Contingencies and Regulatory Matters
12 Months Ended
Dec. 31, 2013
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
General Litigation Matters
Southern Company and its subsidiaries are subject to certain claims and legal actions arising in the ordinary course of business. In addition, the business activities of Southern Company's subsidiaries are subject to extensive governmental regulation related to public health and the environment, such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury, property damage, and other claims for damages alleged to have been caused by carbon dioxide (CO2) and other emissions, coal combustion residuals, and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters, have become more frequent. The ultimate outcome of such pending or potential litigation against Southern Company and its subsidiaries cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on Southern Company's financial statements.
Insurance Recovery
Mirant Corporation (Mirant) was an energy company with businesses that included independent power projects and energy trading and risk management companies in the U.S. and other countries. Mirant was a wholly-owned subsidiary of Southern Company until its initial public offering in 2000. In 2001, Southern Company completed a spin-off to its stockholders of its remaining ownership, and Mirant became an independent corporate entity.
In 2003, Mirant and certain of its affiliates filed voluntary petitions for relief under Chapter 11 of the Bankruptcy Code. In 2005, Mirant, as a debtor in possession, and the unsecured creditors' committee filed a complaint against Southern Company. Later in 2005, this complaint was transferred to MC Asset Recovery, LLC (MC Asset Recovery) as part of Mirant's plan of reorganization. In 2009, Southern Company entered into a settlement agreement with MC Asset Recovery to resolve this action. The settlement included an agreement where Southern Company paid MC Asset Recovery $202 million. Southern Company filed an insurance claim in 2009 to recover a portion of this settlement and received payments from its insurance provider of $25 million in June 2012 and $15 million on December 10, 2013. Additionally, legal fees related to these insurance settlements totaled approximately $6 million in 2012 and $4 million in 2013. As a result, the net reduction to expense presented as MC Asset Recovery insurance settlement in the statement of income was approximately $19 million in 2012 and $11 million in 2013.
Environmental Matters
New Source Review Actions
As part of a nationwide enforcement initiative against the electric utility industry which began in 1999, the EPA brought civil enforcement actions in federal district court against Alabama Power and Georgia Power alleging violations of the New Source Review (NSR) provisions of the Clean Air Act at certain coal-fired electric generating units, including units co-owned by Gulf Power and Mississippi Power. These civil actions seek penalties and injunctive relief, including orders requiring installation of the best available control technologies at the affected units. The case against Georgia Power (including claims related to a unit co-owned by Gulf Power) has been administratively closed in the U.S. District Court for the Northern District of Georgia since 2001. The case against Alabama Power (including claims involving a unit co-owned by Mississippi Power) has been actively litigated in the U.S. District Court for the Northern District of Alabama, resulting in a settlement in 2006 of the alleged NSR violations at Plant Miller; voluntary dismissal of certain claims by the EPA; and a grant of summary judgment for Alabama Power on all remaining claims and dismissal of the case with prejudice in 2011. On September 19, 2013, the U.S. Court of Appeals for the Eleventh Circuit affirmed in part and reversed in part the 2011 judgment in favor of Alabama Power, and the case has been transferred back to the U.S. District Court for the Northern District of Alabama for further proceedings.
Southern Company believes the traditional operating companies complied with applicable laws and regulations in effect at the time the work in question took place. The Clean Air Act authorizes maximum civil penalties of $25,000 to $37,500 per day, per violation, depending on the date of the alleged violation. An adverse outcome could require substantial capital expenditures that cannot be determined at this time and could possibly require payment of substantial penalties. Such expenditures could affect future results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates. The ultimate outcome of these matters cannot be determined at this time.
Environmental Remediation
The Southern Company system must comply with environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Southern Company system could incur substantial costs to clean up properties. The traditional operating companies have each received authority from their respective state PSCs to recover approved environmental compliance costs through regulatory mechanisms. These rates are adjusted annually or as necessary within limits approved by the state PSCs.
Georgia Power's environmental remediation liability as of December 31, 2013 was $18 million. Georgia Power has been designated or identified as a potentially responsible party (PRP) at sites governed by the Georgia Hazardous Site Response Act and/or by the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), including a site in Brunswick, Georgia on the CERCLA National Priorities List (NPL). The parties have completed the removal of wastes from the Brunswick site as ordered by the EPA. Additional cleanup and claims for recovery of natural resource damages at this site or for the assessment and potential cleanup of other sites are anticipated.
Georgia Power and numerous other entities have been designated by the EPA as PRPs at the Ward Transformer Superfund site located in Raleigh, North Carolina. In 2011, the EPA issued a Unilateral Administrative Order (UAO) to Georgia Power and 22 other parties, ordering specific remedial action of certain areas at the site. Later in 2011, Georgia Power filed a response with the EPA stating it has sufficient cause to believe it is not a liable party under CERCLA. The EPA notified Georgia Power in 2011 that it is considering enforcement options against Georgia Power and other non-complying UAO recipients. If the EPA pursues enforcement actions and the court determines that a respondent failed to comply with the UAO without sufficient cause, the EPA may also seek civil penalties of up to $37,500 per day for the violation and punitive damages of up to three times the costs incurred by the EPA as a result of the party's failure to comply with the UAO.
In addition to the EPA's action at this site, Georgia Power, along with many other parties, was sued in a private action by several existing PRPs for cost recovery related to the removal action. On February 1, 2013, the U.S. District Court for the Eastern District of North Carolina Western Division granted Georgia Power's summary judgment motion, ruling that Georgia Power has no liability in the private action. On May 10, 2013, the plaintiffs appealed the U.S. District Court for the Eastern District of North Carolina Western Division's order to the U.S. Court of Appeals for the Fourth Circuit.
The ultimate outcome of these matters will depend upon the success of defenses asserted, the ultimate number of PRPs participating in the cleanup, and numerous other factors and cannot be determined at this time; however, as a result of the regulatory recovery mechanisms, these matters are not expected to have a material impact on Southern Company's financial statements.
Gulf Power's environmental remediation liability includes estimated costs of environmental remediation projects of approximately $50 million as of December 31, 2013. These estimated costs relate to site closure criteria by the Florida Department of Environmental Protection (FDEP) for potential impacts to soil and groundwater from herbicide applications at Gulf Power substations. The schedule for completion of the remediation projects will be subject to FDEP approval. The projects have been approved by the Florida PSC for recovery through Gulf Power's environmental cost recovery clause; therefore, there was no impact on net income as a result of these liabilities.
The final outcome of these matters cannot be determined at this time. However, based on the currently known conditions at these sites and the nature and extent of activities relating to these sites, management does not believe that additional liabilities, if any, at these sites would be material to the financial statements.
Nuclear Fuel Disposal Costs
Acting through the U.S. Department of Energy (DOE) and pursuant to the Nuclear Waste Policy Act of 1982, the U.S. government entered into contracts with Alabama Power and Georgia Power that require the DOE to dispose of spent nuclear fuel and high level radioactive waste generated at Plants Hatch and Farley and Plant Vogtle Units 1 and 2. The DOE failed to timely perform and has yet to commence the performance of its contractual and statutory obligation to dispose of spent nuclear fuel beginning no later than January 31, 1998. Consequently, Alabama Power and Georgia Power have pursued and continue to pursue legal remedies against the U.S. government for its partial breach of contract.
As a result of the first lawsuit, Georgia Power recovered approximately $27 million, based on its ownership interests, and Alabama Power recovered approximately $17 million, representing the vast majority of the Southern Company system's direct costs of the expansion of spent nuclear fuel storage facilities at Plants Farley and Hatch and Plant Vogtle Units 1 and 2 from 1998 through 2004. In April 2012, Alabama Power credited the award to cost of service for the benefit of customers. In July 2012, Georgia Power credited the award to accounts where the original costs were charged and used it to reduce rate base, fuel, and cost of service for the benefit of customers.
In 2008, Alabama Power and Georgia Power filed a second lawsuit against the U.S. government for the costs of continuing to store spent nuclear fuel at Plants Farley and Hatch and Plant Vogtle Units 1 and 2. Damages are being sought for the period from January 1, 2005 through December 31, 2010. Damages will continue to accumulate until the issue is resolved or storage is provided. No amounts have been recognized in the financial statements as of December 31, 2013 for any potential recoveries from the second lawsuit. The final outcome of these matters cannot be determined at this time; however, no material impact on Southern Company's net income is expected.
An on-site dry storage facility at Plant Vogtle Units 1 and 2 began operation in October 2013. At Plants Hatch and Farley, on-site dry spent fuel storage facilities are also operational. Facilities at all plants can be expanded to accommodate spent fuel through the expected life of each plant.
Retail Regulatory Matters
Alabama Power
Retail Rate Adjustments
In 2011, the Alabama PSC issued an order to eliminate a tax-related adjustment under Alabama Power's rate structure effective with October 2011 billings. The elimination of this adjustment resulted in additional revenues of approximately $31 million for 2011. In accordance with the order, Alabama Power made additional accruals to the natural disaster reserve (NDR) in the fourth quarter 2011 of an amount equal to such additional 2011 revenues. The NDR was impacted as a result of operations and maintenance expenses incurred in connection with the 2011 storms in Alabama. See "Natural Disaster Reserve" below for additional information. The elimination of this adjustment resulted in additional revenues of approximately $106 million for 2012.
Rate RSE
Alabama Power operates under a rate stabilization and equalization plan (Rate RSE) approved by the Alabama PSC. Alabama Power's Rate RSE adjustments are based on forward-looking information for the applicable upcoming calendar year. Rate adjustments for any two-year period, when averaged together, cannot exceed 4.0% and any annual adjustment is limited to 5.0%. If Alabama Power's actual retail return is above the allowed equity return range, customer refunds will be required; however, there is no provision for additional customer billings should the actual retail return fall below the allowed equity return range. Prior to 2014, retail rates remained unchanged when the retail return on common equity (ROE) was projected to be between 13.0% and 14.5%.
During 2013, the Alabama PSC held public proceedings regarding the operation and utilization of Rate RSE. On August 13, 2013, the Alabama PSC voted to issue a report on Rate RSE that found that Alabama Power's Rate RSE mechanism continues to be just and reasonable to customers and Alabama Power, but recommended Alabama Power modify Rate RSE as follows:
Eliminate the provision of Rate RSE establishing an allowed range of ROE.
Eliminate the provision of Rate RSE limiting Alabama Power's capital structure to an allowed equity ratio of 45%.
Replace these two provisions with a provision that establishes rates based upon an allowed weighted cost of equity (WCE) range of 5.75% to 6.21%, with an adjusting point of 5.98%. If calculated under the previous Rate RSE provisions, the resulting WCE would range from 5.85% to 6.53%, with an adjusting point of 6.19%.
Provide eligibility for a performance-based adder of seven basis points, or 0.07%, to the WCE adjusting point if Alabama Power (i) has an "A" credit rating equivalent with at least one of the recognized rating agencies or (ii) is in the top one-third of a designated customer value benchmark survey.
Substantially all other provisions of Rate RSE were unchanged.
On August 21, 2013, Alabama Power filed its consent to these recommendations with the Alabama PSC. The changes became effective for calendar year 2014. On November 27, 2013, Alabama Power made its Rate RSE submission to the Alabama PSC of projected data for calendar year 2014; projected earnings were within the specified WCE range and, therefore, retail rates under Rate RSE remained unchanged for 2014. In 2012 and 2013, retail rates under Rate RSE remained unchanged from 2011. Under the terms of Rate RSE, the maximum possible increase for 2015 is 5.00%.
Rate CNP
Alabama Power's retail rates, approved by the Alabama PSC, provide for adjustments to recognize the placing of new generating facilities into retail service under rate certificated new plant (Rate CNP). Alabama Power may also recover retail costs associated with certificated PPAs under rate certificated new plant (Rate CNP PPA). There was no adjustment to Rate CNP PPA in 2012. On March 5, 2013, the Alabama PSC issued a consent order that Alabama Power leave in effect the current Rate CNP PPA factor for billings for the period April 1, 2013 through March 31, 2014. It is anticipated that no adjustment will be made to Rate CNP PPA in 2014. As of December 31, 2013, Alabama Power had an under recovered certificated PPA balance of $18 million, all of which is included in deferred under recovered regulatory clause revenues in the balance sheet.
In 2011, the Alabama PSC approved and certificated a PPA of approximately 200 MWs of energy from wind-powered generating facilities which became operational in December 2012. In September 2012, the Alabama PSC approved and certificated a second wind PPA of approximately 200 MWs which became operational in January 2014. The terms of the wind PPAs permit Alabama Power to use the energy and retire the associated environmental attributes in service of its customers or to sell environmental attributes, separately or bundled with energy. Alabama Power has elected the normal purchase normal sale (NPNS) scope exception under the derivative accounting rules for its two wind PPAs, which total approximately 400 MWs. The NPNS exception allows the PPAs to be recorded at a cost, rather than fair value, basis. The industry’s application of the NPNS exception to certain physical forward transactions in nodal markets is currently under review by the U.S. Securities and Exchange Commission (SEC) at the request of the electric utility industry. The outcome of the SEC’s review cannot now be determined. If Alabama Power is ultimately required to record these PPAs at fair value, an offsetting regulatory asset or regulatory liability will be recorded.
Alabama Power's retail rates, approved by the Alabama PSC also allows for the recovery of Alabama Power's retail costs associated with environmental laws, regulations, or other such mandates (Rate CNP Environmental). Rate CNP Environmental is based on forward-looking information and provides for the recovery of these costs pursuant to a factor that is calculated annually. Environmental costs to be recovered include operations and maintenance expenses, depreciation, and a return on certain invested capital. There was no adjustment to Rate CNP Environmental in 2012 or 2013. On August 13, 2013, the Alabama PSC approved Alabama Power's petition requesting a revision to Rate CNP Environmental that allows recovery of costs related to pre-2005 environmental assets previously being recovered through Rate RSE. The revenue impact as a result of this revision is estimated to be $58 million in 2014. On November 21, 2013, Alabama Power submitted calculations associated with its cost of complying with environmental mandates, as provided under Rate CNP Environmental. The filing reflected a projected unrecovered retail revenue requirement for environmental compliance of approximately $72 million, which is to be recovered in the billing months of January 2014 through December 2014. On December 3, 2013, the Alabama PSC issued a consent order that Alabama Power leave in effect for 2014 the factors associated with Alabama Power's environmental compliance costs for the year 2013. Any unrecovered amounts associated with 2014 will be reflected in the 2015 filing. As of December 31, 2013, Alabama Power had an under recovered environmental clause balance of $7 million which is included in deferred under recovered regulatory clause revenues in the balance sheet.
Environmental Accounting Order
Based on an order from the Alabama PSC, Alabama Power is allowed to establish a regulatory asset to record the unrecovered investment costs, including the unrecovered plant asset balance and the unrecovered costs associated with site removal and closure associated with future unit retirements caused by environmental regulations. These costs would be amortized over the affected unit's remaining useful life, as established prior to the decision regarding early retirement.
Compliance and Pension Cost Accounting Order
In November 2012, the Alabama PSC approved an accounting order to defer to a regulatory asset account certain compliance-related operations and maintenance expenditures for the years 2013 through 2017, as well as the incremental increase in operations expense related to pension cost for 2013. These deferred costs are to be amortized over a three-year period beginning in January 2015. The compliance related expenditures were related to (i) standards addressing Critical Infrastructure Protection issued by the North American Electric Reliability Corporation, (ii) cyber security requirements issued by the NRC, and (iii) NRC guidance addressing the readiness at nuclear facilities within the U.S. for severe events. The compliance-related expenses to be afforded regulatory asset treatment over the five-year period are currently estimated to be approximately $37 million. The amount of operations and maintenance expenses deferred to a regulatory asset in 2013 associated with compliance-related expenditures and pension cost was approximately $8 million and $12 million, respectively. Pursuant to the accounting order, Alabama Power has the ability to accelerate the amortization of the regulatory assets with notification to the Alabama PSC.
Retail Energy Cost Recovery
Alabama Power has established energy cost recovery rates under Alabama Power's energy cost recovery rate (Rate ECR) as approved by the Alabama PSC. Rates are based on an estimate of future energy costs and the current over or under recovered balance. Revenues recognized under Rate ECR and recorded on the financial statements are adjusted for the difference in actual recoverable fuel costs and amounts billed in current regulated rates. The difference in the recoverable fuel costs and amounts billed give rise to the over or under recovered amounts recorded as regulatory assets or liabilities. Alabama Power, along with the Alabama PSC, continually monitors the over or under recovered cost balance to determine whether an adjustment to billing rates is required. Changes in the Rate ECR factor have no significant effect on net income, but will impact operating cash flows. Currently, the Alabama PSC may approve billing rates under Rate ECR of up to 5.910 cents per kilowatt hour (KWH). On December 3, 2013, the Alabama PSC issued a consent order that Alabama Power leave in effect the energy cost recovery rates which began in April 2011 for 2014. Therefore, the Rate ECR factor as of January 1, 2014 remained at 2.681 cents per KWH. Effective with billings beginning in January 2015, the Rate ECR factor will be 5.910 cents per KWH, absent a further order from the Alabama PSC.
Alabama Power's over recovered fuel costs at December 31, 2013 totaled $42 million as compared to under recovered fuel costs of $4 million at December 31, 2012. At December 31, 2013, $27 million is included in other regulatory liabilities, current and $15 million is included in deferred over recovered regulatory clause revenues. The under recovered fuel costs at December 31, 2012 are included in deferred under recovered regulatory clause revenues in the balance sheets. These classifications are based on estimates, which include such factors as weather, generation availability, energy demand, and the price of energy. A change in any of these factors could have a material impact on the timing of any recovery of the under recovered fuel costs.
Natural Disaster Reserve
Based on an order from the Alabama PSC, Alabama Power maintains a reserve for operations and maintenance expenses to cover the cost of damages from major storms to its transmission and distribution facilities. The order approves a separate monthly Rate Natural Disaster Reserve (Rate NDR) charge to customers consisting of two components. The first component is intended to establish and maintain a reserve balance for future storms and is an on-going part of customer billing. The second component of the Rate NDR charge is intended to allow recovery of any existing deferred storm-related operations and maintenance costs and any future reserve deficits over a 24-month period. The Alabama PSC order gives Alabama Power authority to record a deficit balance in the NDR when costs of storm damage exceed any established reserve balance. Absent further Alabama PSC approval, the maximum total Rate NDR charge consisting of both components is $10 per month per non-residential customer account and $5 per month per residential customer account. Alabama Power has the authority, based on an order from the Alabama PSC, to accrue certain additional amounts as circumstances warrant. The order allows for reliability-related expenditures to be charged against the additional accruals when the NDR balance exceeds $75 million. Alabama Power may designate a portion of the NDR to reliability-related expenditures as a part of an annual budget process for the following year or during the current year for identified unbudgeted reliability-related expenditures that are incurred. Accruals that have not been designated can be used to offset storm charges. Additional accruals to the NDR will enhance Alabama Power's ability to deal with the financial effects of future natural disasters, promote system reliability, and offset costs retail customers would otherwise bear.
As revenue from the Rate NDR charge is recognized, an equal amount of operations and maintenance expenses related to the NDR will also be recognized. As a result, the Rate NDR charge will not have an effect on net income but will impact operating cash flows.
In accordance with the order that was issued by the Alabama PSC in 2011 to eliminate a tax-related adjustment under Alabama Power's rate structure that resulted in additional revenues, Alabama Power made additional accruals to the NDR in the fourth quarter 2011 of an amount equal to the additional 2011 revenues, which were approximately $31 million.
The accumulated balances in the NDR for the years ended December 31, 2013 and December 31, 2012 were approximately $96 million and $103 million, respectively. Any accruals to the NDR are included in the balance sheets under other regulatory liabilities, deferred and are reflected as other operations and maintenance expenses in the statements of income.
Nuclear Outage Accounting Order
In accordance with a 2010 Alabama PSC order, nuclear outage operations and maintenance expenses for the two units at Plant Farley are deferred to a regulatory asset when the charges actually occur and are then amortized over the subsequent 18-month operational cycle.
Approximately $31 million of nuclear outage costs from the spring of 2012 was amortized to nuclear operations and maintenance expenses over the 18-month period ended in December 2013. During the spring of 2013, approximately $28 million of nuclear outage costs was deferred to a regulatory asset, and beginning in July 2013, these deferred costs are being amortized over an 18-month period. During the fall of 2013, approximately $32 million of nuclear outage costs associated with the second unit was deferred to a regulatory asset, and beginning in January 2014, these deferred costs are being amortized over an 18-month period. Alabama Power will continue the pattern of deferral of nuclear outage expenses as incurred and the recognition of expenses over a subsequent 18-month period pursuant to the Alabama PSC order.
Non-Nuclear Outage Accounting Order
On August 13, 2013, the Alabama PSC approved Alabama Power's petition requesting authorization to defer to a regulatory asset account certain operations and maintenance expenses associated with planned outages at non-nuclear generation facilities in 2014 and to amortize those expenses over a three-year period beginning in 2015. The 2014 outage expenditures to be deferred and amortized are estimated to total approximately $78 million.
Georgia Power
Rate Plans
In 2010, the Georgia PSC approved the 2010 ARP, which resulted in base rate increases of approximately $562 million, $17 million, $125 million, and $74 million effective January 1, 2011, January 1, 2012, April 1, 2012, and January 1, 2013, respectively.
On December 17, 2013, the Georgia PSC voted to approve the 2013 ARP. The 2013 ARP reflects the settlement agreement among Georgia Power, the Georgia PSC’s Public Interest Advocacy Staff, and 11 of the 13 intervenors, which was filed with the Georgia PSC on November 18, 2013.
On January 1, 2014, in accordance with the 2013 ARP, Georgia Power increased its tariffs as follows: (1) traditional base tariff rates by approximately $80 million; (2) Environmental Compliance Cost Recovery (ECCR) tariff by an additional $25 million; (3) Demand-Side Management (DSM) tariffs by an additional $1 million; and (4) Municipal Franchise Fee (MFF) tariff by an additional $4 million, for a total increase in base revenues of approximately $110 million.
Under the 2013 ARP, the following additional rate adjustments will be made to Georgia Power’s tariffs in 2015 and 2016 based on annual compliance filings to be made at least 90 days prior to the effective date of the tariffs:
Effective January 1, 2015 and 2016, the traditional base tariff rates will increase by an estimated $101 million and $36 million, respectively, to recover additional generation capacity-related costs;
Effective January 1, 2015 and 2016, the ECCR tariff will increase by an estimated $76 million and $131 million, respectively, to recover additional environmental compliance costs;
Effective January 1, 2015, the DSM tariffs will increase by an estimated $6 million and decrease by an estimated $1 million effective January 1, 2016; and
The MFF tariff will increase consistent with these adjustments.
Georgia Power currently estimates these adjustments will result in base revenue increases of approximately $187 million in 2015 and $170 million in 2016. The estimated traditional base tariff rate increases for 2015 and 2016 do not include additional Qualifying Facility (QF) PPA expenses; however, compliance filings will include QF PPA expenses for those facilities that are projected to provide capacity to Georgia Power during the following year.
Under the 2013 ARP, Georgia Power’s retail ROE is set at 10.95%, and earnings are evaluated against a retail ROE range of 10.00% to 12.00%. Two-thirds of any earnings above 12.00% will be directly refunded to customers, with the remaining one-third retained by Georgia Power. There will be no recovery of any earnings shortfall below 10.00% on an actual basis. However, if at any time during the term of the 2013 ARP, Georgia Power projects that its retail earnings will be below 10.00% for any calendar year, it may petition the Georgia PSC for implementation of the Interim Cost Recovery (ICR) tariff that would be used to adjust Georgia Power’s earnings back to a 10.00% retail ROE. The Georgia PSC would have 90 days to rule on Georgia Power’s request. The ICR tariff will expire at the earlier of January 1, 2017 or the end of the calendar year in which the ICR tariff becomes effective. In lieu of requesting implementation of an ICR tariff, or if the Georgia PSC chooses not to implement the ICR tariff, Georgia Power may file a full rate case.
Except as provided above, Georgia Power will not file for a general base rate increase while the 2013 ARP is in effect. Georgia Power is required to file a general rate case by July 1, 2016, in response to which the Georgia PSC would be expected to determine whether the 2013 ARP should be continued, modified, or discontinued.
Integrated Resource Plans
On January 31, 2013, Georgia Power filed its triennial IRP (2013 IRP). The filing included Georgia Power's request to decertify 16 coal- and oil-fired units totaling 2,093 MWs. Several factors, including the cost to comply with existing and future environmental regulations, recent and forecasted economic conditions, and lower natural gas prices, contributed to the decision to close these units.
On April 17, 2013, the Georgia PSC approved the decertification of Plant Bowen Unit 6 (32 MWs), which was retired on April 25, 2013. On September 30, 2013, Plant Branch Unit 2 (319 MWs) was retired as approved by the Georgia PSC in the 2011 Integrated Resource Plan Update (2011 IRP Update) in order to comply with the State of Georgia's Multi-Pollutant Rule.
On July 11, 2013, the Georgia PSC approved Georgia Power's request to decertify and retire Plant Boulevard Units 2 and 3 (28 MWs) effective July 17, 2013. Plant Branch Units 3 and 4 (1,016 MWs), Plant Yates Units 1 through 5 (579 MWs), and Plant McManus Units 1 and 2 (122 MWs) will be decertified and retired by April 16, 2015, the compliance date of the Mercury and Air Toxics Standards (MATS) rule. The decertification date of Plant Branch Unit 1 was extended from December 31, 2013 as specified in the final order in the 2011 IRP Update to coincide with the decertification date of Plant Branch Units 3 and 4. The decertification and retirement of Plant Kraft Units 1 through 4 (316 MWs) was also approved and will be effective by April 16, 2016, based on a one-year extension of the MATS rule compliance date that was approved by the State of Georgia Environmental Protection Division on September 10, 2013 to allow for necessary transmission system reliability improvements.
Additionally, the Georgia PSC approved Georgia Power's proposed MATS rule compliance plan for emissions controls necessary for the continued operation of Plants Bowen Units 1 through 4, Wansley Units 1 and 2, Scherer Units 1 through 3, and Hammond Units 1 through 4, the switch to natural gas as the primary fuel at Plant Yates Units 6 and 7 and Southern Electric Generating Company's (SEGCO) Plant Gaston Units 1 through 4, as well as the fuel switch at Plant McIntosh Unit 1 to operate on Powder River Basin coal.
In the 2013 ARP, the Georgia PSC approved the amortization of the construction work in progress (CWIP) balances related to environmental projects that will not be completed at Plant Branch Units 1 through 4 and Plant Yates Units 6 and 7 over nine years beginning in January 2014 and the amortization of any remaining net book values of Plant Branch Unit 2 from October 2013 to December 2022, Plant Branch Unit 1 from May 2015 to December 2020, Plant Branch Unit 3 from May 2015 to December 2023, and Plant Branch Unit 4 from May 2015 to December 2024. The Georgia PSC deferred a decision regarding the appropriate recovery period for the costs associated with unusable materials and supplies remaining at the retiring plants to Georgia Power's next base rate case, which Georgia Power expects to file in 2016 (2016 Rate Case). In the 2013 IRP, the Georgia PSC also deferred decisions regarding the recovery of any fuel related costs that could be incurred in connection with the retirement units to be addressed in future fuel cases.
A request was filed with the Georgia PSC on January 10, 2014 to cancel the proposed biomass fuel conversion of Plant Mitchell Unit 3 (155 MWs) because it would not be cost effective for customers. The filing also notified the Georgia PSC of Georgia Power’s plans to seek decertification later this year. Plant Mitchell Unit 3 will continue to operate as a coal unit until April 2015 when it will be required to cease operation or install additional environmental controls to comply with the MATS rule. In connection with the retirement decision, Georgia Power reclassified the retail portion of the net carrying value of Plant Mitchell Unit 3 from plant in service, net of depreciation, to other utility plant, net.
The decertification of these units and fuel conversions are not expected to have a material impact on Southern Company's financial statements; however, the ultimate outcome depends on the Georgia PSC's order in the 2016 Rate Case and future fuel cases and cannot be determined at this time.
Renewables Development
On December 17, 2013, four PPAs totaling 50 MWs of utility scale solar generation under the Georgia Power Advanced Solar Initiative (GPASI) were approved by the Georgia PSC, with Georgia Power as the purchaser. These contracts will begin in 2015 and end in 2034. The resulting purchases will be for energy only and recovered through Georgia Power’s fuel cost recovery mechanism. Under the 2013 IRP, the Georgia PSC approved an additional 525 MWs of solar generation to be purchased by Georgia Power. The 525 MWs will be divided into 425 MWs of utility scale projects and 100 MWs of distributed generation.
On November 4, 2013, Georgia Power filed an application for the certification of two PPAs which were executed on April 22, 2013 for the purchase of energy from two wind farms in Oklahoma with capacity totaling 250 MWs that will begin in 2016 and end in 2035.
During 2013, Georgia Power executed four PPAs to purchase a total of 169 MWs of biomass capacity and energy from four facilities in Georgia that will begin in 2015 and end in 2035. On May 21, 2013, the Georgia PSC approved two of the biomass PPAs and the remaining two were approved on December 17, 2013. The four biomass PPAs are contingent upon the counterparty meeting specified contract dates for posting collateral and commercial operation. The ultimate outcome of this matter cannot be determined at this time.
Fuel Cost Recovery
Georgia Power has established fuel cost recovery rates approved by the Georgia PSC. The Georgia PSC approved reductions in Georgia Power's total annual billings of approximately $43 million effective June 1, 2011, $567 million effective June 1, 2012, and $122 million effective January 1, 2013. The 2013 reduction was due to the Georgia PSC authorizing an Interim Fuel Rider, which is set to expire June 1, 2014. Georgia Power continues to be allowed to adjust its fuel cost recovery rates prior to the next fuel case if the under or over recovered fuel balance exceeds $200 million. Georgia Power's fuel cost recovery includes costs associated with a natural gas hedging program as revised and approved by the Georgia PSC on February 7, 2013, requiring it to use options and hedges within a 24-month time horizon. On February 18, 2014, the Georgia PSC approved the deferral of Georgia Power's next fuel case, which is now expected to be filed by March 1, 2015.
Georgia Power's over recovered fuel balance totaled approximately $58 million and $230 million at December 31, 2013 and 2012, respectively, and is included in current liabilities and other deferred credits and liabilities.
Fuel cost recovery revenues as recorded on the financial statements are adjusted for differences in actual recoverable fuel costs and amounts billed in current regulated rates. Accordingly, changes in the billing factor will not have a significant effect on Southern Company's revenues or net income, but will affect cash flow.
Storm Damage Recovery
Georgia Power defers and recovers certain costs related to damages from major storms as mandated by the Georgia PSC. As of December 31, 2013, the balance in the regulatory asset related to storm damage was $37 million. As a result of this regulatory treatment, the costs related to storms are generally not expected to have a material impact on Southern Company's financial statements.
Nuclear Construction
In 2008, Georgia Power, acting for itself and as agent for Oglethorpe Power Corporation (OPC), the Municipal Electric Authority of Georgia (MEAG Power), and the City of Dalton, Georgia (Dalton), acting by and through its Board of Water, Light, and Sinking Fund Commissioners (collectively, Owners), entered into an agreement with a consortium consisting of Westinghouse Electric Company LLC (Westinghouse) and Stone & Webster, Inc. (collectively, Contractor), pursuant to which the Contractor agreed to design, engineer, procure, construct, and test two AP1000 nuclear units (with electric generating capacity of approximately 1,100 MWs each) and related facilities at Plant Vogtle (Vogtle 3 and 4 Agreement). Under the terms of the Vogtle 3 and 4 Agreement, the Owners agreed to pay a purchase price that is subject to certain price escalations and adjustments, including fixed escalation amounts and index-based adjustments, as well as adjustments for change orders, and performance bonuses for early completion and unit performance. Each Owner is severally (and not jointly) liable for its proportionate share, based on its ownership interest, of all amounts owed to the Contractor under the Vogtle 3 and 4 Agreement. Georgia Power's proportionate share is 45.7%. The Vogtle 3 and 4 Agreement provides for liquidated damages upon the Contractor's failure to fulfill the schedule and performance guarantees. The Contractor's liability to the Owners for schedule and performance liquidated damages and warranty claims is subject to a cap.
Certain payment obligations of Westinghouse and Stone & Webster, Inc. under the Vogtle 3 and 4 Agreement are guaranteed by Toshiba Corporation and The Shaw Group, Inc., respectively. In the event of certain credit rating downgrades of any Owner, such Owner will be required to provide a letter of credit or other credit enhancement. The Owners may terminate the Vogtle 3 and 4 Agreement at any time for their convenience, provided that the Owners will be required to pay certain termination costs. The Contractor may terminate the Vogtle 3 and 4 Agreement under certain circumstances, including certain Owner suspension or delays of work, action by a governmental authority to permanently stop work, certain breaches of the Vogtle 3 and 4 Agreement by the Owners, Owner insolvency, and certain other events.
In 2009, the NRC issued an Early Site Permit and Limited Work Authorization which allowed limited work to begin on Plant Vogtle Units 3 and 4. The NRC certified the Westinghouse Design Control Document, as amended (DCD), for the AP1000 nuclear reactor design, effective December 30, 2011, and issued combined construction and operating licenses (COLs) in February 2012. Receipt of the COLs allowed full construction to begin. There have been technical and procedural challenges to the construction and licensing of Plant Vogtle Units 3 and 4, at the federal and state level, and additional challenges are expected as construction proceeds.
In 2009, the Georgia PSC approved inclusion of the construction of two new nuclear generating units at Plant Vogtle (Plant Vogtle Units 3 and 4) related CWIP accounts in rate base, and the State of Georgia enacted the Georgia Nuclear Energy Financing Act, which allows Georgia Power to recover financing costs for nuclear construction projects certified by the Georgia PSC. Financing costs are recovered on all applicable certified costs through annual adjustments to the Nuclear Construction Cost Recovery (NCCR) tariff by including the related CWIP accounts in rate base during the construction period. The Georgia PSC approved increases to the NCCR tariff of approximately $223 million, $35 million, $50 million, and $60 million, effective January 1, 2011, 2012, 2013, and 2014, respectively. Through the NCCR tariff, Georgia Power is collecting and amortizing to earnings approximately $91 million of financing costs, capitalized in 2009 and 2010, over the five-year period ending December 31, 2015, in addition to the ongoing financing costs. At December 31, 2013, approximately $37 million of these 2009 and 2010 costs remained unamortized in CWIP.
Georgia Power is required to file semi-annual Vogtle Construction Monitoring (VCM) reports with the Georgia PSC by February 28 and August 31 each year. If the projected certified construction capital costs to be borne by Georgia Power increase by 5% or the projected in-service dates are significantly extended, Georgia Power is required to seek an amendment to the Plant Vogtle Units 3 and 4 certificate from the Georgia PSC. Accordingly, Georgia Power's eighth VCM report requested an amendment to the certificate to increase the estimated in-service capital cost of Plant Vogtle Units 3 and 4 from $4.4 billion to $4.8 billion and to extend the estimated in-service dates to the fourth quarter 2017 and the fourth quarter 2018 for Plant Vogtle Units 3 and 4, respectively.
On September 3, 2013, the Georgia PSC approved a stipulation entered into by Georgia Power and the Georgia PSC staff to waive the requirement to amend the Plant Vogtle Units 3 and 4 certificate, until the commercial operation date of Plant Vogtle Unit 3, or earlier if deemed appropriate by the Georgia PSC and Georgia Power. In accordance with the Georgia Integrated Resource Planning Act, any costs incurred by Georgia Power in excess of the certified amount will not be included in rate base, unless shown to be reasonable and prudent. In addition, financing costs on any excess construction-related costs potentially would be subject to recovery through AFUDC instead of the NCCR tariff. As required by the stipulation, Georgia Power filed an abbreviated status update with the Georgia PSC on September 3, 2013, which reflected approximately $2.4 billion of total construction capital costs incurred through June 30, 2013. On October 15, 2013, the Georgia PSC voted to approve Georgia Power's eighth VCM report, reflecting construction capital costs incurred, which through December 31, 2012 totaled approximately $2.2 billion. Also in accordance with the stipulation, Georgia Power will file with the Georgia PSC on February 28, 2014 a combined ninth and tenth VCM report covering the period from January 1 through December 31, 2013 (Ninth/Tenth VCM report), which will request approval for an additional $0.4 billion of construction capital costs. The Ninth/Tenth VCM report will reflect estimated in-service construction capital costs of $4.8 billion and associated financing costs during the construction period, which are estimated to total approximately $2.0 billion. Georgia Power expects to resume filing semi-annual VCM reports in August 2014.
In July 2012, the Owners and the Contractor began negotiations regarding the costs associated with design changes to the DCD and the delays in the timing of approval of the DCD and issuance of the COLs, including the assertion by the Contractor that the Owners are responsible for these costs under the terms of the Vogtle 3 and 4 Agreement. The portion of the additional costs claimed by the Contractor that would be attributable to Georgia Power (based on Georgia Power's ownership interest) with respect to these issues is approximately $425 million (in 2008 dollars). The Contractor also has asserted it is entitled to further schedule extensions. Georgia Power has not agreed with either the proposed cost or schedule adjustments or that the Owners have any responsibility for costs related to these issues. In November 2012, Georgia Power and the other Owners filed suit against the Contractor in the U.S. District Court for the Southern District of Georgia seeking a declaratory judgment that the Owners are not responsible for these costs. Also in November 2012, the Contractor filed suit against Georgia Power and the other Owners in the U.S. District Court for the District of Columbia alleging the Owners are responsible for these costs. On August 30, 2013, the U.S. District Court for the District of Columbia dismissed the Contractor's suit, ruling that the proper venue is the U.S. District Court for the Southern District of Georgia. The Contractor appealed the decision to the U.S. Court of Appeals for the District of Columbia Circuit on September 27, 2013. While litigation has commenced and Georgia Power intends to vigorously defend its positions, Georgia Power also expects negotiations with the Contractor to continue with respect to cost and schedule during which negotiations the parties may reach a mutually acceptable compromise of their positions.
Processes are in place that are designed to assure compliance with the requirements specified in the DCD and the COLs, including inspections by Southern Nuclear and the NRC that occur throughout construction. As a result of such compliance processes, certain license amendment requests have been filed and approved or are pending before the NRC. Various design and other licensing-based compliance issues are expected to arise as construction proceeds, which may result in additional license amendments or require other resolution. If any license amendment requests or other licensing-based compliance issues are not resolved in a timely manner, there may be delays in the project schedule that could result in increased costs either to the Owners, the Contractor, or both.
As construction continues, the risk remains that additional challenges in the fabrication, assembly, delivery, and installation of structural modules, delays in the receipt of the remaining permits necessary for the operation of Plant Vogtle Units 3 and 4, or other issues could arise and may further impact project schedule and cost. Additional claims by the Contractor or Georgia Power (on behalf of the Owners) are also likely to arise throughout construction. These claims may be resolved through formal and informal dispute resolution procedures under the Vogtle 3 and 4 Agreement, but also may be resolved through litigation.
The ultimate outcome of these matters cannot be determined at this time.
Gulf Power
Retail Base Rate Case
On December 3, 2013, the Florida PSC voted to approve the Settlement Agreement (Gulf Power Settlement Agreement) among Gulf Power and all of the intervenors to the docketed proceeding with respect to Gulf Power's request to increase retail base rates. Under the terms of the Gulf Power Settlement Agreement, Gulf Power (1) increased base rates designed to produce an additional $35 million in annual revenues effective January 2014 and will increase base rates designed to produce an additional $20 million in annual revenues effective January 2015; (2) continued its current authorized retail ROE midpoint and range; and (3) will accrue a return similar to AFUDC on certain transmission system upgrades that go into service after January 2014 until Gulf Power's next retail rate case or January 1, 2017, whichever comes first.
The Gulf Power Settlement Agreement also includes a self-executing adjustment mechanism that will increase the authorized ROE midpoint and range by 25 basis points in the event the 30-year treasury yield rate increases by an average of at least 75 basis points above 3.7947% for a consecutive six-month period.
The Gulf Power Settlement Agreement also provides that Gulf Power may reduce depreciation expense and record a regulatory asset that will be included as an offset to the other cost of removal regulatory liability in an amount up to $62.5 million between January 2014 and June 2017. In any given month, such depreciation expense reduction may not exceed the amount necessary for the ROE, as reported to the Florida PSC monthly, to reach the midpoint of the authorized ROE range then in effect. Recovery of the regulatory asset will occur over a period to be determined by the Florida PSC in Gulf Power’s next base rate case or next depreciation and dismantlement study proceeding, whichever comes first.
The Gulf Power Settlement Agreement also provides for recovery of costs associated with any tropical systems named by the National Hurricane Center through the initiation of a storm surcharge. The storm surcharge will begin, on an interim basis, 60 days following the filing of a cost recovery petition. The storm surcharge generally may not exceed $4.00/1,000 KWHs on monthly residential bills in aggregate for a calendar year. This limitation does not apply if Gulf Power incurs in excess of $100 million in storm recovery costs that qualify for recovery in a given calendar year. This threshold amount is inclusive of the amount necessary to replenish the storm reserve to the level that existed as of December 31, 2013.
Pursuant to the Gulf Power Settlement Agreement, Gulf Power may not request an increase in its retail base rates to be effective until after June 2017, unless Gulf Power's actual retail ROE falls below the authorized ROE range.
Integrated Coal Gasification Combined Cycle
Kemper IGCC Overview
Construction of Mississippi Power's Kemper IGCC is nearing completion and start-up activities will continue until the Kemper IGCC is placed in service. The Kemper IGCC will utilize an integrated coal gasification combined cycle technology with an output capacity of 582 MWs. The Kemper IGCC will be fueled by locally mined lignite (an abundant, lower heating value coal) from a mine owned by Mississippi Power and situated adjacent to the Kemper IGCC. The mine, operated by North American Coal Corporation, started commercial operation on June 5, 2013. In connection with the Kemper IGCC, Mississippi Power constructed and plans to operate approximately 61 miles of CO2 pipeline infrastructure for the planned transport of captured CO2 for use in enhanced oil recovery.
Kemper IGCC Project Approval
In April 2012, the Mississippi PSC issued a detailed order confirming the certificate of public convenience and necessity (CPCN) originally approved by the Mississippi PSC in 2010 authorizing the acquisition, construction, and operation of the Kemper IGCC (2012 MPSC CPCN Order), which the Sierra Club appealed to the Chancery Court of Harrison County, Mississippi (Chancery Court). In December 2012, the Chancery Court affirmed the 2012 MPSC CPCN Order. On January 8, 2013, the Sierra Club filed an appeal of the Chancery Court's ruling with the Mississippi Supreme Court. The ultimate outcome of the CPCN challenge cannot be determined at this time.
Kemper IGCC Schedule and Cost Estimate
The certificated cost estimate of the Kemper IGCC included in the 2012 MPSC CPCN Order was $2.4 billion, net of $245 million of grants awarded to the project by the DOE under the Clean Coal Power Initiative Round 2 (DOE Grants) and excluding the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, and AFUDC related to the Kemper IGCC. The 2012 MPSC CPCN Order approved a construction cost cap of up to $2.88 billion, with recovery of prudently-incurred costs subject to approval by the Mississippi PSC. Exceptions to the $2.88 billion cost cap include the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, AFUDC, and certain general exceptions, including change of law, force majeure, and beneficial capital (which exists when Mississippi Power demonstrates that the purpose and effect of the construction cost increase is to produce efficiencies that will result in a neutral or favorable effect on the ratepayers, relative to the original proposal for the CPCN) (Cost Cap Exceptions), as contemplated in the settlement agreement between Mississippi Power and the Mississippi PSC entered into on January 24, 2013 (Settlement Agreement) and the 2012 MPSC CPCN Order. Recovery of the Cost Cap Exception amounts remains subject to review and approval by the Mississippi PSC. The Kemper IGCC was originally scheduled to be placed in service in May 2014 and is currently scheduled to be placed in service in the fourth quarter 2014.
Mississippi Power’s 2010 project estimate, current cost estimate, and actual costs incurred as of December 31, 2013 for the Kemper IGCC are as follows:
Cost Category
2010 Project Estimate(d)
Current Estimate
Actual Costs at 12/31/2013
 
(in billions)
Plant Subject to Cost Cap(a)
$
2.40

$
4.06

$
3.25

Lignite Mine and Equipment
0.21
0.23
0.23
CO2 Pipeline Facilities
0.14
0.11
0.09
AFUDC(b)
0.17
0.45
0.28
General Exceptions
0.05
0.10
0.07
Regulatory Asset(c)

0.09
0.07
Total Kemper IGCC(a)
$
2.97

$
5.04

$
3.99

(a)
The 2012 MPSC CPCN Order approved a construction cost cap of up to $2.88 billion, net of the DOE Grants and excluding the Cost Cap Exceptions.
(b)
Mississippi Power’s original estimate included recovery of financing costs during construction which was not approved by the Mississippi PSC in June 2012 as described in "Rate Recovery of Kemper IGCC Costs."
(c)
The 2012 MPSC CPCN Order approved deferral of non-capital Kemper IGCC-related costs during construction as described in "Rate Recovery of Kemper IGCC Costs – Regulatory Assets."
(d)
The 2010 Project Estimate is the certificated cost estimate adjusted to include the certificated estimate for the CO2 pipeline facilities which was approved in 2011 by the Mississippi PSC.
Of the total costs incurred as of December 31, 2013, $2.74 billion was included in CWIP (which is net of the DOE Grants and estimated probable losses of $1.18 billion), $70.5 million in other regulatory assets, and $3.9 million in other deferred charges and assets in the balance sheet, and $1.0 million was previously expensed.
Mississippi Power does not intend to seek any rate recovery or joint owner contributions for any related costs that exceed the $2.88 billion cost cap, excluding the Cost Cap Exceptions and net of the DOE Grants. Southern Company recorded pre-tax charges to income for revisions to the cost estimate of $1.2 billion ($729 million after-tax) in 2013. The revised cost estimates reflect increased labor costs, piping and other material costs, start-up costs, decreases in construction labor productivity, the change in the in-service date, and an increase in the contingency for risks associated with start-up activities.
Mississippi Power could experience further construction cost increases and/or schedule extensions with respect to the Kemper IGCC as a result of factors including, but not limited to, labor costs and productivity, adverse weather conditions, shortages and inconsistent quality of equipment, materials, and labor, contractor or supplier delay, or non-performance under construction or other agreements. Furthermore, Mississippi Power could also experience further schedule extensions associated with start-up activities for this "first-of-a-kind" technology, including major equipment failure, system integration, and operations, and/or unforeseen engineering problems, which would result in further cost increases and could result in the loss of certain tax benefits related to bonus depreciation. In subsequent periods, any further changes in the estimated costs to complete construction of the Kemper IGCC subject to the $2.88 billion cost cap will be reflected in Southern Company's statements of income and these changes could be material.
Rate Recovery of Kemper IGCC Costs
The ultimate outcome of the rate recovery matters discussed herein, including the resolution of legal challenges, determinations of prudency, and the specific manner of recovery of prudently-incurred costs, cannot be determined at this time, but could have a material impact on the Company’s results of operations, financial condition, and liquidity.
2012 MPSC CPCN Order
The 2012 MPSC CPCN Order included provisions relating to both Mississippi Power's recovery of financing costs during the course of construction of the Kemper IGCC and Mississippi Power's recovery of costs following the date the Kemper IGCC is placed in service. With respect to recovery of costs following the in-service date of the Kemper IGCC, the 2012 MPSC CPCN Order provided for the establishment of operational cost and revenue parameters based upon assumptions in Mississippi Power's petition for the CPCN.
In June 2012, the Mississippi PSC denied Mississippi Power's proposed rate schedule for recovery of financing costs during construction, pending a final ruling from the Mississippi Supreme Court regarding the Sierra Club's appeal of the Mississippi PSC's issuance of the CPCN for the Kemper IGCC (2012 MPSC CWIP Order).
In July 2012, Mississippi Power appealed the Mississippi PSC's June 2012 decision to the Mississippi Supreme Court and requested interim rates under bond. In July 2012, the Mississippi Supreme Court denied Mississippi Power's request for interim rates under bond.
Settlement Agreement
On January 24, 2013, Mississippi Power entered into the Settlement Agreement with the Mississippi PSC that, among other things, establishes the process for resolving matters regarding cost recovery related to the Kemper IGCC and dismissed Mississippi Power's appeal of the 2012 MPSC CWIP Order. Under the Settlement Agreement, Mississippi Power agreed to limit the portion of prudently-incurred Kemper IGCC costs to be included in retail rate base to the $2.4 billion certificated cost estimate, plus the Cost Cap Exceptions, but excluding AFUDC, and any other costs permitted or determined to be excluded from the $2.88 billion cost cap by the Mississippi PSC. The Settlement Agreement also allows Mississippi Power to secure alternate financing for costs that are not otherwise recovered in any Mississippi PSC rate proceedings contemplated by the Settlement Agreement. Legislation to authorize a multi-year rate plan and legislation to provide for alternate financing through securitization of up to $1.0 billion of prudently-incurred costs was enacted into law on February 26, 2013. Mississippi Power intends to securitize (1) prudently-incurred costs in excess of the certificated cost estimate and up to the $2.88 billion cost cap, net of the DOE Grants and excluding the Cost Cap Exceptions, (2) accrued AFUDC, and (3) other prudently-incurred costs as approved by the Mississippi PSC. The rate recovery necessary to recover the annual costs of securitization is expected to be filed and become effective after the Kemper IGCC is placed in service and following completion of the Mississippi PSC's final prudence review of costs for the Kemper IGCC.
The Settlement Agreement provides that Mississippi Power may terminate the Settlement Agreement if certain conditions are not met, if Mississippi Power is unable to secure alternate financing for any prudently-incurred Kemper IGCC costs not otherwise recovered in any Mississippi PSC rate proceeding contemplated by the Settlement Agreement, or if the Mississippi PSC fails to comply with the requirements of the Settlement Agreement. Mississippi Power continues to work with the Mississippi PSC and the Mississippi Public Utilities Staff to implement the procedural schedules set forth in the Settlement Agreement and variations to the schedule are likely.
2013 MPSC Rate Order
Consistent with the terms of the Settlement Agreement, on January 25, 2013, Mississippi Power filed a new request to increase retail rates in 2013 by $172 million annually, based on projected investment for 2013, to be recorded to a regulatory liability to be used to mitigate rate impacts when the Kemper IGCC is placed in service.
On March 5, 2013, the Mississippi PSC issued an order (2013 MPSC Rate Order) approving retail rate increases of 15% effective March 19, 2013 and 3% effective January 1, 2014, which collectively are designed to collect $156 million annually beginning in 2014. Amounts collected through these rates are being recorded as a regulatory liability to be used to mitigate customer rate impacts after the Kemper IGCC is placed in service. As of December 31, 2013, $98.1 million had been collected, with $10.3 million recognized in retail revenues in the statement of income and the remainder deferred in other regulatory liabilities and included in the balance sheet.
Because the 2013 MPSC Rate Order did not provide for the inclusion of CWIP in rate base as permitted by legislation designed to enhance the Mississippi PSC's authority to facilitate development and construction of baseload generation in the State of Mississippi (Baseload Act), Mississippi Power continues to record AFUDC on the Kemper IGCC during the construction period. Mississippi Power will not record AFUDC on any additional costs of the Kemper IGCC that exceed the $2.88 billion cost cap, except for Cost Cap Exception amounts. Mississippi Power will continue to comply with the 2013 MPSC Rate Order by collecting and deferring the approved rates during the construction period unless directed to do otherwise by the Mississippi PSC. On March 21, 2013, a legal challenge to the 2013 MPSC Rate Order was filed by Thomas A. Blanton with the Mississippi Supreme Court, which remains pending against Mississippi Power and the Mississippi PSC.
Seven-Year Rate Plan
Also consistent with the Settlement Agreement, on February 26, 2013, Mississippi Power filed with the Mississippi PSC a rate recovery plan for the Kemper IGCC for the first seven years of its operation, along with a proposed revenue requirement under such plan for 2014 through 2020 (Seven-Year Rate Plan).
On March 22, 2013, Mississippi Power, in compliance with the 2013 MPSC Rate Order, filed a revision to the Seven-Year Rate Plan with the Mississippi PSC for the Kemper IGCC for cost recovery through 2020, which is still under review by the Mississippi PSC. In the Seven-Year Rate Plan, Mississippi Power proposed recovery of an annual revenue requirement of approximately $156 million of Kemper IGCC-related operational costs and rate base amounts, including plant costs equal to the $2.4 billion certificated cost estimate. The 2013 MPSC Rate Order, which increased rates beginning on March 19, 2013, is integral to the Seven-Year Rate Plan, which contemplates amortization of the regulatory liability balance at the in-service date to be used to mitigate customer rate impacts through 2020, based on a fixed amortization schedule that requires approval by the Mississippi PSC. Under the Seven-Year Rate Plan filing, Mississippi Power proposed annual rate recovery to remain the same from 2014 through 2020. At the time of the filing of the Seven-Year Rate Plan, the proposed revenue requirement approximated the forecasted cost of service for the period 2014 through 2020. Under Mississippi Power's proposal, to the extent that the actual annual cost of service differs from the forecast approved in the Seven-Year Rate Plan, the difference would be deferred as a regulatory asset or liability, subject to accrual of carrying costs, and would be included in the next year's rate recovery calculation. If any deferred balance remains at the end of the Seven-Year Rate Plan term, the Mississippi PSC will review the amount and determine the appropriate method and period of disposition.
The revenue requirements set forth in the Seven-Year Rate Plan assume the sale of a 15% undivided interest in the Kemper IGCC to South Mississippi Electric Power Association (SMEPA) and utilization of bonus depreciation as provided by the American Taxpayer Relief Act of 2012 (ATRA), which currently requires that the Kemper IGCC be placed in service in 2014. See "Investment Tax Credits and Bonus Depreciation" herein for additional information regarding bonus depreciation.
In 2014, Mississippi Power plans to amend the Seven-Year Rate Plan to reflect changes including the revised in-service date, the change in expected benefits relating to tax credits, various other revenue requirement items, and other tax matters, which include ensuring compliance with the normalization requirements of the Internal Revenue Code. The impact of these revisions for the average annual retail revenue requirement is estimated to be approximately $35 million through 2020. The amendment to the Seven-Year Rate Plan is also expected to reflect rate mitigation options identified by Mississippi Power that, if approved by the Mississippi PSC, would result in no change to the total customer rate impacts contemplated in the original Seven-Year Rate Plan.
Further cost increases and/or schedule extensions with respect to the Kemper IGCC could have an adverse impact on the Seven-Year Rate Plan, such as the inability to recover items considered as Cost Cap Exceptions, potential costs subject to securitization financing in excess of $1.0 billion, and the loss of certain tax benefits related to bonus depreciation. While the Kemper IGCC is scheduled to be placed in service in the fourth quarter 2014, any schedule extension beyond 2014 would result in the loss of the tax benefits related to bonus depreciation. The estimated value of the bonus depreciation tax benefits to retail customers is approximately $200 million. Loss of these tax benefits would require further adjustment to the Seven-Year Rate Plan and approval by the Mississippi PSC to ensure compliance with the normalization requirements of the Internal Revenue Code. In the event that the Mississippi PSC does not approve or Mississippi Power withdraws the Seven-Year Rate Plan, Mississippi Power would seek rate recovery through an alternate means, which could include a traditional rate case.
Prudence Reviews
The Mississippi PSC’s prudence review of Kemper IGCC costs incurred through March 31, 2013, as provided for in the Settlement Agreement, is expected to occur in the second quarter 2014. A final review of all costs incurred after March 31, 2013 is expected to be completed within six months of the Kemper IGCC’s in-service date. Furthermore, regardless of any prudence determinations made during the construction and start-up period, the Mississippi PSC has the right to make a final prudence determination after the Kemper IGCC has been placed in service.
Regulatory Assets
Consistent with the treatment of non-capital costs incurred during the pre-construction period, the Mississippi PSC granted Mississippi Power the authority to defer all non-capital Kemper IGCC-related costs to a regulatory asset during the construction period, subject to review of such costs by the Mississippi PSC. The amortization period for any such costs approved for recovery will be determined by the Mississippi PSC at a later date. In addition, Mississippi Power is authorized to accrue carrying costs on the unamortized balance of such regulatory assets at a rate and in a manner to be determined by the Mississippi PSC in future cost recovery mechanism proceedings.
Lignite Mine and CO2 Pipeline Facilities
In conjunction with the Kemper IGCC, Mississippi Power will own the lignite mine and equipment and has acquired and will continue to acquire mineral reserves located around the Kemper IGCC site. The mine started commercial operation on June 5, 2013.
In 2010, Mississippi Power executed a 40-year management fee contract with Liberty Fuels Company, LLC, a wholly-owned subsidiary of The North American Coal Corporation (Liberty Fuels), which will develop, construct, and manage the mining operations. The contract with Liberty Fuels is effective through the end of the mine reclamation. As the mining permit holder, Liberty Fuels has a legal obligation to perform mine reclamation and Mississippi Power has a contractual obligation to fund all reclamation activities. In addition to the obligation to fund the reclamation activities, Mississippi Power currently provides working capital support to Liberty Fuels through cash advances for capital purchases, payroll, and other operating expenses. See Note 1 under "Asset Retirement Obligations and Other Costs of Removal" for additional information.
In addition, Mississippi Power will acquire, construct, and operate the CO2 pipeline for the planned transport of captured CO2 for use in enhanced oil recovery. Mississippi Power has entered into agreements with Denbury Onshore (Denbury), a subsidiary of Denbury Resources Inc., and Treetop Midstream Services, LLC (Treetop), an affiliate of Tellus Operating Group, LLC and a subsidiary of Tengrys, LLC, pursuant to which Denbury will purchase 70% of the CO2 captured from the Kemper IGCC and Treetop will purchase 30% of the CO2 captured from the Kemper IGCC.
The ultimate outcome of these matters cannot be determined at this time.
Proposed Sale of Undivided Interest to SMEPA
In 2010, Mississippi Power and SMEPA entered into an asset purchase agreement whereby SMEPA agreed to purchase a 17.5% undivided interest in the Kemper IGCC. In February 2012, the Mississippi PSC approved the sale and transfer of 17.5% of the Kemper IGCC to SMEPA. In June 2012, Mississippi Power and SMEPA signed an amendment to the asset purchase agreement whereby SMEPA reduced its purchase commitment percentage from a 17.5% to a 15% undivided interest in the Kemper IGCC. On March 29, 2013, Mississippi Power and SMEPA signed an amendment to the asset purchase agreement whereby Mississippi Power and SMEPA agreed to amend the power supply agreement entered into by the parties in April 2011 to reduce the capacity amounts to be received by SMEPA by half (approximately 75 MWs) at the sale and transfer of the undivided interest in the Kemper IGCC to SMEPA. Capacity revenues under the April 2011 power supply agreement were $17.5 million in 2013. On December 24, 2013, Mississippi Power and SMEPA agreed to extend SMEPA's option to purchase through December 31, 2014. The sale and transfer of an interest in the Kemper IGCC to SMEPA is subject to approval by the Mississippi PSC.
The closing of this transaction is conditioned upon execution of a joint ownership and operating agreement, receipt of all construction permits, appropriate regulatory approvals, financing, and other conditions. In September 2012, SMEPA received a conditional loan commitment from Rural Utilities Service to provide funding for SMEPA's undivided interest in the Kemper IGCC.
In March 2012 and subsequent to December 31, 2013, Mississippi Power received $150 million and $75 million, respectively, of interest-bearing refundable deposits from SMEPA to be applied to the purchase. While the expectation is that these amounts will be applied to the purchase price at closing, Mississippi Power would be required to refund the deposits upon the termination of the asset purchase agreement, within 60 days of a request by SMEPA for a full or partial refund, or within 15 days at SMEPA's discretion in the event that Mississippi Power is assigned a senior unsecured credit rating of BBB+ or lower by Standard and Poor's Ratings Services, a division of The McGraw Hill Companies, Inc. (S&P) or Baa1 or lower by Moody's Investors Service, Inc. (Moody's) or ceases to be rated by either of these rating agencies. Given the interest-bearing nature of the deposit and SMEPA's ability to request a refund, the March 2012 deposit has been presented as a current liability in the balance sheet and as financing proceeds in the statement of cash flow. On July 18, 2013, Southern Company entered into an agreement with SMEPA under which Southern Company has agreed to guarantee the obligations of Mississippi Power with respect to any required refund of the deposits.
The ultimate outcome of these matters cannot be determined at this time.
Baseload Act
In 2008, the Baseload Act was signed by the Governor of Mississippi. The Baseload Act authorizes, but does not require, the Mississippi PSC to adopt a cost recovery mechanism that includes in retail base rates, prior to and during construction, all or a portion of the prudently-incurred pre-construction and construction costs incurred by a utility in constructing a base load electric generating plant. Prior to the passage of the Baseload Act, such costs would traditionally be recovered only after the plant was placed in service. The Baseload Act also provides for periodic prudence reviews by the Mississippi PSC and prohibits the cancellation of any such generating plant without the approval of the Mississippi PSC. In the event of cancellation of the construction of the plant without approval of the Mississippi PSC, the Baseload Act authorizes the Mississippi PSC to make a public interest determination as to whether and to what extent the utility will be afforded rate recovery for costs incurred in connection with such cancelled generating plant. There are legal challenges to the constitutionality of the Baseload Act currently pending before the Mississippi Supreme Court. The ultimate outcome of any legal challenges to this legislation cannot be determined at this time. See "Rate Recovery of Kemper IGCC Costs" herein for additional information.
Investment Tax Credits and Bonus Depreciation
The IRS allocated $133 million (Phase I) and $279 million (Phase II) of Internal Revenue Code Section 48A tax credits to Mississippi Power in connection with the Kemper IGCC. On May 15, 2013, the IRS notified Mississippi Power that no additional tax credits under the Internal Revenue Code Section 48A Phase III were allocated to the Kemper IGCC. As a result of the schedule extension for the Kemper IGCC, the Phase I credits have been recaptured. Through December 31, 2013, Mississippi Power had recorded tax benefits totaling $276.4 million for the remaining Phase II credits, which will be amortized as a reduction to depreciation and amortization over the life of the Kemper IGCC and are dependent upon meeting the IRS certification requirements, including an in-service date no later than April 19, 2016 and the capture and sequestration (via enhanced oil recovery) of at least 65% of the CO2 produced by the Kemper IGCC during operations in accordance with the Internal Revenue Code. A portion of the Phase II tax credits will be subject to recapture upon successful completion of SMEPA's purchase of an undivided interest in the Kemper IGCC as described above.
On January 2, 2013, the ATRA was signed into law. The ATRA retroactively extended several tax credits through 2013 and extended 50% bonus depreciation for property placed in service in 2013 (and for certain long-term production-period projects to be placed in service in 2014), which is expected to apply to the Kemper IGCC and have a positive impact on the future cash flows of Mississippi Power of between $560 million and $620 million in 2014. These estimated positive cash flow impacts are dependent upon placing the Kemper IGCC in service in 2014. See "Rate Recovery of Kemper IGCC Costs – Seven-Year Rate Plan" herein for additional information.
The ultimate outcome of these matters cannot be determined at this time.
Alabama Power [Member]
 
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
General Litigation Matters
The Company is subject to certain claims and legal actions arising in the ordinary course of business. In addition, the Company's business activities are subject to extensive governmental regulation related to public health and the environment, such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury, property damage, and other claims for damages alleged to have been caused by carbon dioxide and other emissions, coal combustion residuals, and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters, have become more frequent. The ultimate outcome of such pending or potential litigation against the Company cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on the Company's financial statements.
Environmental Matters
New Source Review Actions
As part of a nationwide enforcement initiative against the electric utility industry which began in 1999, the EPA brought civil enforcement actions in federal district court against the Company alleging violations of the New Source Review (NSR) provisions of the Clean Air Act at certain coal-fired electric generating units, including a unit co-owned by Mississippi Power. These civil actions seek penalties and injunctive relief, including orders requiring installation of the best available control technologies at the affected units. The case against the Company (including claims involving a unit co-owned by Mississippi Power) has been actively litigated in the U.S. District Court for the Northern District of Alabama, resulting in a settlement in 2006 of the alleged NSR violations at Plant Miller; voluntary dismissal of certain claims by the EPA; and a grant of summary judgment for the Company on all remaining claims and dismissal of the case with prejudice in 2011. On September 19, 2013, the U.S. Court of Appeals for the Eleventh Circuit affirmed in part and reversed in part the 2011 judgment in favor of the Company, and the case has been transferred back to the U.S. District Court for the Northern District of Alabama for further proceedings.
The Company believes it complied with applicable laws and regulations in effect at the time the work in question took place. The Clean Air Act authorizes maximum civil penalties of $25,000 to $37,500 per day, per violation, depending on the date of the alleged violation. An adverse outcome could require substantial capital expenditures that cannot be determined at this time and could possibly require payment of substantial penalties. Such expenditures could affect future results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates. The ultimate outcome of this matter cannot be determined at this time.
Environmental Remediation
The Company must comply with environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Company could incur substantial costs to clean up properties. The Company conducts studies to determine the extent of any required cleanup and has recognized in its financial statements the costs to clean up known sites. Amounts for cleanup and ongoing monitoring costs were not material for any year presented. The Company may be liable for some or all required cleanup costs for additional sites that may require environmental remediation.
Nuclear Fuel Disposal Costs
Acting through the U.S. Department of Energy (DOE) and pursuant to the Nuclear Waste Policy Act of 1982, the U.S. government entered into a contract with the Company that requires the DOE to dispose of spent nuclear fuel and high level radioactive waste generated at Plant Farley. The DOE failed to timely perform and has yet to commence the performance of its contractual and statutory obligation to dispose of spent nuclear fuel beginning no later than January 31, 1998. Consequently, the Company has pursued and continues to pursue legal remedies against the U.S. government for its partial breach of contract.
As a result of the first lawsuit, the Company recovered approximately $17 million, representing the vast majority of the Company's direct costs of the expansion of spent nuclear fuel storage facilities at Plant Farley from 1998 through 2004. In April 2012, the award was credited to cost of service for the benefit of customers.
In 2008, the Company filed a second lawsuit against the U.S. government for the costs of continuing to store spent nuclear fuel at Plant Farley. Damages are being sought for the period from January 1, 2005 through December 31, 2010. Damages will continue to accumulate until the issue is resolved or storage is provided. No amounts have been recognized in the financial statements as of December 31, 2013 for any potential recoveries from the second lawsuit. The final outcome of this matter cannot be determined at this time; however, no material impact on the Company's net income is expected.
At Plant Farley, on-site dry spent fuel storage facilities are operational and can be expanded to accommodate spent fuel through the expected life of the plant.
Retail Regulatory Matters
Retail Rate Adjustments
In 2011, the Alabama PSC issued an order to eliminate a tax-related adjustment under the Company's rate structure effective with October 2011 billings. The elimination of this adjustment resulted in additional revenues of approximately $31 million for 2011. In accordance with the order, the Company made additional accruals to the NDR in the fourth quarter 2011 of an amount equal to such additional 2011 revenues. The NDR was impacted as a result of operations and maintenance expenses incurred in connection with the 2011 storms in Alabama. See "Natural Disaster Reserve" below for additional information. The elimination of this adjustment resulted in additional revenues of approximately $106 million for 2012.
Rate RSE
Rate stabilization and equalization plan (Rate RSE) adjustments are based on forward-looking information for the applicable upcoming calendar year. Rate adjustments for any two-year period, when averaged together, cannot exceed 4.0% and any annual adjustment is limited to 5.0%. If the Company's actual retail return is above the allowed equity return range, customer refunds will be required; however, there is no provision for additional customer billings should the actual retail return fall below the allowed equity return range. Prior to 2014, retail rates remained unchanged when the retail return on common equity (ROE) was projected to be between 13.0% and 14.5%.
During 2013, the Alabama PSC held public proceedings regarding the operation and utilization of Rate RSE. On August 13, 2013, the Alabama PSC voted to issue a report on Rate RSE that found that the Company's Rate RSE mechanism continues to be just and reasonable to customers and the Company, but recommended the Company modify Rate RSE as follows:
Eliminate the provision of Rate RSE establishing an allowed range of ROE.
Eliminate the provision of Rate RSE limiting the Company's capital structure to an allowed equity ratio of 45%.
Replace these two provisions with a provision that establishes rates based upon an allowed weighted cost of equity (WCE) range of 5.75% to 6.21%, with an adjusting point of 5.98%. If calculated under the previous Rate RSE provisions, the resulting WCE would range from 5.85% to 6.53%, with an adjusting point of 6.19%.
Provide eligibility for a performance-based adder of seven basis points, or 0.07%, to the WCE adjusting point if the Company (i) has an "A" credit rating equivalent with at least one of the recognized rating agencies or (ii) is in the top one-third of a designated customer value benchmark survey.
Substantially all other provisions of Rate RSE were unchanged.
On August 21, 2013, the Company filed its consent to these recommendations with the Alabama PSC. The changes became effective for calendar year 2014. On November 27, 2013, the Company made its Rate RSE submission to the Alabama PSC of projected data for calendar year 2014; projected earnings were within the specified WCE range and, therefore, retail rates under Rate RSE remained unchanged for 2014. In 2012 and 2013, retail rates under Rate RSE remained unchanged from 2011. Under the terms of Rate RSE, the maximum possible increase for 2015 is 5.00%.
Rate CNP
The Company's retail rates, approved by the Alabama PSC, provide for adjustments to recognize the placing of new generating facilities into retail service under rate certificated new plant (Rate CNP). The Company may also recover retail costs associated with certificated PPAs under rate certificated new plant (Rate CNP PPA). There was no adjustment to Rate CNP PPA in 2012. On March 5, 2013, the Alabama PSC issued a consent order that the Company leave in effect the current Rate CNP PPA factor for billings for the period April 1, 2013 through March 31, 2014. It is anticipated that no adjustment will be made to Rate CNP PPA in 2014. As of December 31, 2013, the Company had an under recovered certificated PPA balance of $18 million, all of which is included in deferred under recovered regulatory clause revenues in the balance sheet.
In 2011, the Alabama PSC approved and certificated a PPA of approximately 200 megawatts (MWs) of energy from wind-powered generating facilities which became operational in December 2012. In September 2012, the Alabama PSC approved and certificated a second wind PPA of approximately 200 MWs which became operational in January 2014. The terms of the wind PPAs permit the Company to use the energy and retire the associated environmental attributes in service of its customers or to sell environmental attributes, separately or bundled with energy. The Company has elected the normal purchase normal sale (NPNS) scope exception under the derivative accounting rules for its two wind PPAs, which total approximately 400 MWs. The NPNS exception allows the PPAs to be recorded at a cost, rather than fair value, basis. The industry's application of the NPNS exception to certain physical forward transactions in nodal markets is currently under review by the SEC at the request of the electric utility industry. The outcome of the SEC's review cannot now be determined. If the Company is ultimately required to record these PPAs at fair value, an offsetting regulatory asset or regulatory liability will be recorded.
Rate certificated new plant environmental (Rate CNP Environmental) also allows for the recovery of the Company's retail costs associated with environmental laws, regulations, or other such mandates. Rate CNP Environmental is based on forward-looking information and provides for the recovery of these costs pursuant to a factor that is calculated annually. Environmental costs to be recovered include operations and maintenance expenses, depreciation, and a return on certain invested capital. There was no adjustment to Rate CNP Environmental in 2012 or 2013. On August 13, 2013, the Alabama PSC approved the Company's petition requesting a revision to Rate CNP Environmental that allows recovery of costs related to pre-2005 environmental assets previously being recovered through Rate RSE. The revenue impact as a result of this revision is estimated to be $58 million in 2014. On November 21, 2013, the Company submitted calculations associated with its cost of complying with environmental mandates, as provided under Rate CNP Environmental. The filing reflected a projected unrecovered retail revenue requirement for environmental compliance of approximately $72 million, which is to be recovered in the billing months of January 2014 through December 2014. On December 3, 2013, the Alabama PSC issued a consent order that the Company leave in effect for 2014 the factors associated with the Company's environmental compliance costs for the year 2013. Any unrecovered amounts associated with 2014 will be reflected in the 2015 filing. As of December 31, 2013, the Company had an under recovered environmental clause balance of $7 million which is included in deferred under recovered regulatory clause revenues in the balance sheet.
Environmental Accounting Order
Based on an order from the Alabama PSC, the Company is allowed to establish a regulatory asset to record the unrecovered investment costs, including the unrecovered plant asset balance and the unrecovered costs associated with site removal and closure associated with future unit retirements caused by environmental regulations. These costs would be amortized over the affected unit's remaining useful life, as established prior to the decision regarding early retirement.
Compliance and Pension Cost Accounting Order
In November 2012, the Alabama PSC approved an accounting order to defer to a regulatory asset account certain compliance-related operations and maintenance expenditures for the years 2013 through 2017, as well as the incremental increase in operations expense related to pension cost for 2013. These deferred costs are to be amortized over a three-year period beginning in January 2015. The compliance related expenditures were related to (i) standards addressing Critical Infrastructure Protection issued by the North American Electric Reliability Corporation, (ii) cyber security requirements issued by the NRC, and (iii) NRC guidance addressing the readiness at nuclear facilities within the U.S. for severe events. The compliance-related expenses to be afforded regulatory asset treatment over the five-year period are currently estimated to be approximately $37 million. The amount of operations and maintenance expenses deferred to a regulatory asset in 2013 associated with compliance-related expenditures and pension cost was approximately $8 million and $12 million, respectively. Pursuant to the accounting order, the Company has the ability to accelerate the amortization of the regulatory assets with notification to the Alabama PSC.
Retail Energy Cost Recovery
The Company has established energy cost recovery rates under the Company's energy cost recovery rate (Rate ECR) as approved by the Alabama PSC. Rates are based on an estimate of future energy costs and the current over or under recovered balance. Revenues recognized under Rate ECR and recorded on the financial statements are adjusted for the difference in actual recoverable fuel costs and amounts billed in current regulated rates. The difference in the recoverable fuel costs and amounts billed give rise to the over or under recovered amounts recorded as regulatory assets or liabilities. The Company, along with the Alabama PSC, continually monitors the over or under recovered cost balance to determine whether an adjustment to billing rates is required. Changes in the Rate ECR factor have no significant effect on the Company's net income, but will impact operating cash flows. Currently, the Alabama PSC may approve billing rates under Rate ECR of up to 5.910 cents per kilowatt hour (KWH). On December 3, 2013, the Alabama PSC issued a consent order that the Company leave in effect the energy cost recovery rates which began in April 2011 for 2014. Therefore, the Rate ECR factor as of January 1, 2014 remained at 2.681 cents per KWH. Effective with billings beginning in January 2015, the Rate ECR factor will be 5.910 cents per KWH, absent a further order from the Alabama PSC.
The Company's over recovered fuel costs at December 31, 2013 totaled $42 million as compared to under recovered fuel costs of $4 million at December 31, 2012. At December 31, 2013, $27 million is included in other regulatory liabilities, current and $15 million is included in deferred over recovered regulatory clause revenues. The under recovered fuel costs at December 31, 2012 are included in deferred under recovered regulatory clause revenues in the balance sheets. These classifications are based on estimates, which include such factors as weather, generation availability, energy demand, and the price of energy. A change in any of these factors could have a material impact on the timing of any recovery of the under recovered fuel costs.
Natural Disaster Reserve
Based on an order from the Alabama PSC, the Company maintains a reserve for operations and maintenance expenses to cover the cost of damages from major storms to its transmission and distribution facilities. The order approves a separate monthly Rate NDR charge to customers consisting of two components. The first component is intended to establish and maintain a reserve balance for future storms and is an on-going part of customer billing. The second component of the Rate NDR charge is intended to allow recovery of any existing deferred storm-related operations and maintenance costs and any future reserve deficits over a 24-month period. The Alabama PSC order gives the Company authority to record a deficit balance in the NDR when costs of storm damage exceed any established reserve balance. Absent further Alabama PSC approval, the maximum total Rate NDR charge consisting of both components is $10 per month per non-residential customer account and $5 per month per residential customer account. The Company has the authority, based on an order from the Alabama PSC, to accrue certain additional amounts as circumstances warrant. The order allows for reliability-related expenditures to be charged against the additional accruals when the NDR balance exceeds $75 million. The Company may designate a portion of the NDR to reliability-related expenditures as a part of an annual budget process for the following year or during the current year for identified unbudgeted reliability-related expenditures that are incurred. Accruals that have not been designated can be used to offset storm charges. Additional accruals to the NDR will enhance the Company's ability to deal with the financial effects of future natural disasters, promote system reliability, and offset costs retail customers would otherwise bear.
As revenue from the Rate NDR charge is recognized, an equal amount of operations and maintenance expenses related to the NDR will also be recognized. As a result, the Rate NDR charge will not have an effect on net income but will impact operating cash flows.
In accordance with the order that was issued by the Alabama PSC in 2011 to eliminate a tax-related adjustment under the Company's rate structure that resulted in additional revenues, the Company made additional accruals to the NDR in the fourth quarter 2011 of an amount equal to the additional 2011 revenues, which were approximately $31 million.
The accumulated balances in the NDR for the years ended December 31, 2013 and December 31, 2012 were approximately $96 million and $103 million, respectively. Any accruals to the NDR are included in the balance sheets under other regulatory liabilities, deferred and are reflected as other operations and maintenance expenses in the statements of income.
Nuclear Outage Accounting Order
In accordance with a 2010 Alabama PSC order, nuclear outage operations and maintenance expenses for the two units at Plant Farley are deferred to a regulatory asset when the charges actually occur and are then amortized over the subsequent 18-month operational cycle.
Approximately $31 million of nuclear outage costs from the spring of 2012 was amortized to nuclear operations and maintenance expenses over the 18-month period ended in December 2013. During the spring of 2013, approximately $28 million of nuclear outage costs was deferred to a regulatory asset, and beginning in July 2013, these deferred costs are being amortized over an 18-month period. During the fall of 2013, approximately $32 million of nuclear outage costs associated with the second unit was deferred to a regulatory asset, and beginning in January 2014, these deferred costs are being amortized over an 18-month period. The Company will continue the pattern of deferral of nuclear outage expenses as incurred and the recognition of expenses over a subsequent 18-month period pursuant to the Alabama PSC order.
Non-Nuclear Outage Accounting Order
On August 13, 2013, the Alabama PSC approved the Company's petition requesting authorization to defer to a regulatory asset account certain operations and maintenance expenses associated with planned outages at non-nuclear generation facilities in 2014 and to amortize those expenses over a three-year period beginning in 2015. The 2014 outage expenditures to be deferred and amortized are estimated to total approximately $78 million.
Georgia Power [Member]
 
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
General Litigation Matters
The Company is subject to certain claims and legal actions arising in the ordinary course of business. In addition, the Company's business activities are subject to extensive governmental regulation related to public health and the environment, such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury, property damage, and other claims for damages alleged to have been caused by carbon dioxide and other emissions, coal combustion residuals, and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters, have become more frequent. The ultimate outcome of such pending or potential litigation against the Company cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on the Company's financial statements.
Environmental Matters
New Source Review Actions
As part of a nationwide enforcement initiative against the electric utility industry which began in 1999, the EPA brought civil enforcement actions in federal district court against the Company alleging violations of the New Source Review provisions of the Clean Air Act at certain coal-fired electric generating units, including a unit co-owned by Gulf Power. These civil actions seek penalties and injunctive relief, including orders requiring installation of the best available control technologies at the affected units. The case against the Company (including claims related to a unit co-owned by Gulf Power) has been administratively closed in the U.S. District Court for the Northern District of Georgia since 2001.
The Company believes it complied with applicable laws and regulations in effect at the time the work in question took place. The Clean Air Act authorizes maximum civil penalties of $25,000 to $37,500 per day, per violation, depending on the date of the alleged violation. An adverse outcome could require substantial capital expenditures that cannot be determined at this time and could possibly require payment of substantial penalties. Such expenditures could affect future results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates. The ultimate outcome of this matter cannot be determined at this time.
Environmental Remediation
The Company must comply with environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Company may also incur substantial costs to clean up properties. See Note 1 under "Environmental Remediation Recovery" for additional information.
The Company has been designated or identified as a potentially responsible party (PRP) at sites governed by the Georgia Hazardous Site Response Act and/or by the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), including a site in Brunswick, Georgia on the CERCLA National Priorities List (NPL). The parties have completed the removal of wastes from the Brunswick site as ordered by the EPA. Additional cleanup and claims for recovery of natural resource damages at this site or for the assessment and potential cleanup of other sites are anticipated.
The Company and numerous other entities have been designated by the EPA as PRPs at the Ward Transformer Superfund site located in Raleigh, North Carolina. In 2011, the EPA issued a Unilateral Administrative Order (UAO) to the Company and 22 other parties, ordering specific remedial action of certain areas at the site. Later in 2011, the Company filed a response with the EPA stating it has sufficient cause to believe it is not a liable party under CERCLA. The EPA notified the Company in 2011 that it is considering enforcement options against the Company and other non-complying UAO recipients. If the EPA pursues enforcement actions and the court determines that a respondent failed to comply with the UAO without sufficient cause, the EPA may also seek civil penalties of up to $37,500 per day for the violation and punitive damages of up to three times the costs incurred by the EPA as a result of the party's failure to comply with the UAO.
In addition to the EPA's action at this site, the Company, along with many other parties, was sued in a private action by several existing PRPs for cost recovery related to the removal action. On February 1, 2013, the U.S. District Court for the Eastern District of North Carolina Western Division granted the Company's summary judgment motion, ruling that the Company has no liability in the private action. On May 10, 2013, the plaintiffs appealed the U.S. District Court for the Eastern District of North Carolina Western Division's order to the U.S. Court of Appeals for the Fourth Circuit.
The ultimate outcome of these matters will depend upon the success of defenses asserted, the ultimate number of PRPs participating in the cleanup, and numerous other factors and cannot be determined at this time; however, as a result of the regulatory recovery mechanisms described in Note 1 under "Environmental Remediation Recovery," these matters are not expected to have a material impact on the Company's financial statements.
Nuclear Fuel Disposal Costs
Acting through the U.S. Department of Energy (DOE) and pursuant to the Nuclear Waste Policy Act of 1982, the U.S. government entered into contracts with the Company that require the DOE to dispose of spent nuclear fuel and high level radioactive waste generated at Plant Hatch and Plant Vogtle Units 1 and 2. The DOE failed to timely perform and has yet to commence the performance of its contractual and statutory obligation to dispose of spent nuclear fuel beginning no later than January 31, 1998. Consequently, the Company has pursued and continues to pursue legal remedies against the U.S. government for its partial breach of contract.
As a result of its first lawsuit, the Company recovered approximately $27 million, based on its ownership interests, representing the vast majority of the Company's direct costs of the expansion of spent nuclear fuel storage facilities at Plant Hatch and Plant Vogtle Units 1 and 2 from 1998 through 2004. The proceeds were received in July 2012 and credited to the Company accounts where the original costs were charged and were used to reduce rate base, fuel, and cost of service for the benefit of customers.
In 2008, the Company filed a second lawsuit against the U.S. government for the costs of continuing to store spent nuclear fuel at Plant Hatch and Plant Vogtle Units 1 and 2. Damages are being sought for the period from January 1, 2005 through December 31, 2010. Damages will continue to accumulate until the issue is resolved or storage is provided. No amounts have been recognized in the financial statements as of December 31, 2013 for any potential recoveries from the second lawsuit. The final outcome of this matter cannot be determined at this time; however, no material impact on the Company's net income is expected as a significant portion of any damage amounts collected from the government is expected to be credited to the Company accounts where the original costs were charged and used to reduce rate base, fuel, and cost of service for the benefit of customers.
An on-site dry storage facility at Plant Vogtle Units 1 and 2 began operation in October 2013. At Plant Hatch, an on-site dry spent fuel storage facility is also operational. Facilities at both plants can be expanded to accommodate spent fuel through the expected life of each plant.
Retail Regulatory Matters
Rate Plans
In 2010, the Georgia PSC approved the 2010 ARP, which resulted in base rate increases of approximately $562 million, $17 million, $125 million, and $74 million effective January 1, 2011, January 1, 2012, April 1, 2012, and January 1, 2013, respectively.
On December 17, 2013, the Georgia PSC voted to approve the 2013 ARP. The 2013 ARP reflects the settlement agreement among the Company, the Georgia PSC’s Public Interest Advocacy Staff, and 11 of the 13 intervenors, which was filed with the Georgia PSC on November 18, 2013.
On January 1, 2014, in accordance with the 2013 ARP, the Company increased its tariffs as follows: (1) traditional base tariff rates by approximately $80 million; (2) ECCR tariff by an additional $25 million; (3) Demand-Side Management (DSM) tariffs by an additional $1 million; and (4) Municipal Franchise Fee (MFF) tariff by an additional $4 million, for a total increase in base revenues of approximately $110 million.
Under the 2013 ARP, the following additional rate adjustments will be made to the Company’s tariffs in 2015 and 2016 based on annual compliance filings to be made at least 90 days prior to the effective date of the tariffs:
Effective January 1, 2015 and 2016, the traditional base tariff rates will increase by an estimated $101 million and $36 million, respectively, to recover additional generation capacity-related costs;
Effective January 1, 2015 and 2016, the ECCR tariff will increase by an estimated $76 million and $131 million, respectively, to recover additional environmental compliance costs;
Effective January 1, 2015, the DSM tariffs will increase by an estimated $6 million and decrease by an estimated $1 million effective January 1, 2016; and
The MFF tariff will increase consistent with these adjustments.
The Company currently estimates these adjustments will result in base revenue increases of approximately $187 million in 2015 and $170 million in 2016. The estimated traditional base tariff rate increases for 2015 and 2016 do not include additional Qualifying Facility (QF) PPA expenses; however, compliance filings will include QF PPA expenses for those facilities that are projected to provide capacity to the Company during the following year.
Under the 2013 ARP, the Company’s retail return on common equity (ROE) is set at 10.95%, and earnings are evaluated against a retail ROE range of 10.00% to 12.00%. Two-thirds of any earnings above 12.00% will be directly refunded to customers, with the remaining one-third retained by the Company. There will be no recovery of any earnings shortfall below 10.00% on an actual basis. However, if at any time during the term of the 2013 ARP, the Company projects that its retail earnings will be below 10.00% for any calendar year, it may petition the Georgia PSC for implementation of the Interim Cost Recovery (ICR) tariff that would be used to adjust the Company’s earnings back to a 10.00% retail ROE. The Georgia PSC would have 90 days to rule on the Company’s request. The ICR tariff will expire at the earlier of January 1, 2017 or the end of the calendar year in which the ICR tariff becomes effective. In lieu of requesting implementation of an ICR tariff, or if the Georgia PSC chooses not to implement the ICR tariff, the Company may file a full rate case.
Except as provided above, the Company will not file for a general base rate increase while the 2013 ARP is in effect. The Company is required to file a general rate case by July 1, 2016, in response to which the Georgia PSC would be expected to determine whether the 2013 ARP should be continued, modified, or discontinued.
Integrated Resource Plans
On January 31, 2013, the Company filed its triennial Integrated Resource Plan (2013 IRP). The filing included the Company's request to decertify 16 coal- and oil-fired units totaling 2,093 megawatts (MWs). Several factors, including the cost to comply with existing and future environmental regulations, recent and forecasted economic conditions, and lower natural gas prices, contributed to the decision to close these units.
On April 17, 2013, the Georgia PSC approved the decertification of Plant Bowen Unit 6 (32 MWs), which was retired on April 25, 2013. On September 30, 2013, Plant Branch Unit 2 (319 MWs) was retired as approved by the Georgia PSC in the 2011 Integrated Resource Plan Update (2011 IRP Update) in order to comply with the State of Georgia's Multi-Pollutant Rule.
On July 11, 2013, the Georgia PSC approved the Company's request to decertify and retire Plant Boulevard Units 2 and 3 (28 MWs) effective July 17, 2013. Plant Branch Units 3 and 4 (1,016 MWs), Plant Yates Units 1 through 5 (579 MWs), and Plant McManus Units 1 and 2 (122 MWs) will be decertified and retired by April 16, 2015, the compliance date of the Mercury and Air Toxics Standards (MATS) rule. The decertification date of Plant Branch Unit 1 was extended from December 31, 2013 as specified in the final order in the 2011 IRP Update to coincide with the decertification date of Plant Branch Units 3 and 4. The decertification and retirement of Plant Kraft Units 1 through 4 (316 MWs) was also approved and will be effective by April 16, 2016, based on a one-year extension of the MATS rule compliance date that was approved by the State of Georgia Environmental Protection Division on September 10, 2013 to allow for necessary transmission system reliability improvements.
Additionally, the Georgia PSC approved the Company's proposed MATS rule compliance plan for emissions controls necessary for the continued operation of Plants Bowen Units 1 through 4, Wansley Units 1 and 2, Scherer Units 1 through 3, and Hammond Units 1 through 4, the switch to natural gas as the primary fuel at Plant Yates Units 6 and 7 and SEGCO's Plant Gaston Units 1 through 4, as well as the fuel switch at Plant McIntosh Unit 1 to operate on Powder River Basin coal. See Note 1 under "Affiliate Transactions" herein for additional information regarding the fuel switch at SEGCO's generating units.
In the 2013 ARP, the Georgia PSC approved the amortization of the construction work in progress (CWIP) balances related to environmental projects that will not be completed at Plant Branch Units 1 through 4 and Plant Yates Units 6 and 7 over nine years beginning in January 2014 and the amortization of any remaining net book values of Plant Branch Unit 2 from October 2013 to December 2022, Plant Branch Unit 1 from May 2015 to December 2020, Plant Branch Unit 3 from May 2015 to December 2023, and Plant Branch Unit 4 from May 2015 to December 2024. The Georgia PSC deferred a decision regarding the appropriate recovery period for the costs associated with unusable materials and supplies remaining at the retiring plants to the Company's next base rate case, which the Company expects to file in 2016 (2016 Rate Case). In the 2013 IRP, the Georgia PSC also deferred decisions regarding the recovery of any fuel related costs that could be incurred in connection with the retirement units to be addressed in future fuel cases.
A request was filed with the Georgia PSC on January 10, 2014 to cancel the proposed biomass fuel conversion of Plant Mitchell Unit 3 (155 MWs) because it would not be cost effective for customers. The filing also notified the Georgia PSC of the Company’s plans to seek decertification later this year. Plant Mitchell Unit 3 will continue to operate as a coal unit until April 2015 when it will be required to cease operation or install additional environmental controls to comply with the MATS rule. In connection with the retirement decision, the Company reclassified the retail portion of the net carrying value of Plant Mitchell Unit 3 from plant in service, net of depreciation, to other utility plant, net.
The decertification of these units and fuel conversions are not expected to have a material impact on the Company's financial statements; however, the ultimate outcome depends on the Georgia PSC's order in the 2016 Rate Case and future fuel cases and cannot be determined at this time.
Renewables Development
On December 17, 2013, four PPAs totaling 50 MWs of utility scale solar generation under the Georgia Power Advanced Solar Initiative (GPASI) were approved by the Georgia PSC, with the Company as the purchaser. These contracts will begin in 2015 and end in 2034. The resulting purchases will be for energy only and recovered through the Company’s fuel cost recovery mechanism. Under the 2013 IRP, the Georgia PSC approved an additional 525 MWs of solar generation to be purchased by the Company. The 525 MWs will be divided into 425 MWs of utility scale projects and 100 MWs of distributed generation.
On November 4, 2013, the Company filed an application for the certification of two PPAs which were executed on April 22, 2013 for the purchase of energy from two wind farms in Oklahoma with capacity totaling 250 MWs that will begin in 2016 and end in 2035.
During 2013, the Company executed four PPAs to purchase a total of 169 MWs of biomass capacity and energy from four facilities in Georgia that will begin in 2015 and end in 2035. On May 21, 2013, the Georgia PSC approved two of the biomass PPAs and the remaining two were approved on December 17, 2013. The four biomass PPAs are contingent upon the counterparty meeting specified contract dates for posting collateral and commercial operation. The ultimate outcome of this matter cannot be determined at this time.
Fuel Cost Recovery
The Company has established fuel cost recovery rates approved by the Georgia PSC. The Georgia PSC approved reductions in the Company's total annual billings of approximately $43 million effective June 1, 2011, $567 million effective June 1, 2012, and $122 million effective January 1, 2013. The 2013 reduction was due to the Georgia PSC authorizing an Interim Fuel Rider, which is set to expire June 1, 2014. The Company continues to be allowed to adjust its fuel cost recovery rates prior to the next fuel case if the under or over recovered fuel balance exceeds $200 million. The Company's fuel cost recovery includes costs associated with a natural gas hedging program as revised and approved by the Georgia PSC on February 7, 2013, requiring it to use options and hedges within a 24-month time horizon. See Note 11 under "Energy-Related Derivatives" for additional information. On February 18, 2014, the Georgia PSC approved the deferral of the Company's next fuel case, which is now expected to be filed by March 1, 2015.
The Company's over recovered fuel balance totaled approximately $58 million and $230 million at December 31, 2013 and 2012, respectively, and is included in current liabilities and other deferred credits and liabilities.
Fuel cost recovery revenues as recorded on the financial statements are adjusted for differences in actual recoverable fuel costs and amounts billed in current regulated rates. Accordingly, changes in the billing factor will not have a significant effect on the Company's revenues or net income, but will affect cash flow.
Nuclear Construction
In 2008, the Company, acting for itself and as agent for Oglethorpe Power Corporation (OPC), the Municipal Electric Authority of Georgia (MEAG Power), and the City of Dalton, Georgia (Dalton), acting by and through its Board of Water, Light, and Sinking Fund Commissioners (collectively, Owners), entered into an agreement with a consortium consisting of Westinghouse Electric Company LLC (Westinghouse) and Stone & Webster, Inc. (collectively, Contractor), pursuant to which the Contractor agreed to design, engineer, procure, construct, and test two AP1000 nuclear units (with electric generating capacity of approximately 1,100 MWs each) and related facilities at Plant Vogtle (Vogtle 3 and 4 Agreement). Under the terms of the Vogtle 3 and 4 Agreement, the Owners agreed to pay a purchase price that is subject to certain price escalations and adjustments, including fixed escalation amounts and index-based adjustments, as well as adjustments for change orders, and performance bonuses for early completion and unit performance. Each Owner is severally (and not jointly) liable for its proportionate share, based on its ownership interest, of all amounts owed to the Contractor under the Vogtle 3 and 4 Agreement. The Company's proportionate share is 45.7%. The Vogtle 3 and 4 Agreement provides for liquidated damages upon the Contractor's failure to fulfill the schedule and performance guarantees. The Contractor's liability to the Owners for schedule and performance liquidated damages and warranty claims is subject to a cap.
Certain payment obligations of Westinghouse and Stone & Webster, Inc. under the Vogtle 3 and 4 Agreement are guaranteed by Toshiba Corporation and The Shaw Group, Inc., respectively. In the event of certain credit rating downgrades of any Owner, such Owner will be required to provide a letter of credit or other credit enhancement. The Owners may terminate the Vogtle 3 and 4 Agreement at any time for their convenience, provided that the Owners will be required to pay certain termination costs. The Contractor may terminate the Vogtle 3 and 4 Agreement under certain circumstances, including certain Owner suspension or delays of work, action by a governmental authority to permanently stop work, certain breaches of the Vogtle 3 and 4 Agreement by the Owners, Owner insolvency, and certain other events.
In 2009, the NRC issued an Early Site Permit and Limited Work Authorization which allowed limited work to begin on Plant Vogtle Units 3 and 4. The NRC certified the Westinghouse Design Control Document, as amended (DCD), for the AP1000 nuclear reactor design, effective December 30, 2011, and issued combined construction and operating licenses (COLs) in February 2012. Receipt of the COLs allowed full construction to begin. There have been technical and procedural challenges to the construction and licensing of Plant Vogtle Units 3 and 4, at the federal and state level, and additional challenges are expected as construction proceeds.
In 2009, the Georgia PSC approved inclusion of the Plant Vogtle Units 3 and 4 related CWIP accounts in rate base, and the State of Georgia enacted the Georgia Nuclear Energy Financing Act, which allows the Company to recover financing costs for nuclear construction projects certified by the Georgia PSC. Financing costs are recovered on all applicable certified costs through annual adjustments to the Nuclear Construction Cost Recovery (NCCR) tariff by including the related CWIP accounts in rate base during the construction period. The Georgia PSC approved increases to the NCCR tariff of approximately $223 million, $35 million, $50 million, and $60 million, effective January 1, 2011, 2012, 2013, and 2014, respectively. Through the NCCR tariff, the Company is collecting and amortizing to earnings approximately $91 million of financing costs, capitalized in 2009 and 2010, over the five-year period ending December 31, 2015, in addition to the ongoing financing costs. At December 31, 2013, approximately $37 million of these 2009 and 2010 costs remained unamortized in CWIP.
The Company is required to file semi-annual Vogtle Construction Monitoring (VCM) reports with the Georgia PSC by February 28 and August 31 each year. If the projected certified construction capital costs to be borne by the Company increase by 5% or the projected in-service dates are significantly extended, the Company is required to seek an amendment to the Plant Vogtle Units 3 and 4 certificate from the Georgia PSC. Accordingly, the Company's eighth VCM report requested an amendment to the certificate to increase the estimated in-service capital cost of Plant Vogtle Units 3 and 4 from $4.4 billion to $4.8 billion and to extend the estimated in-service dates to the fourth quarter 2017 and the fourth quarter 2018 for Plant Vogtle Units 3 and 4, respectively.
On September 3, 2013, the Georgia PSC approved a stipulation entered into by the Company and the Georgia PSC staff to waive the requirement to amend the Plant Vogtle Units 3 and 4 certificate, until the commercial operation date of Plant Vogtle Unit 3, or earlier if deemed appropriate by the Georgia PSC and the Company. In accordance with the Georgia Integrated Resource Planning Act, any costs incurred by the Company in excess of the certified amount will not be included in rate base, unless shown to be reasonable and prudent. In addition, financing costs on any excess construction-related costs potentially would be subject to recovery through AFUDC instead of the NCCR tariff. As required by the stipulation, the Company filed an abbreviated status update with the Georgia PSC on September 3, 2013, which reflected approximately $2.4 billion of total construction capital costs incurred through June 30, 2013. On October 15, 2013, the Georgia PSC voted to approve the Company's eighth VCM report, reflecting construction capital costs incurred, which through December 31, 2012 totaled approximately $2.2 billion. Also in accordance with the stipulation, the Company will file with the Georgia PSC on February 28, 2014 a combined ninth and tenth VCM report covering the period from January 1 through December 31, 2013 (Ninth/Tenth VCM report), which will request approval for an additional $0.4 billion of construction capital costs. The Ninth/Tenth VCM report will reflect estimated in-service construction capital costs of $4.8 billion and associated financing costs during the construction period, which are estimated to total approximately $2.0 billion. The Company expects to resume filing semi-annual VCM reports in August 2014.
In July 2012, the Owners and the Contractor began negotiations regarding the costs associated with design changes to the DCD and the delays in the timing of approval of the DCD and issuance of the COLs, including the assertion by the Contractor that the Owners are responsible for these costs under the terms of the Vogtle 3 and 4 Agreement. The portion of the additional costs claimed by the Contractor that would be attributable to the Company (based on the Company's ownership interest) with respect to these issues is approximately $425 million (in 2008 dollars). The Contractor also has asserted it is entitled to further schedule extensions. The Company has not agreed with either the proposed cost or schedule adjustments or that the Owners have any responsibility for costs related to these issues. In November 2012, the Company and the other Owners filed suit against the Contractor in the U.S. District Court for the Southern District of Georgia seeking a declaratory judgment that the Owners are not responsible for these costs. Also in November 2012, the Contractor filed suit against the Company and the other Owners in the U.S. District Court for the District of Columbia alleging the Owners are responsible for these costs. On August 30, 2013, the U.S. District Court for the District of Columbia dismissed the Contractor's suit, ruling that the proper venue is the U.S. District Court for the Southern District of Georgia. The Contractor appealed the decision to the U.S. Court of Appeals for the District of Columbia Circuit on September 27, 2013. While litigation has commenced and the Company intends to vigorously defend its positions, the Company also expects negotiations with the Contractor to continue with respect to cost and schedule during which negotiations the parties may reach a mutually acceptable compromise of their positions.
Processes are in place that are designed to assure compliance with the requirements specified in the DCD and the COLs, including inspections by Southern Nuclear and the NRC that occur throughout construction. As a result of such compliance processes, certain license amendment requests have been filed and approved or are pending before the NRC. Various design and other licensing-based compliance issues are expected to arise as construction proceeds, which may result in additional license amendments or require other resolution. If any license amendment requests or other licensing-based compliance issues are not resolved in a timely manner, there may be delays in the project schedule that could result in increased costs either to the Owners, the Contractor, or both.
As construction continues, the risk remains that additional challenges in the fabrication, assembly, delivery, and installation of structural modules, delays in the receipt of the remaining permits necessary for the operation of Plant Vogtle Units 3 and 4, or other issues could arise and may further impact project schedule and cost. Additional claims by the Contractor or the Company (on behalf of the Owners) are also likely to arise throughout construction. These claims may be resolved through formal and informal dispute resolution procedures under the Vogtle 3 and 4 Agreement, but also may be resolved through litigation.
The ultimate outcome of these matters cannot be determined at this time.
Gulf Power [Member]
 
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
General Litigation Matters
The Company is subject to certain claims and legal actions arising in the ordinary course of business. In addition, the Company's business activities are subject to extensive governmental regulation related to public health and the environment, such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury, property damage, and other claims for damages alleged to have been caused by carbon dioxide and other emissions, coal combustion residuals, and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters, have become more frequent. The ultimate outcome of such pending or potential litigation against the Company cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on the Company's financial statements.
Environmental Matters
New Source Review Actions
As part of a nationwide enforcement initiative against the electric utility industry which began in 1999, the EPA brought civil enforcement actions in federal district court against Georgia Power alleging violations of the New Source Review (NSR) provisions of the Clean Air Act at certain coal-fired electric generating units, including a unit co-owned by the Company. These civil actions seek penalties and injunctive relief, including orders requiring installation of the best available control technologies at the affected units. These actions were filed concurrently with the issuance of notices of violation of the NSR provisions to the Company with respect to the Company's Plant Crist. The case against Georgia Power (including claims related to a unit co-owned by the Company) has been administratively closed in the U.S. District Court for the Northern District of Georgia since 2001.
The Company believes it complied with applicable laws and regulations in effect at the time the work in question took place. The Clean Air Act authorizes maximum civil penalties of $25,000 to $37,500 per day, per violation, depending on the date of the alleged violation. An adverse outcome could require substantial capital expenditures that cannot be determined at this time and could possibly require payment of substantial penalties. Such expenditures could affect future results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates. The ultimate outcome of this matter cannot be determined at this time.
Environmental Remediation
The Company must comply with environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Company may also incur substantial costs to clean up properties. The Company received authority from the Florida PSC to recover approved environmental compliance costs through the environmental cost recovery clause. The Florida PSC reviews costs and adjusts rates up or down annually.
The Company recognizes a liability for environmental remediation costs only when it determines a loss is probable. At December 31, 2013, the Company's environmental remediation liability included estimated costs of environmental remediation projects of approximately $50.4 million. For 2013, approximately $3.1 million was included in under recovered regulatory clause revenues and other current liabilities, and approximately $47.3 million was included in other regulatory assets, deferred and other deferred credits and liabilities. These estimated costs relate to site closure criteria by the Florida Department of Environmental Protection (FDEP) for potential impacts to soil and groundwater from herbicide applications at the Company's substations. The schedule for completion of the remediation projects will be subject to FDEP approval. The projects have been approved by the Florida PSC for recovery through the Company's environmental cost recovery clause; therefore, there was no impact on net income as a result of these liabilities.
The final outcome of these matters cannot be determined at this time. However, based on the currently known conditions at these sites and the nature and extent of activities relating to these sites, the Company does not believe that additional liabilities, if any, at these sites would be material to the Company's financial statements.
Retail Regulatory Matters
The Company's rates and charges for service to retail customers are subject to the regulatory oversight of the Florida PSC. The Company's rates are a combination of base rates and several separate cost recovery clauses for specific categories of costs. These separate cost recovery clauses address such items as fuel and purchased energy costs, purchased power capacity costs, energy conservation and demand side management programs, and the costs of compliance with environmental laws and regulations. Costs not addressed through one of the specific cost recovery clauses are recovered through the Company's base rates.
Retail Base Rate Case
On December 3, 2013, the Florida PSC voted to approve the Settlement Agreement among the Company and all of the intervenors to the docketed proceeding with respect to the Company's request to increase retail base rates. Under the terms of the Settlement Agreement, the Company (1) increased base rates designed to produce an additional $35 million in annual revenues effective January 2014 and will increase base rates designed to produce an additional $20 million in annual revenues effective January 2015; (2) continued its current authorized retail return on equity (ROE) midpoint and range; and (3) will accrue a return similar to AFUDC on certain transmission system upgrades that go into service after January 2014 until the next retail rate case or January 1, 2017, whichever comes first.
The Settlement Agreement also includes a self-executing adjustment mechanism that will increase the authorized ROE midpoint and range by 25 basis points in the event the 30-year treasury yield rate increases by an average of at least 75 basis points above 3.7947% for a consecutive six-month period.
The Settlement Agreement also provides that the Company may reduce depreciation expense and record a regulatory asset that will be included as an offset to the other cost of removal regulatory liability in an amount up to $62.5 million between January 2014 and June 2017. In any given month, such depreciation expense reduction may not exceed the amount necessary for the ROE, as reported to the Florida PSC monthly, to reach the midpoint of the authorized ROE range then in effect. Recovery of the regulatory asset will occur over a period to be determined by the Florida PSC in the Company’s next base rate case or next depreciation and dismantlement study proceeding, whichever comes first.
The Settlement Agreement also provides for recovery of costs associated with any tropical systems named by the National Hurricane Center through the initiation of a storm surcharge. The storm surcharge will begin, on an interim basis, 60 days following the filing of a cost recovery petition. The storm surcharge generally may not exceed $4.00/1,000 KWHs on monthly residential bills in aggregate for a calendar year. This limitation does not apply if the Company incurs in excess of $100 million in storm recovery costs that qualify for recovery in a given calendar year. This threshold amount is inclusive of the amount necessary to replenish the storm reserve to the level that existed as of December 31, 2013.
Pursuant to the Settlement Agreement, the Company may not request an increase in its retail base rates to be effective until after June 2017, unless the Company's actual retail ROE falls below the authorized ROE range.
Cost Recovery Clauses
On November 4, 2013, the Florida PSC approved the Company's annual request for its fuel, purchased power capacity, environmental, and energy conservation cost recovery factors for 2014. The net effect of the approved changes is a $65.2 million increase in annual revenue for 2014.
Revenues for all cost recovery clauses, as recorded on the financial statements, are adjusted for differences in actual recoverable costs and amounts billed in current regulated rates. Accordingly, changes in the billing factor for fuel and purchased power will have no significant effect on the Company's revenues or net income, but will affect annual cash flow. The recovery provisions for environmental compliance and energy conservation include related expenses and a return on net average investment.
Fuel Cost Recovery
The Company has established fuel cost recovery rates as approved by the Florida PSC. If, at any time during the year, the projected year-end fuel cost over or under recovery balance exceeds 10% of the projected fuel revenue applicable for the period, the Company is required to notify the Florida PSC and indicate if an adjustment to the fuel cost recovery factor is being requested.
The change in the fuel cost over recovered balance to an under recovered balance during 2013 was primarily due to higher than expected fuel costs and purchased power energy expenses, partially offset by approximately $26.6 million received during 2013 as a result of a payment from one of the Company's fuel vendors pursuant to the resolution of a coal contract dispute. At December 31, 2013, the under recovered fuel balance was approximately $21.0 million, which is included in under recovered regulatory clause revenues in the balance sheets. At December 31, 2012, the over recovered fuel balance was approximately $17.1 million, which is included in other regulatory liabilities, current in the balance sheets.
Purchased Power Capacity Recovery
The Company has established purchased power capacity recovery cost rates as approved by the Florida PSC. If the projected year-end purchased power capacity cost over or under recovery balance exceeds 10% of the projected purchased power capacity revenue applicable for the period, the Company is required to notify the Florida PSC and indicate if an adjustment to the purchased power capacity cost recovery factor is being requested.
At December 31, 2013 and 2012, the under recovered purchased power capacity balance was approximately $2.8 million and $0.8 million, respectively, which is included in under recovered regulatory clause revenues in the balance sheets.
Environmental Cost Recovery
The Florida Legislature adopted legislation for an environmental cost recovery clause, which allows an electric utility to petition the Florida PSC for recovery of prudent environmental compliance costs that are not being recovered through base rates or any other recovery mechanism. Such environmental costs include operations and maintenance expenses, emissions allowance expense, depreciation, and a return on net average investment. This legislation also allows recovery of costs incurred as a result of an agreement between the Company and the FDEP for the purpose of ensuring compliance with ozone ambient air quality standards adopted by the EPA.
In 2007, the Florida PSC voted to approve a stipulation among the Company, the Office of Public Counsel, and the Florida Industrial Power Users Group regarding the Company's plan for complying with certain federal and state regulations addressing air quality. The Company's environmental compliance plan as filed in 2007 contemplated implementation of specific projects identified in the plan from 2007 through 2018. The stipulation covers all elements of the original plan that were committed for implementation at the time of the stipulation. The Florida PSC's approval of the stipulation also required the Company to file annual updates to the plan and outlined a process for approval of additional elements in the plan when they became committed projects. In the 2010 update filing, the Company identified several elements of the updated plan that the Company had decided to implement. Following the process outlined in the original approved stipulation, these additional projects were approved by the Florida PSC later in 2010. The Florida PSC acknowledged that the costs of the approved projects associated with the Company's Clean Air Interstate Rule and Clean Air Visibility Rule compliance plans are eligible for recovery through the environmental cost recovery clause.
Annually, the Company seeks recovery of projected costs including any true-up amounts from prior periods. At December 31, 2013 and 2012, the under recovered environmental balance was approximately $14.4 million and $1.9 million, respectively, which is included in under recovered regulatory clause revenues in the balance sheets.
In April 2012, the Mississippi PSC approved Mississippi Power's request for a certificate of public convenience and necessity to construct a flue gas desulfurization system (scrubber) on Plant Daniel Units 1 and 2. In May 2012, the Sierra Club filed a notice of appeal of the order with the Chancery Court of Harrison County, Mississippi. These units are jointly owned by Mississippi Power and the Company, with 50% ownership each. The estimated total cost of the project is approximately $660 million, with the Company's portion being $330 million, excluding AFUDC, and it is scheduled for completion in December 2015. The Company's portion of the cost is expected to be recovered through the environmental cost recovery clause. The ultimate outcome of this matter cannot be determined at this time.
Energy Conservation Cost Recovery
Every five years, the Florida PSC establishes new numeric conservation goals covering a 10-year period for utilities to reduce annual energy and seasonal peak demand using demand-side management (DSM) programs. After the goals are established, utilities develop plans and programs to meet the approved goals. The costs for these programs are recovered through rates established annually in the energy conservation cost recovery (ECCR) clause.
The most recent goal setting process established new DSM goals for the period 2010 through 2019. The new goals are significantly higher than the goals established in the previous five-year cycle due to a change in the cost-effectiveness test on which the Florida PSC relies to set the goals. The DSM program standards were approved in April 2011. The Company implemented several new programs in June 2011, and the costs related to these programs were reflected in the 2012 and 2013 ECCR factors approved by the Florida PSC. Higher cost recovery rates and achievement of the new DSM goals may result in reduced sales of electricity which could negatively impact results of operations, cash flows, and financial condition if base rates cannot be adjusted on a timely basis.
At December 31, 2013 and 2012, the under recovered energy conservation balance was approximately $7.0 million and $0.8 million, respectively, which is included in under recovered regulatory clause revenues in the balance sheets.
Mississippi Power [Member]
 
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
General Litigation Matters
The Company is subject to certain claims and legal actions arising in the ordinary course of business. In addition, the Company's business activities are subject to extensive governmental regulation related to public health and the environment such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury, property damage, and other claims for damages alleged to have been caused by carbon dioxide (CO2) and other emissions, coal combustion residuals, and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters, have become more frequent. The ultimate outcome of such pending or potential litigation against the Company cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on the Company's financial statements.
Environmental Matters
New Source Review Actions
As part of a nationwide enforcement initiative against the electric utility industry which began in 1999, the EPA brought civil enforcement actions in federal district court against Alabama Power alleging violations of the New Source Review (NSR) provisions of the Clean Air Act at certain coal-fired electric generating units, including a unit co-owned by the Company. These civil actions seek penalties and injunctive relief, including orders requiring installation of the best available control technologies at the affected units. These actions were filed concurrently with the issuance of notices of violation to the Company with respect to the Company's Plant Watson. The case against Alabama Power (including claims involving a unit co-owned by the Company) has been actively litigated in the U.S. District Court for the Northern District of Alabama, resulting in a settlement in 2006 of the alleged NSR violations at Plant Miller; voluntary dismissal of certain claims by the EPA; and a grant of summary judgment for Alabama Power on all remaining claims and dismissal of the case with prejudice in 2011. On September 19, 2013, the U.S. Court of Appeals for the Eleventh Circuit affirmed in part and reversed in part the 2011 judgment in favor of Alabama Power, and the case has been transferred back to the U.S. District Court for the Northern District of Alabama for further proceedings.
The Company believes it complied with applicable laws and regulations in effect at the time the work in question took place. The Clean Air Act authorizes maximum civil penalties of $25,000 to $37,500 per day, per violation, depending on the date of the alleged violation. An adverse outcome could require substantial capital expenditures that cannot be determined at this time and could possibly require payment of substantial penalties. Such expenditures could affect future results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates. The ultimate outcome of this matter cannot be determined at this time.
Environmental Remediation
The Company must comply with environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Company may also incur substantial costs to clean up properties. The Company has authority from the Mississippi PSC to recover approved environmental compliance costs through regulatory mechanisms.
In 2003, the Texas Commission on Environmental Quality (TCEQ) designated the Company as a potentially responsible party at a site in Texas. The site was owned by an electric transformer company that handled the Company's transformers as well as those of many other entities. The site owner is bankrupt and the State of Texas has entered into an agreement with the Company and several other utilities to investigate and remediate the site. Hundreds of entities have received notices from the TCEQ requesting their participation in the anticipated site remediation. The TCEQ approved the final site remediation plan in December 2013.
Amounts expensed and accrued during 2011, 2012, and 2013 related to this work were not material. The final impact of this matter on the Company will depend upon further environmental assessment and the ultimate number of potentially responsible parties. The remediation expenses incurred by the Company are expected to be recovered through the Environmental Compliance Overview (ECO) Plan.
The final outcome of this matter cannot now be determined. However, based on the currently known conditions at this site and the nature and extent of activities relating to this site, the Company does not believe that additional liabilities, if any, at this site would be material to the financial statements.
FERC Matters
In November 2011, the Company filed a request with the FERC for an increase in wholesale base revenues of approximately $32 million under the wholesale cost-based electric tariff. In its filing with the FERC, the Company sought (i) approval to establish a regulatory asset for the portion of non-capitalizable Kemper IGCC-related costs which have been and will continue to be incurred during the construction period for the Kemper IGCC, (ii) authorization to defer as a regulatory asset, for the 10-year period ending October 2021, the difference between the revenue requirement under the purchase option of Plant Daniel Units 3 and 4 (assuming a remaining 30-year life) and the revenue requirement assuming the continuation of the operating lease regulatory treatment with the accumulated deferred balance at the end of the deferral being amortized into wholesale rates over the remaining life of Plant Daniel Units 3 and 4, and (iii) authority to defer in a regulatory asset costs related to the retirement or partial retirement of generating units as a result of environmental compliance rules.
In March 2012, the Company entered into a settlement agreement with its wholesale customers with respect to the Company's request for revised rates under the wholesale cost-based electric tariff. The settlement agreement provided that base rates under the cost-based electric tariff increase by approximately $22.6 million over a 12-month period with revised rates effective April 1, 2012. A significant portion of the difference between the requested base rate increase and the agreed upon rate increase was due to a change in the recovery methodology for the return on the Kemper IGCC CWIP. Under the settlement agreement, a portion of CWIP will continue to accrue AFUDC. The tariff customers specifically agreed to the same regulatory treatment for tariff ratemaking as the treatment approved for retail ratemaking by the Mississippi PSC with respect to (i) the accounting for Kemper IGCC-related costs that cannot be capitalized, (ii) the accounting for the lease termination and purchase of Plant Daniel Units 3 and 4, and (iii) the establishment of a regulatory asset for certain potential plant retirement costs.
In March 2012, the FERC approved a motion to place interim rates into effect beginning in May 2012. In September 2012, the Company, with its wholesale customers, filed a final settlement agreement with the FERC. On May 3, 2013, the Company received an order from the FERC accepting the settlement agreement.
On April 1, 2013, the Company reached a settlement agreement with its wholesale customers and filed a request with the FERC for an additional increase in the Municipal and Rural Associations (MRA) cost-based electric tariff, which was accepted by the FERC on May 30, 2013. The 2013 settlement agreement provided that base rates under the MRA cost-based electric tariff will increase by approximately $24.2 million annually, effective April 1, 2013.
Retail Regulatory Matters
General
In August 2012, the Mississippi PSC issued an order for the purpose of investigating and reviewing for informational purposes only the return on equity (ROE) formulas used by the Company and all other regulated electric utilities in Mississippi. On March 14, 2013, the Mississippi Public Utilities Staff (MPUS) filed with the Mississippi PSC its report on the ROE formulas used by the Company and all other regulated electric utilities in Mississippi. The ultimate outcome of this matter cannot be determined at this time.
Energy Efficiency
On July 11, 2013, the Mississippi PSC approved an energy efficiency and conservation rule requiring electric and gas utilities in Mississippi serving more than 25,000 customers to implement energy efficiency programs and standards. Quick Start Plans, which include a portfolio of energy efficiency programs that are intended to provide benefits to a majority of customers, were required to be filed within six months of the order and will be in effect for two to three years. An annual report addressing the performance of all energy efficiency programs is required. On January 10, 2014, the Company submitted its 2014 Energy Efficiency Quick Start Plan filing which proposed a portfolio of energy efficiency programs. The ultimate outcome of this matter cannot be determined at this time.
Performance Evaluation Plan
The Company’s retail base rates are set under the Performance Evaluation Plan (PEP), a rate plan approved by the Mississippi PSC. Two filings are made for each calendar year: the PEP projected filing, which is typically filed prior to the beginning of the year based on projected revenue requirement, and the PEP lookback filing, which is filed after the year and allows for review of actual revenue requirement compared to the projected filing. PEP was designed with the objective to reduce the impact of rate changes on the customer and provide incentives for the Company to keep customer prices low and customer satisfaction and reliability high. PEP is a mechanism for rate adjustments based on three indicators: price, customer satisfaction, and service reliability.
In 2011, the Company submitted its annual PEP lookback filing for 2010, which recommended no surcharge or refund. Later in 2011, the Company received a letter from the MPUS disputing certain items in the 2010 PEP lookback filing. In May 2012, the Mississippi PSC issued an order suspending the Company's annual lookback filing for 2011. On March 15, 2013, the Company submitted its annual PEP lookback filing for 2012, which indicated a refund due to customers of $4.7 million, which was accrued in retail revenues in 2013. On May 1, 2013, the MPUS contested the filing. Unresolved matters related to certain costs included in the 2010 PEP lookback filing, which are currently under review, also impact the 2012 PEP lookback filing.
On March 5, 2013, the Mississippi PSC approved the projected PEP filing for 2013, which resulted in a rate increase of 1.925%, or $15.3 million, annually, with the new rates effective March 19, 2013. The Company may be entitled to $3.3 million in additional revenues related to 2013 as a result of the late implementation of the 2013 PEP rate increase.
While the Company does not expect the resolution of these matters to have a material impact on its financial statements, the ultimate outcome cannot be determined at this time.
Environmental Compliance Overview Plan
In 2011, the Company filed a request to establish a regulatory asset to defer certain plant retirement costs if such costs are incurred. This request was made to minimize the potential rate impact to customers arising from pending and final environmental regulations which may require the premature retirement of some generating units. These environmental rules and regulations are continuously monitored by the Company and all options are evaluated. In December 2011, an order was issued by the Mississippi PSC authorizing the Company to defer all plant retirement related costs resulting from compliance with environmental regulations as a regulatory asset for future recovery.
In April 2012, the Mississippi PSC approved the Company's request for a certificate of public convenience and necessity (CPCN) to construct a flue gas desulfurization system (scrubber) on Plant Daniel Units 1 and 2. In May 2012, the Sierra Club filed a notice of appeal of the order with the Chancery Court of Harrison County, Mississippi (Chancery Court). These units are jointly owned by the Company and Gulf Power, with 50% ownership each. The estimated total cost of the project is approximately $660 million, with the Company's portion being $330 million, excluding AFUDC. The Company's portion of the cost is expected to be recovered through the ECO Plan following the scheduled completion of the project in December 2015. As of December 31, 2013, total project expenditures were $320.6 million, of which the Company's portion was $162.3 million, excluding AFUDC of $8.5 million.
In June 2012, the Mississippi PSC approved the Company's 2012 ECO Plan filing, including a 0.16%, or $1.5 million, decrease in annual revenues, effective June 29, 2012. On August 13, 2013, the Mississippi PSC approved the Company’s 2013 ECO Plan filing which proposed no change in rates.
The ultimate outcome of these matters cannot be determined at this time.
Fuel Cost Recovery
The Company establishes, annually, a retail fuel cost recovery factor that is approved by the Mississippi PSC. The Company is required to file for an adjustment to the retail fuel cost recovery factor annually; the most recent filing occurred on November 15, 2013. The Mississippi PSC approved the 2014 retail fuel cost recovery factor on January 7, 2014, with the new rates effective in February 2014. The retail fuel cost recovery factor will result in an annual increase of 3.4% of total 2013 retail revenue, or $30.1 million. At December 31, 2013, the amount of over recovered retail fuel costs included in the balance sheets was $14.5 million compared to $56.6 million at December 31, 2012. The Company also has a wholesale MRA and a Market Based (MB) fuel cost recovery factor. Effective January 1, 2014, the wholesale MRA fuel rate increased resulting in an annual increase of $10.1 million. Effective February 1, 2014, the wholesale MB fuel rate increased, resulting in an annual increase of $1.2 million. At December 31, 2013, the amount of over recovered wholesale MRA and MB fuel costs included in the balance sheets was $7.3 million and $0.3 million compared to $19.0 million and $2.1 million, respectively, at December 31, 2012. In addition, at December 31, 2013, the amount of under recovered MRA emissions allowance cost included in the balance sheets was $3.8 million compared to $0.4 million at December 31, 2012. The Company's operating revenues are adjusted for differences in actual recoverable fuel cost and amounts billed in accordance with the currently approved cost recovery rate. Accordingly, changes in the billing factor have no significant effect on the Company's revenues or net income, but will affect cash flow.
In March 2011, a portion of the Company's territorial wholesale loads that was formerly served under the MB tariff terminated service. Beginning in April 2011, a new power purchase agreement (PPA) went into effect to cover these MB customers as non-territorial load. In June 2011, the Company and South Mississippi Electric Power Association (SMEPA) reached an agreement to allocate $3.7 million of the over recovered fuel balance at March 31, 2011 to the PPA. This amount was subsequently refunded to SMEPA in June 2011.
The Mississippi PSC engaged an independent professional audit firm to conduct an audit of the Company's fuel-related expenditures included in the retail fuel adjustment clause and ECM. The 2013, 2012, and 2011 audits of fuel-related expenditures were completed with no audit findings.
Ad Valorem Tax Adjustment
The Company establishes, annually, an ad valorem tax adjustment factor that is approved by the Mississippi PSC to collect the ad valorem taxes paid by the Company. On June 4, 2013, the Mississippi PSC approved an annual rate increase of 0.9%, or $7.1 million, due to an increase in ad valorem taxes resulting from the expiration of a tax exemption related to Plant Daniel Units 3 and 4.
System Restoration Rider
The Company is required to make annual SRR filings to review charges to the property damage reserve and to determine the revenue requirement associated with property damage. The purpose of the SRR is to provide for recovery of costs associated with property damage (including certain property insurance and the costs of self-insurance) and to facilitate the Mississippi PSC's review of these costs. The Mississippi PSC periodically agrees on SRR revenue levels that are developed based on historical data, expected exposure, type and amount of insurance coverage excluding insurance costs, and other relevant information. The applicable SRR rate level will be reviewed every three years, unless a significant change in circumstances occurs such that the Company and the MPUS or the Mississippi PSC deems that a more frequent change in rates would be appropriate. The Company will submit annual filings setting forth SRR-related revenues, expenses, and investment for the projected filing period, as well as the true-up for the prior period.
For 2011, 2012, and 2013, the SRR rate was zero. The Mississippi PSC approved accruals to the property damage reserve of $3.8 million and $3.2 million in 2012 and 2013, respectively. On February 3, 2014, the Company submitted its 2014 SRR rate filing with the Mississippi PSC, which proposed that the 2014 SRR rate level remain at zero and the Company be allowed to accrue $3.3 million to the property damage reserve in 2014. The ultimate outcome of this matter cannot be determined at this time.
Storm Damage Cost Recovery
The Company maintains a reserve to cover the cost of damage from major storms to its transmission and distribution facilities and generally the cost of uninsured damage to its generation facilities and other property. The total storm restoration costs incurred in 2013 and 2012 were $2.3 million and $10.5 million, respectively. At December 31, 2013, the balance in the property damage reserve was $60.1 million.
Baseload Act
In 2008, legislation designed to enhance the Mississippi PSC's authority to facilitate development and construction of baseload generation in the State of Mississippi (Baseload Act) was signed by the Governor of Mississippi. The Baseload Act authorizes, but does not require, the Mississippi PSC to adopt a cost recovery mechanism that includes in retail base rates, prior to and during construction, all or a portion of the prudently-incurred pre-construction and construction costs incurred by a utility in constructing a base load electric generating plant. Prior to the passage of the Baseload Act, such costs would traditionally be recovered only after the plant was placed in service. The Baseload Act also provides for periodic prudence reviews by the Mississippi PSC and prohibits the cancellation of any such generating plant without the approval of the Mississippi PSC. In the event of cancellation of the construction of the plant without approval of the Mississippi PSC, the Baseload Act authorizes the Mississippi PSC to make a public interest determination as to whether and to what extent the utility will be afforded rate recovery for costs incurred in connection with such cancelled generating plant. There are legal challenges to the constitutionality of the Baseload Act currently pending before the Mississippi Supreme Court. The ultimate outcome of any legal challenges to this legislation cannot be determined at this time. See "Integrated Coal Gasification Combined Cycle – Rate Recovery of Kemper IGCC Costs" herein for additional information.
Integrated Coal Gasification Combined Cycle
Kemper IGCC Overview
Construction of the Kemper IGCC is nearing completion and start-up activities will continue until the Kemper IGCC is placed in service. The Kemper IGCC will utilize an integrated coal gasification combined cycle technology with an output capacity of 582 megawatts (MWs). The Kemper IGCC will be fueled by locally mined lignite (an abundant, lower heating value coal) from a mine owned by the Company and situated adjacent to the Kemper IGCC. The mine, operated by North American Coal Corporation, started commercial operation on June 5, 2013. In connection with the Kemper IGCC, the Company constructed and plans to operate approximately 61 miles of CO2 pipeline infrastructure for the planned transport of captured CO2 for use in enhanced oil recovery.
Kemper IGCC Project Approval
In April 2012, the Mississippi PSC issued a detailed order confirming the CPCN originally approved by the Mississippi PSC in 2010 authorizing the acquisition, construction, and operation of the Kemper IGCC (2012 MPSC CPCN Order), which the Sierra Club appealed to the Chancery Court. In December 2012, the Chancery Court affirmed the 2012 MPSC CPCN Order. On January 8, 2013, the Sierra Club filed an appeal of the Chancery Court's ruling with the Mississippi Supreme Court. The ultimate outcome of the CPCN challenge cannot be determined at this time.
Kemper IGCC Schedule and Cost Estimate
The certificated cost estimate of the Kemper IGCC included in the 2012 MPSC CPCN Order was $2.4 billion, net of the $245.3 million of DOE Grants and excluding the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, and AFUDC related to the Kemper IGCC. The 2012 MPSC CPCN Order approved a construction cost cap of up to $2.88 billion, with recovery of prudently-incurred costs subject to approval by the Mississippi PSC. Exceptions to the $2.88 billion cost cap include the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, AFUDC, and certain general exceptions, including change of law, force majeure, and beneficial capital (which exists when the Company demonstrates that the purpose and effect of the construction cost increase is to produce efficiencies that will result in a neutral or favorable effect on the ratepayers, relative to the original proposal for the CPCN) (Cost Cap Exceptions), as contemplated in the settlement agreement between the Company and the Mississippi PSC entered into on January 24, 2013 (Settlement Agreement) and the 2012 MPSC CPCN Order. Recovery of the Cost Cap Exception amounts remains subject to review and approval by the Mississippi PSC. The Kemper IGCC was originally scheduled to be placed in service in May 2014 and is currently scheduled to be placed in service in the fourth quarter 2014.
The Company's 2010 project estimate, current cost estimate, and actual costs incurred as of December 31, 2013 for the Kemper IGCC are as follows:
Cost Category
2010 Project Estimate(d)
Current Estimate
Actual Costs at 12/31/2013
 
(in billions)
Plant Subject to Cost Cap(a)
$
2.40

$
4.06

$
3.25

Lignite Mine and Equipment
0.21
0.23
0.23
CO2 Pipeline Facilities
0.14
0.11
0.09
AFUDC(b)
0.17
0.45
0.28
General Exceptions
0.05
0.10
0.07
Regulatory Asset(c)

0.09
0.07
Total Kemper IGCC(a)
$
2.97

$
5.04

$
3.99

(a)
The 2012 MPSC CPCN Order approved a construction cost cap of up to $2.88 billion, net of the DOE Grants and excluding the Cost Cap Exceptions.
(b)
The Company’s original estimate included recovery of financing costs during construction which was not approved by the Mississippi PSC in June 2012 as described in "Rate Recovery of Kemper IGCC Costs."
(c)
The 2012 MPSC CPCN Order approved deferral of non-capital Kemper IGCC-related costs during construction as described in "Rate Recovery of Kemper IGCC Costs – Regulatory Assets."
(d)
The 2010 Project Estimate is the certificated cost estimate adjusted to include the certificated estimate for the CO2 pipeline facilities which was approved in 2011 by the Mississippi PSC.
Of the total costs incurred as of December 31, 2013, $2.74 billion was included in CWIP (which is net of the DOE Grants and estimated probable losses of $1.18 billion), $70.5 million in other regulatory assets, and $3.9 million in other deferred charges and assets in the balance sheet, and $1.0 million was previously expensed.
The Company does not intend to seek any rate recovery or joint owner contributions for any related costs that exceed the $2.88 billion cost cap, excluding the Cost Cap Exceptions and net of the DOE Grants. The Company recorded pre-tax charges to income for revisions to the cost estimate of $78.0 million ($48.2 million after tax) and $1.1 billion ($680.5 million after tax) in 2012 and 2013, respectively. The revised cost estimates reflect increased labor costs, piping and other material costs, start-up costs, decreases in construction labor productivity, the change in the in-service date, and an increase in the contingency for risks associated with start-up activities.
The Company could experience further construction cost increases and/or schedule extensions with respect to the Kemper IGCC as a result of factors including, but not limited to, labor costs and productivity, adverse weather conditions, shortages and inconsistent quality of equipment, materials, and labor, contractor or supplier delay, or non-performance under construction or other agreements. Furthermore, the Company could also experience further schedule extensions associated with start-up activities for this "first-of-a-kind" technology, including major equipment failure, system integration, and operations, and/or unforeseen engineering problems, which would result in further cost increases and could result in the loss of certain tax benefits related to bonus depreciation. In subsequent periods, any further changes in the estimated costs to complete construction of the Kemper IGCC subject to the $2.88 billion cost cap will be reflected in the Company's statements of income and these changes could be material.
Rate Recovery of Kemper IGCC Costs
See "FERC Matters" for additional information regarding the Company’s MRA cost based tariff relating to recovery of a portion of the Kemper IGCC costs from the Company’s wholesale customers. Rate recovery of the retail portion of the Kemper IGCC is subject to the jurisdiction of the Mississippi PSC. See "Retail Regulatory Matters – Baseload Act" for additional information.
The ultimate outcome of the rate recovery matters discussed herein, including the resolution of legal challenges, determinations of prudency, and the specific manner of recovery of prudently-incurred costs, cannot be determined at this time, but could have a material impact on the Company’s results of operations, financial condition, and liquidity.
2012 MPSC CPCN Order
The 2012 MPSC CPCN Order included provisions relating to both the Company's recovery of financing costs during the course of construction of the Kemper IGCC and the Company's recovery of costs following the date the Kemper IGCC is placed in service. With respect to recovery of costs following the in-service date of the Kemper IGCC, the 2012 MPSC CPCN Order provided for the establishment of operational cost and revenue parameters based upon assumptions in the Company's petition for the CPCN.
In June 2012, the Mississippi PSC denied the Company's proposed rate schedule for recovery of financing costs during construction, pending a final ruling from the Mississippi Supreme Court regarding the Sierra Club's appeal of the Mississippi PSC's issuance of the CPCN for the Kemper IGCC (2012 MPSC CWIP Order).
In July 2012, the Company appealed the Mississippi PSC's June 2012 decision to the Mississippi Supreme Court and requested interim rates under bond. In July 2012, the Mississippi Supreme Court denied the Company's request for interim rates under bond.
Settlement Agreement
On January 24, 2013, the Company entered into the Settlement Agreement with the Mississippi PSC that, among other things, establishes the process for resolving matters regarding cost recovery related to the Kemper IGCC and dismissed the Company's appeal of the 2012 MPSC CWIP Order. Under the Settlement Agreement, the Company agreed to limit the portion of prudently-incurred Kemper IGCC costs to be included in retail rate base to the $2.4 billion certificated cost estimate, plus the Cost Cap Exceptions, but excluding AFUDC, and any other costs permitted or determined to be excluded from the $2.88 billion cost cap by the Mississippi PSC. The Settlement Agreement also allows the Company to secure alternate financing for costs that are not otherwise recovered in any Mississippi PSC rate proceedings contemplated by the Settlement Agreement. Legislation to authorize a multi-year rate plan and legislation to provide for alternate financing through securitization of up to $1.0 billion of prudently-incurred costs was enacted into law on February 26, 2013. The Company intends to securitize (1) prudently-incurred costs in excess of the certificated cost estimate and up to the $2.88 billion cost cap, net of the DOE Grants and excluding the Cost Cap Exceptions, (2) accrued AFUDC, and (3) other prudently-incurred costs as approved by the Mississippi PSC. The rate recovery necessary to recover the annual costs of securitization is expected to be filed and become effective after the Kemper IGCC is placed in service and following completion of the Mississippi PSC's final prudence review of costs for the Kemper IGCC.
The Settlement Agreement provides that the Company may terminate the Settlement Agreement if certain conditions are not met, if the Company is unable to secure alternate financing for any prudently-incurred Kemper IGCC costs not otherwise recovered in any Mississippi PSC rate proceeding contemplated by the Settlement Agreement, or if the Mississippi PSC fails to comply with the requirements of the Settlement Agreement. The Company continues to work with the Mississippi PSC and the MPUS to implement the procedural schedules set forth in the Settlement Agreement and variations to the schedule are likely.
2013 MPSC Rate Order
Consistent with the terms of the Settlement Agreement, on January 25, 2013, the Company filed a new request to increase retail rates in 2013 by $172 million annually, based on projected investment for 2013, to be recorded to a regulatory liability to be used to mitigate rate impacts when the Kemper IGCC is placed in service.
On March 5, 2013, the Mississippi PSC issued an order (2013 MPSC Rate Order) approving retail rate increases of 15% effective March 19, 2013 and 3% effective January 1, 2014, which collectively are designed to collect $156 million annually beginning in 2014. Amounts collected through these rates are being recorded as a regulatory liability to be used to mitigate customer rate impacts after the Kemper IGCC is placed in service. As of December 31, 2013, $98.1 million had been collected, with $10.3 million recognized in retail revenues in the statement of operations and the remainder deferred in other regulatory liabilities and included in the balance sheet.
Because the 2013 MPSC Rate Order did not provide for the inclusion of CWIP in rate base as permitted by the Baseload Act, the Company continues to record AFUDC on the Kemper IGCC during the construction period. The Company will not record AFUDC on any additional costs of the Kemper IGCC that exceed the $2.88 billion cost cap, except for Cost Cap Exception amounts. The Company will continue to comply with the 2013 MPSC Rate Order by collecting and deferring the approved rates during the construction period unless directed to do otherwise by the Mississippi PSC. On March 21, 2013, a legal challenge to the 2013 MPSC Rate Order was filed by Thomas A. Blanton with the Mississippi Supreme Court, which remains pending against the Company and the Mississippi PSC.
Seven-Year Rate Plan
Also consistent with the Settlement Agreement, on February 26, 2013, the Company filed with the Mississippi PSC the proposed Seven-Year Rate Plan, which is a rate recovery plan for the Kemper IGCC for the first seven years of its operation, along with a proposed revenue requirement under such plan for 2014 through 2020.
On March 22, 2013, the Company, in compliance with the 2013 MPSC Rate Order, filed a revision to the Seven-Year Rate Plan with the Mississippi PSC for the Kemper IGCC for cost recovery through 2020, which is still under review by the Mississippi PSC. In the Seven-Year Rate Plan, the Company proposed recovery of an annual revenue requirement of approximately $156 million of Kemper IGCC-related operational costs and rate base amounts, including plant costs equal to the $2.4 billion certificated cost estimate. The 2013 MPSC Rate Order, which increased rates beginning on March 19, 2013, is integral to the Seven-Year Rate Plan, which contemplates amortization of the regulatory liability balance at the in-service date to be used to mitigate customer rate impacts through 2020, based on a fixed amortization schedule that requires approval by the Mississippi PSC. Under the Seven-Year Rate Plan filing, the Company proposed annual rate recovery to remain the same from 2014 through 2020. At the time of the filing of the Seven-Year Rate Plan, the proposed revenue requirement approximated the forecasted cost of service for the period 2014 through 2020. Under the Company's proposal, to the extent that the actual annual cost of service differs from the forecast approved in the Seven-Year Rate Plan, the difference would be deferred as a regulatory asset or liability, subject to accrual of carrying costs, and would be included in the next year's rate recovery calculation. If any deferred balance remains at the end of the Seven-Year Rate Plan term, the Mississippi PSC will review the amount and determine the appropriate method and period of disposition.
The revenue requirements set forth in the Seven-Year Rate Plan assume the sale of a 15% undivided interest in the Kemper IGCC to SMEPA and utilization of bonus depreciation as provided by the American Taxpayer Relief Act of 2012 (ATRA), which currently requires that the Kemper IGCC be placed in service in 2014. See "Investment Tax Credits and Bonus Depreciation" herein for additional information regarding bonus depreciation.
In 2014, the Company plans to amend the Seven-Year Rate Plan to reflect changes including the revised in-service date, the change in expected benefits relating to tax credits, various other revenue requirement items, and other tax matters, which include ensuring compliance with the normalization requirements of the Internal Revenue Code. The impact of these revisions for the average annual retail revenue requirement is estimated to be approximately $35 million through 2020. The amendment to the Seven-Year Rate Plan is also expected to reflect rate mitigation options identified by the Company that, if approved by the Mississippi PSC, would result in no change to the total customer rate impacts contemplated in the original Seven-Year Rate Plan.
Further cost increases and/or schedule extensions with respect to the Kemper IGCC could have an adverse impact on the Seven-Year Rate Plan, such as the inability to recover items considered as Cost Cap Exceptions, potential costs subject to securitization financing in excess of $1.0 billion, and the loss of certain tax benefits related to bonus depreciation. While the Kemper IGCC is scheduled to be placed in service in the fourth quarter 2014, any schedule extension beyond 2014 would result in the loss of the tax benefits related to bonus depreciation. The estimated value of the bonus depreciation tax benefits to retail customers is approximately $200 million. Loss of these tax benefits would require further adjustment to the Seven-Year Rate Plan and approval by the Mississippi PSC to ensure compliance with the normalization requirements of the Internal Revenue Code. In the event that the Mississippi PSC does not approve or the Company withdraws the Seven-Year Rate Plan, the Company would seek rate recovery through an alternate means, which could include a traditional rate case.
Prudence Reviews
The Mississippi PSC’s prudence review of Kemper IGCC costs incurred through March 31, 2013, as provided for in the Settlement Agreement, is expected to occur in the second quarter 2014. A final review of all costs incurred after March 31, 2013 is expected to be completed within six months of the Kemper IGCC’s in-service date. Furthermore, regardless of any prudence determinations made during the construction and start-up period, the Mississippi PSC has the right to make a final prudence determination after the Kemper IGCC has been placed in service.
Regulatory Assets
Consistent with the treatment of non-capital costs incurred during the pre-construction period, the Mississippi PSC granted the Company the authority to defer all non-capital Kemper IGCC-related costs to a regulatory asset during the construction period, subject to review of such costs by the Mississippi PSC. The amortization period for any such costs approved for recovery will be determined by the Mississippi PSC at a later date. In addition, the Company is authorized to accrue carrying costs on the unamortized balance of such regulatory assets at a rate and in a manner to be determined by the Mississippi PSC in future cost recovery mechanism proceedings.
Lignite Mine and CO2 Pipeline Facilities
In conjunction with the Kemper IGCC, the Company will own the lignite mine and equipment and has acquired and will continue to acquire mineral reserves located around the Kemper IGCC site. The mine started commercial operation on June 5, 2013.
In 2010, the Company executed a 40-year management fee contract with Liberty Fuels, which will develop, construct, and manage the mining operations. The contract with Liberty Fuels is effective through the end of the mine reclamation. As the mining permit holder, Liberty Fuels has a legal obligation to perform mine reclamation and the Company has a contractual obligation to fund all reclamation activities. In addition to the obligation to fund the reclamation activities, the Company currently provides working capital support to Liberty Fuels through cash advances for capital purchases, payroll, and other operating expenses. See Note 1 under "Asset Retirement Obligations and Other Costs of Removal" for additional information.
In addition, the Company will acquire, construct, and operate the CO2 pipeline for the planned transport of captured CO2 for use in enhanced oil recovery. The Company has entered into agreements with Denbury Onshore (Denbury), a subsidiary of Denbury Resources Inc., and Treetop Midstream Services, LLC (Treetop), an affiliate of Tellus Operating Group, LLC and a subsidiary of Tengrys, LLC, pursuant to which Denbury will purchase 70% of the CO2 captured from the Kemper IGCC and Treetop will purchase 30% of the CO2 captured from the Kemper IGCC.
The ultimate outcome of these matters cannot be determined at this time.
Proposed Sale of Undivided Interest to SMEPA
In 2010, the Company and SMEPA entered into an asset purchase agreement whereby SMEPA agreed to purchase a 17.5% undivided interest in the Kemper IGCC. In February 2012, the Mississippi PSC approved the sale and transfer of 17.5% of the Kemper IGCC to SMEPA. In June 2012, the Company and SMEPA signed an amendment to the asset purchase agreement whereby SMEPA reduced its purchase commitment percentage from a 17.5% to a 15% undivided interest in the Kemper IGCC. On March 29, 2013, the Company and SMEPA signed an amendment to the asset purchase agreement whereby the Company and SMEPA agreed to amend the power supply agreement entered into by the parties in April 2011 to reduce the capacity amounts to be received by SMEPA by half (approximately 75 MWs) at the sale and transfer of the undivided interest in the Kemper IGCC to SMEPA. Capacity revenues under the April 2011 power supply agreement were $17.5 million in 2013. On December 24, 2013, the Company and SMEPA agreed to extend SMEPA's option to purchase through December 31, 2014. The sale and transfer of an interest in the Kemper IGCC to SMEPA is subject to approval by the Mississippi PSC.
The closing of this transaction is conditioned upon execution of a joint ownership and operating agreement, receipt of all construction permits, appropriate regulatory approvals, financing, and other conditions. In September 2012, SMEPA received a conditional loan commitment from Rural Utilities Service to provide funding for SMEPA's undivided interest in the Kemper IGCC.
In March 2012 and subsequent to December 31, 2013, the Company received $150 million and $75 million, respectively, of interest-bearing refundable deposits from SMEPA to be applied to the purchase. While the expectation is that these amounts will be applied to the purchase price at closing, the Company would be required to refund the deposits upon the termination of the asset purchase agreement, within 60 days of a request by SMEPA for a full or partial refund, or within 15 days at SMEPA's discretion in the event that the Company is assigned a senior unsecured credit rating of BBB+ or lower by Standard and Poor's Ratings Services, a division of The McGraw Hill Companies, Inc. (S&P) or Baa1 or lower by Moody's Investors Service, Inc. (Moody's) or ceases to be rated by either of these rating agencies. Given the interest-bearing nature of the deposit and SMEPA's ability to request a refund, the March 2012 deposit has been presented as a current liability in the balance sheet and as financing proceeds in the statement of cash flow. On July 18, 2013, Southern Company entered into an agreement with SMEPA under which Southern Company has agreed to guarantee the obligations of the Company with respect to any required refund of the deposits.
The ultimate outcome of these matters cannot be determined at this time.
Investment Tax Credits and Bonus Depreciation
The Internal Revenue Service (IRS) allocated $133 million (Phase I) and $279 million (Phase II) of Internal Revenue Code Section 48A tax credits to the Company in connection with the Kemper IGCC. On May 15, 2013, the IRS notified the Company that no additional tax credits under the Internal Revenue Code Section 48A Phase III were allocated to the Kemper IGCC. As a result of the schedule extension for the Kemper IGCC, the Phase I credits have been recaptured. Through December 31, 2013, the Company had recorded tax benefits totaling $276.4 million for the remaining Phase II credits, which will be amortized as a reduction to depreciation and amortization over the life of the Kemper IGCC and are dependent upon meeting the IRS certification requirements, including an in-service date no later than April 19, 2016 and the capture and sequestration (via enhanced oil recovery) of at least 65% of the CO2 produced by the Kemper IGCC during operations in accordance with the Internal Revenue Code. A portion of the Phase II tax credits will be subject to recapture upon successful completion of SMEPA's purchase of an undivided interest in the Kemper IGCC as described above.
On January 2, 2013, the ATRA was signed into law. The ATRA retroactively extended several tax credits through 2013 and extended 50% bonus depreciation for property placed in service in 2013 (and for certain long-term production-period projects to be placed in service in 2014), which is expected to apply to the Kemper IGCC and have a positive impact on the future cash flows of the Company of between $560 million and $620 million in 2014. These estimated positive cash flow impacts are dependent upon placing the Kemper IGCC in service in 2014. See "Rate Recovery of Kemper IGCC Costs – Seven-Year Rate Plan" herein for additional information.
The ultimate outcome of these matters cannot be determined at this time.
Southern Power [Member]
 
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
General Litigation Matters
The Company is subject to certain claims and legal actions arising in the ordinary course of business. In addition, the Company's business activities are subject to extensive governmental regulation related to public health and the environment. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury, property damage, and other claims for damages alleged to have been caused by carbon dioxide and other emissions and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters, have become more frequent. The ultimate outcome of such pending or potential litigation against the Company and its subsidiaries cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on the Company's financial statements.