5. COMMITMENTS AND CONTINGENCIES

General Insurance

The Duke Energy Registrants have insurance and reinsurance coverage either directly or through indemnification from Duke Energy's captive insurance company, Bison, and its affiliates, consistent with companies engaged in similar commercial operations with similar type properties. The Duke Energy Registrants' coverage includes (i) commercial general liability coverage for liabilities arising to third parties for bodily injury and property damage resulting from the Duke Energy Registrants' operations; (ii) workers' compensation liability coverage to statutory limits; (iii) automobile liability coverage for all owned, non-owned and hired vehicles covering liabilities to third parties for bodily injury and property damage; (iv) insurance policies in support of the indemnification provisions of the Duke Energy Registrants' by-laws and (v) property coverage for all real and personal property damage, excluding electric transmission and distribution lines, including damages arising from boiler and machinery breakdowns, earthquake, flood damage and extra expense, but not outage or replacement power coverage. All coverage is subject to certain deductibles or retentions, sublimits, terms and conditions common for companies with similar types of operations.

The Duke Energy Registrants self-insure their transmission and distribution lines against loss due to storm damage and other natural disasters. As discussed further in Note 4, Progress Energy Florida maintains a storm damage reserve and has a regulatory mechanism to recover the cost of named storms on an expedited basis.

The cost of the Duke Energy Registrants' coverage can fluctuate year to year reflecting any changing claims history and conditions of the insurance and reinsurance markets.

In the event of a loss, the terms and amount of insurance and reinsurance available might not be adequate to cover claims and other expenses incurred. Uninsured losses and other expenses, to the extent not recovered by other sources, could have a material effect on the Duke Energy Registrants' results of operations, cash flows or financial position. Each company is responsible to the extent losses may exceed limits of the coverage available.

Nuclear Insurance

Nuclear insurance includes nuclear liability coverage; property, decontamination and premature decommissioning coverage; and replacement power expense coverage.

Duke Energy Carolinas owns and operates the McGuire Nuclear Station (McGuire) and the Oconee Nuclear Station (Oconee) and operates and has a partial ownership interest in the Catawba Nuclear Station (Catawba). McGuire and Catawba each have two nuclear reactors and Oconee has three. The other joint owners of Catawba reimburse Duke Energy Carolinas for certain expenses associated with nuclear insurance per the Catawba joint owner agreements.

Progress Energy Carolinas owns and operates the Robinson Nuclear Station (Robinson) and operates and has a partial ownership interest in the Brunswick Nuclear Station (Brunswick) and Harris. Robinson and Harris each have one nuclear reactor and Brunswick has two. The other joint owners of Brunswick and Harris reimburse Progress Energy Carolinas for certain expenses associated with nuclear insurance per the Brunswick and Harris joint owner agreements.

Progress Energy Florida has a partial ownership interest in Crystal River Unit 3. The other joint owners of Crystal River Unit 3 reimburse Progress Energy Florida for certain expenses associated with nuclear insurance per the Crystal River Unit 3 joint owner participation agreement. Due to the planned retirement of Crystal River Unit 3, Progress Energy Florida and the other joint owners will evaluate appropriate nuclear insurance adjustments.

Nuclear Liability Coverage

The Price-Anderson Act requires owners of nuclear reactors to provide for public nuclear liability protection per nuclear incident up to a maximum total financial protection liability. The maximum total financial protection liability, which is currently $12.6 billion, is subject to an inflationary provision adjustment every five years. Total nuclear liability coverage consists of a combination of private primary nuclear liability insurance coverage and a mandatory industry risk-sharing program to provide for excess nuclear liability coverage above the maximum reasonably available private primary coverage. There is a possibility that Congress could impose revenue-raising measures on the nuclear industry to pay claims.

Primary Nuclear Liability Insurance. Duke Energy Carolinas, Progress Energy Carolinas and Progress Energy Florida have purchased the maximum reasonably available private primary nuclear liability insurance as required by law, which currently is $375 million per station.

Excess Nuclear Liability Program. This program provides $12.2 billion of coverage per incident through the Price-Anderson Act's mandatory industry-wide excess secondary financial protection program of risk pooling. The $12.2 billion is the sum of the current potential cumulative retrospective premium assessments of $117.5 million per licensed commercial nuclear reactor. There are currently 104 licensed commercial nuclear reactors in the industry. This would be increased by $117.5 million for each additional commercial nuclear reactor licensed, or reduced by $117.5 million for nuclear reactors no longer operational and which may be exempted from the risk pooling program. Under this program, licensees could be assessed retrospective premiums to compensate for public nuclear liability damages in the event of a nuclear incident at any licensed facility in the U.S. If such an incident should occur and public nuclear liability damages exceed primary nuclear liability insurance, licensees may be assessed up to $117.5 million for each of their licensed reactors, payable at a rate not to exceed $17.5 million a year per licensed reactor for each incident. The assessment and rate are subject to indexing for inflation and may be subject to state premium taxes. The Price-Anderson Act provides for an inflation adjustment at least every five years with the last adjustment effective October 2008.

Nuclear Property Coverage

Duke Energy Carolinas, Progress Energy Carolinas and Progress Energy Florida are members of NEIL, which provides property and accidental outage insurance coverage for nuclear facilities under three policy programs: the primary property insurance program, the excess property insurance program and the accidental outage insurance program.

Pursuant to regulations of the NRC, each company's property damage insurance policies provide that all proceeds from such insurance be applied, first, to place the plant in a safe and stable condition after a qualifying accident, and second, to decontaminate the plant before any proceeds can be used for decommissioning, plant repair or restoration.

Losses resulting from non-certified acts of terrorism are covered as common occurrences, such that if non-certified terrorist acts occur against one or more commercial nuclear power plants insured by NEIL within a 12 month period, they would be treated as one event and the owners of the plants where the act occurred would share one full limit of liability. The full limit of liability is currently $3.2 billion. Effective April 1, 2013, NEIL will sublimit the total aggregate for all of their policies for non-nuclear terrorist events to approximately $1.83 billion.

In the event of a loss, the terms and amount of insurance available might not be adequate to cover property damage and other expenses incurred. Uninsured losses and other expenses, to the extent not recovered by other sources, could have a material effect on Duke Energy Carolinas', Progress Energy Carolinas' and Progress Energy Florida's results of operations, cash flows or financial position. Each company is responsible to the extent losses may exceed limits of the coverage available.

Primary Property Insurance. This policy provides $500 million of primary property damage coverage, with a $2.5 million deductible per occurrence obligation, for Duke Energy Carolinas' nuclear facilities and with a $10 million deductible per occurrence obligation for each Progress Energy Carolinas' and Progress Energy Florida's nuclear facilities.

Excess Property Insurance. For Duke Energy Carolinas, this policy provides excess property, decontamination and decommissioning liability insurance of $2.25 billion for Catawba and $1 billion each for Oconee and McGuire. Oconee and McGuire also share an additional $1 billion insurance limit above their dedicated $1 billion underlying excess. This shared additional excess $1 billion limit is not subject to reinstatement in the event of a loss.

For Progress Energy Carolinas, this policy provides excess property, decontamination and decommissioning liability insurance with limits of $750 million on Brunswick, Harris and Robinson. For Progress Energy Florida, this policy provides excess property, decontamination and decommissioning liability insurance with limits of $750 million on Crystal River Unit 3. Progress Energy Carolinas' nuclear stations and Progress Energy Florida's nuclear station also share an additional $1 billion insurance limit above their dedicated $750 million underlying excess. This shared additional excess $1 billion limit is not subject to reinstatement in the event of a loss.

Effective April 1, 2013, NEIL will sublimit property damage losses to $1.5 billion for non-nuclear accidental property damage.

Accidental Outage Insurance. This policy provides replacement power expense coverage resulting from an accidental property damage outage of a nuclear unit.

Duke Energy Carolinas' McGuire and Catawba units are each insured for up to $3.5 million per week, and the Oconee units are insured for up to $2.8 million per week. Coverage amounts decrease in the event more than one unit at a station is out of service due to a common accident. Initial coverage begins after a 12-week deductible period for Catawba and a 26-week deductible period for McGuire and Oconee and continues at 100 percent of the weekly limits for 52 weeks and 80 percent of the weekly limits for the next 110 weeks. The per accidental outage McGuire and Catawba policy limit is $490 million and the Oconee policy limit is $392 million.

Progress Energy Carolinas' Brunswick, Harris and Robinson units are each insured for up to $3.5 million per week. Initial coverage begins after a 12-week deductible period and continues at 100 percent of the weekly limits for 52 weeks and at 80 percent of the weekly limits for the next 110 weeks. The per accidental outage policy limit is $490 million. Coverage amounts decrease in the event more than one unit at a station is out of service due to a common accident.

Progress Energy Florida's Crystal River Unit 3 is insured for up to $4.5 million per week. Initial coverage begins after a 12-week deductible period and continues at 100 percent of the weekly limits for 52 weeks and at 80 percent of the weekly limits for the next 71 weeks. The per accidental outage policy limit is $490 million.

Effective April 1, 2013, NEIL will sublimit the accidental outage recovery to approximately $328 million for non-nuclear accidental property damage.

Potential Retroactive Premium Assessments. In the event of NEIL losses, NEIL's board of directors may assess member companies retroactive premiums of amounts up to 10 times their annual premiums. The current potential maximum assessments for Duke Energy Carolinas are primary property insurance for $45 million, excess property insurance for $42 million and accidental outage insurance for $22 million. The current potential maximum assessments for Progress Energy Carolinas are primary property insurance for $27 million, excess property insurance for $32 million and accidental outage insurance for $19 million. The current potential maximum assessments for Progress Energy Florida are primary property insurance for $11 million, excess property insurance for $10 million and accidental outage insurance for $6 million.

The maximum assessment amounts include 100 percent of Duke Energy Carolinas', Progress Energy Carolinas', and Progress Energy Florida's potential obligations to NEIL for their share of jointly owned reactors. However, the other joint owners of the jointly owned reactors are obligated to assume their pro rata share of liability for retrospective premiums and other premium assessments resulting from the Price-Anderson Act's excess secondary financial protection program of risk pooling, or from the NEIL policies.

Environmental

Duke Energy is subject to international, federal, state and local regulations regarding air and water quality, hazardous and solid waste disposal and other environmental matters. The Subsidiary Registrants are subject to federal, state and local regulations regarding air and water quality, hazardous and solid waste disposal and other environmental matters. These regulations can be changed from time to time, imposing new obligations on the Duke Energy Registrants.

The following environmental matters impact all of the Duke Energy Registrants.

Remediation Activities. The Duke Energy Registrants are responsible for environmental remediation at various contaminated sites. These include some properties that are part of ongoing operations and sites formerly owned or used by Duke Energy entities. In some cases, the Duke Energy Registrants no longer own the property. These sites are in various stages of investigation, remediation and monitoring. Managed in conjunction with relevant federal, state and local agencies, activities vary with site conditions and locations, remediation requirements, complexity and sharing of responsibility. If remediation activities involve joint and several liability provisions, strict liability, or cost recovery or contribution actions, the Duke Energy Registrants could potentially be held responsible for contamination caused by other parties. In some instances, the Duke Energy Registrants may share liability associated with contamination with other potentially responsible parties, and may also benefit from insurance policies or contractual indemnities that cover some or all cleanup costs. All of these sites generally are managed as part of business or affiliate operations. The Duke Energy Registrants continually assess the nature and extent of known or potential environmentally related contingencies and record liabilities when losses become probable and are reasonably estimable. The Duke Energy Registrants have accrued costs associated with remediation activities at some of their current and former sites for the stages of investigation, remediation and monitoring that can be reasonably estimated, as well as other relevant environmental contingent liabilities. At this time, the Duke Energy Registrants cannot estimate the total costs that may be incurred in connection with the remediation of all stages of all sites because the extent of environmental impact, allocation among potentially responsible parties, remediation alternatives, and/or regulatory decisions have not yet been determined. It is anticipated that additional costs, which could be material, associated with remediation activities at certain sites will be incurred in the future. Costs associated with remediation activities within the Duke Energy Registrants' operations are typically expensed as Operation, maintenance and other unless regulatory recovery of the costs is deemed probable.

The following table contains information regarding reserves for probable and estimable costs related to the Duke Energy Registrants' various environmental sites. These amounts are recorded in Other within Deferred Credits and Other Liabilities on the Duke Energy Registrants' Consolidated Balance Sheets.

                      
(in millions)Duke Energy Duke Energy Carolinas Progress Energy Progress Energy Carolinas Progress Energy Florida Duke Energy Ohio Duke Energy Indiana
Balance at December 31, 2009$ 65 $ 13 $ 42 $ 13 $ 29 $ 20 $ 15
Provisions / adjustments  37     21   3   18   39   (2)
Cash reductions  (14)     (28)   (4)   (24)   (9)   (2)
Balance at December 31, 2010  88   13   35   12   23   50   11
Provisions / adjustments  6     10   1   9   5   1
Cash reductions  (33)   (1)   (22)   (2)   (20)   (27)   (3)
Balance at December 31, 2011  61   12   23   11   12   28   9
Provisions / adjustments  39   1   19   5   14   5   3
Cash reductions  (25)   (1)   (9)   (2)   (7)   (18)   (4)
Balance at December 31, 2012$ 75 $ 12 $ 33 $ 14 $ 19 $ 15 $ 8
                      

The Duke Energy Registrants' accruals relate to certain former manufactured gas plants (MGP) and other sites that have required, or are anticipated to require, investigation and/or remediation. The Duke Energy Registrants could incur additional losses in excess of their recorded reserves for the stages of investigation, remediation and monitoring for their environmental sites that can be reasonably estimated at this time. The maximum amount of the range for all stages of the Duke Energy Registrants' environmental sites cannot be determined at this time. Actual experience may differ from current estimates, and it is probable that estimates will continue to change in the future.

In 2012, Progress Energy Carolinas received approval from the North Carolina Department of Environment and Natural Resources of the remedial action plan for its remaining MGP site. Progress Energy Carolinas has accrued the estimated cost for this remedial action plan.

At December 31, 2012, Progress Energy Florida's accrual primarily relates to an MGP site located in Orlando, Florida. In 2012, the potentially responsible parties received estimates for a range of viable remedial approaches for the first phase of the Orlando MGP site. Progress Energy Florida has accrued its best estimate of its obligation for the first phase of the Orlando MGP site based on current estimates for the remedial approach considered to have more merit and its current allocation share. The viable remedial approaches and related costs for the second phase at the Orlando MGP site have not been determined.

Duke Energy Ohio has received an order from the PUCO to defer the costs incurred for probable and estimable costs related to environmental sites. Recovery of those costs is being sought in Duke Energy Ohio's natural gas distribution rate case as discussed in Note 4.

The additional losses in excess of their recorded reserves that the Duke Energy Registrants' could incur for the stages of investigation, remediation and monitoring for their environmental sites that can be reasonably estimated at this time are presented in the table below.

       
(in millions)   
Duke Energy   $ 92
Duke Energy Carolinas     28
Progress Energy     7
Progress Energy Carolinas     3
Progress Energy Florida     4
Duke Energy Ohio     51
Duke Energy Indiana     5
       

Clean Water Act 316(b). The EPA published its proposed cooling water intake structures rule on April 20, 2011. The proposed rule advances one main approach and three alternatives. The main approach establishes aquatic protection requirements for existing facilities that withdraw 2 million gallons or more of water per day from rivers, streams, lakes, reservoirs, estuaries, oceans, or other U.S. waters for cooling purposes. Based on the main approach proposed, most, if not all of the coal, natural gas and nuclear-fueled steam electric generating facilities in which the Duke Energy Registrants are either a whole or partial owner are likely affected sources unless retired prior to implementation of the 316(b) requirements.

The EPA plans to finalize the 316(b) rule by June 2013. Compliance with portions of the rule could begin as early as 2016. Because of the wide range of potential outcomes, including the other three alternative proposals, the Duke Energy Registrants are unable to predict the outcome of the rulemaking or estimate their costs to comply at this time.

Cross-State Air Pollution Rule (CSAPR). On August 8, 2011, the final Cross-State Air Pollution Rule (CSAPR) was published in the Federal Register. The CSAPR established state-level annual SO2 budgets and annual seasonal NOx budgets that were to take effect on January 1, 2012.

Numerous parties challenged the rule. On August 21, 2012, by a 2-1 decision, the United States Court of Appeals for the District of Columbia vacated the CSAPR. The court also directed the EPA to continue administering the Clean Air Interstate Rule (CAIR) that the Duke Energy Registrants have been complying with since 2009, pending completion of a remand rulemaking to replace CSAPR with a valid rule. The CAIR requires additional reductions in SO2 and NOx emissions beginning in 2015. The EPA petitioned for rehearing by the Court of Appeals, which was denied. The EPA might seek review by the U.S. Supreme Court. The CAIR will remain in force for an unknown period of time until the EPA develops a replacement rule.

The Duke Energy Registrants cannot predict the outcome of any further appeal or how a potential CSAPR replacement rule could affect future emission reduction requirements. The continued implementation of the CAIR pending the outcome of the rehearing process and a potential CSAPR replacement rulemaking will not result in the Duke Energy Registrants adding new emission controls.

Coal Combustion Residuals (CCR). On June 21, 2010, the EPA issued a proposal to regulate, under the Resource Conservation and Recovery Act, coal combustion residuals (CCR), a term the EPA uses to describe the coal combustion byproducts associated with the generation of electricity. The EPA proposal contains two regulatory options whereby CCRs not employed in approved beneficial use applications either would be regulated as hazardous waste or would continue to be regulated as non-hazardous waste. The Duke Energy Registrants cannot predict the outcome of this rulemaking. The EPA has stated that it may be 2014 before it finalizes the regulation.

Mercury and Air Toxics Standards (MATS). The final Mercury and Air Toxics Standards rule, previously referred to as the Utility MACT Rule, was published in the Federal Register on February 16, 2012. The final rule establishes emission limits for hazardous air pollutants from new and existing coal-fired and oil-fired steam electric generating units. The rule requires sources to comply with the emission limits by April 16, 2015. Under the CAA, permitting authorities have the discretion to grant up to a 1-year compliance extension, on a case-by-case basis, to sources that are unable to complete the installation of emission controls before the compliance deadline. The Duke Energy Registrants continue to develop and implement strategies for complying with the rule's requirements. Strategies to achieve compliance with the final MATS rules could include installing new or upgrading existing air emission control equipment, developing monitoring processes, fuel switching and accelerating retirement of some coal-fired electric-generating units. For additional information, refer to Note 4 regarding potential plant retirements.

Numerous petitions for review of the final MATS rule have been filed with the United States Court of Appeals for the District of Columbia. The court established a schedule for the litigation that has final briefs being filed on April 8, 2013. Oral arguments have not been scheduled. The Duke Energy Registrants cannot predict the outcome of the litigation or how it might affect the MATS requirements as they apply to the Duke Energy Registrants. As disclosed in the following table, the cost to the Duke Energy Registrants to comply with the proposed MATS regulations will be material.

EPA Greenhouse Gas New Source Performance Standards (NSPS). On April 13, 2012, the EPA published in the Federal Register its proposed rule to establish carbon dioxide (CO2) emissions standards for pulverized coal, IGCC, and natural gas combined cycle electric generating units that are permitted and constructed in the future. The proposal would not apply to any of the Duke Energy Registrants' coal, including IGCC, and natural gas electric generation plants that are currently under construction or in operation. Any future pulverized coal and IGCC units will have to employ carbon capture and storage (CCS) technology to meet the CO2 emission standard the EPA has proposed. The proposed standard will not require new natural gas combined cycle facilities to install CCS technology.

Management does not expect any material impact on the Duke Energy Registrants' future results of operations or cash flows based on the EPA's proposal. The final rule, however, could be significantly different from the proposal. It is not known when the EPA might finalize the rule.

Estimated Cost and Impacts of EPA Rulemakings. While the ultimate compliance requirements for the Duke Energy Registrants for MATS, Clean Water Act 316(b) and CCRs will not be known until all the rules have been finalized, for planning purposes, the Duke Energy Registrants currently estimate that the cost of new control equipment that may need to be installed on existing power plants to comply with EPA regulations could total $5 billion to $6 billion, excluding AFUDC, over the next 10 years. This range includes estimated costs for new control equipment necessary to comply with the MATS, which is the only rule that has been finalized, as shown in the table below:

        
(in millions)    
Duke Energy$ 650 to$ 800
Duke Energy Carolinas  65 to  85
Progress Energy  7 to  30
Progress Energy Carolinas  5 to  10
Progress Energy Florida  2 to  20
Duke Energy Ohio  40 to  85
Duke Energy Indiana  540 to  600
        

The Duke Energy Registrants also expect to incur increased fuel, purchased power, operation and maintenance, and other expenses in conjunction with these EPA regulations, and also expect to incur costs for replacement generation for potential coal-fired power plant retirements. Until the final regulatory requirements of the group of EPA regulations are known and can be fully evaluated, the potential compliance costs associated with these EPA regulatory actions are subject to considerable uncertainty. Therefore, the actual compliance costs incurred may be materially different from these estimates based on the timing and requirements of the final EPA regulations. The Duke Energy Registrants intend to seek regulatory recovery of amounts incurred associated with regulated operations in complying with these regulations. Refer to Note 4 for further information regarding potential plant retirements and regulatory filings related to the Duke Energy Registrants.

Litigation

Duke Energy

Progress Energy Merger Shareholder Litigation. On July 20, 2012, Duke Energy was served with a shareholder Derivative Complaint filed in the Delaware Chancery Court (Rupp v. Rogers, et al.). The lawsuit names as defendants James E. Rogers and the ten other members of the Duke Energy board of directors who were also members of the pre-merger Duke Energy board of directors (Legacy Duke Directors). Duke Energy is named as a nominal defendant. Raul v. Rogers, also filed in Delaware Chancery Court was consolidated with the Rupp case on September 24, 2012. Two shareholders, each of whom previously made separate Section 220 demands to inspect various Duke Energy books and records, filed derivative cases against James E. Rogers and the Legacy Duke Directors. The Gerber v Rogers, et al. lawsuit was filed on December 5, 2012, and the Reilly v. Rogers, et al. lawsuit was filed on January 8, 2013. Each of the lawsuits alleges claims for breach of fiduciary duties of loyalty and care by the defendants in connection with the post-merger change in CEO, as discussed in Note 4.

On August 3, 2012, Duke Energy was served with a shareholder Derivative Complaint, which has been transferred to the North Carolina Business Court (Krieger v. Johnson, et al.). The lawsuit names as defendants, William D. Johnson, James E. Rogers and the Legacy Duke Directors. Duke Energy is named as a nominal defendant. The lawsuit alleges claims for breach of fiduciary duty in granting excessive compensation to Mr. Johnson. A hearing on the defendants' motion to dismiss was held on January 22, 2013. A decision on the motion made by the defendants remains pending.

Duke Energy has been served with two shareholder Derivative Complaints, filed in federal district court in Delaware. The plaintiffs in Tansey v. Rogers, et al., served on August 17, 2012, and Pinchuck v. Rogers, et al., served on October 31, 2012, allege claims for breach of fiduciary duty and waste of corporate assets, as well as claims under Section 14(a) and 20(a) of the Exchange Act against the Legacy Duke Directors. Duke Energy is named as a nominal defendant. On December 18, 2012, the defendants filed a motion to stay the case.

Duke Energy was also served in July 2012 with three purported securities class action lawsuits. These three cases (Craig v. Duke Energy Corporation, et al.; Nieman v. Duke Energy Corporation, et al.; and Sunner v. Duke Energy Corporation, et al.), have been consolidated in the United States District Court for the Western District of North Carolina. The plaintiff filed a Corrected Consolidated Complaint on January 28, 2013, alleging federal Securities Act and Exchange Act claims based on allegedly materially false and misleading representations and omissions made in the Registration Statement filed on July 7, 2011, and subsequently incorporated into other documents, all in connection with the post merger change in CEO. The Corrected Consolidated Complaint names as defendants the Legacy Duke Directors and certain officers of the company. The claims are purportedly brought on behalf of a class of all persons who purchased or otherwise acquired Duke Energy securities between June 11, 2012 and July 9, 2012.

It is not possible to predict whether Duke Energy will incur any liability or to estimate the damages, if any, that Duke Energy might incur in connection with these lawsuits. Additional lawsuits may be filed.

Alaskan Global Warming Lawsuit. On February 26, 2008, plaintiffs, the governing bodies of an Inupiat village in Alaska, filed suit in the U.S. Federal Court for the Northern District of California against Peabody Coal and various oil and power company defendants, including Duke Energy and certain of its subsidiaries. Plaintiffs brought the action on their own behalf and on behalf of the village's 400 residents. The lawsuit alleges that defendants' emissions of CO2 contributed to global warming and constitute a private and public nuisance. Plaintiffs also allege that certain defendants, including Duke Energy, conspired to mislead the public with respect to global warming. The plaintiffs in the case have requested damages in the range of $95 million to $400 million related to the cost of relocating the Village of Kivalina. On June 30, 2008, the defendants filed a motion to dismiss on jurisdictional grounds, together with a motion to dismiss the conspiracy claims. On October 15, 2009, the District Court granted defendants' motion to dismiss. The plaintiffs filed a notice of appeal and the U.S. Court of Appeals for the Ninth Circuit held argument in the case on November 28, 2011. On September 21, 2012, the Court of Appeals ruled that the case could not proceed, affirming the District Court's motion to dismiss. The Plaintiffs have filed a motion for rehearing en banc by the Court of Appeals, which was denied on November 27, 2012. A Petition for Certiorari to the U.S. Supreme Court, if filed, was due on February 25, 2013. Although Duke Energy believes the likelihood of loss is remote based on current case law, it is not possible to predict the ultimate outcome of this matter.

Price Reporting Cases. A total of five lawsuits were filed against Duke Energy affiliates and other energy companies and remain pending in a consolidated, single federal court proceeding in Nevada.

In November 2009, the judge granted defendants' motion for reconsideration of the denial of defendants' summary judgment motion in two of the remaining five cases to which Duke Energy affiliates are a party. A hearing on that motion occurred on July 15, 2011, and on July 19, 2011, the judge granted the motion for summary judgment. Plaintiffs have filed a notice of appeal to the U.S. Court of Appeals for the Ninth Circuit, which held argument on October 19, 2012.

Each of these cases contains similar claims, that the respective plaintiffs, and the classes they claim to represent, were harmed by the defendants' alleged manipulation of the natural gas markets by various means, including providing false information to natural gas trade publications and entering into unlawful arrangements and agreements in violation of the antitrust laws of the respective states. Plaintiffs seek damages in unspecified amounts. It is not possible to predict whether Duke Energy will incur any liability or to estimate the damages, if any, that Duke Energy might incur in connection with the remaining matters. However, based on Duke Energy's past experiences with similar cases of this nature, it does not believe its exposure under these remaining matters is material.

Duke Energy International Paranapanema Lawsuit. On July 16, 2008, Duke Energy International Geracao Paranapanema S.A. (DEIGP) filed a lawsuit in the Brazilian federal court challenging transmission fee assessments imposed under two new resolutions promulgated by the Brazilian Electricity Regulatory Agency (ANEEL) (collectively, the Resolutions). The Resolutions purport to impose additional transmission fees (retroactive to July 1, 2004 and effective through June 30, 2009) on generation companies located in the State of São Paulo for utilization of the electric transmission system. The new charges are based upon a flat-fee that fails to take into account the locational usage by each generator. DEIGP's additional assessment under these Resolutions amounts to approximately $61 million, inclusive of interest, through December 2012. Based on DEIGP's continuing refusal to tender payment of the disputed sums, on April 1, 2009, ANEEL imposed an additional fine against DEIGP in the current amount of $9 million. DEIGP filed a request to enjoin payment of the fine and for an expedited decision on the merits or, alternatively, an order requiring that all disputed sums be deposited in the court's registry in lieu of direct payment to the distribution companies.

On June 30, 2009, the court issued a ruling in which it granted DEIGP's request for injunction regarding the additional fine, but denied DEIGP's request for an expedited decision on the original assessment or payment into the court registry. Under the court's order, DEIGP was required to make installment payments on the original assessment directly to the distribution companies pending resolution on the merits. DEIGP filed an appeal and on August 28, 2009, the order was modified to allow DEIGP to deposit the disputed portion of each installment, which was most of the assessed amount, into an escrow account pending resolution on the merits. Duke Energy has made deposits to escrow of $33 million associated with this matter.

Brazil Expansion Lawsuit. On August 9, 2011, the State of São Paulo filed a lawsuit in Brazilian state court against DEIGP based upon a claim that DEIGP is under a continuing obligation to expand installed generation capacity by 15 percent pursuant to a stock purchase agreement under which DEIGP purchased generation assets from the state. On August 10, 2011, a judge granted an ex parte injunction ordering DEIGP to present a detailed expansion plan in satisfaction of the 15 percent obligation. DEIGP has previously taken a position that the 15 percent expansion obligation is no longer viable given the changes that have occurred in the electric energy sector since privatization of that sector. After filing various objections, defenses and appeals regarding the referenced order, DEIGP submitted its proposed expansion plan on November 11, 2011, but reserved its objections regarding enforceability. The parties will in due course present evidence to the court regarding their respective positions. No trial date has been set.

Crescent Litigation. On September 3, 2010, the Crescent Resources Litigation Trust filed suit against Duke Energy along with various affiliates and several individuals, including current and former employees of Duke Energy, in the U.S. Bankruptcy Court for the Western District of Texas. The Crescent Resources Litigation Trust was established in May 2010 pursuant to the plan of reorganization approved in the Crescent bankruptcy proceedings in the same court. The complaint alleges that in 2006 the defendants caused Crescent to borrow approximately $1.2 billion from a consortium of banks and immediately thereafter distribute most of the loan proceeds to Crescent's parent company without benefit to Crescent. The complaint further alleges that Crescent was rendered insolvent by the transactions, and that the distribution is subject to recovery by the Crescent bankruptcy estate as an alleged fraudulent transfer. The plaintiff requests return of the funds as well as other statutory and equitable relief, punitive damages and attorneys' fees. Duke Energy and its affiliated defendants believe that the referenced 2006 transactions were legitimate and did not violate any state or federal law. Defendants filed a motion to dismiss in December 2010. On March 21, 2011, the plaintiff filed a response to the defendant's motion to dismiss and a motion for leave to file an amended complaint, which was granted. The Defendants filed a second motion to dismiss in response to plaintiffs' amended complaint.

The plaintiffs filed a demand for a jury trial, a motion to transfer the case to the federal district court, and a motion to consolidate the case with a separate action filed by the plaintiffs against Duke Energy's legal counsel. On March 22, 2012, the federal District Court issued an order denying the defendant's motion to dismiss and granting the plaintiffs' motions for transfer and consolidation. The court has not yet made a final ruling on whether the plaintiffs are entitled to a jury trial. Trial on this matter has been set to commence in January 2014. Mediation, held on August 21 and 22, 2012, was unsuccessful. It is not possible to predict whether Duke Energy will incur any liability or to estimate the damages, if any, that Duke Energy might incur in connection with this lawsuit. The ultimate resolution of this matter could have a material effect on the consolidated results of operations, cash flows or financial position of Duke Energy.

Federal Advanced Clean Coal Tax Credits. Duke Energy Carolinas has been awarded $125 million of federal advanced clean coal tax credits associated with its construction of Cliffside Unit 6 and Duke Energy Indiana has been awarded $134 million of federal advanced clean coal tax credits associated with its construction of the Edwardsport IGCC plant. In March 2008, two environmental groups, Appalachian Voices and the Canary Coalition, filed suit against the Federal government in the United States District Court for the District of Columbia challenging the tax credits awarded to incentivize certain clean coal projects. Although Duke Energy was not a party to the case, the allegations center on the tax incentives provided for the Cliffside and Edwardsport projects. The initial complaint alleged a failure to comply with the National Environmental Policy Act. The first amended complaint, filed in August 2008, added an Endangered Species Act claim and also sought declaratory and injunctive relief against the DOE and the U.S. Department of the Treasury. In 2008, the District Court dismissed the case. On September 23, 2009, the District Court issued an order granting plaintiffs' motion to amend their complaint and denying, as moot, the motion for reconsideration. Plaintiffs have filed their second amended complaint. The Federal government has moved to dismiss the second amended complaint; the motion is pending. On July 26, 2010, the District Court denied plaintiffs' motion for preliminary injunction seeking to halt the issuance of the tax credits.

Duke Energy Carolinas

New Source Review (NSR). In 1999-2000, the U.S. Department of Justice (DOJ), acting on behalf of the EPA and joined by various citizen groups and states, filed a number of complaints and notices of violation against multiple utilities across the country for alleged violations of the NSR provisions of the CAA. Generally, the government alleges that projects performed at various coal-fired units were major modifications, as defined in the CAA, and that the utilities violated the CAA when they undertook those projects without obtaining permits and installing the best available emission controls for SO2, NOx and particulate matter. The complaints seek injunctive relief to require installation of pollution control technology on various generating units that allegedly violated the CAA, and unspecified civil penalties in amounts of up to $32,500 per day for each violation. A number of Duke Energy Carolinas' plants have been subject to these allegations. Duke Energy Carolinas asserts that there were no CAA violations because the applicable regulations do not require permitting in cases where the projects undertaken are “routine” or otherwise do not result in a net increase in emissions.

In 2000, the government brought a lawsuit against Duke Energy Carolinas in the U.S. District Court in Greensboro, North Carolina. The EPA claims that 29 projects performed at 25 of Duke Energy Carolinas' coal-fired units violate these NSR provisions. Three environmental groups have intervened in the case. In August 2003, the trial court issued a summary judgment opinion adopting Duke Energy Carolinas' legal positions on the standard to be used for measuring an increase in emissions, and granted judgment in favor of Duke Energy Carolinas. The trial court's decision was appealed and ultimately reversed and remanded for trial by the U.S. Supreme Court. At trial, Duke Energy Carolinas will continue to assert that the projects were routine or not projected to increase emissions. On February 11, 2011, the trial judge held an initial status conference and on March 22, 2011, the judge entered an interim scheduling order. The parties have filed a stipulation in which the United States and Plaintiff-Intervenors have dismissed with prejudice 16 claims. In exchange, Duke Energy Carolinas dismissed certain affirmative defenses. The parties have filed motions for summary judgment on the remaining claims. No trial date has been set, but a trial is not expected until the second half of 2013, at the earliest.

It is not possible to estimate the damages, if any, that might be incurred in connection with the unresolved matters related to Duke Energy Carolinas discussed above. Ultimate resolution of these matters could have a material effect on the consolidated results of operations, cash flows or financial position of Duke Energy Carolinas. However, the appropriate regulatory treatment will be pursued for any costs incurred in connection with such resolution.

Asbestos-related Injuries and Damages Claims. Duke Energy Carolinas has experienced numerous claims for indemnification and medical cost reimbursement relating to damages for bodily injuries alleged to have arisen from the exposure to or use of asbestos in connection with construction and maintenance activities conducted on its electric generation plants prior to 1985. As of December 31, 2012, there were 111 asserted claims for non-malignant cases with the cumulative relief sought of up to $27 million, and 49 asserted claims for malignant cases with the cumulative relief sought of up to $17 million. Based on Duke Energy Carolinas' experience, it is expected that the ultimate resolution of most of these claims likely will be less than the amount claimed.

Amounts recognized as asbestos-related reserves related to Duke Energy Carolinas in the Consolidated Balance Sheets totaled $751 million and $801 million as of December 31, 2012 and December 31, 2011, respectively, and are classified in Other within Deferred Credits and Other Liabilities and Other within Current Liabilities. These reserves are based upon the minimum amount in Duke Energy Carolinas' best estimate of the range of loss for current and future asbestos claims through 2030. Management believes that it is possible there will be additional claims filed against Duke Energy Carolinas after 2030. In light of the uncertainties inherent in a longer-term forecast, management does not believe that they can reasonably estimate the indemnity and medical costs that might be incurred after 2030 related to such potential claims. Asbestos-related loss estimates incorporate anticipated inflation, if applicable, and are recorded on an undiscounted basis. These reserves are based upon current estimates and are subject to greater uncertainty as the projection period lengthens. A significant upward or downward trend in the number of claims filed, the nature of the alleged injury, and the average cost of resolving each such claim could change our estimated liability, as could any substantial or favorable verdict at trial. A federal legislative solution, further state tort reform or structured settlement transactions could also change the estimated liability. Given the uncertainties associated with projecting matters into the future and numerous other factors outside our control, management believes that it is possible Duke Energy Carolinas may incur asbestos liabilities in excess of the recorded reserves.

Duke Energy Carolinas has a third-party insurance policy to cover certain losses related to asbestos-related injuries and damages above an aggregate self insured retention of $476 million. Duke Energy Carolinas' cumulative payments began to exceed the self insurance retention on its insurance policy in 2008. Future payments up to the policy limit will be reimbursed by Duke Energy Carolinas' third party insurance carrier. The insurance policy limit for potential future insurance recoveries for indemnification and medical cost claim payments is $935 million in excess of the self insured retention. Insurance recoveries of $781 million and $813 million related to this policy are classified in the respective Consolidated Balance Sheets in Other within Investments and Other Assets and Receivables as of both December 31, 2012 and December 31, 2011, respectively. Duke Energy Carolinas is not aware of any uncertainties regarding the legal sufficiency of insurance claims. Management believes the insurance recovery asset is probable of recovery as the insurance carrier continues to have a strong financial strength rating.

Progress Energy

Synthetic Fuels Matters. In October 2009, a jury delivered a verdict in a lawsuit against Progress Energy and a number of its subsidiaries and affiliates arising out of an Asset Purchase Agreement dated as of October 19, 1999, and amended as of August 23, 2000 (the Asset Purchase Agreement) by and among U.S. Global, LLC (Global); Earthco synthetic fuels facilities (Earthco); certain affiliates of Earthco; EFC Synfuel LLC (which was owned indirectly by Progress Energy) and certain of its affiliates, including Solid Energy LLC; Solid Fuel LLC; Ceredo Synfuel LLC; Gulf Coast Synfuel LLC (renamed Sandy River Synfuel LLC) (collectively, the Progress Affiliates), as amended by an amendment to the Asset Purchase Agreement. In a case filed in the Circuit Court for Broward County, Florida. in March 2003 (the Florida Global Case), Global requested an unspecified amount of compensatory damages, as well as declaratory relief. Global asserted (i) that pursuant to the Asset Purchase Agreement, it was entitled to an interest in two synthetic fuels facilities previously owned by the Progress Affiliates and an option to purchase additional interests in the two synthetic fuels facilities and (ii) that it was entitled to damages because the Progress Affiliates prohibited it from procuring purchasers for the synthetic fuels facilities. As a result of the 2007 expiration of the Internal Revenue Code Section 29 tax credit program, all of Progress Energy's synthetic fuels businesses were abandoned and the synthetic fuels businesses were reclassified as discontinued operations.

The jury awarded Global $78 million. In November 2009, the court assessed $55 million in prejudgment interest and entered judgment in favor of Global in a total amount of $133 million. In December 2009, Progress Energy appealed the Broward County judgment to the Florida Fourth District Court of Appeals. Also, in December 2009, Progress Energy made a $154 million payment, which represented payment of the total judgment and a required premium equivalent to two years of interest, to the Broward County Clerk of Court bond account. Progress Energy continued to accrue interest related to this judgment.

On October 3, 2012, the Florida Fourth District Court of Appeals reversed the lower court ruling and directed a verdict on damages under the Commission and Services Agreement, which was modified by the court's December 12, 2012 ruling on Global's motion for reconsideration. The court held that Global was entitled to 59 percent of its claim, or approximately $90 million of the $154 million paid into the registry of the court. Progress Energy was entitled to a refund of the remainder of the funds. Progress Energy received and recorded a $63 million pretax gain for the refund in December 2012. The gain was recorded in Income from discontinued operations, net of tax in the Consolidated Statements of Operations.

The case was remanded to the trial court to determine whether specific performance is an appropriate remedy for the claims under the Asset Purchase Agreement. The plaintiff seeks specific performance of an award of the corporate interests in the Progress Affiliates it claims it was entitled to receive under the Asset Purchase Agreement as of the date the jury determined the breach of contract occurred (March 19, 2002). The Progress Affiliates contend that specific performance is an inapplicable remedy.

In a second suit filed in the Superior Court for Wake County, N.C., Progress Synfuel Holdings, Inc. et al. v. U.S. Global, LLC (the North Carolina Global Case), the Progress Affiliates seek declaratory relief consistent with our interpretation of the Asset Purchase Agreement. Global was served with the North Carolina Global Case on April 17, 2003. In May 2003, Global moved to dismiss the North Carolina Global Case for lack of personal jurisdiction over Global. In the alternative, Global requested that the court decline to exercise its discretion to hear the Progress Affiliates' declaratory judgment action. In August 2003, the Wake County Superior Court denied Global's motion to dismiss, but stayed the North Carolina Global Case, pending the outcome of the Florida Global Case. The Progress Affiliates appealed the superior court's order staying the case. By order dated September 7, 2004, the North Carolina Court of Appeals dismissed the Progress Affiliates' appeal. Based upon the verdict in the Florida Global Case, Progress Energy anticipates dismissal of the North Carolina Global Case.

Progress Energy Carolinas and Progress Energy Florida

Spent Nuclear Fuel Matters. Pursuant to the Nuclear Waste Policy Act of 1982, Progress Energy Carolinas and Progress Energy Florida entered into contracts with the DOE under which the DOE agreed to begin taking spent nuclear fuel by no later than January 31, 1998. All similarly situated utilities were required to sign the same Standard Contract for Disposal of Spent Nuclear Fuel.

The DOE failed to begin taking spent nuclear fuel by January 31, 1998. In January 2004, Progress Energy Carolinas and Progress Energy Florida filed a complaint in the U.S. Court of Federal Claims against the United States, claiming that the DOE breached the standard contract and asserting damages incurred through 2005. In 2011, the U.S. Court of Federal Claims issued a ruling to award Progress Energy Carolinas substantially all their asserted damages. As a result, Progress Energy Carolinas recorded the award as an offset for past spent fuel storage costs incurred.

On December 12, 2011, Progress Energy Carolinas and Progress Energy Florida filed another complaint in the U.S. Court of Federal Claims against the United States, claiming damages incurred from January 1, 2006 through December 31, 2010. The damages stem from the same breach of contract asserted in the previous litigation. On March 23, 2012, Progress Energy Carolinas and Progress Energy Florida filed their initial disclosure of $113 million of damages with the U.S. Court of Federal Claims and the DOE. The total amount of damages could change during discovery, which is set to end on May 15, 2013. Progress Energy Carolinas and Progress Energy Florida may file subsequent damage claims as they incur additional costs. A status conference to discuss trial dates is scheduled for May 10, 2013. Progress Energy Carolinas and Progress Energy Florida cannot predict the outcome of this matter.

Duke Energy Ohio

Antitrust Lawsuit. In January 2008, four plaintiffs, including individual, industrial and nonprofit customers, filed a lawsuit against Duke Energy Ohio in federal court in the Southern District of Ohio. Plaintiffs alleged that Duke Energy Ohio (then The Cincinnati Gas & Electric Company), conspired to provide inequitable and unfair price advantages for certain large business consumers by entering into non-public option agreements with such consumers in exchange for their withdrawal of challenges to Duke Energy Ohio's pending Rate Stabilization Plan (RSP), which was implemented in early 2005. On March 31, 2009, the District Court granted Duke Energy Ohio's motion to dismiss. Plaintiffs filed a motion to alter or set aside the judgment, which was denied by an order dated March 31, 2010. In April 2010, the plaintiffs filed their appeal of that order with the U.S. Court of Appeals for the Sixth Circuit, which heard argument on that appeal on January 11, 2012. On June 4, 2012, the Sixth Circuit Court of Appeals reversed the district court's decision and remanded the matter on all claims for trial on the merits and on July 25, 2012, the Court denied Duke Energy Ohio's petition for an en banc review of the case. On October 15, 2012, Duke Energy filed a petition for certiorari to the United States Supreme Court, which was denied on January 14, 2013. The plaintiffs' January 2013 mediation demand was for $160 million. It is not possible to predict at this time whether Duke Energy Ohio will incur any liability or to estimate the damages, if any, that may be incurred in connection with this lawsuit.

Asbestos-related Injuries and Damages Claims. Duke Energy Ohio has been named as a defendant or co-defendant in lawsuits related to asbestos at its electric generating stations. The impact on Duke Energy Ohio's consolidated results of operations, cash flows or financial position of these cases to date has not been material. Based on estimates under varying assumptions concerning uncertainties, such as, among others: (i) the number of contractors potentially exposed to asbestos during construction or maintenance of Duke Energy Ohio generating plants; (ii) the possible incidence of various illnesses among exposed workers, and (iii) the potential settlement costs without federal or other legislation that addresses asbestos tort actions, Duke Energy Ohio estimates that the range of reasonably possible exposure in existing and future suits over the foreseeable future is not material. This estimated range of exposure may change as additional settlements occur and claims are made and more case law is established.

Other Litigation and Legal Proceedings

The Duke Energy Registrants are involved in other legal, tax and regulatory proceedings arising in the ordinary course of business, some of which involve substantial amounts. Management believes that the final disposition of these proceedings will not have a material effect on its consolidated results of operations, cash flows or financial position.

The Duke Energy Registrants expense legal costs related to the defense of loss contingencies as incurred.

The Duke Energy Registrants have exposure to certain legal matters that are described herein. The Duke Energy Registrants have recorded reserves for these proceedings and exposures as presented in the table below. These reserves represent management's best estimate of probable loss as defined in the accounting guidance for contingencies. The estimated reasonably possible range of loss for non-asbestos related matters in excess of the recorded reserves is not material. Duke Energy Carolinas has insurance coverage for certain of these losses incurred as presented in the table below.

  Years Ended December 31,
(in millions)2012 2011
Reserves for Legal and Other Matters(a)     
Duke Energy(b)$ 846 $ 810
Duke Energy Carolinas(b)  751   801
Progress Energy  79   83
Progress Energy Carolinas  12   11
Progress Energy Florida(c)  47   51
Duke Energy Indiana  8   4
Probable Insurance Recoveries(d)     
Duke Energy(e)$ 781 $ 813
Duke Energy Carolinas(e)  781   813
       
(a)Reserves are classified in the respective Consolidated Balance Sheets in Other within Deferred Credits and Other Liabilities and Other within Current Liabilities.
(b)Includes reserves for aforementioned asbestos-related injuries and damages claims.
(c)Includes workers' compensation claims.
(d)Insurance recoveries are classified in the respective Consolidated Balance Sheets in Other within Investments and Other Assets and Receivables.
(e)Relates to recoveries associated with aforementioned asbestos-related injuries and damages claims.
       

Other Commitments and Contingencies

General

As part of its normal business, the Duke Energy Registrants are a party to various financial guarantees, performance guarantees and other contractual commitments to extend guarantees of credit and other assistance to various subsidiaries, investees and other third parties. To varying degrees, these guarantees involve elements of performance and credit risk, which are not included on the respective Consolidated Balance Sheets. The possibility of any of the Duke Energy Registrants having to honor their contingencies is largely dependent upon future operations of various subsidiaries, investees and other third parties, or the occurrence of certain future events.

In addition, the Duke Energy Registrants enter into various fixed-price, non-cancelable commitments to purchase or sell power (tolling arrangements or power purchase contracts), take-or-pay arrangements, transportation or throughput agreements and other contracts that may or may not be recognized on their respective Consolidated Balance Sheets. Some of these arrangements may be recognized at fair value on the respective Consolidated Balance Sheets if such contracts meet the definition of a derivative and the NPNS exception does not apply. In most cases, the Duke Energy Registrants purchase obligation contracts contain provisions for price adjustments, minimum purchase levels and other financial commitments. The commitment amounts presented below are estimates and therefore will likely differ from actual purchase amounts.

Purchase Obligations

The following table presents long-term commitments that are noncancelable or are cancelable only under certain conditions, have a term of more than one year, and that third parties have used to secure financing for the facilities that will provide the contracted goods or services as of December 31, 2012.

                      
(in millions)2013 2014 2015 2016 2017 Thereafter Total
Duke Energy(a)$ 68 $ 19 $ 5 $ 3 $ 2 $ 18 $ 115
Progress Energy(a)  68   19   5   3   2   18   115
Progress Energy Florida(a)  68   19   5   3   2   18   115
                      
(a)Represents estimated amounts for Progress Energy Florida's obligations primarily related to selected components of long lead time equipment at Levy as discussed under "Other Purchase Obligations."

Purchases under the above long-term purchase agreements were $29 million, $6 million and $23 million in 2012, 2011 and 2010, respectively.

Purchased Power

The Duke Energy Registrants have ongoing purchased power contracts, including renewable energy contracts, with other utilities, certain co-generators and qualified facilities (QFs), with expiration dates ranging from 2013 to 2032. These purchased power contracts generally provide for capacity and energy payments or bundled capacity and energy payments. In addition, the Duke Energy Registrants have various contracts to secure transmission rights. Certain purchased power agreements are classified as leases.

Progress Energy Carolinas has executed certain firm contracts for purchased power with other utilities, including tolling contracts, with expiration dates ranging from 2017 to 2032 and representing 100 percent of plant net output. Minimum purchases under these contracts, including those classified as leases, are approximately $88 million, $90 million, $91 million, $92 million and $80 million for 2013 through 2017, respectively, and $578 million payable thereafter.

Progress Energy Florida has executed certain firm contracts for purchased power with other utilities, including tolling contracts, with expiration dates ranging from 2017 to 2027 and representing between 2 percent and 100 percent of plant net output. Minimum purchases under these contracts, including those classified as leases, are approximately $102 million, $102 million, $102 million, $71 million and $49 million for 2013 through 2017, respectively, and $381 million payable thereafter.

Progress Energy Florida has ongoing purchased power contracts with certain QFs for firm capacity with expiration dates ranging from 2013 to 2025. Energy payments are based on the actual power taken under these contracts. Capacity payments are subject to the QFs meeting certain contract performance obligations. These contracts account for 100 percent of the net generating capacity of each of the facilities. All ongoing commitments have been approved by the FPSC. Minimum expected future capacity payments under these contracts are $309 million, $237 million, $244 million, $273 million and $288 million for 2013 through 2017, respectively, and $2,440 million payable thereafter. The FPSC allows the capacity payments to be recovered through a capacity cost-recovery clause, which is similar to, and works in conjunction with, energy payments recovered through the fuel cost-recovery clause.

Duke Energy Ohio has executed certain firm contracts for purchased power with other utilities with expiration dates ranging from 2013 to 2015 and representing between 1 percent and 24 percent of plant net output. Minimum purchases under these contracts are approximately $316 million, $252 million and $80 million for 2013 through 2015, respectively.

Other Purchase Obligations

The long-term commitments related to Levy presented in the previous table for Duke Energy, Progress Energy and Progress Energy Florida include only selected components of long lead time equipment. As discussed in Note 4, Progress Energy Florida identified a schedule shift in the Levy project, and major construction activities on Levy have been postponed until after the NRC issues the COL for the plants. Due to the schedule shifts, Progress Energy Florida has executed amendments to the Levy engineering, procurement and construction (EPC) agreement. The EPC agreement includes provisions for termination. For termination without cause, the EPC agreement contains exit provisions with termination fees, which may be significant, that vary based on the termination circumstances. Because Progress Energy Florida has executed amendments to the EPC agreement and anticipates negotiating additional amendments upon receipt of the COL, Progress Energy Florida cannot currently predict when those obligations will be satisfied or the magnitude of any change. Progress Energy Florida cannot predict the outcome of this matter.

Operating and Capital Lease Commitments

The Duke Energy Registrants lease assets in several areas of their operations. The Duke Energy Registrants lease office buildings, railcars, vehicles, computer equipment and other property and equipment with various terms and expiration dates. Additionally, Progress Energy Carolinas has a capital lease related to firm gas pipeline transportation capacity and as discussed under “Purchased Power,” Progress Energy Carolinas and Progress Energy Florida have entered into certain purchased power agreements, which are classified as leases. Consolidated capitalized lease obligations are classified as Long-term debt on the Consolidated Balance Sheets. Amortization of assets recorded under capital leases is included in Depreciation and amortization on the Consolidated Statements of Operations.

The following table presents rental expense for operating leases. These amounts are included in Operation, maintenance and other on the Consolidated Statements of Operations.

  For the Years Ended December 31,
(in millions)201220112010
Duke Energy $ 232 $ 104 $ 122
Duke Energy Carolinas   38   43   60
Progress Energy   232   104   100
Progress Energy Carolinas   164   88   63
Progress Energy Florida   68   15   37
Duke Energy Ohio   14   19   19
Duke Energy Indiana   20   24   24
           

                      
 The following table presents future minimum lease payments under operating leases, which at inception had a non-cancelable
term of more than one year, as of December 31, 2012.
                      
(in millions)Duke Energy Duke Energy Carolinas Progress Energy Progress Energy Carolinas Progress Energy Florida Duke Energy Ohio Duke Energy Indiana
2013$ 171 $ 35 $ 91 $ 47 $ 38 $ 11 $ 19
2014  156   28   88   46   37   10   15
2015  139   21   86   46   37   8   12
2016  127   16   85   46   36   7   9
2017  108   14   71   35   36   6   6
Thereafter  981   77   721   431   290   24   7
Total$ 1,682 $ 191 $ 1,142 $ 651 $ 474 $ 66 $ 68
                      

                      
 The following table presents future minimum lease payments under capital leases as of December 31, 2012.
                      
(in millions)Duke Energy Duke Energy Carolinas Progress Energy Progress Energy Carolinas Progress Energy Florida Duke Energy Ohio Duke Energy Indiana
2013$ 210 $ 7 $ 47 $ 21 $ 26 $ 10 $ 5
2014  180   7   46   20   26   9   5
2015  181   7   46   20   26   7   4
2016  183   8   45   19   26   6   4
2017  180   8   45   20   25   3   1
Thereafter  1,779   65   579   325   254   5   35
Minimum annual payments  2,713   102   808   425   383   40   54
Less amount representing interest  (1,024)   (70)   (469)   (275)   (194)   (5)   (31)
Total$ 1,689 $ 32 $ 339 $ 150 $ 189 $ 35 $ 23