We are involved in various legal proceedings, including commercial, competition, environmental, intellectual property, regulatory, product liability, and insurance matters. We do not currently believe there are any legal proceedings for which it is reasonably possible, individually or in the aggregate, to have a material impact on our financial condition, results of operations, or cash flows.
In September 2010, the Brazilian Administrative Council for Economic Defense ("CADE") issued a decision against our Brazilian subsidiary, Air Products Brasil Ltda., and several other Brazilian industrial gas companies for alleged anticompetitive activities. CADE imposed a civil fine of R$179.2 million (approximately $36 at 31 March 2024) on Air Products Brasil Ltda. This fine was based on a recommendation by a unit of the Brazilian Ministry of Justice, following an investigation beginning in 2003, which alleged violation of competition laws with respect to the sale of industrial and medical gases. The fines are based on a percentage of our total revenue in Brazil in 2003.
We have denied the allegations made by the authorities and filed an appeal in October 2010 with the Brazilian courts. On 6 May 2014, our appeal was granted and the fine against Air Products Brasil Ltda. was dismissed. CADE has appealed that ruling and the matter remains pending. We, with advice of our outside legal counsel, have assessed the status of this matter and have concluded that, although an adverse final judgment after exhausting all appeals is possible, such a judgment is not probable. As a result, no provision has been made in the consolidated financial statements. In the event of an adverse final judgment, we estimate the maximum possible loss to be the full amount of the fine of R$179.2 million (approximately $36 at 31 March 2024) plus interest accrued thereon until final disposition of the proceedings.
Additionally, a Texas state court entered final judgment in our favor on 27 March 2024 for litigation involving disputed energy management charges related to Winter Storm Uri, a severe winter weather storm that impacted the U.S. Gulf Coast in February 2021. The judgement is subject to appeal and had no impact on our consolidated financial statements during the second quarter and first six months of fiscal year 2024.
Environmental
In the normal course of business, we are involved in legal proceedings under the Comprehensive Environmental Response, Compensation, and Liability Act ("CERCLA," the federal Superfund law), Resource Conservation and Recovery Act ("RCRA"), and similar state environmental laws relating to the designation of certain sites for investigation or remediation. Presently, there are 27 sites on which a final settlement or remediation has not been achieved where we, usually along with others, have been designated a potentially responsible party by environmental authorities or are otherwise engaged in investigation or remediation, including cleanup activity at certain of our former manufacturing sites. We continually monitor these sites for which we have environmental exposure.
Accruals for environmental loss contingencies are recorded when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. The consolidated balance sheets at 31 March 2024 and 30 September 2023 included an accrual of $62.2 and $64.5, respectively, primarily as part of other noncurrent liabilities. The environmental liabilities will be paid over a period of up to 26 years. We estimate the exposure for environmental loss contingencies to range from $62 to a reasonably possible upper exposure of $75 as of 31 March 2024.
Actual costs to be incurred at identified sites in future periods may vary from the estimates, given inherent uncertainties in evaluating environmental exposures. Using reasonably possible alternative assumptions of the exposure level could result in an increase to the environmental accrual. Due to the inherent uncertainties related to environmental exposures, a significant increase to the reasonably possible upper exposure level could occur if a new site is designated, the scope of remediation is increased, a different remediation alternative is identified, or a significant increase in our proportionate share occurs. We do not expect that any sum we may have to pay in connection with environmental matters in excess of the amounts recorded or disclosed above would have a material adverse impact on our financial position or results of operations in any one year.
Pace
At 31 March 2024, $36.3 of the environmental accrual was related to our facility in Pace, Florida.
In 2006, we sold our Amines business, which included operations at the Pace facility and recognized a liability for retained environmental obligations associated with remediation activities at the facility. We are required by the Florida Department of Environmental Protection ("FDEP") and the United States Environmental Protection Agency ("USEPA") to continue our remediation efforts. We recognized a before-tax expense of $42 in fiscal year 2006 in results from discontinued operations and recorded an environmental accrual of $42 in continuing operations on the consolidated balance sheets.
In the first quarter of 2015, we entered into a consent order with the FDEP requiring us to continue our remediation efforts at the Pace facility and complete a cost review every five years. In fiscal year 2020, we completed an updated cost review of the environmental remediation status at the Pace facility. The review was completed in conjunction with requirements to maintain financial assurance per the consent order issued by the FDEP discussed below. Based on our review, we expect ongoing activities to continue for 26 years. As a result of these changes, we increased our environmental accrual for this site by $19 in continuing operations on the consolidated balance sheets and recognized a before-tax expense of $19 in results from discontinued operations in fiscal year 2020. There have been no significant changes to the estimated exposure range related to the Pace facility since fiscal year 2020.
We have implemented many of the remedial corrective measures at the Pace facility required under the 1995 consent orders issued by the FDEP and the USEPA. Contaminated soils have been bioremediated, and the treated soils have been secured in a lined on-site corrective action management unit. Several groundwater recovery systems have been installed to contain and remove contamination from groundwater. We completed an extensive assessment of the site to determine the efficacy of existing measures, what additional corrective measures may be needed, and whether newer remediation technologies that were not available in the 1990s might be better suited for groundwater remediation. Based on assessment results, we completed a focused feasibility study that has identified alternative approaches that may more effectively remove contaminants. We continue to review alternative remedial approaches with the FDEP, and we completed additional field work during 2021 to support the design of an improved groundwater recovery network. This network targets areas of higher contaminant concentration and avoids areas of high groundwater iron which has proven to be a significant operability issue for the project. The design of the optimized recovery system was initiated in fiscal year 2023, with construction expected to begin in fiscal year 2025. In fiscal year 2025, we expect to connect groundwater recovery wells and ancillary equipment to the existing groundwater recovery system. Further, we expect additional future capital expenditures to consider the extended time horizon for remediation at the site.
Pasadena
At 31 March 2024, $10.4 of the environmental accrual was related to a production facility site in Pasadena, Texas.
During fiscal year 2012, management committed to permanently shutting down our polyurethane intermediates ("PUI") production facility in Pasadena, Texas. In shutting down and dismantling the facility, we have undertaken certain obligations related to soil and groundwater contaminants. We have been pumping and treating groundwater to control off-site contaminant migration in compliance with regulatory requirements and under the approval of the Texas Commission on Environmental Quality ("TCEQ"). We estimate that the pump and treat system will continue to operate until 2042.
We continue to perform additional work to address other environmental obligations at the site. This additional work includes remediating, as required, impacted soils, investigating groundwater west of the former PUI facility, continuing post closure care for two closed RCRA surface impoundment units, and maintaining engineering controls. Additionally, we have conducted an interim corrective action to treat impacted soils as recommended in the TCEQ 2019 Annual Report. In 2012, we estimated the total exposure at this site to be $13. There have been no significant changes to the estimated exposure.