XML 38 R10.htm IDEA: XBRL DOCUMENT v3.5.0.2
Contingencies and Regulatory Matters
6 Months Ended
Jun. 30, 2016
Commitments and Contingencies Disclosure [Abstract]  
CONTINGENCIES AND REGULATORY MATTERS
CONTINGENCIES AND REGULATORY MATTERS
See Note 3 to the financial statements of the registrants in Item 8 of the Form 10-K for information relating to various lawsuits, other contingencies, and regulatory matters.
General Litigation Matters
Each registrant is subject to certain claims and legal actions arising in the ordinary course of business. In addition, business activities of Southern Company's subsidiaries are subject to extensive governmental regulation related to public health and the environment, such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has occurred throughout the U.S. This litigation has included claims for damages alleged to have been caused by CO2 and other emissions, CCR, and alleged exposure to hazardous materials, and/or requests for injunctive relief in connection with such matters.
The ultimate outcome of such pending or potential litigation against each registrant and any subsidiaries cannot be predicted at this time; however, for current proceedings not specifically reported herein or in Note 3 to the financial statements of each registrant in Item 8 of the Form 10-K, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on such registrant's financial statements.
Environmental Remediation
The Southern Company system must comply with environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Southern Company system could incur substantial costs to clean up affected sites. The traditional electric operating companies have each received authority from their respective state PSCs to recover approved environmental compliance costs through regulatory mechanisms. These rates are adjusted annually or as necessary within limits approved by the state PSCs.
Georgia Power's environmental remediation liability as of June 30, 2016 was $23 million. Georgia Power has been designated or identified as a potentially responsible party (PRP) at sites governed by the Georgia Hazardous Site Response Act and/or by the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), including a site in Brunswick, Georgia on the CERCLA National Priorities List. The PRPs at the Brunswick site have completed a removal action as ordered by the EPA. On July 29, 2016, Honeywell International, Inc. and Georgia Power entered into a consent decree with the EPA to perform additional remediation at the site. Additional response actions at the site are anticipated. In September 2015, Georgia Power entered into an allocation agreement with another PRP, under which that PRP will be responsible (as between Georgia Power and that PRP) for paying and performing certain investigation, assessment, remediation, and other incidental activities at the Brunswick site, including costs associated with implementation of the consent decree. Assessment and potential cleanup of other sites are anticipated.
The ultimate outcome of these matters will depend upon the success of defenses asserted, the ultimate number of PRPs participating in the cleanup, and numerous other factors and cannot be determined at this time; however, as a result of Georgia Power's regulatory treatment for environmental remediation expenses, these matters are not expected to have a material impact on Southern Company's or Georgia Power's financial statements.
Gulf Power's environmental remediation liability includes estimated costs of environmental remediation projects of approximately $46 million as of June 30, 2016. These estimated costs primarily relate to site closure criteria by the Florida Department of Environmental Protection (FDEP) for potential impacts to soil and groundwater from herbicide applications at Gulf Power substations. The schedule for completion of the remediation projects is subject to FDEP approval. The projects have been approved by the Florida PSC for recovery through Gulf Power's environmental cost recovery clause; therefore, these liabilities have no impact on net income.
The final outcome of these matters cannot be determined at this time. However, based on the currently known conditions at these sites and the nature and extent of activities relating to these sites, management of Southern Company and Gulf Power does not believe that additional liabilities, if any, at these sites would be material to their respective financial statements.
FERC Matters
Municipal and Rural Associations Tariff
See Note 3 to the financial statements of Mississippi Power under "FERC Matters" in Item 8 of the Form 10-K for additional information regarding a settlement agreement entered into by Mississippi Power regarding the establishment of a regulatory asset for Kemper IGCC-related costs. See "Integrated Coal Gasification Combined Cycle" herein for information regarding Mississippi Power's construction of the Kemper IGCC.
On March 31, 2016, Mississippi Power reached a settlement agreement with its wholesale customers and filed a request with the FERC for an increase in wholesale base revenues under the Municipal and Rural Associations (MRA) cost-based electric tariff. The settlement agreement, accepted by the FERC, effective for services rendered beginning May 1, 2016, provides that base rates under the MRA cost-based electric tariff will produce additional annual base revenues of $7 million. The increase is primarily due to the Plant Daniel Units 1 and 2 scrubbers, which were placed in service in November 2015. Additionally, under the settlement agreement, the tariff customers agreed to similar regulatory treatment for MRA tariff ratemaking as the treatment approved for retail ratemaking under the December 2015 Mississippi PSC order authorizing rates providing recovery of assets previously placed in service (In-Service Asset Rate Order). This regulatory treatment primarily includes (i) recovery of the Kemper IGCC assets currently operational and providing service to customers and other related costs, (ii) amortization of the Kemper IGCC-related regulatory assets included in rates under the settlement agreement over 36 months, (iii) Kemper IGCC-related expenses included in rates under the settlement agreement no longer being deferred and charged to expense, and (iv) removing all of the Kemper IGCC CWIP from rate base with a corresponding increase in accrual of AFUDC. The additional resulting AFUDC is estimated to be approximately $8 million through the Kemper IGCC's projected in-service date of October 31, 2016.
Fuel Cost Recovery
Mississippi Power has a wholesale MRA and a Market Based (MB) fuel cost recovery factor. At June 30, 2016, the amount of over-recovered wholesale MRA fuel costs included in the balance sheets was $23 million compared to $24 million at December 31, 2015. See Note 3 to the financial statements of Mississippi Power under "FERC Matters Fuel Cost Recovery" in Item 8 of the Form 10-K for additional information.
Market-Based Rate Authority
The traditional electric operating companies and Southern Power have authority from the FERC to sell electricity at market-based rates. Since 2008, that authority, for certain balancing authority areas, has been conditioned on compliance with the requirements of an energy auction, which the FERC found to be tailored mitigation that addresses potential market power concerns. In accordance with FERC regulations governing such authority, the traditional electric operating companies and Southern Power filed a triennial market power analysis in 2014, which included continued reliance on the energy auction as tailored mitigation. In April 2015, the FERC issued an order finding that the traditional electric operating companies' and Southern Power's existing tailored mitigation may not effectively mitigate the potential to exert market power in certain areas served by the traditional electric operating companies and in some adjacent areas. The FERC directed the traditional electric operating companies and Southern Power to show why market-based rate authority should not be revoked in these areas or to provide a mitigation plan to further address market power concerns. The traditional electric operating companies and Southern Power filed a request for rehearing in May 2015 and in June 2015 filed their response with the FERC. The ultimate outcome of this matter cannot be determined at this time.
Retail Regulatory Matters
Alabama Power
See Note 3 to the financial statements of Southern Company and Alabama Power under "Retail Regulatory Matters Alabama Power" and "Retail Regulatory Matters," respectively, in Item 8 of the Form 10-K for additional information regarding Alabama Power's recovery of retail costs through various regulatory clauses and accounting orders. The balance of each regulatory clause recovery on the balance sheet follows:
Regulatory Clause
Balance Sheet Line Item
June 30,
2016

December 31, 2015


(in millions)
Rate CNP Compliance
Under recovered regulatory clause revenues
$
7

 
$
43

 
Deferred under recovered regulatory clause revenues
21

 

Rate CNP PPA
Deferred under recovered regulatory clause revenues
115


99

Retail Energy Cost Recovery
Other regulatory liabilities, current
75


238


Deferred over recovered regulatory clause revenues
102



Natural Disaster Reserve
Other regulatory liabilities, deferred
72


75


Environmental Accounting Order
In April 2016, as part of its environmental compliance strategy, Alabama Power ceased using coal at Plant Greene County Units 1 and 2 (300 MWs representing Alabama Power's ownership interest) and began operating Units 1 and 2 solely on natural gas in May 2016 and July 2016, respectively.
Georgia Power
Rate Plans
See Note 3 to the financial statements of Southern Company and Georgia Power under "Retail Regulatory Matters – Georgia Power – Rate Plans" and "Retail Regulatory Matters – Rate Plans," respectively, in Item 8 of the Form 10-K for additional information.
Georgia Power's revenues from regulated retail operations are collected through various rate mechanisms subject to the oversight of the Georgia PSC. Georgia Power currently recovers its costs from the regulated retail business through the 2013 ARP, which includes traditional base tariff rates, Demand-Side Management tariffs, Environmental Compliance Cost Recovery tariffs, and Municipal Franchise Fee tariffs. In addition, financing costs related to the construction of Plant Vogtle Units 3 and 4 are being collected through the NCCR tariff and fuel costs are collected through separate fuel cost recovery tariffs. See "Fuel Cost Recovery" herein and Note 3 to the financial statements of Georgia Power under "Retail Regulatory Matters – Nuclear Construction" and Southern Company under "Retail Regulatory Matters – Georgia Power – Fuel Cost Recovery" and " – Nuclear Construction" in Item 8 of the Form 10-K for additional information regarding fuel cost recovery and the NCCR tariff, respectively.
Pursuant to the terms and conditions of a settlement agreement related to Southern Company's acquisition of Southern Company Gas approved by the Georgia PSC on April 14, 2016, Georgia Power's 2013 ARP will continue in effect until December 31, 2019, and Georgia Power will be required to file its next base rate case by July 1, 2019. Furthermore, through December 31, 2019, Georgia Power and Atlanta Gas Light Company (collectively, Utilities) each will retain their respective merger savings, net of transition costs, as defined in the settlement agreement; through December 31, 2022, such net merger savings applicable to each utility will be shared on a 60/40 basis between their respective customers and the Utilities; thereafter, all merger savings will be retained by customers. See Note (I) under "Southern CompanyMerger with Southern Company Gas" for additional information regarding the Merger.
Integrated Resource Plan
See Note 3 to the financial statements of Southern Company and Georgia Power under "Retail Regulatory Matters – Georgia Power – Integrated Resource Plan" and "Retail Regulatory Matters – Integrated Resource Plan," respectively, in Item 8 of the Form 10-K for additional information regarding Georgia Power's triennial Integrated Resource Plan (2016 IRP).
On July 28, 2016, the Georgia PSC voted to approve the 2016 IRP including the decertification and retirement of Plant Mitchell Units 3, 4A, and 4B (217 MWs) and Plant Kraft Unit 1 combustion turbine (17 MWs), as well as the decertification of the Intercession City unit (143 MWs total capacity). On August 2, 2016, the Plant Mitchell and Plant Kraft units were retired. Georgia Power exercised its contractual option to sell its 33% ownership interest in the Intercession City unit to Duke Energy Florida, Inc., with an expected closing date in late August 2016.
Additionally, the Georgia PSC approved Georgia Power's environmental compliance strategy and related expenditures proposed in the 2016 IRP, including measures taken to comply with existing government-imposed environmental mandates, subject to limits on expenditures for Plant McIntosh Unit 1 and Plant Hammond Units 1 through 4.
The Georgia PSC approved reclassification of the remaining net book value of Plant Mitchell Unit 3 and costs associated with materials and supplies remaining at the unit retirement date to a regulatory asset. Recovery of the unit's net book value will continue through December 31, 2019, as provided in the 2013 ARP. Recovery of the remaining balance of the unit's net book value as of December 31, 2019 and costs associated with materials and supplies remaining at the unit retirement date will be deferred for consideration in Georgia Power's 2019 general base rate case.
The Georgia PSC also approved the Renewable Energy Development Initiative to procure an additional 1,200 MWs of renewable resources primarily utilizing market-based prices established through a competitive bidding process with expected in-service dates between 2018 and 2021. Additionally, 200 MWs of self-build capacity for use by Georgia Power was approved, as well as consideration for no more than 200 MWs of capacity as part of a renewable commercial and industrial program.
The Georgia PSC also approved recovery of costs up to $99 million through June 30, 2019 to preserve the nuclear option at a future generation site in Stewart County, Georgia. The timing of cost recovery will be determined by the Georgia PSC in a future base rate case. The ultimate outcome of this matter cannot be determined at this time.
Fuel Cost Recovery
See Note 3 to the financial statements of Southern Company and Georgia Power under "Retail Regulatory Matters – Georgia Power – Fuel Cost Recovery" and "Retail Regulatory Matters – Fuel Cost Recovery," respectively, in Item 8 of the Form 10-K for additional information.
As of June 30, 2016 and December 31, 2015, Georgia Power's over recovered fuel balance totaled $164 million and $116 million, respectively, and is included in current liabilities and other deferred liabilities on Southern Company's and Georgia Power's Condensed Balance Sheets. On May 17, 2016, the Georgia PSC approved Georgia Power's request to decrease fuel rates by 15% effective June 1, 2016, which will reduce annual billings by approximately $313 million. Georgia Power is currently scheduled to file its next fuel case by February 28, 2017.
Fuel cost recovery revenues are adjusted for differences in actual recoverable fuel costs and amounts billed in current regulated rates. Accordingly, changes in the billing factor will not have a significant effect on Southern Company's or Georgia Power's revenues or net income, but will affect cash flow.
Nuclear Construction
See Note 3 to the financial statements of Southern Company and Georgia Power under "Retail Regulatory Matters – Georgia Power – Nuclear Construction" and "Retail Regulatory Matters – Nuclear Construction," respectively, in Item 8 of the Form 10-K for additional information regarding Georgia Power's construction of Plant Vogtle Units 3 and 4, Vogtle Construction Monitoring (VCM) reports, the NCCR tariff, the Vogtle Construction Litigation (as defined below), and the Contractor Settlement Agreement (as defined below).
In 2008, Georgia Power, acting for itself and as agent for the Vogtle Owners, entered into an agreement with the Contractor, pursuant to which the Contractor agreed to design, engineer, procure, construct, and test Plant Vogtle Units 3 and 4 (Vogtle 3 and 4 Agreement).
Under the terms of the Vogtle 3 and 4 Agreement, the Vogtle Owners agreed to pay a purchase price subject to certain price escalations and adjustments, including fixed escalation amounts and index-based adjustments, as well as adjustments for change orders, and performance bonuses for early completion and unit performance. The Vogtle 3 and 4 Agreement also provides for liquidated damages upon the Contractor's failure to fulfill the schedule and performance guarantees, subject to a cap. In addition, the Vogtle 3 and 4 Agreement provides for limited cost sharing by the Vogtle Owners for Contractor costs under certain conditions (which have not occurred), with maximum additional capital costs under this provision attributable to Georgia Power (based on Georgia Power's ownership interest) of approximately $114 million. Each Vogtle Owner is severally (and not jointly) liable for its proportionate share, based on its ownership interest, of all amounts owed to the Contractor under the Vogtle 3 and 4 Agreement. Georgia Power's proportionate share is 45.7%.
On December 31, 2015, Westinghouse acquired Stone & Webster, Inc. from Chicago Bridge & Iron Company, N.V. (CB&I) and changed the name of Stone & Webster, Inc. to WECTEC Global Project Services Inc. (WECTEC). Certain obligations of Westinghouse and WECTEC under the Vogtle 3 and 4 Agreement were originally guaranteed by Toshiba Corporation (Westinghouse's parent company) and The Shaw Group Inc. (which is now a subsidiary of CB&I), respectively. On March 9, 2016, in connection with Westinghouse's acquisition of WECTEC and pursuant to the settlement agreement described below, the guarantee of The Shaw Group Inc. was terminated. The guarantee of Toshiba Corporation remains in place. In the event of certain credit rating downgrades of any Vogtle Owner, such Vogtle Owner will be required to provide a letter of credit or other credit enhancement. Additionally, as a result of credit rating downgrades of Toshiba Corporation, Westinghouse provided the Vogtle Owners with letters of credit in an aggregate amount of $920 million in accordance with, and subject to adjustment under, the terms of the Vogtle 3 and 4 Agreement.
The Vogtle Owners may terminate the Vogtle 3 and 4 Agreement at any time for their convenience, provided that the Vogtle Owners will be required to pay certain termination costs. The Contractor may terminate the Vogtle 3 and 4 Agreement under certain circumstances, including certain Vogtle Owner suspension or delays of work, action by a governmental authority to permanently stop work, certain breaches of the Vogtle 3 and 4 Agreement by the Vogtle Owners, Vogtle Owner insolvency, and certain other events.
In 2009, the Georgia PSC voted to certify construction of Plant Vogtle Units 3 and 4. Georgia Power is required to file semi-annual VCM reports with the Georgia PSC by February 28 and August 31 each year. If the projected construction capital costs to be borne by Georgia Power increase by 5% above the certified cost or the projected in-service dates are significantly extended, Georgia Power is required to seek an amendment to the Plant Vogtle Units 3 and 4 certificate from the Georgia PSC. In February 2013, Georgia Power requested an amendment to the certificate to increase the estimated in-service capital cost of Plant Vogtle Units 3 and 4 from $4.4 billion to $4.8 billion and to extend the estimated in-service dates to the fourth quarter 2017 (from April 2016) and the fourth quarter 2018 (from April 2017) for Plant Vogtle Units 3 and 4, respectively. In October 2013, the Georgia PSC approved a stipulation (2013 Stipulation) between Georgia Power and the Georgia PSC Staff (Staff) to waive the requirement to amend the Plant Vogtle Units 3 and 4 certificate until the completion of Plant Vogtle Unit 3 or earlier if deemed appropriate by the Georgia PSC and Georgia Power.
On April 15, 2015, the Georgia PSC issued a procedural order in connection with the twelfth VCM report, which included a requested amendment (Requested Amendment) to the Plant Vogtle Units 3 and 4 certificate to reflect the Contractor's revised forecast for completion of Plant Vogtle Units 3 and 4 (second quarter of 2019 and second quarter of 2020, respectively) as well as additional estimated Vogtle Owner's costs, of approximately $10 million per month, including property taxes, oversight costs, compliance costs, and other operational readiness costs to include the estimated Vogtle Owner's costs associated with the proposed 18-month Contractor delay and to increase the estimated total in-service capital cost of Plant Vogtle Units 3 and 4 to $5.0 billion. Pursuant to the Georgia PSC's procedural order, the Georgia PSC deemed the Requested Amendment unnecessary and withdrawn until the completion of construction of Plant Vogtle Unit 3 consistent with the 2013 Stipulation. The Georgia PSC recognized that the certified cost and the 2013 Stipulation do not constitute a cost recovery cap. In accordance with the Georgia Integrated Resource Planning Act, any costs incurred by Georgia Power in excess of the certified amount will be included in rate base, provided Georgia Power shows the costs to be reasonable and prudent. Financing costs up to the certified amount will be collected through the NCCR tariff until the units are placed in service and contemplated in a general base rate case, while financing costs on any construction-related costs in excess of the $4.4 billion certified amount are expected to be recovered through AFUDC.
On December 31, 2015, Westinghouse and the Vogtle Owners entered into a definitive settlement agreement (Contractor Settlement Agreement) to resolve disputes between the Vogtle Owners and the Contractor under the Vogtle 3 and 4 Agreement, including litigation that was pending in the U.S. District Court for the Southern District of Georgia (Vogtle Construction Litigation). Effective December 31, 2015, Georgia Power, acting for itself and as agent for the other Vogtle Owners, and the Contractor entered into an amendment to the Vogtle 3 and 4 Agreement to implement the Contractor Settlement Agreement. The Contractor Settlement Agreement and the related amendment to the Vogtle 3 and 4 Agreement (i) restrict the Contractor's ability to seek further increases in the contract price by clarifying and limiting the circumstances that constitute nuclear regulatory changes in law; (ii) provide for enhanced dispute resolution procedures; (iii) revise the guaranteed substantial completion dates to match the current estimated in-service dates of June 30, 2019 for Unit 3 and June 30, 2020 for Unit 4; (iv) provide that delay liquidated damages will commence from the current estimated nuclear fuel loading date for each unit, which is December 31, 2018 for Unit 3 and December 31, 2019 for Unit 4; and (v) provide that Georgia Power, based on its ownership interest, will pay to the Contractor and capitalize to the project cost approximately $350 million, of which approximately $250 million had been paid as of June 30, 2016. In addition, the Contractor Settlement Agreement provides for the resolution of other open existing items relating to the scope of the project under the Vogtle 3 and 4 Agreement, including cyber security, for which costs were reflected in Georgia Power's previously disclosed in-service cost estimate. Further, as part of the settlement and Westinghouse's acquisition of WECTEC: (i) Westinghouse engaged Fluor Enterprises, Inc., a subsidiary of Fluor Corporation, as a new construction subcontractor; and (ii) the Vogtle Owners, CB&I, and The Shaw Group Inc. entered into mutual releases of any and all claims arising out of events or circumstances in connection with the construction of Plant Vogtle Units 3 and 4 that occurred on or before the date of the Contractor Settlement Agreement. On January 5, 2016, the Vogtle Construction Litigation was dismissed with prejudice.
On January 21, 2016, Georgia Power submitted the Contractor Settlement Agreement and the related amendment to the Vogtle 3 and 4 Agreement to the Georgia PSC for its review. In accordance with the Georgia PSC's subsequent order, on April 5, 2016, Georgia Power filed supplemental information in support of the Contractor Settlement Agreement and Georgia Power's position that all construction costs to date have been prudently incurred and that the current estimated in-service capital cost and schedule are reasonable. The Staff is conducting a review of all costs incurred related to Plant Vogtle Units 3 and 4, the schedule for completion of Plant Vogtle Units 3 and 4, and the Contractor Settlement Agreement, and is authorized to engage in related settlement discussions with Georgia Power and any intervenors.
The order provides that the Staff is required to report to the Georgia PSC by October 19, 2016 with respect to the status of its review and any settlement-related negotiations. If a settlement with the Staff is reached with respect to costs of Plant Vogtle Units 3 and 4, the Georgia PSC will then conduct a hearing to consider whether to approve that settlement. If a settlement with the Staff is not reached, the Georgia PSC will determine how to proceed, including (i) modifying the 2013 Stipulation, (ii) directing Georgia Power to file a request for an amendment to the certificate for Plant Vogtle Units 3 and 4, (iii) issuing a scheduling order to address remaining disputed issues, or (iv) taking any other option within its authority.
The Georgia PSC has approved thirteen VCM reports covering the periods through June 30, 2015, including construction capital costs incurred, which through that date totaled $3.1 billion. On February 26, 2016, Georgia Power filed its fourteenth VCM report with the Georgia PSC covering the period from July 1 through December 31, 2015. The fourteenth VCM report does not include a requested amendment to the certified cost of Plant Vogtle Units 3 and 4. Georgia Power is requesting approval of $160 million of construction capital costs incurred during that period. Georgia Power incurred approximately $141 million in total construction capital costs during the period of January 1, 2016 through June 30, 2016. Georgia Power's CWIP balance for Plant Vogtle Units 3 and 4 was $3.7 billion as of June 30, 2016. The in-service capital cost forecast is $5.44 billion and includes costs related to the Contractor Settlement Agreement. Estimated financing costs during the construction period total approximately $2.4 billion, of which $1.1 billion had been incurred through June 30, 2016.
There have been technical and procedural challenges to the construction and licensing of Plant Vogtle Units 3 and 4, at the federal and state level, and additional challenges may arise as construction proceeds. Processes are in place that are designed to assure compliance with the requirements specified in the Westinghouse Design Control Document and the combined construction and operating licenses, including inspections by Southern Nuclear and the NRC that occur throughout construction. As a result of such compliance processes, certain license amendment requests have been filed and approved or are pending before the NRC. Various design and other licensing-based compliance matters, including the timely resolution of Inspections, Tests, Analyses, and Acceptance Criteria and the related approvals by the NRC, may arise as construction proceeds, which may result in additional license amendments or require other resolution. If any license amendment requests or other licensing-based compliance issues are not resolved in a timely manner, there may be delays in the project schedule that could result in increased costs either to the Vogtle Owners or the Contractor or to both.
As construction continues, the risk remains that challenges with Contractor performance including labor productivity, fabrication, assembly, delivery, and installation of plant equipment, the shield building and structural modules, delays in the receipt of the remaining permits necessary for the operation of Plant Vogtle Units 3 and 4, or other issues could arise and may further impact project schedule and cost. In addition, the IRS allocated production tax credits to each of Plant Vogtle Units 3 and 4, which require the applicable unit to be placed in service before 2021.
Future claims by the Contractor or Georgia Power (on behalf of the Vogtle Owners) could arise throughout construction. These claims may be resolved through formal and informal dispute resolution procedures under the Vogtle 3 and 4 Agreement and, under the enhanced dispute resolution procedures, may be resolved through litigation after the completion of nuclear fuel load for both units.
The ultimate outcome of these matters cannot be determined at this time.
Gulf Power
Retail Base Rate Case
See Note 3 to the financial statements of Gulf Power under "Retail Regulatory Matters – Retail Base Rate Case" in Item 8 of the Form 10-K for additional information.
In 2013, the Florida PSC approved a settlement agreement that authorized Gulf Power to reduce depreciation and record a regulatory asset up to $62.5 million from January 2014 through June 2017. In any given month, such depreciation reduction may not exceed the amount necessary for the retail ROE, as reported to the Florida PSC monthly, to reach the midpoint of the authorized retail ROE range then in effect. For 2014, 2015, and the first six months of 2016, Gulf Power recognized reductions in depreciation of $8.4 million, $20.1 million, and $6.4 million, respectively.
Cost Recovery Clauses
See Note 3 to the financial statements of Gulf Power under "Retail Regulatory Matters – Cost Recovery Clauses" in Item 8 of the Form 10-K for additional information regarding Gulf Power's recovery of retail costs through various regulatory clauses and accounting orders. Gulf Power has four regulatory clauses which are approved by the Florida PSC. The balance of each regulatory clause recovery on the balance sheet follows:
Regulatory Clause
Balance Sheet Location
June 30,
2016

December 31, 2015


(in millions)
Fuel Cost Recovery
Other regulatory liabilities, current
$
18


$
18

Purchased Power Capacity Recovery
Under recovered regulatory clause revenues
4


1

Environmental Cost Recovery
Under recovered regulatory clause revenues
1

 
19

Energy Conservation Cost Recovery
Other regulatory liabilities, current

 
4


Mississippi Power
Energy Efficiency
See Note 3 to the financial statements of Mississippi Power under "Retail Regulatory Matters – Energy Efficiency" in Item 8 of the Form 10-K for additional information regarding Mississippi Power's energy efficiency programs.
On May 3, 2016, the Mississippi PSC issued an order approving the annual Energy Efficiency Cost Rider Compliance filing, which included an anticipated reduction of $2 million in retail revenues for the year ending December 31, 2016.
Performance Evaluation Plan
See Note 3 to the financial statements of Mississippi Power under "Retail Regulatory Matters – Performance Evaluation Plan" in Item 8 of the Form 10-K for additional information regarding Mississippi Power's base rates.
On April 1, 2016, Mississippi Power submitted its annual PEP lookback filing for 2015, which reflected the need for a $5 million surcharge to be recovered from customers. The filing has been suspended for review by the Mississippi PSC.
On July 12, 2016, Mississippi Power submitted its annual projected PEP filing for 2016 which indicated no change in rates.
The ultimate outcome of these matters cannot be determined at this time.
Fuel Cost Recovery
See Note 3 to the financial statements of Mississippi Power under "Retail Regulatory Matters – Fuel Cost Recovery" in Item 8 of the Form 10-K for information regarding Mississippi Power's retail fuel cost recovery.
At June 30, 2016, the amount of over-recovered retail fuel costs included on Mississippi Power's Condensed Balance Sheet was $76 million compared to $71 million at December 31, 2015.
The Mississippi PSC conditionally approved a decrease of $120 million annually in fuel cost recovery rates on January 5, 2016, effective with the first billing cycle of February. As required by the order, on February 1, 2016, Mississippi Power submitted updated natural gas price forecasts and resulting fuel factors to the Mississippi PSC. If approved by the Mississippi PSC, the updated forecast would decrease fuel cost recovery rates by an additional $36 million annually. The ultimate outcome of this matter cannot be determined at this time.
Integrated Coal Gasification Combined Cycle
See Note 3 to the financial statements of Southern Company and Mississippi Power under "Integrated Coal Gasification Combined Cycle" in Item 8 of the Form 10-K for information regarding Mississippi Power's construction of the Kemper IGCC.
Kemper IGCC Overview
Construction of Mississippi Power's Kemper IGCC is nearing completion and start-up activities will continue until the Kemper IGCC is placed in service. The Kemper IGCC will utilize an IGCC technology with an expected output capacity of 582 MWs. The Kemper IGCC will be fueled by locally mined lignite (an abundant, lower heating value coal) from a mine owned by Mississippi Power and situated adjacent to the Kemper IGCC. The mine, operated by North American Coal Corporation, started commercial operation in 2013. In connection with the Kemper IGCC, Mississippi Power constructed and plans to operate approximately 61 miles of CO2 pipeline infrastructure for the planned transport of captured CO2 for use in enhanced oil recovery.
Kemper IGCC Schedule and Cost Estimate
In 2012, the Mississippi PSC issued the 2012 MPSC CPCN Order, a detailed order confirming the CPCN originally approved by the Mississippi PSC in 2010 authorizing the acquisition, construction, and operation of the Kemper IGCC. The certificated cost estimate of the Kemper IGCC included in the 2012 MPSC CPCN Order was $2.4 billion, net of $245 million of grants awarded to the Kemper IGCC project by the DOE under the Clean Coal Power Initiative Round 2 (Initial DOE Grants) and excluding the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, and AFUDC related to the Kemper IGCC. The 2012 MPSC CPCN Order approved a construction cost cap of up to $2.88 billion, with recovery of prudently-incurred costs subject to approval by the Mississippi PSC. The Kemper IGCC was originally projected to be placed in service in May 2014. Mississippi Power placed the combined cycle and the associated common facilities portion of the Kemper IGCC in service in August 2014 and continues to progress towards completing the remainder of the Kemper IGCC, including the gasifiers and the gas clean-up facilities. The in-service date for the remainder of the Kemper IGCC is currently expected to occur by October 31, 2016, which reflects a one-month extension. The initial production of syngas began on July 14, 2016 and testing has continued on gasifier 'B' and the related lignite feed and ash systems. The schedule extension provides for time to complete mechanical equipment modifications to the gasifiers' supporting systems to increase capacity to the levels necessary to complete the remaining start-up activities and achieve sustained operations on both gasifiers. The remaining schedule also reflects the time expected to complete the initial operation and testing of the facility's syngas clean-up systems, as well as the integration of all systems necessary for both combustion turbines to simultaneously generate electricity with syngas.
Recovery of the costs subject to the cost cap and the cost of the lignite mine and equipment, the cost of the CO2 pipeline facilities, AFUDC, and certain general exceptions, including change of law, force majeure, and beneficial capital (which exists when Mississippi Power demonstrates that the purpose and effect of the construction cost increase is to produce efficiencies that will result in a neutral or favorable effect on customers relative to the original proposal for the CPCN) (Cost Cap Exceptions) remains subject to review and approval by the Mississippi PSC. Mississippi Power's Kemper IGCC 2010 project estimate, current cost estimate (which includes the impacts of the Mississippi Supreme Court's (Court) decision discussed herein under "Rate Recovery of Kemper IGCC Costs – 2013 MPSC Rate Order"), and actual costs incurred as of June 30, 2016, are as follows:
Cost Category
2010 Project Estimate(a)
 
Current Cost Estimate(b)
 
Actual Costs
 
(in billions)
Plant Subject to Cost Cap(c)(e)
$
2.40

 
$
5.43

 
$
5.15

Lignite Mine and Equipment
0.21

 
0.23

 
0.23

CO2 Pipeline Facilities
0.14

 
0.11

 
0.12

AFUDC(d)
0.17

 
0.72

 
0.66

Combined Cycle and Related Assets Placed in
Service – Incremental
(e)

 
0.03

 
0.02

General Exceptions
0.05

 
0.10

 
0.09

Deferred Costs(e)

 
0.20

 
0.19

Additional DOE Grants(f)

 
(0.14
)
 
(0.14
)
Total Kemper IGCC
$
2.97

 
$
6.68

 
$
6.32

(a)
The 2010 Project Estimate is the certificated cost estimate adjusted to include the certificated estimate for the CO2 pipeline facilities approved in 2011 by the Mississippi PSC, as well as the lignite mine and equipment, AFUDC, and general exceptions.
(b)
Amounts in the Current Cost Estimate reflect estimated costs through October 31, 2016.
(c)
The 2012 MPSC CPCN Order approved a construction cost cap of up to $2.88 billion, net of the Initial DOE Grants and excluding the Cost Cap Exceptions. The Current Cost Estimate and the Actual Costs include non-incremental operating and maintenance costs related to the combined cycle and associated common facilities placed in service in August 2014 that are subject to the $2.88 billion cost cap and exclude post-in-service costs for the lignite mine. See "Rate Recovery of Kemper IGCC Costs2013 MPSC Rate Order" herein for additional information. The Current Cost Estimate and the Actual Costs reflect 100% of the costs of the Kemper IGCC. See note (e) for additional information.
(d)
Mississippi Power's 2010 Project Estimate included recovery of financing costs during construction rather than the accrual of AFUDC. This approach was not approved by the Mississippi PSC as described in "Rate Recovery of Kemper IGCC Costs2013 MPSC Rate Order." The Current Cost Estimate also reflects the impact of a settlement agreement with the wholesale customers for cost-based rates under FERC's jurisdiction. See "FERC Matters" herein for additional information.
(e)
Non-capital Kemper IGCC-related costs incurred during construction were initially deferred as regulatory assets. Some of these costs are now included in rates and are being recognized through income; however such costs continue to be included in the Current Cost Estimate and the Actual Costs at June 30, 2016. The wholesale portion of debt carrying costs, whether deferred or recognized through income, are not included in the Current Cost Estimate and the Actual Costs at June 30, 2016. See "Rate Recovery of Kemper IGCC CostsRegulatory Assets and Liabilities" herein for additional information.
(f)
On April 8, 2016, Mississippi Power received approximately $137 million in additional grants from the DOE for the Kemper IGCC (Additional DOE Grants), which are expected to be used to reduce future rate impacts for customers.
Of the total costs, including post-in-service costs for the lignite mine, incurred as of June 30, 2016, $3.59 billion was included in property, plant, and equipment (which is net of the Initial DOE Grants, the Additional DOE Grants, and estimated probable losses of $2.55 billion), $6 million in other property and investments, $81 million in fossil fuel stock, $46 million in materials and supplies, $35 million in other regulatory assets, current, $180 million in other regulatory assets, deferred, $1 million in other current assets, and $11 million in other deferred charges and assets in the balance sheet.
Mississippi Power does not intend to seek rate recovery for any costs related to the construction of the Kemper IGCC that exceed the $2.88 billion cost cap, net of the Initial DOE Grants and excluding the Cost Cap Exceptions. Mississippi Power recorded pre-tax charges to income for revisions to the cost estimate of $81 million ($50 million after tax) in the second quarter 2016 and a total of $134 million ($83 million after tax) for the six months ended June 30, 2016. Since 2012, in the aggregate, Mississippi Power has incurred charges of $2.55 billion ($1.57 billion after tax) as a result of changes in the cost estimate above the cost cap for the Kemper IGCC through June 30, 2016. The increase to the cost estimate in 2016 primarily reflects costs for the extension of the Kemper IGCC's projected in-service date through October 31, 2016 and increased efforts related to operational readiness and challenges in start-up and commissioning activities, which includes the cost of repairs and modifications associated with the lignite feed process and the refractory lining for the gasifiers. Any extension of the in-service date beyond October 31, 2016 is currently estimated to result in additional base costs of approximately $25 million to $35 million per month, which includes maintaining necessary levels of start-up labor, materials, and fuel, as well as operational resources required to execute start-up and commissioning activities. However, additional costs may be required for remediation of any further equipment and/or design issues identified. Any extension of the in-service date with respect to the Kemper IGCC beyond October 31, 2016 would also increase costs for the Cost Cap Exceptions, which are not subject to the $2.88 billion cost cap established by the Mississippi PSC. These costs include AFUDC, which is currently estimated to total approximately $14 million per month, as well as carrying costs and operating expenses on Kemper IGCC assets placed in service and consulting and legal fees of approximately $3 million per month. For additional information, see "2015 Rate Case" herein.
Mississippi Power's analysis of the time needed to complete the start-up and commissioning activities for the Kemper IGCC will continue until the remaining Kemper IGCC assets are placed in service. Significant testing activities, including those for coal feed and gasification systems, as well as the initial operation and testing of the facility's gas clean-up systems and production of clean syngas, and, ultimately the generation of electricity, remain in process. Further cost increases and/or extensions of the expected in-service date may result from factors including, but not limited to, difficulties integrating the systems required for sustained operations, major equipment failure, unforeseen engineering or design problems including any repairs and/or modifications to systems, and/or operational performance (including additional costs to satisfy any operational parameters ultimately adopted by the Mississippi PSC). Any further changes in the estimated costs to complete construction and start-up of the Kemper IGCC subject to the $2.88 billion cost cap, net of the Initial DOE Grants and excluding the Cost Cap Exceptions, will be reflected in Southern Company's and Mississippi Power's statements of income and these changes could be material.
Rate Recovery of Kemper IGCC Costs
See "FERC Matters" herein for additional information regarding Mississippi Power's MRA cost based tariff relating to recovery of a portion of the Kemper IGCC costs from Mississippi Power's wholesale customers. Rate recovery of the retail portion of the Kemper IGCC is subject to the jurisdiction of the Mississippi PSC. See Note (G) under "Unrecognized Tax BenefitsSection 174 Research and Experimental Deduction" for additional tax information related to the Kemper IGCC.
The ultimate outcome of the rate recovery matters discussed herein, including the resolution of legal challenges, determinations of prudency, and the specific manner of recovery of prudently-incurred costs, cannot be determined at this time, but could have a material impact on Southern Company's and Mississippi Power's results of operations, financial condition, and liquidity.
2012 MPSC CPCN Order
The 2012 MPSC CPCN Order included provisions relating to both Mississippi Power's recovery of financing costs during the course of construction of the Kemper IGCC and Mississippi Power's recovery of costs following the date the Kemper IGCC is placed in service. With respect to recovery of costs following the in-service date of the Kemper IGCC, the 2012 MPSC CPCN Order provided for the establishment of operational cost and revenue parameters based upon assumptions in Mississippi Power's petition for the CPCN. Mississippi Power expects the Mississippi PSC to apply operational parameters in connection with future proceedings related to the operation of the Kemper IGCC. To the extent the Mississippi PSC determines the Kemper IGCC does not meet the operational parameters ultimately adopted by the Mississippi PSC or Mississippi Power incurs additional costs to satisfy such parameters, there could be a material adverse impact on Southern Company's or Mississippi Power's financial statements.
2013 MPSC Rate Order
In January 2013, Mississippi Power entered into a settlement agreement with the Mississippi PSC that was intended to establish the process for resolving matters regarding cost recovery related to the Kemper IGCC (2013 Settlement Agreement). Under the 2013 Settlement Agreement, Mississippi Power agreed to limit the portion of prudently-incurred Kemper IGCC costs to be included in retail rate base to the $2.4 billion certificated cost estimate, plus the Cost Cap Exceptions, but excluding AFUDC, and any other costs permitted or determined to be excluded from the $2.88 billion cost cap by the Mississippi PSC. In March 2013, the Mississippi PSC issued a rate order approving retail rate increases of 15% effective March 19, 2013 and 3% effective January 1, 2014, which collectively were designed to collect $156 million annually beginning in 2014 (2013 MPSC Rate Order) to be used to mitigate customer rate impacts after the Kemper IGCC is placed in service, based on a mirror CWIP methodology (Mirror CWIP rate).
Because the 2013 MPSC Rate Order did not provide for the inclusion of CWIP in rate base as permitted by the Baseload Act, Mississippi Power continues to record AFUDC on the Kemper IGCC. Mississippi Power will not record AFUDC on any additional costs of the Kemper IGCC that exceed the $2.88 billion cost cap, except for Cost Cap Exception amounts.
On February 12, 2015, the Court reversed the 2013 MPSC Rate Order based on, among other things, its findings that (1) the Mirror CWIP rate treatment was not provided for under the Baseload Act and (2) the Mississippi PSC should have determined the prudence of Kemper IGCC costs before approving rate recovery through the 2013 MPSC Rate Order. The Court also found the 2013 Settlement Agreement unenforceable due to a lack of public notice for the related proceedings. On July 7, 2015, the Mississippi PSC ordered that the Mirror CWIP rate be terminated effective July 20, 2015 and required the fourth quarter 2015 refund of the $342 million collected under the 2013 MPSC Rate Order, along with associated carrying costs of $29 million. The Court's decision did not impact the 2012 MPSC CPCN Order or the February 2013 legislation described below.
2015 Rate Case
On August 13, 2015, the Mississippi PSC approved Mississippi Power's request for interim rates, which presented an alternative rate proposal (In-Service Asset Proposal) designed to recover Mississippi Power's costs associated with the Kemper IGCC assets that are commercially operational and currently providing service to customers (the transmission facilities, combined cycle, natural gas pipeline, and water pipeline) and other related costs. The interim rates were designed to collect approximately $159 million annually and became effective with the first billing cycle in September 2015, subject to refund and certain other conditions.
On December 3, 2015, the Mississippi PSC issued the In-Service Asset Rate Order adopting in full a stipulation entered into between Mississippi Power and the Mississippi Public Utilities Staff (MPUS) regarding the In-Service Asset Proposal. The In-Service Asset Rate Order provided for retail rate recovery of an annual revenue requirement of approximately $126 million, based on Mississippi Power's actual average capital structure, with a maximum common equity percentage of 49.733%, a 9.225% return on common equity, and actual embedded interest costs. The In-Service Asset Rate Order also included a prudence finding of all costs in the stipulated revenue requirement calculation for the in-service assets. The stipulated revenue requirement excluded the costs of the Kemper IGCC related to the 15% undivided interest that was previously projected to be purchased by SMEPA. Mississippi Power continues to evaluate its alternatives with respect to its investment and related costs associated with the 15% undivided interest.
With implementation of the new rates on December 17, 2015, the interim rates were terminated and, in March 2016, Mississippi Power completed customer refunds of approximately $11 million for the difference between the interim rates collected and the permanent rates.
On July 27, 2016, the Court dismissed Greenleaf CO2 Solutions, LLC (Greenleaf) motion for reconsideration of its previous decision to dismiss Greenleaf's appeal of the In-Service Asset Rate Order.
Pursuant to the In-Service Asset Rate Order, Mississippi Power is required to file a subsequent rate request within 18 months. As part of the filing, Mississippi Power expects to request recovery of certain costs that the Mississippi PSC had excluded from the revenue requirement calculation.
Legislation to authorize a multi-year rate plan and legislation to provide for alternate financing through securitization of up to $1.0 billion of prudently-incurred costs was enacted into law in 2013. Mississippi Power expects to securitize prudently-incurred qualifying facility costs in excess of the certificated cost estimate of $2.4 billion. Qualifying facility costs include, but are not limited to, pre-construction costs, construction costs, regulatory costs, and accrued AFUDC. The Court's decision regarding the 2013 MPSC Rate Order did not impact Mississippi Power's ability to utilize alternate financing through securitization or the February 2013 legislation.
Mississippi Power expects to seek additional rate relief to address recovery of the remaining Kemper IGCC assets. In addition to current estimated costs at June 30, 2016 of $6.68 billion, Mississippi Power anticipates that it will incur additional expenses in excess of current rates associated with operating the Kemper IGCC after it is placed in service until the Kemper IGCC cost recovery approach is finalized, which are expected to be material. These costs include, but are not limited to, regulatory costs, operational costs in excess of current rates, and additional carrying costs. Mississippi Power will seek approval from the Mississippi PSC to defer these costs for future rate recovery to be determined in connection with the final Kemper IGCC cost recovery approach ultimately approved. See "Regulatory Assets and Liabilities" below for additional information.
Regulatory Assets and Liabilities
Consistent with the treatment of non-capital costs incurred during the pre-construction period, the Mississippi PSC issued an accounting order in 2011 granting Mississippi Power the authority to defer all non-capital Kemper IGCC-related costs to a regulatory asset through the in-service date, subject to review of such costs by the Mississippi PSC. Such costs include, but are not limited to, carrying costs on Kemper IGCC assets currently placed in service, costs associated with Mississippi PSC and MPUS consultants, prudence costs, legal fees, and operating expenses associated with assets placed in service.
In August 2014, Mississippi Power requested confirmation by the Mississippi PSC of Mississippi Power's authority to defer all operating expenses associated with the operation of the combined cycle subject to review of such costs by the Mississippi PSC. In addition, Mississippi Power is authorized to accrue carrying costs on the unamortized balance of such regulatory assets at a rate and in a manner to be determined by the Mississippi PSC in future cost recovery mechanism proceedings. Beginning in the third quarter 2015 and second quarter 2016, in connection with the implementation of retail and wholesale rates, respectively, Mississippi Power began expensing certain ongoing project costs and certain retail debt carrying costs (associated with assets placed in service and other non-CWIP accounts) that previously were deferred as regulatory assets and began amortizing certain regulatory assets associated with assets placed in service and consulting and legal fees. The amortization periods for these regulatory assets vary from two years to 10 years as set forth in the In-Service Asset Rate Order and the settlement agreement with wholesale customers. As of June 30, 2016, the balance associated with these regulatory assets was $114 million, of which $35 million is included in current assets. Other regulatory assets associated with the remainder of the Kemper IGCC totaled $101 million as of June 30, 2016. The amortization period for these assets is expected to be determined by the Mississippi PSC in future rate proceedings following completion of construction and start-up of the Kemper IGCC and related prudence reviews.
See "2013 MPSC Rate Order" herein for information related to the July 7, 2015 Mississippi PSC order terminating the Mirror CWIP rate and requiring refund of collections under Mirror CWIP. Also see "FERC Matters" herein for information related to the 2016 settlement agreement with wholesale customers.
See Note 1 to the financial statements of Southern Company and Mississippi Power under "Regulatory Assets and Liabilities" in Item 8 of the Form 10-K for additional information.
The In-Service Asset Rate Order requires Mississippi Power to submit an annual true-up calculation of its actual cost of capital, compared to the stipulated total cost of capital, with the first occurring as of May 31, 2016. At June 30, 2016, Mississippi Power's related regulatory liability included in its balance sheet totaled approximately $5 million. See "2015 Rate Case" herein for additional information.
Lignite Mine and CO2 Pipeline Facilities
In conjunction with the Kemper IGCC, Mississippi Power will own the lignite mine and equipment and has acquired and will continue to acquire mineral reserves located around the Kemper IGCC site. The mine started commercial operation in June 2013.
In 2010, Mississippi Power executed a 40-year management fee contract with Liberty Fuels Company, LLC (Liberty Fuels), a wholly-owned subsidiary of The North American Coal Corporation, which developed, constructed, and is operating and managing the mining operations. The contract with Liberty Fuels is effective through the end of the mine reclamation. As the mining permit holder, Liberty Fuels has a legal obligation to perform mine reclamation and Mississippi Power has a contractual obligation to fund all reclamation activities. In addition to the obligation to fund the reclamation activities, Mississippi Power currently provides working capital support to Liberty Fuels through cash advances for capital purchases, payroll, and other operating expenses. See Note 1 to the financial statements of Mississippi Power under "Asset Retirement Obligations and Other Costs of Removal" and "Variable Interest Entities" in Item 8 of the Form 10-K for additional information.
In addition, Mississippi Power has constructed and will operate the CO2 pipeline for the planned transport of captured CO2 for use in enhanced oil recovery. Mississippi Power entered into agreements with Denbury Onshore (Denbury) and Treetop Midstream Services, LLC, pursuant to which Denbury would purchase 70% of the CO2 captured from the Kemper IGCC and Treetop would purchase 30% of the CO2 captured from the Kemper IGCC. On June 3, 2016, Mississippi Power cancelled its contract with Treetop and amended its contract with Denbury to reflect, among other things, Denbury's agreement to purchase 100% of the CO2 captured from the Kemper IGCC, an initial contract term of 16 years, and termination rights if Mississippi Power has not satisfied its contractual obligation to deliver captured CO2 by July 1, 2017, in addition to Denbury's existing termination rights in the event of a change in law, force majeure, or an event of default by Mississippi Power. Any termination or material modification of the agreement with Denbury could impact the operations of the Kemper IGCC and result in a material reduction in Mississippi Power's revenues to the extent Mississippi Power is not able to enter into other similar contractual arrangements or otherwise sequester the CO2 produced. Additionally, sustained oil price reductions could result in significantly lower revenues than Mississippi Power forecasted to be available to offset customer rate impacts, which could have a material impact on Mississippi Power's financial statements.
The ultimate outcome of these matters cannot be determined at this time.
Litigation
On April 26, 2016, a complaint against Mississippi Power was filed in Harrison County Circuit Court (Circuit Court) by Biloxi Freezing & Processing Inc., Gulfside Casino Partnership, and John Carlton Dean, which was amended and refiled on July 11, 2016 to include, among other things, Southern Company as a defendant. The individual plaintiff, John Carlton Dean, alleges that Mississippi Power and Southern Company violated the Mississippi Unfair Trade Practices Act. All plaintiffs have alleged that Mississippi Power and Southern Company concealed, falsely represented, and failed to fully disclose important facts concerning the cost and schedule of the Kemper IGCC and that these alleged breaches have unjustly enriched Mississippi Power and Southern Company. The plaintiffs seek unspecified actual damages and punitive damages; ask the Circuit Court to appoint a receiver to oversee, operate, manage, and otherwise control all affairs relating to the Kemper IGCC; ask the Circuit Court to revoke any licenses or certificates authorizing Mississippi Power or Southern Company to engage in any business related to the Kemper IGCC in Mississippi; and seek attorney's fees, costs, and interest. The plaintiffs also seek an injunction to prevent any Kemper IGCC costs from being charged to customers through electric rates.
On June 9, 2016, Treetop, Greenleaf, Tenrgys, LLC, Tellus Energy, LLC, WCOA, LLC, and Tellus Operating Group filed a complaint against Mississippi Power, Southern Company, and SCS in the state court in Gwinnett County, Georgia. The complaint relates to the cancelled CO2 contract with Treetop and alleges fraudulent misrepresentation, fraudulent concealment, civil conspiracy, and breach of contract on the part of Mississippi Power, Southern Company, and SCS and seeks compensatory damages of $100 million, as well as unspecified punitive damages.
Southern Company and Mississippi Power believe these legal challenges have no merit; however, an adverse outcome in these proceedings could impact Southern Company's results of operations, financial condition, and liquidity and could have a material impact on Mississippi Power's results of operations, financial condition, and liquidity. Southern Company and Mississippi Power will vigorously defend themselves in these matters, and the ultimate outcome of these matters cannot be determined at this time.