Under the NWPA, the DOE is responsible for disposing of spent nuclear fuel from the Callaway energy center and other commercial nuclear energy centers. The NWPA established the fee that Ameren Missouri and other utilities that own and operate those energy centers pay the federal government for disposing of the spent nuclear fuel at one mill, or one-tenth of one cent, for each kilowatthour generated and sold by those plants. The NWPA also requires the DOE to review the nuclear waste fee annually against the cost of the nuclear waste disposal program and to propose to the United States Congress any fee adjustment necessary to offset the costs of the program. As required by the NWPA, Ameren Missouri and other utilities have entered into standard contracts with the DOE. Consistent with the NWPA and its standard contract, which stated that the DOE would begin to dispose of spent nuclear fuel by 1998, Ameren Missouri had historically collected one mill from its electric customers for each kilowatthour of electricity that it generated and sold from its Callaway energy center. Because the federal government is not meeting its disposal obligation, the collection of this fee was suspended in May 2014. The DOE's delay in carrying out its obligation to dispose of spent nuclear fuel from the Callaway energy center is not expected to adversely affect the continued operations of the energy center.
As a result of the DOE's failure to fulfill its contractual obligations, Ameren Missouri and other nuclear energy center owners sued the DOE to recover costs incurred for ongoing storage of their spent fuel. The lawsuit resulted in a settlement agreement that provides for annual reimbursement of additional spent fuel storage and related costs. For the six months ended June 30, 2017 and 2016, Ameren Missouri did not receive any such reimbursements. Ameren Missouri will continue to apply for reimbursement from the DOE for allowable costs associated with the ongoing storage of spent fuel.
Decommissioning
Electric utility rates charged to customers provide for the recovery of the Callaway energy center's decommissioning costs, which include decontamination, dismantling, and site restoration costs, over the expected life of the nuclear energy center. Amounts collected from customers are deposited into the external nuclear decommissioning trust fund to provide for the Callaway energy center’s decommissioning. It is assumed that the Callaway energy center site will be decommissioned through the immediate dismantlement method and removed from service. Ameren and Ameren Missouri have recorded an ARO for the Callaway energy center decommissioning costs at fair value, which represents the present value of estimated future cash outflows. Annual decommissioning costs of $7 million are included in the costs used to establish electric rates for Ameren Missouri's customers. Every three years, the MoPSC requires Ameren Missouri to file an updated cost study and funding analysis for decommissioning its Callaway energy center. In April 2016, the MoPSC approved no change in the annual decommissioning costs used to establish electric rates.
The fair value of the trust fund for Ameren Missouri's Callaway energy center is reported as "Nuclear decommissioning trust fund" in Ameren's and Ameren Missouri's balance sheets. This amount is legally restricted and may be used only to fund the costs of nuclear decommissioning. Changes in the fair value of the trust fund are recorded as an increase or decrease to the nuclear decommissioning trust fund, with an offsetting adjustment to the related regulatory liability. If the assumed return on trust assets is not earned, Ameren Missouri believes that it is probable that any such earnings deficiency will be recovered in rates.
Supplier of Fuel Assemblies
The next scheduled refueling and maintenance outage at Ameren Missouri’s Callaway energy center will be in fall 2017. The Callaway energy center uses nuclear fuel assemblies fabricated by Westinghouse. Ameren Missouri has received all necessary fuel assemblies for the fall 2017 refueling and maintenance outage. Westinghouse is currently the only NRC-licensed supplier authorized to provide fuel assemblies to the Callaway energy center. During the first quarter of 2017, Westinghouse filed voluntary petitions for a court-supervised restructuring process under Chapter 11 of the United States Bankruptcy Code. Westinghouse could petition the bankruptcy court to reject Ameren Missouri’s contracts as part of the restructuring process, and if the bankruptcy court agrees, this could result in Ameren Missouri not having access to the fuel assemblies necessary to refuel the Callaway energy center in future scheduled refueling and maintenance outages. At this time, Ameren and Ameren Missouri believe the restructuring proceeding will not affect Westinghouse’s performance under the terms of its existing contracts with Ameren Missouri, and therefore do not expect any material impact to Ameren Missouri’s operations as a result of this restructuring proceeding. However, Ameren and Ameren Missouri could incur material unexpected costs as a result of the Westinghouse bankruptcy, such as the loss of fuel inventory that is stored at Westinghouse’s facility and the cost of replacement power. A change of fuel suppliers or a change in the type of fuel assembly design that is currently licensed for use at the Callaway energy center could take an estimated three years of analysis and NRC licensing efforts to implement.
Insurance
The following table presents insurance coverage at Ameren Missouri’s Callaway energy center at June 30, 2017. The property coverage and the nuclear liability coverage renewal dates are April 1 and January 1, respectively, of each year. Both coverages were renewed in 2017.
Type and Source of Coverage
Maximum Coverages
 
Maximum Assessments
for Single Incidents
 
Public liability and nuclear worker liability:
 
 
 
 
American Nuclear Insurers
$
450

  
$

  
Pool participation
12,986

(a) 
127

(b) 
 
$
13,436

(c) 
$
127

  
Property damage:
 
 
 
 
NEIL and EMANI
$
3,200

(d) 
$
29

(e) 
Replacement power:
 
 
 
 
NEIL
$
490

(f) 
$
7

(e) 
(a)
Provided through mandatory participation in an industrywide retrospective premium assessment program.
(b)
Retrospective premium under the Price-Anderson Act. This is subject to retrospective assessment with respect to a covered loss in excess of $450 million in the event of an incident at any licensed United States commercial reactor, payable at $19 million per year.
(c)
Limit of liability for each incident under the Price-Anderson liability provisions of the Atomic Energy Act of 1954, as amended. This limit is subject to change to account for the effects of inflation and changes in the number of licensed reactors.
(d)
NEIL provides $2.7 billion in property damage, stabilization, decontamination, and premature decommissioning insurance for radiation events and $2.3 billion in property damage for nonradiation events. EMANI provides $490 million for both radiation and nonradiation events.
(e)
All NEIL insured plants could be subject to assessments should losses exceed the accumulated funds from NEIL.
(f)
Provides replacement power cost insurance in the event of a prolonged accidental outage. Weekly indemnity up to $4.5 million for 52 weeks, which commences after the first twelve weeks of an outage, plus up to $3.6 million per week for a minimum of 71 weeks thereafter for a total not exceeding the policy limit of $490 million. Nonradiation events are limited to $328 million.
The Price-Anderson Act is a federal law that limits the liability for claims from an incident involving any licensed United States commercial nuclear energy center. The limit is based on the number of licensed reactors. The limit of liability and the maximum potential annual payments are adjusted at least every five years for inflation to reflect changes in the Consumer Price Index. The most recent five-year inflationary adjustment became effective in September 2013. Owners of a nuclear reactor cover this exposure through a combination of private insurance and mandatory participation in a financial protection pool, as established by the Price-Anderson Act.
Losses resulting from terrorist attacks on nuclear facilities are subject to industrywide aggregates, such that terrorist acts against one or more commercial nuclear power plants insured by NEIL or EMANI within a stated time period would be treated as a single event, and the owners of the nuclear power plants would share one full limit of liability. NEIL policies have an aggregate limit of $3.2 billion within a 12-month period for radiation events, or $1.8 billion for events not involving radiation contamination. The EMANI policies have an aggregate limit of €600 million for radiation and nonradiation events within a period of 72 hours.
If losses from a nuclear incident at the Callaway energy center exceed the limits of, or are not covered by insurance, or if coverage is unavailable, Ameren Missouri is at risk for any uninsured losses. If a serious nuclear incident were to occur, it could have a material adverse effect on Ameren’s and Ameren Missouri’s results of operations, financial position, or liquidity.