Commitments and Contingencies COMMITMENTS AND CONTINGENCIES
INSURANCE
General Insurance
The Duke Energy Registrants have insurance and reinsurance coverage either directly or through indemnification from Duke Energy’s captive insurance company, Bison, and its affiliates, consistent with companies engaged in similar commercial operations with similar type properties. The Duke Energy Registrants’ coverage includes (i) commercial general liability coverage for liabilities arising to third parties for bodily injury and property damage; (ii) workers’ compensation; (iii) automobile liability coverage; and (iv) property coverage for all real and personal property damage. Real and personal property damage coverage excludes electric transmission and distribution lines, but includes damages arising from boiler and machinery breakdowns, earthquakes, flood damage and extra expense, but not outage or replacement power coverage. All coverage is subject to certain deductibles or retentions, sublimits, exclusions, terms and conditions common for companies with similar types of operations. The Duke Energy Registrants self-insure their electric transmission and distribution lines against loss due to storm damage and other natural disasters. As discussed further in Note 4, Duke Energy Florida maintains a storm damage reserve and has a regulatory mechanism to recover the cost of named storms on an expedited basis.
The cost of the Duke Energy Registrants’ coverage can fluctuate from year to year reflecting claims history and conditions of the insurance and reinsurance markets. In the event of a loss, terms and amounts of insurance and reinsurance available might not be adequate to cover claims and other expenses incurred. Uninsured losses and other expenses, to the extent not recovered by other sources, could have a material effect on the Duke Energy Registrants’ results of operations, cash flows or financial position. Each company is responsible to the extent losses may be excluded or exceed limits of the coverage available.
Nuclear Insurance
Duke Energy Carolinas owns and operates McGuire and Oconee and operates and has a partial ownership interest in Catawba. McGuire and Catawba each have two reactors. Oconee has three reactors. The other joint owners of Catawba reimburse Duke Energy Carolinas for certain expenses associated with nuclear insurance per the Catawba joint owner agreements.
Duke Energy Progress owns and operates Robinson, Brunswick and Harris. Robinson and Harris each have one reactor. Brunswick has two reactors.
Duke Energy Florida owns Crystal River Unit 3, which permanently ceased operation in 2013 and achieved a SAFSTOR condition in July 2019. On October 1, 2020, Crystal River Unit 3 changed decommissioning strategies from SAFSTOR to DECON.
In the event of a loss, terms and amounts of insurance available might not be adequate to cover property damage and other expenses incurred. Uninsured losses and other expenses, to the extent not recovered by other sources, could have a material effect on Duke Energy Carolinas’, Duke Energy Progress’ and Duke Energy Florida’s results of operations, cash flows or financial position. Each company is responsible to the extent losses may be excluded or exceed limits of the coverage available.
Nuclear Liability Coverage
The Price-Anderson Act requires owners of nuclear reactors to provide for public nuclear liability protection per nuclear incident up to a maximum total financial protection liability. The maximum total financial protection liability, which is approximately $16.2 billion, is subject to change every five years for inflation and for the number of licensed reactors. Total nuclear liability coverage consists of a combination of private primary nuclear liability insurance coverage and a mandatory industry risk-sharing program to provide for excess nuclear liability coverage above the maximum reasonably available private primary coverage. The U.S. Congress could impose revenue-raising measures on the nuclear industry to pay claims.
Primary Liability Insurance
Duke Energy Carolinas and Duke Energy Progress have purchased the maximum reasonably available private primary nuclear liability insurance as required by law, which is $450 million per station. Duke Energy Florida has purchased $100 million primary nuclear liability insurance for Crystal River in compliance with the law.
Excess Liability Program
This program provides $16.2 billion of coverage per incident through the Price-Anderson Act’s mandatory industrywide excess secondary financial protection program of risk pooling. This amount is the product of potential cumulative retrospective premium assessments of $166 million times the current 95 licensed commercial nuclear reactors in the U.S. Under this program, operating unit licensees could be assessed retrospective premiums to compensate for public nuclear liability damages in the event of a nuclear incident at any licensed facility in the U.S. Retrospective premiums may be assessed at a rate not to exceed $24.7 million per year per licensed reactor for each incident. The assessment may be subject to state premium taxes.
Nuclear Property and Accidental Outage Coverage
Duke Energy Carolinas, Duke Energy Progress and Duke Energy Florida are members of Nuclear Electric Insurance Limited (NEIL), an industry mutual insurance company, which provides property damage, nuclear accident decontamination and premature decommissioning insurance for each station for losses resulting from damage to its nuclear plants, either due to accidents or acts of terrorism. Additionally, NEIL provides accidental outage coverage for losses in the event of a major accidental outage at an insured nuclear station.
Pursuant to regulations of the NRC, each company’s property damage insurance policies provide that all proceeds from such insurance be applied, first, to place the plant in a safe and stable condition after a qualifying accident and second, to decontaminate the plant before any proceeds can be used for decommissioning, plant repair or restoration.
Losses resulting from acts of terrorism are covered as common occurrences, such that if terrorist acts occur against one or more commercial nuclear power plants insured by NEIL within a 12-month period, they would be treated as one event and the owners of the plants where the act occurred would share one full limit of liability. The full limit of liability is currently $3.2 billion. NEIL sublimits the total aggregate for all of their policies for non-nuclear terrorist events to approximately $1.8 billion.
Each nuclear facility has accident property damage, nuclear accident decontamination and premature decommissioning liability insurance from NEIL with limits of $1.5 billion, except for Crystal River Unit 3. Crystal River Unit 3’s limit is $50 million and is on an actual cash value basis. All nuclear facilities except for Catawba and Crystal River Unit 3 also share an additional $1.25 billion nuclear accident insurance limit above their dedicated underlying limit. This shared additional excess limit is not subject to reinstatement in the event of a loss. Catawba has a dedicated $1.25 billion of additional nuclear accident insurance limit above its dedicated underlying limit. Catawba and Oconee also have an additional $750 million of non-nuclear accident property damage limit. All coverages are subject to sublimits and significant deductibles.
NEIL’s Accidental Outage policy provides some coverage, similar to business interruption, for losses in the event of a major accident property damage outage of a nuclear unit. Coverage is provided on a weekly limit basis after a significant waiting period deductible and at 100% of the applicable weekly limits for 52 weeks and 80% of the applicable weekly limits for up to the next 110 weeks. Coverage is provided until these applicable weekly periods are met, where the accidental outage policy limit will not exceed $490 million for Catawba, McGuire and Harris, $462 million for Brunswick and Oconee and $378 million for Robinson. NEIL sublimits the accidental outage recovery up to the first 104 weeks of coverage not to exceed $328 million from non-nuclear accidental property damage. Coverage amounts decrease in the event more than one unit at a station is out of service due to a common accident. All coverages are subject to sublimits and significant deductibles.
Potential Retroactive Premium Assessments
In the event of NEIL losses, NEIL’s board of directors may assess member companies' retroactive premiums of amounts up to 10 times their annual premiums for up to six years after a loss. NEIL has never exercised this assessment. The maximum aggregate annual retrospective premium obligations for Duke Energy Carolinas, Duke Energy Progress and Duke Energy Florida are $147 million, $90 million and $1 million, respectively. Duke Energy Carolinas' maximum assessment amount includes 100% of potential obligations to NEIL for jointly owned reactors. Duke Energy Carolinas would seek reimbursement from the joint owners for their portion of these assessment amounts.
ENVIRONMENTAL
The Duke Energy Registrants are subject to federal, state and local regulations regarding air and water quality, hazardous and solid waste disposal, coal ash and other environmental matters. These regulations can be changed from time to time, imposing new obligations on the Duke Energy Registrants. The following environmental matters impact all of the Duke Energy Registrants.
Remediation Activities
In addition to AROs recorded as a result of various environmental regulations, discussed in Note 10, the Duke Energy Registrants are responsible for environmental remediation at various sites. These include certain properties that are part of ongoing operations and sites formerly owned or used by Duke Energy entities. These sites are in various stages of investigation, remediation and monitoring. Managed in conjunction with relevant federal, state and local agencies, remediation activities vary based upon site conditions and location, remediation requirements, complexity and sharing of responsibility. If remediation activities involve joint and several liability provisions, strict liability, or cost recovery or contribution actions, the Duke Energy Registrants could potentially be held responsible for environmental impacts caused by other potentially responsible parties and may also benefit from insurance policies or contractual indemnities that cover some or all cleanup costs. Liabilities are recorded when losses become probable and are reasonably estimable. The total costs that may be incurred cannot be estimated because the extent of environmental impact, allocation among potentially responsible parties, remediation alternatives and/or regulatory decisions have not yet been determined at all sites. Additional costs associated with remediation activities are likely to be incurred in the future and could be significant. Costs are typically expensed as Operation, maintenance and other in the Consolidated Statements of Operations unless regulatory recovery of the costs is deemed probable.
The following table contains information regarding reserves for probable and estimable costs related to the various environmental sites. These reserves are recorded in Accounts Payable within Other Current Liabilities and Other within Other Noncurrent Liabilities on the Consolidated Balance Sheets.
(in millions)December 31, 2023December 31, 2022
Reserves for Environmental Remediation
Duke Energy$88 $84 
Duke Energy Carolinas23 22 
Progress Energy19 19 
Duke Energy Progress9 
Duke Energy Florida10 11 
Duke Energy Ohio36 33 
Duke Energy Indiana2 
Piedmont7 
Additional losses in excess of recorded reserves that could be incurred for the stages of investigation, remediation and monitoring for environmental sites that have been evaluated at this time are not material.
LITIGATION
Duke Energy
Texas Storm Uri Tort Litigation
Duke Energy (Parent), several Duke Energy renewables project companies, and others in the ERCOT market were named in multiple lawsuits arising out of Texas Storm Uri, which occurred in February 2021. These lawsuits seek recovery for property damage, personal injury and wrongful death allegedly caused by the power outages that plaintiffs claim were the collective failure of generators including Duke Energy entities, transmission and distribution operators (TDUs), retail energy providers, and all others, including ERCOT. The cases were consolidated into a Texas state court multidistrict litigation (MDL) proceeding for discovery and pre-trial motions. Five MDL cases were designated as lead cases in which motions to dismiss were filed and all other cases were stayed. On January 28, 2023, the Court denied certain motions including those by the generator defendants and TDUs and granted others. The generators and TDUs filed separate petitions for Writ of Mandamus to the Texas Court of Appeals seeking to overturn the denials. The TDUs' petition, filed first, was accepted and oral argument was held on October 23, 2023. In the cases against the generators, Plaintiffs have dismissed the claims against Duke Energy (Parent). However, before Duke Energy (Parent) was dismissed from all cases, on December 14, 2023, without argument, the Court of Appeals accepted mandamus of the generator defendants’ appeal, which includes all Duke Energy entities, and directed the MDL court to dismiss all claims. Plaintiffs filed their Petition for Reconsideration on January 29, 2024. Regardless of the outcome of any motion for reconsideration or appeal, claims against Duke Energy (Parent) will remain dismissed. In October 2023, in conjunction with the closing of the sale of the utility-scale solar and wind group, all but one of the project company lawsuits transferred to Brookfield. Based on legal proceedings to date and applicable insurance and reinsurance coverage, Duke Energy (Parent) does not anticipate any material financial impacts with this remaining case. Duke Energy cannot predict the ultimate outcome of this matter. See Note 2 for more information related to the sale of the Commercial Renewables Disposal Groups.
Duke Energy Carolinas
Ruben Villano, et al. v. Duke Energy Carolinas, LLC
On June 16, 2021, a group of nine individuals went over a low-head dam adjacent to the Dan River Steam Station in Eden, North Carolina, while water tubing. Emergency personnel rescued four people and five others were confirmed deceased. On August 11, 2021, Duke Energy Carolinas was served with the complaint filed in Durham County Superior Court on behalf of four survivors, which was later amended to include all the decedents along with the survivors. The lawsuit alleges that Duke Energy Carolinas knew that the river was used for recreational purposes, did not adequately warn about the dam, and created a dangerous and hidden hazard on the Dan River in building and maintaining the low-head dam. In 2023, Duke Energy Carolinas reached an agreement that resolved this matter. The resolution, which did not have a material financial impact, was approved by the Durham County Superior Court. The case was dismissed on June 6, 2023.
NTE Carolinas II, LLC Litigation
In November 2017, Duke Energy Carolinas entered into a standard FERC large generator interconnection agreement (LGIA) with NTE Carolinas II, LLC (NTE), a company that proposed to build a combined-cycle natural gas plant in Rockingham County, North Carolina. On September 6, 2019, Duke Energy Carolinas filed a lawsuit in Mecklenburg County Superior Court against NTE for breach of contract, alleging that NTE's failure to pay benchmark payments for Duke Energy Carolinas' transmission system upgrades required under the interconnection agreement constituted a termination of the interconnection agreement. Duke Energy Carolinas sought a monetary judgment against NTE because NTE failed to make multiple milestone payments. The lawsuit was moved to federal court in North Carolina. NTE filed a motion to dismiss Duke Energy Carolinas’ complaint and brought counterclaims alleging anti-competitive conduct and violations of state and federal statutes. Duke Energy Carolinas filed a motion to dismiss NTE's counterclaims. Both NTE's and Duke Energy Carolinas' motions to dismiss were subsequently denied by the court.
On May 21, 2020, in response to a NTE petition challenging Duke Energy Carolinas' termination of the LGIA, FERC issued a ruling that 1) it has exclusive jurisdiction to determine whether a transmission provider may terminate a LGIA; 2) FERC approval is required to terminate a conforming LGIA if objected to by the interconnection customer; and 3) Duke Energy may not announce the termination of a conforming LGIA unless FERC has approved the termination. FERC's Office of Enforcement also initiated an investigation of Duke Energy Carolinas into matters pertaining to the LGIA. On April 6, 2023, Duke Energy Carolinas received notice from the FERC Office of Enforcement that they have closed their non-public investigation with no further action recommended.
Following completion of discovery, Duke Energy Carolinas filed a motion for summary judgment seeking a ruling in its favor as to some of its affirmative claims against NTE and to all of NTE’s counterclaims. On June 24, 2022, the court issued an order partially granting Duke Energy Carolinas' motion by dismissing NTE's counterclaims that Duke Energy Carolinas engaged in anti-competitive behavior in violation of state and federal statutes. On October 12, 2022, the parties executed a settlement agreement with respect to the remaining breach of contract claims in the litigation and a Stipulation of Dismissal was filed with the court on October 13, 2022. On November 11, 2022, NTE filed its Notice of Appeal to the U.S. Court of Appeals for the Fourth Circuit as to the District Court's summary judgment ruling in Duke Energy Carolinas' favor on NTE's antitrust and unfair competition claims. Briefing on NTE's appeal was completed on June 30, 2023. Oral Argument has been tentatively set for May 7-10, 2024. Duke Energy Carolinas cannot predict the outcome of this matter.
Asbestos-related Injuries and Damages Claims
Duke Energy Carolinas has experienced numerous claims for indemnification and medical cost reimbursement related to asbestos exposure. These claims relate to damages for bodily injuries alleged to have arisen from exposure to or use of asbestos in connection with construction and maintenance activities conducted on its electric generation plants prior to 1985.
Duke Energy Carolinas has recognized asbestos-related reserves of $423 million and $457 million at December 31, 2023, and 2022, respectively. These reserves are classified in Other within Other Noncurrent Liabilities and Other within Current Liabilities on the Consolidated Balance Sheets. These reserves are based upon Duke Energy Carolinas' best estimate for current and future asbestos claims through 2043 and are recorded on an undiscounted basis. In light of the uncertainties inherent in a longer-term forecast, management does not believe they can reasonably estimate the indemnity and medical costs that might be incurred after 2043 related to such potential claims. It is possible Duke Energy Carolinas may incur asbestos liabilities in excess of the recorded reserves.
Duke Energy Carolinas has third-party insurance to cover certain losses related to asbestos-related injuries and damages above an aggregate self-insured retention. Receivables for insurance recoveries were $572 million and $595 million at December 31, 2023, and 2022, respectively. These amounts are classified in Other within Other Noncurrent Assets and Receivables within Current Assets on the Consolidated Balance Sheets. Any future payments up to the policy limit will be reimbursed by the third-party insurance carrier. Duke Energy Carolinas is not aware of any uncertainties regarding the legal sufficiency of insurance claims. Duke Energy Carolinas believes the insurance recovery asset is probable of recovery as the insurance carrier continues to have a strong financial strength rating.
The reserve for credit losses for insurance receivables for the asbestos-related injuries and damages is $9 million as of December 31, 2023, and $12 million as of December 31, 2022, for both Duke Energy and Duke Energy Carolinas. The insurance receivable is evaluated based on the risk of default and the historical losses, current conditions and expected conditions around collectability. Management evaluates the risk of default annually based on payment history, credit rating and changes in the risk of default from credit agencies.
Duke Energy Indiana
Coal Ash Insurance Coverage Litigation
In June 2022, Duke Energy Indiana filed a civil action in Indiana Superior Court against various insurance companies seeking declaratory relief with respect to insurance coverage for CCR-related expenses and liabilities covered by third-party liability insurance policies. The insurance policies cover the 1969-1972 and 1984-1985 periods and provide third-party liability insurance for claims and suits alleging property damage, bodily injury and personal injury (or a combination thereof). A trial date has not yet been set. On June 30, 2023, Duke Energy Indiana and Associated Electric and Gas Insurance Services (AEGIS) reached a confidential settlement, the results of which were not material to Duke Energy, and as a result, AEGIS was dismissed from the litigation on July 13, 2023. On December 11, 2023, Duke Energy Indiana and Munich Reinsurance America, Inc. (formerly known as American Re-Insurance Company) (AmRe) reached a confidential settlement, the results of which were not material, and AmRe was dismissed from the litigation on January 18, 2024. The lawsuit remains pending as to the other insurers, but is stayed until March 31, 2024, to allow for further settlement negotiations with other defendants. Duke Energy Indiana cannot predict the outcome of this matter.
Other Litigation and Legal Proceedings
The Duke Energy Registrants are involved in other legal, tax and regulatory proceedings arising in the ordinary course of business, some of which involve significant amounts. The Duke Energy Registrants believe the final disposition of these proceedings will not have a material effect on their results of operations, cash flows or financial position for the years presented. Reserves are classified on the Consolidated Balance Sheets in Other within Other Noncurrent Liabilities and Other within Current Liabilities.
OTHER COMMITMENTS AND CONTINGENCIES
General
As part of their normal business, the Duke Energy Registrants are party to various financial guarantees, performance guarantees and other contractual commitments to extend guarantees of credit and other assistance to various subsidiaries, investees and other third parties. These guarantees involve elements of performance and credit risk, which are not fully recognized on the Consolidated Balance Sheets and have uncapped maximum potential payments. However, the Duke Energy Registrants do not believe these guarantees will have a material effect on their results of operations, cash flows or financial position. See Note 8 for more information.
Purchase Obligations
Purchased Power
Duke Energy Progress, Duke Energy Florida, Duke Energy Ohio and Duke Energy Indiana have ongoing purchased power contracts, including renewable energy contracts, with other utilities, wholesale marketers, co-generators and qualified facilities. These purchased power contracts generally provide for capacity and energy payments. In addition, Duke Energy Progress and Duke Energy Florida have various contracts to secure transmission rights.
The following table presents executory purchased power contracts with terms exceeding one year, excluding contracts classified as leases.
  Minimum Purchase Amount at December 31, 2023
Contract
(in millions) Expiration20242025202620272028ThereafterTotal
Duke Energy Progress(a)
2028-2032$21 $22 $18 $19 $19 $$106 
Duke Energy Florida(b)
2025
86 91 — — — — 177 
Duke Energy Ohio(c)
2025
153 98 — — — — 251 
Duke Energy Indiana(c)
2026
12 20 — — — 40 
(a)    Contracts represent between 18% and 100% of net plant output.
(b)    Contracts represent 100% of net plant output.
(c)    Share of net plant output varies. Duke Energy Ohio excludes PPA with OVEC.
Gas Supply and Capacity Contracts
Duke Energy Ohio and Piedmont routinely enter into long-term natural gas supply commodity and capacity commitments and other agreements that commit future cash flows to acquire services needed in their businesses. These commitments include pipeline and storage capacity contracts and natural gas supply contracts to provide service to customers. Costs arising from the natural gas supply commodity and capacity commitments, while significant, are pass-through costs to customers and are generally fully recoverable through specific fuel rate components operating in conjunction with PGA procedures, and subject to periodic prudence reviews in North Carolina and South Carolina and the Performance Incentive Plan in Tennessee. In the Midwest, these costs are recovered via the Gas Cost Recovery Rate in Ohio or the Gas Cost Adjustment Clause in Kentucky. The time periods for fixed payments under pipeline and storage capacity contracts are up to 19 years. The time periods for fixed payments under natural gas supply contracts is up to two years. The time period for the natural gas supply purchase commitments is up to seven years.
Certain storage and pipeline capacity contracts require the payment of demand charges that are based on rates approved by the FERC in order to maintain rights to access the natural gas storage or pipeline capacity on a firm basis during the contract term. The demand charges that are incurred in each period are recognized in the Consolidated Statements of Operations and Comprehensive Income as part of natural gas purchases and are included in Cost of natural gas.
The following table presents future unconditional purchase obligations under natural gas supply and capacity contracts as of December 31, 2023.
(in millions)20242025202620272028ThereafterTotal
Duke Energy Ohio$103 $87 $57 $53 $51 $574 $925 
Piedmont295 287 268 209 186 373 1,618