Contractual Obligations, Commercial Commitments and Contingencies
3 Months Ended
Mar. 31, 2015
Contractual Obligations, Commercial Commitments And Contingencies

   

9.  Contractual Obligations, Commercial Commitments and Contingencies 

   

DPL Inc. – Guarantees

In the normal course of business, DPL enters into various agreements with its wholly owned subsidiaries, DPLE, DPLER and DPLER’s wholly owned subsidiary, MC Squared, providing financial or performance assurance to third parties.  These agreements are entered into primarily to support or enhance the creditworthiness otherwise attributed to these subsidiaries on a stand-alone basis, thereby facilitating the extension of sufficient credit to accomplish these subsidiaries’ intended commercial purposes. 

   

At March 31, 2015,  DPL had $20.5 million of guarantees to third parties for future financial or performance assurance under such agreements:  $2.0 million of guarantees on behalf of DPLER, $18.3 million of guarantees on behalf of DPLE and $0.2 million of guarantees on behalf of MC Squared, which will be released upon the April 1, 2015 sale of MC Squared.  The guarantee arrangements entered into by DPL with these third parties cover select present and future obligations of DPLE, DPLER and MC Squared to such beneficiaries and are terminable by DPL upon written notice to the beneficiaries within a certain time. The carrying amount of obligations for commercial transactions covered by these guarantees and recorded in our Condensed Consolidated Balance Sheets was $2.2 million at March 31, 2015

   

To date, DPL has not incurred any losses related to the guarantees of DPLER’s, DPLE’s or MC Squared’s obligations and we believe it is remote that DPL would be required to perform or incur any losses in the future associated with any of the above guarantees. 

   

DP&L – Equity Ownership Interest

DP&L owns a 4.9% equity ownership interest in OVEC, an electric generation company, which is recorded using the cost method of accounting under GAAP.  As of March 31, 2015,  DP&L could be responsible for the repayment of 4.9%, or $74.4 million, of a $1,519.3 million debt obligation that has maturities from 2018 to 2040.  This would only happen if OVEC defaulted on its debt payments.  As of March 31, 2015, we have no knowledge of such a default.    

   

Commercial Commitments and Contractual Obligations 

There have been no material changes, outside the ordinary course of business, to our commercial commitments and to the information disclosed in the contractual obligations table in our Form 10-K for the fiscal year ended December 31, 2014.    

   

Contingencies 

In the normal course of business, we are subject to various lawsuits, actions, proceedings, claims and other matters asserted under various laws and regulations.  We believe the amounts provided in our Condensed Consolidated Financial Statements, as prescribed by GAAP, are adequate in light of the probable and estimable contingencies.  However, there can be no assurances that the actual amounts required to satisfy alleged liabilities from various legal proceedings, claims, tax examinations and other matters discussed below, and to comply with applicable laws and regulations, will not exceed the amounts reflected in our Condensed Consolidated Financial Statements.  As such, costs, if any, that may be incurred in excess of those amounts provided as of March 31, 2015, cannot be reasonably determined. 

   

Environmental Matters

DPL’s and DP&L’s facilities and operations are subject to a wide range of federal, state and local environmental regulations and laws.  The environmental issues that may affect us include:

 

·

The federal CAA and state laws and regulations (including SIPs) which require compliance, obtaining permits and reporting as to air emissions,

·

Litigation with federal and certain state governments and certain special interest groups regarding whether modifications to or maintenance of certain coal-fired generating stations require additional permitting or pollution control technology, or whether emissions from coal-fired generating stations cause or contribute to global climate changes,

·

Rules and future rules issued by the USEPA and the Ohio EPA that require substantial reductions in SO2, particulates, mercury, acid gases, NOx, and other air emissions.  DP&L has installed emission control technology and is taking other measures to comply with required and anticipated reductions,

·

Rules and future rules issued by the USEPA and the Ohio EPA that require reporting and reductions of GHGs,

·

Rules and future rules issued by the USEPA associated with the federal Clean Water Act, which prohibits the discharge of pollutants into waters of the United States except pursuant to appropriate permits, and

·

Solid and hazardous waste laws and regulations, which govern the management and disposal of certain waste.  The majority of solid waste created from the combustion of coal and fossil fuels is fly ash and other coal combustion by-products. 

 

In addition to imposing continuing compliance obligations, these laws and regulations authorize the imposition of substantial penalties for noncompliance, including fines, injunctive relief and other sanctions.  In the normal course of business, we have investigatory and remedial activities underway at our facilities to comply, or to determine compliance, with such regulations.  We record liabilities for loss contingencies related to environmental matters when a loss is probable of occurring and can be reasonably estimated in accordance with the provisions of GAAP.  At March 31, 2015, and December 31, 2014, we had accruals of approximately $0.8 million and $0.8 million, respectively, for environmental matters and other claims.  We also have a number of environmental matters for which we have not accrued loss contingencies because the risk of loss is not probable or a loss cannot be reasonably estimated, which are disclosed in the paragraphs below.  We evaluate the potential liability related to environmental matters quarterly and may revise our accruals.  Such revisions in the estimates of the potential liabilities could have a material adverse effect on our results of operations, financial condition or cash flows.

 

We have several pending environmental matters associated with our EGUs and stations.  Some of these matters could have material adverse effects on the operation of the power stations.

 

National Ambient Air Quality Standards

Effective August 23, 2010, the USEPA implemented its revisions to its primary NAAQS for SO2 replacing the previous 24-hour standard and annual standard with a one-hour standard.  Initial non-attainment designations were made July 25, 2013, and Pierce Township in Clermont County, location of DP&L’s co-owned unit Beckjord Unit 6, was the only area with DP&L operations designated as non-attainment.  Beckjord Unit 6 was retired effective October 1, 2014.  Non-attainment areas will be required to meet the 2010 standard by October 2018.  On April 17, 2014, the USEPA proposed a data requirements rule for air agencies to ascertain attainment characterization more extensively across the country by additional modeling and/or monitoring requirements of areas with sources that exceed specified thresholds of SO2 emissions.  The rule, if finalized, could require the installation of monitors at one or more of DP&L’s coal-fired power plants and result in additional non-attainment designations that could impact our operations.  On March 20, 2015, the USEPA informed environmental commissioners of 28 states, including Ohio, that certain areas within their states will be addressed in the next round of designations.  The areas will be included if they have monitors that have newly violated the standard, or have areas with a stationary source that had SO2 emissions greater than a specified level.  The designations are to be completed by July 2, 2016.  DP&L’s co-owned unit Zimmer meets the criteria for stationary sources. DP&L is unable to determine the effect of these rule changes on its operations.

 

Carbon Dioxide and Other Greenhouse Gas Emissions

The USEPA issued proposed GHG emissions rules for existing, modified and reconstructed generating units on June 2, 2014.  Under the proposed rules, called the Clean Power Plan, states would be judged against state-specific CO2 emissions targets beginning in 2020, with an expected total U.S. power sector emissions reduction of 30% from 2005 levels by 2030.  For Ohio specifically, the Clean Power Plan proposes an interim goal for 2020-2029 and a proposed 2030 final goal of 1,452 pounds of CO2 per megawatt hour and 1,338 pounds of CO2 per megawatt hour, respectively, a reduction of approximately 28% from 2012 levels.  The proposed rule requires states to submit implementation plans to meet the standards set forth in the rule by June 30, 2016, with the possibility of one- or two-year extensions under certain circumstances.  The state plans may focus on energy efficiency improvements at power stations, state renewable portfolio standards, re-dispatch to natural gas combined cycle units and other measures.  We could be required, among other things, to make efficiency improvements at our facilities.  USEPA expects to finalize this rule by August 1, 2015.  We cannot predict the effect of these proposed rules on DP&L’s operations. 

 

Clean Water Act – Regulation of Water Discharge

In December 2006, DP&L submitted a renewal application for the Stuart generating station NPDES permit that was due to expire on June 30, 2007.  The Ohio EPA issued a draft permit that was received on November 12, 2008.  In September 2010, the USEPA formally objected to the November 12, 2008, draft permit due to questions regarding the basis for the alternate thermal limitation.  The Ohio EPA issued a draft permit in December 2011 and a public hearing was held on February 2, 2012.  The draft permit required DP&L, over the 54 months following issuance of a final permit, to take undefined actions to lower the temperature of its discharged water to a level unachievable by the station under its current design or alternatively make other significant modifications to the cooling water system.  DP&L submitted comments to the draft permit.  In November 2012, the Ohio EPA issued another draft which included a compliance schedule for performing a study to justify an alternate thermal limitation and to which DP&L submitted comments.  In December 2012, the USEPA formally withdrew their objection to the permit.  On January 7, 2013, the Ohio EPA issued a final permit.  On February 1, 2013, DP&L appealed various aspects of the final permit to the Environmental Review Appeals Commission.  A hearing before the Commission is scheduled for August 2015.  Depending on the outcome of the appeal process, the effects on DP&L’s operations could be material.

 

Regulation of Waste Disposal

In September 2002, DP&L and other parties received a special notice that the USEPA considers us to be a PRP for the clean-up of hazardous substances at the South Dayton Dump landfill site.  In August 2005, DP&L and other parties received a general notice regarding the performance of a Remedial Investigation and Feasibility Study (RI/FS) under a Superfund Alternative Approach.  In October 2005, DP&L received a special notice letter inviting it to enter into negotiations with the USEPA to conduct the RI/FS.  No recent activity has occurred with respect to that notice or PRP status.  On August 16, 2006, an Administrative Settlement Agreement and Order on Consent (“ASAOC”) was executed and became effective among a group of PRPs, not including DP&L, and the USEPA.  On August 25, 2009, the USEPA issued an Administrative Order requiring that access to DP&L’s service center building site, which is across the street from the landfill site, be given to the USEPA and the existing PRP group to help determine the extent of the landfill site’s contamination as well as to assess whether certain chemicals used at the service center building site might have migrated through groundwater to the landfill site.  DP&L granted such access and drilling of soil borings and installation of monitoring wells occurred in late 2009 and early 2010.  On May 24, 2010, three members of the existing PRP group, Hobart Corporation, Kelsey-Hayes Company and NCR Corporation, filed a civil complaint in the United States District Court for the Southern District of Ohio (the “District Court”) against DP&L and numerous other defendants alleging that DP&L and the other defendants contributed to the contamination at the South Dayton Dump landfill site and seeking reimbursement of the PRP group’s costs associated with the investigation and remediation of the site.  On February 10, 2011, the District Court Judge dismissed claims against DP&L that related to allegations that chemicals used by DP&L at its service center contributed to the landfill site’s contamination.  The District Court Judge, however, did not dismiss claims alleging financial responsibility for remediation costs based on hazardous substances from DP&L that were allegedly directly delivered by truck to the landfill.  Discovery, including depositions of past and present DP&L employees, was conducted in 2012.  On February 8, 2013, the District Court Judge granted DP&L’s motion for summary judgment on statute of limitations grounds with respect to claims seeking a contribution toward the costs that are expected to be incurred by the PRP group in performing an RI/FS under the August 15, 2006 ASAOC.  That summary judgment ruling was appealed on March 4, 2013, and on July 14, 2014, a three-judge panel of the U.S. Court of Appeals for the 6th Circuit affirmed the lower Court’s ruling and subsequently denied a request by the plaintiffs for rehearing.  On November 14, 2014, the PRP group appealed the decision to the U.S. Supreme Court, but the writ of certiorari was denied by the Court on January 20, 2015.  On April 5, 2013, the PRP group entered into a second ASAOC relating primarily to vapor intrusion under some of the buildings at the South Dayton Dump landfill site.  On April 13, 2013, as amended July 30, 2013, the PRP group filed another civil complaint against DP&L and numerous other defendants alleging that each defendant contributed to the contamination of the site by delivering hazardous waste to the site or by releasing hazardous waste on other sites that migrated to the landfill site.  On February 18, 2014, after considering various motions and alternative grounds to dismiss, the District Court Judge dismissed some of the alleged grounds for relief that the PRP group had made, but ruled in the PRP group’s favor with respect to motions to dismiss the case in its entirety finding, among other things, that the 2013 ASAOC involved a different scope of work and thus the contributions sought were not seeking the same remedy that had been dismissed in the first civil suit.  Appeals from this ruling are pending before the 6th Circuit Court of Appeals.  On January 14, 2015, the PRP group served DP&L and other defendants a request for production of documents related to any survey regarding waste management or waste disposal.  Information responsive to this request was provided on February 17, 2015.  In addition, on January 16, 2015, the USEPA issued a Special Notice Letter and Section 104(e) Information Request to DP&L and other defendants, requesting historical information related to waste management practices.  DP&L responded to this request on March 27, 2015.  DP&L is unable to predict the outcome of this action by the plaintiffs and USEPA.  Additionally, the District Court’s 2013 ruling and the Court of Appeals’ affirmation of that ruling in 2014 does not address future litigation that may arise with respect to actual remediation costs.  While DP&L is unable to predict the outcome of these matters, if DP&L were required to contribute to the clean-up of the site, it could have a material adverse effect on its operations.

 

 

Regulation of Ash Ponds

There has been increasing advocacy to regulate coal combustion residuals (CCR) under the Resource Conservation Recovery Act (RCRA).  On June 21, 2010, the USEPA published a proposed rule seeking comments on two options under consideration for the regulation of coal combustion byproducts including regulating the material as a hazardous waste under RCRA Subtitle C or as a solid waste under RCRA Subtitle D.  The USEPA released its final rule on December 19, 2014, designating coal combustion residuals that are not beneficially reused as non-hazardous solid waste under RCRA Subtitle D.  The rule was published in the Federal Register on April 17, 2015 and becomes effective October 19, 2015, and applies new detailed management practices to new and existing landfills and surface impoundments, including lateral expansions of such units.  DP&L is currently reviewing the rule and assessing the impact on our operations.  Our business, financial condition or operations could be materially and adversely affected by this regulation. 

       

DP&L [Member]  
Contractual Obligations, Commercial Commitments And Contingencies

   

10.  Contractual Obligations, Commercial Commitments and Contingencies 

   

DP&L – Equity Ownership Interest

DP&L owns a 4.9% equity ownership interest in OVEC, an electric generation company, which is recorded using the cost method of accounting under GAAP.  As of March 31, 2015,  DP&L could be responsible for the repayment of 4.9%, or $74.4 million, of a $1,519.3 million debt obligation that has maturities from 2018 to 2040.  This would only happen if OVEC defaulted on its debt payments.  As of March 31, 2015, we have no knowledge of such a default. 

   

Commercial Commitments and Contractual Obligations 

There have been no material changes, outside the ordinary course of business, to our commercial commitments and to the information disclosed in the contractual obligations table in our Form 10-K for the fiscal year ended December 31, 2014.    

   

Contingencies 

In the normal course of business, we are subject to various lawsuits, actions, proceedings, claims and other matters asserted under laws and regulations.  We believe the amounts provided in our Condensed Financial Statements, as prescribed by GAAP, are adequate in light of the probable and estimable contingencies.  However, there can be no assurances that the actual amounts required to satisfy alleged liabilities from various legal proceedings, claims, tax examinations and other matters discussed below, and to comply with applicable laws and regulations, will not exceed the amounts reflected in our Condensed Financial Statements.  As such, costs, if any, that may be incurred in excess of those amounts provided as of March 31, 2015, cannot be reasonably determined. 

   

Environmental Matters

DP&L’s facilities and operations are subject to a wide range of federal, state and local environmental regulations and laws.  The environmental issues that may affect us include:

 

·

The federal CAA and state laws and regulations (including SIPs) which require compliance, obtaining permits and reporting as to air emissions,

·

Litigation with federal and certain state governments and certain special interest groups regarding whether modifications to or maintenance of certain coal-fired generating stations require additional permitting or pollution control technology, or whether emissions from coal-fired generating stations cause or contribute to global climate changes,

·

Rules and future rules issued by the USEPA and the Ohio EPA that require substantial reductions in SO2, particulates, mercury, acid gases, NOx, and other air emissions.  DP&L has installed emission control technology and is taking other measures to comply with required and anticipated reductions,

·

Rules and future rules issued by the USEPA and the Ohio EPA that require reporting and reductions of GHGs,

·

Rules and future rules issued by the USEPA associated with the federal Clean Water Act, which prohibits the discharge of pollutants into waters of the United States except pursuant to appropriate permits, and

·

Solid and hazardous waste laws and regulations, which govern the management and disposal of certain waste.  The majority of solid waste created from the combustion of coal and fossil fuels is fly ash and other coal combustion by-products. 

 

In addition to imposing continuing compliance obligations, these laws and regulations authorize the imposition of substantial penalties for noncompliance, including fines, injunctive relief and other sanctions.  In the normal course of business, we have investigatory and remedial activities underway at our facilities to comply, or to determine compliance, with such regulations.  We record liabilities for loss contingencies related to environmental matters when a loss is probable of occurring and can be reasonably estimated in accordance with the provisions of GAAP.  At March 31, 2015, and December 31, 2014, we had accruals of approximately $0.8 million and $0.8 million, respectively, for environmental matters and other claims.  We also have a number of environmental matters for which we have not accrued loss contingencies because the risk of loss is not probable or a loss cannot be reasonably estimated, which are disclosed in the paragraphs below.  We evaluate the potential liability related to environmental matters quarterly and may revise our estimates.  Such revisions in the estimates of the potential liabilities could have a material adverse effect on our results of operations, financial condition or cash flows.

 

We have several pending environmental matters associated with our EGUs and stations.  Some of these matters could have material adverse effects on the operation of the power stations.  

 

National Ambient Air Quality Standards

Effective August 23, 2010, the USEPA implemented its revisions to its primary NAAQS for SO2 replacing the previous 24-hour standard and annual standard with a one-hour standard.  Initial non-attainment designations were made July 25, 2013, and Pierce Township in Clermont County, location of DP&L’s co-owned unit Beckjord Unit 6, was the only area with DP&L operations designated as non-attainment.  Beckjord Unit 6 was retired effective October 1, 2014.  Non-attainment areas will be required to meet the 2010 standard by October 2018.  On April 17, 2014, the USEPA proposed a data requirements rule for air agencies to ascertain attainment characterization more extensively across the country by additional modeling and/or monitoring requirements of areas with sources that exceed specified thresholds of SO2 emissions.  The rule, if finalized, could require the installation of monitors at one or more of DP&L’s coal-fired power plants and result in additional non-attainment designations that could impact our operations.  On March 20, 2015, the USEPA informed environmental commissioners of 28 states, including Ohio, that certain areas within their states will be addressed in the next round of designations.  The areas will be included if they have monitors that have newly violated the standard, or have areas with a stationary source that had SO2 emissions greater than a specified level.  The designations are to be completed by July 2, 2016.  DP&L’s co-owned unit Zimmer meets the criteria for stationary sources. DP&L is unable to determine the effect of these rule changes on its operations.

 

Carbon Dioxide and Other Greenhouse Gas Emissions

The USEPA issued proposed GHG emissions rules for existing, modified and reconstructed generating units on June 2, 2014.  Under the proposed rules, called the Clean Power Plan, states would be judged against state-specific CO2 emissions targets beginning in 2020, with an expected total U.S. power sector emissions reduction of 30% from 2005 levels by 2030.  For Ohio specifically, the Clean Power Plan proposes an interim goal for 2020-2029 and a proposed 2030 final goal of 1,452 pounds of CO2 per megawatt hour and 1,338 pounds of CO2 per megawatt hour, respectively, a reduction of approximately 28% from 2012 levels.  The proposed rule requires states to submit implementation plans to meet the standards set forth in the rule by June 30, 2016, with the possibility of one- or two-year extensions under certain circumstances.  The state plans may focus on energy efficiency improvements at power stations, state renewable portfolio standards, re-dispatch to natural gas combined cycle units and other measures.  We could be required, among other things, to make efficiency improvements at our facilities.  USEPA expects to finalize this rule by August 1, 2015.  We cannot predict the effect of these proposed rules on DP&L’s operations. 

 

Clean Water Act – Regulation of Water Discharge

In December 2006, DP&L submitted a renewal application for the Stuart generating station NPDES permit that was due to expire on June 30, 2007.  The Ohio EPA issued a draft permit that was received on November 12, 2008.  In September 2010, the USEPA formally objected to the November 12, 2008, draft permit due to questions regarding the basis for the alternate thermal limitation.  The Ohio EPA issued a draft permit in December 2011 and a public hearing was held on February 2, 2012.  The draft permit required DP&L, over the 54 months following issuance of a final permit, to take undefined actions to lower the temperature of its discharged water to a level unachievable by the station under its current design or alternatively make other significant modifications to the cooling water system.  DP&L submitted comments to the draft permit.  In November 2012, the Ohio EPA issued another draft which included a compliance schedule for performing a study to justify an alternate thermal limitation and to which DP&L submitted comments.  In December 2012, the USEPA formally withdrew their objection to the permit.  On January 7, 2013, the Ohio EPA issued a final permit.  On February 1, 2013, DP&L appealed various aspects of the final permit to the Environmental Review Appeals Commission.  A hearing before the Commission is scheduled for August 2015.  Depending on the outcome of the appeal process, the effects on DP&L’s operations could be material.

 

Regulation of Waste Disposal

In September 2002, DP&L and other parties received a special notice that the USEPA considers us to be a PRP for the clean-up of hazardous substances at the South Dayton Dump landfill site.  In August 2005, DP&L and other parties received a general notice regarding the performance of a Remedial Investigation and Feasibility Study (RI/FS) under a Superfund Alternative Approach.  In October 2005, DP&L received a special notice letter inviting it to enter into negotiations with the USEPA to conduct the RI/FS.  No recent activity has occurred with respect to that notice or PRP status.  On August 16, 2006, an Administrative Settlement Agreement and Order on Consent (“ASAOC”) was executed and became effective among a group of PRPs, not including DP&L, and the USEPA.  On August 25, 2009, the USEPA issued an Administrative Order requiring that access to DP&L’s service center building site, which is across the street from the landfill site, be given to the USEPA and the existing PRP group to help determine the extent of the landfill site’s contamination as well as to assess whether certain chemicals used at the service center building site might have migrated through groundwater to the landfill site.  DP&L granted such access and drilling of soil borings and installation of monitoring wells occurred in late 2009 and early 2010.  On May 24, 2010, three members of the existing PRP group, Hobart Corporation, Kelsey-Hayes Company and NCR Corporation, filed a civil complaint in the United States District Court for the Southern District of Ohio (the “District Court”) against DP&L and numerous other defendants alleging that DP&L and the other defendants contributed to the contamination at the South Dayton Dump landfill site and seeking reimbursement of the PRP group’s costs associated with the investigation and remediation of the site.  On February 10, 2011, the District Court Judge dismissed claims against DP&L that related to allegations that chemicals used by DP&L at its service center contributed to the landfill site’s contamination.  The District Court Judge, however, did not dismiss claims alleging financial responsibility for remediation costs based on hazardous substances from DP&L that were allegedly directly delivered by truck to the landfill.  Discovery, including depositions of past and present DP&L employees, was conducted in 2012.  On February 8, 2013, the District Court Judge granted DP&L’s motion for summary judgment on statute of limitations grounds with respect to claims seeking a contribution toward the costs that are expected to be incurred by the PRP group in performing an RI/FS under the August 15, 2006 ASAOC.  That summary judgment ruling was appealed on March 4, 2013, and on July 14, 2014, a three-judge panel of the U.S. Court of Appeals for the 6th Circuit affirmed the lower Court’s ruling and subsequently denied a request by the plaintiffs for rehearing.  On November 14, 2014, the PRP group appealed the decision to the U.S. Supreme Court, but the writ of certiorari was denied by the Court on January 20, 2015.  On April 5, 2013, the PRP group entered into a second ASAOC relating primarily to vapor intrusion under some of the buildings at the South Dayton Dump landfill site.  On April 13, 2013, as amended July 30, 2013, the PRP group filed another civil complaint against DP&L and numerous other defendants alleging that each defendant contributed to the contamination of the site by delivering hazardous waste to the site or by releasing hazardous waste on other sites that migrated to the landfill site.  On February 18, 2014, after considering various motions and alternative grounds to dismiss, the District Court Judge dismissed some of the alleged grounds for relief that the PRP group had made, but ruled in the PRP group’s favor with respect to motions to dismiss the case in its entirety finding, among other things, that the 2013 ASAOC involved a different scope of work and thus the contributions sought were not seeking the same remedy that had been dismissed in the first civil suit.  Appeals from this ruling are pending before the 6th Circuit Court of Appeals.  On January 14, 2015, the PRP group served DP&L and other defendants a request for production of documents related to any survey regarding waste management or waste disposal.  Information responsive to this request was provided on February 17, 2015.  In addition, on January 16, 2015, the USEPA issued a Special Notice Letter and Section 104(e) Information Request to DP&L and other defendants, requesting historical information related to waste management practices.  DP&L responded to this request on March 27, 2015.  DP&L is unable to predict the outcome of this action by the plaintiffs and USEPA.  Additionally, the District Court’s 2013 ruling and the Court of Appeals’ affirmation of that ruling in 2014 does not address future litigation that may arise with respect to actual remediation costs.  While DP&L is unable to predict the outcome of these matters, if DP&L were required to contribute to the clean-up of the site, it could have a material adverse effect on its operations.

 

Regulation of Ash Ponds

There has been increasing advocacy to regulate coal combustion residuals (CCR) under the Resource Conservation Recovery Act (RCRA).  On June 21, 2010, the USEPA published a proposed rule seeking comments on two options under consideration for the regulation of coal combustion byproducts including regulating the material as a hazardous waste under RCRA Subtitle C or as a solid waste under RCRA Subtitle D.  The USEPA released its final rule on December 19, 2014, designating coal combustion residuals that are not beneficially reused as non-hazardous solid waste under RCRA Subtitle D.  The rule was published in the Federal Register on April 17, 2015 and becomes effective October 19, 2015, and applies new detailed management practices to new and existing landfills and surface impoundments, including lateral expansions of such units.  DP&L is currently reviewing the rule and assessing the impact on our operations.  Our business, financial condition or operations could be materially and adversely affected by this regulation.