XML 52 R20.htm IDEA: XBRL DOCUMENT v3.24.0.1
Contingencies and Commitments
12 Months Ended
Dec. 31, 2023
Other Commitments [Line Items]  
Contingencies and Commitments Contingencies and Commitments
CMS Energy and Consumers are involved in various matters that give rise to contingent liabilities. Depending on the specific issues, the resolution of these contingencies could negatively affect CMS Energy’s and Consumers’ liquidity, financial condition, and results of operations. In their disclosures of these matters, CMS Energy and Consumers provide an estimate of the possible loss or range of loss when such an estimate can be made. Disclosures stating that CMS Energy or Consumers cannot predict the outcome of a matter indicate that they are unable to estimate a possible loss or range of loss for the matter.
CMS Energy Contingencies
Bay Harbor: CMS Land retained environmental remediation obligations for the collection and treatment of leachate at Bay Harbor after selling its interests in the development in 2002. Leachate is produced when water enters into cement kiln dust piles left over from former cement plant operations at the site. In 2012, CMS Land and EGLE finalized an agreement establishing the final remedies and the future water quality criteria at the site. CMS Land completed all construction necessary to implement the remedies required by the agreement and will continue to maintain and operate a system to discharge treated leachate into Little Traverse Bay under an NPDES permit, which is valid through 2025.
At December 31, 2023, CMS Energy had a recorded liability of $45 million for its remaining obligations for environmental remediation. CMS Energy calculated this liability based on discounted projected costs, using a discount rate of 4.34 percent and an inflation rate of one percent on annual operating and
maintenance costs. The undiscounted amount of the remaining obligation is $57 million. CMS Energy expects to pay the following amounts for long-term leachate disposal and operating and maintenance costs in each of the next five years:
In Millions
20242025202620272028
CMS Energy
Long-term leachate disposal and operating and maintenance costs$$$$$
CMS Energy’s estimate of response activity costs and the timing of expenditures could change if there are changes in circumstances or assumptions used in calculating the liability. Although a liability for its present estimate of remaining response activity costs has been recorded, CMS Energy cannot predict the ultimate financial impact or outcome of this matter.
Consumers Electric Utility Contingencies
Electric Environmental Matters: Consumers’ operations are subject to environmental laws and regulations. Historically, Consumers has generally been able to recover, in customer rates, the costs to operate its facilities in compliance with these laws and regulations.
Cleanup and Solid Waste: Consumers expects to incur remediation and other response activity costs at a number of sites under NREPA. Consumers believes that these costs should be recoverable in rates, but cannot guarantee that outcome. Consumers estimates its liability for NREPA sites for which it can estimate a range of loss to be between $2 million and $4 million. At December 31, 2023, Consumers had a recorded liability of $2 million, the minimum amount in the range of its estimated probable NREPA liability, as no amount in the range was considered a better estimate than any other amount.
Consumers is a potentially responsible party at a number of contaminated sites administered under CERCLA. CERCLA liability is joint and several. In 2010, Consumers received official notification from the EPA that identified Consumers as a potentially responsible party for cleanup of PCBs at the Kalamazoo River CERCLA site. The notification claimed that the EPA had reason to believe that Consumers disposed of PCBs and arranged for the disposal and treatment of PCB-containing materials at portions of the site. In 2011, Consumers received a follow-up letter from the EPA requesting that Consumers agree to participate in a removal action plan along with several other companies for an area of lower Portage Creek, which is connected to the Kalamazoo River. All parties asked to participate in the removal action plan, including Consumers, declined to accept liability. Until further information is received from the EPA, Consumers is unable to estimate a range of potential liability for cleanup of the river.
Based on its experience, Consumers estimates its share of the total liability for known CERCLA sites to be between $3 million and $8 million. Various factors, including the number and creditworthiness of potentially responsible parties involved with each site, affect Consumers’ share of the total liability. At December 31, 2023, Consumers had a recorded liability of $3 million for its share of the total liability at these sites, the minimum amount in the range of its estimated probable CERCLA liability, as no amount in the range was considered a better estimate than any other amount.
The timing of payments related to Consumers’ remediation and other response activities at its CERCLA and NREPA sites is uncertain. Consumers periodically reviews these cost estimates. A change in the underlying assumptions, such as an increase in the number of sites, different remediation techniques, the
nature and extent of contamination, and legal and regulatory requirements, could affect its estimates of NREPA and CERCLA liability.
Ludington Overhaul Contract Dispute: Consumers and DTE Electric, co-owners of Ludington, are parties to a 2010 engineering, procurement, and construction agreement with TAES, under which TAES contracted to perform a major overhaul and upgrade of Ludington. The overhauled Ludington units are operational, but TAES’ work has been defective and nonconforming. Consumers and DTE Electric have demanded that TAES provide a comprehensive plan to resolve those matters, including adherence to its warranty commitments and other contractual obligations. Consumers and DTE Electric have taken extensive efforts to resolve these issues with TAES, including a formal demand to TAES’ parent, Toshiba, under a parent guaranty it provided. TAES has not provided a comprehensive plan or otherwise met its performance obligations.
In order to enforce the contract, Consumers and DTE Electric filed a complaint against TAES and Toshiba in the U.S. District Court for the Eastern District of Michigan in April 2022. In June 2022, TAES and Toshiba filed a motion to dismiss the complaint, along with an answer and counterclaims seeking approximately $15 million in damages related to payments allegedly owed under the parties’ contract. As a co-owner of Ludington, Consumers would be liable for 51 percent of any such damages, if liability and damages were proven. In September 2022, the court denied the motion to dismiss filed by TAES and Toshiba. The parties are engaged in ongoing litigation, including discovery, pursuant to a court-ordered schedule. Consumers believes the counterclaims filed by TAES and Toshiba are without merit, but cannot predict the financial impact or outcome of this matter. An unfavorable outcome could have a material adverse effect on CMS Energy’s and Consumers’ financial condition, results of operations, or liquidity.
Toshiba has announced that, through a common stock purchase, TBJH became the majority shareholder and new parent company of Toshiba. TBJH is a subsidiary of a Japanese private equity firm. Consumers and DTE Electric continue to monitor this development, but do not believe that this affects their rights under the parent guaranty provided by Toshiba.
In May 2023, the MPSC approved Consumers’ and DTE Electric’s jointly-filed request for authority to defer as a regulatory asset the costs associated with repairing or replacing the defective work performed by TAES while the litigation with TAES and Toshiba moves forward; such costs will be offset by potential future litigation proceeds received from TAES or Toshiba. Consumers and DTE Electric will have the opportunity to seek appropriate recovery and ratemaking treatment for amounts recorded as a regulatory asset following resolution of the litigation, but cannot predict the financial impact or outcome of such proceedings.
J.H. Campbell 3 Plant Retirement Contract Dispute: In May 2022, Consumers filed a complaint against Wolverine Power in the Ottawa County Circuit Court and requested a ruling that Consumers has sole authority to decide to retire the J.H. Campbell 3 coal-fueled generating unit under the unit’s Joint Ownership and Operating Agreement. In July 2022, Wolverine Power filed an answer, affirmative defenses, and a counterclaim seeking approximately $37 million in damages allegedly caused by Consumers’ decision to retire the unit before the end of its useful life. In October 2022, the state circuit court judge found that Consumers may, in its sole discretion, retire the J.H. Campbell 3 coal-fueled generating unit, provided that Consumers continues to operate and make necessary improvements to the unit while the litigation concerning Wolverine Power’s claim for damages is pending. In May 2023, the circuit court judge issued an order granting Consumers’ Motion for Clarification confirming that Consumers may continue to operate and invest in J.H. Campbell 3 consistent with the May 2025 retirement date. Consumers believes Wolverine Power’s claim has no merit, but cannot predict the final impact or outcome on this matter. An unfavorable outcome could have a material adverse effect on CMS Energy’s and Consumers’ financial condition, results of operations, or liquidity.
Consumers Gas Utility Contingencies
Gas Environmental Matters: Consumers expects to incur remediation and other response activity costs at a number of sites under NREPA. These sites include 23 former MGP facilities. Consumers operated the facilities on these sites for some part of their operating lives. For some of these sites, Consumers has no present ownership interest or may own only a portion of the original site.
At December 31, 2023, Consumers had a recorded liability of $62 million for its remaining obligations for these sites. Consumers expects to pay the following amounts for remediation and other response activity costs in each of the next five years:
In Millions
20242025202620272028
Consumers
Remediation and other response activity costs$$$$10 $25 
Consumers periodically reviews these cost estimates. Any significant change in the underlying assumptions, such as an increase in the number of sites, changes in remediation techniques, or legal and regulatory requirements, could affect Consumers’ estimates of annual response activity costs and the MGP liability.
Pursuant to orders issued by the MPSC, Consumers defers its MGP-related remediation costs and recovers them from its customers over a ten-year period. At December 31, 2023, Consumers had a regulatory asset of $99 million related to the MGP sites.
Consumers estimates that its liability to perform remediation and other response activities at NREPA sites other than the MGP sites could reach $1 million. At December 31, 2023, Consumers had a recorded liability of less than $1 million, the minimum amount in the range of its estimated probable liability, as no amount in the range was considered a better estimate than any other amount.
Guarantees
Presented in the following table are CMS Energy’s and Consumers’ guarantees at December 31, 2023:
In Millions
Guarantee DescriptionIssue DateExpiration DateMaximum ObligationCarrying Amount
CMS Energy, including Consumers
Indemnity obligations from sale of membership interests in VIEs1
variousindefinite$304 $— 
Indemnity obligations from stock and asset sale agreements2
variousindefinite153 
Guarantee3
2011indefinite30 — 
Consumers
Guarantee3
2011indefinite$30 $— 
1These obligations arose from the sale of membership interests in NWO Holdco, Aviator Wind, and Newport Solar Holdings to tax equity investors. NorthStar Clean Energy provided certain indemnity obligations that protect the tax equity investors against losses incurred as a result of breaches of representations and warranties under the associated limited liability company agreements. These
obligations are generally capped at an amount equal to the tax equity investor’s capital contributions plus a specified return, less any distributions and tax benefits it receives, in connection with its membership interest. For any indemnity obligations related to Aviator Wind, NorthStar Clean Energy would recover 49 percent of any amounts paid to the tax equity investor from the other owner of Aviator Wind Equity Holdings. Additionally, Aviator Wind holds insurance coverage that would partially protect against losses incurred as a result of certain failures to qualify for production tax credits. For further details on NorthStar Clean Energy’s ownership interest in NWO Holdco, Aviator Wind, and Newport Solar Holdings, see Note 18, Variable Interest Entities.
2These obligations arose from stock and asset sale agreements under which CMS Energy or a subsidiary of CMS Energy indemnified the purchaser for losses resulting from various matters, including claims related to taxes. The maximum obligation amount is mostly related to an Equatorial Guinea tax claim.
3This obligation comprises a guarantee provided by Consumers to the U.S. Department of Energy in connection with a settlement agreement regarding damages resulting from the department’s failure to accept spent nuclear fuel from nuclear power plants formerly owned by Consumers.
Additionally, in the normal course of business, CMS Energy, Consumers, and certain other subsidiaries of CMS Energy have entered into various agreements containing tax and other indemnity provisions for which they are unable to estimate the maximum potential obligation. CMS Energy and Consumers consider the likelihood that they would be required to perform or incur substantial losses related to these indemnities and those disclosed in the table to be remote.
Other Contingencies
In addition to the matters disclosed in this Note and Note 2, Regulatory Matters, there are certain other lawsuits and administrative proceedings before various courts and governmental agencies, as well as unasserted claims that may result in such proceedings, arising in the ordinary course of business to which CMS Energy, Consumers, and certain other subsidiaries of CMS Energy are parties. These other lawsuits, proceedings, and unasserted claims may involve personal injury, property damage, contracts, environmental matters, federal and state taxes, rates, licensing, employment, and other matters. Further, CMS Energy and Consumers occasionally self-report certain regulatory non‑compliance matters that may or may not eventually result in administrative proceedings. CMS Energy and Consumers believe that the outcome of any one of these proceedings and potential claims will not have a material negative effect on their consolidated results of operations, financial condition, or liquidity.
Contractual Commitments
Purchase Obligations: Purchase obligations arise from long-term contracts for the purchase of commodities and related services, and construction and service agreements. The commodities and related services include long-term PPAs, natural gas and associated transportation, and coal and associated transportation. Related-party PPAs are between Consumers and certain affiliates of NorthStar Clean
Energy. Presented in the following table are CMS Energy’s and Consumers’ contractual purchase obligations at December 31, 2023 for each of the periods shown:
In Millions
Payments Due
Total20242025202620272028Beyond 2028
CMS Energy, including Consumers
Total PPAs$7,204 $711 $792 $783 $787 $702 $3,429 
Other3,491 1,720 885 301 207 150 228 
Total purchase obligations$10,695 $2,431 $1,677 $1,084 $994 $852 $3,657 
Consumers
PPAs
MCV PPA$2,506 $342 $402 $416 $410 $371 $565 
Related-party PPAs206 60 44 30 31 14 27 
Other PPAs4,492 309 346 337 346 317 2,837 
Total PPAs$7,204 $711 $792 $783 $787 $702 $3,429 
Other2,802 1,615 648 266 168 82 23 
Total purchase obligations$10,006 $2,326 $1,440 $1,049 $955 $784 $3,452 
MCV PPA: Consumers has a PPA with the MCV Partnership giving Consumers the right to purchase up to 1,240 MW of capacity and energy produced by the MCV Facility through May 2030. The MCV PPA provides for:
a capacity charge of $10.14 per MWh of available capacity through March 2025 and $5.00 per MWh of available capacity from March 2025 through the termination date of the PPA
a fixed energy charge of $6.30 per MWh for on-peak hours and $6.00 for off-peak hours
a variable energy charge based on the MCV Partnership’s cost of production for energy delivered to Consumers
a $5 million annual contribution by the MCV Partnership to a renewable resources program through March 2025
Capacity and energy charges under the MCV PPA were $340 million in 2023, $519 million in 2022, and $348 million in 2021.
Other PPAs: Consumers has PPAs expiring through 2048 with various counterparties. The majority of the PPAs have capacity and energy charges for delivered energy. Capacity and energy charges under these PPAs were $498 million in 2023, $510 million in 2022, and $338 million in 2021. In addition, CMS Energy and Consumers account for several of their PPAs as leases. See Note 8, Leases for more information about CMS Energy’s and Consumers’ lease obligations.
Consumers Energy Company  
Other Commitments [Line Items]  
Contingencies and Commitments Contingencies and Commitments
CMS Energy and Consumers are involved in various matters that give rise to contingent liabilities. Depending on the specific issues, the resolution of these contingencies could negatively affect CMS Energy’s and Consumers’ liquidity, financial condition, and results of operations. In their disclosures of these matters, CMS Energy and Consumers provide an estimate of the possible loss or range of loss when such an estimate can be made. Disclosures stating that CMS Energy or Consumers cannot predict the outcome of a matter indicate that they are unable to estimate a possible loss or range of loss for the matter.
CMS Energy Contingencies
Bay Harbor: CMS Land retained environmental remediation obligations for the collection and treatment of leachate at Bay Harbor after selling its interests in the development in 2002. Leachate is produced when water enters into cement kiln dust piles left over from former cement plant operations at the site. In 2012, CMS Land and EGLE finalized an agreement establishing the final remedies and the future water quality criteria at the site. CMS Land completed all construction necessary to implement the remedies required by the agreement and will continue to maintain and operate a system to discharge treated leachate into Little Traverse Bay under an NPDES permit, which is valid through 2025.
At December 31, 2023, CMS Energy had a recorded liability of $45 million for its remaining obligations for environmental remediation. CMS Energy calculated this liability based on discounted projected costs, using a discount rate of 4.34 percent and an inflation rate of one percent on annual operating and
maintenance costs. The undiscounted amount of the remaining obligation is $57 million. CMS Energy expects to pay the following amounts for long-term leachate disposal and operating and maintenance costs in each of the next five years:
In Millions
20242025202620272028
CMS Energy
Long-term leachate disposal and operating and maintenance costs$$$$$
CMS Energy’s estimate of response activity costs and the timing of expenditures could change if there are changes in circumstances or assumptions used in calculating the liability. Although a liability for its present estimate of remaining response activity costs has been recorded, CMS Energy cannot predict the ultimate financial impact or outcome of this matter.
Consumers Electric Utility Contingencies
Electric Environmental Matters: Consumers’ operations are subject to environmental laws and regulations. Historically, Consumers has generally been able to recover, in customer rates, the costs to operate its facilities in compliance with these laws and regulations.
Cleanup and Solid Waste: Consumers expects to incur remediation and other response activity costs at a number of sites under NREPA. Consumers believes that these costs should be recoverable in rates, but cannot guarantee that outcome. Consumers estimates its liability for NREPA sites for which it can estimate a range of loss to be between $2 million and $4 million. At December 31, 2023, Consumers had a recorded liability of $2 million, the minimum amount in the range of its estimated probable NREPA liability, as no amount in the range was considered a better estimate than any other amount.
Consumers is a potentially responsible party at a number of contaminated sites administered under CERCLA. CERCLA liability is joint and several. In 2010, Consumers received official notification from the EPA that identified Consumers as a potentially responsible party for cleanup of PCBs at the Kalamazoo River CERCLA site. The notification claimed that the EPA had reason to believe that Consumers disposed of PCBs and arranged for the disposal and treatment of PCB-containing materials at portions of the site. In 2011, Consumers received a follow-up letter from the EPA requesting that Consumers agree to participate in a removal action plan along with several other companies for an area of lower Portage Creek, which is connected to the Kalamazoo River. All parties asked to participate in the removal action plan, including Consumers, declined to accept liability. Until further information is received from the EPA, Consumers is unable to estimate a range of potential liability for cleanup of the river.
Based on its experience, Consumers estimates its share of the total liability for known CERCLA sites to be between $3 million and $8 million. Various factors, including the number and creditworthiness of potentially responsible parties involved with each site, affect Consumers’ share of the total liability. At December 31, 2023, Consumers had a recorded liability of $3 million for its share of the total liability at these sites, the minimum amount in the range of its estimated probable CERCLA liability, as no amount in the range was considered a better estimate than any other amount.
The timing of payments related to Consumers’ remediation and other response activities at its CERCLA and NREPA sites is uncertain. Consumers periodically reviews these cost estimates. A change in the underlying assumptions, such as an increase in the number of sites, different remediation techniques, the
nature and extent of contamination, and legal and regulatory requirements, could affect its estimates of NREPA and CERCLA liability.
Ludington Overhaul Contract Dispute: Consumers and DTE Electric, co-owners of Ludington, are parties to a 2010 engineering, procurement, and construction agreement with TAES, under which TAES contracted to perform a major overhaul and upgrade of Ludington. The overhauled Ludington units are operational, but TAES’ work has been defective and nonconforming. Consumers and DTE Electric have demanded that TAES provide a comprehensive plan to resolve those matters, including adherence to its warranty commitments and other contractual obligations. Consumers and DTE Electric have taken extensive efforts to resolve these issues with TAES, including a formal demand to TAES’ parent, Toshiba, under a parent guaranty it provided. TAES has not provided a comprehensive plan or otherwise met its performance obligations.
In order to enforce the contract, Consumers and DTE Electric filed a complaint against TAES and Toshiba in the U.S. District Court for the Eastern District of Michigan in April 2022. In June 2022, TAES and Toshiba filed a motion to dismiss the complaint, along with an answer and counterclaims seeking approximately $15 million in damages related to payments allegedly owed under the parties’ contract. As a co-owner of Ludington, Consumers would be liable for 51 percent of any such damages, if liability and damages were proven. In September 2022, the court denied the motion to dismiss filed by TAES and Toshiba. The parties are engaged in ongoing litigation, including discovery, pursuant to a court-ordered schedule. Consumers believes the counterclaims filed by TAES and Toshiba are without merit, but cannot predict the financial impact or outcome of this matter. An unfavorable outcome could have a material adverse effect on CMS Energy’s and Consumers’ financial condition, results of operations, or liquidity.
Toshiba has announced that, through a common stock purchase, TBJH became the majority shareholder and new parent company of Toshiba. TBJH is a subsidiary of a Japanese private equity firm. Consumers and DTE Electric continue to monitor this development, but do not believe that this affects their rights under the parent guaranty provided by Toshiba.
In May 2023, the MPSC approved Consumers’ and DTE Electric’s jointly-filed request for authority to defer as a regulatory asset the costs associated with repairing or replacing the defective work performed by TAES while the litigation with TAES and Toshiba moves forward; such costs will be offset by potential future litigation proceeds received from TAES or Toshiba. Consumers and DTE Electric will have the opportunity to seek appropriate recovery and ratemaking treatment for amounts recorded as a regulatory asset following resolution of the litigation, but cannot predict the financial impact or outcome of such proceedings.
J.H. Campbell 3 Plant Retirement Contract Dispute: In May 2022, Consumers filed a complaint against Wolverine Power in the Ottawa County Circuit Court and requested a ruling that Consumers has sole authority to decide to retire the J.H. Campbell 3 coal-fueled generating unit under the unit’s Joint Ownership and Operating Agreement. In July 2022, Wolverine Power filed an answer, affirmative defenses, and a counterclaim seeking approximately $37 million in damages allegedly caused by Consumers’ decision to retire the unit before the end of its useful life. In October 2022, the state circuit court judge found that Consumers may, in its sole discretion, retire the J.H. Campbell 3 coal-fueled generating unit, provided that Consumers continues to operate and make necessary improvements to the unit while the litigation concerning Wolverine Power’s claim for damages is pending. In May 2023, the circuit court judge issued an order granting Consumers’ Motion for Clarification confirming that Consumers may continue to operate and invest in J.H. Campbell 3 consistent with the May 2025 retirement date. Consumers believes Wolverine Power’s claim has no merit, but cannot predict the final impact or outcome on this matter. An unfavorable outcome could have a material adverse effect on CMS Energy’s and Consumers’ financial condition, results of operations, or liquidity.
Consumers Gas Utility Contingencies
Gas Environmental Matters: Consumers expects to incur remediation and other response activity costs at a number of sites under NREPA. These sites include 23 former MGP facilities. Consumers operated the facilities on these sites for some part of their operating lives. For some of these sites, Consumers has no present ownership interest or may own only a portion of the original site.
At December 31, 2023, Consumers had a recorded liability of $62 million for its remaining obligations for these sites. Consumers expects to pay the following amounts for remediation and other response activity costs in each of the next five years:
In Millions
20242025202620272028
Consumers
Remediation and other response activity costs$$$$10 $25 
Consumers periodically reviews these cost estimates. Any significant change in the underlying assumptions, such as an increase in the number of sites, changes in remediation techniques, or legal and regulatory requirements, could affect Consumers’ estimates of annual response activity costs and the MGP liability.
Pursuant to orders issued by the MPSC, Consumers defers its MGP-related remediation costs and recovers them from its customers over a ten-year period. At December 31, 2023, Consumers had a regulatory asset of $99 million related to the MGP sites.
Consumers estimates that its liability to perform remediation and other response activities at NREPA sites other than the MGP sites could reach $1 million. At December 31, 2023, Consumers had a recorded liability of less than $1 million, the minimum amount in the range of its estimated probable liability, as no amount in the range was considered a better estimate than any other amount.
Guarantees
Presented in the following table are CMS Energy’s and Consumers’ guarantees at December 31, 2023:
In Millions
Guarantee DescriptionIssue DateExpiration DateMaximum ObligationCarrying Amount
CMS Energy, including Consumers
Indemnity obligations from sale of membership interests in VIEs1
variousindefinite$304 $— 
Indemnity obligations from stock and asset sale agreements2
variousindefinite153 
Guarantee3
2011indefinite30 — 
Consumers
Guarantee3
2011indefinite$30 $— 
1These obligations arose from the sale of membership interests in NWO Holdco, Aviator Wind, and Newport Solar Holdings to tax equity investors. NorthStar Clean Energy provided certain indemnity obligations that protect the tax equity investors against losses incurred as a result of breaches of representations and warranties under the associated limited liability company agreements. These
obligations are generally capped at an amount equal to the tax equity investor’s capital contributions plus a specified return, less any distributions and tax benefits it receives, in connection with its membership interest. For any indemnity obligations related to Aviator Wind, NorthStar Clean Energy would recover 49 percent of any amounts paid to the tax equity investor from the other owner of Aviator Wind Equity Holdings. Additionally, Aviator Wind holds insurance coverage that would partially protect against losses incurred as a result of certain failures to qualify for production tax credits. For further details on NorthStar Clean Energy’s ownership interest in NWO Holdco, Aviator Wind, and Newport Solar Holdings, see Note 18, Variable Interest Entities.
2These obligations arose from stock and asset sale agreements under which CMS Energy or a subsidiary of CMS Energy indemnified the purchaser for losses resulting from various matters, including claims related to taxes. The maximum obligation amount is mostly related to an Equatorial Guinea tax claim.
3This obligation comprises a guarantee provided by Consumers to the U.S. Department of Energy in connection with a settlement agreement regarding damages resulting from the department’s failure to accept spent nuclear fuel from nuclear power plants formerly owned by Consumers.
Additionally, in the normal course of business, CMS Energy, Consumers, and certain other subsidiaries of CMS Energy have entered into various agreements containing tax and other indemnity provisions for which they are unable to estimate the maximum potential obligation. CMS Energy and Consumers consider the likelihood that they would be required to perform or incur substantial losses related to these indemnities and those disclosed in the table to be remote.
Other Contingencies
In addition to the matters disclosed in this Note and Note 2, Regulatory Matters, there are certain other lawsuits and administrative proceedings before various courts and governmental agencies, as well as unasserted claims that may result in such proceedings, arising in the ordinary course of business to which CMS Energy, Consumers, and certain other subsidiaries of CMS Energy are parties. These other lawsuits, proceedings, and unasserted claims may involve personal injury, property damage, contracts, environmental matters, federal and state taxes, rates, licensing, employment, and other matters. Further, CMS Energy and Consumers occasionally self-report certain regulatory non‑compliance matters that may or may not eventually result in administrative proceedings. CMS Energy and Consumers believe that the outcome of any one of these proceedings and potential claims will not have a material negative effect on their consolidated results of operations, financial condition, or liquidity.
Contractual Commitments
Purchase Obligations: Purchase obligations arise from long-term contracts for the purchase of commodities and related services, and construction and service agreements. The commodities and related services include long-term PPAs, natural gas and associated transportation, and coal and associated transportation. Related-party PPAs are between Consumers and certain affiliates of NorthStar Clean
Energy. Presented in the following table are CMS Energy’s and Consumers’ contractual purchase obligations at December 31, 2023 for each of the periods shown:
In Millions
Payments Due
Total20242025202620272028Beyond 2028
CMS Energy, including Consumers
Total PPAs$7,204 $711 $792 $783 $787 $702 $3,429 
Other3,491 1,720 885 301 207 150 228 
Total purchase obligations$10,695 $2,431 $1,677 $1,084 $994 $852 $3,657 
Consumers
PPAs
MCV PPA$2,506 $342 $402 $416 $410 $371 $565 
Related-party PPAs206 60 44 30 31 14 27 
Other PPAs4,492 309 346 337 346 317 2,837 
Total PPAs$7,204 $711 $792 $783 $787 $702 $3,429 
Other2,802 1,615 648 266 168 82 23 
Total purchase obligations$10,006 $2,326 $1,440 $1,049 $955 $784 $3,452 
MCV PPA: Consumers has a PPA with the MCV Partnership giving Consumers the right to purchase up to 1,240 MW of capacity and energy produced by the MCV Facility through May 2030. The MCV PPA provides for:
a capacity charge of $10.14 per MWh of available capacity through March 2025 and $5.00 per MWh of available capacity from March 2025 through the termination date of the PPA
a fixed energy charge of $6.30 per MWh for on-peak hours and $6.00 for off-peak hours
a variable energy charge based on the MCV Partnership’s cost of production for energy delivered to Consumers
a $5 million annual contribution by the MCV Partnership to a renewable resources program through March 2025
Capacity and energy charges under the MCV PPA were $340 million in 2023, $519 million in 2022, and $348 million in 2021.
Other PPAs: Consumers has PPAs expiring through 2048 with various counterparties. The majority of the PPAs have capacity and energy charges for delivered energy. Capacity and energy charges under these PPAs were $498 million in 2023, $510 million in 2022, and $338 million in 2021. In addition, CMS Energy and Consumers account for several of their PPAs as leases. See Note 8, Leases for more information about CMS Energy’s and Consumers’ lease obligations.