Contingencies and Regulatory Matters
12 Months Ended
Dec. 31, 2012
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
General Litigation Matters
Southern Company and its subsidiaries are subject to certain claims and legal actions arising in the ordinary course of business. In addition, the business activities of Southern Company's subsidiaries are subject to extensive governmental regulation related to public health and the environment, such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury, property damage, and other claims for damages alleged to have been caused by carbon dioxide (CO2) and other emissions, coal combustion byproducts, and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters, have become more frequent. The ultimate outcome of such pending or potential litigation against Southern Company and its subsidiaries cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on Southern Company's financial statements.
Insurance Recovery
Mirant Corporation (Mirant) was an energy company with businesses that included independent power projects and energy trading and risk management companies in the U.S. and other countries. Mirant was a wholly-owned subsidiary of Southern Company until its initial public offering in 2000. In 2001, Southern Company completed a spin-off to its stockholders of its remaining ownership, and Mirant became an independent corporate entity.
In 2003, Mirant and certain of its affiliates filed voluntary petitions for relief under Chapter 11 of the Bankruptcy Code. In 2005, Mirant, as a debtor in possession, and the unsecured creditors' committee filed a complaint against Southern Company. Later in 2005, this complaint was transferred to MC Asset Recovery, LLC (MC Asset Recovery) as part of Mirant's plan of reorganization. In 2009, Southern Company entered into a settlement agreement with MC Asset Recovery to resolve this action. The settlement included an agreement where Southern Company paid MC Asset Recovery $202 million. Southern Company filed an insurance claim in 2009 to recover a portion of this settlement and received a nontaxable $25 million payment from its insurance provider on June 14, 2012. Additionally, legal fees related to this insurance settlement totaled approximately $6 million. As a result, the net reduction to expense presented as MC Asset Recovery insurance settlement in the statement of income was approximately $19 million.
Environmental Matters
New Source Review Actions
In 1999, the EPA brought a civil action in the U.S. District Court for the Northern District of Georgia against certain Southern Company subsidiaries, including Alabama Power and Georgia Power, alleging that these subsidiaries had violated the New Source Review (NSR) provisions of the Clean Air Act and related state laws at certain coal-fired generating facilities. The EPA alleged NSR violations at five coal-fired generating facilities operated by Alabama Power, including a unit co-owned by Mississippi Power, and three coal-fired generating facilities operated by Georgia Power, including a unit co-owned by Gulf Power. The civil action sought penalties and injunctive relief, including an order requiring installation of the best available control technology at the affected units. The case against Georgia Power (including claims related to the unit co-owned by Gulf Power) was administratively closed in 2001 and has not been reopened. After Alabama Power was dismissed from the original action, the EPA filed a separate action in 2001 against Alabama Power (including claims related to the unit co-owned by Mississippi Power) in the U.S. District Court for the Northern District of Alabama.
In 2006, the U.S. District Court for the Northern District of Alabama entered a consent decree, resolving claims relating to the alleged NSR violations at Plant Miller. In 2010, the EPA dismissed five of its eight remaining claims against Alabama Power, leaving only three claims, including one relating to the unit co-owned by Mississippi Power. In March 2011, the U.S. District Court for the Northern District of Alabama granted Alabama Power summary judgment on all remaining claims and dismissed the case with prejudice. That judgment is on appeal to the U.S. Court of Appeals for the Eleventh Circuit. On February 23, 2012, the EPA filed a motion in the U.S. District Court for the Northern District of Alabama seeking vacatur of the judgment and recusal of the judge in the case involving Alabama Power.
Southern Company believes the traditional operating companies complied with applicable laws and regulations in effect at the time the work in question took place. The Clean Air Act authorizes maximum civil penalties of $25,000 to $37,500 per day, per violation, depending on the date of the alleged violation. An adverse outcome could require substantial capital expenditures that cannot be determined at this time and could possibly require payment of substantial penalties. Such expenditures could affect future results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates. The ultimate outcome of these matters cannot be determined at this time.
Climate Change Litigation
Kivalina Case
In 2008, the Native Village of Kivalina and the City of Kivalina filed a lawsuit in the U.S. District Court for the Northern District of California against several electric utilities (including Southern Company), several oil companies, and a coal company. The plaintiffs allege that the village is being destroyed by erosion allegedly caused by global warming that the plaintiffs attribute to emissions of greenhouse gases by the defendants. The plaintiffs assert claims for public and private nuisance and contend that some of the defendants (including Southern Company) acted in concert and are therefore jointly and severally liable for the plaintiffs' damages. The suit seeks damages for lost property values and for the cost of relocating the village, which is alleged to be $95 million to $400 million. In 2009, the U.S. District Court for the Northern District of California granted the defendants' motions to dismiss the case. On September 21, 2012, the U.S. Court of Appeals for the Ninth Circuit upheld the U.S. District Court for the Northern District of California's dismissal of the case. On November 27, 2012, the U.S. Court of Appeals for the Ninth Circuit denied the plaintiffs' request for review of the decision. On February 25, 2013, the plaintiffs filed a petition for writ of certiorari with the U.S. Supreme Court. Southern Company believes that these claims are without merit. While Southern Company believes the likelihood of loss is remote based on existing case law, it is not possible to predict with certainty whether Southern Company will incur any liability in connection with this matter. The ultimate outcome of this matter cannot be determined at this time.
Hurricane Katrina Case
In 2005, immediately following Hurricane Katrina, a lawsuit was filed in the U.S. District Court for the Southern District of Mississippi by Ned Comer on behalf of Mississippi residents seeking recovery for property damage and personal injuries caused by Hurricane Katrina. In 2006, the plaintiffs amended the complaint to include Southern Company and many other electric utilities, oil companies, chemical companies, and coal producers. The plaintiffs allege that the defendants contributed to climate change, which contributed to the intensity of Hurricane Katrina. In 2007, the U.S. District Court for the Southern District of Mississippi dismissed the case. On appeal to the U.S. Court of Appeals for the Fifth Circuit, a three-judge panel reversed the U.S. District Court for the Southern District of Mississippi, holding that the case could proceed, but, on rehearing, the full U.S. Court of Appeals for the Fifth Circuit dismissed the plaintiffs' appeal, resulting in reinstatement of the decision of the U.S. District Court for the Southern District of Mississippi in favor of the defendants. In May 2011, the plaintiffs filed an amended version of their class action complaint, arguing that the earlier dismissal was on procedural grounds and under Mississippi law the plaintiffs have a right to re-file. The amended complaint was also filed against numerous chemical, coal, oil, and utility companies, including Alabama Power, Georgia Power, Gulf Power, and Southern Power. On March 20, 2012, the U.S. District Court for the Southern District of Mississippi dismissed the plaintiffs' amended complaint. On April 16, 2012, the plaintiffs appealed the case to the U.S. Court of Appeals for the Fifth Circuit. Southern Company believes that these claims are without merit. While Southern Company believes the likelihood of loss is remote based on existing case law, it is not possible to predict with certainty whether the Company will incur any liability in connection with this matter. The ultimate outcome of this matter cannot be determined at this time.
Environmental Remediation
The Southern Company system must comply with environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Southern Company system could incur substantial costs to clean up properties. The traditional operating companies have each received authority from their respective state PSCs to recover approved environmental compliance costs through regulatory mechanisms. These rates are adjusted annually or as necessary within limits approved by the state PSCs.
Georgia Power's environmental remediation liability as of December 31, 2012 was $19 million. Georgia Power has been designated or identified as a potentially responsible party (PRP) at sites governed by the Georgia Hazardous Site Response Act and/or by the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), including a large site in Brunswick, Georgia on the CERCLA National Priorities List (NPL). The parties have completed the removal of wastes from the Brunswick site as ordered by the EPA. Additional cleanup and claims for recovery of natural resource damages at this site or for the assessment and potential cleanup of other sites on the Georgia Hazardous Sites Inventory and the CERCLA NPL are anticipated.
Georgia Power and numerous other entities have been designated by the EPA as PRPs at the Ward Transformer Superfund site located in Raleigh, North Carolina. In September 2011, the EPA issued a Unilateral Administrative Order (UAO) to Georgia Power and 22 other parties, ordering specific remedial action of certain areas at the site. In November 2011, Georgia Power filed a response with the EPA stating it has sufficient cause to believe it is not a liable party under CERCLA. The EPA notified Georgia Power in November 2011 that it is considering enforcement options against Georgia Power and other non-complying UAO recipients. If the court determines that a respondent failed to comply with the UAO without sufficient cause, the EPA may also seek civil penalties of up to $37,500 per day for the violation and punitive damages of up to three times the costs incurred by the EPA as a result of the party's failure to comply with the UAO.
In addition to the EPA's action at this site, Georgia Power, along with many other parties, was sued in a private action by several existing PRPs for cost recovery related to the removal action. On February 1, 2013, the court granted Georgia Power's summary judgment motion ruling that Georgia Power has no liability in the private action. The plaintiffs may appeal the court's order to the U.S. Court of Appeals for the Fourth Circuit.
The ultimate outcome of these matters will depend upon the success of defenses asserted, the ultimate number of PRPs participating in the cleanup, and numerous other factors and cannot be determined at this time; however, as a result of the regulatory treatment, these matters are not expected to have a material impact on Southern Company's financial statements.
Gulf Power's environmental remediation liability includes estimated costs of environmental remediation projects of approximately $61 million as of December 31, 2012. These estimated costs relate to site closure criteria by the Florida Department of Environmental Protection (FDEP) for potential impacts to soil and groundwater from herbicide applications at Gulf Power substations. The schedule for completion of the remediation projects will be subject to FDEP approval. The projects have been approved by the Florida PSC for recovery through Gulf Power's environmental cost recovery clause; therefore, there was no impact on net income as a result of these estimates.
The final outcome of these matters cannot be determined at this time. However, based on the currently known conditions at these sites and the nature and extent of activities relating to these sites, management does not believe that additional liabilities, if any, at these sites would be material to the financial statements.
Nuclear Fuel Disposal Costs
Acting through the U.S. Department of Energy (DOE) and pursuant to the Nuclear Waste Policy Act of 1982, the U.S. government entered into contracts with Alabama Power and Georgia Power that require the DOE to dispose of spent nuclear fuel and high level radioactive waste generated at Plants Hatch and Farley and Plant Vogtle Units 1 and 2. The DOE failed to timely perform and has yet to commence the performance of its contractual and statutory obligation to dispose of spent nuclear fuel beginning no later than January 31, 1998. Consequently, Alabama Power and Georgia Power have pursued and continue to pursue legal remedies against the U.S. government for its partial breach of contract.
As a result of the first lawsuit, Georgia Power recovered approximately $27 million, based on its ownership interests, and Alabama Power recovered approximately $17 million, representing substantially all of the Southern Company system's direct costs of the expansion of spent nuclear fuel storage facilities at Plants Farley and Hatch and Plant Vogtle Units 1 and 2 from 1998 through 2004.
In 2008, Alabama Power and Georgia Power filed a second lawsuit against the U.S. government for the costs of continuing to store spent nuclear fuel at Plants Farley and Hatch and Plant Vogtle Units 1 and 2. Damages are being sought for the period from January 1, 2005 through December 31, 2010. Damages will continue to accrue until the issue is resolved or storage is provided. No amounts have been recognized in the financial statements as of December 31, 2012 for any potential recoveries from the second lawsuit. The final outcome of these matters cannot be determined at this time; however, no material impact on Southern Company's net income is expected.
Sufficient pool storage capacity for spent fuel is available at Plant Vogtle Units 1 and 2 to maintain full-core discharge capability for both units into 2014. Construction of an on-site dry storage facility at Plant Vogtle Units 1 and 2 has begun. The facility is expected to begin operation in sufficient time to maintain full-core discharge capability, with additional on-site dry storage to be added as needed. At Plants Hatch and Farley, on-site dry spent fuel storage facilities are operational and can be expanded to accommodate spent fuel through the expected life of each plant.
Retail Regulatory Matters
Alabama Power
Retail Rate Adjustments
In July 2011, the Alabama PSC issued an order to eliminate a tax-related adjustment under Alabama Power's rate structure effective with October 2011 billings. The elimination of this adjustment resulted in additional revenues of approximately $31 million for 2011. In accordance with the order, Alabama Power made additional accruals to the natural disaster reserve (NDR) in the fourth quarter 2011 of an amount equal to such additional 2011 revenues. The NDR was impacted as a result of operations and maintenance expenses incurred in connection with the April 2011 storms in Alabama. See "Natural Disaster Reserve" below for additional information. The elimination of this adjustment resulted in additional revenues of approximately $106 million for 2012.
Rate RSE
Alabama Power operates under a rate stabilization and equalization plan (Rate RSE) approved by the Alabama PSC. Alabama Power's Rate RSE adjustments are based on forward-looking information for the applicable upcoming calendar year. Rate adjustments for any two-year period, when averaged together, cannot exceed 4.0% and any annual adjustment is limited to 5.0%. Retail rates remain unchanged when the retail return on common equity (ROE) is projected to be between 13.0% and 14.5%. If Alabama Power's actual retail ROE is above the allowed equity return range, customer refunds will be required; however, there is no provision for additional customer billings should the actual retail ROE fall below the allowed equity return range.
In 2011 and 2012, retail rates under Rate RSE remained unchanged from 2010. On November 30, 2012, Alabama Power made its Rate RSE submission to the Alabama PSC of projected data for calendar year 2013; projected earnings were within the specified return range, and, therefore, retail rates under Rate RSE remained unchanged for 2013. Under the terms of Rate RSE, the maximum possible increase for 2014 is 5.00%. However, Alabama Power is working with the Alabama PSC to develop a plan that will potentially preclude the need for a Rate RSE increase in 2014. The ultimate outcome of this matter cannot be determined at this time.
Rate CNP
Alabama Power's retail rates, approved by the Alabama PSC, provide for adjustments to recognize the placing of new generating facilities into retail service under rate certificated new plant (Rate CNP). Alabama Power may also recover retail costs associated with certificated PPAs under rate certificated new plant (Rate CNP PPA). Effective April 2011, Rate CNP PPA was reduced by approximately $5 million annually. On March 6, 2012, the Alabama PSC issued a consent order that Alabama Power leave in effect the current Rate CNP PPA factor for billings for the period April 1, 2012 through March 31, 2013. It is anticipated that no adjustment will be made to Rate CNP PPA in 2013. As of December 31, 2012, Alabama Power had an under recovered certificated PPA balance of $9 million, $7 million of which is included in deferred under recovered regulatory clause revenues and $2 million of which is included in under recovered regulatory clause revenues in the balance sheet.
On September 17, 2012, the Alabama PSC approved and certificated a PPA for the purchase of approximately 200 megawatts (MWs) of the approximately 400 MWs of energy from wind-powered generating facilities and all associated environmental attributes, including renewable energy credits. The terms of this PPA and a previously approved and certificated PPA permit Alabama Power to use the energy and retire the associated environmental attributes in service of its customers or to sell environmental attributes, separately or bundled with energy, to third parties. Approximately 200 MWs of energy from wind-powered generating facilities was operational in December 2012.
Alabama Power's retail rates, approved by the Alabama PSC also allow for the recovery of Alabama Power's retail costs associated with environmental laws, regulations, or other such mandates (Rate CNP Environmental). Rate CNP Environmental is based on forward-looking information and provides for the recovery of these costs pursuant to a factor that is calculated annually. Environmental costs to be recovered include operations and maintenance expenses, depreciation, and a return on certain invested capital. There was no adjustment to Rate CNP Environmental to recover environmental costs in 2011 or 2012. On November 26, 2012, Alabama Power submitted calculations associated with its cost of complying with environmental mandates, as provided under Rate CNP Environmental. The filing reflected a projected unrecovered retail revenue requirement for environmental compliance of less than $1 million, which is to be recovered in the billing months of January 2013 through December 2013. On December 4, 2012, the Alabama PSC issued a consent order that Alabama Power leave in effect for 2013 the factors associated with Alabama Power's environmental compliance costs for the year 2012. Any unrecovered amounts associated with 2013 will be reflected in the 2014 filing. As of December 31, 2012, Alabama Power had an under recovered environmental clause balance of $21 million which is included in under recovered regulatory clause revenues in the balance sheet.
Environmental Accounting Order
Proposed and final environmental regulations could result in significant additional compliance costs that could affect future unit retirement and replacement decisions. In September 2011, the Alabama PSC approved an order allowing for the establishment of a regulatory asset to record the unrecovered investment costs associated with any such decisions, including the unrecovered plant asset balance and the unrecovered costs associated with site removal and closure. These costs would be amortized over the affected unit's remaining useful life, as established prior to the decision regarding early retirement.
Compliance and Pension Cost Accounting Order
On November 6, 2012, the Alabama PSC approved an accounting order for certain compliance-related operation and maintenance expenditures for the years 2013 through 2017, as well as the incremental increase in operation expense related to pension cost for 2013. Under the accounting order, expenses from January 2013 through December 2017 related to compliance with standards addressing Critical Infrastructure Protection issued by the North American Electric Reliability Corporation and cyber security requirements issued by the NRC will be deferred to a regulatory asset account and amortized over a three-year period beginning in January 2015. Expenses from January 2013 through December 2017 related to compliance with NRC guidance addressing the readiness at nuclear facilities within the U.S., as prompted by the earthquake and tsunami that struck Japan in March 2011, also will be deferred as a regulatory asset and recovered over the same amortization period. The compliance-related expenses to be afforded regulatory asset treatment over the five-year period are currently estimated to be approximately $43 million. In addition, the accounting order authorizes Alabama Power to defer an incremental increase in its pension cost for 2013. That increased pension cost is estimated to be approximately $17 million. During 2013, the actual incremental increase will be deferred to a regulatory asset account and will be amortized over a three-year period beginning in January 2015. Pursuant to the accounting order, Alabama Power has the ability to accelerate the amortization of the regulatory assets.
Energy Cost Recovery
Alabama Power has established energy cost recovery rates under Alabama Power's energy cost recovery rate (Rate ECR) as approved by the Alabama PSC. Rates are based on an estimate of future energy costs and the current over or under recovered balance. Revenues recognized under Rate ECR and recorded on the financial statements are adjusted for the difference in actual recoverable fuel costs and amounts billed in current regulated rates. The difference in the recoverable fuel costs and amounts billed give rise to the over or under recovered amounts recorded as regulatory assets or liabilities. Alabama Power, along with the Alabama PSC, continually monitors the over or under recovered cost balance to determine whether an adjustment to billing rates is required. Changes in the Rate ECR factor have no significant effect on net income, but will impact operating cash flows. Currently, the Alabama PSC may approve billing rates under Rate ECR of up to 5.910 cents per kilowatt hour (KWH). On December 4, 2012, the Alabama PSC issued a consent order that Alabama Power leave in effect the energy cost recovery rates which began in April 2011 for 2013. Therefore, the Rate ECR factor as of January 1, 2013 remained at 2.681 cents per KWH. Effective with billings beginning in January 2014, the Rate ECR factor will be 5.910 cents per KWH, absent a further order from the Alabama PSC.
As of December 31, 2012 and 2011, Alabama Power had under recovered fuel balances of approximately $4 million and $31 million, respectively, which are included in deferred under recovered regulatory clause revenues in the balance sheets. This classification is based on estimates, which include such factors as weather, generation availability, energy demand, and the price of energy. A change in any of these factors could have a material impact on the timing of any recovery of the under recovered fuel costs.
Natural Disaster Reserve
Based on an order from the Alabama PSC, Alabama Power maintains a reserve for operations and maintenance expenses to cover the cost of damages from major storms to its transmission and distribution facilities. The order approves a separate monthly Rate Natural Disaster Reserve (Rate NDR) charge to customers consisting of two components. The first component is intended to establish and maintain a reserve balance for future storms and is an on-going part of customer billing. The second component of the Rate NDR charge is intended to allow recovery of any existing deferred storm-related operations and maintenance costs and any future reserve deficits over a 24-month period. The Alabama PSC order gives Alabama Power authority to record a deficit balance in the NDR when costs of storm damage exceed any established reserve balance. Alabama Power has the authority, based on an order from the Alabama PSC, to accrue certain additional amounts as circumstances warrant. The order allows for reliability-related expenditures to be charged against the additional accruals when the NDR balance exceeds $75 million. Alabama Power may designate a portion of the NDR to reliability-related expenditures as a part of an annual budget process for the following year or during the current year for identified unbudgeted reliability-related expenditures that are incurred. Accruals that have not been designated can be used to offset storm charges. Additional accruals to the NDR will enhance Alabama Power's ability to deal with the financial effects of future natural disasters, promote system reliability, and offset costs retail customers would otherwise bear.
As revenue from the Rate NDR charge is recognized, an equal amount of operations and maintenance expenses related to the NDR will also be recognized. As a result, the Rate NDR charge will not have an effect on net income but will impact operating cash flows.
During the first half of 2011, multiple storms caused varying degrees of damage to Alabama Power's transmission and distribution facilities. The most significant storms occurred in April 2011, causing over 400,000 of Alabama Power's 1.4 million customers to be without electrical service. The cost of repairing the damage to facilities and restoring electrical service to customers as a result of these storms was $42 million for operations and maintenance expenses and $161 million for capital-related expenditures.
In accordance with the order that was issued by the Alabama PSC in July 2011 to eliminate a tax-related adjustment under Alabama Power's rate structure that resulted in additional revenues, Alabama Power made additional accruals to the NDR in the fourth quarter 2011 of an amount equal to the additional 2011 revenues, which were approximately $31 million.
The accumulated balances in the NDR for the years ended December 31, 2012 and December 31, 2011 were approximately $103 million and $110 million, respectively. Any accruals to the NDR are included in the balance sheets under other regulatory liabilities, deferred and are reflected as other operations and maintenance expenses in the statements of income.
Nuclear Outage Accounting Order
In 2010, the Alabama PSC approved a change to the nuclear maintenance outage accounting process associated with routine refueling activities. Previously, Alabama Power accrued nuclear outage operations and maintenance expenses for the two units at Plant Farley during the 18-month cycle for the outages. In accordance with the 2010 order, nuclear outage expenses are deferred when the charges actually occur and then amortized over the subsequent 18-month period.
The initial result of implementation of the accounting order was that no nuclear maintenance outage expenses were recognized from January 2011 through December 2011, which decreased nuclear outage operations and maintenance expenses in 2011 from 2010 by approximately $50 million. During the fall of 2011, approximately $38 million of actual nuclear outage expenses associated with one unit at Plant Farley was deferred to a regulatory asset account; beginning in January 2012, these deferred costs are being amortized to nuclear operations and maintenance expenses over an 18-month period. During the spring of 2012, approximately $31 million of actual nuclear outage expenses associated with the second unit at Plant Farley was deferred to a regulatory asset account; beginning in July 2012, these deferred costs are being amortized to nuclear operations and maintenance expenses over an 18-month period. Alabama Power will continue the pattern of deferral of nuclear outage expenses as incurred and the recognition of expenses over a subsequent 18-month period pursuant to the existing order.
Georgia Power
Rate Plans
The economic recession significantly reduced Georgia Power's revenues upon which retail rates were set by the Georgia PSC for 2008 through 2010 (2007 Retail Rate Plan). In 2009, despite stringent efforts to reduce expenses, Georgia Power's projected retail ROE for both 2009 and 2010 was below 10.25%. However, in lieu of a full base rate case to increase customer rates as allowed under the 2007 Retail Rate Plan, in 2009, the Georgia PSC approved Georgia Power's request for an accounting order. Under the terms of the accounting order, Georgia Power could amortize up to $108 million of the regulatory liability related to other cost of removal obligations in 2009 and up to $216 million in 2010, limited to the amount needed to earn no more than a 9.75% and 10.15% retail ROE in 2009 and 2010, respectively. For the years ended December 31, 2009 and 2010, Georgia Power amortized $41 million and $174 million, respectively, of the regulatory liability related to other cost of removal obligations.
In 2010, the Georgia PSC approved the 2010 ARP, which became effective January 1, 2011. The terms of the 2010 ARP reflect a settlement agreement among Georgia Power, the Georgia PSC Public Interest Advocacy Staff, and eight other intervenors. Under the terms of the 2010 ARP, Georgia Power is amortizing approximately $92 million of its remaining regulatory liability related to other cost of removal obligations over the three years ending December 31, 2013.
Also under the terms of the 2010 ARP, effective January 1, 2011, Georgia Power increased its (1) traditional base tariff rates by approximately $347 million; (2) Demand-Side Management (DSM) tariff rates by approximately $31 million; (3) environmental compliance cost recovery tariff rate by approximately $168 million; and (4) Municipal Franchise Fee (MFF) tariff rate by approximately $16 million, for a total increase in base revenues of approximately $562 million.
Under the 2010 ARP, the following additional base rate adjustments have been made to Georgia Power's tariffs in 2012 and 2013:
Effective January 1, 2012 and 2013, the DSM tariffs increased by $17 million and $14 million, respectively;
Effective April 1, 2012 and January 1, 2013, the traditional base tariffs increased by an estimated $122 million and $58 million, respectively, to recover the revenue requirements for Plant McDonough-Atkinson Units 4, 5, and 6 for the period through December 31, 2013; and
The MFF tariff increased consistently with the adjustments above, as well as those related to the interim fuel rider (IFR) and Nuclear Construction Cost Recovery (NCCR) tariff adjustments described herein under "Fuel Cost Recovery" and "Nuclear Construction."
Under the 2010 ARP, Georgia Power's allowed retail ROE is set at 11.15%, and earnings will be evaluated against a retail ROE range of 10.25% to 12.25%. Two-thirds of any earnings above 12.25% will be directly refunded to customers, with the remaining one-third retained by Georgia Power. There were no refunds related to earnings for 2011 or 2012. Georgia Power is required to file a general base rate case by July 1, 2013, in response to which the Georgia PSC would be expected to determine whether the 2010 ARP should be continued, modified, or discontinued.
Integrated Resource Plans
On March 20, 2012, the Georgia PSC approved Georgia Power's request to decertify and retire Plant Branch Units 1 and 2 as of December 31, 2013 and October 31, 2013, the compliance dates for the respective units under the Georgia Multi-Pollutant Rule, and an oil-fired unit at Plant Mitchell as of March 26, 2012, as requested in the 2011 Integrated Resource Plan (IRP). The Georgia PSC also approved three PPAs totaling 998 MWs with Southern Power for capacity and energy that will commence in 2015 and end in 2030. On November 21, 2012, the FERC accepted the PPAs.
Separately, on March 20, 2012, the Georgia PSC certified 495 MWs of wholesale capacity to be returned to retail service in 2015 and 2016 under a 2010 agreement, subject to the decertification of any related generating units including 243 MWs of the 16 units described below.
On January 31, 2013, Georgia Power filed its triennial IRP (2013 IRP). The filing included Georgia Power's request to decertify 16 coal- and oil-fired units totaling 2,093 MWs. Several factors, including the cost to comply with existing and future environmental regulations, recent and forecasted economic conditions, and lower natural gas prices, contributed to the decision to close these units.
Georgia Power requested the decertification of Plant Boulevard Units 2 and 3 (28 MWs) upon approval of the 2013 IRP and the decertification of Plant Bowen Unit 6 (32 MWs) by April 16, 2013. Plant Branch Units 3 and 4 (1,016 MWs), Plant Yates Units 1 through 5 (579 MWs), and Plant McManus Units 1 and 2 (122 MWs) will be retired by April 16, 2015, the compliance date of the Mercury and Air Toxics Standards (MATS) rule. Georgia Power has also requested a revision to the decertification date of Plant Branch Unit 1 from December 31, 2013 to April 16, 2015. To allow for necessary transmission reliability improvements, Georgia Power expects to seek a one-year extension of the MATS rule compliance date for Plant Kraft Units 1 through 4 (316 MWs) and to retire these units by April 16, 2016.
The filing also included Georgia Power's request to switch the primary fuel source for Plant Yates Units 6 and 7 from coal to natural gas. Additionally, Georgia Power plans to switch the primary fuel source for Plant McIntosh Unit 1 from Central Appalachian coal to Powder River Basin (PRB) coal following further evaluation, including a successful test burn of the PRB fuel.
Under the terms of the 2010 ARP, any costs associated with changes to Georgia Power's approved environmental operating or capital budgets resulting from new or revised environmental regulations through 2013 that are approved by the Georgia PSC in connection with an updated IRP will be deferred as a regulatory asset to be recovered over a time period deemed appropriate by the Georgia PSC. In connection with the retirement decisions, Georgia Power reclassified the retail portion of the net carrying value of Plant Branch Units 1 through 4 from plant in service, net of depreciation, to other utility plant, net. Georgia Power is continuing to depreciate these units using the current composite straight-line rates previously approved by the Georgia PSC. Upon actual retirement, the Georgia PSC approved the continued deferral and amortization of the remaining net carrying values for Plant Branch Units 1 and 2 in its order for the 2011 IRP and Georgia Power has requested similar treatment for Plant Branch Units 3 and 4 in the 2013 IRP. Georgia Power also reclassified the construction work in progress (CWIP) balances totaling $65 million related to environmental controls for Plant Branch Units 1 through 4 and Plant Yates Units 6 and 7 that will not be completed as a result of the retirement decisions to regulatory assets and ceased accruing AFUDC. The Georgia PSC approved a three-year amortization period beginning January 2014 for the $13 million balance relating to Plant Branch Units 1 and 2 in its order for the 2011 IRP and Georgia Power has requested similar treatment for the balances related to Plant Branch Units 3 and 4 and Plant Yates Units 6 and 7 in the 2013 IRP. Georgia Power has also requested that the Georgia PSC approve the deferral of the costs associated with material and supplies remaining at the unit retirement dates to a regulatory asset, to be amortized over a time period deemed appropriate by the Georgia PSC. As a result of this regulatory treatment, the decertification of these units is not expected to have a material impact on Southern Company's financial statements. The Georgia PSC is scheduled to vote on the 2013 IRP by July 2013.
Fuel Cost Recovery
Georgia Power has established fuel cost recovery rates approved by the Georgia PSC. The Georgia PSC approved reductions in Georgia Power's total annual billings of approximately $43 million effective June 1, 2011, $567 million effective June 1, 2012, and $122 million effective January 1, 2013. In addition, the Georgia PSC has authorized an IFR, which allows Georgia Power to adjust its fuel cost recovery rates prior to the next fuel case if the under or over recovered fuel balance exceeds $215 million through February 2013 and $200 million thereafter. Georgia Power's fuel cost recovery includes costs associated with a natural gas hedging program as revised and approved by the Georgia PSC on February 7, 2013, requiring it to use options and hedges within a 24-month time horizon. Georgia Power expects to file its next fuel case by March 1, 2014.
Georgia Power's over recovered fuel balance totaled approximately $230 million at December 31, 2012 and is included in current liabilities and other deferred credits and liabilities.
Fuel cost recovery revenues as recorded on the financial statements are adjusted for differences in actual recoverable fuel costs and amounts billed in current regulated rates. Accordingly, changes in the billing factor will not have a significant effect on Southern Company's revenues or net income, but will affect cash flow.
Storm Damage Recovery
Georgia Power defers and recovers certain costs related to damages from major storms as mandated by the Georgia PSC. As of December 31, 2012, the balance in the regulatory asset related to storm damage was $38 million. As a result of this regulatory treatment, the costs related to storms are generally not expected to have a material impact on Southern Company's financial statements.
Nuclear Construction
In 2008, Georgia Power, acting for itself and as agent for Oglethorpe Power Corporation (OPC), the Municipal Electric Authority of Georgia (MEAG Power), and the City of Dalton, Georgia (Dalton), acting by and through its Board of Water, Light, and Sinking Fund Commissioners (collectively, Owners), entered into an agreement (Vogtle 3 and 4 Agreement) with a consortium consisting of Westinghouse Electric Company LLC (Westinghouse) and Stone & Webster, Inc. (collectively, Contractor), pursuant to which the Contractor agreed to design, engineer, procure, construct, and test two AP1000 nuclear units (with electric generating capacity of approximately 1,100 MWs each) and related facilities at Plant Vogtle (Plant Vogtle Units 3 and 4). Under the terms of the Vogtle 3 and 4 Agreement, the Owners agreed to pay a purchase price that is subject to certain price escalations and adjustments, including fixed escalation amounts and index-based adjustments, as well as adjustments for change orders, and performance bonuses for early completion and unit performance. Each Owner is severally (and not jointly) liable for its proportionate share, based on its ownership interest, of all amounts owed to the Contractor under the Vogtle 3 and 4 Agreement. Georgia Power's proportionate share is 45.7%. The Vogtle 3 and 4 Agreement provides for liquidated damages upon the Contractor's failure to fulfill the schedule and performance guarantees. The Contractor's liability to the Owners for schedule and performance liquidated damages and warranty claims is subject to a cap.
Certain payment obligations of Westinghouse and Stone & Webster, Inc. under the Vogtle 3 and 4 Agreement are guaranteed by Toshiba Corporation and The Shaw Group, Inc., respectively. In the event of certain credit rating downgrades of any Owner, such Owner will be required to provide a letter of credit or other credit enhancement. The Owners may terminate the Vogtle 3 and 4 Agreement at any time for their convenience, provided that the Owners will be required to pay certain termination costs and, at certain stages of the work, cancellation fees to the Contractor. The Contractor may terminate the Vogtle 3 and 4 Agreement under certain circumstances, including certain Owner suspension or delays of work, action by a governmental authority to permanently stop work, certain breaches of the Vogtle 3 and 4 Agreement by the Owners, Owner insolvency, and certain other events. 
In 2009, the Georgia PSC originally certified construction costs of $6.4 billion to place Plant Vogtle Units 3 and 4 into service in April 2016 and April 2017, respectively, and approved inclusion of the related CWIP accounts in rate base. Also in 2009, the State of Georgia enacted the Georgia Nuclear Energy Financing Act, which allows Georgia Power to recover financing costs for nuclear construction projects through annual adjustments to an NCCR tariff by including the related CWIP accounts in rate base during the construction period. With respect to Plant Vogtle Units 3 and 4, this legislation allowed Georgia Power, beginning in 2011, to recover an estimated $1.7 billion of related financing costs during the construction period. As a result, in 2009, the Georgia PSC also revised the certified in-service capital cost to approximately $4.4 billion.
The Georgia PSC approved increases to the NCCR tariff of approximately $223 million, $35 million, and $50 million, effective January 1, 2011, 2012, and 2013, respectively. Through the NCCR tariff, Georgia Power is collecting and amortizing to earnings approximately $91 million of financing costs, capitalized in 2009 and 2010, over the five-year period ending December 31, 2015, in addition to the ongoing financing costs. At December 31, 2012, approximately $55 million of these 2009 and 2010 costs remained unamortized in CWIP. At December 31, 2012, Georgia Power's CWIP balance for Plant Vogtle Units 3 and 4 totaled $2.3 billion.
In 2009, the NRC issued an Early Site Permit and Limited Work Authorization which allowed limited work to begin on Plant Vogtle Units 3 and 4. The NRC certified the Westinghouse Design Control Document, as amended (DCD), for the AP1000 nuclear reactor design, effective December 30, 2011, and issued combined construction and operating licenses (COLs) on February 10, 2012. Receipt of the COLs allowed full construction to begin.
On February 16, 2012, separate groups of petitioners filed petitions in the U.S. Court of Appeals for the District of Columbia Circuit seeking judicial review of the NRC's issuance of the COLs and certification of the DCD. These petitions were consolidated on April 3, 2012. On April 18, 2012, another group of petitioners filed a motion to stay the effectiveness of the COLs with the U.S. District Court for the District of Columbia. On July 11, 2012, the U.S. Court of Appeals for the District of Columbia Circuit denied the petitioners' motion to stay the effectiveness of the COLs. Georgia Power has intervened in, and intends to vigorously contest, these petitions. Additional technical and procedural challenges to the construction and licensing of Plant Vogtle Units 3 and 4, at the federal and state level, are expected as construction proceeds.
Georgia Power is required to file semi-annual Vogtle Construction Monitoring (VCM) reports with the Georgia PSC by February 28 and August 31 each year. On February 19, 2013, the Georgia PSC voted to approve Georgia Power's seventh VCM report, including construction capital costs incurred through June 30, 2012 of approximately $2.0 billion. Georgia Power's eighth VCM report requests approval for an additional $0.2 billion of construction capital costs incurred through December 31, 2012. If the projected certified construction capital costs to be borne by Georgia Power increase by 5% or the projected in-service dates are significantly extended, Georgia Power is required to seek an amendment to the Plant Vogtle Units 3 and 4 certificate from the Georgia PSC. Accordingly, the eighth VCM also requests an amendment to the certificate to increase the estimated in-service capital cost of Plant Vogtle Units 3 and 4 to $4.8 billion and to extend the estimated in-service dates to fourth quarter 2017 and fourth quarter 2018 for Plant Vogtle Units 3 and 4, respectively. Associated financing costs during the construction period are estimated to total approximately $2.0 billion.
In July 2012, the Owners and the Contractor began negotiations regarding the costs associated with design changes to the DCD and the delays in the timing of approval of the DCD and issuance of the COLs, including the assertion by the Contractor that the Owners are responsible for these costs under the terms of the Vogtle 3 and 4 Agreement. The Contractor has claimed that its estimated adjustment attributable to Georgia Power (based on Georgia Power's ownership interest) is approximately $425 million (in 2008 dollars) with respect to these issues. The Contractor also has asserted it is entitled to further schedule extensions. Georgia Power has not agreed with either the proposed cost or schedule adjustments or that the Owners have any responsibility for costs related to these issues. On November 1, 2012, Georgia Power and the other Owners filed suit against the Contractor in the U.S. District Court for the Southern District of Georgia seeking a declaratory judgment that the Owners are not responsible for these costs. Also on November 1, 2012, the Contractor filed suit against Georgia Power and the other Owners in the U.S. District Court for the District of Columbia alleging the Owners are responsible for these costs. While litigation has commenced and Georgia Power intends to vigorously defend its positions, Georgia Power expects negotiations with the Contractor to continue with respect to cost and schedule during which negotiations the parties may reach a mutually acceptable compromise of their positions.
In addition, there are processes in place that are designed to assure compliance with the requirements specified in the DCD and the COLs, including rigorous inspections by Southern Nuclear and the NRC that occur throughout construction. During the fourth quarter 2012, certain details of the rebar design for the Plant Vogtle Unit 3 nuclear island were evaluated for consistency with the DCD and a few non-safety-related deviations were identified. On January 15, 2013 and January 18, 2013, Southern Nuclear submitted two license amendment requests to conform the rebar design details to NRC requirements. On January 29, 2013, the NRC issued "no objection" letters in response to the related preliminary amendment requests, enabling completion of final work supporting the pouring of base mat concrete, which is expected to occur following approval of the license amendment requests in March 2013. Various design and other issues are expected to arise as construction proceeds, which may result in additional license amendments or require other resolution. If any license amendment requests are not resolved in a timely manner, there may be delays in the project schedule that could result in increased costs either to the Owners, the Contractor, or both.
As construction continues, additional delays in the fabrication and assembly of structural modules, the failure of such modules to meet applicable standards, or other issues may further impact project schedule and cost. Additional claims by the Contractor or Georgia Power (on behalf of the Owners) are also likely to arise throughout construction. These claims may be resolved through formal and informal dispute resolution procedures under the Vogtle 3 and 4 Agreement, but also may be resolved through litigation.
The ultimate outcome of these matters cannot be determined at this time.
Integrated Coal Gasification Combined Cycle
General
Mississippi Power is constructing a new electric generating facility located in Kemper County, Mississippi which will utilize an integrated coal gasification combined cycle technology with an output capacity of 582 MWs (Kemper IGCC). The Kemper IGCC will use as fuel locally mined lignite (an abundant, lower heating value coal) from a mine owned by Mississippi Power and situated adjacent to the Kemper IGCC. In connection with the Kemper IGCC, Mississippi Power also plans to construct and operate approximately 61 miles of CO2 pipeline infrastructure. The Kemper IGCC is scheduled to be placed in-service in May 2014.
In 2010, the Mississippi PSC issued a certificate of public convenience and necessity (CPCN) authorizing the acquisition, construction, and operation of the Kemper IGCC (2010 MPSC Order). The Sierra Club filed an appeal of the Mississippi PSC's issuance of the CPCN and, on March 15, 2012, the Mississippi Supreme Court reversed the decision of the Chancery Court of Harrison County, Mississippi (Chancery Court) upholding the 2010 MPSC Order and remanded the matter to the Mississippi PSC. The Mississippi Supreme Court concluded that the 2010 MPSC Order did not cite in sufficient detail substantial evidence upon which the Mississippi Supreme Court could determine the basis for the findings of the Mississippi PSC granting the CPCN. On March 30, 2012, the Mississippi PSC issued a temporary authorization which allowed Mississippi Power to continue construction and, on April 24, 2012, issued a detailed order (2012 MPSC Order) confirming the CPCN for the Kemper IGCC. On April 26, 2012, the Sierra Club appealed the 2012 MPSC Order to the Chancery Court. On December 17, 2012, the Chancery Court affirmed the 2012 MPSC Order which confirmed the issuance of the CPCN for the Kemper IGCC. On January 8, 2013, the Sierra Club filed an appeal of the Chancery Court's ruling with the Mississippi Supreme Court.
The certificated cost estimate of the Kemper IGCC included in the 2012 MPSC Order was $2.4 billion, net of $245 million of grants awarded to the project by the DOE under the Clean Coal Power Initiative Round 2 (CCPI2) and excluding the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, and financing costs related to the Kemper IGCC. The 2012 MPSC Order approved a construction cost cap of up to $2.88 billion, with recovery of prudently-incurred costs subject to approval by the Mississippi PSC. Exemptions from the cost cap included in the 2012 MPSC Order included the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, financing costs, and certain general exceptions, including change of law, force majeure, and beneficial capital (which exists when Mississippi Power demonstrates that the purpose and effect of the construction cost increase is to produce efficiencies that will result in a neutral or favorable effect on the ratepayers, relative to the original proposal for the CPCN).
Mississippi Power's current cost estimate for the Kemper IGCC (net of the $245 million CCPI2 grant, and excluding the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, financing costs, and certain general exceptions as contemplated in the 2012 MPSC Order and the settlement agreement between Mississippi Power and the Mississippi PSC entered into on January 24, 2013 (Settlement Agreement) that must be specifically approved by the Mississippi PSC) is approximately $2.88 billion. The Mississippi PSC and the Mississippi Public Utilities Staff (MPUS) have engaged their independent monitors to assess the current cost estimates and schedule projections for the Kemper IGCC. These consultants have issued reports with their own opinions as to the likelihood that costs for the Kemper IGCC will remain at or under the $2.88 billion cost cap and as to the expected in-service date. While Mississippi Power continues to believe its cost estimate and schedule projection remain appropriate based on the current status of the project, it is possible that Mississippi Power could experience further cost increases and/or schedule delays with respect to the Kemper IGCC. Certain factors have caused and may continue to cause the costs for the Kemper IGCC to increase and/or schedule delays to occur including, but not limited to, costs and productivity of labor, adverse weather conditions, shortages and inconsistent quality of equipment, materials, and labor, contractor or supplier delay or non-performance under construction or other agreements, and unforeseen engineering problems. To the extent it becomes probable that costs beyond any permitted exceptions to the cost cap will exceed $2.88 billion or it becomes probable that the Mississippi PSC will disallow a portion of the costs relating to the Kemper IGCC, including certain general exceptions as contemplated in the 2012 MPSC Order and the Settlement Agreement, charges to expense may occur and these charges could be material. See "Cost Recovery Plans" below for additional information relating to the Settlement Agreement that defines the process for resolving matters regarding cost recovery related to the Kemper IGCC.
As of December 31, 2012, Mississippi Power had spent a total of $2.51 billion on the Kemper IGCC, including the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, and other deferred costs. Of this total, $2.47 billion was included in CWIP (which is net of $245 million of CCPI2 grant funds), $35 million was recorded in other regulatory assets, $4 million was recorded in other deferred charges and assets, and $1 million was previously expensed. Consistent with the treatment of non-capital costs incurred during the pre-construction period, the Mississippi PSC granted Mississippi Power the authority to defer all non-capital Kemper IGCC-related costs to a regulatory asset during the construction period. This includes deferred costs associated with the generation resource planning, evaluation, and screening activities. The amortization period for the regulatory asset will be determined by the Mississippi PSC at a later date.
In addition, Mississippi Power is authorized to accrue carrying costs on the unamortized balance of such regulatory assets at a rate and in a manner to be determined by the Mississippi PSC in future cost recovery mechanism proceedings.
The 2012 MPSC Order established periodic prudence reviews during the annual CWIP review process. Of the total costs of $51 million incurred through March 2009, $46 million has been reviewed and deemed prudent by the Mississippi PSC. Due to the decision of the Mississippi PSC to deny the Certificated New Plant-A (CNP-A) rate filing and a 2012 rate request related to the Kemper IGCC described below, prudence reviews for the construction costs of the Kemper IGCC incurred after March 2009 have not been made. The Settlement Agreement provides for completion of all prudence reviews within six months of the date the Kemper IGCC is placed in service. See "Cost Recovery Plans" herein for additional information.
The ultimate outcome of these matters, including the determinations of prudency and the specific manner of recovery of prudently-incurred costs relating to the Kemper IGCC, is subject to further regulatory actions and cannot be determined at this time.
Cost Recovery Plans
The 2012 MPSC Order included provisions relating to both Mississippi Power's recovery of financing costs during the course of construction of the Kemper IGCC and Mississippi Power's recovery of costs following the date the Kemper IGCC is placed in service. In the 2012 MPSC Order, the Mississippi PSC approved financing cost recovery on CWIP balances not to exceed the $2.4 billion certificated cost estimate for the Kemper IGCC. The 2012 MPSC Order provided for the accrual of AFUDC in 2010 and 2011 and for the current recovery of financing costs on 100% of CWIP in 2012, 2013, and through May 1, 2014 (provided that the amount of financing cost recovery allowed is to be reduced by the amount of certain state and federal government construction cost incentives received by Mississippi Power and must be justified by a showing that such recovery will benefit customers over the life of the Kemper IGCC). With respect to recovery of costs following the in-service date of the Kemper IGCC, the 2012 MPSC Order provided for the establishment of operational cost and revenue parameters based upon assumptions in Mississippi Power's petition for the CPCN.
On June 1, 2012, the MPUS signed a joint stipulation with Mississippi Power to establish a proposed rate schedule detailing CNP-A and, on June 14, 2012, Mississippi Power submitted to the Mississippi PSC a filing to establish the new CNP-A rate schedule and a stipulated rate increase based upon the revenue request of between $55 million and $59 million to recover financing costs over the remainder of 2012. On June 22, 2012, the Mississippi PSC denied the proposed CNP-A rate schedule and the 2012 rate recovery filings submitted by Mississippi Power, pending a final ruling from the Mississippi Supreme Court regarding the Sierra Club's appeal of the Mississippi PSC's issuance of the CPCN for the Kemper IGCC.
On July 9, 2012, Mississippi Power appealed the Mississippi PSC's June 22, 2012 decision to the Mississippi Supreme Court and requested interim rates under bond of $55 million. On July 31, 2012, the Mississippi Supreme Court denied Mississippi Power's request for interim rates under bond until the Mississippi Supreme Court decides Mississippi Power's appeal of the Mississippi PSC's June 22, 2012 decision.
On January 24, 2013, Mississippi Power and the Mississippi PSC entered into the Settlement Agreement that (1) establishes the process for resolving matters regarding cost recovery related to the Kemper IGCC for the purpose of mitigating risks to Mississippi Power and its customers and expediting the regulatory process associated with future rate filings required under the Settlement Agreement and (2) resolves Mississippi Power's CNP-A rate appeal before the Mississippi Supreme Court.
On February 12, 2013, the Mississippi Supreme Court granted Mississippi Power and the Mississippi PSC's joint filing for dismissal of Mississippi Power's appeal of the Mississippi PSC's June 22, 2012 decision.
Under the terms of the Settlement Agreement, Mississippi Power and the Mississippi PSC will follow certain agreed-upon regulatory procedures and schedules for resolving the cost recovery matters related to the Kemper IGCC. These procedures and schedules include the following: (1) Mississippi Power's filing within 30 days of the Settlement Agreement of a new request to increase rates in 2013 in an amount not to exceed a $172 million annual revenue requirement, based upon projected investment as December 31, 2013, to be recorded to a regulatory liability to be used to mitigate rate impacts when the Kemper IGCC is placed in service (which filing for $172 million was made on January 25, 2013); (2) the Mississippi PSC's decision on that matter within 50 days of Mississippi Power's request; (3) Mississippi Power's collaboration with the MPUS to file with the Mississippi PSC within three months of the Settlement Agreement a rate recovery plan for the Kemper IGCC for the first seven years of its operation, along with a proposed revenue requirement under such plan for 2014 through 2020 (which filing was made on February 26, 2013 as described below); (4) the Mississippi PSC's decision on the rate recovery plan within four months of that filing; (5) Mississippi Power's agreement to limit the portion of prudently-incurred Kemper IGCC costs to be included in rate base to the $2.4 billion certificated cost estimate, plus costs related to the lignite mine and CO2 pipeline as well as any other costs permitted or determined to be excluded from the cost cap, provided that this limitation will not prevent Mississippi Power from securing alternate financing to recover any prudently-incurred Kemper IGCC costs, including financing costs and plant costs above the $2.4 billion certificated cost estimate, not otherwise recovered in any Mississippi PSC rate proceeding contemplated by the Settlement Agreement; and (6) the Mississippi PSC's completion of its prudence review of the Kemper IGCC costs incurred through 2012 within six months of the Settlement Agreement, an additional prudence review upon considering the seven-year rate plan for costs incurred through the most recent reporting period, and a final prudence review of the remaining project costs within six months of the Kemper IGCC's in-service date.
Legislation to authorize a multi-year rate plan and legislation to provide for alternate financing through securitization was passed in the Mississippi legislature and was signed by the Governor on February 26, 2013. Mississippi Power contemplates using securitization as provided in the legislation as its form of alternate financing for prudently-incurred Kemper IGCC costs, including financing costs and plant costs above the $2.4 billion certificated cost estimate, not otherwise recovered in any Mississippi PSC rate proceeding contemplated by the Settlement Agreement.
On February 26, 2013, Mississippi Power, in compliance with the Settlement Agreement, filed with the Mississippi PSC a rate recovery plan for the Kemper IGCC for 2014 through 2020, the first seven years of operation of the Kemper IGCC. The rate recovery plan proposes recovery of an annual revenue requirement of approximately $150 million of Kemper IGCC-related operational costs and rate base amounts, including plant costs equal to the $2.4 billion certificated cost estimate. Approval of Mississippi Power's request to increase rates in 2013 to mitigate the rate impacts of the Kemper IGCC filed on January 25, 2013 is integral to the rate recovery plan as the proposed filing contemplates amortization of the regulatory liability to be used to mitigate rate impacts from 2014 through 2020, based on a fixed amortization schedule that requires approval by the Mississippi PSC. Under the rate recovery plan filing, Mississippi Power proposes annual recovery to remain the same from 2014 through 2020 and, while it is the intent of Mississippi Power for the actual revenue requirement to equal the proposed revenue requirement for certain items, Mississippi Power proposes that the annual differences for those items through 2020 will be deferred, subject to accrual of carrying costs, and the cumulative balance will be reviewed at the end of the term of the Settlement Agreement by the Mississippi PSC for determination of the manner of the recovery. Mississippi Power proposes to secure recovery of prudently-incurred Kemper IGCC costs, including financing costs and plant costs above the $2.4 billion certificated cost estimate, not otherwise recovered in any Mississippi PSC rate proceeding contemplated by the Settlement Agreement to be provided for with alternate financing through securitization. The rate recovery necessary to recover the annual costs of securitization is proposed to be filed and begin after the Kemper IGCC is placed in service.
Under the terms of the Settlement Agreement, Mississippi Power has the right to terminate the Settlement Agreement if certain conditions, including the passage of multi-year rate plan legislation that is contemplated under the Settlement Agreement, are not met, if Mississippi Power is unable to secure alternate financing for any prudently-incurred Kemper IGCC costs not otherwise recovered in any Mississippi PSC rate proceeding contemplated by the Settlement Agreement, or if the Mississippi PSC fails to comply with the requirements of the Settlement Agreement.
The ultimate outcome of these matters, including the determinations of prudency and the specific manner of recovery of prudently-incurred costs relating to the Kemper IGCC, is subject to further regulatory actions and cannot be determined at this time.
Tax Incentives
The IRS has allocated $133 million (Phase I) and $279 million (Phase II) of Internal Revenue Code Section 48A tax credits to Mississippi Power in connection with the Kemper IGCC. Mississippi Power's utilization of Phase I and Phase II credits is dependent upon meeting the IRS certification requirements, including an in-service date no later than May 11, 2014 for the Phase I credits and April 19, 2016 for the Phase II credits. In order to remain eligible for the Phase II credits, Mississippi Power plans to capture and sequester (via enhanced oil recovery) at least 65% of the CO2 produced by the Kemper IGCC during operations in accordance with the rules for Section 48A investment tax credits. Through December 31, 2012, Mississippi Power received or accrued tax benefits totaling $362 million for these tax credits, which will be amortized as a reduction to depreciation and amortization over the life of the Kemper IGCC. As a result of bonus tax depreciation on certain assets placed, or to be placed, in service in 2012 and 2013, and the subsequent reduction in federal taxable income, Mississippi Power estimates that it will not be able to utilize $171 million of these tax credits until after 2013. IRS guidelines allow these unused tax credits to be carried forward for 20 years, expiring at the end of 2031, if not utilized before then. On October 15, 2012, Mississippi Power filed an application with the DOE for certification of the Kemper IGCC for additional tax credits under the Internal Revenue Code Section 48A (Phase III). A portion of the tax credits realized by Mississippi Power may be subject to recapture upon successful completion of South Mississippi Electric Power Association's (SMEPA) purchase of an undivided interest in the Kemper IGCC as described below. In addition, all or a portion of the tax credits will be subject to recapture if Mississippi Power fails to satisfy the in-service date requirements and carbon capture requirements described above.
On January 2, 2013, the American Taxpayer Relief Act of 2012 (ATRA) was signed into law. The ATRA retroactively extended several tax credits through 2013 and 50% bonus depreciation for property to be placed in service in 2013 (and for certain long-term production-period projects to be placed in service in 2014), which is expected to apply to the Kemper IGCC.
The ultimate outcome of these matters cannot be determined at this time.
Lignite Mine and CO2 Pipeline Facilities
In conjunction with the Kemper IGCC, Mississippi Power will own the lignite mine and equipment and has acquired and will continue to acquire mineral reserves located around the Kemper IGCC site in Kemper County. The mine is scheduled to be placed in service in June 2013. The estimated capital cost of the mine is approximately $245 million, of which $163 million has been incurred through December 31, 2012.
In 2010, Mississippi Power executed a 40-year management fee contract with Liberty Fuels Company, LLC, a wholly-owned subsidiary of The North American Coal Corporation (Liberty Fuels), which will develop, construct, and manage the mining operations. Because Liberty Fuels conducts all of its activities on behalf of Mississippi Power, Liberty Fuels qualifies as a VIE for which Mississippi Power is the primary beneficiary. The contract with Liberty Fuels is effective through the end of the mine reclamation. As the mining permit holder, Liberty Fuels has a legal obligation to perform mine reclamation and Mississippi Power has a contractual obligation to fund all reclamation activities. Consistent with the requirements of consolidation accounting, Liberty Fuels is consolidated in the financial statements of Mississippi Power and accordingly the asset retirement cost and the asset retirement obligation have been recorded in Mississippi Power's financial statements. In addition to the obligation to fund the reclamation activities, Mississippi Power currently provides working capital support to Liberty Fuels through cash advances for capital purchases, payroll, and other operating expenses.
In addition, Mississippi Power will acquire, construct, and operate the CO2 pipeline for the planned transport of captured CO2 for use in enhanced oil recovery. Mississippi Power has entered into agreements with Denbury Onshore (Denbury), a subsidiary of Denbury Resources Inc., and Treetop Midstream Services, LLC (Treetop), an affiliate of Tellus Operating Group, LLC and a subsidiary of Tengrys, LLC, pursuant to which Denbury will purchase 70% of the CO2 captured from the Kemper IGCC and Treetop will purchase 30% of the CO2 captured from the Kemper IGCC. The estimated capital cost of the CO2 pipeline facilities is approximately $132 million, of which $78 million has been incurred through December 31, 2012.
The ultimate outcome of these matters, including the determinations of prudency and the specific manner of recovery of prudently-incurred costs relating to the Kemper IGCC, is subject to further regulatory actions and cannot be determined at this time.
Proposed Sale of Undivided Interest to SMEPA
In 2010, Mississippi Power and SMEPA entered into an asset purchase agreement whereby SMEPA agreed to purchase a 17.5% undivided interest in the Kemper IGCC. On February 28, 2012, the Mississippi PSC approved the sale and transfer of 17.5% of the Kemper IGCC to SMEPA. On June 29, 2012, Mississippi Power and SMEPA signed an amendment to the asset purchase agreement whereby SMEPA extended its option to purchase until December 31, 2012 and reduced its purchase commitment percentage from a 17.5% to a 15% undivided interest in the Kemper IGCC, subject to approval by the Mississippi PSC. On December 31, 2012, Mississippi Power and SMEPA agreed to extend SMEPA's option to purchase through December 31, 2013.
The closing of this transaction is conditioned upon execution of a joint ownership and operating agreement, receipt of all construction permits, appropriate regulatory approvals, financing, and other conditions. On September 27, 2012, SMEPA received a conditional loan commitment from Rural Utilities Service to provide funding for SMEPA's undivided interest in the Kemper IGCC.
On March 6, 2012, Mississippi Power received a $150 million interest-bearing refundable deposit from SMEPA to be applied to the purchase. While the expectation is that the amount will be applied to the purchase price at closing, Mississippi Power would be required to refund the deposit upon the termination of the asset purchase agreement, within 60 days of a request by SMEPA for a full or partial refund, or within 15 days at SMEPA's discretion in the event that Mississippi Power is assigned a senior unsecured credit rating of BBB+ or lower by Standard and Poor's Ratings Services, a division of The McGraw Hill Companies, Inc. (S&P) or Baa1 or lower by Moody's Investors Services, Inc. (Moody's) or ceases to be rated by either of these rating agencies. Given the interest-bearing nature of the deposit and SMEPA's ability to request a refund, the deposit has been presented as a current liability in Southern Company's balance sheet herein and as financing proceeds in Southern Company's statement of cash flows herein.
The ultimate outcome of these matters cannot be determined at this time.
Baseload Act
In the 2008 regular session of the Mississippi legislature, a bill was passed and signed by the Governor to enhance the Mississippi PSC's authority to facilitate development and construction of base load generation in the State of Mississippi (Baseload Act). The Baseload Act authorizes, but does not require, the Mississippi PSC to adopt a cost recovery mechanism that includes in retail base rates, prior to and during construction, all or a portion of the prudently-incurred pre-construction and construction costs incurred by a utility in constructing a base load electric generating plant. Prior to the passage of the Baseload Act, such costs would traditionally be recovered only after the plant was placed in service. The Baseload Act also provides for periodic prudence reviews by the Mississippi PSC and prohibits the cancellation of any such generating plant without the approval of the Mississippi PSC. In the event of cancellation of the construction of the plant without approval of the Mississippi PSC, the Baseload Act authorizes the Mississippi PSC to make a public interest determination as to whether and to what extent the utility will be afforded rate recovery for costs incurred in connection with such cancelled generating plant. There are legal challenges to the constitutionality of the Baseload Act currently pending before the Mississippi Supreme Court. The ultimate impact of this legislation will depend on the outcome of any legal challenges and cannot be determined at this time. See "Cost Recovery Plans" herein for additional information regarding certain legislation related to the Kemper IGCC.
Alabama Power [Member]
 
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
General Litigation Matters
The Company is subject to certain claims and legal actions arising in the ordinary course of business. In addition, the Company's business activities are subject to extensive governmental regulation related to public health and the environment, such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury, property damage, and other claims for damages alleged to have been caused by carbon dioxide and other emissions, coal combustion byproducts, and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters, have become more frequent. The ultimate outcome of such pending or potential litigation against the Company cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on the Company's financial statements.
Environmental Matters
New Source Review Actions
In 1999, the EPA brought a civil action in the U.S. District Court for the Northern District of Georgia against certain Southern Company subsidiaries, including the Company, alleging that these subsidiaries had violated the New Source Review (NSR) provisions of the Clean Air Act and related state laws at certain coal-fired generating facilities. The EPA alleged NSR violations at five coal-fired generating facilities operated by the Company and three coal-fired generating facilities operated by Georgia Power. The civil action sought penalties and injunctive relief, including an order requiring installation of the best available control technology at the affected units. The case against Georgia Power was administratively closed in 2001 and has not been reopened. After the Company was dismissed from the original action, the EPA filed a separate action in 2001 against the Company in the U.S. District Court for the Northern District of Alabama.
In 2006, the U.S. District Court for the Northern District of Alabama entered a consent decree, resolving claims relating to the alleged NSR violations at Plant Miller. In 2010, the EPA dismissed five of its eight remaining claims against the Company, leaving only three claims, including one relating to a unit co-owned by Mississippi Power. In March 2011, the U.S. District Court for the Northern District of Alabama granted the Company summary judgment on all remaining claims and dismissed the case with prejudice. That judgment is on appeal to the U.S. Court of Appeals for the Eleventh Circuit. On February 23, 2012, the EPA filed a motion in the U.S. District Court for the Northern District of Alabama seeking vacatur of the judgment and recusal of the judge in the case involving the Company.
The Company believes it complied with applicable laws and regulations in effect at the time the work in question took place. The Clean Air Act authorizes maximum civil penalties of $25,000 to $37,500 per day, per violation, depending on the date of the alleged violation. An adverse outcome could require substantial capital expenditures that cannot be determined at this time and could possibly require payment of substantial penalties. Such expenditures could affect future results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates. The ultimate outcome of this matter cannot be determined at this time.
Climate Change Litigation
Kivalina Case
In 2008, the Native Village of Kivalina and the City of Kivalina filed a lawsuit in the U.S. District Court for the Northern District of California against several electric utilities (including Southern Company), several oil companies, and a coal company. The plaintiffs allege that the village is being destroyed by erosion allegedly caused by global warming that the plaintiffs attribute to emissions of greenhouse gases by the defendants. The plaintiffs assert claims for public and private nuisance and contend that some of the defendants (including Southern Company) acted in concert and are therefore jointly and severally liable for the plaintiffs' damages. The suit seeks damages for lost property values and for the cost of relocating the village, which is alleged to be $95 million to $400 million. In 2009, the U.S. District Court for the Northern District of California granted the defendants' motions to dismiss the case. On September 21, 2012, the U.S. Court of Appeals for the Ninth Circuit upheld the U.S. District Court for the Northern District of California's dismissal of the case. On November 27, 2012, the U.S. Court of Appeals for the Ninth Circuit denied the plaintiffs' request for review of the decision. On February 25, 2013, the plaintiffs filed a petition for writ of certiorari with the U.S. Supreme Court. Southern Company believes that these claims are without merit. While Southern Company believes the likelihood of loss is remote based on existing case law, it is not possible to predict with certainty whether the Company will incur any liability in connection with this matter. The ultimate outcome of this matter cannot be determined at this time.
Hurricane Katrina Case
In 2005, immediately following Hurricane Katrina, a lawsuit was filed in the U.S. District Court for the Southern District of Mississippi by Ned Comer on behalf of Mississippi residents seeking recovery for property damage and personal injuries caused by Hurricane Katrina. In 2006, the plaintiffs amended the complaint to include Southern Company and many other electric utilities, oil companies, chemical companies, and coal producers. The plaintiffs allege that the defendants contributed to climate change, which contributed to the intensity of Hurricane Katrina. In 2007, the U.S. District Court for the Southern District of Mississippi dismissed the case. On appeal to the U.S. Court of Appeals for the Fifth Circuit, a three-judge panel reversed the U.S. District Court for the Southern District of Mississippi, holding that the case could proceed, but, on rehearing, the full U.S. Court of Appeals for the Fifth Circuit dismissed the plaintiffs' appeal, resulting in reinstatement of the decision of the U.S. District Court for the Southern District of Mississippi in favor of the defendants. In May 2011, the plaintiffs filed an amended version of their class action complaint, arguing that the earlier dismissal was on procedural grounds and under Mississippi law the plaintiffs have a right to re-file. The amended complaint was also filed against numerous chemical, coal, oil, and utility companies, including the Company. On March 20, 2012, the U.S. District Court for the Southern District of Mississippi dismissed the plaintiffs' amended complaint. On April 16, 2012, the plaintiffs appealed the case to the U.S. Court of Appeals for the Fifth Circuit. The Company believes that these claims are without merit. While the Company believes the likelihood of loss is remote based on existing case law, it is not possible to predict with certainty whether the Company will incur any liability in connection with this matter. The ultimate outcome of this matter cannot be determined at this time.
Environmental Remediation
The Company must comply with environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Company could incur substantial costs to clean up properties. The Company conducts studies to determine the extent of any required cleanup and has recognized in its financial statements the costs to clean up known sites. Amounts for cleanup and ongoing monitoring costs were not material for any year presented. The Company may be liable for some or all required cleanup costs for additional sites that may require environmental remediation.
Nuclear Fuel Disposal Costs
Acting through the U.S. Department of Energy (DOE) and pursuant to the Nuclear Waste Policy Act of 1982, the U.S. government entered into a contract with the Company that requires the DOE to dispose of spent nuclear fuel and high level radioactive waste generated at Plant Farley. The DOE failed to timely perform and has yet to commence the performance of its contractual and statutory obligation to dispose of spent nuclear fuel beginning no later than January 31, 1998. Consequently, the Company has pursued and continues to pursue legal remedies against the U.S. government for its partial breach of contract.
As a result of the first lawsuit, the Company recovered approximately $17 million, representing substantially all of the Company's direct costs of the expansion of spent nuclear fuel storage facilities at Plant Farley from 1998 through 2004. In April 2012, the award was credited to cost of service for the benefit of customers.
In 2008, the Company filed a second lawsuit against the U.S. government for the costs of continuing to store spent nuclear fuel at Plant Farley. Damages are being sought for the period from January 1, 2005 through December 31, 2010. Damages will continue to accrue until the issue is resolved or storage is provided. No amounts have been recognized in the financial statements as of December 31, 2012 for any potential recoveries from the second lawsuit. The final outcome of this matter cannot be determined at this time; however, no material impact on the Company's net income is expected.
At Plant Farley, on-site dry spent fuel storage facilities are operational and can be expanded to accommodate spent fuel through the expected life of the plant.
Retail Regulatory Matters
Retail Rate Adjustments
In July 2011, the Alabama PSC issued an order to eliminate a tax-related adjustment under the Company's rate structure effective with October 2011 billings. The elimination of this adjustment resulted in additional revenues of approximately $31 million for 2011. In accordance with the order, the Company made additional accruals to the NDR in the fourth quarter 2011 of an amount equal to such additional 2011 revenues. The NDR was impacted as a result of operations and maintenance expenses incurred in connection with the April 2011 storms in Alabama. See "Natural Disaster Reserve" below for additional information. The elimination of this adjustment resulted in additional revenues of approximately $106 million for 2012.
Rate RSE
Rate stabilization and equalization plan (Rate RSE) adjustments are based on forward-looking information for the applicable upcoming calendar year. Rate adjustments for any two-year period, when averaged together, cannot exceed 4.0% and any annual adjustment is limited to 5.0%. Retail rates remain unchanged when the retail return on common equity (ROE) is projected to be between 13.0% and 14.5%. If the Company's actual retail ROE is above the allowed equity return range, customer refunds will be required; however, there is no provision for additional customer billings should the actual retail ROE fall below the allowed equity return range.
In 2011 and 2012, retail rates under Rate RSE remained unchanged from 2010. On November 30, 2012, the Company made its Rate RSE submission to the Alabama PSC of projected data for calendar year 2013; projected earnings were within the specified return range, and, therefore, retail rates under Rate RSE remained unchanged for 2013. Under the terms of Rate RSE, the maximum possible increase for 2014 is 5.00%. However, the Company is working with the Alabama PSC to develop a plan that will potentially preclude the need for a Rate RSE increase in 2014. The ultimate outcome of this matter cannot be determined at this time.
Rate CNP
The Company's retail rates, approved by the Alabama PSC, provide for adjustments to recognize the placing of new generating facilities into retail service under rate certificated new plant (Rate CNP). The Company may also recover retail costs associated with certificated PPAs under rate certificated new plant (Rate CNP PPA). Effective April 2011, Rate CNP PPA was reduced by approximately $5 million annually. On March 6, 2012, the Alabama PSC issued a consent order that the Company leave in effect the current Rate CNP PPA factor for billings for the period April 1, 2012 through March 31, 2013.  It is anticipated that no adjustment will be made to Rate CNP PPA in 2013. As of December 31, 2012, the Company had an under recovered certificated PPA balance of $9 million, $7 million of which is included in deferred under recovered regulatory clause revenues and $2 million of which is included in under recovered regulatory clause revenues in the balance sheet.
On September 17, 2012, the Alabama PSC approved and certificated a PPA for the purchase of approximately 200 megawatts (MWs) of the approximately 400 MWs of energy from wind-powered generating facilities and all associated environmental attributes, including renewable energy credits. The terms of this PPA and a previously approved and certificated PPA permit the Company to use the energy and retire the associated environmental attributes in service of its customers or to sell environmental attributes, separately or bundled with energy, to third parties. Approximately 200 MWs of energy from wind-powered generating facilities was operational in December 2012.
Rate certificated new plant environmental (Rate CNP Environmental) also allows for the recovery of the Company's retail costs associated with environmental laws, regulations, or other such mandates. Rate CNP Environmental is based on forward-looking information and provides for the recovery of these costs pursuant to a factor that is calculated annually. Environmental costs to be recovered include operations and maintenance expenses, depreciation, and a return on certain invested capital. There was no adjustment to Rate CNP Environmental to recover environmental costs in 2011 or 2012. On November 26, 2012, the Company submitted calculations associated with its cost of complying with environmental mandates, as provided under Rate CNP Environmental. The filing reflected a projected unrecovered retail revenue requirement for environmental compliance of less than $1 million, which is to be recovered in the billing months of January 2013 through December 2013. On December 4, 2012, the Alabama PSC issued a consent order that the Company leave in effect for 2013 the factors associated with the Company's environmental compliance costs for the year 2012. Any unrecovered amounts associated with 2013 will be reflected in the 2014 filing. As of December 31, 2012, the Company had an under recovered environmental clause balance of $21 million which is included in under recovered regulatory clause revenues in the balance sheet.
Environmental Accounting Order
Proposed and final environmental regulations could result in significant additional compliance costs that could affect future unit retirement and replacement decisions. In September 2011, the Alabama PSC approved an order allowing for the establishment of a regulatory asset to record the unrecovered investment costs associated with any such decisions, including the unrecovered plant asset balance and the unrecovered costs associated with site removal and closure. These costs would be amortized over the affected unit's remaining useful life, as established prior to the decision regarding early retirement.
Compliance and Pension Cost Accounting Order
On November 6, 2012, the Alabama PSC approved an accounting order for certain compliance-related operation and maintenance expenditures for the years 2013 through 2017, as well as the incremental increase in operation expense related to pension cost for 2013. Under the accounting order, expenses from January 2013 through December 2017 related to compliance with standards addressing Critical Infrastructure Protection issued by the North American Electric Reliability Corporation and cyber security requirements issued by the NRC will be deferred to a regulatory asset account and amortized over a three-year period beginning in January 2015. Expenses from January 2013 through December 2017 related to compliance with NRC guidance addressing the readiness at nuclear facilities within the U.S., as prompted by the earthquake and tsunami that struck Japan in March 2011, also will be deferred as a regulatory asset and recovered over the same amortization period. The compliance-related expenses to be afforded regulatory asset treatment over the five-year period are currently estimated to be approximately $43 million. In addition, the accounting order authorizes the Company to defer an incremental increase in its pension cost for 2013. That increased pension cost is estimated to be approximately $17 million. During 2013, the actual incremental increase will be deferred to a regulatory asset account and will be amortized over a three-year period beginning in January 2015. Pursuant to the accounting order, the Company has the ability to accelerate the amortization of the regulatory assets.
Energy Cost Recovery
The Company has established energy cost recovery rates under the Company's energy cost recovery rate (Rate ECR) as approved by the Alabama PSC. Rates are based on an estimate of future energy costs and the current over or under recovered balance. Revenues recognized under Rate ECR and recorded on the financial statements are adjusted for the difference in actual recoverable fuel costs and amounts billed in current regulated rates. The difference in the recoverable fuel costs and amounts billed give rise to the over or under recovered amounts recorded as regulatory assets or liabilities. The Company, along with the Alabama PSC, continually monitors the over or under recovered cost balance to determine whether an adjustment to billing rates is required. Changes in the Rate ECR factor have no significant effect on the Company's net income, but will impact operating cash flows. Currently, the Alabama PSC may approve billing rates under Rate ECR of up to 5.910 cents per kilowatt hour (KWH). On December 4, 2012, the Alabama PSC issued a consent order that the Company leave in effect the energy cost recovery rates which began in April 2011 for 2013. Therefore, the Rate ECR factor as of January 1, 2013 remained at 2.681 cents per KWH. Effective with billings beginning in January 2014, the Rate ECR factor will be 5.910 cents per KWH, absent a further order from the Alabama PSC.
As of December 31, 2012 and 2011, the Company had under recovered fuel balances of approximately $4 million and $31 million, respectively, which are included in deferred under recovered regulatory clause revenues in the balance sheets. This classification is based on estimates, which include such factors as weather, generation availability, energy demand, and the price of energy. A change in any of these factors could have a material impact on the timing of any recovery of the under recovered fuel costs.
Natural Disaster Reserve
Based on an order from the Alabama PSC, the Company maintains a reserve for operations and maintenance expenses to cover the cost of damages from major storms to its transmission and distribution facilities. The order approves a separate monthly Rate NDR charge to customers consisting of two components. The first component is intended to establish and maintain a reserve balance for future storms and is an on-going part of customer billing. The second component of the Rate NDR charge is intended to allow recovery of any existing deferred storm-related operations and maintenance costs and any future reserve deficits over a 24-month period. The Alabama PSC order gives the Company authority to record a deficit balance in the NDR when costs of storm damage exceed any established reserve balance. Absent further Alabama PSC approval, the maximum total Rate NDR charge consisting of both components is $10 per month per non-residential customer account and $5 per month per residential customer account. The Company has the authority, based on an order from the Alabama PSC, to accrue certain additional amounts as circumstances warrant. The order allows for reliability-related expenditures to be charged against the additional accruals when the NDR balance exceeds $75 million. The Company may designate a portion of the NDR to reliability-related expenditures as a part of an annual budget process for the following year or during the current year for identified unbudgeted reliability-related expenditures that are incurred. Accruals that have not been designated can be used to offset storm charges. Additional accruals to the NDR will enhance the Company's ability to deal with the financial effects of future natural disasters, promote system reliability, and offset costs retail customers would otherwise bear.
As revenue from the Rate NDR charge is recognized, an equal amount of operations and maintenance expenses related to the NDR will also be recognized. As a result, the Rate NDR charge will not have an effect on net income but will impact operating cash flows.
During the first half of 2011, multiple storms caused varying degrees of damage to the Company's transmission and distribution facilities. The most significant storms occurred in April 2011, causing over 400,000 of the Company's 1.4 million customers to be without electrical service. The cost of repairing the damage to facilities and restoring electrical service to customers as a result of these storms was $42 million for operations and maintenance expenses and $161 million for capital-related expenditures.
In accordance with the order that was issued by the Alabama PSC in July 2011 to eliminate a tax-related adjustment under the Company's rate structure that resulted in additional revenues, the Company made additional accruals to the NDR in the fourth quarter 2011 of an amount equal to the additional 2011 revenues, which were approximately $31 million.
The accumulated balances in the NDR for the years ended December 31, 2012 and December 31, 2011 were approximately $103 million and $110 million, respectively. Any accruals to the NDR are included in the balance sheets under other regulatory liabilities, deferred and are reflected as other operations and maintenance expenses in the statements of income.
Nuclear Outage Accounting Order
In 2010, the Alabama PSC approved a change to the nuclear maintenance outage accounting process associated with routine refueling activities. Previously, the Company accrued nuclear outage operations and maintenance expenses for the two units at Plant Farley during the 18-month cycle for the outages. In accordance with the 2010 order, nuclear outage expenses are deferred when the charges actually occur and then amortized over the subsequent 18-month period.
The initial result of implementation of the accounting order was that no nuclear maintenance outage expenses were recognized from January 2011 through December 2011, which decreased nuclear outage operations and maintenance expenses in 2011 from 2010 by approximately $50 million. During the fall of 2011, approximately $38 million of actual nuclear outage expenses associated with one unit at Plant Farley was deferred to a regulatory asset account; beginning in January 2012, these deferred costs are being amortized to nuclear operations and maintenance expenses over an 18-month period. During the spring of 2012, approximately $31 million of actual nuclear outage expenses associated with the second unit at Plant Farley was deferred to a regulatory asset account; beginning in July 2012, these deferred costs are being amortized to nuclear operations and maintenance expenses over an 18-month period. The Company will continue the pattern of deferral of nuclear outage expenses as incurred and the recognition of expenses over a subsequent 18-month period pursuant to the existing order.
Georgia Power [Member]
 
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
General Litigation Matters
The Company is subject to certain claims and legal actions arising in the ordinary course of business. In addition, the Company's business activities are subject to extensive governmental regulation related to public health and the environment, such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury, property damage, and other claims for damages alleged to have been caused by carbon dioxide and other emissions, coal combustion byproducts, and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters, have become more frequent. The ultimate outcome of such pending or potential litigation against the Company cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on the Company's financial statements.
Environmental Matters
New Source Review Actions
In 1999, the EPA brought a civil action in the U.S. District Court for the Northern District of Georgia against certain Southern Company subsidiaries, including the Company, alleging that these subsidiaries had violated the New Source Review (NSR) provisions of the Clean Air Act and related state laws at certain coal-fired generating facilities. The EPA alleged NSR violations at three coal-fired generating facilities operated by the Company and five coal-fired generating facilities operated by Alabama Power. The civil action sought penalties and injunctive relief, including an order requiring installation of the best available control technology at the affected units. The case against the Company was administratively closed in 2001 and has not been reopened.
The Company believes it complied with applicable laws and regulations in effect at the time the work in question took place. The Clean Air Act authorizes maximum civil penalties of $25,000 to $37,500 per day, per violation, depending on the date of the alleged violation. An adverse outcome could require substantial capital expenditures that cannot be determined at this time and could possibly require payment of substantial penalties. Such expenditures could affect future results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates. The ultimate outcome of this matter cannot be determined at this time.
Climate Change Litigation
Kivalina Case
In 2008, the Native Village of Kivalina and the City of Kivalina filed a lawsuit in the U.S. District Court for the Northern District of California against several electric utilities (including Southern Company), several oil companies, and a coal company. The plaintiffs allege that the village is being destroyed by erosion allegedly caused by global warming that the plaintiffs attribute to emissions of greenhouse gases by the defendants. The plaintiffs assert claims for public and private nuisance and contend that some of the defendants (including Southern Company) acted in concert and are therefore jointly and severally liable for the plaintiffs' damages. The suit seeks damages for lost property values and for the cost of relocating the village, which is alleged to be $95 million to $400 million. In 2009, the U.S. District Court for the Northern District of California granted the defendants' motions to dismiss the case. On September 21, 2012, the U.S. Court of Appeals for the Ninth Circuit upheld the U.S. District Court for the Northern District of California's dismissal of the case. On November 27, 2012, the U.S. Court of Appeals for the Ninth Circuit denied the plaintiffs' request for review of the decision. On February 25, 2013, the plaintiffs filed a petition for writ of certiorari with the U.S. Supreme Court. Southern Company believes that these claims are without merit. While Southern Company believes the likelihood of loss is remote based on existing case law, it is not possible to predict with certainty whether the Company will incur any liability in connection with this matter. The ultimate outcome of this matter cannot be determined at this time.
Hurricane Katrina Case
In 2005, immediately following Hurricane Katrina, a lawsuit was filed in the U.S. District Court for the Southern District of Mississippi by Ned Comer on behalf of Mississippi residents seeking recovery for property damage and personal injuries caused by Hurricane Katrina. In 2006, the plaintiffs amended the complaint to include Southern Company and many other electric utilities, oil companies, chemical companies, and coal producers. The plaintiffs allege that the defendants contributed to climate change, which contributed to the intensity of Hurricane Katrina. In 2007, the U.S. District Court for the Southern District of Mississippi dismissed the case. On appeal to the U.S. Court of Appeals for the Fifth Circuit, a three-judge panel reversed the U.S. District Court for the Southern District of Mississippi, holding that the case could proceed, but, on rehearing, the full U.S. Court of Appeals for the Fifth Circuit dismissed the plaintiffs' appeal, resulting in reinstatement of the decision of the U.S. District Court for the Southern District of Mississippi in favor of the defendants. In May 2011, the plaintiffs filed an amended version of their class action complaint, arguing that the earlier dismissal was on procedural grounds and under Mississippi law the plaintiffs have a right to re-file. The amended complaint was also filed against numerous chemical, coal, oil, and utility companies, including the Company. On March 20, 2012, the U.S. District Court for the Southern District of Mississippi dismissed the plaintiffs' amended complaint. On April 16, 2012, the plaintiffs appealed the case to the U.S. Court of Appeals for the Fifth Circuit. The Company believes that these claims are without merit. While the Company believes the likelihood of loss is remote based on existing case law, it is not possible to predict with certainty whether the Company will incur any liability in connection with this matter. The ultimate outcome of this matter cannot be determined at this time.
Environmental Remediation
The Company must comply with environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Company may also incur substantial costs to clean up properties. See Note 1 under "Environmental Remediation Recovery" for additional information.
The Company has been designated or identified as a potentially responsible party (PRP) at sites governed by the Georgia Hazardous Site Response Act and/or by the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), including a large site in Brunswick, Georgia on the CERCLA National Priorities List (NPL). The parties have completed the removal of wastes from the Brunswick site as ordered by the EPA. Additional cleanup and claims for recovery of natural resource damages at this site or for the assessment and potential cleanup of other sites on the Georgia Hazardous Sites Inventory and the CERCLA NPL are anticipated.
The Company and numerous other entities have been designated by the EPA as PRPs at the Ward Transformer Superfund site located in Raleigh, North Carolina. In September 2011, the EPA issued a Unilateral Administrative Order (UAO) to the Company and 22 other parties, ordering specific remedial action of certain areas at the site. In November 2011, the Company filed a response with the EPA stating it has sufficient cause to believe it is not a liable party under CERCLA. The EPA notified the Company in November 2011 that it is considering enforcement options against the Company and other non-complying UAO recipients. If the court determines that a respondent failed to comply with the UAO without sufficient cause, the EPA may also seek civil penalties of up to $37,500 per day for the violation and punitive damages of up to three times the costs incurred by the EPA as a result of the party's failure to comply with the UAO.
In addition to the EPA's action at this site, the Company, along with many other parties, was sued in a private action by several existing PRPs for cost recovery related to the removal action. On February 1, 2013, the court granted the Company's summary judgment motion ruling that the Company has no liability in the private action. The plaintiffs may appeal the court's order to the U.S. Court of Appeals for the Fourth Circuit.
The ultimate outcome of these matters will depend upon the success of defenses asserted, the ultimate number of PRPs participating in the cleanup, and numerous other factors and cannot be determined at this time; however, as a result of the regulatory treatment described in Note 1 under "Environmental Remediation Recovery," these matters are not expected to have a material impact on the Company's financial statements.
Nuclear Fuel Disposal Costs
Acting through the U.S. Department of Energy (DOE) and pursuant to the Nuclear Waste Policy Act of 1982, the U.S. government entered into contracts with the Company that require the DOE to dispose of spent nuclear fuel and high level radioactive waste generated at Plant Hatch and Plant Vogtle Units 1 and 2. The DOE failed to timely perform and has yet to commence the performance of its contractual and statutory obligation to dispose of spent nuclear fuel beginning no later than January 31, 1998. Consequently, the Company has pursued and continues to pursue legal remedies against the U.S. government for its partial breach of contract.
As a result of its first lawsuit, the Company recovered approximately $27 million, based on its ownership interests, representing substantially all of the Company's direct costs of the expansion of spent nuclear fuel storage facilities at Plant Hatch and Plant Vogtle Units 1 and 2 from 1998 through 2004. The proceeds were received in July 2012 and credited to the Company accounts where the original costs were charged and were used to reduce rate base, fuel, and cost of service for the benefit of customers.
In 2008, the Company filed a second lawsuit against the U.S. government for the costs of continuing to store spent nuclear fuel at Plant Hatch and Plant Vogtle Units 1 and 2. Damages are being sought for the period from January 1, 2005 through December 31, 2010. Damages will continue to accrue until the issue is resolved or storage is provided. No amounts have been recognized in the financial statements as of December 31, 2012 for any potential recoveries from the second lawsuit. The final outcome of this matter cannot be determined at this time; however, no material impact on the Company's net income is expected as a significant portion of any damage amounts collected from the government is expected to be credited to the Company accounts where the original costs were charged and used to reduce rate base, fuel, and cost of service for the benefit of the customers.
Sufficient pool storage capacity for spent fuel is available at Plant Vogtle Units 1 and 2 to maintain full-core discharge capability for both units into 2014. Construction of an on-site dry storage facility at Plant Vogtle Units 1 and 2 has begun. The facility is expected to begin operation in sufficient time to maintain full-core discharge capability, with additional on-site dry storage to be added as needed. At Plant Hatch, an on-site dry spent fuel storage facility is operational and can be expanded to accommodate spent fuel through the expected life of the plant.
Retail Regulatory Matters
Rate Plans
The economic recession significantly reduced the Company's revenues upon which retail rates were set under the 2007 Retail Rate Plan. In 2009, despite stringent efforts to reduce expenses, the Company's projected retail return on common equity (ROE) for both 2009 and 2010 was below 10.25%. However, in lieu of a full base rate case to increase customer rates as allowed under the 2007 Retail Rate Plan, in 2009, the Georgia PSC approved the Company's request for an accounting order. Under the terms of the accounting order, the Company could amortize up to $108 million of the regulatory liability related to other cost of removal obligations in 2009 and up to $216 million in 2010, limited to the amount needed to earn no more than a 9.75% and 10.15% retail ROE in 2009 and 2010, respectively. For the years ended December 31, 2009 and 2010, the Company amortized $41 million and $174 million, respectively, of the regulatory liability related to other cost of removal obligations.
In 2010, the Georgia PSC approved the 2010 ARP, which became effective January 1, 2011. The terms of the 2010 ARP reflect a settlement agreement among the Company, the Georgia PSC Public Interest Advocacy Staff, and eight other intervenors. Under the terms of the 2010 ARP, the Company is amortizing approximately $92 million of its remaining regulatory liability related to other cost of removal obligations over the three years ending December 31, 2013.
Also under the terms of the 2010 ARP, effective January 1, 2011, the Company increased its (1) traditional base tariff rates by approximately $347 million; (2) Demand-Side Management (DSM) tariff rates by approximately $31 million; (3) ECCR tariff rate by approximately $168 million; and (4) Municipal Franchise Fee (MFF) tariff rate by approximately $16 million, for a total increase in base revenues of approximately $562 million.
Under the 2010 ARP, the following additional base rate adjustments have been made to the Company's tariffs in 2012 and 2013:
Effective January 1, 2012 and 2013, the DSM tariffs increased by $17 million and $14 million, respectively;
Effective April 1, 2012 and January 1, 2013, the traditional base tariffs increased by an estimated $122 million and $58 million, respectively, to recover the revenue requirements for Plant McDonough-Atkinson Units 4, 5, and 6 for the period through December 31, 2013; and
The MFF tariff increased consistently with the adjustments above, as well as those related to the interim fuel rider (IFR) and Nuclear Construction Cost Recovery (NCCR) tariff adjustments described herein under "Fuel Cost Recovery" and "Nuclear Construction."
Under the 2010 ARP, the Company's allowed retail ROE is set at 11.15%, and earnings will be evaluated against a retail ROE range of 10.25% to 12.25%. Two-thirds of any earnings above 12.25% will be directly refunded to customers, with the remaining one-third retained by the Company. There were no refunds related to earnings for 2011 or 2012. The Company is required to file a general base rate case by July 1, 2013, in response to which the Georgia PSC would be expected to determine whether the 2010 ARP should be continued, modified, or discontinued.
Integrated Resource Plans
On March 20, 2012, the Georgia PSC approved the Company's request to decertify and retire Plant Branch Units 1 and 2 as of December 31, 2013 and October 31, 2013, the compliance dates for the respective units under the Georgia Multi-Pollutant Rule, and an oil-fired unit at Plant Mitchell as of March 26, 2012, as requested in the 2011 Integrated Resource Plan (IRP). The Georgia PSC also approved three PPAs totaling 998 MWs with Southern Power for capacity and energy that will commence in 2015 and end in 2030. On November 21, 2012, the FERC accepted the PPAs.
Separately, on March 20, 2012, the Georgia PSC certified 495 MWs of wholesale capacity to be returned to retail service in 2015 and 2016 under a 2010 agreement, subject to the decertification of any related generating units including 243 MWs of the 16 units described below.
Separately, on October 16, 2012, the Georgia PSC approved a 50 MW PPA with a small power production facility (80 MWs or less) that is a qualifying facility under the Public Utility Regulatory Policies Act of 1978 for capacity and energy that will commence in 2015 and end in 2035.
In addition, on November 20, 2012, the Georgia PSC approved the Company's advanced solar initiative. The Company may acquire up to 210 MWs of additional solar capacity over a three-year period through long-term contracts.
On January 31, 2013, the Company filed its triennial IRP (2013 IRP). The filing included the Company's request to decertify 16 coal- and oil-fired units totaling 2,093 MWs.  Several factors, including the cost to comply with existing and future environmental regulations, recent and forecasted economic conditions, and lower natural gas prices, contributed to the decision to close these units.
The Company requested the decertification of Plant Boulevard Units 2 and 3 (28 MWs) upon approval of the 2013 IRP and the decertification of Plant Bowen Unit 6 (32 MWs) by April 16, 2013. Plant Branch Units 3 and 4 (1,016 MWs), Plant Yates Units 1 through 5 (579 MWs), and Plant McManus Units 1 and 2 (122 MWs) will be retired by April 16, 2015, the compliance date of the EPA's final Mercury and Air Toxics Standards (MATS) rule. The Company has also requested a revision to the decertification date of Plant Branch Unit 1 from December 31, 2013 to April 16, 2015. To allow for necessary transmission reliability improvements, the Company expects to seek a one-year extension of the MATS rule compliance date for Plant Kraft Units 1 through 4 (316 MWs) and to retire these units by April 16, 2016.
The filing also included the Company's request to switch the primary fuel source for Plant Yates Units 6 and 7 from coal to natural gas. Additionally, the Company plans to switch the primary fuel source for Plant McIntosh Unit 1 from Central Appalachian coal to Powder River Basin (PRB) coal following further evaluation, including a successful test burn of the PRB fuel.
Under the terms of the 2010 ARP, any costs associated with changes to the Company's approved environmental operating or capital budgets resulting from new or revised environmental regulations through 2013 that are approved by the Georgia PSC in connection with an updated IRP will be deferred as a regulatory asset to be recovered over a time period deemed appropriate by the Georgia PSC. In connection with the retirement decisions, the Company reclassified the retail portion of the net carrying value of Plant Branch Units 1 through 4 from plant in service, net of depreciation, to other utility plant, net.  The Company is continuing to depreciate these units using the current composite straight-line rates previously approved by the Georgia PSC. Upon actual retirement, the Georgia PSC approved the continued deferral and amortization of the remaining net carrying values for Plant Branch Units 1 and 2 in its order for the 2011 IRP and the Company has requested similar treatment for Plant Branch Units 3 and 4 in the 2013 IRP. The Company also reclassified the construction work in progress (CWIP) balances totaling $65 million related to environmental controls for Plant Branch Units 1 through 4 and Plant Yates Units 6 and 7 that will not be completed as a result of the retirement decisions to regulatory assets and ceased accruing AFUDC. The Georgia PSC approved a three-year amortization period beginning January 2014 for the $13 million balance relating to Plant Branch Units 1 and 2 in its order for the 2011 IRP and the Company has requested similar treatment for the balances related to Plant Branch Units 3 and 4 and Plant Yates Units 6 and 7 in the 2013 IRP. The Company has also requested that the Georgia PSC approve the deferral of the costs associated with material and supplies remaining at the unit retirement dates to a regulatory asset, to be amortized over a time period deemed appropriate by the Georgia PSC. As a result of this regulatory treatment, the decertification of these units is not expected to have a material impact on the Company's financial statements. The Georgia PSC is scheduled to vote on the 2013 IRP by July 2013.
Fuel Cost Recovery
The Company has established fuel cost recovery rates approved by the Georgia PSC. The Georgia PSC approved reductions in the Company's total annual billings of approximately $43 million effective June 1, 2011, $567 million effective June 1, 2012, and $122 million effective January 1, 2013. In addition, the Georgia PSC has authorized an IFR, which allows the Company to adjust its fuel cost recovery rates prior to the next fuel case if the under or over recovered fuel balance exceeds $215 million through February 2013 and $200 million thereafter. The Company's fuel cost recovery includes costs associated with a natural gas hedging program as revised and approved by the Georgia PSC on February 7, 2013, requiring it to use options and hedges within a 24-month time horizon. See Note 11 under "Energy-Related Derivatives" for additional information. The Company expects to file its next fuel case by March 1, 2014.
The Company's over recovered fuel balance totaled approximately $230 million at December 31, 2012 and is included in current liabilities and other deferred credits and liabilities.
Fuel cost recovery revenues as recorded on the financial statements are adjusted for differences in actual recoverable fuel costs and amounts billed in current regulated rates. Accordingly, changes in the billing factor will not have a significant effect on the Company's revenues or net income, but will affect cash flow.
Nuclear Construction
In 2008, the Company, acting for itself and as agent for Oglethorpe Power Corporation (OPC), the Municipal Electric Authority of Georgia (MEAG Power), and the City of Dalton, Georgia (Dalton), acting by and through its Board of Water, Light, and Sinking Fund Commissioners (collectively, Owners), entered into an agreement with a consortium consisting of Westinghouse Electric Company LLC (Westinghouse) and Stone & Webster, Inc. (collectively, Contractor), pursuant to which the Contractor agreed to design, engineer, procure, construct, and test two AP1000 nuclear units (with electric generating capacity of approximately 1,100 MWs each) and related facilities at Plant Vogtle (Vogtle 3 and 4 Agreement). Under the terms of the Vogtle 3 and 4 Agreement, the Owners agreed to pay a purchase price that is subject to certain price escalations and adjustments, including fixed escalation amounts and index-based adjustments, as well as adjustments for change orders, and performance bonuses for early completion and unit performance. Each Owner is severally (and not jointly) liable for its proportionate share, based on its ownership interest, of all amounts owed to the Contractor under the Vogtle 3 and 4 Agreement. The Company's proportionate share is 45.7%. The Vogtle 3 and 4 Agreement provides for liquidated damages upon the Contractor's failure to fulfill the schedule and performance guarantees. The Contractor's liability to the Owners for schedule and performance liquidated damages and warranty claims is subject to a cap.
Certain payment obligations of Westinghouse and Stone & Webster, Inc. under the Vogtle 3 and 4 Agreement are guaranteed by Toshiba Corporation and The Shaw Group, Inc., respectively. In the event of certain credit rating downgrades of any Owner, such Owner will be required to provide a letter of credit or other credit enhancement. The Owners may terminate the Vogtle 3 and 4 Agreement at any time for their convenience, provided that the Owners will be required to pay certain termination costs and, at certain stages of the work, cancellation fees to the Contractor. The Contractor may terminate the Vogtle 3 and 4 Agreement under certain circumstances, including certain Owner suspension or delays of work, action by a governmental authority to permanently stop work, certain breaches of the Vogtle 3 and 4 Agreement by the Owners, Owner insolvency, and certain other events.
In 2009, the Georgia PSC originally certified construction costs of $6.4 billion to place Plant Vogtle Units 3 and 4 into service in April 2016 and April 2017, respectively, and approved inclusion of the related CWIP accounts in rate base. Also in 2009, the State of Georgia enacted the Georgia Nuclear Energy Financing Act, which allows the Company to recover financing costs for nuclear construction projects through annual adjustments to an NCCR tariff by including the related CWIP accounts in rate base during the construction period. With respect to Plant Vogtle Units 3 and 4, this legislation allowed the Company, beginning in 2011, to recover an estimated $1.7 billion of related financing costs during the construction period. As a result, in 2009, the Georgia PSC also revised the certified in-service capital cost to approximately $4.4 billion.
The Georgia PSC approved increases to the NCCR tariff of approximately $223 million, $35 million, and $50 million, effective January 1, 2011, 2012, and 2013, respectively. Through the NCCR tariff, the Company is collecting and amortizing to earnings approximately $91 million of financing costs, capitalized in 2009 and 2010, over the five-year period ending December 31, 2015, in addition to the ongoing financing costs. At December 31, 2012, approximately $55 million of these 2009 and 2010 costs remained unamortized in CWIP. At December 31, 2012, the Company's CWIP balance for Plant Vogtle Units 3 and 4 totaled $2.3 billion.
In 2009, the NRC issued an Early Site Permit and Limited Work Authorization which allowed limited work to begin on Plant Vogtle Units 3 and 4. The NRC certified the Westinghouse Design Control Document, as amended (DCD), for the AP1000 nuclear reactor design, effective December 30, 2011, and issued combined construction and operating licenses (COLs) on February 10, 2012. Receipt of the COLs allowed full construction to begin.
On February 16, 2012, separate groups of petitioners filed petitions in the U.S. Court of Appeals for the District of Columbia Circuit seeking judicial review of the NRC's issuance of the COLs and certification of the DCD. These petitions were consolidated on April 3, 2012. On April 18, 2012, another group of petitioners filed a motion to stay the effectiveness of the COLs with the U.S. District Court for the District of Columbia. On July 11, 2012, the U.S. Court of Appeals for the District of Columbia Circuit denied the petitioners' motion to stay the effectiveness of the COLs. The Company has intervened in, and intends to vigorously contest, these petitions. Additional technical and procedural challenges to the construction and licensing of Plant Vogtle Units 3 and 4, at the federal and state level, are expected as construction proceeds.
The Company is required to file semi-annual Vogtle Construction Monitoring (VCM) reports with the Georgia PSC by February 28 and August 31 each year. On February 19, 2013, the Georgia PSC voted to approve the Company's seventh VCM report, including construction capital costs incurred through June 30, 2012 of approximately $2.0 billion. The Company's eighth VCM report requests approval for an additional $0.2 billion of construction capital costs incurred through December 31, 2012. If the projected certified construction capital costs to be borne by the Company increase by 5% or the projected in-service dates are significantly extended, the Company is required to seek an amendment to the Plant Vogtle Units 3 and 4 certificate from the Georgia PSC. Accordingly, the eighth VCM also requests an amendment to the certificate to increase the estimated in-service capital cost of Plant Vogtle Units 3 and 4 to $4.8 billion and to extend the estimated in-service dates to fourth quarter 2017 and fourth quarter 2018 for Plant Vogtle Units 3 and 4, respectively. Associated financing costs during the construction period are estimated to total approximately $2.0 billion.
In July 2012, the Owners and the Contractor began negotiations regarding the costs associated with design changes to the DCD and the delays in the timing of approval of the DCD and issuance of the COLs, including the assertion by the Contractor that the Owners are responsible for these costs under the terms of the Vogtle 3 and 4 Agreement. The Contractor has claimed that its estimated adjustment attributable to the Company (based on the Company's ownership interest) is approximately $425 million (in 2008 dollars) with respect to these issues. The Contractor also has asserted it is entitled to further schedule extensions. The Company has not agreed with either the proposed cost or schedule adjustments or that the Owners have any responsibility for costs related to these issues. On November 1, 2012, the Company and the other Owners filed suit against the Contractor in the U.S. District Court for the Southern District of Georgia seeking a declaratory judgment that the Owners are not responsible for these costs. Also on November 1, 2012, the Contractor filed suit against the Company and the other Owners in the U.S. District Court for the District of Columbia alleging the Owners are responsible for these costs. While litigation has commenced and the Company intends to vigorously defend its positions, the Company expects negotiations with the Contractor to continue with respect to cost and schedule during which negotiations the parties may reach a mutually acceptable compromise of their positions.
In addition, there are processes in place that are designed to assure compliance with the requirements specified in the DCD and the COLs, including rigorous inspections by Southern Nuclear and the NRC that occur throughout construction. During the fourth quarter 2012, certain details of the rebar design for the Plant Vogtle Unit 3 nuclear island were evaluated for consistency with the DCD and a few non-safety-related deviations were identified. On January 15, 2013 and January 18, 2013, Southern Nuclear submitted two license amendment requests to conform the rebar design details to NRC requirements. On January 29, 2013, the NRC issued "no objection" letters in response to the related preliminary amendment requests, enabling completion of final work supporting the pouring of base mat concrete, which is expected to occur following approval of the license amendment requests in March 2013. Various design and other issues are expected to arise as construction proceeds, which may result in additional license amendments or require other resolution. If any license amendment requests are not resolved in a timely manner, there may be delays in the project schedule that could result in increased costs either to the Owners, the Contractor, or both.
As construction continues, additional delays in the fabrication and assembly of structural modules, the failure of such modules to meet applicable standards, or other issues may further impact project schedule and cost. Additional claims by the Contractor or the Company (on behalf of the Owners) are also likely to arise throughout construction. These claims may be resolved through formal and informal dispute resolution procedures under the Vogtle 3 and 4 Agreement, but also may be resolved through litigation.
The ultimate outcome of these matters cannot be determined at this time.
Gulf Power [Member]
 
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
General Litigation Matters
The Company is subject to certain claims and legal actions arising in the ordinary course of business. In addition, the Company's business activities are subject to extensive governmental regulation related to public health and the environment, such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury, property damage, and other claims for damages alleged to have been caused by carbon dioxide and other emissions, coal combustion byproducts, and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters, have become more frequent. The ultimate outcome of such pending or potential litigation against the Company cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on the Company's financial statements.
Environmental Matters
New Source Review Actions
In 1999, the EPA brought a civil action in the U.S. District Court for the Northern District of Georgia against certain Southern Company subsidiaries, including Alabama Power and Georgia Power, alleging that these subsidiaries had violated the New Source Review (NSR) provisions of the Clean Air Act and related state laws at certain coal-fired generating facilities. The EPA alleged NSR violations at five coal-fired generating facilities operated by Alabama Power and three coal-fired generating facilities operated by Georgia Power, including a unit co-owned by the Company. The civil action sought penalties and injunctive relief, including an order requiring installation of the best available control technology at the affected units. These actions were filed concurrently with the issuance of notices of violation of the NSR provisions to the Company with respect to the Company's Plant Crist. The case against Georgia Power (including claims related to the unit co-owned by the Company) was administratively closed in 2001 and has not been reopened. After Alabama Power was dismissed from the original action, the EPA filed a separate action in 2001 against Alabama Power in the U.S. District Court for the Northern District of Alabama.
The Company believes it complied with applicable laws and regulations in effect at the time the work in question took place. The Clean Air Act authorizes maximum civil penalties of $25,000 to $37,500 per day, per violation, depending on the date of the alleged violation. An adverse outcome could require substantial capital expenditures that cannot be determined at this time and could possibly require payment of substantial penalties. Such expenditures could affect future results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates. The ultimate outcome of this matter cannot be determined at this time.
Climate Change Litigation
Kivalina Case
In 2008, the Native Village of Kivalina and the City of Kivalina filed a lawsuit in the U.S. District Court for the Northern District of California against several electric utilities (including Southern Company), several oil companies, and a coal company. The plaintiffs allege that the village is being destroyed by erosion allegedly caused by global warming that the plaintiffs attribute to emissions of greenhouse gases by the defendants. The plaintiffs assert claims for public and private nuisance and contend that some of the defendants (including Southern Company) acted in concert and are therefore jointly and severally liable for the plaintiffs' damages. The suit seeks damages for lost property values and for the cost of relocating the village, which is alleged to be $95 million to $400 million. In 2009, the U.S. District Court for the Northern District of California granted the defendants' motions to dismiss the case. On September 21, 2012, the U.S. Court of Appeals for the Ninth Circuit upheld the U.S. District Court for the Northern District of California's dismissal of the case. On November 27, 2012, the U.S. Court of Appeals for the Ninth Circuit denied the plaintiffs' request for review of the decision. On February 25, 2013, the plaintiffs filed a petition for writ of certiorari with the U.S. Supreme Court. Southern Company believes that these claims are without merit. While Southern Company believes the likelihood of loss is remote based on existing case law, it is not possible to predict with certainty whether the Company will incur any liability in connection with this matter. The ultimate outcome of this matter cannot be determined at this time.
Hurricane Katrina Case
In 2005, immediately following Hurricane Katrina, a lawsuit was filed in the U.S. District Court for the Southern District of Mississippi by Ned Comer on behalf of Mississippi residents seeking recovery for property damage and personal injuries caused by Hurricane Katrina. In 2006, the plaintiffs amended the complaint to include Southern Company and many other electric utilities, oil companies, chemical companies, and coal producers. The plaintiffs allege that the defendants contributed to climate change, which contributed to the intensity of Hurricane Katrina. In 2007, the U.S. District Court for the Southern District of Mississippi dismissed the case. On appeal to the U.S. Court of Appeals for the Fifth Circuit, a three-judge panel reversed the U.S. District Court for the Southern District of Mississippi, holding that the case could proceed, but on rehearing, the full U.S. Court of Appeals for the Fifth Circuit dismissed the plaintiffs' appeal, resulting in reinstatement of the decision of the U.S. District Court for the Southern District of Mississippi in favor of the defendants. In May 2011, the plaintiffs filed an amended version of their class action complaint, arguing that the earlier dismissal was on procedural grounds and under Mississippi law the plaintiffs have a right to re-file. The amended complaint was also filed against numerous chemical, coal, oil, and utility companies, including the Company. On March 20, 2012, the U.S. District Court for the Southern District of Mississippi dismissed the plaintiffs' amended complaint. On April 16, 2012, the plaintiffs appealed the case to the U.S. Court of Appeals for the Fifth Circuit. The Company believes that these claims are without merit. While the Company believes the likelihood of loss is remote based on existing case law, it is not possible to predict with certainty whether the Company will incur any liability in connection with this matter. The ultimate outcome of this matter cannot be determined at this time.
Environmental Remediation
The Company must comply with environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Company may also incur substantial costs to clean up properties. The Company received authority from the Florida PSC to recover approved environmental compliance costs through the environmental cost recovery clause. The Florida PSC reviews costs and adjusts rates up or down annually.
The Company recognizes a liability for environmental remediation costs only when it determines a loss is probable. At December 31, 2012, the Company's environmental remediation liability included estimated costs of environmental remediation projects of approximately $60.5 million. For 2012, approximately $2.6 million was included in under recovered regulatory clause revenues and other current liabilities, and approximately $57.9 million was included in other regulatory assets, deferred and other deferred credits and liabilities. These estimated costs relate to site closure criteria by the Florida Department of Environmental Protection (FDEP) for potential impacts to soil and groundwater from herbicide applications at the Company's substations. The schedule for completion of the remediation projects will be subject to FDEP approval. The projects have been approved by the Florida PSC for recovery through the Company's environmental cost recovery clause; therefore, there was no impact on net income as a result of these liabilities.
The final outcome of these matters cannot be determined at this time. However, based on the currently known conditions at these sites and the nature and extent of activities relating to these sites, the Company does not believe that additional liabilities, if any, at these sites would be material to the Company's financial statements.
Retail Regulatory Matters
The Company's rates and charges for service to retail customers are subject to the regulatory oversight of the Florida PSC. The Company's rates are a combination of base rates and several separate cost recovery clauses for specific categories of costs. These separate cost recovery clauses address such items as fuel and purchased energy costs, purchased power capacity costs, energy conservation and demand side management programs, and the costs of compliance with environmental laws and regulations. Costs not addressed through one of the specific cost recovery clauses are recovered through the Company's base rates.
Retail Base Rate Case
On March 12, 2012, the Florida PSC approved an increase in retail base rates and charges of $64 million effective April 11, 2012. The amount of the increase includes the previously approved $38.5 million interim retail rate increase implemented in September 2011. The Florida PSC's decision on the amount of the increase also included a determination that none of the base rate revenues collected on an interim basis would be refunded. The Company's authorized retail ROE is a range of 9.25% to 11.25% with new retail base rates set at the midpoint retail ROE of 10.25%. In addition, the Florida PSC also approved a step increase to the Company's retail base rates and charges of $4 million effective in January 2013.
Cost Recovery Clauses
On November 5, 2012, the Florida PSC approved the Company's annual rate clause requests for its fuel, purchased power capacity, conservation, and environmental compliance cost recovery factors for 2013. The net effect of the approved changes is a 1.9% rate increase for residential customers using 1,000 KWHs per month.
Revenues for all cost recovery clauses, as recorded on the financial statements, are adjusted for differences in actual recoverable costs and amounts billed in current regulated rates. Accordingly, changes in the billing factor for fuel and purchased power will have no significant effect on the Company's revenues or net income, but will affect annual cash flow. The recovery provisions for environmental compliance and energy conservation include related expenses and a return on net average investment.
Fuel Cost Recovery
The Company has established fuel cost recovery rates as approved by the Florida PSC. If, at any time during the year, the projected year-end fuel cost over or under recovery balance exceeds 10% of the projected fuel revenue applicable for the period, the Company is required to notify the Florida PSC and indicate if an adjustment to the fuel cost recovery factor is being requested. On February 14, 2012, the Florida PSC approved a reduction to the fuel cost recovery factors starting in March 2012. The effect of the approved change was a 2.7% decrease for residential customers using 1,000 KWHs per month. On June 19, 2012, the Florida PSC approved an additional decrease in the Company's fuel rates lowering the 1,000 KWH residential bill 7.8% to reduce annual billings by approximately $58.8 million effective July 2, 2012.
The increase in the fuel cost over recovered balance during 2012 was primarily due to lower than expected fuel costs and purchased power energy expenses. At December 31, 2012 and 2011, the over recovered fuel balance was approximately $17.1 million and $9.9 million, respectively, which is included in other regulatory liabilities, current in the balance sheets.
Purchased Power Capacity Recovery
The Company has established purchased power capacity recovery cost rates as approved by the Florida PSC. If the projected year-end purchased power capacity cost over or under recovery balance exceeds 10% of the projected purchased power capacity revenue applicable for the period, the Company is required to notify the Florida PSC and indicate if an adjustment to the purchased power capacity cost recovery factor is being requested.
At December 31, 2012, the Company had an under recovered purchased power capacity balance of approximately $0.8 million, which is included in under recovered regulatory clause revenues in the balance sheets. At December 31, 2011, the Company had an over recovered purchased power capacity balance of approximately $8.0 million, which is included in other regulatory liabilities, current in the balance sheets.
Environmental Cost Recovery
The Florida Legislature adopted legislation for an environmental cost recovery clause, which allows an electric utility to petition the Florida PSC for recovery of prudent environmental compliance costs that are not being recovered through base rates or any other recovery mechanism. Such environmental costs include operations and maintenance expenses, emissions allowance expense, depreciation, and a return on net average investment. This legislation also allows recovery of costs incurred as a result of an agreement between the Company and the FDEP for the purpose of ensuring compliance with ozone ambient air quality standards adopted by the EPA.
In 2007, the Florida PSC voted to approve a stipulation among the Company, the Office of Public Counsel, and the Florida Industrial Power Users Group regarding the Company's plan for complying with certain federal and state regulations addressing air quality. The Company's environmental compliance plan as filed in 2007 contemplated implementation of specific projects identified in the plan from 2007 through 2018. The stipulation covers all elements of the original plan that were committed for implementation at the time of the stipulation. The Florida PSC's approval of the stipulation also required the Company to file annual updates to the plan and outlined a process for approval of additional elements in the plan when they became committed projects. In the 2010 update filing, the Company identified several elements of the updated plan that the Company had decided to implement. Following the process outlined in the original approved stipulation, these additional projects were approved by the Florida PSC later in 2010. The Florida PSC acknowledged that the costs of the approved projects associated with the Company's Clean Air Interstate Rule and Clean Air Visibility Rule compliance plans are eligible for recovery through the environmental cost recovery clause.
Annually, the Company seeks recovery of projected costs including any true-up amounts from prior periods. At December 31, 2012, the under recovered environmental balance was approximately $1.9 million, which is included in under recovered regulatory clause revenues in the balance sheets. At December 31, 2011, the over recovered environmental balance was approximately $10.0 million, which is included in other regulatory liabilities, current in the balance sheets.
On April 3, 2012, the Mississippi PSC approved Mississippi Power's request for a certificate of public convenience and necessity to construct a flue gas desulfurization system (scrubber) on Plant Daniel Units 1 and 2. On May 3, 2012, the Sierra Club filed a notice of appeal of the order with the Chancery Court of Harrison County, Mississippi. These units are jointly owned by Mississippi Power and the Company, with 50% ownership each. The estimated total cost of the project is approximately $660 million, excluding AFUDC, and it is scheduled for completion in December 2015. The Company's portion of the cost is expected to be recovered through the environmental cost recovery clause. The ultimate outcome of this matter cannot be determined at this time.
Energy Conservation Cost Recovery
Every five years, the Florida PSC establishes new numeric conservation goals covering a 10-year period for utilities to reduce annual energy and seasonal peak demand using demand-side management (DSM) programs. After the goals are established, utilities develop plans and programs to meet the approved goals. The costs for these programs are recovered through rates established annually in the energy conservation cost recovery (ECCR) clause.
The most recent goal setting process established new DSM goals for the period 2010 through 2019. The new goals are significantly higher than the goals established in the previous five-year cycle due to a change in the cost-effectiveness test on which the Florida PSC relies to set the goals. The DSM program standards were approved in April 2011, which allow the Company to implement its DSM programs designed to meet the new goals. Several of these new programs were implemented in June 2011 and the costs related to these programs are reflected in the 2012 ECCR factor approved by the Florida PSC. Higher cost recovery rates and achievement of the new DSM goals may result in reduced sales of electricity which could negatively impact results of operations, cash flows, and financial condition if base rates cannot be adjusted on a timely basis.
At December 31, 2012 and 2011, the under recovered energy conservation balance was approximately $0.8 million and $3.1 million, respectively, which is included in under recovered regulatory clause revenues in the balance sheets.
Mississippi Power [Member]
 
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
General Litigation Matters
The Company is subject to certain claims and legal actions arising in the ordinary course of business. In addition, the Company's business activities are subject to extensive governmental regulation related to public health and the environment such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury, property damage, and other claims for damages alleged to have been caused by carbon dioxide (CO2) and other emissions, coal combustion byproducts, and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters, have become more frequent. The ultimate outcome of such pending or potential litigation against the Company cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on the Company's financial statements.
Environmental Matters
New Source Review Actions
In 1999, the EPA brought a civil action in the U.S. District Court for the Northern District of Georgia against certain Southern Company subsidiaries, including Alabama Power and Georgia Power, alleging that these subsidiaries had violated the New Source Review (NSR) provisions of the Clean Air Act and related state laws at certain coal-fired generating facilities. The EPA alleged NSR violations at five coal-fired generating facilities operated by Alabama Power, including a unit co-owned by the Company, and three coal-fired generating facilities operated by Georgia Power. The civil action sought penalties and injunctive relief, including an order requiring installation of the best available control technology at the affected units. These actions were filed concurrently with the issuance of notices of violation to the Company with respect to the Company's Plant Watson. The case against Georgia Power was administratively closed in 2001 and has not been reopened. After Alabama Power was dismissed from the original action, the EPA filed a separate action in 2001 against Alabama Power (including claims related to the unit co-owned by the Company) in the U.S. District Court for the Northern District of Alabama.
In 2006, the U.S. District Court for the Northern District of Alabama entered a consent decree, resolving claims relating to the alleged NSR violations at Plant Miller. In 2010, the EPA dismissed five of its eight remaining claims against Alabama Power, leaving only three claims, including one relating to the unit co-owned by the Company. In March 2011, the U.S. District Court for the Northern District of Alabama granted Alabama Power summary judgment on all remaining claims and dismissed the case with prejudice. That judgment is on appeal to the U.S. Court of Appeals for the Eleventh Circuit. On February 23, 2012, the EPA filed a motion in the U.S. District Court for the Northern District of Alabama seeking vacatur of the judgment and recusal of the judge in the case involving Alabama Power.
The Company believes it complied with applicable laws and regulations in effect at the time the work in question took place. The Clean Air Act authorizes maximum civil penalties of $25,000 to $37,500 per day, per violation, depending on the date of the alleged violation. An adverse outcome could require substantial capital expenditures that cannot be determined at this time and could possibly require payment of substantial penalties. Such expenditures could affect future results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates. The ultimate outcome of this matter cannot be determined at this time.
Climate Change Litigation
Kivalina Case
In 2008, the Native Village of Kivalina and the City of Kivalina filed a lawsuit in the U.S. District Court for the Northern District of California against several electric utilities (including Southern Company), several oil companies, and a coal company. The plaintiffs allege that the village is being destroyed by erosion allegedly caused by global warming that the plaintiffs attribute to emissions of greenhouse gases by the defendants. The plaintiffs assert claims for public and private nuisance and contend that some of the defendants (including Southern Company) acted in concert and are therefore jointly and severally liable for the plaintiffs' damages. The suit seeks damages for lost property values and for the cost of relocating the village, which is alleged to be $95 million to $400 million. In 2009, the U.S. District Court for the Northern District of California granted the defendants' motions to dismiss the case. On September 21, 2012, the U.S. Court of Appeals for the Ninth Circuit upheld the U.S. District Court for the Northern District of California's dismissal of the case. On November 27, 2012, the U.S. Court of Appeals for the Ninth Circuit denied the plaintiffs' request for review of the decision. On February 25, 2013, the plaintiffs filed a petition for writ of certiorari with the U.S. Supreme Court. Southern Company believes that these claims are without merit. While Southern Company believes the likelihood of loss is remote based on existing case law, it is not possible to predict with certainty whether the Company will incur any liability in connection with this matter. The ultimate outcome of this matter cannot be determined at this time.
Environmental Remediation
The Company must comply with environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Company may also incur substantial costs to clean up properties. The Company has authority from the Mississippi PSC to recover approved environmental compliance costs through regulatory mechanisms.
In 2003, the Texas Commission on Environmental Quality (TCEQ) designated the Company as a potentially responsible party at a site in Texas. The site was owned by an electric transformer company that handled the Company's transformers as well as those of many other entities. The site owner is bankrupt and the State of Texas has entered into an agreement with the Company and several other utilities to investigate and remediate the site. The feasibility study/presumptive remedy document was originally filed with TCEQ in June 2011 and remains under consideration by the agency. Amounts expensed and accrued during 2010, 2011, and 2012 related to this work were not material. Hundreds of entities have received notices from the TCEQ requesting their participation in the anticipated site remediation. The final impact of this matter on the Company will depend upon further environmental assessment and the ultimate number of potentially responsible parties. The remediation expenses incurred by the Company are expected to be recovered through the Environmental Compliance Overview (ECO) Plan.
The final outcome of this matter cannot now be determined. However, based on the currently known conditions at this site and the nature and extent of activities relating to this site, the Company does not believe that additional liabilities, if any, at this site would be material to the financial statements.
FERC Matters
In November 2011, the Company filed a request with the FERC for an increase in wholesale base revenues of approximately $32 million under the wholesale cost-based electric tariff. In its filing with the FERC, the Company sought (i) approval to establish a regulatory asset for the portion of non-capitalizable Kemper IGCC-related costs which have been and will continue to be incurred during the construction period for the Kemper IGCC, (ii) authorization to defer as a regulatory asset, for the 10-year period ending October 2021, the difference between the revenue requirement under the purchase option of Plant Daniel Units 3 and 4 (assuming a remaining 30-year life) and the revenue requirement assuming the continuation of the operating lease regulatory treatment with the accumulated deferred balance at the end of the deferral being amortized into wholesale rates over the remaining life of Plant Daniel Units 3 and 4, and (iii) authority to defer in a regulatory asset costs related to the retirement or partial retirement of generating units as a result of environmental compliance rules.
On March 9, 2012, the Company entered into a settlement agreement with its wholesale customers with respect to the Company's request for revised rates under the wholesale cost-based electric tariff. The settlement agreement provides that base rates under the cost-based electric tariff will increase by approximately $22.6 million over a 12-month period with revised rates effective April 1, 2012. A significant portion of the difference between the requested base rate increase and the agreed upon rate increase is due to a change in the CWIP recovery on the Kemper IGCC. Under the settlement agreement, a portion of CWIP will continue to accrue AFUDC. The tariff customers specifically agreed to the same regulatory treatment for tariff ratemaking as the treatment approved for retail ratemaking by the Mississippi PSC with respect to (i) the accounting for Kemper IGCC-related costs that cannot be capitalized, (ii) the accounting for the lease termination and purchase of Plant Daniel Units 3 and 4, and (iii) the establishment of a regulatory asset for certain potential plant retirement costs.
On March 28, 2012, the FERC approved a motion to place interim rates into effect beginning in May 2012. On September 27, 2012, the Company, with its wholesale customers, filed a final settlement agreement with the FERC. On November 5, 2012, the settlement judge certified the settlement agreement to the FERC with the recommendation that it be approved. The FERC has not yet approved the settlement agreement. The ultimate outcome of this matter cannot be determined at this time.
Retail Regulatory Matters
Performance Evaluation Plan
The Company’s retail base rates are set under the Performance Evaluation Plan (PEP), a rate plan approved by the Mississippi PSC. PEP was designed with the objective to reduce the impact of rate changes on the customer and provide incentives for the Company to keep customer prices low and customer satisfaction and reliability high. PEP is a mechanism for rate adjustments based on three indicators: price, customer satisfaction, and service reliability.
In the 2004 order establishing the Company's forward-looking PEP, the Mississippi PSC ordered that the MPUS and the Company review the operations of the PEP in 2007. By mutual agreement, this review was deferred until 2008 and continued into 2009. In 2009, concurrent with this review, the annual PEP evaluation filing for 2009 was suspended and the MPUS and the Company filed a joint report with the Mississippi PSC proposing several changes to the PEP. The Mississippi PSC approved the revised PEP in 2009, which resulted in a lower performance incentive under the PEP and therefore smaller and/or less frequent rate changes in the future. Later that year, the Company resumed annual evaluations and filed its annual PEP filing for 2010 under the revised PEP, which resulted in a lower allowed return on investment but no rate change.
In 2010, the Company filed its annual PEP filing for 2011 under the revised PEP, which indicated a rate increase of 1.936%, or $16.1 million, annually. In January 2011, the MPUS contested the filing. In June 2011, the Mississippi PSC issued an order approving a joint stipulation between the MPUS and the Company resulting in no change in rates.
In November 2011, the Company filed its annual PEP filing for 2012, which indicated a rate increase of 1.893%, or $17.4 million, annually. On January 10, 2012, the MPUS contested the filing.
In March 2011, the Company submitted its annual PEP lookback filing for 2010, which recommended no surcharge or refund. In May 2011, the Company received a letter from the MPUS disputing certain items in the 2010 PEP lookback filing. On April 2, 2012, the Company filed a motion to suspend the PEP lookback filing for 2011. Unresolved matters related to certain costs included in the 2010 PEP lookback filing also impact the 2011 PEP lookback filing, making it impractical to determine the Company's actual retail return on investment for 2011 for purposes of the 2011 PEP lookback filing. An order granting the suspension of the 2011 PEP lookback was signed by the Mississippi PSC on May 8, 2012. On or before March 15, 2013, the Company will submit its annual PEP lookback filing for 2012. While the Company does not expect the resolution of these unresolved matters to have a material impact on its financial statements, the ultimate outcome of these matters cannot be determined at this time.
On January 18, 2013, the Company filed its annual PEP filing for 2013, which indicated a rate increase of 1.990%, or $15.8 million, annually.
The ultimate outcome of these matters cannot be determined at this time.
Environmental Compliance Overview Plan
In November 2011, the Company filed a request to establish a regulatory asset to defer certain plant retirement costs if such costs are incurred. This request was made to minimize the potential rate impact to customers arising from pending and final environmental regulations which may require the premature retirement of some generating units. These environmental rules and regulations are continuously being monitored by the Company and all options are being evaluated. In December 2011, an order was issued by the Mississippi PSC authorizing the Company to defer all plant retirement related costs resulting from compliance with environmental regulations as a regulatory asset for future recovery.
On February 14, 2012, the Company submitted its 2012 ECO Plan filing which proposed a 0.3% increase in annual revenues for the Company. In compliance with the certificate of public convenience and necessity (CPCN) to construct a scrubber on Plant Daniel Units 1 and 2, the Company revised the 2012 ECO Plan filing to exclude scrubber expenditures from rate base, which resulted in a 0.16% decrease in annual revenues. On June 22, 2012, the 2012 ECO Plan filing, including the proposed rate decrease, was approved by the Mississippi PSC, effective on June 29, 2012.
On April 3, 2012, the Mississippi PSC approved the Company's request for a CPCN to construct a scrubber on Plant Daniel Units 1 and 2. On May 3, 2012, the Sierra Club filed a notice of appeal of the order with the Chancery Court of Harrison County, Mississippi (Chancery Court). These units are jointly owned by the Company and Gulf Power, with 50% ownership each. The estimated total cost of the project is approximately $660 million, with the Company's portion being $330 million, excluding AFUDC. The project is scheduled for completion in December 2015. The Company's portion of the cost is expected to be recovered through the ECO Plan. As of December 31, 2012, total project expenditures were $146.6 million, with the Company's portion being $73.3 million.
On February 12, 2013, the Company submitted its 2013 ECO Plan filing, which proposed no change in rates.
The ultimate outcome of these matters cannot be determined at this time.
Certificated New Plant
See "Integrated Coal Gasification Combined Cycle" for information on certificated new plant and the Company's cost recovery plans.
Fuel Cost Recovery
The Company establishes, annually, a retail fuel cost recovery factor that is approved by the Mississippi PSC. On January 18, 2013, in compliance with the Company's filing requirement, the Company requested an annual adjustment of the retail fuel cost recovery factor in an amount equal to a decrease of 4.7% of total 2012 retail revenue. At December 31, 2012, the amount of over recovered retail fuel costs included in the balance sheets was $56.6 million compared to $42.4 million at December 31, 2011. The Company also has a wholesale Municipal and Rural Associations (MRA) and a Market Based (MB) fuel cost recovery factor. Effective January 1, 2013, the wholesale MRA fuel rate decreased resulting in an annual decrease in an amount equal to 3.3% of total 2012 MRA revenue. Effective February 1, 2013, the wholesale MB fuel rate decreased, resulting in an annual decrease in an amount equal to 5.5% of total 2012 MB revenue. At December 31, 2012, the amount of over recovered wholesale MRA and MB fuel costs included in the balance sheets was $19.0 million and $2.1 million compared to $14.3 million and $2.2 million, respectively, at December 31, 2011. In addition, at December 31, 2012, the amount of over recovered MRA emissions allowance cost included in the balance sheets was $0.4 million compared to $1.7 million at December 31, 2011. The Company's operating revenues are adjusted for differences in actual recoverable fuel cost and amounts billed in accordance with the currently approved cost recovery rate. Accordingly, changes in the billing factor have no significant effect on the Company's revenues or net income, but will affect annual cash flow.
In March 2011, a portion of the Company's territorial wholesale loads that was formerly served under the MB tariff terminated service. Beginning in April 2011, a new power purchase agreement (PPA) went into effect to cover these MB customers as non-territorial load. In June 2011, the Company and South Mississippi Electric Power Association (SMEPA) reached an agreement to allocate $3.7 million of the over recovered fuel balance at March 31, 2011 to the PPA. This amount was subsequently refunded to SMEPA in June 2011.
The Mississippi PSC engaged an independent professional audit firm to conduct an audit of the Company's fuel-related expenditures included in the retail fuel adjustment clause and ECM. The 2012 audit of fuel-related expenditures began in the second quarter 2012 and was completed in the fourth quarter 2012 with no audit findings.
System Restoration Rider
The Company is required to make annual SRR filings to review charges to the property damage reserve and to determine the revenue requirement associated with property damage. The purpose of the SRR is to provide for recovery of costs associated with property damage (including certain property insurance and the costs of self insurance) and to facilitate the Mississippi PSC's review of these costs. The Mississippi PSC periodically agrees on SRR revenue levels that are developed based on historical data, expected exposure, type and amount of insurance coverage excluding insurance costs, and other relevant information. The applicable SRR rate level will be adjusted every three years, unless a significant change in circumstances occurs such that the Company and the MPUS or the Mississippi PSC deems that a more frequent change would be appropriate. The Company will submit annual filings setting forth SRR-related revenues, expenses, and investment for the projected filing period, as well as the true-up for the prior period.
In January 2011, the Company submitted its 2011 SRR rate filing with the Mississippi PSC, which proposed that the 2011 SRR rate level remain at zero and the Company be allowed to accrue $3.6 million to the property damage reserve in 2011. On May 5, 2011, the filing was approved by the Mississippi PSC. On February 2, 2012, the Company submitted its 2012 SRR rate filing with the Mississippi PSC, which proposed that the 2012 SRR rate level remain at zero and the Company be allowed to accrue $3.8 million to the property damage reserve in 2012. On April 3, 2012, the filing was approved by the Mississippi PSC. On February 1, 2013, the Company submitted its 2013 SRR rate filing with the Mississippi PSC, which proposed that the 2013 SRR rate level remain at zero and the Company be allowed to accrue $3.2 million to the property damage reserve in 2013. The ultimate outcome of this matter cannot be determined at this time.
Storm Damage Cost Recovery
In August 2012, Hurricane Isaac hit the Gulf Coast of the United States and caused damage within the Company's service area. The estimated total storm restoration costs relating to Hurricane Isaac through December 31, 2012 were $10.5 million. The Company maintains a reserve to cover the cost of damage from major storms to its transmission and distribution facilities and generally the cost of uninsured damage to its generation facilities and other property. At December 31, 2012, the balance in the storm reserve was $58.8 million.
Integrated Coal Gasification Combined Cycle
General
The Company is constructing the Kemper IGCC which will utilize an IGCC technology with an output capacity of 582 MWs. The Kemper IGCC will use as fuel locally mined lignite (an abundant, lower heating value coal) from a mine owned by the Company and situated adjacent to the Kemper IGCC. In connection with the Kemper IGCC, the Company also plans to construct and operate approximately 61 miles of CO2 pipeline infrastructure. The Kemper IGCC is scheduled to be placed in-service in May 2014.
In 2010, the Mississippi PSC issued a CPCN authorizing the acquisition, construction, and operation of the Kemper IGCC (2010 MPSC Order). The Sierra Club filed an appeal of the Mississippi PSC's issuance of the CPCN and, on March 15, 2012, the Mississippi Supreme Court reversed the decision of the Chancery Court of Harrison County, Mississippi (Chancery Court) upholding the 2010 MPSC Order and remanded the matter to the Mississippi PSC. The Mississippi Supreme Court concluded that the 2010 MPSC Order did not cite in sufficient detail substantial evidence upon which the Mississippi Supreme Court could determine the basis for the findings of the Mississippi PSC granting the CPCN. On March 30, 2012, the Mississippi PSC issued a temporary authorization which allowed the Company to continue construction and, on April 24, 2012, issued a detailed order (2012 MPSC Order) confirming the CPCN for the Kemper IGCC. On April 26, 2012, the Sierra Club appealed the 2012 MPSC Order to the Chancery Court. On December 17, 2012, the Chancery Court affirmed the 2012 MPSC Order which confirmed the issuance of the CPCN for the Kemper IGCC. On January 8, 2013, the Sierra Club filed an appeal of the Chancery Court's ruling with the Mississippi Supreme Court.
The certificated cost estimate of the Kemper IGCC included in the 2012 MPSC Order was $2.4 billion, net of $245.3 million of grants awarded to the project by the DOE under the CCPI2 and excluding the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, and financing costs related to the Kemper IGCC. The 2012 MPSC Order approved a construction cost cap of up to $2.88 billion, with recovery of prudently-incurred costs subject to approval by the Mississippi PSC. Exemptions from the cost cap included in the 2012 MPSC Order included the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, financing costs, and certain general exceptions, including change of law, force majeure, and beneficial capital (which exists when the Company demonstrates that the purpose and effect of the construction cost increase is to produce efficiencies that will result in a neutral or favorable effect on the ratepayers, relative to the original proposal for the CPCN).
The Company's current cost estimate for the Kemper IGCC (net of the $245.3 million CCPI2 grant, and excluding the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, financing costs, and certain general exceptions as contemplated in the 2012 MPSC Order and the settlement agreement between the Company and the Mississippi PSC entered into on January 24, 2013 (Settlement Agreement) that must be specifically approved by the Mississippi PSC) is approximately $2.88 billion. The Mississippi PSC and the MPUS have engaged their independent monitors to assess the current cost estimates and schedule projections for the Kemper IGCC. These consultants have issued reports with their own opinions as to the likelihood that costs for the Kemper IGCC will remain at or under the $2.88 billion cost cap and as to the expected in-service date. While the Company continues to believe its cost estimate and schedule projection remain appropriate based on the current status of the project, it is possible that the Company could experience further cost increases and/or schedule delays with respect to the Kemper IGCC. Certain factors have caused and may continue to cause the costs for the Kemper IGCC to increase and/or schedule delays to occur including, but not limited to, costs and productivity of labor, adverse weather conditions, shortages and inconsistent quality of equipment, materials and labor, contractor or supplier delay or non-performance under construction or other agreements, and unforeseen engineering problems. To the extent it becomes probable that costs beyond any permitted exceptions to the cost cap will exceed $2.88 billion or it becomes probable that the Mississippi PSC will disallow a portion of the costs relating to the Kemper IGCC, including certain general exceptions as contemplated in the 2012 MPSC Order and the Settlement Agreement, charges to expense may occur and these charges could be material. See "Cost Recovery Plans" below for additional information relating to the Settlement Agreement that defines the process for resolving matters regarding cost recovery related to the Kemper IGCC.
As of December 31, 2012, the Company had spent a total of $2.51 billion on the Kemper IGCC, including the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, and other deferred costs. Of this total, $2.47 billion was included in CWIP (which is net of $245.3 million of CCPI2 grant funds), $34.9 million was recorded in other regulatory assets, $3.8 million was recorded in other deferred charges and assets, and $1.0 million was previously expensed. Consistent with the treatment of non-capital costs incurred during the pre-construction period, the Mississippi PSC granted the Company the authority to defer all non-capital Kemper IGCC-related costs to a regulatory asset during the construction period. This includes deferred costs associated with the generation resource planning, evaluation, and screening activities. The amortization period for the regulatory asset will be determined by the Mississippi PSC at a later date.
In addition, the Company is authorized to accrue carrying costs on the unamortized balance of such regulatory assets at a rate and in a manner to be determined by the Mississippi PSC in future cost recovery mechanism proceedings.
The 2012 MPSC Order established periodic prudence reviews during the annual CWIP review process. Of the total costs of $51 million incurred through March 2009, $46 million has been reviewed and deemed prudent by the Mississippi PSC. Due to the decision of the Mississippi PSC to deny the Certificated New Plant-A (CNP-A) rate filing and a 2012 rate request related to the Kemper IGCC described below, prudence reviews for the construction costs of the Kemper IGCC incurred after March 2009 have not been made. The Settlement Agreement provides for completion of all prudence reviews within six months of the date the Kemper IGCC is placed in service. See "Cost Recovery Plans" herein for additional information.
The ultimate outcome of these matters, including the determinations of prudency and the specific manner of recovery of prudently-incurred costs relating to the Kemper IGCC, is subject to further regulatory actions and cannot be determined at this time.
Cost Recovery Plans
The 2012 MPSC Order included provisions relating to both the Company's recovery of financing costs during the course of construction of the Kemper IGCC and the Company's recovery of costs following the date the Kemper IGCC is placed in service. In the 2012 MPSC Order, the Mississippi PSC approved financing cost recovery on CWIP balances not to exceed the $2.4 billion certificated cost estimate for the Kemper IGCC. The 2012 MPSC Order provided for the accrual of AFUDC in 2010 and 2011 and for the current recovery of financing costs on 100% of CWIP in 2012, 2013, and through May 1, 2014 (provided that the amount of financing cost recovery allowed is to be reduced by the amount of certain state and federal government construction cost incentives received by the Company and must be justified by a showing that such recovery will benefit customers over the life of the Kemper IGCC). With respect to recovery of costs following the in-service date of the Kemper IGCC, the 2012 MPSC Order provided for the establishment of operational cost and revenue parameters based upon assumptions in the Company's petition for the CPCN.
On June 1, 2012, the MPUS signed a joint stipulation with the Company to establish a proposed rate schedule detailing CNP-A and, on June 14, 2012, the Company submitted to the Mississippi PSC a filing to establish the new CNP-A rate schedule and a stipulated rate increase based upon the revenue request of between $55.3 million and $58.6 million to recover financing costs over the remainder of 2012. On June 22, 2012, the Mississippi PSC denied the proposed CNP-A rate schedule and the 2012 rate recovery filings submitted by the Company, pending a final ruling from the Mississippi Supreme Court regarding the Sierra Club's appeal of the Mississippi PSC's issuance of the CPCN for the Kemper IGCC.
On July 9, 2012, the Company appealed the Mississippi PSC's June 22, 2012 decision to the Mississippi Supreme Court and requested interim rates under bond of $55.3 million. On July 31, 2012, the Mississippi Supreme Court denied the Company's request for interim rates under bond until the Mississippi Supreme Court decides the Company's appeal of the Mississippi PSC's June 22, 2012 decision.
On January 24, 2013, the Company and the Mississippi PSC entered into the Settlement Agreement that (1) establishes the process for resolving matters regarding cost recovery related to the Kemper IGCC for the purpose of mitigating risks to the Company and its customers and expediting the regulatory process associated with future rate filings required under the Settlement Agreement and (2) resolves the Company's CNP-A rate appeal before the Mississippi Supreme Court.
On February 12, 2013, the Mississippi Supreme Court granted the Company and the Mississippi PSC's joint filing for dismissal of the Company's appeal of the Mississippi PSC's June 22, 2012 decision. 
Under the terms of the Settlement Agreement, the Company and the Mississippi PSC will follow certain agreed-upon regulatory procedures and schedules for resolving the cost recovery matters related to the Kemper IGCC. These procedures and schedules include the following:  (1) the Company's filing within 30 days of the Settlement Agreement of a new request to increase rates in 2013 in an amount not to exceed a $172 million annual revenue requirement, based upon projected investment as of December 31, 2013, to be recorded to a regulatory liability to be used to mitigate rate impacts when the Kemper IGCC is placed in service (which filing for $172 million was made on January 25, 2013); (2) the Mississippi PSC's decision on that matter within 50 days of the Company's request; (3) the Company's collaboration with the MPUS to file with the Mississippi PSC within three months of the Settlement Agreement a rate recovery plan for the Kemper IGCC for the first seven years of its operation, along with a proposed revenue requirement under such plan for 2014 through 2020 (which filing was made on February 26, 2013 as described below); (4) the Mississippi PSC's decision on the rate recovery plan within four months of that filing; (5) the Company's agreement to limit the portion of prudently-incurred Kemper IGCC costs to be included in rate base to the $2.4 billion certificated cost estimate, plus costs related to the lignite mine and CO2 pipeline as well as any other costs permitted or determined to be excluded from the cost cap, provided that this limitation will not prevent the Company from securing alternate financing to recover any prudently-incurred Kemper IGCC costs, including financing costs and plant costs above the $2.4 billion certificated cost estimate, not otherwise recovered in any Mississippi PSC rate proceeding contemplated by the Settlement Agreement; and (6) the Mississippi PSC's completion of its prudence review of the Kemper IGCC costs incurred through 2012 within six months of the Settlement Agreement, an additional prudence review upon considering the seven-year rate plan for costs incurred through the most recent reporting period, and a final prudence review of the remaining project costs within six months of the Kemper IGCC's in-service date.
Legislation to authorize a multi-year rate plan and legislation to provide for alternate financing through securitization was passed in the Mississippi legislature and was signed by the Governor on February 26, 2013. The Company contemplates using securitization as provided in the legislation as its form of alternate financing for prudently-incurred Kemper IGCC costs, including financing costs and plant costs above the $2.4 billion certificated cost estimate, not otherwise recovered in any Mississippi PSC rate proceeding contemplated by the Settlement Agreement.
On February 26, 2013, the Company, in compliance with the Settlement Agreement, filed with the Mississippi PSC a rate recovery plan for the Kemper IGCC for 2014 through 2020, the first seven years of operation of the Kemper IGCC. The rate recovery plan proposes recovery of an annual revenue requirement of approximately $150 million of Kemper IGCC-related operational costs and rate base amounts, including plant costs equal to the $2.4 billion certificated cost estimate. Approval of the Company's request to increase rates in 2013 to mitigate the rate impacts of the Kemper IGCC filed on January 25, 2013 is integral to the rate recovery plan as the proposed filing contemplates amortization of the regulatory liability to be used to mitigate rate impacts from 2014 through 2020, based on a fixed amortization schedule that requires approval by the Mississippi PSC. Under the rate recovery plan filing, the Company proposes annual recovery to remain the same from 2014 through 2020 and while it is the intent of the Company for the actual revenue requirement to equal the proposed revenue requirement for certain items, the Company proposes that the annual differences for those items through 2020 will be deferred, subject to accrual of carrying costs, and the cumulative balance will be reviewed at the end of the term of the Settlement Agreement by the Mississippi PSC for determination of the manner of recovery. The Company proposes to secure recovery of prudently-incurred Kemper IGCC costs, including financing costs and plant costs above the $2.4 billion certificated cost estimate, not otherwise recovered in any Mississippi PSC rate proceeding contemplated by the Settlement Agreement to be provided for with alternate financing through securitization. The rate recovery necessary to recover the annual costs of securitization is proposed to be filed and begin after the Kemper IGCC is placed in service.
Under the terms of the Settlement Agreement, the Company has the right to terminate the Settlement Agreement if certain conditions, including the passage of multi-year rate plan legislation that is contemplated under the Settlement Agreement, are not met, if the Company is unable to secure alternate financing for any prudently-incurred Kemper IGCC costs not otherwise recovered in any Mississippi PSC rate proceeding contemplated by the Settlement Agreement, or if the Mississippi PSC fails to comply with the requirements of the Settlement Agreement.
The ultimate outcome of these matters, including the determinations of prudency and the specific manner of recovery of prudently-incurred costs relating to the Kemper IGCC, is subject to further regulatory actions and cannot be determined at this time.
Tax Incentives
The Internal Revenue Service (IRS) has allocated $133 million (Phase I) and $279 million (Phase II) of Internal Revenue Code Section 48A tax credits to the Company in connection with the Kemper IGCC. The Company's utilization of Phase I and Phase II credits is dependent upon meeting the IRS certification requirements, including an in-service date no later than May 11, 2014 for the Phase I credits and April 19, 2016 for the Phase II credits. In order to remain eligible for the Phase II credits, the Company plans to capture and sequester (via enhanced oil recovery) at least 65% of the CO2 produced by the Kemper IGCC during operations in accordance with the rules for Section 48A investment tax credits. Through December 31, 2012, the Company received or accrued tax benefits totaling $361.6 million for these tax credits, which will be amortized as a reduction to depreciation and amortization over the life of the Kemper IGCC. As a result of bonus tax depreciation on certain assets placed, or to be placed, in service in 2012 and 2013, and the subsequent reduction in federal taxable income, the Company estimates that it will not be able to utilize $170.9 million of these tax credits until after 2013. IRS guidelines allow these unused tax credits to be carried forward for 20 years, expiring at the end of 2031, if not utilized before then. On October 15, 2012, the Company filed an application with the DOE for certification of the Kemper IGCC for additional tax credits under the Internal Revenue Code Section 48A (Phase III). A portion of the tax credits realized by the Company may be subject to recapture upon successful completion of SMEPA's purchase of an undivided interest in the Kemper IGCC as described below. In addition, all or a portion of the tax credits will be subject to recapture if the Company fails to satisfy the in-service date requirements and carbon capture requirements described above. See Note 5 under "Current and Deferred Income Taxes" for additional information.
On January 2, 2013, the American Taxpayer Relief Act of 2012 (ATRA) was signed into law. The ATRA retroactively extended several tax credits through 2013 and 50% bonus depreciation for property to be placed in service in 2013 (and for certain long-term production-period projects to be placed in service in 2014), which is expected to apply to the Kemper IGCC.
The ultimate outcome of these matters cannot be determined at this time.
Lignite Mine and CO2 Pipeline Facilities
In conjunction with the Kemper IGCC, the Company will own the lignite mine and equipment and has acquired and will continue to acquire mineral reserves located around the Kemper IGCC site in Kemper County. The mine is scheduled to be placed in-service in June 2013. The estimated capital cost of the mine is approximately $245 million, of which $163.3 million has been incurred through December 31, 2012.
In 2010, the Company executed a 40-year management fee contract with Liberty Fuels Company, LLC, a wholly-owned subsidiary of The North American Coal Corporation (Liberty Fuels), which will develop, construct, and manage the mining operations. Because Liberty Fuels conducts all of its activities on behalf of the Company, Liberty Fuels qualifies as a VIE for which the Company is the primary beneficiary. The contract with Liberty Fuels is effective through the end of the mine reclamation. As the mining permit holder, Liberty Fuels has a legal obligation to perform mine reclamation and the Company has a contractual obligation to fund all reclamation activities. Consistent with the requirements of consolidation accounting, Liberty Fuels is consolidated in the financial statements of the Company and accordingly the asset retirement cost and the ARO have been recorded in the Company's financial statements. In addition to the obligation to fund the reclamation activities, the Company currently provides working capital support to Liberty Fuels through cash advances for capital purchases, payroll, and other operating expenses.
In addition, the Company will acquire, construct, and operate the CO2 pipeline for the planned transport of captured CO2 for use in enhanced oil recovery. The Company has entered into agreements with Denbury Onshore (Denbury), a subsidiary of Denbury Resources Inc., and Treetop Midstream Services, LLC (Treetop), an affiliate of Tellus Operating Group, LLC and a subsidiary of Tengrys, LLC, pursuant to which Denbury will purchase 70% of the CO2 captured from the Kemper IGCC and Treetop will purchase 30% of the CO2 captured from the Kemper IGCC. The estimated capital cost of the CO2 pipeline facilities is approximately $132 million, of which $78.4 million has been incurred through December 31, 2012.
The ultimate outcome of these matters, including the determinations of prudency and the specific manner of recovery of prudently-incurred costs relating to the Kemper IGCC, is subject to further regulatory actions and cannot be determined at this time.
Proposed Sale of Undivided Interest to SMEPA
In 2010, the Company and SMEPA entered into an asset purchase agreement whereby SMEPA agreed to purchase a 17.5% undivided interest in the Kemper IGCC. On February 28, 2012, the Mississippi PSC approved the sale and transfer of 17.5% of the Kemper IGCC to SMEPA. On June 29, 2012, the Company and SMEPA signed an amendment to the asset purchase agreement whereby SMEPA extended its option to purchase until December 31, 2012 and reduced its purchase commitment percentage from a 17.5% to a 15% undivided interest in the Kemper IGCC, subject to approval by the Mississippi PSC. On December 31, 2012, the Company and SMEPA agreed to extend SMEPA's option to purchase through December 31, 2013.
The closing of this transaction is conditioned upon execution of a joint ownership and operating agreement, receipt of all construction permits, appropriate regulatory approvals, financing, and other conditions. On September 27, 2012, SMEPA received a conditional loan commitment from Rural Utilities Service to provide funding for SMEPA's undivided interest in the Kemper IGCC.
On March 6, 2012, the Company received a $150 million interest-bearing refundable deposit from SMEPA to be applied to the purchase. While the expectation is that the amount will be applied to the purchase price at closing, the Company would be required to refund the deposit upon the termination of the asset purchase agreement, within 60 days of a request by SMEPA for a full or partial refund, or within 15 days at SMEPA's discretion in the event that the Company is assigned a senior unsecured credit rating of BBB+ or lower by Standard and Poor's Ratings Services, a division of The McGraw Hill Companies, Inc. (S&P) or Baa1 or lower by Moody's Investors Services, Inc. (Moody's) or ceases to be rated by either of these rating agencies. Given the interest-bearing nature of the deposit and SMEPA's ability to request a refund, the deposit has been presented as a current liability in the Company's balance sheet herein and as financing proceeds in the Company's statement of cash flows herein.
The ultimate outcome of these matters cannot be determined at this time.
Baseload Act
In the 2008 regular session of the Mississippi legislature, a bill was passed and signed by the Governor to enhance the Mississippi PSC's authority to facilitate development and construction of base load generation in the State of Mississippi (Baseload Act). The Baseload Act authorizes, but does not require, the Mississippi PSC to adopt a cost recovery mechanism that includes in retail base rates, prior to and during construction, all or a portion of the prudently-incurred pre-construction and construction costs incurred by a utility in constructing a base load electric generating plant. Prior to the passage of the Baseload Act, such costs would traditionally be recovered only after the plant was placed in service. The Baseload Act also provides for periodic prudence reviews by the Mississippi PSC and prohibits the cancellation of any such generating plant without the approval of the Mississippi PSC. In the event of cancellation of the construction of the plant without approval of the Mississippi PSC, the Baseload Act authorizes the Mississippi PSC to make a public interest determination as to whether and to what extent the utility will be afforded rate recovery for costs incurred in connection with such cancelled generating plant. There are legal challenges to the constitutionality of the Baseload Act currently pending before the Mississippi Supreme Court. The ultimate impact of this legislation will depend on the outcome of any legal challenges and cannot be determined at this time. See "Cost Recovery Plans" herein for additional information regarding certain legislation related to the Kemper IGCC.
Southern Power [Member]
 
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
General Litigation Matters
The Company is subject to certain claims and legal actions arising in the ordinary course of business. In addition, the Company's business activities are subject to extensive governmental regulation related to public health and the environment. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury, property damage, and other claims for damages alleged to have been caused by carbon dioxide and other emissions and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters, have become more frequent. The ultimate outcome of such pending or potential litigation against the Company and its subsidiaries cannot be predicted at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on the Company's financial statements.
Climate Change Litigation
Kivalina Case
In 2008, the Native Village of Kivalina and the City of Kivalina filed a lawsuit in the U.S. District Court for the Northern District of California against several electric utilities (including Southern Company), several oil companies, and a coal company. The plaintiffs allege that the village is being destroyed by erosion allegedly caused by global warming that the plaintiffs attribute to emissions of greenhouse gases by the defendants. The plaintiffs assert claims for public and private nuisance and contend that some of the defendants (including Southern Company) acted in concert and are therefore jointly and severally liable for the plaintiffs' damages. The suit seeks damages for lost property values and for the cost of relocating the village, which is alleged to be $95 million to $400 million. In 2009, the U.S. District Court for the Northern District of California granted the defendants' motions to dismiss the case. On September 21, 2012, the U.S. Court of Appeals for the Ninth Circuit upheld the U.S. District Court for the Northern District of California's dismissal of the case. On November 27, 2012, the U.S. Court of Appeals for the Ninth Circuit denied the plaintiffs' request for review of the decision. On February 25, 2013, the plaintiffs filed a petition for writ of certiorari with the U.S. Supreme Court. Southern Company believes that these claims are without merit. While Southern Company believes the likelihood of loss is remote based on existing case law, it is not possible to predict with certainty whether the Company will incur any liability in connection with this matter. The ultimate outcome of this matter cannot be determined at this time.
Hurricane Katrina Case
In 2005, immediately following Hurricane Katrina, a lawsuit was filed in the U.S. District Court for the Southern District of Mississippi by Ned Comer on behalf of Mississippi residents seeking recovery for property damage and personal injuries caused by Hurricane Katrina. In 2006, the plaintiffs amended the complaint to include Southern Company and many other electric utilities, oil companies, chemical companies, and coal producers. The plaintiffs allege that the defendants contributed to climate change, which contributed to the intensity of Hurricane Katrina. In 2007, the U.S. District Court for the Southern District of Mississippi dismissed the case. On appeal to the U.S. Court of Appeals for the Fifth Circuit, a three-judge panel reversed the U.S. District Court for the Southern District of Mississippi, holding that the case could proceed, but, on rehearing, the full U.S. Court of Appeals for the Fifth Circuit dismissed the plaintiffs' appeal, resulting in reinstatement of the decision of the U.S. District Court for the Southern District of Mississippi in favor of the defendants. In May 2011, the plaintiffs filed an amended version of their class action complaint, arguing that the earlier dismissal was on procedural grounds and under Mississippi law the plaintiffs have a right to re-file. The amended complaint was also filed against numerous chemical, coal, oil, and utility companies, including the Company. On March 20, 2012, the U.S. District Court for the Southern District of Mississippi dismissed the plaintiffs' amended complaint. On April 16, 2012, the plaintiffs appealed the case to the U.S. Court of Appeals for the Fifth Circuit. The Company believes that these claims are without merit. While the Company believes the likelihood of loss is remote based on existing case law, it is not possible to predict with certainty whether the Company will incur any liability in connection with this matter. The ultimate outcome of this matter cannot be determined at this time.