Commitments and Contingencies
9 Months Ended
Sep. 30, 2013
Commitments and Contingencies  
Commitments and Contingencies

Note 7— Commitments and Contingencies

 

Legal Proceedings

 

We are a party to various claims and legal proceedings arising out of the normal course of our business. Management regularly analyzes this information, and has provided accruals for any liabilities, in accordance with the guidelines presented in the ASC on accounting for contingencies. In the opinion of management, it is not probable, given the company’s defenses, that the ultimate outcome of these claims and lawsuits will have a material adverse effect upon our financial condition, or results of operations or cash flows.

 

A lawsuit was filed in Jasper County Circuit Court (the Court) against us by three of our residential customers, purporting to act on behalf of all Empire customers. These customers were seeking a refund of certain amounts paid for service provided by Empire between January 1, 2007, and December 13, 2007. At all times, we charged the three plaintiffs, and all of our customers, the rates approved by and on file with the MPSC from our 2006 rate case. We filed a motion asking the Court to dismiss the case. On October 1, 2013, the Missouri Supreme Court denied the plaintiff’s appeal affirming the Court’s dismissal with prejudice which finalizes the case.

 

Coal, Natural Gas and Transportation Contracts

 

The following table sets forth our firm physical gas, coal and transportation contracts for the periods indicated as of September 30, 2013 (in millions).

 

 

 

Firm physical gas and
transportation contracts

 

Coal and coal
transportation contracts

 

 

 

 

 

 

 

October 1, 2013 through December 31, 2013

 

$

10.6

 

$

5.7

 

January 1, 2014 through December 31, 2015

 

30.5

 

34.3

 

January 1, 2016 through December 31, 2017

 

22.2

 

22.6

 

January 1, 2018 and beyond

 

8.3

 

22.6

 

 

Included in the table above is an agreement with Southern Star Central Pipeline, Inc., effective April 2011, to purchase one million Dths of firm gas storage service capacity for our electric business for a period of five years, expiring April 2016. The reservation charge for this storage capacity is approximately $1.1 million annually.

 

In addition to the above, subsequent to September 30, 2013, we extended our transportation contract with ANR Pipeline Company, expiring on March 31, 2014, for a period of ten years, expiring on March 31, 2024. Annual costs under this contract are expected to be approximately $0.5 million, depending on volume.

 

We have entered into long and short-term agreements to purchase coal and natural gas for our energy supply and natural gas operations. Under these contracts, the natural gas supplies are divided into firm physical commitments and derivatives that are used to hedge future purchases. In the event that this gas cannot be used at our plants, the gas would be liquidated at market price. The firm physical gas and transportation commitments are detailed in the table above.

 

We have coal supply agreements and transportation contracts in place to provide for the delivery of coal to the plants. These contracts are written with Force Majeure clauses that enable us to reduce tonnages or cease shipments under certain circumstances or events. These include mechanical or electrical maintenance items, acts of God, war or insurrection, strikes, weather and other disrupting events. This reduces the risk we have for not taking the minimum requirements of fuel under the contracts. The minimum requirements for our coal and coal transportation contracts as of September 30, 2013, are detailed in the table above.

 

Purchased Power

 

We currently supplement our on-system generating capacity with purchases of capacity and energy from other entities in order to meet the demands of our customers and the capacity margins applicable to us under current pooling agreements and National Electric Reliability Council (NERC) rules.

 

The Plum Point Energy Station (Plum Point) is a 670-megawatt, coal-fired generating facility near Osceola, Arkansas. We own, through an undivided interest, 50 megawatts of the unit’s capacity. We also have a long-term (30 year) agreement for the purchase of capacity from Plum Point. We began receiving purchased power under this agreement on September 1, 2010. We have the option to purchase an undivided ownership interest in the 50 megawatts covered by the purchased power agreement in 2015. We evaluated this purchase option as part of our Integrated Resource Plan (IRP), which was filed with the MPSC on July 1, 2013. While it is not currently our intention to exercise this option in 2015, we will continue to evaluate this purchase option through the exercise date as well as explore other options with the purchase power agreement holder, Plum Point Energy Associates (PPEA), related to the timing of this option. Commitments under this agreement are approximately $299.6 million through August 31, 2039, the end date of the agreement.

 

We have a 20-year purchased power agreement, which began on December 15, 2008, with Cloud County Windfarm, LLC, owned by EDP Renewables North America LLC (formerly Horizon Wind Energy), Houston, Texas to purchase the energy generated at the approximately 105-megawatt Phase 1 Meridian Way Wind Farm located in Cloud County, Kansas. Annual payments are contingent upon output of the facility and can range from zero to a maximum of approximately $14.6 million based on a 20-year average cost. We also have a 20-year contract, which began on December 15, 2005, with Elk River Windfarm, LLC, owned by IBERDROLA RENEWABLES, Inc., to purchase the energy generated at the 150-megawatt Elk River Windfarm located in Butler County, Kansas. Annual payments are contingent upon output of the facility and can range from zero to a maximum of approximately $16.9 million based on a 20-year average cost. Although these agreements are considered operating leases under Generally Accepted Accounting Principles (GAAP), payments for these wind agreements are recorded as purchased power expenses, and, because of the contingent nature of these payments, are not included in our operating lease obligations. We do not own any portion of these windfarms.

 

New Construction

 

On July 9, 2013, we signed a contract with a third party vendor to complete engineering, procurement, and construction activities at our Riverton plant to convert Riverton Unit 12 from a simple cycle combustion turbine to a combined cycle unit. The conversion will include the installation of a heat recovery steam generator (HRSG), steam turbine generator, auxiliary boiler, cooling tower, and other auxiliary equipment. The Air Emission Source Construction Permit necessary for this project was issued by Kansas Department of Health and Environment on July 11, 2013. See “Environmental Matters” below for additional information about this project and associated compliance measures.

 

On January 16, 2012, we signed a contract with a third party vendor to complete environmental retrofits at our Asbury plant. The retrofits include the installation of a pulse-jet fabric filter (baghouse), circulating dry scrubber and powder activated carbon injection system. This equipment will enable us to comply with the Mercury and Air Toxics Standard (MATS). See “Environmental Matters” below for more information and for project costs.

 

Leases

 

We have purchased power agreements with Cloud County Windfarm, LLC and Elk River Windfarm, LLC, which are considered operating leases for GAAP purposes. Details of these agreements are disclosed in the Purchased Power section of this note.

 

We also currently have short-term operating leases for two unit trains to meet coal delivery demands, for garage and office facilities for our electric segment and for one office facility related to our gas segment. In addition, we have capital leases for certain office equipment and 108 railcars to provide coal delivery for our ownership and purchased power agreement shares of the Plum Point generating facility.

 

Environmental Matters

 

We are subject to various federal, state, and local laws and regulations with respect to air and water quality and with respect to hazardous and toxic materials and hazardous and other wastes, including their identification, transportation, disposal, record-keeping and reporting, as well as remediation of contaminated sites and other environmental matters. We believe that our operations are in material compliance with present environmental laws and regulations. Environmental requirements have changed frequently and become more stringent over time. We expect this trend to continue. While we are not in a position to accurately estimate compliance costs for any new requirements, we expect any such costs to be material, although recoverable in rates.

 

Electric Segment

 

The Federal Clean Air Act (CAA) and comparable state laws regulate air emissions from stationary sources such as electric power plants through permitting and/or emission control and related requirements. These requirements include maximum emission limits on our facilities for sulfur dioxide (SO2), particulate matter, nitrogen oxides (NOx) and hazardous air pollutants including mercury. In the future they will include limits on greenhouse gases (GHG) such as carbon dioxide (CO2).

 

Permits

 

Under the CAA we have obtained, and renewed as necessary, site operating permits, which are valid for five years, for each of our plants. As stated above, on July 11, 2013, we received the Air Emission Source Construction Permit necessary to begin construction on the Riverton 12 Combined Cycle Conversion project.

 

Compliance Plan

 

In order to comply with forthcoming environmental regulations, Empire is taking actions to implement its compliance plan and strategy (Compliance Plan).  While the Cross State Air Pollution Rule (CSAPR — formerly the Clean Air Transport Rule, or CATR) that was set to take effect on January 1, 2012 was stayed in late December 2011 then vacated in August 2012 by the District of Columbia Circuit Court of Appeals, the Mercury Air Toxics Standard (MATS) was signed by the Environmental Protection Agency (EPA) Administrator on December 16, 2011 and became effective on April 16, 2012. MATS requires compliance by April 2015 (with flexibility for extensions for reliability reasons). Our Compliance Plan largely follows the preferred plan presented in our 2010 Integrated Resource Plan (IRP) and is further supported by our recent IRP filing. As described above under New Construction, we have begun the installation of a scrubber, fabric filter, and powder activated carbon injection system at our Asbury plant. The addition of this air quality control equipment is expected to be completed by early 2015 at a cost ranging from $112.0 million to $130.0 million, excluding AFUDC. Construction costs through September 30, 2013 were $43.2 million for 2013 and $73.5 million for the project to date, excluding AFUDC. The addition of this air quality control equipment will require the retirement of Asbury Unit 2, a steam turbine currently rated at 14 megawatts that is used for peaking purposes.

 

In September 2012, we completed the transition of our Riverton Units 7 and 8 from operation on coal to operating completely on natural gas. Riverton Units 7 and 8, along with Riverton Unit 9, a small combustion turbine that requires steam from Unit 7 or 8 for start-up, will be retired upon the conversion of Riverton Unit 12, a simple cycle combustion turbine, to a combined cycle unit. This conversion is currently scheduled to be completed in mid-2016 at a cost estimated to range from $165 million to $175 million, excluding AFUDC. This amount is included in our updated five-year capital expenditure plan disclosed in our 2013 third quarter 10-Q. Construction costs, consisting of pre-engineering and site preparation activities thus far, through September 30, 2013 were $5.3 million for 2013 and $5.9 million for the project to date, excluding AFUDC.

 

SO2 Emissions

 

The CAA regulates the amount of SO2 an affected unit can emit. Currently SO2 emissions are regulated by the Title IV Acid Rain Program and the Clean Air Interstate Rule (CAIR). On January 1, 2012, CAIR was to have been replaced by the Cross-State Air Pollution Rule (CSAPR). But, as discussed above, CSAPR was subsequently vacated, and CAIR will remain in effect until the EPA develops a valid replacement.

 

On October 5, 2012, the Department of Justice, on behalf of the EPA, requested that the Court of Appeals grant a request for a re-hearing of CSAPR. On January 24, 2013, the request was denied by the Court of Appeals and on March 29, 2013, the EPA petitioned the United States Supreme Court (the Supreme Court) to review the D.C. Circuit Court’s decision. On June 24, 2013 the Supreme Court agreed to review the D.C. Circuit court’s decision with a hearing date set for December 6, 2013 and a decision expected by June 30, 2014.  In the meantime, both the Title IV Acid Rain Program and CAIR will remain in effect.

 

The Mercury Air Toxics Standards (MATS), discussed further below, was signed on December 16, 2011, and will affect SO2 emission rates at our facilities. In addition, the compliance date for the revised SO2 National Ambient Air Quality Standards (NAAQS) is August of 2017; this could also affect SO2 emissions at our facilities. The SO2 NAAQS is discussed in more detail below.

 

Title IV Acid Rain Program:

 

Under the Title IV Acid Rain Program, each existing affected unit has been allocated a specific number of emission allowances by the U.S. Environmental Protection Agency (EPA).  Each allowance entitles the holder to emit one ton of SO2. Covered utilities, such as Empire, must have emission allowances equal to the number of tons of SO2 emitted during a given year by each of their affected units. Allowances in excess of the annual emissions are banked for future use. In 2012, our SO2 emissions exceeded the annual allocations. This deficit was covered by our banked allowances. We estimate our Title IV Acid Rain Program SO2 allowance bank plus annual allocations will be more than our projected emissions through 2017. Long-term compliance with this program will be met by the Compliance Plan detailed above along with possible procurement of additional SO2 allowances. We expect the cost of compliance to be fully recoverable in our rates.

 

CAIR:

 

In 2005, the EPA promulgated CAIR under the CAA. CAIR generally calls for fossil-fueled power plants greater than 25 megawatts to reduce emission levels of SO2 and/or NOx in 28 eastern states and the District of Columbia, including Missouri, where our Asbury, Energy Center, State Line and Iatan Units No. 1 and No. 2 are located. Kansas was not included in CAIR and our Riverton Plant was not affected. Arkansas, where our Plum Point Plant is located, was included for ozone season NOx but not for SO2.

 

In 2008, the U.S. Court of Appeals for the District of Columbia vacated CAIR and remanded it back to EPA for further consideration, but also stayed its vacatur. As a result, CAIR became effective for NOx on January 1, 2009 and for SO2 on January 1, 2010 and required covered states to develop State Implementation Plans (SIPs) to comply with specific SO2 state-wide annual budgets.

 

SO2 allowance allocations under the Title IV Acid Rain Program are used for compliance in the CAIR SO2 Program. For our Missouri units, beginning in 2010, CAIR required the SO2 allowances to be utilized at a 2:1 ratio and, beginning in 2015, will require the SO2 allowances to be utilized at a 2.86:1 ratio. As a result, based on current SO2 allowance usage projections, we expect to have sufficient allowances to take us through 2017.

 

In order to meet CAIR requirements for SO2 and NOx emissions (NOx is discussed below in more detail) and as a requirement for the air permit for Iatan 2, a Selective Catalytic Reduction system (SCR), a Flue-Gas Desulfurization (FGD) scrubber system and baghouse were installed at our jointly-owned Iatan 1 plant and a SCR was placed in service at our Asbury plant in 2008. Our jointly-owned Iatan 2 and Plum Point plants were originally constructed with the above technology.

 

CSAPR- formerly the Clean Air Transport Rule:

 

On July 6, 2010, the EPA published a proposed CAIR replacement rule entitled the Clean Air Transport Rule (CATR). As proposed and supplemented, the CATR included Missouri and Kansas under both the annual and ozone season for NOx as well as the SO2 program while Arkansas remained in the ozone season NOx program only. The final CATR was released on July 7, 2011 under the name of the CSAPR, and was set to become effective January 1, 2012. However, as mentioned above, the District of Columbia Circuit Court of Appeals vacated CSAPR on August 21, 2012, and the EPA has subsequently petitioned the Supreme Court to review the D.C. Circuit Court’s decision. On June 24, 2013 the Supreme Court agreed to review the D.C. Circuit court’s decision, which is set to occur December 6, 2013. The CAIR will be in effect until a valid replacement is developed by the EPA.

 

When it was published, the final CSAPR required a 73% reduction in SO2 from 2005 levels by 2014. The SO2 allowances allocated under the EPA’s Title IV Acid Rain Program could not be used for compliance with CSAPR but would continue to be used for compliance with the Title IV Acid Rain Program. Therefore, new SO2 allowances would be allocated under CSAPR and retired at one allowance per ton of SO2 emissions emitted. Based on current projections, we would receive more SO2 allowances than would be emitted. Long-term compliance with this Rule will be met by the Compliance Plan detailed above along with possible procurement of additional SO2 allowances. We anticipate compliance costs associated with CAIR or its subsequent replacement to be recoverable in our rates.

 

Mercury Air Toxics Standard (MATS):

 

The MATS standard was fully implemented and effective as of April 16, 2012, thus requiring compliance by April 16, 2015 (with flexibility for extensions for reliability reasons). The MATS regulation does not include allowance mechanisms. Rather, it establishes alternative standards for certain pollutants, including SO2 (as a surrogate for hydrogen chloride (HCI)), which must be met to show compliance with hazardous air pollutant limits (see additional discussion in the MATS section below).

 

SO2 National Ambient Air Quality Standard (NAAQS):

 

In June 2010, the EPA finalized a new 1-hour SO2 NAAQS which, for areas with no ambient SO2 monitor, originally required modeling to determine attainment and non-attainment areas within each state. In April 2012, the EPA announced that it is reconsidering this approach. The modeling of emission sources was to have been completed by June 2013 with compliance with the SO2 NAAQS required by August 2017. Because the EPA is reconsidering the compliance determination approach for areas without ambient SO2 monitors, the compliance time-frame may be pushed back. Draft guidance for 1-hour SO2 NAAQS has been published by the EPA to assist states as they prepare their SIP submissions. The EPA is also planning a rulemaking called the Data Requirements Rule (DRR) to address some of the 1-hour SO2 NAAQS implementation program elements. It is likely that coal-fired generating units will need scrubbers to be capable of meeting the new 1-hour SO2 NAAQS. In addition, units will be required to include SO2 emissions limits in their Title V permits or execute consent decrees to assure attainment and future compliance.

 

NOx Emissions

 

The CAA regulates the amount of NOx an affected unit can emit. As currently operated, each of our affected units is in compliance with the applicable NOx limits. Currently, revised NOx emissions are limited by the CAIR as a result of the vacated CSPAR rule and by ozone NAAQS rules (discussed below) which were established in 1997 and in 2008.

 

CAIR:

 

The CAIR required covered states to develop SIPs to comply with specific annual NOx state-wide allowance allocation budgets. Based on existing SIPs, we had excess NOx allowances during 2012 which were banked for future use and will be sufficient for compliance through at least the end of 2017. The CAIR NOx program also was to have been replaced by the CSAPR program January 1, 2012 but because the D.C. Circuit Court vacated CSAPR and the case is being re-heard by the Supreme Court, CAIR will remain in effect until the EPA develops a valid replacement.

 

CSAPR:

 

As published, the CSAPR would have required a 54% reduction in NOx from 2005 levels by 2014. The NOx annual and ozone season allowances that were allocated and banked under CAIR could not be used for compliance under CSAPR. New allowances would have been issued under CSAPR. However, as discussed above, CSPAR was vacated by the District of Columbia Circuit Court of Appeals on August 21, 2012 and the case is set to be re-heard by the Supreme Court on December 6, 2013.

 

Ozone NAAQS:

 

Ozone, also called ground level smog, is formed by the mixing of NOx and Volatile Organic Compounds (VOCs) in the presence of sunlight. On January 6, 2010, to protect public health, the EPA proposed to lower the primary NAAQS for ozone to a range between 60 and 70 ppb and to set a separate secondary NAAQS for ozone to protect sensitive vegetation and ecosystems.

 

On September 2, 2011, President Obama ordered the EPA to withdraw proposed air quality standards lowering the 2008 ozone standard pending the CAA 2013 scheduled reconsideration of the ozone NAAQS (the normal 5 year reconsideration period). States moved forward with area designations based on the 2008 75 ppb standard using 2008-2010 quality assured monitoring data. Our service territory is designated as attainment, meaning that it is in compliance with the standard.

 

A revised Ozone NAAQS is expected to be proposed by the EPA early 2014 and is anticipated to be between 60 and 70 ppb.

 

PM NAAQS:

 

Particulate matter (PM) is the term for particles found in the air which comes from a variety of sources. On January 15, 2013, the EPA finalized the PM 2.5 primary annual standard at 12 ug/m(3) (micrograms per cubic meter of air). States are required to meet the primary standard in 2020.

 

The standard should have no impact on our existing generating fleet because the PM 2.5 ambient monitor results are below the required level. However, the proposed standards could impact future major modifications/construction projects that require a Prevention of Significant Deterioration (PSD) permit.

 

Mercury Air Toxics Standard (MATS)

 

In 2005, the EPA issued the Clean Air Mercury Rule (CAMR) under the CAA. It set limits on mercury emissions by power plants and created a market-based cap and trade system expected to reduce nationwide mercury emissions in two phases. New mercury emission limits for Phase 1 were to go into effect January 1, 2010. On February 8, 2008, the U.S. Court of Appeals for the District of Columbia vacated CAMR. This decision was appealed to the U.S. Supreme Court which denied the appeal on February 23, 2009.

 

The EPA issued Information Collection Requests (ICR) for determining the National Emission Standards for Hazardous Air Pollutants (NESHAP), including mercury, for coal and oil-fired electric steam generating units on December 24, 2009. The ICRs included our Iatan, Asbury and Riverton plants. All responses to the ICRs were submitted as required. The EPA ICRs were intended for use in developing regulations under Section 112(r) of the CAA maximum achievable emission standards for the control of the emission of hazardous air pollutants (HAPs), including mercury. The EPA proposed the national mercury and air toxics standards (MATS) in March 2011, which became effective April 16, 2012. MATS establishes numerical emission limits to reduce emissions of heavy metals, including mercury (Hg), arsenic, chromium, and nickel, and acid gases, including HCl and hydrogen fluoride (HF). For all existing and new coal-fired electric utility steam generating units (EGUs), the proposed standard will be phased in over three years, and allows states the ability to give facilities a fourth year to comply. On March 28, 2013, the EPA finalized updates to certain emission limits for new power plants under the MATS. The new standards affect only new coal and oil-fired power plants that will be built in the future. The update does not change the final emission limits or other requirements for existing power plants. On June 25, 2013, the startup, shutdown portion of the MATS was proposed for reconsideration in order to better define startup and shutdown periods (instances when the emission unit is on but the pollution control equipment is not in full operation) that will be excluded from emissions averaging for compliance purposes.

 

The MATS regulation of HAPs in combination with CSAPR is the driving regulation behind our Compliance Plan and its implementation schedule.  We expect compliance costs to be recoverable in our rates.

 

Greenhouse Gases

 

Our coal and gas plants, vehicles and other facilities, including EDG (our gas segment), emit CO2 and/or other Greenhouse Gases (GHGs) which are measured in Carbon Dioxide Equivalents (CO2e).

 

On September 22, 2009, the EPA issued the final Mandatory Reporting of Greenhouse Gases Rule under the CAA which requires power generating and certain other facilities that equal or exceed an emission threshold of 25,000 metric tons of CO2e to report GHGs to the EPA annually commencing in September 2011. EDE and EDG’s GHG emissions for 2011 and 2012 have been reported as required to the EPA.

 

On December 7, 2009, responding to a 2007 U.S. Supreme Court decision that determined that GHGs constitute “air pollutants” under the CAA, the EPA issued its final finding that GHGs threaten both the public health and the public welfare. This “endangerment” finding did not itself trigger any EPA regulations, but was a necessary predicate for the EPA to proceed with regulations to control GHGs. Since that time, a series of rules including the Prevention of Significant Deterioration and Title V Greenhouse Gas Tailoring Rule (Tailoring Rule) have been issued by the EPA. Several parties have filed petitions with the EPA and lawsuits have been filed challenging these rules. On June 26, 2012, the D.C. Circuit Court issued its opinion in the principal litigation of the EPA GHG rules (Endangerment, the Tailoring Rule, GHG emission standards for light-duty vehicles, and the EPA’s rule on reconsideration of the PSD Interpretive Memorandum). The three-judge panel upheld the EPA’s interpretation of the Clean Air Act provisions as unambiguously correct. This opinion solidifies the EPA’s position that the CAA requires PSD and Title V permits for major emitters of greenhouse gases, such as Empire. Our ongoing projects are currently being evaluated for the projected increase or decrease of CO2e emissions as required by the Tailoring Rule.

 

As the result of an agreement to settle litigation pending in the U.S. Court of Appeals, on April 13, 2012, the EPA proposed a Carbon Pollution Standard for new power plants to limit the amount of carbon emitted by electric utility generating units (EGUs). In light of the more than 2.5 million comments received by the EPA, this standard was rescinded, and a re-proposal of standards of performance for affected fossil fuel-fired EGUs was issued on September 20, 2013 as required by President Obama. The proposed rule sets separate standards for natural gas-fired combustion turbines and for fossil fuel-fired utility boilers. Limiting CO2 output to 1,000 or 1,100 pounds per megawatt hour based on size and fuel type, the standards apply only to new EGUs. It is expected that most new natural gas-fired combined cycle units will meet the new standard. The EPA believes fossil-fuel fired boilers can meet the standard through efficient technology or some level of carbon capture and sequestration, but the high cost, technical feasibility, and long term liability of stored carbon are issues that have not been resolved and limit this option for Empire and all electric utilities.

 

The proposal would not apply to existing units including modifications such as those required to meet other air pollution standards which are currently being undertaken at our Asbury facility and at the Riverton facility with the conversion of simple cycle Unit 12 to combined cycle. In response to President Obama’s June 25, 2013 memorandum to the EPA Administrator, the EPA is engaging states and stakeholders in a process to identify approaches to establish carbon pollution standards for currently operating power plants.

 

President Obama’s memorandum to the EPA Administrator requested the EPA issue proposed carbon pollution standards, regulations, or guidelines for modified, reconstructed, and existing power plants by no later than June 1, 2014;  issue final standards, regulations, or guidelines, for modified, reconstructed, and existing power plants by no later than June 1, 2015; and include in the guidelines addressing existing power plants a requirement that states submit to the EPA implementation plans by no later than June 30, 2016. As of October 15, 2013, the U.S. Supreme Court agreed to review an appeals court decision that said the EPA could regulate greenhouse gas emissions from fixed sources based on a previous decision based on green house emissions from cars.

 

In addition, a variety of proposals have been and are likely to continue to be considered by Congress to reduce GHGs. Proposals are also being considered in the House and Senate that would delay, limit or eliminate the EPA’s authority to regulate GHGs. At this time, it is not possible to predict what legislation, if any, will ultimately emerge from Congress regarding control of GHGs.

 

Certain states have taken steps to develop cap and trade programs and/or other regulatory systems which may be more stringent than federal requirements. For example, Kansas is a participating member of the Midwestern Greenhouse Gas Reduction Accord (MGGRA), one purpose of which is to develop a market-based cap and trade mechanism to reduce GHG emissions. The MGGRA has announced, however, that it will not issue a CO2e regulatory system pending federal legislative developments. Missouri is not a participant in the MGGRA.

 

The ultimate cost of any GHG regulations cannot be determined at this time. However, we expect the cost of complying with any such regulations to be recoverable in our rates.

 

Water Discharges

 

We operate under the Kansas and Missouri Water Pollution Plans that were implemented in response to the Federal Clean Water Act (CWA). Our plants are in material compliance with applicable regulations and have received necessary discharge permits.

 

The Riverton Units 7 and 8 and Iatan Unit 1, which utilize once-through cooling water, were affected by regulations for Cooling Water Intake Structures issued by the EPA under the CWA Section 316(b) Phase II. The regulations became final on February 16, 2004. In accordance with these regulations, we submitted sampling and summary reports to the Kansas Department of Health and Environment (KDHE) which indicate that the effect of the cooling water intake structure on Empire Lake’s aquatic life is insignificant. KCP&L, who operates Iatan Unit 1, submitted the appropriate sampling and summary reports to the Missouri Department of Natural Resources (MDNR).

 

In 2007 the United States Court of Appeals for the Second Circuit remanded key sections of these CWA regulations to the EPA. As a result, the EPA suspended the regulations and revised and signed a pre-publication proposed regulation on March 28, 2011. The EPA has secured an additional year to finalize the standards for cooling water intake structures under a modified settlement agreement. Following a recent court approved delay, the EPA is now obligated to finalize the rule by November 4, 2013. We will not know the full impact of these rules until they are finalized. If adopted in their present form, we expect regulations of Cooling Water Intake Structures issued by the EPA under the CWA Section 316(b) to have a limited impact at Riverton. The retirement of units 7 and 8 is scheduled in 2016. A new intake structure design and cooling tower will be constructed as part of the Unit 12 conversion at Riverton. Impacts at Iatan 1 could range from flow velocity reductions or traveling screen modifications for fish handling to installation of a closed cycle cooling tower retrofit. Our new Iatan Unit 2 and Plum Point Unit 1 are covered by the proposed regulation but were constructed with cooling towers, the proposed Best Technology Available. We expect them to be unaffected or minimally impacted by the final rule.

 

Surface Impoundments

 

We own and maintain coal ash impoundments located at our Riverton and Asbury Power Plants. Additionally, we own a 12% interest in a coal ash impoundment at the Iatan Generating Station and a 7.52% interest in a coal ash impoundment at Plum Point. On April 19, 2013, the EPA signed a notice of proposed rulemaking to revise its wastewater effluent limitation guidelines and standards under the CWA for coal-fired power plants. The proposal calls for updates to operating permits beginning in July 2017. Once the new guidelines are issued, the EPA and states would incorporate the new standards into wastewater discharge permits, including permits for coal ash impoundments. We do not have sufficient information at this time to estimate additional costs that might result from any new standards. All of our coal ash impoundments are compliant with existing state and federal regulations.

 

On June 21, 2010, the EPA proposed a new regulation pursuant to the Federal Resource Conservation and Recovery Act (RCRA) governing the management and storage of Coal Combustion Residuals (CCR). In the proposal, the EPA presents two options: (1) regulation of CCR under RCRA subtitle C as a hazardous waste and (2) regulation of CCR under RCRA subtitle D as a non-hazardous waste. The public comment period closed in November 2010. It is anticipated that the final regulation will be published in 2014. We expect compliance with either option as proposed to result in the need to construct a new landfill and the conversion of existing ash handling from a wet to a dry system(s) at a potential cost of up to $15 million at our Asbury and Riverton Power Plants. This preliminary estimate will likely change based on the final CCR rule and its requirements. We expect resulting costs to be recoverable in our rates.

 

On September 23, 2010 and on November 4, 2010 EPA consultants conducted on-site inspections of our Riverton and Asbury coal ash impoundments, respectively. The consultants performed a visual inspection of the impoundments to assess the structural integrity of the berms surrounding the impoundments, requested documentation related to construction of the impoundments, and reviewed recently completed engineering evaluations of the impoundments and their structural integrity. In response to the inspection comments, the recommended geotechnical studies have been completed and new flow monitoring devices and settlement monuments at both coal ash impoundments have been installed. As a result of the transition from coal to natural gas, closure of the Riverton impoundment is in progress in compliance with KDHE Bureau of Waste Management regulations. We expect to complete the closure by late 2013. The final design for additional recommendations that will improve safety for slope stability at the Asbury impoundment is under review. We have received preliminary approval by the MDNR for the site permitting of a new utility waste landfill adjacent to the Asbury plant. Additionally, the work plan for the detailed site investigation (DSI) to include geologic and hydrologic investigations has been approved by the MDNR Division of Geology and Land Survey. Construction of the new landfill is expected in 2016.

 

Renewable Energy

 

As previously discussed, we have purchased power agreements with Cloud County Windfarm, LLC, located in Cloud County, Kansas and Elk River Windfarm, LLC, located in Butler County, Kansas. We do not own any portion of either windfarm.  More than 15% of the energy we put into the grid comes from these long-term Purchased Power Agreements (PPAs). Through these PPAs, we generate about 900,000 renewable energy certificates (RECs) each year. A REC represents one megawatt-hour of renewable energy that has been delivered into the bulk power grid and “unbundles” the renewable attributes from the associated energy. This unbundling is important because it cannot be determined where the renewable energy is ultimately delivered once it enters the bulk power grid. As a result, RECs provide an avenue for renewable energy tracking and compliance purposes.

 

Missouri regulations currently require us and other investor-owned utilities in Missouri to generate or purchase electricity from renewable energy sources, such as solar, wind, biomass and hydro power, or purchase RECs, at the rate of at least 2% of retail sales in 2012, increasing to at least 5% by 2014 and ultimately to at least 15% by 2021. We are currently in compliance with this regulatory requirement. The regulations require that 2% of the renewable energy source must be solar; however, we believe we are exempted from the solar requirement. A challenge to our exemption, brought by two of our customers and Power Source Solar, Inc., was dismissed on May 31, 2011 by the Missouri Western District Court of Appeals. The plaintiffs filed in the Missouri Supreme Court for transfer of the case from the Missouri Western District to the Missouri Supreme Court. The transfer was denied. On January 30, 2013, a complaint was filed with the MPSC by Renew Missouri and others regarding several points of our 2011 RES Compliance Report and the 2012-2014 Compliance Plan. The complaint, which was lodged against four investor-owned utilities (Ameren Missouri, Kansas City Power & Light Company (KCP&L), KCP&L Greater Missouri Operations, and Empire), is currently under consideration by the MPSC. On October 3, 2013, the MPSC issued an order denying motions for summary determination of Renew Missouri and KCP&L/GMO, but granting motion for summary determination of Empire. In this order, the MPSC determined the provisions of the rule exempt Empire from the obligation to provide a detailed explanation of the calculation of the RES retail impact limit for its 2012 Plan.  By granting Empire’s motion, the MPSC unconsolidated the complaint against Empire and ordered that it would proceed independently. Items remaining under consideration from the original complaint include the qualification of Empire’s Ozark Beach facility as a hydropower renewable energy resource, the use of early RECs for compliance and Empire’s exemption from the use of solar RECs for compliance.

 

Renewable energy standard compliance rules were published by the MPSC on July 7, 2010.  Missouri investor-owned utilities and others initiated litigation to challenge these rules. On June 30, 2011, a Cole County Circuit Court judge ruled that portions of the MPSC rules were unlawful and unreasonable, in conflict with Missouri statute and in violation of the Missouri Constitution. Subsequent to that decision, a portion of the appeal was dropped and the entire order was stayed.  On December 27, 2011 the judge issued another order identical to the one that was stayed except that the rulings with regard to the constitutionality issue had been omitted. The MPSC appealed this decision and in November of 2012 the court dismissed lawsuits brought against the RES and affirmed the MPSC rules that were finalized in July 2010. Kansas established a renewable portfolio standard (RPS), effective November 19, 2010. It requires 10% of our Kansas retail customer peak capacity requirements to be sourced from renewables in 2012, increasing to 15% by 2016, and 20% by 2020. In addition, there are several proposals currently before the U.S. Congress to adopt a nationwide RPS.

 

We have been selling the majority of our RECs and plan to continue to sell all or a portion of them in the future. As a result of these REC sales, we cannot claim the underlying energy is renewable. Once a REC has been claimed or retired, it cannot be used for any other purpose. At the end of 2012, sufficient RECs, including hydro, were retired to comply with the Missouri and Kansas requirements through the end of November 2012. Additional RECs were retired in January of 2013 to complete the process for 2012. In the future, we will continue to retain a sufficient amount of RECs to meet any current or future requirements.

 

Gas Segment

 

The acquisition of Missouri Gas in June 2006 involved the property transfer of two former manufactured gas plant (FMGP) sites owned by predecessors. Site #1 in Chillicothe, Missouri is listed in the MDNR Registry of Confirmed Abandoned or Uncontrolled Hazardous Waste Disposal Sites in Missouri. No remediation of this site is expected to be required in the near term.  We have received a letter stating no further action is required from the MDNR with respect to Site #2 in Marshall, Missouri. We have incurred $0.2 million in remediation costs and estimate further remediation costs at these two FMGP sites to be minimal.