-----BEGIN PRIVACY-ENHANCED MESSAGE----- Proc-Type: 2001,MIC-CLEAR Originator-Name: webmaster@www.sec.gov Originator-Key-Asymmetric: MFgwCgYEVQgBAQICAf8DSgAwRwJAW2sNKK9AVtBzYZmr6aGjlWyK3XmZv3dTINen TWSM7vrzLADbmYQaionwg5sDW3P6oaM5D3tdezXMm7z1T+B+twIDAQAB MIC-Info: RSA-MD5,RSA, WBgab6j7NeX7803jE8lG27WACtMIS6hS9MyEeOsAIBsU7NfyPtTNBSefFOlDMvTo uV/HMtAqK5GHxPiWg7l+ZQ== 0000023426-96-000002.txt : 19960201 0000023426-96-000002.hdr.sgml : 19960201 ACCESSION NUMBER: 0000023426-96-000002 CONFORMED SUBMISSION TYPE: 8-K PUBLIC DOCUMENT COUNT: 1 CONFORMED PERIOD OF REPORT: 19960131 ITEM INFORMATION: Other events FILED AS OF DATE: 19960131 SROS: NYSE FILER: COMPANY DATA: COMPANY CONFORMED NAME: CONNECTICUT LIGHT & POWER CO CENTRAL INDEX KEY: 0000023426 STANDARD INDUSTRIAL CLASSIFICATION: ELECTRIC SERVICES [4911] IRS NUMBER: 060303850 STATE OF INCORPORATION: CT FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 8-K SEC ACT: 1934 Act SEC FILE NUMBER: 001-11419 FILM NUMBER: 96509200 BUSINESS ADDRESS: STREET 1: 707 SELDEN ST CITY: BERLIN STATE: CT ZIP: 06037-1616 BUSINESS PHONE: 2036655000 8-K 1 FORM 8-K FOR THE CONNECTICUT LIGHT & POWER COMPANY SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549-1004 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 Date of Report (Date of earliest event reported) January 31, 1996 ----------------- Commission File Number 0-404 ----- THE CONNECTICUT LIGHT AND POWER COMPANY --------------------------------------- (Exact name of registrant as specified in its charter) CONNECTICUT 06-0303850 ----------- ---------- (State of other jurisdiction of (I.R.S Employer incorporation or organization) Identification No.) SELDEN STREET, BERLIN, CONNECTICUT 06037-1616 ------------------------------------------------------------- (Address of principal executive officers) (Zip Code) (203) 665-5000 -------------- (Registrant's telephone number, including area code) Not Applicable -------------- (Former name of former address, if changed since last report) Item 5. Other Events 1. Nuclear Operations On January 31, 1996, the Nuclear Regulatory Commission ("NRC") announced that the Millstone Nuclear Power Station in Waterford, Connecticut ("Millstone") had been placed on its "watch list" because of longstanding performance concerns that warranted "increased NRC attention until the licensee demonstrates a period of improved performance." Millstone 1, a 660 Megawatt (MW) boiling water reactor, and Millstone 2, a 870 MW pressurized water reactor, are owned by The Connecticut Light and Power Company (CL&P) and Western Massachusetts Electric Company (WMECO), 81% and 19% for each, respectively. Millstone 3, a 1,148 MW pressurized water reactor, is owned by CL&P (52.93%), WMECO (12.24%), and Public Service Company of New Hampshire (PSNH) (2.85%), and a number of non-affiliates. The three Millstone units are operated by Northeast Nuclear Energy Company, a Northeast Utilities (NU) subsidiary. CL&P, WMECO and PSNH are also NU subsidiaries. The NRC listed a number of problems which have arisen since 1990 at Millstone, including licensed reactor operator requalification failures, repetitive improper maintenance causing an unisolable valve failure, problems with a supplemental leak collection release system, inadequate erosion- corrosion monitoring, untimely corrective action involving a heater drain tank recirculation line rupture, poor testing control causing an inadvertent drain-down of a reactor vessel, a high number of safety system failures, safety relief valve setpoint drift problems, untimely corrective actions for identified design deficiencies, failures to implement procedures which precipitated significant plant events and in some cases endangered plant staff and failure to comply with safety-related aspects of Millstone's Final Safety Analysis Report ("FSAR") and portions of other requirements. Also mentioned were two instances of escalated enforcement actions by the NRC for harassment, intimidation and discrimination against employees raising safety concerns and a continuing high volume of employee allegations of safety concerns not being resolved appropriately by NU. The NRC recognized that at present there are significant current variations in the performance of the three units, but the foregoing events, combined with a failure to sustain performance improvements across all three units and to resolve employee concerns, required continued close NRC monitoring of programs and performance at Millstone to assure development and implementation of effective corrective action programs. The NRC did not specifically restrict operations at the Millstone units, but management expects that the increased NRC attention will inevitably have effects and costs that cannot be accurately estimated at this time. Management plans to continue its extensive efforts already underway to address these concerns. For instance, concurrently with the NRC's action, NU has provided to the NRC the results of a comprehensive self-assessment review of the employee concern program at Millstone. The three month review included candid feedback from employees and concurs with a number of issues raised by the NRC. Millstone 1's latest refueling and maintenance outage, which began November 4, 1995 and was scheduled to end December 23, 1995, has been extended to early April while NU conducts a review of the unit's FSAR and an overall assessment of its readiness to restart. Millstone 2 and 3 are currently operating at full power. SIGNATURE Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized. THE CONNECTICUT LIGHT AND POWER COMPANY --------------------------------------- Registrant Date January 31, 1996 By /s/John B. Keane ------------------ ------------------------------------ John B. Keane Vice President and Treasurer -----END PRIVACY-ENHANCED MESSAGE-----