EX-99.1 2 exhibit991.htm EXHIBIT 99.1- DIRECT TESTIMONY OF KEITH D. CRUMP exhibit991.htm
 



EXHIBIT 99.1
 
BEFORE THE
 
 

 
 
LOUISIANA PUBLIC SERVICE COMMISSION
 
EX PARTE:
APPLICATION OF CLECO
POWER LLC FOR:
(1) IMPLEMENTATION OF
CHANGES IN RATES
AND FORMULA RATE PLAN
TO BE EFFECTIVE UPON THE
COMMERCIAL OPERATION
DATE OF RODEMACHER
POWER STATION UNIT NO. 3
(RPS-3); (2) FAVORABLE
PUBLIC INTEREST
DETERMINATIONFOR
TRANSMISSION UPGRADES IN
THE ACADIANA LOAD
POCKET; AND (3) RENEWAL
OF TRANSACTION
GUIDELINES APPLICABLE TO
CERTAIN ECONOMY POWER
PURCHASES FROM ACADIA
POWER PARTNERS LLC
 
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
 
 
 
 
 
 
 
 
 
DOCKET NO. U-__________
 
 
 
 

 
DIRECT TESTIMONY
 
OF
 
KEITH DOUGLAS CRUMP
 
ON BEHALF OF
 
CLECO POWER LLC
 
JULY 14, 2008
 


 
 
 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________


EXHIBITS
 
 
EXHIBIT NO.
DESCRIPTION
KDC-1
Energy Sales and Customers
KDC-2
Summary of Unit Data
KDC-3
Estimate of Load Requirements and Sources
KDC-4
Quantified Fuel Savings - RPS-3 vs. Current Cleco System
KDC-5
Henry Hub Gas Daily and Petroleum Coke Monthly Historical $/MMBtu

 

 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-___________


TABLE OF CONTENTS   
          
                                                                                                                                    
         
I. 
 
 
 2
 
II. 
 
                                                           
 3
 
    
 
 12
 
IV. 
 
 
 14
 
V. 
 
 
 16
 
VI. 
 
 
 25
 
 

 


 
ii 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________


 
I.  INTRODUCTION AND BACKGROUND
 
 
Q.
PLEASE STATE YOUR NAME, OCCUPATION AND BUSINESS ADDRESS.
 
A.
My name is Keith Douglas Crump.  I am Vice President, Regulatory, Retail Operations & Resource Planning of Cleco Power LLC (“Cleco Power” or the “Company”).  My office address is 2030 Donahue Ferry Road, Pineville, Louisiana 71360.

Q.
WHAT ARE YOUR RESPONSIBILITIES AS THE VICE PRESIDENT, REGULATORY, RETAIL OPERATIONS & RESOURCE PLANNING?
 
A.
In my capacity as Vice President, Regulatory, Retail Operations & Resource Planning, I am responsible for all regulatory matters, all retail utility transactions, and resource planning to meet our customers’ future demand and energy needs.

Q.
PLEASE DESCRIBE YOUR PROFESSIONAL AND EDUCATIONAL BACKGROUND.
 
A.
Prior to assuming my current responsibilities in March 2007, I served as Treasurer of Cleco Corporation and Cleco Power from May 2005 to March 2007 and Manager of Budgeting, Forecasting and Analytics for Cleco Corporation from October 2002 to May 2005.  In those capacities, I was responsible for initially identifying the need for the capacity that is ultimately to be provided by Rodemacher Power Station Unit 3 (RPS-3).
 
 
 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
 
 
    I have a Bachelor of Science in Civil Engineering from Louisiana Tech University.  I received membership into Chi Epsilon, the Civil Engineering Honor Society. I have also received my Professional Engineering license from the State of Louisiana.

 
II.  PURPOSE OF TESTIMONY

Q.           WHAT IS THE PURPOSE OF YOUR TESTIMONY?
 
A.
My testimony summarizes Cleco Power’s Application for a base rate increase in this proceeding.  In this Application, Cleco Power is requesting that the Louisiana Public Service Commission (LPSC or the “Commission”) approve Cleco Power’s request for a $250.1 million increase to base rates. Cleco Power projects that the requested base rate increase will be substantially offset by a reduction in retail fuel costs of $224.3 million that will result when RPS-3 is placed in service and fully operational. The increase in base rates will be further offset by a $98.0 million cessation of collection of a portion of RPS-3 financing costs and the return of those collections.  The sum of these amounts indicates Cleco Power projects a net reduction in total retail billings of $72.2 million.  The fuel savings listed above do not include any benefits of off system sales from excess power. Should Cleco Power be able to sell excess power, the fuel cost savings will be greater, thereby resulting in a greater net reduction in total billings to our customers. The need for a base rate increase is being driven by a number of factors that will be described in greater detail in the Application and the
 
 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
 
supporting testimony of Cleco Power’s other witnesses.  The primary driver of the requested base rate increase is the impending commercial operation date (COD) of RPS-3.  As previously mentioned, Cleco Power anticipates significant savings of fuel costs once RPS-3 is fully placed in commercial operation.  In my direct testimony, I generally describe the extent to which fuel costs are anticipated to decline.  I will also generally describe Cleco Power’s service territory and electric operations, the history of Cleco Power’s capacity additions, and Cleco Power’s efforts to improve the efficiency with which it provides service.
    Additionally, it should be noted that in Order No. U-28765-A, issued May 12, 2006, in which the Commission granted its certificate of public convenience and necessity for RPS-3, the Commission directed Cleco Power to file a full base rate case 12 months prior to the expected in-service date of RPS-3 (Order No. U-28765-A, ordering paragraph 4 at p. 21).  Based upon the current construction schedule for RPS-3, Cleco Power anticipates that the commercial operation date of RPS-3 may be July 1, 2009, approximately 3 months ahead of the original schedule.  Throughout the construction of RPS-3, Cleco Power has kept the Commission Staff informed of the progress of the RPS-3 project pursuant to the post-certification monitoring plan mandated by the Commission in Order No. U-28765-A (ordering paragraph 9 at p. 22) and further developed collaboratively by Commission Staff and Cleco Power.  The monitoring plan includes both formal, comprehensive quarterly reports as directed specifically by Order No. U-28765-A and internal reports to Cleco Power’s management that provide monthly updates to the quarterly reports.

 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________


Q.
ARE THERE OTHER REASONS CLECO POWER IS REQUESTING A RATE INCREASE?
 
A.
Yes. Cleco Power is requesting a rate increase to cover its current base rate deficit. Cleco Power has not petitioned the Commission for a base rate increase since Dolet Hills began commercial operations in 1986.  By 1988, Cleco Power had lowered its base rates by $11.5 million annually as a result of changes in the federal statutory tax rates.  Cleco Power again lowered its base rates by $3.0 million annually in 1996, and by an additional $2.0 million annually in 1998.  Since that time, the Company has refunded $14.5 million to its customers from 1998 through 2002.  Cleco Power has not had a rate refund resulting from the Rate Stabilization Plan (RSP) since 2002, and has earned below its target return on equity since that time due to increasing cost pressures.  Cleco Power has experienced large cost increases in vegetation management, transportation, staffing, medical costs, property insurance, generation maintenance, materials and supplies, and regulatory compliance.  Additionally, Cleco Power has experienced cost increases resulting from new regulatory compliance requirements, including North American Electric Reliability Corporation (NERC) standards and requirements to comply with the Sarbanes-Oxley Act of 2002 (SOX), as well as more stringent environmental regulation.  These compliance issues affect all electric utilities, but due to Cleco Power’s relatively small size in comparison to multi-jurisdictional electric utilities (including those with operations in Louisiana) they represent a greater percentage of Cleco Power’s operating costs than those of the larger electric utilities. Although Cleco Power has effectively managed its
 
 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
 
costs and avoided base rate increases to its customers, costs have nonetheless continued to escalate, and Cleco Power must now increase its base rates in order to meet its operating and financial obligations.
 
 
Q.
WOULD YOU PROVIDE SOME SPECIFIC EXAMPLES OF THE INCREASES IN OPERATING COSTS TO WHICH YOU ARE REFERRING?
 
A.
Yes.  The Company last earned at or above its target return on equity in 2002. Therefore, many of the examples below compare expense changes over the last several years to expenses in 2002.  Operating costs in a number of categories have increased significantly since 2002. These costs have been absorbed into the earnings shareholders have realized rather than added to revenue requirements for our customers.   For example:
 
·  
Vegetation management - In 2002, the Company spent $3.6 million on vegetation management to keep distribution system reliability performance within the LPSC minimum performance standard.  Since then, Cleco Power has averaged $5.7 million per year on vegetation management between 2002 and 2007.  In 2008, the Company plans to spend $6.2 million on vegetation management.   The increase has been driven by tighter vegetation management cycles to meet the LPSC performance standard and increases in contractor cost.
 
·  
Vehicle fuel costs - Higher fuel costs alone make up most of the $0.9 million increase in vehicle expense from 2002 through 2007.  Gasoline is
 
 
 
 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
 
now in excess of $4.00 per gallon and diesel is now in excess of $4.50 per gallon.  The higher fuel prices are also evident in our transportation costs. The IRS increased its allowable mileage reimbursement for personal vehicles used for company business from $0.36 per mile in 2002 to $0.505 per mile in 2008.
 
·  
Vehicle acquisition costs - Large trucks are costing 25% more today than a couple of years ago because of the increases in metals and labor costs to build the vehicles.  New federal emission standards for 2007 diesel engines have driven up the cost of Cleco Power’s medium duty fleet by 20% in the past two years. Like many utilities, Cleco Power delayed acquisition of some of its fleet in an effort to postpone as long as possible the full effect of the new emissions standards.  In 2008, though, the impact is significant as the Company anticipates a 33% increase in overall vehicle costs, despite a significant reduction in the number of vehicles purchased.  These costs will continue to increase as manufacturers have warned of a 20% increase in steel prices, which will cause 2009 costs to increase substantially.  Further, 2010 brings additional federal emissions standards with an impact predicted to mirror that of 2007.
 
·  
Payroll costs - Payroll increases since 2002 average about 3% annually for employee progressions (due to promotions) and merit increases as the Company has tried to keep pace with market rates for compensation.
 
·  
Generation payroll costs - Excluding new RPS-3 employees, there was an 11% headcount increase during the period 2003 through 2008.  There is an
 
 
 
 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
 
economic benefit in replacing higher cost external contractors with company employees.  In addition, there is the need to provide training and prepare for employee retirements over the next several years.
 
·  
Generation outage costs - Outage costs have escalated dramatically during the past three years. While cost comparisons from outage to outage are inexact due to scope differences from year to year, the general trend is that outage costs have been sharply higher.  From 2005 through 2007, the hourly rates for most external contractors used on outages have increased over 50%.  In addition, costs for raw material commodities, such as steel, aluminum and copper, have increased dramatically.
 
·  
Materials and supplies – Since 2005, the price of many items increased by an average of 30%.  Due to across-the-board price increases, which are likely to continue to rise based on global shortages of copper, core steel and aluminum, transmission and distribution inventory costs will continue to increase.  In addition, costs for distribution transformers will increase by an additional 7% beginning in 2010 due to the new U.S. Department of Energy conservation standards that were promulgated in 10 CFR §431.196(b), which  will become effective January 2010.
 
·  
Financial reporting - The passage of SOX brought additional costs to the Company.  During 2003 and 2004, Cleco Power incurred $1.8 million of incremental external costs to prepare for the first SOX-required audit of internal controls over financial reporting. Annual audit fees have risen by
 
 
 
 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
  
$1.0 million. Additionally, Cleco Support Group LLC now has three full-time personnel dedicated to compliance with SOX.

 
Q.
WHAT HAS CLECO POWER DONE TO MITIGATE COST INCREASES TO ITS CUSTOMERS?
 
A.
While Cleco Power is facing significant cost pressures, the Company has challenged itself to continuously find ways to provide economical service to its customers.  For example, Cleco Power has worked hard to improve the efficiency of its generating fleet so that it is among the most efficient in the nation.  Cleco Power has had an Equivalent Availability Factor, an industry measure of plant performance, higher than the NERC system average for each of the years 2000 through 2006 and expects the same result for 2007.  This results in significant cost savings for Cleco Power’s customers by maximizing our solid fuel fleet in lieu of more expensive purchased power.
Cleco Power has also reduced the energy generated by its gas fleet by 48% from 2000 to 2007.  In doing so, Cleco Power has taken advantage of lower heat rate products from the market without reducing service reliability.  This has also provided Cleco Power’s customers with fuel cost savings. Cleco Power also constructed CLE Pipeline to add additional natural gas suppliers in 1998. This drove the transportation charge down from $0.25/million British thermal units (MMBtu) to $0.105/MMBtu.
Like most businesses, Cleco Power faces increased operating costs, which as noted above, is one reason this base rate increase is necessary.  Cleco Power,
 
 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
however, has sought to control its operating costs in ways that do not compromise service to its customers, which has kept Cleco Power from requesting a base rate increase at an earlier date.  The following examples will serve to demonstrate this effort:
 
·  
In 2005, Cleco Power began a cost-control effort related to the leasing of equipment, developing a strategy that saved close to $0.5 million. That strategy included an out-right purchase of light duty vehicles in 2005, resulting in much more competitive leasing opportunities in 2006. Those new leases included lower interest rates and fixed terms. Additionally, Cleco Power negotiated extended lease terms on vehicles with a history of long-term service.  The Company also negotiated a fixed term on medium duty vehicle leases.
 
·  
In 2006, Cleco Power renegotiated its contract with its vehicle fuel provider, securing a $0.06 per gallon reduction in the commission charge above rack rate price for onsite fuel and a flat $0.005 per gallon discount for retail fuel instead of a percentage increase over the rack rate.
 
·  
In 2008, Cleco Power reduced its vehicle/equipment additions by more than 30% from prior years. The reduction enabled Cleco to minimize the dramatic price increases on medium duty vehicles (20% on the chassis alone) that were the result of changes in federal emissions standards.
 
·  
Insurance premiums on Cleco Power’s all-risk property improved in several areas, and the Company’s property insurance premium has been reduced by $0.4 million, or 14.8%.  The Company has locked this
 
 
 
10 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
 
premium in for two years.  Similar improvements are expected on the Company’s other lines of coverage. 
 
·  
Cleco Power’s Customer Call Center Voice Response Unit system saves the Company about $0.3 million annually.  The automated call handling is equivalent to about six employees answering customer calls.
 
·  
The Company developed computer systems over the last several years to efficiently manage its field operations. The Distribution Work Management system organizes customer and Company requested work in a manner to efficiently and effectively manage its operations and costs, and to meet customer expectations by assigning work to employees based on an optimized route.  Each distribution employee views that day’s work on a mobile data terminal and works from the assigned schedule.
 
·  
The meter reading system determines meter routes in the most efficient and effective read schedule and route.  The routes are constantly updated for the most efficient route with the given number of meter readers.  The Company’s meter reader accuracy averages above 99.9%.  The accuracy contributes to correct bills and manageable workloads in the call center and billing operations.
 
·  
Cleco Power has sought to control increasing medical expenses by reviewing costs and making benefit plan design changes intended to hold costs borne by the customers to normal inflationary levels. Cleco Power has shifted more of its medical cost increases to employees by offering consumer-driven plans. These changes were in coordination with Cleco
 
 
11 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
 
Power’s studies to keep its employee benefits in line with market conditions.
 
 
 
III.  CLECO POWER’S CORPORATE STRUCTURE, SERVICE TERRITORY, AND ELECTRIC OPERATIONS

Q.
PLEASE DESCRIBE CLECO POWER’S CORPORATE STRUCTURE.
 
A.
Cleco Power, a Louisiana limited liability company, is a wholly-owned subsidiary of Cleco Corporation.  Cleco Corporation is a public utility holding company, traded on the New York Stock Exchange (NYSE: CNL).  Cleco Corporation, subject to certain limited exceptions, is exempt from regulation as a public utility holding company pursuant to provisions of the Public Utility Holding Company Act of 2005, which became effective in early 2006.

Q.
PLEASE DESCRIBE, IN GENERAL, CLECO POWER’S SERVICE TERRITORY AND ELECTRIC OPERATIONS.
 
A.
Cleco Power provides retail electric service to approximately 273,000 customers in 23 parishes and 65 incorporated communities in Louisiana, and currently owns and operates seven (7) generating units at four (4) power plants, all located in Louisiana.  Cleco Power’s combined generating capability from these operating plants is 1,359 megawatts (MW).
Cleco Power’s electrical system also includes approximately 1,210 miles of high voltage transmission lines, ranging from 69 kilovolts (KV) to 500 KV,
 
 
 
12 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
and over 11,130 miles of lower voltage distribution lines and related substations. Cleco Power’s electric system has 21 interconnections with two other large investor-owned electric systems. The majority of these interconnections are with the Entergy system.

Q.
PLEASE DESCRIBE THE SIZE OF CLECO POWER’S OPERATIONS.
 
A.
As shown on Exhibit KDC-1, Cleco Power’s average number of retail customers has grown from slightly more than 260,000 in 2003 to approximately 273,000 customers in 2007.  This growth is expected to continue; Cleco Power anticipates that it will provide service to approximately 281,000 customers by the year 2009.  With limited exceptions, Cleco Power anticipates moderate growth among residential, commercial, industrial and public lighting customers.
 
    The number of residential customers, as shown in Exhibit KDC-1, has increased from approximately 222,000 in 2003 to approximately 234,000 in 2007, and is expected to grow to approximately 241,000 in 2009.  The average annual usage per residential customer is expected to increase from 15,379 kilowatt hours per year (kWh/year) in 2007 to 15,413 kWh/year in 2009.  Growth rates in different sectors and time periods are also provided in Exhibit KDC-1.
 

 
13 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________


 
IV.  CLECO POWER’S EXISTING GENERATING CAPACITY

Q.
PLEASE DESCRIBE CLECO POWER’S EXISTING GENERATING UNITS.
 
A.
As previously stated, Cleco Power owns and operates seven (7) generating units at four (4) power plants.  These generating units are: the Dolet Hills Unit; Teche Units 1, 2 and 3; Rodemacher Units 1 and 2; and the Franklin Unit.
The Dolet Hills Unit went into operation in 1986, and has a nameplate capacity of 650 MW, of which Cleco Power owns 50%, or 325 MW, with the remaining 50% being owned by AEP-SWEPCO (40.234%), North Texas Electric Cooperative (5.860%), and Oklahoma Municipal Power Authority (3.906%). The Dolet Hills Unit utilizes lignite, a type of coal mined in DeSoto and Red River parishes, to fire generation.  It is the only plant in Louisiana fueled by lignite.  The lignite reserves are under the control of the plant owners, and we currently estimate the remaining reserves to total approximately 25 million recoverable tons, sufficient to produce energy through 2016.  Cleco Power’s share of Dolet Hills was built to provide sufficient generating capacity to meet Cleco Power’s projected capacity needs without further unit additions until the early to mid 1990’s.
Teche Power Station is located in south Louisiana in the town of Baldwin and sits on approximately 45 acres of land.  Teche Units 1, 2 and 3 are 100% owned by Cleco Power. They were completed in 1953, 1956 and 1971, respectively, and are all fueled by natural gas.  Teche Unit 3 has the flexibility of
 
 
14 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
burning fuel oil as an alternate fuel source. Combined, the three units have a total nameplate capacity of 430 MW, with Teche Unit 3, the largest, producing 359 of the 430 MW.
Rodemacher Power Station is located on a 6,000-acre site in Lena near Boyce, Louisiana. Covering about half of the plant site is Rodemacher Lake, a man-made lake, which serves as a cooling source for the plant's generating units.  Rodemacher Unit 1 is 100% owned by Cleco Power.  It is fueled by natural gas or low-sulfur fuel oil and has a nameplate capacity of 440 MW.  The initial start-up of Rodemacher Unit 1 occurred in 1975. In response to the need to shift from natural gas-fired generation to less costly and more reliable solid fuel, Rodemacher Unit 2, using coal as the primary fuel, went into commercial operation in August 1982. Rodemacher Unit 2 is jointly owned by Cleco Power (30%), Louisiana Energy and Power Authority (20%), and Lafayette Utilities System (50%) and is fueled predominantly by coal from Wyoming. Rodemacher Unit 2 has a nameplate capacity of 523 MW, of which Cleco Power owns 157 MW.
The Franklin Unit is 100% owned by Cleco Power.  It went into commercial operation in 1973 and is a natural gas-fired turbine located in Franklin, Louisiana. The nameplate rating is 7 MW.
The nameplate and rated capacities for each of these units are summarized in Exhibit KDC-2.

 
15 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________


 
V.  RODEMACHER POWER STATION UNIT 3 (RPS-3)

Q.
PLEASE DESCRIBE RPS-3 AND ITS ASSOCIATED OPERATIONS.
 
A.
RPS-3 is a nominal 600 MW generating unit using Circulating Fluidized Bed (CFB) technology, which will use primarily petroleum coke (petcoke), to fire generation. This will be Cleco Power’s first petcoke-fired plant.  Cleco Power proposes to maintain a reserve stockpile of petcoke at the plant sufficient for 90 days of full operation of the unit.
Nitrogen oxide (NOx) emissions are inherently reduced in a CFB combustor because the 'fluidizing' action of the combustion process maintains firing temperatures around 1,600 degrees F, which is below the threshold where most nitrogen oxides form.  In addition, Cleco Power will also install a Selective Non-Catalytic Reduction control device on each CFB boiler. This added technology can reduce NOx by an additional 50% to 70% by injecting aqueous ammonia into the hot flue gas.
The design of the CFB boiler that will be utilized in RPS-3 provides for the removal of more than 90% of sulfur dioxide (SO2) in the combustion process without the necessity of adding post-combustion controls. This is accomplished by injecting a limestone mixture into the boiler, which absorbs the SO2.  Cleco Power will also add a polishing scrubber, which is a post-combustion control. Lime is injected into the scrubber to further decrease SO2.  The use of the CFB technology, with the add-on control of the polishing scrubber, will achieve a total removal of approximately 98% of SO2.
 
 
16 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
The construction and operation of RPS-3 is discussed in comprehensive detail in the Direct Testimony of Cleco Power Witness J. Mark Prevost.
 The Commission, in Order No. U-28765-A issued May 12, 2006, granted its certificate of public convenience and necessity authorizing the construction of RPS-3 at an estimated cost of $1.0 billion. This unit will be 100% owned by Cleco Power LLC.

Q.
WHY WAS RPS-3 SELECTED FOR CONSTRUCTION?
 
A.
Two considerations were predominant in Cleco Power’s decision to select RPS-3 for construction.  The first consideration was simply the need for reliable capacity to meet customer needs.  Cleco Power’s 2004 Integrated Resource Plan (IRP) identified the need for up to 650 MW of capacity beginning in 2006 and up to 1,000 MW of new capacity over the next 10 years.  The IRP also identified that up to 600 MW of the needed capacity was required to be baseload.
Over 70% of Cleco Power’s existing energy supply is directly affected by highly volatile and rapidly increasing natural gas prices.  The IRP recommended increasing Cleco Power’s existing energy supply, indicating that such an increase could be filled with stable-priced solid fuel products.  The need for the stable-priced solid fuel product was a direct effect of the current and forecasted volatility and pricing in the natural gas market.  The IRP also noted that the fuel supply should be reliable and competitively priced.  As a result, the second, and major, consideration in Cleco Power’s decision to select RPS-3 for construction was the promise and customer benefit of more economical power generation.  RPS-3 was
 
 
17 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
selected as part of a portfolio of products in a process that was overseen and certificated by the LPSC.  The selected portfolio included a 4-year purchased power agreement (PPA) for 500 MW; a 1-year PPA for 200 MW; and RPS-3 at 600 MW.
Exhibit KDC-3 compares Cleco Power’s system load requirements to the generation resources that will meet those requirements from 2007 to 2010.  The first full year of commercial operation of RPS-3 will be 2010.  From the exhibit, it can be seen that the capacity from RPS-3 will displace an equivalent amount of short-term, gas-fired PPA and contract sources, thereby resulting in more reliable long-term supply.  The completion of RPS-3 will continue Cleco Power’s strategy of obtaining diversification of its fuel supply to reduce its dependence on volatile natural gas.

Q.
WHY DID CLECO POWER CHOOSE PETCOKE AS THE FUEL FOR RPS-3?
 
A.
The CFB technology was selected because of its economics, because it is one of two clean coal technologies, and because the use of petcoke will diversify Cleco Power’s fuel mix.  Also, petcoke is the leading choice for fuel at RPS-3 because of its availability in the region and the reasonable price to transport petcoke to Rodemacher Power Station.  Cleco Power is able to use existing Louisiana waterways to deliver petcoke from the refineries where it is produced to the plant site.  By using petcoke to fire generation, Cleco Power’s fuel supply will be diversified, substantially reducing Cleco Power's dependence on natural gas, and
 
 
18 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
  adding flexibility to Cleco Power’s generation mix. Aside from the reliability and flexibility of fuel supply, another important reason for selecting petcoke was lower fuel cost.

Q.
HAS CLECO POWER QUANTIFIED THE ANTICIPATED FUEL COST SAVINGS THAT WILL RESULT FROM THE ADDITION OF RPS-3?
 
A.
Yes.  The fuel cost savings calculations are summarized in Exhibit KDC-4.  In that exhibit, I calculate the fuel cost benefit to Cleco Power’s customers assuming that the generation from RPS-3 displaces higher cost natural gas-fired generation that could be expected from Cleco Power’s PPAs.  Using forecasted values for fuel prices, heat rates and capacity factors, the annual anticipated aggregate fuel-cost savings (for both LPSC-jurisdictional and non-LPSC-jurisdictional customers) associated with RPS-3 are approximately $235.0 million in the first full year of operation.
 
    In addition, Cleco Power’s customers will benefit from a fuel source (petcoke) that exhibits less price volatility than the natural gas that it will displace.

Q.
CAN CLECO POWER DEMONSTRATE THIS LATTER BENEFIT?
 
A.
Yes.  See Exhibit KDC-5, which is a graph of the Henry Hub Gas Daily historical natural gas prices in dollars per MMBtu from January 2001 to January 2008, compared to monthly petcoke prices. From that graph, the generally upward trend in natural gas prices can be observed.  However, the more remarkable observation from the graph is the historical volatility of natural gas prices.  Petcoke, like all
 
 
19 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
  energy products, has also shown volatility but, in relation to natural gas, will provide a more stable effect on Cleco Power’s fuel costs. Thus, displacing natural gas with petcoke will not only mitigate rising natural gas prices, but also will guard Cleco Power’s customers against the greater anticipated volatility of natural gas prices.

Q.
HOW MUCH WILL THE ADDITION OF RPS-3 REDUCE CLECO POWER’S RELIANCE ON NATURAL GAS AS A FUEL SOURCE FOR ELECTRICITY GENERATION?
 
A.
The chart below compares Cleco Power’s 2007 capacity supply mix by fuel type to Cleco Power’s 2010 capacity supply mix by fuel type.
 
 
Capacity Supply Mix by Fuel Type
Fuel Type
2007
2010
Lignite
15%
16%
Natural Gas
78%
49%
Coal
7%
7%
Petcoke
0%
28%

As can be seen from these figures, the net impact of the addition of the RPS-3 capacity is to reduce Cleco Power’s reliance on natural gas from 78% of system capacity to just under 50%.  Thus, from and after the commercial operation date of RPS-3, slightly more than one-half of Cleco Power’s system capacity supply will be fired by solid fuels (lignite, coal and petcoke).
 
 
20 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
The chart below shows Cleco Power’s energy fuel mix in 2007 before RPS-3 and in 2010, after RPS-3 is part of the fuel mix.  As is evident from this table, the majority of Cleco Power’s energy will be provided by solid fuels.
 
 
 
Energy Fuel Mix by Fuel Type
Fuel Type
2007
2010
Lignite
18%
24%
Natural Gas
71%
25%
Coal
11%
9%
Petcoke
0%
42%

Q.
IS THIS REDUCED RELIANCE ON NATURAL GAS AS A GENERATING FUEL CONSISTENT WITH OBJECTIVES OR CONCERNS IDENTIFIED BY THE LPSC?
 
A:
Yes.  At Cleco Power’s Technical Conference held May 13, 2004 in connection with Cleco Power’s 2004 RFP, the LPSC Staff stated that it would prefer to see more fuel diversity in the state of Louisiana.  The construction and initiation of service of RPS-3 is consistent with satisfying that objective.
 
 

 
 
21 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________


Q.
WHAT OTHER FINANCIAL CONSIDERATIONS SHOULD THE COMMISSION TAKE INTO ACCOUNT WHEN IT CONSIDERS CLECO POWER’S REQUEST FOR AN INCREASE IN BASE RATES IN CONNECTION WITH THE ANTICIPATED INITIATION OF SERVICE OF RPS-3?
 
A.
The electric utility business is in an unprecedented phase of capital expenditures.  These expenditures come from the need for continued system growth, aging infrastructure, new environmental regulation, new projects to lower or stabilize fuel costs, and potential new renewable portfolio requirements.  This pressure for capital comes at a time when the costs of materials and labor have increased in the last several years, with such increases forecasted to continue in the foreseeable future.  An electric utility’s ability to make these expenditures depends on attracting reasonably-priced capital.  Cleco Power must compete for this capital along with other businesses, including other electric utilities. To successfully attract this capital on favorable terms, Cleco Power needs to have a rate of return that takes into account its specific circumstances and challenges. These circumstances and challenges are described in detail in the Direct Testimonies of Cleco Power’s Witnesses R. Russell Davis and Paul R. Moul.

Q.
ARE THERE ANY OTHER ISSUES THAT CLECO POWER DESIRES TO ADDRESS IN THIS CASE?
 
A.
Yes.  Cleco Power requests that the Commission certify, as in the public interest, a proposed transmission project in the “Acadiana Load Pocket.” This project will
 
 
22 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
  provide much-needed reliability to the Acadiana Load Pocket and also will allow Cleco Power’s Teche units to be dispatched in an economic manner. The foregoing is discussed in detail in the Direct Testimony of Cleco Power Witness Terry John Whitmore.
Cleco Power further requests that the Commission extend the waiver that the Commission first granted in Order No. U-29526, issued July 6, 2006, and extended pursuant to Order No. U-29526- A, issued June 11, 2007. In those Orders, the Commission granted, and extended, respectively, a limited waiver from compliance with the Commission’s rules requiring lower of cost or market pricing and competitive bidding for affiliate transactions, in connection with purchases by Cleco Power of economy and emergency power sourced from the Acadia Power Station. Acadia Power Station is a 1,160 MW electric generating facility located in Eunice, Louisiana, and is owned by Acadia Power Partners LLC (“Acadia”). Acadia is 50% owned by Acadia Power Holdings, which in turn is wholly owned by Cleco Midstream Resources, which in turn is a direct subsidiary of Cleco Corporation.
In Order U-29526, the LPSC required that as part of its approval for Cleco Power to purchase from its Acadia affiliate, Cleco Power was to periodically audit the transactions to make sure they were in compliance with the pricing restrictions expressly imposed on Acadia by the Federal Energy Regulatory Commission (FERC) in its Order 115 FERC 61,394, issued June 30, 2006.  Those restrictions limit the price Acadia can charge as follows:  “ . . . for hours when Acadia makes non-affiliated economy or emergency energy sales, the sales price to Cleco Power
 
 
23 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
shall not exceed the weighted average price of Acadia’s non-affiliate transactions.  If no non-affiliate sales occur during the consecutive hour period that Acadia makes sales to Cleco, the sales to Cleco Power will be set at a price that does not exceed Acadia’s incremental cost plus ten percent.”
In an overall transmission-constrained region, the Acadia Power Station is strategically and critically located in Cleco Power’s control area, and historically has been a reliable source of energy for Cleco Power’s native load, particularly during peak periods. Extension of the waiver will maximize Cleco Power’s opportunities to ensure reliable, reasonably-priced power to serve its native load customers. Cleco Power is requesting that the extension be granted generally in accordance with the terms set forth in (i) the Commission’s Order No. U-29526-A, and (ii) the authorization granted by the Federal Energy Regulatory Commission in Order 115 FERC ¶ 61,394.

Q:
HAS THE ACADIA AUDIT LISTED ABOVE BEEN CONDUCTED?
 
A:
Yes.  Cleco Support Group’s Internal Audit department, which is organizationally removed from Cleco Power, conducted the audit of transactions from June 1, 2007 through December 31, 2007.  That audit report was submitted to the LPSC as required in the Order.  Based on the results of that audit, Cleco Power is in general compliance with the pricing requirements imposed by FERC and the LPSC.  The audit found that for 32 day-ahead transactions, three had been priced slightly above the agreed-upon price limitations.  The total price difference for the three transactions was $767.43.  That difference has been remitted to Cleco Power
 
 
24 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
  and credited to Cleco Power’s fuel expense.  The audit report for the first six months of 2008 is not yet available.  Cleco Power anticipates that it will continue to be in compliance with the LPSC and FERC orders described above.  Cleco Power anticipates beginning an audit of the transactions from January 1, 2008 through June 30, 2008 during the third quarter of 2008.

 
VI.  OVERVIEW OF CLECO POWER’S PRESENTATION OF
 
THIS RATE CASE

Q.
PLEASE DESCRIBE THE REMAINDER OF CLECO POWER’S PRESENTATION OF THIS RATE CASE.
 
A.
In addition to my testimony, the testimonies of eight other Cleco Power witnesses support the Company’s Application.  Cleco Power Witness Paul R. Moul, an outside independent consultant, presents his analysis of the required cost of equity that will enable Cleco Power to attract capital to support its investment needs throughout the rate effective period.  Mr. Moul also discusses Cleco Power’s proposed capital structure for the test year and his recommended overall cost of capital.
Cleco Power Witness R. Russell Davis, Cleco Power’s interim Chief Financial Officer, presents testimony discussing the unique financial challenges facing the electric utility industry in general and facing Cleco Power specifically.
Cleco Power Witness J. Mark Prevost will discuss the construction and operation of RPS-3 and its anticipated in-service date.
 
 
25 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________

 
 
Cleco Power Witness James E. Clement will discuss a history of Cleco Power’s rate proceedings and its Rate Stabilization Plan (RSP), along with succeeding extensions and modifications as ordered by the Commission in Docket No. U-28765, pursuant to the Commission’s Order No. U-28765-A, issued May 12, 2006, and Order No. U-29157, issued April 18, 2006. Mr. Clement will also discuss the benefits of the RSP to customers (including savings).
Cleco Power Witness J. Robert Cleghorn will present Cleco Power’s proposed Formula Rate Plan and proforma base rate expenses and rate base adjustments to the test year. Mr. Cleghorn will also discuss the development of revenue requirements, cost of service study results, and historical and proposed class revenues.
Cleco Power Witness Charles R. Parmelee, an outside independent consultant, will discuss the preparation of Cleco Power’s cost of service study, including functionalization and allocation to the Louisiana retail jurisdiction along with allocation to the rate classes.
Cleco Power Witness Michael R. Schmidt will discuss the Company’s proposed rate designs to collect the Louisiana jurisdictional revenue requirement as proposed by Company Witnesses J. Robert Cleghorn and Charles R. Parmelee.
Cleco Power Witness Terry John Whitmore will discuss the need for the proposed Acadiana Load Pocket transmission project and the public benefit that will result from that project.

 
26 

 
CLECO POWER LLC
DIRECT TESTIMONY OF KEITH DOUGLAS CRUMP
LPSC DOCKET NO. U-____________


Q.
DOES THIS CONCLUDE YOUR TESTIMONY?
 
A.
Yes, at this time.


27