Transaction Agreement with IPH
On March 14, 2013, Ameren entered into a transaction agreement to divest New AER to IPH. Under the terms of the transaction agreement, AER will effect a reorganization that will, among other things, transfer substantially all of the assets and liabilities of AER, other than (i) any outstanding debt obligations of AER to Ameren or its other subsidiaries, except for certain intercompany balances discussed below, (ii) all of the issued and outstanding equity interests in Medina Valley, (iii) the assets and liabilities associated with Genco’s Meredosia, Hutsonville, Elgin, Gibson City, and Grand Tower gas-fired energy centers, (iv) the obligations relating to Ameren's single-employer pension and postretirement benefit plans, and (v) the deferred tax positions associated with Ameren's ownership of these retained assets and liabilities, to New AER. IPH will acquire all of the equity interests in New AER.
Ameren will retain the pension and postretirement benefit obligations associated with current and former employees of AER that are included in the Ameren Retirement Plan, the Ameren Supplemental Retirement Plan, the Ameren Retiree Medical Plan, and the Ameren Group Life Insurance Plan. This noncurrent obligation is reflected on Ameren’s consolidated balance sheet as “Pension and other postretirement benefits.” IPH will assume the pension and other postretirement benefit obligations associated with EEI’s current and former employees that are included in the Revised Retirement Plan for Employees of Electric Energy, Inc., the Group Insurance Plan for Management Employees of Electric Energy, Inc., and the Group Insurance Plan for Bargaining Unit Employees of Electric Energy, Inc. The obligations to be assumed by IPH are estimated at $32 million at September 30, 2013. IPH will also acquire the estimated $15 million asset at September 30, 2013, relating to the overfunded status of one of EEI’s postretirement plans.
Ameren will retain Genco’s Meredosia and Hutsonville energy centers, which are idle and had an immaterial property and plant asset balance as of September 30, 2013. Ameren will also retain AROs associated with these energy centers, estimated at $27 million as of September 30, 2013. The Meredosia and Hutsonville energy centers are currently included in continuing operations; however, Ameren is evaluating whether it would be appropriate to classify them as abandoned and discontinued coincident with closing of the transaction with IPH. All other AROs associated with AER are expected to be assumed by either New AER or the third-party buyer of the Grand Tower energy center.
Upon the transaction agreement closing, with the exception of certain agreements, such as supply obligations to Ameren Illinois, a note from New AER to Ameren relating to cash collateral that will remain outstanding at closing, and Genco money pool advances, all intercompany agreements and debt between AER and its subsidiaries, on the one hand, and Ameren and its non-AER affiliates, on the other hand, will be either retained or cancelled by Ameren, without any cost or obligation to IPH or New AER and its subsidiaries. Immediately prior to the transaction agreement closing, the cash collateral provided to New AER by Ameren through money pool borrowings will be converted to a note payable to Ameren, which will be payable, with interest, 24 months after closing or sooner as cash collateral requirements are reduced. Cash collateral postings by AER and its subsidiaries with external parties, including postings related to exchange-traded contracts, at September 30, 2013, were $27 million.
Genco's $825 million in aggregate principal amount of senior notes will remain outstanding following the closing of the transaction agreement and will continue to be solely obligations of Genco. Pursuant to the transaction agreement, in addition to the cash paid to Genco for the Elgin, Gibson City, and Grand Tower energy center sale, Ameren will cause $85 million of cash to be retained at New AER.
As a condition to the transaction agreement, Genco exercised the amended put option agreement for the sale of the Elgin, Gibson City, and Grand Tower gas-fired energy centers to Medina Valley. In October 2013, immediately after receipt of FERC approval, Genco completed the sale of the Elgin, Gibson City, and Grand Tower gas-fired energy centers to Medina Valley.
Completion of the divestiture of New AER to IPH requires FERC and FCC approvals. In October 2013, FERC issued an order approving the divestiture of New AER. The FCC approval was received in August 2013. Separately, as a condition to IPH’s obligation to complete the New AER transaction, the Illinois Pollution Control Board must approve the transfer to IPH of, or otherwise approve a variance in favor of IPH on the same material terms as, AER’s variance of the Illinois MPS. In May 2013, AER and IPH filed a transfer request with the Illinois Pollution Control Board, which was subsequently denied by the board on procedural grounds. On July 22, 2013, IPH, AER, and Medina Valley, as current and future owners of the coal-fired energy centers, filed a request for a variance with the Illinois Pollution Control Board seeking materially the same relief as the existing AER variance. The Illinois Pollution Control Board has until late November 2013 to issue a decision. See Note 10 - Commitments and Contingencies for additional information. Ameren’s and IPH’s obligation to complete the transaction is also subject to other customary closing conditions, including the material accuracy of each company’s representations and warranties and the compliance, in all material respects, with each company’s covenants. The transaction agreement contains customary representations and warranties of Ameren and IPH, including representations and warranties of Ameren with respect to the business being sold. The transaction agreement also contains customary covenants of Ameren and IPH, including the covenant of Ameren that AER will be operated in the ordinary course prior to the closing.
Ameren expects the closing of the New AER divestiture to IPH will occur in the fourth quarter of 2013. If the closing does not occur on or before March 14, 2014, either party may elect to terminate the transaction agreement if the inability to close the transaction by such date is not the result of the failure of the terminating company to fulfill any of its obligations under the transaction agreement. The transaction agreement with IPH also provides for a $25 million cash termination fee if either Ameren or IPH breach any of their representations, warranties, covenants or obligations in a manner that would result in the other party having the right to terminate the transaction agreement, or if Ameren or IPH fails to complete the transaction within three business days of the scheduled closing date, subject to certain exceptions.
Amended Put Option Agreement, Asset Purchase Agreement and Guaranty
Prior to entry into the transaction agreement with IPH as discussed above, (i) the original put option agreement between Genco and AERG was novated and amended such that the rights and obligations of AERG under the agreement were assigned to and assumed by Medina Valley and (ii) Genco exercised its option under the amended put option agreement to sell the Elgin, Gibson City, and Grand Tower gas-fired energy centers to Medina Valley. As a result, on March 14, 2013, Genco received an initial payment of $100 million in accordance with the terms of the amended put option agreement. Genco advanced the initial payment amount it received into the non-state-regulated subsidiary money pool. In connection with the amended put option agreement, Ameren's guaranty, dated March 28, 2012, was modified to replace all references to AERG with references to Medina Valley.
Pursuant to the amended put option agreement, Genco and Medina Valley entered into an asset purchase agreement, dated March 14, 2013. The asset purchase agreement provided that Genco would receive an additional payment upon closing of the asset purchase agreement to the extent the average fair market value for the Elgin, Gibson City, and Grand Tower gas-fired energy centers, as determined based on three independent appraisals, exceeded the $100 million initial payment Genco received from Medina Valley. Genco and Medina Valley engaged three independent appraisers to conduct fair market valuations of the Elgin, Gibson City, and Grand Tower gas-fired energy centers. The average fair market value pursuant to such appraisals for the Elgin, Gibson City, and Grand Tower gas-fired energy centers was $137.5 million, which was greater than the original fair value estimate of $133 million. Therefore, after receipt of FERC approval and upon closing of the asset purchase agreement in October 2013, Genco received an additional payment of $37.5 million from Medina Valley. Genco advanced the additional $37.5 million it received into the non-state-regulated subsidiary money pool.

The transaction agreement with IPH provides that if the Elgin, Gibson City, and Grand Tower gas-fired energy centers are subsequently sold to a third-party and Medina Valley receives proceeds within two years of the closing of the New AER divestiture, Medina Valley will pay Genco any proceeds from such sale, net of taxes and other expenses, in excess of the amounts previously paid to Genco, which totaled $137.5 million.

Medina Valley has entered into an agreement to sell the Elgin, Gibson City, and Grand Tower gas-fired energy centers to Rockland Capital. This agreement requires a portion of the purchase price to be held in escrow until the two year anniversary of the closing of the sale to fund certain indemnity obligations, if any, of Medina Valley. Ameren expects the sale of the Elgin, Gibson City, and Grand Tower gas-fired energy centers to Rockland Capital to close by the end of 2013, subject to receipt of FERC and other regulatory approvals. If this sale is completed, Medina Valley could pay Genco after-tax net proceeds of up to an additional $15 million based on the maximum escrow amount that could ultimately be released, projected working capital adjustments, and projected transaction expenses.
In August 2013, the Illinois Municipal Electric Agency, which is a wholesale customer of Marketing Company, filed a lawsuit in the United States District Court for the Central District of Illinois against Marketing Company alleging that the removal of certain assets that were related to the amended put option agreement from the parties’ contract schedules without the customer’s consent constituted a breach of contract. In addition, the lawsuit alleges that Genco and AERG failed to recognize certain asset impairments that the Illinois Municipal Electric Agency alleges have occurred and which the Illinois Municipal Electric Agency claims would, if recognized, reduce the billings to the Illinois Municipal Electric Agency. The lawsuit also makes certain other claims that the proposed divestiture would result in a breach of the parties’ contract. Marketing Company believes its defenses to these allegations are meritorious and will defend itself vigorously.
Discontinued Operations Presentation
As of March 14, 2013, Ameren determined that New AER and the Elgin, Gibson City, and Grand Tower gas-fired energy centers qualified for discontinued operations presentation and, therefore, were classified separately in Ameren’s consolidated financial statements as discontinued operations for all periods presented in this report. Ameren concluded that New AER and collectively the Elgin, Gibson City, and Grand Tower gas-fired energy centers are two separate disposal groups. Both disposal groups have been aggregated in the disclosures below. Each disposal group was measured at fair value on a nonrecurring basis with inputs that are classified as Level 3 within the fair value hierarchy.
The following table presents the components of discontinued operations in Ameren's consolidated statement of income for the three and nine months ended September 30, 2013, and 2012:
 
Three Months
 
Nine months
 
 
2013
 
2012
 
2013
 
2012
 
Operating revenues
$
311

 
$
293

 
$
878

 
$
797

 
Operating expenses
(309
)
 
(237
)
 
(1,034
)
(a) 
(1,301
)
(b) 
Operating income (loss)
2

 
56

 
(156
)
 
(504
)
 
Other income (loss)

 

 
(1
)
 

 
Interest charges
(9
)
 
(14
)
 
(31
)
 
(43
)
 
Income (loss) before income taxes
(7
)
 
42

 
(188
)
 
(547
)
 
Income tax (expense) benefit
4

 
21

 
(24
)
 
216

 
Income (loss) from discontinued operations, net of taxes
$
(3
)
 
$
63

 
$
(212
)
 
$
(331
)
 
(a)
Includes a noncash pretax impairment charge of $175 million for the nine months ended September 30, 2013, to reduce the carrying value of the New AER disposal group to its estimated fair value less cost to sell.
(b)
Includes a noncash pretax asset impairment charge of $628 million to reduce the carrying value of AERG’s Duck Creek energy center to its estimated fair value under held and used accounting guidance.
As the New AER disposal group continued to meet the discontinued operations criteria at September 30, 2013, Ameren evaluated whether any impairment existed by comparing the disposal group’s carrying value to the estimated fair value of the disposal group, less cost to sell. The fair value was based on the terms of Ameren’s agreement to divest New AER to IPH. Ameren will receive no cash proceeds from IPH for the divestiture of New AER. Ameren recorded a cumulative pretax charge to earnings of $175 million for the nine months ended September 30, 2013, to reduce the carrying value of the New AER disposal group to its estimated fair value less cost to sell. Ameren recorded a pretax charge to earnings of $7 million for the three months ended September 30, 2013, to reduce the carrying value of the New AER disposal group to its estimated fair value less cost to sell. The pretax charge to earnings increased during the three months ended September 30, 2013, as the disposal group’s carrying value increased, primarily as a result of contributions made to EEI’s pension plan and derivative market value gains. The impairment loss was recorded in “Operating expenses” within the components of the discontinued operations statement of income with a corresponding reduction in “Property and Plant, net” within the components of the discontinued operations balance sheet. Ameren estimated the impairment loss of the disposal group based on the estimated fair value pursuant to the terms of the transaction agreement with IPH, using information currently available, and assuming an expected fourth quarter 2013 closing. Actual operating results, derivative market values, capital expenditures and other items will impact the ultimate loss recognized to reduce the carrying value of the New AER disposal group to its actual fair value less cost to sell, which will be recorded in discontinued operations after all of the information becomes available. In addition, any curtailment gain related to Ameren's pension and postretirement plans will be recorded when the related employees terminate employment with Ameren. The ultimate impairment loss may differ materially from the estimated loss recorded as of September 30, 2013.
Ameren adjusted accumulated deferred income taxes on its balance sheet to reflect the excess of tax basis over financial reporting basis of its stock investment in AER, during the three months ended March 31, 2013, when it became apparent that the temporary difference would reverse. This change in basis resulted in a discontinued operations deferred tax expense of $96 million, which was partially offset by the expected tax benefits of $72 million related to the pretax loss from discontinued operations including the impairment charge, during the nine months ended September 30, 2013. During the third quarter of 2013, Ameren recorded tax benefits of $3 million related to the incremental pretax loss from discontinued operations recorded during the third quarter of 2013. In addition, Ameren recorded a $1 million reduction in discontinued operations deferred tax expense during the third quarter of 2013 to reflect changes in the estimates of the excess of tax basis over financial reporting basis of Ameren’s stock investment in AER. The final tax basis of the AER disposal group and the related tax benefit resulting from the transaction agreement with IPH are dependent upon taxable losses utilized by the disposal group through the closing and the resolution of tax matters under audit, including the adoption of recently issued guidance from the Internal Revenue Service related to tangible property repairs and other matters. As a result, tax expense and benefits realized in discontinued operations may differ materially from those recorded as of September 30, 2013.
As the Elgin, Gibson City, and Grand Tower gas-fired energy center disposal group continued to meet the discontinued operations criteria at September 30, 2013, Ameren evaluated whether any impairment existed by comparing the disposal group’s carrying value to the estimated fair value of the disposal group, less cost to sell. The fair value was based on the appraised value of these three gas-fired energy centers. In December 2012, Ameren recorded a noncash long-lived asset impairment charge to reduce the carrying value of AER’s energy centers, including the Elgin, Gibson City, and Grand Tower gas-fired energy centers, to their estimated fair values under the accounting guidance for held and used assets. The December 2012 held and used asset impairment charge reduced these energy centers’ disposal group carrying value to their estimated fair value of $133 million. Ameren will not recognize a gain from the third party sale to Rockland Capital for any value in excess of the $133 million carrying value of this disposal group since any excess amount that Medina Valley may receive, net of taxes and other expenses, over the carrying value, will ultimately be paid to Genco pursuant to the transaction agreement with IPH. Ameren does not expect to have significant continuing involvement or material cash flows with the Elgin, Gibson City, and Grand Tower gas-fired energy centers after their sale.
Effective with its conclusion that the New AER disposal group and the Elgin, Gibson City, and Grand Tower gas-fired energy centers’ disposal group each met the criteria for held for sale presentation, Ameren suspended recording depreciation on these assets in March 2013.
Interest on Genco’s senior notes, which will continue to be solely obligations of Genco following the closing of the transaction agreement with IPH, are included in the “Interest charges” component within the discontinued operations line item in the statement of income. Ameren did not allocate corporate interest to the disposal groups. Additionally, general corporate overhead expenses originally allocated to the disposal groups were classified as expenses of continuing operations.

The following table presents the carrying amounts of the components of assets and liabilities segregated on Ameren's consolidated balance sheets as discontinued operations at September 30, 2013, and December 31, 2012:
 
September 30, 2013
 
December 31, 2012
Assets of discontinued operations
 
 
 
Cash and cash equivalents
$
25

 
$
25

Accounts receivable and unbilled revenue
102

 
102

Materials and supplies
121

 
134

Mark-to-market derivative assets
71

 
102

Property and plant, net
623

 
748

Accumulated deferred income taxes, net
357

 
385

Other assets
96

 
104

Total assets of discontinued operations
$
1,395

 
$
1,600

Liabilities of discontinued operations
 
 
 
Accounts payable and other current obligations
$
141

 
$
133

Mark-to-market derivative liabilities
38

 
63

Long-term debt, net
824

 
824

Asset retirement obligations
87

 
78

Pension and other postretirement benefits
32

 
40

Other liabilities
19

 
28

Total liabilities of discontinued operations
$
1,141

 
$
1,166

Accumulated other comprehensive income(a)
$
3

 
$
19

Noncontrolling interest(b)
$
8

 
$
8

(a)
Accumulated other comprehensive income related to discontinued operations remains in “Accumulated other comprehensive loss” on Ameren’s September 30, 2013, and December 31, 2012, balance sheets. This balance relates to New AER assets and liabilities that will be realized or removed from Ameren’s balance sheet either before or at the closing of the New AER divestiture.
(b)
The 20% ownership interest of EEI not owned by Ameren was included in “Noncontrolling interests” on Ameren’s September 30, 2013, and December 31, 2012, balance sheets. This noncontrolling interest will be removed from Ameren’s balance sheet at the closing of the New AER divestiture.
Ameren will have continuing transactions with New AER after the divestiture is complete. Ameren Illinois has power supply agreements with Marketing Company, which are a result of the power procurement process in Illinois administered by the IPA as required by the Illinois Public Utilities Act. Ameren Illinois will continue to purchase power and purchase trade receivables as required by Illinois law, and Ameren will reflect these items as continuing operations after the divestiture occurs. Ameren Illinois and ATXI currently sell, and will continue to sell, transmission services to Marketing Company after the divestiture of New AER is completed. Also, upon the divestiture of New AER, the transaction agreement requires Ameren (parent) to maintain its financial obligations with respect to all credit support provided to New AER for all transactions entered into prior to the closing of such divestiture for up to 24 months after the closing. IPH shall indemnify Ameren for any payments Ameren makes pursuant to these credit support obligations if the counterparty does not return the posted collateral to Ameren. IPH’s indemnification obligation will be secured by certain AERG and Genco assets. In addition, Dynegy has provided a limited guarantee of $25 million to Ameren (parent) pursuant to which Dynegy will, among other things, guarantee IPH’s indemnification obligations for a period of up to 24 months after the closing (subject to certain exceptions). Immediately prior to the transaction agreement closing, the cash collateral provided to New AER by Ameren through money pool borrowings will be converted to a note payable to Ameren which will be payable, with interest, 24 months after closing or sooner as cash collateral requirements are reduced. Also, within 120 days after closing, a working capital adjustment will be finalized, which may result in a cash payment from Ameren to New AER. Ameren has determined that the continuing cash flows generated by these arrangements are not significant and, accordingly, are not deemed direct cash flows of the divested business. Additionally, these arrangements do not provide Ameren the ability to significantly influence the operating results of New AER after the divestiture is complete. See Note 9 - Related Party Transactions for additional information regarding existing transactions between Ameren and New AER.
For a period of up to 12 months following the closing, Ameren will provide certain transitional services to IPH. Such services will be provided at no charge for 90 days, subject to a $5 million limit; thereafter, services will be provided at cost, except for certain services that may be applied to the $5 million limit to the extent such limit has not been reached by the end of the 90 day period. The transitional services may be provided for six months after the closing and can be extended by IPH on a month-to-month basis for up to an additional six months.
See Note 10 - Commitments and Contingencies for information regarding amendments to the plant transfer agreements between both Genco and Ameren Illinois and AERG and Ameren Illinois as well as other AER related matters.
Genco Indenture Provisions
Genco’s indenture includes provisions that require Genco to maintain certain interest coverage and debt-to-capital ratios in order for Genco to pay dividends, to make principal or interest payments on subordinated borrowings, to make loans to or investments in affiliates, or to incur additional external, third-party indebtedness. The following table summarizes these ratios for the 12 months ended and as of September 30, 2013:
  
Required
Ratio
Actual
Ratio
Interest coverage ratio- restricted payment (a)
≥1.75
1.05

Interest coverage ratio- additional indebtedness (b)
≥2.50
1.05

Debt-to-capital ratio- additional indebtedness (b)
≤60%
51
%
(a)
As of the date of the restricted payment, as defined, the minimum ratio must have been achieved for the most recently ended four fiscal quarters and projected by management to be achieved for each of the subsequent four six-month periods. Investments in the non-state-regulated subsidiary money pool and repayments of non-state-regulated subsidiary money pool borrowings are not subject to this incurrence test.
(b)
Ratios must be computed on a pro forma basis considering the additional indebtedness to be incurred and the related interest expense. Non-state-regulated subsidiary money pool borrowings are defined as permitted indebtedness and are not subject to these incurrence tests. Other borrowings from third-party external sources are included in the definition of indebtedness and are subject to these incurrence tests.
Genco’s debt incurrence-related ratio restrictions under its indenture may be disregarded if both Moody’s and S&P reaffirm the ratings of Genco in place at the time of the debt incurrence after considering the additional indebtedness.
As shown in the table above, under the provisions of Genco’s indenture, Genco may not borrow additional funds from external, third-party sources if its interest coverage ratio is less than 2.5 or its debt-to-capital ratio is greater than 60%. Beginning in the first quarter of 2013, Genco’s interest coverage ratio fell to a value less than the specified minimum level required for external borrowings, and Genco expects the ratio to remain less than this minimum level through at least 2015. As a result, Genco’s ability to borrow additional funds from external third-party sources is restricted. Genco’s indenture does not restrict intercompany borrowings from Ameren’s non-state-regulated subsidiary money pool. However, borrowings from the money pool are subject to Ameren’s control. If a Genco intercompany financing need were to arise, borrowings from the non-state-regulated subsidiary money pool by Genco would be dependent on consideration by Ameren of the facts and circumstances existing at that time. As stated above, the transaction agreement requires Ameren to operate New AER, including Genco, in the ordinary course prior to the closing.
Illinois Sales and Use Tax Exemptions and Credits
Beginning in the second quarter of 2010 through 2011, Genco, including EEI, and AERG claimed Illinois sales and use tax exemptions and credits for purchase transactions related to their generation operations. During the second quarter of 2013, Ameren and the Illinois Department of Revenue resolved a tax dispute relating to these sales and use tax exemptions and credits for all open periods related to this issue with an aggregate payment of $7 million by Genco, including EEI, and AERG to the Illinois Department of Revenue. This charge was recorded within “Loss from discontinued operations, net of taxes” on Ameren’s consolidated statement of income for the nine months ended September 30, 2013.