Commitments and Contingencies
3 Months Ended
Mar. 31, 2016
Commitments and Contingencies Disclosure [Abstract]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES
ENVIRONMENTAL
Duke Energy is subject to international, federal, state and local regulations regarding air and water quality, hazardous and solid waste disposal and other environmental matters. The Subsidiary Registrants are subject to federal, state and local regulations regarding air and water quality, hazardous and solid waste disposal and other environmental matters. These regulations can be changed from time to time, imposing new obligations on the Duke Energy Registrants. The following environmental matters impact all of the Duke Energy Registrants.
Remediation Activities
In addition to Asset Retirement Obligations recorded as a result of various environmental regulations, the Duke Energy Registrants are responsible for environmental remediation at various sites. These include certain properties that are part of ongoing operations and sites formerly owned or used by Duke Energy entities. These sites are in various stages of investigation, remediation and monitoring. Managed in conjunction with relevant federal, state and local agencies, remediation activities vary based upon site conditions and location, remediation requirements, complexity and sharing of responsibility. If remediation activities involve joint and several liability provisions, strict liability or cost recovery or contribution actions, the Duke Energy Registrants could potentially be held responsible for environmental impacts caused by other potentially responsible parties, and may also benefit from insurance policies or contractual indemnities that cover some or all cleanup costs. Liabilities are recorded when losses become probable and are reasonably estimable. The total costs that may be incurred cannot be estimated because the extent of environmental impact, allocation among potentially responsible parties, remediation alternatives and/or regulatory decisions have not yet been determined. Additional costs associated with remediation activities are likely to be incurred in the future and could be significant. Costs are typically expensed as Operation, maintenance and other in the Condensed Consolidated Statements of Operations unless regulatory recovery of the costs is deemed probable.
The following tables contain information regarding reserves for probable and estimable costs related to the various environmental sites. These reserves are recorded in Other within Deferred Credits and Other Liabilities on the Condensed Consolidated Balance Sheets.
 
Three Months Ended March 31, 2016
 
 
 
Duke

 
 
 
Duke

 
Duke

 
Duke

 
Duke

 
Duke

 
Energy

 
Progress

 
Energy

 
Energy

 
Energy

 
Energy

(in millions)
Energy

 
Carolinas

 
Energy

 
Progress

 
Florida

 
Ohio

 
Indiana

Balance at beginning of period
$
97

 
$
10

 
$
17

 
$
3

 
$
14

 
$
54

 
$
12

Provisions/adjustments
10

 
2

 
1

 

 
1

 

 
6

Cash reductions
(3
)
 
(1
)
 
(2
)
 
(1
)
 
(1
)
 

 

Balance at end of period
$
104

 
$
11

 
$
16

 
$
2

 
$
14

 
$
54

 
$
18

 
Three Months Ended March 31, 2015
 
 
 
Duke

 
 
 
Duke

 
Duke

 
Duke

 
Duke

 
Duke

 
Energy

 
Progress

 
Energy

 
Energy

 
Energy

 
Energy

(in millions)
Energy

 
Carolinas

 
Energy

 
Progress

 
Florida

 
Ohio

 
Indiana

Balance at beginning of period
$
97

 
$
10

 
$
17

 
$
5

 
$
12

 
$
54

 
$
10

Provisions/adjustments
2

 

 

 

 

 
1

 
2

Cash reductions
(3
)
 

 

 

 

 
(1
)
 
(1
)
Balance at end of period
$
96

 
$
10

 
$
17

 
$
5

 
$
12

 
$
54

 
$
11


Additional losses in excess of recorded reserves that could be incurred for the stages of investigation, remediation and monitoring for environmental sites that have been evaluated at this time are not material except as presented in the table below.
(in millions)
 
Duke Energy
$
83

Duke Energy Carolinas
22

Duke Energy Ohio
42

Duke Energy Indiana
15


North Carolina and South Carolina Ash Basins
On February 2, 2014, a break in a stormwater pipe beneath an ash basin at Duke Energy Carolinas’ retired Dan River Steam Station caused a release of ash basin water and ash into the Dan River. On February 8, 2014, a permanent plug was installed in the stormwater pipe, stopping the release of materials into the river. Duke Energy Carolinas estimates 30,000 to 39,000 tons of ash and 24 million to 27 million gallons of basin water were released into the river. In July 2014, Duke Energy completed remediation work identified by the EPA and continues to cooperate with the EPA's civil enforcement process. Future costs related to the Dan River release, including pending or future state or federal civil enforcement proceedings, future regulatory directives, natural resources damages, additional pending litigation, future claims or litigation and long-term environmental impact costs, cannot be reasonably estimated at this time.
North Carolina Department of Environmental Quality (NCDEQ), formerly the North Carolina Department of Environment and Natural Resources, has historically assessed Duke Energy Carolinas and Duke Energy Progress with Notice of Violations (NOV) for violations that were most often resolved through satisfactory corrective actions and minor, if any, fines or penalties. Subsequent to the Dan River matter discussed above, Duke Energy Carolinas and Duke Energy Progress have been served with a higher level of NOVs, including for violations at L.V. Sutton Plant and Dan River Steam Station. In August 2014, NCDEQ issued an NOV for alleged groundwater violations at Duke Energy Progress' L.V. Sutton Plant. On March 10, 2015, NCDEQ issued a civil penalty of approximately $25 million to Duke Energy Progress for environmental damages related to groundwater contamination at the L.V. Sutton Plant. On February 8, 2016, NCDEQ assessed a penalty of approximately $6.8 million, including enforcement costs, against Duke Energy Carolinas related to stormwater pipes and associated discharges at the Dan River Steam Station. Duke Energy Carolinas recorded a charge in December 2015 for this penalty. See "Litigation" section below for additional discussion of matters related to these penalties. These fines and penalties are unprecedented and were not consistent with historic enforcement practices of NCDEQ. Based on historic practices the expected liability of any existing notice of violations would not be material. Duke Energy Carolinas and Duke Energy Progress cannot predict whether the NCDEQ will assess future penalties related to existing NOVs and if such penalties would be material.
Asset retirement obligations recorded on the Duke Energy Carolinas and Duke Energy Progress Condensed Consolidated Balance Sheets at March 31, 2016 and December 31, 2015, include the legal obligation for closure of coal ash basins and the disposal of related ash as a result of the North Carolina Coal Ash Management Act of 2014 (Coal Ash Act) and other agreements. In January 2016, NCDEQ published draft proposed risk classifications for sites not specifically delineated by the Coal Ash Act as high priority. These risk rankings were generally determined based on three primary criteria: structural integrity of the impoundments and impact to both surface and groundwaters. NCDEQ categorized 12 basins at four sites as intermediate risk and four basins at three plants as low risk. NCDEQ also categorized nine basins at six plants as “low-to-intermediate” risk, thereby not assigning a definitive risk ranking at that time. The risk rankings of these sites will be based upon receipt of additional data primarily related to groundwater quality and the completion of specific modifications and repairs to the impoundments. NCDEQ is expected to finalize proposed classifications in May 2016, based on results of the public comment period which ended in April 2016. Duke Energy cannot predict the final classifications.
Per the Coal Ash Act, final proposed classifications are subject to Coal Ash Management Commission (Coal Ash Commission) adjustments and approval but may become law if the Commission fails to act within 60 days of receiving the final proposed classifications. In March 2016, the Coal Ash Commission originally created by the Coal Ash Act was disbanded by the Governor of North Carolina based on a North Carolina Supreme Court ruling regarding the constitutionality of the body. As a result, the finality of NCDEQ's classifications may be subject to challenge.
Estimated asset retirement obligations have been recognized based on the assigned risk categories or, if not assigned, based on a probability weighting of potential closure methods. Actual closure costs incurred could be materially different from current estimates that form the basis of the recorded asset retirement obligations. Cost recovery for future expenditures will be pursued through the normal ratemaking process with federal and state utility commissions, which permit recovery of necessary and prudently incurred costs associated with Duke Energy’s regulated operations.
Coal Combustion Residuals
On April 17, 2015, the EPA published in the Federal Register a rule to regulate the disposal of CCR from electric utilities as solid waste. The federal regulation, which became effective in October 2015, classifies CCR as nonhazardous waste under Subtitle D of the Resource Conservation and Recovery Act and allows for beneficial use of CCR with some restrictions. The regulation applies to all new and existing landfills, new and existing surface impoundments receiving CCR and existing surface impoundments that are no longer receiving CCR but contain liquid located at stations currently generating electricity (regardless of fuel source). The rule establishes requirements regarding landfill design, structural integrity design and assessment criteria for surface impoundments, groundwater monitoring and protection procedures and other operational and reporting procedures to ensure the safe disposal and management of CCR. Various industry and environmental parties have appealed the EPA's CCR rule in the D.C. Circuit Court of Appeals. On April 18, 2016, the EPA filed a motion with the federal court to settle five issues raised in litigation. The Duke Energy Registrants cannot predict the court's response to the proposed settlement, but would not expect a material impact from the settlement if approved as proposed by the EPA. Duke Energy is reviewing the proposed settlement to determine if additional asset retirement obligation adjustments will be required.
In addition to the requirements of the federal CCR regulation, CCR landfills and surface impoundments will continue to be independently regulated by most states. As a result of the EPA rule, the Subsidiary Registrants recorded asset retirement obligation amounts during 2015.
LITIGATION
Duke Energy
Ash Basin Shareholder Derivative Litigation
Five shareholder derivative lawsuits were filed in Delaware Chancery Court relating to the release at Dan River and to the management of Duke Energy’s ash basins. On October 31, 2014, the five lawsuits were consolidated in a single proceeding titled "In Re Duke Energy Corporation Coal Ash Derivative Litigation." On December 2, 2014, plaintiffs filed a Corrected Verified Consolidated Shareholder Derivative Complaint (Consolidated Complaint). The Consolidated Complaint names as defendants several current and former Duke Energy officers and directors (collectively, the “Duke Energy Defendants”). Duke Energy is named as a nominal defendant.
The Consolidated Complaint alleges the Duke Energy Defendants breached their fiduciary duties by failing to adequately oversee Duke Energy’s ash basins and that these breaches of fiduciary duty may have contributed to the incident at Dan River and continued thereafter. The lawsuit also asserts claims against the Duke Energy Defendants for corporate waste (relating to the money Duke Energy has spent and will spend as a result of the fines, penalties and coal ash removal) and unjust enrichment (relating to the compensation and director remuneration that was received despite these alleged breaches of fiduciary duty). The lawsuit seeks both injunctive relief against Duke Energy and restitution from the Duke Energy Defendants. On January 21, 2015, the Duke Energy Defendants filed a Motion to Stay and an alternative Motion to Dismiss. On August 31, 2015, the court issued an order staying the case which was lifted on March 24, 2016. On April 22, 2016, plaintiffs filed an Amended Verified Consolidated Shareholder Derivative Complaint (Amended Complaint) making the same allegations as in the Consolidated Complaint. The Duke Energy Defendants anticipate filing a Motion to Dismiss the Amended Complaint.
On March 5, 2015, shareholder Judy Mesirov filed a shareholder derivative complaint (Mesirov Complaint) in North Carolina state court. The lawsuit, styled Mesirov v. Good, is similar to the consolidated derivative action pending in Delaware Chancery Court and was filed against the same current directors and former directors and officers as the Delaware litigation. Duke Energy Corporation, Duke Energy Progress and Duke Energy Carolinas are named as nominal defendants. The Mesirov Complaint alleges that the Duke Energy Board of Directors was aware of Clean Water Act (CWA) compliance issues and failures to maintain structures in ash basins, but that the Board of Directors did not require Duke Energy Carolinas and Duke Energy Progress to take action to remedy deficiencies. The Mesirov Complaint further alleges that the Board of Directors sanctioned activities to avoid compliance with the law by allowing improper influence of NCDEQ to minimize regulation and by opposing previously anticipated citizen suit litigation. The Mesirov Complaint seeks corporate governance reforms and damages relating to costs associated with the Dan River release, remediation of ash basins that are out of compliance with the CWA and defending and payment of fines, penalties and settlements relating to criminal and civil investigations and lawsuits. On December 7, 2015, the Duke Energy Defendants filed a Motion to Stay the proceedings. The proceedings are currently stayed until July 1, 2016, after which the Duke Energy Defendants may seek an additional stay.
In addition to the above derivative complaints, in 2014, Duke Energy also received two shareholder litigation demand letters. The letters alleged that the members of the Board of Directors and certain officers breached their fiduciary duties by allowing the company to illegally dispose of and store coal ash pollutants. One of the letters also alleged a breach of fiduciary duty in the decision-making relating to the leadership changes following the close of the Progress Energy merger in July 2012.
By letter dated September 4, 2015, attorneys for the shareholders were informed that, on the recommendation of the Demand Review Committee formed to consider such matters, the Board of Directors concluded not to pursue potential claims against individuals. One of the shareholders, Mitchell Pinsly, sent a formal demand for records and Duke Energy responded to this request.
On October 30, 2015, shareholder Saul Bresalier filed a shareholder derivative complaint in the U.S. District Court for the District of Delaware. The lawsuit alleges that several current and former Duke Energy officers and directors (Bresalier Defendants) breached their fiduciary duties in connection with coal ash environmental issues, the post-merger change in Chief Executive Officer and oversight of political contributions. Duke Energy is named as a nominal defendant. The Bresalier Complaint contends that the Demand Review Committee failed to appropriately consider the shareholder’s earlier demand for litigation and improperly decided not to pursue claims against the Bresalier Defendants. The Bresalier Defendants filed a Motion to Dismiss the Bresalier litigation on January 15, 2016. In lieu of a response to the Motion to Dismiss, the plaintiff filed a Motion to Convert the Bresalier Defendants' Motion to Dismiss into a Motion for Summary Judgment and also for limited discovery. Briefing on the Motion to Convert is complete.
It is not possible to predict whether Duke Energy will incur any liability or to estimate the damages, if any, it might incur in connection with these matters.
Progress Energy Merger Shareholder Litigation
On May 31, 2013, the Delaware Chancery Court consolidated four shareholder derivative lawsuits filed in 2012. The Court also appointed a lead plaintiff and counsel for plaintiffs and designated the case as In Re Duke Energy Corporation Derivative Litigation. The lawsuit names as defendants the 11 members of the Board of Directors who were also members of the pre-merger Board of Directors. Duke Energy is named as a nominal defendant. The case alleges claims for breach of fiduciary duties of loyalty and care in connection with the post-merger change in CEO. On December 10, 2015, the Duke Energy defendants filed a Motion to Dismiss the litigation. Oral argument on the motion is scheduled for May 9, 2016.
Two shareholder Derivative Complaints, filed in 2012 in federal district court in Delaware, were consolidated as Tansey v. Rogers, et al. The case alleges claims for breach of fiduciary duty and waste of corporate assets, as well as claims under Section 14(a) and 20(a) of the Exchange Act. Duke Energy is named as a nominal defendant. On December 21, 2015, Plaintiff filed a Consolidated Amended Complaint asserting the same claims contained in the original complaints. Duke Energy filed a Motion to Dismiss on February 19, 2016. On March 18, 2016, the Chancery Court Plaintiffs moved to intervene in the Tansey proceeding, asking the federal district court to stay the federal litigation in favor of the Delaware Chancery litigation.
It is not possible to predict whether Duke Energy will incur any liability or to estimate the damages, if any, it might incur in connection with the remaining litigation.
Price Reporting Cases
Duke Energy Trading and Marketing, LLC (DETM), a non-operating Duke Energy affiliate, was a defendant, along with numerous other energy companies, in four class-action lawsuits and a fifth single-plaintiff lawsuit pending in a consolidated federal court proceeding in Nevada. Each of these lawsuits contains similar claims that defendants allegedly manipulated natural gas markets by various means, including providing false information to natural gas trade publications and entering into unlawful arrangements and agreements in violation of the antitrust laws of the respective states. Plaintiffs seek damages in unspecified amounts.
In February 2016, DETM reached agreements in principle to settle all of the pending lawsuits. Settlement of the single-plaintiff settlement was finalized and paid in March 2016. Settlement of the class-action lawsuits are currently being finalized and will be subject to court approval. The settlement amounts are not material to Duke Energy.
Brazil Expansion Lawsuit
On August 9, 2011, the State of São Paulo sued Duke Energy International Geracao Paranapenema S.A. (DEIGP) in Brazilian state court. The lawsuit claims DEIGP is under a continuing obligation to expand installed generation capacity in the State of São Paulo by 15 percent pursuant to a stock purchase agreement under which DEIGP purchased generation assets from the state. On August 10, 2011, a judge granted an injunction ordering DEIGP to present a detailed expansion plan in satisfaction of the 15 percent obligation. DEIGP has previously taken a position that the expansion obligation is no longer viable given changes that have occurred in the electric energy sector since privatization. DEIGP submitted its proposed expansion plan on November 11, 2011, but reserved objections regarding enforceability. In January 2013, DEIGP filed appeals in the federal courts, which are still pending, regarding various procedural issues. A decision on the merits in the first instance court is also pending. It is not possible to predict whether Duke Energy will incur any liability or to estimate the damages, if any, it might incur in connection with this matter.
Brazil Generation
Record drought conditions in Brazil during 2014 and 2015 negatively impacted DEIGP. A number of electric generators have filed lawsuits seeking relief in the Brazilian courts to mitigate hydrological exposure and diminishing dispatch levels. Some courts have granted injunction orders to limit the financial exposure of certain generators. The implication of these orders is that other electricity market participants not covered by the injunctions may be required to compensate for the financial impact of the liability limitations. The Independent Power Producer Association (APINE) filed one such lawsuit on behalf of DEIGP and other hydroelectric generators against the Brazilian electric regulatory agency (ANEEL). On July 2, 2015, an injunction was granted in favor of APINE limiting the financial exposure of DEIGP and the other plaintiff generators, until the merits of the lawsuit are determined. ANEEL's appeal of the injunction was denied on December 18, 2015. The outcome of these lawsuits is uncertain. It is not possible to predict the impact to Duke Energy from the outcome of these matters.
Duke Energy Carolinas and Duke Energy Progress
NCDEQ Notices of Violation (NOV)
In August 2014, NCDEQ issued an NOV for alleged groundwater violations at Duke Energy Progress' L.V. Sutton Plant. On March 10, 2015, NCDEQ issued a civil penalty of approximately $25 million to Duke Energy Progress for environmental damages related to the groundwater contamination at the L.V. Sutton Plant. On April 9, 2015, Duke Energy Progress filed a Petition for Contested Case hearing in the Office of Administrative Hearings. In February 2015, NCDEQ issued an NOV for alleged groundwater violations at Duke Energy Progress' Asheville Plant. Duke Energy Progress responded to NCDEQ regarding this NOV.
On September 29, 2015, Duke Energy Progress and Duke Energy Carolinas entered into a settlement agreement with NCDEQ resolving all former, current and future groundwater penalties at all Duke Energy Carolinas and Duke Energy Progress coal facilities in North Carolina. Under the agreement, Duke Energy Progress paid approximately $6 million and Duke Energy Carolinas paid approximately $1 million. In addition to these payments, Duke Energy Progress and Duke Energy Carolinas will accelerate remediation actions at the Sutton, Asheville, Belews Creek and H.F. Lee plants. The ALJ entered a consent order resolving the contested case relating to the Sutton Plant and NCDEQ rescinded the NOVs relating to alleged groundwater violations at both the Sutton and Asheville plants.
On October 13, 2015, the Southern Environmental Law Center (SELC), representing multiple conservation groups, filed a lawsuit in North Carolina Superior Court seeking judicial review of the order approving the settlement agreement with NCDEQ. The conservation groups contend that the ALJ exceeded his statutory authority in approving a settlement that provided for past, present, and future resolution of groundwater issues at facilities which were not at issue in the penalty appeal. On December 18, 2015, Duke Energy Carolinas and Duke Energy Progress filed a Motion to Dismiss the complaint. On February 12, 2016, the ALJ entered a new order clarifying that the dismissal of the contested case only applied to the specific issues before the ALJ in the Petition for Contested Case. On March 10, 2016, the court dismissed the SELC lawsuit based on the ALJ's entry of the new order.
On February 8, 2016, NCDEQ assessed a penalty of approximately $6.8 million, including enforcement costs, against Duke Energy Carolinas related to storm-water pipes and associated discharges at the Dan River Steam Station. Duke Energy Carolinas recorded a charge in December 2015 for this penalty. In March 2016, Duke Energy Carolinas filed an appeal of this penalty. Trial date is set for August 22, 2016, for this proceeding. Duke Energy Carolinas cannot predict the outcome of this matter.
NCDEQ State Enforcement Actions
In the first quarter of 2013, SELC sent notices of intent to sue Duke Energy Carolinas and Duke Energy Progress related to alleged CWA violations from coal ash basins at two of their coal-fired power plants in North Carolina. NCDEQ filed enforcement actions against Duke Energy Carolinas and Duke Energy Progress alleging violations of water discharge permits and North Carolina groundwater standards. The cases have been consolidated and are being heard before a single judge.
On August 16, 2013, NCDEQ filed an enforcement action against Duke Energy Carolinas and Duke Energy Progress related to their remaining plants in North Carolina, alleging violations of the CWA and violations of the North Carolina groundwater standards. Both of these cases have been assigned to the judge handling the enforcement actions discussed above. SELC is representing several environmental groups who have been permitted to intervene in these cases.
On July 10, 2015, Duke Energy Carolinas and Duke Energy Progress filed two Motions for Partial Summary Judgment in the case on the basis that there is no longer either a genuine controversy or disputed material facts about the relief for seven of the 14 North Carolina plants with coal ash basins. On September 14, 2015, the court granted the Motions for Partial Summary Judgment pending court approval of the terms through an order. In November 2015, NCDEQ submitted a proposed order. On November 23, 2015, Duke Energy Carolinas, Duke Energy Progress and SELC filed separate objections to portions of the NCDEQ filing. Following a hearing held on February 12, 2016, Duke Energy Carolinas and Duke Energy Progress submitted a revised proposed order to comply with rulings made by the judge at the hearing. On April 4, 2016, the court issued an order granting Duke Energy Progress' motion for partial summary judgment for cases involving the H.F. Lee, Cape Fear and Weatherspoon plants, thus concluding the litigation for those plants. Duke Energy Carolinas and Duke Energy Progress have submitted a proposed order relating to the remaining plants for which summary judgment has been granted. A ruling related to the proposed order for the remaining plants is pending.
It is not possible to predict any liability or estimate any damages Duke Energy Carolinas or Duke Energy Progress might incur in connection with these matters.
Federal Citizens Suits
There are currently five cases filed in various North Carolina federal courts related to the Riverbend, Sutton, Cape Fear, H.F. Lee and Buck plants.
On June 11, 2013, Catawba Riverkeeper Foundation, Inc. (Catawba Riverkeeper) filed a separate action in the United States Court for the Western District of North Carolina. The lawsuit contends the state enforcement action discussed above does not adequately address issues raised in Catawba Riverkeeper’s notice of intent to sue relating to the Riverbend Steam Station. On April 11, 2014, the Court denied Catawba Riverkeeper’s objections to the Magistrate Judge’s recommendation that plaintiff’s case be dismissed as well as Duke Energy Carolinas’ motion to dismiss. On August 13, 2015, the court issued an order suspending all proceedings until further order from the court.
On September 12, 2013, Cape Fear River Watch, Inc., Sierra Club and Waterkeeper Alliance filed a citizen suit in the Federal District Court for the Eastern District of North Carolina. The lawsuit alleges unpermitted discharges to surface water and groundwater violations at the Sutton Plant. On June 9, 2014, the court granted Duke Energy Progress' request to dismiss the groundwater claims but rejected its request to dismiss the surface water claims. In response to a motion filed by the SELC, on August 1, 2014, the court modified the original June 9 order to dismiss only the plaintiff's federal law claim based on hydrologic connections at Sutton Lake. The claims related to the alleged state court violations of the permits are back in the case. On August 26, 2015, the court suspended the proceedings until further order from the court.
On September 3, 2014, three citizen suits were filed by various environmental groups: (i) a citizen suit in the United States Court for the Middle District of North Carolina alleging unpermitted discharges to surface water and groundwater violations at the Cape Fear Plant; (ii) in the United States Court for the Eastern District of North Carolina alleging unpermitted discharges to surface water and groundwater violations at the H.F. Lee Plant; and (iii) in the United States Court for the Middle District of North Carolina alleging unpermitted discharges to surface water and groundwater violations at the Buck Steam Station. Motions to Stay or Dismiss the proceedings were filed in each of the three cases. The proceedings related to Cape Fear and H.F. Lee have been stayed. On October 20, 2015, the court issued an order denying the motions in the Buck proceedings. Duke Energy Carolinas' motion seeking appellate review of the District Court's decision was denied on January 29, 2016.
On April 11, 2016, the Roanoke River Basin Association served a Notice of Intent to Sue under the CWA, alleging unpermitted discharges to surface water and groundwater violations at the Mayo Plant. A federal citizen suit may be filed 60 days after service of the Notice of Intent to Sue.
It is not possible to predict whether Duke Energy Carolinas or Duke Energy Progress will incur any liability or to estimate the damages, if any, they might incur in connection with these matters.
Potential Groundwater Contamination Claims
Beginning in May 2015, a number of residents living in the vicinity of the North Carolina facilities with ash basins received letters from NCDEQ advising them not to drink water from the private wells on their land tested by NCDEQ as the samples were found to have certain substances at levels higher than the criteria set by the North Carolina Department of Health and Human Services (DHHS). The criteria, in some cases, are considerably more stringent than federal drinking water standards established to protect human health and welfare. The Coal Ash Act requires additional groundwater monitoring and assessments for each of the 14 coal-fired plants in North Carolina, including sampling of private water supply wells. The data gathered through these Comprehensive Site Assessments (CSAs) will be used by NCDEQ to determine whether the water quality of these private water supply wells has been adversely impacted by the ash basins. Duke Energy has submitted CSAs documenting the results of extensive groundwater monitoring around coal ash basins at all 14 of the plants with coal ash basins. Generally, the data gathered through the installation of new monitoring wells and soil and water samples across the state have been consistent with historical data provided to state regulators over many years. The DHHS and NCDEQ sent follow-up letters on October 15, 2015, to residents near coal ash basins who have had their wells tested, stating that private well samplings at a considerable distance from coal ash impoundments, as well as some municipal water supplies, contain similar levels of vanadium and hexavalent chromium which leads investigators to believe these constituents are naturally occurring. In March 2016, DHHS rescinded the advisories. It is not possible to estimate the maximum exposure of loss, if any, that may occur in connection with claims which might be made by these residents.
Asbestos-related Injuries and Damages Claims
Duke Energy Carolinas has experienced numerous claims for indemnification and medical cost reimbursement related to asbestos exposure. These claims relate to damages for bodily injuries alleged to have arisen from exposure to or use of asbestos in connection with construction and maintenance activities conducted on its electric generation plants prior to 1985. As of March 31, 2016, there were 118 asserted claims for non-malignant cases with the cumulative relief sought of up to $30 million, and 68 asserted claims for malignant cases with the cumulative relief sought of up to $10 million. Based on Duke Energy Carolinas’ experience, it is expected that the ultimate resolution of most of these claims likely will be less than the amount claimed.
Duke Energy Carolinas has recognized asbestos-related reserves of $527 million at March 31, 2016 and $536 million at December 31, 2015. These reserves are classified in Other within Deferred Credits and Other Liabilities and Other within Current Liabilities on the Condensed Consolidated Balance Sheets. These reserves are based upon the minimum amount of the range of loss for current and future asbestos claims through 2033, are recorded on an undiscounted basis and incorporate anticipated inflation. In light of the uncertainties inherent in a longer-term forecast, management does not believe they can reasonably estimate the indemnity and medical costs that might be incurred after 2033 related to such potential claims. It is possible Duke Energy Carolinas may incur asbestos liabilities in excess of the recorded reserves.
Duke Energy Carolinas has third-party insurance to cover certain losses related to asbestos-related injuries and damages above an aggregate self-insured retention. Duke Energy Carolinas’ cumulative payments began to exceed the self-insurance retention in 2008. Future payments up to the policy limit will be reimbursed by the third-party insurance carrier. The insurance policy limit for potential future insurance recoveries indemnification and medical cost claim payments is $847 million in excess of the self-insured retention. Receivables for insurance recoveries were $600 million at March 31, 2016 and $599 million at December 31, 2015. These amounts are classified in Other within Investments and Other Assets and Receivables on the Condensed Consolidated Balance Sheets. Duke Energy Carolinas is not aware of any uncertainties regarding the legal sufficiency of insurance claims. Duke Energy Carolinas believes the insurance recovery asset is probable of recovery as the insurance carrier continues to have a strong financial strength rating.
Duke Energy Florida
Class Action Lawsuit
On February 22, 2016, Newton, et al v. FP&L, was filed in the U.S. District Court for the Southern District of Florida on behalf of a putative class of Duke Energy Florida and FP&L’s customers in Florida. The suit alleges the State of Florida’s nuclear power plant cost recovery statutes (NCRS) are unconstitutional and pre-empted by federal law. Plaintiffs claim they are entitled to repayment of all money paid by customers of Duke Energy Florida and FP&L as a result of the NCRS, as well as an injunction against any future charges under those statutes. The constitutionality of the NCRS has been challenged unsuccessfully in a number of prior cases on alternative grounds. Duke Energy Florida's response to the complaint was due May 5, 2016. Duke Energy Florida cannot predict the outcome of this matter.
Westinghouse Contract Litigation
On March 28, 2014, Duke Energy Florida filed a lawsuit against Westinghouse in the U.S. District Court for the Western District of North Carolina. The lawsuit seeks recovery of $54 million in milestone payments in excess of work performed under the terminated Engineering, Procurement and Construction agreement (EPC) for Levy as well as a determination by the court of the amounts due to Westinghouse as a result of the termination of the EPC. Duke Energy Florida recognized an exit obligation as a result of the termination of the EPC contract.
On March 31, 2014, Westinghouse filed a lawsuit against Duke Energy Florida in U.S. District Court for the Western District of Pennsylvania. The Pennsylvania lawsuit alleged damages under the EPC in excess of $510 million for engineering and design work, costs to end supplier contracts and an alleged termination fee.
On June 9, 2014, the judge in the North Carolina case ruled that the litigation will proceed in the Western District of North Carolina. In November 2014, Westinghouse filed a Motion for Partial Judgment on the pleadings, which was denied on March 30, 2015. The trial date is set for October 17, 2016. It is not possible to predict the outcome of the litigation, whether Duke Energy Florida will ultimately have any liability for terminating the EPC contract or to estimate the damages, if any, it might incur in connection with these matters. Ultimate resolution of these matters could have a material effect on the results of operations, financial position or cash flows of Duke Energy Florida. However, appropriate regulatory recovery will be pursued for the retail portion of any costs incurred in connection with such resolution.
Duke Energy Ohio
Antitrust Lawsuit
In January 2008, four plaintiffs, including individual, industrial and nonprofit customers, filed a lawsuit against Duke Energy Ohio in federal court in the Southern District of Ohio. Plaintiffs alleged Duke Energy Ohio conspired to provide inequitable and unfair price advantages for certain large business consumers by entering into nonpublic option agreements in exchange for their withdrawal of challenges to Duke Energy Ohio’s Rate Stabilization Plan implemented in early 2005. In March 2014, a federal judge certified this matter as a class action. Plaintiffs allege claims for antitrust violations under the federal Robinson Patman Act as well as fraud and conspiracy allegations under the federal Racketeer Influenced and Corrupt Organizations statute and the Ohio Corrupt Practices Act.
On October 21, 2015, the parties received preliminary court approval for a settlement agreement. A litigation settlement reserve was recorded for the full amount of $81 million and classified in Other within Current Liabilities on Duke Energy Ohio's Condensed Consolidated Balance Sheets as of March 31, 2016. The settlement was approved at a hearing held on April 19, 2016.
W.C. Beckjord Fuel Release
On August 18, 2014, approximately 9,000 gallons of fuel oil were inadvertently discharged into the Ohio River during a fuel oil transfer at the W.C. Beckjord generating station. The Ohio Environmental Protection Agency (Ohio EPA) issued a Notice of Violation related to the discharge. Duke Energy Ohio is cooperating with the Ohio EPA, the EPA and the U.S. Attorney for the Southern District of Ohio. No Notice of Violation has been issued by the EPA and no penalty has been assessed. Total repair and remediation costs related to the release were not material. Other costs related to the release, including state or federal civil or criminal enforcement proceedings, cannot be reasonably estimated at this time.
Other Litigation and Legal Proceedings
The Duke Energy Registrants are involved in other legal, tax and regulatory proceedings arising in the ordinary course of business, some of which involve significant amounts. The Duke Energy Registrants believe the final disposition of these proceedings will not have a material effect on their results of operations, cash flows or financial position.
The table below presents recorded reserves based on management’s best estimate of probable loss for legal matters, excluding asbestos related reserves and the exit obligation discussed above related to the termination of an EPC contract. Reserves are classified on the Condensed Consolidated Balance Sheets in Other within Deferred Credits and Other Liabilities and Accounts payable and Other within Current Liabilities. The reasonably possible range of loss in excess of recorded reserves is not material, other than as described above.
(in millions)
March 31, 2016

 
December 31, 2015

Reserves for Legal Matters
 
 
 
Duke Energy
$
181

 
$
166

Duke Energy Carolinas
11

 
11

Progress Energy
54

 
54

Duke Energy Progress
6

 
6

Duke Energy Florida
31

 
31

Duke Energy Ohio
80

 
80


OTHER COMMITMENTS AND CONTINGENCIES
General
As part of their normal business, the Duke Energy Registrants are party to various financial guarantees, performance guarantees and other contractual commitments to extend guarantees of credit and other assistance to various subsidiaries, investees and other third parties. These guarantees involve elements of performance and credit risk, which are not fully recognized on the Condensed Consolidated Balance Sheets and have unlimited maximum potential payments. However, the Duke Energy Registrants do not believe these guarantees will have a material effect on their results of operations, cash flows or financial position.
In addition, the Duke Energy Registrants enter into various fixed-price, noncancelable commitments to purchase or sell power, take-or-pay arrangements, transportation, or throughput agreements and other contracts that may or may not be recognized on their respective Condensed Consolidated Balance Sheets. Some of these arrangements may be recognized at fair value on their respective Condensed Consolidated Balance Sheets if such contracts meet the definition of a derivative and the normal purchase/normal sale (NPNS) exception does not apply. In most cases, the Duke Energy Registrants’ purchase obligation contracts contain provisions for price adjustments, minimum purchase levels and other financial commitments.