that approximately 4.9 million barrels of oil were discharged from the well. There were eleven fatalities and a number of injuries as a result of the Macondo well incident.
We are currently unable to fully estimate the impact the Macondo well incident will have on us. The beginning of the multi-district litigation (MDL) trial referred to below has been set for February 25, 2013. We cannot predict the outcome of the many lawsuits and investigations relating to the Macondo well incident, including orders and rulings of the court that impact the MDL, whether the MDL will proceed to trial, the results of any such trial, the effect that the settlements between BP and the Plaintiffs' Steering Committee (PSC) in the MDL and other settlements may have on claims against us, or whether we might settle with one or more of the parties to any lawsuit or investigation. At the request of the court, in late February 2012 we participated in a series of discussions with the Magistrate Judge in the MDL relating to whether the MDL could be settled. Although these discussions did not result in a settlement, we recorded a $300 million liability during the first quarter of 2012 for an estimated loss contingency relating to the MDL. This loss contingency, which is included in “Other liabilities” in our consolidated balance sheet as of December 31, 2012 and in “Cost of services” on the consolidated statement of operations for the year ended December 31, 2012, represents a loss contingency that is probable and for which a reasonable estimate of a loss or range of loss can be made. Although we continue to believe that we have substantial legal arguments and defenses against any liability and that BP's indemnity obligation protects us as described below, we cannot conclude that a probable loss associated with the MDL is zero. There are additional loss contingencies relating to the Macondo well incident that are reasonably possible but for which we cannot make a reasonable estimate. Given the numerous potential developments relating to the MDL and other lawsuits and investigations, which could occur at any time, we may adjust our estimated loss contingency in the future. Liabilities arising out of the Macondo well incident could have a material adverse effect on our liquidity, consolidated results of operations, and consolidated financial condition.
Investigations and Regulatory Action. The United States Coast Guard, a component of the United States Department of Homeland Security, and the Bureau of Ocean Energy Management, Regulation and Enforcement (formerly known as the Minerals Management Service and which was replaced effective October 1, 2011 by two new, independent bureaus – the Bureau of Safety and Environmental Enforcement (BSEE) and the Bureau of Ocean Energy Management), a bureau of the United States Department of the Interior, shared jurisdiction over the investigation into the Macondo well incident and formed a joint investigation team that reviewed information and held hearings regarding the incident (Marine Board Investigation). We were named as one of the 16 parties-in-interest in the Marine Board Investigation. The Marine Board Investigation, as well as investigations of the incident that were conducted by The National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling (National Commission) and the National Academy of Sciences, have been completed, and reports issued as a result of those investigations have been critical of BP, Transocean, and us, among others. For example, one or more of those reports have concluded that primary cement failure was a direct cause of the blowout, cement testing performed by an independent laboratory “strongly suggests” that the foam cement slurry used on the Macondo well was unstable, and that numerous other oversights and factors caused or contributed to the cause of the incident, including BP's failure to run a cement bond log, BP's and Transocean's failure to properly conduct and interpret a negative-pressure test, the failure of the drilling crew and our surface data logging specialist to recognize that an unplanned influx of oil, natural gas, or fluid into the well was occurring, communication failures among BP, Transocean, and us, and flawed decisions relating to the design, construction, and testing of barriers critical to the temporary abandonment of the well. The U.S. Chemical Safety and Hazard Investigation Board is also conducting an investigation of the incident.
In October 2011, the BSEE issued a notification of Incidents of Noncompliance (INCs) to us for allegedly violating federal regulations relating to the failure to take measures to prevent the unauthorized release of hydrocarbons, the failure to take precautions to keep the Macondo well under control, the failure to cement the well in a manner that would, among other things, prevent the release of fluids into the Gulf of Mexico, and the failure to protect health, safety, property, and the environment as a result of a failure to perform operations in a safe and workmanlike manner. According to the BSEE's notice, we did not ensure an adequate barrier to hydrocarbon flow after cementing the production casing and did not detect the influx of hydrocarbons until they were above the blowout preventer stack. We understand that the regulations in effect at the time of the alleged violations provide for fines of up to $35,000 per day per violation. We have appealed the INCs to the Interior Board of Land Appeals (IBLA). In January 2012, the IBLA, in response to our and the BSEE's joint request, suspended the appeal and ordered us and the BSEE to file notice within 15 days after the conclusion of the MDL and, within 60 days after the MDL court issues a final decision, to file a proposal for further action in the appeal. The BSEE has announced that the INCs will be reviewed for possible imposition of civil penalties once the appeal has ended. The BSEE has stated that this is the first time the Department of the Interior has issued INCs directly to a contractor that was not the well's operator.
The Cementing Job and Reaction to Reports. We disagree with the reports referred to above regarding many of their findings and characterizations with respect to our cementing and surface data logging services, as applicable, on the Deepwater Horizon. We have provided information to the National Commission, its staff, and representatives of the joint investigation team for the Marine Board Investigation that we believe has been overlooked or omitted from their reports, as applicable. We intend to continue to vigorously defend ourselves in any investigation relating to our involvement with the Macondo well that we believe inaccurately evaluates or depicts our services on the Deepwater Horizon.
The cement slurry on the Deepwater Horizon was designed and prepared pursuant to well condition data provided by BP. Regardless of whether alleged weaknesses in cement design and testing are or are not ultimately established, and regardless of whether the cement slurry was utilized in similar applications or was prepared consistent with industry standards, we believe that had BP and Transocean properly interpreted a negative-pressure test, this test would have revealed any problems with the cement. In addition, had BP designed the Macondo well to allow a full cement bond log test or if BP had conducted even a partial cement bond log test, the test likely would have revealed any problems with the cement. BP, however, elected not to conduct any cement bond log tests, and with Transocean misinterpreted the negative-pressure test, both of which could have resulted in remedial action, if appropriate, with respect to the cementing services.
At this time we cannot predict the impact of the investigations or reports referred to above, or the conclusions of future investigations or reports. We also cannot predict whether any investigations or reports will have an influence on or result in us being named as a party in any action alleging liability or violation of a statute or regulation, whether federal or state and whether criminal or civil.
We intend to continue to cooperate fully with all hearings, investigations, and requests for information relating to the Macondo well incident. We cannot predict the outcome of, or the costs to be incurred in connection with, any of these hearings or investigations, and therefore we cannot predict the potential impact they may have on us.
DOJ Investigations and Actions. On June 1, 2010, the United States Attorney General announced that the Department of Justice (DOJ) was launching civil and criminal investigations into the Macondo well incident to closely examine the actions of those involved, and that the DOJ was working with attorneys general of states affected by the Macondo well incident. The DOJ announced that it was reviewing, among other traditional criminal statutes, possible violations of and liabilities under The Clean Water Act (CWA), The Oil Pollution Act of 1990 (OPA), The Migratory Bird Treaty Act of 1918 (MBTA), and the Endangered Species Act of 1973 (ESA). As part of its criminal investigation, the DOJ is examining certain aspects of our conduct after the incident, including with respect to record-keeping, record retention, post-incident testing and modeling and the retention thereof, securities filings, and public statements by us or our employees, to evaluate whether there has been any violation of federal law.
The CWA provides authority for civil and criminal penalties for discharges of oil into or upon navigable waters of the United States, adjoining shorelines, or in connection with the Outer Continental Shelf Lands Act (OCSLA) in quantities that are deemed harmful. A single discharge event may result in the assertion of numerous violations under the CWA. Criminal sanctions under the CWA can be assessed for negligent discharges (up to $50,000 per day per violation), for knowing discharges (up to $100,000 per day per violation), and for knowing endangerment (up to $2 million per violation), and federal agencies could be precluded from contracting with a company that is criminally sanctioned under the CWA. Civil proceedings under the CWA can be commenced against an “owner, operator, or person in charge of any vessel, onshore facility, or offshore facility from which oil or a hazardous substance is discharged” in violation of the CWA. The civil penalties that can be imposed against responsible parties range from up to $1,100 per barrel of oil discharged in the case of those found strictly liable to $4,300 per barrel of oil discharged in the case of those found to have been grossly negligent.
The OPA establishes liability for discharges of oil from vessels, onshore facilities, and offshore facilities into or upon the navigable waters of the United States. Under the OPA, the “responsible party” for the discharging vessel or facility is liable for removal and response costs as well as for damages, including recovery costs to contain and remove discharged oil and damages for injury to natural resources and real or personal property, lost revenues, lost profits, and lost earning capacity. The cap on liability under the OPA is the full cost of removal of the discharged oil plus up to $75 million for damages, except that the $75 million cap does not apply in the event the damage was proximately caused by gross negligence or the violation of certain federal safety, construction or operating standards. The OPA defines the set of responsible parties differently depending on whether the source of the discharge is a vessel or an offshore facility. Liability for vessels is imposed on owners and operators; liability for offshore facilities is imposed on the holder of the permit or lessee of the area in which the facility is located.
The MBTA and the ESA provide penalties for injury and death to wildlife and bird species. The MBTA provides that violators are strictly liable and such violations are misdemeanor crimes subject to fines of up to $15,000 per bird killed and imprisonment of up to six months. The ESA provides for civil penalties for knowing violations that can range up to $25,000 per violation and, in the case of criminal penalties, up to $50,000 per violation.
In addition, federal law provides for a variety of fines and penalties, the most significant of which is the Alternative Fines Act. In lieu of the express amount of the criminal fines that may be imposed under some of the statutes described above, the Alternative Fines Act provides for a fine in the amount of twice the gross economic loss suffered by third parties, which amount, although difficult to estimate, is significant.
On December 15, 2010, the DOJ filed a civil action seeking damages and injunctive relief against BP Exploration, Anadarko Petroleum Corporation and Anadarko E&P Company LP (together, Anadarko), which had an approximate 25% interest in the Macondo well, certain subsidiaries of Transocean Ltd., and others for violations of the CWA and the OPA. The DOJ’s complaint seeks an action declaring that the defendants are strictly liable under the CWA as a result of harmful discharges of oil into the Gulf of Mexico and upon United States shorelines as a result of the Macondo well incident. The complaint also seeks an action declaring that the defendants are strictly liable under the OPA for the discharge of oil that has resulted in, among other things, injury to, loss of, loss of use of, or destruction of natural resources and resource services in and around the Gulf of Mexico and the adjoining United States shorelines and resulting in removal costs and damages to the United States far exceeding $75 million. BP Exploration has been designated, and has accepted the designation, as a responsible party for the pollution under the CWA and the OPA. Others have also been named as responsible parties, and all responsible parties may be held jointly and severally liable for any damages under the OPA. A responsible party may make a claim for contribution against any other responsible party or against third parties it alleges contributed to or caused the oil spill. In connection with the proceedings discussed below under “Litigation,” in April 2011 BP Exploration filed a claim against us for contribution with respect to liabilities incurred by BP Exploration under the OPA or another law, which subsequent court filings have indicated may include the CWA, and requested a judgment that the DOJ assert its claims for OPA financial liability directly against us. We filed a motion to dismiss BP Exploration’s claim, and that motion is pending.
We have not been named as a responsible party under the CWA or the OPA in the DOJ civil action, and we do not believe we are a responsible party under the CWA or the OPA. While we are not included in the DOJ’s civil complaint, there can be no assurance that the DOJ or other federal or state governmental authorities will not bring an action, whether civil or criminal, against us under the CWA, the OPA, and/or other statutes or regulations. In connection with the DOJ’s filing of the civil action, it announced that its criminal and civil investigations are continuing and that it will employ efforts to hold accountable those who are responsible for the incident.
A federal grand jury has been convened in Louisiana to investigate potential criminal conduct in connection with the Macondo well incident. We are cooperating fully with the DOJ’s criminal investigation. As of February 11, 2013, the DOJ has not commenced any criminal proceedings against us. We cannot predict the status or outcome of the DOJ’s criminal investigation or estimate the potential impact the investigation may have on us or our liability assessment, all of which may change as the investigation progresses. We have had and expect to continue to have discussions with the DOJ regarding the Macondo well incident and associated pre-incident and post-incident conduct.
In November 2012, BP announced that it reached an agreement with the DOJ to resolve all federal criminal charges against it stemming from the Macondo well incident. BP agreed to plead guilty to 14 criminal charges, with 13 of those charges based on the negligent misinterpretation of the negative-pressure test conducted on the Deepwater Horizon. BP also agreed to pay $4.0 billion, including approximately $1.3 billion in criminal fines, to take actions to further enhance the safety of drilling operations in the Gulf of Mexico, to a term of five years' probation, and to the appointment of two monitors with four-year terms, one relating to process safety and risk management procedures concerning deepwater drilling in the Gulf of Mexico and one relating to the improvement, implementation, and enforcement of BP's code of conduct.
In January 2013, Transocean announced that it reached an agreement with the DOJ to resolve certain claims for civil penalties and potential criminal claims against it arising from the Macondo well incident. Transocean agreed to plead guilty to one misdemeanor violation of the CWA for negligent discharge of oil into the Gulf of Mexico, to pay $1.0 billion in CWA penalties and $400 million in fines and recoveries, to implement certain measures to prevent a recurrence of an uncontrolled discharge of hydrocarbons, and to a term of five years' probation. Transocean's civil and criminal settlements are subject to court approval, and its civil settlement is also subject to public notice and comment.
Litigation. Since April 21, 2010, plaintiffs have been filing lawsuits relating to the Macondo well incident. Generally, those lawsuits allege either (1) damages arising from the oil spill pollution and contamination (e.g., diminution of property value, lost tax revenue, lost business revenue, lost tourist dollars, inability to engage in recreational or commercial activities) or (2) wrongful death or personal injuries. We are named along with other unaffiliated defendants in more than 400 complaints, most of which are alleged class actions, involving pollution damage claims and at least seven personal injury lawsuits involving four decedents and at least 10 allegedly injured persons who were on the drilling rig at the time of the incident. At least six additional lawsuits naming us and others relate to alleged personal injuries sustained by those responding to the explosion and oil spill. Plaintiffs originally filed the lawsuits described above in federal and state courts throughout the United States. Except for certain lawsuits not yet consolidated, the Judicial Panel on Multi-District Litigation ordered all of the lawsuits against us consolidated in the MDL proceeding before Judge Carl Barbier in the United States Eastern District of Louisiana. The pollution complaints generally allege, among other things, negligence and gross negligence, property damages, taking of protected species, and potential economic losses as a result of environmental pollution and generally seek awards of unspecified economic, compensatory, and punitive damages, as well as injunctive relief. Plaintiffs in these pollution cases have brought suit under various legal provisions, including the OPA, the CWA, the MBTA, the ESA, the OCSLA, the Longshoremen and Harbor Workers Compensation Act, general maritime law, state common law, and various state environmental and products liability statutes.
Furthermore, the pollution complaints include suits brought against us by governmental entities, including the State of Alabama, the State of Louisiana, Plaquemines Parish, the City of Greenville, and three Mexican states. Complaints brought against us by at least seven other parishes in Louisiana were dismissed with prejudice, and the dismissal is being appealed by those parishes. The wrongful death and other personal injury complaints generally allege negligence and gross negligence and seek awards of compensatory damages, including unspecified economic damages, and punitive damages. We have retained counsel and are investigating and evaluating the claims, the theories of recovery, damages asserted, and our respective defenses to all of these claims.
Judge Barbier is also presiding over a separate proceeding filed by Transocean under the Limitation of Liability Act (Limitation Action). In the Limitation Action, Transocean seeks to limit its liability for claims arising out of the Macondo well incident to the value of the rig and its freight. While the Limitation Action has been formally consolidated into the MDL, the court is nonetheless, in some respects, treating the Limitation Action as an associated but separate proceeding. In February 2011, Transocean tendered us, along with all other defendants, into the Limitation Action. As a result of the tender, we and all other defendants will be treated as direct defendants to the plaintiffs’ claims as if the plaintiffs had sued us and the other defendants directly. In the Limitation Action, the judge intends to determine the allocation of liability among all defendants in the hundreds of lawsuits associated with the Macondo well incident, including those in the MDL proceeding that are pending in his court. Specifically, we believe the judge will determine the liability, limitation, exoneration, and fault allocation with regard to all of the defendants in a trial, which is scheduled to occur in at least two phases beginning on February 25, 2013. The first phase of this portion of the trial is scheduled to cover issues arising out of the conduct and degree of culpability of various parties allegedly relevant to the loss of well control, the ensuing fire and explosion on and sinking of the Deepwater Horizon, and the initiation of the release of hydrocarbons from the Macondo well. The MDL court has projected September 2013 for the beginning of the second phase of this portion of the trial, which is scheduled to cover actions relating to attempts to control the flow of hydrocarbons from the well and the quantification of hydrocarbons discharged from the well. Subsequent proceedings would be held to the extent triable issues remain unsolved by the first two phases of the trial, settlements, motion practice, or stipulation. While the DOJ will participate in the first two phases of the trial with regard to BP's conduct and the amount of hydrocarbons discharged from the well, it is anticipated that the DOJ's civil action for the CWA and OPA violations, fines, and penalties will be addressed by the court in a subsequent proceeding. We do not believe that a single apportionment of liability in the Limitation Action is properly applied, particularly with respect to gross negligence and punitive damages, to the hundreds of lawsuits pending in the MDL proceeding.
Damages for the cases tried in the MDL proceeding, including punitive damages, are expected to be tried following the two phases of the trial described above. Under ordinary MDL procedures, such cases would, unless waived by the respective parties, be tried in the courts from which they were transferred into the MDL. It remains unclear, however, what impact the overlay of the Limitation Action will have on where these matters are tried. Document discovery and depositions among the parties to the MDL are ongoing.
In April and May 2011, certain defendants in the proceedings described above filed numerous cross claims and third party claims against certain other defendants. BP Exploration and BP America Production Company filed claims against us seeking subrogation, contribution, including with respect to liabilities under the OPA, and direct damages, and alleging negligence, gross negligence, fraudulent conduct, and fraudulent concealment. Transocean filed claims against us seeking indemnification, and subrogation and contribution, including with respect to liabilities under the OPA and for the total loss of the Deepwater Horizon, and alleging comparative fault and breach of warranty of workmanlike performance. Anadarko filed claims against us seeking tort indemnity and contribution, and alleging negligence, gross negligence and willful misconduct, and MOEX Offshore 2007 LLC (MOEX), who had an approximate 10% interest in the Macondo well at the time of the incident, filed a claim against us alleging negligence. Cameron International Corporation (Cameron) (the manufacturer and designer of the blowout preventer), M-I Swaco (provider of drilling fluids and services, among other things), Weatherford U.S. L.P. and Weatherford International, Inc. (together, Weatherford) (providers of casing components, including float equipment and centralizers, and services), and Dril-Quip, Inc. (Dril-Quip) (provider of wellhead systems), each filed claims against us seeking indemnification and contribution, including with respect to liabilities under the OPA in the case of Cameron, and alleging negligence. Additional civil lawsuits may be filed against us. In addition to the claims against us, generally the defendants in the proceedings described above filed claims, including for liabilities under the OPA and other claims similar to those described above, against the other defendants described above. BP has since announced that it has settled those claims between it and each of MOEX, Weatherford, Anadarko, and Cameron. Also, BP and M-I Swaco have dismissed all claims between them.
In April 2011, we filed claims against BP Exploration, BP p.l.c. and BP America Production Company (BP Defendants), M-I Swaco, Cameron, Anadarko, MOEX, Weatherford, Dril-Quip, and numerous entities involved in the post-blowout remediation and response efforts, in each case seeking contribution and indemnification and alleging negligence. Our claims also alleged gross negligence and willful misconduct on the part of the BP Defendants, Anadarko, and Weatherford. We also filed claims against M-I Swaco and Weatherford for contractual indemnification, and against Cameron, Weatherford and Dril-Quip for strict products liability, although the court has since issued orders dismissing all claims asserted against Dril-Quip and Weatherford in the MDL and we have dismissed our contractual indemnification claim against M-I Swaco. We filed our answer to Transocean’s Limitation petition denying Transocean’s right to limit its liability, denying all claims and responsibility for the incident, seeking contribution and indemnification, and alleging negligence and gross negligence.
Judge Barbier has issued an order, among others, clarifying certain aspects of law applicable to the lawsuits pending in his court. The court ruled that: (1) general maritime law will apply and therefore dismissed all claims brought under state law causes of action; (2) general maritime law claims may be brought directly against defendants who are non-“responsible parties” under the OPA with the exception of pure economic loss claims by plaintiffs other than commercial fishermen; (3) all claims for damages, including pure economic loss claims, may be brought under the OPA directly against responsible parties; and (4) punitive damage claims can be brought against both responsible and non-responsible parties under general maritime law. As discussed above, with respect to the ruling that claims for damages may be brought under the OPA against responsible parties, we have not been named as a responsible party under the OPA, but BP Exploration has filed a claim against us for contribution with respect to liabilities incurred by BP Exploration under the OPA.
In September 2011, we filed claims in Harris County, Texas against the BP Defendants seeking damages, including lost profits and exemplary damages, and alleging negligence, grossly negligent misrepresentation, defamation, common law libel, slander, and business disparagement. Our claims allege that the BP Defendants knew or should have known about an additional hydrocarbon zone in the well that the BP Defendants failed to disclose to us prior to our designing the cement program for the Macondo well. The location of the hydrocarbon zones is critical information required prior to performing cementing services and is necessary to achieve desired cement placement. We believe that had the BP Defendants disclosed the hydrocarbon zone to us, we would not have proceeded with the cement program unless it was redesigned, which likely would have required a redesign of the production casing. In addition, we believe that the BP Defendants withheld this information from the report of BP's internal investigation team and from the various investigations discussed above. In connection with the foregoing, we also moved to amend our claims against the BP Defendants in the MDL proceeding to include fraud. The BP Defendants have denied all of the allegations relating to the additional hydrocarbon zone and filed a motion to prevent us from adding our fraud claim in the MDL. In October 2011, our motion to add the fraud claim against the BP Defendants in the MDL proceeding was denied. The court’s ruling does not, however, prevent us from using the underlying evidence in our pending claims against the BP Defendants.
In December 2011, BP filed a motion for sanctions against us alleging, among other things, that we destroyed evidence relating to post-incident testing of the foam cement slurry on the Deepwater Horizon and requesting adverse findings against us. The magistrate judge in the MDL proceeding denied BP’s motion. BP appealed that ruling, and Judge Barbier affirmed the magistrate judge’s decision.
In April 2012, BP announced that it had reached definitive settlement agreements with the PSC to resolve the substantial majority of eligible private economic loss and medical claims stemming from the Macondo well incident. The PSC acts on behalf of individuals and business plaintiffs in the MDL. BP has estimated that the cost of the settlements would be approximately $8.5 billion, including payments to claimants who opt out of the settlements, administration costs, and plaintiffs’ attorneys’ fees and expenses, and has stated that it is possible the actual cost could be higher. According to BP, the settlements do not include claims against BP made by the DOJ or other federal agencies or by states and local governments. In addition, the settlements provide that, to the extent permitted by law, BP will assign to the settlement class certain of its claims, rights, and recoveries against Transocean and us for damages, including BP's alleged direct damages such as damages for clean-up expenses and damage to the well and reservoir. We do not believe that our contract with BP Exploration permits the assignment of certain claims to the settlement class without our consent. In April and May, 2012, BP and the PSC filed two settlement agreements and amendments with the MDL court, one agreement addressing economic claims and one agreement addressing medical claims, as well as numerous supporting documents and motions requesting that the court approve, among other things, the certification of the classes for both settlements and a schedule for holding a fairness hearing and approving the settlements. The MDL court has since confirmed certification of the classes for both settlements and granted final approval of the settlements. We objected to the settlements on the grounds set forth above, among other reasons. The MDL court held, however, that we, as a non-settling defendant, lacked standing to object to the settlements but noted that it did not express any opinion as to the validity of BP's assignment of certain claims to the settlement class and that the settlements do not affect any of our procedural or substantive rights in the MDL. We are unable to predict at this time the effect that the settlements may have on claims against us.
In October 2012, the MDL court issued an order dismissing three types of plaintiff claims: (1) claims by or on behalf of owners, lessors, and lessees of real property that allege to have suffered a reduction in the value of real property even though the property was not physically touched by oil and the property was not sold; (2) claims for economic losses based solely on consumers' decisions not to purchase fuel or goods from BP fuel stations and stores based on consumer animosity toward BP; and (3) claims by or on behalf of recreational fishermen, divers, beachgoers, boaters and others that allege damages such as loss of enjoyment of life from their inability to use portions of the Gulf of Mexico for recreational and amusement purposes. The MDL court also noted that we are not liable with respect to those claims under the OPA because we are not a “responsible party” under OPA.
We intend to vigorously defend any litigation, fines, and/or penalties relating to the Macondo well incident and to vigorously pursue any damages, remedies, or other rights available to us as a result of the Macondo well incident. We have incurred and expect to continue to incur significant legal fees and costs, some of which we expect to be covered by indemnity or insurance, as a result of the numerous investigations and lawsuits relating to the incident.
Macondo derivative case. In February 2011, a shareholder who had previously made a demand on our Board of Directors with respect to another derivative lawsuit filed a shareholder derivative lawsuit relating to the Macondo well incident. In 2012, we settled those lawsuits and the cases were dismissed. See “Shareholder derivative cases” below.
Indemnification and Insurance. Our contract with BP Exploration relating to the Macondo well generally provides for our indemnification by BP Exploration for certain potential claims and expenses relating to the Macondo well incident, including those resulting from pollution or contamination (other than claims by our employees, loss or damage to our property, and any pollution emanating directly from our equipment). Also, under our contract with BP Exploration, we have, among other things, generally agreed to indemnify BP Exploration and other contractors performing work on the well for claims for personal injury of our employees and subcontractors, as well as for damage to our property. In turn, we believe that BP Exploration was obligated to obtain agreement by other contractors performing work on the well to indemnify us for claims for personal injury of their employees or subcontractors, as well as for damages to their property. We have entered into separate indemnity agreements with Transocean and M-I Swaco, under which we have agreed to indemnify those parties for claims for personal injury of our employees and subcontractors and they have agreed to indemnify us for claims for personal injury of their employees and subcontractors.
In April 2011, we filed a lawsuit against BP Exploration in Harris County, Texas to enforce BP Exploration’s contractual indemnity and alleging BP Exploration breached certain terms of the contractual indemnity provision. BP Exploration removed that lawsuit to federal court in the Southern District of Texas, Houston Division. We filed a motion to remand the case to Harris County, Texas, and the lawsuit was transferred to the MDL.
BP Exploration, in connection with filing its claims with respect to the MDL proceeding, asked that court to declare that it is not liable to us in contribution, indemnification, or otherwise with respect to liabilities arising from the Macondo well incident. Other defendants in the litigation discussed above have generally denied any obligation to contribute to any liabilities arising from the Macondo well incident.
In January 2012, the court in the MDL proceeding entered an order in response to our and BP’s motions for summary judgment regarding certain indemnification matters. The court held that BP is required to indemnify us for third-party compensatory claims, or actual damages, that arise from pollution or contamination that did not originate from our property or equipment located above the surface of the land or water, even if we are found to be grossly negligent. The court did not express an opinion as to whether our conduct amounted to gross negligence, but we do not believe the performance of our services on the Deepwater Horizon constituted gross negligence. The court also held, however, that BP does not owe us indemnity for punitive damages or for civil penalties under the CWA, if any, and that fraud could void the indemnity on public policy grounds, although the court stated that it was mindful that mere failure to perform contractual obligations as promised does not constitute fraud. As discussed above, the DOJ is not seeking civil penalties from us under the CWA. The court in the MDL proceeding deferred ruling on whether our indemnification from BP covers penalties or fines under the OCSLA, whether our alleged breach of our contract with BP Exploration would invalidate the indemnity, and whether we committed an act that materially increased the risk to or prejudiced the rights of BP so as to invalidate the indemnity. We do not believe that we breached our contract with BP Exploration or committed an act that would otherwise invalidate the indemnity. The court’s rulings will be subject to appeal at the appropriate time.
In responding to similar motions for summary judgment between Transocean and BP, the court also held that public policy would not bar Transocean’s claim for indemnification of compensatory damages, even if Transocean was found to be grossly negligent. The court also held, among other things, that Transocean’s contractual right to indemnity does not extend to punitive damages or civil penalties under the CWA.
The rulings in the MDL proceeding regarding the indemnities are based on maritime law and may not bind the determination of similar issues in lawsuits not comprising a part of the MDL proceeding. Accordingly, it is possible that different conclusions with respect to indemnities will be reached by other courts.
Indemnification for criminal fines or penalties, if any, may not be available if a court were to find such indemnification unenforceable as against public policy. In addition, certain state laws, if deemed to apply, would not allow for enforcement of indemnification for gross negligence, and may not allow for enforcement of indemnification of persons who are found to be negligent with respect to personal injury claims.
In addition to the contractual indemnities discussed above, we have a general liability insurance program of $600 million. Our insurance is designed to cover claims by businesses and individuals made against us in the event of property damage, injury, or death and, among other things, claims relating to environmental damage, as well as legal fees incurred in defending against those claims. We have received and expect to continue to receive payments from our insurers with respect to covered legal fees incurred in connection with the Macondo well incident. Through December 31, 2012, we have incurred legal fees and related expenses of approximately $175 million, of which $158 million has been reimbursed under or is expected to be covered by our insurance program. To the extent we incur any losses beyond those covered by indemnification, there can be no assurance that our insurance policies will cover all potential claims and expenses relating to the Macondo well incident. In addition, we may not be insured with respect to civil or criminal fines or penalties, if any, pursuant to the terms of our insurance policies. Insurance coverage can be the subject of uncertainties and, particularly in the event of large claims, potential disputes with insurance carriers, as well as other potential parties claiming insured status under our insurance policies.
BP’s public filings indicate that BP has recognized in excess of $40 billion in pre-tax charges, excluding offsets for settlement payments received from certain defendants in the proceedings described above under “Litigation,” as a result of the Macondo well incident. BP’s public filings also indicate that the amount of, among other things, certain natural resource damages with respect to certain OPA claims, some of which may be included in such charges, cannot be reliably estimated as of the dates of those filings.
Barracuda-Caratinga arbitration
We agreed to provide indemnification in favor of our former subsidiary, KBR, under the Master Separation Agreement for liabilities KBR may incur after November 20, 2006 as a result of certain allegedly defective subsea flowline bolts installed in connection with the Barracuda-Caratinga project. Prior to that, at the inception of the project, we provided a guarantee to Barracuda & Caratinga Leasing Company BV (BCLC), a subsidiary of our customer, Petrobras, of KBR's obligations with respect to the project.
In March 2006, BCLC commenced arbitration against KBR claiming $220 million plus interest for the cost of monitoring and replacing the allegedly defective bolts and all related costs and expenses of the arbitration, including the cost of attorneys' fees. During the third quarter of 2011, an arbitration panel issued an award against KBR in the amount of approximately $201 million, plus post-judgment interest. BCLC filed a motion to confirm, and KBR filed a motion to vacate, the arbitration award with the United States District Court for the Southern District of New York. In December 2012, BCLC sent us a demand for payment of the arbitration award under the terms of our guarantee. In January 2013, the matter was resolved by our payment of $219 million to BCLC under the guarantee. BCLC has agreed that our obligations under the guarantee have been satisfied. See Note 7 for further discussion of the Barracuda-Caratinga matter.
Securities and related litigation
In June 2002, a class action lawsuit was filed against us in federal court alleging violations of the federal securities laws after the Securities and Exchange Commission (SEC) initiated an investigation in connection with our change in accounting for revenue on long-term construction projects and related disclosures. In the weeks that followed, approximately twenty similar class actions were filed against us. Several of those lawsuits also named as defendants several of our present or former officers and directors. The class action cases were later consolidated, and the amended consolidated class action complaint, styled Richard Moore, et al. v. Halliburton Company, et al., was filed and served upon us in April 2003. As a result of a substitution of lead plaintiffs, the case was styled Archdiocese of Milwaukee Supporting Fund (AMSF) v. Halliburton Company, et al. AMSF has changed its name to Erica P. John Fund, Inc. (the Fund). We settled with the SEC in the second quarter of 2004.
In June 2003, the lead plaintiffs filed a motion for leave to file a second amended consolidated complaint, which was granted by the court. In addition to restating the original accounting and disclosure claims, the second amended consolidated complaint included claims arising out of our 1998 acquisition of Dresser Industries, Inc., including that we failed to timely disclose the resulting asbestos liability exposure.
In April 2005, the court appointed new co-lead counsel and named the Fund the new lead plaintiff, directing that it file a third consolidated amended complaint and that we file our motion to dismiss. The court held oral arguments on that motion in August 2005. In March 2006, the court entered an order in which it granted the motion to dismiss with respect to claims arising prior to June 1999 and granted the motion with respect to certain other claims while permitting the Fund to re-plead some of those claims to correct deficiencies in its earlier complaint. In April 2006, the Fund filed its fourth amended consolidated complaint. We filed a motion to dismiss those portions of the complaint that had been re-pled. A hearing was held on that motion in July 2006, and in March 2007 the court ordered dismissal of the claims against all individual defendants other than our Chief Executive Officer (CEO). The court ordered that the case proceed against our CEO and us.
In September 2007, the Fund filed a motion for class certification, and our response was filed in November 2007. The district court held a hearing in March 2008, and issued an order November 3, 2008 denying the motion for class certification. The Fund appealed the district court’s order to the Fifth Circuit Court of Appeals. The Fifth Circuit affirmed the district court’s order denying class certification. On May 13, 2010, the Fund filed a writ of certiorari in the United States Supreme Court. In January 2011, the Supreme Court granted the writ of certiorari and accepted the appeal. The Court heard oral arguments in April 2011 and issued its decision in June 2011, reversing the Fifth Circuit ruling that the Fund needed to prove loss causation in order to obtain class certification. The Court’s ruling was limited to the Fifth Circuit’s loss causation requirement, and the case was returned to the Fifth Circuit for further consideration of our other arguments for denying class certification. The Fifth Circuit returned the case to the district court, and in January 2012 the court issued an order certifying the class. We filed a Petition for Leave to Appeal with the Fifth Circuit, which was granted and the case is stayed at the district court pending this appeal. The Fifth Circuit is set to hear oral argument in the appeal in March 2013. In spite of its age, the case is at an early stage, and we cannot predict the outcome or consequences thereof. As of December 31, 2012, we had not accrued any amounts related to this matter because we do not believe that a loss is probable. Further, an estimate of possible loss or range of loss related to this matter cannot be made. We intend to vigorously defend this case.
Shareholder derivative cases
In May 2009, two shareholder derivative lawsuits involving us and KBR were filed in Harris County, Texas, naming as defendants various current and retired Halliburton directors and officers and current KBR directors. These cases allege that the individual Halliburton defendants violated their fiduciary duties of good faith and loyalty, to our detriment and the detriment of our shareholders, by failing to properly exercise oversight responsibilities and establish adequate internal controls. The District Court consolidated the two cases, and the plaintiffs filed a consolidated petition against only current and former Halliburton directors and officers containing various allegations of wrongdoing including violations of the United States Foreign Corrupt Practices Act (FCPA), claimed KBR offenses while acting as a government contractor in Iraq, claimed KBR offenses and fraud under United States government contracts, Halliburton activity in Iran, and illegal kickbacks. Subsequently, a shareholder made a demand that the Board take remedial action respecting the FCPA claims in the pending lawsuit. Our Board of Directors designated a special committee of certain independent and disinterested directors to oversee the investigation of the allegations made in the lawsuits and shareholder demand. Upon receipt of the special committee’s findings and recommendations, the independent and disinterested members of the Board determined that the shareholder claims were without merit and not otherwise in our best interest to pursue. The Board directed our counsel to report its determinations to the plaintiffs and demanding shareholder.
In 2012, we agreed to settle the consolidated lawsuit, and the court approved the settlement and dismissed the case. Pursuant to the settlement, we paid the plaintiffs' legal fees which were not material to our consolidated financial statements, and we have implemented certain changes to our corporate governance policies.
In February 2011, the same shareholder who had made the demand on our Board of Directors in connection with one of the derivative lawsuits discussed above filed a shareholder derivative lawsuit in Harris County, Texas naming us as a nominal defendant and certain of our directors and officers as defendants. This case alleges that these defendants, among other things, breached fiduciary duties of good faith and loyalty by failing to properly exercise oversight responsibilities and establish adequate internal controls, including controls and procedures related to cement testing and the communication of test results, as they relate to the Macondo well incident. Our Board of Directors designated a special committee of certain independent and disinterested directors to oversee the investigation of the allegations made in the lawsuit and shareholder demand. Upon receipt of the special committee’s findings and recommendations, the independent and disinterested members of the Board determined that the shareholder claims were without merit and not otherwise in our best interest to pursue. The Board directed our counsel to report its determinations to the plaintiffs and demanding shareholder.
In 2012, we agreed to settle this lawsuit, and the court approved the settlement and dismissed the case. Pursuant to the settlement, we paid the plaintiffs' legal fees which were not material to our consolidated financial statements, and we have implemented certain changes to our corporate governance and health, safety, and environmental policies.
Investigations
We are conducting internal investigations of certain areas of our operations in Angola and Iraq, focusing on compliance with certain company policies, including our Code of Business Conduct (COBC), and the FCPA and other applicable laws.
In December 2010, we received an anonymous e-mail alleging that certain current and former personnel violated our COBC and the FCPA, principally through the use of an Angolan vendor. The e-mail also alleges conflicts of interest, self-dealing, and the failure to act on alleged violations of our COBC and the FCPA. We contacted the DOJ to advise them that we were initiating an internal investigation.
Since the third quarter of 2011, we have been participating in meetings with the DOJ and the SEC to brief them on the status of our investigation and have been producing documents to them both voluntarily and as a result of SEC subpoenas to the company and certain of our current and former officers and employees.
During the second quarter of 2012, in connection with a meeting with the DOJ and the SEC regarding the above investigation, we advised the DOJ and the SEC that we were initiating unrelated, internal investigations into payments made to a third-party agent relating to certain customs matters in Angola and to third-party agents relating to certain customs and visa matters in Iraq.
We expect to continue to have discussions with the DOJ and the SEC regarding the Angola and Iraq matters described above and have indicated that we would further update them as our investigations progress. We have engaged outside counsel and independent forensic accountants to assist us with the investigations. We intend to continue to cooperate with the DOJ's and the SEC's inquiries and requests in these investigations. Because these investigations are ongoing, we cannot predict their outcome or the consequences thereof.
Environmental
We are subject to numerous environmental, legal, and regulatory requirements related to our operations worldwide. In the United States, these laws and regulations include, among others:
-
the Comprehensive Environmental Response, Compensation, and Liability Act;
-
the Resource Conservation and Recovery Act;
-
the Clean Air Act;
-
the Federal Water Pollution Control Act;
-
the Toxic Substances Control Act; and
-
the OPA.
In addition to the federal laws and regulations, states and other countries where we do business often have numerous environmental, legal, and regulatory requirements by which we must abide. We evaluate and address the environmental impact of our operations by assessing and remediating contaminated properties in order to avoid future liabilities and comply with environmental, legal, and regulatory requirements. Our Health, Safety and Environment group has several programs in place to maintain environmental leadership and to help prevent the occurrence of environmental contamination. On occasion, in addition to the matters relating to the Macondo well incident described above and the Duncan, Oklahoma matter described below, we are involved in other environmental litigation and claims, including the remediation of properties we own or have operated, as well as efforts to meet or correct compliance-related matters. We do not expect costs related to those claims and remediation requirements to have a material adverse effect on our liquidity, consolidated results of operations, or consolidated financial position. Excluding our loss contingency for the Macondo well incident, our accrued liabilities for environmental matters were $72 million as of December 31, 2012 and $81 million as of December 31, 2011. Because our estimated liability is typically within a range and our accrued liability may be the amount on the low end of that range, our actual liability could eventually be well in excess of the amount accrued. Our total liability related to environmental matters covers numerous properties.
In November 2012, the Company received an Enforcement Notice from the Pennsylvania Department of Environmental Protection (PADEP) regarding an alleged improper disposal of oil field acid in or around Homer City, Pennsylvania between 1999 and 2011. We are currently negotiating with the PADEP to resolve this matter in an amicable manner. We expect the PADEP to assess a penalty in excess of $100,000 and have therefore accrued for an immaterial amount.
Between approximately 1965 and 1991, one or more former Halliburton units performed work (as a contractor or subcontractor) for the U.S. Department of Defense cleaning solid fuel from missile motor casings at a semi-rural facility on the north side of Duncan, Oklahoma. In addition, from approximately November 1983 through December 1985, a discrete portion of the site was used to conduct a recycling project on stainless steel nuclear fuel rod racks from Omaha Public Power District’s Fort Calhoun Station. We closed the site in coordination with the Oklahoma Department of Environmental Quality (DEQ) in the mid-1990s, but continued to monitor the groundwater at the DEQ’s request. A principal component of the missile fuel was ammonium perchlorate, a salt that is highly soluble in water, which has been discovered in the soil and groundwater on our site and in certain residential water wells near our property. In August 2011, we entered into the DEQ’s Voluntary Cleanup Program and executed a voluntary Memorandum of Agreement and Consent Order for Site Characterization and Risk Based Remediation with the DEQ relating to the remediation of this site.
Commencing in October 2011, a number of lawsuits were filed against us, including a putative class action case in federal court in the Western District of Oklahoma and other lawsuits filed in Oklahoma state courts. The lawsuits generally allege, among other things, that operations at our Duncan facility caused releases of pollutants, including ammonium perchlorate and, in the case of the federal lawsuit, nuclear or radioactive waste, into the groundwater, and that we knew about those releases and did not take corrective actions to address them. It is also alleged that the plaintiffs have suffered from certain health conditions, including hypothyroidism, a condition that has been associated with exposure to perchlorate at sufficiently high doses over time. These cases seek, among other things, damages, including punitive damages, and the establishment of a fund for future medical monitoring. The cases allege, among other things, strict liability, trespass, private nuisance, public nuisance, and negligence and, in the case of the federal lawsuit, violations of the U.S. Resource Conservation and Recovery Act (RCRA), resulting in personal injuries, property damage, and diminution of property value.
The lawsuits generally allege that the cleaning of the missile casings at the Duncan facility contaminated the surrounding soils and groundwater, including certain water wells used in a number of residential homes, through the migration of, among other things, ammonium perchlorate. The federal lawsuit also alleges that our processing of radioactive waste from a nuclear power plant over 25 years ago resulted in the release of “nuclear/radioactive” waste into the environment. In April 2012, the judge in the federal lawsuit dismissed the plaintiffs’ RCRA claim. The other claims brought in that lawsuit remain pending.
To date, soil and groundwater sampling relating to the allegations discussed above has confirmed that the alleged nuclear or radioactive material is confined to the soil in a discrete area of the onsite operations and is not presently believed to be in the groundwater onsite or in any areas offsite. The radiological impacts from this discrete area are not believed to present any health risk for offsite exposure. With respect to ammonium perchlorate, we have made arrangements to supply affected residents with bottled drinking water and, if needed, with access to temporary public water supply lines, at no cost to the residents. We have worked with the City of Duncan and the DEQ to expedite expansion of the city water supply to the relevant areas at our expense.
The lawsuits described above are at an early stage, and additional lawsuits and proceedings may be brought against us. We cannot predict their outcome or the consequences thereof. As of December 31, 2012, we had accrued $25 million related to our initial estimate of response efforts, third-party property damage, and remediation related to the Duncan, Oklahoma matter. We intend to vigorously defend the lawsuits and do not believe that these lawsuits will have a material adverse effect on our liquidity, consolidated results of operations, or consolidated financial condition.
Additionally, we have subsidiaries that have been named as potentially responsible parties along with other third parties for nine federal and state superfund sites for which we have established reserves. As of December 31, 2012, those nine sites accounted for approximately $6 million of our $72 million total environmental reserve. Despite attempts to resolve these superfund matters, the relevant regulatory agency may at any time bring suit against us for amounts in excess of the amount accrued. With respect to some superfund sites, we have been named a potentially responsible party by a regulatory agency; however, in each of those cases, we do not believe we have any material liability. We also could be subject to third-party claims with respect to environmental matters for which we have been named as a potentially responsible party.
Guarantee arrangements
In the normal course of business, we have agreements with financial institutions under which approximately $1.9 billion of letters of credit, bank guarantees, or surety bonds were outstanding as of December 31, 2012, including $277 million of surety bonds related to Venezuela. Some of the outstanding letters of credit have triggering events that would entitle a bank to require cash collateralization.
Leases
We are party to numerous operating leases, principally for the use of land, offices, equipment, manufacturing and field facilities, and warehouses. Total rentals on our operating leases, net of sublease rentals, were $850 million in 2012, $735 million in 2011, and $591 million in 2010.
Future total rentals on our noncancellable operating leases are $961 million in the aggregate, which includes the following: $287 million in 2013; $214 million in 2014; $146 million in 2015; $102 million in 2016; $48 million in 2017; and $164 million thereafter.