XML 75 R16.htm IDEA: XBRL DOCUMENT v3.2.0.727
Other Material Contingencies
6 Months Ended
Jun. 30, 2015
Guarantor Obligations [Line Items]  
Other Material Contingencies
Other Material Contingencies
Manhattan Steam Main Rupture
In July 2007, a CECONY steam main located in midtown Manhattan ruptured. It has been reported that one person died and others were injured as a result of the incident. Several buildings in the area were damaged. Debris from the incident included dirt and mud containing asbestos. The response to the incident required the closing of several buildings and streets for various periods. Approximately 90 suits are pending against the company seeking generally unspecified compensatory and, in some cases, punitive damages, for personal injury, property damage and business interruption. The company has notified its insurers of the incident and believes that the policies in force at the time of the incident will cover the company’s costs to satisfy its liability to others in connection with the suits. In the company’s estimation, there is not a reasonable possibility that an exposure to loss exists for the suits that is materially in excess of the estimated liability accrued. At June 30, 2015, the company has accrued its estimated liability for the suits of $50 million and an insurance receivable in the same amount.
Manhattan Explosion and Fire
On March 12, 2014, two multi-use five-story tall buildings located on Park Avenue between 116th and 117th Street in Manhattan were destroyed by an explosion and fire. CECONY had delivered gas to the buildings through service lines from a distribution main located below ground on Park Avenue. Eight people died and more than 50 people were injured. Additional buildings were also damaged. The National Transportation Safety Board (NTSB) investigated. The parties to the investigation included the company, the City of New York, the Pipeline and Hazardous Materials Safety Administration and the NYSPSC (which is also conducting an investigation). In June 2015, the NTSB issued a final report concerning the incident, its probable cause and safety recommendations. The NTSB determined that the probable cause of the incident was (1) the failure of a defective fusion joint at a service tee (which joined a plastic service line to a distribution main) installed by the company that allowed gas to leak from the distribution main and migrate into a building where it ignited and (2) a breach in a City sewer line that allowed groundwater and soil to flow into the sewer, resulting in a loss of support for the distribution main, which caused it to sag and overstressed the defective fusion joint. The NTSB also made safety recommendations, including recommendations to the company that addressed its procedures for the preparation and examination of plastic fusions, training of its staff on conditions for notifications to the City’s Fire Department and extension of its gas main isolation valve installation program. Approximately 70 suits are pending against the company seeking generally unspecified damages and, in one case, punitive damages, for personal injury, property damage and business interruption. The company has notified its insurers of the incident and believes that the policies in force at the time of the incident will cover the company’s costs, in excess of a required retention (the amount of which is not material), to satisfy any liability it may have for damages in connection with the incident. The company is unable to estimate the amount or range of its possible loss related to the incident. At June 30, 2015, the company had not accrued a liability for the incident.
Other Contingencies
See “Other Regulatory Matters” in Note B and “Uncertain Tax Positions” in Note I.
Guarantees
Con Edison and its subsidiaries enter into various agreements providing financial or performance assurance primarily to third parties on behalf of their subsidiaries. Maximum amounts guaranteed by Con Edison totaled $2,529 million and $2,547 million at June 30, 2015 and December 31, 2014, respectively.
A summary, by type and term, of Con Edison’s total guarantees at June 30, 2015 is as follows:
 
Guarantee Type
0 – 3 years
4 – 10 years

> 10 years

Total
 
(Millions of Dollars)
NY Transco
$1,359

$—


$—

$1,359
Energy transactions
739
42
90
871
Renewable electric production projects
165
50
54
269
Other
30


30
Total
$2,293
$92
$144
$2,529

NY Transco — Con Edison has guaranteed payment by its subsidiary, Con Edison Transmission, of the contributions it agreed to make to New York Transco LLC (NY Transco). Con Edison Transmission acquired a 46 percent interest in NY Transco when it was formed in 2014. NY Transco’s transmission projects are expected to be developed initially by CECONY and other New York transmission owners and then sold to NY Transco. The development of the projects would be subject to authorizations from the NYSPSC, the FERC and other federal, state and local agencies. Guarantee amount shown is for the maximum possible required amount of Con Edison Transmission’s contributions, which assumes that all the NY Transco projects proposed when NY Transco was formed receive all required regulatory approvals and are completed at 175 percent of their estimated costs and that NY Transco does not use any debt financing for the projects. Guarantee term shown is assumed as the timing of the contributions is not known.
Energy Transactions — Con Edison guarantees payments on behalf of its competitive energy businesses in order to facilitate physical and financial transactions in gas, pipeline capacity, transportation, oil, electricity, renewable energy credits and energy services. To the extent that liabilities exist under the contracts subject to these guarantees, such liabilities are included in Con Edison’s consolidated balance sheet.
Renewable Electric Production Projects — Con Edison and Con Edison Development guarantee payments associated with the investment in solar and wind energy facilities on behalf of their wholly-owned subsidiaries. In addition, Con Edison Development also provided $3 million in guarantees to Travelers Insurance Company for indemnity agreements for surety bonds in connection with the construction and operation of solar energy facilities performed by its subsidiaries.
Other — Other guarantees primarily relate to guarantees provided by Con Edison to Travelers Insurance Company for indemnity agreements for surety bonds in connection with energy service projects performed by Con Edison Solutions ($25 million). In addition, Con Edison issued a guarantee to the Public Utility Commission of Texas covering obligations of Con Edison Solutions as a retail electric provider. Con Edison’s estimate of the maximum potential obligation for this guarantee is $5 million as of June 30, 2015.
CECONY  
Guarantor Obligations [Line Items]  
Other Material Contingencies
Other Material Contingencies
Manhattan Steam Main Rupture
In July 2007, a CECONY steam main located in midtown Manhattan ruptured. It has been reported that one person died and others were injured as a result of the incident. Several buildings in the area were damaged. Debris from the incident included dirt and mud containing asbestos. The response to the incident required the closing of several buildings and streets for various periods. Approximately 90 suits are pending against the company seeking generally unspecified compensatory and, in some cases, punitive damages, for personal injury, property damage and business interruption. The company has notified its insurers of the incident and believes that the policies in force at the time of the incident will cover the company’s costs to satisfy its liability to others in connection with the suits. In the company’s estimation, there is not a reasonable possibility that an exposure to loss exists for the suits that is materially in excess of the estimated liability accrued. At June 30, 2015, the company has accrued its estimated liability for the suits of $50 million and an insurance receivable in the same amount.
Manhattan Explosion and Fire
On March 12, 2014, two multi-use five-story tall buildings located on Park Avenue between 116th and 117th Street in Manhattan were destroyed by an explosion and fire. CECONY had delivered gas to the buildings through service lines from a distribution main located below ground on Park Avenue. Eight people died and more than 50 people were injured. Additional buildings were also damaged. The National Transportation Safety Board (NTSB) investigated. The parties to the investigation included the company, the City of New York, the Pipeline and Hazardous Materials Safety Administration and the NYSPSC (which is also conducting an investigation). In June 2015, the NTSB issued a final report concerning the incident, its probable cause and safety recommendations. The NTSB determined that the probable cause of the incident was (1) the failure of a defective fusion joint at a service tee (which joined a plastic service line to a distribution main) installed by the company that allowed gas to leak from the distribution main and migrate into a building where it ignited and (2) a breach in a City sewer line that allowed groundwater and soil to flow into the sewer, resulting in a loss of support for the distribution main, which caused it to sag and overstressed the defective fusion joint. The NTSB also made safety recommendations, including recommendations to the company that addressed its procedures for the preparation and examination of plastic fusions, training of its staff on conditions for notifications to the City’s Fire Department and extension of its gas main isolation valve installation program. Approximately 70 suits are pending against the company seeking generally unspecified damages and, in one case, punitive damages, for personal injury, property damage and business interruption. The company has notified its insurers of the incident and believes that the policies in force at the time of the incident will cover the company’s costs, in excess of a required retention (the amount of which is not material), to satisfy any liability it may have for damages in connection with the incident. The company is unable to estimate the amount or range of its possible loss related to the incident. At June 30, 2015, the company had not accrued a liability for the incident.
Other Contingencies
See “Other Regulatory Matters” in Note B and “Uncertain Tax Positions” in Note I.
Guarantees
Con Edison and its subsidiaries enter into various agreements providing financial or performance assurance primarily to third parties on behalf of their subsidiaries. Maximum amounts guaranteed by Con Edison totaled $2,529 million and $2,547 million at June 30, 2015 and December 31, 2014, respectively.
A summary, by type and term, of Con Edison’s total guarantees at June 30, 2015 is as follows:
 
Guarantee Type
0 – 3 years
4 – 10 years

> 10 years

Total
 
(Millions of Dollars)
NY Transco
$1,359

$—


$—

$1,359
Energy transactions
739
42
90
871
Renewable electric production projects
165
50
54
269
Other
30


30
Total
$2,293
$92
$144
$2,529

NY Transco — Con Edison has guaranteed payment by its subsidiary, Con Edison Transmission, of the contributions it agreed to make to New York Transco LLC (NY Transco). Con Edison Transmission acquired a 46 percent interest in NY Transco when it was formed in 2014. NY Transco’s transmission projects are expected to be developed initially by CECONY and other New York transmission owners and then sold to NY Transco. The development of the projects would be subject to authorizations from the NYSPSC, the FERC and other federal, state and local agencies. Guarantee amount shown is for the maximum possible required amount of Con Edison Transmission’s contributions, which assumes that all the NY Transco projects proposed when NY Transco was formed receive all required regulatory approvals and are completed at 175 percent of their estimated costs and that NY Transco does not use any debt financing for the projects. Guarantee term shown is assumed as the timing of the contributions is not known.
Energy Transactions — Con Edison guarantees payments on behalf of its competitive energy businesses in order to facilitate physical and financial transactions in gas, pipeline capacity, transportation, oil, electricity, renewable energy credits and energy services. To the extent that liabilities exist under the contracts subject to these guarantees, such liabilities are included in Con Edison’s consolidated balance sheet.
Renewable Electric Production Projects — Con Edison and Con Edison Development guarantee payments associated with the investment in solar and wind energy facilities on behalf of their wholly-owned subsidiaries. In addition, Con Edison Development also provided $3 million in guarantees to Travelers Insurance Company for indemnity agreements for surety bonds in connection with the construction and operation of solar energy facilities performed by its subsidiaries.
Other — Other guarantees primarily relate to guarantees provided by Con Edison to Travelers Insurance Company for indemnity agreements for surety bonds in connection with energy service projects performed by Con Edison Solutions ($25 million). In addition, Con Edison issued a guarantee to the Public Utility Commission of Texas covering obligations of Con Edison Solutions as a retail electric provider. Con Edison’s estimate of the maximum potential obligation for this guarantee is $5 million as of June 30, 2015.