EX-96.1 9 metc-20211231xex96d1.htm EXHIBIT 96.1

Exhibit 96.1

Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Notice

Weir International, Inc. (WEIR) was retained by Ramaco Resources, LLC (Ramaco) to prepare this Technical Report Summary (TRS) related to Ramaco’s Berwind Complex.  This report provides a statement of Ramaco’s coal reserves and resources at its Berwind Complex and has been prepared in accordance with the United States Securities and Exchange Commission (SEC), Regulation S-K 1300 for Mining Property Disclosure (S-K 1300) and 17 Code of Federal Regulations (CFR) § 229.601(b)(96)(iii)(B) reporting requirements. This report was prepared for the sole use of Ramaco and its affiliates and is effective as of December 31, 2021.

This report was prepared by full-time WEIR personnel who meet the SEC’s definition of Qualified Persons (QPs) with sufficient experience in the relevant type of mineralization and deposit under consideration in this report.

In preparing this report, WEIR relied upon data, written reports and statements provided by Ramaco. WEIR has taken all appropriate steps, in its professional opinion, to ensure information provided by Ramaco is reasonable and reliable for use in this report.

The accuracy of reserve and resource estimates are, in part, a function of the quality and quantity of available data at the time this report was prepared.  Estimates presented herein are considered reasonable.  However, they should be accepted with the understanding that with additional data and analysis available subsequent to the date of this report, the estimates may necessitate revision which may be material.  Certain information set forth in this report contains “forward-looking information”, including production, productivity, operating costs, capital costs, sales prices, and other assumptions. These statements are not guarantees of future performance and undue reliance should not be placed on them. The assumptions used to develop the forward-looking information and the risks that could cause the actual results to differ materially are detailed in the body of this report.

WEIR and its personnel are not affiliates of Ramaco or any other entity with ownership, royalty or other interest in the subject property of this report.

Weir International, Inc. hereby consents to the use of Ramaco’s Berwind Complex coal reserve and resource estimates as of December 31, 2021.

Qualified Person:

/s/ Weir International, Inc.

Date:

November 22, 2022

Address:

Weir International, Inc.

1431 Opus Place, Suite 210

Downers Grove, IL 60515

November 22, 2022

Page i


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

TABLE OF CONTENTS

Page

1.0

Executive Summary

1

1.1

Property Description

1

1.2

Geological Setting and Mineralization

4

1.3

Exploration

4

1.4

Development and Operations

5

1.5

Mineral Reserve and Resource Estimate

6

1.6

Economic Evaluation

8

1.7

Environmental Studies and Permitting Requirements

9

1.8

Conclusions and Recommendations

11

2.0

Introduction

13

2.1

Registrant

13

2.2

Terms of Reference and Purpose

13

2.3

Sources of Information and Data

14

2.4

Details of the Personal Inspection of the Property

16

2.5

Previous TRS

16

3.0

Property Description

17

3.1

Property Location

17

3.2

Property Area

17

3.3

Property Control

19

3.4

Mineral Control

20

3.5

Significant Property Encumbrances and Permit Status

22

3.6

Significant Property Factors and Risks

22

3.7

Royalty Interest

23

4.0

Accessibility, Climate, Local Resources, Infrastructure, and Physiography

24

4.1

Topography, Elevation, and Vegetation

24

4.2

Property Access

24

4.3

Climate and Operating Season

25

4.4

Infrastructure

25

5.0

History

27

5.1

Previous Operations

27

5.2

Previous Exploration and Development

28

6.0

Geological Setting, Mineralization, and Deposit

29

6.1

Regional, Local, and Property Geology

29

6.1.1

Regional Geology

29

6.1.2

Local Geology

29

6.1.3

Property Geology

30

6.2

Mineral Deposit Type and Geological Model

31

6.3

Stratigraphic Column and Cross section

32

November 22, 2022

Page ii


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

7.0

Exploration

34

7.1

Non-Drilling Exploration

34

7.2

Drilling

34

7.3

Hydrogeological Data

35

7.4

Geotechnical Data

36

7.5

Site Map and Drillhole Locations

37

7.6

Other Relevant Drilling Data

38

8.0

Sample Preparation, Analyses, and Security

39

8.1

Sample Preparation Methods and Quality Control

39

8.2

Laboratory Sample Preparation, Assaying, and Analytical Procedures

39

8.2.1

SGS North America Inc.

39

8.2.2

Precision Testing Laboratory, Inc

39

8.2.3

Other Laboratories

39

8.3

Quality Control Procedures and Quality Assurance

40

8.4

Sample Preparation, Security, and Analytical Procedures Adequacy

40

9.0

Data Verification

41

9.1

Data Verification Procedures

41

9.2

Data Verification Limitations

42

9.3

Adequacy of Data

42

10.0

Mineral Processing and Metallurgical Testing

43

10.1

Mineral Processing Testing and Analytical Procedures

43

10.2

Mineralization Sample Representation

43

10.3

Analytical Laboratories

43

10.4

Relevant Results and Processing Factors

44

10.5

Data Adequacy

45

11.0

Mineral Resource Estimates

46

11.1

Key Assumptions, Parameters, and Methods

46

11.2

Estimates of Mineral Resources

50

11.3

Technical and Economic Factors for Determining Prospects of Economic Extraction

51

11.4

Mineral Resource Classification

52

11.5

Uncertainty in Estimates of Mineral Resources

55

11.6

Additional Commodities or Mineral Equivalent

57

11.7

Risk and Modifying Factors

57

12.0

Mineral Reserve Estimates

59

12.1

Key Assumptions, Parameters, and Methods

59

12.2

Estimates of Mineral Reserves

60

12.3

Estimates of Reserve Cut-off Grade

61

12.4

Mineral Reserve Classification

62

12.5

Coal Reserve Quality and Sales Price

63

12.6

Risk and Modifying Factors

63

13.0

Mining Methods

65

13.1

Geotechnical and Hydrological Models

65

13.1.1

Geotechnical Model

65

November 22, 2022

Page iii


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

13.0

Mining Methods (Cont.)

13.1.2

Hydrogeological Model

67

13.1.3

Other Mine Design and Planning Parameters

68

13.2

Production, Mine Life, Dimensions, Dilution, and Recovery

69

13.2.1

Production Rates

69

13.2.2

Expected Mine Life

70

13.2.3

Mine Design Dimensions

71

13.2.4

Mining Dilution

72

13.2.5

Mining Recovery

72

13.3

Development and Reclamation Requirements

72

13.3.1

Underground Development Requirements

72

13.3.2

Reclamation (Backfilling) Requirements

73

13.4

Mining Equipment and Personnel

73

13.4.1

Mining Equipment

73

13.4.2

Staffing

75

13.5

Life of Mine Plan Map

78

14.0

Processing and Recovery Methods

81

14.1

Plant Process and Flowsheet

81

14.2

Plant Processing Design, Equipment Characteristics and Specifications

82

14.3

Energy, Water, Process Materials, and Personnel Requirements

84

15.0

Infrastructure

86

15.1

Roads

86

15.2

Rail

86

15.3

Power

86

15.4

Water

86

15.5

Pipelines

87

15.6

Port Facilities, Dams, and Refuse Disposal

87

15.7

Map of Infrastructure

88

16.0

Market Studies

89

16.1

Markets

89

16.2

Material Contracts

90

16.3

Price Forecast

90

17.0

Environmental Studies, Permitting, and Local Individuals or Groups Agreements

92

17.1

Environmental Studies

92

17.2

Refuse Disposal and Water Management

93

17.3

Permits and Bonding

97

17.4

Local Stakeholders

97

17.5

Mine Closure Plans

98

17.6

Environmental Compliance, Permitting, and Local Individuals or Groups Issues

99

18.0

Capital and Operating Costs

100

18.1

Capital Expenditures

100

18.2

Operating Costs and Risks

102

November 22, 2022

Page iv


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

19.0

Economic Analysis

105

19.1

Assumptions, Parameters, and Methods

105

19.2

Economic Analysis and Annual Cash Flow Forecast

106

19.3

Sensitivity Analysis

108

20.0

Adjacent Properties

110

21.0

Other Relevant Data and Information

111

22.0

Interpretations and Conclusions

112

22.1

Summary of Interpretations and Conclusions

112

22.2

Significant Risks and Uncertainties

112

23.0

Recommendations

115

24.0

References

116

25.0

Reliance on Information Provided by the Registrant

117

FIGURES

Figure 1.1-1

General Location Map

3

Figure 6.3-1

Berwind Stratigraphic Column

32

Figure 6.3-2

Berwind Cross Section SW to NE

33

Figure 7.5-1

Drillhole Locations

37

Figure 10.4-1

Preparation Plant Recovery

44

Figure 11.4-1

Variogram Model Tiller No. 1 Seam Thickness

54

Figure 13.5-1

Life of Mine Plans, Berwind No. 1 Pocahontas 4 Deep Mine and

Triad Pocahontas 4 Deep Mine

78

Figure 13.5-2

Life of Mine Plan, Big Creek Surface and Highwall Mine

79

Figure 13.5-3

Life of Mine Plan, Big Creek Jawbone 1 Deep Mine

80

Figure 14.1-1

Simplified Preparation Plant Flowsheet

81

Figure 15.7-1

Mine Infrastructure

88

Figure 16.1-1

Metallurgical Coal Sales Prices

89

Figure 16.1-2

Historical and Forecast Coal Sales Prices

91

Figure 18.1-2

Historical and Projected LOM Plan Capital Expenditures

100

Figure 18.2-1

Berwind Complex Historical and LOM Plan Operating Costs

102

Figure 19.1-1

FOB Mine Coal Sales Price Forecast

106

Figure 19.2-1

Annual Cash Flow Forecast

106

Figure 19.3-1

Net Present Value Sensitivity Analysis

109

November 22, 2022

Page v


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

TABLES

Table 1.5-1

In-Place Coal Resource Tonnage and Quality Estimate, as of December 31, 2021

6

Table 1.5-2

Recoverable Coal Reserve Tonnage and Quality Estimate, as of December 31, 2021

7

Table 1.6-1

Key Operating Statistics

8

Table 1.7-1

Berwind Complex Mining and NPDES Permits

10

Table 3.3-1

Berwind Property Control

20

Table 3.4-1

Berwind Property Mineral Control

20

Table 3.4-1

Berwind Property Mineral Control (continued)

21

Table 3.5-1

Permit Status

22

Table 5.2-1

Previous Exploration

28

Table 7.2-1

Drilling Programs

34

Table 10.4-1

Historical Preparation Plant Recovery

45

Table 11.1-1

Stratigraphic Model Interpolators

47

Table 11.1-2

Drillhole Statistics

48

Table 11.2-1

In-Place Coal Resource Tonnage and Quality Estimate as of December 31, 2021

50

Table 11.4-1

Theoretical Variogram Ranges

54

Table 11.4-2

Statistics for Berwind Complex Composited Samples

55

Table 12.1-3

Recoverable Coal Reserve Tonnage and Quality Estimate as of December 31, 2021

60

Table 12.1-4

Reserve Validation

61

Table 12.5-1

Average Reserve Coal Quality

63

Table 13.2.1-1

Berwind Complex Historical Clean Production

70

Table 13.2.1-2

Berwind Complex LOM Plan Projected ROM and Clean Production, and Preparation Plant Yield

70

Table 13.4.1-1

Standard/Typical Continuous Miner Section Equipment

73

Table 13.4.1-2

Berwind Complex Primary Underground Equipment Fleet

74

Table 13.4.1-3

Surface Mining Equipment

74

Table 13.4.2-1

Current Staffing

75

Table 13.4.2-2

LOM Plan Staffing

75

Table 13.4.2-3

Berwind Complex Manhours Worked, NFDL Injuries and NFDL Incidence Rate

76

Table 13.4.2-4

Plant Manhours Worked, NFDL Injuries and NFDL Incidence Rate

77

Table 14.2-1

Major Preparation Plant and Material Handling Equipment

83

Table 17.3-1

Berwind Complex Mining and NPDES Permits

97

Table 18.2-1

LOM Plan Annual Operating Cost and Capital Expenditures

103

Table 19.2-1

Annual Cash Flow Forecast Detail

106

Table 19.2-2

After-Tax NPV, IRR, Cumulative Cash Flow, and ROI

107

Table 19.2-3

Key Operating Statistics

108

Table 22.2-1

Berwind Complex Risk Assessment Summary

113

Table 25.1

Information Relied Upon from Registrant

117

November 22, 2022

Page vi


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

APPENDIX A - EXHIBIT

Exhibit 6.3-2

Berwind Complex, Geological Cross Sections

118

November 22, 2022

Page vii


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

1.0

EXECUTIVE SUMMARY

WEIR was retained by Ramaco Resources, Inc. (Ramaco) to prepare a Technical Report Summary (TRS) related to Ramaco’s Berwind Complex coal holdings This report has been prepared in accordance with the United States Securities and Exchange Commission (SEC), Regulation S-K 1300 for Mining Property Disclosure (S-K 1300) and 17 Code of Federal Regulations (CFR) § 229.601(b)(96)(iii)(B) reporting requirements.

1.1PROPERTY DESCRIPTION

The Berwind Complex consists of three general properties or areas as follows:

·

Berwind Property

·

Big Creek Property

·

Knox Creek Property

The Berwind Complex is located approximately 80 miles south of Charleston, West Virginia; 100 miles west of Roanoke, Virginia; 60 miles northeast of Kingsport, Tennessee; and 160 miles east/southeast of Lexington, Kentucky at 37.164522 degrees North Latitude and 81.744893 degrees West Longitude on the World Geodetic System (WGS 84) reference coordinate system. The complex includes areas in Buchanan, Russell and Tazewell Counties, Virginia and McDowell County, West Virginia. The Berwind Complex is within the Southwest Virginia and Southern West Virginia coal fields of the Central Appalachia Coal Producing (CAPP) Region of the United States (see Figure 1.1-1).

The Berwind Complex consists of approximately 103,400 acres of owned and leased coal holdings. Within the Berwind Complex controlled coal holdings, 32,500 acres lie in McDowell County, West Virginia, 24,900 acres lie in Buchanan County, Virginia, 30,300 acres in Tazewell County, Virginia, and 15,700 acres in Russell County Virginia. Currently, there are three active mines and two planned and permitted mines within the complex:

Active Mines:

·

Berwind No. 1 Pocahontas 4 Deep Mine

·

Triad Pocahontas 4 Deep Mine

·

Big Creek Surface and Highwall Mine

November 22, 2022

Page 1


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Planned and Permitted Mines:

·

Big Creek Jawbone 1 Deep Mine, scheduled for mid-2022 startup

·

Laurel Fork Deep Mine, scheduled for mid-2022 startup

The Laurel Fork Deep Mine was recently acquired by Ramaco, however, geology work has not been completed for this mining property. Therefore, the Laurel Fork Deep Mine will not be included in this TRS.

November 22, 2022

Page 2


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Figure 1.1-1 General Location Map

Graphic

November 22, 2022

Page 3


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

1.2 GEOLOGICAL SETTING AND MINERALIZATION

The upper coal seams of interest within the Berwind Complex belong to the Norton Formation in Virginia of Early Pennsylvanian Age, which is stratigraphically equivalent to the Lower Kanawha and New River formations in southwestern West Virginia. The lower coal seams of interest belong to the Pocahontas Formation of the Pottsville Group (Lower Pennsylvanian). The depositional setting for these seams is complex and thought to be upper delta plain, with subsidence controlling the sedimentation rate. The Lower Pennsylvania (Pottsville) sedimentary strata of the coal-bearing rocks of the Pocahontas Formation rest uncomformably on the Mississippian Bluestone Formation of the Mauch Chunk Group.

1.3EXPLORATION

Drilling has served as the primary form of exploration on the Berwind Complex.  In addition to exploration drillholes, coal seam outcrop measurements, in-mine measurements, and survey points taken from mine maps of previous operations were considered. A total of 194 seam outcrop measurements, 360 mine measurements, and 886 survey points were recognized in modeling the deposit. Data from degasification, coal bed methane, and water wells were also implemented in the model including a total of 1,458 drillholes.

It is WEIR’s opinion that the adequacy of sample preparation, security, and analytical procedures for holes that were drilled by Ramaco after acquiring the property are acceptable and that these procedures meet typical industry standards.

The adequacy of sample preparation, security, and analytical procedures are generally unknown for holes that were drilled prior to Ramaco acquiring the initial leases in 2011.  However, the geologist’s logs for these holes contain sampling descriptions and lithologic descriptions that are sufficiently detailed to ascertain that an experienced geologist supervised the drilling and sampling.  It is unknown if all coal quality analyses were performed to ASTM standards by qualified laboratories, as detailed in Section 8.0, however, this legacy drillhole information was included as the samples matched the coal seam intervals and reported quality data that was consistent between the different data sources.  Model verifications further support WEIR’s high level of confidence that a representative, valid, and accurate drillhole database and geological model have been generated for the Berwind Complex that can be relied upon to accurately estimate coal resources and reserves.

November 22, 2022

Page 4


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

1.4DEVELOPMENT AND OPERATIONS

The Berwind Complex currently has three active mines and two planned and permitted mines. The three active mines include one surface mine with a highwall miner, and two underground room and pillar mines, which use continuous miners for mine development. Ramaco began production of metallurgical coal at the complex in 2017. A majority of the underground mines will implement retreat mining, which results in mining recovery of greater than 80 percent.  Contour mining has an average mining recovery of approximately 90 percent, and the highwall mine has an average mining recovery of approximately 40 percent.

The Berwind Complex is mining several seams and seam splits, including the Pocahontas 4, Pocahontas 3, Jawbone and Tiller.

Historical coal production from the Berwind Complex, in accordance with the Mine Safety and Health Administration (MSHA) statistics, is summarized as follows:

·

80,923 tons in 2018

·

188,241 tons in 2019

·

147,330 tons in 2020

·

225,920 tons in 2021

The current Berwind Complex Life-of-Mine (LOM) Plan projects mining through 2039, an expected mine life for the complex of 18 years. Ramaco projects total annual production to range from 0.8 to 1.0 million clean tons when the surface and continuous miner units are operating (2022 through 2023), and 0.4 to 0.8 million clean tons per year from 2024 through 2039 after surface mining ceases in 2023. It is likely future mines will be planned and scheduled, as necessary, from resource areas within the complex, to meet internal Ramaco production goals aligned with market conditions.

All Run-of-Mine (ROM) coal is washed at the Knox Creek Preparation Plant.  The Knox Creek Preparation Plant, built in 1981 by Powell Construction Company located in Johnson City, Tennessee, is a well designed and constructed preparation plant, with ROM processing capacity of 750 tons per hour.

The Berwind Complex produces a high quality, mid and low volatile metallurgical coal.  Historically, the market for metallurgical coal from the Berwind Complex has been domestic metallurgical coal consumers and the global seaborne metallurgical coal market.  The Berwind

November 22, 2022

Page 5


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Complex also produces a minimal quantity of thermal coal from the surface mine, which represents approximately two percent of its total coal sales.

1.5MINERAL RESERVE AND RESOURCE ESTIMATE

The Berwind Complex coal resources, as of December 31, 2021, are reported as in-place resources and are exclusive of reported coal reserve tons.  Resources are reported in categories of Measured, Indicated and Inferred tonnage, in accordance with Regulation S-K Item 1302(d), summarized in Table 1.5-1 as follows:

Table 1.5-1 In-Place Coal Resource Tonnage and Quality Estimate,

as of December 31, 2021

Coal Quality (Dry Basis)

Raw

Average Coal

Relative

Mine

Area

Thickness

In-Place Resources (000 Tons)

Ash

Density

Area

Seam

(Acres)

(Feet)

Measured

Indicated

Total

Inferred

(%)

(Lbs/CF)

Berwind

Red Ash 2

2,420

3.49

15,740

15,740

8.3

86.48

Tiller

2,210

3.83

11,230

11,230

22.4

92.68

Greasy Creek 2

675

2.33

3,325

3,325

30.6

97.27

Pocahontas 11

1,295

3.10

8,030

8,030

22.6

91.73

Pocahontas 10

2,055

2.82

11,075

11,075

15.9

87.94

Pocahontas 9-2

4,140

3.15

25,155

45

25,200

17.0

88.61

Pocahontas 9-1

5,145

3.04

9,700

15,920

25,620

4,495

17.0

88.61

Pocahontas 4

2,587

2.97

9,870

9,870

26.8

94.90

Pocahontas 3

10,780

2.84

60,140

400

60,540

17.7

89.00

Squire Jim

13,230

2.41

42,950

24,460

67,410

33.9

101.02

44,537

197,215

40,825

238,040

4,495

Big Creek

Red Ash 3

1,275

2.04

5,025

5,025

17.0

88.61

Red Ash 2

1,420

2.75

7,495

7,495

4.5

87.98

Jawbone 3

1,400

2.27

6,445

6,445

24.0

92.98

Jawbone 1

1,520

2.82

8,665

8,665

9.5

92.98

Tiller 1-2

495

2.67

2,520

2,520

21.7

87.36

6,110

30,150

30,150

Knox Creek

Upper Banner 2

450

2.27

2,060

2,060

17.0

88.61

Kennedy 2

1,775

2.72

9,020

9,020

3.0

85.65

Red Ash 2

12,485

2.65

59,450

35

59,485

4.7

82.41

Jawbone 3

8,420

3.13

50,260

50,260

5.4

87.43

Jawbone 1

15,025

3.21

93,500

150

93,650

13.6

89.46

Upper Seaboard 2

450

2.72

2,340

2,340

17.0

88.61

Greasy Creek 2

290

4.29

2,640

2,640

43.0

97.93

Lower Seaboard 2

760

2.75

4,470

4,470

30.9

98.19

Pocahontas 11

770

4.72

7,010

7,010

17.0

88.61

Lower Horsepen 1

1,425

2.89

7,965

7,965

17.0

88.61

Pocahontas 9-2

2,030

2.80

8,240

2,750

10,990

17.0

88.61

Pocahontas 4

1,605

2.97

8,300

3,830

12,130

26.6

94.90

Pocahontas 3

710

2.77

3,780

3,780

17.0

88.61

46,195

259,035

6,765

265,800

Berwind Complex

Total

96,842

486,400

47,590

533,990

4,495

November 22, 2022

Page 6


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Notes:

·

Mineral Resources reported above are not Mineral Reserves and do not meet the threshold for reserve modifying factors, such as estimated economic viability, that would allow for conversion to mineral reserves. There is no certainty that any part of the Mineral Resources estimated will be converted into Mineral Reserves. Mineral Resources reported here are exclusive of Mineral Reserves.

·

Resource economic mineability based on underground minable resources with 2.0 feet minimum seam thickness, surface and highwall mines with 1.0 feet minimum seam thickness, surface and contour mining with a cutoff stripping ratio of 20:1, producing primarily metallurgical mid and low volatile coal product realizing an average sales price of $142 per ton at a cash cost of $77 per clean ton (FOB Mine)

·

Numbers in the table have been rounded to reflect the accuracy of the estimate and may not sum due to rounding

The conversion of resources to reserves at the Berwind Complex considers the design of a mine plan accommodating the planned mining equipment and executed in accordance with the MSHA rules and regulations, projected dilution and loss of product coal quality, projected coal sales prices, operating costs, and mineral control to determine if the saleable coal product will be economically mineable.

The coal reserves representing the economically viable tonnage controlled by Ramaco, and estimated in accordance with Regulation S-K Item 1302(e), is summarized in Table 1.5-2 as follows:

Table 1.5-2 Recoverable Coal Reserve Tonnage and Quality Estimate,

as of December 31, 2021

Coal Quality (Dry Basis)

 

Raw

Average Coal

Clean Recoverable Tons (000)

Relative

Product

Area

Thickness

Reserves

Ash

Density

Area / Mine / Seam

    

Quality

    

(Acres)

    

(Feet)

    

Proven

    

Probable

    

Total

    

(%)

    

(Lbs/CF)

Berwind

Pocahontas No. 1 Deep

Pocahontas 4 Rider

Low Vol

2,905

0.85

1,705

1,705

25.04

93.63

Pocahontas 4

Low Vol

2,905

3.39

7,590

25

7,615

23.02

92.35

Triad Pocahontas 4 Deep Mine

Pocahontas 4

Low Vol

35

4.03

90

90

5,845

9,385

25

9,410

Big Creek

Surface and Highwall Mine

Jawbone

Mid Vol

20

1.27

30

30

8.19

89.50

Tiller

Mid Vol

175

2.61

420

420

19.09

89.75

Jawbone Deep Mine

Jawbone

Mid Vol

400

2.95

670

670

10.91

93.39

595

1,120

1,120

Berwind Complex Grand Total

6,440

10,505

25

10,530

Notes:

·

Clean recoverable reserve tonnage based on underground mining recovery of 50 to 80 percent (contingent upon retreat mining capability), 90 percent for surface mining, 40 percent for highwall mining, theoretical preparation plant yield, and a 95 percent preparation plant efficiency

·

Mineral Reserves estimated based on predominately low and mid volatile metallurgical coal product at an average sales price of $142 per ton and cash cost of $77 per clean ton (FOB Mine)

·

Numbers in the table have been rounded to reflect the accuracy of the estimate and may not sum due to rounding

·

Mineral Reserves are reported exclusive of Mineral Resources

November 22, 2022

Page 7


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

1.6ECONOMIC EVALUATION

WEIR prepared a Preliminary Feasibility Study financial model in order to assess the economic viability of the Berwind Complex LOM Plan. Specifically, plans were evaluated using discounted cash flow analysis, incorporating annual revenue projections for the Berwind LOM Plan. Cash outflows such as capital, including preproduction costs, sustaining capital, operating costs, transportation costs, royalties, and taxes are subtracted from cash inflows, resulting in annual cash flow projections. No adjustments are made for inflation and all cash flows are in 2021 United States dollars.  WEIR’s study was conducted on an un-levered basis, excluding costs associated with any debt servicing requirements. In its assessment of the Discounted Cash Flow Net Present Value (DCF-NPV), WEIR utilized a discount rate of 10 percent.

The Preliminary Feasibility Study financial model developed for use in this TRS was meant to evaluate the prospects of economic extraction of coal within the Berwind Complex resource area. This economic evaluation is not meant to represent a project valuation. Furthermore, optimization of the LOM Plan was outside of the scope of this engagement.

The results of WEIR’s Preliminary Feasibility Study demonstrated an after-tax DCF-NPV of $246.8 million for the Berwind Complex LOM Plan. Key operational statistics for the LOM Plan, on an after-tax basis, are summarized in Table 1.6-1 as follows:

Table 1.6-1 Key Operating Statistics

    

LOM Plan

 

ROM Tons Produced (000s)

23,397

Clean Tons Produced (000s)

10,461

Preparation Plant Yield (%)

44.7

Marketable Tons Sold (000s)

10,445

($ Per Ton)

Coal Sales Realization

142.33

Direct Cash Costs

76.79

Non-cash Costs

5.33

Total Cost of Sales

82.13

Profit / (Loss)

60.21

EBITDA

65.54

CAPEX

10.92

November 22, 2022

Page 8


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

A sensitivity analysis was undertaken to examine the influence of changes to coal sales prices, production, operating cost, capital expenditures, and the discount rate on the base case after-tax NPV. The sensitivity analysis range (+/- 25 percent) was designed to capture the bounds of reasonable variability for each element analyzed.

The Berwind Complex NPV is most sensitive to changes in coal sales prices and operating costs. It is less sensitive to changes in production and least sensitive to changes in discount rate and capital expenditures.

1.7ENVIRONMENTAL STUDIES AND PERMITTING REQUIREMENTS

As part of the permitting process required by the Virginia Department of Energy (VDE) and West Virginia Department of Environmental Protection (WVDEP), numerous baseline studies or impact assessments were undertaken by Ramaco. These baseline studies or impact assessments included in the permit are summarized as follows, with pertinent text from the permit replicated below:

·

Groundwater Inventory and Baseline Quality

·

Surface Water Baseline Quality and Quantity

·

Surface Water Runoff Analysis

·

Probable Hydrologic Consequences

Based on water samples from adjacent mining and the baseline surface water sampling, acid or toxic mine drainage is not expected or anticipated. All of the Ramaco existing and proposed mines are well above any significantly producing aquifers.  Probable Hydrologic Consequence (PHC) studies showed no significant ground or surface water resource is likely to be contaminated, diminished, or interrupted, providing that the approved drainage control and revegetation plans are adhered to throughout existing and planned mining activities.

November 22, 2022

Page 9


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Coal mines in West Virginia are required to file applications for and receive approval of mining permits issued by the WVDEP to conduct surface disturbance and mining activities.  Similar filings are required in Virginia through the VDE.  The Berwind Complex has been issued mining permits and associated NPDES permits by the WVDEP and the VDE as shown in Table 1.7.-1 as follows:

Table 1.7-1 Berwind Complex Mining and NPDES Permits

Permitted

 

Permit

Surface Area

NPDES 

Property Description

    

Number

    

State

    

(Acres)

    

Issue Date

    

Permit No.

Berwind Deep Mine No. 1

U-3008-16

WV

30.29

6/26/2017

WV1028952

Berwind Deep Mine No. 1

1202294

VA

0.00

5/20/2019

NA

Berwind Poca 6 Seam Deep Mine

U-5007-21

WV

6.70

Pending

Pending

Big Creek Surface Mine

1102335

VA

447.63

1/22/2020

0082335

Capital No. 3/ Tiller No. 1 Deep Mine

1402231

VA

42.61

5/22/2017

0082231

Dry Fork Deep Mine

U-4004-11

WV

7.12

11/20/2012

WV1024281

Dry Fork Deep Mine

Pending

VA

0.00

Pending

WV1024281

Fork Ridge (Tiller) Deep Mine

1202204

VA

20.57

2/15/2017

0082204

Hess Creek Surface Mine

1702202

VA

75.95

2/14/2017

0082202

Kennedy Surface Mine

1402215

VA

106.81

4/3/2017

0082215

Knox Creek Preparation Plant

1302184

VA

41.94

12/2/2017

0082184

Knox Creek Refuse Disposal Area

1302232

VA

322.71

11/23/2018

0082232

Mudlick Surface Mine

1102334

VA

26.25

7/7/2020

0082234

Squire Jim Deep Mine No. 1

U-3004-18

WV

8.83

8/31/2020

WV1029088

Triad Pocahontas 4 Deep Mine

U-5004-19

WV

6.12

3/2/2020

WV1028952

Triad Pocahontas 6 Deep Mine

U-5007-21

WV

6.70

Pending

WV1028952

Vansant No. 1 Deep Mine

U-4010-94

WV

14.20

12/7/1994

WV1016113

Vansant No. 2 Deep Mine

U-4013-94

WV

15.72

12/19/1994

WV1016113

Vica Deep Mine

U-0011-85

WV

2.34

2/25/1985

WV1005685

Vica Deep Mine

1202149

VA

0.00

Pending

NA

Total

1,182.49

As of December 31, 2021, Ramaco estimated a reclamation liability of $10.0 million for its disturbed permit acreage, which is covered with a total bond amount of $11.3 million.

Ramaco currently employs approximately 144 personnel at the Berwind Complex and is projected to have maximum employment of 308 personnel through its Berwind Complex LOM Plan. The Berwind Complex also creates substantial economic value with its third-party service and supply providers, utilities, and through payment of taxes and fees to local, state and federal governments.

Ramaco’s environmental citations issued by the WVDEP and VDE are typical of similar citations issued to other operators in southern West Virginia and Southwestern Virginia. Most of these violations or citations were quickly abated and none were significant in nature.

Based on WEIR’s review of Ramaco’s plans for environmental compliance, permit compliance and conditions, and dealings with local individuals and groups, Ramaco’s efforts are adequate and reasonable in order to obtain necessary approvals relative to its mine plans.

November 22, 2022

Page 10


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

1.8CONCLUSIONS AND RECOMMENDATIONS

Ramaco has a long operating history of resource exploration, mine development, and mining operations at the Berwind Complex, with extensive exploration data including drillholes, in-mine seam thickness and elevation measurements, and in-mine channel samples supporting the determination of mineral resource and reserve estimates, and economic viability.  The data has been reviewed and analyzed by WEIR and determined to be adequate in quantity and reliability to support the coal resource and coal reserve estimates in this TRS.

Ramaco has full mineral control through current leases for all existing and planned mines included in the Berwind Complex LOM plan.  There are no uncontrolled areas.

The coal resource and coal reserve estimates and supporting Preliminary Feasibility Study were prepared in accordance with Regulation S-K 1300 requirements. There are 535 million in-place tons of measured and indicated coal resources, exclusive of reserves, and 10.5 million clean recoverable tons of underground mineable reserves within the Berwind Complex, as of December 31, 2021.  Reasonable prospects for economic extraction were established through the development of a Preliminary Feasibility Study relative to the Berwind Complex LOM Plan, considering historical mining performance, historical and projected metallurgical coal sales prices, historical and projected mine operating costs, and recognizing reasonable and sufficient capital expenditures.

The ability of Ramaco, or any coal company, to achieve production and financial projections is dependent on numerous factors. These factors primarily include site-specific geological conditions, the capabilities of management and mine personnel, level of success in acquiring reserves and surface properties, coal sales prices and market conditions, environmental issues, securing permits and bonds, and developing and operating mines in a safe and efficient manner.  Unforeseen changes in legislation and new industry developments could substantially alter the performance of any mining company.

Coal mining is carried out in an environment where not all events are predictable. While an effective management team can identify known risks and take measures to manage and/or mitigate these risks, there is still the possibility of unexpected and unpredictable events occurring.  It is not possible therefore to totally remove all risks or state with certainty that an event that may have a material impact on the operation of a coal mine will not occur.

November 22, 2022

Page 11


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

WEIR assessed that the risks associated with the economic mineability of the Berwind Complex were low to moderate and adds that the majority of the risks can be kept low and/or mitigated with efficient and effective mine planning and mine engineering and monitoring of the mining operations.

WEIR recommends that any future exploration work and mineral property acquisition should include what has been historically implemented related to the following:

·

Have an experienced geologist log core holes, measure core recovery, and complete sampling. Geophysically log core holes to verify seam and coal thickness and core recovery.

·

Geophysically log rotary holes to verify strata and coal thickness.

·

Continue to prepare laboratory sample analysis at 1.40 and 1.50 specific gravities to better match the preparation plant specific gravity.

·

Continue collecting in mine channel samples

November 22, 2022

Page 12


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

2.0

INTRODUCTION

2.1REGISTRANT

WEIR was retained by Ramaco (Nasdaq: METC) to prepare a TRS related to Ramaco’s Berwind Complex coal holdings.

The Berwind Complex is located approximately two miles from the town of Berwind, West Virginia 80 miles south of Charleston, West Virginia; 100 miles west of Roanoke, Virginia; 60 miles northeast of Kingsport, Tennessee; and 160 miles east/southeast of Lexington, Kentucky. The Berwind Complex is located in McDowell County, West Virginia, and Buchanan, Russell, and Tazewell Counties, Virginia (see Figure 1.1-1).

2.2TERMS OF REFERENCE AND PURPOSE

This TRS was prepared specifically for Ramaco’s Berwind Complex. The reserves and resources at the Berwind Complex have been classified in accordance with SEC mining property disclosure rules under Subpart 1300 and Item 601 (96)(B)(iii) of Regulation S-K.  Unless otherwise stated, all volumes, qualities, distances, and currencies are expressed in United States customary units.

The accuracy of reserve and resource estimates are, in part, a function of the quality and quantity of available data at the time this report was prepared.  Estimates presented herein are considered reasonable, however, estimates should be accepted with the understanding that with additional data and analysis subsequent to the date of this report, the estimates may necessitate revision which may be material.  Certain information set forth in this report contains “forward-looking information”, including production, productivity, operating costs, capital expenditures, coal sales prices, and other assumptions.  These statements are not guarantees of future performance and undue reliance should not be placed on these statements. The assumptions used to develop the forward-looking information and the risks that could cause the actual results to differ materially are detailed in the body of this report.

For the Berwind Complex, this TRS reports both mineral reserves and resources (exclusive of reserves).  Supporting the assessment of the economic mineability of reported reserves and prospects of economically feasible extraction of reported resources, this report includes summary detail of a Preliminary Feasibility Study conducted relative to the Berwind Complex.

November 22, 2022

Page 13


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

WEIR’s evaluation of coal reserves and resources was conducted in accordance with Regulation S-K 1300 definitions for Mineral Resource, Mineral Reserve and Preliminary Feasibility Study as follows:

·

Mineral Resource is a concentration or occurrence of material of economic interest in or on the earth’s crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A mineral resource is a reasonable estimate of mineralization, taking into account relevant factors such as cut-off grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralization drilled or sampled.

·

Mineral Reserve is an estimate of tonnage and grade or quality of indicated and measured mineral resources that, in the opinion of the Qualified Person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a measured or indicated mineral resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted.

·

Preliminary Feasibility Study is a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a Qualified Person has determined (in the case of underground mining) a preferred mining method, or (in the case of surface mining) a pit configuration, and in all cases has determined an effective method of mineral processing and an effective plan to sell the product.

2.3SOURCES OF INFORMATION AND DATA

The primary information used in this study was obtained from the following sources:

·

Geological data that was exclusively provided by Ramaco geology and engineering personnel. The geological data includes drillhole information such as drillers logs, geologists logs, both full and partial scans of geophysical logs, survey data, coal quality laboratory certificates, and MS Excel (Excel) versions of drillhole survey, lithology and quality data. Additionally, WEIR was provided with in-mine seam measurement thicknesses, mine channel samples, and other base geological data.

·

Mineral and surface ownership maps, and supplemental files were provided exclusively by Ramaco.

November 22, 2022

Page 14


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

·

Site visits by WEIR Qualified Persons (QPs) on November 30, 2021.

·

Interviews between WEIR personnel and Ramaco personnel including

Ø

Senior V.P., General Counsel and Secretary

Ø

Director of Financial Reporting and Accounting

Ø

Chief Operating Officer

Ø

Contract Geologist

Ø

V.P. of Safety

Ø

V.P. of Surface Mining Operations

Ø

V.P. of Underground Mining Operations

Ø

Mine Managers

·

Historical production, productivity, staffing levels, operating costs, capital expenditures, and coal sales revenue provided by Ramaco.

·

Life of Mine (LOM) projections and cost models provided by Ramaco.

·

Coal processing and handling facilities plot plans and flow sheets provided by Ramaco.

·

Health, safety, and environmental issues discussed during interviews between WEIR personnel and Ramaco personnel.

·

Current mine permit information, in addition to recent permit revisions and renewals, from documents provided by Ramaco and data that is publicly available from the WVDEP and VDE.

·

Current and projected mine plans, including production, productivity, operating costs, and capital expenditures required to sustain projected levels of production for the Berwind Complex provided by Ramaco, and all data was reviewed for reasonableness by WEIR.

·

Market outlook and coal sales price projections provided by Ramaco.

·

Projected reclamation costs for mine closure activities provided by Ramaco.

A detailed list of all data received and reviewed for this study is provided in Sections 24.0 and 25.0 of this TRS.

November 22, 2022

Page 15


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

2.4DETAILS OF THE PERSONAL INSPECTION OF THE PROPERTY

WEIR personnel visited the Berwind Complex on November 30, 2021.  While on-site, WEIR personnel conducted interviews with company and mine management relative to the following key topics:

·

Geology

·

Property

·

Infrastructure

·

Mine Plan, Production and Productivity

·

Preparation Plant and Coal Handling Facilities

·

Operating Costs and Capital Expenditures

·

Marketing

·

Environmental and Compliance

·

Risks and Uncertainties

Key areas inspected by WEIR personnel at the Berwind Complex included the following:

·

Mine surface operations including office, maintenance, and warehouse facilities

·

Knox Creek Preparation Plant, stockpiles, and rail loadout facilities

·

Mine operations

Ø

Berwind No. 1 Pocahontas 3 and 4 Deep Mines

Ø

Triad Pocahontas 4 Deep Mine

Ø

Big Creek Surface and Highwall Mine

·

Refuse Disposal Facilities

Based on WEIR’s inspection of the Berwind Complex, the mines, the preparation plant, and associated facilities and equipment are well maintained and operated with regard for all state and federal rules and regulations related to mine safety and health standards.

2.5PREVIOUS TRS

This TRS is the initial TRS to be filed related to the Berwind Complex.

November 22, 2022

Page 16


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

3.0

PROPERTY DESCRIPTION

3.1PROPERTY LOCATION

The Berwind Complex consists of three properties as follows:

·

Berwind Property

·

Big Creek Property

·

Knox Creek Property

The town of Berwind, West Virginia is located approximately two miles northeast of the central area of the Berwind Complex. The Berwind Complex is generally located approximately 80 miles south of Charleston, West Virginia; 100 miles west of Roanoke, Virginia; 60 miles northeast of Kingsport, Tennessee; and 160 miles east/southeast of Lexington, Kentucky at 37.164522 degrees North Latitude and 81.744893 degrees West Longitude on the WGS 84 reference coordinate system.  The comprised properties are fairly remote containing scattered rural residences and some small towns.

The Berwind Complex is within the Southern West Virginia and Southwest Virginia Coal Fields of the CAPP Region of the United States (see Figure 1.1-1).  The USGS 7.5-minute quadrangle map sheets are Patterson, Keen Mountain, Honaker, Bradshaw, Jewell Ridge, Richlands, War, Amonate, Gary, and Tazewell North.

3.2PROPERTY AREA

Berwind Property

The Berwind Property consists of approximately 31,200 acres of leased coal holdings located in McDowell County, West Virginia and Buchanan and Tazewell Counties, Virginia.    Ramaco obtained their initial lease for this property in 2015 and commenced mine operations in 2017.

The Berwind Property’s surface facilities are located within the Berwind Property’s permit area, near the central area of the southern boundary of the permit.  The surface facilities include a mine office, bath house, and parking lot near the Berwind No. 1 Pocahontas 3 Deep Mine.

Currently, there are two active mines on the Berwind property:

·

Berwind No. 1 Pocahontas 4 Deep Mine

·

Triad Pocahontas 4 Deep Mine

November 22, 2022

Page 17


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Ramaco started operations at the Berwind No. Pocahontas 4 Deep Mine in 2017 and the Triad Pocahontas 4 Deep Mine in 2021.  There is an additional permitted mine, the Squire Jim No. 1 Deep Mine, which as yet does not have a scheduled startup date.  There is one permitted inactive mine, the Berwind No. 1 Pocahontas 3 Deep Mine, which provides access by underground slope to the Berwind No. 1 Pocahontas 4 Deep Mine.  This mine may re-start at a date yet to be determined.

In December 2021, Ramaco completed the acquisition of property adjacent to the Berwind Property. The acquisition of the Amonate Property from Coronado Global Resources was reported to have included nearly 50 million tons of low and mid volatile reserves, several permitted mining operations, and a preparation plant. While Ramaco has immediate plans to mine reserves within the Amonate Property, as a result of the timing of the acquisition, WEIR has not completed a Regulation S-K 1300 compliant analysis of the newly acquired property.  The tonnage reported to have been acquired should not be considered a current estimate and is not included in reserve or resource tonnages within this report, nor have mining plans within the new property been considered in WEIR’s Preliminary Feasibility Study conducted for the Berwind Complex.

Big Creek Property

The Big Creek Property covers an area of approximately 10,100 acres of leased coal holdings in Buchanan and Tazewell counties, Virginia. Ramaco obtained leases for the Big Creek Property in late 2019 and commenced surface mining activities in 2021.

The Big Creek Property includes Ramaco’s Big Creek Surface and Highwall Mine which is a currently active multi-seam surface mine with associated highwall mining operations. The northern portion of the permit is a contour mining operation in the Tiller Seam with subsequent highwall mining. The southern portion of the permit involves surface area mining with the Tiller Seam as a base.  Over the permit area, small amounts of the above Jawbone Seam that are mineable are also recovered.  In the future, the Red Ash Seam may be contour and highwall mined on the far north side of the permitted area.  The Red Ash Seam mining prospects are still being evaluated.

The Big Creek Property also includes the fully planned and permitted Big Creek Jawbone 1 Deep Mine in the Jawbone No. 1 Seam just to the north of the current surface mine.  This deep mine is scheduled for a mid-2022 startup date.

November 22, 2022

Page 18


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Knox Creek Property

The Knox Creek Property consists primarily of three separate areas which, in total, cover approximately 62,100 acres of owned and leased coal holdings. The areas, shown in Figure 1.1-1, are the original Knox Creek Property, the Knox Creek Jewell Property, and the Knox Creek East Property. The original Knox Creek Property was obtained by Ramaco in 2016. Ramaco started mining coal on the property in 2019. The Knox Creek Jewell and Knox Creek East Properties were acquired subsequently.

The Knox Creek Property includes the Knox Creek Preparation Plant, which currently processes coal from both the Berwind and Big Creek Properties.  The Jamison Creek Refuse Disposal Area, which services the Knox Creek Preparation Plant, is located on the property adjacent to and just northeast of the plant.  The property also includes the currently idle Knox Creek Tiller Deep Mine which is currently in the Jawbone 3 Seam.  The Knox Creek Tiller Deep Mine is planned to restart at an as yet undetermined date.

Ramaco owns approximately 976 acres (1.6 percent) of mineral rights on the Knox Creek Property.  All other mineral rights are leased.  Ramaco also owns surface rights to 1,026 acres on the property, which includes the Knox Creek Preparation Plant. Ramaco holds surface leases to approximately 21,994 acres (35 percent of total at the Knox Creek Property), which includes the Jamison Creek Refuse Disposal Area that is adjacent to, and northeast of, the Knox Creek Preparation Plant.

Ramaco’s Knox Creek Property coal holdings covers a very large area that has large amounts resources in many different seams (see Section 11).  However, current mine plans and permits on the property are limited to the Knox Creek Tiller Deep Mine.

3.3PROPERTY CONTROL

Ramaco’s Berwind Property coal holdings are all leased from the Berwind Land Company (BLC), with the original lease executed in August 2015.  Big Creek involves leases from White Wolf Energy and Omega Highwall Mining LLC that were secured in late 2019. The Knox Creek Property is comprised of numerous leases from both individuals and other businesses.

Over the Berwind Complex extents, leases typically apply to specific seams, or a vertical range of seams.  Therefore, the seams involved often vary from lease to lease for specific areas across the complex.  Table 3.3-1 below shows the various property control contracts.

November 22, 2022

Page 19


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Table 3.3-1 Berwind Property Control

Area

    

Document Type

    

Quantity

Berwind

Coal Leases/Coal Subleases

5

Mutual Cooperation Agreement

1

Big Creek

Coal Leases

2

Knox Creek

Agreements

2

Assignments

37

Coal Leases/Coal Subleases

72

Deeds

113

Easements

11

Guarentees

1

Liscense

1

Options

1

3.4MINERAL CONTROL

The Berwind Complex mineral control is detailed in Table 3.4-1 below:

Table 3.4-1 Berwind Property Mineral Control

Area

    

File Number

    

Document Type

    

Seams

    

Expiration Date (1)

 

Berwind

15

Coal Lease

Poca #4, Poca #3 and Squire
Jim Only

8/17/2030 Extensions of 1 year until all coal exhausted

16

Coal Sublease

Poca #4, Poca #3 and Squire
Jim Only

8/17/2025 Extensions of 5 year until all coal exhausted

17

Mutual Cooperation Agreement

N/A

18

Coal Lease

Poca #5 and Above

2/26/2025 With an additional 10 year term, then extensions of 1 year until all coal exhausted

19

Coal Sublease

Same as Base Lease

11/11/2022 Extensions of 1 year until all coal
exhausted

Big Creek

25

Coal Lease

9/19/2026 Extensions of 5 years until all coal
exhausted

26

Coal Lease

02/28/2026 Extensions of 5 year until all coal
exhausted

November 22, 2022

Page 20


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Area

    

File Number

    

Document Type

    

Seams

    

Expiration Date (1)

Knox Creek

1A

Coal Deed

Unknown

NA

 

2

Deed of Lease

Jawbone

20 year term, extensions of 20 years until all coal exhausted

3

Coal Lease

30 year term, extensions of 20 years until all coal exhausted

4

Coal Lease

Raven, Tiller and Lower Seaboard

2 year term, extensions of 50 years until all coal exhausted

5 through 64

Coal Deeds

Unknown

NA

65

Coal Lease

Tiller and Above

1 year terms until all coal exhausted

66

Coal Lease

Tiller and Above

1 year terms until all coal exhausted

67

Coal Lease

Tiller and Above

1 year terms until all coal exhausted

68

Coal Lease

Tiller and Above

1 year terms until all coal exhausted

69

Coal Lease

Tiller and Above

10 year terms until all coal exhausted

70

Coal Lease

Tiller and Above

10 year terms until all coal exhausted

72

Coal Lease

Tiller and Above

5 year terms until all coal exhausted

73

Coal Lease

Red Ash

1 year terms until all coal exhausted

74

Coal Lease

Jawbone, Red Ash and Kennedy

4 year terms until all coal exhausted

75

Coal Lease

Tiller and Above

1 year terms until all coal exhausted

76

Coal Lease

Kennedy and Above

1 year terms until all coal exhausted

79

Coal Lease

Tiller and Above

10 year terms until all coal exhausted

80

Coal Lease

Tiller and Above

5 year terms until all coal exhausted

81

Coal Lease

Tiller and Above

5 year terms until all coal exhausted

82

Coal Lease

Tiller and Above

5 year terms until all coal exhausted

83

Coal Lease

Tiller and Above

5 year terms until all coal exhausted

84

Coal Lease

Tiller and Above

5 year terms shall not exceed 20 years

85

Coal Lease

Tiller and Above

5 year terms shall not exceed 20 years

86

Coal Lease

Tiller and Above

5 year terms shall not exceed 20 years

87

Coal Lease

Tiller and Above

5 year terms shall not exceed 20 years

88

Coal Lease

Tiller and Above

5 year terms shall not exceed 20 years

89

Coal Lease

Tiller and Above

5 year terms shall not exceed 20 years

90

Coal Lease

Tiller and Above

5 year terms until all coal exhausted

91

Coal Lease

Tiller and Above

5 year terms until all coal exhausted

92

Coal Lease

Tiller and Above

5 year terms until all coal exhausted

93

Coal Deed

Unknown

NA

94

Coal Lease

Tiller and Above

5 year terms until all coal exhausted

95

Coal Lease

Tiller and Above

5 year terms until all coal exhausted

96

Coal Lease

Tiller and Above

5 year terms until all coal exhausted

97

Coal Lease

Tiller and Above

5 year terms until all coal exhausted

99

Coal Lease

Jawbone and Tiller

5 year terms until all coal exhausted

100

Coal Lease

Jawbone and Tiller

5 year terms until all coal exhausted

101

Coal Lease

Jawbone and Tiller

5 year terms until all coal exhausted

102

Coal Lease

Jawbone and Tiller

5 year terms until all coal exhausted

103

Coal Lease

Jawbone and Tiller

5 year terms until all coal exhausted

104

Coal Lease

Jawbone and Tiller

5 year terms until all coal exhausted

105

Coal Lease

Jawbone and Tiller

1 year terms until all coal exhausted

106

Coal Sublease

Jawbone and Tiller

20 year term

109 through 117

Coal Lease

Right to surface mine

Until all surface mineable coal has been removed

122

Coal Lease

All coal above drainage

5 year terms, up to 20 times

124

Coal Lease

Tiller

5 year terms, up to 20 times

127

Coal Sublease

Lower Spit of Banner

1 year terms until all coal exhausted

128

Coal Sublease

Unknown

Terminates with 30 day notice from either party

130

Coal Deed

Unknown

NA

138

Coal Sublease

Kennedy

Until all mineable coal has been removed

139

Coal Sublease

Banner

Until all mineable coal has been removed

140

Coal Sublease

Kennedy

Until all mineable coal has been removed

141

Coal Sublease

Upper and Lower Banner

Until all mineable coal has been removed

143

Coal Deed

Unknown

NA

164

Coal Sublease

Banner

Until all mineable coal has been removed

178 through 225

Coal Deeds

Unknown

NA

November 22, 2022

Page 21


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

3.5SIGNIFICANT PROPERTY ENCUMBRANCES AND PERMIT STATUS

WEIR has not discovered any significant encumbrances for any of the tracts within the Berwind Complex.

A list of Ramaco’s permits for the Berwind Complex and permit status is shown in Table 3.5-1, with a more detailed description of the permits discussed in Section 17.3.

Table 3.5-1 Permit Status

Permitted

 

Permit

Surface Area

NPDES

Property Description

    

Number

    

State

    

(Acres)

    

Issue Date

    

Permit No.

Berwind Deep Mine No. 1

U-3008-16

WV

30.29

6/26/2017

WV1028952

Berwind Deep Mine No. 1

1202294

VA

0.00

5/20/2019

NA

Berwind Poca 6 Seam Deep Mine

U-5007-21

WV

6.70

Pending

Pending

Big Creek Surface Mine

1102335

VA

447.63

1/22/2020

0082335

Capital No. 3/ Tiller No. 1 Deep Mine

1402231

VA

42.61

5/22/2017

0082231

Dry Fork Deep Mine

U-4004-11

WV

7.12

11/20/2012

WV1024281

Dry Fork Deep Mine

Pending

VA

0.00

Pending

WV1024281

Fork Ridge (Tiller) Deep Mine

1202204

VA

20.57

2/15/2017

0082204

Hess Creek Surface Mine

1702202

VA

75.95

2/14/2017

0082202

Kennedy Surface Mine

1402215

VA

106.81

4/3/2017

0082215

Knox Creek Preparation Plant

1302184

VA

41.94

12/2/2017

0082184

Knox Creek Refuse Disposal Area

1302232

VA

322.71

11/23/2018

0082232

Mudlick Surface Mine

1102334

VA

26.25

7/7/2020

0082234

Squire Jim Deep Mine No. 1

U-3004-18

WV

8.83

8/31/2020

WV1029088

Triad Pocahontas 4 Deep Mine

U-5004-19

WV

6.12

3/2/2020

WV1028952

Triad Pocahontas 6 Deep Mine

U-5007-21

WV

6.70

Pending

WV1028952

Vansant No. 1 Deep Mine

U-4010-94

WV

14.20

12/7/1994

WV1016113

Vansant No. 2 Deep Mine

U-4013-94

WV

15.72

12/19/1994

WV1016113

Vica Deep Mine

U-0011-85

WV

2.34

2/25/1985

WV1005685

Vica Deep Mine

1202149

VA

0.00

Pending

NA

Total

1,182.49

3.6SIGNIFICANT PROPERTY FACTORS AND RISKS

Given Ramaco’s controlled interests at the Berwind Complex, which relate to property that is mostly held by others and leased to Ramaco, WEIR assesses that there are no significant issues affecting access to the coal interests or Ramaco’s ability to execute its mine plans.

WEIR did not conduct an independent verification of property control, nor has it independently surveyed the mining locations. Rather, WEIR has relied on information compiled from maps and summaries of the leased properties prepared by Ramaco. WEIR did not conduct a legal title investigation relative to Ramaco’s mineral and surface rights.

November 22, 2022

Page 22


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

3.7ROYALTY INTEREST

Ramaco, within the Berwind Complex, holds no material royalty or similar interest in property which is owned or operated by another party.

November 22, 2022

Page 23


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

4.0

ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE, AND PHYSIOGRAPHY

4.1TOPOGRAPHY, ELEVATION, AND VEGETATION

The Berwind Complex is in the southwestern part of the Appalachian Plateau Province directly north and adjacent to the Valley and Ridge Province.  It is in the Cumberland Mountain zone of the Appalachian Plateau. The terrain is mountainous, steep, and rugged with elevations ranging from approximately 1,120 feet above Mean Sea Level (MSL) along the valley bottoms to over 4,040 feet above MSL along the ridges, averaging 2,230 feet.  The landscapes are well-dissected with dendritic drainage systems. There are no major rivers in the area, however, there are numerous small creeks throughout the complex. The Dry Fork, Jacobs Fork, Indian Creek, and War Creek rivers, all tributaries of the Tug Fork River of the Ohio River watershed, traverse the complex. Topography and other features of the area are shown on Figure 7.5-1.

The Berwind Complex consists mostly of unmanaged forestland and scattered pastureland.  The forestland consists of typical trees for this area of the Appalachians, with Oak/Hickory as the dominant forest-type group and a lesser percentage of the Maple/Beech/Birch forest-type group.

The wildlife indigenous to the area is typical of the species and diversities associated with the geographical and climatic areas within which the proposed surface mine site is located. Reconnaissance of the area affected by the proposed mining determined that the following species are or have been present: Whitetail Deer, Fox Squirrels, Gray Squirrels, Ground Squirrels, Eastern Opossums, Raccoon, Rabbits, Eastern Black Bear, Wild Turkey, and numerous species of birds.   On the basis of numerous reconnaissance surveys, no endangered or threatened species of plants or animals, or habitats of such species were found to exist within or adjacent to the mine permit areas.

4.2PROPERTY ACCESS

The primary access road to the properties is US Route 460, a four-lane highway, located south of the Berwind and Big Creek properties. From US Route 460, Virginia Route 637 and connecting West Virginia Routes 9 and 11 can be used to access the Berwind Property to the north.  Similarly, the Big Creek Property can be accessed from US Route 460 to the north using Virginia Route 67.  Other highways and county roads traverse these two properties.  US Route 460 turns to the north after running south of Big Creek and continues through the middle of the original Knox Creek Property.  US Route 460 passes just to the east of the Knox Creek Preparation Plant and its associated Jamison Creek Refuse Disposal Area.

November 22, 2022

Page 24


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

The Norfolk Southern (NS) Railroad passes through and has a rail spur to each of the properties.  The NS Railroad provides rail service in the area extending from Amonate, Virginia northward through Berwind, West Virginia and from Swords Creek, Virginia eastward through Richlands, Virginia, south of the Knox Creek Property (see Figure 1.1-1).

The nearest airport is the Tri-Cities Airport (TRI), which is located in Bristol, Tennessee. The Tri-Cities Airport is approximately 90 miles from Berwind, West Virginia and the Yeager International Airport (CRW) in Charleston, West Virginia, 120 miles from Berwind, West Virginia.

The surrounding waterways are not navigable for commercial traffic. The closest barge docking area is approximately 70 miles to the north on the Kanawha River, south of Charleston, West Virginia.

4.3CLIMATE AND OPERATING SEASON

The climate associated with the Berwind Complex is classified as a humid continental, characterized by hot, humid summers and moderately cold winters. Climate conditions vary greatly in the state of West Virginia due to influence of the rugged topography.  Average high temperatures range from 82 to 87 degrees Fahrenheit in the summer, with average low temperatures ranging from 20 to 25 degrees Fahrenheit in winter. Average yearly rainfall measured in nearby Logan, West Virginia is approximately 47 inches per year, with approximately 1.6 inches occurring as snowfall.  The mines on the Berwind Complex currently operate year-round, regardless of weather conditions.

4.4INFRASTRUCTURE

Power

Electrical power for the Knox Creek Preparation Plant and mines on the Berwind Complex is provided by American Electric Power (AEP).  AEP’s average industrial price is 6.4 cents per KWH.

November 22, 2022

Page 25


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Water

Water for mining and coal processing operations is provided by a combination of extraction from abandoned underground mine pools and from settling ponds located on the surface.  Individual mine sites use purchased potable water. Potable water at the preparation plant is supplied by a local municipality water connection.

Personnel

The area surrounding the Berwind Complex has a long history of coal mining and attracting mining personnel with qualified skills has not been an issue for Ramaco thus far.   The Berwind Complex is projected to employ a maximum of 308 personnel over the LOM Plan. The Berwind Complex operations employed approximately 142 personnel at the end of December 2021. The hourly labor force remains non-union and no change in this labor arrangement is anticipated in the near term.

Supplies

Supplies for the mining operations are available from multiple nearby vendors that service the coal industry in the CAPP Region. There are 10 Caterpillar mining equipment dealerships located within 50 miles of the Berwind Complex. There are three Komatsu/Joy Manufacturing mining equipment dealerships within 50 miles of the Berwind Complex.

November 22, 2022

Page 26


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

5.0

HISTORY

5.1PREVIOUS OPERATIONS

The Berwind Complex and surrounding area has an extensive history of coal mining, primarily by underground mining methods. Detailed underground mine maps showing previous mine workings were provided by Ramaco. Other sources of maps showing previous mine workings that WEIR referenced were from the West Virginia Geological and Economic Survey, the Virginia Department of Mines Minerals and Energy, the USGS, and the MSHA. Mining within the Berwind Complex likely began in the early 1900s.  There have been many different mine operators both large and small in the region since then.

Areas of the Berwind Property have been previously surface and underground mined.  Ramaco is currently mining the Pocahontas No. 4 Seam on the Berwind Property in the Berwind No. 1 Pocahontas 4 Deep Mine.  Within the Berwind Property, mining has occurred in seams above the Pocahontas No. 4 Seam in some reserve areas, notably in the Pocahontas 11 Seam (also locally known as the War Creek or Beckley Seam).  Previously mined out areas on the property were provided to WEIR by Ramaco, however, WEIR has not verified, nor field checked these previously mined out areas.

Areas of the Big Creek Property have been previously surface and underground mined.  Ramaco is currently surface mining the Tiller Seam at the Big Creek Surface and Highwall Mine. Previous mining on this property mostly involved the Jawbone, Tiller, and Red Ash seams. Previously mined out areas on the property were provided to WEIR by Ramaco, however, WEIR has not verified, nor field checked these previously mined out areas.

Areas of the Knox Creek Property have been previously surface and underground mined.  There is currently no mining activity within the Knox Creek Property.  However, the Red Ash 2, Jawbone 3 and Jawbone 1 seams have been extensively mined on the property until recently, as a result of desirable metallurgical coal properties, seam continuity, and ease of seam access. Previously mined out areas on the property were provided by Ramaco, however, WEIR has not verified, nor field checked these previously mined out areas.

November 22, 2022

Page 27


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

5.2PREVIOUS EXPLORATION AND DEVELOPMENT

Prior to Ramaco’s control of the property in 2011, previous exploration included 4,821 holes drilled within or in proximity to the Berwind Complex.  Previous exploration activity dates back prior to 1910. A list of companies conducting exploration, number of holes drilled, total footage drilled, and approximate dates are shown in Table 5.2-1. Since property ownership has changed several times over the years, prior exploration drilling records are not fully available in original form.

Table 5.2-1 Previous Exploration

Company

    

Drill Holes

    

Drilled Footage

    

Year Drilled

Anker Coal Group, Inc.

57

25,087

Unknown

Consol Energy, Inc.

3,474

4,497,009

1970's-1980's

Georgia-Pacific

31

39,355

Unknown

Harmon Coal Company

1

750

Unknown

Island Creek Coal Coampany

70

114,561

Unknown

Jewell Ridge Coal Company

241

125,314

1960's-1990's

Jewell Smokeless Coal Corporation

473

221,931

1940's-2013

New River & Pocahontas Consolidated

73

50,287

1910's-Unknown

Olga Mining Company

22

17,434

Unknown

Paramont Coal Company Virginia, LLC

9

3,828

Unknown

Permac, Inc.

19

7,029

Unknown

Pocahontas Fuel Company, Inc.

25

18,649

Unknown

Republic Steel Corporation

98

47,738

Unknown

United Coal Company

126

53,973

Unknown

US Steel Corporation

1

617

Unknown

West Virginia Geological & Economic Survey

2

9

Unknown

Unknown

99

5,688

Unknown

Total

4,821

5,229,258

As can be seen in Table 5.2-1, the Berwind Complex has a rich history of coal exploration.  It should be noted that Consol Energy, Inc. has an exceptionally large number of drillholes because of their substantial participation in the natural gas industry within the Berwind Complex.

Organizing such significantly large amount of data by performing tasks such as; 1) removing drillhole duplicates (especially where companies change drillhole names to match their own naming conventions), 2) resolving multiple copies of drillholes “shared” between companies (i.e. different companies own different seams over the same area and agree to “share” drillhole data, but delete the data for their seams before sharing), 3) resolving localized seam naming differences, and 4) resolving different coordinate systems, is a significant (and on-going) task for Ramaco.  WEIR’s review of Ramaco’s current drillhole database is highly complementary based on the results of their work to date on these matters.  Based upon thorough review of Ramaco’s compilation of this historical drilling data, it is WEIR’s opinion that this historical data is reliable for use in generating an accurate geological and quality model for the Berwind Complex.

November 22, 2022

Page 28


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

6.0

GEOLOGICAL SETTING, MINERALIZATION, AND DEPOSIT

6.1REGIONAL, LOCAL, AND PROPERTY GEOLOGY

6.1.1Regional Geology

The upper coal seams of interest within the Berwind Complex belong to the Norton Formation in Virginia of Early Pennsylvanian Age, which is stratigraphically equivalent to the Lower Kanawha and New River formations in southwestern West Virginia. The lower coal seams of interest belong to the Pocahontas Formation of the Pottsville Group (Lower Pennsylvanian). The depositional setting for these seams is complex and thought to be upper delta plain, with subsidence controlling the sedimentation rate. The Lower Pennsylvania (Pottsville) sedimentary strata of the coal-bearing rocks of the Pocahontas Formation rest uncomformably on the Mississippian Bluestone Formation of the Mauch Chunk Group.

The Pocahontas Basin encompasses the Berwind Complex and is within the western margin of the folded and faulted Central Appalachian Basin, with deformation occurring during the Alleghany (post-Permian) Orogeny. The Dry Fork Anticline is a regionally persistent fold, which extends from Buchanan County, Virginia to Mercer County, West Virginia. The anticline passes through the center of the complex and plunges to the southwest. North of the Dry Fork Anticline, coal beds dip at approximately one degree to the northwest, while to the south, seams dip one to two degrees toward the Boissevain Fault to the south/southwest.

The coalbeds of the Norton Formation are interbedded with sandstones, shales, siltstones, and underclays. The sandstones are light gray, very fine coarse grained, thin bedded to massive, and crossbedded, and consist of 50 to 65 percent quartz, with large proportions of white-weathering feldspar, mica flakes and dark mineral grains. The shales are medium to dark, thinly laminated, and carbonaceous. Horizontally laminated or crossbedded medium light gray siltstones and medium gray clayey to silty underclays occur in thin beds throughout the formation.

6.1.2Local Geology

The coal seams of interest within the Berwind Complex are in the Southwest Virginia Coal Field and the Southern Coal Field in West Virginia.  These coal seams are known for very high calorific content (Btu/lb) and high through low-volatile metallurgical coal characteristics, with high fluidity, low ash content, and low sulfur content.

November 22, 2022

Page 29


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Seven faults are known to occur within the Berwind Complex: the Boissevain Fault, Middle Creek Fault, Bishop-Bradshaw Fault, Keen Mountain Fault, Pistol Gap Fault, Spur Fault, and Canebrake Fault.

The Boissevain and Middle Creek faults are northeast/southwest trending thrust faults, which pass through the southern boundary of the Knox Creek Property. The strata on the southeast side of the fault has been thrust upward, relative to the strata on the northern side, along a plane which is, in most places, inclined at approximately 45 degrees. Along much of the length of the fault, the strata have been overturned, and the fault offset is over 200 feet. The Boissevain and Middle Creek faults parallel the Richlands Fault, another large thrust fault to the south of the property, where Mississippian Age strata have been thrust above the Pennsylvanian coal-bearing formations. No mining has occurred south of the Boissevain and Middle Creek faults, within or near the complex.

The Bishop-Bradshaw Fault has been interpreted as a right lateral strike-slip fault and intersects the Dry Fork Anticline and the Middle Creek and Richlands Fault systems to the south. Coal mining has taken place along the southeastern end on both sides of the Bishop-Bradshaw Fault.

The Keen Mountain and Pistol Gap faults are northwest/southeast trending right-lateral strike slip faults. The southern side of both faults is downthrown, up to 18 feet vertically. The Spur Fault is a small fault which occurs perpendicular to, and terminates in, the Keen Mountain Fault in the northern area of the property.  Mining has occurred on both sides of these faults throughout the area, and fault crossings were common.

The Canebrake Fault is a northwest/southeast trending fault, with an offset of approximately 200 feet based on evaluation of drillhole information. The upthrown side is to the north of the fault. Underground mining in the Red Ash Seam has occurred on both sides of the fault.

6.1.3Property Geology

Berwind Property

The primary coal seams of interest on the Berwind Property, in descending stratigraphic order, are the Tiller, Pocahontas No. 4, Pocahontas No. 3 and Squire Jim. All of the coal seams of interest outcrop on the property. The Bishop-Bradshaw Fault passes through the Berwind Property.

November 22, 2022

Page 30


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Big Creek Property

The primary coal seams of interest on the Big Creek Property, in descending order, are the Red Ash, Jawbone 1, and Tiller.  No significant faults have been mapped on the property.

Knox Creek Property

The primary coal seams of interest on the Knox Creek Property, in descending stratigraphic order, are the Kennedy, Red Ash, Jawbone 3, and Jawbone 1 (see Figure 6.3-1, Generalized Stratigraphic Section).  However, there are several other mineable seams that occur throughout the property.  Six of the seven faults described above occur on the property.

6.2MINERAL DEPOSIT TYPE AND GEOLOGICAL MODEL

The Berwind Complex resource area is a relatively flat lying, sedimentary deposit of Pennsylvanian Age.   The 34 coal seams in the Pocahontas Formation and the overlying Norton Formation account for approximately 3,000 feet of geologic section.  For internal planning, Ramaco models these seams from exploration results using the SurvCad® mine planning software package, completing model updates after each phase of exploration drilling.  WEIR modeled the reserves and resources using Datamine MineScape® Stratmodel geological modeling software. Exploration consists of core drilling for all the mineable seams, which is performed each year in advance of mining, to refine the resource boundary and to define limits of the mine plans. The WEIR geological model is discussed in more detail in Section 9.1.

November 22, 2022

Page 31


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

6.3STRATIGRAPHIC COLUMN AND CROSS SECTION

Figure 6.3-1 shows the stratigraphic column for the Berwind Complex. Cross sections related to the Berwind Complex can be found on Figure 6.3-2. For more detail on these sections, please see Exhibit 6.3-2.

Figure 6.3-1 Berwind Stratigraphic Column

Graphic

November 22, 2022

Page 32


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Figure 6.3-2 Berwind Cross Section SW to NE

Graphic

November 22, 2022

Page 33


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

7.0

EXPLORATION

7.1NON-DRILLING EXPLORATION

Drilling has served as the primary form of exploration within the Berwind Complex.  In addition to exploration drillholes, seam outcrop measurements, in-mine measurements, and survey points taken from mine maps of previous operations were considered.  A total of 194 seam outcrop measurements, 360 mine measurements, and 886 survey points were implemented in modeling the deposit.  Data from degasification, coal bed methane, and water wells were also incorporated in the geological model, including a total of 1,458 drillholes.

7.2DRILLING

Ramaco’s exploration activities involve rotary and continuous core drilling performed by competent contract drilling companies.  In addition to providing information about the coal seams present, the exploration drilling also provides core samples of roof strata and floor strata for geotechnical evaluation which is stored and evaluated as needed. The geologist’s drilling logs are checked against the geophysical logs for thickness accuracy and to confirm core recovery. Drillholes with core recovery of less than 90 percent are noted and subsequently reviewed in consideration for re-drilling.  The successful acquisition of accurate geophysical logs for holes with poor core recovery play an important role in the decision to re-drill, since improvements in lithology recognition in geophysical logging has significantly improved over the years.

Once recovered, all core samples are boxed, photographed, and stored.  Coal seam core samples are sent to laboratories for quality analyses.  Caliper, density, gamma, and resistivity downhole geophysical logs are completed as drill site and hole conditions allow.  Each drillhole collar location is surveyed using RTK GPS equipment to obtain accurate coordinates for subsequent modeling efforts.

Table 7.2-1 summarizes data for Ramaco’s drilling programs.

Table 7.2-1 Drilling Programs

Hole Type

Number of Holes with Base Data

Total

Drill

Downhole

Lab

Number of

Hole

Geophysical

Deviation

Geologist's

Driller's

Analyis

Drilling Series

    

Program Dates

    

Drill Holes

    

Drilled Footage

    

Rotary

    

Core

    

Header

    

Logs

    

Log

    

Log

    

Log

    

Certificates

BL Series

2015-2021

67

46,378

28

39

67

66

37

28

17

KC Series

1998-2018

37

14,725

5

32

37

31

8

32

11

104

61,103

33

71

104

97

45

60

28

November 22, 2022

Page 34


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Referring to the drilling programs outlined in Table 7.2-1, the BL (Berwind) and KC (Knox Creek) series of drillholes are mainly intended as in-fill drilling on the complex. Quality control procedures followed by Ramaco geologists are clearly defined.  Ramaco’s field geologists take specified steps to protect sample integrity and to ensure core samples are always under Ramaco geologist’s control.  These steps include the following:

·

Field geologist to be on site whenever drilling is occurring

·

Geologists log to be created for each drillhole

·

Each drillhole to be logged using geophysical methods if physically possible

·

Geologist to compare field geologists logs to the e-log data

·

Geologist to compare the core samples against both field geologists logs and e-logs to confirm coal thickness

·

All immediate roof, coal and immediate floor core are to be boxed and photographed

·

Quality sample sheets to be filled out, provided to a supervisor for approval and shipped to the laboratory

·

Once core samples have been analyzed, field geologists to scrutinize the resulting quality data for accuracy

WEIR did not have direct involvement with the planning, implementation, or supervision of Ramaco’s drilling programs. However, having reviewed the details of Ramaco’s drilling programs, WEIR finds the results to be consistent with industry standards and appropriate for use in the estimation of reserves and resources.

WEIR did not observe core samples in person, however, Ramaco provided photos of core logs for 19 drillholes.  In review of these photos, WEIR found the cores to be representative of the data reported for each drillhole.

7.3HYDROGEOLOGICAL DATA

Hydrological data is generally obtained from existing wells and surface water monitoring locations in proximity to Ramaco’s existing and planned operations.  No additional exploration is performed specifically for the purposes of hydrological study. See Section 13.1.2, Hydrogeological Model, for more detail.

November 22, 2022

Page 35


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

7.4GEOTECHNICAL DATA

Ramaco does not specifically gather geotechnical data at its existing or planned operations at the Berwind Complex.  See Section 13.1.1, Geotechnical Model, for more detail.

November 22, 2022

Page 36


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

7.5SITE MAP AND DRILLHOLE LOCATIONS

A map showing the location of all drillholes on the Berwind Complex is provided on Figure 7.5-1.  Mine measurements are excluded from this figure to assist with legibility.

Figure 7.5-1 Drillhole Locations

Graphic

November 22, 2022

Page 37


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

7.6OTHER RELEVANT DRILLING DATA

Ramaco generally uses one of several local drilling companies based on availability and pricing.  Downhole geophysical logging is performed by Marshall Miller & Associates located in Bluefield, Virginia.  Coal quality analyses are currently performed by Precision Testing Laboratory, Inc. (Precision) located in Beckley, West Virginia.

November 22, 2022

Page 38


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

8.0

SAMPLE PREPARATION, ANALYSES, AND SECURITY

8.1SAMPLE PREPARATION METHODS AND QUALITY CONTROL

Relative to the drilling overseen by Ramaco, once the target coal seam has been drilled the coal core is stored in plastic lined wooden core boxes. The core is photographed, and the coal seam is measured and described by the geologist. The geologist’s seam thickness measurements are cross checked against geophysical logs for thickness accuracy and to confirm core recovery.

8.2

LABORATORY SAMPLE PREPARATION, ASSAYING, AND ANALYTICAL PROCEDURES

8.2.1SGS North America Inc.

Ramaco used SGS North America Inc. (SGS) located in Sophia, West Virginia as its primary laboratory for coal analyses, prior to 2016.  Typically, once quality samples were bagged and labeled at the mine, the samples were delivered to SGS for quality analyses.  The samples were first prepared by crushing, splitting, and sizing.  The analyses performed included Proximate, Washability, Ash Fusion, Ultimate, Ash Mineral, Dilatometer, Plastometer, Trace Elements, and Petrographics.  SGS is certified by the ANSI National Accreditation Board.  SGS performs all of the coal analyses to ASTM standards.

8.2.2Precision Testing Laboratory, Inc

Ramaco has utilized Precision Testing Laboratory, Inc. (Precision) located in Beckley, West Virginia beginning in 2016. Also certified by the ANSI National Accreditation Board, Precision performs all the coal analyses to ASTM standards.  Once quality samples are bagged and labeled at the mine, the samples are delivered to Precision for quality analyses. The samples are first prepared by crushing, splitting, and sizing.  The analyses performed included Proximate, Washability, Ash Fusion, Ultimate, Ash Mineral, Dilatometer, Plastometer, Trace Elements, and Petrographics.

8.2.3Other Laboratories

As outlined in Section 5.2, WEIR relied upon drillhole data from prior property owners.   The quality data from other laboratories appears to be valid and appropriate to include in this study based upon available documentation and consistency of the data between the different sources.

November 22, 2022

Page 39


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

8.3QUALITY CONTROL PROCEDURES AND QUALITY ASSURANCE

As ANSI certified laboratories, both SGS and Precision have in-house quality control and assurance procedures.  Both are a well-known and respected providers of coal quality analysis services.

8.4

SAMPLE PREPARATION, SECURITY, AND ANALYTICAL PROCEDURES ADEQUACY

Once in possession of the samples, Precision’s standard sample preparation and security procedures are followed. After the sample has been tested, reviewed, and accepted, the disposal of the sample is done in accordance with local, state and EPA approved methods.

WEIR has determined the sample preparation, security and analysis procedures used for the Berwind Complex’s drillhole samples meet current coal industry standards and practices for quality testing, with laboratory results suitable to use for geological modeling, mineral resource estimation and economic evaluation.

November 22, 2022

Page 40


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

9.0

DATA VERIFICATION

9.1DATA VERIFICATION PROCEDURES

Ramaco provided WEIR copies of all available drilling records for the Berwind Complex, which included Excel spreadsheets, driller’s log, field geologist’s logs, core photographs, quality results sheets from the coal quality laboratories, mine measurement tables, as well as drawing files or PDFs of the e-logs. Each hole in the database was individually checked by WEIR against a copy of the driller’s and/or geologist’s log to confirm data accuracy.

Geological reviews performed by WEIR included:

·

Drillhole lithology database comparison to geophysical logs

·

Drillhole coal quality database comparison to quality certificates

After completing the precursory verifications and validations described above, the drillhole data was loaded into Datamine’s MineScape® Stratmodel, a geological modeling software.  MineScape provides robust error checking features during the initial data load, which include confirmations of seam continuity, total depth versus hole header file data, interval overlap, and quality sample continuity with coal seams.  Once the drillhole data was loaded, a stratigraphic model was created.

Several further verifications were then possible, which included:

·

Creating cross sections through the model to visually inspect if anomalies occur due to miscorrelation of seams

·

Creating structural and quality contour plots to visually check for other anomalies due to faulty seam elevations or quality data entry mistakes in the drillhole database

Typical errors which may impact reserve and resource estimates relate to discrepancies in original data entry. These errors may include:

·

Incorrect drillhole coordinates (including elevation)

·

Mislabeled drillhole lithology

·

Unnoticed erroneous quality analyses where duplicate analyses were not requested

·

Excessive drillhole core loss

November 22, 2022

Page 41


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

WEIR conducted a detailed independent geological evaluation of data provided by Ramaco to identify and correct errors of the nature listed above.  Where errors are identified and cannot be successfully resolved, it is WEIR’s policy to exclude that data from the geological model.  Based on WEIR’s geological evaluation of data provided, 81 drillholes were excluded from the drillhole database due to various reasons.

9.2DATA VERIFICATION LIMITATIONS

Limitations of data verification included incomplete or missing records for some drillholes. The primary reason for this situation is incomplete data transfers upon change in property ownership.  Based on its modeling results, WEIR found drillholes with incomplete data to be consistent with the deposit and appropriate to include in WEIR’s geological model.

9.3ADEQUACY OF DATA

It is WEIR’s opinion that the adequacy of sample preparation, security, and analytical procedures for holes and procedures that were drilled by Ramaco after acquiring the property is acceptable and that these methods meet typical industry standards. Ramaco employs detailed process and procedures, described in Section 8.4, that are followed each time a core hole is to be sampled.  The Ramaco geologist’s logs for these holes contain sampling descriptions and lithologic descriptions that are sufficiently detailed to ascertain that an experienced geologist supervised the drilling and sampling.  Ramaco coal quality analyses are performed by SGS to ASTM standards, as detailed in Section 8.0.

The adequacy of sample preparation, security, and analytical procedures are generally unknown for drillholes that were drilled prior to Ramaco acquiring the initial leases in 2016.  However, the geologist’s logs for these holes contain sampling descriptions and lithologic descriptions that are sufficiently detailed to ascertain that an experienced geologist supervised the drilling and sampling.  It is unknown if all coal quality analyses were performed to ASTM standards by qualified laboratories, as detailed in Section 8.0, however, this legacy drillhole information was included as the samples matched the coal seam intervals and reported quality data that was consistent between the different data sources.  Model verifications further support WEIR’s high level of confidence that a representative, valid, and accurate drillhole database and geological model have been generated for the Berwind Complex that can be relied upon to accurately estimate coal resources and reserves.

November 22, 2022

Page 42


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

10.0

MINERAL PROCESSING AND METALLURGICAL TESTING

10.1MINERAL PROCESSING TESTING AND ANALYTICAL PROCEDURES

Daily sampling is performed by SGS on samples obtained from various conveyor and stockpile locations prior to shipping clean coal products. Proximate and oxidation analyses are performed on the samples.  Train and sublot samples include all petrographic and rheology analyses for each individual customer specification.

These results help ensure both proper preparation plant operation and coal product classification. Coal tonnages for raw and post-processed products are estimated using standard belt scales, which are calibrated monthly against the end of month survey data summary reports.

Efficiency testing is performed on all critical preparation plant circuitry on an on-going basis to help ensure proper coal and non-coal separations are occurring throughout the preparation plant processing operation. This performance testing is extensive and involves measuring flow rates, pressures, moistures, reagent application rates, size fractions, specific gravity, and coal quality at specific locations from raw feed through clean coal products and tailings.

10.2MINERALIZATION SAMPLE REPRESENTATION

Coal deposits originate in flat, low-lying ground within deltas, alluvial plains, and coastal systems, and as such are a relatively homogeneous, sedimentary mineral occurrence. The deposit within the Berwind Complex area exhibits homogeneous characteristics and does not show any substantial variations in mineralization types or styles that would adversely affect processing of the coal.  Sample data are well representative of the deposit as a whole.

10.3ANALYTICAL LABORATORIES

Coal sample analyses performed by Precision are described in Section 8.2.1.  Preparation plant circuitry performance is maintained by plant staff through the plant monitoring systems.  SGS performs daily analysis on the collected clean coal samples from automated samplers and any raw coal samples collected. Typical analysis on daily runs is proximate analysis only plus oxidation. Train and sublot samples with petrographics and rheology are performed per individual customer specifications.

November 22, 2022

Page 43


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

10.4RELEVANT RESULTS AND PROCESSING FACTORS

Coal recovery and resulting product qualities are primary concerns for any coal preparation plant.  A coal preparation plant’s recovery and resulting quality of its saleable products are dependent on ROM coal quality and the efficiency at which non coal impurities are removed by the preparation plant process. Tracking and adjusting throughput rates for different plant circuitry, based on ROM coal feed quality, are critical to plant efficiency and product quality. The Berwind Preparation Plant processes ROM coal at specific gravities ranging from 1.50 to 1.65 in order to produce saleable metallurgical coal products, depending on customer specifications.

Historical (2018 through 2021) and projected LOM Plan preparation plant recovery are shown on Figure 10.4-3.

Figure 10.4-1 Preparation Plant Recovery

Graphic

Preparation plant recovery and saleable product quality are expected to track closely with the modeled recovery from raw coal analysis, once adjusted for out of seam dilution (OSD) mined by the surface and underground mines.

November 22, 2022

Page 44


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Historical preparation plant recovery from 2018 through 2021, based on plant belt scale records, is summarized in Table 10.4-1 as follows:

Table 10.4-1 Historical Preparation Plant Recovery

    

2018

    

2019

    

2020

    

2021

 

Raw tons processed

1,594,469

835,868

885,269

264,239

Clean tons processed

494,378

292,897

267,675

119,542

Plant Yield (%)

31.0

35.0

30.2

45.2

The testing procedures described above provide validation for modeled data and help to ensure coal sales specifications are met for resulting saleable coal products.  The testing also helps to maintain preparation plant efficiency at a high level so that processing costs are minimized.

10.5DATA ADEQUACY

Ramaco employs testing and analytical procedures in accordance with industry standards, which result in efficient preparation plant operations and provides the necessary quality control to meet product quality and quantity projections.  The testing performed is sufficient to support the projected preparation plant yield and saleable product quality for the LOM Plan.

November 22, 2022

Page 45


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

11.0

MINERAL RESOURCE ESTIMATES

The coal resources, as of December 31, 2021, are reported as in-place resources and are exclusive of reported coal reserve tons (see Section 12.0 for reserve tonnage estimates).  Resources are reported in categories of Measured, Indicated, and Inferred tonnage in accordance with Regulation S-K Item 1302(d).

In addition to the currently active and planned mines, there are numerous other resource areas within the Berwind Complex which Ramaco may plan and/or permit at a future date.

11.1KEY ASSUMPTIONS, PARAMETERS, AND METHODS

Data Sources

Planimetric data was provided by Ramaco in AutoCAD format and primarily included base map information such as rivers, drainages, roads, mine features, and property boundaries.

Ramaco provided WEIR drillhole data, which included survey, lithology, and coal quality information. This data was provided in different formats including Excel, ASCII files and PDFs. Geophysical logs, coal quality certificates, driller’s logs, geologist’s logs, downhole deviation data, and drillhole survey records were provided as scanned PDF files and AutoCAD drawing files. Data was provided for 4,925 drillholes, 4,680 holes of which are included in the geological model.

In-mine seam thickness and floor measurement from previous operations’ mine maps were provided in tabular file format. These mine measurements included 360 data points. Mine measurement data points were used to model coal seam thickness and structure but were not used as points of observations in estimating resource confidence.

Coal quality data for 621 drillholes was provided for the Berwind Complex.  Of the 621 drillholes, 555 holes were used in the quality model.  Data was provided in Excel format along with quality certificates in PDF.

Reasons for excluding drillhole quality samples in the modeling process included:

·

Poor core recovery noted in the drillers logs.

·

Quality logs that could not be matched to a drillhole.

November 22, 2022

Page 46


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

·

The qualities listed for the hole were not relevant to the model (for example raw Btu/lb. or sulfur were supplied, but not final product Btu/lb. or sulfur). The only relevant raw values used are specific gravity and raw ash.  Both are derivable from one another and have bearing on estimated in-place tons.

·

Analyses were not performed at the appropriate wash specific gravity

Geological Model

The Berwind Complex geological model was developed by using seam surface grids that were created in Datamine’s MineScape® Stratmodel (MineScape) geological modeling software.

Topography data was gridded using MineScape software and a grid cell size of 100 feet by 100 feet from the USGS on-line 3-D Elevation Project data source. The resolution of the topography data is 1/3 arc-second, which results in approximately a 30 by 30 feet data point spacing.  The gridded USGS topography contours were compared to drillhole collars.  WEIR investigated significant collar elevation discrepancies. Most differences are due to original drillhole locations being covered with burden or being subsequently mined.

The seam surfaces and thicknesses were created by loading the drilling and mine measurement data into MineScape and gridding the seam intercepts using a grid cell size of 100 feet by 100 feet.  The parameters used to create the model are defined in the MineScape modeling schema which is a specification of modeling rules that is created for the site. The MineScape interpolators that were used in this study are common in most mine planning software packages. The Planar interpolator is a triangulation method with extrapolation enabled.  Finite Element Analysis (FEM) is a widely used method for numerically solving differential equations arising in engineering and mathematical modeling. A trend surface is used in MineScape to promote conformability for the modeled seams to regional structures such as synclines, anticlines, or simply seam dip.  MineScape caters to using different interpolators for thickness, roofs and floors (surfaces), and the selected trend surface as they are all modeled separately. The interpolator used for each of these items is selected on the basis of appropriateness to the data sets involved, as well as modeling experience.  Stratigraphic Model Interpolators are shown in Table 11.1-1, as follows:

Table 11.1-1 Stratigraphic Model Interpolators

Interpolator

    

Parameter

    

Power/Order

 

Planar

Thickness

0

FEM

Surface

1

Planar

Trend

0

November 22, 2022

Page 47


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Ninety-eight (98) coal seams (including seam splits) were modeled for the Berwind Complex.  A summary of drillhole statistics for the 19 seams found to have economic potential are shown in Table 11.1-2.

Table 11.1-2 Drillhole Statistics

Average

Minimum

Maximum

Standard

 

In Mine

Number of

Thickness

Hole

Thickness

Hole

Thickness

Deviation

CODE

    

Seam

    

Plan

    

Intercepts

    

(Feet)

    

Name

    

(Feet)

    

Name

    

(Feet)

    

(Feet)

UPB2

Upper Banner 2

No

163

1.26

J-328

0.08

J-542

4.32

0.85

KDY2

Kennedy 2

No

917

1.99

20

0.04

04BI113

9.50

1.25

RED3

Red Ash 3

No

788

0.91

VA-160

0.02

CBMW49A

4.30

0.76

RED2

Red Ash 2

No

1755

2.51

25

0.08

80RU-8

8.00

0.98

JWB3

Jawbone 3

Yes

2110

2.02

KC00-03

0.05

06AW114A

8.00

0.97

JWB1

Jawbone 1

Yes

2120

2.51

L053

0.05

85RU-53

11.74

1.18

TL22

Tiller 2-2

Yes

1270

1.28

96VA283

0.08

00-VA-301

7.70

0.90

TL12

Tiller 1-2

Yes

1030

1.48

VA-157

0.03

07BB48A

7.20

1.10

USB2

Upper Seaboard 2

No

944

1.66

73332

0.01

03DGL58

7.08

1.02

GCK2

Greasy Creek 2

No

1804

1.47

75KC12

0.05

07AV150

8.40

0.98

LSB2

Lower Seaboard 2

No

1849

1.68

OLGA-13

0.08

74AM57

7.75

1.10

P114

Pocahontas 11

No

2166

2.60

75AM106

0.01

GPPC-010

12.00

1.01

P102

Pocahontas 10

No

1794

1.19

75AM106

0.01

01DGTA16

6.40

0.72

LHP1

Lower Horsepen 1

No

937

1.49

VA-145

0.05

VA-57

6.33

0.83

PO92

Pocahontas 9-2

No

1160

1.97

78AM160

0.01

84AM167

16.40

1.40

PO91

Pocahontas 9-1

No

512

1.63

05DGTA64

0.10

78A224

8.30

1.40

PO42

Pocahontas 4

Yes

1289

2.24

B67

0.08

84AM171

8.55

1.94

PO32

Pocahontas 3

No

1456

2.49

05AY140

0.03

VA-206

9.25

1.86

SQJ2

Squire Jim

No

1003

1.79

95VA277

0.06

77AM132

8.95

1.37

The gridded coal seam structure and coal seam thicknesses were validated against drillhole information to ensure that the data was properly modeled.  Inconsistencies between modeled seam surfaces and surrounding drillholes were investigated and any confirmed errors in the drillhole data or model parameters were corrected.  This process was repeated until a final version of the model was developed.

Coal Quality Model

The drillhole data described previously in this report were used to create a washed coal quality model that included raw ash and raw relative density.  The washed quality model values were based on a specific gravity of 1.50.

November 22, 2022

Page 48


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

The drillholes were verified to ensure that the seam depths used in the lithology file matched the sample depths in the quality file.  Coal quality samples were loaded into MineScape and composited against the drillhole thicknesses.  The composited values were then gridded using a grid cell size of 200 feet by 200 feet and the inverse distance weighted (squared) interpolator.  The following quality data was modeled for all seams:

·

Raw

Ø

Ash, Dry weight percent

Ø

Relative Density

·

Float @ 1.50 Specific Gravity

Ø

Ash, Dry weight percent

Ø

Calorific Value, Dry Btu/lb

Ø

Total Sulfur, Dry weight percent

Ø

Volatile Matter, Dry weight percent

Ø

Audibert-Arnu Maximum Dilation (ARNU), Dry percent

Ø

Coal Oxidation by Light Transmittance, Dry percent

Ø

Total Inerts, Dry weight percent

Ø

Rank Index

Ø

Composition Balance Index

Ø

Gieseler Maximum Fluidity, Dry DDPM

Ø

Hargrove Grindability Index

Ø

Reflectance (ROMAX), Dry percent

Ø

Calculated Stability Index

Ø

Free Swell Index

Ø

Yield, weight percent

Quality contours were generated from the grids to check outlier values.

Additional Resource Criteria and Parameters

Based on WEIR’s review and evaluation of the data and plans relative to the Berwind Complex, resource estimation criteria were applied to ensure reported mineral resource tonnage has a reasonable prospect for economic extraction.  Resource criteria and parameters for the Berwind Complex are as follows:

·

Resources were estimated as of December 31, 2021.

·

Underground areas where coal thickness did not meet a minimum thickness of 2.0 feet were excluded from the resource estimate.

·

Underground areas within 200 feet of old mine workings were excluded from resource estimates.

·

Underground areas with less than 100 feet of cover were excluded from resource estimates.

·

Surface and highwall mining areas where coal thickness did not meet a minimum thickness of 1.0 feet were excluded from the resource estimate.

November 22, 2022

Page 49


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

·

Surface areas, where there was no subsequent highwall mining, and where stripping ratio exceeds 20:1, were excluded from the resource estimate.

·

Tonnage outside of current LOM plans, but within existing property control, and meeting the criteria listed here, is classified as Resource tonnage and is reported exclusive of Reserve tonnage.

·

Coal density (pounds per cubic foot) is based on apparent specific gravity data from dill holes and channel samples, where available.  Otherwise, it is based on raw coal ash (dry basis) using the formula [1.25+(Ash/100)] x 62.4 pounds per cubic foot

11.2ESTIMATES OF MINERAL RESOURCES

The coal resources, as of December 31, 2021, are reported as in-place resources and are exclusive of reported coal reserve tons (see Section 12.0).  Resources are reported based on the coal resource estimate methodology described and are summarized in Table 11.2-1 as follows:

Table 11.2-1 In-Place Coal Resource Tonnage and Quality Estimate as of December 31, 2021

Coal Quality (Dry Basis)

Raw

Average Coal

Relative

Mine

Area

Thickness

In-Place Resources (000 Tons)

Ash

Density

Area

    

Seam

    

(Acres)

    

(Feet)

    

Measured

    

Indicated

    

Total

    

Inferred

    

(%)

    

(Lbs/CF)

Berwind

Red Ash 2

2,420

3.49

15,740

15,740

8.3

86.48

Tiller

2,210

3.83

11,230

11,230

22.4

92.68

Greasy Creek 2

675

2.33

3,325

3,325

30.6

97.27

Pocahontas 11

1,295

3.10

8,030

8,030

22.6

91.73

Pocahontas 10

2,055

2.82

11,075

11,075

15.9

87.94

Pocahontas 9-2

4,140

3.15

25,155

45

25,200

17.0

88.61

Pocahontas 9-1

5,145

3.04

9,700

15,920

25,620

4,495

17.0

88.61

Pocahontas 4

2,587

2.97

9,870

9,870

26.8

94.90

Pocahontas 3

10,780

2.84

60,140

400

60,540

17.7

89.00

Squire Jim

13,230

2.41

42,950

24,460

67,410

33.9

101.02

44,537

197,215

40,825

238,040

4,495

Big Creek

Red Ash 3

1,275

2.04

5,025

5,025

17.0

88.61

Red Ash 2

1,420

2.75

7,495

7,495

4.5

87.98

Jawbone 3

1,400

2.27

6,445

6,445

24.0

92.98

Jawbone 1

1,520

2.82

8,665

8,665

9.5

92.98

Tiller 1-2

495

2.67

2,520

2,520

21.7

87.36

6,110

30,150

30,150

November 22, 2022

Page 50


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Coal Quality (Dry Basis)

Raw

Average Coal

Relative

Mine

Area

Thickness

In-Place Resources (000 Tons)

Ash

Density

Area

   

Seam

   

(Acres)

   

(Feet)

   

Measured

   

Indicated

   

Total

   

Inferred

   

(%)

   

(Lbs/CF)

Knox Creek

Upper Banner 2

450

2.27

2,060

2,060

17.0

88.61

Kennedy 2

1,775

2.72

9,020

9,020

3.0

85.65

Red Ash 2

12,485

2.65

59,450

35

59,485

4.7

82.41

Jawbone 3

8,420

3.13

50,260

50,260

5.4

87.43

Jawbone 1

15,025

3.21

93,500

150

93,650

13.6

89.46

Upper Seaboard 2

450

2.72

2,340

2,340

17.0

88.61

Greasy Creek 2

290

4.29

2,640

2,640

43.0

97.93

Lower Seaboard 2

760

2.75

4,470

4,470

30.9

98.19

Pocahontas 11

770

4.72

7,010

7,010

17.0

88.61

Lower Horsepen 1

1,425

2.89

7,965

7,965

17.0

88.61

Pocahontas 9-2

2,030

2.80

8,240

2,750

10,990

17.0

88.61

Pocahontas 4

1,605

2.97

8,300

3,830

12,130

26.6

94.90

Pocahontas 3

710

2.77

3,780

3,780

17.0

88.61

46,195

259,035

6,765

265,800

Berwind Complex

Total

96,842

486,400

47,590

533,990

4,495

Notes:

·

Mineral Resources reported above are not Mineral Reserves and do not meet the threshold for reserve modifying factors, such as estimated economic viability, that would allow for conversion to mineral reserves. There is no certainty that any part of the Mineral Resources estimated will be converted into Mineral Reserves. Mineral Resources reported here are exclusive of Mineral Reserves.

·

Resource probable economic mineability based on underground minable resources with 2.0 feet minimum seam thickness, surface and highwall mines with 1.0 feet minimum seam thickness, area mining with a cutoff stripping ratio of 20:1, and primarily metallurgical low and mid volatile coal product realizing a sales price of $142 per ton at a cash cost of $77 per clean ton (FOB Mine)

·

Numbers in the table have been rounded to reflect the accuracy of the estimate and may not sum due to rounding

11.3

TECHNICAL AND ECONOMIC FACTORS FOR DETERMINING PROSPECTS OF ECONOMIC EXTRACTION

A Preliminary Feasibility Study was conducted to assess the prospects for economic extraction of coal within the Berwind Complex.

Ramaco’s forecasted Berwind Complex FOB mine coal sales prices are $169.46 per ton in 2022, $137.57 in 2023, $139.14 in 2024 and $139.56 thereafter through 2039. Ramaco’s sales price projections conform to published forward price curves for coal of similar quality to that of the Berwind Complex.  The sales price is further supported in Section 16.0 of this report.

Capital expenditures are discussed in further detail in Section 18.1 and are projected to average $10.92 per ton over the Berwind Complex LOM Plan, compared to actual capital expenditures of $110.46 per ton in 2018 through third quarter 2021, which included high development capital and low production for the Berwind No. 1 Mine.

November 22, 2022

Page 51


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Operating cash costs are discussed in further detail in Section 18.2 and are projected to average $76.79 per ton over the Berwind Complex LOM Plan, compared to actual Berwind Complex operating cost of $123.79 per ton in 2018 through third quarter 2021. The historical costs were elevated as a result of development of the thinner Pocahontas 3 Seam to access the Pocahontas No. 4 Seam at the Berwind No. 1 Pocahontas 4 Deep Mine.

Total projected capital expenditures and operating cost of $87.72 per ton and a coal sales price per ton as indicated above, provide a reasonable basis for WEIR to determine that all underground mineable coal of thickness greater than 2.0 feet, surface and highwall mineable coal with seam thickness greater than 1.0 feet, and surface and contour mineable coal with stripping ratio of approximately 20:1 or lower, has prospects of economic extraction within the Berwind Complex.

11.4MINERAL RESOURCE CLASSIFICATION

Mineral Resource estimates prepared for the Berwind Complex are based on the Regulation S-K Item 1302(d), which established definitions and guidance for mineral resources, mineral reserves, and mining studies used in the United States. The definition standards relative to resources are as follows:

Mineral Resource:

Mineral resource is a concentration or occurrence of material of economic interest in or on the Earth's crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A mineral resource is a reasonable estimate of mineralization, taking into account relevant factors such as cut-off grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable.  It is not merely an inventory of all mineralization drilled or sampled.

·

Inferred mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The level of geological uncertainty associated with an inferred mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an inferred mineral resource has the lowest level of geological confidence of all mineral resources, which prevents the application of the modifying factors in a manner useful for evaluation of economic viability, an inferred mineral resource may not be considered when assessing the economic viability of a mining project, and may not be converted to a mineral reserve.

November 22, 2022

Page 52


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

·

Indicated mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of adequate geological evidence and sampling. The level of geological certainty associated with an indicated mineral resource is sufficient to allow a qualified person to apply modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an indicated mineral resource has a lower level of confidence than the level of confidence of a measured mineral resource, an indicated mineral resource may only be converted to a probable mineral reserve.

·

Measured mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of conclusive geological evidence and sampling. The level of geological certainty associated with a measured mineral resource is sufficient to allow a Qualified Person to apply modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. Because a measured mineral resource has a higher level of confidence than the level of confidence of either an indicated mineral resource or an inferred mineral resource, a measured mineral resource may be converted to a proven mineral reserve or to a probable mineral reserve.

Geostatistical methods were applied to drillhole and mine measurement coal thickness data for four primary seams at the Berwind Complex to develop variogram ranges (radii) used for resource classification.  Figure 11.4-1 illustrates the variogram for the Tiller No. 1 Seam, containing 649 seam thickness measurements. Table 11.4-1 shows the sample count, Measured and Indicated resource ranges determined by the variogram model, and average sample spacing in feet for the Jawbone No. 1, Pocahontas No. 4, and Tiller No.1 and No. 2 seams at the B.  Variographic ranges were similar in each seam, demonstrating seam thickness continuity over 9,000 feet in each case. Theoretical ranges estimated for Measured (to 3,000 feet) and Indicated (to 9,200 feet) resources in the analysis demonstrates the spatial continuity of mineable coal seam thickness at the Berwind Complex.

November 22, 2022

Page 53


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Figure 11.4-1 Variogram Model Tiller No. 1 Seam Thickness

Graphic

Table 11.4-1 Theoretical Variogram Ranges

Variogram

    

Figure

    

Sample
Count

    

Measured
Range (ft.)

    

Indicated
Range (ft.)

 

Jawbone No. 1 Seam

1

1,290

2,250

6,800

Pocahontas No. 4 Seam

2

865

7,300

22,000

Tiller No. 1 Seam

3

649

3,050

9,200

Tiller No. 2 Seam

4

702

4,800

14,500

As depicted above, variability in drillhole thickness measurements is highly correlated with the distance between individual drillholes, in particular within the theoretical ranges for Measured and Indicated tonnage. Additionally, WEIR’s generation and review of the applicable quality contours further supports the continuity of coal quality throughout the deposit. Table 11.4-2 shows overall quality parameters for the coal seams at the Berwind Complex.

November 22, 2022

Page 54


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Table 11.4-2Statistics for Berwind Complex Composited Samples

Quality Parameter

    

Number of
Samples

    

Total Sample
Length (ft)

    

Minimum
Value

    

Maximum
Value

    

Average 

Value

 

Audibert-Arnu Maximum Dialation (%)

116

314

0

300

188

Composition Balance Index

48

135

0.51

7.63

5.38

Free Swell Index

374

1,020

3.1

9

8.6

Gieseler Maximum Fluidity (DDPM)

219

586

1

30,000

9,457

HGI

17

60

94

105

99

Inerts (%)

61

169

8.2

36.3

25.8

Raw Ash (%)

357

984

2.7

62.1

20.4

In-Place Relative Density

925

2,585

1.27

1.96

1.44

Reflectance (ROMAX, %)

112

323

1.2

1.71

1.45

Rank

48

135

0.6

7.0

4.7

Stability Index

99

289

42.0

65.0

55.7

Coal Oxidation by Light Transmittance (%)

17

60

97.0

99.0

97.7

Ash (%)

809

2,223

2.0

19.1

5.9

BTU/lb

507

1,361

12,509

15,505

14,627

Sulfur (%)

803

2,206

0.37

3.50

0.85

Volatiles (%)

721

1,983

15.5

37.4

26.2

Yield (%)

923

2,582

10.4

100.0

74.8

Note: Unless otherwise specified, analyses are on a Dry Basis for coal washed at 1.50 specific gravity

Within the Measured and Indicated ranges, WEIR has demonstrated a level of geological confidence sufficient to allow for the application of modifying factors to support detailed mine planning and evaluation of the economic viability of the deposit. Beyond the four coal seams mentioned above, there are no outlier seams being considered for resources that display anomalous behavior in comparison.  As such, classification radii utilized by WEIR in this study are as follows:

·

Measured: 0 - 3,000 feet (based on 905 observations informing estimate of coal thickness within this range)

·

Indicated: 3,000 - 9,200 feet (based on 905 observations informing estimate of coal thickness within this range)

·

Inferred: greater than 9,200 feet (based on 905 observations informing estimate of coal thickness within this range)

11.5UNCERTAINTY IN ESTIMATES OF MINERAL RESOURCES

Mining is a high risk, capital-intensive venture and each mineral deposit is unique in its geographic, social, economic, political, environmental, and geologic aspects.  At the base of any mining project is the mineral resource itself.  Potential risk factors and uncertainties in the geologic data serving as the basis for deposit volume and quality estimations are significant considerations when assessing the potential success of a mining project.

November 22, 2022

Page 55


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Geological confidence may be considered in the framework of both the natural variability of the mineral occurrence and the uncertainty in the estimation process and data behind it.  The mode of mineralization, mineral assemblage, geologic structure, and homogeneity naturally vary for each deposit.  Structured variability like cyclic depositional patterns in sedimentary rock can be delineated mathematically with solutions like trend surface analysis or variography. Unstructured variability, in the distribution of igneous rock composition, for example, is more random and less predictable.

The reliability of mineral resource estimation is related to uncertainties introduced at different phases of exploration. Resources meeting criteria for Measured, Indicated, and Inferred categories are determined by the quality of modeled input data, both raw and interpreted.  An exploration program comprises several stages of progressive data collection, analysis, and estimation, including:

Geological data collection
Geotechnical data collection
Sampling and assaying procedures
Bulk density determination
Geological interpretation and modeling
Volume and quality estimation
Validation
Resource classification and estimation

Error may be introduced at any phase.  Data acquisition and methodologies should be properly documented and subject to regular quality control and assurance protocols at all stages, from field acquisition through resource estimation.  Managing uncertainty requires frequent review of process standards, conformance, correctional action, and continuous improvement planning.  Risk can be minimized with consistent exploration practices that provide transparent, backwards traceable results that ultimately deliver admissible resource estimates for tonnage and quality.

As discussed in Sections 8.0, 9.0, and 10.0, it is WEIR’s opinion that Ramaco’s methodology of data acquisition, record-keeping, and QA/QC protocols are adequate and reasonable for resource estimation at the Berwind Complex.

November 22, 2022

Page 56


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

In summary, WEIR has reviewed all geologic and geotechnical data inputs, collection protocols, sampling, assaying, and laboratory procedures serving as the basis for the deposit model, its interpretation, and the estimation and validation of the volume and quality of coal resources at the Berwind Complex. The spatial continuity of all seams with resource attributes at the Berwind Complex is well demonstrated by professionally developed, well maintained, quantitative and qualitative data. WEIR finds no material reason, regarding geologic uncertainty, that would prohibit acceptably accurate estimation of mineral resources.

11.6ADDITIONAL COMMODITIES OR MINERAL EQUIVALENT

There are no other commodities or minerals of interest within the Berwind Complex resource area other than the coal deposit discussed in this TRS.

11.7RISK AND MODIFYING FACTORS

The existing and planned underground mines in the complex are above drainage and relatively dry, which decreases risk for bad floor conditions from the presence of underclays.  Similar drainage conditions are present at the Big Creek Surface and Highwall Mine, resulting in favorable surface mining conditions, as Ramaco has so experienced thus far.

The consistency of the seams within the complex and good exploration drilling coverage combine to reduce geological risks at the complex.  This also relates to product quality risks, which WEIR sees as low for the same reasons.  The appearance and disappearance of partings within mined benches is expected and is difficult to accurately map without extensive drilling.  However, these partings are of little consequence to the final product, apart from the marginal additional processing costs involved at the preparation plant for non-coal partings removal.

A large percentage (approximately 97 percent) of currently planned coal leases have been secured by Ramaco at the Berwind Complex and WEIR finds no high risks associated with them.   Resources that exist in currently unplanned areas are well situated for potential mining as the total size of the uncontrolled areas are not significant in comparison to the total potential mining areas.

Risk is also associated with volatility of coal market prices. Significant variations in operating costs, capital expenditures, productivity, and coal sales prices could impact the economic mineability of the Berwind Complex.

November 22, 2022

Page 57


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Unforeseen changes in legislation and new industry developments could alter the performance of Ramaco by impacting coal consumer demand, regulation and taxes, including those aimed at reducing emissions of elements such as mercury, sulfur dioxides, nitrogen oxides, particulate matter or greenhouse gases. The emphasis on reducing emissions, however, is more of a concern for mines producing a thermal coal product, as opposed to the metallurgical coal produced from the Berwind Complex.

November 22, 2022

Page 58


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

12.0

MINERAL RESERVE ESTIMATES

12.1KEY ASSUMPTIONS, PARAMETERS, AND METHODS

The conversion of resources to reserves at the Berwind Complex considers the effects of projected dilution and associated loss of product coal quality, projected coal sales prices, operating costs, regulatory compliance requirements, and mineral control.  These factors all determine if the saleable coal product will be economically mineable.  The design of executable mine plans that accommodate the planned mining equipment and facilities and provide a safe work environment is also considered.

For Ramaco’s underground room and pillar operations, it should be noted that retreat mining will be implemented in most of the existing and planned underground operations within the complex. This will result in over 80 percent mining recovery of coal and will necessitate planned subsidence, all of which are addressed in the respective mining permits.

The Berwind Complex mine layouts have several key variables that will largely impact coal recovery. Pillar and panel dimensions are based on minimum, maximum, and optimal equipment operating parameters, as well as geotechnical considerations relative to the safety of the mining operations and subsidence predictions.

Based on a mine’s historical performance and projected mineral continuity, the mine design is the primary consideration, apart from mineral resource classification, whereupon resources are converted to reserves at the Berwind Complex.

Based on WEIR’s review and evaluation of the Berwind Complex LOM plans, the justification for conversion of resources to reserves was based on specific criteria.  In addition to the criteria stated in Section 11.0 for resources, the following criteria were used to estimate reserves for the Berwind Complex:

·

Reserves were estimated as of December 31, 2021.

·

Underground mining recovery of 50 to 80 percent (dependent on whether retreat mining can be performed), surface mining recovery of 90 percent, and highwall mining recovery of 40 percent were assumed.

·

A minimum of two inches of out of seam dilution is included in the ROM underground tonnage estimates, except in areas where the total seam thickness is greater than the maximum mining height.

November 22, 2022

Page 59


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

·

A highwall mining maximum penetration depth of 800 feet, and a minimum of 400 feet was assumed.

·

The point of reference for reserve estimates is post preparation plant processing and recoverable tons were adjusted for a theoretical preparation plant yield based on drillhole and channel sample analyses washed at a 1.50 specific gravity.

·

A conservative preparation plant efficiency factor of 95.0 percent was applied to reflect actual performance of the preparation plant, compared to theoretical laboratory results at a 1.50 specific gravity.

·

The estimate of reserve tons includes areas that are exclusively within the current Berwind Complex LOM plans.

12.2ESTIMATES OF MINERAL RESERVES

The coal reserves that represent the economically viable tonnage controlled by Ramaco at the Berwind Complex, based on the coal reserve estimate methodology described, are shown in Table 12.1-3 as follows:

Table 12.1-3 Recoverable Coal Reserve Tonnage and Quality Estimate as of December 31, 2021

Coal Quality (Dry Basis)

 

Raw

Average Coal

Clean Recoverable Tons (000)

Relative

Product

Area

Thickness

Reserves

Ash

Density

Area / Mine / Seam

    

Quality

    

(Acres)

    

(Feet)

    

Proven

    

Probable

    

Total

    

(%)

    

(Lbs/CF)

Berwind

Pocahontas No. 1 Deep

Pocahontas 4 Rider

Low Vol

2,905

0.85

1,705

1,705

25.04

93.63

Pocahontas 4

Low Vol

2,905

3.39

7,590

25

7,615

23.02

92.35

Triad Pocahontas 4 Deep Mine

Pocahontas 4

Low Vol

35

4.03

90

90

5,845

9,385

25

9,410

Big Creek

Surface and Highwall Mine

Jawbone

Mid Vol

20

1.27

30

30

8.19

89.50

Tiller

Mid Vol

175

2.61

420

420

19.09

89.75

Jawbone Deep Mine

Jawbone

Mid Vol

400

2.95

670

670

10.91

93.39

595

1,120

1,120

Berwind Complex Grand Total

6,440

10,505

25

10,530

Notes:

·

Clean recoverable reserve tonnage based on underground mining recovery of 50 to 80 percent (contingent upon retreat mining capability), 90 percent for surface mining, 40 percent for highwall mining, theoretical preparation plant yield, and a 95 percent preparation plant efficiency

November 22, 2022

Page 60


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

·

Mineral Reserves estimated based on predominately low and mid volatile metallurgical coal product at a sales price of $142 per ton and cash cost of $77 per clean ton (FOB Mine)

·

Numbers in the table have been rounded to reflect the accuracy of the estimate and may not sum due to rounding

·

Mineral Reserves are reported exclusive of Mineral Resources

WEIR completed a validation check of its tonnage estimates by using the model to calculate the theoretical tonnage of the areas mined in 2021 and comparing the results to the actual production tonnage mined for the Triad Pocahontas 4 Deep mine in 2021. The results of the validation are shown in Table 12.1-4.

Table 12.1-4 Reserve Validation

Mine Area

    

Seam

    

Actual 2020
Production Tons

    

Estimated 
Model

    

Variance
(%)

 

Triad Pocahontas 4 Deep Mine

Pocahontas 4

108,000

115,000

1.06

12.3ESTIMATES OF RESERVE CUT-OFF GRADE

The seams within the Berwind Complex display consistent quality attributes representative of high-quality metallurgical coal. The diversity of volatiles in these seams involves individual seam products ranging from low to high volatile A, with the overall average being high quality low and mid volatile products. The main variable is OSD which results in additional preparation plant costs to obtain a saleable coal product. Preparation plant throughput is also a consideration. However, preparation plant ROM throughput is not a limitation at the Berwind Complex, and the incremental cost of “washing out” the additional OSD as a result of minimum mining heights for equipment clearance does not forgo mining coal seams with thicknesses of 2.0 feet. Mining heights below 2.0 feet result in increased operational difficulty given equipment limitations and capabilities.  WEIR did not discover any areas within the complex where washed coal quality parameters for planned mining tonnage was deficient relative to maintaining a high-quality metallurgical grade coal status. The coal on the property is consistently of high-quality.

In summary, based on Ramaco’s Berwind Complex historical and consistent saleable coal product quality, current coal sales contract specifications, and the projected coal quality that has been modeled, WEIR does not foresee any deviations that would adversely affect future saleable coal product.

November 22, 2022

Page 61


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

12.4MINERAL RESERVE CLASSIFICATION

WEIR prepared the Berwind Complex reserve estimates in accordance with Regulation S-K Item 1302(e), which establishes guidance and definitions for mineral reserves to be used in the United States. The SEC Regulation S-K 1300 Definition Standards relative to reserves are as follows:

Modifying factors are the factors that a qualified person must apply to indicated and measured mineral resources and then evaluate to establish the economic viability of mineral reserves. A qualified person must apply and evaluate modifying factors to convert measured and indicated mineral resources to proven and probable mineral reserves. These factors include but are not restricted to: Mining; processing; metallurgical; infrastructure; economic; marketing; legal; environmental compliance; plans, negotiations, or agreements with local individuals or groups; and governmental factors. The number, type and specific characteristics of the modifying factors applied will necessarily be a function of and depend upon the mineral, mine, property, or project.

A mineral reserve is an estimate of tonnage and grade or quality of indicated and measured mineral resources that, in the opinion of the qualified person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a measured or indicated mineral resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted.

·

Probable mineral reserve is the economically mineable part of an indicated and, in some cases, a measured mineral resource.

·

Proven mineral reserve is the economically mineable part of a measured mineral resource and can only result from conversion of a measured mineral resource.

Within the extent of the LOM Plan for the Berwind Complex, Measured Resources were converted to Proven Reserves and Indicated Resources were converted to Probable Reserves.

November 22, 2022

Page 62


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

12.5COAL RESERVE QUALITY AND SALES PRICE

Berwind Complex coal quality was determined by modeling the drillhole coal quality for the reserve areas.  The average dry basis coal quality by seam, for raw coal and washed coal at a 1.50 specific gravity, for the reserves are shown in Table 12.5-1 as follows:

Table 12.5-1 Average Reserve Coal Quality

    

Coal Quality (Dry Basis)

 

Raw

Washed @ 1.50 Specific Gravity

Relative

Calorific

Theoretical

Ash

Density

Ash

Sulfur

Volatile

Value

Plant

Seam

    

(%)

    

(Lbs/CF)

    

(%)

    

(%)

    

Matter

    

(Btu/lb)

    

Yield (%)

Berwind

Pocahontas 4

23.02

92.4

6.33

0.64

19.40

14,170

70.70

Big Creek

Jawbone 3

8.19

89.5

7.48

0.76

29.13

13,890

71.33

Tiller 1-2

19.09

89.8

5.26

0.66

28.87

14,780

75.50

The average quality for the reserve tons shows that the Berwind Complex ranges from a high quality low volatile to a high quality mid volatile metallurgical coal product, all which possess good coking properties. The range of dry washed volatile matter is between approximately 19.40 and 29.13 percent, with an average of 20.3 percent.  The average proximate analyses reflect an overall coal product that is relatively low in ash and sulfur, and high in calorific value. Other quality parameters such as ROMAX, Free Swelling Index, Audibert-Arnu Maximum Dilation, and Gieseler Fluidity indicate high quality metallurgical grade coal products.

Ramaco’s forecasted Berwind Complex FOB mine coal sales prices are $169.46 per ton in 2022, $137.57 in 2023, $139.14 in 2024 and $139.56 thereafter through 2039. Ramaco’s sales price projections conform to published forward price curves for coal of similar quality to that of the Berwind Complex.  The sales price is further supported in Section 16.0 of this report.

12.6RISK AND MODIFYING FACTORS

Due to the relatively high continuity of the coal seams within the Berwind Complex LOM plans (both in terms of structure and quality), geologic uncertainties do not appear to pose a significant mining risk.

The operating mines at Berwind Complex have good safety records and maintain diligent regulatory compliance. Workforce census has been and is expected to remain stable. The primary mining equipment is well-maintained, as observed from WEIR’s site visit, and has sufficient capacity to attain projected levels of productivity and production. This further contributes to the Berwind Complex being a relatively low risk operation.  As previously noted, mineral rights are acceptably secure for all operating and planned mines.

November 22, 2022

Page 63


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Coal recovery is an important aspect in assessing the economic viability of a mine.  Based on Ramaco’s historical extraction rates and generally conservative pillar design, WEIR does not anticipate significant deviation of product recovery in the future. For deep mines, aerial recovery is based on the pillar size that has been designed for the operation, which is dependent on depth of cover and overlying rock quality. The pillar design is most importantly intended to provide safe operation of the primary coal extraction efforts. WEIR utilized an average mining recovery of 50 percent for the Berwind Complex continuous miners for first mining and an additional 30 percent mining recovery for areas of retreat mining.  This is consistent with industry standards and with actual mining recovery reported by Ramaco.

Risk is also associated with the volatility of coal market prices. Significant variations in operating costs, capital expenditures, productivity, and coal sales prices could impact the economic mineability of the Berwind Complex. Economic analyses and associated sensitivities are further detailed in Section 19.0.

November 22, 2022

Page 64


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

13.0

MINING METHODS

The underground mining method at the Berwind Complex is room and pillar mining utilizing continuous miners. Mains and submains are generally developed on 120 feet by 90 feet centers.  Panels are generally developed on 70 feet by 70 feet centers, depending on depth of cover and exposed surface structure concerns with potential subsidence. Mine entry widths are approximately 20 feet for all entries. Retreat mining in the panels, where it is permitted, increases overall mining recovery to at least 80 percent. Due to lack of surface structures within the complex, retreat mining is planned for the majority of the underground mining areas, which will result in planned subsidence. Although Ramaco has subsidence rights, Ramaco acknowledges the rules and regulations in regard to measures to be taken to mitigate or remedy any material damage or diminution in value that may occur to surface lands, structures, or facilities due to subsidence.  No deep mining is proposed within 50 feet of gas wells.

The Big Creek Surface and Highwall Mine operations involve a mix of contour mining and area removal methods. The contour mining on the norther portion of the property is almost exclusively intended to accommodate subsequent highwall mining. To accommodate the subsequent highwall mining, a minimum contour mining bench width of 125 feet projected by WEIR. Concerns regarding stripping ratio for Ramaco’s contour operations are secondary in comparison to the access gained to coal seams to be mined by lower cost highwall mining.  The area removal method is planned in the southern portion of the mine plan where the economically feasible in-place stripping ratio of approximately 20:1 (BCY per ton) or less occurs.  One gas well on the property will be replaced at the expense of the well owner.

13.1GEOTECHNICAL AND HYDROLOGICAL MODELS

13.1.1Geotechnical Model

Ramaco bases its underground mine pillar design on; 1) the general characteristics of the roof, coal, and floor strata in concert with Analysis of Coal Pillar Stability (ACPS) and Analysis of Retreat Mining Pillar Stability (ARMPS) software which are both accepted industry standards, 2) experience in the mining industry, and 3) results from similar or adjacent mines.  Underground mining conditions at the Berwind Complex are consistent with roof and floor being primarily shales and sandstones, with competent coals seams (See Figure 6.3-1).  Pillars for first mining are designed according to minimum unconfined compressive strengths (UCS) of materials such that pillar stability is greater than 2.0.  In the currently active and planned underground mines on the Berwind Complex, the first mining protection zones are limited to small areas where there are intermittent streams with less than 200 feet of cover.

November 22, 2022

Page 65


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Generally speaking, the UCS of shale ranges from 2,000 to 20,000 pounds per square inch (psi) while sandstone ranges from 7,000 to 35,000 psi.  The compressive strength of the coal used in the coal pillar stability analysis is 900 psi.  This means that there is a safety factor of at least 2.0 above the safety factor in the coal pillar analysis, when using the lowest value for the compressive strength of shale.  Due to this large safety factor when using the minimum commonly accepted UCS value for shale, and since the only protection zones are for intermittent streams in areas of less than 200 feet of cover, Ramaco has waivers in its WVDEP and VDE permits for analysis of the engineering properties of soft rock.

The subsidence surveys have identified some gas wells and associated gas lines in proposed underground mining areas.  The owners of the gas wells have been identified on the Subsidence Survey Map in the associated WVDEP and VDE permits.  No mining is proposed within 50 feet of the gas wells.  No protection is proposed for the gas lines that lie within the proposed mining areas.

Ramaco has roof control plans for all of its permitted underground mines. The plans must be approved by the MSHA before mining can commence. The MSHA routinely performs inspections to ensure that the roof control plans are being properly implemented.

For surface mining operations, standing highwall configurations are not that maintained substantial to warrant specific geotechnical studies.  Maximum cut slopes and safety benches are maintained according to MSHA-approved Ground Control Plans.

For highwall mining operations, hole spacing is based on ACPS analysis and previous results in combination with accepted industry standards.  The maximum anticipated recovery within highwall mining areas is less than 50 percent, which should not result in subsidence.  No other measures are required to prevent or minimize subsidence or subsidence related damage.  Because no subsidence is anticipated from the proposed highwall mining, no plan for monitoring the extent of subsidence is proposed at this time. No water supplies are located above the proposed highwall mining areas.  The subsidence surveys have identified some gas wells and associated gas lines in proposed highwall mining areas.  The owners of the gas wells have been identified on the Subsidence Survey Map in the WVDEP and VDE permits.  No mining is proposed within 50 feet of the gas wells. One gas well will be replaced on the property at the well owner’s expense.  No protection is proposed for the gas lines that lie within the proposed highwall mining areas.

November 22, 2022

Page 66


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

In summary, no specific detailed geotechnical models or data sets have thus far been created for Ramaco’s existing or planned mining operations at the Berwind Complex. WEIR notes that to date, Ramaco has not experienced any significant stability problems at their Berwind Complex mines. Based on WEIR’s experience in the industry and Ramaco’s successful operating history, both in regard to geotechnical considerations, Ramaco is operating its mines in accordance with industry acceptable geotechnical evaluation and standards.

13.1.2Hydrogeological Model

The Berwind Complex is regionally within the Virginia Big Sandy River Basin and Upper Guyandotte River watershed of West Virginia.  The Clinch River, to the south of the complex, is the primary hydrological feature in the local area and is a tributary of the Tennessee River.  The major hydrogeological unit in the area is the Lower Pennsylvanian.

Recharge rates for aquifers in this area are relatively low at approximately 12 inches per year.  Transmissivity data for the Norton Formation in the region shows relatively high rates of 100 to 2000 square feet per day (Aquifer-Characteristics Data for West Virginia, Water-Resources Investigations Report 01-4036, USGS/West Virginia Bureau for Public Health, 2001).  These data both suggest unconfined aquifers, and this generally supports the hydrology sections of permits for the Ramaco mines on the property.

A 1993 study conducted by the USGS in cooperation with the VDE in the immediate vicinity further supports this and suggests that the primary aquifers with significant horizontal flow in the area are due to relatively shallow fracture flow systems.  Coal seams also act in horizontal flow systems typically resulting in discharge as springs or seeps on hill slopes, or recharge of coal seams at depth. The study found that as depth increases beyond 100 ft, hydraulic conductivity significantly decreases for strata other than coal. This results in little deep regional ground-water flow.

Due to the rural nature of the area, there are several cooperative and private water wells on and adjacent to the Berwind Complex. There are also structures that utilize the Public Service District water services, and those that utilize both. This ground water inventory information has been summarized by Ramaco in its permit applications.

November 22, 2022

Page 67


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

The operating and planned Ramaco mines will be constructed above drainage and above all domestic surface and groundwater sources. Due to above drainage construction and low aquifer recharge rates in the area, the Ramaco mines are relatively dry with little concern for water infiltration.  Fracturing and weathering are invariably present in varying degrees in shallow rocks throughout the property. Fracturing affects the hydrologic regime by controlling subsurface water flow (and thus weathering) due to the very low permeability of un-fractured strata.  Infiltration due to this fracturing is sometimes encountered but is insignificant to mine operations.

Surface Water Runoff Analyses are included in permit submittals and indicate that stream flows will not increase during or after mining, therefore there will be no increased potential for flooding or channel scouring. In general, diminution, or interruption of any water supply, as a result of the Ramaco mines, is not anticipated.

Groundwater inventories, water quality data, water balance, recharge and seepage rates have been reviewed in the approved permits and current permit revisions, including hydrologic impact assessments outlining risks, monitoring program detail, and mitigation obligations.  Ramaco’s approach to obtaining and managing its surface and groundwater data for the Berwind Complex has been demonstrated to be adequate and aligned with regulatory requirements and standard industry practices.  WEIR finds no material barriers to the continued success of the Berwind Complex regarding hydrologic impact or compliance.

13.1.3Other Mine Design and Planning Parameters

Mine ventilation is a primary design concern for underground mines. WEIR has reviewed Ramaco’s designs and planning for this aspect of its mining operations and has found no significant problems concerning adequacy of ventilation fans or fan locations.

Proximity to previously underground mined areas above or below the operating or planned underground mine is an important consideration at the Berwind Complex, since there are many areas that have been previously mined in many coal seams.  WEIR reviewed Ramaco’s mines in proximity to previous mine workings and associated fracture depths and cones used by Ramaco and found no concerns for its existing or planned operations.

Underground mine surface facilities and surface mining sites require drainage designs to control surface water runoff. WEIR has reviewed Ramaco’s designs, which have been approved in its WVDEP, VDEP, and NPDES permits, and found the designs to be adequate and consistent with industry standards.

November 22, 2022

Page 68


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

13.2PRODUCTION, MINE LIFE, DIMENSIONS, DILUTION, AND RECOVERY

13.2.1Production Rates

Berwind No. 1 Pocahontas 4 Deep Mine

Two continuous miners operate in a supersection at this mine.  Supersections are continuous miner sections with split ventilation that allows two continuous miners to operate simultaneously, which significantly enhances continuous miner section productivity.  Access is provided via slope from the Berwind No. 1 Pocahontas 3 Deep Mine, which will remain inactive for an undetermined period of time.  Ramaco commenced production at the Berwind No. 1 Pocahontas 4 Deep Mine in late 2021 after completion of the slope.  The mine currently employs approximately 44 people.

Triad Pocahontas 4 Deep Mine

One continuous miner operates at this mine.  Ramaco commenced production at this mine in January 2021. This mine currently employs approximately 40 people and is expected to be completed in the second quarter of 2022 where operations will effectively transfer to a second full supersection in the Berwind No. 1 Pocahontas 4 Deep Mine.

Big Creek Surface and Highwall Mine

The mine employs both contour mining and area removal mining methods. Highwall mining follows behind the contour mining. Stripping ratio averages approximately 20:1 BCY/ton, excluding highwall miner production. The highwall miner has the ability to penetrate approximately 800 feet into coal seams as thin as two feet in thickness.  Highwall mining in an area is avoided if the holes cannot average more than 400 feet in penetration, as a result of boundary restrictions or seam thickness shortcomings.

This relatively new Ramaco mine is a multiple seam operation involving the Jawbone and Tiller seams. The Tiller Seam is the only seam that is highwall mined. Ramaco started operations in early 2021 and currently employs a total of 33 people.

Planned Mines

Other planned mines that will start/re-start production in the future include:

·

Knox Creek Tiller Deep Mine (Jawbone 3 Seam, currently inactive)

·

Squire Jim No. 1 Deep Mine (Squire Jim Seam, startup date undetermined)

·

Laurel Fork Deep Mine (Pocahontas 3 Seam, scheduled for mid-2022 startup)

November 22, 2022

Page 69


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Actual clean coal production attained by the Berwind Complex for 2018 through 2021 is shown in Table 13.3.1-1 as follows:

Table 13.2.1-1 Berwind Complex Historical Clean Production

2018

   

2019

    

2020

    

2021

    

Average

 

Mine

    

Clean Tons

Berwind No. 1 Deep Mine

80,923

188,241

147,330

16,870

108,341

Big Creek Surface and Highwall Mine

45,330

45,330

Triad Pocahontas 4 Deep Mine

163,720

163,720

Berwind Complex Total

80,923

188,241

147,330

225,920

160,604

Actual and projected ROM and clean coal production, and preparation plant yield for the Big Creek Surface and Highwall Mine, and each of the underground mines for the Berwind Complex LOM Plan are shown in Table 13.2.1-2 as follows:

Table 13.2.1-2 Berwind Complex LOM Plan Projected ROM and Clean Production, and Preparation Plant Yield

  

2021 (1)

  

2022

  

2023

  

2024

  

2025

  

2026

  

2027

  

2028

  

2029

  

2030

  

2031

  

2032

  

2033

  

2034

  

2035

  

2036

  

2037

  

2038

  

2039

  

Total

 

ROM Tons (000s)

Berwind No. 1 Pocahontas 4 Deep Mine

21

1,100

1,095

1,184

1,154

1,215

1,133

1,322

1,204

1,153

1,182

1,203

896

1,224

1,077

1,227

1,178

1,264

532

20,364

Triad Pocahontas 4 Deep Mine

365

227

592

Big Creek Surface and Highwall Mine

94

223

201

518

Big Creek Jawbone Deep Mine

410

430

463

96

1,400

Total

480

1,960

1,726

1,648

1,250

1,215

1,133

1,322

1,204

1,153

1,182

1,203

896

1,224

1,077

1,227

1,178

1,264

532

22,874

Clean Tons (000s)

Berwind No. 1 Pocahontas 4 Deep Mine

17

627

523

626

646

574

503

471

512

448

499

532

434

563

508

507

486

482

271

9,231

Triad Pocahontas 4 Deep Mine

164

102

266

Big Creek Surface and Highwall Mine

45

114

129

288

Big Creek Jawbone Deep Mine

196

164

125

28

513

Total

226

1,039

816

751

674

574

503

471

512

448

499

532

434

563

508

507

486

482

271

10,298

Preparation Plant Yield (%)

Berwind No. 1 Pocahontas 4 Deep Mine

79.8

57.1

47.8

52.9

56.0

47.3

44.4

35.7

42.5

38.8

42.2

44.2

48.4

46.0

47.1

41.4

41.3

38.1

50.9

45.3

Triad Pocahontas 4 Deep Mine

44.9

44.9

44.9

Big Creek Surface and Highwall Mine

48.2

50.9

64.1

55.5

Big Creek Jawbone Deep Mine

47.9

38.0

27.0

29.3

36.7

Average

47.1

53.0

47.3

45.6

54.0

47.3

44.4

35.7

42.5

38.8

42.2

44.2

48.4

46.0

47.1

41.4

41.3

38.1

50.9

45.0


(1) 2021 Actual

13.2.2Expected Mine Life

Individual mines at the Berwind Complex have expected mine lives varying from two years and beyond, with 10 years as an approximate average.  Because the mines are being staged in development, estimation of an expected life of mine for the complex is not appropriate, since there are fairly vast resources available to be mined as reported in Section 11.0. As mining at the complex progresses, future mines will be planned and scheduled as necessary to meet internal Ramaco goals as they align with market conditions. WEIR and Ramaco both acknowledge that this reporting methodology may result in the need for future updates to this TRS.

November 22, 2022

Page 70


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

13.2.3Mine Design Dimensions

The projected mining through 2039 for the various mine plans are shown on Figures 13.5-1 through 13.5-8.

Mine design criteria utilized for these mine plans are as follows:

·

Gas Wells

Ø

State Permit required to mine within 500 feet of a well

Ø

MSHA Permit required to mine within 150 feet of a well

Ø

Active Well barrier - tangent of 15 degrees x depth of cover or 50 feet, whichever is greater

Ø

Inactive Well barrier - tangent of 5 degrees x depth of cover or 50 feet, whichever is greater

Ø

Plugged Wells - mine-through is allowed with acquisition of proper State and MSHA Permits

·

Pillar Size

Ø

ARPMS stability factor of 2.0 or greater for mining under protected areas, which is primarily intermittent streams with less than 200 feet of cover.  This is true throughout the complex.

Ø

ARMPS stability factor of 1.5 or greater for all other room and pillar development.

·

Depth of Cover

Ø

Ramaco implements a 100 feet minimum depth of cover for all of their underground mines

·

Areas without Subsidence Rights

Ø

ARMPS stability factor of 2.0 or greater will be maintained during first mining.

Ø

Retreat mining will come no closer than a tangent of 30 degrees times depth of cover to the property boundary.

·

Coal Thickness

Ø

Mining is not planned in areas of coal seams less than 2.0 feet in thickness.

Ø

Continuous miner units are assumed to mine the entire seam thickness (averaging approximately 3.0 feet, and ranging from 2.0 to 10.0 feet).

November 22, 2022

Page 71


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

13.2.4Mining Dilution

OSD on continuous miner units for Ramaco’s Berwind Complex typically consists of a total of 2 to 3 inches of waste from the roof and/or floor. Some areas may require mining more OSD to accommodate mine facilities such as ventilation or conveyors.  OSD is not included in the reserve or resource estimates since all underground ROM coal is processed at the preparation plant, which effectively eliminates OSD from the saleable coal product.

13.2.5Mining Recovery

Mining recovery when utilizing continuous miner mining is based on the pillar design, which is in turn based on depth of cover.  Mining recovery varies based on whether the panel is a main or sub-main entries, or a production panel due to the longevity requirements for the mine entries. Mining recovery for first mining at the complex is approximately 50 percent, based on pillar design.  In the areas where retreat mining is conducted, an additional 30 percent mining recovery is attainable. The continuous miners have the cutting height capacity to recover the entire seam thickness in the planned mining areas.

For surface mining, a recovery of 90 percent was projected.  The hole spacing for highwall mining results in a mining recovery of approximately 40 percent.

13.3DEVELOPMENT AND RECLAMATION REQUIREMENTS

13.3.1Underground Development Requirements

The Berwind Complex currently has two active underground mines and an active surface mine.  As the underground mines progress, and as with similar mining operations, continuous development is required for extensions of belt conveyors, mine power, pipelines, track, and ventilation facilities.

Future ventilation punchouts, or bleeder holes, are anticipated for areas where retreat mining is executed, applicable at most deep mines within the complex.  Each bleeder hole installation will be completed just prior to starting panel development.

Minor development such as drilling holes for rock dust and electrical distribution from the surface may be required at some of the mines, where existing underground mine development is extensive.

November 22, 2022

Page 72


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

13.3.2Reclamation (Backfilling) Requirements

The construction of underground mines requires the removal of material to create an adequate working surface for the underground mine face-up, haul roads, mine surface facilities, and access roads. Upon mine closure, selected areas will be reclaimed to near Approximate Original Contour (AOC). Other areas will be left in-place as per the approved alternate post-mining land use requirements.  Regrading and backfilling activities will commence within 180 days after the mining operations are complete.

As part of Ramaco’s surface mine plans, the contour mining method will require backfilling as mining progresses. Some of these areas involve facing up Abandoned Mine Lands (AML or, pre-1977 Surface Mine Reclamation Act law).  Material from the current contour cuts will be used to re-slope previously contour-mined areas to AOC.  To the extent possible, Ramaco avoids the use of valley fills during surface mining operations in preference to backfilling of previously contour mined working areas.

WEIR has reviewed Ramaco’s 6/28/21 Asset Retirement Obligations (ARO) summary and backfilling obligations appear to be properly accounted for at its mines. Based on Ramaco’s permit filings with the WVDEP and VDE, bonding requirements are also current and at satisfactory levels at the Berwind Complex (see Section 17.3 and 17.5 for additional details on bonding and mine closure planning).

13.4MINING EQUIPMENT AND PERSONNEL

13.4.1Mining Equipment

The Berwind Complex is currently utilizing the following industry standard mining equipment on the continuous miner sections, as shown in Table 13.4-1.

Table 13.4.1-1 Standard/Typical Continuous Miner Section Equipment

Units

    

    

    

Continuous Miner Supersection Equipment

 

2

Joy 1415 Continuous Miners

3

Narco 10SC32 Shuttle Cars

2

Fletcher CHDDR15 Roof Bolters

2

Fairchild 35C Battery Scoops

1

Feeder Breaker

2

Mantrips

November 22, 2022

Page 73


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Table 13.4.1-2 shows the total underground equipment fleet expected at the Berwind Complex over the next 10 years.  In some cases, mines that commence later in the LOM Plan will utilize equipment currently being used at other mines at the Berwind Complex to avoid additional capital expenditures.

Table 13.4.1-2 Berwind Complex Primary Underground Equipment Fleet

Mine

   

Supersections

   

Continuous
Miners

    

Shuttle
Cars

    

Roof
Bolters

    

Battery
Scoops

    

Feeder
Breakers

    

Mantrips

    

Service
Locomotive

 

Berwind No. 1 Pocahontas 4 Deep Mine

2

4

6

4

4

2

4

2

Triad Pocahontas 4 Deep Mine

1

2

3

2

2

1

2

1

Total

3

6

9

6

6

3

6

3

Current equipment at the Big Creek Surface and Highwall Mine is shown in Table 13.4.1-3.    There will be one highwall miner at the Big Creek Surface and Highwall Mine.  The equipment for the highwall mining operations will be owned, operated, and maintained by Ramaco.

Table 13.4.1-3 Surface Mining Equipment

Units

    

Surface Mining Equipment

 

1

Caterpillar 992G Front End Loader (15 Cu. Yard)

1

Caterpillar 988H Front End Loader (10 Cu. Yard)

1

Caterpillar 980H Front End Lader (8 Cu. Yard)

1

John Deere 724K Front End Loader (4.5 Cu. Yard)

3

Caterpillar 777 Overburden End Dump Haul Trucks (100 - Ton)

1

Caterpillar D10T Track Dozer

1

Caterpillar D9T Track Dozer

1

Superior Highwall Miner #55

1

Caterpillar 16H Road Grader

1

Atlas-Copco DM 50 Overburden Drill

1

Caterpillar 773B 20,000 Gallon Water Truck

1

Komatsu PC360LC Excavator (Utility 2.5 Cu. Yards)

1

John Deere 250G Excavator (Utilitiy 1.5 Cu. Yard)

4

Service Trucks (International 4300-4400 series)

5

Ford F250 Pickup Trucks

No changes are planned in the type of mining equipment used throughout the Berwind Complex LOM Plan. Based on WEIR’s experience in the industry and on Ramaco’s historical performance, WEIR believes that Ramaco can meet planned production requirements with the mining equipment described in this section using prudent operating methods and operating schedules.

November 22, 2022

Page 74


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

13.4.2Staffing

The current Berwind Complex staffing is summarized in Table 13.4.2-1 as follows:

Table 13.4.2-1 Current Staffing

    

Salary

    

Hourly

    

Total

Berwind Pocahontas 4 Deep Mine

1

43

44

Triad Pocahontas 4 Deep Mine

7

33

40

Big Creek Surface and Highwall Mine

3

30

33

Knox Creek Preparation Plant

5

14

19

Administration

8

-

8

24

120

144


Note: Staffing as of December 2021

Each operating mine at the Berwind Complex is scheduled to produce coal on two production shifts each day, the A Shift and the B Shift.  Underground mine crews on the night idle shift provide support services including production unit moves, off-shift maintenance and other support functions as required.  In addition, general underground support crews work each shift performing routine supply, belt maintenance and outby support functions.  Hourly personnel are not affiliated by any union, with no anticipated changes to this in the near term.

The preparation plant is staffed with two crews to process ROM coal 20 hours per day over two, 10-hour shifts, five days per week with no holidays.

The actual and projected staffing for the LOM Plan is shown in Table 13.4.2-2 as follows:

Table 13.4.2-2 LOM Plan Staffing

    

Total

 

Current(1)

142

2022

222

2023

308

2024

308

2025

308

2026 - 2039

308


(1) As of January 14, 2022.

November 22, 2022

Page 75


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

The staffing increase from current levels is due to startup of the Big Creek Jawbone Deep Mine in 2022.  After 2023, staffing levels are expected to be relatively constant.

Most of Ramaco’s employees live nearby in McDowell County, West Virginia, and Buchanan, Tazewell, and Russell Counties, Virginia. Ramaco has had no major issues hiring qualified candidates for open positions and relies considerably on employee referrals.

Based on industry experience and Ramaco’s historical performance, WEIR believes that the staffing levels are adequate to meet Ramaco’s planned production.

Mine Safety

An industry standard for safety performance is the Non-Fatal Days Lost (NFDL) Incidence Rate, which is determined by the number of lost time injuries multiplied by 200,000 divided by the manhours worked.

The Berwind Complex mines (excluding the preparation plant) manhours worked, NFDL injuries, and NFDL Incidence Rate reported to the MSHA for 2018 through the third quarter 2021, compared to the national average NFDL Incidence Rate for United States surface and underground coal mines are shown in Table 13.4.2-3 for each of the active mines.

Table 13.4.2-3 Berwind Complex Manhours Worked, NFDL Injuries and NFDL Incidence Rate

NFDL

Incidence  Rate

Manhours

NFDL Injuries

Mine

National

    

Worked

    

Employee

    

Contractor

    

Total

    

Average

Berwind No. 1 Deep Mine

2021 (1)

29,908

1

6.69

2020

116,253

2

3.44

3.18

2019

161,031

2

2.48

3.08

2018

81,053

1

2.47

3.20

Triad Deep Mine

2021 (1)

58,351

2020

3.18

2019

3.08

2018

3.20

Big Creek Surface Mine

2021 (1)

15,278

2020

3.18

2019

3.08

2018

39,778

3.20


(1) As of Third Quarter YTD

November 22, 2022

Page 76


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

The Berwind Complex NFDL Incidence Rate were generally similar to or lower than the national average from 2018 through 2021.  Given Ramaco’s low staffing levels, minimal injury counts result in high NFDL Incidence Rates, as compared to the national average.

The Knox Creek Preparation Plant manhours worked, NFDL injuries, and NFDL Incidence Rate reported to the MSHA for 2018 through third quarter 2021, compared to the national average NFDL Incidence Rate for United States preparation plants are shown in Table 13.4.2-4 as follows:

Table 13.4.2-4 Plant Manhours Worked, NFDL Injuries and NFDL Incidence Rate

NFDL

 

Incidence Rate

Manhours

NFDL Injuries

Knox Creek

National

    

Worked

    

Knox Creek

    

Contractor

    

Plant

    

Average

2021 (1)

30,530

2020

32,996

1.78

2019

19,480

2.03

2018

20,345

1.77


(1) As of Third Quarter YTD

The Knox Creek Preparation Plant historical NFDL Incidence Rates are perfect and are significantly lower than the national average.

November 22, 2022

Page 77


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

13.5LIFE OF MINE PLAN MAP

The projected mining areas for the Berwind Complex LOM Plans are shown on Figures 13.5-1 through 13.5-5.

Figure 13.5-1 Life of Mine Plans, Berwind No. 1 Pocahontas 4 Deep Mine and

Triad Pocahontas 4 Deep Mine

Map  Description automatically generated

November 22, 2022

Page 78


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Figure 13.5-2 Life of Mine Plan, Big Creek Surface and Highwall Mine

Map  Description automatically generated

November 22, 2022

Page 79


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Figure 13.5-3 Life of Mine Plan, Big Creek Jawbone 1 Deep Mine

Graphic

November 22, 2022

Page 80


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

14.0

PROCESSING AND RECOVERY METHODS

14.1PLANT PROCESS AND FLOWSHEET

Presently coal requiring processing within the Berwind Complex is processed at the Knox Creek Preparation Plant. The processing circuits include a heavy media cyclone, classifying cyclones, spirals, and conventional self-aspirating flotation cells. A simplified flowsheet for the Berwind Preparation Plant is shown on Figure 14.1-1.

Figure 14.1-1 Simplified Preparation Plant Flowsheet

Graphic

November 22, 2022

Page 81


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

14.2

PLANT PROCESSING DESIGN, EQUIPMENT CHARACTERISTICS AND SPECIFICATIONS

The Knox Creek Preparation Plant, built in 1981 by Powell Construction Company located in Johnson City, Tennessee, is a well designed and constructed preparation plant.  The preparation plant has a design capacity of 750 ROM tons per hour. Based on the Berwind Complex LOM Plan average projected preparation plant yield of 45 percent, a 20 hour per day, 260 days per year processing schedule, and 96 percent plant mechanical availability, the preparation plant has a capacity of approximately 1.8 million clean tons per year, with its existing circuitry.

ROM coal from the mines within the Berwind Complex is hauled by over the highway end-dump trucks to the Knox Creek Preparation Plant and dumped into either a 100,000 ton ROM ground storage stockpile or into one of seven ROM hoppers. The ROM coal is reclaimed with feeders from either the stockpile or the truck dump bins and enters a nine-feet x 16-feet Pennsylvania rotary breaker at 750 ROM tons per hour. From the rotary breaker, a 36 inch wide conveyor feeds ROM coal to the preparation plant.

The plant feed ROM coal material is screened at +3 inch, 3/4 inch x 5/16 inch and 5/16 inch x 0.  The 3 inch x 5/16 inch ROM coal is processed in a heavy media vessel.  The 5/16 inch x 0 material is screened at ½ mm with 5/16 inch x 28 mesh material processed in heavy media cyclones and the 28 mesh x 0 material reporting to raw coal cyclones. From the raw coal cyclones, 28 mesh x 100 mesh material is processed in triple-start spirals. The ultrafine 100 mesh x 0 material is cleaned by way of two banks of 5-300 cubic feet conventional flotation cells.

Clean coal can be stored in either of two clean coal stockpiles, each with a capacity of 40,000 tons. Clean coal is reclaimed from these piles and belted to the rail loadout at a rate of approximately 2,500 tons per hour and it can load 46-car trains. The load-out facility is served by the NS Railroad. The loadout belt is equipped with a J.B. Long two stage sweep sampler.  The rail loadout facility has a capacity of 2,500 tons per hour.

Knox Creek disposes of refuse in the adjacent Jamison Creek Refuse Disposal Area, which is an impoundment and coarse refuse disposal area.  Coarse refuse is transported to the disposal area by conveyor belt with fine refuse pumped as slurry to the impoundment. Current permitted life for this facility is approximately seven years at an annual refuse production rate of 1.48 million tons/year (combined).  A permit package is currently being prepared, which will add an additional 11.8 years of capacity at the same production rate.

November 22, 2022

Page 82


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

The preparation plant is scheduled to operate two, 10-hour shifts per day, five days per week, depending on the quantity of ROM coal to process.  According to Ramaco records, the Knox Creek Preparation Plant averaged 96 percent mechanical availability in 2021.  In Ramaco’s December 2021 acquisition of the Amonate Property, Ramaco acquired the Amonate Preparation Plant.  While not considered in the economics for this study, Ramaco intends to rehabilitate that preparation plant and bring it into service processing ROM coal from the adjacent Berwind No. 1 Pocahontas 4 Deep Mine.

The Knox Creek Preparation Plant and coal handling facilities consist of the following equipment shown in Table 14.2-1:

Table 14.2-1 Major Preparation Plant and Material Handling Equipment

    

ROM Coal Handling System

 

2

 — 

Truck Scales

7

 — 

Truck Dumps, 3 - 500 Ton and 4 - 250 Ton Capacity

1

 — 

Truck Dump Reclaim Conveyor, 48-Inch x 665-Feet

2

 — 

Stacking Tubes, 70-Feet

2

 — 

ROM Coal Stockpiles, 110,000 Ton Total Capacity

1

 — 

Reclaim Tunnel, 331-Feet

11

 — 

ROM Coal Reclaim Feeders (Truck Dumps and Stockpile)

1

 — 

ROM Coal Stockpile Reclaim Conveyor, 48-Inch x 590-Feet

1

 — 

Tramp Iron Magnet

1

 — 

ROM Breaker Feed Conveyor, 48-Inch x 400-Feet

1

 — 

Pennsylvania Rotary Breaker, 9-Feet x 16-Feet

3

 — 

Belt Scales

1

 — 

Plant Feed Conveyor, 36-Inch x 648-Feet

Preparation Plant - 750 ROM TPH

2

 — 

ROM Coal Double Deck Screens, 7-Feet x 16-Feet

2

 — 

Pre-wet Screens, 7-Feet x 12-Feet

1

 — 

Peters Heavy Media Vessel, 56-Inch x 9-Feet

1

 — 

Coarse Clean Coal Double Deck Screen, 6-Feet x 16-Feet

1

 — 

Refuse Double Deck Drain and Rinse Screen, 6-Feet x 16-Feet

1

 — 

McLanahan Crusher

1

 — 

Coarse Clean Coal Centrifuge, VC-48

4

 — 

Desliming Screens, 8-Feet x 16-Feet

4

 — 

Heavy Media Cyclones, 20-Inch Diameter

November 22, 2022

Page 83


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Preparation Plant - 750 ROM TPH

4

 — 

Small Clean Coal Single Deck Screens, 8-Feet x 16-Feet

4

 — 

Small Clean Coal Centrifuge, EB-36

2

 — 

Small Refuse Single Deck Screens, 6-Feet x 16-Feet

8

 — 

Triple Start Spirals

2

 — 

Clean Coal Classifying Cyclones, 15-Inch Diameter

5

 — 

Raw Coal Classifying Cyclones, 15-Inch Diameter

1

 — 

Refuse Classifying Cyclone

2

 — 

Refuse High Frequency Screens, 6-Feet x 12-Feet

10

 — 

Flotation Cells, 300 Cubic Feet

5

 — 

Screen Bowl Centrifuges, 36-Inch x 72-Inch

1

 — 

High Rate Thickener, 90-Feet Diameter

Clean Coal Handling System

1

 — 

No. 1 Clean Coal Stacker Conveyor, 42-Inch x 642-Feet

1

 — 

No. 2 Clean Coal Stacker Conveyor, 42-Inch x 642-Feet

2

 — 

Stacking Tubes, 91-Feet

2

 — 

Clean Coal Stockpiles, 70,000 Ton Total Capacity

1

 — 

Belt Sweep Clean Coal Sampler

1

 — 

Reclaim Tunnel, 50-Feet

1

 — 

Loadout Conveyor, 54-Inch x 1,254-Feet

1

 — 

Belt Scale

1

 — 

100-Ton Railroad Car Loadout

Refuse Handling System

1

 — 

Belt Sweep Refuse Sampler

1

 — 

Refuse Conveyor, 36-Inch x 615-Feet

1

 — 

Belt Scale

1

 — 

Refuse Bin, 100-Ton

7

 — 

Refuse Conveyors, 42-Inch x 10,269-Feet (Total)

14.3

ENERGY, WATER, PROCESS MATERIALS, AND PERSONNEL REQUIREMENTS

Power is supplied to the plant by American Electric Power (AEP).  Power is received at a primary voltage of 69,000 volts and fed through a 10,000 KVA substation where voltage is reduced to 12,470 volts. Voltage is further reduced inside the preparation plant, to 480 volts by a 1,000 KVA transformer bank.

Make up water is supplied to the plant from a 100,000 gallon storage tank located above the plant.  Water is pumped into the storage tank from an idled underground mine. This underground area has a storage capacity of approximately 8.5 million gallons.  Water can also be supplied to the storage tank from ponds located at the toe of the refuse area. Water is supplied to these ponds by the refuse underdrain, clear water diversion ditches and runoff from the refuse area itself.  Make up water requirements are approximately 500 gallons per minute.

November 22, 2022

Page 84


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Magnetite consumption is approximately 0.9 pounds per ROM ton processed. The preparation plant chemicals utilized cost approximately $0.20 per ROM ton processed (excluding magnetite).

Personnel requirements to operate the processing shifts at the preparation plant currently are 12 employees per shift on day shift and five employees on night shift. The LOM Plan projects a total of 23 employees.

November 22, 2022

Page 85


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

15.0

INFRASTRUCTURE

15.1ROADS

The primary access road to the properties is US Route 460, a four-lane highway, located to the south of the Berwind and Big Creek Properties.  From US Route 460, Virginia Route 637 and connecting West Virginia Routes 9 and 11 can be used to access the Berwind Property to the North.  Similarly, the Big Creek Property can be accessed from US Route 460 to the north using Virginia Route 67.  Other highways and county roads traverse these two properties.  US Route 460 turns to the north after running south of Big Creek and continues through the middle of the original Knox Creek Property and passes just to the east of the Knox Creek Preparation Plant and its associated Jamison Creek Refuse Disposal Area.

15.2RAIL

The NS Railroad passes through and has a rail spur to each of the properties. The NS Railroad provides rail service in the area extending from Amonate, Virginia northward through Berwind, West Virginia and from Swords Creek, Virginia eastward through Richlands, Virginia, south of the Knox Creek Property (see Figure 1.1-1).

15.3POWER

Electrical power is supplied to the Berwind Complex by AEP. Electrical power is received at the preparation plant at a primary voltage of 69,000 volts and fed through a 10,000 KVA substation where voltage is reduced to 12,470 volts. Voltage is further reduced inside the preparation plant, to 480 volts by a 1,000 KVA transformer bank. Electrical power is also supplied to mines from the substation.

15.4WATER

Water for mining and coal processing operations is provided by a combination of extraction from abandoned underground mine pools and from settling ponds located on the surface. Mine pool recharge rates are higher than Ramaco water usages.

Individual mine sites use purchased potable water.  Potable water at the preparation plant is supplied by a local municipality water connection.

November 22, 2022

Page 86


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

15.5PIPELINES

There are some oil and gas collection lines that service gas wells within the Berwind Complex.  Any construction and earth moving activities in proximity to these lines requires coordination with the oil or gas line owner.

15.6PORT FACILITIES, DAMS, AND REFUSE DISPOSAL

Port Facilities

The surrounding waterways are not navigable for commercial traffic. The closest barge docking area is approximately 70 miles to the north on the Kanawha River, south of Charleston, West Virginia.

Export coal from the Berwind Complex is railed, via the NS Railroad, to the Pier 6 Terminal, owned and operated by Norfolk Southern Corporation, located at Lamberts Point in Norfolk, Virginia.

Dams and Refuse Disposal

There are no structures that are existing or planned to be constructed in such a size or manner that will be subject to the West Virginia Dam Control Act, the Virginia Dam Safety Act, and/or MSHA regulations.  Refer to Section 17.2 for details on coal refuse disposal for the complex.

November 22, 2022

Page 87


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

15.7MAP OF INFRASTRUCTURE

Mine facilities are generally kept to a minimum.  At the mine portal locations, there is typically a small bath house and office with a parking lot, and a parts trailer.  There are no significant facilities at the Big Creek Surface and Highwall Mine.  The Berwind Complex infrastructure is summarized below on Figure 15.7-1.

Figure 15.7-1 Mine Infrastructure

Graphic

November 22, 2022

Page 88


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

16.0

MARKET STUDIES

16.1MARKETS

The Berwind Complex produces saleable low volatile and mid volatile metallurgical coal, with minor quantities of high volatile A and B metallurgical coal.  Depending on mining areas, the low volatile product typically represents 80 to 90 percent of the complex’s projected annual sales, with the remainder of coal sales consisting of mid volatile metallurgical coal and a small amount (typically less than 2 percent) of thermal coal.

The market for metallurgical coal from the Berwind Complex consists of both domestic metallurgical coal consumers and exports into the global seaborne metallurgical coal market.  The US Energy Information Administration (EIA) compiles average historical price data for metallurgical coal delivered to domestic coke plants and metallurgical coal delivered to tidewater terminals for export. Note that the EIA data includes all classifications of metallurgical coal (high, mid and low volatile) as well as both spot and contract sales prices.  Historical prices for metallurgical coal, as reported by the EIA, are shown on Figure 16.1-1 as follows:

Figure 16.1-1 Metallurgical Coal Sales Prices

Graphic

Source: EIA Quarterly Coal Report

November 22, 2022

Page 89


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Between 2016 and third quarter 2021, export prices (FOB port) and domestic coke plant prices (delivered cost) have averaged $121.81 and 124.33 per ton, respectively.

A small amount of thermal coal product is sold from the Berwind Complex which is produced from oxidized coal recovered from Ramaco’s surface mining operations. Most of this oxidized coal is sold raw while on occasion it is processed at the Knox Creek Preparation Plant. This coal is sold on thermal spot markets, based on product availability.  All thermal coal sales from the Berwind Complex are projected to end in 2024.

16.2MATERIAL CONTRACTS

On October 28, 2021, Ramaco announced completion of 2022 sales negotiations with its North American steel customers. Ramaco (across all of its mining operations) is contracted to sell 1.67 million tons of both low-volatile and high-volatile metallurgical coal at an overall average price of roughly $196 per ton FOB mine.

Contracted domestic metallurgical coal sales from the Berwind Complex represent approximately 32.9 percent of Ramaco’s 2022 projected coal sales tonnage, with metallurgical coal exports representing 62.9 percent, and thermal coals representing 4.2 percent of Ramaco’s 2022 projected coal sales.

Ramaco has a contract with NS for rail coal haulage from the Berwind Complex that is renewed annually.

16.3PRICE FORECAST

For purposes of this report, WEIR utilized price forecasts which Ramaco prepared for its Berwind Complex coal sales.  Ramaco based its Berwind Complex FOB mine pricing on available FOB Port index forward pricing and Ramaco’s estimated adjustments for Berwind coal quality, freight expense, and loading expense.  Ramaco’s price forecasts and adjustments reflect its experience in selling and transporting Berwind Complex saleable coal since 2017.

Ramaco’s historical (2018 through 2021) and forecast (2022 through 2040) FOB mine coal sales price for the Berwind Complex is shown on Figure 16.1-2.

November 22, 2022

Page 90


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Figure 16.1-2 Historical and Forecast Coal Sales Prices

Graphic

Ramaco’s forecasted Berwind Complex FOB mine coal sales prices are $169.46 per ton in 2022, $137.57 in 2023, $139.14 in 2024 and $139.56 thereafter through 2039.

November 22, 2022

Page 91


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

17.0

ENVIRONMENTAL STUDIES, PERMITTING, AND LOCAL INDIVIDUALS OR GROUPS AGREEMENTS

17.1ENVIRONMENTAL STUDIES

As part of the permitting process required by the WVDEP and VDE, numerous baseline studies or impact assessments were undertaken by Ramaco. These baseline studies or impact assessments included in the permit are summarized as follows, with pertinent text from the permit replicated below:

·

Groundwater Inventory and Baseline Quality

·

Surface Water Baseline Quality and Quantity

·

Surface Water Runoff Analysis

·

Probable Hydrologic Consequences

Groundwater Inventory and Baseline Quality

Ramaco conducted surveys to inventory water use and to determine the extent and purpose of ground water usage in the areas that could be affected by existing and planned mines within ½ mile of proposed mining limits for each permitted mine site.  Field teams made door-to-door visits to these potentially affected residents to gather information by way of completing questionnaire forms regarding water supply source(s), extent of reliance, purpose of reliance (domestic, agricultural, etc.), depth of well(s), character of springs, and other data.  The teams measured water level depths in wells where possible and agreeable by owners and obtained surveyed locations accordingly.  The detailed results of the surveys are included in each site’s WVDEP and VDE permit application.

Surface Water Baseline Quality, Quantity, and Runoff Analysis

Baseline surface water monitoring for flow and quality parameters was conducted at strategic, WVDEP and VDE approved locations, as applicable, over a period of six months for each of the permit areas. During mining and through the final release of the permit, the stations selected for each site are monitored in accordance with the approved surface water monitoring plans submitted in the site’s permits. Data collected during this period will be compared with the pre-mining baseline data to determine if and how the proposed operation is affecting the surface water systems. If necessary, remedial measures can be taken to assure the protection of the surface water systems.

November 22, 2022

Page 92


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Based on samples from adjacent mining and the baseline surface water sampling there should be no acid or toxic mine drainage.  However, Ramaco proposes that all coal wastes will be treated as potentially toxic material and handled accordingly using encapsulation cells that are discussed below.

Surface water runoff analyses were performed over the watershed(s) associated with each permit site to evaluate the potential impact of proposed operations on flooding and streamflow alteration.  Peak discharges were calculated for the “pre-mining”, “during-mining”, and post-mining” conditions and were compared.  These evaluations were performed using SEDCAD 4 software, developed by the University of Kentucky. These analyses and results are included in the individual sites’ permits and show that there will be no increase in peak discharge during mining or post mining for any of the permit areas. It should be noted that in order to attain these acceptable results, the construction of some additional sediment control structures was required at the Ram No.1 Surface and Highwall Mine. Original laboratory data sheets for surface and ground water baseline monitoring are included in the permits.

Probable Hydrologic Consequences

PHCs were evaluated for each permit application.   Planned subsidence will occur where retreat mining has been executed as approved.  It is expected that direct fracturing of overburden will occur with consequently increased porosity (increased storage capacity) and lateral permeability in response to mining.  The little water that is present in that strata will be drained into the underground mines, but the overlying intervals contains no significant aquifers other than, perhaps, the coal seams.  Highwall mining will be conducted in such a manner that subsidence will not occur and as thus, should be of no consequence to PHC.

In summary, all of the Ramaco existing and proposed mines are well above any significantly producing aquifers.  The PHC studies and results are included in each individual sites’ permit application.  The PHC studies showed no significant ground or surface water resource is likely to be contaminated, diminished, or interrupted, providing that the approved drainage control and revegetation plans are adhered to throughout existing and planned mining activities.

17.2REFUSE DISPOSAL AND WATER MANAGEMENT

Refuse Disposal

The Jamison Creek Refuse Disposal Area (MSHA ID No. 44-05236) is a coal refuse disposal facility that serves the Knox Creek Preparation Plant. Coarse refuse from the plant is transported to the disposal area by conveyor belt with fine refuse pumped as slurry to the impoundment. The estimated life for this facility as of January 2022 is approximately seven years.

November 22, 2022

Page 93


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

A PHC determination included in the Jamison Creek Refuse Disposal Area Permit No. 1302232 concluded that no detrimental hydrologic consequences are either anticipated, or expected, with a fine coal refuse slurry impoundment at this facility.

Further, a Breakthrough Potential Study was conducted by Schnabel Engineering, LLC in April 2020 (Schnabel Report) to assess whether there is a breakthrough potential to the Red Ash and Kennedy seams mined beneath the impoundment. The Schnabel Report concluded that the Breakthrough Potential into the Red Ash mine workings and Kennedy auger holes is considered to be moderate. However, based on the four significant barriers to breakthrough into the Red Ash mine workings that were discussed in the AME report and considering that the Kennedy auger holes are going to be grouted, Schnabel believes that the Breakthrough Potential at this site is somewhat lower.

The refuse disposal structure will be constructed in such a size or manner that will be subjected to the Virginia Dam Safety Act, and/or MSHA regulations.  Stability analyses of the refuse disposal structure show that design of the structure exceeds the minimum safety factors of 1.5 for static stability and 1.2 for dynamic stability that are required by the current Virginia State Code of Regulations.  The stability analyses were performed using the Rotational Equilibrium Analysis of Multilayered Embankments software that is copyrighted by the University of Kentucky.

No coal or non-coal disposal is planned at any of the mine sites.

Water Monitoring and Management

In order to determine the impact of existing and proposed operations on the hydrologic balance, surface water samples are collected bi-monthly with a minimum seven days between sample dates at each of the permitted sites. Samples are sent to a qualified laboratory and analyzed for the following parameters: flow, pH, total acidity, total alkalinity, total iron, total manganese, total sulfates, total suspended solids, and total dissolved solids or specific conductance at 25 degrees C. The samples collected during and after mining will be compared with each other, and with the data collected during the baseline surface water study and used to determine the impact of the operation on the water in the receiving streams.

November 22, 2022

Page 94


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

A waiver of groundwater monitoring during mining was requested for the mine sites due to the proposed mining being well above any groundwater users and any significant aquifers that insure water use.

No specific water treatment facilities other than sediment control are required or planned for any of the mine sites.  Based on previous mining and collected water samples. the operations will not contaminate any of the ground or surface water systems of the Berwind Complex.  Results of water sampling has shown no significant levels of surface water contamination at the mine sites.

Surface water management for both Ramaco’s surface and underground permitted mining areas on the Berwind Complex generally involves a combination of structures such as; 1) sediment ditches, 2) temporary sedimentation ponds, 3) soil encapsulation cells that are specifically designed to contain potentially hazardous soil in regards to acid forming materials, 4) permanent and temporary diversion ditches, 5) corrugated metal pipe (CMP) placement for drainages that cross access roads or haulroads, and 6) drainage diversion ditches and collections for excess spoil disposal areas. The Big Creek Surface and Highwall Mine has a relatively large network of these construction types. The underground mine locations have a significantly smaller footprint, however, these locations use the same surface water management design considerations as surface mines. Detailed designs for all drainage and sediment control structures are included in Ramaco’s permits.  There are no significant water retention structures subject to the West Virginia Dam Control Act, the Virginia Dam Safety Act, or MSHA regulations.  There are no permanent impoundments planned at any of the mine permit sites.

All permitted mine sites have a Materials Handling Plan designed to mitigate the potential for acid mine drainage generation regarding those materials excavated during the land disturbance activities associated with development of the proposed mining facility. Some areas have known potentially acid generating materials. This is determined from Acid Base Accounting data that is collected as part of the permitting requirements. Also, selenium data is documented within the water chemistry of the equivalent mine discharge samples. The equivalent water data provides a more appropriate geochemical characterization as compared to in-situ strata testing.

Material that requires special handling for potentially acidic discharges meets the following standards: have a net acid base accounting that is ≥-5 and at least 1 foot thick; have Selenium concentrations greater than 1 mg/kg and at least 1 foot thick; have a pH ≤4 and be at least 1-foot-thick.  Materials to be specially handled will be placed in encapsulation cells to assure there is no potential for acid producing material. The cells will be located on the mine bench in an area free of any seeps, springs, or mine drainage, “high and dry”, and sealed with a minimum of 4.0 feet of the most imperious material available. The approximate location of planned encapsulation cells is shown on the Geohydrologic Maps that are included in the permit applications.

November 22, 2022

Page 95


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Discharges from these structures will be monitored in accordance with the approved plans. Sediment structures will be cleaned or enlarged if the total suspended solids exceed effluent limitations.  All discharges will go through sediment control structures. The pond discharges will be monitored in accordance with approved plans and treated to meet effluent limitations, if needed.

Regarding highwall mining concerns, there is no residual head of water anticipated on any of the designed outcrop barriers which are designed at a minimum of 50 feet width.  Based on water samples collected from adjacent mining, there is not anticipated to be any acid, alkaline, or iron laden drainage.

All permitted sites have a surface water runoff monitoring plan.  Within twenty-four hours of a one-year frequency, twenty-four hour storm event or greater, a permit-wide inspection and report of the drainage systems is completed and submitted to the WVDEP or VDE, as applicable. The inspection and subsequent report note any damages or deficiencies in the drainage system so that repairs can be implemented immediately.  It also indicates if any sediment structure is at or near it’s clean out capacity (60 percent).  A rain gauge, located at the mine office on the Berwind Complex is used to monitor precipitation events.  In-stream monitoring stations are used to take stream flow measurements.  The rain gauge is monitored daily and reported monthly to the appropriate regulatory authority.

November 22, 2022

Page 96


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

17.3PERMITS AND BONDING

Coal mines in West Virginia are required to file applications for and receive approval of mining permits issued by the WVDEP to conduct surface disturbance and mining activities.  A similar filing and approval process is required by the VDE. The Berwind Complex has been issued mining permits and associated NPDES permits by the WVDEP and the VDE as shown in Table 17.3-1 as follows:

Table 17.3-1 Berwind Complex Mining and NPDES Permits

Permitted

 

Permit

Surface  Area

NPDES

Property Description

    

Number

    

State

    

(Acres)

    

Issue Date

    

Permit No.

Berwind Deep Mine No. 1

U-3008-16

WV

30.29

6/26/2017

WV1028952

Berwind Deep Mine No. 1

1202294

VA

0.00

5/20/2019

NA

Berwind Poca 6 Seam Deep Mine

U-5007-21

WV

6.70

Pending

Pending

Big Creek Surface Mine

1102335

VA

447.63

1/22/2020

0082335

Capital No. 3/ Tiller No. 1 Deep Mine

1402231

VA

42.61

5/22/2017

0082231

Dry Fork Deep Mine

U-4004-11

WV

7.12

11/20/2012

WV1024281

Dry Fork Deep Mine

Pending

VA

0.00

Pending

WV1024281

Fork Ridge (Tiller) Deep Mine

1202204

VA

20.57

2/15/2017

0082204

Hess Creek Surface Mine

1702202

VA

75.95

2/14/2017

0082202

Kennedy Surface Mine

1402215

VA

106.81

4/3/2017

0082215

Knox Creek Preparation Plant

1302184

VA

41.94

12/2/2017

0082184

Knox Creek Refuse Disposal Area

1302232

VA

322.71

11/23/2018

0082232

Mudlick Surface Mine

1102334

VA

26.25

7/7/2020

0082234

Squire Jim Deep Mine No. 1

U-3004-18

WV

8.83

8/31/2020

WV1029088

Triad Pocahontas 4 Deep Mine

U-5004-19

WV

6.12

3/2/2020

WV1028952

Triad Pocahontas 6 Deep Mine

U-5007-21

WV

6.70

Pending

WV1028952

Vansant No. 1 Deep Mine

U-4010-94

WV

14.20

12/7/1994

WV1016113

Vansant No. 2 Deep Mine

U-4013-94

WV

15.72

12/19/1994

WV1016113

Vica Deep Mine

U-0011-85

WV

2.34

2/25/1985

WV1005685

Vica Deep Mine

1202149

VA

0.00

Pending

NA

Total

1,182.49

A total bond amount of $11.3 million held by Ramaco is based on the mine closure reclamation liability cost estimate as of December 31, 2021.  The ARO estimate for all sites on the complex is $10.0 million, as of December 31, 2021.  Both the WVDEP and VDE utilize a bond matrix that determines the rate per acre based upon the activity that the land is to be used for.  This rate per acre is simply applied to the permit sites’ acreage to obtain the bond requirement.  WEIR concludes that Ramaco’s overall bonding approach, the bond amounts, and the ARO estimates that are currently allocated for the Berwind Complex sites appear reasonable.

Upon searching the WVDEP and the VDE violation records, it was found that the Berwind Complex has an excellent environmental compliance record without a history of any significant fines or citations over the last two years.

17.4LOCAL STAKEHOLDERS

As indicated in Section 13.4.2, Ramaco currently employs 142 personnel at the Berwind Complex and is projected to have a maximum employment of approximately 308 personnel during the Berwind Complex LOM Plan.  The complex creates substantial economic value with its third-party service and supply providers, utilities and through payment of taxes and fees to local, state and federal governmental agencies.

November 22, 2022

Page 97


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

The Berwind Complex is located in a rural and fairly isolated area of West Virginia and Virginia. Reportedly, there have been no social or community impact issues relative to the Berwind Complex.  The local area supports Ramaco for the jobs that it provides for people in the surrounding communities.

17.5MINE CLOSURE PLANS

Upon mine closure, areas will be reclaimed to near AOC configuration.  Regrading and backfilling activities are required to commence within 180 days after the mining operations are complete.

The primary pre-mining land use for the Berwind Complex is forestland. The approved post-mining land use for Ramaco’s permits is forestland.  No land within the permit areas have been historically used for prime farmland.  The slope of all land within the existing and proposed permit areas is ten percent or greater, which also precludes post-mining land use as prime farmland.

Upon completion of mining operations and regrading, topsoil will be redistributed over the disturbed areas. Mine soil that served as a base for coal stockpiles will be tested to determine if supplemental liming is necessary prior to blending this material with the other mine soil onsite.  After the permit area has been graded, soil analysis will be performed to determine the quantity of agricultural limestone, or an equivalent supplement, and fertilizer necessary to achieve the post-mining land use.

All regraded areas will be revegetated as soon as practical to establish quick vegetative cover and minimize erosion. Disturbed and un-reclaimed acreage including excess spoil disposal sites, will not exceed two hundred (200) acres or fifty (50) percent of the permit area, whichever is less. Runoff from these regraded areas will be routed through properly constructed and maintained sediment structures that are designed to retain site runoff along enough for the suspended solids to settle.

Streams on the complex are generally approximately 1,000 feet below the ridges. Soils within the permit area formed in residual parent material derived from interbedded shale, siltstone and sandstone. This consist of very steep soils on narrow ridge tops and on side slopes. The annual precipitation in the area averages approximately 47 inches. Woodlands make up about 85 percent of the total area in this county and soils in this area are well suited to growing forests. The areas to be disturbed and later reclaimed are in the oak-hickory type, of the Appalachian Forest and consists of yellow poplar, basswood, red and black oak, hickory, sugar maple, chestnut oak, white oak, beech, pine/hemlock, scarlet oak, other miscellaneous hardwoods. On dry ridges, spurs and southern slopes white oak, hickory, chestnut oak, Virginia pine and pitch pine are the dominant species. These sites tend to be less productive, and the timber has slower growth, while the moist coves and northern and eastern slopes contain yellow poplar, sugar maple, red oak, black oak, beech, and basswood and are more productive sites.

November 22, 2022

Page 98


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Both hardwoods and pine seedlings will be hand planted by a reputable tree planting contractor to create a diverse and productive forest. Several species will be selected to create a diverse forest.  The overall stocking density for all woody plants on the permitted mine site is at least 500 plants per acre. The stocking density for trees is at least 350 plants per acre.  All final land use is planned as forestland except small areas of permanent drainage structures and access roads that have been approved to remain.

Temporary erosion control vegetative cover is established as contemporaneously as practical, with backfilling and grading, until a permanent tree cover can be established. A tree-compatible cover will be used to keep the vegetation that is being established for erosion control from competing too aggressively with the tree seedlings.

17.6

ENVIRONMENTAL COMPLIANCE, PERMITTING, AND LOCAL INDIVIDUALS OR GROUPS ISSUES

Based on WEIR’s review of Ramaco’s plans for environmental compliance, permit compliance and conditions, and dealings with local individuals and groups, Ramaco’s efforts appear to be adequate and reasonable in order to obtain approvals necessary relative to the execution of the Berwind Complex mining plans.

November 22, 2022

Page 99


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

18.0

CAPITAL AND OPERATING COSTS

Ramaco provided historical and projected operating costs and capital expenditures for the Berwind Complex, which were an adequate check and basis for the LOM Plan cost projections. The operating costs and capital expenditures are included in the financial statements that are audited annually by Briggs & Veselka Co. for Ramaco’s 10-K reporting to the SEC. The auditing performed by Briggs & Veselka Co.  is conducted in accordance with the standards of the Public Company Accounting Oversight Board.

18.1CAPITAL EXPENDITURES

The Berwind Complex will require capital to be expended each year for infrastructure additions/extensions, as well as for mining equipment rebuilds/replacements to continue to produce coal at currently projected annual levels of production.

Ramaco’s Berwind Complex development costs since 2017 are considered “Sunk Costs” and as economic returns in this economic analysis are presented only on a forward-looking basis, Sunk Costs are not included in the economic return of the project, as estimated in this study.

The projected capital expenditures are categorized according to each mining operation, and the Knox Creek Preparation Plant. Actual capital expenditures for 2018 through September 2021 and projected capital expenditures, in 2021 dollars, for 2022 through 2039, are shown on Figure 18.1-2:

Figure 18.1-2 Historical and Projected LOM Plan Capital Expenditures

Graphic

November 22, 2022

Page 100


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

The capital expenditures in 2022 relate to the slope construction and equipment for the Berwind No. 1 Pocahontas 4 Deep Mine, the Triad Pocahontas 4 Deep Mine, development of the Big Creek Jawbone 1 Deep Mine, the Big Creek Surface and Highwall Mine, and the Knox Creek Preparation Plant.

Ramaco began development of the Berwind Complex in 2017 and commenced mining in the fourth quarter 2017. Mine management has had several years of experience estimating capital expenditures for surface and underground mining and the risk of inaccurate estimates is low. The LOM Plan projected average capital cost of $10.92 per ton for projected mining equipment and infrastructure requirements is $99.54 per ton lower than the historical average of $110.46 per ton, which included high development capital from 2018 through September 2021 for the Berwind No. 1 Mine. Capital expenditures estimates per annual ton are estimated to have an accuracy within +/- 15.0 percent.

Contingency costs account for undeveloped scope and insufficient data. Contingency for required major projects and mining equipment is estimated at 10 percent and is intended to cover unallocated costs from lack of detailing in scope items. It is a compilation of aggregate risk from estimated cost areas.

November 22, 2022

Page 101


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

18.2OPERATING COSTS AND RISKS

Operating costs are projected based on historical operating costs and adjusted based on projected changes in staffing, hours worked, and production and productivity for mining areas in the LOM Plan.  The Berwind Complex actual and LOM Plan projected operating costs in dollars and dollars per ton, are shown on Figure 18.2-1:

Figure 18.2-1 Berwind Complex Historical and LOM Plan Operating Costs

Graphic

Descriptions or explanations of the operating costs considered in the LOM Plan are as follows:

Direct Cash Cost:

·

Labor cost, which includes wages and benefits for hourly and salary personnel at the mine and preparation plant.

·

Maintenance and supplies, which are expenses related to upkeep of mining equipment and associated infrastructure.

·

Utility expenses, which are expenses related primarily to purchase of electrical power to operate mining equipment at the mines and preparation plant equipment, telephone and data lines, water, and garbage services.

·

Trucking costs, which are expenses primarily related to transportation of ROM coal from the mines to the preparation plant.

·

Allocations (in/out), which are various costs for the preparation plant.

·

Professional services, which are expenses related to legal, engineering, and other firms providing services to the Berwind Complex.

November 22, 2022

Page 102


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

·

Property Tax and Insurance are expenses related to property taxes and liability insurance for risk management purposes.

·

Other costs, which are miscellaneous expenses related to operation of the mines and preparation plant.

·

Sales related costs are expenses related to Black Lung Excise Tax, Virginia and West Virginia Severance Taxes, and Virginia, West Virginia and Office of Surface Mining reclamation taxes.

·

Royalties are expenses related to leased surface and mineral properties.

·

General and Administrative, which include expenses related to administrative offices and personnel to manage the mining operations.

Selling, General and Administrative Costs:

·

Expenses related to coal sales and corporate administrative costs

Non-Cash Costs:

·

Asset retirement obligation accretion, depreciation, and amortization costs

Detailed LOM Plan annual operating costs and capital expenditures are shown below in Table 18.2-1.

Table 18.2-1          LOM Plan Annual Operating Cost and Capital Expenditures

   

2022

  

2023

   

2024

  

2025

   

2026

  

2027

   

2028

   

2029

  

2030

  

2031

  

2032

  

2033

  

2034

  

2035

  

2036

  

2037

  

2038

  

2039

  

Total

Labor costs

 

15.6

 

12.6

 

12.1

 

12.0

 

10.3

 

9.2

 

8.5

 

9.2

 

8.1

 

9.0

 

9.5

 

7.9

 

10.0

 

9.1

 

9.1

 

8.7

 

8.7

 

5.1

 

174.7

Maintenance & supplies

 

28.2

 

22.2

 

22.7

 

22.5

 

20.1

 

17.6

 

16.2

 

17.6

 

15.4

 

17.1

 

18.3

 

14.9

 

19.3

 

17.4

 

17.4

 

16.7

 

16.5

 

9.0

 

329.2

Utility expenses

 

4.4

 

2.9

 

3.3

 

3.3

 

3.1

 

2.7

 

1.6

 

1.8

 

1.6

 

1.7

 

1.8

 

1.5

 

1.9

 

1.8

 

1.7

 

1.7

 

1.7

 

1.0

 

39.5

Trucking costs

 

3.7

 

3.4

 

3.2

 

3.1

 

2.7

 

2.4

 

2.2

 

2.4

 

2.1

 

2.4

 

2.5

 

2.1

 

2.7

 

2.4

 

2.4

 

2.3

 

2.3

 

1.2

 

45.4

Contract Mining

 

7.2

 

7.8

 

8.1

 

8.2

 

8.2

 

6.9

 

 

 

 

 

 

 

 

 

 

 

 

 

46.4

Purchased third-party coal

 

0.8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0.8

Professional services

 

0.1

 

0.0

 

0.1

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.3

Property tax & insurance

 

0.8

 

0.7

 

0.8

 

0.8

 

0.6

 

0.6

 

0.6

 

0.6

 

0.5

 

0.6

 

0.6

 

0.5

 

0.6

 

0.6

 

0.6

 

0.6

 

0.6

 

0.5

 

11.0

Other costs

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.0

 

0.5

Sales related tax costs

 

18.7

 

10.9

 

10.9

 

10.7

 

9.7

 

8.5

 

6.7

 

7.2

 

6.3

 

7.1

 

7.5

 

6.2

 

7.9

 

7.2

 

7.2

 

6.9

 

6.8

 

3.7

 

150.3

Administrative costs

 

0.6

 

0.6

 

0.7

 

0.7

 

0.1

 

0.1

 

0.1

 

0.1

 

0.1

 

0.1

 

0.1

 

0.1

 

0.1

 

0.1

 

0.1

 

0.1

 

0.1

 

0.1

 

4.5

Total Cost of Production

 

80.4

 

60.6

 

61.8

 

61.4

 

55.0

 

48.0

 

36.0

 

38.9

 

34.3

 

38.0

 

40.4

 

33.3

 

42.6

 

38.6

 

38.6

 

37.0

 

36.7

 

20.7

 

802.1

Asset Retirement obligation

 

0.4

 

0.4

 

0.4

 

0.4

 

0.2

 

0.2

 

0.2

 

0.2

 

0.2

 

0.2

 

0.2

 

0.2

 

0.2

 

0.2

 

0.2

 

0.2

 

0.2

 

0.1

 

4.4

Depreciation and amortization

 

3.6

 

4.4

 

5.1

 

5.0

 

2.9

 

2.5

 

2.3

 

2.5

 

2.2

 

2.4

 

2.6

 

2.1

 

2.7

 

2.5

 

2.5

 

2.4

 

2.4

 

1.3

 

51.3

Total Costs and Expenses

 

84.4

 

65.4

 

67.3

 

66.8

 

58.1

 

50.7

 

38.5

 

41.6

 

36.6

 

40.6

 

43.2

 

35.6

 

45.6

 

41.3

 

41.3

 

39.6

 

39.3

 

22.1

 

857.8

Capital Expenditures

 

19.5

 

6.2

 

6.4

 

6.4

 

6.2

 

6.0

 

5.7

 

5.7

 

5.8

 

5.7

 

5.7

 

5.7

 

5.9

 

5.7

 

5.7

 

5.7

 

5.7

 

0.1

 

114.1

The LOM Plan projected cash operating cost of $76.79 per ton is $41.89 per ton lower than the four-year historical average of $118.69 per ton. The historical cash operating cost was elevated due to the development costs associated with ramping from the Pocahontas No. 3 Seam to the Pocahontas No. 4 Seam at the Berwind No. 1 Mine. With the long history of cost of sales, no contingency is included, although the accuracy of the LOM Plan projected cost of sales should be considered to be within 15 percent of the historical average.

November 22, 2022

Page 103


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Capital and Operating Cost Estimation Risk

The Berwind Complex has been in operation since 2017 and has had a relatively long period of experience with capital expenditure costs and operating costs. Since the mining operations will continue in similar coal seams and mined in the same manner as historically, there is little risk associated with the specific engineering estimation methods used to arrive at projected capital expenditures and operating costs. An assessment of accuracy of estimation methods is reflected in the sensitivity analysis in Section 19.3.

For purposes of the Preliminary Feasibility Study relative to the Berwind Complex LOM Plan, capital expenditures are estimated to an accuracy of +/- 15 percent, with a contingency of 10 percent, and operating costs are estimated at an accuracy of +/- 15 percent, with no contingency.

November 22, 2022

Page 104


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

19.0

ECONOMIC ANALYSIS

19.1ASSUMPTIONS, PARAMETERS, AND METHODS

A Preliminary Feasibility Study financial model has been prepared in order to assess the economic viability of the Berwind Complex LOM Plan.  Specifically, plans were evaluated using discounted cash flow analysis, which consists of annual revenue projections for the Berwind Complex LOM Plan. Cash outflows such as capital, including preproduction costs, sustaining capital costs, operating costs, transportation costs, and taxes are subtracted from the inflows to produce the annual cash flow projections. Cash flows are recognized to occur at the end of each period. There is no adjustment for inflation in the financial model, and all cash flows are in 2021 dollars. WEIR’s study is conducted on an un-levered basis, excluding costs associated with any debt servicing requirements.

To reflect the time value of money, annual net cash flow projections are discounted back to the project valuation date, using a discount rate of 10 percent. The discount rate appropriate to a specific project depends on many factors, including the type of commodity and the level of project risks, such as market risk, technical risk, and political risk. The discounted present values of the cash flows are summed to arrive at the Berwind Complex NPV.

Projected cash flows do not include allowance of any potential salvage value.  Additionally, capital previously expended (sunk cost) is not included in the assessment of economic returns.

WEIR’s after-tax NPV incorporates a projected corporate income tax rate of 21 percent, as provided by Ramaco.

In addition to NPV, the Internal Rate of Return (IRR) is also calculated. The IRR is defined as the discount rate that results in an NPV equal to zero. Payback Period is calculated as the time required to achieve positive cumulative cash flow for the Berwind Complex at a 10 percent discount rate. As the Berwind Complex is ongoing with no initial investment required (i.e., already sunk cost), payback period is less than one year.

November 22, 2022

Page 105


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

The actual and LOM Plan coal sales price forecast used to estimate Berwind Complex revenue are depicted on Figure 19.1-1.

Figure 19.1-1 FOB Mine Coal Sales Price Forecast

Graphic

19.2ECONOMIC ANALYSIS AND ANNUAL CASH FLOW FORECAST

The annual cash flow for the Berwind Complex LOM Plan are summarized on Figure 19.2-1 and Table 19.2-1 as follows:

Figure 19.2-1 Annual Cash Flow Forecast

Graphic

Table 19.2-1          Annual Cash Flow Forecast Detail

  

2022

   

2023

   

2024

   

2025

   

2026

   

2027

   

2028

   

2029

   

2030

   

2031

   

2032

   

2033

   

2034

   

2035

   

2036

   

2037

   

2038

   

2039

   

Total

Revenues

 

184.2

 

110.9

 

109.5

 

107.5

 

97.5

 

84.8

 

65.5

 

71.1

 

62.2

 

69.4

 

74.0

 

60.3

 

78.3

 

70.6

 

70.5

 

67.6

 

66.9

 

36.0

 

1,486.7

Total Costs and Expenses

 

84.4

 

65.4

 

67.3

 

66.8

 

58.1

 

50.7

 

38.5

 

41.6

 

36.6

 

40.6

 

43.2

 

35.6

 

45.6

 

41.3

 

41.3

 

39.6

 

39.3

 

22.1

 

857.8

Income before taxes

 

99.8

 

45.4

 

42.2

 

40.6

 

39.4

 

34.1

 

27.1

 

29.5

 

25.6

 

28.8

 

30.8

 

24.8

 

32.7

 

29.3

 

29.3

 

28.0

 

27.7

 

13.9

 

628.9

Income tax expense

 

21.0

 

9.5

 

8.9

 

8.5

 

8.3

 

7.2

 

5.7

 

6.2

 

5.4

 

6.0

 

6.5

 

5.2

 

6.9

 

6.2

 

6.1

 

5.9

 

5.8

 

2.9

 

132.1

Net income

 

78.8

 

35.9

 

33.3

 

32.1

 

31.1

 

26.9

 

21.4

 

23.3

 

20.2

 

22.7

 

24.3

 

19.6

 

25.8

 

23.2

 

23.1

 

22.1

 

21.9

 

11.0

 

496.8

Adjusted EBITDA

 

82.9

 

40.7

 

38.9

 

37.6

 

34.2

 

29.6

 

23.9

 

26.0

 

22.6

 

25.4

 

27.1

 

21.8

 

28.8

 

25.8

 

25.8

 

24.7

 

24.4

 

12.3

 

552.5

Capital Expenditures

 

19.5

 

6.2

 

6.4

 

6.4

 

6.2

 

6.0

 

5.7

 

5.7

 

5.8

 

5.7

 

5.7

 

5.7

 

5.9

 

5.7

 

5.7

 

5.7

 

5.7

 

0.1

 

114.1

Total Cash Flow

 

63.4

 

34.5

 

32.4

 

31.1

 

28.0

 

23.6

 

18.1

 

20.3

 

16.8

 

19.6

 

21.4

 

16.1

 

22.9

 

20.1

 

20.1

 

18.9

 

18.7

 

12.2

 

438.4

November 22, 2022

Page 106


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Cash flows decline after 2022, as a result of a projected decrease in coal sales realizations. While not included in these cash flows, Ramaco plans to commence other mining operations within the Berwind Complex, as existing operations phase out.  Significant tonnage associated with those future, to-be-planned operations, is currently classified as Resource tonnage. As LOM plans are prepared for operations within the current Resource areas of the Berwind Complex, updates will be made to this analysis.

The Berwind Complex LOM Plan has an after-tax NPV of $246.8 million, at a base case discount rate of 10 percent (Table 19.2-2). As the Berwind Complex is ongoing with no initial investment required (i.e., already sunk cost), the IRR indicates that the Berwind Complex NPV is infinite. Cumulative (undiscounted) cash flow over the LOM Plan is positive, at $438.4 million. The Return on Investment (ROI), at a 10 percent discount rate, is 290 percent.

The after-tax NPV, IRR, cumulative cash flow and ROI are summarized in Table 19.2-2 as follows:

Table 19.2-2 After-Tax NPV, IRR, Cumulative Cash Flow, and ROI

    

LOM Plan

 

NPV ($Million)

246.8

IRR (%)

Infinite

Cumulative Cash Flow ($Million)

438.4

Return on Investment (%)

290

Table 19.2-3 presents key operational statistics for the LOM Plan on an after-tax basis. Over the LOM Plan, the average cash operating cost is $76.79 per clean ton. Operating costs include mining, processing, G&A, but exclude amortization costs on capital expenditures.

November 22, 2022

Page 107


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Table 19.2-3 Key Operating Statistics

    

LOM Plan

 

ROM Tons Produced (000s)

23,397

Clean Tons Produced (000s)

10,461

Preparation Plant Yield (%)

44.7

Marketable Tons Sold (000s)

10,445

($ Per Ton)

Coal Sales Realization

142.33

Direct Cash Costs

76.79

Non-cash Costs

5.33

Total Cost of Sales

82.13

Profit / (Loss)

60.21

EBITDA

65.54

CAPEX

10.92

19.3SENSITIVITY ANALYSIS

A sensitivity analysis was undertaken to examine the influence of changes to assumptions for coal sales prices, production, operating cost, capital expenditures, and the discount rate on the base case after-tax NPV. The sensitivity analysis range (+/- 25 percent) was designed to capture the bounds of reasonable variability for each element analyzed. The basis for reasonable variability for each element analyzed is summarized as follows:

·

Sales Price - Historical coal sales price variability of 20 percent between 2018 and September 2021

·

Production - Variability in production of up to 28 percent from the 2019 through 2020

·

Operating Cost - Estimated accuracy of +/- 15 percent

·

Capital Costs - Estimated accuracy of +/- 15 percent

·

Discount Rate - based on range of variability from 7.5 to 12.5 percent

November 22, 2022

Page 108


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

Figure 19.3-1 depicts the results of the NPV sensitivity analysis.

Figure 19.3-1 Net Present Value Sensitivity Analysis

Graphic

Figure 19.3-1 shows that the Berwind Complex NPV is most sensitive to changes in coal sales prices and operating costs. It is less sensitive to changes in production and least sensitive to changes in discount rate and capital expenditures.

November 22, 2022

Page 109


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

20.0

ADJACENT PROPERTIES

This TRS does not include any estimates of coal resources or coal reserves associated with adjacent uncontrolled properties.

November 22, 2022

Page 110


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

21.0

OTHER RELEVANT DATA AND INFORMATION

Conducting a due diligence investigation relative to the mineral and surface rights of Ramaco’s mining operations was not part of WEIR’s scope of work. This TRS is based on Ramaco controlling, by lease or ownership, or having the ability to acquire the coal reserves and surface lands necessary to support its mine plans.

The ability of Ramaco, or any coal company, to achieve production and financial projections is dependent on numerous factors. These factors primarily include site-specific geological conditions, the capabilities of management and mine personnel, level of success in acquiring reserves and surface properties, coal sales prices and market conditions, environmental issues, securing permits and bonds, and developing and operating mines in a safe and efficient manner.  Unforeseen changes in legislation and new industry developments could substantially alter the performance of any mining company.

Coal mining is carried out in an environment where not all events are predictable. While an effective management team can identify known risks and take measures to manage and/or mitigate these risks, there is still the possibility of unexpected and unpredictable events occurring.  It is not possible therefore to totally remove all risks or state with certainty that an event that may have a material impact on the operation of a coal mine will not occur.

November 22, 2022

Page 111


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

22.0

INTERPRETATIONS AND CONCLUSIONS

22.1SUMMARY OF INTERPRETATIONS AND CONCLUSIONS

Interpretation

Ramaco has a long operating history of resource exploration, mine development, and mining operations at the Berwind Complex, with extensive exploration data including drillholes, in-mine seam thickness and elevation measurements, and in-mine channel samples supporting the determination of mineral resource and reserve estimates, and projected economic viability.  The data has been reviewed and analyzed by WEIR and determined to be adequate in quantity and reliability to support the coal resource and coal reserve estimates in this TRS.

Conclusion

The coal resource and coal reserve estimates and supporting Preliminary Feasibility Study were prepared in accordance with Regulation S-K 1300 requirements. There are 535 million in-place tons of measured and indicated coal resources, exclusive of reserves, and 10.5 million clean recoverable tons of mineable reserves within the Berwind Complex as of December 31, 2021. Reasonable prospects for economic extraction were established through the development of a Preliminary Feasibility Study relative to the Berwind Complex LOM Plan, considering historical mining performance, historical and projected metallurgical coal sales prices, historical and projected mine operating costs, and recognizing reasonable and sufficient capital expenditures.

22.2SIGNIFICANT RISKS AND UNCERTAINTIES

Risk, as defined for this study, is a hazard, condition, or event related to geology and reserves, mine operations and planning, environmental issues, health and safety, and general business issues that when taken individually, or in combination, have an adverse impact on Ramaco’s development of the Berwind Complex. Risks can disrupt operations, adversely affect production and productivity, and result in increased operating cost and/or increased capital expenditures.

November 22, 2022

Page 112


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

In the context of this TRS, the likelihood of a risk is a subjective measure of the probability of the risk occurring, recognizing the magnitude of the risk defined as follows:

Low Risk indicates that the combined probabilities (low/medium/high) together with the economic impact (minimal/significant/adverse), if conditions exist, should not have any material adverse effect on the economic viability of the project.

Moderate Risk indicates that the combined probabilities (low/medium/high) together with the economic impact (minimal/significant/adverse), if conditions exist, could have a detrimental effect on the economic viability of the project.

High Risk indicates that the combined probabilities (low/medium/high) together with the economic impact (minimal/significant/adverse), if conditions exist, could have a seriously adverse effect the economic viability of the project.

Based on a review of available information and discussions with Ramaco personnel, WEIR identified potential risks associated with the Berwind Complex LOM Plan. The risks, WEIR’s assessment of risk magnitude, and comments based on WEIR’s experience with surface and underground mining operations are summarized in Table 22.2-1 as follows:

Table 22.2-1 Berwind Complex Risk Assessment Summary

WEIR Risk

 

Area of Risk

    

Assessment

    

Comments

Coal Quality

Low

Based on previous production and core hole quality data, coal quality appears to be a consistently good metallurgical coal product.

Horizontal Stress

Low

Observed mining conditions do not indicate horizontal stress problems.

Land Acquisition

Low

All mineral control is maintained through current leases and subleases. No additional acquisitions are necessary for the LOM Plan.

Methane

Low to Moderate

Although methane gas is present in the seams, gas liberation experienced to date has been low to moderate, or at levels that can be safely mitigated during mining. Procedures and continuous gas monitoring are in place to prevent, to the extent possible, methane ignitions and mine fires.

Overburden Stress

Low

The potential for a coal pillar bump or release of stress when mining will be monitored as a part of the normal mining operation. Due to the mountainous terrain, overburden can approach 1,000 feet when mining under ridges. However, the risk of bumps occurring is minimal, since coal outbursts, as a result of sudden release of energy, are typically associated with depth of cover of 1,500 to plus 2,000 feet.

Qualified Employees

Low to Moderate

Recent changes in the coal mining industry have resulted in many coal miners being closed resulting in fewer qualified employees available in general. Ramaco has existing operations with sufficient qualified employees. However, additional mine startups may cause some employee shortages. Ramaco can train inexperienced miners along their experienced miners.

November 22, 2022

Page 113


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

WEIR Risk

Area of Risk

    

Assessment

    

Comments

Rail Lines

Low to Moderate

There is currently a shortage of coal rail transportation capacity. The recent upswing in coal prices has resulted in short term increases in rail capacity. This capacity will likely be a relative unknown for the medium to long term.

Refuse Disposal

Low

Ramaco's currently permitted refuse disposal capacity is sufficient for the long term.

Roof Lithology

Low to Moderate

All underground coal mines have the potential to experience unstable roof conditions. The relative consistency of the Norton and Pocahontas Formations that primarily consists of competent sandstones and shales help decrease this risk at the Berwind Complex Deep Mines. Additionally, this potential risk can be kept in the low range through proper ground control engineering and following approved roof control plans.

Geology

Low to Moderate

The structure of the seams at the Berwind Complex all have a relatively gentle dip of approximately two degrees to the northwest or to the south/southwest. There are seven significant faults in the area. There are no known structural anomalies such as sand channels that cut out seams.

Spontaneous Combustion

Low

Seams at the Berwind Complex have a low potential for spontaneous combustion, and Ramaco has not experienced any loss of production due to spontaneous combustion.

Water Inflow

Low

Ramaco mines at the Berwind Complex are relatively dry since the mines are well above drainage.

Market Conditions

Moderate

Market conditions remain volatile for metallurgical coal. Blast Furnace methods for making steel is under pressure from various world-wide government entities due to CO2 emissions. Markets in China and India are likely to be primary drivers for the metallurgical coal industry. Ramaco should prioritize maintaining good relations with existing and potential clients.

It is WEIR’s opinion that the majority of the risks can be kept low and/or mitigated with efficient and effective mine planning and mine engineering, and monitoring of the mining operations.

November 22, 2022

Page 114


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

23.0

RECOMMENDATIONS

The Berwind Complex has sufficient geologic exploration data to estimate mineral reserves and resources.  Future exploration work will be undertaken by Ramaco to continuously provide geological data primarily for use by mine operations personnel related to effective implementation of the Mine Plans.  Future exploration work and mineral property acquisition should include what has been historically implemented related to the following:

Geology

·

Have an experienced geologist log core holes, measure core recovery, and complete sampling. Geophysically log core holes to verify seam and coal thickness and core recovery.

·

Geophysically log rotary holes to verify strata and coal thickness.

·

Continue to prepare laboratory sample analysis at 1.40 and 1.50 specific gravities to better match the preparation plant specific gravity when processing a metallurgical coal.

·

Continue collecting channel samples (include parting).

November 22, 2022

Page 115


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

24.0

REFERENCES

References used in preparation of this TRS are as follows:

·

Ramaco. 2021. Berwind No1 Mine Pocahontas No 3 Seam Plan 2021 - Standard

·

Ramaco. 2021. Berwind Poca4 CTPF Mine Plan 2022 - Standard

·

Ramaco. 2021. Triad P4 Mine Plan 2022 - Standard

·

Ramaco. 2021. Big Creek Jawbone Deep Mine Plan 2021- Standard

·

Ramaco. 2021. Big Creek Surface Mine Plan 2021 - Standard

·

Ramaco. 2021. Knox Creek Tiller Mine Jawbone Seam Plan 2020 – Standard

·

Harlow, George E., Jr. and LeCain, Gary D., 1993, Hydraulic Characteristics of, and Ground-Water Flow in, Coal-Bearing Rocks of Southwestern Virginia: U. S. Geological Survey Water-Supply Paper 2388.

Websites Referenced:

·

Securities and Exchange Commission - Modernization of Property Disclosures for Mining Registrants - Final Rule Adoption

https://www.sec.gov/rules/final/2018/33-10570.pdf

·

MSHA Data Retrieval Site

https://www.msha.gov/mine-data-retrieval-system

·

WVDEP Permits

https://apps.dep.wv.gov/webapp/_dep/securearea/public_query/ePermittingApplicationSearchPage.cfm

·

VDE Permits; Mined Land Repurposing Internet (virginia.gov)

November 22, 2022

Page 116


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

25.0

RELIANCE ON INFORMATION PROVIDED BY THE REGISTRANT

In preparing this report, WEIR relied upon data, written reports and statements provided by the registrant.  It is WEIR’s belief that the underlying assumptions and facts supporting information provided by the registrant are factual and accurate, and WEIR has no reason to believe that any material facts have been withheld or misstated.  WEIR has taken all appropriate steps, in its professional opinion, to ensure information provided by the registrant is reasonable and reliable for use in this report.

The registrant’s technical and financial personnel provided information as summarized on Table 25.1 as follows:

Table 25.1 Information Relied Upon from Registrant

Category

    

Information

    

Report Section

 

Legal

Mineral control and surface rights

3

Geotechnical

Pillar design, roof control plans, and rock quality analyses

13.1.1

Hydrogeological

Hydrogeological Analysis including inflow rates, permeability and tranmisivity calculations, and watershed analysis

13.1.2

Marketing

Coal sales price projections

16

Environmental

Permits, bond, and reclamation liability

17

Macroeconomic

Real price growth (coal sales, labor and other cash costs)

18

Income Tax

Income Tax Rate

19

November 22, 2022

Page 117


Technical Report Summary
Berwind Complex

Prepared for Ramaco Resources, Inc.

Graphic

APPENDIX A - EXHIBIT

Exhibit 6.3-2Berwind Complex, Geological Cross Sections

Graphic

November 22, 2022

Page 118