Contractual Obligations, Commercial Commitments And Contingencies
3 Months Ended
Mar. 31, 2012
Contractual Obligations, Commercial Commitments And Contingencies

13. Contractual Obligations, Commercial Commitments and Contingencies

DPL Inc. Guarantees

In the normal course of business, DPL enters into various agreements with its wholly owned subsidiaries, DPLE and DPLER and its wholly owned subsidiary, MC Squared, providing financial or performance assurance to third parties. These agreements are entered into primarily to support or enhance the creditworthiness otherwise attributed to these subsidiaries on a stand-alone basis, thereby facilitating the extension of sufficient credit to accomplish these subsidiaries' intended commercial purposes.

At March 31, 2012, DPL had $47.4 million of guarantees to third parties for future financial or performance assurance under such agreements, including $47.1 million of guarantees, on behalf of DPLE and DPLER and $0.3 million of guarantees on behalf of MC Squared. The guarantee arrangements entered into by DPL with these third parties cover select present and future obligations of DPLE, DPLER and MC Squared to such beneficiaries and are terminable by DPL upon written notice within a certain time to the beneficiaries. The carrying amount of obligations for commercial transactions covered by these guarantees and recorded in our Condensed Consolidated Balance Sheets was $0.4 million at March 31, 2012.

To date, DPL has not incurred any losses related to the guarantees of DPLE's, DPLER's and MC Squared's obligations and we believe it is remote that DPL would be required to perform or incur any losses in the future associated with any of the above guarantees of DPLE's, DPLER's and MC Squared's obligations.

Equity Ownership Interest

DP&L owns a 4.9% equity ownership interest in an electric generation company which is recorded using the cost method of accounting under GAAP. As of March 31, 2012, DP&L could be responsible for the repayment of 4.9%, or $64.9 million, of a $1,324.7 million debt obligation that features maturities from 2013 to 2026. This would only happen if this electric generation company defaulted on its debt payments. As of March 31, 2012, we have no knowledge of such a default.

Commercial Commitments and Contractual Obligations

There have been no material changes, outside the ordinary course of business, to our commercial commitments and to the information disclosed in the contractual obligations table in our Form 10-K for the fiscal year ended December 31, 2011.

Contingencies

In the normal course of business, we are subject to various lawsuits, actions, proceedings, claims and other matters asserted under laws and regulations. We believe the amounts provided in our Condensed Consolidated Financial Statements, as prescribed by GAAP, are adequate in light of the probable and estimable contingencies. However, there can be no assurances that the actual amounts required to satisfy alleged liabilities from various legal proceedings, claims, tax examinations and other matters discussed below, and to comply with applicable laws and regulations, will not exceed the amounts reflected in our Condensed Consolidated Financial Statements. As such, costs, if any, that may be incurred in excess of those amounts provided as of March 31, 2012, cannot be reasonably determined.

Environmental Matters

DPL, DP&L and our subsidiaries' facilities and operations are subject to a wide range of environmental regulations and laws by federal, state and local authorities. As well as imposing continuing compliance obligations, these laws and regulations authorize the imposition of substantial penalties for noncompliance, including fines, injunctive relief and other sanctions. In the normal course of business, we have investigatory and remedial activities underway at these facilities to comply, or to determine compliance, with such regulations. We record liabilities for losses that are probable of occurring and can be reasonably estimated in accordance with the provisions of GAAP. We have estimated liabilities of approximately $3.2 million for environmental matters. We evaluate the potential liability related to probable losses quarterly and may revise our estimates. Such revisions in the estimates of the potential liabilities could have a material adverse effect on our results of operations, financial condition or cash flows.

We have several pending environmental matters associated with our power plants. Some of these matters could have material adverse impacts on our business and on the operation of the power plants; especially the plants that do not have SCR and FGD equipment installed to further control certain emissions. Currently, Hutchings and Beckjord are our only coal-fired power plants that do not have this equipment installed. DP&L owns 100% of the Hutchings station and a 50% interest in Beckjord Unit 6.

On July 15, 2011, Duke Energy, a co-owner at the Beckjord Unit 6 facility, filed their Long-term Forecast Report with the PUCO. The plan indicated that Duke Energy plans to cease production at the Beckjord Station, including our jointly owned Unit 6, in December 2014. This was followed by a notification by Duke Energy to PJM, dated February 1, 2012, of a planned April 1, 2015 deactivation of this unit. Beckjord Unit 6 was valued at zero at the Merger date. The Hutchings station was also valued at zero at the Merger date. We are considering options for the Hutchings station, but have not yet made a final decision. We do not believe that any accruals are needed related to the Hutchings station.

DPL revalued DP&L's investment in the above plants at the estimated fair value for each plant at the Merger date.

Environmental Matters Related to Air Quality

Clean Air Act Compliance

In 1990, the federal government amended the CAA to further regulate air pollution. Under the CAA, the USEPA sets limits on how much of a pollutant can be in the ambient air anywhere in the United States. The CAA allows individual states to have stronger pollution controls than those set under the CAA, but states are not allowed to have weaker pollution controls than those set for the whole country. The CAA has a material effect on our operations and such effects are detailed below with respect to certain programs under the CAA.

Cross-State Air Pollution Rule

The Clean Air Interstate Rule (CAIR) final rules were published on May 12, 2005. CAIR created an interstate trading program for annual NOx emission allowances and made modifications to an existing trading program for SO2. Appeals brought by various parties resulted in a decision by the U.S. Court of Appeals for the District of Columbia Circuit on July 11, 2008 to vacate CAIR and its associated Federal Implementation Plan. On December 23, 2008, the U.S. Court of Appeals issued an order on reconsideration that permits CAIR to remain in effect until the USEPA issues new regulations that would conform to the CAA requirements and the Court's July 2008 decision.

In an attempt to conform to the Court's decision, on July 6, 2010, the USEPA proposed the Clean Air Transport Rule (CATR). CATR was finalized as the Cross-State Air Pollution Rule (CSAPR) on July 6, 2011, but subsequent litigation has resulted in CSAPR implementation being delayed indefinitely. CSAPR creates four separate trading programs: two SO2 areas (Group 1 and Group 2); and two NOx reduction requirements (annual and ozone season). Group 1 states (16 states including Ohio) will have to meet a 2012 cap and additional reductions in 2014. Group 2 states (7 states) will only have to meet the 2012 cap. We do not believe the rule will have a material effect on our operations in 2012. The Ohio EPA has a State Implementation Plan (SIP) that incorporates the CAIR program requirements, which remain in effect pending judicial review of CSAPR. If CSAPR becomes effective, the USEPA is expected to institute a federal implementation plan (FIP) in lieu of state SIPs and allow for the states to develop SIPs for approval as early as 2013. DP&L is unable to estimate the effect of the new requirements; however, CSAPR could have a material adverse effect on our operations.

Mercury and Other Hazardous Air Pollutants

On May 3, 2011, the USEPA published proposed Maximum Achievable Control Technology (MACT) standards for coal- and oil-fired electric generating units. The standards include new requirements for emissions of mercury and a number of other heavy metals. The EPA Administrator signed the final rule, now called MATS (Mercury and Air Toxics Standards), on December 16, 2011, and the rule was published in the Federal Register on February 16, 2012. Affected electric generating units (EGUs) will have to come into compliance with the new requirements by April 16, 2015, but may be granted an additional year contingent on Ohio EPA approval. DP&L is evaluating the costs that may be incurred to comply with the new requirement; however, MATS could have a material adverse effect on our operations and result in material compliance costs.

On April 29, 2010, the USEPA issued a proposed rule that would reduce emissions of toxic air pollutants from new and existing industrial, commercial and institutional boilers, and process heaters at major and area source facilities. The final rule was published in the Federal Register on March 21, 2011. This regulation affects seven auxiliary boilers used for start-up purposes at DP&L's generation facilities. The regulations contain emissions limitations, operating limitations and other requirements.  In December 2011, the USEPA proposed additional changes to this rule and solicited comments. Compliance costs are not expected to be material to DP&L's operations.

On May 3, 2010, the USEPA finalized the "National Emissions Standards for Hazardous Air Pollutants" for compression ignition (CI) reciprocating internal combustion engines (RICE). The units affected at DP&L are 18 diesel electric generating engines and eight emergency "black start" engines. The existing CI RICE units must comply by May 3, 2013. The regulations contain emissions limitations, operating limitations and other requirements. Compliance costs on DP&L's operations are not expected to be material.

Carbon Emissions and Other Greenhouse Gases

In response to a U.S. Supreme Court decision that the USEPA has the authority to regulate CO2 emissions from motor vehicles, the USEPA made a finding that CO2 and certain other GHGs are pollutants under the CAA. Subsequently, under the CAA, USEPA determined that CO2 and other GHGs from motor vehicles threaten the health and welfare of future generations by contributing to climate change. This finding became effective in January 2010. Numerous affected parties have petitioned the USEPA Administrator to reconsider this decision. On April 1, 2010, USEPA signed the "Light-Duty Vehicle Greenhouse Gas Emission Standards and Corporate Average Fuel Economy Standards" rule. Under USEPA's view, this is the final action that renders carbon dioxide and other GHGs "regulated air pollutants" under the CAA.

Under USEPA regulations finalized in May 2010 (referred to as the "Tailoring Rule"), the USEPA began regulating GHG emissions from certain stationary sources in January 2011. The Tailoring Rule sets forth criteria for determining which facilities are required to obtain permits for their GHG emissions pursuant to the CAA Prevention of Significant Deterioration and Title V operating permit programs. Under the Tailoring Rule, permitting requirements are being phased in through successive steps that may expand the scope of covered sources over time. The USEPA has issued guidance on what the best available control technology entails for the control of GHGs and individual states are required to determine what controls are required for facilities on a case-by-case basis. The ultimate impact of the Tailoring Rule to DP&L cannot be determined at this time, but the cost of compliance could be material.

On April 13, 2012 the USEPA published its GHG standards for new and modified electric generating units (EGUs) under CAA subsection 111(b), which would require certain new EGUs to meet a standard of 1,000 pounds of carbon dioxide per megawat-hour, a standard based on the emissions limitations achievable through natural gas combined cycle generation.  The proposal anticipates that affected coal-fired units would need to install carbon capture and storage or other expensive carbon dioxide emission control technology to meet the standard.  Furthemore, the USEPA may propose and promulgate guidelines for states to address GHG standards for existing EGUs under CAA subsection 111(d) later in 2012. These latter rules may focus on energy efficiency improvements at power plants. We cannot predict the effect of these standards, if any, on DP&L's operations.

Approximately 99% of the energy we produce is generated by coal. DP&L's share of CO2 emissions at generating stations we own and co-own is approximately 16 million tons annually. Further GHG legislation or regulation finalized at a future date could have a significant effect on DP&L's operations and costs, which could adversely affect our net income, cash flows and financial condition. However, due to the uncertainty associated with such legislation or regulation, we cannot predict the final outcome or the financial impact that such legislation or regulation may have on DP&L.

On September 22, 2009, the USEPA issued a final rule for mandatory reporting of GHGs from large sources that emit 25,000 metric tons per year or more of CO2, including electric generating units. DP&L's first report to the USEPA was submitted prior to the September 30, 2011 due date for 2010 emissions. This reporting rule will guide development of policies and programs to reduce emissions. DP&L does not anticipate that this reporting rule will result in any significant cost or other effect on current operations.

Litigation, Notices of Violation and Other Matters Related to Air Quality

Litigation Involving Co-Owned Plants

On June 20, 2011, the U.S. Supreme Court ruled that the USEPA's regulation of GHGs under the CAA displaced any right that plaintiffs may have had to seek similar regulation through federal common law litigation in the court system. Although we are not named as a party to these lawsuits, DP&L is a co-owner of coal-fired plants with Duke Energy and AEP (or their subsidiaries) that could have been affected by the outcome of these lawsuits or similar suits that may have been filed against other electric power companies, including DP&L. Because the issue was not squarely before it, the U.S. Supreme Court did not rule against the portion of plaintiffs' original suits that sought relief under state law.

As a result of a 2008 consent decree entered into with the Sierra Club and approved by the U.S. District Court for the Southern District of Ohio, DP&L and the other owners of the J.M. Stuart generating station are subject to certain specified emission targets related to NOx, SO2 and particulate matter. The consent decree also includes commitments for energy efficiency and renewable energy activities. An amendment to the consent decree was entered into and approved in 2010 to clarify how emissions would be computed during malfunctions. Continued compliance with the consent decree, as amended, is not expected to have a material effect on DP&L's results of operations, financial condition or cash flows in the future.

Notices of Violation Involving Co-Owned Plants

In November 1999, the USEPA filed civil complaints and NOVs against operators and owners of certain generation facilities for alleged violations of the CAA. Generation units operated by Duke Energy (Beckjord Unit 6) and CSP (Conesville Unit 4) and co-owned by DP&L were referenced in these actions. Although DP&L was not identified in the NOVs, civil complaints or state actions, the results of such proceedings could materially affect DP&L's co-owned plants.

In June 2000, the USEPA issued an NOV to the DP&L-operated J.M. Stuart generating station (co-owned by DP&L, Duke Energy, and CSP) for alleged violations of the CAA.  The NOV contained allegations allegations that Stuart station engaged in projects between 1978 and 2000 without New Source Review and PSD permits that resulted in signficant increases in particulate matter, SO2 and NOx. These allegations are consistent with NOVs and complaints the USEPA ha brought against numerous other coal fired utilities in the Midwest.  The NOV indicated the USEPA may: (1) issue an order requiring compliance with the requirements of the Ohio SIP; or (2) bring a civil action seeking injunctive relief and civil penalties of up to $27,500 per day for each violation. To date, neither action has been taken. DP&L cannot predict the outcome of this matter.

In December 2007, the Ohio EPA issued an NOV to the DP&L-operated Killen generating station (co-owned by DP&L and Duke Energy) for alleged violations of the CAA. The NOV alleged deficiencies in the continuous monitoring of opacity. We submitted a compliance plan to the Ohio EPA on December 19, 2007. To date, no further actions have been taken by the Ohio EPA.

On March 13, 2008, Duke Energy, the operator of the Zimmer generating station, received an NOV and a Finding of Violation (FOV) from the USEPA alleging violations of the CAA, the Ohio State Implementation Program (SIP) and permits for the station in areas including SO2, opacity and increased heat input. A second NOV and FOV with similar allegations was issued on November 4, 2010. Also in 2010, USEPA issued an NOV to Zimmer for excess emissions. DP&L is a co-owner of the Zimmer generating station and could be affected by the eventual resolution of these matters. Duke Energy is expected to act on behalf of itself and the co-owners with respect to these matters. DP&L is unable to predict the outcome of these matters.

Notices of Violation Involving Wholly Owned Plants

In 2007, the Ohio EPA and the USEPA issued NOVs to DP&L for alleged violations of the CAA at the Hutchings station. The NOVs' alleged deficiencies related to stack opacity and particulate emissions. Discussions are under way with the USEPA, the U.S. Department of Justice and Ohio EPA. On November 18, 2009, the USEPA issued an NOV to DP&L for alleged NSR violations of the CAA at the Hutchings station relating to capital projects performed in 2001 involving Unit 3 and Unit 6. DP&L does not believe that the projects described in the NOV were modifications subject to NSR. DP&L is engaged in discussions with the USEPA and the U.S. Department of Justice to resolve these matters, but DP&L is unable to determine the timing, costs or method by which these issues may be resolved. The Ohio EPA is kept apprised of these discussions.

Environmental Matters Related to Water Quality, Waste Disposal and Ash Ponds

Clean Water Act Regulation of Water Intake

On July 9, 2004, the USEPA issued final rules pursuant to the Clean Water Act governing existing facilities that have cooling water intake structures. The rules require an assessment of impingement and/or entrainment of organisms as a result of cooling water withdrawal. A number of parties appealed the rules. In April 2009, the U.S. Supreme Court ruled that the USEPA did have the authority to compare costs with benefits in determining best technology available. The USEPA released new proposed regulations on March 28, 2011, published in the Federal Register on April 20, 2011. We submitted comments to the proposed regulations on August 17, 2011. The final rules are expected to be in place by mid-2012. We do not yet know the impact these proposed rules will have on our operations.

Clean Water Act Regulation of Water Discharge

In December 2006, we submitted an application for the renewal of the Stuart station NPDES Permit that was due to expire on June 30, 2007. In July 2007, we received a draft permit proposing to continue our authority to discharge water from the station into the Ohio River. On February 5, 2008, we received a letter from the Ohio EPA indicating that they intended to impose a compliance schedule as part of the final Permit, that requires us to implement one of two diffuser options for the discharge of water from the station into the Ohio River as identified in a thermal discharge study completed during the previous permit term. Subsequently, DP&L and the Ohio EPA reached an agreement to allow DP&L to restrict public access to the water discharge area as an alternative to installing one of the diffuser options. Ohio EPA issued a revised draft permit that was received on November 12, 2008. In December 2008, the USEPA requested that the Ohio EPA provide additional information regarding the thermal discharge in the draft permit. In June 2009, DP&L provided information to the USEPA in response to their request to the Ohio EPA. In September 2010, the USEPA formally objected to a revised permit provided by Ohio EPA due to questions regarding the basis for the alternate thermal limitation. In December 2010, DP&L requested a public hearing on the objection, which was held on March 23, 2011. We participated in and presented our position on the issue at the hearing and in written comments submitted on April 28, 2011. In a letter to the Ohio EPA dated September 28, 2011, the USEPA reaffirmed its objection to the revised permit as previously drafted by the Ohio EPA. This reaffirmation stipulated that if the Ohio EPA does not re-draft the permit to address the USEPA's objection, then the authority for issuing the permit will pass to the USEPA. The Ohio EPA issued another draft permit in December 2011 and a public hearing was held on February 2, 2012. The draft permit would require DP&L, over the 54 months following issuance of a final permit, to take undefined actions to lower the temperature of its discharged water to a level unachievable by the station under its current design or alternatively make other significant modifications to the cooling water system. DP&L submitted comments to the draft permit and is considering legal options. Depending on the outcome of the process, the effects could be material on DP&L's operation.

In September 2009, the USEPA announced that it will be revising technology-based regulations governing water discharges from steam electric generating facilities. The rulemaking included the collection of information via an industry-wide questionnaire as well as targeted water sampling efforts at selected facilities. It is anticipated that the USEPA will release a proposed rule by November 2012 with a final regulation in place by early 2014.  At present, DP&L is unable to predict the impact this rulemaking will have on its operations.

Regulation of Waste Disposal

In September 2002, DP&L and other parties received a special notice that the USEPA considers us to be a PRP for the clean-up of hazardous substances at the South Dayton Dump landfill site. In August 2005, DP&L and other parties received a general notice regarding the performance of a Remedial Investigation and Feasibility Study (RI/FS) under a Superfund Alternative Approach. In October 2005, DP&L received a special notice letter inviting it to enter into negotiations with the USEPA to conduct the RI/FS. No recent activity has occurred with respect to that notice or PRP status. However, on August 25, 2009, the USEPA issued an Administrative Order requiring that access to DP&L's service center building site, which is across the street from the landfill site, be given to the USEPA and the existing PRP group to help determine the extent of the landfill site's contamination as well as to assess whether certain chemicals used at the service center building site might have migrated through groundwater to the landfill site. DP&L granted such access and drilling of soil borings and installation of monitoring wells occurred in late 2009 and early 2010. On May 24, 2010, three members of the existing PRP group, Hobart Corporation, Kelsey-Hayes Company and NCR Corporation, filed a civil complaint in the United States District Court for the Southern District of Ohio against DP&L and numerous other defendants alleging that DP&L and the other defendants contributed to the contamination at the South Dayton Dump landfill site and seeking reimbursement of the PRP group's costs associated with the investigation and remediation of the site. On February 10, 2011, the Court dismissed claims against DP&L that related to allegations that chemicals used by DP&L at its service center contributed to the landfill site's contamination. The Court, however, did not dismiss claims alleging financial responsibility for remediation costs based on hazardous substances from DP&L that were allegedly directly delivered by truck to the landfill. Discovery, including depositions of past and present DP&L employees, is ongoing. While DP&L is unable to predict the outcome of these matters, if DP&L were required to contribute to the clean-up of the site, it could have a material adverse effect on its operations.

In December 2003, DP&L and other parties received a special notice that the USEPA considers us to be a PRP for the clean-up of hazardous substances at the Tremont City landfill site. Information available to DP&L does not demonstrate that it contributed hazardous substances to the site. While DP&L is unable to predict the outcome of this matter, if DP&L were required to contribute to the clean-up of the site, it could have a material adverse effect on its operations.

On April 7, 2010, the USEPA published an Advance Notice of Proposed Rulemaking announcing that it is reassessing existing regulations governing the use and distribution in commerce of polychlorinated biphenyls (PCBs). While this reassessment is in the early stages and the USEPA is seeking information from potentially affected parties on how it should proceed, the outcome may have a material effect on DP&L. The USEPA has indicated that a proposed rule will be released in late 2012. At present, DP&L is unable to predict the impact this initiative will have on its operations.

Regulation of Ash Ponds

In March 2009, the USEPA, through a formal Information Collection Request, collected information on ash pond facilities across the country, including those at Killen and J.M. Stuart stations. Subsequently, the USEPA collected similar information for the Hutchings station.

In August 2010, the USEPA conducted an inspection of the Hutchings station ash ponds. In June 2011, the USEPA issued a final report from the inspection including recommendations relative to the Hutchings station ash ponds. DP&L is unable to predict whether there will be additional USEPA action relative to DP&L's proposed plan or the effect on operations that might arise under a different plan.

In June 2011, the USEPA conducted an inspection of the Killen station ash ponds. DP&L is unable to predict the outcome this inspection will have on its operations.

There has been increasing advocacy to regulate coal combustion byproducts under the Resource Conservation Recovery Act (RCRA). On June 21, 2010, the USEPA published a proposed rule seeking comments on two options under consideration for the regulation of coal combustion byproducts including regulating the material as a hazardous waste under RCRA Subtitle C or as a solid waste under RCRA Subtitle D. The USEPA anticipates issuing a final rule on this topic in late 2012. DP&L is unable to predict the financial effect of this regulation, but if coal combustion byproducts are regulated as hazardous waste, it is expected to have a material adverse effect on operations.

Notice of Violation Involving Co-Owned Plants

On September 9, 2011, DP&L received a notice of violation from the USEPA with respect to its co-owned J.M. Stuart generating station based on a compliance evaluation inspection conducted by the USEPA and Ohio EPA in 2009. The notice alleged non-compliance by DP&L with certain provisions of the RCRA, the Clean Water Act National Pollutant Discharge Elimination System permit program and the station's storm water pollution prevention plan. The notice requested that DP&L respond with the actions it has subsequently taken or plans to take to remedy the USEPA's findings and ensure that further violations will not occur. Based on its review of the findings, although there can be no assurance, we believe that the notice will not result in any material effect on DP&L's results of operations, financial condition or cash flow.

Legal and Other Matters

In February 2007, DP&L filed a lawsuit against a coal supplier seeking damages incurred due to the supplier's failure to supply approximately 1.5 million tons of coal to two commonly owned plants under a coal supply agreement, of which approximately 570 thousand tons was DP&L's share. DP&L obtained replacement coal to meet its needs. The supplier has denied liability, and is currently in federal bankruptcy proceedings in which DP&L is participating as an unsecured creditor. DP&L is unable to determine the ultimate resolution of this matter. DP&L has not recorded any assets relating to possible recovery of costs in this lawsuit.

In connection with DP&L and other utilities joining PJM, in 2006, the FERC ordered utilities to eliminate certain charges to implement transitional payments, known as SECA, effective December 1, 2004 through March 31, 2006, subject to refund. Through this proceeding, DP&L was obligated to pay SECA charges to other utilities, but received a net benefit from these transitional payments. A hearing was held and an initial decision was issued in August 2006. A final FERC order on this issue was issued on May 21, 2010 that substantially supports DP&L's and other utilities' position that SECA obligations should be paid by parties that used the transmission system during the timeframe stated above. Prior to this final order being issued, DP&L entered into a significant number of bilateral settlement agreements with certain parties to resolve the matter, which by design will be unaffected by the final decision. With respect to unsettled claims, DP&L management has deferred $18.1 million and $17.8 million as of March 31, 2012 and December 31, 2011, respectively, as Other deferred credits representing the amount of unearned income and interest where the earnings process is not complete. The amount at March 31, 2012 and December 31, 2011 includes estimated earnings and interest of $5.5 million and $5.2 million, respectively. On September 30, 2011, the FERC issued two SECA-related orders that affirmed an earlier order issued in 2010 by denying the rehearing requests that a number of different parties, including DP&L, had filed. These orders are now final, subject to possible appellate court review. These orders do not affect prior settlements that had been reached with other parties that owed SECA revenues to DP&L or were recipients of amounts paid by DP&L. For other parties that had not previously settled with DP&L, the exact timing and amounts of any payments that would be made or received by DP&L under these orders is still uncertain.

Lawsuits were filed in connection with the Merger seeking, among other things, one or more of the following: to enjoin consummation of the Merger until certain conditions were met, to rescind the Merger or for rescissory damages, or to commence a sale process and/or obtain an alternative transaction or to recover an unspecified amount of other damages and costs, including attorneys' fees and expenses, or a constructive trust or an accounting from the individual defendants for benefits they allegedly obtained as a result of their alleged breach of duty. All of these lawsuits, except one, were resolved and/or dismissed prior to the March 28, 2012 filing of our Form 10-K for the fiscal year ending December 31, 2011, and were discussed in that and previous reports we filed. The last of these lawsuits was dismissed on March 29, 2012 as noted below.

On April 28, 2011, a lawsuit was filed in the Court of Common Pleas of Montgomery County, Ohio, naming DPL and each member of DPL's board of directors as defendants. The lawsuit filed by Payne Family Trust was a purported class action on behalf of plaintiff and an alleged class of DPL shareholders. On March 29, 2012, the Court entered an order dismissing this lawsuit with prejudice pursuant to a stipulation filed by the parties. Plaintiff had alleged, among other things, that DPL's directors breached their fiduciary duties in approving the Merger of DPL and AES.

DP&L [Member]
 
Contractual Obligations, Commercial Commitments And Contingencies
 

12. Contractual Obligations, Commercial Commitments and Contingencies

DP&L – Equity Ownership Interest

DP&L owns a 4.9% equity ownership interest in an electric generation company which is recorded using the cost method of accounting under GAAP. As of March 31, 2012, DP&L could be responsible for the repayment of 4.9%, or $64.9 million, of a $1,324.7 million debt obligation that features maturities from 2013 to 2026. This would only happen if this electric generation company defaulted on its debt payments. As of March 31, 2012, we have no knowledge of such a default.

Commercial Commitments and Contractual Obligations

There have been no material changes, outside the ordinary course of business, to our commercial commitments and to the information disclosed in the contractual obligations table in our Form 10-K for the fiscal year ended December 31, 2011.

Contingencies

In the normal course of business, we are subject to various lawsuits, actions, proceedings, claims and other matters asserted under laws and regulations. We believe the amounts provided in our Condensed Financial Statements, as prescribed by GAAP, are adequate in light of the probable and estimable contingencies. However, there can be no assurances that the actual amounts required to satisfy alleged liabilities from various legal proceedings, claims, tax examinations and other matters discussed below, and to comply with applicable laws and regulations, will not exceed the amounts reflected in our Condensed Financial Statements. As such, costs, if any, that may be incurred in excess of those amounts provided as of March 31, 2012, cannot be reasonably determined.

Environmental Matters

DP&L's facilities and operations are subject to a wide range of federal, state and local environmental regulations and laws. As well as imposing continuing compliance obligations, these laws and regulations authorize the imposition of substantial penalties for noncompliance, including fines, injunctive relief and other sanctions. In the normal course of business, we have investigatory and remedial activities underway at these facilities to comply, or to determine compliance, with such regulations. We record liabilities for losses that are probable of occurring and can be reasonably estimated in accordance with GAAP. We have estimated liabilities of approximately $3.2 million for environmental matters. We evaluate the potential liability related to probable losses quarterly and may revise our estimates. Such revisions in the estimates of the potential liabilities could have a material adverse effect on our results of operations, financial condition or cash flows.

We have several pending environmental matters associated with our power plants. Some of these matters could have material adverse impacts on our business and on the operation of the power plants; especially the plants that do not have SCR and FGD equipment installed to further control certain emissions. Currently, Hutchings and Beckjord are our only coal-fired power plants that do not have this equipment installed. DP&L owns 100% of the Hutchings station and a 50% interest in Beckjord Unit 6.

On July 15, 2011, Duke Energy, co-owner at the Beckjord Unit 6 facility, filed their Long-term Forecast Report with the PUCO. The plan indicated that Duke Energy plans to cease production at the Beckjord station, including our jointly owned Unit 6, in December 2014. This was followed ba a notification by Duke Energy to PJM, dated February 1, 2012, of a planned April 1, 2015 deactivation of this unit.  We are depreciating Unit 6 through December 2014 and do not believe that any additional accruals or impairment charges are needed as a result of this decision. We are considering options for the Hutchings station, but have not yet made a final decision. We do not believe that any accruals or impairment charges are needed related to the Hutchings station.

Environmental Matters Related to Air Quality

Clean Air Act Compliance

In 1990, the federal government amended the CAA to further regulate air pollution. Under the CAA, the USEPA sets limits on how much of a pollutant can be in the ambient air anywhere in the United States. The CAA allows individual states to have stronger pollution controls than those set under the CAA, but states are not allowed to have weaker pollution controls than those set for the whole country. The CAA has a material effect on our operations and such effects are detailed below with respect to certain programs under the CAA.

Cross-State Air Pollution Rule

The Clean Air Interstate Rule (CAIR) final rules were published on May 12, 2005. CAIR created an interstate trading program for annual NOx emission allowances and made modifications to an existing trading program for SO2. Appeals brought by various parties resulted in a decision by the U.S. Court of Appeals for the District of Columbia Circuit on July 11, 2008 to vacate CAIR and its associated Federal Implementation Plan. On December 23, 2008, the U.S. Court of Appeals issued an order on reconsideration that permits CAIR to remain in effect until the USEPA issues new regulations that would conform to the CAA requirements and the Court's July 2008 decision.

In an attempt to conform to the Court's decision, on July 6, 2010, the USEPA proposed the Clean Air Transport Rule (CATR). CATR was finalized as the Cross-State Air Pollution Rule (CSAPR) on July 6, 2011, but subsequent litigation has resulted in CSAPR implementation being delayed indefinitely. CSAPR creates four separate trading programs: two SO2 areas (Group 1 and Group 2); and two NOx reduction requirements (annual and ozone season). Group 1 states (16 states including Ohio) will have to meet a 2012 cap and additional reductions in 2014. Group 2 states (7 states) will only have to meet the 2012 cap. We do not believe the rule will have a material effect on our operations in 2012. The Ohio EPA has a State Implementation Plan (SIP) that incorporates the CAIR program requirements, which remain in effect pending judicial review of CSAPR. If CSAPR becomes effective, the USEPA is expected to institute a federal implementation plan (FIP) in lieu of state SIPs and allow for the states to develop SIPs for approval as early as 2013. DP&L is unable to estimate the effect of the new requirements; however, CSAPR could have a material adverse effect on our operations.

Mercury and Other Hazardous Air Pollutants

On May 3, 2011, the USEPA published proposed Maximum Achievable Control Technology (MACT) standards for coal- and oil-fired electric generating units. The standards include new requirements for emissions of mercury and a number of other heavy metals. The EPA Administrator signed the final rule, now called MATS (Mercury and Air Toxics Standards), on December 16, 2011, and the rule was published in the Federal Register on February 16, 2012. Affected electric generating units (EGUs) will have to come into compliance with the new requirements by April 16, 2015, but may be granted an additional year contingent on Ohio EPA approval. DP&L is evaluating the costs that may be incurred to comply with the new requirement; however, MATS could have a material adverse effect on our operations and result in material compliance costs.

On April 29, 2010, the USEPA issued a proposed rule that would reduce emissions of toxic air pollutants from new and existing industrial, commercial and institutional boilers, and process heaters at major and area source facilities. The final rule was published in the Federal Register on March 21, 2011. This regulation affects seven auxiliary boilers used for start-up purposes at DP&L's generation facilities. The regulations contain emissions limitations, operating limitations and other requirements. The compliance date was originally March 21, 2014. However, the USEPA has announced that the compliance date for existing boilers will be delayed until a judicial review is no longer pending or until the EPA completes its reconsideration of the rule. In December 2011, the EPA proposed additional changes to this rule and solicited comments. Compliance costs are not expected to be material to DP&L's operations.

On May 3, 2010, the USEPA finalized the "National Emissions Standards for Hazardous Air Pollutants" for compression ignition (CI) reciprocating internal combustion engines (RICE). The units affected at DP&L are 18 diesel electric generating engines and eight emergency "black start" engines. The existing CI RICE units must comply by May 3, 2013. The regulations contain emissions limitations, operating limitations and other requirements. Compliance costs on DP&L's operations are not expected to be material.

Carbon Emissions and Other Greenhouse Gases

In response to a U.S. Supreme Court decision that the USEPA has the authority to regulate CO2 emissions from motor vehicles, the USEPA made a finding that CO2 and certain other GHGs are pollutants under the CAA. Subsequently, under the CAA, USEPA determined that CO2 and other GHGs from motor vehicles threaten the health and welfare of future generations by contributing to climate change. This finding became effective in January 2010. Numerous affected parties have petitioned the USEPA Administrator to reconsider this decision. On April 1, 2010, USEPA signed the "Light-Duty Vehicle Greenhouse Gas Emission Standards and Corporate Average Fuel Economy Standards" rule. Under USEPA's view, this is the final action that renders CO2 and other GHGs "regulated air pollutants" under the CAA.

Under USEPA regulations finalized in May 2010 (referred to as the "Tailoring Rule"), the USEPA began regulating GHG emissions from certain stationary sources in January 2011. The Tailoring Rule sets forth criteria for determining which facilities are required to obtain permits for their GHG emissions pursuant to the CAA Prevention of Significant Deterioration and Title V operating permit programs. Under the Tailoring Rule, permitting requirements are being phased in through successive steps that may expand the scope of covered sources over time. The USEPA has issued guidance on what the best available control technology entails for the control of GHGs and individual states are required to determine what controls are required for facilities on a case-by-case basis. The ultimate impact of the Tailoring Rule to DP&L cannot be determined at this time, but the cost of compliance could be material.

On April 13, 2012 the USEPA published its GHG standards for new and modified electric generating units (EGUs) under CAA subsection 111(b), which would require certain new EGUs to meet a standard of 1,000 pounds of carbon dioxide per megawat-hour, a standard based on the emissions limitations achievable through natural gas combined cycle generation. The proposal anticipates that affected coal-fired units would need to install carbon capture and storage or other expensive carbon dioxide emission control technology to meet the standard. Furthemore, the USEPA may propose and promulgate guidelines for states to address GHG standards for existing EGUs under CAA subsection 111(d) later in 2012. These latter rules may focus on energy efficiency improvements at power plants. We cannot predict the effect of these standards, if any, on DP&L's operations.

Approximately 99% of the energy we produce is generated by coal. DP&L's share of CO2 emissions at generating stations we own and co-own is approximately 16 million tons annually. Further GHG legislation or regulation finalized at a future date could have a significant effect on DP&L's operations and costs, which could adversely affect our net income, cash flows and financial condition. However, due to the uncertainty associated with such legislation or regulation, we cannot predict the final outcome or the financial impact that such legislation or regulation may have on DP&L.

On September 22, 2009, the USEPA issued a final rule for mandatory reporting of GHGs from large sources that emit 25,000 metric tons per year or more of CO2, including electric generating units. DP&L's first report to the USEPA was submitted prior to the September 30, 2011 due date for 2010 emissions. This reporting rule will guide development of policies and programs to reduce emissions. DP&L does not anticipate that this reporting rule will result in any significant cost or other effecton current operations.

Litigation, Notices of Violation and Other Matters Related to Air Quality

Litigation Involving Co-Owned Plants

On June 20, 2011, the U.S. Supreme Court ruled that the USEPA's regulation of GHGs under the CAA displaced any right that plaintiffs may have had to seek similar regulation through federal common law litigation in the court system. Although we are not named as a party to these lawsuits, DP&L is a co-owner of coal-fired plants with Duke Energy and AEP (or their subsidiaries) that could have been affected by the outcome of these lawsuits or similar suits that may have been filed against other electric power companies, including DP&L. Because the issue was not squarely before it, the U.S. Supreme Court did not rule against the portion of plaintiffs' original suits that sought relief under state law.

As a result of a 2008 consent decree entered into with the Sierra Club and approved by the U.S. District Court for the Southern District of Ohio, DP&L and the other owners of the J.M. Stuart generating station are subject to certain specified emission targets related to NOx, SO2 and particulate matter. The consent decree also includes commitments for energy efficiency and renewable energy activities. An amendment to the consent decree was entered into and approved in 2010 to clarify how emissions would be computed during malfunctions. Continued compliance with the consent decree, as amended, is not expected to have a material effect on DP&L's results of operations, financial condition or cash flows in the future.

 

Notices of Violation Involving Co-Owned Plants

In November 1999, the USEPA filed civil complaints and NOVs against operators and owners of certain generation facilities for alleged violations of the CAA. Generation units operated by Duke Energy (Beckjord Unit 6) and CSP (Conesville Unit 4) and co-owned by DP&L were referenced in these actions. Although DP&L was not identified in the NOVs, civil complaints or state actions, the results of such proceedings could materially affect DP&L's co-owned plants.

In June 2000, the USEPA issued an NOV to the DP&L-operated J.M. Stuart generating station (co-owned by DP&L, Duke Energy, and CSP) for alleged violations of the CAA. The NOV contained allegations that Stuart station engaged in projects between 1978 and 2000 without New Source Review and PSD permits that resulted in signficant increases in particulate matter, SO2 and NOx.  These allegations are consistent with NOVs and complaints that the USEPA had brought against numerous other coal-fired utilities in the Midwest. The NOV indicated the USEPA may: (1) issue an order requiring compliance with the requirements of the Ohio SIP; or (2) bring a civil action seeking injunctive relief and civil penalties of up to $27,500 per day for each violation. To date, neither action has been taken. DP&L cannot predict the outcome of this matter.

In December 2007, the Ohio EPA issued an NOV to the DP&L-operated Killen generating station (co-owned by DP&L and Duke Energy) for alleged violations of the CAA. The NOV alleged deficiencies in the continuous monitoring of opacity. We submitted a compliance plan to the Ohio EPA on December 19, 2007. To date, no further actions have been taken by the Ohio EPA.

On March 13, 2008, Duke Energy, the operator of the Zimmer generating station, received an NOV and a Finding of Violation (FOV) from the USEPA alleging violations of the CAA, the Ohio State Implementation Program (SIP) and permits for the station in areas including SO2, opacity and increased heat input. A second NOV and FOV with similar allegations was issued on November 4, 2010. Also in 2010, USEPA issued an NOV to Zimmer for excess emissions. DP&L is a co-owner of the Zimmer generating station and could be affected by the eventual resolution of these matters. Duke Energy is expected to act on behalf of itself and the co-owners with respect to these matters. DP&L is unable to predict the outcome of these matters.

Notices of Violation Involving Wholly Owned Plants

In 2007, the Ohio EPA and the USEPA issued NOVs to DP&L for alleged violations of the CAA at the Hutchings station. The NOVs' alleged deficiencies related to stack opacity and particulate emissions. Discussions are under way with the USEPA, the U.S. Department of Justice and Ohio EPA. On November 18, 2009, the USEPA issued an NOV to DP&L for alleged NSR violations of the CAA at the Hutchings station relating to capital projects performed in 2001 involving Unit 3 and Unit 6. DP&L does not believe that the two projects described in the NOV were modifications subject to NSR. DP&L is engaged in discussions with the USEPA and the U.S. Department of Justice to resolve these matters, but DP&L is unable to determine the timing, costs or method by which these issues may be resolved. The Ohio EPA is kept apprised of these discussions.

Environmental Matters Related to Water Quality, Waste Disposal and Ash Ponds

Clean Water Act – Regulation of Water Intake

On July 9, 2004, the USEPA issued final rules pursuant to the Clean Water Act governing existing facilities that have cooling water intake structures. The rules require an assessment of impingement and/or entrainment of organisms as a result of cooling water withdrawal. A number of parties appealed the rules. In April 2009, the U.S. Supreme Court ruled that the USEPA did have the authority to compare costs with benefits in determining best technology available. The USEPA released new proposed regulations on March 28, 2011, published in the Federal Register on April 20, 2011. We submitted comments to the proposed regulations on August 17, 2011. The final rules are expected to be in place by mid-2012. We do not yet know the impact these proposed rules will have on our operations.

Clean Water Act – Regulation of Water Discharge

In December 2006, we submitted an application for the renewal of the Stuart station NPDES Permit that was due to expire on June 30, 2007. In July 2007, we received a draft permit proposing to continue our authority to discharge water from the station into the Ohio River. On February 5, 2008, we received a letter from the Ohio EPA indicating that they intended to impose a compliance schedule as part of the final Permit, that requires us to implement one of two diffuser options for the discharge of water from the station into the Ohio River as identified in a thermal discharge study completed during the previous permit term. Subsequently, DP&L and the Ohio EPA reached an agreement to allow DP&L to restrict public access to the water discharge area as an alternative to installing one of the diffuser options. Ohio EPA issued a revised draft permit that was received on November 12, 2008. In December 2008, the USEPA requested that the Ohio EPA provide additional information regarding the thermal discharge in the draft permit. In June 2009, DP&L provided information to the USEPA in response to their request to the Ohio EPA. In September 2010, the USEPA formally objected to a revised permit provided by Ohio EPA due to questions regarding the basis for the alternate thermal limitation. In December 2010, DP&L requested a public hearing on the objection, which was held on March 23, 2011. We participated in and presented our position on the issue at the hearing and in written comments submitted on April 28, 2011. In a letter to the Ohio EPA dated September 28, 2011, the USEPA reaffirmed its objection to the revised permit as previously drafted by the Ohio EPA. This reaffirmation stipulated that if the Ohio EPA does not re-draft the permit to address the USEPA's objection, then the authority for issuing the permit will pass to the USEPA. The Ohio EPA issued another draft permit in December 2011 and a public hearing was held on February 2, 2012. The draft permit would require DP&L, over the 54 months following issuance of a final permit, to take undefined actions to lower the temperature of its discharged water to a level unachievable by the station under its current design or alternatively make other significant modifications to the cooling water system. DP&L submitted comments to the draft permit and is considering legal options. Depending on the outcome of the process, the effects could be material on DP&L's operation.

In September 2009, the USEPA announced that it will be revising technology-based regulations governing water discharges from steam electric generating facilities. The rulemaking included the collection of information via an industry-wide questionnaire as well as targeted water sampling efforts at selected facilities. Subsequent to the information collection effort, it was anticipated that the USEPA will  release a proposed rule by November 2012 with a final regulation in place by early 2014. It is anticipate the USEPA revised the date for the proposed rule to November 2012. At present, DP&L is unable to predict the impact this rulemaking will have on its operations.

Regulation of Waste Disposal

In September 2002, DP&L and other parties received a special notice that the USEPA considers us to be a PRP for the clean-up of hazardous substances at the South Dayton Dump landfill site. In August 2005, DP&L and other parties received a general notice regarding the performance of a Remedial Investigation and Feasibility Study (RI/FS) under a Superfund Alternative Approach. In October 2005, DP&L received a special notice letter inviting it to enter into negotiations with the USEPA to conduct the RI/FS. No recent activity has occurred with respect to that notice or PRP status. However, on August 25, 2009, the USEPA issued an Administrative Order requiring that access to DP&L's service center building site, which is across the street from the landfill site, be given to the USEPA and the existing PRP group to help determine the extent of the landfill site's contamination as well as to assess whether certain chemicals used at the service center building site might have migrated through groundwater to the landfill site. DP&L granted such access and drilling of soil borings and installation of monitoring wells occurred in late 2009 and early 2010. On May 24, 2010, three members of the existing PRP group, Hobart Corporation, Kelsey-Hayes Company and NCR Corporation, filed a civil complaint in the United States District Court for the Southern District of Ohio against DP&L and numerous other defendants alleging that DP&L and the other defendants contributed to the contamination at the South Dayton Dump landfill site and seeking reimbursement of the PRP group's costs associated with the investigation and remediation of the site. On February 10, 2011, the Court dismissed claims against DP&L that related to allegations that chemicals used by DP&L at its service center contributed to the landfill site's contamination. The Court, however, did not dismiss claims alleging financial responsibility for remediation costs based on hazardous substances from DP&L that were allegedly directly delivered by truck to the landfill. Discovery, including depositions of past and present DP&L employees, is ongoing. While DP&L is unable to predict the outcome of these matters, if DP&L were required to contribute to the clean-up of the site, it could have a material adverse effect on us.

In December 2003, DP&L and other parties received a special notice that the USEPA considers us to be a PRP for the clean-up of hazardous substances at the Tremont City landfill site. Information available to DP&L does not demonstrate that it contributed hazardous substances to the site. While DP&L is unable to predict the outcome of this matter, if DP&L were required to contribute to the clean-up of the site, it could have a material adverse effect on us.

On April 7, 2010, the USEPA published an Advance Notice of Proposed Rulemaking announcing that it is reassessing existing regulations governing the use and distribution in commerce of polychlorinated biphenyls (PCBs). While this reassessment is in the early stages and the USEPA is seeking information from potentially affected parties on how it should proceed, the outcome may have a material effect on DP&L. The USEPA has indicated that a proposed rule will be released in late 2012. At present, DP&L is unable to predict the impact this initiative will have on its operations.

Regulation of Ash Ponds

In March 2009, the USEPA, through a formal Information Collection Request, collected information on ash pond facilities across the country, including those at Killen and J.M. Stuart stations. Subsequently, the USEPA collected similar information for the Hutchings station.

In August 2010, the USEPA conducted an inspection of the Hutchings station ash ponds. In June 2011, the USEPA issued a final report from the inspection including recommendations relative to the Hutchings station ash ponds. DP&L is unable to predict whether there will be additional USEPA action relative to DP&L's proposed plan or the effect on operations that might arise under a different plan.

In June 2011, the USEPA conducted an inspection of the Killen station ash ponds. DP&L is unable to predict the outcome this inspection will have on its operations.

There has been increasing advocacy to regulate coal combustion byproducts under the Resource Conservation Recovery Act (RCRA). On June 21, 2010, the USEPA published a proposed rule seeking comments on two options under consideration for the regulation of coal combustion byproducts including regulating the material as a hazardous waste under RCRA Subtitle C or as a solid waste under RCRA Subtitle D. The USEPA anticipates issuing a final rule on this topic in late 2012. DP&L is unable to predict the financial impact of this regulation, but if coal combustion byproducts are regulated as hazardous waste, it is expected to have a material adverse effect on DP&L's operations.

Notice of Violation involving Co-Owned Plants

On September 9, 2011, DP&L received a notice of violation from the USEPA with respect to its co-owned J.M. Stuart station based on a compliance evaluation inspection conducted by the USEPA and Ohio EPA in 2009. The notice alleged non-compliance by DP&L with certain provisions of the RCRA, the Clean Water Act National Pollutant Discharge Elimination System permit program and the station's storm water pollution prevention plan. The notice requested that DP&L respond with the actions it has subsequently taken or plans to take to remedy the USEPA's findings and ensure that further violations will not occur. Based on its review of the findings, although there can be no assurance, we believe that the notice will not result in any material effect on DP&L's results of operations, financial condition or cash flow.

Legal and Other Matters

In February 2007, DP&L filed a lawsuit against a coal supplier seeking damages incurred due to the supplier's failure to supply approximately 1.5 million tons of coal to two commonly owned plants under a coal supply agreement, of which approximately 570 thousand tons was DP&L's share. DP&L obtained replacement coal to meet its needs. The supplier has denied liability, and is currently in federal bankruptcy proceedings in which DP&L is participating as an unsecured creditor. DP&L is unable to determine the ultimate resolution of this matter. DP&L has not recorded any assets relating to possible recovery of costs in this lawsuit.

In connection with DP&L and other utilities joining PJM, in 2006, the FERC ordered utilities to eliminate certain charges to implement transitional payments, known as SECA, effective December 1, 2004 through March 31, 2006, subject to refund. Through this proceeding, DP&L was obligated to pay SECA charges to other utilities, but received a net benefit from these transitional payments. A hearing was held and an initial decision was issued in August 2006. A final FERC order on this issue was issued on May 21, 2010 that substantially supports DP&L's and other utilities' position that SECA obligations should be paid by parties that used the transmission system during the timeframe stated above. Prior to this final order being issued, DP&L entered into a significant number of bilateral settlement agreements with certain parties to resolve the matter, which by design will be unaffected by the final decision. With respect to unsettled claims, DP&L management has deferred $18.1 million and $17.8 million as of March 31, 2012 and December 31, 2011, respectively, as Other deferred credits representing the amount of unearned income and interest where the earnings process is not complete. The amount at March 31, 2012 and December 31, 2011 includes estimated earnings and interest of $5.5 million and $5.2 million, respectively. On September 30, 2011, the FERC issued two SECA-related orders that affirmed an earlier order issued in 2010 by denying the rehearing requests that a number of different parties, including DP&L, had filed. These orders are now final, subject to possible appellate court review. These orders do not affect prior settlements that had been reached with other parties that owed SECA revenues to DP&L or were recipients of amounts paid by DP&L. For other parties that had not previously settled with DP&L, the exact timing and amounts of any payments that would be made or received by DP&L under these orders is still uncertain.

Lawsuits were filed in connection with the Merger seeking, among other things, one or more of the following: to enjoin consummation of the Merger until certain conditions were met, to rescind the Merger or for rescissory damages, or to commence a sale process and/or obtain an alternative transaction or to recover an unspecified amount of other damages and costs, including attorneys' fees and expenses, a constructive trust or an accounting from the individual defendants for benefits they allegedly obtained as a result of their alleged breach of duty. All of these lawsuits, except one, were resolved and/or dismissed prior to the March 28, 2012 filing of our Form 10-K for the fiscal year ending December 31, 2011, and were discussed in that and previous reports we filed. The last of these lawsuits was dismissed on March 29, 2012 as noted below.

On April 28, 2011, a lawsuit was filed in the Court of Common Pleas of Montgomery County, Ohio, naming DPL and each member of DPL's board of directors as defendants. The lawsuit filed by Payne Family Trust was a purported class action on behalf of plaintiff and an alleged class of DPL shareholders. On March 29, 2012, the Court entered an order dismissing this lawsuit with prejudice pursuant to a stipulation filed by the parties. Plaintiff had alleged, among other things, that DPL's directors breached their fiduciary duties in approving the Merger of DPL and AES.