Valaris Limited
Fleet Status Report
May 1, 2023
New Contracts and Extensions, Rig Sales and Other Updates Since Last Fleet Status Report
Floaters
Three-year contract with Petrobras for drillship VALARIS DS-8. The rig is being reactivated for this contract. The total contract value is approximately $500 million, including a $30 million mobilization fee.
100-day contract with a TotalEnergies affiliate for drillship VALARIS DS-12. The contract is expected to commence in second quarter 2023.
Priced option exercised by TotalEnergies EP Brasil offshore Brazil for drillship VALARIS DS-15. Following the exercise of this priced option, the rig is expected to be under contract through second quarter 2024. There are no further options remaining under this contract. The operating day rate for the option period, which has an estimated duration of 100 days, is approximately $254,000.

       Jackups
Two-year contract extension with Harbour Energy in the UK North Sea for standard duty jackup VALARIS 92. The extension period is expected to commence in first quarter 2024 in direct continuation of the existing contract. The operating day rate for the extension period is $95,000, during which the rig is expected to be exclusively undertaking plug and abandonment (P&A) work.
70-day contract with Beach Energy offshore New Zealand for heavy duty modern jackup VALARIS 107. The contract is expected to commence in third quarter 2023. The total contract value is approximately $26 million.
One-well contract with NEO Energy in the UK North Sea for heavy duty ultra-harsh environment jackup VALARIS Norway. The contract is expected to commence in July 2023 and has an estimated duration of 20 days. The operating day rate is $105,000.

Rig Sale
The previously announced sale of 40-year-old standard duty legacy jackup VALARIS 54 for $28.5 million has completed.











New Disclosure: bolded text signifies items that have not previously been disclosed
Page 1 of 12


    
vlrhposclrclrspcrgb190701a.jpg
Valaris Limited
Fleet Status Report
May 1, 2023
Contract Backlog(1) (2)
($ millions)
202320242025+Total
Contracted Days(1) (2)
202320242025+
Drillships$483.5 $641.8 $373.7 $1,499.0 Drillships1,847 1,924 949 
Semisubmersibles122.5 137.6 10.1 270.2 Semisubmersibles545 606 45 
Floaters$606.0 $779.4 $383.8 $1,769.2 Floaters2,392 2,530 994 
HD - Ultra-Harsh & Harsh$136.3 $114.7 $26.7 $277.7 HD - Ultra-Harsh & Harsh1,299 926 206 
HD & SD - Modern150.0 73.3 94.4 317.7 HD & SD - Modern1,656 853 840 
SD - Legacy30.2 49.3 40.2 119.7 SD - Legacy399 600 423 
Jackups$316.5 $237.3 $161.3 $715.1 Jackups3,354 2,379 1,469 
Other(3)
$111.9 $112.9 $94.1 $318.9 
Other(3)
2,593 3,669 2,722 
Total$1,034.4 $1,129.6 $639.2 $2,803.2 Total8,339 8,578 5,185 
ARO Drilling(4)
Average Day Rates(1) (2)
202320242025+
Owned Rigs$164.8 $246.6 $336.3 $747.7 Drillships$262,000 $334,000 $394,000 
Leased Rigs206.3 352.2 326.2 884.7 Semisubmersibles225,000 227,000 225,000 
Total$371.1 $598.8 $662.5 $1,632.4 Floaters$253,000 $308,000 $386,000 
HD - Ultra-Harsh & Harsh$105,000 $124,000 $130,000 
HD & SD - Modern91,000 86,000 112,000 
SD - Legacy76,000 82,000 95,000 
Jackups$94,000 $100,000 $110,000 
(1) Contract backlog, contracted days and average day rates as of May 1, 2023.
(2) Contract backlog and average day rates exclude certain types of non-recurring revenues such as lump sum mobilization payments. Contract backlog and contracted days include backlog and days when a rig is under suspension. Average day rates are adjusted to exclude suspension backlog and days.
(3) Other represents contract backlog and contracted days related to bareboat charter agreements and management services contracts.
(4) ARO Drilling contract backlog as of May 1, 2023.
HD = Heavy Duty; SD = Standard Duty

Page 2 of 12


vlrhposclrclrspcrgb190701a.jpg
Valaris Limited
Fleet Status Report
May 1, 2023
Asset Category / RigDesignYear DeliveredCustomerLocationContract Start Date
Contract End Date(1)
Day Rate(2)
Comments
Drillships     
VALARIS DS-18GustoMSC P100002015ChevronU.S. GOMAug 22Jul 25Contract includes MPD services. Additional rate charged when MPD services provided.
VALARIS DS-17GustoMSC P100002014EquinorBrazilJun 23Dec 24Contract includes MPD and additional services. Total contract value of $327 million, including an upfront payment of approx. $86 million for mobilization, capital upgrades and a contribution towards reactivation costs. Two priced options each with an estimated duration of 60 days
VALARIS DS-16

GustoMSC P100002014OccidentalU.S. GOMMay 22May 24Contract includes MPD services. Additional rate charged when MPD services provided. 1-year priced option
VALARIS DS-15GustoMSC P100002014TotalEnergiesBrazil
Jun 21
Jan 24
Dec 23
Apr 24

$254,000
Contract includes MPD services. Additional rate charged when MPD services provided.
VALARIS DS-12
DSME 120002014
BP

Undisclosed
TotalEnergies
BP
Mauritania/Senegal
Angola
West Africa
Egypt
Apr 22

Mar 23
Jun 23
Oct 23
Feb 23

May 23
Sep 23
Aug 24


Total contract value of $26.2 million

Total contract value of $136 million
VALARIS DS-10
Samsung GF120002017SNEPCoNigeriaApr 22
Apr 23
Apr 23
Mar 24

$231,000
VALARIS DS-9Samsung GF120002015ExxonMobilAngolaJul 22Jul 24Contract includes MPD services. Four 6-month priced options
VALARIS DS-8Samsung GF120002015PetrobrasBrazil$428,150Three-year contract. Plus mobilization fee of approx. $30 million. Contract includes additional services. Rig being reactivated in Spain and is expected to mobilize to Brazil in mid 4Q23
VALARIS DS-4Samsung 96K2010PetrobrasBrazilJul 22Dec 23Contract includes MPD and additional services. 6-month priced option
Stacked
VALARIS DS-11DSME 120002013Spain
VALARIS DS-7
Samsung 96K2013Spain
Purchase Options(3)
VALARIS DS-14

DSME 12000South KoreaOption to take delivery by year-end 2023. Purchase price of approx. $218 million assuming a Dec 31, 2023 delivery
VALARIS DS-13


DSME 12000South KoreaOption to take delivery by year-end 2023. Purchase price of approx. $119 million assuming a Dec 31, 2023 delivery
Changes: bolded rig names and underlined text signify changes in rig status from previous report
Page 3 of 12


vlrhposclrclrspcrgb190701a.jpg
Valaris Limited
Fleet Status Report
May 1, 2023
Asset Category / RigDesignYear DeliveredCustomerLocationContract Start Date
Contract End Date(1)
Day Rate(2)
Comments
Semisubmersibles
VALARIS DPS-5


ENSCO 8500 Series,
DP + Moored
2012EniMexicoJan 23Jul 23$313,500Plus mobilization fee of approx. $1.2 million
VALARIS DPS-1


F&G ExD Millennium, DP2012Woodside


Australia


Apr 22
Sep 23
Aug 23
Feb 25
VALARIS MS-1


F&G ExD Millennium, Moored2011Santos




Undisclosed
Australia




Australia
Jul 22




Oct 23
Oct 23




Aug 24
Contract suspended. During the contract suspension period, the duration of which is currently unknown, we do not expect a material impact on revenues and earnings. Three priced options each with an estimated duration of 30 days
Stacked
VALARIS DPS-6
ENSCO 8500 Series, DP2012U.S. GOM
VALARIS DPS-3
ENSCO 8500 Series,
DP + Moored
2010U.S. GOM
Changes: bolded rig names and underlined text signify changes in rig status from previous report


Page 4 of 12


vlrhposclrclrspcrgb190701a.jpg
Valaris Limited
Fleet Status Report
May 1, 2023
Asset Category / RigDesignYear DeliveredCustomerLocationContract Start Date
Contract End Date(1)
Day Rate(2)
Comments
Jackups      
Heavy Duty Ultra-Harsh Environment(4)
VALARIS NorwayKFELS N Class2011
BP
Centrica Storage
NEO Energy
North Sea Natural Resources
UK
UK
UK
UK
May 22
Feb 23
Jul 23
Aug 23

Jan 23
Jun 23
Aug 23
Oct 23



$105,000
$105,000
VALARIS StavangerKFELS N Class2011AvailableUK
VALARIS 250LT Super Gorilla XL2003Saudi AramcoSaudi ArabiaJun 18Dec 24
Leased to ARO Drilling(5)
VALARIS 249LT Super Gorilla2002OMV
Undisclosed
New Zealand
Trinidad
Feb 22
Jun 23
Mar 23
Jun 24

$125,000

Plus mobilization fee of $8.5 million and a daily rate of $64,000 while the rig is in transit from New Zealand to Trinidad
VALARIS 248LT Super Gorilla2000NeptuneUKAug 20Mar 24
VALARIS 247LT Super Gorilla1998DNO
Perenco
UK
UK
May 21
Mar 23
Jan 23
Sep 23

One priced option with an estimated duration of 60 days
Stacked
VALARIS VikingKFELS N Class2010RepsolNorway
UK
Jun 22Jan 23
Changes: bolded rig names and underlined text signify changes in rig status from previous report
Page 5 of 12


vlrhposclrclrspcrgb190701a.jpg
Valaris Limited
Fleet Status Report
May 1, 2023
Asset Category / RigDesignYear DeliveredCustomerLocationContract Start Date
Contract End Date(1)
Day Rate(2)
Comments
Jackups     
Heavy Duty Harsh Environment(4)
 
VALARIS 123KFELS Super A2019Kistos
ONE-Dyas
Netherlands
Netherlands
Nov 22
Mar 23
Mar 23
Sep 23
VALARIS 122


KFELS Super A2014Shell
UK
Nov 22
Sep 23
Aug 23
Jan 25

Total contract value of over $60 million based on estimated duration of 500 days
VALARIS 121KFELS Super A2013Harbour Energy
Petrofac
Shell
UK
UK
UK
Jul 21
Jul 23
Oct 23
Jan 23
Sep 23
Apr 24


Total contract value of over $25 million. Four priced options
VALARIS 120KFELS Super A2013Harbour EnergyUKJul 17
Jul 23
Jul 23
Jul 25

$130,000
Stacked
VALARIS 102KFELS MOD V-A2002U.S. GOM
Changes: bolded rig names and underlined text signify changes in rig status from previous report

Page 6 of 12


vlrhposclrclrspcrgb190701a.jpg
Valaris Limited
Fleet Status Report
May 1, 2023
Asset Category / RigDesignYear DeliveredCustomerLocationContract Start Date
Contract End Date(1)
Day Rate(2)
Comments
Jackups
Heavy Duty - Modern(4)
VALARIS 118LT 240-C2011BP
Trinidad
Oct 22
Jul 23
Jun 23
Jan 24

Total contract value of approx. $24 million
VALARIS 117LT 240-C2009EniMexicoDec 21Jun 24
VALARIS 116LT 240-C2008Saudi AramcoSaudi ArabiaDec 18Dec 24
Leased to ARO Drilling(5)
VALARIS 115BM Pacific Class 4002013Shell
BruneiApr 23Apr 27Total contract value of approx. $159 million
VALARIS 110KFELS MOD V-B2015North Oil CompanyQatarOct 21Oct 24Two 1-year priced options
VALARIS 108KFELS MOD V-B2007Saudi Aramco
Saudi Arabia
Nov 18
Jul 23
Mar 23
Jul 26

Leased to ARO Drilling(5)
VALARIS 107KFELS MOD V-B2006
Eni
Eni
GB Energy
Undisclosed
Beach Energy

Australia
Australia
Australia
Australia
New Zealand

Nov 22
Mar 23
May 23
Jul 23
Aug 23

Mar 23
May 23
Jul 23
Aug 23
Dec 23

$115,000
$126,500
$118,000
$120,000




Total contract value of approx. $26 million
VALARIS 106KFELS MOD V-B2005BPIndonesia
Jan 18
Jan 24
Seven priced options each with an estimated duration of 90 days
Stacked
VALARIS 111KFELS MOD V-B2003Croatia
VALARIS 109KFELS MOD V-Super B2008Namibia
VALARIS 104KFELS MOD V-B2002UAE
Changes: bolded rig names and underlined text signify changes in rig status from previous report
Page 7 of 12


vlrhposclrclrspcrgb190701a.jpg
Valaris Limited
Fleet Status Report
May 1, 2023
Asset Category / RigDesignYear DeliveredCustomerLocationContract Start Date
Contract End Date(1)
Day Rate(2)
Comments
Jackups
Standard Duty - Modern
VALARIS 148LT Super 116-E2013Saudi AramcoSaudi ArabiaNov 19Feb 26
Leased to ARO Drilling(5)
VALARIS 147LT Super 116-E 2013Saudi AramcoSaudi ArabiaSep 19Dec 25
Leased to ARO Drilling(5)
VALARIS 146LT Super 116-E2011Saudi AramcoSaudi ArabiaSep 18Dec 24
Leased to ARO Drilling(5)
VALARIS 144LT Super 116-E2010Cantium
Cantium
Talos
U.S. GOM
U.S. GOM
U.S. GOM
Dec 22
Apr 23
Jul 23
Mar 23
Jun 23
Sep 23
$80,000
$85,000
$86,900

VALARIS 143LT Super 116-E 2010Saudi AramcoSaudi ArabiaOct 18Dec 24
Leased to ARO Drilling(5)
VALARIS 141LT Super 116-E2016Saudi AramcoSaudi ArabiaAug 22Aug 25
Leased to ARO Drilling(5)
VALARIS 140LT Super 116-E2016Saudi Aramco
Saudi ArabiaMar 22Mar 25
Leased to ARO Drilling(5)
VALARIS 76LT Super 116-C2000Saudi Aramco
Saudi Arabia
Jan 15
Feb 24
Oct 23
Feb 29

Leased to ARO Drilling(5)
Stacked
VALARIS 145LT Super 116-E2010U.S. GOM
VALARIS 75LT Super 116-C 1999U.S. GOM
Changes: bolded rig names and underlined text signify changes in rig status from previous report
Page 8 of 12


vlrhposclrclrspcrgb190701a.jpg
Valaris Limited
Fleet Status Report
May 1, 2023
Asset Category / RigDesignYear DeliveredCustomerLocationContract Start Date
Contract End Date(1)
Day Rate(2)
Comments
Jackups
Standard Duty - Legacy 
VALARIS 92LT 116-C1982Harbour EnergyUK
Feb 17
Mar 24
Feb 24
Feb 26

$95,000
VALARIS 72Hitachi K1025N1981Eni
UK
Jan 20

Jun 24
Sold
VALARIS 54F&G L-780 Mod II-C1982
Saudi Aramco
Sold
Saudi ArabiaSep 14Mar 23
Changes: bolded rig names and underlined text signify changes in rig status from previous report


Page 9 of 12


vlrhposclrclrspcrgb190701a.jpg
Valaris Limited
Fleet Status Report
May 1, 2023
Asset Category / RigDesignCustomerLocationContract Start Date
Contract End Date(1)
Day Rate(2)
Comments
Other
Drilling Management 
Thunder HorseDeepwater SemisubmersibleBPU.S. GOMJan 17Jan 24
Mad DogDeepwater Spar Drilling RigBPU.S. GOMJan 17Jan 24
ARO Drilling
Jackup Rigs Owned by ARO Drilling 
ARO 2001LT 116-CSaudi AramcoSaudi ArabiaOct 17Jan 26
ARO 2003BM 200-HSaudi AramcoSaudi ArabiaFeb 18Feb 26
ARO 3001LT Tarzan 225-CSaudi AramcoSaudi ArabiaOct 17Jan 26
ARO 3002LT Tarzan 225-CSaudi AramcoSaudi ArabiaOct 17Jan 26
ARO 3003LT Tarzan 225-CSaudi AramcoSaudi ArabiaOct 18Dec 26
ARO 3004LT Tarzan 225-CSaudi AramcoSaudi ArabiaOct 18Dec 26
ARO 4001KFELS Super BSaudi AramcoSaudi ArabiaOct 17Jan 26
ARO 2005LT 116-CSaudi ArabiaUnder construction. Delivery expected in 2023
ARO 2006LT 116-CSaudi ArabiaUnder construction. Delivery expected in 2023
Changes: bolded rig names and underlined text signify changes in rig status from previous report
(1) Contract duration does not include any unexercised optional extensions. Contract end dates can vary based on how long it takes to complete the wells subject to the contract.
(2) Day rates are provided unless such disclosures are restricted by confidentiality provisions.
(3) Valaris has the right, but not the obligation, to take delivery of either or both rigs on or before December 31, 2023. Not included in Valaris' fleet count.
(4) Heavy duty jackups are well-suited for operations in tropical revolving storm areas.
(5) Rigs leased to ARO Drilling via bareboat charter agreements to fulfill contracts between ARO Drilling and Saudi Aramco.
Page 10 of 12


fsrglobalfleetmap_05012023a.jpg
Page 11 of 12


vlrhposclrclrspcrgb190701a.jpg
Valaris Limited
Fleet Status Report
May 1, 2023
 
Additional Information Regarding this Fleet Status Report
 
Day Rate and Terms. The day rates reflected in this Fleet Status Report are stated in U.S. dollars and are the operating day rates charged to customers, which may include estimated contractual adjustments for changes in operating costs and/or reimbursable cost adjustments for ongoing expenses such as crew, catering, insurance and taxes. The day rates, however, do not include certain types of non-recurring revenues such as lump sum mobilization payments, revenues earned during mobilizations, revenues associated with contract preparation and other non-recurring reimbursable items such as mobilizations and capital enhancements, and the impact of the fair market value adjustments to previously acquired drilling contracts. Routine and non-routine downtime may reduce the actual revenues recognized during the contract term. Additionally, we sometimes negotiate special rates and/or day rate adjustments with customers that may reduce revenues recognized.

Total Contract Value. Total contract value is the estimated total compensation expected to be received for a contract, including the operating day rate over the estimated firm term of the contract and any non-recurring lump sum payments for items such as mobilization, reactivation and capital upgrades.
 
Forward-Looking Statements. Statements contained in this Fleet Status Report that are not historical facts are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Forward-looking statements include words or phrases such as "anticipate," "believe," "estimate," "expect," "intend," "likely," "plan," "project," "could," "may," "might," "should," "will" and similar words and specifically include statements regarding expected financial performance; expected utilization, day rates, revenues, operating expenses, cash flows, contract status, terms and duration, contract backlog, capital expenditures, insurance, financing and funding; the offshore drilling market, including supply and demand, customer drilling programs, stacking of rigs, effects of new rigs on the market and effect of the volatility of commodity prices; expected work commitments, awards, contracts and letters of intent; scheduled delivery dates for rigs; performance of our joint ventures, including our joint venture with Saudi Aramco; the availability, delivery, mobilization, contract commencement, availability, relocation or other movement of rigs and the timing thereof; rig reactivations; suitability of rigs for future contracts; divestitures of assets; general economic, market, business and industry conditions, including inflation and recessions, trends and outlook; general political conditions, including political tensions, conflicts and war (such as the ongoing conflict in Ukraine); cybersecurity attacks and threats; impacts and effects of public health crises, pandemics and epidemics, such as the COVID-19 pandemic; future operations; increasing regulatory complexity; targets, progress, plans and goals related to environmental, social and governance (“ESG”) matters; the outcome of tax disputes; assessments and settlements; and expense management. The forward-looking statements contained in this Fleet Status Report are subject to numerous risks, uncertainties and assumptions that may cause actual results to vary materially from those indicated, including cancellation, suspension, renegotiation or termination of drilling contracts and programs; our ability to obtain financing, service our debt, fund capital expenditures and pursue other business opportunities; adequacy of sources of liquidity for us and our customers; future share repurchases; actions by regulatory authorities, or other third parties; actions by our security holders; internal control risk; commodity price fluctuations and volatility, customer demand, loss of a significant customer or customer contract, downtime and other risks associated with offshore rig operations; adverse weather, including hurricanes; changes in worldwide rig supply, including as a result of reactivations and newbuilds; and demand, competition and technology; supply chain and logistics challenges; consumer preferences for alternative fuels and forecasts or expectations regarding the global energy transition; increased scrutiny of our ESG targets, including our Scope 1 emissions intensity reduction target, initiatives and reporting and our ability to achieve such targets or initiatives; changes in customer strategy; future levels of offshore drilling activity; governmental action, civil unrest and political and economic uncertainties, including recessions, volatility affecting the banking system and financial markets, inflation and adverse changes in the level of international trade activity; terrorism, piracy and military action; risks inherent to shipyard rig reactivation, upgrade, repair, maintenance or enhancement; our ability to enter into, and the terms of, future drilling contracts; suitability of rigs for future contracts; the cancellation of letters of intent or letters of award or any failure to execute definitive contracts following announcements of letters of intent, letters of award or other expected work commitments; the outcome of litigation, legal proceedings, investigations or other claims or contract disputes; governmental regulatory, legislative and permitting requirements affecting drilling operations; our ability to attract and retain skilled personnel on commercially reasonable terms; environmental or other liabilities, risks or losses; compliance with our debt agreements and debt restrictions that may limit our liquidity and flexibility; cybersecurity risks and threats; and changes in foreign currency exchange rates. In addition to the numerous factors described above, you should also carefully read and consider "Item 1A. Risk Factors" in Part I and "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations" in Part II of our most recent annual report on Form 10-K, which is available on the Securities and Exchange Commission's website at www.sec.gov or on the Investor Relations section of our website at www.valaris.com. Each forward-looking statement speaks only as of the date of the particular statement, and we undertake no obligation to update or revise any forward-looking statements, except as required by law.