XML 55 R16.htm IDEA: XBRL DOCUMENT v3.22.2
Commitments And Contingencies
6 Months Ended
Jun. 30, 2022
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies COMMITMENTS AND CONTINGENCIES
We are involved in legal, tax, and regulatory proceedings before various courts, regulatory commissions, authorities, and governmental agencies with respect to matters that arise in the ordinary course of business, some of which involve substantial amounts of money. We believe that the final disposition of these proceedings, except as otherwise disclosed in the notes to our financial statements in this report and in the Form 10-K, will not have a material adverse effect on our results of operations, financial position, or liquidity.
Reference is made to Note 1 – Summary of Significant Accounting Policies, Note 2 – Rate and Regulatory Matters, Note 9 – Callaway Energy Center, Note 13 – Related-party Transactions, and Note 14 – Commitments and Contingencies under Part II, Item 8, of the Form 10-K. See also Note 1 – Summary of Significant Accounting Policies, Note 2 – Rate and Regulatory Matters, Note 8 – Related-party Transactions, and Note 10 – Callaway Energy Center of this report.
Environmental Matters
Our electric generation, transmission, and distribution and natural gas distribution and storage operations must comply with a variety of statutes and regulations relating to the protection of the environment and human health and safety including permitting programs implemented via federal, state, and local authorities. Such environmental laws address air emissions; discharges to water bodies; the storage, handling and disposal of hazardous substances and waste materials; siting and land use requirements; and potential ecological impacts. Complex and lengthy processes are required to obtain and renew approvals, permits, and licenses for new, existing, or modified facilities. Additionally, the use and handling of various chemicals or hazardous materials require release prevention plans and emergency response procedures. We employ dedicated personnel knowledgeable in environmental matters to oversee our business activities’ compliance with regulatory requirements.
Environmental regulations have a significant impact on the electric utility industry and compliance with these regulations could be costly for Ameren Missouri, which operates coal-fired power plants. Regulations under the Clean Air Act that apply to the electric utility industry include the NSPS, the CSAPR, the MATS, and the National Ambient Air Quality Standards, which are subject to periodic review for certain pollutants. Collectively, these regulations cover a variety of pollutants, such as SO2, particulate matter, NOx, mercury, toxic metals and acid gases, and CO2 emissions from new power plants. Regulations implementing the Clean Water Act govern both intake and discharges of water, and may require evaluation of the ecological and biological impact of our operations and could require modifications to water intake structures or more stringent limitations on wastewater discharges. Depending upon the scope of modifications ultimately required by state regulators, capital expenditures associated with these modifications could be significant. The management and disposal of coal ash is regulated under the Resource Conservation and Recovery Act and the CCR Rule, which require the closure of certain surface impoundments at Ameren Missouri’s coal-fired energy centers. The individual or combined effects of existing and new environmental regulations could result in significant capital expenditures, increased operating costs, or the closure or alteration of operations at some of Ameren Missouri’s energy centers. Ameren and Ameren Missouri expect that such compliance costs would be recoverable through rates, subject to MoPSC prudence review, but the timing of costs and their recovery could be subject to regulatory lag.
Additionally, Ameren Missouri’s wind generation facilities may be subject to operating restrictions to limit the impact on protected species. Nighttime operating restrictions may be required during the critical biological season, which typically occurs from April through October. Seasonal nighttime curtailment began at the High Prairie Renewable Energy Center at the end of March 2022, but the extent and duration of the curtailment is unknown at this time as assessment of mitigation technologies is ongoing. Ameren Missouri does not anticipate these operating curtailments to result in significant impacts on its results of operations, financial position, or liquidity.
Ameren and Ameren Missouri estimate that they will need to make capital expenditures of $125 million to $175 million from 2022 through 2026 in order to comply with existing environmental regulations. Additional environmental controls beyond 2026 could be required. This estimate of capital expenditures includes ash pond closure and corrective action measures required by the CCR Rule and the effluent limitation guidelines applicable to steam electric generating units, and potential modifications to cooling water intake structures at existing power plants under Clean Water Act rules, all of which are discussed below. In addition to planned retirements of fossil fuel-fired energy centers as set forth in the 2022 Change to the 2020 IRP filed with the MoPSC in June 2022 and as noted in the NSR and Clean Air Act litigation and Illinois emissions standards discussed below, Ameren Missouri’s current plan for compliance with existing air emission regulations includes burning low-sulfur coal and installing new or optimizing existing air pollution control equipment. The actual amount of capital expenditures required to comply with existing environmental regulations may vary substantially from the above estimates because of uncertainty as to future permitting requirements made by state regulators and the EPA, potential revisions to regulatory obligations, and the cost of potential compliance strategies, among other things.
The following sections describe the more significant environmental laws and rules and environmental enforcement and remediation matters that affect or could affect our operations. The EPA has initiated an administrative review of several regulations and proposed amendments to regulations and guidelines, including the CSAPR, which could ultimately result in the revision of all or part of such rules.
Clean Air Act
Federal and state laws, including CSAPR, regulate emissions of SO2 and NOx through the reduction of emissions at their source and the use and retirement of emission allowances. CSAPR is implemented through a series of phases, and the second phase became effective in 2017. In April 2022, the EPA proposed plans for additional emission reductions from power plants in Missouri, Illinois, and other states through revisions to the CSAPR; and additional emission reduction requirements may apply in subsequent years. The EPA expects to issue a final rule in March 2023. Ameren Missouri complies with current CSAPR requirements by minimizing emissions through the use of low-sulfur coal, operation of two scrubbers at its Sioux Energy Center, and optimization of other existing air pollution control equipment. Ameren Missouri could incur additional costs to lower its emissions at one or more of its energy centers to comply with additional CSAPR requirements in future years. These additional costs for compliance are expected to be recovered from customers through the FAC or higher base rates.
CO2 Emissions Standards
In June 2022, the United States Supreme Court issued its decision in West Virginia v. EPA. The decision clarifies that there are limits on how the EPA may regulate greenhouse gases absent further direction from the United States Congress. The court concluded that emission caps that would cause generation shifting from fossil-fuel-fired power plants to renewable energy facilities would require specific congressional authorization and that such authorization had not been given under the Clean Air Act. The decision by the United States Supreme Court may affect the EPA’s development of any new regulations to address CO2 emissions from coal- and natural gas-fired power plants; however, at this time, Ameren Missouri cannot predict the impact of any such regulations or the decision by the United States Supreme Court on the results of operations, financial position, and liquidity of Ameren or Ameren Missouri.
NSR and Clean Air Act Litigation
In January 2011, the United States Department of Justice, on behalf of the EPA, filed a complaint against Ameren Missouri in the United States District Court for the Eastern District of Missouri alleging that in performing projects at its coal-fired Rush Island Energy Center in 2007 and 2010, Ameren Missouri violated provisions of the Clean Air Act and Missouri law. In January 2017, the district court issued a liability ruling against Ameren Missouri and, in September 2019, entered a remedy order that required Ameren Missouri to install a flue gas desulfurization system at the Rush Island Energy Center and a dry sorbent injection system at the Labadie Energy Center. Following an appeal from Ameren Missouri in August 2021, the United States Court of Appeals for the Eighth Circuit affirmed the liability ruling and the district court’s remedy order as it related to the installation of a flue gas desulfurization system at the Rush Island Energy Center, but reversed the order as it related to the installation of a dry sorbent injection system at the Labadie Energy Center. In November 2021, the court of appeals issued an order denying requests for consideration previously sought by both Ameren Missouri and the United States Department of Justice.
Based on its assessment of available legal, operational, and regulatory alternatives, Ameren Missouri filed a motion in December 2021, with the district court to modify the remedy order to allow the retirement of the Rush Island Energy Center in advance of its previously expected useful life in lieu of installing a flue gas desulfurization system. In June 2022, Ameren Missouri supplemented its filing with the district court by proposing reduced operations, mostly operating during peak demand times and emergencies until the energy center is retired. The March 31, 2024 compliance date contained in the district court’s September 2019 remedy order remains in effect unless extended by the district court. In July 2022, in response to an Ameren Missouri request for a final, binding reliability assessment, the MISO designated the Rush Island Energy Center as a system support resource and concluded that certain mitigation measures, including transmission upgrades, should occur before the energy center is retired. The transmission upgrade projects have been approved by the MISO, and Ameren Missouri has started design and procurement activities necessary to complete the upgrades and expects to complete the upgrades by late 2025. The FERC will need to approve a system support resource agreement detailing the manner of continued operation of the Rush Island Energy Center, as well as a request from Ameren Missouri for recovery of non-energy costs under the related MISO tariff. The agreement, if approved, would have a term of 12 months. The system support resource designation and the related agreement are subject to renewal and revision. Any difference between revenues and costs under the MISO tariff is expected to be included in the FAC. The district court has the authority to determine the retirement date and operating parameters for the Rush Island Energy Center and is not bound by the MISO determination of the Rush Island Energy Center as a system support resource or the FERC’s approval. While the district court is under no deadline to issue a ruling modifying the remedy order, a decision is expected in the near term. Related to this matter, in February 2022, the MoPSC issued an order directing the MoPSC staff to review the planned accelerated retirement of the Rush Island Energy Center. See Note 2 – Rate and Regulatory Matters for additional information.
In connection with the planned accelerated retirement of the Rush Island Energy Center, Ameren Missouri expects to seek approval from the MoPSC to finance the costs associated with the retirement, including the remaining unrecovered net plant balance associated with the facility, through the issuance of securitized utility tariff bonds pursuant to the Missouri securitization statute. As such, Ameren Missouri did not request a change in the depreciation rates related to the Rush Island Energy Center in the electric regulatory rate review filed in August 2022. See Note 2 – Rate and Regulatory Matters for additional information on the August 2022 electric regulatory rate review. As of June 30, 2022, the Rush Island Energy Center had a net plant balance of approximately $0.6 billion included in plant to be abandoned, net, within “Property, Plant, and Equipment, Net” and a rate base of approximately $0.5 billion. See Note 1 – Summary of Significant Accounting Policies under Part II, Item 8, of the Form 10-K for additional information regarding plant to be abandoned, net. In addition, Ameren Missouri filed a 2022 Change to the 2020 IRP with the MoPSC in June 2022 to reflect, among other things, the planned acceleration of the retirement of the Rush Island Energy Center from 2039, the retirement year for the facility as reflected in the 2020 IRP and reflected in depreciation rates approved by the December 2021 MoPSC electric rate order.
Ameren Missouri is unable to predict the ultimate resolution of this matter; however, such resolution could have a material adverse effect on the results of operations, financial position, and liquidity of Ameren and Ameren Missouri.
Clean Water Act
The EPA’s regulations implementing Section 316(b) of the Clean Water Act require power plant operators to evaluate cooling water intake structures and identify measures for reducing the number of aquatic organisms impinged on a power plant’s cooling water intake screens or entrained through the plant’s cooling water system. All of Ameren Missouri’s coal-fired and nuclear energy centers are subject to the cooling water intake structures rule. Requirements of the rule are implemented by state regulators through the permit renewal process of each power plant’s water discharge permit, which is expected to be completed by 2023 for Ameren Missouri.
In 2015, the EPA issued a rule to revise the effluent limitation guidelines applicable to steam electric generating units. These guidelines established national standards for water discharges, prohibit effluent discharges of certain waste streams, and impose more stringent limitations on certain water discharges from power plants. To meet the requirements of the guidelines, Ameren Missouri installed dry ash handling systems and in 2020 completed construction of wastewater treatment facilities at three of its four coal-fired energy centers. The Meramec Energy Center is scheduled to retire in 2022 and, as a result, does not require new wastewater and dry ash handling systems.
CCR Management
The EPA’s CCR Rule establishes requirements for the management and disposal of CCR from coal-fired power plants and will result in the closure of certain surface impoundments at Ameren Missouri’s energy centers. Ameren Missouri completed the closure of all surface impoundments at its Labadie and Rush Island energy centers in 2021, and has made significant progress by closing several surface impoundments at its Sioux and Meramec energy centers. Ameren Missouri plans to complete the closures of the remaining surface impoundments as required by the CCR Rule in 2023. In January 2022, Ameren Missouri received notice of a proposed determination by the EPA that it has rejected Ameren Missouri’s requests to extend the timeline for operating certain surface impoundments located at the Sioux and Meramec energy centers. Pursuant to the terms of the proposed determination, compliance with the CCR Rule’s requirements for closure of the surface impoundments would be required 135 days after the EPA issues a final determination. In February 2022, Ameren Missouri filed comments with the EPA requesting additional time to construct a CCR Rule-compliant impoundment at the Sioux Energy Center and complete the closure of the surface impoundments at the Meramec Energy Center. The EPA is under no deadline to issue a final determination. If Ameren Missouri was no longer able to use the surface impoundments at the Sioux or Meramec energy centers, Ameren Missouri would not be able to operate the energy centers unless an alternative for handling the CCR material was available. Ameren Missouri will retire the Meramec Energy Center in 2022, and construction of a CCR Rule-compliant surface impoundment at the Sioux Energy Center is expected to be completed by the fall of 2022 to allow for continued operations. Ameren Missouri does not expect that this matter will have a material adverse effect on its results of operations, financial position, or liquidity.
Ameren and Ameren Missouri have AROs of $77 million recorded on their respective balance sheets as of June 30, 2022, associated with CCR storage facilities. Ameren Missouri estimates it will need to make capital expenditures of $60 million to $80 million from 2022 through 2026 to implement its CCR management compliance plan, which includes installation of groundwater monitoring equipment and groundwater treatment facilities.
Remediation
The Ameren Companies are involved in a number of remediation actions to clean up sites impacted by the use or disposal of materials containing hazardous substances. Federal and state laws can require responsible parties to fund remediation regardless of their degree of fault, the legality of original disposal, or the ownership of a disposal site.
As of June 30, 2022, Ameren Illinois has remediated the majority of the 44 former MGP sites in Illinois and could substantially conclude remediation efforts at the remaining sites by 2023. The ICC allows Ameren Illinois to recover such remediation and related litigation costs from its electric and natural gas utility customers through environmental cost riders that are subject to annual prudence reviews by the ICC. As of June 30, 2022, Ameren Illinois estimated the remaining obligation related to these former MGP sites at $78 million to $147 million. Ameren and Ameren Illinois recorded a liability of $78 million to represent the estimated minimum obligation for these sites, as no other amount within the range was a better estimate.
The scope of the remediation activities at these former MGP sites may increase as remediation efforts continue. Considerable uncertainty remains in these estimates because many site-specific factors can influence the actual costs, including unanticipated underground structures, the degree to which groundwater is encountered, regulatory changes, local ordinances, and site accessibility. The actual costs and timing of completion may vary substantially from these estimates.
Our operations or those of our predecessor companies involve the use of, disposal of, and, in appropriate circumstances, the cleanup of substances regulated under environmental laws. We are unable to determine whether such historical practices will result in future environmental commitments or will affect our results of operations, financial position, or liquidity.
Illinois Emission Standards
The IETL established emission standards that became effective in September 2021. Ameren Missouri’s natural gas-fired energy centers in Illinois are subject to limits on emissions, including CO2 and NOx, equal to their unit-specific average emissions from 2018 through 2020, for any rolling twelve-month period beginning October 1, 2021, through 2029. Further reductions to emissions limits will become effective between 2030 and 2040, resulting in the closure of the Venice Energy Center by 2029. The reductions could also limit the operations of Ameren Missouri’s other four natural gas-fired energy centers located in the state of Illinois, and will result in their closure by 2040. These energy centers are utilized to support peak loads. Subject to conditions in the IETL, these energy centers may be allowed to exceed the emissions limits in order to maintain reliability of electric utility service as necessary. Ameren Missouri filed a 2022 Change to the 2020 IRP with the MoPSC in June 2022 to reflect, among other things, the updated scheduled retirement dates of the natural gas-fired energy centers located in the state of Illinois.