Commitments and Contingencies
3 Months Ended
Jul. 01, 2011
Commitments and Contingencies [Abstract]  
Commitments and Contingencies
Note 14—Commitments and Contingencies
 
Commitments
 
In the normal course of business, the Company may provide certain clients, principally governmental entities, with financial performance guarantees, which are generally backed by standby letters of credit or surety bonds.  In general, the Company would only be liable for the amounts of these guarantees in the event that nonperformance by the Company permits termination of the related contract by the Company’s client.  As of July 1, 2011, the Company had $532 million of outstanding letters of credit and surety bonds relating to these performance guarantees. The Company believes it is in compliance with its performance obligations under all service contracts for which there is a financial performance guarantee, and the ultimate liability, if any, incurred in connection with these guarantees will not have a material adverse affect on its consolidated results of operations or financial position.
 
The Company uses standby letters of credit in lieu of cash to support various risk management insurance policies. These letters of credit represent a contingent liability and the Company would only be liable if it defaults on its payment obligations towards these policies. As of July 1, 2011, the Company had $72 million of outstanding standby letters of credit. The Company also guarantees working capital lines of credit for certain of its non-U.S. business units with local financial institutions. Generally, guarantees have a one-year term and are renewed annually.
 
 
 
The following table summarizes the expiration of the Company’s financial guarantees outstanding as of July 1, 2011.
 
(Amounts in millions)
 
Fiscal 2012
  
Fiscal 2013
  
Fiscal 2014
and thereafter
  
Total
 
              
Performance guarantees:
            
   Surety bonds
 $16  $14  $-  $30 
   Letters of credit
  469   21   12   502 
Standby letters of credit
  53   10   9   72 
Foreign subsidiary debt guarantees
  431   270   -   701 
     Total
 $969  $315  $21  $1,305 
 
The Company generally indemnifies licensees of its proprietary software products against claims brought by third parties alleging infringement of their intellectual property rights (including rights in patents (with or without geographic limitations), copyright, trademarks and trade secrets). CSC’s indemnification of its licensees relates to costs arising from court awards, negotiated settlements and the related legal and internal costs of those licensees. The Company maintains the right, at its own costs, to modify or replace software in order to eliminate any infringement. Historically, CSC has not incurred any significant costs related to licensee software indemnification.
 
Contingencies
 
The Company and the U.K. National Health Service (NHS) are parties to a £2.9 billion (approximately $5.4 billion at originally announced exchange rate) contract under which the Company is developing and deploying an integrated electronic patient records system. The NHS contract was amended in April 2009 and the parties have entered into variation agreements subsequent to the 2009 amendment agreeing to various operational terms and conditions. The 2009 amendment included mutual releases of all claims existing at the time of the amendment. Since 2010, as part of the U.K. government’s austerity program and to address delays in development and deployments, the Company and NHS have discussed modification of the contract scope in order to reduce the total contract value by £500 million or $800 million. During the fourth quarter of fiscal year 2011, additional scope modification and total contract value reduction were discussed, bringing the combined total contract value reduction to £764 million or $1,222 million which would reduce the total contract value to approximately £2.1 billion or $3.4 billion. Terms related to this scope modification and contract value reduction are included in the memorandum of understanding (MOU) described below.
 
Since signing the 2009 contract amendment various disputes have arisen between the parties, primarily related to delays in development and deployment of the Lorenzo software product, the principal software product under the contract owned and licensed by the Company’s subcontractor, iSoft Group Limited, the acquisition of which was completed by the Company on July 29, 2011. NHS has notified the Company of various alleged events of default under the contract related to these delays and other alleged operational issues. In response, the Company has cured or is in the process of curing the alleged events of default, asserted that failures and breaches of contract on the part of NHS have caused these delays and issues, paid certain immaterial amounts as delay deductions into escrow under the contract for final resolution as part of the expected contract amendment, or otherwise disputed these allegations. Except as described below with regard to NHS’ allegations related to Pennine Care NHS Foundation Trust (Pennine), when NHS has notified the Company of alleged events of default it has generally reserved its rights without demanding, pursuing or otherwise asserting further remedies.
 
On February 4, 2011, NHS formally notified the Company that it believes the Company’s failure to achieve a key milestone related to the Pennine Lorenzo deployment by January 28, 2011, constitutes a breach of contract and NHS is considering its position on termination of all or parts of the contract; however, NHS subsequently clarified that its notice was not intended to suggest that termination is the only option which it is considering and, in fact, NHS is considering the full range of options it believes are available to NHS. The Company has disputed the alleged breach. NHS is not at this time actively pursuing this claim under the dispute resolution procedures of the contract. Pennine subsequently elected not to continue with the Lorenzo deployment; however, NHS and the Company are jointly working to replace Pennine with another mental health care trust which would implement the Lorenzo system. Notwithstanding this dispute, both NHS and the Company continued discussions with the intention of finalizing the terms of the MOU.
 
 
 
As described above, NHS and the Company have been in discussions since 2010 regarding an MOU which would set forth an agreement in principle to the key terms of a reduction in scope and related total contract value. Beginning in the second half of fiscal year 2011, the MOU discussions have also included negotiation of terms and conditions which would form the basis for the parties’ future obligations under the contract and final resolution of all claims and disputes between the parties. The MOU generally represents a non-binding agreement in principle; however, it includes a legally binding standstill agreement which provides that while the parties are negotiating a contract amendment to implement the terms of the MOU, neither party will pursue any claims against the other party. Negotiation of the terms of the MOU was confirmed by the NHS to be substantially completed in May 2011. Subsequent government reviews of the MOU are occurring and final government approval is still pending. The Company has not been advised of a date by which final government action on the MOU is expected. A review of the overall NHS IT program for delivery of an integrated electronic patient records system, including but not limited to the Company’s contract with NHS, is being conducted by the U.K. Major Projects Authority, the joint U.K. Cabinet Office-Treasury body which oversees large public sector projects. The Company’s understanding is that this review must be concluded before NHS will be authorized to enter into a contract amendment implementing the terms of the MOU. The U.K. House of Commons Public Accounts Committee also undertook a review of the overall NHS IT program and issued its report on August 3, 2011. The Committee’s report is critical of the performance of the IT suppliers involved in the program, including that of the Company, and of NHS’ management of the program, as well as the benefits achieved under the program to date. Further, the Committee recommends that the Department of Health should review whether to continue the program and whether the remaining program funding should be spent elsewhere. The Committee also recommends that the Major Projects Authority exercise close scrutiny over the NHS’ continuing negotiations with the Company and that the government give serious consideration to whether the Company has proved itself fit to tender for other government work. Although NHS advised the Public Accounts Committee in the Committee’s May 23, 2011, public hearing that it intended to go forward with the IT program and to complete negotiations with the Company, and the Company has not been advised otherwise by NHS to date, there can be no assurance that the MOU will be approved nor, if it is approved, what final terms would be negotiated and included in the MOU.
 
As of July 1, 2011, the Company had a net investment in the contract of approximately £701 million ($1.1 billion), which includes primarily $264 million of receivables, $1,188 million of contractual work in progress recorded in prepaid expenses and other current assets, $316 million of advance contract payments recorded in deferred revenue, and $51 million of dedicated computer equipment. As a result of the contract amendment anticipated by the MOU, the Company estimates that total contract value will be reduced by £764 million ($1,222 million). The MOU also anticipates that the contract term will be extended one year to June 2017 and the Company estimates revenue of £1.5 to £2.0 billion ($2.4 to $3.2 billion) over that remaining term. During the fourth quarter of fiscal year 2011, the Company recorded a contract inception-to-date adjustment reducing inception to date profit on the contract by $57 million and reduced the estimated margin rate for the remainder of the contract period, primarily due to increases in cost estimates for deployments, schedule delays and a reduced number of contractually required deployments under the contract amendment anticipated by the MOU. These adjustments reflect the Company’s estimated cost to complete the contract under the terms of the contract amendment as reflected in the MOU. With these amendments, the contract remains profitable and the Company would recover its investment. Future events, including a decision by the U.K. government not to approve the terms of the MOU, however, could result in a charge to reduce the contract profitability recognized to date and impair the Company’s net investment in the contract, a reduction in future profitability or a material adverse impact on the Company’s cash flows. On April 1, 2011, pursuant to the contract, NHS made an advance payment to the Company of £200 million ($320 million) related to the forecasted charges expected by the Company during fiscal year 2012. The advance payment is secured by performance bonds obtained by the Company. The advance payment arrangement provides, as one of its conditions, that the Company could be required to repay the advance payment upon NHS’ demand on September 30, 2011, if the parties are not progressing satisfactorily toward completion of the contract amendment. There can be no assurance that the parties will have made satisfactory progress toward completion of a contract amendment within that time frame such that the advance payment will be extended beyond September 30, 2011, and the advance payment may have to be repaid.
 
NHS has the right to terminate the contract for convenience, in which case NHS would owe significant termination fees to the Company and the Company would have claims against NHS for compensation due to delays and excess costs caused by NHS or for contractual deployment delay remedies. The Company believes that NHS, when considering its alternatives of maintaining or terminating the contract, will consider costs and risks that NHS may incur over and above those related to termination fees or damages payable to the Company and the associated legal processes, including the cost of initiating and managing a public tender procedure or procedures to obtain one or more suitable replacement suppliers, the operational risk of switching suppliers at this stage in the contract with the Company, the cost of alternative suppliers, and the cost of obtaining exit management services from the Company to ensure an orderly transition to one or more replacement suppliers. If NHS elected to terminate the contract for convenience, the total amount recoverable by the Company from termination fees payable by NHS and from claims by the Company is uncertain and it is possible the Company’s total recovery would be materially less than the net asset value associated with the contract. Future deployment delays caused by the Company could increase this shortfall materially until a contract amendment is signed.
 
 
 
There can be no assurance that the Company and NHS will successfully conclude negotiations and enter into a contract amendment or, if a contract amendment is negotiated and entered into, that the contract amendment as finally negotiated will reflect the terms of the MOU. The time required to complete a contract amendment is uncertain and while the Company expects completion, signing and approval of a contract amendment in fiscal year 2012, further unexpected delays could occur. The final terms of any contract amendment, a significant delay in completing a contract amendment, failure to conclude a contract amendment, or a termination of the contract by NHS for convenience could result in an impairment of the Company’s net investment in the contract and have a material adverse effect on the Company’s consolidated financial position, results of operations and cash flow. In addition, these events could result in a goodwill impairment charge.
 
If the parties do not successfully conclude a contract amendment, either or both parties could elect to assert claims against the other for breach of contract or similar claims. Subject to a legal obligation to mitigate its damages and subject to contractual limits of the Company’s liability, NHS could elect in this event to seek delay damages under the contract or terminate the contract and seek damages from the Company, including alleged damages for the cost of a replacement system and for unrealized savings and benefits under the contract. The Company could assert claims against NHS for breach of contract and seek damages from NHS, including compensation due to delays and excess costs caused by NHS or for contractual deployment delay remedies. If NHS wrongfully seeks to terminate the contract and refuses to withdraw its termination notice following the Company's demand, the Company could assert a claim for wrongful termination and seek damages for repudiatory breach of contract. Although the parties have not asserted claims formally in any arbitration or other legal proceeding, there can be no assurance that in any such proceeding NHS will not assert claims against the Company for damages in a material amount. The Company believes that the NHS contract is enforceable and that NHS has no existing right to terminate the contract. However, contractual disputes and litigation of this nature are complex and inherently uncertain and the Company’s position is subject to the ongoing review and evaluation of new facts and information which may come to the Company’s attention. If a contractual dispute or litigation ensues, the outcome is uncertain and there can be no assurance that the Company would prevail or that the NHS would not obtain a judgment and a material award of damages against the Company which could have a material adverse effect on the Company's financial statements.
 
As of July 1, 2011, the Company had 14 claims totaling approximately $675 million, excluding interest, asserted against the U.S. federal government under a single contract pending before the Armed Services Board of Contracts Appeals (“ASBCA”).  These claims were filed under the Contract Disputes Act of 1978 (the “CDA”).
 
During the second quarter of fiscal 2007, the Company filed its 14 interest bearing claims (collectively the “CDA Claims”), then totaling approximately $858 million, with the government.  During the first quarter of fiscal 2008, the government denied the Company’s 14 CDA Claims and issued a $42 million counterclaim. The Company disagrees with the government’s denials both factually and contractually.  In contrast to the Company’s CDA Claims, all of which were properly certified under the CDA, the government’s counter-claim was submitted with no verifiable evidence, no citation to any supporting evidence and no explanation of its method for calculating value.  Because of these disputes, on September 11, 2007, the Company initiated litigation at the ASBCA, one of the two forums available for litigation of CDA claims.  Decisions of the ASBCA may be appealed to the Court of Appeals for the Federal Circuit and that court’s ruling may be appealed to the U.S. Supreme Court.
 
In accordance with accepted practice, the Company amended its CDA Claims twice to reflect adjustments to the total value of the CDA Claims.  During the third quarter of fiscal 2008, the Company and its litigation team undertook a standard review of the value of the CDA Claims.  On December 21, 2007, as a result of that review, the Company amended the complaint it filed with the ASBCA on September 11, 2007, and adjusted its value downward.  On December 24, 2009, the Government made a partial payment of $35 million on one of the CDA Claims.  Thereafter, CSC filed a second amended complaint with the ASBCA reducing the value of its CDA Claims by $35 million.
 
Included in receivables and prepaid expenses and other current assets are approximately $379 million of unbilled receivables, reflecting the third quarter fiscal 2010 payment of $35 million referenced above, and $227 million of deferred costs related to the CDA Claims, respectively.  The Company has not recorded any profit element when it defers costs associated with CDA claims.
 
The Company believes it has valid bases for pursuing recovery of the CDA Claims supported by outside counsel’s evaluation of the facts and assistance in the preparation of the claims.  To verify its position, CSC requested that outside counsel analyze whether the first two conditions of Paragraph 31 of Accounting Standards Codification (“ASC”) 605-35-25 were satisfied with respect to the Company’s assertions of Government breaches of the contract, Government-caused delays and disruption to the Company’s performance of the contract, and unanticipated additional work performed by the Company under the contract.  The outside counsel issued an opinion that the Company’s position met the criteria on April 22, 2005, and has reiterated that opinion as recently as May 20, 2011.  The Company remains committed to vigorous pursuit of its claimed entitlements and associated value, and continues to believe based on review of applicable law and other considerations that recovery of at least its net balance sheet position is probable.  However, the Company’s position is subject to the ongoing evaluation of new facts and information which may come to the Company’s attention during the litigation.
 
 
 
On November 19, 2010, the Government and the Company entered into a formal agreement to stay the CDA Claims litigation and engage in a non-binding alternate dispute resolution (“ADR”) process to resolve all outstanding CDA Claims and other issues associated with the contract. This expedited process began on December 6, 2010, and is expected to conclude in the second quarter of fiscal year 2012. If the parties do not reach settlement, the litigation will resume. During the course of the ADR process in June 2011, the Company’s forensic accounting expert consultants conducted an independent review of the CDA Claims. As a result of their review, the Company reduced the value of the CDA Claims by approximately $3 million to $675 million in June 2011. This reduction related to the removal of overlapping costs among the CDA Claims, the removal of costs that may not have been considered allowable in accordance with the Federal Acquisition Regulation, and other minor adjustments. As part of the ADR process and in accordance with the terms of the ADR agreement, on November 22, 2010, the Company filed with the Government two requests for equitable adjustment (“REA”) totaling approximately $1.1 billion associated with the same contract under which the CDA Claims were brought. REAs, unlike CDA Claims, are not interest bearing. The matters covered by the REAs overlap with each other and, to some extent, with certain matters covered by the CDA claims, but the REAs seek recovery under other legal theories. The aggregate amount of REAs and CDA Claims filed by the Company is not indicative of the amounts that would ultimately be recoverable by the Company. However, were the Company to be successful with its REAs, the amount recovered could be greater than the total value of the CDA Claims. There are no additional assets on the Company’s books that relate to the REAs described above.
 
In the course of the ADR process and discussions with the Government, the Company may consider various settlement options. A settlement could occur in the Company's fiscal 2012 second quarter. There can be no assurance that a settlement will be agreed to, or if it is agreed to, that the settlement value received by the Company would equal or exceed the Company's balance sheet value associated with this contract.
 
Several additional claims that had been pending before the ASBCA under a separate contract were settled in the second quarter of fiscal 2010. As a result of that settlement and other contractual arrangements, the Company expects the deferred costs related to those claims will be fully recovered.
 
On May 29, 2009, a class action lawsuit entitled Shirley Morefield vs. Computer Sciences Corporation, et al., Case # A-09-591338-C, was brought in state court in Clark County, Nevada, against the Company and certain current and former officers and directors asserting claims for declarative and injunctive relief related to stock option backdating.  The alleged factual basis for the claims is the same as that which was alleged in a prior derivative case, In re CSC Shareholder Derivative Litigation, CV 06-5288, filed in U.S. District Court in Los Angeles, which was dismissed on August 9, 2007, by such court.  This dismissal was affirmed on appeal by the Ninth Circuit, which judgment is final. The defendants in the Morefield case deny the allegations in the complaint.  On June 30, 2009, the Company removed the case to the United States District Court for the District of Nevada, Case No. 2:09-cv-1176-KJD-GWF.  On motion made by the plaintiffs, the District Court remanded the case to state court on February 18, 2010.  Defendants filed a motion to dismiss on April 30, 2010, and plaintiffs filed their opposition on June 14, 2010.  A hearing took place on August 18, 2010.  A decision is pending.  It is not possible to make reasonable estimate of the amount or range of loss, if any, that could result from this matter at this time.
 
As previously disclosed, in CSC’s Annual Report on Form 10-K for the fiscal year ended April 1, 2011, the Company initiated an investigation into certain accounting errors in our MSS segment, primarily involving accounting irregularities in the Nordic region. Initially, the investigation was conducted by Company personnel, but outside Company counsel and forensic accountants retained by such counsel later assisted in the Company's investigation. On January 28, 2011, the Company was notified by the Division of Enforcement of the SEC that it had commenced a formal civil investigation relating to these matters and other matters subsequently identified by the SEC, with which the Company is cooperating.  On May 2, 2011, the Audit Committee of the Board of Directors commenced an independent investigation into matters relating to MSS and the Nordic region, matters identified by subpoenas issued by the SEC's Division of Enforcement and certain other accounting matters identified by the Audit Committee and retained independent counsel to represent CSC on behalf of, and under the exclusive direction of, the Audit Committee in connection with such independent investigation. Independent counsel has retained forensic accountants to assist their work. Independent counsel also represents CSC on behalf of, and under the exclusive direction of, the Audit Committee in connection with the investigation by the SEC's Division of Enforcement.
 
In addition, the SEC's Division of Corporation Finance has issued comment letters to the Company requesting additional information regarding its previously disclosed adjustments in connection with the above-referenced accounting errors, the Company's conclusions regarding the materiality of such adjustments and the Company's analysis of the effectiveness of its disclosure controls and procedures and its internal control over financial reporting. The Division of Corporation Finance's comment letter process is ongoing, and the Company is continuing to cooperate with that process.
 
 
The investigations being conducted by the Division of Enforcement and the Audit Committee as well as the review of our financial disclosures by the Division of Corporation Finance are continuing and could identify other accounting errors. As a result, we have incurred and will continue to incur significant legal and accounting expenditures, and a significant amount of time of our senior management has been focused on these matters. We are unable to predict how long the Division of Enforcement's and Audit Committee's investigations will continue or whether, at the conclusion of its investigation, the SEC will seek to impose fines or take other actions against us. In addition, we are unable to predict the timing of the completion of the Division of Corporation Finance's review of our financial disclosures or the outcome of such review. Publicity surrounding the foregoing or any enforcement action as a result of the SEC's investigation, even if ultimately resolved favorably for us, could have an adverse impact on our reputation, business, financial condition or results of operations.
 
On June 3, 2011, a putative federal class action complaint was filed in the United States District Court for the Eastern District of Virginia by the City of Roseville Employees' Retirement System, entitled City of Roseville Employees' Retirement System v Computer Sciences Corporation, et al. (Civil Docket for Case #: 1:11-cv-00610-TSE-IDD). A similar putative federal class action complaint, entitled Murphy v Computer Sciences, et al. (Civil Docket for Case #: 1:11-cv-00636-TSE-IDD) was filed on June 13, 2011, in the same court. Two additional similar putative federal class action complaints, entitled Hilary Kramer v Computer Sciences Corporation, et al. (Civil Docket for Case #: 1:11-cv-00636-TSE-IDD) and Norton Goldman v Computer Sciences Corporation, et al. (Civil Docket for Case #:1:11-cv-777TSE-IDD) were filed in the same court on July 15, 2011, and July 21, 2011, respectively.  The complaints name as defendants Computer Sciences Corporation, Michael W. Laphen and Michael J. Mancuso, and the Kramer and Norton complaints also name Donald G. DeBuck as an additional defendant. Each complaint alleges violations of the federal securities laws in connection with alleged misrepresentations and omissions regarding the business and operations of the Company. The defendants deny the allegations made in the complaints and intend to defend their position vigorously. It is not possible to make reliable estimates of the amounts or range of losses that could result from these matters at this time.
 
In addition to the matters noted above, the Company is currently party to a number of disputes which involve or may involve litigation.  The Company consults with legal counsel on those issues related to litigation and seeks input from other experts and advisors with respect to such matters in the ordinary course of business.  Whether any losses, damages or remedies ultimately resulting from such matters could reasonably have a material effect on the Company's business, financial condition, results of operation, or cash flows will depend on a number of variables, including, for example, the timing and amount of such losses or damages (if any) and the structure and type of any such remedies.  For these reasons, it is not possible to make reliable estimates of the amount or range of loss that could result from these other matters at this time.  Company management does not, however, presently expect any of such other matters to have a material impact on the consolidated condensed financial statements of the Company.