Commitments And Contingencies
9 Months Ended
Sep. 30, 2012
Commitments And Contingencies

5. Commitments and Contingencies

Environmental.

Duke Energy is subject to international, federal, state and local regulations regarding air and water quality, hazardous and solid waste disposal and other environmental matters. Duke Energy Carolinas, Duke Energy Ohio and Duke Energy Indiana are subject to federal, state and local regulations regarding air and water quality, hazardous and solid waste disposal and other environmental matters. These regulations can be changed from time to time, imposing new obligations on the Duke Energy Registrants.

The following environmental matters impact all of the Duke Energy Registrants.

Remediation Activities. The Duke Energy Registrants are responsible for environmental remediation at various contaminated sites. These include some properties that are part of ongoing operations and sites formerly owned or used by Duke Energy entities. In some cases, Duke Energy no longer owns the property. Managed in conjunction with relevant federal, state and local agencies, activities vary with site conditions and locations, remediation requirements, complexity and sharing of responsibility. If remediation activities involve statutory joint and several liability provisions, strict liability, or cost recovery or contribution actions, the Duke Energy Registrants could potentially be held responsible for contamination caused by other parties. In some instances, the Duke Energy Registrants may share liability associated with contamination with other potentially responsible parties, and may also benefit from insurance policies or contractual indemnities that cover some or all cleanup costs. Reserves associated with remediation activities at certain sites have been recorded and it is anticipated that additional costs associated with remediation activities at certain sites will be incurred in the future. All of these sites generally are managed in the normal course of business or affiliate operations. The Duke Energy Registrants have accrued costs associated with remediation activities at some of its current and former sites, as well as other relevant environmental contingent liabilities. Management, in the normal course of business, continually assesses the nature and extent of known or potential environmentally related contingencies and records liabilities when losses become probable and are reasonably estimable. Costs associated with remediation activities within the Duke Energy Registrants' operations are typically expensed unless regulatory recovery of the costs is deemed probable.

The following tables contain information regarding reserves for probable and estimable costs related to Duke Energy's various environmental sites. These amounts are recorded in Other within Current Liabilities and Other within Deferred Credits and Other Liabilities on the Duke Energy Registrants' Consolidated Balance Sheets.

(in millions)Balance at December 31, 2011 Provisions / Adjustments(b)Cash Reductions Balance at September 30, 2012
Duke Energy(a)$ 61 $ 43$ (19) $ 85
Duke Energy Carolinas  12   1    13
Duke Energy Ohio(a)  28   10  (15)   23
Duke Energy Indiana  9   2  (2)   9
            
(in millions)Balance at December 31, 2010 Provisions / AdjustmentsCash Reductions Balance at September 30, 2011
Duke Energy(a)$ 88 $ 5$ (21) $ 72
Duke Energy Carolinas  13      13
Duke Energy Ohio(a)  50   3  (17)   36
Duke Energy Indiana  11   1  (2)   10
            
(a)Environmental reserves relate primarily to former Manufactured Gas Plants (MGP) and Other Sites.
(b)Amounts at Duke Energy include $32 million in environmental reserves assumed during the Progress Energy merger.

Duke Energy Ohio has received an order from the PUCO to defer the costs incurred as noted in the above table. The PUCO will rule on the recovery of these costs at a future proceeding.

Management believes it is probable that additional liabilities will be incurred as work progresses at Duke Energy Ohio and Progress Energy Florida MGP sites; however, costs associated with future remediation cannot currently be reasonably estimated.

Clean Water Act 316(b). The EPA published its proposed cooling water intake structures rule on April 20, 2011. The proposed rule advances one main approach and three alternatives. The main approach establishes aquatic protection requirements for existing facilities and new on-site facility additions that withdraw 2 million gallons or more of water per day from rivers, streams, lakes, reservoirs, estuaries, oceans, or other U.S. waters for cooling purposes. Based on the main approach proposed, most, if not all of the coal, natural gas and nuclear-fueled steam electric generating facilities in which the Duke Energy Registrants are either a whole or partial owner are likely affected sources unless retired prior to implementation of the 316(b) requirements.

The EPA recently modified a previous settlement agreement that now calls for the EPA to finalize the 316(b) rule by June 2013. Compliance with portions of the rule could begin as early as 2016. Because of the wide range of potential outcomes, including the other three alternative proposals, the Duke Energy Registrants are unable to predict the outcome of the rulemaking or estimate its costs to comply at this time.

Cross-State Air Pollution Rule (CSAPR). On August 8, 2011, the final Cross-State Air Pollution Rule (CSAPR) was published in the Federal Register. The CSAPR established state-level annual SO2 and NOx budgets that were to take effect on January 1, 2012, and state-level ozone-season NOx budgets that were to take effect on May 1, 2012, allocating emission allowances to affected sources in each state equal to the state budget less an allowance set-aside for new sources. The budget levels were set to decline in 2014 for many states, including each state that the Duke Energy Registrants operate in, except for South Carolina and Florida where the applicable budgets were to remain constant. The rule allowed both intrastate and limited interstate allowance trading.

Numerous petitions for review of the CSAPR were filed with the United States Court of Appeals for the District of Columbia (D.C. Circuit or The Court). On August 21, 2012, by a 2-1 decision, the D.C Circuit vacated the CSAPR. The Court also directed the EPA to continue administering the Clean Air Interstate Rule (CAIR) that the Duke Energy Registrants have been complying with since 2009 pending completion of a remand rulemaking to replace CSAPR with a valid rule. CAIR requires additional Phase II reductions in SO2 and NOx emissions beginning in 2015. The court's decision to vacate the CSAPR leaves the future of the rule uncertain. The EPA has filed a petition with the D.C. Circuit for en banc rehearing of the CSAPR decision. If the court's August 21, 2012 decision is upheld, the CAIR will remain in force for an unknown period of time until EPA develops a replacement rule. If the decision is overturned on rehearing, it is not known when EPA would move to implement the CSAPR.

The Duke Energy Registrants cannot predict the outcome of the rehearing process or how it could affect future emission reduction requirements that might apply to the Duke Energy Registrants as a result of a potential CSAPR replacement rulemaking. The continued implementation of the CAIR pending the outcome of the rehearing process and a potential CSAPR replacement rulemaking, including the potential implementation of CAIR Phase II in 2015, will not result in the Duke Energy Registrants adding new emission controls.

Coal Combustion Residuals (CCR). On June 21, 2010, the EPA issued a proposal to regulate, under the Resource Conservation and Recovery Act, coal combustion residuals (CCR), a term the EPA uses to describe the CCPs associated with the generation of electricity. The EPA proposal contains two regulatory options whereby CCRs not employed in approved beneficial use applications would either be regulated as hazardous waste or would continue to be regulated as non-hazardous waste. The Duke Energy Registrants cannot predict the outcome of this rulemaking. However, based on the proposal, the cost of complying with the final regulation will be material. In response to a motion filed in federal court by environmental groups asking the court to compel the EPA to issue a final rule, the EPA filed a declaration on October 11, 2012, suggesting that it could take more than a year to complete the regulation.

Mercury and Air Toxics Standards (MATS). The final Mercury and Air Toxics Standards rule (previously referred to as the Utility MACT Rule) was published in the Federal Register on February 16, 2012. The final rule establishes emission limits for hazardous air pollutants from new and existing coal-fired and oil-fired steam electric generating units. The rule requires sources to comply with the emission limits by April 16, 2015. Under the Clean Air Act, permitting authorities have the discretion to grant up to a 1-year compliance extension, on a case-by-case basis, to sources that are unable to complete the installation of emission controls before the compliance deadline. The Duke Energy Registrants continue to evaluate the requirements of the rule and develop strategies for complying with the rule's requirements. Strategies to achieve compliance with the final MATS rules are likely to include installing new or upgrading existing air emission control equipment, developing monitoring processes, fuel switching and accelerating retirement of some coal-fired electric-generating units. For additional information, refer to Note 4, Regulatory Matters, regarding potential plant retirements.

Numerous petitions for review of the final MATS rule have been filed with the United States Court of Appeals for the District of Columbia. The court established a schedule for the litigation that has final briefs being filed on April 8, 2013. Oral arguments have not been scheduled. The Duke Energy Registrants cannot predict the outcome of the litigation or how it might affect the MATS requirements as they apply to the Duke Energy Registrants.

As finalized, the cost to the Duke Energy Registrants to comply with the regulation will be material.

EPA Greenhouse Gas New Source Performance Standards (NSPS). On April 13, 2012, the EPA published in the Federal Register its proposed rule to establish carbon dioxide (CO2) emissions standards for pulverized coal, IGCC, and natural gas combined cycle electric generating units that are permitted and constructed in the future. The proposal would not apply to any of the Duke Energy Registrants' coal (which includes IGCC) and natural gas electric generation plants that are currently under construction or in operation. Any future pulverized coal and IGCC units will have to employ carbon capture and storage (CCS) technology to meet the CO2 emission standard the EPA has proposed. The proposed standard will not require new natural gas combined cycle facilities to install CCS technology.

Management does not expect any material impact on the Duke Energy Registrants' future results of operations or cash flows based on the EPA's proposal. The final rule, however, could be significantly different from the proposal. It is not known when the EPA might finalize the rule.

Estimated Cost and Impacts of EPA Rulemakings. While the ultimate compliance requirements for the Duke Energy Registrants for MATS, Clean Water Act 316(b) and CCRs will not be known until all the rules have been finalized, for planning purposes, the Duke Energy Registrants currently estimate that the cost of new control equipment that may need to be installed on existing power plants to comply with this group of rules could total $6 billion to $7 billion, excluding AFUDC, over the next 10 years. The Duke Energy Registrants also expect to incur increased fuel, purchased power, operation and maintenance, and other expenses in conjunction with these EPA regulations, and also expect to incur costs for replacement generation for potential coal-fired power plant retirements. Until the final regulatory requirements of the group of EPA regulations are known and can be fully evaluated, the potential compliance costs associated with these EPA regulatory actions are subject to considerable uncertainty. Therefore, the actual compliance costs incurred may be materially different from these estimates based on the timing and requirements of the final EPA regulations.

The Duke Energy Registrants intend to seek regulatory recovery of amounts incurred associated with regulated operations in complying with these regulations. Refer to Note 4 for further information regarding potential plant retirements and regulatory filings related to the Duke Energy Registrants.

Litigation.

Duke Energy

Progress Energy Merger Shareholder Litigation. On July 20, 2012, Duke Energy was served with a shareholder Derivative Complaint filed in the Delaware Chancery Court (Rupp v. Rogers, et al.). The lawsuit names as defendants Jim Rogers and the ten other members of the Duke Energy board of directors who were also members of the pre-merger Duke Energy board of directors (Legacy Duke Directors). Duke Energy is named as a nominal defendant. Raul v. Rogers, also filed in Delaware Chancery Court was consolidated with the Rupp case on September 24, 2012. The lawsuit alleges claims for breach of fiduciary duties of loyalty and care by the defendants in connection with the post-merger change in CEO, as discussed in Note 4.

On August 3, 2012, Duke Energy was served with a shareholder Derivative Complaint, which has been transferred to the North Carolina Business Court (Krieger v. Johnson, et al.). The lawsuit names as defendants, William D. Johnson, James E. Rogers and the Legacy Duke Energy Directors. Duke Energy is named as a nominal defendant. The lawsuit alleges claims for breach of fiduciary duty in granting excessive compensation to Mr. Johnson.

Duke Energy has been served with two cases shareholder Derivative Complaints, filed in federal district court in Delaware. The plaintiffs in Tansey v. Rogers, et al., served on August 17, 2012, allege claims of breach of fiduciary duty and waste of corporate assets. The plaintiffs in Pinchuck v. Rogers, et al., served on October 31, 2012, also alleges claims for breach of fiduciary duty. The Legacy Duke Energy Directors are named as defendants in both of these cases.

Duke Energy was also served in July 2012 with three purported securities class action lawsuits. These three cases (Craig v. Duke Energy Corporation, et al.; Nieman v. Duke Energy Corporation, et al.; and Sunner v. Duke Energy Corporation, et al.), have been consolidated in the United States District Court for the Western District of North Carolina. The cases are purportedly brought on behalf of classes of various persons who purchased stock of Duke Energy and Progress Energy and name as defendants the Legacy Duke Energy Directors and certain officers of the company.

It is not possible to predict whether Duke Energy will incur any liability or to estimate the damages, if any, that Duke Energy might incur in connection with these lawsuits. Additional lawsuits may be filed.

Spent Nuclear Fuel Matters. Pursuant to the Nuclear Waste Policy Act of 1982, Progress Energy Carolinas and Progress Energy Florida entered into contracts with the U.S. Department of Energy (DOE) under which the DOE agreed to begin taking spent nuclear fuel by no later than January 31, 1998. All similarly situated utilities were required to sign the same Standard Contract for Disposal of Spent Nuclear Fuel.

The DOE failed to begin taking spent nuclear fuel by January 31, 1998. In January 2004, Progress Energy Carolinas and Progress Energy Florida filed a complaint in the U.S. Court of Federal Claims against the DOE, claiming that the DOE breached the standard contract and asserting damages incurred through 2005. In 2011, the judge in the U.S. Court of Federal Claims issued a ruling to award Progress Energy Carolinas substantially all their asserted damages. As a result, Progress Energy Carolinas recorded the award in 2011 as an offset for past spent fuel storage costs incurred.

On December 12, 2011, Progress Energy Carolinas and Progress Energy Florida filed another complaint in the U.S. Court of Federal Claims against the DOE, claiming damages incurred from January 1, 2006 through December 31, 2010. The damages stem from the same breach of contract asserted in the previous litigation. On March 23, 2012, Progress Energy Carolinas and Progress Energy Florida filed its initial disclosure of $113 million of damages with the U.S. Court of Federal Claims and the DOE. The next status conference to discuss trial dates is scheduled for May 10, 2013. Progress Energy Carolinas and Progress Energy Florida may file subsequent damage claims as they incur additional costs. The next status conference to discuss trial dates is scheduled for January 10, 2013. Duke Energy cannot predict the outcome of this matter.

Synthetic Fuels Matters. In October 2009, a jury delivered a verdict in a lawsuit against Progress Energy and a number of its subsidiaries and affiliates arising out of an Asset Purchase Agreement dated as of October 19, 1999, and amended as of August 23, 2000 (the Asset Purchase Agreement) by and among U.S. Global, LLC (Global); Earthco synthetic fuels facilities (Earthco); certain affiliates of Earthco; EFC Synfuel LLC (which was owned indirectly by Progress Energy) and certain of its affiliates, including Solid Energy LLC; Solid Fuel LLC; Ceredo Synfuel LLC; Gulf Coast Synfuel LLC (renamed Sandy River Synfuel LLC) (collectively, the Progress Affiliates), as amended by an amendment to the Asset Purchase Agreement. In a case filed in the Circuit Court for Broward County, Fla., in March 2003 (the Florida Global Case), Global requested an unspecified amount of compensatory damages, as well as declaratory relief. Global asserted (i) that pursuant to the Asset Purchase Agreement, it was entitled to an interest in two synthetic fuels facilities previously owned by the Progress Affiliates and an option to purchase additional interests in the two synthetic fuels facilities and (ii) that it was entitled to damages because the Progress Affiliates prohibited it from procuring purchasers for the synthetic fuels facilities. As a result of the 2007 expiration of the Internal Revenue Code Section 29 tax credit program, all of Progress Energy's synthetic fuels businesses were abandoned and the synthetic fuels businesses were reclassified as discontinued operations.

The jury awarded Global $78 million. In November 2009, the court assessed $55 million in prejudgment interest and entered judgment in favor of Global in a total amount of $133 million. In December 2009, Progress Energy appealed the Broward County judgment to the Florida Fourth District Court of Appeals. Also, in December 2009, Progress Energy made a $154 million payment, which represented payment of the total judgment and a required premium equivalent to two years of interest at the then statutory rate, to the Broward County Clerk of Court bond account. The appellate briefing process has been completed. Oral argument on the appeal was held on September 27, 2011. On October 3, 2012, the Florida appellate court reversed the trial court ruling and directed a verdict on damages. The case was remanded to the trial court to determine whether specific performance is an appropriate remedy. On October 18, 1012, Global filed a Motion for Clarification and Rehearing of Panel Decision which has yet to be ruled upon. On November 1, 2012, Progress Energy filed a response in opposition to U.S. Global's motion. Duke Energy cannot predict the outcome of this matter.

In a second suit filed in the Superior Court for Wake County, N.C., Progress Synfuel Holdings, Inc. et al. v. U.S. Global, LLC (the North Carolina Global Case), the Progress Affiliates seek declaratory relief consistent with their interpretation of the Asset Purchase Agreement. Global was served with the North Carolina Global Case on April 17, 2003. In May 2003, Global moved to dismiss the North Carolina Global Case for lack of personal jurisdiction over Global. In the alternative, Global requested that the court decline to exercise its discretion to hear the Progress Affiliates' declaratory judgment action. In August 2003, the Wake County Superior Court denied Global's motion to dismiss, but stayed the North Carolina Global Case, pending the outcome of the Florida Global Case. The Progress Affiliates appealed the superior court's order staying the case. By order dated September 7, 2004, the North Carolina Court of Appeals dismissed the Progress Affiliates' appeal. Based upon the outcome of the Florida Global Case, Duke Energy anticipates dismissal of the North Carolina Global Case.

Alaskan Global Warming Lawsuit. On February 26, 2008, plaintiffs, the governing bodies of an Inupiat village in Alaska, filed suit in the U.S. Federal Court for the Northern District of California against Peabody Coal and various oil and power company defendants, including Duke Energy and certain of its subsidiaries. Plaintiffs brought the action on their own behalf and on behalf of the village's 400 residents. The lawsuit alleges that defendants' emissions of CO2 contributed to global warming and constitute a private and public nuisance. Plaintiffs also allege that certain defendants, including Duke Energy, conspired to mislead the public with respect to global warming. The plaintiffs in the case have requested damages in the range of $95 million to $400 million related to the cost of relocating the Village of Kivalina. On June 30, 2008, the defendants filed a motion to dismiss on jurisdictional grounds, together with a motion to dismiss the conspiracy claims. On October 15, 2009, the District Court granted defendants motion to dismiss. The plaintiffs filed a notice of appeal and the U.S. Court of Appeals for the Ninth Circuit (Court of Appeals) held argument in the case on November 28, 2011. On September 21, 2012, the Court of Appeals ruled that the case could not proceed, affirming the District Court's motion to dismiss. The Plaintiffs have filed a motion for rehearing en banc by the Court of Appeals. Although Duke Energy believes the likelihood of loss is remote based on current case law, it is not possible to predict the ultimate outcome of this matter.

Price Reporting Cases. A total of five lawsuits were filed against Duke Energy affiliates and other energy companies and remain pending in a consolidated, single federal court proceeding in Nevada.

In November 2009, the judge granted defendants' motion for reconsideration of the denial of defendants' summary judgment motion in two of the remaining five cases to which Duke Energy affiliates are a party. A hearing on that motion occurred on July 15, 2011, and on July 19, 2011, the judge granted the motion for summary judgment. Plaintiffs have filed a notice of appeal to the U.S. Court of Appeals for the Ninth Circuit, which held argument on October 19, 2012.

Each of these cases contains similar claims, that the respective plaintiffs, and the classes they claim to represent, were harmed by the defendants' alleged manipulation of the natural gas markets by various means, including providing false information to natural gas trade publications and entering into unlawful arrangements and agreements in violation of the antitrust laws of the respective states. Plaintiffs seek damages in unspecified amounts. It is not possible to predict whether Duke Energy will incur any liability or to estimate the damages, if any, that Duke Energy might incur in connection with the remaining matters. However, based on Duke Energy's past experiences with similar cases of this nature, it does not believe its exposure under these remaining matters is material.

Duke Energy International Paranapanema Lawsuit. On July 16, 2008, Duke Energy International Geracao Paranapanema S.A. (DEIGP) filed a lawsuit in the Brazilian federal court challenging transmission fee assessments imposed under two new resolutions promulgated by the Brazilian Electricity Regulatory Agency (ANEEL) (collectively, the Resolutions). The Resolutions purport to impose additional transmission fees (retroactive to July 1, 2004 and effective through June 30, 2009) on generation companies located in the State of São Paulo for utilization of the electric transmission system. The new charges are based upon a flat-fee that fails to take into account the locational usage by each generator. DEIGP's additional assessment under these Resolutions amounts to approximately $60 million, inclusive of interest, through September 2012. Based on DEIGP's continuing refusal to tender payment of the disputed sums, on April 1, 2009, ANEEL imposed an additional fine against DEIGP in the current amount of $10 million. DEIGP filed a request to enjoin payment of the fine and for an expedited decision on the merits or, alternatively, an order requiring that all disputed sums be deposited in the court's registry in lieu of direct payment to the distribution companies.

On June 30, 2009, the court issued a ruling in which it granted DEIGP's request for injunction regarding the additional fine, but denied DEIGP's request for an expedited decision on the original assessment or payment into the court registry. Under the court's order, DEIGP was required to make installment payments on the original assessment directly to the distribution companies pending resolution on the merits. DEIGP filed an appeal and on August 28, 2009, the order was modified to allow DEIGP to deposit the disputed portion of each installment, which was most of the assessed amount, into an escrow account pending resolution on the merits. In the second quarter of 2009, Duke Energy recorded a pre-tax charge of $33 million associated with this matter.

Brazil Expansion Lawsuit. On August 9, 2011, the State of São Paulo filed a lawsuit in Brazilian state court against DEIGP based upon a claim that DEIGP is under a continuing obligation to expand installed generation capacity by 15% pursuant to a stock purchase agreement under which DEIGP purchased generation assets from the state. On August 10, 2011, a judge granted an ex parte injunction ordering DEIGP to present a detailed expansion plan in satisfaction of the 15% obligation. DEIGP has previously taken a position that the 15% expansion obligation is no longer viable given the changes that have occurred in the electric energy sector since privatization of that sector. After filing various objections, defenses and appeals regarding the referenced order, DEIGP submitted its proposed expansion plan on November 11, 2011, but reserved its objections regarding enforceability. The parties will in due course present evidence to the court regarding their respective positions. No trial date has been set.

Crescent Litigation. On September 3, 2010, the Crescent Resources Litigation Trust filed suit against Duke Energy along with various affiliates and several individuals, including current and former employees of Duke Energy, in the U.S. Bankruptcy Court for the Western District of Texas. The Crescent Resources Litigation Trust was established in May 2010 pursuant to the plan of reorganization approved in the Crescent bankruptcy proceedings in the same court. The complaint alleges that in 2006 the defendants caused Crescent to borrow approximately $1.2 billion from a consortium of banks and immediately thereafter distribute most of the loan proceeds to Crescent's parent company without benefit to Crescent. The complaint further alleges that Crescent was rendered insolvent by the transactions, and that the distribution is subject to recovery by the Crescent bankruptcy estate as an alleged fraudulent transfer. The plaintiff requests return of the funds as well as other statutory and equitable relief, punitive damages and attorneys' fees. Duke Energy and its affiliated defendants believe that the referenced 2006 transactions were legitimate and did not violate any state or federal law. Defendants filed a motion to dismiss in December 2010. On March 21, 2011, the plaintiff filed a response to the defendant's motion to dismiss and a motion for leave to file an amended complaint, which was granted. The Defendants filed a second motion to dismiss in response to plaintiffs' amended complaint.

The plaintiffs filed a demand for a jury trial, a motion to transfer the case to the federal district court, and a motion to consolidate the case with a separate action filed by the plaintiffs against Duke Energy's legal counsel. On March 22, 2012, the federal District Court issued an order denying the defendant's motion to dismiss and granting the plaintiffs' motions for transfer and consolidation. The court has not yet made a final ruling on whether the plaintiffs are entitled to a jury trial. Trial on this matter has been set to commence in January 2014. Mediation, held on August 21 and 22, 2012, was unsuccessful. It is not possible to predict whether Duke Energy will incur any liability or to estimate the damages, if any, that Duke Energy might incur in connection with this lawsuit.

Federal Advanced Clean Coal Tax Credits. Duke Energy Carolinas has been awarded $125 million of federal advanced clean coal tax credits associated with its construction of Cliffside Unit 6 and Duke Energy Indiana has been awarded $134 million of federal advanced clean coal tax credits associated with its construction of the Edwardsport IGCC plant. In March 2008, two environmental groups, Appalachian Voices and the Canary Coalition, filed suit against the Federal government challenging the tax credits awarded to incentivize certain clean coal projects. Although Duke Energy was not a party to the case, the allegations center on the tax incentives provided for the Cliffside and Edwardsport projects. The initial complaint alleged a failure to comply with the National Environmental Policy Act. The first amended complaint, filed in August 2008, added an Endangered Species Act claim and also sought declaratory and injunctive relief against the DOE and the U.S. Department of the Treasury. In 2008, the District Court dismissed the case. On September 23, 2009, the District Court issued an order granting plaintiffs' motion to amend their complaint and denying, as moot, the motion for reconsideration. Plaintiffs have filed their second amended complaint. The Federal government has moved to dismiss the second amended complaint; the motion is pending. On July 26, 2010, the District Court denied plaintiffs' motion for preliminary injunction seeking to halt the issuance of the tax credits.

Duke Energy Carolinas

New Source Review (NSR). In 1999-2000, the DOJ, acting on behalf of the EPA and joined by various citizen groups and states, filed a number of complaints and notices of violation against multiple utilities across the country for alleged violations of the NSR provisions of the CAA. Generally, the government alleges that projects performed at various coal-fired units were major modifications, as defined in the CAA, and that the utilities violated the CAA when they undertook those projects without obtaining permits and installing the best available emission controls for SO2, NOx and particulate matter. The complaints seek injunctive relief to require installation of pollution control technology on various generating units that allegedly violated the CAA, and unspecified civil penalties in amounts of up to $32,500 per day for each violation. A number of Duke Energy Carolinas' plants have been subject to these allegations. Duke Energy Carolinas asserts that there were no CAA violations because the applicable regulations do not require permitting in cases where the projects undertaken are “routine” or otherwise do not result in a net increase in emissions.

In 2000, the government brought a lawsuit against Duke Energy Carolinas in the U.S. District Court in Greensboro, North Carolina. The EPA claims that 29 projects performed at 25 of Duke Energy Carolinas' coal-fired units violate these NSR provisions. Three environmental groups have intervened in the case. In August 2003, the trial court issued a summary judgment opinion adopting Duke Energy Carolinas' legal positions on the standard to be used for measuring an increase in emissions, and granted judgment in favor of Duke Energy Carolinas. The trial court's decision was appealed and ultimately reversed and remanded for trial by the U.S. Supreme Court. At trial, Duke Energy Carolinas will continue to assert that the projects were routine or not projected to increase emissions. On February 11, 2011, the trial judge held an initial status conference and on March 22, 2011, the judge entered an interim scheduling order. The parties have filed a stipulation in which the United States and Plaintiff-Intervenors have dismissed with prejudice 16 claims. In exchange, Duke Energy Carolinas dismissed certain affirmative defenses. The parties have filed motions for summary judgment on the remaining claims. No trial date has been set, but a trial is not expected until the second half of 2012, at the earliest.

It is not possible to estimate the damages, if any, that might be incurred in connection with the unresolved matters related to Duke Energy Carolinas discussed above. Ultimate resolution of these matters could have a material effect on the consolidated results of operations, cash flows or financial position of Duke Energy Carolinas. However, the appropriate regulatory treatment will be pursued for any costs incurred in connection with such resolution.

Asbestos-related Injuries and Damages Claims. Duke Energy Carolinas has experienced numerous claims for indemnification and medical cost reimbursement relating to damages for bodily injuries alleged to have arisen from the exposure to or use of asbestos in connection with construction and maintenance activities conducted on its electric generation plants prior to 1985. As of September 30, 2012, there were 132 asserted claims for non-malignant cases with the cumulative relief sought of up to $33 million, and 47 asserted claims for malignant cases with the cumulative relief sought of up to $16 million. Based on Duke Energy Carolinas' experience, it is expected that the ultimate resolution of most of these claims likely will be less than the amount claimed.

Amounts recognized as asbestos-related reserves related to Duke Energy Carolinas in the respective Condensed Consolidated Balance Sheets totaled $763 million and $801 million as of September 30, 2012 and December 31, 2011, respectively, and are classified in Other within Deferred Credits and Other Liabilities and Other within Current Liabilities. These reserves are based upon the minimum amount in Duke Energy Carolinas' best estimate of the range of loss for current and future asbestos claims through 2030. Management believes that it is possible there will be additional claims filed against Duke Energy Carolinas after 2030. In light of the uncertainties inherent in a longer-term forecast, management does not believe that they can reasonably estimate the indemnity and medical costs that might be incurred after 2030 related to such potential claims. Asbestos-related loss estimates incorporate anticipated inflation, if applicable, and are recorded on an undiscounted basis. These reserves are based upon current estimates and are subject to greater uncertainty as the projection period lengthens. A significant upward or downward trend in the number of claims filed, the nature of the alleged injury, and the average cost of resolving each such claim could change our estimated liability, as could any substantial or favorable verdict at trial. A federal legislative solution, further state tort reform or structured settlement transactions could also change the estimated liability. Given the uncertainties associated with projecting matters into the future and numerous other factors outside our control, management believes that it is possible Duke Energy Carolinas may incur asbestos liabilities in excess of the recorded reserves.

Duke Energy Carolinas has a third-party insurance policy to cover certain losses related to asbestos-related injuries and damages above an aggregate self insured retention of $476 million. Duke Energy Carolinas' cumulative payments began to exceed the self insurance retention on its insurance policy in 2008. Future payments up to the policy limit will be reimbursed by Duke Energy Carolinas' third party insurance carrier. The insurance policy limit for potential future insurance recoveries for indemnification and medical cost claim payments is $935 million in excess of the self insured retention. Insurance recoveries of $781 and $813 million related to this policy are classified in the respective Condensed Consolidated Balance Sheets in Other within Investments and Other Assets and Receivables as of September 30, 2012 and December 31, 2011, respectively. Duke Energy Carolinas is not aware of any uncertainties regarding the legal sufficiency of insurance claims. Management believes the insurance recovery asset is probable of recovery as the insurance carrier continues to have a strong financial strength rating.

Duke Energy Ohio

Antitrust Lawsuit. In January 2008, four plaintiffs, including individual, industrial and nonprofit customers, filed a lawsuit against Duke Energy Ohio in federal court in the Southern District of Ohio. Plaintiffs alleged that Duke Energy Ohio (then The Cincinnati Gas & Electric Company), conspired to provide inequitable and unfair price advantages for certain large business consumers by entering into non-public option agreements with such consumers in exchange for their withdrawal of challenges to Duke Energy Ohio's pending Rate Stabilization Plan (RSP), which was implemented in early 2005. On March 31, 2009, the District Court granted Duke Energy Ohio's motion to dismiss. Plaintiffs filed a motion to alter or set aside the judgment, which was denied by an order dated March 31, 2010. In April 2010, the plaintiffs filed their appeal of that order with the U.S. Court of Appeals for the Sixth Circuit, which heard argument on that appeal on January 11, 2012. On June 4, 2012, the Sixth Circuit Court of Appeals reversed the district court's decision and remanded the matter on all claims for trial on the merits and on July 25, 2012, the Court denied Duke Energy Ohio's petition for an en banc review of the case, and on October 15, 2012, Duke Energy filed a petition for certiorari to the United States Supreme Court. It is not possible to predict at this time whether Duke Energy Ohio will incur any liability or to estimate the damages, if any, that Duke Energy Ohio might incur in connection with this lawsuit.

Asbestos-related Injuries and Damages Claims. Duke Energy Ohio has been named as a defendant or co-defendant in lawsuits related to asbestos at its electric generating stations. The impact on Duke Energy Ohio's consolidated results of operations, cash flows or financial position of these cases to date has not been material. Based on estimates under varying assumptions concerning uncertainties, such as, among others: (i) the number of contractors potentially exposed to asbestos during construction or maintenance of Duke Energy Ohio generating plants; (ii) the possible incidence of various illnesses among exposed workers, and (iii) the potential settlement costs without federal or other legislation that addresses asbestos tort actions, Duke Energy Ohio estimates that the range of reasonably possible exposure in existing and future suits over the foreseeable future is not material. This estimated range of exposure may change as additional settlements occur and claims are made and more case law is established.

Other Litigation and Legal Proceedings.

The Duke Energy Registrants are involved in other legal, tax and regulatory proceedings arising in the ordinary course of business, some of which involve substantial amounts. Management believes that the final disposition of these proceedings will not have a material effect on its consolidated results of operations, cash flows or financial position.

The Duke Energy Registrants expense legal costs related to the defense of loss contingencies as incurred.

The Duke Energy Registrants have exposure to certain legal matters that are described herein. The Duke Energy Registrants have recorded reserves for these proceedings and exposures as presented in the table below. These reserves represent management's best estimate of probable loss as defined in the accounting guidance for contingencies. The estimated reasonably possible range of loss for non-asbestos related matters in excess of the recorded reserves is not material. Duke Energy has insurance coverage for certain of these losses incurred as presented in the table below.

(in millions)September 30, 2012 December 31, 2011
Reserves for Legal Matters(a)     
Duke Energy(b)$ 975 $ 810
Duke Energy Carolinas(b)  763   801
Duke Energy Indiana  7   4
Probable Insurance Recoveries(c)     
Duke Energy(d)$ 781 $ 813
Duke Energy Carolinas(d)  781   813
       
(a)Reserves are classified in the respective Condensed Consolidated Balance Sheets in Other within Deferred Credits and Other Liabilities and Other within Current Liabilities.
(b)Includes reserves for aforementioned asbestos-related injuries and damages claims.
(c)Insurance recoveries are classified in the respective Condensed Consolidated Balance Sheets in Other within Investments and Other Assets and Receivables.
(d)Relates to recoveries associated with aforementioned asbestos-related injuries and damages claims.

Other Commitments and Contingencies

General.

As part of its normal business, the Duke Energy Registrants are a party to various financial guarantees, performance guarantees and other contractual commitments to extend guarantees of credit and other assistance to various subsidiaries, investees and other third parties. To varying degrees, these guarantees involve elements of performance and credit risk, which are not included on the respective Condensed Consolidated Balance Sheets. The possibility of any of the Duke Energy Registrants having to honor their contingencies is largely dependent upon future operations of various subsidiaries, investees and other third parties, or the occurrence of certain future events.

In addition, the Duke Energy Registrants enter into various fixed-price, non-cancelable commitments to purchase or sell power (tolling arrangements or power purchase contracts), take-or-pay arrangements, transportation or throughput agreements and other contracts that may or may not be recognized on the respective Condensed Consolidated Balance Sheets. Some of these arrangements may be recognized at fair value on the respective Condensed Consolidated Balance Sheets if such contracts meet the definition of a derivative and the normal purchase normal sale (NPNS) exception does not apply.