We are involved in legal, tax and regulatory proceedings before various courts, regulatory commissions, and governmental agencies with respect to matters that arise in the ordinary course of business, some of which involve substantial amounts of money. We believe that the final disposition of these proceedings, except as otherwise disclosed in the notes to our financial statements, will not have a material adverse effect on our results of operations, financial position, or liquidity.

Reference is made to Note 1 - Summary of Significant Accounting Policies, Note 2 - Rate and Regulatory Matters, Note 14 - Related Party Transactions, and Note 15 - Commitments and Contingencies under Part II, Item 8 of the Form 10-K. See also Note 1 - Summary of Significant Accounting Policies, Note 2 - Rate and Regulatory Matters, Note 8 - Related Party Transactions and Note 10 - Callaway Nuclear Plant in this report.

Callaway Energy Center

The following table presents insurance coverage at Ameren Missouri’s Callaway energy center at June 30, 2012. The property coverage and the nuclear liability coverage must be renewed on April 1 and January 1, respectively, of each year.

 

Type and Source of Coverage    Maximum Coverages     Maximum Assessments
for Single Incidents
 

Public liability and nuclear worker liability:

    

American Nuclear Insurers

   $ 375      $ -   

Pool participation

     12,219 (a)      118 (b) 
   $ 12,594 (c)    $ 118   

Property damage:

    

Nuclear Electric Insurance Ltd.

   $ 2,750 (d)    $ 23   

Replacement power:

    

Nuclear Electric Insurance Ltd

   $ 490 (e)    $ 9   

Energy Risk Assurance Company

   $ 64 (f)    $ -   

 

(a) Provided through mandatory participation in an industrywide retrospective premium assessment program.
(b) Retrospective premium under Price-Anderson. This is subject to retrospective assessment with respect to a covered loss in excess of $375 million in the event of an incident at any licensed United States commercial reactor, payable at $17.5 million per year.
(c) Limit of liability for each incident under the Price-Anderson liability provisions of the Atomic Energy Act of 1954, as amended. A company could be assessed up to $118 million per incident for each licensed reactor it operates with a maximum of $17.5 million per incident to be paid in a calendar year for each reactor. This limit is subject to change to account for the effects of inflation and changes in the number of licensed reactors.
(d) Provides for $500 million in property damage and decontamination, excess property insurance, and premature decommissioning coverage up to $2.25 billion for losses in excess of the $500 million primary coverage.
(e) Provides the replacement power cost insurance in the event of a prolonged accidental outage at our nuclear energy center. Weekly indemnity up to $4.5 million for 52 weeks, which commences after the first eight weeks of an outage, plus up to $3.6 million per week for a minimum of 71 weeks thereafter for a total not exceeding the policy limit of $490 million.
(f) Provides the replacement power cost insurance in the event of a prolonged accidental outage at our nuclear energy center. The coverage commences after the first 52 weeks of insurance coverage from Nuclear Electric Insurance Ltd. and is for a weekly indemnity of $900,000 for 71 weeks in excess of the $3.6 million per week set forth above. Energy Risk Assurance Company is an affiliate and has reinsured this coverage with third-party insurance companies. See Note 8 - Related Party Transactions for more information on this affiliate transaction.

The Price-Anderson Act is a federal law that limits the liability for claims from an incident involving any licensed United States commercial nuclear power facility. The limit is based on the number of licensed reactors. The limit of liability and the maximum potential annual payments are adjusted at least every five years for inflation to reflect changes in the Consumer Price Index. The five-year inflationary adjustment as prescribed by the most recent Price-Anderson Act renewal was effective October 29, 2008. Owners of a nuclear reactor cover this exposure through a combination of private insurance and mandatory participation in a financial protection pool, as established by Price-Anderson.

Losses resulting from terrorist attacks are covered under Nuclear Electric Insurance Ltd.’s policies, subject to an industrywide aggregate policy limit of $3.24 billion within a 12-month period for coverage for such terrorist acts.

If losses from a nuclear incident at the Callaway energy center exceed the limits of, or are not covered by, insurance, or if coverage is unavailable, Ameren Missouri is at risk for any uninsured losses. If a serious nuclear incident were to occur, it could have a material adverse effect on Ameren’s and Ameren Missouri’s results of operations, financial position, or liquidity.

 

Other Obligations

To supply a portion of the fuel requirements of our generating plants, we have entered into various long-term commitments for the procurement of coal, natural gas, nuclear fuel, and methane gas. We have also entered into various long-term commitments for purchased power and natural gas for distribution. For a complete listing of our obligations and commitments, see Note 15 - Commitments and Contingencies under Part II, Item 8 of the Form 10-K.

Genco’s commitments for the procurement of natural gas have materially increased from amounts previously disclosed as of December 31, 2011. The following table presents our total estimated natural gas commitments at June 30, 2012:

 

      2012      2013      2014      2015      2016      Thereafter      Total  

Ameren

   $     211       $     367       $     241       $     131       $     53       $     132       $     1,135   

Genco

     16         34         3         2         -         -         55   

In the second quarter of 2012, Ameren Illinois used a RFP process, administered by the IPA, to contract capacity and energy products for the period from June 1, 2012, through May 31, 2015. Ameren Illinois contracted to purchase approximately 48,000 MWs of capacity for approximately $15 million during this period. Ameren Illinois contracted to purchase approximately 612,000 megawatthours of energy products for approximately $17 million during this period.

Previously, Ameren Illinois entered into an agreement to purchase approximately 15.5 billion cubic feet of synthetic natural gas annually over a 10-year period beginning in 2016 for its natural gas customers. The agreement was entered into pursuant to an Illinois law, which became effective August 2, 2011. Ameren Illinois’ obligations under the agreement were contingent on the counterparty reaching certain milestones during the project development and the construction of the plant that was to produce the synthetic natural gas. The counterparty failed to meet certain milestones during the second quarter of 2012 and, accordingly, the contract was terminated.

Environmental Matters

We are subject to various environmental laws and regulations enforced by federal, state, and local authorities. From the beginning phases of siting and development to the ongoing operation of existing or new electric generating, transmission and distribution facilities and natural gas storage, transmission and distribution facilities, our activities involve compliance with diverse environmental laws and regulations. These laws and regulations address emissions, impacts to air, land, and water, noise, protected natural and cultural resources (such as wetlands, endangered species and other protected wildlife, and archeological and historical resources), and chemical and waste handling. Complex and lengthy processes are required to obtain approvals, permits, or licenses for new, existing or modified facilities. Additionally, the use and handling of various chemicals or hazardous materials (including wastes) requires release prevention plans and emergency response procedures.

In addition to existing laws and regulations, including the Illinois MPS that applies to our energy centers in Illinois, the EPA is developing numerous new environmental regulations that will have a significant impact on the electric utility industry. These regulations could be particularly burdensome for certain companies, including Ameren, Ameren Missouri and Genco, that operate coal-fired energy centers. Significant new rules proposed or promulgated since the beginning of 2010 include the regulation of greenhouse gas emissions; revised national ambient air quality standards for SO2 and NO2 emissions; the CSAPR, which requires further reductions of SO2 and NOx emissions from power plants; a regulation governing management of CCR and coal ash impoundments; the MATS, which requires reduction of emissions of mercury, toxic metals, and acid gases from power plants; revised NSPS for particulate matter, SO2, and NOx emissions from new sources; and new regulations under the Clean Water Act that could require significant capital expenditures such as new water intake structures or cooling towers at our energy centers. The EPA has proposed CO2 limits for new coal-fired and natural gas-fired combined cycle units and is expected to propose limits for existing units in the future. These new regulations may be litigated, so the timing of their implementation is uncertain, as evidenced by the stay of the CSAPR by the United States Court of Appeals for the District of Columbia on December 30, 2011. Although many details of these future regulations are unknown, the combined effects of the new and proposed environmental regulations may result in significant capital expenditures and/or increased operating costs over the next five to ten years for Ameren, Ameren Missouri and Genco. Actions required to ensure that our facilities and operations are in compliance with environmental laws and regulations could be prohibitively expensive. If they are, these regulations could require us to close or to significantly alter the operation of our energy centers, which could have an adverse effect on our results of operations, financial position, and liquidity, including the impairment of long-lived assets. Failure to comply with environmental laws and regulations might also result in the imposition of fines, penalties, and injunctive measures.

 

The estimates in the table below contain all of the known capital costs to comply with existing environmental regulations and our assessment of the potential impacts of the EPA’s proposed regulation for CCR, the finalized MATS, the stayed CSAPR as currently designed, and the revised national ambient air quality standards for SO2 and NOx emissions as of June 30, 2012. The estimates in the table below assume that CCR will continue to be regarded as nonhazardous. The estimates in the table below do not include the impacts of regulations proposed by the EPA under the Clean Water Act in March 2011 regarding cooling water intake structures as our evaluation of those impacts is ongoing. The estimates shown in the table below could change significantly depending upon a variety of factors including:

 

 

additional or modified federal or state requirements;

 

 

regulation of greenhouse gas emissions;

 

 

whether AER is granted a variance to extend compliance dates for SO2 emission levels contained within the MPS for five years until December 31, 2020;

 

 

new national ambient air quality standards or changes to existing standards for ozone, fine particulates, SO2, and NOx emissions;

 

 

additional rules governing air pollutant transport;

 

 

finalized regulations under the Clean Water Act;

 

 

CCR being classified as hazardous;

 

 

whether the CSAPR is implemented and whether any modifications are made to its existing requirements;

 

 

new technology;

 

 

expected power prices;

 

 

variations in costs of material or labor; and

 

 

alternative compliance strategies or investment decisions.

 

      2012      2013 - 2016      2017 - 2021      Total  

AMO(a)

   $ 55       $ 325         -       $ 400       $ 845         -       $ 1,030       $ 1,225         -       $ 1,485   

Genco

     150         100         -         125         245         -         295         495         -         570   

AERG

     5         20         -         25         80         -         100         105         -         130   

Ameren

   $     210       $     445         -       $     550       $     1,170         -       $   1,425       $   1,825         -       $   2,185   

 

(a) Ameren Missouri’s expenditures are expected to be recoverable from ratepayers.

The decision to make pollution control equipment investments at our Merchant Generation business depends on whether the expected future market price for power reflects the increased cost for environmental compliance. During early 2012, the observable market price for power for delivery in the current year and in future years sharply declined below 2011 levels primarily because of declining natural gas prices, as well as the impact from the stay of the CSAPR. As a result of this sharp decline in the market price for power, as well as uncertain environmental regulations, Genco decelerated the construction of two scrubbers at its Newton energy center. These scrubbers were originally expected to be installed in late 2013 and early 2014. The ultimate installation of these scrubbers, now estimated to occur between 2017 and 2021 in the table above, has been postponed until such time as the incremental investment necessary for completion is justified by visible market conditions. However, Genco will continue to incur capital costs related to the construction of these scrubbers. The table above includes Genco’s estimated costs of approximately $150 million in 2012 and approximately $20 million annually, excluding capitalized interest, from 2013 through 2016 for the construction of the two scrubbers. In addition to Genco’s reduction in estimated capital expenditures, AERG deferred precipitator upgrades at its E.D. Edwards energy center beyond 2016. Based on current environmental rules and regulations, if Merchant Generation and Genco do not complete these environmental upgrades by the beginning of 2015, Merchant Generation and Genco may need to reduce generation output at their energy centers to meet applicable emissions requirements. To achieve flexibility in its efforts to comply with the MPS by 2015, AER filed a request for a variance with the Illinois Pollution Control Board to extend certain compliance dates as discussed in more detail below. If Merchant Generation is not granted a variance to extend compliance dates for SO2 emission levels contained within the MPS, there is significant risk that Merchant Generation will have to mothball two of its unscrubbed coal-fired energy centers beginning in 2015.

The following sections describe the more significant environmental rules that affect or could affect our operations.

Clean Air Act

Both federal and state laws require significant reductions in SO2 and NOx emissions that result from burning fossil fuels. In March 2005, the EPA issued regulations with respect to SO2 and NOx emissions (the CAIR). The CAIR required generating facilities in 28 states, including Missouri and Illinois, and the District of Columbia, to participate in cap-and-trade programs to reduce annual SO2 emissions, annual NOx emissions, and ozone season NOx emissions.

In December 2008, the United States Court of Appeals for the District of Columbia remanded the CAIR to the EPA for further action to remedy the rule’s flaws, but allowed the CAIR’s cap-and-trade programs to remain effective until they are replaced by the EPA. In July 2011, the EPA issued the CSAPR as the CAIR replacement. The CSAPR was to become effective on January 1, 2012, for SO2 and annual NOx reductions and on May 1, 2012, for ozone season NOx reductions. In the CSAPR, the EPA developed federal implementation plans for each state covered by this rule; however, each impacted state can develop its own implementation rule starting as early as 2013. The CSAPR establishes emission allowance budgets for each of the states subject to the regulation, including Missouri and Illinois. With the CSAPR, the EPA abandoned CAIR’s regional approach to cutting emissions and instead set a pollution budget for each of the impacted states based on the EPA’s analysis of each upwind state’s contribution to air quality in downwind states. For Missouri and Illinois, emission reductions were required in two phases beginning in 2012, with further reductions in 2014. With the CSAPR, the EPA adopted a cap-and-trade approach that allows intrastate and limited interstate trading of emission allowances with other sources within the same program, that is, in the SO2 program, in the annual NOx, and in the ozone season NOx program. Multiple legal challenges were filed requesting to have CSAPR partially or entirely vacated and to stay the implementation of the CSAPR while the court considers the challenges. On December 30, 2011, the United States Court of Appeals for the District of Columbia issued a stay of the CSAPR. The stay does not invalidate the rule, but only delays its implementation until a final court ruling is issued. The United States Court of Appeals for the District of Columbia has expedited its consideration of the challenges to the regulation. The ultimate outcome of the challenges to the regulation is uncertain. The court could uphold CSAPR or remand it back to the EPA for partial or entire revision. Until the CSAPR appeal process is concluded, the EPA will continue to administer the CAIR.

In December 2011, the EPA issued the MATS under the Clean Air Act, which require emission reductions for mercury and other hazardous air pollutants, such as acid gases, toxic metals, and particulate matter by setting emission limits equal to the average emissions of the best performing 12% of existing coal and oil-fired electric generating units. Also, the standards require reductions in hydrogen chloride emissions, which were not regulated previously, and they will require continuous monitoring systems that are not currently in place. The MATS do not require a specific control technology to achieve the emission reductions. The MATS will apply to each unit at a coal-fired power plant; however, emission compliance can be averaged for the entire power plant. Compliance is required by April 2015 or, with a case-by-case extension, by April 2016.

Separately, on June 15, 2012, the EPA proposed to make more stringent the national ambient air quality standard for fine particulate matter. Under the proposed standard, the EPA and states would develop control measures designed to reduce the emission of fine particulate matter below required levels. Such measures may or may not apply to power plants. The EPA expects to issue a final standard for fine particulate matter by the end of 2012, which would require each state to achieve compliance with the final standard by 2020. In September 2011, the EPA announced that it was implementing the 2008 national ambient air quality standard for ozone. The EPA is required to revisit this standard for ozone again in 2013. The state of Illinois and the state of Missouri will be required to develop separate attainment plans to comply with the new ambient air quality standards for ozone and fine particulate matter. Ameren, Ameren Missouri and Genco continue to assess the impacts of these new standards.

Ameren Missouri’s current environmental compliance plan for air emissions from its energy centers includes burning ultra-low-sulfur coal and installing new or optimizing existing pollution control equipment. In July 2011, Ameren Missouri contracted to procure significantly higher volumes of lower-sulfur-content coal than Ameren Missouri’s energy centers have historically burned, which will allow Ameren Missouri to eliminate or postpone capital expenditures for pollution control equipment. In 2010, Ameren Missouri completed the installation of two scrubbers at its Sioux energy center to reduce SO2 emissions. Currently, Ameren Missouri’s compliance plan assumes the installation of two scrubbers within its coal-fired fleet during the next 10 years and precipitator upgrades at multiple energy centers. However, Ameren Missouri is currently evaluating its operations and options to determine how to comply with the additional emission reductions required by 2014 under the CSAPR, if ultimately implemented, the MATS, and other recently finalized or proposed EPA regulations.

Genco and AERG expect to install additional, or optimize existing, pollution control equipment, or modify or cease energy center operations to meet new and incremental emission reduction requirements under the MPS, the MATS, and the CSAPR as they become effective. Under the MPS, Illinois generators are required to reduce mercury, SO2, and NOx emissions by 2015. In May 2012, AER filed a request for a variance with the Illinois Pollution Control Board to extend compliance dates for SO2 emission levels contained within the MPS for five years until December 31, 2020. In exchange for delaying compliance with these emission levels through 2020, AER has proposed a plan that restricts its SO2 emissions through 2014 to levels lower than those required by the existing MPS, offsetting any environmental impact from the variance. AER has indicated to the Illinois Pollution Control Board that if a variance is not granted, or power prices do not materially increase, there is a significant risk that the Merchant Generation segment will have to mothball two of its unscrubbed coal-fired energy centers beginning in 2015. AER expects a decision from the Illinois Pollution Control Board by the end of September 2012. To comply with the existing MPS and other air emissions laws and regulations, Genco and AERG are installing equipment designed to reduce their emissions of mercury, NOx, and SO2. Genco and AERG have installed a total of three scrubbers at two energy centers. Two additional scrubbers are being constructed at Genco’s Newton energy center. As discussed above, the timing of the installation of these scrubbers, as well as precipitator upgrades at AERG’s E.D. Edwards energy center, has been delayed. Merchant Generation and Genco will continue to review and adjust their compliance plans in light of evolving outlooks for power and capacity prices, delivered fuel costs, environmental standards and compliance technologies, among other factors.

 

The completion of Ameren’s, Ameren Missouri’s and Genco’s review of recently finalized environmental regulations and compliance measures could result in significant increases in capital expenditures and operating costs. The compliance costs could be prohibitive at some of our energy centers as the expected return from these investments, at current market prices for energy and capacity, might not justify the required capital expenditures or their continued operation, which could result in the impairment of long-lived assets.

Emission Allowances

The Clean Air Act created marketable commodities called emission allowances under the acid rain program, the NOx budget trading program, the CAIR, and the CSAPR. With the CSAPR, the EPA adopted a cap-and-trade approach that allows intrastate and limited interstate trading of emission allowances with other sources within the same program, that is, either the SO2, annual NOx, or ozone season NOx programs. As noted above, on December 30, 2011, the United States Court of Appeals for the District of Columbia issued a stay of the CSAPR. Until the CSAPR appeal process is concluded, the EPA will continue to administer the CAIR, including its allowance program.

Environmental regulations including the CAIR and the CSAPR, the timing of the installation of pollution control equipment, fuel mix, and the level of operations, will have a significant impact on the number of allowances required for ongoing operations. The CAIR uses the acid rain program’s allowances for SO2 emissions and created annual and ozone season NOx allowances. The CSAPR, however, did not rely upon the acid rain program, the NOx budget trading program, or CAIR allowances for its allowance allocation program. Instead, the EPA issued a new type of emissions allowance for each program under the CSAPR. Any unused SO2 allowances, annual NOx allowances, and ozone season NOx allowances issued under CAIR cannot be used for compliance with CSAPR. Ameren, Ameren Missouri and Genco expect to have adequate CAIR allowances for 2012 to avoid needing to make external purchases.

Ameren, Ameren Missouri and Genco are studying their compliance options to identify additional opportunities that may exist for compliance in an economical fashion should the CSAPR become effective as issued. Ameren, Ameren Missouri and Genco may be required to purchase emission allowances, if available, to install new or optimize existing pollution control equipment, to limit generation, or take other actions to achieve compliance with the CSAPR in future phase-in years.

Global Climate Change

State and federal authorities, including the United States Congress, have considered initiatives to limit greenhouse gas emissions and to address global climate change. Potential impacts from any climate change legislation or regulation could vary, depending upon proposed CO2 emission limits, the timing of implementation of those limits, the method of distributing any allowances, the degree to which offsets are allowed and available, and provisions for cost-containment measures, such as a “safety valve” provision that provides a maximum price for emission allowances. As a result of our fuel portfolio, our emissions of greenhouse gases vary among our energy centers, but coal-fired power plants are significant sources of CO2. The enactment of a climate change law could result in a significant rise in household costs, and rates for electricity could rise significantly. The burden could fall particularly hard on electricity consumers and upon the economy in the Midwest because of the region’s reliance on electricity generated by coal-fired power plants. Natural gas emits about half as much CO2 as coal when burned to produce electricity. Therefore, climate change regulation could cause the conversion of coal-fired power plants to natural gas, or the construction of new natural gas plants to replace coal-fired power plants. As a result, economywide shifts to natural gas as a fuel source for electricity generation also could affect the cost of heating for our utility customers and many industrial processes that use natural gas.

In December 2009, the EPA issued its “endangerment finding” under the Clean Air Act, which stated that greenhouse gas emissions, including CO2, endanger human health and welfare and that emissions of greenhouse gases from motor vehicles contribute to that endangerment. In March 2010, the EPA issued a determination that greenhouse gas emissions from stationary sources, such as power plants, would be subject to regulation under the Clean Air Act effective the beginning of 2011. As a result of these actions, we are required to consider the emissions of greenhouse gases in any air permit application.

Recognizing the difficulties presented by regulating at once virtually all emitters of greenhouse gases, the EPA finalized the “Tailoring Rule,” which established new higher thresholds beginning in January 2011, for regulating greenhouse gas emissions from stationary sources, such as power plants. The rule requires any source that already has an operating permit to have greenhouse-gas-specific provisions added to its permits upon renewal. Currently, all Ameren energy centers have operating permits that, when renewed, may be modified to address greenhouse gas emissions. The Tailoring Rule also provides that if projects performed at major sources result in an increase in emissions of greenhouse gases over an applicable annual threshold, such projects could trigger permitting requirements under the NSR programs and the application of best available control technology, if any, to control greenhouse gas emissions. New major sources are also required to obtain such a permit and to install the best available control technology if their greenhouse gas emissions exceed the applicable emissions threshold. The extent to which the Tailoring Rule could have a material impact on our energy centers depends upon how state agencies apply the EPA’s guidelines as to what constitutes the best available control technology for greenhouse gas emissions from power plants and whether physical changes or changes in operations subject to the rule occur at our energy centers. In June 2012, the United States Court of Appeals for the District of Columbia upheld the Tailoring Rule.

Separately, on March 27, 2012, the EPA issued the proposed Carbon Pollution Standard for New Power Plants. This proposed NSPS for greenhouse gas emissions would apply only to new fossil-fuel fired electric energy centers and therefore does not impact any of Ameren’s, Ameren Missouri’s, or Genco’s existing energy centers. Ameren anticipates this proposed rule, if enacted, could make the construction of new coal-fired energy centers in the United States prohibitively expensive. A final rule is expected in 2012. Any federal climate change legislation that is enacted may preempt the EPA’s regulation of greenhouse gas emissions, including the Tailoring Rule and the Carbon Pollution Standard for New Power Plants, particularly as it relates to power plant greenhouse gas emissions.

Future federal and state legislation or regulations that mandate limits on the emission of greenhouse gases would likely result in significant increases in capital expenditures and operating costs, which, in turn, could lead to increased liquidity needs and higher financing costs. Moreover, to the extent Ameren Missouri requests recovery of these costs through rates, its regulators might delay or deny timely recovery of these costs. Excessive costs to comply with future legislation or regulations might force Ameren, Ameren Missouri and Genco as well as other similarly situated electric power generators to close some coal-fired facilities earlier than planned, which could lead to possible impairment of assets and reduced revenues. As a result, mandatory limits could have a material adverse impact on Ameren’s, Ameren Missouri’s, and Genco’s results of operations, financial position, and liquidity.

Recent federal court decisions have considered the application of common law causes of action, such as nuisance, to address damages resulting from global climate change. In March 2012, the United States District Court for the Southern District of Mississippi dismissed the Comer v. Murphy Oil lawsuit, which alleged CO2 emissions from several industrial companies, including Ameren Missouri and Genco, created the atmospheric conditions that intensified Hurricane Katrina, thereby causing property damage. The case has been appealed to the appellate court.

The impact on us of future initiatives related to greenhouse gas emissions and global climate change is unknown. Compliance costs could increase as future federal legislative, federal regulatory, and state-sponsored initiatives to control greenhouse gases continue to progress, making it more likely that some form of greenhouse gas emissions control will eventually be required. Since these initiatives continue to evolve, the impact on our coal-fired energy centers and our customers’ costs is unknown, but could result in significant increases in our capital expenditures and operating costs. The compliance costs could be prohibitive at some of our energy centers as the expected return from these investments, at current market prices for energy and capacity, might not justify the required capital expenditures or their continued operation, which could result in the impairment of long-lived assets.

NSR and Clean Air Litigation

The EPA is engaged in an enforcement initiative to determine whether coal-fired power plants failed to comply with the requirements of the NSR and NSPS provisions under the Clean Air Act when the plants implemented modifications. The EPA’s inquiries focus on whether projects performed at power plants should have triggered various permitting requirements and the installation of pollution control equipment.

Commencing in 2005, Genco received a series of information requests from the EPA pursuant to Section 114(a) of the Clean Air Act. The requests sought detailed operating and maintenance history data with respect to Genco’s Coffeen, Hutsonville, Meredosia, Newton, and Joppa energy centers and AERG’s E.D. Edwards and Duck Creek energy centers. In April and June 2012, the EPA issued additional Section 114(a) requests to Genco regarding projects at its Newton and Joppa energy centers. Genco is in the process of responding to the 2012 information requests. In August 2012, Genco received a Notice of Violation from the EPA alleging violations of permitting requirements and of Title V of the Clean Air Act. The EPA contends that projects performed in 1997, 2006, and 2007 at Genco’s Newton energy center violated federal law. Genco believes its defenses to the allegations described the Notice of Violation are meritorious. Ameren and Genco are unable to predict the outcome of this matter and whether EPA will address this Notice of Violation administratively or through litigation.

Following the issuance of a Notice of Violation, in January 2011, the Department of Justice on behalf of the EPA filed a complaint against Ameren Missouri in the United States District Court for the Eastern District of Missouri. The EPA’s complaint alleges that in performing projects at its Rush Island coal-fired energy center, Ameren Missouri violated provisions of the Clean Air Act and Missouri law. In January 2012, the United States District Court granted, in part, Ameren Missouri’s motion to dismiss various aspects of the EPA’s penalty claims. The EPA’s claims for injunctive relief, including to require the installation of pollution control equipment, remain. At present, the complaint does not include Ameren Missouri’s other coal-fired energy centers, but the EPA has issued Notices of Violation under its NSR enforcement initiative against Ameren Missouri’s Labadie, Meramec, and Sioux coal-fired energy centers. Litigation of this matter could take many years to resolve. Ameren Missouri believes its defenses to the allegations described in the complaint as well as the Notices of Violation are meritorious. Ameren Missouri will defend itself vigorously. However, there can be no assurances that it will be successful in its efforts.

Ultimate resolution of these matters could have a material adverse impact on the future results of operations, financial position, and liquidity of Ameren, Ameren Missouri and Genco. A resolution could result in increased capital expenditures for the installation of pollution control equipment, increased operations and maintenance expenses, and penalties. We are unable to predict the ultimate resolution of these matters or the costs that might be incurred.

Clean Water Act

In March 2011, the EPA announced a proposed rule applicable to cooling water intake structures at existing power plants that have the ability to withdraw more than 2 million gallons of water per day from a body of water and use at least 25 percent of that water exclusively for cooling. Under the proposed rule, affected facilities would be required either to meet mortality limits for aquatic life impinged on the plant’s intake screens or to reduce intake velocity to 0.5 feet per second. The proposed rule also requires plants to meet site-specific entrainment standards or to reduce the cooling water intake flow commensurate with the intake flow of a closed-cycle cooling system. The final rule is scheduled to be issued in July 2013, with compliance expected within eight years thereafter. All coal-fired, nuclear, and combined cycle energy centers at Ameren, Ameren Missouri and Genco with cooling water systems are subject to this proposed rule. The proposed rule did not mandate cooling towers at existing facilities, as other technology options potentially could meet the site-specific standards. Ameren, Ameren Missouri and Genco are currently evaluating the proposed rule, and their assessment of the proposed rule’s impacts is ongoing. Therefore, we cannot predict at this time the capital or operating costs associated with compliance. The proposed rule could have an adverse effect on our results of operations, financial position, and liquidity if its implementation requires the installation of cooling towers at our energy centers.

In September 2009, the EPA announced its plan to revise the effluent guidelines applicable to steam electric generating units under the Clean Water Act. Effluent guidelines are national standards for wastewater discharges to surface water that are based on the effectiveness of available control technology. The EPA is engaged in information collection and analysis activities in support of this rulemaking. It has indicated that it expects to issue a proposed rule in November 2012 and to finalize the rule in April 2014. We are unable at this time to predict the impact of this development.

Remediation

We are involved in a number of remediation actions to clean up hazardous waste sites as required by federal and state law. Such statutes require that responsible parties fund remediation actions regardless of their degree of fault, the legality of original disposal, or the ownership of a disposal site. Ameren Missouri and Ameren Illinois have each been identified by the federal or state governments as a potentially responsible party (PRP) at several contaminated sites. Several of these sites involve facilities that were transferred by our rate-regulated utility operations in Illinois to Genco in May 2000 and to AERG in October 2003. As part of each transfer, Ameren Illinois contractually agreed to indemnify Genco and AERG for remediation costs associated with pre-existing environmental contamination at the transferred sites.

As of June 30, 2012, Ameren and Ameren Illinois owned or were otherwise responsible for 44 former MGP sites in Illinois. These are in various stages of investigation, evaluation, and remediation. Based on current estimated plans, Ameren and Ameren Illinois could substantially conclude remediation efforts at most of these sites by 2015. The ICC permits Ameren Illinois to recover remediation and litigation costs associated with its former MGP sites from its electric and natural gas utility customers through environmental adjustment rate riders. To be recoverable, such costs must be prudently and properly incurred. Costs are subject to annual review by the ICC.

As of June 30, 2012, Ameren and Ameren Missouri own or are otherwise responsible for 10 MGP sites in Missouri and one site in Iowa. Ameren Missouri does not currently have a rate rider mechanism that permits recovery of remediation costs associated with MGP sites from utility customers. Ameren Missouri does not have any retail utility operations in Iowa that would provide a source of recovery of these remediation costs.

The following table presents, as of June 30, 2012, the estimated probable obligation to remediate these MGP sites.

 

      Estimate          
      Low      High      Recorded
   Liability(a)
 

Ameren

   $   102       $   181       $   102   

Ameren Missouri

     3         4         3   

Ameren Illinois

     99         177         99   

 

(a) Recorded liability represents the estimated minimum probable obligations, as no other amount within the range was a better estimate.

 

Ameren Illinois is responsible for the cleanup of a former coal ash landfill in Coffeen, Illinois. As of June 30, 2012, Ameren Illinois estimated that obligation at $0.5 million to $6 million. Ameren Illinois recorded a liability of $0.5 million to represent its estimated minimum obligation for this site, as no other amount within the range was a better estimate. Ameren Illinois is also responsible for the cleanup of a landfill, underground storage tanks, and a water treatment plant in Illinois. As of June 30, 2012, Ameren Illinois recorded a liability of $0.8 million to represent its estimate of the obligation for these sites.

Ameren Missouri has responsibility for the investigation and potential cleanup of two waste sites in Missouri as a result of federal agency mandates. One of the cleanup sites is a former coal tar distillery located in St. Louis, Missouri. In 2008, the EPA issued an administrative order to Ameren Missouri pertaining to this distillery operated by Koppers Company or its predecessor and successor companies. Ameren Missouri is the current owner of the site, but Ameren Missouri did not conduct any of the manufacturing operations involving coal tar or its byproducts. Ameren Missouri, along with two other PRPs, is currently performing a site investigation. As of June 30, 2012, Ameren Missouri estimated its obligation at $2 million to $5 million. Ameren Missouri recorded a liability of $2 million to represent its estimated minimum obligation, as no other amount within the range was a better estimate. Ameren Missouri’s other active federal agency-mandated cleanup site in Missouri is a site in Cape Girardeau. Ameren Missouri was a customer of an electrical equipment repair and disposal company that previously operated a facility at this site. A trust was established in the early 1990s by several businesses and governmental agencies to fund the cleanup of this site, which was completed in 2005. Ameren Missouri anticipates this trust fund will be sufficient to complete the remaining adjacent off-site cleanup and therefore has no recorded liability at June 30, 2012, related to this site.

Ameren Missouri also has a federal agency mandate to complete a site investigation for a site in Illinois. In 2000, the EPA notified Ameren Missouri and numerous other companies, including Solutia, that former landfills and lagoons in Sauget, Illinois, may contain soil and groundwater contamination. These sites are known as Sauget Area 2. From about 1926 until 1976, Ameren Missouri operated an energy center adjacent to Sauget Area 2. Ameren Missouri currently owns a parcel of property that was once used as a landfill. Under the terms of an Administrative Order on Consent, Ameren Missouri has joined with other PRPs to evaluate the extent of potential contamination with respect to Sauget Area 2.

The Sauget Area 2 investigations overseen by the EPA have been completed. The results have been submitted to the EPA, and a record of decision is expected in 2012. Once the EPA has selected a remedy, if any, it would begin negotiations with various PRPs regarding implementation. Over the last several years, numerous other parties have joined the PRP group. In addition, Pharmacia Corporation and Monsanto Company have agreed to assume the liabilities related to Solutia’s former chemical waste landfill in the Sauget Area 2. As of June 30, 2012, Ameren Missouri estimated its obligation at $0.3 million to $10 million. Ameren Missouri recorded a liability of $0.3 million to represent its estimated minimum obligation, as no other amount within the range was a better estimate.

Our operations or those of our predecessor companies involve the use of, disposal of, and in appropriate circumstances, the cleanup of substances regulated under environmental protection laws. We are unable to determine whether such practices will result in future environmental commitments or affect our results of operations, financial position, or liquidity.

Ash Management

There has been activity at both state and federal levels regarding additional regulation of ash pond facilities and CCR. In May 2010, the EPA announced proposed new regulations regarding the regulatory framework for the management and disposal of CCR, which could affect future disposal and handling costs at our energy centers. Those proposed regulations include two options for managing CCRs under either solid or hazardous waste regulations, but either alternative would allow for some continued beneficial uses, such as recycling of CCR without classifying it as waste. As part of its proposal, the EPA is considering alternative regulatory approaches that require coal-fired power plants either to close surface impoundments, such as ash ponds, or to retrofit such facilities with liners. Existing impoundments and landfills used for the disposal of CCR would be subject to groundwater monitoring requirements and requirements related to closure and postclosure care under the proposed regulations. Additionally, in January 2010, EPA announced its intent to develop regulations establishing financial responsibility requirements for the electric generation industry, among other industries, and it specifically discussed CCR as a reason for developing the new requirements. Ameren, Ameren Missouri and Genco are currently evaluating all of the proposed regulations to determine whether current management of CCR, including beneficial reuse, and the use of the ash ponds should be altered. Ameren, Ameren Missouri and Genco also are evaluating the potential costs associated with compliance with the proposed regulation of CCR impoundments and landfills, which could be material, if such regulations are adopted.

Pumped-storage Hydroelectric Facility Breach

In December 2005, there was a breach of the upper reservoir at Ameren Missouri’s Taum Sauk pumped-storage hydroelectric energy center. This resulted in significant flooding in the local area, which damaged a state park. The rebuilt Taum Sauk energy center became fully operational in April 2010.

Ameren Missouri included certain capitalized costs associated with enhancements, or costs that would have been incurred absent the breach, at the rebuilt Taum Sauk energy center not recovered from property insurers in an electric rate case filing. However, in its July 2011 rate order, the MoPSC disallowed all of these capitalized costs associated with the rebuilding of the Taum Sauk energy center. See Note 2 - Rate and Regulatory Matters for additional information about the appeal of the MoPSC’s July 2011 electric rate order.

Ameren Missouri had liability insurance coverage for the Taum Sauk incident, subject to certain limits and deductibles. As of June 30, 2012, Ameren Missouri had an insurance receivable balance subject to liability coverage of $68 million.

In June 2010, Ameren Missouri sued an insurance company that was providing Ameren Missouri with liability coverage on the date of the Taum Sauk incident. In the litigation, filed in the United States District Court for the Eastern District of Missouri, Ameren Missouri claimed the insurance company breached its duty to indemnify Ameren Missouri for the losses experienced from the incident. In January 2011, the court ruled that the parties must first pursue alternative dispute resolution under the terms of their coverage agreement. In February 2011, Ameren Missouri filed an appeal of the January ruling with the United States Court of Appeals for the Eighth Circuit, seeking the ability to pursue resolution of this dispute outside of a dispute resolution process under the terms of its coverage agreement. The United States Court of Appeals is expected to issue a decision during 2012. Separately, in April 2012, Ameren Missouri sued a different insurance company that was providing Ameren Missouri with liability coverage on the date of the Taum Sauk incident. In the April 2012 litigation, which is pending in the U.S. District Court for the Eastern District of Missouri, Ameren Missouri claimed the insurance company breached its duty to indemnify Ameren Missouri for the losses experienced from the incident.

Until Ameren’s remaining liability insurance claims and the related litigation are resolved, we are unable to determine the total impact the breach could have on Ameren’s and Ameren Missouri’s results of operations, financial position, and liquidity beyond those amounts already recognized.

Asbestos-related Litigation

Ameren, Ameren Missouri, Ameren Illinois and EEI have been named, along with numerous other parties, in a number of lawsuits filed by plaintiffs claiming varying degrees of injury from asbestos exposure. Most have been filed in the Circuit Court of Madison County, Illinois. The total number of defendants named in each case varies, with as many as 272 parties named in some pending cases and as few as two in others. In the cases pending as of June 30, 2012, the average number of parties was 79.

The claims filed against Ameren, Ameren Missouri and Ameren Illinois allege injury from asbestos exposure during the plaintiffs’ activities at our present or former electric generating plants. Certain former Ameren Illinois energy centers are now owned by either Genco or AERG. As a part of the transfer of energy center ownership in 2000 and 2003, Ameren Illinois contractually agreed to indemnify Genco and AERG, respectively, for liabilities associated with asbestos-related claims arising from activities prior to each transfer. Each lawsuit seeks unspecified damages that, if awarded at trial, typically would be shared among the various defendants.

The following table presents the pending asbestos-related lawsuits filed against the Ameren Companies as of June 30, 2012:

 

Ameren   

Ameren

Missouri

  

Ameren 

llinois

   Genco   Total(a)
4    69    91    (b)   115

 

(a) Total does not equal the sum of the subsidiary unit lawsuits because some of the lawsuits name multiple Ameren entities as defendants.
(b) As of June 30, 2012, eight asbestos-related lawsuits were pending against EEI. The general liability insurance maintained by EEI provides coverage with respect to liabilities arising from asbestos-related claims.

At June 30, 2012, Ameren, Ameren Missouri, Ameren Illinois and Genco had liabilities of $21 million, $8 million, $13 million, and $- million, respectively, recorded to represent their estimate of their obligations related to asbestos claims.

Ameren Illinois has a tariff rider which permits recovery from customers within IP’s historical service territory of asbestos-related litigation claims that occurred within IP’s historical service territory. The rider can recover the costs of asbestos-related litigation claims, subject to the following terms: 90% of cash expenditures in excess of the amount included in base electric rates are to be recovered from a trust fund that was established when Ameren acquired IP. At June 30, 2012, the trust fund balance was $23 million, including accumulated interest. If cash expenditures are less than the amount in base rates, Ameren Illinois will contribute 90% of the difference to the trust fund. Once the trust fund is depleted, 90% of allowed cash expenditures in excess of base rates will be recovered through charges assessed to customers under the tariff rider.

Illinois Sales and Use Tax Exemptions and Credits

In Exelon Corporation v. Department of Revenue, the Illinois Supreme Court decided in 2009 that electricity is tangible personal property for purposes of the Illinois income tax investment credit. In March 2010, the United States Supreme Court refused to hear an appeal of the case, and the decision became final. During the second quarter of 2010, Genco, including EEI, and AERG began claiming Illinois sales and use tax exemptions and credits for purchase transactions related to their generation operations. The primary basis for those claims is that the determination in the Exelon case that electricity is tangible personal property applies to sales and use tax manufacturing exemptions and credits. On November 2, 2011, EEI received a notice of proposed tax liability, documenting the state of Illinois’ position that EEI did not qualify for the manufacturing exemption it used during 2010. EEI is challenging the state of Illinois’ position. In December 2011, EEI filed a request for review by the Informal Conference Board of the Illinois Department of Revenue. Ameren and Genco do not believe that it is probable that the state of Illinois will prevail and therefore have not recorded a charge to earnings for the loss contingency. From the second quarter of 2010 through December 31, 2011, Ameren and Genco claimed manufacturing exemptions and credits of $27 million and $19 million, respectively, which represents the maximum potential tax liability to Ameren and Genco.

Genco, including EEI, and AERG do not anticipate utilizing any additional manufacturing exemptions or credits in 2012, pending discussions with the Illinois Department of Revenue, and therefore will pay use tax on the applicable purchases. Each company, however, is reserving the right to apply for applicable refunds at a later date.

Ameren Energy Generating Company [Member]
 
Commitments And Contingencies

NOTE 9 - COMMITMENTS AND CONTINGENCIES

We are involved in legal, tax and regulatory proceedings before various courts, regulatory commissions, and governmental agencies with respect to matters that arise in the ordinary course of business, some of which involve substantial amounts of money. We believe that the final disposition of these proceedings, except as otherwise disclosed in the notes to our financial statements, will not have a material adverse effect on our results of operations, financial position, or liquidity.

Reference is made to Note 1 - Summary of Significant Accounting Policies, Note 2 - Rate and Regulatory Matters, Note 14 - Related Party Transactions, and Note 15 - Commitments and Contingencies under Part II, Item 8 of the Form 10-K. See also Note 1 - Summary of Significant Accounting Policies, Note 2 - Rate and Regulatory Matters, Note 8 - Related Party Transactions and Note 10 - Callaway Nuclear Plant in this report.

Callaway Energy Center

The following table presents insurance coverage at Ameren Missouri’s Callaway energy center at June 30, 2012. The property coverage and the nuclear liability coverage must be renewed on April 1 and January 1, respectively, of each year.

 

Type and Source of Coverage    Maximum Coverages     Maximum Assessments
for Single Incidents
 

Public liability and nuclear worker liability:

    

American Nuclear Insurers

   $ 375      $ -   

Pool participation

     12,219 (a)      118 (b) 
   $ 12,594 (c)    $ 118   

Property damage:

    

Nuclear Electric Insurance Ltd.

   $ 2,750 (d)    $ 23   

Replacement power:

    

Nuclear Electric Insurance Ltd

   $ 490 (e)    $ 9   

Energy Risk Assurance Company

   $ 64 (f)    $ -   

 

(a) Provided through mandatory participation in an industrywide retrospective premium assessment program.
(b) Retrospective premium under Price-Anderson. This is subject to retrospective assessment with respect to a covered loss in excess of $375 million in the event of an incident at any licensed United States commercial reactor, payable at $17.5 million per year.
(c) Limit of liability for each incident under the Price-Anderson liability provisions of the Atomic Energy Act of 1954, as amended. A company could be assessed up to $118 million per incident for each licensed reactor it operates with a maximum of $17.5 million per incident to be paid in a calendar year for each reactor. This limit is subject to change to account for the effects of inflation and changes in the number of licensed reactors.
(d) Provides for $500 million in property damage and decontamination, excess property insurance, and premature decommissioning coverage up to $2.25 billion for losses in excess of the $500 million primary coverage.
(e) Provides the replacement power cost insurance in the event of a prolonged accidental outage at our nuclear energy center. Weekly indemnity up to $4.5 million for 52 weeks, which commences after the first eight weeks of an outage, plus up to $3.6 million per week for a minimum of 71 weeks thereafter for a total not exceeding the policy limit of $490 million.
(f) Provides the replacement power cost insurance in the event of a prolonged accidental outage at our nuclear energy center. The coverage commences after the first 52 weeks of insurance coverage from Nuclear Electric Insurance Ltd. and is for a weekly indemnity of $900,000 for 71 weeks in excess of the $3.6 million per week set forth above. Energy Risk Assurance Company is an affiliate and has reinsured this coverage with third-party insurance companies. See Note 8 - Related Party Transactions for more information on this affiliate transaction.

The Price-Anderson Act is a federal law that limits the liability for claims from an incident involving any licensed United States commercial nuclear power facility. The limit is based on the number of licensed reactors. The limit of liability and the maximum potential annual payments are adjusted at least every five years for inflation to reflect changes in the Consumer Price Index. The five-year inflationary adjustment as prescribed by the most recent Price-Anderson Act renewal was effective October 29, 2008. Owners of a nuclear reactor cover this exposure through a combination of private insurance and mandatory participation in a financial protection pool, as established by Price-Anderson.

Losses resulting from terrorist attacks are covered under Nuclear Electric Insurance Ltd.’s policies, subject to an industrywide aggregate policy limit of $3.24 billion within a 12-month period for coverage for such terrorist acts.

If losses from a nuclear incident at the Callaway energy center exceed the limits of, or are not covered by, insurance, or if coverage is unavailable, Ameren Missouri is at risk for any uninsured losses. If a serious nuclear incident were to occur, it could have a material adverse effect on Ameren’s and Ameren Missouri’s results of operations, financial position, or liquidity.

 

Other Obligations

To supply a portion of the fuel requirements of our generating plants, we have entered into various long-term commitments for the procurement of coal, natural gas, nuclear fuel, and methane gas. We have also entered into various long-term commitments for purchased power and natural gas for distribution. For a complete listing of our obligations and commitments, see Note 15 - Commitments and Contingencies under Part II, Item 8 of the Form 10-K.

Genco’s commitments for the procurement of natural gas have materially increased from amounts previously disclosed as of December 31, 2011. The following table presents our total estimated natural gas commitments at June 30, 2012:

 

      2012      2013      2014      2015      2016      Thereafter      Total  

Ameren

   $     211       $     367       $     241       $     131       $     53       $     132       $     1,135   

Genco

     16         34         3         2         -         -         55   

In the second quarter of 2012, Ameren Illinois used a RFP process, administered by the IPA, to contract capacity and energy products for the period from June 1, 2012, through May 31, 2015. Ameren Illinois contracted to purchase approximately 48,000 MWs of capacity for approximately $15 million during this period. Ameren Illinois contracted to purchase approximately 612,000 megawatthours of energy products for approximately $17 million during this period.

Previously, Ameren Illinois entered into an agreement to purchase approximately 15.5 billion cubic feet of synthetic natural gas annually over a 10-year period beginning in 2016 for its natural gas customers. The agreement was entered into pursuant to an Illinois law, which became effective August 2, 2011. Ameren Illinois’ obligations under the agreement were contingent on the counterparty reaching certain milestones during the project development and the construction of the plant that was to produce the synthetic natural gas. The counterparty failed to meet certain milestones during the second quarter of 2012 and, accordingly, the contract was terminated.

Environmental Matters

We are subject to various environmental laws and regulations enforced by federal, state, and local authorities. From the beginning phases of siting and development to the ongoing operation of existing or new electric generating, transmission and distribution facilities and natural gas storage, transmission and distribution facilities, our activities involve compliance with diverse environmental laws and regulations. These laws and regulations address emissions, impacts to air, land, and water, noise, protected natural and cultural resources (such as wetlands, endangered species and other protected wildlife, and archeological and historical resources), and chemical and waste handling. Complex and lengthy processes are required to obtain approvals, permits, or licenses for new, existing or modified facilities. Additionally, the use and handling of various chemicals or hazardous materials (including wastes) requires release prevention plans and emergency response procedures.

In addition to existing laws and regulations, including the Illinois MPS that applies to our energy centers in Illinois, the EPA is developing numerous new environmental regulations that will have a significant impact on the electric utility industry. These regulations could be particularly burdensome for certain companies, including Ameren, Ameren Missouri and Genco, that operate coal-fired energy centers. Significant new rules proposed or promulgated since the beginning of 2010 include the regulation of greenhouse gas emissions; revised national ambient air quality standards for SO2 and NO2 emissions; the CSAPR, which requires further reductions of SO2 and NOx emissions from power plants; a regulation governing management of CCR and coal ash impoundments; the MATS, which requires reduction of emissions of mercury, toxic metals, and acid gases from power plants; revised NSPS for particulate matter, SO2, and NOx emissions from new sources; and new regulations under the Clean Water Act that could require significant capital expenditures such as new water intake structures or cooling towers at our energy centers. The EPA has proposed CO2 limits for new coal-fired and natural gas-fired combined cycle units and is expected to propose limits for existing units in the future. These new regulations may be litigated, so the timing of their implementation is uncertain, as evidenced by the stay of the CSAPR by the United States Court of Appeals for the District of Columbia on December 30, 2011. Although many details of these future regulations are unknown, the combined effects of the new and proposed environmental regulations may result in significant capital expenditures and/or increased operating costs over the next five to ten years for Ameren, Ameren Missouri and Genco. Actions required to ensure that our facilities and operations are in compliance with environmental laws and regulations could be prohibitively expensive. If they are, these regulations could require us to close or to significantly alter the operation of our energy centers, which could have an adverse effect on our results of operations, financial position, and liquidity, including the impairment of long-lived assets. Failure to comply with environmental laws and regulations might also result in the imposition of fines, penalties, and injunctive measures.

 

The estimates in the table below contain all of the known capital costs to comply with existing environmental regulations and our assessment of the potential impacts of the EPA’s proposed regulation for CCR, the finalized MATS, the stayed CSAPR as currently designed, and the revised national ambient air quality standards for SO2 and NOx emissions as of June 30, 2012. The estimates in the table below assume that CCR will continue to be regarded as nonhazardous. The estimates in the table below do not include the impacts of regulations proposed by the EPA under the Clean Water Act in March 2011 regarding cooling water intake structures as our evaluation of those impacts is ongoing. The estimates shown in the table below could change significantly depending upon a variety of factors including:

 

 

additional or modified federal or state requirements;

 

 

regulation of greenhouse gas emissions;

 

 

whether AER is granted a variance to extend compliance dates for SO2 emission levels contained within the MPS for five years until December 31, 2020;

 

 

new national ambient air quality standards or changes to existing standards for ozone, fine particulates, SO2, and NOx emissions;

 

 

additional rules governing air pollutant transport;

 

 

finalized regulations under the Clean Water Act;

 

 

CCR being classified as hazardous;

 

 

whether the CSAPR is implemented and whether any modifications are made to its existing requirements;

 

 

new technology;

 

 

expected power prices;

 

 

variations in costs of material or labor; and

 

 

alternative compliance strategies or investment decisions.

 

      2012      2013 - 2016      2017 - 2021      Total  

AMO(a)

   $ 55       $ 325         -       $ 400       $ 845         -       $ 1,030       $ 1,225         -       $ 1,485   

Genco

     150         100         -         125         245         -         295         495         -         570   

AERG

     5         20         -         25         80         -         100         105         -         130   

Ameren

   $     210       $     445         -       $     550       $     1,170         -       $   1,425       $   1,825         -       $   2,185   

 

(a) Ameren Missouri’s expenditures are expected to be recoverable from ratepayers.

The decision to make pollution control equipment investments at our Merchant Generation business depends on whether the expected future market price for power reflects the increased cost for environmental compliance. During early 2012, the observable market price for power for delivery in the current year and in future years sharply declined below 2011 levels primarily because of declining natural gas prices, as well as the impact from the stay of the CSAPR. As a result of this sharp decline in the market price for power, as well as uncertain environmental regulations, Genco decelerated the construction of two scrubbers at its Newton energy center. These scrubbers were originally expected to be installed in late 2013 and early 2014. The ultimate installation of these scrubbers, now estimated to occur between 2017 and 2021 in the table above, has been postponed until such time as the incremental investment necessary for completion is justified by visible market conditions. However, Genco will continue to incur capital costs related to the construction of these scrubbers. The table above includes Genco’s estimated costs of approximately $150 million in 2012 and approximately $20 million annually, excluding capitalized interest, from 2013 through 2016 for the construction of the two scrubbers. In addition to Genco’s reduction in estimated capital expenditures, AERG deferred precipitator upgrades at its E.D. Edwards energy center beyond 2016. Based on current environmental rules and regulations, if Merchant Generation and Genco do not complete these environmental upgrades by the beginning of 2015, Merchant Generation and Genco may need to reduce generation output at their energy centers to meet applicable emissions requirements. To achieve flexibility in its efforts to comply with the MPS by 2015, AER filed a request for a variance with the Illinois Pollution Control Board to extend certain compliance dates as discussed in more detail below. If Merchant Generation is not granted a variance to extend compliance dates for SO2 emission levels contained within the MPS, there is significant risk that Merchant Generation will have to mothball two of its unscrubbed coal-fired energy centers beginning in 2015.

The following sections describe the more significant environmental rules that affect or could affect our operations.

Clean Air Act

Both federal and state laws require significant reductions in SO2 and NOx emissions that result from burning fossil fuels. In March 2005, the EPA issued regulations with respect to SO2 and NOx emissions (the CAIR). The CAIR required generating facilities in 28 states, including Missouri and Illinois, and the District of Columbia, to participate in cap-and-trade programs to reduce annual SO2 emissions, annual NOx emissions, and ozone season NOx emissions.

In December 2008, the United States Court of Appeals for the District of Columbia remanded the CAIR to the EPA for further action to remedy the rule’s flaws, but allowed the CAIR’s cap-and-trade programs to remain effective until they are replaced by the EPA. In July 2011, the EPA issued the CSAPR as the CAIR replacement. The CSAPR was to become effective on January 1, 2012, for SO2 and annual NOx reductions and on May 1, 2012, for ozone season NOx reductions. In the CSAPR, the EPA developed federal implementation plans for each state covered by this rule; however, each impacted state can develop its own implementation rule starting as early as 2013. The CSAPR establishes emission allowance budgets for each of the states subject to the regulation, including Missouri and Illinois. With the CSAPR, the EPA abandoned CAIR’s regional approach to cutting emissions and instead set a pollution budget for each of the impacted states based on the EPA’s analysis of each upwind state’s contribution to air quality in downwind states. For Missouri and Illinois, emission reductions were required in two phases beginning in 2012, with further reductions in 2014. With the CSAPR, the EPA adopted a cap-and-trade approach that allows intrastate and limited interstate trading of emission allowances with other sources within the same program, that is, in the SO2 program, in the annual NOx, and in the ozone season NOx program. Multiple legal challenges were filed requesting to have CSAPR partially or entirely vacated and to stay the implementation of the CSAPR while the court considers the challenges. On December 30, 2011, the United States Court of Appeals for the District of Columbia issued a stay of the CSAPR. The stay does not invalidate the rule, but only delays its implementation until a final court ruling is issued. The United States Court of Appeals for the District of Columbia has expedited its consideration of the challenges to the regulation. The ultimate outcome of the challenges to the regulation is uncertain. The court could uphold CSAPR or remand it back to the EPA for partial or entire revision. Until the CSAPR appeal process is concluded, the EPA will continue to administer the CAIR.

In December 2011, the EPA issued the MATS under the Clean Air Act, which require emission reductions for mercury and other hazardous air pollutants, such as acid gases, toxic metals, and particulate matter by setting emission limits equal to the average emissions of the best performing 12% of existing coal and oil-fired electric generating units. Also, the standards require reductions in hydrogen chloride emissions, which were not regulated previously, and they will require continuous monitoring systems that are not currently in place. The MATS do not require a specific control technology to achieve the emission reductions. The MATS will apply to each unit at a coal-fired power plant; however, emission compliance can be averaged for the entire power plant. Compliance is required by April 2015 or, with a case-by-case extension, by April 2016.

Separately, on June 15, 2012, the EPA proposed to make more stringent the national ambient air quality standard for fine particulate matter. Under the proposed standard, the EPA and states would develop control measures designed to reduce the emission of fine particulate matter below required levels. Such measures may or may not apply to power plants. The EPA expects to issue a final standard for fine particulate matter by the end of 2012, which would require each state to achieve compliance with the final standard by 2020. In September 2011, the EPA announced that it was implementing the 2008 national ambient air quality standard for ozone. The EPA is required to revisit this standard for ozone again in 2013. The state of Illinois and the state of Missouri will be required to develop separate attainment plans to comply with the new ambient air quality standards for ozone and fine particulate matter. Ameren, Ameren Missouri and Genco continue to assess the impacts of these new standards.

Ameren Missouri’s current environmental compliance plan for air emissions from its energy centers includes burning ultra-low-sulfur coal and installing new or optimizing existing pollution control equipment. In July 2011, Ameren Missouri contracted to procure significantly higher volumes of lower-sulfur-content coal than Ameren Missouri’s energy centers have historically burned, which will allow Ameren Missouri to eliminate or postpone capital expenditures for pollution control equipment. In 2010, Ameren Missouri completed the installation of two scrubbers at its Sioux energy center to reduce SO2 emissions. Currently, Ameren Missouri’s compliance plan assumes the installation of two scrubbers within its coal-fired fleet during the next 10 years and precipitator upgrades at multiple energy centers. However, Ameren Missouri is currently evaluating its operations and options to determine how to comply with the additional emission reductions required by 2014 under the CSAPR, if ultimately implemented, the MATS, and other recently finalized or proposed EPA regulations.

Genco and AERG expect to install additional, or optimize existing, pollution control equipment, or modify or cease energy center operations to meet new and incremental emission reduction requirements under the MPS, the MATS, and the CSAPR as they become effective. Under the MPS, Illinois generators are required to reduce mercury, SO2, and NOx emissions by 2015. In May 2012, AER filed a request for a variance with the Illinois Pollution Control Board to extend compliance dates for SO2 emission levels contained within the MPS for five years until December 31, 2020. In exchange for delaying compliance with these emission levels through 2020, AER has proposed a plan that restricts its SO2 emissions through 2014 to levels lower than those required by the existing MPS, offsetting any environmental impact from the variance. AER has indicated to the Illinois Pollution Control Board that if a variance is not granted, or power prices do not materially increase, there is a significant risk that the Merchant Generation segment will have to mothball two of its unscrubbed coal-fired energy centers beginning in 2015. AER expects a decision from the Illinois Pollution Control Board by the end of September 2012. To comply with the existing MPS and other air emissions laws and regulations, Genco and AERG are installing equipment designed to reduce their emissions of mercury, NOx, and SO2. Genco and AERG have installed a total of three scrubbers at two energy centers. Two additional scrubbers are being constructed at Genco’s Newton energy center. As discussed above, the timing of the installation of these scrubbers, as well as precipitator upgrades at AERG’s E.D. Edwards energy center, has been delayed. Merchant Generation and Genco will continue to review and adjust their compliance plans in light of evolving outlooks for power and capacity prices, delivered fuel costs, environmental standards and compliance technologies, among other factors.

 

The completion of Ameren’s, Ameren Missouri’s and Genco’s review of recently finalized environmental regulations and compliance measures could result in significant increases in capital expenditures and operating costs. The compliance costs could be prohibitive at some of our energy centers as the expected return from these investments, at current market prices for energy and capacity, might not justify the required capital expenditures or their continued operation, which could result in the impairment of long-lived assets.

Emission Allowances

The Clean Air Act created marketable commodities called emission allowances under the acid rain program, the NOx budget trading program, the CAIR, and the CSAPR. With the CSAPR, the EPA adopted a cap-and-trade approach that allows intrastate and limited interstate trading of emission allowances with other sources within the same program, that is, either the SO2, annual NOx, or ozone season NOx programs. As noted above, on December 30, 2011, the United States Court of Appeals for the District of Columbia issued a stay of the CSAPR. Until the CSAPR appeal process is concluded, the EPA will continue to administer the CAIR, including its allowance program.

Environmental regulations including the CAIR and the CSAPR, the timing of the installation of pollution control equipment, fuel mix, and the level of operations, will have a significant impact on the number of allowances required for ongoing operations. The CAIR uses the acid rain program’s allowances for SO2 emissions and created annual and ozone season NOx allowances. The CSAPR, however, did not rely upon the acid rain program, the NOx budget trading program, or CAIR allowances for its allowance allocation program. Instead, the EPA issued a new type of emissions allowance for each program under the CSAPR. Any unused SO2 allowances, annual NOx allowances, and ozone season NOx allowances issued under CAIR cannot be used for compliance with CSAPR. Ameren, Ameren Missouri and Genco expect to have adequate CAIR allowances for 2012 to avoid needing to make external purchases.

Ameren, Ameren Missouri and Genco are studying their compliance options to identify additional opportunities that may exist for compliance in an economical fashion should the CSAPR become effective as issued. Ameren, Ameren Missouri and Genco may be required to purchase emission allowances, if available, to install new or optimize existing pollution control equipment, to limit generation, or take other actions to achieve compliance with the CSAPR in future phase-in years.

Global Climate Change

State and federal authorities, including the United States Congress, have considered initiatives to limit greenhouse gas emissions and to address global climate change. Potential impacts from any climate change legislation or regulation could vary, depending upon proposed CO2 emission limits, the timing of implementation of those limits, the method of distributing any allowances, the degree to which offsets are allowed and available, and provisions for cost-containment measures, such as a “safety valve” provision that provides a maximum price for emission allowances. As a result of our fuel portfolio, our emissions of greenhouse gases vary among our energy centers, but coal-fired power plants are significant sources of CO2. The enactment of a climate change law could result in a significant rise in household costs, and rates for electricity could rise significantly. The burden could fall particularly hard on electricity consumers and upon the economy in the Midwest because of the region’s reliance on electricity generated by coal-fired power plants. Natural gas emits about half as much CO2 as coal when burned to produce electricity. Therefore, climate change regulation could cause the conversion of coal-fired power plants to natural gas, or the construction of new natural gas plants to replace coal-fired power plants. As a result, economywide shifts to natural gas as a fuel source for electricity generation also could affect the cost of heating for our utility customers and many industrial processes that use natural gas.

In December 2009, the EPA issued its “endangerment finding” under the Clean Air Act, which stated that greenhouse gas emissions, including CO2, endanger human health and welfare and that emissions of greenhouse gases from motor vehicles contribute to that endangerment. In March 2010, the EPA issued a determination that greenhouse gas emissions from stationary sources, such as power plants, would be subject to regulation under the Clean Air Act effective the beginning of 2011. As a result of these actions, we are required to consider the emissions of greenhouse gases in any air permit application.

Recognizing the difficulties presented by regulating at once virtually all emitters of greenhouse gases, the EPA finalized the “Tailoring Rule,” which established new higher thresholds beginning in January 2011, for regulating greenhouse gas emissions from stationary sources, such as power plants. The rule requires any source that already has an operating permit to have greenhouse-gas-specific provisions added to its permits upon renewal. Currently, all Ameren energy centers have operating permits that, when renewed, may be modified to address greenhouse gas emissions. The Tailoring Rule also provides that if projects performed at major sources result in an increase in emissions of greenhouse gases over an applicable annual threshold, such projects could trigger permitting requirements under the NSR programs and the application of best available control technology, if any, to control greenhouse gas emissions. New major sources are also required to obtain such a permit and to install the best available control technology if their greenhouse gas emissions exceed the applicable emissions threshold. The extent to which the Tailoring Rule could have a material impact on our energy centers depends upon how state agencies apply the EPA’s guidelines as to what constitutes the best available control technology for greenhouse gas emissions from power plants and whether physical changes or changes in operations subject to the rule occur at our energy centers. In June 2012, the United States Court of Appeals for the District of Columbia upheld the Tailoring Rule.

Separately, on March 27, 2012, the EPA issued the proposed Carbon Pollution Standard for New Power Plants. This proposed NSPS for greenhouse gas emissions would apply only to new fossil-fuel fired electric energy centers and therefore does not impact any of Ameren’s, Ameren Missouri’s, or Genco’s existing energy centers. Ameren anticipates this proposed rule, if enacted, could make the construction of new coal-fired energy centers in the United States prohibitively expensive. A final rule is expected in 2012. Any federal climate change legislation that is enacted may preempt the EPA’s regulation of greenhouse gas emissions, including the Tailoring Rule and the Carbon Pollution Standard for New Power Plants, particularly as it relates to power plant greenhouse gas emissions.

Future federal and state legislation or regulations that mandate limits on the emission of greenhouse gases would likely result in significant increases in capital expenditures and operating costs, which, in turn, could lead to increased liquidity needs and higher financing costs. Moreover, to the extent Ameren Missouri requests recovery of these costs through rates, its regulators might delay or deny timely recovery of these costs. Excessive costs to comply with future legislation or regulations might force Ameren, Ameren Missouri and Genco as well as other similarly situated electric power generators to close some coal-fired facilities earlier than planned, which could lead to possible impairment of assets and reduced revenues. As a result, mandatory limits could have a material adverse impact on Ameren’s, Ameren Missouri’s, and Genco’s results of operations, financial position, and liquidity.

Recent federal court decisions have considered the application of common law causes of action, such as nuisance, to address damages resulting from global climate change. In March 2012, the United States District Court for the Southern District of Mississippi dismissed the Comer v. Murphy Oil lawsuit, which alleged CO2 emissions from several industrial companies, including Ameren Missouri and Genco, created the atmospheric conditions that intensified Hurricane Katrina, thereby causing property damage. The case has been appealed to the appellate court.

The impact on us of future initiatives related to greenhouse gas emissions and global climate change is unknown. Compliance costs could increase as future federal legislative, federal regulatory, and state-sponsored initiatives to control greenhouse gases continue to progress, making it more likely that some form of greenhouse gas emissions control will eventually be required. Since these initiatives continue to evolve, the impact on our coal-fired energy centers and our customers’ costs is unknown, but could result in significant increases in our capital expenditures and operating costs. The compliance costs could be prohibitive at some of our energy centers as the expected return from these investments, at current market prices for energy and capacity, might not justify the required capital expenditures or their continued operation, which could result in the impairment of long-lived assets.

NSR and Clean Air Litigation

The EPA is engaged in an enforcement initiative to determine whether coal-fired power plants failed to comply with the requirements of the NSR and NSPS provisions under the Clean Air Act when the plants implemented modifications. The EPA’s inquiries focus on whether projects performed at power plants should have triggered various permitting requirements and the installation of pollution control equipment.

Commencing in 2005, Genco received a series of information requests from the EPA pursuant to Section 114(a) of the Clean Air Act. The requests sought detailed operating and maintenance history data with respect to Genco’s Coffeen, Hutsonville, Meredosia, Newton, and Joppa energy centers and AERG’s E.D. Edwards and Duck Creek energy centers. In April and June 2012, the EPA issued additional Section 114(a) requests to Genco regarding projects at its Newton and Joppa energy centers. Genco is in the process of responding to the 2012 information requests. In August 2012, Genco received a Notice of Violation from the EPA alleging violations of permitting requirements and of Title V of the Clean Air Act. The EPA contends that projects performed in 1997, 2006, and 2007 at Genco’s Newton energy center violated federal law. Genco believes its defenses to the allegations described the Notice of Violation are meritorious. Ameren and Genco are unable to predict the outcome of this matter and whether EPA will address this Notice of Violation administratively or through litigation.

Following the issuance of a Notice of Violation, in January 2011, the Department of Justice on behalf of the EPA filed a complaint against Ameren Missouri in the United States District Court for the Eastern District of Missouri. The EPA’s complaint alleges that in performing projects at its Rush Island coal-fired energy center, Ameren Missouri violated provisions of the Clean Air Act and Missouri law. In January 2012, the United States District Court granted, in part, Ameren Missouri’s motion to dismiss various aspects of the EPA’s penalty claims. The EPA’s claims for injunctive relief, including to require the installation of pollution control equipment, remain. At present, the complaint does not include Ameren Missouri’s other coal-fired energy centers, but the EPA has issued Notices of Violation under its NSR enforcement initiative against Ameren Missouri’s Labadie, Meramec, and Sioux coal-fired energy centers. Litigation of this matter could take many years to resolve. Ameren Missouri believes its defenses to the allegations described in the complaint as well as the Notices of Violation are meritorious. Ameren Missouri will defend itself vigorously. However, there can be no assurances that it will be successful in its efforts.

Ultimate resolution of these matters could have a material adverse impact on the future results of operations, financial position, and liquidity of Ameren, Ameren Missouri and Genco. A resolution could result in increased capital expenditures for the installation of pollution control equipment, increased operations and maintenance expenses, and penalties. We are unable to predict the ultimate resolution of these matters or the costs that might be incurred.

Clean Water Act

In March 2011, the EPA announced a proposed rule applicable to cooling water intake structures at existing power plants that have the ability to withdraw more than 2 million gallons of water per day from a body of water and use at least 25 percent of that water exclusively for cooling. Under the proposed rule, affected facilities would be required either to meet mortality limits for aquatic life impinged on the plant’s intake screens or to reduce intake velocity to 0.5 feet per second. The proposed rule also requires plants to meet site-specific entrainment standards or to reduce the cooling water intake flow commensurate with the intake flow of a closed-cycle cooling system. The final rule is scheduled to be issued in July 2013, with compliance expected within eight years thereafter. All coal-fired, nuclear, and combined cycle energy centers at Ameren, Ameren Missouri and Genco with cooling water systems are subject to this proposed rule. The proposed rule did not mandate cooling towers at existing facilities, as other technology options potentially could meet the site-specific standards. Ameren, Ameren Missouri and Genco are currently evaluating the proposed rule, and their assessment of the proposed rule’s impacts is ongoing. Therefore, we cannot predict at this time the capital or operating costs associated with compliance. The proposed rule could have an adverse effect on our results of operations, financial position, and liquidity if its implementation requires the installation of cooling towers at our energy centers.

In September 2009, the EPA announced its plan to revise the effluent guidelines applicable to steam electric generating units under the Clean Water Act. Effluent guidelines are national standards for wastewater discharges to surface water that are based on the effectiveness of available control technology. The EPA is engaged in information collection and analysis activities in support of this rulemaking. It has indicated that it expects to issue a proposed rule in November 2012 and to finalize the rule in April 2014. We are unable at this time to predict the impact of this development.

Remediation

We are involved in a number of remediation actions to clean up hazardous waste sites as required by federal and state law. Such statutes require that responsible parties fund remediation actions regardless of their degree of fault, the legality of original disposal, or the ownership of a disposal site. Ameren Missouri and Ameren Illinois have each been identified by the federal or state governments as a potentially responsible party (PRP) at several contaminated sites. Several of these sites involve facilities that were transferred by our rate-regulated utility operations in Illinois to Genco in May 2000 and to AERG in October 2003. As part of each transfer, Ameren Illinois contractually agreed to indemnify Genco and AERG for remediation costs associated with pre-existing environmental contamination at the transferred sites.

As of June 30, 2012, Ameren and Ameren Illinois owned or were otherwise responsible for 44 former MGP sites in Illinois. These are in various stages of investigation, evaluation, and remediation. Based on current estimated plans, Ameren and Ameren Illinois could substantially conclude remediation efforts at most of these sites by 2015. The ICC permits Ameren Illinois to recover remediation and litigation costs associated with its former MGP sites from its electric and natural gas utility customers through environmental adjustment rate riders. To be recoverable, such costs must be prudently and properly incurred. Costs are subject to annual review by the ICC.

As of June 30, 2012, Ameren and Ameren Missouri own or are otherwise responsible for 10 MGP sites in Missouri and one site in Iowa. Ameren Missouri does not currently have a rate rider mechanism that permits recovery of remediation costs associated with MGP sites from utility customers. Ameren Missouri does not have any retail utility operations in Iowa that would provide a source of recovery of these remediation costs.

The following table presents, as of June 30, 2012, the estimated probable obligation to remediate these MGP sites.

 

      Estimate          
      Low      High      Recorded
   Liability(a)
 

Ameren

   $   102       $   181       $   102   

Ameren Missouri

     3         4         3   

Ameren Illinois

     99         177         99   

 

(a) Recorded liability represents the estimated minimum probable obligations, as no other amount within the range was a better estimate.

 

Ameren Illinois is responsible for the cleanup of a former coal ash landfill in Coffeen, Illinois. As of June 30, 2012, Ameren Illinois estimated that obligation at $0.5 million to $6 million. Ameren Illinois recorded a liability of $0.5 million to represent its estimated minimum obligation for this site, as no other amount within the range was a better estimate. Ameren Illinois is also responsible for the cleanup of a landfill, underground storage tanks, and a water treatment plant in Illinois. As of June 30, 2012, Ameren Illinois recorded a liability of $0.8 million to represent its estimate of the obligation for these sites.

Ameren Missouri has responsibility for the investigation and potential cleanup of two waste sites in Missouri as a result of federal agency mandates. One of the cleanup sites is a former coal tar distillery located in St. Louis, Missouri. In 2008, the EPA issued an administrative order to Ameren Missouri pertaining to this distillery operated by Koppers Company or its predecessor and successor companies. Ameren Missouri is the current owner of the site, but Ameren Missouri did not conduct any of the manufacturing operations involving coal tar or its byproducts. Ameren Missouri, along with two other PRPs, is currently performing a site investigation. As of June 30, 2012, Ameren Missouri estimated its obligation at $2 million to $5 million. Ameren Missouri recorded a liability of $2 million to represent its estimated minimum obligation, as no other amount within the range was a better estimate. Ameren Missouri’s other active federal agency-mandated cleanup site in Missouri is a site in Cape Girardeau. Ameren Missouri was a customer of an electrical equipment repair and disposal company that previously operated a facility at this site. A trust was established in the early 1990s by several businesses and governmental agencies to fund the cleanup of this site, which was completed in 2005. Ameren Missouri anticipates this trust fund will be sufficient to complete the remaining adjacent off-site cleanup and therefore has no recorded liability at June 30, 2012, related to this site.

Ameren Missouri also has a federal agency mandate to complete a site investigation for a site in Illinois. In 2000, the EPA notified Ameren Missouri and numerous other companies, including Solutia, that former landfills and lagoons in Sauget, Illinois, may contain soil and groundwater contamination. These sites are known as Sauget Area 2. From about 1926 until 1976, Ameren Missouri operated an energy center adjacent to Sauget Area 2. Ameren Missouri currently owns a parcel of property that was once used as a landfill. Under the terms of an Administrative Order on Consent, Ameren Missouri has joined with other PRPs to evaluate the extent of potential contamination with respect to Sauget Area 2.

The Sauget Area 2 investigations overseen by the EPA have been completed. The results have been submitted to the EPA, and a record of decision is expected in 2012. Once the EPA has selected a remedy, if any, it would begin negotiations with various PRPs regarding implementation. Over the last several years, numerous other parties have joined the PRP group. In addition, Pharmacia Corporation and Monsanto Company have agreed to assume the liabilities related to Solutia’s former chemical waste landfill in the Sauget Area 2. As of June 30, 2012, Ameren Missouri estimated its obligation at $0.3 million to $10 million. Ameren Missouri recorded a liability of $0.3 million to represent its estimated minimum obligation, as no other amount within the range was a better estimate.

Our operations or those of our predecessor companies involve the use of, disposal of, and in appropriate circumstances, the cleanup of substances regulated under environmental protection laws. We are unable to determine whether such practices will result in future environmental commitments or affect our results of operations, financial position, or liquidity.

Ash Management

There has been activity at both state and federal levels regarding additional regulation of ash pond facilities and CCR. In May 2010, the EPA announced proposed new regulations regarding the regulatory framework for the management and disposal of CCR, which could affect future disposal and handling costs at our energy centers. Those proposed regulations include two options for managing CCRs under either solid or hazardous waste regulations, but either alternative would allow for some continued beneficial uses, such as recycling of CCR without classifying it as waste. As part of its proposal, the EPA is considering alternative regulatory approaches that require coal-fired power plants either to close surface impoundments, such as ash ponds, or to retrofit such facilities with liners. Existing impoundments and landfills used for the disposal of CCR would be subject to groundwater monitoring requirements and requirements related to closure and postclosure care under the proposed regulations. Additionally, in January 2010, EPA announced its intent to develop regulations establishing financial responsibility requirements for the electric generation industry, among other industries, and it specifically discussed CCR as a reason for developing the new requirements. Ameren, Ameren Missouri and Genco are currently evaluating all of the proposed regulations to determine whether current management of CCR, including beneficial reuse, and the use of the ash ponds should be altered. Ameren, Ameren Missouri and Genco also are evaluating the potential costs associated with compliance with the proposed regulation of CCR impoundments and landfills, which could be material, if such regulations are adopted.

Pumped-storage Hydroelectric Facility Breach

In December 2005, there was a breach of the upper reservoir at Ameren Missouri’s Taum Sauk pumped-storage hydroelectric energy center. This resulted in significant flooding in the local area, which damaged a state park. The rebuilt Taum Sauk energy center became fully operational in April 2010.

Ameren Missouri included certain capitalized costs associated with enhancements, or costs that would have been incurred absent the breach, at the rebuilt Taum Sauk energy center not recovered from property insurers in an electric rate case filing. However, in its July 2011 rate order, the MoPSC disallowed all of these capitalized costs associated with the rebuilding of the Taum Sauk energy center. See Note 2 - Rate and Regulatory Matters for additional information about the appeal of the MoPSC’s July 2011 electric rate order.

Ameren Missouri had liability insurance coverage for the Taum Sauk incident, subject to certain limits and deductibles. As of June 30, 2012, Ameren Missouri had an insurance receivable balance subject to liability coverage of $68 million.

In June 2010, Ameren Missouri sued an insurance company that was providing Ameren Missouri with liability coverage on the date of the Taum Sauk incident. In the litigation, filed in the United States District Court for the Eastern District of Missouri, Ameren Missouri claimed the insurance company breached its duty to indemnify Ameren Missouri for the losses experienced from the incident. In January 2011, the court ruled that the parties must first pursue alternative dispute resolution under the terms of their coverage agreement. In February 2011, Ameren Missouri filed an appeal of the January ruling with the United States Court of Appeals for the Eighth Circuit, seeking the ability to pursue resolution of this dispute outside of a dispute resolution process under the terms of its coverage agreement. The United States Court of Appeals is expected to issue a decision during 2012. Separately, in April 2012, Ameren Missouri sued a different insurance company that was providing Ameren Missouri with liability coverage on the date of the Taum Sauk incident. In the April 2012 litigation, which is pending in the U.S. District Court for the Eastern District of Missouri, Ameren Missouri claimed the insurance company breached its duty to indemnify Ameren Missouri for the losses experienced from the incident.

Until Ameren’s remaining liability insurance claims and the related litigation are resolved, we are unable to determine the total impact the breach could have on Ameren’s and Ameren Missouri’s results of operations, financial position, and liquidity beyond those amounts already recognized.

Asbestos-related Litigation

Ameren, Ameren Missouri, Ameren Illinois and EEI have been named, along with numerous other parties, in a number of lawsuits filed by plaintiffs claiming varying degrees of injury from asbestos exposure. Most have been filed in the Circuit Court of Madison County, Illinois. The total number of defendants named in each case varies, with as many as 272 parties named in some pending cases and as few as two in others. In the cases pending as of June 30, 2012, the average number of parties was 79.

The claims filed against Ameren, Ameren Missouri and Ameren Illinois allege injury from asbestos exposure during the plaintiffs’ activities at our present or former electric generating plants. Certain former Ameren Illinois energy centers are now owned by either Genco or AERG. As a part of the transfer of energy center ownership in 2000 and 2003, Ameren Illinois contractually agreed to indemnify Genco and AERG, respectively, for liabilities associated with asbestos-related claims arising from activities prior to each transfer. Each lawsuit seeks unspecified damages that, if awarded at trial, typically would be shared among the various defendants.

The following table presents the pending asbestos-related lawsuits filed against the Ameren Companies as of June 30, 2012:

 

Ameren   

Ameren

Missouri

  

Ameren 

llinois

   Genco   Total(a)
4    69    91    (b)   115

 

(a) Total does not equal the sum of the subsidiary unit lawsuits because some of the lawsuits name multiple Ameren entities as defendants.
(b) As of June 30, 2012, eight asbestos-related lawsuits were pending against EEI. The general liability insurance maintained by EEI provides coverage with respect to liabilities arising from asbestos-related claims.

At June 30, 2012, Ameren, Ameren Missouri, Ameren Illinois and Genco had liabilities of $21 million, $8 million, $13 million, and $- million, respectively, recorded to represent their estimate of their obligations related to asbestos claims.

Ameren Illinois has a tariff rider which permits recovery from customers within IP’s historical service territory of asbestos-related litigation claims that occurred within IP’s historical service territory. The rider can recover the costs of asbestos-related litigation claims, subject to the following terms: 90% of cash expenditures in excess of the amount included in base electric rates are to be recovered from a trust fund that was established when Ameren acquired IP. At June 30, 2012, the trust fund balance was $23 million, including accumulated interest. If cash expenditures are less than the amount in base rates, Ameren Illinois will contribute 90% of the difference to the trust fund. Once the trust fund is depleted, 90% of allowed cash expenditures in excess of base rates will be recovered through charges assessed to customers under the tariff rider.

Illinois Sales and Use Tax Exemptions and Credits

In Exelon Corporation v. Department of Revenue, the Illinois Supreme Court decided in 2009 that electricity is tangible personal property for purposes of the Illinois income tax investment credit. In March 2010, the United States Supreme Court refused to hear an appeal of the case, and the decision became final. During the second quarter of 2010, Genco, including EEI, and AERG began claiming Illinois sales and use tax exemptions and credits for purchase transactions related to their generation operations. The primary basis for those claims is that the determination in the Exelon case that electricity is tangible personal property applies to sales and use tax manufacturing exemptions and credits. On November 2, 2011, EEI received a notice of proposed tax liability, documenting the state of Illinois’ position that EEI did not qualify for the manufacturing exemption it used during 2010. EEI is challenging the state of Illinois’ position. In December 2011, EEI filed a request for review by the Informal Conference Board of the Illinois Department of Revenue. Ameren and Genco do not believe that it is probable that the state of Illinois will prevail and therefore have not recorded a charge to earnings for the loss contingency. From the second quarter of 2010 through December 31, 2011, Ameren and Genco claimed manufacturing exemptions and credits of $27 million and $19 million, respectively, which represents the maximum potential tax liability to Ameren and Genco.

Genco, including EEI, and AERG do not anticipate utilizing any additional manufacturing exemptions or credits in 2012, pending discussions with the Illinois Department of Revenue, and therefore will pay use tax on the applicable purchases. Each company, however, is reserving the right to apply for applicable refunds at a later date.

Union Electric Company [Member]
 
Commitments And Contingencies

NOTE 9 - COMMITMENTS AND CONTINGENCIES

We are involved in legal, tax and regulatory proceedings before various courts, regulatory commissions, and governmental agencies with respect to matters that arise in the ordinary course of business, some of which involve substantial amounts of money. We believe that the final disposition of these proceedings, except as otherwise disclosed in the notes to our financial statements, will not have a material adverse effect on our results of operations, financial position, or liquidity.

Reference is made to Note 1 - Summary of Significant Accounting Policies, Note 2 - Rate and Regulatory Matters, Note 14 - Related Party Transactions, and Note 15 - Commitments and Contingencies under Part II, Item 8 of the Form 10-K. See also Note 1 - Summary of Significant Accounting Policies, Note 2 - Rate and Regulatory Matters, Note 8 - Related Party Transactions and Note 10 - Callaway Nuclear Plant in this report.

Callaway Energy Center

The following table presents insurance coverage at Ameren Missouri’s Callaway energy center at June 30, 2012. The property coverage and the nuclear liability coverage must be renewed on April 1 and January 1, respectively, of each year.

 

Type and Source of Coverage    Maximum Coverages     Maximum Assessments
for Single Incidents
 

Public liability and nuclear worker liability:

    

American Nuclear Insurers

   $ 375      $ -   

Pool participation

     12,219 (a)      118 (b) 
   $ 12,594 (c)    $ 118   

Property damage:

    

Nuclear Electric Insurance Ltd.

   $ 2,750 (d)    $ 23   

Replacement power:

    

Nuclear Electric Insurance Ltd

   $ 490 (e)    $ 9   

Energy Risk Assurance Company

   $ 64 (f)    $ -   

 

(a) Provided through mandatory participation in an industrywide retrospective premium assessment program.
(b) Retrospective premium under Price-Anderson. This is subject to retrospective assessment with respect to a covered loss in excess of $375 million in the event of an incident at any licensed United States commercial reactor, payable at $17.5 million per year.
(c) Limit of liability for each incident under the Price-Anderson liability provisions of the Atomic Energy Act of 1954, as amended. A company could be assessed up to $118 million per incident for each licensed reactor it operates with a maximum of $17.5 million per incident to be paid in a calendar year for each reactor. This limit is subject to change to account for the effects of inflation and changes in the number of licensed reactors.
(d) Provides for $500 million in property damage and decontamination, excess property insurance, and premature decommissioning coverage up to $2.25 billion for losses in excess of the $500 million primary coverage.
(e) Provides the replacement power cost insurance in the event of a prolonged accidental outage at our nuclear energy center. Weekly indemnity up to $4.5 million for 52 weeks, which commences after the first eight weeks of an outage, plus up to $3.6 million per week for a minimum of 71 weeks thereafter for a total not exceeding the policy limit of $490 million.
(f) Provides the replacement power cost insurance in the event of a prolonged accidental outage at our nuclear energy center. The coverage commences after the first 52 weeks of insurance coverage from Nuclear Electric Insurance Ltd. and is for a weekly indemnity of $900,000 for 71 weeks in excess of the $3.6 million per week set forth above. Energy Risk Assurance Company is an affiliate and has reinsured this coverage with third-party insurance companies. See Note 8 - Related Party Transactions for more information on this affiliate transaction.

The Price-Anderson Act is a federal law that limits the liability for claims from an incident involving any licensed United States commercial nuclear power facility. The limit is based on the number of licensed reactors. The limit of liability and the maximum potential annual payments are adjusted at least every five years for inflation to reflect changes in the Consumer Price Index. The five-year inflationary adjustment as prescribed by the most recent Price-Anderson Act renewal was effective October 29, 2008. Owners of a nuclear reactor cover this exposure through a combination of private insurance and mandatory participation in a financial protection pool, as established by Price-Anderson.

Losses resulting from terrorist attacks are covered under Nuclear Electric Insurance Ltd.’s policies, subject to an industrywide aggregate policy limit of $3.24 billion within a 12-month period for coverage for such terrorist acts.

If losses from a nuclear incident at the Callaway energy center exceed the limits of, or are not covered by, insurance, or if coverage is unavailable, Ameren Missouri is at risk for any uninsured losses. If a serious nuclear incident were to occur, it could have a material adverse effect on Ameren’s and Ameren Missouri’s results of operations, financial position, or liquidity.

 

Other Obligations

To supply a portion of the fuel requirements of our generating plants, we have entered into various long-term commitments for the procurement of coal, natural gas, nuclear fuel, and methane gas. We have also entered into various long-term commitments for purchased power and natural gas for distribution. For a complete listing of our obligations and commitments, see Note 15 - Commitments and Contingencies under Part II, Item 8 of the Form 10-K.

Genco’s commitments for the procurement of natural gas have materially increased from amounts previously disclosed as of December 31, 2011. The following table presents our total estimated natural gas commitments at June 30, 2012:

 

      2012      2013      2014      2015      2016      Thereafter      Total  

Ameren

   $     211       $     367       $     241       $     131       $     53       $     132       $     1,135   

Genco

     16         34         3         2         -         -         55   

In the second quarter of 2012, Ameren Illinois used a RFP process, administered by the IPA, to contract capacity and energy products for the period from June 1, 2012, through May 31, 2015. Ameren Illinois contracted to purchase approximately 48,000 MWs of capacity for approximately $15 million during this period. Ameren Illinois contracted to purchase approximately 612,000 megawatthours of energy products for approximately $17 million during this period.

Previously, Ameren Illinois entered into an agreement to purchase approximately 15.5 billion cubic feet of synthetic natural gas annually over a 10-year period beginning in 2016 for its natural gas customers. The agreement was entered into pursuant to an Illinois law, which became effective August 2, 2011. Ameren Illinois’ obligations under the agreement were contingent on the counterparty reaching certain milestones during the project development and the construction of the plant that was to produce the synthetic natural gas. The counterparty failed to meet certain milestones during the second quarter of 2012 and, accordingly, the contract was terminated.

Environmental Matters

We are subject to various environmental laws and regulations enforced by federal, state, and local authorities. From the beginning phases of siting and development to the ongoing operation of existing or new electric generating, transmission and distribution facilities and natural gas storage, transmission and distribution facilities, our activities involve compliance with diverse environmental laws and regulations. These laws and regulations address emissions, impacts to air, land, and water, noise, protected natural and cultural resources (such as wetlands, endangered species and other protected wildlife, and archeological and historical resources), and chemical and waste handling. Complex and lengthy processes are required to obtain approvals, permits, or licenses for new, existing or modified facilities. Additionally, the use and handling of various chemicals or hazardous materials (including wastes) requires release prevention plans and emergency response procedures.

In addition to existing laws and regulations, including the Illinois MPS that applies to our energy centers in Illinois, the EPA is developing numerous new environmental regulations that will have a significant impact on the electric utility industry. These regulations could be particularly burdensome for certain companies, including Ameren, Ameren Missouri and Genco, that operate coal-fired energy centers. Significant new rules proposed or promulgated since the beginning of 2010 include the regulation of greenhouse gas emissions; revised national ambient air quality standards for SO2 and NO2 emissions; the CSAPR, which requires further reductions of SO2 and NOx emissions from power plants; a regulation governing management of CCR and coal ash impoundments; the MATS, which requires reduction of emissions of mercury, toxic metals, and acid gases from power plants; revised NSPS for particulate matter, SO2, and NOx emissions from new sources; and new regulations under the Clean Water Act that could require significant capital expenditures such as new water intake structures or cooling towers at our energy centers. The EPA has proposed CO2 limits for new coal-fired and natural gas-fired combined cycle units and is expected to propose limits for existing units in the future. These new regulations may be litigated, so the timing of their implementation is uncertain, as evidenced by the stay of the CSAPR by the United States Court of Appeals for the District of Columbia on December 30, 2011. Although many details of these future regulations are unknown, the combined effects of the new and proposed environmental regulations may result in significant capital expenditures and/or increased operating costs over the next five to ten years for Ameren, Ameren Missouri and Genco. Actions required to ensure that our facilities and operations are in compliance with environmental laws and regulations could be prohibitively expensive. If they are, these regulations could require us to close or to significantly alter the operation of our energy centers, which could have an adverse effect on our results of operations, financial position, and liquidity, including the impairment of long-lived assets. Failure to comply with environmental laws and regulations might also result in the imposition of fines, penalties, and injunctive measures.

 

The estimates in the table below contain all of the known capital costs to comply with existing environmental regulations and our assessment of the potential impacts of the EPA’s proposed regulation for CCR, the finalized MATS, the stayed CSAPR as currently designed, and the revised national ambient air quality standards for SO2 and NOx emissions as of June 30, 2012. The estimates in the table below assume that CCR will continue to be regarded as nonhazardous. The estimates in the table below do not include the impacts of regulations proposed by the EPA under the Clean Water Act in March 2011 regarding cooling water intake structures as our evaluation of those impacts is ongoing. The estimates shown in the table below could change significantly depending upon a variety of factors including:

 

 

additional or modified federal or state requirements;

 

 

regulation of greenhouse gas emissions;

 

 

whether AER is granted a variance to extend compliance dates for SO2 emission levels contained within the MPS for five years until December 31, 2020;

 

 

new national ambient air quality standards or changes to existing standards for ozone, fine particulates, SO2, and NOx emissions;

 

 

additional rules governing air pollutant transport;

 

 

finalized regulations under the Clean Water Act;

 

 

CCR being classified as hazardous;

 

 

whether the CSAPR is implemented and whether any modifications are made to its existing requirements;

 

 

new technology;

 

 

expected power prices;

 

 

variations in costs of material or labor; and

 

 

alternative compliance strategies or investment decisions.

 

      2012      2013 - 2016      2017 - 2021      Total  

AMO(a)

   $ 55       $ 325         -       $ 400       $ 845         -       $ 1,030       $ 1,225         -       $ 1,485   

Genco

     150         100         -         125         245         -         295         495         -         570   

AERG

     5         20         -         25         80         -         100         105         -         130   

Ameren

   $     210       $     445         -       $     550       $     1,170         -       $   1,425       $   1,825         -       $   2,185   

 

(a) Ameren Missouri’s expenditures are expected to be recoverable from ratepayers.

The decision to make pollution control equipment investments at our Merchant Generation business depends on whether the expected future market price for power reflects the increased cost for environmental compliance. During early 2012, the observable market price for power for delivery in the current year and in future years sharply declined below 2011 levels primarily because of declining natural gas prices, as well as the impact from the stay of the CSAPR. As a result of this sharp decline in the market price for power, as well as uncertain environmental regulations, Genco decelerated the construction of two scrubbers at its Newton energy center. These scrubbers were originally expected to be installed in late 2013 and early 2014. The ultimate installation of these scrubbers, now estimated to occur between 2017 and 2021 in the table above, has been postponed until such time as the incremental investment necessary for completion is justified by visible market conditions. However, Genco will continue to incur capital costs related to the construction of these scrubbers. The table above includes Genco’s estimated costs of approximately $150 million in 2012 and approximately $20 million annually, excluding capitalized interest, from 2013 through 2016 for the construction of the two scrubbers. In addition to Genco’s reduction in estimated capital expenditures, AERG deferred precipitator upgrades at its E.D. Edwards energy center beyond 2016. Based on current environmental rules and regulations, if Merchant Generation and Genco do not complete these environmental upgrades by the beginning of 2015, Merchant Generation and Genco may need to reduce generation output at their energy centers to meet applicable emissions requirements. To achieve flexibility in its efforts to comply with the MPS by 2015, AER filed a request for a variance with the Illinois Pollution Control Board to extend certain compliance dates as discussed in more detail below. If Merchant Generation is not granted a variance to extend compliance dates for SO2 emission levels contained within the MPS, there is significant risk that Merchant Generation will have to mothball two of its unscrubbed coal-fired energy centers beginning in 2015.

The following sections describe the more significant environmental rules that affect or could affect our operations.

Clean Air Act

Both federal and state laws require significant reductions in SO2 and NOx emissions that result from burning fossil fuels. In March 2005, the EPA issued regulations with respect to SO2 and NOx emissions (the CAIR). The CAIR required generating facilities in 28 states, including Missouri and Illinois, and the District of Columbia, to participate in cap-and-trade programs to reduce annual SO2 emissions, annual NOx emissions, and ozone season NOx emissions.

In December 2008, the United States Court of Appeals for the District of Columbia remanded the CAIR to the EPA for further action to remedy the rule’s flaws, but allowed the CAIR’s cap-and-trade programs to remain effective until they are replaced by the EPA. In July 2011, the EPA issued the CSAPR as the CAIR replacement. The CSAPR was to become effective on January 1, 2012, for SO2 and annual NOx reductions and on May 1, 2012, for ozone season NOx reductions. In the CSAPR, the EPA developed federal implementation plans for each state covered by this rule; however, each impacted state can develop its own implementation rule starting as early as 2013. The CSAPR establishes emission allowance budgets for each of the states subject to the regulation, including Missouri and Illinois. With the CSAPR, the EPA abandoned CAIR’s regional approach to cutting emissions and instead set a pollution budget for each of the impacted states based on the EPA’s analysis of each upwind state’s contribution to air quality in downwind states. For Missouri and Illinois, emission reductions were required in two phases beginning in 2012, with further reductions in 2014. With the CSAPR, the EPA adopted a cap-and-trade approach that allows intrastate and limited interstate trading of emission allowances with other sources within the same program, that is, in the SO2 program, in the annual NOx, and in the ozone season NOx program. Multiple legal challenges were filed requesting to have CSAPR partially or entirely vacated and to stay the implementation of the CSAPR while the court considers the challenges. On December 30, 2011, the United States Court of Appeals for the District of Columbia issued a stay of the CSAPR. The stay does not invalidate the rule, but only delays its implementation until a final court ruling is issued. The United States Court of Appeals for the District of Columbia has expedited its consideration of the challenges to the regulation. The ultimate outcome of the challenges to the regulation is uncertain. The court could uphold CSAPR or remand it back to the EPA for partial or entire revision. Until the CSAPR appeal process is concluded, the EPA will continue to administer the CAIR.

In December 2011, the EPA issued the MATS under the Clean Air Act, which require emission reductions for mercury and other hazardous air pollutants, such as acid gases, toxic metals, and particulate matter by setting emission limits equal to the average emissions of the best performing 12% of existing coal and oil-fired electric generating units. Also, the standards require reductions in hydrogen chloride emissions, which were not regulated previously, and they will require continuous monitoring systems that are not currently in place. The MATS do not require a specific control technology to achieve the emission reductions. The MATS will apply to each unit at a coal-fired power plant; however, emission compliance can be averaged for the entire power plant. Compliance is required by April 2015 or, with a case-by-case extension, by April 2016.

Separately, on June 15, 2012, the EPA proposed to make more stringent the national ambient air quality standard for fine particulate matter. Under the proposed standard, the EPA and states would develop control measures designed to reduce the emission of fine particulate matter below required levels. Such measures may or may not apply to power plants. The EPA expects to issue a final standard for fine particulate matter by the end of 2012, which would require each state to achieve compliance with the final standard by 2020. In September 2011, the EPA announced that it was implementing the 2008 national ambient air quality standard for ozone. The EPA is required to revisit this standard for ozone again in 2013. The state of Illinois and the state of Missouri will be required to develop separate attainment plans to comply with the new ambient air quality standards for ozone and fine particulate matter. Ameren, Ameren Missouri and Genco continue to assess the impacts of these new standards.

Ameren Missouri’s current environmental compliance plan for air emissions from its energy centers includes burning ultra-low-sulfur coal and installing new or optimizing existing pollution control equipment. In July 2011, Ameren Missouri contracted to procure significantly higher volumes of lower-sulfur-content coal than Ameren Missouri’s energy centers have historically burned, which will allow Ameren Missouri to eliminate or postpone capital expenditures for pollution control equipment. In 2010, Ameren Missouri completed the installation of two scrubbers at its Sioux energy center to reduce SO2 emissions. Currently, Ameren Missouri’s compliance plan assumes the installation of two scrubbers within its coal-fired fleet during the next 10 years and precipitator upgrades at multiple energy centers. However, Ameren Missouri is currently evaluating its operations and options to determine how to comply with the additional emission reductions required by 2014 under the CSAPR, if ultimately implemented, the MATS, and other recently finalized or proposed EPA regulations.

Genco and AERG expect to install additional, or optimize existing, pollution control equipment, or modify or cease energy center operations to meet new and incremental emission reduction requirements under the MPS, the MATS, and the CSAPR as they become effective. Under the MPS, Illinois generators are required to reduce mercury, SO2, and NOx emissions by 2015. In May 2012, AER filed a request for a variance with the Illinois Pollution Control Board to extend compliance dates for SO2 emission levels contained within the MPS for five years until December 31, 2020. In exchange for delaying compliance with these emission levels through 2020, AER has proposed a plan that restricts its SO2 emissions through 2014 to levels lower than those required by the existing MPS, offsetting any environmental impact from the variance. AER has indicated to the Illinois Pollution Control Board that if a variance is not granted, or power prices do not materially increase, there is a significant risk that the Merchant Generation segment will have to mothball two of its unscrubbed coal-fired energy centers beginning in 2015. AER expects a decision from the Illinois Pollution Control Board by the end of September 2012. To comply with the existing MPS and other air emissions laws and regulations, Genco and AERG are installing equipment designed to reduce their emissions of mercury, NOx, and SO2. Genco and AERG have installed a total of three scrubbers at two energy centers. Two additional scrubbers are being constructed at Genco’s Newton energy center. As discussed above, the timing of the installation of these scrubbers, as well as precipitator upgrades at AERG’s E.D. Edwards energy center, has been delayed. Merchant Generation and Genco will continue to review and adjust their compliance plans in light of evolving outlooks for power and capacity prices, delivered fuel costs, environmental standards and compliance technologies, among other factors.

 

The completion of Ameren’s, Ameren Missouri’s and Genco’s review of recently finalized environmental regulations and compliance measures could result in significant increases in capital expenditures and operating costs. The compliance costs could be prohibitive at some of our energy centers as the expected return from these investments, at current market prices for energy and capacity, might not justify the required capital expenditures or their continued operation, which could result in the impairment of long-lived assets.

Emission Allowances

The Clean Air Act created marketable commodities called emission allowances under the acid rain program, the NOx budget trading program, the CAIR, and the CSAPR. With the CSAPR, the EPA adopted a cap-and-trade approach that allows intrastate and limited interstate trading of emission allowances with other sources within the same program, that is, either the SO2, annual NOx, or ozone season NOx programs. As noted above, on December 30, 2011, the United States Court of Appeals for the District of Columbia issued a stay of the CSAPR. Until the CSAPR appeal process is concluded, the EPA will continue to administer the CAIR, including its allowance program.

Environmental regulations including the CAIR and the CSAPR, the timing of the installation of pollution control equipment, fuel mix, and the level of operations, will have a significant impact on the number of allowances required for ongoing operations. The CAIR uses the acid rain program’s allowances for SO2 emissions and created annual and ozone season NOx allowances. The CSAPR, however, did not rely upon the acid rain program, the NOx budget trading program, or CAIR allowances for its allowance allocation program. Instead, the EPA issued a new type of emissions allowance for each program under the CSAPR. Any unused SO2 allowances, annual NOx allowances, and ozone season NOx allowances issued under CAIR cannot be used for compliance with CSAPR. Ameren, Ameren Missouri and Genco expect to have adequate CAIR allowances for 2012 to avoid needing to make external purchases.

Ameren, Ameren Missouri and Genco are studying their compliance options to identify additional opportunities that may exist for compliance in an economical fashion should the CSAPR become effective as issued. Ameren, Ameren Missouri and Genco may be required to purchase emission allowances, if available, to install new or optimize existing pollution control equipment, to limit generation, or take other actions to achieve compliance with the CSAPR in future phase-in years.

Global Climate Change

State and federal authorities, including the United States Congress, have considered initiatives to limit greenhouse gas emissions and to address global climate change. Potential impacts from any climate change legislation or regulation could vary, depending upon proposed CO2 emission limits, the timing of implementation of those limits, the method of distributing any allowances, the degree to which offsets are allowed and available, and provisions for cost-containment measures, such as a “safety valve” provision that provides a maximum price for emission allowances. As a result of our fuel portfolio, our emissions of greenhouse gases vary among our energy centers, but coal-fired power plants are significant sources of CO2. The enactment of a climate change law could result in a significant rise in household costs, and rates for electricity could rise significantly. The burden could fall particularly hard on electricity consumers and upon the economy in the Midwest because of the region’s reliance on electricity generated by coal-fired power plants. Natural gas emits about half as much CO2 as coal when burned to produce electricity. Therefore, climate change regulation could cause the conversion of coal-fired power plants to natural gas, or the construction of new natural gas plants to replace coal-fired power plants. As a result, economywide shifts to natural gas as a fuel source for electricity generation also could affect the cost of heating for our utility customers and many industrial processes that use natural gas.

In December 2009, the EPA issued its “endangerment finding” under the Clean Air Act, which stated that greenhouse gas emissions, including CO2, endanger human health and welfare and that emissions of greenhouse gases from motor vehicles contribute to that endangerment. In March 2010, the EPA issued a determination that greenhouse gas emissions from stationary sources, such as power plants, would be subject to regulation under the Clean Air Act effective the beginning of 2011. As a result of these actions, we are required to consider the emissions of greenhouse gases in any air permit application.

Recognizing the difficulties presented by regulating at once virtually all emitters of greenhouse gases, the EPA finalized the “Tailoring Rule,” which established new higher thresholds beginning in January 2011, for regulating greenhouse gas emissions from stationary sources, such as power plants. The rule requires any source that already has an operating permit to have greenhouse-gas-specific provisions added to its permits upon renewal. Currently, all Ameren energy centers have operating permits that, when renewed, may be modified to address greenhouse gas emissions. The Tailoring Rule also provides that if projects performed at major sources result in an increase in emissions of greenhouse gases over an applicable annual threshold, such projects could trigger permitting requirements under the NSR programs and the application of best available control technology, if any, to control greenhouse gas emissions. New major sources are also required to obtain such a permit and to install the best available control technology if their greenhouse gas emissions exceed the applicable emissions threshold. The extent to which the Tailoring Rule could have a material impact on our energy centers depends upon how state agencies apply the EPA’s guidelines as to what constitutes the best available control technology for greenhouse gas emissions from power plants and whether physical changes or changes in operations subject to the rule occur at our energy centers. In June 2012, the United States Court of Appeals for the District of Columbia upheld the Tailoring Rule.

Separately, on March 27, 2012, the EPA issued the proposed Carbon Pollution Standard for New Power Plants. This proposed NSPS for greenhouse gas emissions would apply only to new fossil-fuel fired electric energy centers and therefore does not impact any of Ameren’s, Ameren Missouri’s, or Genco’s existing energy centers. Ameren anticipates this proposed rule, if enacted, could make the construction of new coal-fired energy centers in the United States prohibitively expensive. A final rule is expected in 2012. Any federal climate change legislation that is enacted may preempt the EPA’s regulation of greenhouse gas emissions, including the Tailoring Rule and the Carbon Pollution Standard for New Power Plants, particularly as it relates to power plant greenhouse gas emissions.

Future federal and state legislation or regulations that mandate limits on the emission of greenhouse gases would likely result in significant increases in capital expenditures and operating costs, which, in turn, could lead to increased liquidity needs and higher financing costs. Moreover, to the extent Ameren Missouri requests recovery of these costs through rates, its regulators might delay or deny timely recovery of these costs. Excessive costs to comply with future legislation or regulations might force Ameren, Ameren Missouri and Genco as well as other similarly situated electric power generators to close some coal-fired facilities earlier than planned, which could lead to possible impairment of assets and reduced revenues. As a result, mandatory limits could have a material adverse impact on Ameren’s, Ameren Missouri’s, and Genco’s results of operations, financial position, and liquidity.

Recent federal court decisions have considered the application of common law causes of action, such as nuisance, to address damages resulting from global climate change. In March 2012, the United States District Court for the Southern District of Mississippi dismissed the Comer v. Murphy Oil lawsuit, which alleged CO2 emissions from several industrial companies, including Ameren Missouri and Genco, created the atmospheric conditions that intensified Hurricane Katrina, thereby causing property damage. The case has been appealed to the appellate court.

The impact on us of future initiatives related to greenhouse gas emissions and global climate change is unknown. Compliance costs could increase as future federal legislative, federal regulatory, and state-sponsored initiatives to control greenhouse gases continue to progress, making it more likely that some form of greenhouse gas emissions control will eventually be required. Since these initiatives continue to evolve, the impact on our coal-fired energy centers and our customers’ costs is unknown, but could result in significant increases in our capital expenditures and operating costs. The compliance costs could be prohibitive at some of our energy centers as the expected return from these investments, at current market prices for energy and capacity, might not justify the required capital expenditures or their continued operation, which could result in the impairment of long-lived assets.

NSR and Clean Air Litigation

The EPA is engaged in an enforcement initiative to determine whether coal-fired power plants failed to comply with the requirements of the NSR and NSPS provisions under the Clean Air Act when the plants implemented modifications. The EPA’s inquiries focus on whether projects performed at power plants should have triggered various permitting requirements and the installation of pollution control equipment.

Commencing in 2005, Genco received a series of information requests from the EPA pursuant to Section 114(a) of the Clean Air Act. The requests sought detailed operating and maintenance history data with respect to Genco’s Coffeen, Hutsonville, Meredosia, Newton, and Joppa energy centers and AERG’s E.D. Edwards and Duck Creek energy centers. In April and June 2012, the EPA issued additional Section 114(a) requests to Genco regarding projects at its Newton and Joppa energy centers. Genco is in the process of responding to the 2012 information requests. In August 2012, Genco received a Notice of Violation from the EPA alleging violations of permitting requirements and of Title V of the Clean Air Act. The EPA contends that projects performed in 1997, 2006, and 2007 at Genco’s Newton energy center violated federal law. Genco believes its defenses to the allegations described the Notice of Violation are meritorious. Ameren and Genco are unable to predict the outcome of this matter and whether EPA will address this Notice of Violation administratively or through litigation.

Following the issuance of a Notice of Violation, in January 2011, the Department of Justice on behalf of the EPA filed a complaint against Ameren Missouri in the United States District Court for the Eastern District of Missouri. The EPA’s complaint alleges that in performing projects at its Rush Island coal-fired energy center, Ameren Missouri violated provisions of the Clean Air Act and Missouri law. In January 2012, the United States District Court granted, in part, Ameren Missouri’s motion to dismiss various aspects of the EPA’s penalty claims. The EPA’s claims for injunctive relief, including to require the installation of pollution control equipment, remain. At present, the complaint does not include Ameren Missouri’s other coal-fired energy centers, but the EPA has issued Notices of Violation under its NSR enforcement initiative against Ameren Missouri’s Labadie, Meramec, and Sioux coal-fired energy centers. Litigation of this matter could take many years to resolve. Ameren Missouri believes its defenses to the allegations described in the complaint as well as the Notices of Violation are meritorious. Ameren Missouri will defend itself vigorously. However, there can be no assurances that it will be successful in its efforts.

Ultimate resolution of these matters could have a material adverse impact on the future results of operations, financial position, and liquidity of Ameren, Ameren Missouri and Genco. A resolution could result in increased capital expenditures for the installation of pollution control equipment, increased operations and maintenance expenses, and penalties. We are unable to predict the ultimate resolution of these matters or the costs that might be incurred.

Clean Water Act

In March 2011, the EPA announced a proposed rule applicable to cooling water intake structures at existing power plants that have the ability to withdraw more than 2 million gallons of water per day from a body of water and use at least 25 percent of that water exclusively for cooling. Under the proposed rule, affected facilities would be required either to meet mortality limits for aquatic life impinged on the plant’s intake screens or to reduce intake velocity to 0.5 feet per second. The proposed rule also requires plants to meet site-specific entrainment standards or to reduce the cooling water intake flow commensurate with the intake flow of a closed-cycle cooling system. The final rule is scheduled to be issued in July 2013, with compliance expected within eight years thereafter. All coal-fired, nuclear, and combined cycle energy centers at Ameren, Ameren Missouri and Genco with cooling water systems are subject to this proposed rule. The proposed rule did not mandate cooling towers at existing facilities, as other technology options potentially could meet the site-specific standards. Ameren, Ameren Missouri and Genco are currently evaluating the proposed rule, and their assessment of the proposed rule’s impacts is ongoing. Therefore, we cannot predict at this time the capital or operating costs associated with compliance. The proposed rule could have an adverse effect on our results of operations, financial position, and liquidity if its implementation requires the installation of cooling towers at our energy centers.

In September 2009, the EPA announced its plan to revise the effluent guidelines applicable to steam electric generating units under the Clean Water Act. Effluent guidelines are national standards for wastewater discharges to surface water that are based on the effectiveness of available control technology. The EPA is engaged in information collection and analysis activities in support of this rulemaking. It has indicated that it expects to issue a proposed rule in November 2012 and to finalize the rule in April 2014. We are unable at this time to predict the impact of this development.

Remediation

We are involved in a number of remediation actions to clean up hazardous waste sites as required by federal and state law. Such statutes require that responsible parties fund remediation actions regardless of their degree of fault, the legality of original disposal, or the ownership of a disposal site. Ameren Missouri and Ameren Illinois have each been identified by the federal or state governments as a potentially responsible party (PRP) at several contaminated sites. Several of these sites involve facilities that were transferred by our rate-regulated utility operations in Illinois to Genco in May 2000 and to AERG in October 2003. As part of each transfer, Ameren Illinois contractually agreed to indemnify Genco and AERG for remediation costs associated with pre-existing environmental contamination at the transferred sites.

As of June 30, 2012, Ameren and Ameren Illinois owned or were otherwise responsible for 44 former MGP sites in Illinois. These are in various stages of investigation, evaluation, and remediation. Based on current estimated plans, Ameren and Ameren Illinois could substantially conclude remediation efforts at most of these sites by 2015. The ICC permits Ameren Illinois to recover remediation and litigation costs associated with its former MGP sites from its electric and natural gas utility customers through environmental adjustment rate riders. To be recoverable, such costs must be prudently and properly incurred. Costs are subject to annual review by the ICC.

As of June 30, 2012, Ameren and Ameren Missouri own or are otherwise responsible for 10 MGP sites in Missouri and one site in Iowa. Ameren Missouri does not currently have a rate rider mechanism that permits recovery of remediation costs associated with MGP sites from utility customers. Ameren Missouri does not have any retail utility operations in Iowa that would provide a source of recovery of these remediation costs.

The following table presents, as of June 30, 2012, the estimated probable obligation to remediate these MGP sites.

 

      Estimate          
      Low      High      Recorded
   Liability(a)
 

Ameren

   $   102       $   181       $   102   

Ameren Missouri

     3         4         3   

Ameren Illinois

     99         177         99   

 

(a) Recorded liability represents the estimated minimum probable obligations, as no other amount within the range was a better estimate.

 

Ameren Illinois is responsible for the cleanup of a former coal ash landfill in Coffeen, Illinois. As of June 30, 2012, Ameren Illinois estimated that obligation at $0.5 million to $6 million. Ameren Illinois recorded a liability of $0.5 million to represent its estimated minimum obligation for this site, as no other amount within the range was a better estimate. Ameren Illinois is also responsible for the cleanup of a landfill, underground storage tanks, and a water treatment plant in Illinois. As of June 30, 2012, Ameren Illinois recorded a liability of $0.8 million to represent its estimate of the obligation for these sites.

Ameren Missouri has responsibility for the investigation and potential cleanup of two waste sites in Missouri as a result of federal agency mandates. One of the cleanup sites is a former coal tar distillery located in St. Louis, Missouri. In 2008, the EPA issued an administrative order to Ameren Missouri pertaining to this distillery operated by Koppers Company or its predecessor and successor companies. Ameren Missouri is the current owner of the site, but Ameren Missouri did not conduct any of the manufacturing operations involving coal tar or its byproducts. Ameren Missouri, along with two other PRPs, is currently performing a site investigation. As of June 30, 2012, Ameren Missouri estimated its obligation at $2 million to $5 million. Ameren Missouri recorded a liability of $2 million to represent its estimated minimum obligation, as no other amount within the range was a better estimate. Ameren Missouri’s other active federal agency-mandated cleanup site in Missouri is a site in Cape Girardeau. Ameren Missouri was a customer of an electrical equipment repair and disposal company that previously operated a facility at this site. A trust was established in the early 1990s by several businesses and governmental agencies to fund the cleanup of this site, which was completed in 2005. Ameren Missouri anticipates this trust fund will be sufficient to complete the remaining adjacent off-site cleanup and therefore has no recorded liability at June 30, 2012, related to this site.

Ameren Missouri also has a federal agency mandate to complete a site investigation for a site in Illinois. In 2000, the EPA notified Ameren Missouri and numerous other companies, including Solutia, that former landfills and lagoons in Sauget, Illinois, may contain soil and groundwater contamination. These sites are known as Sauget Area 2. From about 1926 until 1976, Ameren Missouri operated an energy center adjacent to Sauget Area 2. Ameren Missouri currently owns a parcel of property that was once used as a landfill. Under the terms of an Administrative Order on Consent, Ameren Missouri has joined with other PRPs to evaluate the extent of potential contamination with respect to Sauget Area 2.

The Sauget Area 2 investigations overseen by the EPA have been completed. The results have been submitted to the EPA, and a record of decision is expected in 2012. Once the EPA has selected a remedy, if any, it would begin negotiations with various PRPs regarding implementation. Over the last several years, numerous other parties have joined the PRP group. In addition, Pharmacia Corporation and Monsanto Company have agreed to assume the liabilities related to Solutia’s former chemical waste landfill in the Sauget Area 2. As of June 30, 2012, Ameren Missouri estimated its obligation at $0.3 million to $10 million. Ameren Missouri recorded a liability of $0.3 million to represent its estimated minimum obligation, as no other amount within the range was a better estimate.

Our operations or those of our predecessor companies involve the use of, disposal of, and in appropriate circumstances, the cleanup of substances regulated under environmental protection laws. We are unable to determine whether such practices will result in future environmental commitments or affect our results of operations, financial position, or liquidity.

Ash Management

There has been activity at both state and federal levels regarding additional regulation of ash pond facilities and CCR. In May 2010, the EPA announced proposed new regulations regarding the regulatory framework for the management and disposal of CCR, which could affect future disposal and handling costs at our energy centers. Those proposed regulations include two options for managing CCRs under either solid or hazardous waste regulations, but either alternative would allow for some continued beneficial uses, such as recycling of CCR without classifying it as waste. As part of its proposal, the EPA is considering alternative regulatory approaches that require coal-fired power plants either to close surface impoundments, such as ash ponds, or to retrofit such facilities with liners. Existing impoundments and landfills used for the disposal of CCR would be subject to groundwater monitoring requirements and requirements related to closure and postclosure care under the proposed regulations. Additionally, in January 2010, EPA announced its intent to develop regulations establishing financial responsibility requirements for the electric generation industry, among other industries, and it specifically discussed CCR as a reason for developing the new requirements. Ameren, Ameren Missouri and Genco are currently evaluating all of the proposed regulations to determine whether current management of CCR, including beneficial reuse, and the use of the ash ponds should be altered. Ameren, Ameren Missouri and Genco also are evaluating the potential costs associated with compliance with the proposed regulation of CCR impoundments and landfills, which could be material, if such regulations are adopted.

Pumped-storage Hydroelectric Facility Breach

In December 2005, there was a breach of the upper reservoir at Ameren Missouri’s Taum Sauk pumped-storage hydroelectric energy center. This resulted in significant flooding in the local area, which damaged a state park. The rebuilt Taum Sauk energy center became fully operational in April 2010.

Ameren Missouri included certain capitalized costs associated with enhancements, or costs that would have been incurred absent the breach, at the rebuilt Taum Sauk energy center not recovered from property insurers in an electric rate case filing. However, in its July 2011 rate order, the MoPSC disallowed all of these capitalized costs associated with the rebuilding of the Taum Sauk energy center. See Note 2 - Rate and Regulatory Matters for additional information about the appeal of the MoPSC’s July 2011 electric rate order.

Ameren Missouri had liability insurance coverage for the Taum Sauk incident, subject to certain limits and deductibles. As of June 30, 2012, Ameren Missouri had an insurance receivable balance subject to liability coverage of $68 million.

In June 2010, Ameren Missouri sued an insurance company that was providing Ameren Missouri with liability coverage on the date of the Taum Sauk incident. In the litigation, filed in the United States District Court for the Eastern District of Missouri, Ameren Missouri claimed the insurance company breached its duty to indemnify Ameren Missouri for the losses experienced from the incident. In January 2011, the court ruled that the parties must first pursue alternative dispute resolution under the terms of their coverage agreement. In February 2011, Ameren Missouri filed an appeal of the January ruling with the United States Court of Appeals for the Eighth Circuit, seeking the ability to pursue resolution of this dispute outside of a dispute resolution process under the terms of its coverage agreement. The United States Court of Appeals is expected to issue a decision during 2012. Separately, in April 2012, Ameren Missouri sued a different insurance company that was providing Ameren Missouri with liability coverage on the date of the Taum Sauk incident. In the April 2012 litigation, which is pending in the U.S. District Court for the Eastern District of Missouri, Ameren Missouri claimed the insurance company breached its duty to indemnify Ameren Missouri for the losses experienced from the incident.

Until Ameren’s remaining liability insurance claims and the related litigation are resolved, we are unable to determine the total impact the breach could have on Ameren’s and Ameren Missouri’s results of operations, financial position, and liquidity beyond those amounts already recognized.

Asbestos-related Litigation

Ameren, Ameren Missouri, Ameren Illinois and EEI have been named, along with numerous other parties, in a number of lawsuits filed by plaintiffs claiming varying degrees of injury from asbestos exposure. Most have been filed in the Circuit Court of Madison County, Illinois. The total number of defendants named in each case varies, with as many as 272 parties named in some pending cases and as few as two in others. In the cases pending as of June 30, 2012, the average number of parties was 79.

The claims filed against Ameren, Ameren Missouri and Ameren Illinois allege injury from asbestos exposure during the plaintiffs’ activities at our present or former electric generating plants. Certain former Ameren Illinois energy centers are now owned by either Genco or AERG. As a part of the transfer of energy center ownership in 2000 and 2003, Ameren Illinois contractually agreed to indemnify Genco and AERG, respectively, for liabilities associated with asbestos-related claims arising from activities prior to each transfer. Each lawsuit seeks unspecified damages that, if awarded at trial, typically would be shared among the various defendants.

The following table presents the pending asbestos-related lawsuits filed against the Ameren Companies as of June 30, 2012:

 

Ameren   

Ameren

Missouri

  

Ameren 

llinois

   Genco   Total(a)
4    69    91    (b)   115

 

(a) Total does not equal the sum of the subsidiary unit lawsuits because some of the lawsuits name multiple Ameren entities as defendants.
(b) As of June 30, 2012, eight asbestos-related lawsuits were pending against EEI. The general liability insurance maintained by EEI provides coverage with respect to liabilities arising from asbestos-related claims.

At June 30, 2012, Ameren, Ameren Missouri, Ameren Illinois and Genco had liabilities of $21 million, $8 million, $13 million, and $- million, respectively, recorded to represent their estimate of their obligations related to asbestos claims.

Ameren Illinois has a tariff rider which permits recovery from customers within IP’s historical service territory of asbestos-related litigation claims that occurred within IP’s historical service territory. The rider can recover the costs of asbestos-related litigation claims, subject to the following terms: 90% of cash expenditures in excess of the amount included in base electric rates are to be recovered from a trust fund that was established when Ameren acquired IP. At June 30, 2012, the trust fund balance was $23 million, including accumulated interest. If cash expenditures are less than the amount in base rates, Ameren Illinois will contribute 90% of the difference to the trust fund. Once the trust fund is depleted, 90% of allowed cash expenditures in excess of base rates will be recovered through charges assessed to customers under the tariff rider.

Illinois Sales and Use Tax Exemptions and Credits

In Exelon Corporation v. Department of Revenue, the Illinois Supreme Court decided in 2009 that electricity is tangible personal property for purposes of the Illinois income tax investment credit. In March 2010, the United States Supreme Court refused to hear an appeal of the case, and the decision became final. During the second quarter of 2010, Genco, including EEI, and AERG began claiming Illinois sales and use tax exemptions and credits for purchase transactions related to their generation operations. The primary basis for those claims is that the determination in the Exelon case that electricity is tangible personal property applies to sales and use tax manufacturing exemptions and credits. On November 2, 2011, EEI received a notice of proposed tax liability, documenting the state of Illinois’ position that EEI did not qualify for the manufacturing exemption it used during 2010. EEI is challenging the state of Illinois’ position. In December 2011, EEI filed a request for review by the Informal Conference Board of the Illinois Department of Revenue. Ameren and Genco do not believe that it is probable that the state of Illinois will prevail and therefore have not recorded a charge to earnings for the loss contingency. From the second quarter of 2010 through December 31, 2011, Ameren and Genco claimed manufacturing exemptions and credits of $27 million and $19 million, respectively, which represents the maximum potential tax liability to Ameren and Genco.

Genco, including EEI, and AERG do not anticipate utilizing any additional manufacturing exemptions or credits in 2012, pending discussions with the Illinois Department of Revenue, and therefore will pay use tax on the applicable purchases. Each company, however, is reserving the right to apply for applicable refunds at a later date.

Ameren Illinois Company [Member]
 
Commitments And Contingencies

NOTE 9 - COMMITMENTS AND CONTINGENCIES

We are involved in legal, tax and regulatory proceedings before various courts, regulatory commissions, and governmental agencies with respect to matters that arise in the ordinary course of business, some of which involve substantial amounts of money. We believe that the final disposition of these proceedings, except as otherwise disclosed in the notes to our financial statements, will not have a material adverse effect on our results of operations, financial position, or liquidity.

Reference is made to Note 1 - Summary of Significant Accounting Policies, Note 2 - Rate and Regulatory Matters, Note 14 - Related Party Transactions, and Note 15 - Commitments and Contingencies under Part II, Item 8 of the Form 10-K. See also Note 1 - Summary of Significant Accounting Policies, Note 2 - Rate and Regulatory Matters, Note 8 - Related Party Transactions and Note 10 - Callaway Nuclear Plant in this report.

Callaway Energy Center

The following table presents insurance coverage at Ameren Missouri’s Callaway energy center at June 30, 2012. The property coverage and the nuclear liability coverage must be renewed on April 1 and January 1, respectively, of each year.

 

Type and Source of Coverage    Maximum Coverages     Maximum Assessments
for Single Incidents
 

Public liability and nuclear worker liability:

    

American Nuclear Insurers

   $ 375      $ -   

Pool participation

     12,219 (a)      118 (b) 
   $ 12,594 (c)    $ 118   

Property damage:

    

Nuclear Electric Insurance Ltd.

   $ 2,750 (d)    $ 23   

Replacement power:

    

Nuclear Electric Insurance Ltd

   $ 490 (e)    $ 9   

Energy Risk Assurance Company

   $ 64 (f)    $ -   

 

(a) Provided through mandatory participation in an industrywide retrospective premium assessment program.
(b) Retrospective premium under Price-Anderson. This is subject to retrospective assessment with respect to a covered loss in excess of $375 million in the event of an incident at any licensed United States commercial reactor, payable at $17.5 million per year.
(c) Limit of liability for each incident under the Price-Anderson liability provisions of the Atomic Energy Act of 1954, as amended. A company could be assessed up to $118 million per incident for each licensed reactor it operates with a maximum of $17.5 million per incident to be paid in a calendar year for each reactor. This limit is subject to change to account for the effects of inflation and changes in the number of licensed reactors.
(d) Provides for $500 million in property damage and decontamination, excess property insurance, and premature decommissioning coverage up to $2.25 billion for losses in excess of the $500 million primary coverage.
(e) Provides the replacement power cost insurance in the event of a prolonged accidental outage at our nuclear energy center. Weekly indemnity up to $4.5 million for 52 weeks, which commences after the first eight weeks of an outage, plus up to $3.6 million per week for a minimum of 71 weeks thereafter for a total not exceeding the policy limit of $490 million.
(f) Provides the replacement power cost insurance in the event of a prolonged accidental outage at our nuclear energy center. The coverage commences after the first 52 weeks of insurance coverage from Nuclear Electric Insurance Ltd. and is for a weekly indemnity of $900,000 for 71 weeks in excess of the $3.6 million per week set forth above. Energy Risk Assurance Company is an affiliate and has reinsured this coverage with third-party insurance companies. See Note 8 - Related Party Transactions for more information on this affiliate transaction.

The Price-Anderson Act is a federal law that limits the liability for claims from an incident involving any licensed United States commercial nuclear power facility. The limit is based on the number of licensed reactors. The limit of liability and the maximum potential annual payments are adjusted at least every five years for inflation to reflect changes in the Consumer Price Index. The five-year inflationary adjustment as prescribed by the most recent Price-Anderson Act renewal was effective October 29, 2008. Owners of a nuclear reactor cover this exposure through a combination of private insurance and mandatory participation in a financial protection pool, as established by Price-Anderson.

Losses resulting from terrorist attacks are covered under Nuclear Electric Insurance Ltd.’s policies, subject to an industrywide aggregate policy limit of $3.24 billion within a 12-month period for coverage for such terrorist acts.

If losses from a nuclear incident at the Callaway energy center exceed the limits of, or are not covered by, insurance, or if coverage is unavailable, Ameren Missouri is at risk for any uninsured losses. If a serious nuclear incident were to occur, it could have a material adverse effect on Ameren’s and Ameren Missouri’s results of operations, financial position, or liquidity.

 

Other Obligations

To supply a portion of the fuel requirements of our generating plants, we have entered into various long-term commitments for the procurement of coal, natural gas, nuclear fuel, and methane gas. We have also entered into various long-term commitments for purchased power and natural gas for distribution. For a complete listing of our obligations and commitments, see Note 15 - Commitments and Contingencies under Part II, Item 8 of the Form 10-K.

Genco’s commitments for the procurement of natural gas have materially increased from amounts previously disclosed as of December 31, 2011. The following table presents our total estimated natural gas commitments at June 30, 2012:

 

      2012      2013      2014      2015      2016      Thereafter      Total  

Ameren

   $     211       $     367       $     241       $     131       $     53       $     132       $     1,135   

Genco

     16         34         3         2         -         -         55   

In the second quarter of 2012, Ameren Illinois used a RFP process, administered by the IPA, to contract capacity and energy products for the period from June 1, 2012, through May 31, 2015. Ameren Illinois contracted to purchase approximately 48,000 MWs of capacity for approximately $15 million during this period. Ameren Illinois contracted to purchase approximately 612,000 megawatthours of energy products for approximately $17 million during this period.

Previously, Ameren Illinois entered into an agreement to purchase approximately 15.5 billion cubic feet of synthetic natural gas annually over a 10-year period beginning in 2016 for its natural gas customers. The agreement was entered into pursuant to an Illinois law, which became effective August 2, 2011. Ameren Illinois’ obligations under the agreement were contingent on the counterparty reaching certain milestones during the project development and the construction of the plant that was to produce the synthetic natural gas. The counterparty failed to meet certain milestones during the second quarter of 2012 and, accordingly, the contract was terminated.

Environmental Matters

We are subject to various environmental laws and regulations enforced by federal, state, and local authorities. From the beginning phases of siting and development to the ongoing operation of existing or new electric generating, transmission and distribution facilities and natural gas storage, transmission and distribution facilities, our activities involve compliance with diverse environmental laws and regulations. These laws and regulations address emissions, impacts to air, land, and water, noise, protected natural and cultural resources (such as wetlands, endangered species and other protected wildlife, and archeological and historical resources), and chemical and waste handling. Complex and lengthy processes are required to obtain approvals, permits, or licenses for new, existing or modified facilities. Additionally, the use and handling of various chemicals or hazardous materials (including wastes) requires release prevention plans and emergency response procedures.

In addition to existing laws and regulations, including the Illinois MPS that applies to our energy centers in Illinois, the EPA is developing numerous new environmental regulations that will have a significant impact on the electric utility industry. These regulations could be particularly burdensome for certain companies, including Ameren, Ameren Missouri and Genco, that operate coal-fired energy centers. Significant new rules proposed or promulgated since the beginning of 2010 include the regulation of greenhouse gas emissions; revised national ambient air quality standards for SO2 and NO2 emissions; the CSAPR, which requires further reductions of SO2 and NOx emissions from power plants; a regulation governing management of CCR and coal ash impoundments; the MATS, which requires reduction of emissions of mercury, toxic metals, and acid gases from power plants; revised NSPS for particulate matter, SO2, and NOx emissions from new sources; and new regulations under the Clean Water Act that could require significant capital expenditures such as new water intake structures or cooling towers at our energy centers. The EPA has proposed CO2 limits for new coal-fired and natural gas-fired combined cycle units and is expected to propose limits for existing units in the future. These new regulations may be litigated, so the timing of their implementation is uncertain, as evidenced by the stay of the CSAPR by the United States Court of Appeals for the District of Columbia on December 30, 2011. Although many details of these future regulations are unknown, the combined effects of the new and proposed environmental regulations may result in significant capital expenditures and/or increased operating costs over the next five to ten years for Ameren, Ameren Missouri and Genco. Actions required to ensure that our facilities and operations are in compliance with environmental laws and regulations could be prohibitively expensive. If they are, these regulations could require us to close or to significantly alter the operation of our energy centers, which could have an adverse effect on our results of operations, financial position, and liquidity, including the impairment of long-lived assets. Failure to comply with environmental laws and regulations might also result in the imposition of fines, penalties, and injunctive measures.

 

The estimates in the table below contain all of the known capital costs to comply with existing environmental regulations and our assessment of the potential impacts of the EPA’s proposed regulation for CCR, the finalized MATS, the stayed CSAPR as currently designed, and the revised national ambient air quality standards for SO2 and NOx emissions as of June 30, 2012. The estimates in the table below assume that CCR will continue to be regarded as nonhazardous. The estimates in the table below do not include the impacts of regulations proposed by the EPA under the Clean Water Act in March 2011 regarding cooling water intake structures as our evaluation of those impacts is ongoing. The estimates shown in the table below could change significantly depending upon a variety of factors including:

 

 

additional or modified federal or state requirements;

 

 

regulation of greenhouse gas emissions;

 

 

whether AER is granted a variance to extend compliance dates for SO2 emission levels contained within the MPS for five years until December 31, 2020;

 

 

new national ambient air quality standards or changes to existing standards for ozone, fine particulates, SO2, and NOx emissions;

 

 

additional rules governing air pollutant transport;

 

 

finalized regulations under the Clean Water Act;

 

 

CCR being classified as hazardous;

 

 

whether the CSAPR is implemented and whether any modifications are made to its existing requirements;

 

 

new technology;

 

 

expected power prices;

 

 

variations in costs of material or labor; and

 

 

alternative compliance strategies or investment decisions.

 

      2012      2013 - 2016      2017 - 2021      Total  

AMO(a)

   $ 55       $ 325         -       $ 400       $ 845         -       $ 1,030       $ 1,225         -       $ 1,485   

Genco

     150         100         -         125         245         -         295         495         -         570   

AERG

     5         20         -         25         80         -         100         105         -         130   

Ameren

   $     210       $     445         -       $     550       $     1,170         -       $   1,425       $   1,825         -       $   2,185   

 

(a) Ameren Missouri’s expenditures are expected to be recoverable from ratepayers.

The decision to make pollution control equipment investments at our Merchant Generation business depends on whether the expected future market price for power reflects the increased cost for environmental compliance. During early 2012, the observable market price for power for delivery in the current year and in future years sharply declined below 2011 levels primarily because of declining natural gas prices, as well as the impact from the stay of the CSAPR. As a result of this sharp decline in the market price for power, as well as uncertain environmental regulations, Genco decelerated the construction of two scrubbers at its Newton energy center. These scrubbers were originally expected to be installed in late 2013 and early 2014. The ultimate installation of these scrubbers, now estimated to occur between 2017 and 2021 in the table above, has been postponed until such time as the incremental investment necessary for completion is justified by visible market conditions. However, Genco will continue to incur capital costs related to the construction of these scrubbers. The table above includes Genco’s estimated costs of approximately $150 million in 2012 and approximately $20 million annually, excluding capitalized interest, from 2013 through 2016 for the construction of the two scrubbers. In addition to Genco’s reduction in estimated capital expenditures, AERG deferred precipitator upgrades at its E.D. Edwards energy center beyond 2016. Based on current environmental rules and regulations, if Merchant Generation and Genco do not complete these environmental upgrades by the beginning of 2015, Merchant Generation and Genco may need to reduce generation output at their energy centers to meet applicable emissions requirements. To achieve flexibility in its efforts to comply with the MPS by 2015, AER filed a request for a variance with the Illinois Pollution Control Board to extend certain compliance dates as discussed in more detail below. If Merchant Generation is not granted a variance to extend compliance dates for SO2 emission levels contained within the MPS, there is significant risk that Merchant Generation will have to mothball two of its unscrubbed coal-fired energy centers beginning in 2015.

The following sections describe the more significant environmental rules that affect or could affect our operations.

Clean Air Act

Both federal and state laws require significant reductions in SO2 and NOx emissions that result from burning fossil fuels. In March 2005, the EPA issued regulations with respect to SO2 and NOx emissions (the CAIR). The CAIR required generating facilities in 28 states, including Missouri and Illinois, and the District of Columbia, to participate in cap-and-trade programs to reduce annual SO2 emissions, annual NOx emissions, and ozone season NOx emissions.

In December 2008, the United States Court of Appeals for the District of Columbia remanded the CAIR to the EPA for further action to remedy the rule’s flaws, but allowed the CAIR’s cap-and-trade programs to remain effective until they are replaced by the EPA. In July 2011, the EPA issued the CSAPR as the CAIR replacement. The CSAPR was to become effective on January 1, 2012, for SO2 and annual NOx reductions and on May 1, 2012, for ozone season NOx reductions. In the CSAPR, the EPA developed federal implementation plans for each state covered by this rule; however, each impacted state can develop its own implementation rule starting as early as 2013. The CSAPR establishes emission allowance budgets for each of the states subject to the regulation, including Missouri and Illinois. With the CSAPR, the EPA abandoned CAIR’s regional approach to cutting emissions and instead set a pollution budget for each of the impacted states based on the EPA’s analysis of each upwind state’s contribution to air quality in downwind states. For Missouri and Illinois, emission reductions were required in two phases beginning in 2012, with further reductions in 2014. With the CSAPR, the EPA adopted a cap-and-trade approach that allows intrastate and limited interstate trading of emission allowances with other sources within the same program, that is, in the SO2 program, in the annual NOx, and in the ozone season NOx program. Multiple legal challenges were filed requesting to have CSAPR partially or entirely vacated and to stay the implementation of the CSAPR while the court considers the challenges. On December 30, 2011, the United States Court of Appeals for the District of Columbia issued a stay of the CSAPR. The stay does not invalidate the rule, but only delays its implementation until a final court ruling is issued. The United States Court of Appeals for the District of Columbia has expedited its consideration of the challenges to the regulation. The ultimate outcome of the challenges to the regulation is uncertain. The court could uphold CSAPR or remand it back to the EPA for partial or entire revision. Until the CSAPR appeal process is concluded, the EPA will continue to administer the CAIR.

In December 2011, the EPA issued the MATS under the Clean Air Act, which require emission reductions for mercury and other hazardous air pollutants, such as acid gases, toxic metals, and particulate matter by setting emission limits equal to the average emissions of the best performing 12% of existing coal and oil-fired electric generating units. Also, the standards require reductions in hydrogen chloride emissions, which were not regulated previously, and they will require continuous monitoring systems that are not currently in place. The MATS do not require a specific control technology to achieve the emission reductions. The MATS will apply to each unit at a coal-fired power plant; however, emission compliance can be averaged for the entire power plant. Compliance is required by April 2015 or, with a case-by-case extension, by April 2016.

Separately, on June 15, 2012, the EPA proposed to make more stringent the national ambient air quality standard for fine particulate matter. Under the proposed standard, the EPA and states would develop control measures designed to reduce the emission of fine particulate matter below required levels. Such measures may or may not apply to power plants. The EPA expects to issue a final standard for fine particulate matter by the end of 2012, which would require each state to achieve compliance with the final standard by 2020. In September 2011, the EPA announced that it was implementing the 2008 national ambient air quality standard for ozone. The EPA is required to revisit this standard for ozone again in 2013. The state of Illinois and the state of Missouri will be required to develop separate attainment plans to comply with the new ambient air quality standards for ozone and fine particulate matter. Ameren, Ameren Missouri and Genco continue to assess the impacts of these new standards.

Ameren Missouri’s current environmental compliance plan for air emissions from its energy centers includes burning ultra-low-sulfur coal and installing new or optimizing existing pollution control equipment. In July 2011, Ameren Missouri contracted to procure significantly higher volumes of lower-sulfur-content coal than Ameren Missouri’s energy centers have historically burned, which will allow Ameren Missouri to eliminate or postpone capital expenditures for pollution control equipment. In 2010, Ameren Missouri completed the installation of two scrubbers at its Sioux energy center to reduce SO2 emissions. Currently, Ameren Missouri’s compliance plan assumes the installation of two scrubbers within its coal-fired fleet during the next 10 years and precipitator upgrades at multiple energy centers. However, Ameren Missouri is currently evaluating its operations and options to determine how to comply with the additional emission reductions required by 2014 under the CSAPR, if ultimately implemented, the MATS, and other recently finalized or proposed EPA regulations.

Genco and AERG expect to install additional, or optimize existing, pollution control equipment, or modify or cease energy center operations to meet new and incremental emission reduction requirements under the MPS, the MATS, and the CSAPR as they become effective. Under the MPS, Illinois generators are required to reduce mercury, SO2, and NOx emissions by 2015. In May 2012, AER filed a request for a variance with the Illinois Pollution Control Board to extend compliance dates for SO2 emission levels contained within the MPS for five years until December 31, 2020. In exchange for delaying compliance with these emission levels through 2020, AER has proposed a plan that restricts its SO2 emissions through 2014 to levels lower than those required by the existing MPS, offsetting any environmental impact from the variance. AER has indicated to the Illinois Pollution Control Board that if a variance is not granted, or power prices do not materially increase, there is a significant risk that the Merchant Generation segment will have to mothball two of its unscrubbed coal-fired energy centers beginning in 2015. AER expects a decision from the Illinois Pollution Control Board by the end of September 2012. To comply with the existing MPS and other air emissions laws and regulations, Genco and AERG are installing equipment designed to reduce their emissions of mercury, NOx, and SO2. Genco and AERG have installed a total of three scrubbers at two energy centers. Two additional scrubbers are being constructed at Genco’s Newton energy center. As discussed above, the timing of the installation of these scrubbers, as well as precipitator upgrades at AERG’s E.D. Edwards energy center, has been delayed. Merchant Generation and Genco will continue to review and adjust their compliance plans in light of evolving outlooks for power and capacity prices, delivered fuel costs, environmental standards and compliance technologies, among other factors.

 

The completion of Ameren’s, Ameren Missouri’s and Genco’s review of recently finalized environmental regulations and compliance measures could result in significant increases in capital expenditures and operating costs. The compliance costs could be prohibitive at some of our energy centers as the expected return from these investments, at current market prices for energy and capacity, might not justify the required capital expenditures or their continued operation, which could result in the impairment of long-lived assets.

Emission Allowances

The Clean Air Act created marketable commodities called emission allowances under the acid rain program, the NOx budget trading program, the CAIR, and the CSAPR. With the CSAPR, the EPA adopted a cap-and-trade approach that allows intrastate and limited interstate trading of emission allowances with other sources within the same program, that is, either the SO2, annual NOx, or ozone season NOx programs. As noted above, on December 30, 2011, the United States Court of Appeals for the District of Columbia issued a stay of the CSAPR. Until the CSAPR appeal process is concluded, the EPA will continue to administer the CAIR, including its allowance program.

Environmental regulations including the CAIR and the CSAPR, the timing of the installation of pollution control equipment, fuel mix, and the level of operations, will have a significant impact on the number of allowances required for ongoing operations. The CAIR uses the acid rain program’s allowances for SO2 emissions and created annual and ozone season NOx allowances. The CSAPR, however, did not rely upon the acid rain program, the NOx budget trading program, or CAIR allowances for its allowance allocation program. Instead, the EPA issued a new type of emissions allowance for each program under the CSAPR. Any unused SO2 allowances, annual NOx allowances, and ozone season NOx allowances issued under CAIR cannot be used for compliance with CSAPR. Ameren, Ameren Missouri and Genco expect to have adequate CAIR allowances for 2012 to avoid needing to make external purchases.

Ameren, Ameren Missouri and Genco are studying their compliance options to identify additional opportunities that may exist for compliance in an economical fashion should the CSAPR become effective as issued. Ameren, Ameren Missouri and Genco may be required to purchase emission allowances, if available, to install new or optimize existing pollution control equipment, to limit generation, or take other actions to achieve compliance with the CSAPR in future phase-in years.

Global Climate Change

State and federal authorities, including the United States Congress, have considered initiatives to limit greenhouse gas emissions and to address global climate change. Potential impacts from any climate change legislation or regulation could vary, depending upon proposed CO2 emission limits, the timing of implementation of those limits, the method of distributing any allowances, the degree to which offsets are allowed and available, and provisions for cost-containment measures, such as a “safety valve” provision that provides a maximum price for emission allowances. As a result of our fuel portfolio, our emissions of greenhouse gases vary among our energy centers, but coal-fired power plants are significant sources of CO2. The enactment of a climate change law could result in a significant rise in household costs, and rates for electricity could rise significantly. The burden could fall particularly hard on electricity consumers and upon the economy in the Midwest because of the region’s reliance on electricity generated by coal-fired power plants. Natural gas emits about half as much CO2 as coal when burned to produce electricity. Therefore, climate change regulation could cause the conversion of coal-fired power plants to natural gas, or the construction of new natural gas plants to replace coal-fired power plants. As a result, economywide shifts to natural gas as a fuel source for electricity generation also could affect the cost of heating for our utility customers and many industrial processes that use natural gas.

In December 2009, the EPA issued its “endangerment finding” under the Clean Air Act, which stated that greenhouse gas emissions, including CO2, endanger human health and welfare and that emissions of greenhouse gases from motor vehicles contribute to that endangerment. In March 2010, the EPA issued a determination that greenhouse gas emissions from stationary sources, such as power plants, would be subject to regulation under the Clean Air Act effective the beginning of 2011. As a result of these actions, we are required to consider the emissions of greenhouse gases in any air permit application.

Recognizing the difficulties presented by regulating at once virtually all emitters of greenhouse gases, the EPA finalized the “Tailoring Rule,” which established new higher thresholds beginning in January 2011, for regulating greenhouse gas emissions from stationary sources, such as power plants. The rule requires any source that already has an operating permit to have greenhouse-gas-specific provisions added to its permits upon renewal. Currently, all Ameren energy centers have operating permits that, when renewed, may be modified to address greenhouse gas emissions. The Tailoring Rule also provides that if projects performed at major sources result in an increase in emissions of greenhouse gases over an applicable annual threshold, such projects could trigger permitting requirements under the NSR programs and the application of best available control technology, if any, to control greenhouse gas emissions. New major sources are also required to obtain such a permit and to install the best available control technology if their greenhouse gas emissions exceed the applicable emissions threshold. The extent to which the Tailoring Rule could have a material impact on our energy centers depends upon how state agencies apply the EPA’s guidelines as to what constitutes the best available control technology for greenhouse gas emissions from power plants and whether physical changes or changes in operations subject to the rule occur at our energy centers. In June 2012, the United States Court of Appeals for the District of Columbia upheld the Tailoring Rule.

Separately, on March 27, 2012, the EPA issued the proposed Carbon Pollution Standard for New Power Plants. This proposed NSPS for greenhouse gas emissions would apply only to new fossil-fuel fired electric energy centers and therefore does not impact any of Ameren’s, Ameren Missouri’s, or Genco’s existing energy centers. Ameren anticipates this proposed rule, if enacted, could make the construction of new coal-fired energy centers in the United States prohibitively expensive. A final rule is expected in 2012. Any federal climate change legislation that is enacted may preempt the EPA’s regulation of greenhouse gas emissions, including the Tailoring Rule and the Carbon Pollution Standard for New Power Plants, particularly as it relates to power plant greenhouse gas emissions.

Future federal and state legislation or regulations that mandate limits on the emission of greenhouse gases would likely result in significant increases in capital expenditures and operating costs, which, in turn, could lead to increased liquidity needs and higher financing costs. Moreover, to the extent Ameren Missouri requests recovery of these costs through rates, its regulators might delay or deny timely recovery of these costs. Excessive costs to comply with future legislation or regulations might force Ameren, Ameren Missouri and Genco as well as other similarly situated electric power generators to close some coal-fired facilities earlier than planned, which could lead to possible impairment of assets and reduced revenues. As a result, mandatory limits could have a material adverse impact on Ameren’s, Ameren Missouri’s, and Genco’s results of operations, financial position, and liquidity.

Recent federal court decisions have considered the application of common law causes of action, such as nuisance, to address damages resulting from global climate change. In March 2012, the United States District Court for the Southern District of Mississippi dismissed the Comer v. Murphy Oil lawsuit, which alleged CO2 emissions from several industrial companies, including Ameren Missouri and Genco, created the atmospheric conditions that intensified Hurricane Katrina, thereby causing property damage. The case has been appealed to the appellate court.

The impact on us of future initiatives related to greenhouse gas emissions and global climate change is unknown. Compliance costs could increase as future federal legislative, federal regulatory, and state-sponsored initiatives to control greenhouse gases continue to progress, making it more likely that some form of greenhouse gas emissions control will eventually be required. Since these initiatives continue to evolve, the impact on our coal-fired energy centers and our customers’ costs is unknown, but could result in significant increases in our capital expenditures and operating costs. The compliance costs could be prohibitive at some of our energy centers as the expected return from these investments, at current market prices for energy and capacity, might not justify the required capital expenditures or their continued operation, which could result in the impairment of long-lived assets.

NSR and Clean Air Litigation

The EPA is engaged in an enforcement initiative to determine whether coal-fired power plants failed to comply with the requirements of the NSR and NSPS provisions under the Clean Air Act when the plants implemented modifications. The EPA’s inquiries focus on whether projects performed at power plants should have triggered various permitting requirements and the installation of pollution control equipment.

Commencing in 2005, Genco received a series of information requests from the EPA pursuant to Section 114(a) of the Clean Air Act. The requests sought detailed operating and maintenance history data with respect to Genco’s Coffeen, Hutsonville, Meredosia, Newton, and Joppa energy centers and AERG’s E.D. Edwards and Duck Creek energy centers. In April and June 2012, the EPA issued additional Section 114(a) requests to Genco regarding projects at its Newton and Joppa energy centers. Genco is in the process of responding to the 2012 information requests. In August 2012, Genco received a Notice of Violation from the EPA alleging violations of permitting requirements and of Title V of the Clean Air Act. The EPA contends that projects performed in 1997, 2006, and 2007 at Genco’s Newton energy center violated federal law. Genco believes its defenses to the allegations described the Notice of Violation are meritorious. Ameren and Genco are unable to predict the outcome of this matter and whether EPA will address this Notice of Violation administratively or through litigation.

Following the issuance of a Notice of Violation, in January 2011, the Department of Justice on behalf of the EPA filed a complaint against Ameren Missouri in the United States District Court for the Eastern District of Missouri. The EPA’s complaint alleges that in performing projects at its Rush Island coal-fired energy center, Ameren Missouri violated provisions of the Clean Air Act and Missouri law. In January 2012, the United States District Court granted, in part, Ameren Missouri’s motion to dismiss various aspects of the EPA’s penalty claims. The EPA’s claims for injunctive relief, including to require the installation of pollution control equipment, remain. At present, the complaint does not include Ameren Missouri’s other coal-fired energy centers, but the EPA has issued Notices of Violation under its NSR enforcement initiative against Ameren Missouri’s Labadie, Meramec, and Sioux coal-fired energy centers. Litigation of this matter could take many years to resolve. Ameren Missouri believes its defenses to the allegations described in the complaint as well as the Notices of Violation are meritorious. Ameren Missouri will defend itself vigorously. However, there can be no assurances that it will be successful in its efforts.

Ultimate resolution of these matters could have a material adverse impact on the future results of operations, financial position, and liquidity of Ameren, Ameren Missouri and Genco. A resolution could result in increased capital expenditures for the installation of pollution control equipment, increased operations and maintenance expenses, and penalties. We are unable to predict the ultimate resolution of these matters or the costs that might be incurred.

Clean Water Act

In March 2011, the EPA announced a proposed rule applicable to cooling water intake structures at existing power plants that have the ability to withdraw more than 2 million gallons of water per day from a body of water and use at least 25 percent of that water exclusively for cooling. Under the proposed rule, affected facilities would be required either to meet mortality limits for aquatic life impinged on the plant’s intake screens or to reduce intake velocity to 0.5 feet per second. The proposed rule also requires plants to meet site-specific entrainment standards or to reduce the cooling water intake flow commensurate with the intake flow of a closed-cycle cooling system. The final rule is scheduled to be issued in July 2013, with compliance expected within eight years thereafter. All coal-fired, nuclear, and combined cycle energy centers at Ameren, Ameren Missouri and Genco with cooling water systems are subject to this proposed rule. The proposed rule did not mandate cooling towers at existing facilities, as other technology options potentially could meet the site-specific standards. Ameren, Ameren Missouri and Genco are currently evaluating the proposed rule, and their assessment of the proposed rule’s impacts is ongoing. Therefore, we cannot predict at this time the capital or operating costs associated with compliance. The proposed rule could have an adverse effect on our results of operations, financial position, and liquidity if its implementation requires the installation of cooling towers at our energy centers.

In September 2009, the EPA announced its plan to revise the effluent guidelines applicable to steam electric generating units under the Clean Water Act. Effluent guidelines are national standards for wastewater discharges to surface water that are based on the effectiveness of available control technology. The EPA is engaged in information collection and analysis activities in support of this rulemaking. It has indicated that it expects to issue a proposed rule in November 2012 and to finalize the rule in April 2014. We are unable at this time to predict the impact of this development.

Remediation

We are involved in a number of remediation actions to clean up hazardous waste sites as required by federal and state law. Such statutes require that responsible parties fund remediation actions regardless of their degree of fault, the legality of original disposal, or the ownership of a disposal site. Ameren Missouri and Ameren Illinois have each been identified by the federal or state governments as a potentially responsible party (PRP) at several contaminated sites. Several of these sites involve facilities that were transferred by our rate-regulated utility operations in Illinois to Genco in May 2000 and to AERG in October 2003. As part of each transfer, Ameren Illinois contractually agreed to indemnify Genco and AERG for remediation costs associated with pre-existing environmental contamination at the transferred sites.

As of June 30, 2012, Ameren and Ameren Illinois owned or were otherwise responsible for 44 former MGP sites in Illinois. These are in various stages of investigation, evaluation, and remediation. Based on current estimated plans, Ameren and Ameren Illinois could substantially conclude remediation efforts at most of these sites by 2015. The ICC permits Ameren Illinois to recover remediation and litigation costs associated with its former MGP sites from its electric and natural gas utility customers through environmental adjustment rate riders. To be recoverable, such costs must be prudently and properly incurred. Costs are subject to annual review by the ICC.

As of June 30, 2012, Ameren and Ameren Missouri own or are otherwise responsible for 10 MGP sites in Missouri and one site in Iowa. Ameren Missouri does not currently have a rate rider mechanism that permits recovery of remediation costs associated with MGP sites from utility customers. Ameren Missouri does not have any retail utility operations in Iowa that would provide a source of recovery of these remediation costs.

The following table presents, as of June 30, 2012, the estimated probable obligation to remediate these MGP sites.

 

      Estimate          
      Low      High      Recorded
   Liability(a)
 

Ameren

   $   102       $   181       $   102   

Ameren Missouri

     3         4         3   

Ameren Illinois

     99         177         99   

 

(a) Recorded liability represents the estimated minimum probable obligations, as no other amount within the range was a better estimate.

 

Ameren Illinois is responsible for the cleanup of a former coal ash landfill in Coffeen, Illinois. As of June 30, 2012, Ameren Illinois estimated that obligation at $0.5 million to $6 million. Ameren Illinois recorded a liability of $0.5 million to represent its estimated minimum obligation for this site, as no other amount within the range was a better estimate. Ameren Illinois is also responsible for the cleanup of a landfill, underground storage tanks, and a water treatment plant in Illinois. As of June 30, 2012, Ameren Illinois recorded a liability of $0.8 million to represent its estimate of the obligation for these sites.

Ameren Missouri has responsibility for the investigation and potential cleanup of two waste sites in Missouri as a result of federal agency mandates. One of the cleanup sites is a former coal tar distillery located in St. Louis, Missouri. In 2008, the EPA issued an administrative order to Ameren Missouri pertaining to this distillery operated by Koppers Company or its predecessor and successor companies. Ameren Missouri is the current owner of the site, but Ameren Missouri did not conduct any of the manufacturing operations involving coal tar or its byproducts. Ameren Missouri, along with two other PRPs, is currently performing a site investigation. As of June 30, 2012, Ameren Missouri estimated its obligation at $2 million to $5 million. Ameren Missouri recorded a liability of $2 million to represent its estimated minimum obligation, as no other amount within the range was a better estimate. Ameren Missouri’s other active federal agency-mandated cleanup site in Missouri is a site in Cape Girardeau. Ameren Missouri was a customer of an electrical equipment repair and disposal company that previously operated a facility at this site. A trust was established in the early 1990s by several businesses and governmental agencies to fund the cleanup of this site, which was completed in 2005. Ameren Missouri anticipates this trust fund will be sufficient to complete the remaining adjacent off-site cleanup and therefore has no recorded liability at June 30, 2012, related to this site.

Ameren Missouri also has a federal agency mandate to complete a site investigation for a site in Illinois. In 2000, the EPA notified Ameren Missouri and numerous other companies, including Solutia, that former landfills and lagoons in Sauget, Illinois, may contain soil and groundwater contamination. These sites are known as Sauget Area 2. From about 1926 until 1976, Ameren Missouri operated an energy center adjacent to Sauget Area 2. Ameren Missouri currently owns a parcel of property that was once used as a landfill. Under the terms of an Administrative Order on Consent, Ameren Missouri has joined with other PRPs to evaluate the extent of potential contamination with respect to Sauget Area 2.

The Sauget Area 2 investigations overseen by the EPA have been completed. The results have been submitted to the EPA, and a record of decision is expected in 2012. Once the EPA has selected a remedy, if any, it would begin negotiations with various PRPs regarding implementation. Over the last several years, numerous other parties have joined the PRP group. In addition, Pharmacia Corporation and Monsanto Company have agreed to assume the liabilities related to Solutia’s former chemical waste landfill in the Sauget Area 2. As of June 30, 2012, Ameren Missouri estimated its obligation at $0.3 million to $10 million. Ameren Missouri recorded a liability of $0.3 million to represent its estimated minimum obligation, as no other amount within the range was a better estimate.

Our operations or those of our predecessor companies involve the use of, disposal of, and in appropriate circumstances, the cleanup of substances regulated under environmental protection laws. We are unable to determine whether such practices will result in future environmental commitments or affect our results of operations, financial position, or liquidity.

Ash Management

There has been activity at both state and federal levels regarding additional regulation of ash pond facilities and CCR. In May 2010, the EPA announced proposed new regulations regarding the regulatory framework for the management and disposal of CCR, which could affect future disposal and handling costs at our energy centers. Those proposed regulations include two options for managing CCRs under either solid or hazardous waste regulations, but either alternative would allow for some continued beneficial uses, such as recycling of CCR without classifying it as waste. As part of its proposal, the EPA is considering alternative regulatory approaches that require coal-fired power plants either to close surface impoundments, such as ash ponds, or to retrofit such facilities with liners. Existing impoundments and landfills used for the disposal of CCR would be subject to groundwater monitoring requirements and requirements related to closure and postclosure care under the proposed regulations. Additionally, in January 2010, EPA announced its intent to develop regulations establishing financial responsibility requirements for the electric generation industry, among other industries, and it specifically discussed CCR as a reason for developing the new requirements. Ameren, Ameren Missouri and Genco are currently evaluating all of the proposed regulations to determine whether current management of CCR, including beneficial reuse, and the use of the ash ponds should be altered. Ameren, Ameren Missouri and Genco also are evaluating the potential costs associated with compliance with the proposed regulation of CCR impoundments and landfills, which could be material, if such regulations are adopted.

Pumped-storage Hydroelectric Facility Breach

In December 2005, there was a breach of the upper reservoir at Ameren Missouri’s Taum Sauk pumped-storage hydroelectric energy center. This resulted in significant flooding in the local area, which damaged a state park. The rebuilt Taum Sauk energy center became fully operational in April 2010.

Ameren Missouri included certain capitalized costs associated with enhancements, or costs that would have been incurred absent the breach, at the rebuilt Taum Sauk energy center not recovered from property insurers in an electric rate case filing. However, in its July 2011 rate order, the MoPSC disallowed all of these capitalized costs associated with the rebuilding of the Taum Sauk energy center. See Note 2 - Rate and Regulatory Matters for additional information about the appeal of the MoPSC’s July 2011 electric rate order.

Ameren Missouri had liability insurance coverage for the Taum Sauk incident, subject to certain limits and deductibles. As of June 30, 2012, Ameren Missouri had an insurance receivable balance subject to liability coverage of $68 million.

In June 2010, Ameren Missouri sued an insurance company that was providing Ameren Missouri with liability coverage on the date of the Taum Sauk incident. In the litigation, filed in the United States District Court for the Eastern District of Missouri, Ameren Missouri claimed the insurance company breached its duty to indemnify Ameren Missouri for the losses experienced from the incident. In January 2011, the court ruled that the parties must first pursue alternative dispute resolution under the terms of their coverage agreement. In February 2011, Ameren Missouri filed an appeal of the January ruling with the United States Court of Appeals for the Eighth Circuit, seeking the ability to pursue resolution of this dispute outside of a dispute resolution process under the terms of its coverage agreement. The United States Court of Appeals is expected to issue a decision during 2012. Separately, in April 2012, Ameren Missouri sued a different insurance company that was providing Ameren Missouri with liability coverage on the date of the Taum Sauk incident. In the April 2012 litigation, which is pending in the U.S. District Court for the Eastern District of Missouri, Ameren Missouri claimed the insurance company breached its duty to indemnify Ameren Missouri for the losses experienced from the incident.

Until Ameren’s remaining liability insurance claims and the related litigation are resolved, we are unable to determine the total impact the breach could have on Ameren’s and Ameren Missouri’s results of operations, financial position, and liquidity beyond those amounts already recognized.

Asbestos-related Litigation

Ameren, Ameren Missouri, Ameren Illinois and EEI have been named, along with numerous other parties, in a number of lawsuits filed by plaintiffs claiming varying degrees of injury from asbestos exposure. Most have been filed in the Circuit Court of Madison County, Illinois. The total number of defendants named in each case varies, with as many as 272 parties named in some pending cases and as few as two in others. In the cases pending as of June 30, 2012, the average number of parties was 79.

The claims filed against Ameren, Ameren Missouri and Ameren Illinois allege injury from asbestos exposure during the plaintiffs’ activities at our present or former electric generating plants. Certain former Ameren Illinois energy centers are now owned by either Genco or AERG. As a part of the transfer of energy center ownership in 2000 and 2003, Ameren Illinois contractually agreed to indemnify Genco and AERG, respectively, for liabilities associated with asbestos-related claims arising from activities prior to each transfer. Each lawsuit seeks unspecified damages that, if awarded at trial, typically would be shared among the various defendants.

The following table presents the pending asbestos-related lawsuits filed against the Ameren Companies as of June 30, 2012:

 

Ameren   

Ameren

Missouri

  

Ameren 

llinois

   Genco   Total(a)
4    69    91    (b)   115

 

(a) Total does not equal the sum of the subsidiary unit lawsuits because some of the lawsuits name multiple Ameren entities as defendants.
(b) As of June 30, 2012, eight asbestos-related lawsuits were pending against EEI. The general liability insurance maintained by EEI provides coverage with respect to liabilities arising from asbestos-related claims.

At June 30, 2012, Ameren, Ameren Missouri, Ameren Illinois and Genco had liabilities of $21 million, $8 million, $13 million, and $- million, respectively, recorded to represent their estimate of their obligations related to asbestos claims.

Ameren Illinois has a tariff rider which permits recovery from customers within IP’s historical service territory of asbestos-related litigation claims that occurred within IP’s historical service territory. The rider can recover the costs of asbestos-related litigation claims, subject to the following terms: 90% of cash expenditures in excess of the amount included in base electric rates are to be recovered from a trust fund that was established when Ameren acquired IP. At June 30, 2012, the trust fund balance was $23 million, including accumulated interest. If cash expenditures are less than the amount in base rates, Ameren Illinois will contribute 90% of the difference to the trust fund. Once the trust fund is depleted, 90% of allowed cash expenditures in excess of base rates will be recovered through charges assessed to customers under the tariff rider.

Illinois Sales and Use Tax Exemptions and Credits

In Exelon Corporation v. Department of Revenue, the Illinois Supreme Court decided in 2009 that electricity is tangible personal property for purposes of the Illinois income tax investment credit. In March 2010, the United States Supreme Court refused to hear an appeal of the case, and the decision became final. During the second quarter of 2010, Genco, including EEI, and AERG began claiming Illinois sales and use tax exemptions and credits for purchase transactions related to their generation operations. The primary basis for those claims is that the determination in the Exelon case that electricity is tangible personal property applies to sales and use tax manufacturing exemptions and credits. On November 2, 2011, EEI received a notice of proposed tax liability, documenting the state of Illinois’ position that EEI did not qualify for the manufacturing exemption it used during 2010. EEI is challenging the state of Illinois’ position. In December 2011, EEI filed a request for review by the Informal Conference Board of the Illinois Department of Revenue. Ameren and Genco do not believe that it is probable that the state of Illinois will prevail and therefore have not recorded a charge to earnings for the loss contingency. From the second quarter of 2010 through December 31, 2011, Ameren and Genco claimed manufacturing exemptions and credits of $27 million and $19 million, respectively, which represents the maximum potential tax liability to Ameren and Genco.

Genco, including EEI, and AERG do not anticipate utilizing any additional manufacturing exemptions or credits in 2012, pending discussions with the Illinois Department of Revenue, and therefore will pay use tax on the applicable purchases. Each company, however, is reserving the right to apply for applicable refunds at a later date.