Manufactured Gas Plant  
Accrual for environmental loss contingencies $ 232.0
Manufactured Gas Plant | Ameren Illinois Company  
Number of remediation sites | site 44
Loss contingency range of possible loss, minimum $ 232.0
Loss contingency range of possible loss, maximum 313.0
Accrual for environmental loss contingencies 232.0
Former Coal Ash Landfill | Ameren Illinois Company  
Loss contingency range of possible loss, minimum 0.5
Loss contingency range of possible loss, maximum 6.0
Accrual for environmental loss contingencies 0.5
Other Environmental | Ameren Illinois Company  
Accrual for environmental loss contingencies 0.7
Former Coal Tar Distillery | Union Electric Company  
Loss contingency range of possible loss, minimum 2.0
Loss contingency range of possible loss, maximum 5.0
Accrual for environmental loss contingencies 2.0
Sauget Area 2 | Union Electric Company  
Loss contingency range of possible loss, minimum 1.0
Loss contingency range of possible loss, maximum 2.5
Accrual for environmental loss contingencies 1.0
Substation in St Charles, Missouri | Union Electric Company  
Accrual for environmental loss contingencies 0.6
Minimum  
Estimated capital costs to comply with existing and known federal and state air emissions regulations 600.0
Maximum  
Estimated capital costs to comply with existing and known federal and state air emissions regulations $ 700.0