Contingencies and Commitments
6 Months Ended
Jun. 30, 2011
Contingencies and Commitments
3: CONTINGENCIES AND COMMITMENTS
CMS Energy and Consumers are involved in various matters that give rise to contingent liabilities. Depending on the specific issues, the resolution of these contingencies could have a material effect on CMS Energy's and Consumers' liquidity, financial condition, and results of operations. In their disclosures of these matters, CMS Energy and Consumers provide an estimate of the possible loss or range of loss when such an estimate can be made. Disclosures that state that CMS Energy or Consumers cannot predict the outcome of a matter indicate that they are unable to estimate a possible loss or range of loss for the matter.
CMS Energy Contingencies
Gas Index Price Reporting Investigation: In 2002, CMS Energy notified appropriate regulatory and governmental agencies that some employees at CMS MST and CMS Field Services appeared to have provided inaccurate information regarding natural gas trades to various energy industry publications which compile and report index prices. CMS Energy cooperated with an investigation by the DOJ regarding this matter. Although CMS Energy has not received any formal notification that the DOJ has completed its investigation, the DOJ's last request for information occurred in 2003, and CMS Energy completed its response to this request in 2004. CMS Energy is unable to predict the outcome of the DOJ investigation and what effect, if any, the investigation will have on CMS Energy.
Gas Index Price Reporting Litigation: CMS Energy, along with CMS MST, CMS Field Services, Cantera Natural Gas, Inc., and Cantera Gas Company, are named as defendants in various lawsuits arising as a result of alleged inaccurate natural gas price reporting to publications that report trade information. Allegations include manipulation of NYMEX natural gas futures and options prices, price-fixing conspiracies, restraint of trade, and artificial inflation of natural gas retail prices in Colorado, Kansas, Missouri, and Wisconsin. The following provides more detail on these proceedings:
    In 2005, CMS Energy, CMS MST, and CMS Field Services were named as defendants in a putative class action filed in Kansas state court, Learjet, Inc., et al. v. Oneok, Inc., et al. The complaint alleges that the defendants engaged in a scheme to violate the Kansas Restraint of Trade Act. The plaintiffs are seeking statutory full consideration damages consisting of the full consideration paid by plaintiffs for natural gas allegedly purchased from defendants.
    In 2007, a class action complaint, Heartland Regional Medical Center, et al. v. Oneok, Inc. et al., was filed in Missouri state court alleging violations of Missouri antitrust laws. Defendants, including CMS Energy, CMS Field Services, and CMS MST, are alleged to have violated the Missouri antitrust laws.
    Breckenridge Brewery of Colorado, LLC and BBD Acquisition Co. v. Oneok, Inc., et al., a class action complaint brought on behalf of retail direct purchasers of natural gas in Colorado, was filed in Colorado state court in 2006. Defendants, including CMS Energy, CMS Field Services, and CMS MST, are alleged to have violated the Colorado Antitrust Act of 1992. Plaintiffs are seeking full refund damages.
    A class action complaint, Arandell Corp., et al. v. XCEL Energy Inc., et al., was filed in 2006 in Wisconsin state court on behalf of Wisconsin commercial entities. The defendants, including CMS Energy, CMS ERM, and Cantera Gas Company, are alleged to have violated Wisconsin's antitrust statute. The plaintiffs are seeking full consideration damages, plus exemplary damages and attorneys' fees. After dismissal on jurisdictional grounds in 2009, plaintiffs filed a new complaint in the U.S. District Court for the Eastern District of Michigan. In 2010, the MDL judge issued an opinion and order granting the CMS Energy defendants' motion to dismiss the Michigan complaint on statute-of-limitations grounds and all CMS Energy defendants have been dismissed from the Arandell (Michigan) action.
    Another class action complaint, Newpage Wisconsin System v. CMS ERM, et al., was filed in 2009 in circuit court in Wood County, Wisconsin, against CMS Energy, CMS ERM, Cantera Gas Company, and others. The plaintiff is seeking full consideration damages, treble damages, costs, interest, and attorneys' fees.
    In 2005, J.P. Morgan Trust Company, in its capacity as Trustee of the FLI Liquidating Trust, filed an action in Kansas state court against CMS Energy, CMS MST, CMS Field Services, and others. The complaint alleges various claims under the Kansas Restraint of Trade Act. The plaintiff is
      seeking statutory full consideration damages for its purchases of natural gas in 2000 and 2001.
After removal to federal court, all of the cases described above were transferred to the MDL. CMS Energy was dismissed from the Learjet, Heartland, and J.P. Morgan cases in 2009, but other CMS Energy defendants remained parties. All CMS Energy defendants were dismissed from the Breckenridge case in 2009. In 2010, CMS Energy and Cantera Gas Company were dismissed from the Newpage case and the Arandell (Wisconsin) case was reinstated against CMS ERM. In July 2011, all claims against remaining CMS Energy defendants in the MDL cases were dismissed based on FERC preemption. Appeals are possible.
These cases involve complex facts, a large number of similarly situated defendants with different factual positions, and multiple jurisdictions. Presently, any estimate of liability would be highly speculative; the amount of CMS Energy's possible loss would be based on widely varying models previously untested in this context. If the outcome after appeals is unfavorable, these cases could have a material adverse impact on CMS Energy's liquidity, financial condition, and results of operations.
Bay Harbor: As part of the development of Bay Harbor by certain subsidiaries of CMS Energy, and under an agreement with the MDEQ, third parties constructed a golf course and park over several abandoned CKD piles left over from the former cement plant operations on the Bay Harbor site. The third parties also undertook a series of response activities, including constructing a leachate collection system in one area where CKD-impacted groundwater was entering Little Traverse Bay. Leachate is produced when water enters into the CKD piles. In 2002, CMS Energy sold its interest in Bay Harbor, but retained its obligations under environmental indemnities entered into at the start of the project.
In 2005, the EPA, along with CMS Land and CMS Capital, voluntarily executed an Administrative Order on Consent under Superfund, and the EPA approved a Removal Action Work Plan to address contamination issues. Collection systems required under the plan have been installed and effectiveness monitoring of the systems at the shoreline is ongoing. CMS Land, CMS Capital, and the EPA agreed upon augmentation measures to address areas where pH measurements were not satisfactory. Several augmentation measures were implemented and completed in 2009, with the remaining measure completed in 2010.
In May 2011, CMS Energy received approval from the EPA on a revised scope of remedies that CMS Energy had submitted in December 2010. CMS Energy is presently in negotiations with the MDEQ to finalize an agreement that will identify the remaining final remedies at the site. In December 2010, the MDEQ issued an NPDES permit that authorizes CMS Land to discharge treated leachate into Little Traverse Bay. This permit requires renewal every five years. Additionally, CMS Land has committed to investigate the potential for a deep injection well on the Bay Harbor site as an alternative long-term solution to the leachate disposal issue. In 2008, the MDEQ and the EPA granted permits for CMS Land or its wholly owned subsidiary, Beeland Group LLC, to construct and operate an off-site deep injection well in Antrim County, Michigan, to dispose of leachate from Bay Harbor. Certain environmental groups, a local township, and a local county filed lawsuits appealing the permits. The legal proceeding was stayed in 2009 and can be renewed by either party at any time.
Various claims have been brought against CMS Land or its affiliates, including CMS Energy, alleging environmental damage to property, loss of property value, insufficient disclosure of environmental matters, breach of agreement relating to access, or other matters. In October 2010, CMS Land and other parties received a demand for payment from the EPA in the amount of $7 million, plus interest, whereby the EPA is seeking recovery, as allowed under Superfund, of the EPA's response costs incurred at the Bay Harbor site. CMS Land believes that this is not a valid claim and intends to dispute it.
CMS Land and CMS Capital, the MDEQ, the EPA, and other parties continue to negotiate the long-term remedy for the Bay Harbor site, including:
    the disposal of leachate;
    the capping and excavation of CKD;
    the location and design of collection lines and upstream water diversion systems;
    application of criteria for various substances such as mercury; and
    other matters that are likely to affect the scope of response activities that CMS Land and CMS Capital may be obligated to undertake.
CMS Energy has recorded a cumulative charge related to Bay Harbor of $223 million, which includes accretion expense. At June 30, 2011, CMS Energy had a recorded liability of $88 million for its remaining obligations. CMS Energy calculated this liability based on discounted projected costs, using a discount rate of 4.34 percent and an inflation rate of one percent on annual operating and maintenance costs. CMS Energy based the discount rate on the interest rate for 30-year U.S. Treasury securities at December 31, 2010. The undiscounted amount of the remaining obligation is $109 million. CMS Energy expects to pay $16 million during the remainder of 2011, $16 million in 2012, $7 million in 2013, $5 million in 2014, $4 million in 2015, and the remaining amount thereafter on long-term liquid disposal and operating and maintenance costs.
CMS Energy's estimate of response activity costs and the timing of expenditures could change if there are additional major changes in circumstances or assumptions, including but not limited to:
    inability to complete the present long-term water disposal strategy at a reasonable cost;
    delays in implementing the present long-term water disposal strategy;
    requirements to alter the present long-term water disposal strategy upon expiration of the NPDES permit if the MDEQ or EPA identify a more suitable alternative;
    an increase in the number of contamination areas;
    different remediation techniques;
    the nature and extent of contamination;
    inability to reach agreement with the MDEQ or the EPA over additional response activities;
    delays in the receipt of requested permits;
    delays following the receipt of any requested permits due to legal appeals of third parties;
    additional or new legal or regulatory requirements; or
    new or different landowner claims.
Depending on the size of any indemnity obligation or liability under environmental laws, an adverse outcome of this matter could have a material adverse effect on CMS Energy's liquidity and financial condition and could negatively affect CMS Energy's financial results. Although a liability for its present estimate of remaining response activity costs has been recorded, CMS Energy cannot predict the ultimate financial impact or outcome of this matter.
Equatorial Guinea Tax Claim: In 2004, CMS Energy received a request for indemnification from the purchaser of CMS Oil and Gas. The indemnity claim relates to the sale of CMS Energy's oil, gas, and methanol projects in Equatorial Guinea and the claim of the government of Equatorial Guinea that CMS Energy owes $142 million in taxes in connection with that sale. CMS Energy concluded that the government's tax claim is without merit and the purchaser of CMS Oil and Gas submitted a response to the government rejecting the claim. The government of Equatorial Guinea indicated in 2008 that it still intends to pursue its claim. CMS Energy cannot predict the financial impact or outcome of this matter.
Consumers' Electric Utility Contingencies
Electric Environmental Matters: Consumers' operations are subject to environmental laws and regulations. Historically, Consumers has generally been able to recover, in customer rates, the costs to operate its facilities in compliance with these laws and regulations.
Cleanup and Solid Waste: Consumers expects to incur remediation and other response activity costs at a number of sites under NREPA. Consumers believes that these costs should be recoverable in rates, but cannot guarantee that outcome. At June 30, 2011, Consumers had a recorded liability of $2 million, its estimated probable NREPA liability.
Consumers is a potentially responsible party at a number of contaminated sites administered under the Superfund. Superfund liability is joint and several. In addition to Consumers, many other creditworthy parties with substantial assets are potentially responsible with respect to the individual sites. In November 2010, Consumers received official notification from the EPA that identified Consumers as a potentially responsible party at the Kalamazoo River Superfund site. The notification claimed that the EPA has reason to believe Consumers disposed of PCBs and arranged for the disposal and treatment of PCB-containing materials at portions of the site. Consumers responded to the EPA in December 2010, stating that it has no information showing that it disposed of PCBs or arranged for disposal or treatment of PCB-containing material at portions of the site and requesting further information from the EPA before Consumers would commit to perform or finance cleanup activities at the site. In April 2011, Consumers received a follow-up letter from the EPA requesting that Consumers, as a potentially responsible party at the Kalamazoo River Superfund site, agree to participate in a removal action plan along with several other companies. The letter also indicated that under Sections 106 and 107 of Superfund, Consumers may be liable for reimbursement of the EPA's costs and potential penalties for noncompliance with any unilateral order that the EPA may issue requiring performance under the removal action plan. The EPA has provided limited information regarding Consumers' potential responsibility for contamination at the site and has not yet given an indication of the share of any cleanup costs for which Consumers could be held responsible. Consumers continues to investigate the EPA's claim that it disposed of PCBs or arranged for disposal or treatment of PCB-containing material at portions of the site. Until further information is received from the EPA, Consumers is unable to estimate a range of potential liability for cleanup of the river.
Based on its experience, Consumers estimates that its share of the total liability for other known Superfund sites will be between $2 million and $8 million. Various factors, including the number of potentially responsible parties involved with each site, affect Consumers' share of the total liability. At June 30, 2011, Consumers had a recorded liability of $2 million for its share of the total liability at these sites, the minimum amount in the range of its estimated probable Superfund liability.
The timing of payments related to Consumers' remediation and other response activities at its Superfund and NREPA sites is uncertain. Consumers periodically reviews these cost estimates. Any significant change in the underlying assumptions, such as an increase in the number of sites, different remediation techniques, the nature and extent of contamination, and legal and regulatory requirements, could affect its estimates of NREPA and Superfund liability.
Ludington PCB: In 1998, during routine maintenance activities, Consumers identified PCB as a component in certain paint, grout, and sealant materials at Ludington. Consumers removed and replaced part of the PCB material with non-PCB material. Since proposing a plan to take action with respect to the remaining materials, Consumers has had several communications with the EPA. Consumers is not able to predict when the EPA will issue a final ruling and cannot predict the financial impact or outcome of this matter.
Electric Utility Plant Air Permit Issues and Notices of Violation: In 2007, Consumers received an NOV/FOV from the EPA alleging that fourteen utility boilers exceeded the visible emission limits in their associated air permits. Consumers has responded formally to the NOV/FOV denying the allegations. In addition, in 2008, Consumers received an NOV for three of its coal-fueled facilities alleging, among other things, violations of NSR PSD regulations relating to ten projects from 1986 to 1998 allegedly subject to review under the NSR. The EPA has alleged that some utilities have classified incorrectly major plant modifications as RMRR rather than seeking permits from the EPA or state regulatory agencies to modify their plants. Consumers responded to the information requests from the EPA on this subject in the past. Consumers believes that it has properly interpreted the requirements of RMRR.
Consumers is engaged in discussions with the EPA on all of these matters. Depending upon the outcome of these discussions, the EPA could bring legal action against Consumers and/or Consumers could be required to install additional pollution control equipment at some or all of its coal-fueled electric generating plants, surrender emission allowances, engage in Supplemental Environmental Projects, and/or pay fines. Additionally, Consumers would need to assess the viability of continuing operations at certain plants. The potential costs relating to these matters could be material and the extent of cost recovery cannot be reasonably estimated. Although Consumers cannot predict the financial impact or outcome of these matters, Consumers expects that it would be able to recover some or all of the costs in rates, consistent with the recovery of other reasonable costs of complying with environmental laws and regulations.
Nuclear Matters: The matters discussed in this section relate to Consumers' previously owned nuclear generating plants.
At June 30, 2011, Consumers had a recorded liability of $163 million to the DOE to fund the disposal of spent nuclear fuel used before 1983. This balance comprised the principal amount of $44 million collected from customers for spent nuclear fuel disposal fees and $119 million of interest accrued on those collections. The liability, which was classified in long-term debt on CMS Energy's and Consumers' consolidated balance sheets, was to be paid to the DOE when it began to accept delivery of spent nuclear fuel. In conjunction with the sale of Palisades and the Big Rock ISFSI in 2007, Consumers retained this obligation and provided a letter of credit to Entergy as security for this obligation.
In 1997, a U.S. Court of Appeals decision confirmed that the DOE was to begin accepting deliveries of spent nuclear fuel for disposal by January 1998. Subsequent U.S. Court of Appeals litigation, in which Consumers and other utilities participated, has not been successful in producing more specific relief for the DOE's failure to accept the spent nuclear fuel. A number of court decisions support the right of utilities to pursue damage claims in the U.S. Court of Claims against the DOE for failure to take delivery of spent nuclear fuel. Consumers filed a complaint in 2002.
In July 2011, Consumers entered into an agreement with the DOE to settle its claims for $120 million. As part of this agreement, Consumers settled its $163 million liability to the DOE. Consumers will request that the MPSC determine the regulatory treatment of the $120 million settlement. In this filing, Consumers will propose that $85 million of the settlement should represent the recovery of its regulatory asset related to nuclear fuel storage costs at Big Rock. Certain other costs related to spent nuclear fuel were recovered from customers through rates, and the MPSC may determine that those amounts should be refunded to customers. If the MPSC concludes that Consumers may retain a portion of the settlement, Consumers will recognize that amount in earnings.
In its November 2010 electric rate order, the MPSC directed Consumers to establish, within six months of the date of the order, an independent trust fund for the amount payable to the DOE. Subsequent rate orders extended this six-month deadline. Following its settlement with the DOE, Consumers petitioned the MPSC to relieve it of the obligation to fund the trust.
As a result of the DOE settlement, Consumers may, under the terms of the purchase and sale agreement with Entergy, request termination of the letter of credit.
Consumers' Gas Utility Contingencies
Gas Environmental Matters: Consumers expects to incur remediation and other response activity costs at a number of sites under the NREPA. These sites include 23 former MGP facilities. Consumers operated the facilities on these sites for some part of their operating lives. For some of these sites, Consumers has no present ownership interest or may own only a portion of the original site. At June 30, 2011, Consumers estimated its undiscounted remaining remediation and other response activity costs to be between $28 million and $43 million. Generally, Consumers has been able to recover most of its costs to date through proceeds from insurance settlements and customer rates.
At June 30, 2011, Consumers had a recorded liability of $28 million and a regulatory asset of $55 million that included $27 million of deferred MGP expenditures. The timing of payments related to the remediation and other response activity at Consumers' former MGP sites is uncertain. Consumers expects its remediation and other response activity costs to average $6 million annually over the next five years. Consumers periodically reviews these cost estimates. Any significant change in the underlying assumptions, such as an increase in the number of sites, changes in remediation techniques, or legal and regulatory requirements, could affect Consumers' estimates of annual response activity costs and the MGP liability.
Guarantees
Presented in the following table are CMS Energy's guarantees at June 30, 2011:
                                 
In Millions  
    Issue     Expiration     Maximum     Carrying  
Guarantee Description   Date     Date     Obligation     Amount  
 
Indemnity obligations from asset sales and other agreements
  Various     Various through June 2022     $ 512 1   $ 21  
Guarantees and put options2
  Various     Various through March 2021       33       1  
 
At June 30, 2011, the maximum obligation and carrying amounts for Consumers' guarantees were less than $1 million.
Presented in the following table is additional information regarding CMS Energy's guarantees:
         
 
Guarantee Description   How Guarantee Arose   Events That Would Require Performance
 
Indemnity obligations from asset sales and other agreements
  Stock and asset sale agreements   Findings of misrepresentation, breach of warranties, tax claims, and other specific events or circumstances
 
Guarantees and put options
  Normal operating activity   Nonperformance or non-payment by a subsidiary under a related contract
 
Guarantees and put options
  Bay Harbor remediation efforts   Owners exercising put options requiring CMS Land to purchase property
 
CMS Energy, Consumers, and certain other subsidiaries of CMS Energy also enter into various agreements containing tax and other indemnity provisions for which they are unable to estimate the maximum potential obligation. These factors include unspecified exposure under certain agreements. CMS Energy and Consumers consider the likelihood that they would be required to perform or incur substantial losses related to these indemnities to be remote.
Other Contingencies
Michigan Single Business Tax: The State of Michigan is finalizing its audit of CMS Energy's and Consumers' combined Michigan single business tax returns for 2004 through 2007. The outcome of this audit could impact CMS Energy's and Consumers' net income. CMS Energy and Consumers are unable to estimate any potential earnings impact.
Other: In addition to the matters disclosed in this note and Note 4, Regulatory Matters, there are certain other lawsuits and administrative proceedings before various courts and governmental agencies arising in the ordinary course of business to which CMS Energy, Consumers, and certain other subsidiaries of CMS Energy are parties. These other lawsuits and proceedings may involve personal injury, property damage, contracts, environmental matters, federal and state taxes, rates, licensing, employment, and other matters. Further, CMS Energy and Consumers occasionally self-report certain regulatory non-compliance matters that may or may not eventually result in administrative proceedings. CMS Energy and Consumers believe that the outcome of any one of these proceedings will not have a material adverse effect on their consolidated results of operations, financial condition, or liquidity.
Consumers Energy Company [Member]
 
Contingencies and Commitments
3: CONTINGENCIES AND COMMITMENTS
CMS Energy and Consumers are involved in various matters that give rise to contingent liabilities. Depending on the specific issues, the resolution of these contingencies could have a material effect on CMS Energy's and Consumers' liquidity, financial condition, and results of operations. In their disclosures of these matters, CMS Energy and Consumers provide an estimate of the possible loss or range of loss when such an estimate can be made. Disclosures that state that CMS Energy or Consumers cannot predict the outcome of a matter indicate that they are unable to estimate a possible loss or range of loss for the matter.
CMS Energy Contingencies
Gas Index Price Reporting Investigation: In 2002, CMS Energy notified appropriate regulatory and governmental agencies that some employees at CMS MST and CMS Field Services appeared to have provided inaccurate information regarding natural gas trades to various energy industry publications which compile and report index prices. CMS Energy cooperated with an investigation by the DOJ regarding this matter. Although CMS Energy has not received any formal notification that the DOJ has completed its investigation, the DOJ's last request for information occurred in 2003, and CMS Energy completed its response to this request in 2004. CMS Energy is unable to predict the outcome of the DOJ investigation and what effect, if any, the investigation will have on CMS Energy.
Gas Index Price Reporting Litigation: CMS Energy, along with CMS MST, CMS Field Services, Cantera Natural Gas, Inc., and Cantera Gas Company, are named as defendants in various lawsuits arising as a result of alleged inaccurate natural gas price reporting to publications that report trade information. Allegations include manipulation of NYMEX natural gas futures and options prices, price-fixing conspiracies, restraint of trade, and artificial inflation of natural gas retail prices in Colorado, Kansas, Missouri, and Wisconsin. The following provides more detail on these proceedings:
    In 2005, CMS Energy, CMS MST, and CMS Field Services were named as defendants in a putative class action filed in Kansas state court, Learjet, Inc., et al. v. Oneok, Inc., et al. The complaint alleges that the defendants engaged in a scheme to violate the Kansas Restraint of Trade Act. The plaintiffs are seeking statutory full consideration damages consisting of the full consideration paid by plaintiffs for natural gas allegedly purchased from defendants.
    In 2007, a class action complaint, Heartland Regional Medical Center, et al. v. Oneok, Inc. et al., was filed in Missouri state court alleging violations of Missouri antitrust laws. Defendants, including CMS Energy, CMS Field Services, and CMS MST, are alleged to have violated the Missouri antitrust laws.
    Breckenridge Brewery of Colorado, LLC and BBD Acquisition Co. v. Oneok, Inc., et al., a class action complaint brought on behalf of retail direct purchasers of natural gas in Colorado, was filed in Colorado state court in 2006. Defendants, including CMS Energy, CMS Field Services, and CMS MST, are alleged to have violated the Colorado Antitrust Act of 1992. Plaintiffs are seeking full refund damages.
    A class action complaint, Arandell Corp., et al. v. XCEL Energy Inc., et al., was filed in 2006 in Wisconsin state court on behalf of Wisconsin commercial entities. The defendants, including CMS Energy, CMS ERM, and Cantera Gas Company, are alleged to have violated Wisconsin's antitrust statute. The plaintiffs are seeking full consideration damages, plus exemplary damages and attorneys' fees. After dismissal on jurisdictional grounds in 2009, plaintiffs filed a new complaint in the U.S. District Court for the Eastern District of Michigan. In 2010, the MDL judge issued an opinion and order granting the CMS Energy defendants' motion to dismiss the Michigan complaint on statute-of-limitations grounds and all CMS Energy defendants have been dismissed from the Arandell (Michigan) action.
    Another class action complaint, Newpage Wisconsin System v. CMS ERM, et al., was filed in 2009 in circuit court in Wood County, Wisconsin, against CMS Energy, CMS ERM, Cantera Gas Company, and others. The plaintiff is seeking full consideration damages, treble damages, costs, interest, and attorneys' fees.
    In 2005, J.P. Morgan Trust Company, in its capacity as Trustee of the FLI Liquidating Trust, filed an action in Kansas state court against CMS Energy, CMS MST, CMS Field Services, and others. The complaint alleges various claims under the Kansas Restraint of Trade Act. The plaintiff is
      seeking statutory full consideration damages for its purchases of natural gas in 2000 and 2001.
After removal to federal court, all of the cases described above were transferred to the MDL. CMS Energy was dismissed from the Learjet, Heartland, and J.P. Morgan cases in 2009, but other CMS Energy defendants remained parties. All CMS Energy defendants were dismissed from the Breckenridge case in 2009. In 2010, CMS Energy and Cantera Gas Company were dismissed from the Newpage case and the Arandell (Wisconsin) case was reinstated against CMS ERM. In July 2011, all claims against remaining CMS Energy defendants in the MDL cases were dismissed based on FERC preemption. Appeals are possible.
These cases involve complex facts, a large number of similarly situated defendants with different factual positions, and multiple jurisdictions. Presently, any estimate of liability would be highly speculative; the amount of CMS Energy's possible loss would be based on widely varying models previously untested in this context. If the outcome after appeals is unfavorable, these cases could have a material adverse impact on CMS Energy's liquidity, financial condition, and results of operations.
Bay Harbor: As part of the development of Bay Harbor by certain subsidiaries of CMS Energy, and under an agreement with the MDEQ, third parties constructed a golf course and park over several abandoned CKD piles left over from the former cement plant operations on the Bay Harbor site. The third parties also undertook a series of response activities, including constructing a leachate collection system in one area where CKD-impacted groundwater was entering Little Traverse Bay. Leachate is produced when water enters into the CKD piles. In 2002, CMS Energy sold its interest in Bay Harbor, but retained its obligations under environmental indemnities entered into at the start of the project.
In 2005, the EPA, along with CMS Land and CMS Capital, voluntarily executed an Administrative Order on Consent under Superfund, and the EPA approved a Removal Action Work Plan to address contamination issues. Collection systems required under the plan have been installed and effectiveness monitoring of the systems at the shoreline is ongoing. CMS Land, CMS Capital, and the EPA agreed upon augmentation measures to address areas where pH measurements were not satisfactory. Several augmentation measures were implemented and completed in 2009, with the remaining measure completed in 2010.
In May 2011, CMS Energy received approval from the EPA on a revised scope of remedies that CMS Energy had submitted in December 2010. CMS Energy is presently in negotiations with the MDEQ to finalize an agreement that will identify the remaining final remedies at the site. In December 2010, the MDEQ issued an NPDES permit that authorizes CMS Land to discharge treated leachate into Little Traverse Bay. This permit requires renewal every five years. Additionally, CMS Land has committed to investigate the potential for a deep injection well on the Bay Harbor site as an alternative long-term solution to the leachate disposal issue. In 2008, the MDEQ and the EPA granted permits for CMS Land or its wholly owned subsidiary, Beeland Group LLC, to construct and operate an off-site deep injection well in Antrim County, Michigan, to dispose of leachate from Bay Harbor. Certain environmental groups, a local township, and a local county filed lawsuits appealing the permits. The legal proceeding was stayed in 2009 and can be renewed by either party at any time.
Various claims have been brought against CMS Land or its affiliates, including CMS Energy, alleging environmental damage to property, loss of property value, insufficient disclosure of environmental matters, breach of agreement relating to access, or other matters. In October 2010, CMS Land and other parties received a demand for payment from the EPA in the amount of $7 million, plus interest, whereby the EPA is seeking recovery, as allowed under Superfund, of the EPA's response costs incurred at the Bay Harbor site. CMS Land believes that this is not a valid claim and intends to dispute it.
CMS Land and CMS Capital, the MDEQ, the EPA, and other parties continue to negotiate the long-term remedy for the Bay Harbor site, including:
    the disposal of leachate;
    the capping and excavation of CKD;
    the location and design of collection lines and upstream water diversion systems;
    application of criteria for various substances such as mercury; and
    other matters that are likely to affect the scope of response activities that CMS Land and CMS Capital may be obligated to undertake.
CMS Energy has recorded a cumulative charge related to Bay Harbor of $223 million, which includes accretion expense. At June 30, 2011, CMS Energy had a recorded liability of $88 million for its remaining obligations. CMS Energy calculated this liability based on discounted projected costs, using a discount rate of 4.34 percent and an inflation rate of one percent on annual operating and maintenance costs. CMS Energy based the discount rate on the interest rate for 30-year U.S. Treasury securities at December 31, 2010. The undiscounted amount of the remaining obligation is $109 million. CMS Energy expects to pay $16 million during the remainder of 2011, $16 million in 2012, $7 million in 2013, $5 million in 2014, $4 million in 2015, and the remaining amount thereafter on long-term liquid disposal and operating and maintenance costs.
CMS Energy's estimate of response activity costs and the timing of expenditures could change if there are additional major changes in circumstances or assumptions, including but not limited to:
    inability to complete the present long-term water disposal strategy at a reasonable cost;
    delays in implementing the present long-term water disposal strategy;
    requirements to alter the present long-term water disposal strategy upon expiration of the NPDES permit if the MDEQ or EPA identify a more suitable alternative;
    an increase in the number of contamination areas;
    different remediation techniques;
    the nature and extent of contamination;
    inability to reach agreement with the MDEQ or the EPA over additional response activities;
    delays in the receipt of requested permits;
    delays following the receipt of any requested permits due to legal appeals of third parties;
    additional or new legal or regulatory requirements; or
    new or different landowner claims.
Depending on the size of any indemnity obligation or liability under environmental laws, an adverse outcome of this matter could have a material adverse effect on CMS Energy's liquidity and financial condition and could negatively affect CMS Energy's financial results. Although a liability for its present estimate of remaining response activity costs has been recorded, CMS Energy cannot predict the ultimate financial impact or outcome of this matter.
Equatorial Guinea Tax Claim: In 2004, CMS Energy received a request for indemnification from the purchaser of CMS Oil and Gas. The indemnity claim relates to the sale of CMS Energy's oil, gas, and methanol projects in Equatorial Guinea and the claim of the government of Equatorial Guinea that CMS Energy owes $142 million in taxes in connection with that sale. CMS Energy concluded that the government's tax claim is without merit and the purchaser of CMS Oil and Gas submitted a response to the government rejecting the claim. The government of Equatorial Guinea indicated in 2008 that it still intends to pursue its claim. CMS Energy cannot predict the financial impact or outcome of this matter.
Consumers' Electric Utility Contingencies
Electric Environmental Matters: Consumers' operations are subject to environmental laws and regulations. Historically, Consumers has generally been able to recover, in customer rates, the costs to operate its facilities in compliance with these laws and regulations.
Cleanup and Solid Waste: Consumers expects to incur remediation and other response activity costs at a number of sites under NREPA. Consumers believes that these costs should be recoverable in rates, but cannot guarantee that outcome. At June 30, 2011, Consumers had a recorded liability of $2 million, its estimated probable NREPA liability.
Consumers is a potentially responsible party at a number of contaminated sites administered under the Superfund. Superfund liability is joint and several. In addition to Consumers, many other creditworthy parties with substantial assets are potentially responsible with respect to the individual sites. In November 2010, Consumers received official notification from the EPA that identified Consumers as a potentially responsible party at the Kalamazoo River Superfund site. The notification claimed that the EPA has reason to believe Consumers disposed of PCBs and arranged for the disposal and treatment of PCB-containing materials at portions of the site. Consumers responded to the EPA in December 2010, stating that it has no information showing that it disposed of PCBs or arranged for disposal or treatment of PCB-containing material at portions of the site and requesting further information from the EPA before Consumers would commit to perform or finance cleanup activities at the site. In April 2011, Consumers received a follow-up letter from the EPA requesting that Consumers, as a potentially responsible party at the Kalamazoo River Superfund site, agree to participate in a removal action plan along with several other companies. The letter also indicated that under Sections 106 and 107 of Superfund, Consumers may be liable for reimbursement of the EPA's costs and potential penalties for noncompliance with any unilateral order that the EPA may issue requiring performance under the removal action plan. The EPA has provided limited information regarding Consumers' potential responsibility for contamination at the site and has not yet given an indication of the share of any cleanup costs for which Consumers could be held responsible. Consumers continues to investigate the EPA's claim that it disposed of PCBs or arranged for disposal or treatment of PCB-containing material at portions of the site. Until further information is received from the EPA, Consumers is unable to estimate a range of potential liability for cleanup of the river.
Based on its experience, Consumers estimates that its share of the total liability for other known Superfund sites will be between $2 million and $8 million. Various factors, including the number of potentially responsible parties involved with each site, affect Consumers' share of the total liability. At June 30, 2011, Consumers had a recorded liability of $2 million for its share of the total liability at these sites, the minimum amount in the range of its estimated probable Superfund liability.
The timing of payments related to Consumers' remediation and other response activities at its Superfund and NREPA sites is uncertain. Consumers periodically reviews these cost estimates. Any significant change in the underlying assumptions, such as an increase in the number of sites, different remediation techniques, the nature and extent of contamination, and legal and regulatory requirements, could affect its estimates of NREPA and Superfund liability.
Ludington PCB: In 1998, during routine maintenance activities, Consumers identified PCB as a component in certain paint, grout, and sealant materials at Ludington. Consumers removed and replaced part of the PCB material with non-PCB material. Since proposing a plan to take action with respect to the remaining materials, Consumers has had several communications with the EPA. Consumers is not able to predict when the EPA will issue a final ruling and cannot predict the financial impact or outcome of this matter.
Electric Utility Plant Air Permit Issues and Notices of Violation: In 2007, Consumers received an NOV/FOV from the EPA alleging that fourteen utility boilers exceeded the visible emission limits in their associated air permits. Consumers has responded formally to the NOV/FOV denying the allegations. In addition, in 2008, Consumers received an NOV for three of its coal-fueled facilities alleging, among other things, violations of NSR PSD regulations relating to ten projects from 1986 to 1998 allegedly subject to review under the NSR. The EPA has alleged that some utilities have classified incorrectly major plant modifications as RMRR rather than seeking permits from the EPA or state regulatory agencies to modify their plants. Consumers responded to the information requests from the EPA on this subject in the past. Consumers believes that it has properly interpreted the requirements of RMRR.
Consumers is engaged in discussions with the EPA on all of these matters. Depending upon the outcome of these discussions, the EPA could bring legal action against Consumers and/or Consumers could be required to install additional pollution control equipment at some or all of its coal-fueled electric generating plants, surrender emission allowances, engage in Supplemental Environmental Projects, and/or pay fines. Additionally, Consumers would need to assess the viability of continuing operations at certain plants. The potential costs relating to these matters could be material and the extent of cost recovery cannot be reasonably estimated. Although Consumers cannot predict the financial impact or outcome of these matters, Consumers expects that it would be able to recover some or all of the costs in rates, consistent with the recovery of other reasonable costs of complying with environmental laws and regulations.
Nuclear Matters: The matters discussed in this section relate to Consumers' previously owned nuclear generating plants.
At June 30, 2011, Consumers had a recorded liability of $163 million to the DOE to fund the disposal of spent nuclear fuel used before 1983. This balance comprised the principal amount of $44 million collected from customers for spent nuclear fuel disposal fees and $119 million of interest accrued on those collections. The liability, which was classified in long-term debt on CMS Energy's and Consumers' consolidated balance sheets, was to be paid to the DOE when it began to accept delivery of spent nuclear fuel. In conjunction with the sale of Palisades and the Big Rock ISFSI in 2007, Consumers retained this obligation and provided a letter of credit to Entergy as security for this obligation.
In 1997, a U.S. Court of Appeals decision confirmed that the DOE was to begin accepting deliveries of spent nuclear fuel for disposal by January 1998. Subsequent U.S. Court of Appeals litigation, in which Consumers and other utilities participated, has not been successful in producing more specific relief for the DOE's failure to accept the spent nuclear fuel. A number of court decisions support the right of utilities to pursue damage claims in the U.S. Court of Claims against the DOE for failure to take delivery of spent nuclear fuel. Consumers filed a complaint in 2002.
In July 2011, Consumers entered into an agreement with the DOE to settle its claims for $120 million. As part of this agreement, Consumers settled its $163 million liability to the DOE. Consumers will request that the MPSC determine the regulatory treatment of the $120 million settlement. In this filing, Consumers will propose that $85 million of the settlement should represent the recovery of its regulatory asset related to nuclear fuel storage costs at Big Rock. Certain other costs related to spent nuclear fuel were recovered from customers through rates, and the MPSC may determine that those amounts should be refunded to customers. If the MPSC concludes that Consumers may retain a portion of the settlement, Consumers will recognize that amount in earnings.
In its November 2010 electric rate order, the MPSC directed Consumers to establish, within six months of the date of the order, an independent trust fund for the amount payable to the DOE. Subsequent rate orders extended this six-month deadline. Following its settlement with the DOE, Consumers petitioned the MPSC to relieve it of the obligation to fund the trust.
As a result of the DOE settlement, Consumers may, under the terms of the purchase and sale agreement with Entergy, request termination of the letter of credit.
Consumers' Gas Utility Contingencies
Gas Environmental Matters: Consumers expects to incur remediation and other response activity costs at a number of sites under the NREPA. These sites include 23 former MGP facilities. Consumers operated the facilities on these sites for some part of their operating lives. For some of these sites, Consumers has no present ownership interest or may own only a portion of the original site. At June 30, 2011, Consumers estimated its undiscounted remaining remediation and other response activity costs to be between $28 million and $43 million. Generally, Consumers has been able to recover most of its costs to date through proceeds from insurance settlements and customer rates.
At June 30, 2011, Consumers had a recorded liability of $28 million and a regulatory asset of $55 million that included $27 million of deferred MGP expenditures. The timing of payments related to the remediation and other response activity at Consumers' former MGP sites is uncertain. Consumers expects its remediation and other response activity costs to average $6 million annually over the next five years. Consumers periodically reviews these cost estimates. Any significant change in the underlying assumptions, such as an increase in the number of sites, changes in remediation techniques, or legal and regulatory requirements, could affect Consumers' estimates of annual response activity costs and the MGP liability.
Guarantees
Presented in the following table are CMS Energy's guarantees at June 30, 2011:
                                 
In Millions  
    Issue     Expiration     Maximum     Carrying  
Guarantee Description   Date     Date     Obligation     Amount  
 
Indemnity obligations from asset sales and other agreements
  Various     Various through June 2022     $ 512 1   $ 21  
Guarantees and put options2
  Various     Various through March 2021       33       1  
 
1   The majority of this amount arises from stock and asset sale agreements under which CMS Energy or a subsidiary of CMS Energy, other than Consumers, indemnified the purchaser for losses resulting from various matters, including claims related to tax disputes, claims related to PPAs, and defects in title to the assets or stock sold to the purchaser by CMS Energy subsidiaries. Except for items described elsewhere in this note, CMS Energy believes the likelihood of material loss to be remote for the indemnity obligations not recorded as liabilities.
 
2   At June 30, 2011, the carrying amount of CMS Land's put option agreements with certain Bay Harbor property owners was $1 million. If CMS Land is required to purchase a Bay Harbor property under a put option agreement, it may sell the property to recover the amount paid under the put option agreement.
At June 30, 2011, the maximum obligation and carrying amounts for Consumers' guarantees were less than $1 million.
Presented in the following table is additional information regarding CMS Energy's guarantees:
         
 
Guarantee Description   How Guarantee Arose   Events That Would Require Performance
 
Indemnity obligations from asset sales and other agreements
  Stock and asset sale agreements   Findings of misrepresentation, breach of warranties, tax claims, and other specific events or circumstances
 
Guarantees and put options
  Normal operating activity   Nonperformance or non-payment by a subsidiary under a related contract
 
Guarantees and put options
  Bay Harbor remediation efforts   Owners exercising put options requiring CMS Land to purchase property
 
CMS Energy, Consumers, and certain other subsidiaries of CMS Energy also enter into various agreements containing tax and other indemnity provisions for which they are unable to estimate the maximum potential obligation. These factors include unspecified exposure under certain agreements. CMS Energy and Consumers consider the likelihood that they would be required to perform or incur substantial losses related to these indemnities to be remote.
Other Contingencies
Michigan Single Business Tax: The State of Michigan is finalizing its audit of CMS Energy's and Consumers' combined Michigan single business tax returns for 2004 through 2007. The outcome of this audit could impact CMS Energy's and Consumers' net income. CMS Energy and Consumers are unable to estimate any potential earnings impact.
Other: In addition to the matters disclosed in this note and Note 4, Regulatory Matters, there are certain other lawsuits and administrative proceedings before various courts and governmental agencies arising in the ordinary course of business to which CMS Energy, Consumers, and certain other subsidiaries of CMS Energy are parties. These other lawsuits and proceedings may involve personal injury, property damage, contracts, environmental matters, federal and state taxes, rates, licensing, employment, and other matters. Further, CMS Energy and Consumers occasionally self-report certain regulatory non-compliance matters that may or may not eventually result in administrative proceedings. CMS Energy and Consumers believe that the outcome of any one of these proceedings will not have a material adverse effect on their consolidated results of operations, financial condition, or liquidity.