Commitments And Contingencies (Environmental Matters) (Detail) (USD $)
In Millions, unless otherwise specified
9 Months Ended
Sep. 30, 2013
State
Minimum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations $ 395 [1]
Maximum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 480 [1]
Estimated Capital Costs 2013
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 35 [1]
Estimated Capital Costs 2014 to 2017 | Minimum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 120 [1]
Estimated Capital Costs 2014 to 2017 | Maximum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 150 [1]
Estimated Capital Costs 2018 to 2022 | Minimum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 240 [1]
Estimated Capital Costs 2018 to 2022 | Maximum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 295 [1]
Ameren Energy Generating Company | Minimum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 350 [2]
Ameren Energy Generating Company | Maximum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 425 [2]
Ameren Energy Generating Company | Estimated Capital Costs 2013
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 30 [2]
Ameren Energy Generating Company | Estimated Capital Costs 2014 to 2017 | Minimum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 100 [2]
Ameren Energy Generating Company | Estimated Capital Costs 2014 to 2017 | Maximum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 125 [2]
Ameren Energy Generating Company | Estimated Capital Costs 2018 to 2022 | Minimum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 220 [2]
Ameren Energy Generating Company | Estimated Capital Costs 2018 to 2022 | Maximum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 270 [2]
Union Electric Company | Minimum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 1,115 [3]
Union Electric Company | Maximum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 1,340 [3]
Union Electric Company | Estimated Capital Costs 2013
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 105 [3]
Union Electric Company | Estimated Capital Costs 2014 to 2017 | Minimum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 215 [3]
Union Electric Company | Estimated Capital Costs 2014 to 2017 | Maximum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 260 [3]
Union Electric Company | Estimated Capital Costs 2018 to 2022 | Minimum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 795 [3]
Union Electric Company | Estimated Capital Costs 2018 to 2022 | Maximum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 975 [3]
AERG | Minimum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 45
AERG | Maximum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 55
AERG | Estimated Capital Costs 2013
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 5
AERG | Estimated Capital Costs 2014 to 2017 | Minimum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 20
AERG | Estimated Capital Costs 2014 to 2017 | Maximum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 25
AERG | Estimated Capital Costs 2018 to 2022 | Minimum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 20
AERG | Estimated Capital Costs 2018 to 2022 | Maximum
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state environmental regulations 25
CAIR
 
Loss Contingencies [Line Items]  
Number of states participating in the cap-and-trade program 28
MATS
 
Loss Contingencies [Line Items]  
Percent of top performing facilities 12.00%
Former Coal Tar Distillery | Union Electric Company
 
Loss Contingencies [Line Items]  
Range of possible loss, minimum 2.0
Range of possible loss maximum 5.0
Accrual for environmental loss contingencies 2.0
Former Coal Ash Landfill | Ameren Illinois Company
 
Loss Contingencies [Line Items]  
Range of possible loss, minimum 0.5
Range of possible loss maximum 6.0
Accrual for environmental loss contingencies 0.5
Newton Energy Center Scrubbers | Ameren Energy Generating Company | Newton Energy Center Estimated Capital Costs 2013 to 2017
 
Loss Contingencies [Line Items]  
Estimated capital costs to comply with existing and known federal and state air emissions regulations 20
Manufactured Gas Plant
 
Loss Contingencies [Line Items]  
Range of possible loss, minimum 251.0
Range of possible loss maximum 337.0
Accrual for environmental loss contingencies 251.0 [4]
Manufactured Gas Plant | Union Electric Company
 
Loss Contingencies [Line Items]  
Range of possible loss, minimum 5.0
Range of possible loss maximum 6.0
Accrual for environmental loss contingencies 5.0 [4]
Manufactured Gas Plant | Ameren Illinois Company
 
Loss Contingencies [Line Items]  
Number of remediation sites 44
Range of possible loss, minimum 246.0
Range of possible loss maximum 331.0
Accrual for environmental loss contingencies 246.0 [4]
Other Environmental | Ameren Illinois Company
 
Loss Contingencies [Line Items]  
Accrual for environmental loss contingencies 0.8
Sauget Area Two | Union Electric Company
 
Loss Contingencies [Line Items]  
Range of possible loss, minimum 0.3
Range of possible loss maximum 10.0
Accrual for environmental loss contingencies 0.3
Substation in St Charles, Missouri | Union Electric Company
 
Loss Contingencies [Line Items]  
Range of possible loss, minimum 1.6
Range of possible loss maximum 4.5
Accrual for environmental loss contingencies $ 1.6
[1] Assumes the Merchant Generation facilities are owned by Ameren.
[2] Includes estimated costs of approximately $20 million annually, excluding capitalized interest, from 2013 through 2017 for construction of two scrubbers at the Newton energy center.
[3] Ameren Missouri’s expenditures are expected to be recoverable from ratepayers.
[4] Recorded liability represents the estimated minimum probable obligations, as no other amount within the range was a better estimate.