EX-23.7 10 tm2331610d1_ex23-7.htm EXHIBIT 23.7

Exhibit 23.7

 

Deep Reach Technology Inc.

10050 Cash Road

Stafford, TX 77477 USA

 

CONSENT OF THIRD-PARTY QUALIFIED PERSON

 

Deep Reach Technology Inc. (“DRT”), in connection with the Registration Statement on Form S-3 of TMC the metals company Inc. and any further amendments or supplements and/or exhibits thereto (collectively, the “Form S-3”), consent to:

 

  the filing and use of the technical report summary titled “Technical Report Summary--Initial Assessment of the NORI Property, Clarion-Clipperton Zone, Deep Green Metals Inc.” (the “NORI Technical Report”), with an effective date of March 17, 2021 and current as of December 31, 2022, as an exhibit to and referenced in the Form S-3;

  the filing and use of the technical report summary titled “Technical Report Summary--Initial Assessment of the TOML Mineral Resource, Clarion-Clipperton Zone, Pacific Ocean, for Deep Green Metals Inc.” (the “TOML Technical Report”), with an effective date of March 17, 2021 and current as of December 31, 2022, as an exhibit to and referenced in the Form S-3;

  the use of and references to our name, including our status as an expert or “qualified person” (as defined in Subpart 1300 of Regulation S-K promulgated by the Securities and Exchange Commission), in connection with the Form S-3 and any such NORI Technical Report and TOML Technical Report; and

  the information derived, summarized, quoted or referenced from the NORI Technical Report and TOML Technical Report, or portions thereof, that was prepared by us, that we supervised the preparation of and/or that was reviewed and approved by us, that is included or incorporated by reference in the Form S-3.

 

DRT is responsible for authoring, and this consent pertains to, the following Sections of the NORI Technical Report:

 

  Section 13.1: Development plan

  Section 13.2: Off-shore system concept

  Section 13.4: Collector Test and Hidden Gem conversion

  Section 13.5: Project Zero

  Section 13.6: Project One

  Section 15.2: Nodule transport

  Section 18.3.1: Off-shore capital costs

  Section 18.6.1: Off-shore operating costs

  Corresponding Subsections of Section 1: Summary

  Corresponding Subsections of Section 22: Interpretation and conclusions

  Corresponding Subsections of Section 23: Recommendations

  Corresponding Subsections of Section 24: References

  Corresponding Subsections of Section 25: Reliance on information provided by the registrant

 

DRT is responsible for authoring, and this consent pertains to, the following Sections of the TOML Technical Report:

 

  Section 11.9.5: Mining Methods

  Section 11.9.7: Infrastructure

  Section 13: Mining Methods

  Section 15: Project Infrastructure

  Corresponding Subsections of Section 1: Summary

  Corresponding Subsections of Section 22: Interpretation and conclusions

  Corresponding Subsections of Section 23: Recommendations

  Corresponding Subsections of Section 24: References

  Corresponding Subsections of Section 25: Reliance on information provided by the registrant

 

Dated this November 30, 2023

 

/s/ John Edwin Halkyard  

John Edwin Halkyard  
Signature of Authorized Person for  

Deep Reach Technology Inc.,

a Qualified Third-Party Firm