EX-99.1 2 firstmining_ex991.htm EX-99.1 firstmining_ex991.htm

EXHIBIT 99.1

   

 

TSX: FF

 

 

 

OTCQX: FFMGF

 

 

 

FRANKFURT: FMG

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ANNUAL

 

INFORMATION

 

FORM

 

For the year ended

 

December 31, 2023

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Date: March 28, 2024

 

 

 

 

 

 

2070 – 1188 WEST GEORGIA STREET, VANCOUVER, BRITISH COLUMBIA V6E 4A2

WWW.FIRSTMININGGOLD.COM | 1-844-306-8827

 

 

 

 

CONTENTS

 

Important information about this document

 

4

 

 

Reporting currency and financial information

 

4

 

 

Non-IFRS Financial Measures

 

4

 

 

Caution about forward-looking information

 

4

 

 

Examples of forward-looking information in this AIF

 

5

 

 

Material risks

 

6

 

 

Material assumptions

 

7

 

 

National Instrument 43-101 definitions

 

9

 

 

Glossary of units

 

12

 

 

Glossary of elements

 

12

 

 

Glossary of abbreviations and acronyms

 

13

 

 

Cautionary note to US investors

 

14

 

About First Mining

 

 

15

 

 

Vision and strategy

 

15

 

 

General overview of our business

 

16

 

 

Three-year history

 

19

 

 

Recent developments

 

29

 

 

Corporate organization

 

31

 

 

Our projects

 

32

 

Material Properties

 

 

32

 

Springpole 

 

 

 

33

 

 

Technical report

 

33

 

 

Project description, location and access

 

33

 

 

History

 

36

 

 

Geological setting, mineralization and deposit types

 

38

 

 

Exploration

 

39

 

 

Drilling

 

39

 

 

Sampling, analysis and data verification

 

40

 

 

Mineral processing and metallurgical testing

 

45

 

 

Mineral resource estimates

 

47

 

 

Mineral reserve estimates

 

48

 

 

Mining methods

 

48

 

 

Processing and recovery operations

 

49

 

 

Infrastructure, permitting and compliance activities

 

50

 

 

Capital and operating costs

 

52

 

 

Exploration, development and production

 

55

 

 

Recent developments

 

56

 

 

Duparquet

 

 

63

 

 

Technical report

 

63

 

 

Project description, location and access

 

63

 

 

History

 

64

 

 

Geological setting, mineralization and deposit types

 

65

 

 

Exploration

 

67

 

 

Drilling

 

68

 

 

Sampling, analysis and data verification

 

68

 

 

 
2 | Page

 

 

 

Mineral processing and metallurgical testing

 

74

 

 

Mineral resource estimates

 

78

 

 

Mining Methods

 

81

 

 

Recovery Methods

 

83

 

 

Infrastructure

 

85

 

 

Environmental Studies, Permitting and Social/Community Impact

 

86

 

 

Capital and Operating Costs

 

87

 

 

Cameron

 

 

90

 

 

Technical report

 

90

 

 

Project description, location and access

 

90

 

 

History

 

91

 

 

Geological setting, mineralization and deposit type

 

92

 

 

Exploration

 

92

 

 

Drilling

 

92

 

 

Sampling, analysis and data verification

 

93

 

 

Mineral processing and metallurgical testing

 

97

 

 

Mineral resource estimates

 

98

 

 

Recent developments

 

100

 

 

Non-material properties

 

 

101

 

 

Risks that can affect our business

 

 

103

 

 

Types of risk

 

104

 

 

Exploration, development, production and operational risks

 

104

 

 

Financial risks

 

109

 

 

Political risks

 

112

 

 

Regulatory risks

 

114

 

 

Environmental risks

 

115

 

 

Industry risks

 

116

 

 

Other risks

 

117

 

 

Investor information

 

 

123

 

 

Share capital

 

123

 

 

Common shares

 

123

 

 

Preferred shares

 

124

 

 

Security-based compensation and convertible securities

 

124

 

 

Material contracts

 

125

 

 

Market for our securities

 

130

 

 

Prior sales

 

130

 

 

Trading activity

 

131

 

 

Our team

 

133

 

 

Audit Committee information

 

140

 

 

Interests of experts

 

143

 

 

Additional information

 

144

 

 

Appendix A – Audit Committee Charter

 

145

 

  

 
3 | Page

 

 

Important information about this document

 

Throughout this document, the terms we, us, our, the Company and First Mining mean First Mining Gold Corp. and its subsidiaries, in the context.

 

 

 

This annual information form (“AIF”) provides important information about the Company. It describes, among other things, our history, our markets, our exploration and development projects, our Mineral Resources and Mineral Reserves, sustainability, our regulatory environment, the risks we face in our business and the market for our shares.

  

Reporting currency and financial information

 

The reporting currency of the Company is Canadian dollars.  Unless we have specified otherwise, all dollar amounts (“$”) referred to in this AIF are in Canadian dollars.  Any references to “US$” mean United States (US) dollars.  On December 29, 2023, the exchange rate of US dollars into Canadian dollars, being the average exchange rate published by the Bank of Canada, was US$1.00 equals $1.32.

 

Non-IFRS Financial Measures

 

In this AIF we refer to future estimates of financial measures that are not IFRS financial measures (“Non-IFRS Financial Measures”). These financial measures are widely used in the mining industry as a benchmark for performance but do not have standardized meanings prescribed by IFRS and may differ from methods used by other companies with similar descriptions. Non-IFRS Financial Measures should not be considered in isolation or in substitute for measures of performance prepared in accordance with IFRS.

 

These Non-IFRS Financial Measures are included in this AIF because these statistics are used as key performance measures that management uses to monitor and assess future performance of the Springpole Project and to plan and assess the overall effectiveness and efficiency of mining operations. Non-IFRS Financial Measures included in this AIF are as follows:

 

 

·

Total Cash Costs and Total Cash Costs per Gold Ounce – Total Cash Costs are reflective of the cost of production. Total Cash Costs reported in the AIF in regards to the Springpole Project include mining costs, processing, water and waste management costs, on-site general and administrative costs, treatment and refining costs, royalties and silver stream credits. Total Cash Costs per Ounce is calculated as Total Cash Costs divided by total LOM payable gold ounces.

 

 

 

 

·

All-in Sustaining Costs (“AISC”) and AISC per Gold Ounce – AISC is reflective of all of the expenditures that are required to produce an ounce of gold from operations. AISC reported in the AIF is in regards to the Springpole Project includes Total Cash Costs, sustaining capital and closure costs. AISC per Ounce is calculated as AISC divided by total LOM payable gold ounces.

  

The AISC and Total Cash Costs are future estimates only and, as the Company has not generated production from the Springpole Project to date, no comparable historical figures are available.

 

Caution about forward-looking information

 

This AIF includes statements and information about our expectations for the future. When we discuss our strategy, business prospects and opportunities, plans and future financial and operating performance, or other things that have not yet taken place, we are making statements considered to be forward-looking information or forward-looking statements under applicable securities laws. We refer to them in this AIF as forward-looking information.

 

 
4 | Page

 

 

Key things to understand about the forward-looking information in this AIF:

 

 

·

It typically includes words and phrases about the future, such as expect, believe, estimate, anticipate, plan, intend, predict, goal, target, forecast, project, scheduled, potential, strategy and proposed (see examples listed below).

 

 

 

 

·

It is based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management made in the light of management's experience and perception of historical trends, current conditions and expected future developments, including those we have listed below, which may prove to be incorrect.

 

 

 

 

·

Actual results and events may be significantly different from what we currently expect, because of the risks associated with our business. We list a number of these material risks on the next page 103. We recommend you also review other parts of this AIF, including the section “Risks that can affect our business” starting on page, which discuss other material risks that could cause our actual results to differ from current expectations.

  

Forward-looking information is designed to help you understand management’s current views of our near-term and longer-term prospects. It may not be appropriate for other purposes. We will not update or revise this forward-looking information unless we are required to do so by applicable securities laws.

 

Examples of forward-looking information in this AIF

 

 

·

statements regarding future acquisitions of mineral properties

 

·

statements relating to our vision and strategy

 

·

statements relating to our plans or intentions to pay, or not pay, a dividend to our shareholders

 

·

our intention to de-risk our material assets through exploration, drilling, calculating resource estimates, conducting economic studies and other activities

 

·

our intention to utilize our management team’s expertise to successfully permit and construct producing mines at our material assets

 

·

statements relating to the criteria we will use when assessing potential acquisitions

 

·

our belief that we will continue to be able to locate and retain professionals with the necessary specialized skills and knowledge

 

·

statements regarding our intention and ability to select, acquire and bring to production suitable properties or prospects for mineral exploration and development

 

·

our ability to raise the capital necessary to fund our operations and the potential development of our properties

 

·

our ability to obtain the resources to conduct exploration and development activities on our properties

 

·

our belief that the policies and procedures implemented by our executive management team provide a safe working environment for all of our employees, consultants, contractors and stakeholders

 

·

forecasts relating to market developments and trends in global supply and demand for gold

 

·

our ability to work with the various Indigenous communities in relation to the development of our projects

 

 
5 | Page

 

 

 

·

our intention to continue to make expenditures to ensure compliance with applicable laws and regulations

 

·

our intentions and expectations regarding exploration, drilling or operations any of our mineral properties or those operated by our partners

 

·

statements regarding the ultimate recovery of gold and silver from our properties, including the Springpole Project and the Duparquet Project

 

·

statements regarding regulatory approval and permitting, including but not limited to the Environmental Assessment process currently underway and our plans to complete a Feasibility Study on the Springpole Project

 

·

statements regarding our plans to address the legacy environmental issues at the Duparquet Project

 

·

forecasts relating to mining, development and other activities at our operations

 

·

statements regarding projected capital and operating costs, net present value, AISC, Total Cash Costs and internal rate of return and cash flows of the Springpole Project and the Duparquet Project

 

·

future royalty and tax payments and rates

 

·

future work on our non-material properties

 

·

our Mineral Reserve and Mineral Resource estimates

 

·

statements regarding our intentions with respect to our holdings of securities of other issuers

 

·

statements regarding future consideration payable to First Mining pursuant to the Silver Stream Agreement and the Treasury Metals SPA

 

Material risks

 

 

·

exploration, development and production risks

 

·

our exploration plans may be delayed or may not be successful

 

 

 

 

 

 

 

·

operational hazards

 

·

we may not be able to obtain or maintain necessary permits or approvals from government authorities

 

 

 

 

 

 

 

·

global financial conditions including supply chain issues, increased inflation, interest rates, economic sanctions and the impact of armed hostilities, such as those ongoing in the Ukraine and the Middle East

 

·

we may be affected by environmental, safety and regulatory risks, including increased regulatory burdens or delays

 

 

 

 

 

 

 

·

commodity price fluctuations

 

·

there may be defects in, or challenges to, title to our properties

 

 

 

 

 

 

 

·

availability of capital and financing on acceptable terms

 

·

our current or future mineral tenure or operations may be challenged by one or more groups holding Indigenous rights

 

 

 

 

 

 

 

·

we have no history of commercially producing metals from our mineral exploration properties

 

 

 

 

 

 

 

 

 

 

·

our Mineral Reserve and Mineral Resource estimates may not be reliable, or we may encounter unexpected or challenging geological, hydrological or mining conditions

 

 

 

  

 
6 | Page

 

 

 

·

some of our mineral projects have legacy environmental issues as a result of past operations which we may need to remediate

 

·

we may be impacted by natural phenomena, including inclement weather, fire, flood and earthquakes and the impacts of climate change

 

 

 

 

 

 

 

·

we may lose our interest in certain projects if we fail to make certain required payments or minimum expenditures

 

·

our exploration projects may be disrupted due to problems with our facilities, the unavailability of equipment, equipment failure, labour shortages, ground movements, transportation disruptions or accidents or other exploration and development risk

 

 

 

 

 

 

 

·

we may be unable to enforce our legal rights under our existing agreements, permits or licences, or may be subject to litigation or arbitration that has an adverse outcome

 

·

uncertainties and substantial expenditures related to determining whether Mineral Resources or Mineral Reserves exist on a property

 

 

 

 

 

 

 

·

we may be adversely affected by currency fluctuations, volatility in securities markets and volatility in mineral prices and interest rates

 

·

we may not be able to attract and retain suitable specialized personnel

 

 

 

 

 

 

 

·

accidents or equipment breakdowns may occur

 

·

the impact of increased costs on the calculation of Mineral Reserves and on the economic viability of projects

 

 

 

 

 

 

 

·

the cyclical nature of the mining industry

 

·

future sales by existing shareholders could reduce the market price of our shares

 

 

 

 

 

 

 

·

there may be changes to government regulations or policies, including tax and trade laws and policies

 

·

climate change regulations may become more onerous over time as governments implement policies to further reduce carbon emissions

 

 

 

 

 

 

 

·

we may be adversely affected by changes in foreign currency exchange rates, interest rates or tax rates

 

·

we are exposed to risks associated with our equity holdings in other public companies

 

 

 

 

 

 

 

·

our estimates of production, purchases, costs, decommissioning or reclamation expenses, or our tax expense estimates, may prove to be inaccurate

 

 

 

  

Material assumptions

 

 

·

the assumptions regarding market conditions upon which we have based our capital expenditure expectations

 

 

 

 

·

the availability of additional capital and financing on acceptable terms, or at all

 

 

 

 

·

our Mineral Reserve and Mineral Resource estimates and the assumptions upon which they are based are reliable

 

 

 

 

·

the success of our exploration plans

 

 

 

 

·

our expectations regarding spot prices and realized prices for gold and other precious metals

 

 

 

 

·

market developments and trends in global supply and demand for gold meeting expectations

 

 

 

 

 
7 | Page

 

 

 

·

our expectations regarding tax rates and payments, foreign currency exchange rates and interest rates

 

 

 

 

·

our reclamation expenses

 

 

 

 

·

the geological conditions at our properties

 

 

 

 

·

the underlying title to each of our properties is valid and will continue to be so

 

 

 

 

·

our ability to satisfy payment and minimum expenditure obligations in respect of certain of our properties

 

 

 

 

·

our ability to comply with current and future environmental, safety and other regulatory requirements, and to obtain and maintain required regulatory approvals without undue delay

 

 

 

 

·

our operations are not significantly disrupted as a result of natural disasters, governmental or political actions, public health crises, litigation or arbitration proceedings, the unavailability of reagents, equipment, operating parts and supplies critical to our activities, equipment failure, labour shortages, ground movements, transportation disruptions or accidents or other exploration and development risks

 

 

 

 

·

our ability to maintain the support of stakeholders and rights holders necessary to develop our mineral projects including, without limitation, holders of Indigenous rights

 

 

 

 

·

the accuracy of geological, mining and metallurgical estimates

 

 

 

 

·

maintaining good relationships with the communities in which we operate

 

 
8 | Page

 

 

National Instrument 43-101 definitions

 

Canadian reporting requirements for disclosure of mineral properties are governed by National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”). The definitions in NI 43-101 are adopted from those given by the Canadian Institute of Mining Metallurgy and Petroleum (“CIM”).

 

Qualified Person

The term “Qualified Person” refers to an individual who is an engineer or geoscientist with at least five years of experience in mineral exploration, mine development, production activities and project assessment, or any combination thereof, including experience relevant to the subject matter of the project or report and is a member in good standing of a self-regulating organization.

  

Mineral Resource

The term “Mineral Resource” refers to a concentration or occurrence of diamonds, natural solid inorganic material, or natural solid fossilized organic material including base and precious metals, coal and industrial minerals in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.

  

Inferred Mineral Resource

The term “Inferred Mineral Resource” refers to that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and limited sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. The estimate is based on limited information and sampling gathered through appropriate sampling techniques from locations such as outcrops, trenches, pits, workings and drill holes.

 

 
9 | Page

 

 

Indicated Mineral Resource

The term “Indicated Mineral Resource” refers to that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with sufficient confidence to allow the appropriate application of modifying factors (including, but not limited to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environment, social and governmental factors) in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to reasonably assume geological and grade or quality continuity between points of observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a “Measured Mineral Resource” and may only be converted to a “Probable Mineral Reserve”.

 

Measured Mineral Resource

 

The term “Measured Mineral Resource” refers to that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with sufficient confidence to allow the appropriate application of modifying factors (including, but not limited to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environment, social and governmental factors) in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm geological and grade or quality continuity between points of observation. A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral Resource. It may be converted to a “Proven Mineral Reserve” or to a Probable Mineral Reserve. 

 

 

 
10 | Page

 

 

Mineral Reserve

The term “Mineral Reserve” refers to that part of a Measured and/or Indicated Mineral Resource which, after the application of all mining factors, result in an estimated tonnage and grade which, in the opinion of the Qualified Person(s) making the estimates, is the basis of an economically viable project after taking account of all relevant modifying factors (including, but not limited to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environment, social and governmental factors). It includes diluting materials that will be mined in conjunction with the Mineral Reserves and delivered to the treatment plant or equivalent facility, as well as allowances for losses which may occur when the material is mined or extracted, and Mineral Reserves are defined by studies at pre-feasibility or feasibility level, as appropriate. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified. The term Mineral Reserve does not necessarily signify that extraction facilities are in place or operative or that all governmental approvals have been received. It does, however, signify that there are reasonable expectations of such approvals.

 

Probable Mineral Reserve

 

The term “Probable Mineral Reserve” refers to the economically mineable part of an Indicated Mineral Resource, and in some circumstances, a Measured Mineral Resource. The confidence in the modifying factors (including, but not limited to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environment, social and governmental factors) applying to a Probable Mineral Reserve is lower than that applying to a “Proven Mineral Reserve”. Probable Mineral Reserve estimates must be demonstrated to be economic, at the time of reporting, by at least a pre-feasibility study. 

 

Proven Mineral Reserve

The term “Proven Mineral Reserve” refers to the economically mineable part of a Measured Mineral Resource. A Proven Mineral Reserve implies that the Qualified Person has the highest degree of confidence in the estimate and the modifying factors (including, but not limited to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environment, social and governmental factors). Use of the term is restricted to that part of the deposit where production planning is taking place and for which any variation in the estimate would not significantly affect the potential economic viability of the deposit. Proven Mineral Reserve estimates must be demonstrated to be economic, at the time of reporting, by at least a pre-feasibility study.

 

 
11 | Page

 

 

Glossary of units

 

Unit

Abbreviation

centimetre(s)

cm

cubic metre(s)

m3

day

d

degree(s)

°

foot/feet (as context requires)

ft.

gram(s)

g

grams per tonne

g/t

hectare(s)

ha

kilogram(s)

kg

kilometre(s)

km

metre(s)

m

micrometre(s)

µm

million ounces

Moz.

million cubic metres

Mm3

million tonnes

Mt

ounce(s)

oz.

ounce(s) per tonne

oz./t

parts per million

ppm

square kilometre(s)

km2

square metre(s)

m2

tonne(s)

t

tonnes per cubic metre

t/m3

 

Glossary of elements

 

Element

Abbreviation

copper

Cu

gold

Au

silver

Ag

 

 
12 | Page

 

   

Glossary of abbreviations and acronyms

 

All-In Sustaining Costs

 AISC

Canadian Environmental Assessment Act

 CEAA

Carbon-in-Pulp

 CIP

Cut-off Grade

 COG

Environmental Impact Statement

 EIS

Engineering, Procurement and Construction Management

 EPCM

General and Administrative

 G&A

Internal Rate of Return

 IRR

Life-of-Mine

 LOM

National Instrument 43-101

 NI 43-101

Net Present Value

 NPV

Net Smelter Return

 NSR

Non-Acid Generating

 NAG

Potentially Acid Generating

 PAG

Pre-Feasibility Study

 PFS

Preliminary Economic Assessment

 PEA

Quality Assurance

 QA

Quality Control

 QC

Waste Storage Facility

 WSF

 

 
13 | Page

 

 

Cautionary note to US investors

 

The technical information contained herein has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of the United States securities laws applicable to U.S. companies. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

 

Technical disclosure contained or incorporated by reference in this AIF has not been prepared in accordance with the requirements of United States securities laws and uses terms that comply with reporting standards in Canada with certain estimates prepared in accordance with NI 43-101.

 

NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning the issuer’s material mineral projects.

 

 
14 | Page

 

 

About First Mining

 

First Mining Gold Corp. is a Canadian-focused gold exploration and development company that was created in 2015 by Mr. Keith Neumeyer, founding President and CEO of First Majestic Silver Corp. and a co-founder of First Quantum Minerals Ltd.

 

We are advancing a portfolio of gold projects in Canada, with a focus on the Springpole Gold Project (the “Springpole Project” or “Springpole”) in northwestern Ontario and the Duparquet Gold Project (the “Duparquet Project” or “Duparquet”) in Quebec.

 

We are publicly listed on the Toronto Stock Exchange (“TSX”) under the trading symbol “FF”, in the US on the OTC-QX under the trading symbol “FFMGF”, and on the Frankfurt Stock Exchange under the symbol “FMG”.  Our board and management team has decades of experience in evaluating, exploring and developing mineral assets.

 

 

First Mining Gold Corp.

(TSX: FF; OTC-QX: FFMGF; Frankfurt: FMG)

 

 

 

 

 

Head Office: 

 

Registered & Records Office:

 

 

 

 

First Mining Gold Corp.

Suite 2070

1188 West Georgia Street

Vancouver, BC V6E 4A2

Canada

 

Bennett Jones LLP

Suite 2500, Park Place

666 Burrard Street

Vancouver, BC V6C 2X8

Canada

 

 

Vision and strategy

 

We hold a portfolio of mineral assets in Canada, with a focus on gold, along with a number of marketable securities.  Our vision is to advance our material assets toward a construction decision and, ultimately, to production.

 

To achieve this goal, our strategy is to:

 

 

·

advance the Springpole Project to a construction decision by taking Springpole through the environmental assessment process and completing a feasibility study;

 

 

 

 

·

enhance the Springpole Project by exploring the consolidated mineral tenure in the prospective Birch-Uchi greenstone belt;

 

 

 

 

·

advance the Duparquet Project by completing environmental baseline, engineering and economic studies to scope a project that demonstrates robust economic return and addresses the environmental legacy of the past-producing mine;

 

 

 

 

·

de-risk our other material assets through exploration, drilling, calculating resource estimates, conducting engineering, environmental and economic studies, advancing the projects through permitting processes and other activities;

 

 

 

 

·

surface value from our portfolio of assets by finding partners to help advance them by committing financial and human capital to advance and de-risk them, and ultimately monetizing those projects to provide funding to advance our material assets;

 

 

 

 

·

utilize our board and management team’s expertise to successfully permit, finance and construct producing mines at our material assets, either on our own or with financial or operating partners; and

 

 

 

 

·

continue to grow our asset base by acquiring additional mineral assets.

  

 
15 | Page

 

 

We may acquire additional mineral assets in the future. We consider the following criteria when assessing potential acquisition targets:

 

 

·

Quality of asset – we consider factors such as economics, grade, size and exploration potential, metallurgy and mineability (eg. strip ratio) when assessing a new mineral property.

 

 

 

 

·

Location – we are focused on assets located in politically stable and mining friendly jurisdictions.

 

 

 

 

·

Compatibility with our existing asset base – we consider whether a project can improve the economic or strategic value of our existing projects.

 

 

 

 

·

Availability of infrastructure – we consider whether the project has good access to power, water, highways, ports and a labour force.

 

 

 

 

·

Holding costs – we take into account the holding costs (eg. assessment work requirements) and annual taxes payable on the mineral claims when deciding whether to acquire a new mineral property.

 

 

 

 

·

Valuation – we look for attractively valued resources to add to our portfolio.

 

General overview of our business

 

We are in the exploration and development stage, and we do not currently own any producing properties. Consequently, we have no current operating income or cash flow from our properties, nor have we had any income from operations in the past three financial years. At this time, our operations are primarily funded by equity and other financings, and the sale or monetization of non-core assets.

 

An investment in First Mining is speculative and involves a high degree of risk due to the nature of our business and the present stage of exploration and development of our mineral properties. We encourage readers to carefully read this AIF in its entirety, including the section “Risks that can affect our business” starting on page 103 which discusses certain material risks related to our business, operations and prospects.

 

Principal products

 

We are currently in the exploration and development stage and do not produce or sell mineral products. Our principal focus is on gold.

 

Specialized skills and knowledge

 

Our business requires individuals with specialized skills and knowledge in the areas of geology, drilling, geophysics, geochemistry, metallurgy, engineering and mineral processing, implementation of exploration programs, mine engineering, environmental assessment and mine permitting, acquisitions, capital raising, mine finance, accounting, and environmental compliance. In order to attract and retain personnel with such skills and knowledge, we seek to maintain competitive remuneration and compensation packages and to provide a work environment that allows our team members to grow professionally and personally. To date, we have been able to locate and retain such professionals in Canada and in the US, and we believe we will be able to continue to do so.

 

Competitive conditions

 

The precious metal mineral exploration and mining industry is very competitive in all phases of exploration and development, and we compete with numerous other companies and individuals in the search for, and the acquisition and development of, attractive precious metal mineral properties.

 

 
16 | Page

 

 

As a result of this competition, we may at times compete with other companies that have greater financial resources and technical facilities, and we may compete with other exploration and mining companies for the procurement of equipment and for the availability of skilled labour, which means that there may be times where we are unable to attract or retain qualified personnel. As well, we cannot assure you that additional capital or other types of financing will be available if needed or that, if available, the terms of such financing will be favourable to us.

 

Cycles

 

The mining business is subject to commodity price cycles. The financial markets for mining in general and mineral exploration and development in particular, continued to be weak through to the end of 2023. Markets continue to experience extreme volatility as of the date of this AIF due to a variety of factors with markets continuing to adjust to a higher interest rate environment. Increases in the rate of inflation which has, in turn, led to increases in interest rates. The long-term outlook for financial markets and the economy in general is at present unknown. If the global economy stalls and commodity prices decline as a consequence, a continuing period of lower prices and/or higher costs could significantly affect the economic potential of many of our current properties and may result in First Mining ceasing work on, or dropping its interest in, some or all of our properties. As we do not currently undertake production activities, our ability to fund ongoing exploration is affected by the availability of financing (and particularly equity financing) which, in turn, is affected by the strength of the economy, commodity prices, interest rates, inflation and other general economic factors. In response to increases in inflation over the past several years, governments have and may continue to raise interest rates. Our exposure to changes in interest rates results from investing activities undertaken to manage our liquidity and capital requirements. In addition, the increase in rates may impact the cost to the Company to advance exploration and development. There can be no assurances that interest rates will not continue to increase, perhaps materially, and if they do, they may have a material adverse effect on our business and financial position.

 

In addition, our mineral exploration activities may be subject to seasonality due to adverse weather conditions at our project sites. Drilling and other exploration activities on our properties may be restricted during the winter season as a result of various weather-related factors including, without limitation, inclement weather, snow covering the ground, frozen ground and restricted access due to snow, ice or other weather-related factors, all of which may exacerbated by climate change.

 

Economic dependence

 

Our business is dependent on the acquisition, exploration, development and operation of mineral properties. We are not dependent on any contract to sell our products or services or to purchase the major part of our requirements for goods, services or raw materials, or on any franchise or licence or other agreement to use a patent, formula, trade secret, process or trade name upon which our business depends.

 

Employees

 

As of the date of this AIF, we have 33 full-time employees, and we also utilize a variable number of fixed-term employees, consultants and contractors as needed to carry on many of our activities and, in particular, to supervise and carry out the work programs at our mineral projects.

 

 
17 | Page

 

 

Environmental protection

 

We are subject to the laws and regulations relating to environmental matters in all jurisdictions in which we operate, including provisions relating to property reclamation, discharge of hazardous materials and other matters, and we conduct our mineral exploration activities in compliance with applicable environmental protection legislation.

 

We may be held liable should environmental problems be discovered that were caused by former owners and operators of our mineral projects. Specifically, at the Duparquet Project, we are aware of certain legacy environmental issues relating to the past operation of the Beattie and Donchester mines in the 1930s to 1950s, including the presence of 3,500 tonnes of arsenic trioxide roaster dust that has been stored on the site since the mine ceased operations. We are proactively working with the relevant ministries in Quebec to develop a plan to address these legacy environmental issues at Duparquet through the development of a new mine.

 

New environmental laws and regulations, amendments to existing laws and regulations, or more stringent implementation of existing laws and regulations could have a material adverse effect on us, both financially and operationally, by potentially increasing capital and/or operating costs and delaying or preventing the development of our mineral properties.

 

Bankruptcy and similar procedures

 

There are no bankruptcies, receivership or similar proceedings against us, nor are we aware of any such pending or threatened proceedings. We have not commenced any bankruptcy, receivership or similar proceedings during our history.

 

 
18 | Page

 

 

Three-year history

 

2021

 

January

 

·

We announced the positive results of a Pre-Feasibility Study (the “Springpole PFS”) that had been completed for our Springpole Project which supports a 30,000 tonnes-per-day open pit mining operation over an 11.3 year mine life. Highlights of the Springpole PFS are as follows:

 

 

US$1.5 billion pre-tax net present value at a 5% discount rate (“NPV5%”) at US$1,600/oz gold (“Au”), increasing to US$1.9 billion at US$1,800/oz Au;

 

 

 

 

○ 

US$995 million after-tax NPV5% at US$1,600/oz Au, increasing to US$1.3 billion at US$1,800/oz Au;

 

 

 

 

36.4% pre-tax internal rate of return (“IRR”); 29.4% after-tax IRR at US$1,600/oz Au;

 

 

 

 

Life of mine (“LOM”) of 11.3 years, with primary mining and processing during the first 9 years and processing lower-grade stockpiles for the balance of the mine life;

 

 

 

 

After-tax payback of 2.4 years;

 

 

 

 

Declaration of Mineral Reserves: Proven and Probable Mineral Reserves of 3.8 Moz Au, 20.5 Moz silver (“Ag”) (121.6 Mt at 0.97 g/t Au, 5.23 g/t Ag);

 

 

 

 

Initial capital costs estimated at US$718 million, sustaining capital costs estimated at US$55 million, plus US$29 million in closure costs;

 

 

 

 

Average annual payable gold production of 335 koz (Years 1 to 9); 287 koz (LOM);

 

 

 

 

Total cash costs of US$558/oz (Years 1 to 9); and US$618/oz (LOM)(1); and

 

 

 

 

All-in sustaining costs (“AISC”) of US$577/oz (Years 1 to 9), and AISC US$645 (LOM) (2)

 

 

 

Notes:

 

Base case parameters for the Springpole PFS assume a gold price of US$1,600/oz and a silver price of US$20, and an exchange rate (C$ to US$) of 0.75. All currencies are reported in U.S. dollars unless otherwise specified. NPV calculated as of the commencement of construction and excludes all pre-construction costs.

 

 

 

 

(1)

Total cash costs consist of mining costs, processing costs, mine-level general and administrative (“G&A”) costs, treatment and refining charges and royalties. It does not include Company level G&A. Please see "Non-IFRS Financial Measures" at the beginning of this AIF.

 

 

 

 

(2)

AISC consists of total cash costs plus sustaining and closure costs. Please see "Non-IFRS Financial Measures" at the beginning of this AIF.

 

 

 

 

See the section of this AIF entitled “Material Properties – Springpole” for further details of the Springpole PFS.

  

 
19 | Page

 

 

March

 

 

·

We announced that we had entered into a three-year option agreement with Exiro Minerals Corp. (“Exiro”) pursuant to which we may earn a 100% interest in Exiro’s Swain Post property in northwestern Ontario through future cash and share payments to Exiro during the term of the option, and by completing all assessment work requirements on the property during the option term. The Swain Post property comprises 237 single cell mining claims covering nearly 5,000 hectares. It is located approximately 20 km west of the Springpole Project and approximately 5 km west of the western-most property boundary at Springpole.

 

 

·

We filed a technical report for the Springpole PFS that was prepared for us in accordance with NI 43-101 by AGP Mining Consultants Inc. The technical report, which is entitled “NI 43-101 Technical Report and Pre-Feasibility Study on the Springpole Gold Project, Ontario, Canada” (report date: February 26, 2021; effective date: January 20, 2021), can be found under our SEDAR+ profile at www.sedarplus.ca, and on our website at www.firstmininggold.com. See the section of this AIF entitled “Material Properties – Springpole” for further details of the technical report for the Springpole PFS.

 

 

·

We announced that FireFly Metals Ltd., formerly known as Auteco Minerals Ltd. (“FireFly”) had completed its $5 million expenditure requirement in respect of Stage 1 of its earn-in to PC Gold Inc. (“PC Gold”) pursuant to the Pickle Crow Earn-In Agreement (the “Pickle Crow Earn-In Agreement”) that was entered into in March of 2020. Pursuant to the Pickle Crow Earn-In Agreement, Firefly, through a subsidiary, can earn up to an 80% interest in PC Gold, a wholly owned subsidiary of First Mining at that time, which owns the Pickle Crow gold project located in Ontario (the “Pickle Crow Project”). For a summary of the key terms of the Pickle Crow Earn-In Agreement, see the section in this AIF entitled “Investor Information – Material contracts – Pickle Crow Earn-In Agreement”.

 

April

 

 

·

First Mining announced that it, along with Coastal Gold Corp. (“Coastal Gold”), a wholly-owned subsidiary of First Mining, had entered into a definitive earn-in agreement (the “Hope Brook Earn-In Agreement”) with Big Ridge Gold Corp. (“Big Ridge”) pursuant to which Big Ridge may earn up to an 80% interest in our Hope Brook gold project located in Newfoundland (the “Hope Brook Project”) through a two-stage earn-in over a five year period (the “Big Ridge Transaction”). For a summary of the key terms of the Hope Brook Earn-In Agreement, see the section in this AIF entitled “Investor information – Material contracts – Hope Brook Earn-In Agreement”.

 

 

·

We announced that we had entered into a definitive earn-in agreement with Whitefish Exploration Inc. (“Whitefish”) pursuant to which we may earn up to a 100% interest in Whitefish’s Swain Lake property ("Swain Property") located in northwestern Ontario through a two-stage earn-in process. We have a three-year option to earn an initial 70% interest in the Swain Property by incurring $500,000 in qualifying expenditures, making cash payments totalling $200,000 and share payments totalling $425,000. Upon completing the first stage of the earn-in we will have a two-year option to acquire the remaining 30% interest in the Swain Property by making a $1 million cash payment and a $1 million share payment to Whitefish. The Company will hold any interest it acquires in the Swain Property through its wholly-owned subsidiary Gold Canyon and in the event only the first stage of the earn-in is completed, Gold Canyon and Whitefish will enter into a joint venture agreement with respect to the Swain Property.

 

 

June

 

 

·

We announced the closing of the Big Ridge Transaction.

 

 

·

We announced that FireFly had issued 100,000,000 of its common shares to us and had accordingly completed the first stage of its earn-in requirements with respect to the Pickle Crow Project. As a result, FireFly earned a 51% interest in PC Gold, the Company that owns the Pickle Crow Project (and that was a wholly-owned subsidiary of First Mining up until completion by FireFly of the stage 1 earn-in). In connection with FireFly earning a 51% interest in PC Gold, the Company and FireFly entered into a joint venture shareholders agreement in respect of PC Gold. For further details, see the section in this AIF entitled “Investor Information – Material contracts – Pickle Crow Earn-In Agreement”.

 

 
20 | Page

 

 

July

 

 

·

In connection with the share purchase agreement (the “Treasury Metals SPA”) with Treasury Metals Inc. (“Treasury Metals”) in respect of the sale of all the issued and outstanding shares of Tamaka Gold Corporation (“Tamaka”), to Treasury Metals (the “Treasury Metals Transaction”), we distributed an aggregate of 23,333,333 common shares (the “TML Shares”) and 11,666,666 warrants (the “TML Warrants”) of Treasury Metals to our shareholders (the "Treasury Metals Distribution") on July 15, 2021. Immediately upon completion of the Treasury Metals Distribution, the Company held 19,999,999 TML Shares, or approximately 15.36% of Treasury Metals’ common shares and no TML Warrants. Accordingly, pursuant to the terms of the Investor Rights Agreement entered into in August of 2020 between First Mining and Treasury Metals (the “TML Investor Rights Agreement”), we currently have the right to nominate two directors to the Treasury Metals’ board.

 

 

·

We announced that we had entered into a mineral exploration agreement with Animakee Wa Whing #37 First Nation regarding, among other things, the protocol for communication and engagement between the parties in relation to the Company’s planned activities at the Cameron Project.

 

 

August

 

 

·

We announced that FireFly had fulfilled the stage 2 earn-in requirements with respect to the Pickle Crow Project by incurring $5 million in qualifying expenditures, paying $1 million in cash to the Company and granting the Company a 2% NSR royalty on the Pickle Crow Project, half of which can be bought back by FireFly for US$2.5 million. As a result, FireFly increased its ownership in PC Gold from 51% to 70%. For further details, see the section in this AIF entitled “Investor Information – Material contracts – Pickle Crow Earn-In Agreement”.

 

 

September

 

 

·

We announced that we had entered into a definitive earn-in agreement with ALX Resources Corp. (“ALX”) pursuant to which we, through our wholly-owned subsidiary Gold Canyon, can earn up to a 100% interest in ALX’s Vixen North, Vixen South and Vixen West properties (together, the “Vixen Properties”) which are located near our Springpole Project. We have a three-year option to earn an initial 70% interest in the Vixen Properties by incurring $500,000 in qualifying expenditures, making cash payments totalling $550,000 and share payments totalling $400,000. Upon completing the first stage of the earn-in, we will have a two-year option to acquire the remaining 30% interest in the Vixen Properties by making a $500,000 cash payment and a $500,000 share payment to ALX. The Company will hold any interest it acquires in the Vixen Properties through its wholly-owned subsidiary Gold Canyon and, in the event only the first stage of the earn-in is completed, Gold Canyon and ALX will enter into a joint venture agreement with respect to the Vixen Properties.

 

 

·

We announced we had acquired additional claims covering approximately 6,000 hectares within the Birch-Uchi Greenstone Belt (“BUGB” or the “BUGB Project”). The claims are located adjacent to the Swain Property in respect of which we have a three-year option agreement with Whitefish.

 

 

October

 

 

·

We announced that we had entered into a definitive earn-in agreement with Pelangio Exploration Inc. (“Pelangio”) pursuant to which we, through our wholly-owned subsidiary Gold Canyon, can earn up to an 80% interest in Pelangio’s Birch Lake and Birch Lake West properties (together, the “Birch Properties”) which are located to the northeast of our Springpole Project. We have a four-year option to earn an initial 51% interest in the Birch Properties by incurring $1,750,000 in qualifying expenditures, making cash payments totalling $350,000 and issuing 1,300,000 shares to Pelangio. Upon completing the first stage of the earn-in we will have a two-year option to acquire an additional 29% interest in the Birch Properties by incurring an additional $1,750,000 in qualifying expenditures and making a $400,000 cash payment to Pelangio. The Company will hold any interest it acquires in the Birch Properties through its wholly-owned subsidiary Gold Canyon and, in the event only the first stage of the earn-in is completed, Gold Canyon and Pelangio will enter into a joint venture agreement with respect to the Birch Properties.

 

 

·

We announced the appointment of Mr. James Maxwell as our Vice President, Exploration.

 

 
21 | Page

 

 

November

 

 

·

We announced that we had received a Notice of Approval from the Ontario Ministry of the Environment, Conservation and Parks (the “Ministry”) in regards to the Environmental Assessment Terms of Reference for our Springpole Project. Receipt of the Notice of Approval marks the formal commencement of the provincial environmental assessment process.

 

2022

 

January

 

 

·

We provided an update on the ongoing technical work at the Springpole Project to further optimize the development plan for Springpole and to further define the project scope for the environmental assessment process and into the feasibility study process. Highlights of such ongoing technical work included:

 

 

o

In 2021, taking 2.4 tonnes of metallurgical samples collected from 10 drill holes to form three production composites that underwent advanced metallurgical testing, as well as 10 variability composites. The initial results supported the test work and assumptions that were used in the Springpole PFS.

 

 

o

 

Filtration test work to optimize the size of the filter plant.

 

 

o

 

An analysis of potential greenhouse gas emissions from the Springpole Project and determining that opportunities exist to reduce such greenhouse gas emissions.

 

 

o

 

Our commissioning of SLR Consulting to complete an initial scoping study of the opportunities to incorporate renewable power generation into the project development plan at Springpole. The study concluded that wind and solar were both viable potential supplemental power sources and warranted further study.

 

 

o

 

During 2021 our environmental field work involved a comprehensive program to supplement the baseline data that had been collected in previous years.

   

·

We announced that Mr. Kenneth Engquist, our Chief Operating Officer, had resigned to pursue another opportunity in the mining industry.

 

 

·

We were made aware of a Statement of Claim filed in the Ontario Superior Court of Justice on January 7, 2022 by Cat Lake First Nation and certain other parties (collectively, the “Plaintiffs”) against the Crown (the “Cat Lake Claim”). Amongst other things, the Plaintiffs are seeking an order from the Court that all mineral tenure on lands that the Plaintiffs claim they have exclusive aboriginal title be returned to the Plaintiffs and that all mining permits, leases, license and patents in respect of such lands be cancelled. The Springpole Project is located on the lands subject to this claim and First Mining is continuing to monitor the claim.

 

 
22 | Page

 

 

February

 

·

We announced that we had acquired 286,904 additional common shares of Beattie Gold Mines Ltd. (“Beattie”), a private company incorporated under the Business Corporations Act (Ontario) which owns the mining concession that forms the largest part of the Duparquet gold project located in Québec (the “Duparquet Project”), and thereby increased our ownership interest in Beattie from 10% to 25.3%. The purchase price paid for these additional common shares comprised of a $1,272,824 cash payment and the issuance of 7,636,944 First Mining Shares.

  

March

 

·

We announced the appointment of Mr. Jeffery Reinson as our Chief Operating Officer, effective March 28, 2022.

  

June

 

·

We announced the publication of our inaugural Annual ESG Report (the “ESG Report”), which included a comprehensive review of our ESG commitments, practices, and performance for the 2021 year. Highlights of the ESG Report included:

   

 

o

We conducted an analysis of potential greenhouse gas (GHG) emissions from the Springpole Project and developed mitigation plans to reduce such GHG emissions, including tying the Springpole Project to the electrical power grid.

 

 

o

 

We provided $51,000 in sponsorship and investments in 2021, including investments of $33,500 to support community well-being and $17,500 to support traditional land use.

 

 

o

 

We provided $500,000 in capacity support funding for impacted Indigenous Communities and $100,000 funding for Traditional Knowledge studies.

 

 

o

 

We completed a comprehensive assessment of cultural heritage resources present in the Springpole Project area through inclusive Indigenous engagement.

 

 

o

 

We became a founding partner in the Sioux Lookout Mining Centre of Excellence with a first-year goal to provide basic mining training to 150 largely Indigenous youth.

 

 

o

 

We reiterated our commitment to increasing diversity through hiring more female and Indigenous employees.

 

 

July

 

·

We announced that we had made an offer to acquire all of the issued and outstanding common shares of Beattie, which owns the mining concession that forms a large part of the Duparquet Project (the “Beattie Offer”), following our February 2022 announcement that our ownership interest in Beattie increased from 10% to 25.3%.  The total consideration of the Beattie Offer was $6,227,176 in cash and the issuance of 39,127,280 First Mining Shares.

 

 

·

Concurrent with the Beattie Offer, we announced that we had entered into share purchase agreements to acquire all of the issued and outstanding shares of 2588111 Manitoba Ltd. (“258 Manitoba”) and 2699681 Canada Ltd. (“269 Canada”) (together, the “Concurrent Transactions). 258 Manitoba is a private company that owns the mineral rights to mining claims that make up the former Donchester mining concession and Dumico property that also form a part of the Duparquet Gold Project. 269 Canada is a private company that owns in whole or in part, the surface rights to the Beattie, Donchester and Dumico Properties. The total consideration payable under the Concurrent Transactions was $2,500,000 in cash and the issuance of 20,000,000 First Mining Shares. In aggregate, the total consideration of the Beattie Offer and the Concurrent Transactions was $8,727,177 in cash and 69,127,820 First Mining Shares.

   

 
23 | Page

 

 

August

 

·

We announced that Mr. Andrew Marshall, our Chief Financial Officer, had resigned to pursue another opportunity in the mining industry, and we announced the appointment of Lisa M. Peterson as our new Chief Financial Officer, effective September 16, 2022.

 

 

·

We announced the closing of the first tranche of a non-brokered private placement offering, raising aggregate gross proceeds of $4.7 million (the “2022 Tranche 1 Offering”), pursuant to which we issued 15,749,868 Flow-Through Shares at a price of $0.30 per Flow-Through Share. The gross proceeds raised from the sale of the Flow-Through Shares under the 2022 Tranche 1 Offering were used by First Mining to fund exploration programs that qualify as “Canadian Development Expenses” (“CEE”) and “flow-through mining expenditures”, as defined in the Income Tax Act (Canada).

   

September

 

 

·

We announced the closing of the final tranche of a non-brokered private placement offering, raising aggregate gross proceeds of approximately $0.6 million (the “2022 Tranche 2 Offering”), pursuant to which we issued 2,000,000 Flow-Through Shares at a price of $0.30 per Share. The net proceeds raised from the sale of the Flow-Through Shares under the 2022 Tranche 2 Offering will be used by First Mining to fund exploration programs that qualify as CEE and “flow-through mining expenditures”, as defined in the Income Tax Act (Canada). In total, we raised gross proceeds of approximately $5.3 million from the 2022 Tranche 1 Offering and the 2022 Tranche 2 Offering.

 

 

·

We announced the closing of the Beattie Offer and the completion of the Concurrent Transactions, resulting in us acquiring 100% ownership of the Duparquet Project. In aggregate, the total consideration paid by us in connection with the Beattie Offer and the Concurrent Transactions was $8,727,177 in cash and 69,127,820 First Mining Shares, and the total transaction value was approximately $24 million.

 

 

·

We announced that Big Ridge had completed the Stage 1 earn-in requirements (the “Hope Brook Stage 1 Earn-In”) with respect to our Hope Brook Project, as set out in the Hope Brook Earn-In Agreement announced in April 2021. As required under the agreement, Big Ridge has: (i) incurred $10 million in qualifying exploration expenditures at the Hope Brook Project, (ii) issued 15,000,000 common shares of Big Ridge to First Mining, and (iii) granted to First Mining a 1.5% NSR royalty on the Hope Brook Project, 0.5% of which can be bought back by Big Ridge for $2 million cash. With the completion of the Hope Brook Stage 1 Earn-In, Big Ridge earned a 51% ownership interest in the Hope Brook Project and has until June 8, 2026 to acquire an additional 29% direct interest in the project.

 

 

October

 

 

·

We filed a technical report for the Duparquet Project that was prepared for First Mining in accordance with NI 43-101 by InnovExplo Inc.  The technical report, which is entitled “NI 43-101 Technical Report and Mineral Resource Estimate Update for the Duparquet Project, Quebec, Canada” (report date: October 6, 2022; effective date: September 12, 2022). This report has now been superseded by a Preliminary Economic Assessment (effective date September 15, 2023). See the section of this AIF entitled “Material Properties – Duparquet” for further details of the Preliminary Economic Assessment for the Duparquet Project.

 

 
24 | Page

 

  

December

 

·

We announced that we had entered into a definitive royalty purchase agreement with an affiliate of Sprott Resource Streaming and Resource Corp. (“Sprott”) pursuant to which we sold our 1.5% NSR royalty on the Goldlund Project (the “Goldlund Royalty”) to Sprott for total cash consideration of approximately $9.5 million (the “Goldlund Royalty Transaction”).

 

2023

 

January

 

·

We provided an update on exploration activities at our BUGB Project located in the Red Lake Mining District of Ontario, Canada, near the Springpole Project.  Highlights of such exploration activities included:

 

 

o

We commenced a district-wide exploration program to unlock the exploration potential on the +70,000-hectare property position located in the underexplored BUGB.

 

 

o

 

District rock sampling programs returned significant gold results across multiple centres of mineralization over the project area.

 

 

o

 

Soil geochemical gap analysis, infill and pioneering surveys were completed over conducive terrains, where an additional +700 samples were collected.

 

 

o

 

We completed a five drill hole campaign, totalling 1,560 m at the Swain Property, with initial results indicative of favourable host lithologies, zones of meaningful width, and increased mineralization around key structures.

 

·

We announced that through our wholly-owned subsidiary, Duparquet Gold Mines Inc., we had entered into an agreement with IAMGOLD Corporation (“IAMGOLD”) to acquire its Porcupine East property (“Porcupine East Property”), located adjacent to our Duparquet Project and connecting our Pitt and Duquesne gold projects to the east (the “IAMGOLD Transaction”), for total consideration of:

 

 

o

2,500,000 First Mining Shares;

 

 

o

 

The grant of a 1.5% NSR royalty on the Porcupine East Property to IAMGOLD;

 

 

o

 

A future contingent payment of $500,000, in cash or First Mining Shares, on the declaration of a minimum of 350,000 oz gold resource estimate on the Porcupine East Property; and

 

 

o

 

A future contingent payment of $1,000,000, in cash or First Mining Shares, to be paid within 12 months of commercial production being declared at the Duparquet Project, as long as any major surface infrastructure related to the Duparquet Project has been constructed on the Porcupine East Property.

 

·

Westward Gold Inc. (“Westward”), successor in interest to Momentum Minerals Ltd., exercised its option to acquire 100% of our Turquoise Canyon Project located in Nevada, and upon exercise of the option, Turquoise Canyon Inc., a wholly-owned subsidiary of Westward, granted us a 2% NSR royalty on the Turquoise Canyon Project, 1% of which can be bought back by Westward for $1 million at any time prior to the first anniversary of commercial production on the property.

 

 
25 | Page

 

 

 

February

 

·

We completed our previously announced acquisition of the Porcupine East Property.

 

 

·

We announced that we had completed a transaction with Elemental Altus Royalties Corp. (“Elemental Altus”) pursuant to which we sold to Elemental Altus all of the issued and outstanding shares of one of our wholly-owned subsidiaries that held our non-core royalty portfolio for total consideration of approximately $6.7 million, comprised of $4.7 million in cash and 1,598,162 common shares of Elemental Altus (the “Royalty Portfolio Transaction”). Our royal portfolio sale to Elemental Altus was comprised of 19 royalties across four countries, including the 2% NSR on the Pickle Crow Project and the 1% NSR on the Hope Brook Project. The Elemental Altus shares paid to us as part of the consideration are subject to a statutory hold period of four months and one day from the issuance of the shares, expiring on June 22, 2023, along with a contractual restriction that expires six months after the closing date of the Royalty Portfolio Transaction, namely August 21, 2023.

 

 

·

We were made aware that the Crown had filed a Statement of Defence and Cross-Claim in the Ontario Superior Court of Justice on February 10, 2023 in respect of the Cat Lake Claim (the “Crown’s Statement of Defence”), with the Crown seeking a dismissal of the Cat Lake Claim and putting forward a cross-claim against the Province of Ontario for contribution and indemnity in the event the federal government of Canada is found liable to pay monies to the Cat Lake First Nation as a result of the Cat Lake Claim.

 

 

April 

 

 

·

We announced the completion of our 2022 development drilling program at Springpole and its results, which expanded mineralization potential with a SW extension zone. Highlights of the drilling program included:

 

 

o

The 2022 Springpole diamond drilling campaign comprised 62 drill holes totalling 5,834 metres, and was focused on advancing geotechnical, hydrogeological, and geochemical studies related to metal leaching and acid rock drainage.

 

 

 

 

o

Drilling in the southwest area of the Springpole deposit identified additional mineralization (“SW Extension Zone”) which extends beyond the ore zone boundary as defined in the 2021 Pre-Feasibility Study, allowing for extension of the deposit continuity outside the current mineral resource area.

 

 

 

 

o

Highlighted intercepts supporting the SW Extension Zone include 1.08 g/t Au over 30.0 m in hole SG22-008, and 0.98 g/t Au over 33.0 m in hole SG22-021, representing an area of opportunity for resource growth potential to be supported by infill and step-out drilling.

 

·

We announced the initiation of a planned 5,000 metre exploration drilling program at Duparquet with a focus on advancing a number of newly developed exploration targets, as well as resource growth and several optimization opportunities.

 

 

·

We completed the sale of certain non-core mining claims (the “Eagle Claims”) located in Manitoba to Grid Metals Corp. (“Grid Metals”), with total consideration comprised of C$300,000 in cash, 250,000 common shares of Grid Metals, a future contingent payment of C$350,000 and a 2.0% NSR royalty on the Eagle Claims.

 

 

June

 

 

·

We announced the publication of our second Annual ESG Report, which included a comprehensive review of our ESG commitments, practices, and performance for the 2022 year, highlighting ESG metrics across our two flagship assets, the Springpole Project and Duparquet Project.

 

 
26 | Page

 

 

·

We announced exploration results from our Swain and Sol d’Or properties in the BUGB Project located in northwestern Ontario, Canada, near our Springpole Project. Results from field and drilling programs on these two properties have identified new gold mineralization in favourable geologic settings. Highlights of the exploration advancements:

  

 

o

Identification of key exploration elements in the Grace Deformation Zone over a structural strike length of 6.5 km.

 

 

o

 

Discovery of a new gold-in-soil anomaly, including a gold assay of 724 ppb Au, with open opportunity for expansion and infill.

 

 

o

 

Return of rock grab samples from the Sol d’Or property, including a high-grade sample of 34.7 g/t Au, confirming potential for a high-grade host environment, and additional samples from the Swain Property, including one at 9.3 g/t Au.

 

 

o

 

Completion of a 150-line km airborne geophysical survey with advanced processing and modelling supporting forward targeting.

 

 

o

 

Identification of six discrete electromagnetic conductive plate models from geophysical modelling favourable for further targeting and resolution advancement.

 

 

o

 

Drilling of five priority holes at the Swain Property validating a geologic setting of favourable host rocks including notable alteration and mineralization, and including drill intersects of up to 0.64 g/t Au over 5.6 m, and 0.34 g/t Au over 14.9 m.

  

·

We announced the closing of a non-brokered private placement offering, raising aggregate gross proceeds of $5 million (the “2023 Offering”), pursuant to which we issued 18,518,519 Flow-Through Units (the “FT Units”) at a price of $0.27 per FT Unit. Each FT Unit was comprised of one common share and one half of one common share purchase warrant, issued on a flow-through basis, with each full common share purchase warrant being exercisable to acquire one additional common share of the Company at a price of $0.27 for a period of 36 months following the closing date of the 2023 Offering. The gross proceeds raised from the sale of the Flow-Through Units under the 2023 Offering will be used by First Mining to fund exploration programs that qualify as CEE and “flow-through mining expenditures”, as defined in the Income Tax Act (Canada).

 

 

July

 

 

·

We announced results from our 2023 drilling program focused on the advancement of our drilling targets at our BUGB Project. The targets are located near our Springpole Project, with the Saddle target located approximately 12 km southwest of our Springpole Project. Winter drilling comprised a total of eleven drill holes for 2,760 meters focused on three target areas including Saddle, Horseshoe, and Atlantis. Highlights include:

  

 

o

Five drill holes were completed at the Saddle target totalling 842 meters which identified a significant gold mineralization system, returning grades of 0.92 g/t Au over 114.0 m in hole SAT23-001, and 0.75 g/t Au over 57.7 m in drill hole SAT23-002.

 

 

o

 

Five drill holes were completed at the Horseshoe target totalling 1,589 m which identified a significant gold mineralization system, with drill highlights including 0.48 g/t Au over 48.5 m in drill hole HOR23-001, 0.54 g/t Au over 57 m in drill hole HOR23-002, and 0.64 g/t Au over 24 m and 0.45 g/t Au over 14.5 m in drill hole HOR23-003.

 

 

o

 

Drilling was also completed at the Atlantis target which focused on EM plate modelled targets identified in the 2022 airborne geophysics campaign.

  

·

We announced that Mr. Samir Patel, our General Counsel and Corporate Secretary, had resigned to pursue another opportunity in the mining industry.

 

 
27 | Page

 

  

September

 

·

We announced initial results from our Phase I exploration drilling program at the Duparquet Project located in Quebec, Canada. Recent drilling at the Project occurred at the newly modeled “Buzz Zone” which intersected 6.52 g/t Au over 4.6 m and 1.19 g/t Au over 10.4 m in drill hole DUP23-002, and 4.94 g/t Au over 1.00 m as well as 2.16 g/t Au over 1.50 m in drill hole DUP23-003, confirming a newly modeled gold zone targeted proximal to the South Beattie Syenite contact. In addition, results from drill hole DUP23-001 returned 2.28 g/t Au over 5.05 m, and drill hole DUP23-002 returned 8.70 g/t Au over 3.3 m, validating wireframes for the existing resource.

 

 

·

We announced the results of a positive Preliminary Economic Assessment (the “Duparquet PEA”) that had been completed for our Duparquet Project. Highlights of the Duparquet PEA are as follows:

 

 

 

o

C$1.07 billion pre-tax NPV5% and C$588 million after-tax NPV5% at US$1,800/oz Au

 

 

 

 

 

 

o

24.9% pre-tax IRR; 18.0% after-tax IRR at US$1,800/oz Au

 

 

 

 

 

 

o

Annual LOM recovered gold production of 233 koz

 

 

 

 

 

 

o

Total LOM recovered gold of 2.5 Moz over an 11-year mine life

 

 

 

 

 

 

o

Pre-tax payback of 3.8 years; after-tax payback of 4.8 years

 

 

 

 

 

 

o

Initial capital costs estimated at C$706 million; sustaining and underground development capital costs estimated at C$738 million

 

 

 

 

 

 

o

Average annual LOM Total Cash Cost of US$751/oz; average annual LOM All-In Sustaining Costs (“AISC”) of US$976/oz

 

 

 

 

 

Notes:

 

Total cash costs consist of mining costs, processing costs, mine-level general and administrative (“G&A”) costs, treatment and refining charges and royalties. It does not include Company level G&A. Please see "Non-IFRS Financial Measures" at the beginning of this AIF.

AISC consists of total cash costs plus sustaining and closure costs. Please see "Non-IFRS Financial Measures" at the beginning of this AIF. 

 

See the section of this AIF entitled “Material Properties – Duparquet” for further details of the Duparquet PEA.

 

October

 

·

We filed a technical report for the Duparquet PEA that was prepared for us in accordance with NI 43-101 by G Mining Services Inc. The technical report, which is entitled “NI 43-101 Technical Report: Preliminary Economic Assessment Duparquet Gold Project, Quebec, Canada” (report date: October 20, 2023; effective date: September 15, 2023), can be found under our SEDAR+ profile at www.sedarplus.ca, and on our website at www.firstmininggold.com. See the section of this AIF entitled “Material Properties – Duparquet” for further details of the technical report for the Duparquet PEA.

 

 

·

We announced a $5 million non-brokered private placement financing (the “2023 Unit Offering”), with an intention to issue 40,000,000 units (the “2023 Units”) at a price of $0.125 per 2023 Unit. Each 2023 Unit was comprised of one common share and one half of one common share purchase warrant with each full common share purchase warrant being exercisable to acquire one additional common share of the Company at a price of $0.20 for a period of 36 months following the closing date of the 2023 Unit Offering.

  

 
28 | Page

 

  

November

 

·

We announced, through our wholly-owned subsidiary Gold Canyon, the sale of our non-core 27% ownership in the Favourable Lake Claims (the “FL Claims”) located in Ontario to Patriot Lithium Ltd (“Patriot Lithium”) for total consideration comprised of 1,250,000 ordinary shares of Patriot Lithium and a 0.54% NSR royalty on the FL Claims.

 

 

·

We upsized the previously announced 2023 Unit Offering to approximately $10 million and closed the first tranche of the 2023 Unit Offering issuing 63,993,000 2023 Units at a price of $0.125 per 2023 Unit for aggregate gross proceeds of approximately $8 million.

 

 

December

 

 

·

We announced the discovery of new gold occurrences confirmed from rock sampling assay results from our 2023 exploration program at our BUGB Project. Highlights at the now established Challenger target include:

 

 

o

Two newly discovered gold mineralization occurrences within 60 m of each other, with samples grading 25.60 g/t Au, 7.10 g/t Au and 4.42 g/t Au

 

 

 

 

o

Close proximity to an expanding gold mineralization system (375 m NW of Saddle) identified in First Mining’s 2023 winter drill program, where Saddle drilling returned 0.92 g/t Au over 114 m

 

 

 

 

o

Employed geoscience systems approach to characterize the target geology, supporting additional exploration opportunities in close proximity to the Challenger and Saddle target areas

  

·

We closed the second and final tranche of the 2023 Unit Offering for total proceeds of approximately $10.8 million across two tranches of the 2023 Unit Offering. In the second tranche of the offering, we issued 22,668,000 2023 Units at a price of $0.125 per 2023 Unit for aggregate gross proceeds of approximately $2.8 million. Each 2023 Unit was comprised of one common share and one half of one common share purchase warrant with each full common share purchase warrant being exercisable to acquire one additional common share of the Company at a price of $0.20 for a period of 36 months following the closing date of the 2023 Unit Offering.

   

Recent developments

 

2024

 

January

 

·

We announced the expansion of multiple gold zones from the drilling of key targets at the Duparquet Project. We completed 17 exploration drill holes totalling 6,966 m in our 2023 exploration drilling campaign which focused on initial drill testing of key targets across the Duparquet Project.  A new area of mineralization continuity was identified at Central Duparquet (Valentre Target), which returned 1.71 g/t Au over 8.9 m, including 5.11 g/t Au over 1 m, and 1.29 g/t Au over 7.6 m, including 3.3 g/t Au over 1.8 m in drill hole DUP23-006.

  

 
29 | Page

 

 

·

We announced the filing of a final short form base shelf prospectus (the “2024 Shelf Prospectus”) with the securities commissions in each of the provinces of Canada, and a corresponding registration statement on Form F-10 (the “2024 Registration Statement”) with the SEC under the U.S./Canada Multijurisdictional Disclosure System. The 2024 Shelf Prospectus and corresponding 2024 Registration Statement will allow us to undertake offerings of common shares (including common shares issued on a “flow-through” basis), preferred shares, warrants, subscription receipts and units, or any combination thereof, up to an aggregate total of $100 million from time to time during the 25-month period that the 2021 Shelf Prospectus remains effective.

 

 

·

We announced that Mr. Jeffrey Reinson, our Chief Operating Officer, had resigned to pursue another opportunity in the mining industry. We also announced officer appointments of James Maxwell as Vice President, Exploration & Project Operations, and Steve Lines as Vice President, Sustainability.

   

February

 

·

We announced all assay results having been received and with several significant discovery and follow-up targets, including a new zone immediately to the south of the current mineral resource area (Buzz Zone: 6.52 g/t Au over 4.6 m), confirmation of mineralization and a higher grade trend in the area of Central Duparquet (CDHG Zone: 2.73 g/t Au over 6.15 m), extension and connectivity of the mineralization between Central Duparquet and the Dumico deposit (Valentre Zone: 1.71 g/t Au over 8.9 m) and most recently, advancing the easterly and down-dip extension of the Donchester South Shear Zone (DCD Zone: 1.83 g/t Au over 7.0 m).

 

 

·

We commenced mobilization activities at the Duparquet Project in support of our 2024 drilling campaigns:

 

 

o

A six-hole, 2,500 m drill program is planned, targeting the North Zone as well as a regional brownfields opportunity from the 2023 field campaign that remains underexplored

 

 

 

 

o

For the second quarter of 2024, we are also aiming to commence a Phase 3 drilling campaign alongside regional airborne geophysics and LiDAR survey programs that will further uplift exploration target development and vectoring ahead of the summer field campaigns

 

·

We received construction permits for a temporary winter road to the Springpole Project by MNRF. Subsequently, First Mining received notice from litigation counsel to Cat Lake First Nation that it intended to challenge the permits issued to First Mining. The lawyers for First Mining, MNRF and CLFN met for a scheduling hearing at which the judge issued an interim order staying the authorization of MNRF, pausing the winter road construction activities.

   

 
30 | Page

 

 

Corporate organization

 

The following diagram shows our current corporate structure and material subsidiaries, including the properties held by the various subsidiaries:

 

 

Note:

 

Our other subsidiaries, which each have total assets and revenues less than 10%, and in the aggregate less than 20%, of our total consolidated assets or our total consolidated revenue, are excluded from the above chart.

 

On March 30, 2015, First Mining was continued out of Alberta under the laws of the Province of British Columbia, Canada pursuant to the Business Corporations Act (British Columbia) (the “BCBCA”), and as a result, First Mining is now governed by the laws of the Province of British Columbia. On January 8, 2018, we changed our name to “First Mining Gold Corp.”.

 

We are a reporting issuer in the province of British Columbia (our principal reporting jurisdiction) and in each of the other provinces of Canada. We currently have the following material wholly-owned subsidiaries:

  

 

·

Gold Canyon Resources Inc., a company incorporated under the BCBCA.

 

For more information:

 

 

 

 

 

 

 

 

·

Cameron Gold Operations Ltd., a company incorporated under the Business Corporations Act (Ontario) (the “OBCA”).

 

You can find more information about First Mining on SEDAR+ (www.sedarplus.ca), and on our website (www.firstmininggold.com).

 

 

 

 

 

 

 

 

·

Coastal Gold Corp., a company incorporated under the OBCA.

 

See our most recent management proxy circular dated May 1, 2023 for additional information, including how our directors and officers are compensated, principal holders of our securities, and securities authorized for issuance under our equity compensation plans. 

 

 

 

 

 

 

 

 

·

Duparquet Gold Mines Inc., a company incorporated under the Canada Business Corporations Act.

 

 

 

 

 

 

See our audited consolidated annual financial statements and management’s discussion and analysis for the financial year ended December 31, 2023 for additional financial information.

 

 

 

Through Duparquet Gold Mines Inc., we own 2699681 Canada Ltd., which itself owns Eldorado Gold Mines Inc., a private company that owns in whole or in part, the surface rights to the Beattie, Donchester and Dumico properties that comprise a portion of the Duparquet Project.

 

 

 

 

 

 

We also own a 30% interest in PC Gold Inc., a joint venture company incorporated under the Business Corporations Act (Ontario), which owns the Pickle Crow Project.

 

 
31 | Page

 

 

Our projects

  

We have interests in mineral properties located in Canada and the United States.  As of December 31, 2023, these properties were carried on our balance sheet as assets with a total book value of approximately $240 million.  The book value consists of acquisition costs plus cumulative expenditures on properties for which the Company has future exploration plans.  The current book value is not necessarily the same as the total cumulative expenditures on each property given the acquisition costs were based on the consideration paid at the time of purchase.  The book value is also not necessarily the fair market value of the properties.

 

Our material and non-material projects as of the date of this AIF are set out below.

 

Material projects

 

 

·

Springpole Project (Ontario)

p. 33

 

 

 

 

 

 

 

·

Duparquet Project (Quebec)

p. 63 

 

 

 

 

 

 

 

·

Cameron Project (Ontario)

p. 90 

 

 

 

 

 

 

Non-material projects

p. 101

 

 

 
32 | Page

 

 

Springpole

 

Technical report

 

The description in this section of the Springpole Project is based on the project’s technical report: NI 43-101 Technical Report and Pre-Feasibility Study on the Springpole Gold Project, Ontario, Canada (report date: February 26, 2021; effective date: January 20, 2021) (the “Springpole Technical Report”). The report was prepared for us in accordance with NI 43-101 by AGP Mining Consultants Inc. (“AGP”) under the supervision of Dr. Gilles Arseneau, Ph.D., P.Geo.; Mr. Gordon Zurowski, P.Eng., Mr. Roland Tosney, P.Eng., Mr. Cameron McCarthy, P.Eng., P.Geo., P.Tech., Mr. Duke Reimer, P.Eng., and Dr. Adrian Dance, P.Eng.; all Qualified Persons within the meaning of NI 43-101.  The following description has been prepared under the supervision of Hazel Mullin, P.Geo., who is a Qualified Person within the meaning of NI 43-101, but is not independent of us.  All currencies used in this summary of the Springpole Technical Report are in Canadian dollars unless otherwise noted.

 

The conclusions, projections and estimates included in this description are subject to the qualifications, assumptions and exclusions set out in the Springpole Technical Report, except as such qualifications, assumptions and exclusions may be modified in this AIF. We recommend you read the Springpole Technical Report in its entirety to fully understand the project. You can download a copy of the Springpole Technical Report from our SEDAR+ profile (www.sedarplus.ca), or from our website (www.firstmininggold.com).

 

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

 

Project description, location and access

 

The Springpole Project lies approximately 110 km northeast of the Municipality of Red Lake in northwest Ontario, Canada. The project is centered on a temporary exploration camp situated on a small land bridge between Springpole Lake and Birch Lake. The latitude and longitude coordinates are:

 

 

·

Latitude

N51° 23ʹ 44.3ʺ 

 

 

 

 

 

·

Longitude

W92° 17ʹ 37.4ʺ 

   

The Universal Transverse Mercator map projection based on the World Geodetic System 1984 zone 15N is:

 

 

·

Easting

549,183 

 

 

 

 

 

·

Northing

5,693,578 

 

 

 

 

 

·

Average Elevation

395 m 

   

During late spring, summer, and early fall, the Springpole Project is accessible by floatplane direct to Springpole Lake or Birch Lake. All fuel, food, and material supplies are flown in from Red Lake or Sioux Lookout, Ontario, or from Winnipeg, Manitoba, with flight distances of 110 km, 145 km, and 370 km, respectively. The closest road access at present is 18 km away at the extension of the Wenesaga forestry access road. During winter, an ice road approximately 85 km long is constructed from the South Bay landing point on Confederation Lake to a point about 1 km from the camp, which is used for transport of supplies to the Springpole camp. Winter access may also be available via temporary airstrips cleared on nearby frozen lakes. During breakup in spring and freeze-up in fall, access to the Springpole Project is by helicopter.  In 2023, First Mining submitted an application for a temporary winter overland access road  to the project in response to improving risks surrounding the safety and environmental operation of the ice road, while also increasing the reliability of site access for exploration camp resupply.  

  

 
33 | Page

 

 

In February 2024, we received construction permits for a temporary winter road to the Springpole Project by the Ontario Ministry of Natural Resources and Forestry (“MNRF”). Subsequently, First Mining received notice from litigation counsel to Cat Lake First Nation that it intended to challenge the permits issued to First Mining. The lawyers for First Mining, MNRF and CLFN met for a scheduling hearing at which the judge issued an interim interim order staying the authorization of MNRF, pausing the winter road construction activities. It is expected that this hearing will take place in 2024.

 

First Mining acquired 100% of the Springpole Project on November 13, 2015 when it completed the acquisition of Gold Canyon Resources Inc. (“Gold Canyon”).  When the Springpole Project was acquired from Gold Canyon, it consisted of 30 patented mining claims and 300 unpatented, contiguous mining claims and six Crown mining leases, totalling an area of approximately 32,448 ha.  Additional mining claims were subsequently acquired by First Mining in the Satterly Lake area, and the original unpatented ‘legacy’ claims were converted into the new Ontario cell claim system in April 2018.  A further seven mining leases were acquired by Gold Canyon in 2019 by conversion of existing mining claims covering 1,531 ha to mining leases.  The Springpole Project, as defined in the 2021 Pre-Feasibility Study, now covers an area of 41,943 hectares and comprises 30 patented mining claims, 282 contiguous mining claims and 13 mining leases. Additional mining claims adjacent to the Springpole Project in the Birch-Uchi Greenstone Belt have been acquired by Gold Canyon since 2021, totaling a further 14,000 hectares. This includes the Swain Post property which was acquired from Exiro Minerals in March 2024, on completion of the 3 year Option Agreement by First Mining.

 

Through Gold Canyon, we lease 10 patented mining claims covering a total area of 182.25 ha. These 10 patented claims are fee simple parcels with all mining and surface rights attached, and registered, together with the notices of lease, with the Land Registry Office in Kenora, Ontario. The lease is for a term of 21 years less one day and terminates on April 14, 2031. Pursuant to an amending agreement dated December 11, 2020 among First Mining, Gold Canyon and the leaseholder:

 

·

We had an option to purchase these 10 patented mining claims from December 11, 2020 until April 15, 2021 (“Purchase Option 1”) for US$7,000,000, of which US$1,000,000 could have been satisfied by the issuance of common shares of First Mining (“First Mining Shares”) to the leaseholder. First Mining elected not to exercise Purchase Option 1.

 

 

·

We have the option to purchase these 10 patented mining claims from April 16, 2021 until April 15, 2025 (“Purchase Option 2”) for US$8,000,000, of which US$2,000,000 may be satisfied by the issuance of First Mining Shares to the leaseholder.

 

 

·

If, on or before April 15, 2025, First Mining provides the leaseholder with written notice, pays US$250,000 to the leaseholder and issues 1,000,000 First Mining Shares to the leaseholder, we acquire a further option to purchase these 10 patented mining claims from April 16, 2025 until April 14, 2031 (“Purchase Option 3”) for US$10,000,000, less US$250,000. Of the total purchase price, US$3,000,000 may be satisfied by the issuance of First Mining Shares to the leaseholder.

 

 

·

If, on or before April 14, 2031, First Mining provides the leaseholder with written notice and pays US$2,000,000 in cash to the leaseholder, the 21-year term of the lease shall automatically be extended by five additional years and the new expiry date of the lease will be April 14, 2036. In addition, we would immediately acquire a further option to purchase the 10 patented mining claims from April 15, 2031 until April 14, 2036 (“Purchase Option 4”) for US$12,000,000, less US$2,250,000. Of the total purchase price, US$4,000,000 may be satisfied by the issuance of First Mining Shares to the leaseholder.

 

 

·

If, on or before April 14, 2036, First Mining provides the leaseholder with written notice and pays a further US$2,000,000 in cash to the leaseholder, then the term of the lease shall automatically be further extended by five additional years and the new expiry date of the lease will be April 14, 2041. In addition, we would immediately acquire a final irrevocable option to purchase the 10 patented mining claims from April 15, 2036 until April 14, 2041 (“Purchase Option 5”) for US$12,000,000, less US$4,250,000. Of the total purchase price, US$4,000,000 may be satisfied by the issuance of First Mining Shares to the leaseholder.

 

 
34 | Page

 

 

·

If at any time during the term of the lease, First Mining commences commercial production, the leaseholder can, by written notice, require us to purchase the 10 patented mining claims for US$12,000,000 (the “Mandatory Purchase Right”), less any cash payments made by Gold Canyon to the leaseholder in connection with Purchase Option 3, Purchase Option 4, and Purchase Option 5. Of the total purchase price, US$4,000,000 may be satisfied by the issuance of First Mining Shares to the leaseholder.

 

 

·

If we purchase the 10 patented mining claims from the leaseholder prior to the commencement of commercial production, upon achieving commercial production, we must make a top-up payment to the leaseholder such that the leaseholder would have received an aggregate of US$12,000,000 from us for the claims (after taking into account any amounts previously paid in connection with the various purchase options). This top-up payment can be any satisfied through any combination of cash payments and First Mining Shares.

 

 

·

We must pay the leaseholder advance royalty payments on a sliding scale of US$33,000/year (2010 – 2011), US$50,000/year (2011 – 2016), US$60,000/year (2016 – 2021), US$100,000/year (2021-2031), and US$120,000/year (2031 – 2041), and all such advance royalty payments shall be deducted from any future NSR payments made to the leaseholder.

   

We must pay all applicable property taxes related to the 10 patented mining claims during the term of the lease, and we maintain a right of first refusal on any sale by the leaseholder of its interest in the claims.

 

Through Gold Canyon, we also have an option and lease to a further 15 patented mining claims which are fee simple parcels with mining and surface rights attached and registered, together with the notice of option and lease, with the Land Registry Officer, Kenora, Ontario. The current term of the purchase option expires on September 9, 2023 and may be extended for successive five-year terms by delivering notice along with a renewal fee of US$50,000 and confirmation that at least $300,000 was spent on mining operations in the prior option period. We are required to make option payments in the aggregate amount of US$35,000 per year and to expend an aggregate of $300,000 on mining operations in each option term as a condition of any renewal and to pay all property taxes related to these patented claims. We have an option to acquire the 15 claims and would be required to do so upon the commencement of commercial production at any time during the option period by payment of an aggregate of US$2 million. Upon exercise of the purchase option, we must also acquire the cabin on the property for the lesser of fair market value or US$20,000.

 

Underlying royalties which affect the Springpole Project are:

 

·

3% NSR on five patented claims payable to Jubilee Gold Exploration Ltd. (“Jubilee Gold”) upon commencement of commercial production with advance royalty payments of $70,000 per year, adjusted using the yearly Consumer Price Index. We have an option to acquire 1% of the NSR for $1,000,000 at any time, and a right of first refusal on any sale of the NSR. We can terminate the royalty obligations at any time by transferring the five patented claims back to Jubilee Gold;

 

 

·

3% NSR on 10 leased patented claims payable to a leaseholder upon commencement of commercial production with advance royalty payments on a sliding scale of US$33,000/year (2010 – 2011), US$50,000/year (2011 – 2016), US$60,000/year (2016 – 2021), US$100,000/year (2021-2031), and US$120,000/year (2031 – 2041). We have a right to acquire up to 2% of the NSR for US$1,000,000 per 1% (the “Buy-Back Right”). In the event that any of Purchase Options 1 to 5 are exercised, or the Mandatory Purchase Right is exercised, the leaseholder would still retain a 3% NSR on the claims, unless the foregoing Buy-Back Right had already been exercised;

 

 
35 | Page

 

 

·

3% NSR on 15 patented claims (held by us pursuant to an option and lease) is payable to an optionor and leaseholder during the option term upon commencement of commercial production or a 1% NSR if the purchase option is exercised prior to commercial production. We have a right to acquire the remaining 1% NSR by a payment of US$500,000; and

 

 

·

3% NSR on six unpatented mining claims payable to an individual vendor upon commencement of commercial production with advance royalty payments of US$50,000 per year. We have an option to acquire all or a portion of the NSR at a rate of US$500,000 per 1% of the NSR.

   

We are required to purchase a vacation home owned by a vendor that is located on the Springpole Project upon commencement of commercial production.

 

To keep a mining claim current, the mining claim holder must perform $400 per single cell mining claim unit worth of approved assessment work per year, or $200 per boundary cell mining claim unit, immediately following the initial registration date. The claim holder has two years to file one year’s worth of assessment work.

 

Surface rights are separate from mining rights. Should any method of mining be appropriate, other than those claims for which Crown leases were issued, the surface rights would need to be secured.

 

We entered into the Silver Stream Agreement with First Majestic on June 10, 2020 pursuant to which First Majestic has agreed to pay a total of US$22,500,000 to First Mining over three tranches for the right to purchase 50% of the payable silver produced from the Springpole Project (the “Silver Stream”). The first two tranches have been paid (the first tranche was paid at closing, and the second tranche was paid in January 2021 following the announcement by First Mining of the results of the Springpole PFS), consisting of an aggregate of US$6,250,000 in cash and US$11,250,000 in common shares of First Majestic (“First Majestic Shares”). First Majestic is required to make a final payment of US$5,000,000 (payable US$2,500,000 in cash and US$2,500,000 in First Majestic Shares) to First Mining upon the earlier receipt by First Mining of approval of a federal or provincial Environmental Assessment for the Springpole Project. Following the commencement of production at the Springpole Project, First Majestic is required to make ongoing cash payments to us equal to 33% of the lesser of the average spot price of silver for the applicable calendar quarter, and the spot price of silver at the time of delivery, subject to a price cap of US$7.50 per ounce of silver. We have the right to repurchase 50% of the Silver Stream for US$22,500,000 at any time prior to the commencement of production. We also granted First Majestic a right of first refusal with respect to any future silver stream financings related to the Springpole Project.

 

History

 

Gold exploration was carried out at Springpole during two main periods, one during the 1920s to 1940s, and a second period from 1985 to the present.

 

Between 1933 and 1936, extensive trenching and prospecting was conducted on the Springpole Project, including 10 short holes totalling 458.5 m. Limited trenching and prospecting was completed in 1945.

 

The area remained dormant until 1985, when an airborne geophysical survey was completed over the entire claim group, and on the 30 patented claims line cutting was done at both 30.5 m centres and 61 m centres. Subsequently, geological mapping, humus geochemistry, and ground geophysics were conducted over the grids.

 

From 1986 through 1989, 118 diamond drill holes were completed in seven drill phases totalling 38,349 m. In addition, during 1986 and 1987, approximately 116,119 m2 of mechanical stripping was carried out and four petrographic reports were produced.

 

 
36 | Page

 

 

From 1989 through 1992, an induced polarization survey over the central portion of the Portage zone under Springpole Lake was conducted and the Springpole Project was tested with eighteen core holes totalling 5,993 m. The majority of the drilling was conducted on the Portage zone. At the same time, a seven-core hole drill program was completed around the east margins of Springpole Lake and lake-bottom sediment sampling of Springpole Lake east of Johnson Island was completed.

 

During 1995, an exploration program consisting of remapping of the main area, of some of the existing drill core, and a reinterpretation of the geology was carried out. During the 1995 and 1996 programs, an additional 69 holes were drilled totalling 15,085 m on the Springpole Project proper and two drill holes on Johnson Island. By late 1996, Gold Canyon acquired 100% of the Springpole Project. Gold Canyon continued exploration in 1997 and 1998 with another 52 core holes totalling 5,643 m.

 

In the summer of 1998 a lake bottom sediment sampling program was conducted in several areas of the Springpole Project, which identified several follow-up targets that were tested in 1999 with 12 core holes totalling 2,779 m.

 

During 2004, 2005, and 2006, diamond drilling programs were conducted on the Springpole Project by Gold Canyon, totalling over 17,322 m in 109 drill holes.

 

In 2007, Gold Canyon conducted an 11 diamond drill hole program that totaled 2,122 m of drilling, and in the fall of 2007, they embarked on a limited exploration program to further investigate the Fluorite zone that was previously identified during a trenching program in 1990.

 

In 2008, Gold Canyon drilled a further seven core holes totaling 2,452 m.

 

From early August through to the end of October 2009, Gold Canyon re-logged and re-sampled a portion of the historic drill core stored at the project site and temporary tent camp. A total of 115 drill holes were re-logged which equates to approximately 31% of the available drill holes.

 

In the winter of 2010, a total of six diamond drill holes were drilled for a total of 1,774.5 m of HQ drilling. During the following summer and fall of 2010, a total of 8,662 m of diamond drilling was completed in 23 drill holes.

 

In 2011, Gold Canyon carried out a drill program which totaled 29,787 m in 82 diamond core holes.

 

A 2012 drill program began in-filling the Portage zone based upon results of the 2011 drill program. The 2012 drill program totaled 39,392 m in 98 diamond core holes.

 

In 2013, Gold Canyon drilled 24 diamond drill holes totaling 5,394.5 m, and 18 Vibracore holes totaling 720.8 m.

 

In the winter of 2013, seven inclined diamond drill holes were drilled totaling 2,401.5 m. These holes were drilled to explore for additional mineralization outside the proposed pit wall and to obtain further structural and geotechnical data around the proposed open-pit area.

 

In June and July 2013, 17 diamond drill holes totaling 2,993 m were drilled from barges on Springpole Lake.

 

In the fall of 2013, 18 holes totaling 720.9 m were drilled from a barge on Springpole Lake using a new drilling technique that employed a combination of standard soil sampling tools and sampling techniques for the very soft material and the use of Vibracore equipment to penetrate and sample the more competent sediments/rocks.

 

 
37 | Page

 

 

In 2013, Gold Canyon commissioned SRK Consulting (Canada) Inc. (“SRK”) to supervise the 2013 geotechnical and structural/geological program and to complete a preliminary economic assessment (“PEA”) on the Springpole Project.

 

On November 13, 2015, we acquired Gold Canyon, and as a result, the Springpole Project.

 

In October 2016 we commenced a drilling program at the Springpole Project to collect additional material for metallurgical testing. A total of four holes comprising 1,712 m were drilled, with hole locations specifically chosen to recover sample material that is representative of the Springpole deposit. In February 2017, we announced the results of the drilling program.

 

In 2017, we commissioned SRK to complete an updated PEA on the Springpole Project.

 

In 2018, we carried out a limited geotechnical drill program to test the integrity of ground relevant to dyke construction and characterize the dyke foundation materials. Eleven short holes were drilled totaling 243 m.

 

In 2019, we commissioned SRK to complete an updated PEA on the Springpole Project.

 

In 2020, three diamond drill holes totaling approximately 1,182 m were drilled for metallurgical purposes,  and 24 diamond drill holes were drilled totaling 4,091 m for geotechnical purposes, some of which were also utilized to collect hydrogeological data. A further 20 diamond drill holes were drilled for condemnation purposes, totalling 2,218 m.

 

In 2021, diamond drilling consisted of 10 drill holes for metallurgical purposes (2,632 m), 3 drill holes for acid rock drainage (“ARD”) test work (231 m), 5 condemnation drill holes (1,030 m), 30 geotechnical drill holes (3,270 m), one vertical hydrogeological monitoring hole, and 6 exploration holes (1,545 m).

 

In 2021, we commissioned AGP Mining Consultants Inc. to complete a PFS on the Springpole Project.

 

In 2022, we completed diamond drilling consisting of 34 HQ-sized diamond drill holes totaling 3,756 m for geotechnical purposes, 10 drill holes totaling 1,612 m for ARD test work, and 18 drill holes totaling 406 m for hydrogeological purposes, which included a program of shallow monitoring well installations positioned around proposed mine infrastructure areas.

 

Geological setting, mineralization and deposit types

 

The Springpole Project is located within the Archean-aged Birch-Uchi Greenstone Belt. Studies of the southern part of the Birch-Uchi greenstone belt have revealed a long, multistage history of crustal development. Based on mapping, lithogeochemistry, and radiometric dating, the supracrustal rocks of the greenstone belt were subdivided into three stratigraphic group-scale units (listed in decreasing age): the Balmer, Woman and Confederation assemblages. This three-part subdivision was applied to most of the Uchi Subprovince. The Confederation assemblage is thought to be a continental margin (Andean-type) arc succession, versus the less certain tectono-stratigraphic context of the other assemblages. Some relatively small conglomeratic units likely form a synorogenic, discontinuously distributed, post-Confederation assemblage in the Birch-Uchi greenstone belt.

 

The northern margin of the Birch-Uchi greenstone belt forms a pattern of sub-regional scale cusps of supracrustal strata alternating with batholiths. Basaltic units are prominent around the periphery of the greenstone belt and may be part of the Woman assemblage but the accuracy of this stratigraphic assignment is unknown. It is suggested that Confederation assemblage age rocks make up the bulk of the greenstone belt.

 

The Springpole Project is underlain by a polyphase alkali, trachyte intrusion displaying autolithic breccia. The intrusion is comprised of a system of multiple phases of trachyte that is believed to be part of the roof zone of a larger syenite intrusion; fragments displaying phaneritic textures were observed from deeper drill cores in the southeast portion of the Portage zone. Early intrusive phases consist of megacrystic feldspar phenocrysts of albite and orthoclase feldspar in an aphanitic groundmass. Successive phases show progressively finer-grained porphyritic texture while the final intrusive phases are aphanitic. Within the country rocks to the north and east are trachyte and lamprophyre dikes and sills that source from the trachyte- or syenite-porphyry intrusive system.

 

 
38 | Page

 

 

The main intrusive complex appears to contain many of the characteristics of alkaline, porphyry style mineralization associated with diatreme breccias (e.g. Cripple Creek, Colorado). Direct comparison with drill core from the two sites shows a number of consistent textures and styles of mineralization. A recent observation made from drilling, combined with the airborne magnetic survey, shows that potentially economic gold mineralization is coincident with an unexplained geophysical anomaly. This style of mineralization is characterized by the Portage zone and portions of the East Extension zone where mineralization is hosted by diatreme breccia in aphanitic trachyte. It is suspected that ductile shearing and brittle faulting have played a significant role in redistributing structurally controlled blocks of the mineralized rock. Still to be identified is a form of porphyry style alteration zoning consisting of an outer zone of phyllic (sericite) dominant alteration with narrow zones of advanced argillic alteration characterized by illite and kaolinite, and a core zone of intense potassic alteration characterized by biotite and K-feldspar.

 

Mineralization at the Springpole Gold Project is dominated by large tonnage, low grade, disseminated porphyry-style or epithermal-style gold mineralization associated with the emplacement of an alkali trachyte intrusion. Textures observed in the extensive repository of drill core appear to confirm that the disseminated gold-silver-sulphide mineralization, the mesothermal to epithermal lode vein gold mineralization, and the banded iron-formation hosted gold mineralization are all the result of the emplacement of multiple phases of trachyte porphyry and associated diatreme breccias, hydrothermal breccias, dikes and sills.

 

Exploration and Drilling

 

During the winters of 2007 and 2008, Gold Canyon conducted drill programs that completed 18 drill holes totalling 4,574 m, 11 holes totalling 2,122 m, and 7 holes totalling 2,452 m of diamond core drilling, respectively.

 

During the winter of 2010, a total of six diamond drill holes were drilled for a total of 1,774.5 m of HQ drilling. Two drill holes were not completed and both holes ended in altered and mineralized rock. The drill program revealed a more complex alteration with broader, intense zones of potassic alteration replacing the original rock mass with biotite and pyrite. During the summer and fall of 2010, an additional 23 diamond drill holes were drilled for a total of 8,662 m.

 

The 2011 drill program totaled 29,787 m in 82 diamond core holes. Five of the diamond core holes were drilled for the purpose of metallurgical testing. All these holes were twins of previously drilled holes.

 

The 2012 drill program began in-filling the Portage zone based upon results of the 2011 drill program. The goal was to infill areas where Inferred Mineral Resources had been defined in the February 2012 Mineral Resource update and to potentially expand the mineralization to the southeast. The 2012 drill program totaled 39,392 m in 98 diamond core holes.

 

During 2013, Gold Canyon drilled 24 drill holes totaling 5,394.5 m, and 18 Vibracore holes totaling 720.8 m. Between January and March 2013, Gold Canyon drilled a total of 2,401.5 m in the seven holes. Three of the drill holes encountered multiple zones of mineralization. In June and July 2013, 17 diamond drill holes totalling 2,993 m were drilled from barges on Springpole Lake. In Fall 2013, eighteen holes totalling 720.9 m were drilled from a barge on Springpole Lake. These holes established that the Portage zone is covered with up to 71 m of soft clay lake bottom sediments and till. The 2013 drilling program firmly established that the zone between lake bottom and the top of bedrock is essentially barren of any significant gold and silver mineralization.

 

The 2016 drill program was implemented to collect additional material from the Portage zone so that additional metallurgical testing could be carried out. In total, 1,712 m were drilled in the four holes (PM-DH-01 to 04).

 

In 2018, we carried out a limited geotechnical drill program to test the integrity of ground relevant to dyke construction and characterize the dyke foundation materials. Eleven short holes were drilled totalling 243 m.

 

 
39 | Page

 

 

During the winter of 2019 – 2020, we initiated a program of core re-sampling. A total of 8,358 samples were collected for total sulphur assays, along with 611 samples collected for bulk density determination.

 

We conducted several field programs throughout 2020, with the primary purpose of collecting additional data to advance the metallurgical, geotechnical, hydrogeological, and environmental studies at the Springpole Project through PFS-level and beyond. Diamond drilling was undertaken to collect samples for metallurgical and geotechnical test work. In addition, a detailed geotechnical field testing and sampling program was completed over the areas of proposed mine infrastructure. Three diamond drill holes totaling approximately 1,182 m were drilled to collect additional material for metallurgical testing within the immediate vicinity of the proposed open pit. A further 24 diamond drill holes were drilled totaling 4,091 m in order to obtain additional geotechnical data in both the pit wall area and the areas of planned mine infrastructure. The ten holes which targeted the pit wall were also utilized to collect hydrogeological data.

 

A program of condemnation drilling targeting key infrastructure areas was commenced in 2020 and was completed in 2021. Additional mapping and sampling of nearby trachyte outcrops was completed during the summer of 2020 and further exploration on these areas and other potential targets outside of the main resource area continued in 2021.

 

In 2021, a total of 55 drill holes were completed, totaling 8,748 m. The program consisted of 3 drill holes for acid rock drainage (“ARD”) test work (231 m), 5 condemnation drill holes (1,030 m), 30 geotechnical drill holes (3,270 m), some of which were also utilized for hydrogeological and ARD data collection, and 6 exploration holes (1,545 m). One vertical drill hole (40 m) was also completed on the southeastern side of the mine area for potential future use as a long-term monitoring well site for hydrogeological data collection. The metallurgical drilling program consisted of 2,632 m of drilling in ten drill holes to collect additional material within the proposed open pit for ongoing metallurgical test work including flowsheet optimization, variability testing, additional flotation studies and materials handling testing. A total of 2.4 tonnes of metallurgical samples were collected from the ten drill holes to form three production composites that underwent advanced metallurgical testing, as well as ten variability composites.

 

In 2022, a total of 62 drill holes for 5,834 m were completed to support development advancement for the Springpole Project, including geotechnical, hydrogeological, and geochemical studies. Geotechnical drilling consisted of 34 HQ-sized diamond drill holes totaling 3,756 m supporting further characterization of the proposed open pit walls, the proposed construction dykes and additional areas of proposed mine infrastructure. A further 10 diamond drill holes totaling 1,612 m were completed in order to collect sample material for the ongoing metal leaching/ARD studies on the project. This drilling primarily targeted areas of waste and low grade within the PFS pit for ARD sample collection. Selected core samples from the geotechnical drill program were also utilized for the ARD test work program. The 2022 hydrogeology drilling formed part of ongoing hydrogeological site investigations required to support the EA process at Springpole. Drilling totaled 18 diamond drill holes over 406 m and included a program of shallow monitoring well installations which were positioned around proposed mine infrastructure areas and are intended for long-term groundwater data collection.

 

Sampling, analysis and data verification

 

Detailed descriptions of the drill core were carried out under the supervision of a senior geologist, a member in good standing of the Association of Professional Geologists of Ontario and American Institute of Professional Geologists.

 

 
40 | Page

 

 

The core logging was carried out on-site in a dedicated core logging facility. Drill log data from drill programs up to 2016 were recorded onto paper logs that were later scanned and digitized. Logging of the 2018 and 2020 drill core was completed using Datamine ‘DH Logger’ software, and data was imported directly into our central Fusion SQL drilling database.

 

Core was laid out 30 to 40 boxes at a time. First, the core was photographed in 15 m batches prior to logging or sampling. This was followed by a geotechnical log that recorded quantitative and qualitative engineering data including detailed recovery data and rock quality designation. Any discrepancies between marker blocks and measured core length were addressed and resolved at this stage. The core was then marked up for sampling.

 

For Gold Canyon’s 2010 and 2011 drill programs, and the 2016 – 2020 First Mining drill programs, all the drill core intervals were sampled using sample intervals of 1 m. During the 2012 drilling program, Gold Canyon changed its standard sample length from 1 m to 2 m lengths. However, in zones of poor recovery, 1.5 m or 3 m samples were sometimes collected. Samples over the standard sample length were typically half core samples and whole core was generally only taken in intervals of poor core recovery across the sampled interval. Sampling marks were made on the core and sample tickets were stapled into the core boxes at the beginning of each sample interval.

 

Quality control samples were inserted into the sample stream. Inserting quality control samples involved the addition of certified blanks, certified gold standards, and field and laboratory duplicates. Field duplicates were collected by quartering the core in the sampling facility on-site. Laboratory duplicates were collected by splitting the first coarse reject and crushing and then generating a second analytical pulp. Blanks, standards, and duplicates made up on average 10% of the total sample stream. Sample tickets were marked blank, field or laboratory duplicate, or standard, and a sample tag was stapled into the core box within the sample stream.

 

Geological descriptions were recorded for all core recovered. Separate columns in the log allow description of the lithology, alteration style, intensity of alteration, relative degree of alteration, sulphide percentage, rock colour, vein type, and veining density. A separate column was reserved for written notes on lithology, mineralization, structure, vein orientations/relations etc. The header page listed the hole number, collar coordinates, final depth, start/end dates, and the name of the core logging geologist.

 

Following the logging and core marking procedures described above, the core was passed to the sampling facility. Core sampling was performed by experienced sampling technicians (for Gold Canyon’s drill programs, technicians were from Ackewance Exploration & Services of Red Lake, Ontario), or on-site geologists, and quality control was maintained through regular verification by on-site geologists. Core was broken, as necessary, into manageable lengths. Pieces were removed from the box without disturbing the sample tags, were cut in half lengthwise with a diamond saw, and then both halves were carefully repositioned in the box. When a complete hole was processed in this manner, one half was collected for assay while the other half remained in the core box as a witness. The remaining core in the boxes was then photographed. All logs and photographs were then submitted to the senior geologist/project manager for review and were archived. Data were backed up.

 

The sampling technician packed one half of the split core sample intervals into transparent vinyl sample bags that were sequentially numbered to match the sample number sequences in the sample tag booklets used by the core-logging geologists. The numbered, blank portion of the triplicate sample tag was placed in the bag with the sample; the portion that was marked with the sample interval remained stapled into the bottom of the core box at the point where the sample interval begins. Sample bags were then sealed with plastic tags. Sealed sample bags were packed into rice sacks five samples at a time. All sacks were individually labeled with the name of the company, number of samples contained therein, and the number sequence of the samples therein. Sacks were assigned sequential numbers on a per shipment basis. A project geologist then checked the sample shipment and created a shipping manifest for the sample batch. A copy was given to the project manager and a copy was sent along with the sample shipment. A copy of the sample shipment form was also sent via e-mail to the analytical laboratory.

 

 
41 | Page

 

 

The project geologist prepared the sample submission form for the assay laboratory. This form identified the number of sample sacks as well as the sequence of sample numbers to be submitted. Due to the remote location, the shipment was then loaded on to a plane or helicopter and flown direct to Red Lake where representatives of the commercial analytical laboratory met the incoming flight and took the samples to the laboratory by pickup truck.

 

Once at the laboratory, a manager checked the rice sacks and sample numbers on the submission form. The laboratory then split the received sample manifest into batches for analysis, assigned a work order to the batch, and sent a copy of the mineral analysis acknowledgement form to the project manager.

 

Aluminum tags embossed with the hole number, box number, and box interval (from/to) were prepared and stapled onto the ends of each core box. Core boxes were cross stacked on pallets and then moved to on-site storage.

 

Core samples collected at the drill site were held in closed core boxes sealed with fiber tape; at various times of day, camp staff collected the core boxes that were then delivered to the core logging facility. All core logging, sampling and storage took place at the Springpole Project site. Following the logging and marking of core, all core preparation and sampling was performed by technicians (for Gold Canyon’s drill programs, technicians were from Ackewance of Red Lake, Ontario) under the supervision of the project manager, or by company geologists. All on-site sampling activities were directly supervised by the project manager or geologist.

 

All gold assay work since the 2010 drill program has been performed by SGS Laboratories in Red Lake, Ontario. Silver and multi-element assays for the Gold Canyon drill programs were performed by the SGS Don Mills laboratory in Toronto, Ontario, and by the SGS laboratory in Vancouver for our 2016 and 2020 drill programs. The SGS facilities are certified and conform to requirements CAN-P-1579 and CAN-P-4E (ISO/IEC 17025:2005). Certification is accredited for precious metals including gold and silver and 52 element geochemical analyses.

 

We have attested that there is no commercial nor other type of relationship between us and SGS Laboratories that would adversely affect the independence of SGS Laboratories.

 

All samples received by SGS Red Lake were processed through a sample tracking system that is an integral part of the company’s laboratory information management system. This system utilizes bar coding and scanning technology that provides complete chain of custody records for every stage in the sample preparation and analytical process.

 

Samples were dried, and then crushed to 70% of the sample passing 2 mm (-70 mesh). A 250 g sample was split off the crushed material and pulverized to 85% passing 75 microns (200 mesh). A 30 g split of the pulp was used for gold fire assay and a 2 g split was used for silver analysis. Crushing and pulverizing equipment was cleaned with barren wash material between sample preparation batches and, where necessary, between highly mineralized samples. Sample preparation stations were also equipped with dust extraction systems to reduce the risk of sample contamination. Once the gold assay was complete, a pulp was sent to the SGS Toronto facility for silver and possibly for multi-element geochemical analysis.

 

As part of the standard internal quality control procedures used by the laboratory, each batch of 75 Springpole Project core samples included four blanks, four internal standards, and eight duplicate samples. In the event that any reference material or duplicate result would fall outside the established control limits, the sample batches would be re-assayed.

 

 
42 | Page

 

 

Pulps and rejects from the core samples, as well as from earlier drill programs where still available, are currently being kept in storage by First Mining.

 

Prepared samples were analyzed for gold by fire assay with atomic absorption finish.  Samples returning assays in excess of 10 g/t gold were re-analyzed with a gravimetric finish.  

 

Prepared pulp samples shipped from SGS Red Lake to SGS Toronto were analyzed for silver by three-acid digestion with atomic absorption finish.

 

During the winter 2010 program, prepared samples were analyzed for 52 elements by acid digestion (3:1 HCl: HNO3).

 

All samples from the 2016 and 2020 drill programs by us were also analyzed for 52 elements by acid digestion.

 

The QA/QC program for 2003 to 2007 consisted of:

 

resubmission of approximately 10% of the sample pulps to a second laboratory (ALS Chemex).

 

 

insertion of two commercial standard reference materials (standards submitted every 30th sample)

 

 

insertion of blanks

 

A total of 18 drill holes were completed in 2007 and 2008 comprising a total of 1,374 assay intervals. These samples were assayed for gold only by the Accurassay Laboratories of Thunder Bay, Ontario. SRK checked a total of 137 samples representing 10% of the total against the original certificates. No errors were found.

 

No program was set up for duplicates, standards, or blanks for this drilling program. The laboratory ran their own set of duplicates for internal monitoring purposes; however, those data were not available to SRK.

 

In 2010, Gold Canyon instituted a QA/QC program consisting of commercial standard reference materials for gold, and, consistent with current industry practice, blanks, field duplicates, and pulp duplicates. In addition, a “round robin” program was instituted in 2011 with ACT Labs of Red Lake, Ontario, that compared pulp re-assay results against the original SGS results for 469 samples. SGS conducted their own program of internal duplicate analysis as well.

 

For the First Mining QA/QC programs from the 2016 and 2020 drilling, blanks and standards were inserted at a rate of one standard for every 20 samples (5% in total), and one blank for every 30 samples (3% in total). ‘Coarse’ duplicates and ‘pulp’ duplicates were also inserted at regular intervals with an insertion rate of 4%. For the 2020 assay program, field duplicates from quartered core were also inserted at regular intervals, with an insertion rate of 4%.

 

In addition to the QA/QC program implemented by First Mining, the laboratories operate their own internal laboratory QA/QC system, inserting quality control materials, blanks, laboratory replicates and laboratory duplicates on each analytical run.

 

Of the 18 drill holes completed in 2007 and 2008, comprising a total of 1,374 assay intervals analyzed for gold, SRK checked a total of 137 samples representing 10% of the total against the original certificates. No errors were found.

 

A total of 3,135 assay values for gold and 3,161 assay values for silver in the database were compared against the original protected PDF assay certificates submitted by SGS Red Lake. These totals represent 10.1% and 10.4% of the total number of assays for gold and silver, respectively.

 

 
43 | Page

 

 

Of the original assay values checked against certificates, the focus was on values material to any resource estimate, either higher-grade intervals or very low-grade intervals in proximity to higher-grade intervals. The average grade of gold samples verified was 2.05 g/t Au. The average grade of silver samples checked was 8.27 g/t Ag.

 

Only two errors were found for gold:

 

The gold value of sample interval SP10-028 from 433 m to 436 m (sample number 8287) was found to have an entered value of 5.96 g/t gold against a value on the assay certificate of 9.00 g/t gold.

 

 

The gold value of sample interval SP11-076 from 69 to 70 m (sample number 14583) having the value of 0.45 oz./t was incorrectly placed in the parts per billion column.

 

No errors were found with respect to silver assays.

 

This represents an error rate of 0.064% in gold assays and an error rate of 0.0% in silver assays. This error rate is well within acceptable industry standards.

 

As part of the Mineral Resource estimation process, SRK reviewed the QA/QC data collected by Gold Canyon, reviewed the procedures in place to assure assay data quality, and verified the assay database against original assay certificates provided directly to SRK by SGS Red Lake, the assay laboratory. A total of 53,431 gold assays, 46% of the assay data, were checked against original assay certificates. No significant database errors were identified. About 143 minor rounding errors were observed. None of the rounding errors are deemed material or of any significance to the Mineral Resource estimate presented in the report.

 

 
44 | Page

 

 

Mineral processing and metallurgical testing

 

The Springpole deposit has been the subject of several metallurgical test work programs and previous studies, as summarized in the following table:

 

Year

Laboratory

Test work Performed

1989

Lakefield Research, Lakefield; LR3657

Whole ore leach cyanide leach and CIL

2011

SGS Mineral Services, Vancouver; 50138-001

Whole ore cyanide leach

2013

SGS Mineral Services, Lakefield; 13152-001

Whole ore cyanide leach

Flotation and concentrate regrind leach

2013

Process Mineralogical Consulting Ltd; Oct2013-05

Mineralogical analysis of two grab samples

2017

Base Met Labs, Kamloops; BL0161

Comminution testing

Mineralogical assessment – BMA, TMS

Whole ore leach

Rougher flotation and concentrate regrind leach

Viscosity

2018

ALS Metallurgy, Kamloops; 180107

Whole ore cyanide leach

Flotation: Concentrate regrind leach and tail leach

2018

Jacobs Engineering Group, Lakeland Florida

Reverse flotation to float off mid-size mica to reduce comminution requirement

2018

Eriez Flotation Division, Erie Pennsylvania

Hydraulic classification to remove multiple size fractions of micas to reduce comminution requirement – cross flow and hydrofloat separation

 

During 2020, we completed a comprehensive comminution and metallurgical test work program to support the PFS. This included head grade analyses, mineralogy, a full suite of comminution, flotation, and leach tests; cyanide detoxification, rheology, and solid/liquid separation. Test work was conducted by SGS Lakefield, Canada in two phases: Phase 1 used available coarse reject material from the 2016 drilling campaign and Phase 2 used fresh HQ drill core from the 2020 winter drilling campaign.

 

Tests were performed on mineralization that is considered to be representative of plant feed, based on a recent mine plan. Composite samples representing major lithologies and a range of head grades were prepared (0.60 to 2.0 g/t Au and 0.5 to 20 g/t Ag). The minimum and maximum grades aligned with expected plant feed for the first nine years of production.

 

Bulk mineralogy on select composites showed the main sulphide mineral was pyrite, ranging from 5.3 to 7.7%, with traces of chalcopyrite, sphalerite, and galena. Gold deportment studies indicated 5 to 12% of the gold is sub-microscopic; 8 to 14% of the gold is locked in <11 µm size fractions; 42 to 64% of the gold is exposed and 22 to 32% is liberated. A host of telluride minerals exist in the microscopic size range, with petzite the most dominant. Gold and electrum occur in minor amounts.

 

Comminution testing showed that the materials tested are considered very soft to medium in competency, with SMC test A*b values ranging from 40 to 124 and SPI test results from 7 to 67 min. Conventional Bond tests showed significant variation in hardness, with Bond rod mill work indices ranging 9 to 15 kWh/t and Bond ball mill work indices ranging from 8 to 18 kWh/t, at a closing screen size of 150 µm.

 

Two parallel flowsheets were evaluated, following the results from the previous studies: flotation + concentrate and tailings leaching versus whole ore leaching. The recommended flowsheet for this study is flotation with concentrate/tailings leaching.

 

Whole ore cyanide leach tests showed relatively poor extraction at a grind size of 80% passing 75 µm or greater using aggressive leach conditions to combat the effects of the telluride minerals. Gold leach extractions ranged from 52 to 72%. At a finer grind of 80% passing 60 µm, gold extractions ranged from 64 to 84%.

 

 
45 | Page

 

 

Rougher flotation tests showed high sulphide recovery was generally achieved within eight minutes. Excessive foaming was observed in some samples. This was considered attributable to a drilling compound added to the core, to aid core recovery (this was also commented on in the 2019 updated PEA report for the Springpole Project, which tested samples from the same drilling program). High mass pull was observed in these samples. A cleaning stage reduced the mass pull reporting to concentrate regrind. Flotation recoveries to cleaner concentrate ranged from 55 to 83% for gold, 55 to 90% for silver and 75 to 98% for sulphur at a target mass pull of 15% or less. Leaching of flotation tails is required to attain acceptable gold recovery. Tailings samples showed very high leach extractions in general.

 

Flotation concentrate gold extraction showed significant benefit from finer regrinding to an 80% passing size of 15 to 17 µm. Particularly high concentrate leach residue grades were observed at 80% passing 25 µm. Flotation concentrate gold extractions ranged from 62 to 97%, somewhat dependent on gold head grade. Flotation tails gold extractions ranged from 52 to 94%.

 

Overall plant gold recoveries are predicted to average 86% for head grades of 0.8 to 1.22 g/t Au. Overall plant recoveries for silver are predicted to range from 85 to 92% for head grades of 3.2 to 8.3 g/t Ag.

 

Cyanide detoxification tests achieved <1 mg/L CNWAD, with favourable reagent consumption rates.

 

Mercury grades were in the range of <0.3 to 8 g/t in the flotation feed. A retort with gas collection system was incorporated into the plant design to manage and control mercury in the process. Arsenic is present in the feed at concentrations up to 30 g/t and is not expected to be problematic in processing. No other elements were noted that may cause issues in the process plant or concerns with product marketability.

 

Thickening and filtration of cyanide detoxified slurry showed a moisture content of 18.5% (by weight) was achieved with high-rate thickening followed by pressing and drying using a conventional plate and frame filter press. A moisture content of 15% was achieved when employing a membrane squeeze in addition to pressing and drying in a plate and frame filter.

 

The authors of the Springpole Technical Report make the following recommendations: (i) future drilling should be done using drill mud additives that have been demonstrated to have minimal impact on metallurgical test work (a bulk sample might be considered to avoid the issue of drilling compound modifying reagents); (ii) investigate the impact of drilling mud additives on flotation mass pull with the objective of reducing flotation circuit size and regrind power requirements; (iii) further optimize concentrate leach reagents and consider reductions in leach extraction time (this includes reducing the number of concentrate leach adsorption tanks and recover residual gold/silver in solution using the flotation tails CIP circuit); (iv) optimize combined tails residual cyanide levels and aim to reduce cyanide detoxification retention time; and (v) conduct a full Feasibility Study metallurgical test work program incorporating variability and production composite test work (this includes dewatering/filtering tests on the final tailings material).

 

 
46 | Page

 

 

Mineral resource estimates

 

There are 662 drill holes in the Springpole Project database provided to SRK for the resource estimate. The Mineral Resource estimate for the Springpole Project utilizes results from 404 core boreholes drilled by previous owners of the property during the period of 2003 to 2013, and seven holes drilled by us in 2016 and 2020.

 

The revised Mineral Resource estimate was based on a gold price of US$1,550/oz and a silver price of US$20/oz, both considered reasonable economic assumptions by SRK. To establish a reasonable prospect of economic extraction in an open pit context, the resources were defined within an optimized pit shell with pit walls set at 35° to 50° based on domains. Assumed metallurgical recoveries of 88% for gold and 93% for silver were used. Mining costs were estimated at $1.62/t of total material, processing costs estimated at $15.38/t, and general and administrative (“G&A”) costs estimated at $1.00/t. A cut-off grade (“COG”) of 0.3 g/t Au was calculated and is considered to be an economically reasonable value corresponding to breakeven mining costs. Approximately 90% of the revenue for the proposed project is derived from gold, with 10% derived from silver.

 

The updated resource estimate is summarized in the table below.

 

Category

Quantity

Grade

Metal

Au

Ag

Au

Ag

(Mt)

(g/t)

(g/t)

(Moz)

(Moz)

Open Pit

Indicated

151

0.94

5.0

4.6

24.3

Inferred

16

0.54

2.8

0.3

1.4

  

Note: This Mineral Resource estimate is as of July 30, 2020.

 

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. The quantity and grade of reported Inferred Mineral Resources in this estimation are uncertain in nature and there has been insufficient exploration to potentially convert some or all of these Inferred Mineral Resources as an Indicated or Measured Mineral Resource and it is uncertain if further exploration will result in upgrading them to the Indicated or Measured Mineral Resource category. SRK is of the opinion that further attempts to convert the remaining Inferred material to Indicated would be of questionable value. The current proportion of the Mineral Resource classified as Inferred Mineral Resources is 10% of total tonnes, and 6% of contained gold.

 

 
47 | Page

 

 

Mineral reserve estimates

 

The Mineral Reserves for the Springpole Project are based on the conversion of the Measured and Indicated Mineral Resources within the current Springpole Technical Report mine plan. Indicated Mineral Resources in the mine plan were converted directly to Probable Mineral Reserves. There are currently no Measured Mineral Resource estimates and therefore there are no Proven Mineral Reserves. The total Mineral Reserves for the Springpole Project are shown in the table below.

 

Category

Tonnes

Grade

Contained Ounces

 

(Mt)

Au (g/t)

Ag (g/t)

Au (Moz)

Ag (Moz)

Proven

0.0

0.00

0.00

0.00

0.0

Probable

121.6

0.97

5.23

3.80

20.5

Total

121.6

0.97

5.23

3.80

20.5

 

*This Mineral Reserve estimate is as of December 30, 2020 and is based on the new Mineral Resource estimate dated July 30, 2020. The Mineral Reserve calculation was completed under the supervision of Gordon Zurowski, P.Eng of AGP, who is a Qualified Person as defined under NI 43-101.  Mineral Reserves are stated within the final design pit based on a US$878/ounce gold price pit shell with a US$1,350 /ounce gold price for revenue.  The equivalent cut-off grade was 0.34 g/t Au for all pit phases.  The mining cost averaged $2.75/tonne mined, processing averages $14.50/tonne milled, and G&A was $1.06/tonne milled.  The process recovery for gold averaged 88% and the silver recovery was 93%.  The exchange rate assumption applied was $1.30 equal to US$1.00.

 

*Pit slope angles ranged from 35 - 50°.

 

The Mineral Reserves for the Springpole Gold Project are based solely on open pit mining assumptions. 

 

The Qualified Person responsible for the preparation of the Mineral Reserve estimates in the Springpole Technical Report has not identified any known legal, political, environmental, or other risks that would materially affect the potential development of the Mineral Reserves. The risk of not being able to secure the necessary permits from the government for development and operation of the Springpole Project exists but the Qualified Person is not aware of any issues that would prevent those permits from being withheld per the normal permitting process.

 

Mining methods

 

The PFS is based on open pit mining of the proposed Springpole pit. This pit is expected to provide feed material necessary to maintain the process plant feed rate at 30,000 tpd while operational.

 

The Springpole pit is planned as a three phased pit which will provide 121.6 Mt of ore grading 0.97 g/t Au, and 5.23 g/t Ag. Waste from this pit will total 275.4 Mt for a strip ratio of 2.3:1 (waste:ore). With the inclusion of the proposed quarry, the total waste movement will be 287.5 Mt for a life-of-mine (“LOM”) strip ratio of 2.36:1 (waste:ore)

 

In addition to the pit, a quarry would be established near the plant location in the pre-production period. This quarry would be used to construct mine infrastructure including haul roads, dykes and to meet site fill requirements for other infrastructure.

 

The mill feed cut-off used is 0.40 g/t Au. During the mine operation material would be stockpiled to optimize the plant feed grade and defer lower-grade material until later in the mine schedule. The three grade bins used for the stockpiles included: low grade (0.40 to 0.60 g/t Au), medium grade (0.60 to 0.80 g/t Au) and high grade (over 0.80 g/t Au).

 

The phases are scheduled to provide 30,000 tpd of feed to the mill over an 11.3 year mine life after three years of pre-production stripping. The first two years of pre-production stripping are construction related. The last three years of mining are stockpile reclaim. The pits are sequenced to minimize initial stripping and provide higher feed grades in the early years of the mine life which the stockpiling strategy accomplishes.

 

The pits will be built on 12 m benches with safety berms placed every 24 m. Inter-ramp angles vary from 39 to 54° in rock depending upon the wall orientation. Overburden will use a 30° inter-ramp angle with 12 m between berms. Minimum mining widths of 35 to 40 m were maintained in the design with preferred bench widths of 60 m or more. Ramps will be at maximum 10% gradient and vary in width from 27.1 m (single lane width) to 35.4 m (double lane width). They have been designed for a 226 t haulage truck.

 

 
48 | Page

 

 

The main fleet is planned to consist of three 251 mm rotary drills, two 36 m3 electric hydraulic shovels and one 23 m3 front-end loader.  The truck fleet is planned to total seventeen 240 t trucks at the peak of mining.  This is due to the long hauls from the pit to the waste storage facilities (“WSF”) as well as the backhaul of tailings material from the plant.  The usual assortment of dozers, graders, small backhoes, and other support equipment is considered in the equipment costing.  A smaller front-end loader (13 m3) will be stationed at the primary crusher.

  

In the pre-production years -3 and -2, 3.9 Mt will be mined within the quarry area.  This mining will be with 91 t trucks, 6 m3 excavators and smaller track drills, more suited to this type of work, preparing the site for the larger, more productive, equipment. Year -1 is the start of major mining activity using the larger equipment when the bay dewatering has advanced sufficiently for mining and the site infrastructure (power lines, roads, etc.) is in place.  The early phases provide the highest grade to the mill early in the schedule.  The open pit will be in operation until Year 9 followed by three years of stockpile reclaim to feed the plant.  When the open pit is complete, the larger mining fleet will move to complete the quarry area, dumping the material into the open pit.  This will serve to cover the slopes in the pit for reclamation purposes.

 

Waste material from the pit will be stored in the WSF. Non-acid generating (“NAG”) material will be used for the outer berms while potentially acid generating material will be co-mingled with filtered tails. The filtered tails will be backhauled from trucks returning from dropping material at the plant either as feed or placed in the stockpiles. As the WSF advances upwards, re-sloping of the sides will be occurring to allow for concurrent reclamation and reducing the visual impact of the facility. The majority of the waste rock will be contained within the WSF (196.6 Mm3), but a small portion of NAG material will be backfilled into Phase 2 of the open pit near the end of the mine life. This will reduce the overall haul length and will help in pit reclamation. A total of 9.8 Mm3 will be backfilled into the pit.

 

Processing and recovery operations

 

The process plant will be designed using conventional processing unit operations. It will treat 30,000 tpd or 1,250 t/h based on an availability of 8,059 hours per annum or 92%. The crusher plant section design is set at 75% availability and the gold room availability is set at 52 weeks per year including two operating days and one smelting day per week. The plant will operate with two shifts per day, 365 days per year, and will produce gold doré bars.

 

The plant feed will be hauled from the mine to a crushing facility that will include a gyratory crusher as the primary stage before being conveyed to the crushed ore stockpile. The crushed ore will be ground by a SAG mill, followed by a closed circuit of a ball mill with a hydro-cyclone cluster. The hydro-cyclone overflow with P80 of 150 mesh (106 µm) will flow to a three-stage flotation circuit including rougher flotation, rougher scavenger flotation, and cleaner flotation. Flotation tailings will report to the tailings leaching and CIP circuit. Flotation concentrate will report to a closed loop cyclone cluster and IsaMill before reporting to the concentrate leach and CIP circuit.

 

Gold and silver leached in the CIP circuits will be recovered onto activated carbon and eluted in a pressurized Anglo American Research Laboratory style elution circuit and then recovered by electrowinning in the gold room. The gold-silver precipitate will be dried in a mercury retort oven and then mixed with fluxes and smelted in a furnace to pour doré bars. Carbon will be re-activated in a carbon regeneration kiln before being returned to the CIP circuits. CIP tails will be treated for cyanide destruction prior to pumping to a final tails thickener and pressure filter. Filter cakes will be hauled to the WSF for disposal.

 

 
49 | Page

 

 

The installed power for the process plant will be 58 MW and the power consumption is estimated to be 32 kWh/t processed. Raw water will be pumped from Birch Lake to a raw-water storage tank. Potable water will be sourced from the raw-water tank and treated in a potable water treatment plant. Gland water will be supplied from the raw-water tank. Process water will primarily consist of water reclaimed from the final tails thickener and pressure filters. Reagents will include pebble lime, sodium cyanide, sodium hydroxide, copper sulphate pentahydrate, hydrochloric acid, sodium metabisulphite, activated carbon, flocculant, coagulant, collector, and frother. The selected flowsheet is shown in the below figure.

 

 

Infrastructure, permitting and compliance activities

 

Key project infrastructure as envisaged in the PFS includes: open pit mine area including mine haul roads and ramps; dykes for hydraulic isolation of the mine pit following bay dewatering; site main access roads, administrative access roads and maintenance roads, site main gate and guard house; administration and dry building, construction and permanent camp accommodations; process plant e-room; crushing area e-room; control room; reagent storage building; gold room; assay laboratory and sample preparation area; plant workshop and warehouse; truck shop and warehouse, tire changing facility, truck wash building; fuel facility, fuel storage and dispensing; fresh water intake; 230 kV overland and 25 kV underground power distribution lines; fresh water intake pumping supply and treatment; WSF, contact water collection ponds; waste water treatment plant and explosives magazine.

 

The main access road will be a private extension of the existing Wenesaga Road which is primarily used for forestry services and has been constructed up to 15 kilometres from the project site.

 

Approximately 58 MW of electrical demand would be supplied via a new 230 kV overhead transmission line, built to connect to the provincial grid’s 230 kV line approximately 75 km to the southeast. A 230kV / 25kV transformer would provide step down prior to feeding a total of six electrical rooms. Variable frequency drives have been allowed where required and all medium-voltage motors or drives are planned to be supplied in 4.16 kV.

 

Two dykes are planned to be constructed to isolate the area of the proposed open pit and facilitate mining following dewatering. A secant pile wall and grout curtain will be installed within the rockfill to establish a hydraulic barrier.

 

 
50 | Page

 

 

A single WSF will be constructed west of the open pit for storage of tailings produced from mineral processing and PAG waste rock generated from open pit mining. The WSF will store approximately 76 Mm3 of tailings and 41 Mm3 of PAG waste rock within a cell. Structural stability of the facility will be provided by perimeter embankment dams constructed with NAG waste rock generated from open pit mining. Surface water run-off from the facility will be removed and stored in a contact water management pond (CWMP), to be located south of the WSF, to limit infiltration of water into the waste materials following placement. An engineered cover is conservatively considered in closure, to promote surface run-off and limit seepage, and will be further evaluated through the Environmental Assessment (“EA”) process.

 

First Mining and its predecessor Gold Canyon have been collecting environmental baseline data to support the Springpole Project’s EA since 2010, and data collection is ongoing. These studies are primarily focused on characterizing biological and physical components of the aquatic and terrestrial environments that may be impacted by and may interact with the proposed Springpole Project. We believe that the dataset compiled to date within these programs exceeds the level of environmental baseline data one would typically have in support of a PFS.

 

The area of Springpole Lake that will be dewatered spans approximately 150 hectares and displays significant variation in lakebed elevation, with the deepest point reaching an approximate maximum depth of 40 m (El. 353 masl). This activity will affect fish habitat. First Mining will continue working with Fisheries and Oceans Canada (DFO) to develop off-setting measures that will help to mitigate any short or long-term effects to local fish communities.

 

First Mining will fully consider the concerns and issues associated with potential adverse environmental effects, as appropriate, to the Indigenous peoples in terms of proximity, historic resources, land and resource use, physical and social effects (including health) on their communities, as well as economy, employment, cultural heritage, in the EA process.

 

Preliminary environmental design criteria have been developed for project features that have the potential to release contaminants into the air, water, and land. First Mining will also develop an environmental, health and safety (“EHS”) management system to address the EHS needs of the Springpole Project based on the results of the Environmental Impact Statement.

 

On February 23, 2018, we submitted a Project Description to the Impact Assessment Agency of Canada (the “IAAC”).  IAAC determined an EA is required for the Springpole Project under the Canadian Environmental Assessment Act (2012) (“CEAA”).  We have also entered into a voluntary agreement with the Ontario Ministry of Environment, Conservation and Parks to undertake an Individual EA under Section 3.0.1 of the provincial Environmental Assessment Act.

 

We published an EIS for the Springpole Project in June 2022.  The EIS was developed to also meet the regulatory requirements associated with the provincial voluntary agreement to undertake an individual EA.

 

In addition to the requirement for assessment under CEAA, 2012, key federal permits that may be required pending further regulatory advice:

 

Fisheries Act Authorization (Fisheries and Oceans Canada (DFO))

Canadian Navigable Waters Act (Transport Canada)

Schedule 2 of Metal and Diamond Mining Effluent Regulations (MDMER)

 

 
51 | Page

 

 

Prohibitions under other pieces of federal legislation also apply but no permitting requirements are currently expected. These may include, but would not necessarily be limited to, the following:

 

Canadian Environmental Protection Act, SC 1999

Migratory Birds Convention Act, SC 1994, c.22

Explosives Act, RSC 1985, C. E-17

Transportation of Dangerous Goods Act, SC 1992, c. 34

Species at Risk Act, SC 2002; c. 29

Nuclear Safety Control Act, SC 1997, c. 9

 

Based on the current understanding of the Springpole Project area and project description provided by First Mining, it is expected that the following permits and approvals will be required:

 

Mine Closure Plan, Mining Act, Energy, Northern Development and Mines

Permit to Take Water, Ontario Water Resources Act, MECP

Environmental Compliance Approval (Air/Noise), Environmental Protection Act, MECP

Environmental Compliance Approval (Sewage), Ontario Water Resources Act, MECP

Environmental Compliance Approval (Waste), Environmental Protection Act, MECP

Work Permit, Public Lands Act, Ministry of Natural Resources and Forestry (MNRF)

Work Permit, Lakes and Rivers Improvement Act, Ministry of Natural Resources and Forestry (MNRF)

Aggregate Permit, Aggregate Resource Act, MNRF

Overall Benefit Permit, Endangered Species Act, MECP

Forestry Resource Licence/Release of Reservation, Crown Forest Sustainability Act, MNRF

Archaeological Clearance, Ontario Heritage Act, Ministry of Heritage, Sports, Tourism, and Culture Industries (MHSTCI)

 

The federal government identified Cat Lake First Nation, Slate Falls First Nation, Lac Seul First Nation, Wabauskang First Nation, Mishkeegogoamang Ojibway Nation, Ojibway Nation of Saugeen, and Métis Nation of Ontario in 2018 (updated in 2020), while in 2018 the provincial government identified Cat Lake First Nation, Slate Falls First Nation, Lac Seul First Nation, Wabauskang First Nation, Mishkeegogoamang Ojibway Nation, Ojibway Nation of Saugeen, Pikangikum First Nation, and Métis Nation of Ontario, as potentially impacted by the Springpole Project or having an interest in the project.

 

In March 2017, the First Nations of Cat Lake, Slate Falls and Lac Seul entered into a Shared Territory Protocol Agreement. These three First Nations are known collectively as the Shared Territory Protocol Nations (“STPN”). In February 2018, we entered into a Negotiation Protocol Agreement with the STPN and will continue information sharing and consultation throughout the EA process.

 

Capital and operating costs

 

The cost estimate for the Springpole Project is based on an engineering, procurement, and construction management (“EPCM”) implementation approach.

 

Operating Costs

 

The operating costs for a mine at the project have been estimated from base principles with vendor quotations for repair and maintenance costs and other suppliers for consumables. Key inputs to the mine cost are fuel and labour. The price provided for the project was $0.80/L (US$0.60/L) delivered to the site. The mine truck and support equipment fleets will be diesel powered. The large production drills, hydraulic shovels and dewatering pumps will be electric powered, and the cost estimate used an electricity price of $0.08/kWh (US$0.06/kWh).

 

 
52 | Page

 

 

Labour costs are based on an owner-operated scenario whereby we would be responsible for the maintenance of the equipment with our own employees.

 

The mining fleet will be leased to help lower capital costs and payments are included in the operating cost.  The mining cost is shown as both cost per tonne mined and cost per tonne moved.  This is due to the large quantity of tailings backhaul included in the operating cost.  The cost per tonne mined is $2.75/t mined (US$2.06/t mined) or $1.94/t moved (US$1.46/t moved).  The cost per tonne milled over the LOM is $8.69/t milled (US$6.52/t milled).

 

The annual process operating cost is estimated at $158.8 M (US$119.1 M) and will average $14.50/t milled (US$10.87/t milled) over the LOM. 

 

The G&A cost is estimated at $11.57 M (US$8.68 M) and will average $1.06/t milled (US$0.79/t milled) over the LOM. 

 

The life of mine operating cost estimate for the Springpole Project is shown in the table below.

 

Operating Cost

Life of Mine Cost (US$ M)

Cost (US$/t Processed)

Mining

793

6.52

Processing

1,323

10.87

G&A

96

0.79

TOTAL

2,212

18.18

Capital Costs

 

The capital cost estimate has an accuracy of -20% / +30% (AACE Class 4).  The estimate includes the cost to complete the design, procurement, construction, and commissioning of all the identified facilities.  The estimate was based on the traditional EPCM approach where the EPCM contractor would oversee the delivery of the completed project from detailed engineering and procurement to handover of a working facility.

 

The estimate was derived from a several fundamental assumptions as indicated in process flow diagrams, general arrangements, mechanical equipment list, electrical equipment list, material take offs, electrical layouts, scope definition and a work breakdown structure. The estimate included all associated infrastructure as defined by the scope of work.

 

The capital cost estimate for the Springpole Project is summarized in the table below.

 

Cost Type

Cost Description

Project Capital (US$ M)

Initial

Sustaining

Total

Direct

Mine

144.5

51.3

195.8

Site Development

21.0

-

21.0

Process Plant

296.7

4.2

300.9

On-site Infrastructure

38.4

-

38.4

Off-site Infrastructure

35.3

-

35.3

Direct Subtotal

535.9

55.5

591.4

Indirect

Indirects

47.9

-

47.9

EPCM Services

37.5

-

37.5

Owner’s Costs

16.1

-

16.1

Indirect Subtotal

101.4

-

101.4

Provisional

Contingency and Management Reserve

80.9

-

80.9

Closure

Closure Costs

-

29.5

29.5

Total

718.3

85.0

803.3

 

 
53 | Page

 

 

Economic Analysis

 

The mine plan is based on Indicated Mineral Resources that have been converted to Probable Mineral Reserves.

 

An economic model was developed to estimate annual pre-tax and post-tax cash flows and sensitivities of the Springpole Project based on a 5% discount rate. It must be noted that tax estimates involve complex variables that can only be accurately calculated during operations and, as such, the after-tax results are approximations. A sensitivity analysis was performed to assess the impact of variations in metal prices, head grades, initial capital cost, total operating cost, foreign exchange rate, and discount rate.

 

The capital and operating cost estimates developed specifically for the Springpole Project are in Canadian dollars and converted with the stated exchange rate. The economic analysis has been run on a constant dollar basis with no inflation.

 

The economic analysis was performed using the following assumptions:

 

·

gold price of US$1,600/oz, silver price of US$20/oz

·

LOM of 11.3 years

·

exchange rate of US$0.75 per $1.00

·

cost estimates in constant Canadian dollars with no inflation or escalation

·

100% ownership with 1.3% NSR; (assumes buy back of 1.4% NSR)

·

capital costs funded with 100% equity (no financing costs assumed)

·

closure cost of US$29 M

·

Canadian corporate income tax system consists of 15% federal income tax and 10% provincial income tax

·

Ontario applies a mining tax rate of 10%

·

total undiscounted tax payments are estimated to be US$720 M over the LOM

 

The pre-tax net present value (“NPV”) discounted at 5% is US$1,482 M; the IRR is 36.4%; and the payback period is 2.2 years.  On an after-tax basis, the NPV discounted at 5% is US$995 M; the IRR is 29.4%; and the payback period is 2.4 years.

 

 
54 | Page

 

 

A summary of the project economics is shown in the following figure and table.

 

 

General

 

Units

LOM Total / Avg.

Gold Price

 

US$/oz

1,600

Silver Price

 

US$/oz

20.00

FX

 

$:US$

0.75

Production

Mine Life

 

yr.

11.3

Mined Ore

 

kt

121,636

Mined Waste

 

kt

287,532

Strip Ratio

 

w:o

2.36

Daily Throughput

 

tpd

30,000

Total Mill Feed

 

kt

121,636

Gold

Mill Head Grade Au

 

g/t

0.97

Mill Recovery Au

 

%

85.7%

Total Payable Ounces Au

 

koz

3,225

Average Annual Payable Au

 

koz

287

Silver

Mill Head Grade Ag

 

g/t

5.2

Mill Recovery Ag

 

%

89.5

Total Payable Ounces Ag

 

koz

18,117

Average Annual Payable Ag

 

koz

1,610

Operating Cost

Mining – mined

 

US$/t mined

2.06

Mining - milled

 

US$/t milled

6.52

Processing

 

US$/t milled

10.87

G&A

 

US$/t milled

0.79

Total

 

US$/t milled

18.18

Capital Cost

Initial Capex

 

US$M

718

Sustaining Capex

 

US$M

55

Closure Cost

 

US$M

29

Operating Costs per Ounce

Cash Costs (net)

 

US$/oz

618

AISC (net)

 

US$/oz

645

Cash Costs

 

US$/oz AuEq

673

AISC

 

US$/oz AuEq

698

Pre-Tax Economics

NPV (5%)

 

US$M

1,482

IRR

 

%

36.4

Post-Tax Economics

NPV (5%)

 

US$M

995

IRR

 

%

29.4

Payback

 

yr.

2.4

 

* Cash costs consist of mining costs, processing costs, mine-level G&A and refining charges and royalties. Please see "Non-IFRS Financial Measures" at the beginning of this AIF.

* AISC includes cash costs plus sustaining capital and closure costs. AISC is at a project-level and does not include an estimate of corporate G&A. Please see "Non-IFRS Financial Measures" at the beginning of this AIF.

 

Exploration, development and production

 

As discussed above, during the winter of 2019 – 2020, we initiated a program of core re-sampling in order to quantify the sulphur content of the in-pit material. A total of 8,358 samples were collected for total sulphur assays, along with 611 samples collected for bulk density determination.

 

 
55 | Page

 

 

We completed several field programs throughout 2020, with the primary purpose of collecting additional data to advance the metallurgical, geotechnical, hydrogeological, and environmental studies at the Springpole Project through PFS-level and beyond.  Diamond drilling was undertaken to collect samples for metallurgical and geotechnical test work.

 

The geotechnical program targeting the pit wall area consisted of drilling and logging of inclined HQ size boreholes, packer tests, fracture surveys using acoustic televiewer, rock testing (point load tests and Brazilian tests), and multi-level piezometer installation.

 

In addition, a detailed geotechnical field testing and sampling program was completed over the areas of proposed mine infrastructure, which included test pit excavations (for overburden investigation), hand auguring, NQ-size borehole drilling, and ground penetrating radar surveys in selected locations.

 

A program of condemnation drilling targeting key infrastructure areas was also commenced in 2020 and continued in 2021.  Additional mapping and sampling of nearby trachyte outcrops was completed during the summer months and further exploration on these areas and other potential targets outside of the main resource area continued in 2021. Drilling for metallurgical purposes was also completed in 2021, as well additional drilling in both 2021 and 2022 for

geotechnical, hydrogeological and geochemical data collection, and exploration.

 

Recent developments

 

In 2023, a total of 11 drill holes for 2,760 m were completed supporting regional exploration efforts in First Mining’s land tenure surrounding the Springpole Project. Drilling was completed using NQ-sized diamond drill holes testing the Saddle, Horseshoe, and Atlantis targets.

 

Regional Land Consolidation

 

First Mining significantly increased the size of exploration mineral tenure in the immediate vicinity of the Springpole Project in 2021 through acquisitions and option agreements, resulting in a current total controlled area of approximately 74,000 Ha throughout the Birch-Uchi Greenstone Belt (“BUGB”) (see the section in this AIF entitled “About First Mining – Three-year history” for more details about these transactions). The BUGB is historically underexplored and has only seen a fraction of the exploration work that has been done in the neighbouring Red Lake and Pickle Lake greenstone belts. The region has seen increased exploration activity to the north and west of Springpole over recent years spurred by regional discovery successes in the surrounding area. Historically the BUGB has hosted several past-producing gold mines including: Argosy – which produced approximately 100,000 oz. at 11.4 g/t Au; Uchi – with a reported 114,000 oz. at 4.7 g/t Au; and a number of smaller gold and base metal mines including the Jackson, Manion, Hudson-Patricia, Bathurst and Sol d’Or mines, which produced gold in the 1930s.

 

Prospective target areas in the expanded mineral tenure include the past-producing high-grade Sol d’Or mine; the Swain Property, the Vixen North property - located nearby the past-producing Argosy mine - and the Birch Property, which includes the HGI prospect where historical drilling has intersected gold grades up to 245 g/t.

 

 
56 | Page

 

 

The following map shows, in green, all of the mineral rights owned through our wholly-owned subsidiary, Gold Canyon that currently comprises the Springpole Project and surrounding area, as well as all of the mineral rights in the immediate vicinity in respect of which we have entered into option or earn-in agreements (these are reflected in red):

   

   

Exploration

 

First Mining has actively been conducting regional-scale exploration in the BUGB since 2021 where the focus has been to infill data gaps, follow up on historical and newly defined prospective areas, and advance discovery to build a prospectivity pipeline.

 

 
57 | Page

 

 

In 2021, we completed a regional data compilation and targeting exercise on the BUGB, and conducted district-scale gold occurrence reconnaissance on First Mining’s claims. In total, 45 gold occurrences were visited, and 191 rock samples were analyzed for multi-element geochemistry.

 

During the summer of 2022, we followed up and expanded on our 2021 targeting work with a comprehensive field program consisting of soil geochemistry, mapping, prospecting and drilling. The soil geochemistry campaign was focused on prospective areas including four of the option properties to advance regional scale vectoring. A total of 705 soil samples were collected during this campaign. Mapping & prospecting campaigns were carried out on the Birch, Swain, Vixen, Stargazer, Horseshoe East and Satterly properties, where more than 500 grab samples were collected and submitted for gold and multi-element analysis. A targeted exploration drilling campaign was carried out on the Swain Property, which consisted of a 5-hole drill program totaling 1,557 m.

 

In October 2022, we completed a 3,843 line kilometre geophysical airborne survey over portions of the Birch-Uchi land tenure, benchmarking and vectoring regional scale magnetic and electromagnetic features for supporting exploration targeting through the use of integrated datasets for 2023 and beyond. The geophysical survey provides a core supplement to the existing geophysical coverage in the region and was successfully supported by industry-leading service providers and partners in SkyTEM and Mira Geoscience.

 

During 2023, exploration activities consisted of a winter drilling program and a summer field campaign. For the winter drilling program a total of eleven drill holes for 2,760 metres were completed, focused on three target areas including Saddle, Horseshoe, and Atlantis.  The results from the 2023 winter drilling highlighted robust intervals of consistent gold mineralization over significant widths, including 0.92 g/t Au over 114 m and 0.75 g/t Au over 57.70 m (drill hole SAT23-001) at the Saddle target. The program was successful in confirming the continuation of the mineralization envelope along the shear structure, opening up the exploration growth potential around the Saddle target which continues to demonstrate an evolving gold mineralization setting with advancing exploration.

 

The 2023 summer field campaign included regional infill mapping transects, regional and infill geochemistry and targeted prospecting. Through mapping and prospecting, 517 grab samples and 680 soil samples were taken across the exploration project area. Highlights of the work included assay results for samples from the Challenger target discovery returning 25.6 g/t Au, 7.1 g/t Au and 4.42 g/t Au in rock grab assays along a regional transect, prompting further in-field mapping and sampling to better characterize and validate the relationship between mineralization, alteration and a resistivity low extending along trend.

 

Technical Programs since the Springpole PFS

 

Since completing the PFS for Springpole in January 2021, First Mining has been engaged in a number of significant technical programs to further optimize the development plan for Springpole and to further define the project scope for the EA process and into the Feasibility Study (“FS”) process. These programs are ongoing and include FS-level metallurgical test work, geotechnical drilling and site investigation to support FS-level preliminary pit slope, dyke and Co-Disposal Facility design work, an update to the Mineral Resource estimate in the PFS incorporating recent drilling results, completion of a power connectivity study, further review of opportunities to reduce the project’s greenhouse gas footprint (“GHG”), exploring renewable power generation opportunities, additional environmental data collection, predictive environmental effects modelling and studies, and EIS/EA document preparation.

 

Metallurgical Program

 

Subsequent to the completion of the PFS, in 2021 we completed a metallurgical drilling program consisting of 2,632 m of drilling in ten drill holes in order to collect additional material within the proposed open pit for ongoing metallurgical test work. Samples from the ten drill holes, all located within the 2021 Pre-Feasibility Study pit shell, were selected to represent the major lithologies and mineralized zones in the target mining area. A total of 2.4 tonnes of metallurgical samples were collected, to form three production composites that underwent advanced metallurgical testing, as well as ten variability composites.

 

 
58 | Page

 

 

The metallurgical test work program in 2021 and 2022 was designed to support the Feasibility Study on the project. Work was carried out at Base Metallurgical Laboratories Ltd. in Kamloops, British Columbia, FLSmidth Inc. in Salt Lake City, Utah, and Jenike & Johanson Ltd. in Mississauga, Ontario. The scope of the program included flowsheet optimization, testing of an alternate flowsheet, comminution and variability testing, flotation piloting and materials handling testing.

 

To date, the metallurgical test programs have confirmed key metallurgical test work findings from the 2021 PFS and provided a larger database of ore physical properties and metallurgical response, which will reduce the design risk of the processing facility.  Its current focus is to confirm metallurgical information and the process design of the PFS and explore opportunities to enhance metal recoveries and reduce operating and capital costs for Springpole.

 

Initial metallurgical test work was completed at the end of Q1 2022 and based on these results an additional test work program was commenced to support finalization of the FS process flowsheet in Q3 2022, and the process flow diagram (PFD), mechanical and electrical equipment lists, and plant layout were revised based on the findings of the program. Final reporting of the work was completed in August of 2023 with a conclusion that a comprehensive metallurgical test program has been undertaken that will support a feasibility level of study.

 

GHG Footprint Reduction – Electric Assist Haul Trucks

 

Following the completion of the PFS, we completed an analysis of potential GHG emissions from the Project and determined that opportunities exist to reduce GHG emissions by reducing diesel consumption associated with the haul trucks with the addition of trolley assist in various areas of the mine. Given that the Project is scoped to be connected to the power grid, we commissioned AGP to study the impact and benefit of a number of electric haul assist technologies. More detailed analysis is warranted and will be carried out in the FS workplan.

 

Renewable Power Generation Opportunities

 

We commissioned an initial scoping study of the opportunities to incorporate renewable power generation into the project development plan at Springpole. The Springpole area has the potential for economic wind and solar resources, as well as a significant biomass opportunity which has been previously studied for the region. The SLR study concluded that wind and solar were both viable potential supplemental power sources for the Project that warrant further study. In furtherance of this, we commenced in Q3 2022 site-specific data collection for wind resources which continued throughout H2 2022 and H1 2023, and commenced a follow-up scoping study for a wind power generation facility along the transmission line corridor. A preliminary wind data report summarizing the 2022 and Q1 2023 findings was issued by SLR in April 2023, with a final 1- year summary wind data report expected to be issued in 2024. First Mining will explore opportunities with the local communities to better understand avenues for partnership in a potential renewable power development.

 

230 kV Transmission Line Design

 

In 2022, First Mining advanced a feasibility-level design of an 89 km, three-phase, 230 kV overhead transmission line from a tap location on the existing Wataynikaneyap Power GP (“Watay”) W51W transmission line to supply electrical power to the mine site.  Ontario’s Independent Electricity System Operator (“IESO”) continued work on a System Impact Assessment (“SIA”) on the Project, which is required for the proposed new transmission line. First Mining engaged Watay to perform a Short-Circuit Study to assist the IESO in its performance of the SIA, a Protection Impact Assessment (“PIA”), and coordinate with Hydro One Networks Inc. (HONI) to ensure that the Short-Circuit Study and the PIA reflect impacts to HONI equipment and protection settings, as required. 

 

 
59 | Page

 

 

In 2023, the IESO issued the final SIA report for the Springpole connection concluding that “the proposed connection of the project is expected to have no material adverse impact on the reliability of the integrated power system” based on the requirement guidelines of the assessment. Additionally in 2023, Watay issued a Customer Impact Assessment that noted the “results did not indicate any material adverse impacts after connection of the Project”.

 

Mine Access Road Design

 

First Mining has completed preliminary design and alignment for mine access road opportunities which would commence at the end of the Wenesaga Forestry Access Road, approximately 18 km from the current camp location at Springpole.

 

Further CDF Optimization

 

In 2022, subsequent to receiving comments on the Draft EIS/EA, First Mining completed further trade-off studies (“ToS”) on the Co-Disposal Facility (“CDF”), which highlighted the opportunity for additional optimization on the PFS design. Based on ToS findings, First Mining worked with experts and consultants throughout 2023 to optimize the PFS design for the CDF, by refining the design such that the NAG tailings would be hydraulically placed rather than filtered and mechanically to provide a more robust operation, improve co-disposal, reduce energy consumption, reduce capital equipment, improve air quality and reduce emissions.  In addition to environmental improvements, these optimizations are expected to reduce initial capital and operating costs of the facility. The CDF configuration is a north cell for NAG thickened hydraulically placed tailings and potentially acid generating (“PAG”) mine rock, and a south cell for conventional slurry PAG tailings. The tailings level in the north cell will be maintained at a higher elevation than the south cell such that contact water flows via gravity to the south cell thus ensuring a water cover is maintained over the PAG tails throughout the LOM.

 

In 2023, First Mining convened an Independent Geotechnical and Tailings Review Board (“IGTRB") comprised of three world-leading experts in tailings facility design and geotechnical risk assessment to review and comment on the design of the Springpole tailings and co-disposal facility.  The IGTRB has met a preliminary report is expected in Q2 2024 with recommendations for areas of further study and design optimization.

 

Environmental Data Collection

 

The 2022 environmental field work activities involved a comprehensive program to supplement the baseline data that had been collected over several previous years. The studies covered a broad range of disciplines across the biological, physical and human environments including air quality, noise, surface water, groundwater, geochemistry, aquatic biology, terrestrial and vegetation and wildlife. Two air quality monitoring stations near the Project site have been operated to gather continuous samples.

 

Surface water studies included monthly surface water quality sampling at 35 locations as well as flow measurements and lake level measurements at six locations. Hydrogeological testing was conducted to improve the understanding of groundwater movement in the area and groundwater quality samples were collected at 33 monitoring wells. The geochemical characterization program included static and kinetic testing of mine rock and tailings as well as static testing of aggregate and overburden. An aerial survey was undertaken early in the year to study Boreal Caribou and other ungulates and furbearers.

 

Other key wildlife and habitat studies included bird and bat surveys as well as vegetation community and wetland mapping. Extensive aquatic studies were undertaken including fish community and habitat assessments, fish tissue sampling, environmental DNA studies, as well as plankton and benthic invertebrate studies.

 

 
60 | Page

 

 

The 2023 environmental field work activities involved a comprehensive program to supplement the baseline data that had been collected over several previous years. The studies covered a broad range of disciplines across the biological, physical and human environments including surface water, groundwater, geochemistry, aquatic biology, archaeology, cultural heritage, and species at risk. The data is being analyzed and reported on for inclusion in the final EIS/EA.

 

Early in 2023, FMG conducted a caribou telemetry study in the regional study area around the Springpole site. The study involved an aerial survey by helicopter, followed by a caribou collaring program. The program resulted in 50 caribou being fitted with GPS satellite collars that are programmed to drop from the animals in 4 years. The objective of the study is to identify important seasonal habitat areas and how caribou use their home range to support species conservation and mitigation strategies.

 

A wolverine study commenced in February 2023 which involved the placement of 25 non-invasive hair snag and camera monitoring stations in the local study area around the Springpole site. The intent of the study is to develop an understanding of wolverine use of the landscape relative to the proposed Springpole project. The stations involve erecting a run pole that is affixed to a sturdy tree. On the run pole there are two upright structures – the first holds 12 alligator clips intended to grab a small amount of fur, and release easily upon contact by wildlife passing through the frame. Fur samples collected are sent to a lab for genetic analysis. The stations were checked on a monthly basis to collect hair samples, refurbish cameras and to ensure the stations remain in a safe and functioning state prior to being decommissioned in May. The program is expected to be a multi-year study and planned to take place again in early 2024.

 

Environmental Assessment Preparation

 

Following a successful environmental field season and the approval of the Provincial EA Terms of Reference on November 8, 2021, WSP (previously Wood plc), on behalf of First Mining, has undertaken further studies to inform the EA documentation covering key areas of the environment at Springpole, including geochemistry, groundwater quantity and quality, surface water quality, hydrology, air quality, noise and vibration, and terrestrial components.  The draft EA also includes economic modelling and highlights the economic and social benefits of the Project.  The technical work has been documented and presented in draft EIS/EA reports which were published in June 2022. 

 

Since June 2022, First Mining has held several meetings with government regulators and received written comments from all relevant provincial ministries and federal agencies. First Mining also received written comments and met with local Indigenous communities. The Municipality of Ear Falls and Municipality of Sioux Lookout have also been consulted on the Project. By the end of 2023, First Mining issued responses to all of the initial comments and is continuing to address follow up through technical meetings. Also in 2023, First Mining hosted public and community open house meetings to engage on the draft EIS/EA . Consultation and engagement on the draft EIS/EA with Indigenous communities, municipalities, regulators and stakeholders will continue in order to shape the final EIS/EA submission in mid-2024.

 

The final EIS/EA technical modelling and analysis started in Q3 2023 and is progressing on track. First Mining is working closely with the lead consultant WSP to continue to update the analysis and environmental assessment reporting.

 

Consultation and engagement is ongoing to obtain feedback from Indigenous communities, regulators, and stakeholders.

 

 
61 | Page

 

 

Cat Lake First Nation

 

On September 18, 2023, the Company was informed that the Cat Lake First Nation had passed a Band Council Resolution (“BCR”) ratifying an existing moratorium on mining and mining related activities in Cat Lake traditional territory. Cat Lake First Nation had declared a moratorium on mining and mining related activities by letter dated December 2022. The Province of Ontario has continued to grant exploration and other permits to the Company throughout 2022 and 2023, and to date the moratorium has not impacted the Company’s ability to carry out its operations, including exploration, development and environmental assessment activities at the Springpole site.

 

In February 2024, we received construction permits for a temporary winter road to the Springpole Project by MNRF. Subsequently, First Mining received notice from litigation counsel to Cat Lake First Nation that it intended to challenge the permits issued to First Mining.  The lawyers for First Mining, MNRF and CLFN met for a scheduling hearing at which the judge issued an interim order staying the authorization of MNRF, pausing the winter road construction activities.  It is expected that this judicial review of the permit granting process will be heard by the courts in 2024.

 

We continue to provide Cat Lake opportunities to engage in the Springpole Project planning and to constructively engage with other local Indigenous communities, government regulators and stakeholders on the Springpole Project.

 

 
62 | Page

 

 

Duparquet

 

Technical report

 

The description in this section of the Duparquet Project is based on the project’s technical report: NI 43-101 Technical Report: Preliminary Economic Assessment Duparquet Gold Project, Quebec, Canada (report date: October 20, 2023; effective date: September 15, 2023) (the “Duparquet Technical Report”). The report was prepared for us in accordance with NI 43-101 by G Mining Services Inc. (“G Mining”) under the supervision of Carl Michaud, P.Eng., MBA., G Mining Services Inc., Alexandre Dorval, P.Eng., G Mining Services Inc., Marina Iund, P.Geo., InnovExplo Inc., Olivier Vadnais-Leblanc, P.Geo., InnovExplo Inc., Carl Pelletier, P.Geo., InnovExplo Inc., Simon Boudreau, P.Eng., InnovExplo Inc., Neil Lincoln, P.Eng., G Mining Services Inc., Philip Rodrigue, P.Eng., G Mining Services Inc. and Sheldon Smith, P.Geo., Stantec Consulting Ltd.; all Qualified Persons within the meaning of NI 43-101. The following description has been prepared under the supervision of Louis Martin, P.Geo., a consultant of First Mining who is a Qualified Person within the meaning of NI 43-101. All currencies used in this summary of the Duparquet Technical Report are in Canadian dollars unless otherwise noted.

 

The conclusions, projections and estimates included in this description are subject to the qualifications, assumptions and exclusions set out in the Duparquet Technical Report, except as such qualifications, assumptions and exclusions may be modified in this AIF.  We recommend you read the Duparquet Technical Report in its entirety to fully understand the project.  You can download a copy of the Duparquet Technical Report from our SEDAR+ profile (www.sedarplus.ca), or from our website (www.firstmininggold.com).

 

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

 

Project description, location and access

  

The Duparquet Project is located in the Abitibi-Témiscamingue administrative region in the western part of the Province of Québec, Canada. The centroid of the Project is approximately 26 km north of the city of Rouyn-Noranda and about 7 km east of the town of Duparquet, Québec. The Duparquet Project lies in the Destor and Duparquet townships and falls within the area covered by NTS map sheets 32D06 and 32D10. The approximate longitude and latitude of the centroid are 79.1304°W and 48.4836°N (NAD83), and the UTM coordinates are 638149m E and 5371738m N (NAD83 Zone 17).

 

The Duparquet Project can be easily reached via the all-season, paved, two-lane provincial road 101 from Rouyn-Noranda, which heads north to La Sarre over approximately 30 km, then turns westward onto provincial road 393 for approximately 15 km to Duparquet. Both roads cross through the Duparquet Project, and several gravel roads also lead onto it.

   

We acquired 100% ownership of the Duparquet Project in September 2022. Duparquet consists of the amalgamation of seven contiguous claim blocks (from west to east): Beattie, Donchester, Dumico, Central Duparquet, Porcupine East, Pitt Gold, and Duquesne.

 

The mining concessions for the previously registered Beattie (CM292) and Donchester (CM442) properties were voluntarily allowed to lapse in April 2021 and August 2021 respectively and have since been converted to mining claims (“CDC”) by the owners. The change from Mining Concession to Mining Claims are the result of an amendment to the Mining Act, Bill 70, Chapter M-13-1 relating to non mining operational mining concessions.

 

The Duparquet project, including all seven contiguous claim blocks, comprises 199 map-designated claims totalling 5,804 hectares, extending 19 km east-west and 8 km north-south along the Destor-Porcupine Fault Zone (“DPFZ”). The Beattie, Donchester and Duquesne blocks contain past-producing underground mines. Historical underground workings and a shaft were developed on the Central Duparquet block, but no gold was produced.

 

The Duparquet Project is located in Abitibiwinni First Nation territory. Claim holders within this territory are bound by the Agreement on Consultation and Accommodation between the Abitibiwinni First Nation Council and the Government of Quebec.  Parts of the Project are located inside the municipal limits of Duparquet. In addition, some parts of the Project are private lands with houses and a golf course and clubhouse.

 

 
63 | Page

 

 

History

 

Gold was first discovered on the Duparquet Township by John Beattie in 1910 and exploration and development activities continued through to 1933, when production commenced at the Beattie property. Operations continued until 1956 when, after 23 years of almost continuous production, the mine closed. During its lifetime, the Beattie mill treated 9,645,000 t with an average grade of 4.01 g/t Au and 0.99 g/t Ag from the North zone of the Beattie mine and Donchester mine (Lavergne, 1985).

 

The current Duparquet Project consists of seven claim blocks: Beattie, Donchester, Dumico, Central Duparquet, Porcupine East, Pitt Gold and Duquesne. It covers and overlaps many historical mining and exploration properties, the boundaries and names of which have changed over time following ownership (and/or option) changes, the abandonment and/or addition of claims, or modifications to mining title status when claims were converted into mining leases and then into mining claims.

 

All the claim blocks have been the subject of multiple exploration programs carried out by numerous exploration companies. The work included prospecting and geological mapping, geophysics, geochemistry and drilling, the latter ranging from exploration-stage to mineral resource definition. The drilling programs at Beattie, Donchester, Central Duparquet and Duquesne were conducted from both surface and underground. The claim blocks have been the subject of many geological studies and reports covering a wide array of topics, from mineral resource and mineral reserve estimates to engineering studies to regional geological surveys and synthesis. Following is a discussion of the activity in more recent years.

  

Between 2008 and 2009, a drilling program was carried out by Clifton Star, comprising 209 holes (58,053 m) on the Beattie property and 99 holes (37,566 m) on the Donchester property.

 

In 2010, under the terms of a joint venture agreement with Osisko Mining Corp. (“Osisko”), the latter became the operator of a drilling program which comprised 314 holes for a total of 102,529 m on the Beattie and Donchester properties. Osisko also carried out a channel sampling program consisting of 220 channels (460 m of cut channels) to complement the drilling program. Osisko contracted SGS Mineral Service (Lakefield, Ontario) to conduct test work on Beattie Duparquet Project samples. The program included comminution test work and preliminary cyanidation and flotation tests to investigate the recovery of gold.

 

During December 2010 and January 2011, Geophysics GPR International Inc. flew a helicopter-borne magnetic and time-domain electromagnetic geophysical survey for Osisko Mining Corporation’s Duparquet Project. The survey was composed of one single block and covers a large portion of the current Duparquet Project. Osisko contracted SGS Canada Inc. (“SGS”) (Geostat) to prepare a NI 43 101 compliant Mineral Resource Estimate on the Beattie sector only.

 

Also in 2011, Clifton Star continued drilling the Beattie and Donchester properties and started drilling the Central Duparquet property. A total of 46 holes and 28 holes extensions were drilled for a total of 17,565 m.

 

 
64 | Page

 

 

In 2012, Clifton Star completed surface outcrop stripping on and in the vicinity of the RWRS Zone, South Zone and the North Zone. A total of 19 outcrops on Beattie, 9 on Donchester and one on Central Duparquet properties were mechanically stripped and then sampled using a conventional channelling technique. The primary goal for the stripping and channel sampling was to test and verify the gold mineralization continuity up to surface. Clifton Star decided to resample 50 of the company’s previous holes that had been selectively sampled at the time of drilling. The selective nature of the sampling resulted in untested shoulders adjacent to mineralized zones.

 

From January to the end of August 2012, Clifton Star drilled a total of 35 new holes and eight extensions of older holes. Overall, the drilling program produced 12,471 m of NQ-size core during this period. From September 2012 until January 2013, Clifton Star continued drilling the Duparquet properties. A total of 53 drill holes and ten drill hole extensions were completed during this period, for a total of 22,675 m of NQ-size core. Clifton Star contracted Tenova Mining & Minerals – Bateman Engineering Pty to develop preliminary capital and operating costs for the construction and operation of a mineral processing plant to process from the Duparquet Project to produce gold doré. The purpose of the study was to assess the viability of the Total Pressure Oxidation, Albion ProcessTM and Biox® Leaching technologies to treat gold-rich concentrate from the Duparquet mine deposits, in order to produce gold doré bar and to provide capital and operating cost estimates to a level of accuracy of ±35% for the proposed three flowsheets.

 

Also in 2012, Clifton Star contracted SGS (Lakefield, Ontario) to conduct test work on Duparquet Project samples. The program included flotation, pressure oxidation and cyanidation test work to investigate the recovery of gold from ore and tailing samples. Preliminary comminution and environmental tests were also conducted.

 

In fall of 2012, 15 of the 19 holes of the Dumico property were entirely resampled and/or downhole surveyed by Clifton Star. Down-hole orientation surveys were done using a Gyroscope instrument.

 

In 2013, Clifton Star sent to SGS in Lakefield, Ontario a 12 t composite bulk sample of the Duparquet Project mineralized zones, from large diameter drill core, for metallurgical and environmental pilot tests. The planned test work included a continuous pilot plant test for POX and also for high grade gold concentrates production. Results received in September 2013 confirmed previous recoveries. Clifton Star began a surface outcrop stripping program on and in the vicinity of the RWRS Zone, South Zone and the North Zone. A total of 41 outcrops on the Beattie property were mechanically stripped and then sampled using a conventional channelling technique. The primary goal for the stripping and channel sampling was to test and verify the gold mineralization continuity up to surface.

 

Also in 2013, Clifton Star decided to resample eight of the company’s previous holes that had been selectively sampled at the time of drilling. The selective nature of the sampling resulted in untested shoulders adjacent to mineralized zones. Clifton Star’s re-sampling program successfully filled in the gaps in these holes. A drilling program was carried out by Clifton Star, comprising 92 holes (16,773.5 m) on the Beattie, Donchester and Central Duparquet properties.

  

Geological setting, mineralization and deposit types

 

The Project is located in the southern portion of the Archean volcanic belt in the Abitibi region of the Superior Province. The Archean Superior Province forms the core of the North American continent and is surrounded by provinces of Paleoproterozoic age to the west, north and east and the Grenville Province of Mesoproterozoic age to the southeast.

 

 
65 | Page

 

 

The Abitibi Subprovince is divided into the Southern and Northern Volcanic Zones (“SVZ” and “NVZ”, respectively; Chown et al., 1992) representing a collage of two arcs delineated by the Destor-Porcupine Fault Zone (“DPFZ”) (Mueller et al., 1996). The SVZ is separated from the Pontiac Terrane sedimentary rocks, an accretionary prism to the south (Calvert and Ludden, 1999), by the Cadillac-Larder Lake Fault Zone (“CLLFZ”).

 

Most of the rocks in the Southern Abitibi Greenstone Belt are Archean, with ages ranging from 2,730 to 2,670 Ma. The overall geometry of the Southern Abitibi comprises east-west trending lithological sequences primarily of volcanic origin that vary in composition from ultramafic (komatiites) through to felsic rocks.

 

The DPFZ extends 200 km from west to east from Ontario to Québec. The deformation zone is well known for having a significant gold endowment, and several mines and projects (active or historic) can be found along the structure.

 

The local geology of the Duparquet Project is characterized by ENE-WSW and WNW-ESE stratigraphy, that dips steeply (80°- 85°) toward the south. The predominant structures are the SE-trending regional DPFZ and its E-W-trending fault splays. On the claim blocks, these splays include the Duquesne, Lac Lepine, Central Duparquet, Donchester and Beattie fault zones. Several subsidiary faults with NE-SW to E-W orientations are closely related to these structures.

 

Gold-bearing mineralization on these claim blocks includes the former Beattie, Donchester and Duquesne mines.

 

At the historical Beattie mine, gold has been associated with silicified and brecciated zones containing a low percentage of very fine-grained pyrite and arsenopyrite (Goutier and Lacroix, 1992). According to Bevan (2011), the main type of gold mineralization generally occurs within shears or brecciated zones along or within the adjacent syenitic intrusions and is associated with finely disseminated pyrite and minor arsenopyrite replacement. Sulphide content is generally low (0.5 to 4%), although it can sometimes reach 10%. Higher gold grades appear to be related to the finer-grained sulphides (Bevan, 2011). Historically, gold production at the Beattie mine was accompanied by the extraction of arsenic trioxide and silver as by-products. The breccia type of mineralized material is found within the metavolcanic rocks (volcanics and tuffs) and is represented as well-mineralized, siliceous, brecciated, grey-coloured, and bleached units. The porphyry-style of mineralization is represented as fine-grained, strongly silicified mineralized zones hosted in porphyry intrusives. These units generally have lower gold grades than other styles of mineralization within the deposit (Bevan, 2011).

 

At the past producing Beattie mine, the main mineralized lenses are hosted along the contacts of the shear zones (BF and DF) and the syenite intrusion. The main zone or North Zone is the northernmost contact of the syenite intrusion, and a second gold-bearing lens, the South Zone, occurs at the southern contact of the syenite intrusion.

 

Gold mineralization at the Donchester mine was of higher grade and associated with an E-W shear zone cutting across volcanic units and syenitic dykes (Goutier and Lacroix, 1992). This zone is interpreted as the east extension of the South Zone. At both the Beattie and Donchester mines, the South Zone can be subdivided into several mineralized lenses, modelled as ten individual subzones. Six other major mineralized zones within the Beattie-Donchester area have been interpreted by Iund et al. 2022.

 

Mineralization at Central Duparquet is hosted within the CDF and is of a similar nature as the South and North zones (Bevan, 2011). InnovExplo interpreted three mineralized zones at Central Duparquet.

 

Dumico is the eastern extension of Central Duparquet. According to Iund et al., 2022, five mineralized zones were interpreted at Dumico. Three of these strike E-W and are interpreted as extensions of the Central Duparquet CD Zones. The other two zones, which strike NW-SE, occur on the eastern portion of Dumico.

  

 
66 | Page

 

 

Based on the current interpretation, they are thought to be associated with a secondary structure subparallel to the regional DPFZ.

 

At Pitt, most of the mineralized intersections have been obtained north of the DPFZ. A few isolated gold values were encountered in sediments to the south of the fault zone and a few more within schist (chlorite, sericite, carbonate, fuchsite) representing the fault zone, but although the assay values could be quite high, limited continuity could be established with the data available.

 

Gold mineralization is more abundant towards the north of the fault zone and is hosted within distinctive structures and units that seem to be more variable and complex. Porphyry intrusions are prominent north of the DPFZ; and their association with gold mineralization is poorly understood. It is suggested that the intrusions were emplaced along the same dilatational structures that mobilized gold-bearing fluids. Drill hole data suggests that gold is not only confined to the porphyries, and there appears to be a cross-cutting relationship between the gold-bearing structures and the porphyries or volcanic units.

 

The mineralization found locally on Porcupine East is disseminated sulphides associated with felsic intrusives. According to Legault et al. (2003), this type of mineralization can be of two types:

 

Disseminated with quartz-carbonate veinlets associated with quartz-feldspar porphyry (“QFP”), in the eastern part of the south claim block, this type can be found in the Touriet and Touriet East showings. This mineralization style is associated with known gold deposits such as the nearby Duquesne deposit and some significant deposits in the Timmins camp, including Hollinger (20 Moz), Dome (16 Moz) and McIntyre (11 Moz).

 

 

Disseminated sulphides associated with a syenite intrusion. On the property, this type is represented by the GF-81 showing (Porcupine-173595) towards the north. Examples of known gold deposits of this type are the nearby Beattie and Donchester deposits.

 

Felsic porphyry intrusions are very important for gold mineralization at Duquesne. These felsic intrusions are located on the contact between two lithostratigraphic units, in the fault zone or on the extension of the sedimentary band of the Duparquet Formation.

 

Gold is found in four geological settings: a) within syenite and feldspar porphyry and mafic to ultramafic host rocks within shears that splay off the DPFZ; b) within sheared and brecciated zones associated with the splay-faults and associated with quartz-feldspar porphyry and syenite porphyry; c) within quartz-carbonate-rich systems within quartz-feldspar porphyry, syenite porphyry, and quartz diorite; in particular silicified and chert rich quartz-flooding of the sheared areas of the host rocks; and d) along contacts between mafic and ultramafic sheared units.

 

Exploration

 

Line cutting and IP survey work was completed on the Duquesne claim block in 2012, 2013, 2015 for Clifton Star Resources Inc., and in 2016 on behalf of First Mining by Geophysique TMC.

 

In 2017, First Mining undertook a program of channel sampling on an outcrop located in the central part of the Duquesne mining concession (#377-Block 4) approximately 450 m northwest of the Duquesne shaft. The geology encountered during the channel sampling program is dominantly a felsic intrusive (quartz porphyry) and zones of finer-grained material with a strong carbonate alteration. It is believed by First Mining to be the stratigraphic equivalent to the rocks hosting the mineralization at the Duquesne mine.

 

 
67 | Page

 

 

Drilling

 

Since February 28, 2013, 57 holes (9,548 m) have been drilled on the Project by Clifton Star, Beattie Gold Mines, and 258 Manitoba.

 

Clifton Star’s 2013 drilling program ran from May 6, 2013, to August 2013. During this period, 47 holes were drilled on the Project for 7,422 m of NQ-sized core.

 

Between 2014 and 2018, Beattie Gold Mines drilled five holes on the Beattie Project, at a rate of one hole per year, for a total of 1,088 m.

 

Between 2014 and 2018, 258 Manitoba drilled five holes on the Donchester Project, at a rate of one hole per year, for a total of 1,039 m.

 

We completed a Phase I diamond drill program totaling 4,884 m between May and September 2023. This program represented the first drill program undertaken by the company since acquiring the Duparquet Project in 2022. Following the completion of the Phase I program, we commenced a Phase II diamond drill program of an additional ~5,000 m, of which 2,082 m were completed by November 12, 2023, prior to a drilling stand down ahead of winter freeze-up conditions for recommencement in 2024.

 

Sampling, analysis and security

 

Beattie, Donchester, Dumico and Central Duparquet Claim Blocks

 

The following paragraphs describe the sample preparation, analyses, and security procedures during the drilling programs carried out between May 6, 2013, and the end of 2018, on the Duparquet Project.

 

The drill core was boxed, covered and sealed at the drill rigs, and transported by the drilling company employees to the core logging facility at the Beattie mine, where personnel took over the core handling.

 

The core was logged and sampled by (or under the supervision of) geologists, all of whom were members in good standing of the OGQ (Quebec’s professional order of geologists). A geologist marked the samples by placing a unique identification tag at the end of each core sample interval. Sample contacts respect lithological contacts and/or changes in the appearance of mineralization or alteration (type and/or strength). A technician sawed each marked sample in half. One half of the core was placed in a plastic bag along with a detached portion of the unique bar-coded sample tag, and the other half was returned to the core box with the remaining tag portion stapled in place. The core boxes were stored in outdoor core racks for future reference. Individually bagged samples were placed in security-sealed rice bags along with the sample list for delivery to the assay laboratory.

 

One (1) blank and one (1) certified reference material (“CRM” or “standard”) were inserted for every twenty (20) samples. The laboratory was also asked to assay one (1) pulp duplicate for every twenty (20) samples.

 

For every 100 samples sent to the laboratory, the numbers ending in the following digits represent QA/QC samples:

 

 

15, 35, 55, 75, or 95 = standard;

 

17, 37, 57, 77, or 97 = pulp duplicate of preceding sample;

 

20, 40, 60, 80, or 00 = blank.

 

 
68 | Page

 

 

The International Organization for Standardization (“ISO”) and the International Electrotechnical Commission (“IEC”) form the specialized system for worldwide standardization. ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration Laboratories sets out the criteria for laboratories wishing to demonstrate that they are technically competent, operating an effective quality system, and able to generate technically valid calibration and test results. The standard forms the basis for the accreditation of competence of laboratories by accreditation bodies.

 

Samples from the 2013 to 2018 drill programs were sent to Techni-Lab S.G.B. Abitibi Inc. (“Techni-Lab”) in Sainte-Germaine-Boulé, Quebec, for preparation and analysis. Techni-Lab received ISO/IEC 17025 accreditation through the Standards Council of Canada (“SCC”). Techni-Lab is a commercial laboratory independent of the issuer and has no interest in the Project.

 

Samples were analyzed for gold using fire assay with atomic absorption spectroscopy (“AAS”) finish. The nominal sample weight was 50 g.  The methodology is described as follows:

 

 

Samples are sorted, bar-coded and logged into the Techni-Lab LIMS program before being placed in the sample drying room.

 

Samples are crushed in their entirety to 85% passing 8 mesh (2.4 mm) using either an oscillating jaw crusher or a roll crusher. A 250 to 300 g fraction derived from the crushing process is pulverized using a ring mill to 90% passing 150 mesh (106 µm).

 

Assay results are provided in Excel spreadsheets, and the official certificate (signed and sealed) is provided as a PDF file.

 

The pulverized pulp is placed in kraft sample bags, and the un-pulverized portions returned to their original sample bags.

 

The remainder of the crushed samples (the rejects) and the pulps are returned to the client and stored at the Beattie mine facility.

 

Samples with grades over 5.0 g/t Au were re-assayed with a gravimetric finish. If the assay result from the gravimetric finish exceeds 10 g/t Au, then the sample was re-assayed by the metallic sieve method.

 

The quality assurance and quality control (“QA/QC”) program for drill core included the insertion of blanks, standards and duplicates in the sample stream of core samples. About 15% of the samples were control samples in the sampling and assaying process. One (1) standard, one (1) blank sample of barren rock and one (1) pulp duplicate were added to each group of 20 samples as an analytical check for the laboratory batches.

 

Geologists and a designated database person were responsible for the QA/QC program and database compilation. Upon receiving the analytical results, the geologists extracted the results for blanks and standards to compare against the expected values. If QA/QC acceptability was achieved for the analytical batch, the data was entered into the project’s database; if not, the laboratory was contacted to review and address the issue, including retesting the batch if required.

 

Accuracy was monitored by inserting CRMs at a ratio of one (1) for every 20 samples (1:20). The standards were supplied by CDN Resource Laboratories Ltd. of Langley, British Colombia. A QC failure is defined as when the assay result for a standard falls outside three standard deviations (“3SD”). Gross outliers were excluded from the standard deviation calculation.

 

Fourteen (14) different standards were used between 2013 and 2018. Of the 310 CRM samples, eight (8) returned results outside 3SD.

 

Contamination was monitored by the routine insertion of a barren sample (blank), which went through the same sample preparation and analytical procedures as the core samples.

 

 
69 | Page

 

 

A total of 313 blanks were inserted in the sample batches from 2013 to 2018. The blank material consisted of crushed marble. A general guideline for success during a contamination QC program is a rate of 90% of blank assay results not exceeding the acceptance limits of three times the detection limit (“3DL”). The detection limit was 0.01 g/t Au.

 

One (1) sample did not pass the quality control procedure, representing a success rate of 99.6%.

 

The precision of the pulp duplicates can be used to determine the incremental loss of precision for the pulp pulverizing stage of the process, thereby establishing whether a given pulp size taken after pulverization is adequate to ensure representative fusing and analysis.

 

A total of 306 pulp duplicates were assayed. The difference between the original and duplicate analyses is presented in Figure 11.3 of the Technical Report. Results show a good precision with R2=0.94. Results also show a good accuracy monitored by the linear regression line (between the 10% tolerance limit).

 

Overall, the sample preparation, security, analysis and QA/QC protocols performed between 2013 to 2018 followed generally accepted industry standards and that the data is valid and of sufficient quality for mineral resource estimation.

 

Pitt Gold Claim Block

 

No new sample preparation or analytical work has been conducted on the Pitt Gold claim block since December 15, 2016, the database close-out date for the previous mineral resource estimate. The following sections describe the sampling, assaying and safety protocols used by Brionor and Normabec on the Pitt Gold claim block and were extracted and modified from Lewis and San Martin.

 

Normabec first employed the sampling methods and approach outlined in this section for its 2005 and 2006 drilling programs. These methods were continued throughout Normabec’s programs and those of its successor, Brionor.

 

Core boxes were collected at the drill site every morning by the project geologist or their assistant. Core boxes were opened at the company core shed and labelled according to the hole number and depth of the interval in the box. The core was then logged by the geologist, who outlined intervals to be sampled with red marks. Two sample tags were placed with each sample; one tag was placed in the sample bag, with the second remaining in the core box to identify the sample location. Sample information was listed in both the sample book and the geologist’s log (date, interval sampled).

 

The geologist decided the size of the interval to be sampled based on geological criteria such as geological contacts, alteration, and mineralization. Samples rarely exceeded a maximum length of 1.5 m and were usually greater than 30 cm. The majority of the sampling was conducted using 1.0 m intervals or shorter. All samples respected the geological boundaries.

 

Selected intervals for assaying were split in two using a hydraulic core splitter. One half of the interval was placed in a plastic bag with one of the sample tags left in the box. The other half was put back at its original location in the core box with the second tag to identify the sample interval for future reference. The sample bag was sealed and readied for shipping to the laboratory. The core splitter was thoroughly cleaned using fine brushes between every sample to avoid contamination.

 

Once all samples had been collected from a core box, the boxes were piled outside the company core shed and eventually strapped when piles reached 1.5 m high. Samples were brought or shipped to the laboratory at regular intervals depending on volume (every week or every few days). Only company employees were permitted to handle the samples before they reached either the laboratory or a shipping company that was employed to deliver the samples to the laboratory. Brionor stated that in no instance was any officer, director, or associate of Brionor involved in any aspect of the sample preparation.

 

 
70 | Page

 

 

The core pulps and rejects were stored outdoors in Rouyn Noranda at a storage facility rented by Brionor and previously by Normabec. The pulps and rejects were not provided to First Mining when they acquired the property from Brionor. Any available drill core for Pitt Gold was moved by First Mining to the Duquesne mine site.

  

Activation Laboratories Ltd (“Actlabs”) in Sainte Germaine de Boulé was the accredited independent laboratory used by Brionor for the 2010 exploration program. Actlabs is an independent laboratory that has ISO / IEC 17025 accreditation through the Standards Council of Canada (“SCC”). Neither Techni Lab nor Actlabs had an interest in Brionor or its predecessor, Normabec.

 

The laboratory used to assay the samples for the 2005, 2006 and 2007 drilling programs was Laboratoire Expert Inc. (“Expert Inc”), which was not accredited per ISO/IEC Guideline 17025 by the SCC at the time. However, this was common for local laboratories, and they usually participated in several round robins with other laboratories while pursuing certification, without affecting the quality of the assaying being performed.

 

In 2008, Techni Lab was chosen to conduct the assaying, and they continued with the assaying for the 2010 drilling program.

 

Duquesne Claim Block

 

The most recent drilling on Duquesne was conducted by Clifton Star during 2007 to 2010 when they had an option on the Duquesne claims. First Mining has not conducted any new drilling on the Duquesne claims since acquiring the property.

 

During the 2007-2009 drilling programs, the workflow from drilling to core storage was as follows:

 

 

The drilling contractor brought the NQ-size core to the old Beattie mine site

 

 

 

 

Clifton Star employees received the core boxes outside on framework supports

 

 

 

 

The core boxes were opened, measured, and tagged

 

 

 

 

The core boxes were placed in outdoor core racks

 

 

 

 

The core boxes were brought into the core shack, and Clifton Star’s geologists logged them

 

 

 

 

While logging the core, geologists indicated with a red mark where the core would be split

 

 

 

 

Once the core was split, the logging geologist also sampled the core

 

 

 

 

Each sample was put into a plastic bag along with a numbered tag

 

 

 

 

Samples were analyzed for gold only

 

 

 

 

Clifton Star stored the pulps and rejects at the old Beattie mine site

 

 

 

 

60 g standards were integrated into the project’s sample stream. In general, one standard sample was inserted for every 20 core samples

 

 
71 | Page

 

 

For the 2010 drilling program, the blanks and standards were inserted every twenty samples, according to the geologist's instructions. ALS Minerals collected the samples and transported them to the ALS Minerals facility for assaying. The workflow from drilling to storage of the core, was as follows:

 

 

The drilling contractor brought the NQ-size core to the old Beattie mine site

 

 

 

 

Clifton Star’s employees received the core boxes outside on framework supports, and a quick log was performed

 

 

 

 

The core boxes were opened, measured, and tagged

 

 

 

 

The core was logged in detail

 

 

 

 

The core was sawed

 

 

 

 

The core boxes were placed in outdoor core racks

 

 

 

 

Once the core was split, a technician completed the sampling

 

 

 

 

Each sample was put into a plastic bag along with a numbered tag

 

 

 

 

Samples were analyzed for gold only

 

 

 

 

Clifton Star kept the pulps and rejects at the old Beattie Mine site

 

 

 

 

60 g standards were integrated into the project’s samples. In general, one standard sample was inserted for every twenty core samples

 

Three different laboratories were used from 2007 to 2010: Techni-Lab (Actlabs) in Ste-Germaine Boulé, Laboratoire Expert in Rouyn-Noranda, and ALS Chemex in Val-d’Or. Techni-Lab (Actlabs) in Ste-Germaine Boulé, and ALS Chemex in Val-d’Or are ISO-certified and independent of the property owners.  Laboratoire Expert in Rouyn-Noranda is not ISO-certified. 

 

Handling procedures vary with the type of samples transported to the selected laboratory.

 

Porcupine East Claim Block

 

First Mining has not conducted any new sampling or analytical work on the Porcupine East claim block since it acquired the claims.

 

Data verification

  

Beattie, Donchester, Dumico and Central Duparquet Claim Blocks

 

Data verification for the current MRE included visits to the Duparquet Project by the “qualified person” (as defined in NI 43-101) (Marina Iund and Carl Pelletier) and an independent review of the data for selected drill holes (surveyor certificates, assay certificates, quality assurance/quality control (“QA/QC”) program and results, downhole surveys, lithologies, alteration and structures). 

 

The updated master database for the Beattie, Donchester, Dumico and Central Duparquet claim blocks contains 904 diamond drill holes totalling 270,119 m and 173,831 sampled intervals, and 2,371 samples from 892 channels (for a total length of 1,827 m).

 

The QP believes that the data verification process demonstrates the validity of the data and the protocols for the Beattie, Donchester, Dumico and Central Duparquet claim blocks. The QP considers the database to be valid and of sufficient quality for use in the 2023 MRE for the Duparquet Project (the “2023 MRE”).

 

 
72 | Page

 

 

Pitt Gold Claim Block

 

This item covers the verification of data supplied by First Mining for the Pitt Gold claim block and used in the current MRE. The close-out date of the 2023 MRE database for Pitt Gold is July 7, 2023.

 

Data verification included a site visit as well as an independent review of the data for selected drill holes (surveyor certificates, assay certificates, QA/QC program and results, downhole surveys, lithologies, alteration and structures).

 

The QP, Olivier Vadnais-Leblanc, visited the Pitt Gold claim block on June 1, 2023, accompanied by Louis Martin from First Mining.  Mr. Vadnais-Leblanc also visited the First Mining core shack and offices in the town of Duparquet.

 

The QPs reviewed all the drilling information from the Pitt Gold claim block that was used for the 2023 MRE. First Mining has not drilled any holes since the 2017 MRE was published (Lewis and San Martin, 2017).

 

The 2023 validation included all aspects of the drill hole database (i.e., collar locations, drilling protocols, down-hole surveys, logging protocols, sampling protocols, QA/QC protocols, validation sampling, density measurements and checks against assay certificates).

 

The QP is of the opinion that the sample preparation, analysis, QA/QC and safety protocols used for those programs met generally accepted industry standards at the time but currently prevent a higher level of estimation confidence. As such, the Pitt Gold MRE is entirely classified as “inferred”.

 

Duquesne Claim Block

 

This item covers the verification of data supplied by First Mining for the Duquesne claim block and used in the current MRE. The close-out date of the 2023 MRE database for Duquesne is February 28, 2023.

 

Data verification included a site visit and an independent review of the data for selected drill holes (surveyor certificates, assay certificates, QA/QC program and results, downhole surveys, lithologies, alteration and structures).

 

The QP, Olivier Vadnais-Leblanc, visited the Duquesne claim block on June 1, 2023, accompanied by Louis Martin from First Mining. Mr. Vadnais-Leblanc also visited the First Mining core shack and offices in the town of Duparquet, the drill site, and the outcrops.

 

The QPs reviewed all the drilling information from the Duquesne claim block that was used for the 2023 MRE. First Mining has not drilled any holes since the 2016 MRE was published (Rioux, 2016).

 

The 2023 validation included all aspects of the drill hole database (i.e., collar locations, drilling protocols, down-hole surveys, logging protocols, sampling protocols, QA/QC protocols, validation sampling, density measurements and checks against assay certificates).

 

The QP is of the opinion that the sample preparation, analysis, QA/QC and safety protocols used for those programs met generally accepted industry standards at the time but currently prevent a higher level of estimation confidence.  As such the Duquesne MRE is entirely classified as “inferred”.

 

Porcupine East Claim Block

 

First Mining has not conducted any new sampling or analytical work on the Porcupine East claim block since the Company acquired the claims. There is currently no Mineral Resource Estimate (“MRE”) defined in the Porcupine East claim block. 

  

 
73 | Page

 

 

Mineral processing and metallurgical testing

 

Metallurgical test work was previously completed on the Duparquet Project and has been documented in the previous NI 43-101 Technical Report by Clifton Star et al., (2014). Several metallurgical test work programs have been completed on the Duparquet Project, with the most recent test work program completed in 2013 by SGS Canada Inc. (“SGS”) which involved flotation, pressure oxidation (“POX”), cyanidation, rheology and environmental bench scale test work. Currently no new metallurgical test work has been completed on samples since 2013.

 

After a comprehensive trade-off study, a conventional comminution and gold flotation flowsheet was selected as the appropriate treatment of mineralized material from the Duparquet deposit to produce a gold-bearing concentrate for sale.

 

Pilot plant flotation test work was conducted on Duparquet samples by SGS in April 2013. The pilot plant was operated to confirm previous laboratory test results and to generate concentrate for a POX pilot plant and high-grade concentrate for direct sale market evaluation. Cyanidation tests were conducted on the flotation tailing to investigate the extraction of gold from this product. Flotation test results from test PP-07 from the pilot plant tests were used as the basis for process plant design and gold recoveries for the Duparquet Report.

 

Previous bench scale metallurgical test work and pilot plant testing have demonstrated a saleable gold concentrate can be produced from samples from the Duparquet Project via a conventional two-stage flotation-regrind circuit. Further test work is required to optimize the flowsheet, improve gold recoveries, and optimize the reagent scheme. The Duparquet Project mineralized material is considered very hard with respect to A x b, abrasion breakage (ta) and RWI, and hard with respect to the BWI and HPGR tests. Samples were found to be abrasive.

 

A single JKSimMet simulation was conducted, using aforementioned grindability test results on the PP Feed sample. In the simulation, it was found that a 30.0’ x 11.0’ SAG mill, operated with a 12% ball charge would be required to grind 453 t/h crushed mineralized material with F80 of 157 mm to a product with P80 of 2 mm. The SAG mill and ball mill specific power requirements were 10.0 and 12.5 kWh/t, respectively for a total power consumption of 22.6 kWh/t. It was also found that 5.7 MW would be required for the ball mill circuit to achieve a final product size of 100 µm. One 20.0’ x 30.0’ ball mill, with internal dimensions of 5.94 x 8.99 m and assumed 0° cone angle (square mill equivalent), operating with a ball charge of about 32% was selected. The SAG and ball mill installed power should be 4,551 kW and 5,674 kW, respectively. The SAG mill motor was selected to allow a ball charge increase up to 15% as well as an increase to 78% of critical speed.

 

Gravity Separation

 

The preliminary gravity separation test work on ground mineralized material samples indicated low gold recovery ranging from 3.7% to 14.9% and averaging 8.6%. Hence, gravity separation was not pursued.

 

Flotation

 

Bench Tests: Bench-scale flotation tests were conducted on the six mineralized material samples and in situ tailings samples evaluated for BWI (Ball Mill Work Index). The recovery of gold to concentrate by flotation was greater than 90% for most samples. The Central Duparquet Main sample is the exception with 84.6% gold recovery, increasing to 87.9% with finer grinding. Gold recovery by pressure oxidation and cyanidation treatment of the flotation concentrate was also investigated and was consistently high.

 

Locked-Cycle Tests: Flotation test work was conducted to investigate the recovery of gold from six mineralized samples. This program also included detailed concentrate analysis and cyanidation tests on the flotation tailings samples. Cleaner flotation tests were conducted to investigate the recovery of the gold in a saleable sulphide concentrate. The gold recovery ranged from 75.5% (Central Duparquet Main sample) to 88.5% (A Zone sample). The cleaner concentrate gold grade ranged from 39.0 to 83.6 g/t Au and the sulphur grade ranged from 20.9% to 35.9% S.

 

 
74 | Page

 

 

Pilot Plant Tests: Flotation tests were also conducted on a pilot plant (PP Feed) sample. The head sample was analyzed at 1.84 g/t Au, 1.16% S, 0.055% As and 7.61% CO3. The pilot plant was operated to generate bulk sulphide flotation concentrate containing 15-18% S for a subsequent pressure oxidation pilot plant to assess gold recovery and to generate 60-80 kg of a higher-grade flotation concentrate assaying over 40 g/t Au for direct sale market evaluation. With one cleaning stage the recovery of gold was 91.7% in a concentrate containing 26.8 g/t Au and 16.1% S. The results indicated that a concentrate with 47.8 g/t Au could be produced at 86.5% gold recovery. Flotation tailings were leached with cyanide to recover the gold remaining in this material. The recovery of gold from the tailings ranged from 45.1% and 40.2%.

 

Cyanidation on Flotation Tailings

 

Bench Tests: Samples of the bench-scale flotation tailings were leached under conventional cyanidation conditions. Standard bottle roll tests were conducted at 40% solids and pH 10.5 with 0.5 g/L NaCN for 48 hours. These tests gave poor gold extractions varying from 26.2% to 56.3%, confirming the refractory nature of the mineralized material.

 

Locked-Cycle Tests: The rougher tailings and cleaner scavenger tailings from each flotation locked cycle test were leached separately to investigate the gold extraction. Depending on the sample, between 3.9% and 11.5% additional gold was leached by cyanidation of flotation tailings. The overall gold recovery ranged from 87.0% (Central Duparquet Main sample) to 92.4% (A Zone sample).

 

Pressure Oxidation (POX) and Cyanidation

 

Bench Tests on Tailings: Test work was performed on two samples of existing tailings on the Project. The overall recovery of gold was 83.5% and 93.3%.

 

Bench Tests on Mineralized Material: conducted on six flotation concentrate samples. The overall recovery of gold was ranging from 91.9% to 95.4%.

 

The first objective of this program was to attempt to reduce costs of the pressure oxidation (POX) and carbon-in-leach (CIL) process by optimizing conditions and reducing reagent requirements. Previous investigation showed high lime consumption in CIL which was attributed to the slow breakdown of basic iron sulphates produced during pressure oxidation. To address this problem, the POX products were kept at 95°C for 4 hours in what is known as a hot cure process allowing the precipitated basic iron sulphate to solubilise back into solution. By this approach, the lime consumption in the CIL circuit was reduced by up to 95%.

 

Acid additions in the pre-acidulation stage before pressure oxidation were reduced by approximately half (by 60 kg/t H2SO4) from the initial tests while maintaining the high degree of sulphide oxidation and high gold recoveries. In addition, the hot cure product solution was successfully used as the source of acid in the pre-acidulation step, eliminating the fresh acid requirement and the cost of neutralizing the POX product. Furthermore, the test work showed similar gold recovery values in the range of 96-99% at a lower POX temperature of 210°C compared to 225°C applied in previous test work. This would result in additional savings in pressure oxidation costs.

 

The second objective was to generate final products for environmental studies. This included the flotation tailings, detoxified CIL pulp and hot cure neutralization sludge with each sample to be evaluated separately as well as a combined tailing product which included all three tailing streams.

 

 
75 | Page

 

 

There is insufficient data to determine the relationship between sulphide oxidation and gold recovery and whether full sulphide oxidation is required to recover the majority of the gold. Earlier batch test work showed a direct relationship between sulphide oxidation and gold extraction.

 

Pilot Plant Tests: Pressure oxidation pilot test results consisted of feed preparation, pressure oxidation, a hot curing stage and thickening of the final hot cured autoclave residue.

 

Pressure oxidation feed (flotation concentrate): The flotation concentrate was generated from a 12 t composite sample produced from drill core from across the deposit. The selected drill core and the average flotation feed mineralized material grade (Au) were selected to be as representative as possible. The head grade of the blended concentrate is 25.4 g/t gold, 32 g/t silver with sulphide grade at 16.8%. The sulphide content is sufficient to operate the pressure oxidation process under autothermal conditions without the requirement for extra heat. The high carbonate content (4.35%) necessitates an acid pre-treatment process to remove carbonate before pressure oxidation to ensure no build-up of carbon dioxide pressure in the autoclave.

 

Pressure oxidation pilot plant tests: A preliminary pilot test program investigated pressure oxidation and hot curing processing of a Duparquet flotation concentrate to render precious metals extractable by cyanidation.

 

The cyanidation test work program has demonstrated that high gold and silver recoveries are obtainable for cyanidation of pressure oxidation residues. The recovery of gold from the pilot plant hot cure discharge ranged from 94.7% to 96.5%, with gold recovery slightly higher for tests conducted after 90-minute POX time (96.2%, Au in residue 0.96 g/t) than those tests conducted after the 60-minute POX time (95%, 1.21 g/t Au in residue).

 

Precious metal leaching kinetics, carbon adsorption test work and process modelling were limited to investigating cyanidation and recovery of gold from hot cured discharge samples.

 

Overall, the current design for the process plant is limited to one test program on one concentrate sample. The concentrate was obtained from a blend of samples from across the Project.

 

Gold Leaching and Carbon Adsorption Test work

 

Leach kinetic tests were carried out to determine the rate of gold leaching on a washed hot cure thickener underflow composite. The leach test work was conducted by bottle roll tests. The leach was conducted at 35% solids density as directed by Clifton Star. The NaCN concentration was maintained at 0.5 g/L and the pH at 10.5 with lime. Each test was carried out for 48 hours with kinetic subsampling at 1, 2, 4, 8, 12 and 24 hours.  Leaching kinetics were fast with gold leaching largely complete within the first two hours.

 

SGS modelled the leaching and adsorption kinetics for gold and proposed a leaching and carbon in pulp configuration for recovering the gold based on the data from the test work sample, but no data were provided for silver leaching or adsorption kinetics. Based on the test results extractable gold and silver yields are expected to increase following lime boil from 95% to 98% for gold and from 9% to ≥89% for silver.

 

Gold and silver leach rates were assumed to be similar at 0.8 t/h.g, and an adsorption rate of 0.010/h. Silver leaching rates are normally slower than gold but as the silver is liberated from jarosite following lime boil it may be assumed that leaching will take place at a similar rate to gold.

 

Cyanide Destruction

 

Bench Tests: The SO2/air method was used to destroy the cyanide in the CIL tailings. Batch tests were conducted at pH 8.5 to lower the CNWAD level in the pulp to approximately 1 mg/L. Although the CNWAD level was reduced to <1 mg/L, the total cyanide (CNT) level was significantly higher for the A Zone and Donchester N samples due to the presence of ferrocyanide.

 

 
76 | Page

 

 

Pilot Plant: Bench-scale test work program conducted to examine various process options relating to the recovery of gold by carbon adsorption from washed hot cure thickener underflow product. The program also investigated neutralization of hot cure thickener overflow solution and cyanide destruction of the cyanide leach product of the pilot plant flotation tailing and hot cure thickener underflow.

 

The results of the tests conducted on the rougher tailings showed that the cyanide was effectively destroyed with an SO2 addition of 5.7 g/g CNWAD (Weak Acid Dissociable Cyanide) with a copper addition as copper sulphate of 0.1 g Cu/g CNWAD. Reducing the copper addition by half resulted in an increase in the CNT (Total Cyanide) although the CNWAD remained similar. A polishing stage is required to achieve a CNT analysis of less than 1 mg/L bringing the total copper addition back to 0.1 g Cu/g CNWAD.

 

Sedimentation Test work

 

Test work by SGS investigated the rheometallurgical responses (i.e., solid-liquid separation and rheology) of the flotation tailings, flotation concentrate (PP CI Conc (POX Feed)), hot cure discharge, and combined leached tailings that were produced as part of the pilot plant test program. Overall, the aforesaid rheometallurgical test data materially reflect the liquid-solid separation and flow behaviours of the process samples tested, rendering them suitable to be used as design criteria. A possible exception to this assessment involves the hot cure stream which displayed a relatively complex rheometallurgical response. To overcome the high overflow total suspended solids content a further clarification step to remove fine solids from the supernatant may be required.

 

Filtration Test work

 

The Outotec Filtration Test Report (2013) includes the results of the filtration test on the flotation cleaner concentrate using a Larox Pressure Filter to achieve filter cake with moisture content of less than 8%. The test work evaluated filter cloth selection, filter cake thickness, filtration rate, moisture content of the cake, and cake handling characteristics.

 

Neutralization Test work

 

Neutralization tests were performed on the pressure oxidation liquor to remove arsenic. The neutralization solution (pH 8) analysed <0.05 mg/L As. A Toxicity Characteristic Leachate Procedure (TCLP) on the neutralization solids confirmed that the arsenic was successfully removed in a stable form with leachate analyses below 0.03 mg/L As.

 

After filtering the hot cure product, the solutions for each sample were neutralized using limestone and lime. The purpose was to prepare the neutralized pulp for subsequent environmental studies.

 

The sequential neutralization test work with limestone and lime successfully demonstrated that the arsenic and iron levels in thickener overflow solutions can be reduced to below 0.1 mg/L. The Fe3+/As ratio in the hot cure discharge liquor is suitably high to favour the effective stabilisation of arsenic as an arsenate upon neutralization.

 

Further variability comminution test work is required to further characterize the mineralized material and waste rock.

 

 
77 | Page

 

 

Mineral resource estimates

 

The 2023 MRE was prepared using all available information. The main objective was to update the 2016 MRE for the Pitt Gold claim block and the Duquesne claim block (Lewis et al., 2016 and Rioux, 2016). A new geological interpretation has been completed for both projects.

 

The effective date of the current mineral resource for the Duparquet deposit is September 12, 2022. The 2023 Pitt Gold and Duquesne MREs are the most recent mineral resource estimates published on those properties. The effective date for the Pitt Gold MRE is September 15, 2023. The effective date for the Duquesne MRE is August 31, 2023.

 

A combination of all mineral resources from the Duparquet, Duquesne and Pitt Gold deposits is presented in the Duparquet Consolidated Mineral Resource Estimate section.

 

Beattie, Donchester, Dumico and Central Duparquet Claim Blocks

 

The QPs have classified the current MRE for the Duparquet deposit as “measured”, “indicated”, and “inferred” resources, based on data density, search ellipse criteria, drill hole spacing and interpolation parameters. The QPs also believe that the requirement of “reasonable prospects for eventual economic extraction” has been met by having:

 

 

resources constrained by a pit shell, with a 50° angle in rock and a 30° angle in overburden;

 

 

 

 

constraining volumes applied to any blocks (potential underground extraction scenario) using Deswik stope optimizer (“DSO”) for the out-pit resources; and

 

 

 

 

cut-off grades based on reasonable inputs amenable to potential open pit and underground extraction scenarios.

 

The Duparquet deposit MRE is considered reliable and based on quality data and geological knowledge. The estimate follows CIM Definition Standards.

 

The table below presents the results of the in-pit and underground portions of the Duparquet MRE, combining potential open pit and underground mining scenarios at respective cut-off grades of 0.4 g/t Au and 1.5 g/t Au.

 

Area

(mining method)

Cut-off

(g/t)

Measured Resource

Indicated Resource

Inferred Resource

Tonnage (t)

Au (g/t)

Ounces

Tonnage (t)

Au (g/t)

Ounces

Tonnage (t)

Au (g/t)

Ounces

Open Pit

0.4

163,700

1.37

7,200

59,410,600

1.52

2,909,600

28,333,000

1.07

970,400

UG Mining

1.5

-

-

-

5,506,900

2.26

399,300

9,038,900

2.29

665,600

Total

-

163,700

1.36

7,200

64,917,474

1.59

3,308,880

37,371,851

1.36

1,636,044

 

Notes to accompany the Mineral Resource Estimate:

1.

The independent and qualified persons for the Mineral Resource Estimate, as defined by NI 43-101, are Marina Iund, P.Geo., Carl Pelletier, P.Geo., Simon Boudreau, P.Eng., all from InnovExplo, and Guy Comeau, P.Eng. from Soutex. The effective date of the estimate is September 12, 2022.

2.

These mineral resources are not mineral reserves, as they do not have demonstrated economic viability. There is currently insufficient data to define these Inferred mineral resources as Indicated or Measured, and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured mineral resource category. The Mineral Resource Estimate follows current CIM Definition Standards.

3.

The results are presented in-situ and undiluted and have reasonable prospects of economic viability.

4.

The estimate encompasses sixty mineralized domains and one dilution envelope using the grade of the adjacent material when assayed or a value of zero when not assayed.

5.

High-grade capping of 25 g/t Au supported by statistical analysis was done on raw assay data before compositing.

 

 
78 | Page

 

 

 

6.

The estimate was completed using a sub-block model built in GEOVIA SURPAC 2021, a block size of 5 m x 5 m x 5 m and a minimum block size of 1.25 m x 1.25 m x 1.25 m. Grades interpolation was obtained by inverse distance squared (“ID2”) using hard boundaries.

7.

A density value of 2.73 g/cm3 was used for the mineralized domains and the envelope. A density value of 2.00 g/cm3 was used for the overburden. A density value of 1.00 g/cm3 was used for the excavation solids (drifts and stopes) assumed to be filled with water.

8.

The Mineral Resource Estimate is classified as Measured, Indicated and Inferred. The Measured category is defined by blocks having a volume of at least 25% within an envelope built at a distance of 10 m around existing channel samples. The Indicated category is defined by blocks meeting at least one (1) of the following conditions: (i) blocks falling within a 15-m buffer surrounding existing stopes, and/or (ii) blocks for which the average distance to composites is less than 45 m. A clipping polygon was generated to constrain indicated resources for each of the 60 mineralized domains. Only the blocks for which reasonable geological and grade continuity have been demonstrated were selected. All remaining interpolated blocks were classified as Inferred resources. Blocks interpolated in the envelope were all classified as Inferred resources.

9.

The Mineral Resource Estimate is locally pit-constrained with a bedrock slope angle of 50° and an overburden slope angle of 30°. The out-pit mineral resource met the requirement of reasonable prospects for eventual economic extraction by having constraining volumes applied to any blocks (potential underground extraction scenario) using DSO. It is reported at a rounded cut-off grade of 0.4 g/t Au (in-pit) and 1.5 g/t Au (UG). The cut-off grades were calculated using the following parameters: mining cost = CAD 70.00 (UG); processing cost = CAD 11.9 to $17.0; G&A = CAD 8.75; refining and selling costs = CAD 5.00; gold price = USD 1,650/oz; USD/CAD exchange rate = 1.31; and mill recovery = 93.9%. The cut-off grades should be re-evaluated in light of future prevailing market conditions (metal prices, exchange rates, mining costs etc.).

10.

The number of metric tons and ounces was rounded to the nearest hundred, following NI 43-101 recommendations, and any discrepancies in the totals are due to rounding effects.

11.

The authors are not aware of any known environmental, permitting, legal, title-related, taxation, socio-political or marketing issues or any other relevant issue not reported in the Technical Report that could materially affect the Mineral Resource Estimate.

 

Tailings Portion of the Duparquet Deposit 2022 Mineral Resource Estimate

 

Domain

Cut-off (g/t)

Potential Measured Resource

Potential Indicated Resource

Tonnage (Mt)

Au (g/t)

Ounces

Tonnage (Mt)

Au (g/t)

Ounces

Zones 1 and 2

0.4

19,900

2.03

1,300

-

-

-

Zones 3 and 4

-

-

-

4,105,200

0.93

123,200

 

Notes to accompany the Mineral Resource Estimate:

1.

The independent and qualified persons, as defined by NI 43-101, are Marina Iund, P.Geo., Carl Pelletier, P.Geo., Simon Boudreau, P. Eng., all from InnovExplo and Guy Comeau, P.Eng. from Soutex. The effective date of the estimate is September 12, 2022.

2.

These mineral resources are not mineral reserves, as they do not have demonstrated economic viability. There is currently insufficient data to define these Inferred mineral resources as Indicated or Measured and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured mineral resource category. The Mineral Resource Estimate follows current CIM Definition Standards.

3.

The results are presented in situ and undiluted and have reasonable prospects of economic viability.

4.

The estimate encompasses four tailing zones.

5.

High-grade capping supported by statistical analysis was done on raw assay data before compositing. High-grade capping was established at 13.0 g/t Au for Zone 1, 3.5 g/t Au for Zone 2, 1.7 g/t Au for Zone 3 and 2.2 g/t Au for Zone 4.

6.

The estimate used a block model built in GEOVIA GEMS with a block size of 5 m x 5 m x 1 m. Grade interpolation was obtained by ID2 using hard boundaries.

7.

A fixed density of 1.45g/cm3 was used in zones and waste.

8.

The Measured and Indicated categories were defined based on the drill hole spacing (Measured: zones 1 and 2 = 30 m x 30 m grid; Indicated: Zone 3 = 100 m x 100 m grid and Zone 4 = 200 m x 200 m grid).

9.

The tailings mineral resource is reported at the in-pit cut-off grade of 0.4 g/t Au. The cut-off grade was calculated using the following parameters: processing cost = CAD 11.9; G&A = CAD 8.75; refining and selling costs = CAD 5.00; gold price = USD 1,650/oz; USD/CAD exchange rate = 1.31; and mill recovery = 93.9%. The cut-off grades should be re-evaluated in light of future prevailing market conditions (metal prices, exchange rates, mining costs etc.).

10.

The number of metric tons and ounces was rounded to the nearest hundred, following the recommendations in NI 43-101. Any discrepancies in the totals are due to rounding effects.

11.

The QPs are not aware of any known environmental, permitting, legal, title-related, taxation, socio-political, or marketing issues or any other relevant issue not reported in the Technical Report that could materially affect the Mineral Resource Estimate.

 

 
79 | Page

 

 

Pitt Gold Claim Block 

The Pitt Gold deposit MRE below includes all blocks (“must-take blocks”) that fall within a potentially mineable shape meeting “reasonable prospects for eventual economic extraction”, as specified in the CIM MRMR Best Practice Guidelines (2019).

 

Pitt Gold - Potential Underground Long-hole Mining

Gold Price ($)

COG

(g/t Au)

Sum of Tonnes

Sum of Ounces

Grade

(g/t Au)

1,800

1.75

2,120,000

187,200

2.75

 

Notes to accompany the Pitt Gold Project Mineral Resource Estimate:  

1.

The independent qualified persons for the Pitt Gold Mineral Resource Estimate, as defined by NI 43-101, are Olivier Vadnais-Leblanc, P.Geo., Carl Pelletier, P.Geo., and Simon Boudreau, P.Eng. from InnovExplo. The effective date of the estimate is September 15, 2023.

2.

These mineral resources are not mineral reserves, as they do not have demonstrated economic viability. There is currently insufficient data to define these Inferred mineral resources as Indicated or Measured mineral resources and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured mineral resource category.  The Mineral Resource Estimate follows current CIM Definition Standards.

3.

The results are presented in-situ and undiluted and have reasonable prospects of eventual economical extraction.

4.

Underground: High-grade capping of 20 g/t Au. High-grade capping supported by statistical analysis was done on composited assays.

5.

The estimates used a sub-block model in GEOVIA SURPAC 2023 with a unit block size of 6 m x 6 m x 6 m and a minimum block size of 1.5 m x 0.5 m x 0.5 m. Grade interpolations were obtained by ID2 using hard boundaries.

6.

A density value of 2.7 g/cm3 was used for the mineralized domains and the envelope.  A density value of 2.00 g/cm3 was used for the overburden. A density value of 1.00 g/cm3 was used for the excavation solids (drifts and stopes) assumed to be filled with water.

7.

The Mineral Resource Estimate is completely classified as Inferred due to a lack of confidence in certain drill hole collar and underground development locations.

8.

The Mineral Resource Estimate for Pitt Gold was prepared using 3D block modelling and the ID2 interpolation method.

9.

The mineral resources are categorized as Inferred based on drill spacing, as well as geological and grade continuity. A maximum distance to the closest composite of 210 m for Inferred in all zones for Pitt Gold.

10.

The reasonable prospect for an eventual economical extraction is met by having used reasonable cut-off grades both for a potential open pit and underground extraction scenarios (minimum mining width of 2 m) and constraining volumes (Deswik optimized shapes and Whittle optimized pit-shells). 

11.

Underground: The out-pit mineral resource met the reasonable prospect for eventual economic extraction by having constraining volumes applied to any blocks (potential underground extraction scenario) using DSO. Pitt Gold resources are reported at a rounded cut-off grade of 1.75 g/t Au (UG). The cut-off grades were calculated using the following parameters: mining cost = CAD 84.86 (UG); processing cost = CAD 21.010; G&A = CAD 11.75; refining and selling costs = CAD  5.00; gold price = USD 1,800/oz; USD:CAD exchange rate = 1.3; and mill recovery = 90%. The cut-off grades should be re-evaluated in light of future prevailing market conditions (metal prices, exchange rates, mining costs etc.).

12.

Royalty NSR % in the MRE input parameters assumes First Mining exercises buy-back option.

13.

The number of metric tons was rounded to the nearest thousand and ounces were rounded to the nearest hundred, following the recommendations in NI 43-101. Any discrepancies in the totals are due to rounding effects.

14.

The qualified persons are not aware of any known environmental, permitting, legal, title-related, taxation, socio-political, or marketing issues, or any other relevant issue not reported herein, that could materially affect the Mineral Resource Estimate.

 

Duquesne Claim Block

 

The Duquesne deposit MRE below includes all blocks (“must-take blocks”) that fall within a potentially mineable shape meeting “reasonable prospects for eventual economic extraction”, as specified in the CIM MRMR Best Practice Guidelines (2019).

 

Area

Cut-off

Duquesne Inferred Resource

(potential mining method)

(g/t)

Tonnage (t)

Au (g/t)

Ounces

Open Pit

0.5

6,300,000

1.56

316,000

UG Mining

1.75

5,030,000

3.1

501,400

Total

 

11,330,000

2.24

817,400

 

Notes to accompany the Duquesne Mineral Resource Estimate:

1.

The independent qualified persons for the Duquesne Mineral Resource Estimate, as defined by NI 43-101, are Olivier Vadnais-Leblanc, P.Geo., Carl Pelletier, P.Geo., and Simon Boudreau, P.Eng. from InnovExplo. The effective date of the estimate is August 31, 2023.

 

 
80 | Page

 

   

2.

These mineral resources are not mineral reserves, as they do not have demonstrated economic viability. There is currently insufficient data to define these Inferred mineral resources as Indicated or Measured mineral resources and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured mineral resource category.  The Mineral Resource Estimate follows current CIM Definition Standards.

3.

The results are presented in-situ and undiluted and have reasonable prospects of eventual economical extraction.

4.

In-pit and Underground: High-grade capping of 55 g/t Au. High-grade capping supported by statistical analysis was done on composited assays.

5.

The estimates used a sub-block model in GEOVIA SURPAC 2023 with a unit block size of 6m x 6m x 6m and a minimum block size of 1.5m x 0.5m x0.5m.  Grade interpolations were obtained by ID2 using hard boundaries.

6.

In-pit and Underground: For Duquesne, a density value of 2.7 g/cm3 was used for the mineralized domains and the envelope.  A density value of 2.00 g/cm3 was used for the overburden. A density value of 1.00 g/cm3 was used for the excavation solids (drifts and stopes) assumed to be filled with water.

7.

In-pit and Underground: For Duquesne, the Mineral Resource Estimate is completely classified as Inferred due to a lack of confidence in certain drill hole collar and underground development locations.

8.

The Mineral Resource Estimate for Duquesne was prepared using 3D block modelling and the ID2 interpolation method.

9.

The mineral resources are categorized as Inferred based on drill spacing, as well as geological and grade continuity. A maximum distance to the closest composite of 75 m for Inferred in all zones for Duquesne.

10.

The reasonable prospect for an eventual economical extraction is met by having used reasonable cut-off grades both for a potential open pit and underground extraction scenarios (minimum mining width of 2m) and constraining volumes (Deswik optimized shapes and Whittle optimized pit-shells). 

11.

In-pit and Underground: The Mineral Resource Estimate is locally pit-constrained with a bedrock slope angle of 50° and an overburden slope angle of 30°. The out-pit mineral resource met the reasonable prospect for eventual economic extraction by having constraining volumes applied to any blocks (potential underground extraction scenario) using DSO. Duquesne resources are reported at a rounded cut-off grade of 0.5 g/t Au (in-pit) and Duquesne resources (underground) are reported at a rounded cut-off grade of 1.75 g/t Au (UG). The cut-off grades were calculated using the following parameters: mining cost = CAD 84.86 (UG); processing cost = CAD 21.010; G&A = CAD 11.75; refining and selling costs = CAD  5.00; gold price = USD  1,800/oz; USD:CAD exchange rate = 1.3; and mill recovery = 90%. The cut-off grades should be re-evaluated in light of future prevailing market conditions (metal prices, exchange rates, mining costs etc.).

12.

Royalty % in the MRE input parameters represents NSR % after First Mining purchases the remaining NSR.

13.

The number of metric tons was rounded to the nearest thousand and ounces were rounded to the nearest hundred, following the recommendations in NI 43-101. Any discrepancies in the totals are due to rounding effects.

14.

The qualified persons are not aware of any known environmental, permitting, legal, title-related, taxation, socio-political, or marketing issues, or any other relevant issue not reported herein, that could materially affect the Mineral Resource Estimate.

    

 Duparquet Consolidated Mineral Resource Estimate

 

 

Total Measured Resource

Total Indicated Resource

Total Inferred Resource

Area (potential mining method)

Tonnage (t)

Au

(g/t)

Ounces

Tonnage (t)

Au

(g/t)

Ounces

Tonnage (t)

Au

(g/t)

Ounces

Open Pit

163,700

1.37

7,200

59,410,600

1.52

2,909,600

34,633,000

1.16

1,286,400

UG Mining 

-

-

-

5,506,900

2.26

399,300

16,189,000

2.6

1,354,100

Tailings

19,900

2.03

1,300

4,105,200

0.93

123,200

-

-

-

Total

183,600

1.43

8,500

69,022,700

1.55

3,432,100

50,822,000

1.62

2,640,500

 

Refer to individual MRE table footnotes for more information on Consolidated Mineral Resources Estimate

 

Mining methods

 

Introduction

 

The Duparquet Project is planned as a mix of conventional open pit mine and a long hole (transversal – longitudinal – uppers) underground mine for the area included in the Beattie, Donchester, Central Duparquet and Dumico claim blocks. The milling rate is planned at 5.5 metric tonnes per annum (“Mtpa”) with a ramp-up period of 0.5 years during the open pit operational period. The mill will run for eleven years. The total stockpile will reach a maximum of 2 million tonnes (“Mt”) to allow steady mill feed. The maximum stockpile is reached at Year 1.

 

 
81 | Page

 

 

Open Pit

 

Open pit mining will be done with the use of diesel equipment including drills and haul trucks coupled with hydraulic shovels. The Duparquet Project consists of seven pits with Pit 1 having three phases. 

 

The peak mining rate is 27.0 Mtpa over a LOM of 11 years. A total of 43.6 Mt of mineralized material will be mined at an average diluted gold grade of 1.36 g/t Au. A total of 4.1 Mt of tailings will be mined at an average total gold grade of 0.93 g/t Au. A total of 235.1 Mt of combined waste and overburden will be extracted, including an estimate of 2.2 Mt of mineralized material that will be lost in the old underground stopes and mined as waste, resulting in a strip ratio of 5.4 t of waste per tonne of mined mineralized material. The primary production equipment includes 12 m³ diesel-hydraulic shovel coupled with 65 t high-capacity road trucks for the mineralized material, and 22 m³ diesel-hydraulic production shovels and 200 t off-highway mining trucks for the waste. An owner mining operation is planned, with overburden stripping and topographic drilling activities outsourced to contractors.

 

Pre-production mining will take place for about six months to provide material for construction and to remove overburden to allow access to the pits. A total of 8.8 Mt of waste and overburden as well as 1.7 Mt of mineralized material will be mined in the pre-production and ramping up period.

 

Underground

The proposed underground operation consists of one mine separated in four zones accessible through access ramps from a common portal. The average underground mine production rate is 3,800 tpd of ore, and the anticipated LOM will be approximately 11 years, which includes an initial ramp-up period of 18 months. Selected mining method is sublevel transverse stoping with longitudinal and transversal variants.

 

 

 
82 | Page

 

 

Recovery methods

 

The preliminary process plant design for the Duparquet Project is based on a robust metallurgical flowsheet to treat gold-bearing material to produce gold concentrate. The flowsheet is based on previous metallurgical test work, industry standards and conventional unit operations. The process plant is designed to nominally treat 15,000 tonnes per day (t/d) of material and will consist of comminution and gold flotation circuits. Flotation tailings will be dewatered to produce a tailings slurry for storage onsite.

 

The key project design criteria for the process plant are listed below:

 

 

Nominal throughput of 5.475 million tonnes per year (Mt/y) of material

 

 

 

 

Crushing plant availability of 75%

 

 

 

 

Grinding and flotation circuits availability of 92% through the use of standby equipment in critical areas, inline crushed material stockpile and reliable power supply

 

 

 

 

Comminution circuit to produce a particle size of 80% passing (P80) of 100 µm

 

 

 

 

Gold flotation circuit with an average mass pull of 4.3%

 

 

 

 

Equipment selection based on suitability for the required duty, reliability, and ease of maintenance

 

The overall flowsheet for the Duparquet Project is presented below:

 

 

 
83 | Page

 

 

The proposed process plant will consist of the following operating units:

 

 

Primary crushing of the Run of Mine material (“ROM”)

 

 

 

 

Coarse material stockpile and reclamation

 

 

 

 

Grinding circuit that consists of a semi-autogenous (“SAG”) grinding mill and ball mill with hydrocyclones producing a final product P80 of 100 µm

 

 

 

 

Two-stage flotation circuit to produce a sulphide concentrate

 

 

 

 

Concentrate dewatering consisting of a thickener and filter press

 

 

 

 

Tailings dewatering using a thickener and stored in a tailings storage facility (“TSF”)

 

 

 

 

Water systems (potable water, raw water, gland seal water and process water)

 

Material from the open pit will be transported to the plant by dump trucks and tip directly to the ROM bin. Material will be withdrawn from the ROM bin to a vibrating grizzly. Oversize from the grizzly will report to the jaw crusher, which will operate in open circuit. Crushed material from the crusher discharges, together with undersize from the grizzly will be withdrawn by a sacrificial conveyor and feed a stockpile. 

 

Reclaimed material from the stockpile will feed a SAG grinding mill with a 9,000-kW synchronous motor and VSD. SAG mill discharge will pass through a screen to remove grinding media scats and a small amount of pebbles. The SAG trommel undersize will report to the cyclone feed pump box, combining with ball mill discharge. SAG trommel oversize will be conveyed to the SAG mill feed conveyor. 

 

Slurry from the cyclone feed pump box will be pumped to a cluster of hydrocyclones for size classification. The cyclone overflow, at a final target product P80 of 100 µm, will flow via gravity to the rougher flotation conditioning tank prior to sulphide flotation. Cyclone underflow will feed a ball mill with a 13,000 kW fixed speed motor. Slurry will overflow from the ball mill to a trommel screen, attached to the ball mill discharge end. Trommel undersize will discharge into the cyclone feed pump box.

 

The flotation circuit will consist of rougher and two stage cleaner tank-cells. The rougher concentrate will feed a concentrate regrind circuit. The rougher tailings will be pumped to a tailings dewatering circuit. The regrind circuit will grind the concentrate to a P80 of 38 µm and the product will feed the first cleaner flotation circuit. First cleaner flotation concentrate will be pumped to the second cleaner flotation circuit and first cleaner flotation tailings will be pumped back to the feed of the rougher circuit. Second cleaner flotation concentrate will be pumped to the concentrate dewatering circuit and second cleaner flotation tailings will be pumped back to the first cleaner circuit.

 

Cleaner flotation concentrate will be pumped to a thickener to increase slurry concentrate density for filtering. Flocculant will be added to the thickener feed to promote the settling of solids. The thickener overflow will report to the process water tank. The thickener underflow will be pumped to a filter feed tank and then pumped to a pressure filter to produce a gold concentrate for sale. Filtrate from the filter press will be pumped back to the concentrate filter. The dewatered gold concentrated will be loaded by front end loader into lined containers for export.

 

Rougher tailings will be pumped to thickener to increase tailings density. Flocculant will be added to the thickener feed to promote the settling of solids. The thickener overflow will report to the process water tank. Thickener underflow will be pumped to the TSF.

 

Reagents consumed within the process plant will be prepared on site and distributed via various reagent handling and makeup systems. These reagents include PAX collector, R208 collector, MIBC frother and flocculant.

 

 
84 | Page

 

 

Infrastructure

 

The infrastructure and process plant platform is located on the north side of the pits. Waste rock stockpiles are located on each side of the pits. A 4.5-kilometre long haul road, primarily constructed using waste rock, will provide access to the infrastructure, stockpiles and the TSF area. The provincial road 393, which crosses the mine property from north to south, will be in the pit footprint and will therefore require relocation before Year 2.

 

The TSF, designed with a capacity of 34.5 million cubic metres and constructed in phases without the use of liners, will leverage the favourable existing topographic and ground conditions in the eastern part of the Duparquet Project site.  Additionally, a 10-million ton waste rock storage is planned with the assumption that no liner will be necessary.

 

A containerized sewage treatment plant is considered, with no plans for domestic water treatment, as it is anticipated that a water well can supply water clean enough for domestic purposes. Four potential freshwater collection points have been identified to access the water sources within the historical mine stopes. Moreover, a Main Water Treatment Plant will be established to treat all on-site contact water before it is released back into the environment. The fire protection distribution system will be a standard containerized skid combined with a fire water tank which will be set up as an overflow to the raw water tank.

 

A new 120 kV transmission line with an approximate length of 15 km is necessary to connect with the Reneault Hydro-Québec substation to feed the process plant. The connected power at site is evaluated at 22.7 MW with an average running load of 17.4 MW.

 

Buildings on site are minimized as much as possible by strategically placing a single multipurpose operations building at the site entrance.  This building will accommodate the security guard office, the offices for technical personnel, the change rooms, the infirmary, and a lunchroom. A temporary fabric shelter truck shop is considered for the initial years of operation, and a permanent six-bay truck shop is planned at Year 4. A 200,000-litre fuel storage system is also planned. The majority of the process plant will be housed in a building, which will include space for reagents storage. An assay lab is planned on site.

 

A containerized explosive magazine has been considered but the location is still to be confirmed.

 

There are no plans for an administrative building, warehouse, facilities for light vehicle maintenance and employee accommodations on-site, as these are considered in the nearby town. Minimal mobile equipment is considered for site operations, with the majority being rented as needed.

 

For the underground mine, the incorporation of a single portal, along with the inclusion of some compressors and the establishment of ventilations and escape ways, are considered.

 

A green wall will be built with waste rock to provide a separation between the pit and the town. Additionally, the Duparquet Project will necessitate the relocation of some houses and potentially a portion of the golf course.

 

Lastly, to facilitate the progress of the Duparquet Project, demolition of the existing infrastructure of the former Beattie mine will be required.

 

 
85 | Page

 

 

Environmental Studies, Permitting and Social/ Community Impact

 

Environmental baseline data necessary to support an Environmental Assessment (“EA”) for the Duparquet Project has been collected on an intermittent basis since 2010 by First Mining and the previous operators of the Project. The studies, both completed and ongoing, are focused on characterizing all relevant biological and physical components of the aquatic and terrestrial environments that may be impacted by, and may interact with, the Project. The Project design incorporates certain brownfield reclamation aspects which are expected to support the improvement of the local environment, including existing groundwater and surface water conditions.

   

The Duparquet Project area is located within the balsam fir – white birch zone and occupies the south of the boreal zone. There have been occurrences of vegetative species at risk within 8 km of the Duparquet area of Lake-cress (Rorippa aquatiqua), Sand Violet (Viola sagittate var. ovata) and Calypso (Calypso bulbosa var. americana).

 

The Duparquet Project is located in fur-bearing animal management zone UGAF3 (fur-bearing animal management units) where fur harvesting is practised.  Species present among others include weasel, beaver, coyote, squirrel, wolf, otter, muskrat, lynx, black bear, and 274 species of birds are reported in the Abitibi-Témiscamingue Rouyn-Noranda region. 

 

The northern and western project area is drained by an unnamed creek referred to as West Creek which drains west and south to Lake Duparquet. The southern portion of the project area drains via several smaller unnamed watercourses south to Lake Duparquet. The area contains a number of naturally occurring lakes. The largest is Lake Duparquet to the south of the Duparquet Project, followed by Lake Hébécourt, located west of Lake Duparquet. The Glory Hole pond on the project site represents a historic surface breakthrough of underground mining. Approximately 35 fish species are potentially present within an 8 km buffer from the Duparquet area. According to the MRNF, two spawning areas are potentially present in the region: one for walleye (Stizostedion vitreum) and the other for pike (Esox lucius).

 

The Duparquet Project is anticipated to require a provincial environmental assessment and potentially a federal impact assessment which will require regulatory engagement and the release of assessment guidelines. The Duparquet Project will also subsequently require a range of federal, provincial and local municipal permits.

 

The Duparquet Project Development Area (“PDA”) is located in the Abitibi-Témiscamingue region in its namesake community. The nearby communities, along with Duparquet, include La Sarre and Rouyn-Noranda, and have been shaped primarily by natural resource-based industries, including mining and forestry. There are currently six operating gold mines in the region and 11 mine projects under development according to the MRNF. In 2019, mining activities generated 1 in 7 jobs in the region. The Abitibi-Témiscamingue region is also known for commercial forestry, mineral exploration, outfitters, cabins, harvesting (e.g., trapping, hunting and fishing), and recreational land use (e.g., hiking, boating, snowmobiling and all-terrain vehicle (ATV) use).

 

First Mining is committed to operating the project within a sustainable development framework which protects the environment, contributes to local communities, respects human and Indigenous rights, and adheres to openness and transparency in operations. As per their Stakeholder Engagement Policy, First Mining has and continues to engage with relevant government departments and agencies, Indigenous groups, and stakeholder organizations, including communities, business and industry organizations, fish and wildlife organizations, environmental non-governmental organizations and individuals (i.e. land users, surface rights holders).

 

Regulatory, Stakeholder and Indigenous Engagement

 

Since acquiring the Duparquet Project in September 2022, First Mining has held meetings with the MELCCFP, MNRF and Ministry of Mines. The focus of the meetings has been to establish introductory dialogue and share the current status and next steps associated with the advancement of the project. Specific discussions have focused on on-going exploration, and the planning for the reclamation of the historical roaster dust storage bunker. First Mining has emphasized that the future site redevelopment will also support managing the existing brownfield site conditions from historical mining activity on the property including historical tailings, impacted soils and groundwater. 

 

 
86 | Page

 

 

First Mining has initiated outreach to local stakeholders with a focus on local land users including the snowmobile club, golf club, and business community. Key contacts have been updated on the current scopes of work and next steps planned for the Duparquet Project. Future plans include expanding the network of stakeholders to share information about the Duparquet Project. 

 

The Duparquet Project has not yet received Impact Study Guidelines from the Impact Assessment Agency of Canada (IACC) nor MELCCFP regarding Indigenous engagement. Introductory outreach to date has focused on the First Nation community of Pikogan located approximately 60 km east of the Duparquet Project. Additionally, as per the Indigenous Peoples Policy, First Mining acknowledges the unique relationship Indigenous Peoples hold within their traditional territories and the rights associated with those lands and resources. First Mining will focus on the environmental protection on those territories in the concept project planning, and through meaningful consultation and collaboration the project can be developed to support the respective vision.

 

Capital and Operating Costs

 

Capital Expenditures

 

The Capital Expenditure (“CAPEX”) estimate is summarized in the table below. Work Breakdown Structure (“WBS”) Areas 100 to 600 include the Project’s direct costs, while WBS Areas 700 to 900 cover indirect costs, owner’s costs and mine pre-production. The CAPEX for construction, equipment purchase and pre-production activities is estimated at $706 million, excluding pre-production revenues. The CAPEX includes a contingency of 25% of the total directs and indirects. The pre-production revenue of the construction period is estimated at $58.1 million. 

 

Capital Expenditures

C$ M

100: Infrastructure

10.4

200: Power and Electrical

14.7

300: Water

37.4

400: Mobile Equipment

4.5

500: Mining

102.2

600: Process Plant

189.9

700: Construction Indirects

89.8

800: General Services

53.9

Construction Cost

502.7

990: Contingency

125.7

900: Pre-production, Start-up, Commissioning

57.2

Working Capital

20.3

Total

706.0

 

 
87 | Page

 

 

Sustaining Capital

 

Sustaining capital of $737.8 million is required over the LOM for infrastructure, power supply, mine equipment purchases (additions and replacements), G&A and surface equipment purchases (additions and replacements), mine development expenditures and underground mine development

 

Operating Costs

 

The operating costs include open pit and underground mining, processing, G&A and royalties. The costs for concentrate transportation to smelters and smelting and refining charges are not considered site operating costs and are therefore excluded from the OPEX estimate. The transportation costs and smelter conversion charges (“TC/RC”) are deducted from gross smelter revenues to estimate the NSR. The LOM operating cost summary is presented in the table below. The total cash operating cost per ounce produced is USD 751/oz and the AISC per ounce produced is USD 976/oz, inclusive of all sustaining capital and closure costs.

 

Item

Total LOM Cost

(M CAD)

Unit Cost

(CAD / t milled-production)

Mining Open Pit

872.9

20.85

Mining Underground

531.9

44.26

Total Mining

1,404.8

23.82

Processing

624.7

10.59

General and Administration

173.1

2.90

Total

2,202.5

37.35

  

Economic Analysis

 

The economic model results are presented in terms of NPV, IRR, and payback period in years for recovery of the initial CAPEX. These economic indicators are presented on both pre-tax and after-tax basis. The NPV is presented both undiscounted (NPV0%) and using a discount rate of 5% (NPV5%).

 

The Duparquet PEA is preliminary in nature as it includes “inferred mineral resources” that are too geologically speculative for the economic considerations that would enable them to be categorized as mineral reserves to be applied, and there is no certainty that the Duparquet Project will be realized. 

 

 
88 | Page

 

 

The economic results on a before-tax and after-tax basis are presented in the table below:

 

Economic Results Summary

Unit

Before-Tax Results

After-Tax Results

NPV 0%

CAD M

1,877.9

1,124.0

NPV 5%

CAD M

1,073.0

588.2

IRR

%

24.9%

18.0%

Payback

Years

3.8

4.8

 

Conclusions and Recommendations from Duparquet PEA

 

The Duparquet PEA, compliant with NI 43-101 standards, was prepared by experienced consultants and QPs, following recognized engineering standards. The main conclusions on the mining and mineralized material estimation are as follows:

 

 

The production schedule is based on mining a combined total of mineralized material to ensure a 5.5 Mtpa mill feed.

 

 

 

 

While no additional geotechnical investigations have been conducted since the 2014 prefeasibility study, geotechnical data from the 2014 documents were considered as part of this preliminary study.

 

 

 

 

The open pit mining method consists of conventional open pit mining with drilling, blasting, loading, and hauling activities, reaching a maximum of 27 Mtpa.

 

 

 

 

Open pit mine design including ramps and in-pit waste disposal, block model dilution, time cycle study, and sequence optimization was done for all pits and phases.

 

 

 

 

The mineralized material for the open pit comprises 43.6 Mt at an average diluted grade of 1.36 g/t Au.

 

 

 

 

Mine equipment selection requires a separate fleet for ore and waste to achieve the planned production. Drilling will be done using diesel DTH production drills, loading will be done using 22 m³ diesel-hydraulic front shovel coupled with 200 tonnes trucks in the waste, and 12 m³ diesel-hydraulic shovel coupled with 65 tonnes high-capacity road trucks. This will help improve mining recovery and reduce external dilution.

 

 

 

 

The underground mining method that consists of both transversal and longitudinal variants of mechanized long hole stoping is the most well suited to this type and geometry of ore body.

 

 

 

 

To achieve the optimized mine to mill production target considered within the PEA, the mine plan requires ore development and production from multiple mining blocks, with multiple stopes available per block across the four zones.

 

 

 

 

Underground mine design including CAPEX and OPEX development was optimized considering the stope design and infrastructure requirements.

 

 

 

 

Mining and development sequence optimization was performed for all underground zones, considering the production targets, time cycle study, and productivity rates calculated for every development and production activity.

 

 

 

 

The mineralized material for the underground comprises 12.02 Mt at an average diluted grade of 2.25 g/t Au.

 

 
89 | Page

 

 

Cameron

 

Technical report

 

The description in this section of our Cameron gold project (the “Cameron Project”) is based on the project’s technical report: Technical Report on the Cameron Gold Deposit, Ontario, Canada (effective date January 17, 2017) (the “Cameron Gold Technical Report”).  The report was prepared for us by Mark Drabble, B. App. Sci. (Geology), MAIG, MAusIMM of Snowden Optiro (previously Optiro Pty Ltd.) in accordance with NI 43-101; a Qualified Person within the meaning of NI 43-101. Datamine acquired Optiro Pty Ltd. and merged it with Snowden, to form Snowden Optiro in 2021.  The following description has been prepared under the supervision of Hazel Mullin, P.Geo., who is a Qualified Person within the meaning of NI 43-101, but is not independent of us.  

 

The conclusions, projections and estimates included in this description are subject to the qualifications, assumptions and exclusions set out in the Cameron Gold Technical Report, except as such qualifications, assumptions and exclusions may be modified in this AIF. We recommend you read the Cameron Gold Technical Report in its entirety to fully understand the project. You can download a copy of the Cameron Gold Technical Report from our SEDAR+ profile (www.sedarplus.ca), or from our website (www.firstmininggold.com).

 

Project description, location and access

 

The Cameron Project is wholly-owned by us through our wholly-owned subsidiary, Cameron Gold Operations Ltd. The Cameron Project comprises 1,789 mining claims, 24 patented claims, seven licences of occupation and four mining leases. All of the claims are located within unsurveyed crown lands, and are situated in the Rowan Lake, Heronry Lake, Tadpole Lake, Brooks Lake, Lawrence Lake, Bluffpoint Lake, and Dogpaw Lake areas, and the Phillips and Godson townships.

 

The total area of the project is approximately 495.74 km2 (49,574 ha).

 

The Cameron Project currently consists of two property areas; namely Cameron (which includes the Cameron deposit) (the “Cameron Deposit”) and West Cedartree (which includes the Dubenski and Dogpaw deposits).  The Cameron Gold Technical Report covers only the Cameron Deposit and Mineral Resource Estimate within the broader Cameron Project.  The Cameron property area comprises 1,699 mining claims, four patented claims, six licences of occupation and three mining leases.  The West Cedartree property area comprises 91 mining claims, 20 patented claims, one licence of occupation and two mining leases.

 

The Cameron Project is located in the southern part of western Ontario, Canada approximately 80 km southeast of Kenora and 80 km northwest of Fort Frances. The nearest towns are Sioux Narrows and Nestor Falls, 30 km and 25 km away respectively. The Cameron Project is on unsurveyed crown lands accessed by sealed and all-weather gravel roads. From Kenora via Highway 17, Hwy 71 and the Cameron Lake road the distance is around 123 km. From Fort Frances via Hwy 11, Hwy 71 and the Cameron Lake road the distance is 168 km.

 

Underlying royalties which affect the Cameron Deposit are:

 

 

1.5% NSR payable to Rubicon Minerals Corp. for 47 unpatented claims. We have the option to repurchase 0.75% of the NSR for $750,000;

 

 

 

 

1% NSR payable to Orion Resource Partners for 20 unpatented claims, 4 patented claims, 6 MLOs and 2 mining leases;

 

 

 

 

2% NSR payable to Mr. Sherridon Johnson and Mr. Edward Antony Barkauskas for one unpatented claim. We have the right to repurchase 1% of the NSR for $500,000;

 

 
90 | Page

 

 

 

$0.30 per ton on all ore mined payable to the estate of W. Moorhouse and D. Petrunka for one mining lease;

 

 

 

 

3% NSR payable to Lasir Gold Inc. We have the right to reduce the NSR to 1.5% by payment of $1,500,000; and

 

 

 

 

1% NSR payable to Chalice on 133 unpatented mining claims, all of which are not encumbered by pre-existing royalties. We have the right to repurchase 0.5% of the NSR for $1,000,000.

 

In order to maintain the title to a mining claim, the recorded holder of the claim is required to undertake approved work expenditure of $400 per single cell mining claim or $200 per boundary cell mining claim within two years of the granting of the claim. Work programmes and expenditure commitments can be grouped across a contiguous series of mining claims. The duration of a mining lease is 21 years from the date of grant. The mining leases within the Cameron Project were initially granted in 1988 and were subsequently renewed for a further 21 years in July 2009, except one mining lease which was renewed in May 2006.

 

History

 

Exploration in the area commenced in the 1940s and numerous companies have carried out prospecting, line cutting, geological mapping, trenching, soil and outcrop sampling and ground magnetic and electromagnetic geophysical surveys.

 

On the Cameron Project there have been numerous exploration and drilling programmes. On the Cameron Deposit itself, the first drilling was undertaken in July 1960. Prior to 2010, there were 836 holes comprising in excess of 90 km of diamond drill core drilled by six companies.

 

In 1987 at the Cameron Gold Deposit, underground development for an extensive sampling programme was undertaken. Some 65,000 m3 of material was excavated with some bulk sampling, diamond drilling and rock chip sampling completed. The excavated material was placed on surface at site in three separate stockpiles: one for unmineralized access development material, one for “low-grade” mineralized material; and one for “mineralized” material. The unmineralized stockpile has been used from time to time for access road maintenance. The mineralized material stockpiles have been surveyed and sampled for the purpose of reconciliation against depletion calculations but no estimate has been prepared that would permit inclusion of the material in a disclosure of resources.

 

Between 2010 and 2012, 242 surface diamond holes were drilled totalling 36,000 m, the majority on the Cameron Deposit.

 

Since 2010, the following exploration work has been carried out throughout the Cameron Project consisting of:

 

 

Airborne magnetic gradiometers survey of the project area in 2010.

 

 

 

 

250 km of line cutting over the property.

 

 

 

 

142-line km of Pole-Dipole Induced Polarisation surveys (July 2010 to February 2011).

 

 

 

 

Orientation geochemical sampling programme of surface pits around the Cameron deposit in late 2011. A total of 19 samples of around 12 kg were collected from the base of till over an area of about 900 m x 600 m.

 

 

 

 

Excavation of 94 pits in 2013 on gold-in-till anomalies.

 

 

 

 

Outcrop mapping and prospecting.

 

 

 

 

Heli-borne magnetics and Versatile Time-domain Electromagnetic (VTEM) over the western portion of the project in 2014. A total of 1457 line km of VTEM was flown at 200 m spacings.

 

 

 

 

Several historical Mineral Resource estimates have been done for the Cameron Deposit.

 

 
91 | Page

 

 

In May 2014, 15 holes for 2,599.5 m were diamond drilled at the Jupiter, Ajax, Juno and Hermione prospects that are proximal to the Cameron Deposit.

 

Geological setting, mineralization and deposit type

 

The mineralization at the Cameron Project is mainly hosted in mafic volcanic rocks within a northwest trending shear zone (“Cameron Lake Shear Zone” or “CLSZ”) which dips steeply to the northeast. In the south-eastern part of the deposit where the greatest amount of gold has been delineated, the shear zone forms the contact between the mafic volcanic rocks and diabase/dolerite rocks of the footwall.

 

Gold mineralization occurs within quartz breccia veins, associated with intense silica‐sericite‐carbonate‐pyrite alteration in a series of zones that dip moderately to steeply to the northeast within and adjacent to the shear zone. Gold is associated with disseminated pyrite with high sulphide concentration generally corresponding with higher gold grade. Visible gold is rare. The mineralization is open at depth and along strike to the northwest with potential to expand the Mineral Resource in these directions.

 

The Cameron Deposit is a greenstone‐hosted gold deposit. While the deposit can generally be considered to be part of the orogenic family of gold deposits, it bears many characteristics atypical of the largest gold deposits of this style. These features include:

 

mineralization dominated by disseminated sulphide replacement and quartz‐sulphide stockwork and quartz breccia veins;

spatial and temporal association of mineralization with porphyry intrusive bodies that have similar alteration assemblages (taking into account primary lithological variations);

relatively minor amounts of auriferous quartz‐carbonate vein material comprising the mineralization, which is likely temporally‐late compared to the disseminated sulphide replacement and quartz breccia veins;

high‐grade mineralization is largely deformed and the disseminated sulphide replacement zones that constitute the bulk of the mineralization are commonly foliated; and

the alteration assemblage of the mineralization (sericite‐albite‐carbonate‐pyrite) is atypical.

 

Exploration

 

Exploration at the Cameron Project commenced in 1960 and has been conducted intermittently until the present day.  The Ontario Geological Survey (OGS) undertook geological mapping in the area in the early 1930s and the area was mapped again by the OGS as part of a regional mapping programme in the 1970s with this work being later recompiled by Johns in 2007. The majority of the previous exploration work was completed by Nuinsco Resources Limited together with a number of partners between 1980 and 2005. The vast majority of this work was undertaken between 1983 and 1989.

 

Drilling

 

A number of diamond drill hole programmes have been carried out across the Cameron Project area by a number of explorers: Noranda Exploration Company Limited (“Noranda”) from 1960 to 1961; Zahevy Mines Limited and Noranda from 1972 to 1974; Nuinsco in 1981; Nuinsco and Lockwood Petroleum Inc. from 1983 to 1984; Nuinsco and Echo Bay Mines Limited from 1985 to 1989; Nuinsco and Deak International Resources Holding Limited in 1989; Cambior Inc. in 1996; Nuinsco from 2003 to 2005; and Coventry Resources Inc.  (“Coventry”) from 2010 to 2012.  In addition, an RC drilling programme was completed by Nuinsco from 1985 to 1986 to sample the overlying glacial till and the bottom of hole in bedrock to test for geochemical anomalism associated with gold mineralization.

 

 
92 | Page

 

 

From 1960 through to 2012, 981 diamond drill holes were drilled for a total of 120,813 m.  An additional 83 RC holes were drilled during the mid-1980s for a total of 862 m.

 

Underground exploration of the Cameron Deposit commenced in October 1986 and was undertaken in two phases until July 1988 to verify the surface drilling results. Overall, 457 underground diamond drill holes were completed for a total of more than 21,707 m. An additional 55 diamond drill holes were drilled from underground for a total of 4,887 m between 1989 and 1990.

 

Sampling, analysis and data verification

 

Documentation regarding historic field procedures applied by previous explorers at the Cameron Gold Deposit, including details regarding sample collection, preparation, transportation and security, and analytical techniques, is poor or non‐existent. Prior to 1988, core was manually split, with half‐core sent for analysis. Post 1988, drill core was cut using a masonry saw. The inclusion of control samples is assumed and is sometimes referenced in documentation but details regarding this are not documented.

 

For the 2010 to 2012 drill programmes, drill core was cut on site with wet masonry core saws by geotechnical personnel who are supervised by Coventry site‐based geologists.  The selection of intervals for cutting and the length of these intervals was based on lithological, alteration or mineralization boundaries as defined by the supervising geologist with 1 m intervals used in zones of similar lithology.  Within mineralization the sampling intervals vary from 0.06 m to 2 m.

 

Samples were received at the laboratory and checked against accompanying sample dispatch sheets to ensure all samples are delivered.  Any discrepancies were noted and Coventry notified that resolution was required before the samples advanced through the preparation process.

 

Sample preparation comprised standard laboratory techniques of: (i) drying for a minimum of 8 hours, (ii) mill crushing to greater than 70% passing 2 mm, (iii) riffle splitting (using a Jones Splitter) to approximately 250 gm, and (iv) disk pulverising to 85% passing 75 microns.  The sample was then split to 30 g for analysis with the remainder retained as a pulp residue.  The coarse remainder was put aside as a bulk residue (reject).

 

Overweight samples (>2.5 kg) were crushed and split into two samples, treating each as above and recombining after pulverising.

 

All samples were analysed for gold by accredited and independent Activation Laboratories Ltd. (“ActLabs”) at their Thunder Bay facility using assay method ‘1A3‐Tbay Au – Fire Assay Gravimetric’ on s30 g samples.  

  

All drill core from the 2010 and 2011 drilling programs is stored in covered steel core racks at the Cameron Project.  Every core box is labelled with Dymo tags, recording hole ID, box number and ‘from’ and ‘to’ depths.

 

All samples were individually bagged and labelled with unique sample numbers.  Corresponding laboratory specific assay tags were included in each sample bag, which were then sealed with plastic zip‐ties and batched in woven nylon bags.  Samples were transported via commercial road transport on a weekly basis during drilling programmes. The samples were taken to ActLabs in Thunder Bay or to the ActLabs sample preparation facility in Dryden before being transferred to Thunder Bay for analysis.

 

 
93 | Page

 

 

Drill core was logged in the exploration camp at Cameron Lake.  The core was logged for geology, alteration, mineralization, structure and other geological features such as veining.  The core was photographed in wet and dry condition and stored in racks prior to sampling by core cutting.  The drill core was marked up with the sample intervals and the core was cut using a diamond blade saw.  Sample tickets were stapled into the wooden core trays and the other half put into the sample bag.  The sample number was also written on the outside of the calico sample bag for identification and sorting purposes.  The core is stored in the exploration facility at the Cameron Property.  This has dedicated covered racks for storing drill core, wooden crates for sample residues, and sea containers for sample pulps.

 

All samples were individually bagged and labelled with unique sample numbers.  Corresponding laboratory specific assay tags were included in each sample bag, which were then sealed with plastic zip‐ties and batched in woven nylon bags.  Samples were transported via Gardewine North commercial road transport of Kenora.  The samples were taken to ActLabs in Thunder Bay.  Confirmation was sent to Chalice that the security tags were intact, and that the numbers match the sample despatch request.

 

As part of its QA/QC review, Snowden Optiro (“Snowden Optiro”) was provided with a Microsoft access database containing two QA/QC tables.  One table comprised standards and blanks and one table comprised duplicates assay results.  Snowden Optiro exported these tables into CSV format and imported the QA/QC results into data analysis spreadsheets to review the Cameron QA/QC results.

 

The underground drilling data collected between 1987 and 1989 was considered critical to the quantity and quality of the 2014 Mineral Resource Estimate, and as no QA/QC information was available, Coventry undertook a re‐sampling program in order to establish confidence in the assay results.  The Coventry re‐sampling programme targeted mineralization in and around the underground development.  Remaining core was quartered either using a core saw or manually (depending on core condition) over the same sample intervals as currently recorded in the database.  The re‐samples were prepared and assayed in exactly the same manner that samples from Coventry’s diamond drilling programme were processed with sample preparation and analysis carried out at ActLabs in Thunder Bay.  This re‐sample programme provided 816 directly comparable assay results, from a total of 1,904.6 m of drill core.  The comparison is between half core (original sample) and quarter core (resample).

 

Snowden Optiro only managed to identify 101 samples recorded in the QA/QC database to be duplicate samples that were submitted by Coventry in 2010 and 2011. Snowden Optiro’s analysis of the 101 identified quarter core duplicate samples indicates a poor repeatability of grades between paired samples with a correlation coefficient of 0.24.  The results suggest that the duplicate samples are under reporting compared to the original grades at gold grades of less than 1 g/t Au, and over reporting compared to the original grades at gold grades of greater than 2 g/t Au.

   

Results from the scatter plot, precision plot and relative difference plots highlight a moderate to poor precision and poor repeatability of duplicates from this resample programme.  In Snowden Optiro’s opinion the repeatability and precision of these duplicates does not demonstrate a high level of confidence.  However, the small number of samples does not in Snowden Optiro’s opinion provide definitive evidence of issues with the duplicate repeatability. Snowden Optiro notes that consideration for differing sample volumes i.e. manually split half core (versus) sawn quarter core needs to be taken into account when reviewing duplicate analysis results.  As such, whilst Snowden Optiro recommends that First Mining needs to review the performance of the Coventry resample programme further, Snowden Optiro considers these results to be adequate for resource estimation.

 

Snowden Optiro has identified 249 blanks submitted by Coventry as part of its resample programmes in 2010 and 2011.  Of the 249 blanks submitted, four returned grades above 0.03 g /t Au.  This represents a failure rate of less than 2%.  Snowden Optiro considers these results to be adequate for resource estimation.

 

Snowden Optiro identified 236 standards submitted by Coventry as part of its resample programmes in 2010 and 2011.  Of the 236 standards submitted, 10 different Certified Reference Material (“CRM”) standards with gold grades ranging from 0.38 g/t to 7.97 g/t Au were used during the Coventry resample programme.  A total of 55 gold standards fall outside three standard deviations which represents a failure rate of approximately 23%.  When graphed, it is evident that a large number of the standard failures are potential sample swaps (i.e. incorrect standard labelling or blanks labelled as a standard).  However, due to the close gold grades of a number of standards, it is not possible to determine with 100% accuracy what the actual standard ID might be.

 

Snowden Optiro does not know whether Coventry resubmitted all failed batches for re-analysis.  

 

 
94 | Page

 

 

Snowden Optiro considers that the sample swaps should be rectified in the database so that the QA/QC performance is representative of the performance of the standards.  In taking these into account, Snowden Optiro considers that the CRM assay performance is adequate for estimation.

 

As part of their 2010 to 2012 drilling programmes, Coventry submitted standards, duplicates and blanks as part of their quality control program. 

 

The blank material was obtained from a granite quarry and whilst not certified, was considered by Coventry to be sufficiently homogenous and unmineralized to act as barren material.  Of the 921 blanks submitted, eight returned grades above 0.03 g /t Au.  This represents a failure rate of less than 2%.  These failures were reviewed at the time by Coventry and were considered to be potential laboratory contamination issues.  Snowden Optiro considers these results adequate for resource estimation.

 

Of the 921 standards submitted, six were recorded as have grades of -99.  Snowden Optiro removed these standards from the database prior to any further analysis.  A total of 12 different CRM standards with gold grades ranging from 0.69 g/t Au to 7.97 g/t Au were used during the Coventry drill programs.

 

The provided database contained 901 quarter core duplicate samples collected by Coventry during the 2010 to 2012 drilling programmes.  The duplicates demonstrate a moderate correlation coefficient (0.83) indicating moderate repeatability of grades between paired samples.

 

The relative precision of a field duplicate dataset is determined by calculating the absolute difference between the two sample’s grades divided by the mean of the sample pairs.  Good or high precision suggests that the paired samples are consistent with each other, both samples have been well homogenised and that sample size (weight) is adequate to be representative of the material collected from the drill hole.  Poor or low precision suggests that the samples have been poorly prepared, have a high inherent nugget, poor assaying, or are not large enough to be representative.  Of the duplicates submitted to ActLabs, 74% of assays were within 5% precision, 76% within 10% precision, and 78% within 15% precision. 

 

Results from the scatter plot, precision plot, and relative difference plots highlight a moderate to poor precision and moderate to poor repeatability of duplicates from these phases of drilling.  Part of this could be due to the use of chisel vs. saw splitting, or the use of quarter vs. half core samples, which Snowden Optiro does not consider to be a true representative duplicate sample when dealing with gold mineralization.  As previously stated, taking into account consideration for differing sample volumes (i.e. half core versus quarter core), Snowden Optiro considers these results to be adequate for resource estimation.  

 

 
95 | Page

 

 

In 2014, Chalice undertook a resampling program to provide additional confidence in the underlying drill hole sample assays results used for Mineral Resource estimation.  The samples selected were considered to be spatially representative of the majority of the Cameron Gold Deposit with an emphasis on near surface locations.  A total of 492 pulps and 325 coarse rejects were selected from the existing drill holes within the following series:

 

 

Historical holes – resample of pulp samples only

 

 

 

 

Coventry 2010 holes – pulps and rejects

 

 

 

 

Coventry 2011 holes – pulps and rejects.

 

The following is an overview of the pulp sampling program taken from the Chalice 2014 Report. 

 

 

Selected pulp samples were sent to AGAT Laboratories of Mississauga, Ontario – the Umpire Laboratory.

 

 

 

 

The samples were not re‐numbered given the sample sequence had never been seen by this laboratory.

 

 

 

 

The laboratory was requested to place an “A” prefix to the start of the sample number to distinguish these results from the original results.

 

 

 

 

Standards and Blanks were included with these samples positioned in the same location sequence as in the original submission; a new standard was placed in the position of the original standard (the original standard sample being exhausted by the analytical process) whilst the blanks were retained from the original submissions.

 

The selected samples were renumbered (for disguise) and re‐submitted to ActLabs to preparation and analysis by the method adopted by Coventry and described in previous reports.

  

Standards and blanks were included with these samples positioned in the same location sequence as in the original submission; a new standard was placed in the position of the original standard (the original standard sample being exhausted by the analytical process) whilst the blanks were retained from the original submissions.

 

Results from the pulp duplicate analysis indicate a good repeatability of pulps, while results from the coarse reject analysis illustrate that the average grade of the rejects is 4% lower than the original sample.  Snowden Optiro was not provided with this data and as such has not been able to replicate these results.

 

Snowden Optiro considers the assay performance of the pulp and reject samples to provide good support for the representivity of the analytical results and for mineral resource estimation.

 

In 2015, Chalice undertook two resampling programs of unsampled intervals within the Cameron Shear Zone.  Snowden Optiro has based the following analysis of standards, duplicates and blanks submitted as part of the 2015 resampling programs based on the coding in the provided database.

 

Of 1,608 blanks submitted during the 2015 resample program, 10 returned grades above 0.03 g/t Au.  This represents a failure rate of less than 1%.  Snowden Optiro considers these results to be a good measure of the sample preparation process and acceptable for resource estimation. 

 

 
96 | Page

 

 

Of 1,644 standards submitted, 10 were recorded as ‘sample consumed’.  Snowden Optiro removed these standards from the database prior to any further analysis.  A total of 9 different CRM standards with gold grades ranging from 0.34 g/t Au to 7.97 g/t Au were used during the Chalice resample programmes.

 

A total of 144 gold standards fell outside of three standard deviations, which represents a failure rate of approximately 9%.  The majority (but not all) of the failures appear to be sample swaps (i.e. incorrect standard labelling or blanks labelled as a standard).  In this program, Chalice did not resubmit failed batches for re-analysis but Snowden Optiro recommends implementation of this protocol for future programs.  In addition, Snowden Optiro notes the presence of what appears to be cyclic trends in the standard results.  Further investigation into these trends is recommended.  

 

Of 1,629 quarter core duplicates submitted, one was recorded as having a grade of -99.  Snowden Optiro removed this sample from the database prior to any further analysis.  The duplicates demonstrate a moderate correlation coefficient (0.79) indicating a moderate repeatability of grades between paired samples.  Snowden Optiro notes there are a number of original samples (43) with barren grade (<0.03 g/t Au) where the duplicate has returned gold grades ranging from 0.1 g/t Au to 2.42 g/t Au.  Furthermore, there a number of duplicate samples (47) of barren grade with an original grade ranging from 0.1 g/t Au to 3.1 g/t Au, suggesting that there are potentially sample swaps.  

 

The relative precision of a field duplicate dataset is determined by calculating the absolute difference between the two sample’s grades divided by the mean of the sample pairs.  Good or high precision suggests that the paired samples are consistent with each other, both samples have been well homogenised and that sample size (weight) is adequate to be representative of the material collected from the drill hole.  Poor or low precision suggests that the samples have been poorly prepared, have a high inherent nugget, poor assaying, or are not large enough to be representative.  Of the duplicates submitted to ActLabs, 86% of assays were within 5% precision, 87% within 10% precision, and 88% within 15% precision.  

 

Results from the scatter plot, precision plot, and relative difference plots highlight a moderate precision and a moderate repeatability of duplicates from these resampling programs. 

  

Based on the good correlation coefficient and moderate repeatability performance of the duplicate samples Snowden Optiro considers the results from the Chalice 2015 resampling program to be acceptable for use in a Mineral Resource estimate. 

 

Aside from the pulp resample programme undertaken by Chalice in 2014, Snowden Optiro is unaware of any additional umpire duplicate sampling that has taken place at Cameron Project.

 

Data verification was carried out by Snowden Optiro to verify the following elements:

 

 

Deposit location and geology confirmed by site visit to view outcrop exposures, drill core samples and photographs of drill core;

 

 

 

 

Drill collar locations and grid coordinates verified by GPS check of randomly selected drill hole coordinates;

 

 

 

 

Downhole survey deviation compared on a random selection of drill holes;

 

 

 

 

Quantum of stated mineralization supported by independent sampling of mineralization; and

 

 

 

 

Assay integrity verified by sample QA/QC analysis, no significant bias identified.

 

Primary source data (surveys, downhole survey information, assay certificates) checked against database for errors and no material issues identified.

 

The results of the data validation process have verified the accuracy and integrity of the information provided by Chalice.  It is Snowden Optiro’s opinion that the Cameron database is acceptable for the purpose of mineral resource estimation.

 

Mineral processing and metallurgical testing

 

A number of preliminary metallurgical studies have been carried out on samples from the Cameron Property from 1985 to the present. Multi-element geochemical assays of the samples from the drill holes drilled between 2010 and 2012 have indicated that concentrations of deleterious elements (such as sulphur) are not significant.

 

 
97 | Page

 

 

Metallurgical test work carried out on samples representative of the style of mineralization at the Cameron Gold deposit showed that recoveries of 92% to 93% were returned from direct cyanidation of samples ground to 75 μm. The results also showed that the recoveries were grind sensitive with maximum recoveries at a P80 grind size in the range 53 to 75 μm. An alternative processing regime of sulphide flotation (mainly pyrite), regrind of flotation concentrate followed by intensive cyanidation of flotation concentrate and flotation tailings provided gold recoveries marginally higher than direct cyanidation. At a grind size of 75 μm the optimum leach time was approximately 24 hours.

 

Test work completed in 2013 by the Vancouver branch of SGS used a composite sample taken from 17 drill hole intersections from 14 separate drill holes at the Cameron Project.  Comminution tests indicated that:

 

 

rod and ball mill bond work indices are low;

 

 

 

 

moderate abrasion index within typical ranges for dolerite-basalt material; and

 

 

 

 

JK breakage parameters indicating the material is highly competent.

 

Gravity recoverable gold is typically around 25% with no improvement in overall recovery after gravity recovery with cyanidation of the gravity tails. Test work carried out in 2014 showed that cyanide in leach processing at a P80 of 75 μm would recover 92.5% of gold with a cyanide usage of 0.2 kg/t and lime usage of 1.2 kg/t. This result was an improvement on direct cyanidation in terms of reagent usage with a lower recovery (92.5% vs. <95% cyanidation). No processing issues or deleterious elements have been identified that could have a significant effect on potential mineral extraction in metallurgical test work completed to date.

 

Mineral resource estimates

 

The Mineral Resource estimates for the Cameron Deposit have been generated from drill hole sample assay results. The interpretations are based on an integrated 3D geological model that defines the relationships of the geological elements at the Cameron Property. The interpreted mineralization wireframes (using a nominal 0.4 g/t Au, and 0.25 g/t Au cut-off grade for low grade domains) have been used to constrain gold grade estimates. There are eight mineralization domains that are split into two global areas – ‘northern’ and ‘southern’, with the separation defined by a set of northwest (grid) striking quartz feldspar porphyry (“QFP”) dykes. The southern domain is the most strongly mineralized. The stronger mineralization is attributed to being dominantly mafic hosted with an inflection point in the Cameron Lake Shear Zone and resultant dilation zone defined by north-south striking hanging wall and footwall QFP dykes.

 

Block grade estimation parameters have been defined on the basis of geology, drill hole spacing and through geostatistical analysis of the data. Top-cut 1.0 metre composite samples informed the block grade estimate by ordinary kriging (“OK”) into a panel size of 5 mE by 10 mN and 5 mRL, which is considered appropriate for the distribution of sample data and the deposit type. Sub-celling of the parent cells to 0.625 mE by 2.5 mN and 1.25 mRL was enabled to ensure good volumetric correlation with the mineralization wireframes.

 

The Mineral Resource estimates have been classified by the geological understanding, data spacing, block proximity to sample locations, underground development and confidence in the block model grade estimate. The Mineral Resource estimate has been reported in accordance with the Standards on Mineral Resources and Reserves of the Canadian Institute of Mining, Metallurgy and Petroleum 2014 Definition Standards.

 

 
98 | Page

 

 

The Mineral Resources have been reported using the constraints and cut-off grades specified in the tabulations below.  The Mineral Resource is tabulated in Table A for Measured and Indicated Mineral Resources and in Table B for Inferred Mineral Resources.

 

Table A – Measured & Indicated Mineral Resource Statement as at January 17, 2017

 

 

Mineral Resource Classification

 

Open-Pit Constraint

 

Gold cut-off (Au g/t)

 

Tonnes

 

Gold g/t

 

Gold (Ounces)

 

Measured Mineral Resource

 

Within US$1,350 open-pit shell

 

0.55

 

2,670,000

 

2.66

 

228,000

 

Indicated Mineral Resource

 

Within US$1,350 open-pit shell

 

0.55

 

820,000

 

1.74

 

46,000

 

Measured + Indicated

 

 

 

 

 

3,490,000

 

2.45

 

274,000

 

Mineral Resource Classification

 

Underground Constraint

 

Gold cut-off (Au g/t)

 

Tonnes

 

Gold g/t

 

Gold (Ounces)

 

Measured Mineral Resource

 

Below US$1,350 open-pit shell

 

2.00

 

690,000

 

3.09

 

69,000

 

Indicated Mineral Resource

 

Below US$1,350 open-pit shell

 

2.00

 

1,350,000

 

2.80

 

121,000

 

Measured + Indicated

 

 

 

 

 

2,040,000

 

2.90

 

190,000

 

TOTAL MEASURED + INDICATED

 

 

 

 

 

5,530,000

 

2.61

 

464,000

               

Table B – Inferred Mineral Resource Statement as at January 17, 2017

 

 

Mineral Resource Classification

 

Open-Pit Constraint

 

Gold cut-off (Au g/t)

 

Tonnes

 

Gold g/t

 

Gold (Ounces)

 

Inferred Mineral Resource

 

Within US$1,350 open-pit shell

 

0.55

 

35,000

 

2.45

 

3,000

 

Mineral Resource Classification

 

Underground Constraint

 

Gold cut-off (Au g/t)

 

Tonnes

 

Gold g/t

 

Gold (Ounces)

 

Inferred Mineral Resource

 

Below US$1,350 open-pit shell

 

2.00

 

6,500,000

 

2.54

 

530,000

 

TOTAL INFERRED

 

 

 

 

 

6,535,000

 

2.54

 

533,000

 

The Measured and Indicated Mineral Resources are defined in the areas of the deposit that have the highest drilling density along with underground development that has exposed and sampled the deposit on three levels of drift development.

 

 
99 | Page

 

 

Recent developments

 

On December 9, 2020, First Mining completed a transaction with Metalore pursuant to which it acquired from Metalore the East Cedartee claims which are located between the Cameron claim block (which includes the “Cameron Gold Deposit” that hosts the current Mineral Resource on the Cameron Project) and the West Cedartree claim block (which includes the Dubenski and Dogpaw deposits on the Cameron Project).  The acquisition of the East Cedartree claims consolidates First Mining’s land holdings at Cameron into a single contiguous block and adds a further 3,200 hectares to the 49,600 hectares that First Mining already holds in the district, making a total of 52,800 hectares for the entire property.  The property area for the Cameron Project is now comprised of 2,001 mining claims, 24 patents, 4 mining leases and 7 licenses of occupation.

 

In 2021, First Mining completed surface water and groundwater quality sampling on and around the Cameron Gold Project in order to maintain an ongoing process of data collection to support any baseline studies for future permitting. Work on the property also included historical drill core organization and site infrastructure maintenance. Exploration field work was also carried out in 2021, which consisted of a 10-day rock sampling program with approximately 50 samples collected for analysis.

 

In 2022, First Mining completed a desktop study comprising of data compilation, geological modelling and exploration target generation across the northern majority of the property covering an area of approximately 700 square kilometres generating 54 targets for future advancement.

 

In 2023, First Mining completed infill sampling and mapping at the project in support of a continued exploration advancement that focuses on resource growth through an integrated property approach. A total of 1,012 infill samples were collected and updated to the project database.

 

An initial 4,000 m drill program at the project is proposed in order to advance the exploration potential of the local geology and identify new drill targets at the West Cedartree and East Cedartree claims.  An exploration permit application in support of this planned work was submitted by First Mining in 2021 and is under review by the Ontario Ministry.

 

First Mining continues to provide opportunities for the sharing of updates and information about the Cameron Gold Project with local Indigenous communities. Animakee Wa Zhing #37 First Nation and First Mining signed an exploration agreement in June 2021.

 

 
100 | Page

 

 

Non-material properties

 

We also hold a number of non-material mineral properties in our portfolio. Some of these properties are resource-stage assets which have NI 43-101 technical reports that support resources of less than one million ounces of attributable gold. Others are grassroots exploration projects that host mineralization but have not had sufficient drilling on them to classify resources under the CIM definition standards. A brief summary of some of these properties is set out in this section.

 

Canada

 

Pickle Crow Gold Project, Ontario

 

We own a 30% interest in PC Gold, the joint venture company that owns the Pickle Crow Project.  Our joint venture partner FireFly Metals (“Firefly”) owns the remaining 70% of PC Gold, and is the current operator of the Pickle Crow Project.  For further information, see the section in this AIF entitled “Investor Information – Material contracts – Pickle Crow Earn-In Agreement”.

 

The Pickle Crow Project hosts an Inferred Mineral Resource of 9.4 Mt grading 4.1 g/t Au and containing 1,230,500 oz. Au.  The technical report in support of these resources, entitled “An Updated Mineral Resource Estimate for the Pickle Crow Property, Patricia Mining Division, Northwestern Ontario, Canada” and dated June 15, 2018, was prepared for us by Micon International Limited in accordance with NI 43-101, and is available under our SEDAR+ profile at www.sedarplus.ca.

 

In 2020 and 2021, our joint venture partner FireFly completed an initial 45,000 m drill program at the Pickle Crow Project. On July 27, 2021, we announced the commencement by FireFly of a second phase, 50,000 m drill program at the Pickle Crow Project.  The second phase 50,000 m drill program was completed in March 2022.

 

Another 50,000 m drill program was started in April 2022 and concluded in March 2023.

 

Hope Brook Gold Project, Newfoundland

 

Big Ridge currently holds a 51% interest in the in the Hope Brook Gold Project and may earn up to an 80% interest.  For a summary of the key terms of the Hope Brook Earn-In Agreement, see the section in this AIF entitled “Investor information – Material contracts – Hope Brook Earn-In Agreement”.

 

The Hope Brook Project covers an area of 26,050 ha in Newfoundland, including six mineral licenses, with a deposit hosted by pyritic silicified zones occurring within a deformed, strike-extensive advanced argillic alteration zone. The project has well maintained infrastructure on site, including an operational 28-person camp, an 1,100 m airstrip, ice-free docking facility and connection to the provincial electrical power grid via an on-site substation.  The project was a former operating gold mine that produced 752,163 oz. Au from 1987 to 1997.

 

 
101 | Page

 

 

On February 21, 2023, Big Ridge reported the following updated mineral resource estimate (“MRE”) on the Hope Brook Gold Project. The MRE was completed by SGS Geological Services and is based on data from 763 surface and underground drill holes representing 164,865 m of drilling, including data for 60 surface drill holes for 19,090 m completed by Big Ridge in 2021 and 2022.  The new resource estimate contemplates open-pit mineral extraction and identifies both in-pit resources and out-of-pit resources considered accessible by underground mining methods.

 

Hope Brook Project Mineral Resource Statement, effective January 17, 2023

 

 

IN PIT

 

Hope Brook

 

Cut-off Grade

(g/t Au)

 

Tonnes

 

Grade

(Au g/t)

 

Contained

Gold Ounces

 

INDICATED

 

Main Zone

 

0.4

 

14,584,000

 

2.14

 

1,002,000

 

UNDERGROUND

 

Hope Brook

 

Cut-off Grade

(g/t Au)

 

Tonnes

 

Grade

(Au g/t)

 

Contained

Gold Ounces

 

INDICATED

 

240 Zone

 

2.0

 

544,000

 

4.31

 

75,000

 

Main Zone

 

2.0

 

1,062,000

 

3.78

 

129,000

 

INFERRED

 

240 Zone

 

2.0

 

1,994,000

 

3.28

 

210,000

 

Main Zone

 

2.0

 

221,000

 

2.96

 

21,000

 

IN PIT AND UNDERGROUND

 

Hope Brook

 

Cut-off Grade

(g/t Au)

 

Tonnes

 

Grade

(Au g/t)

 

Contained

Gold Ounces

 

INDICATED

 

240 Zone

 

2.0

 

544,000

 

4.31

 

75,000

 

Main Zone

 

0.5 and 2.0

 

15,646,000

 

2.25

 

1,131,000

 

INFERRED

 

240 Zone

 

2.0

 

1,994,000

 

3.28

 

210,000

 

Main Zone

 

2.0

 

221,000

 

2.96

 

21,000

 

Notes:

 

 

1.

The classification of the current Mineral Resource Estimate into Indicated and Inferred is consistent with current 2014 CIM Definition Standards - For Mineral Resources and Mineral Reserves.

 

2.

All figures are rounded to reflect the relative accuracy of the estimate.

 

3.

All Resources are presented undiluted and in situ, constrained by continuous 3D wireframe models, and are considered to have reasonable prospects for eventual economic extraction.

 

4.

Mineral resources which are not mineral reserves do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to a Measured and Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

 

 
102 | Page

 

 

 

5.

The update MRE is based on data for 763 surface and underground drill holes representing 164,865 m of drilling, including data for 60 surface drill holes for 19,090 m completed by Big Ridge in 2021 and 2022.

 

6.

The mineral resource estimate is based on 2 three-dimensional ("3D") resource models for the Main Zone and 240 Zones.

 

7.

High grade capping was applied to the 1.5 m composite data. A capping value of 50 g/t Au was to the Main Zone and 40 g/t Au for the 240 Zone.

 

8.

Average density values were assigned per zone.

 

9.

Gold is estimated for each mineralization domain. Blocks (5x5x5) within each mineralized domain were interpolated using 1.5 metre capped composites assigned to that domain. To generate grade within the blocks, the inverse distance squared (ID2) interpolation method was used for all domains.

 

10.

It is envisioned that parts of the Main Zone may be mined using open pit mining methods. Open pit mineral resources are reported at a base case cut-off grade of 0.4 g/t Au within a conceptual pit shell.

 

11.

It is envisioned that parts of the Main Zone as well as the 240 Zone may be mined using underground mining methods. A selected base case cut-off grade of 2.0 g/t Au is used to determine the underground mineral resource for the Main Zone and 240 Zone. The underground Mineral Resource grade blocks were quantified above the base case cut-off grade, below the constraining pit shell and within the constraining mineralized wireframes.

 

12.

Base case cut-off grades consider a metal price of US$1750.00/oz Au and considers a metal recovery of 86 % for Au.

 

13.

The pit optimization and in-pit base case cut-off grade of 0.4 g/t Au considers a mining cost of US$2.65/t rock and processing, treatment and refining, transportation and G&A cost of US$15.60/t mineralized material, and an overall pit slope of 55°. The underground base case cut-off grade of 2.0 g/t Au considers a mining cost of US$54.00/t rock and processing, treatment and refining, transportation and G&A cost of US$15.550. The cut-off grades should be re-evaluated in light of future prevailing market conditions (metal prices, exchange rates, mining costs etc.).

 

14.

The results from the pit optimization are used solely for the purpose of testing the "reasonable prospects for economic extraction" by an open pit and do not represent an attempt to estimate mineral reserves. There are no mineral reserves on the Property. The results are used as a guide to assist in the preparation of a Mineral Resource statement and to select an appropriate resource reporting cut-off grade.

 

15.

The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no certainty that all or any part of the Inferred Mineral Resource will be upgraded to an Indicated or Measured Mineral Resource as a result of continued exploration. There is no other relevant data or information available that is necessary to make the technical report understandable and not misleading.

 

Risks that can affect our business

 

There are risks in every business.

 

The nature of our business means we face many kinds of risks and hazards – some that relate to the mineral exploration industry in general, and others that apply to specific properties, operations or planned operations. These risks could have a significant impact on our business, earnings, cash flows, financial condition, results of operations or prospects.

 

The following section describes the risks that are most material to our business. This is not, however, a complete list of the potential risks we face – there may be others we are not aware of, or risks we believe are not material today that could become material in the future. We have in place systems and procedures appropriate for a company at our stage of development to manage these risks, to the extent possible, but there is no assurance that we will be successful in preventing the harm that any of these risks could cause.

 

 
103 | Page

 

 

Types of risk

 

Exploration, development,

production and operational risks

p. 104

 

 

 

Financial risks 

p. 109

 

 

 

Political risks 

p. 112

 

 

 

Regulatory risks 

p. 114

 

 

 

Environmental risks

p. 115

 

 

 

Industry risks 

p. 116

 

 

 

Other risks 

p. 117

 

Exploration, development, production and operational risks

 

Exploration and development risks

 

The exploration for and development of minerals involves significant risks, which even a combination of careful evaluation, experience and knowledge may not eliminate. These risks include:

 

 

few properties that are explored are ultimately developed into producing mines;

 

 

 

 

there can be no guarantee that the estimates of quantities and qualities of minerals disclosed will be economically recoverable;

 

 

 

 

with all mining operations there is uncertainty and, therefore, risk associated with operating parameters and costs resulting from the scaling up of extraction methods tested in pilot conditions; and

 

 

 

 

mineral exploration is speculative in nature and there can be no assurance that any minerals discovered will result in an increase in our resource base.

                  

Exploration and development of mineral properties is capital intensive and unsuccessful exploration or development programs could have a material adverse impact on our operations and financial condition.

 

Operational hazards and risks

 

Our operations will be subject to all of the hazards and risks normally encountered in the exploration and development of minerals. To the extent that we take a property to production, we will be subject to all of the hazards and risks associated with the production of minerals. These risks include:

 

 

unusual and unexpected geological formations;

 

 

 

 

rock falls;

 

 

 

 

seismic activity;

 

 

 

 

flooding and other conditions involved in the extraction of material, any of which could result in damage to, or destruction of, mines and other producing facilities, damage to life or property, environmental damage and possible legal liability;

 

 

 

 

environmental pollution, and consequent liability that could have a material adverse impact on our business, operations and financial performance;

 

 

 

 

mechanical equipment, facility performance problems and industrial accidents; and

 

 

 

 

periodic disruptions due to inclement or hazardous weather conditions.

 

 
104 | Page

 

 

Substantial expenditures

 

Substantial expenditures are required to establish Mineral Resources and Mineral Reserves through drilling, to develop metallurgical processes to extract the metal from the ore and, in certain cases, to develop infrastructure at any site chosen for exploration. Although substantial benefits may be derived from the discovery of a major mineralized deposit, no assurance can be given that minerals will be discovered in sufficient quantities to justify commercial operations or that funds required for development can be obtained on a timely basis.

 

The economics of developing mineral properties is affected by many factors including:

 

the cost of operations, which may fluctuate due to a variety of factors, including inflation;

variations in the grade of mineralized material mined;

fluctuations in metal markets; and

such other factors as government regulations, including regulations relating to royalties, allowable production, importing and exporting of minerals and environmental protection.

 

The remoteness and restrictions on access of properties in which we have an interest will have an adverse effect on expenditures as a result of higher infrastructure costs. There are also physical risks to the exploration personnel working in the terrain in which our properties are located, occasionally in poor climate conditions.

 

No history of mineral production

 

First Mining has no history of commercially producing metals from its mineral exploration properties. There can be no assurance that we will successfully establish mining operations or profitably produce gold or other precious metals on any of our properties. The development of mineral properties involves a high degree of risk and few properties that are explored are ultimately developed into producing mines. The commercial viability of a mineral deposit is dependent upon a number of factors which are beyond our control, including the attributes of the deposit, commodity prices, government policies and regulation and environmental protection. Fluctuations in the market prices of minerals may render Mineral Reserves and deposits containing relatively lower grades of mineralization uneconomic.

 

While our Springpole Project is currently in development, none of our other mineral properties are currently under development or production. The future development of any properties found to be economically feasible will require applicable licenses and permits and will require the construction and operation of mines, processing plants and related infrastructure. As a result, the development of any property will be subject to all of the risks associated with establishing new mining operations and business enterprises, including, but not limited to:

 

 

the timing and cost of the construction of mining and processing facilities;

 

 

 

 

the availability and costs of skilled labour and mining equipment;

 

 
105 | Page

 

 

 

the availability and cost of appropriate smelting and/or refining arrangements;

 

 

 

 

the need to obtain necessary environmental and other governmental approvals and permits and the timing of those approvals and permits;

 

 

 

 

our ability to build relationships with, and secure consent from, the Indigenous communities around our projects; and

 

 

 

 

the availability of funds to finance construction and development activities.

 

It is common in new mining operations to experience unexpected problems and delays during development, construction and mine start-up. In addition, delays in the commencement of mineral production often occur. Accordingly, there are no assurances that our activities will result in profitable mining operations or that mining operations will be established at any of our properties.

 

Title risks

 

Title to mineral properties, as well as the location of boundaries on the ground may be disputed. Moreover, additional amounts may be required to be paid to surface right owners in connection with any mineral exploration or development activities. At all properties where we have current or planned exploration activities, we believe that we have either contractual, statutory, or common law rights to make such use of the surface as is reasonably necessary in connection with those activities.

 

We do not have title insurance for any of our mining claims and our ability to ensure that we have obtained secure claims to individual mineral properties or mining concessions may be severely constrained. We have not conducted surveys of all our claims; therefore, the precise area and location of such claims may be in doubt. In addition, many of our mineral properties have had previous owners, and third parties may have valid claims (known or unknown) underlying our interests therein. Accordingly, our properties may be subject to prior unregistered liens, agreements, royalties, transfers or claims, including First Nations land claims, and title may be affected by, among other things, undetected defects. In January 2022 we became aware that the Cat Lake First Nation and certain other parties have filed a Statement of Claim against the Crown seeking an order from the Ontario Superior Court of Justice that all mineral tenure over which the Cat Lake First Nation claim exclusive aboriginal title (which includes the land where the Springpole Project is situated) be returned to them and all mining permits, leases, licenses and patents in respect of such lands be cancelled. We are continuing to monitor this claim but there is no assurance it will be resolved in the favour of the Crown. If the claim is resolved in favour of the Cat Lake First Nation this would have a material and adverse effect on our ability to operate and develop the Springpole Project. Please see the "Political Risks – Indigenous Peoples" in this AIF below for further information. In addition, we may be unable to explore our properties as permitted or to enforce our rights with respect to our properties. An impairment to or defect in our title to our properties could have a material adverse effect on our business, financial condition or results of operation.

 

Mineral Reserves/Mineral Resources

 

The properties in which we hold an interest are currently considered to be in the exploration stage and do not contain a known body of commercial minerals beyond the PFS level. Mineral Resources and Mineral Reserves are, in large part, estimates and no assurance can be given that the anticipated tonnages and grades will be achieved or that the particular level of recovery will be realized.

 

 
106 | Page

 

 

Mineral Resources on our properties have been determined based upon assumed cut-off grades, metal prices and operating costs at the time of calculation, as set out in the applicable technical reports. Future production, if any, could differ dramatically from Mineral Resource and Mineral Reserve estimates because, among other reasons:

 

 

mineralization or formations could be different from those predicted by drilling, sampling and similar examinations;

 

 

 

 

calculation errors could be made in estimating Mineral Resources and Mineral Reserves;

 

 

 

 

increases in operating mining costs and processing costs could adversely affect Mineral Resources and Mineral Reserves;

 

 

 

 

the grade of the Mineral Resources and Mineral Reserves may vary significantly from time to time and there is no assurance that any particular level of metals may be recovered from the ore; and

 

 

 

 

declines in the market price of the metals may render the mining of some or all of the Mineral Reserves uneconomic.

 

Estimated Mineral Resources may require downward revisions based on changes in metal prices, further exploration or development activity, increased production costs or actual production experience. This could materially and adversely affect estimates of the tonnage or grade of mineralization, estimated recovery rates or other important factors that influence Mineral Resource and Mineral Reserve estimates.

 

Any reduction in estimated Mineral Resources as a result could require material write downs in investment in the affected mining property and increased amortization, reclamation and closure charges, which could have a material and adverse effect on future cash flows for the property and on our earnings, results of operations and financial condition.

 

Because we do not currently have any producing properties, mineralization estimates for our properties may require adjustments or downward revisions based upon further exploration or development work or actual future production experience. In addition, the grade of mineralized material ultimately mined, if any, may differ from that indicated by drilling results. There can be no assurance that minerals recovered in small-scale tests will be duplicated in large-scale tests under on- site conditions or in production scale.

 

Extended declines in market prices for gold or other metals may render portions of our mineralization uneconomic and result in reduced reported mineralization. Any material reductions in mineralization estimates, or of the ability to extract mineralized material from our properties, could (directly or indirectly) have a material adverse effect on our results of operations or financial condition.

 

Capital costs, operating costs, production and economic returns

 

Actual capital costs, operating costs, production and economic returns with respect to our properties may differ significantly from those we have anticipated and there are no assurances that any future development activities will result in profitable mining operations. The capital costs required to develop or take our projects into production may be significantly higher than anticipated. To the extent that such risks impact upon any such properties, there may be a material adverse effect on results of operations on such properties which may in turn have a material adverse effect on our financial condition.

 

 
107 | Page

 

 

None of our mineral properties have sufficient operating history upon which we can base estimates of future operating costs. Decisions about the development of these and other mineral properties will ultimately be based upon feasibility studies. Feasibility studies derive estimates of cash operating costs based upon, among other things:

 

 

anticipated tonnage, grades and metallurgical characteristics of the mineralized material to be mined and processed;

 

 

 

 

anticipated recovery rates metals from the mineralized material;

 

 

 

 

cash operating costs of comparable facilities and equipment; and

 

 

 

 

anticipated climatic conditions.

 

Cash operating costs, production and economic returns, and other estimates contained in studies or estimates prepared by or for us, may differ significantly from those anticipated by our current studies and estimates due to a variety of factors, including increased inflation and ongoing hostilities in the Ukraine and the Middle East, and there can be no assurance that our actual operating costs will not be higher than currently anticipated.

 

Property interests

 

The agreements pursuant to which we hold rights to certain of our properties provide that we must make a series of cash payments over certain time periods or make minimum exploration expenditures. If we fail to make such payments or expenditures in a timely manner, we may lose some or all of our interest in those projects.

 

Availability of supplies

 

As with other mineral exploration companies, certain raw materials, supplies and other critical resources used in connection with our operations are obtained from a sole or limited group of suppliers. Due to an increase in activity in the global mining sector, there has been an increase in global demand for such resources. In addition, the ongoing hostilities in the Ukraine and Middle East may cause disruptions in global supply chains which may reduce or eliminate the availability of certain supplies, particularly those sourced from outside of Canada. Any decrease in the supplier’s inventory could cause unanticipated cost increases, an inability to obtain adequate supplies and delays in delivery times, thereby impacting operating costs, and timing of exploration and development programs.

 

Lack of infrastructure

 

The completion of the development of our development projects is subject to various requirements, including the availability and timing of acceptable arrangements for electricity or other sources of power, water and transportation facilities. The lack of availability on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay the development of our exploration projects. If adequate infrastructure is not available in a timely manner, there can be no assurance that: the development of our projects will be completed on a timely basis, if at all; any resulting operations will achieve the anticipated production volume; or the ongoing operating costs associated with the development of our projects will not be higher than anticipated.

 

Personnel recruitment and retention

 

The success of our operations and development projects depend in part on our ability to attract and retain geologists, engineers, metallurgists and other personnel with specialized skill and knowledge about the mining industry in the geographic areas in which we operate. The number of persons skilled in exploration and development of mining properties is limited and competition for such persons is intense. As our business grows, we may require additional key financial, administrative, and mining personnel as well as additional operations staff. There can be no assurance that we will be successful in attracting, training, and retaining qualified personnel as competition for persons with these skill sets increases. If we are unable to attract and retain sufficiently trained, skilled or experienced personnel, our business may suffer and we may experience significantly higher staff or contractor costs, which could have a material adverse effect on our operations and financial condition.

 

 
108 | Page

 

 

Financial risks

 

Substantial capital requirements

 

Our management team anticipates that we may make substantial capital expenditures for the exploration and development of our properties, in the future. As we are in the exploration stage with no revenue being generated from the exploration activities on our mineral properties, we have limited ability to raise the capital necessary to undertake or complete future exploration work, including drilling programs. As of the date of this AIF, financial markets have suffered significant disruption due to the ongoing hostilities in the Ukraine and the Middle East and sanctions imposed by many nations on Russia and Belarus could cause additional disruptions, particularly if hostilities spread to other nations. There can be no assurance that debt or equity financing will be available or sufficient to meet these requirements or for other corporate purposes or, if debt or equity financing is available, that it will be on terms acceptable to us and any such financing may result in substantial dilution to existing shareholders. Moreover, future activities may require us to alter our capitalization significantly. Our inability to access sufficient capital for our operations could have a material adverse effect on our financial condition, results of operations or prospects. In particular, failure to obtain such financing on a timely basis could cause us to forfeit our interest in certain properties, miss certain acquisition opportunities and reduce or terminate our operations.

 

History of net losses

 

We have received no revenue to date from activities on our properties, and there is no assurance that any of our properties will generate earnings, operate profitably or provide a return on investment in the future. We have not determined that production activity is warranted as of yet on any of our mineral properties. Even if we (alone or in conjunction with a third party) undertake development and production activities on any of our mineral properties, there is no certainty that we will produce revenue, operate profitably or provide a return on investment in the future.

 

We are subject to all of the risks associated with new mining operations and business enterprises including, but not limited to:

 

 

the timing and cost, which can be considerable, for the further construction of mining and processing facilities;

 

the availability and costs of skilled labour, consultants, mining equipment and supplies;

 

the availability and cost of appropriate smelting and/or refining arrangements;

 

the need to obtain necessary environmental and other governmental approvals, licenses and permits, and the timing of those approvals, licenses and permits; and

 

the availability of funds to finance construction and development activities.

 

 
109 | Page

 

 

It is common in new mining operations to experience unexpected problems and delays during construction, development, and mine start-up. In addition, delays in mineral production often occur. Accordingly, there are no assurances that our activities will result in sustainable profitable mining operations or that we will successfully establish mining operations or profitably produce metals at any of our other properties.

 

Potential volatility of share price

 

The securities markets in Canada have in the past experienced a high level of price and volume volatility, and the market price of securities of many junior companies have experienced wide fluctuations in price. The market price of our shares may be volatile and could be subject to wide fluctuations due to a number of factors, including but not limited to: actual or anticipated fluctuations in the results of our operations; changes in estimates of our future results of operations by management or securities analysts; portfolio balancing activities by exchange traded funds; and general economic or industry changes. In addition, the financial markets are currently experiencing significant price and value fluctuations due to a number of factors including from the ongoing hostilities in the Ukraine and the Middle East and sanctions imposed by many nations on Russia and Belarus. Such fluctuations may have a disproportionate impact on equity securities of venture issuers which is unrelated to the operating performance of these companies. Broad market fluctuations, as well as economic conditions generally and in the mining industry specifically, may also adversely affect the market price of our shares.

 

Non-Canadian investors

 

We are a public Canadian corporation, with our principal place of business in Canada. A majority of our directors and officers are residents of Canada and a significant portion of our assets and the assets of a majority of our directors and officers are located outside the United States. Consequently, it may be difficult for US or foreign investors to effect service of process within their local jurisdiction upon First Mining or its directors or officers or such experts who are residents of Canada, or to realize in their local jurisdiction upon judgments of local courts (including, but not limited to, judgments predicated upon civil liabilities under the United States Securities Act of 1933, as amended). Investors should not assume that Canadian courts: (i) would enforce judgments of foreign courts obtained in actions against First Mining or such directors, officers or experts (including, but not limited to, judgments predicated upon the civil liability provisions of the US federal securities laws or the securities or “blue sky” laws of any state within the United States); or (ii) would enforce, in original actions, liabilities against First Mining or such directors, officers or experts predicated upon foreign securities laws (including, but not limited to, the US federal securities laws or any state securities or “blue sky” laws). In addition, the protections afforded by Canadian securities laws may not be available to foreign investors.

 

Volatility of metal prices

 

Metal prices are affected by numerous factors beyond our control, such as industrial demand, inflation and expectations with respect to the rate of inflation, the strength of the US dollar and of other currencies, interest rates, forward sales by producers, production and cost levels, changes in investment trends, global and regional levels of supply and demand, metal stock levels maintained by producers, inventory carrying costs, availability, demand and costs of metal substitutes, international economic and political conditions, armed hostilities, economic sanctions, reduced demand resulting from obsolescence of technologies and processes utilizing metals and increased production due to new mine developments and improved mining and production levels. Gold prices are sometimes subject to rapid short-term changes because of speculative activities, and the market price of gold and other metals may not remain at current levels. If these prices were to decline significantly or for an extended period of time, we might be unable to continue our operations, develop our properties or fulfill our obligations under agreements with our partners or under our permits and licenses. As a result, we might lose our interest in, or be forced to sell, some of our properties. In the event of a sustained, significant drop in gold prices, we may be required to re-evaluate our assets, resulting in reduced estimates of Mineral Resources and Mineral Reserves and in material write-downs of our investment in mining properties. Furthermore, since gold prices are established in US dollars, a significant decrease in the value of the Canadian dollar relative to the US dollar coupled with stable or declining gold prices could adversely affect our results with respect to development of and eventual sale of gold.

 

 
110 | Page

 

 

Global financial conditions

 

Global financial conditions have, at various times in the past and may, in the future, experience extreme volatility. Many industries, including the mining industry, are impacted by volatile market conditions. Global financial conditions may be subject to sudden and rapid destabilizations in response to economic shocks or other events, such as armed hostilities ongoing in the Ukraine and the Middle East and economic sanctions. A slowdown in the financial markets or other economic conditions, including but not limited to consumer spending, employment rates, business conditions, inflation, fluctuations in fuel and energy costs, consumer debt levels, lack of available credit, instability of certain financial institutions, the state of the financial markets, interest rates and tax rates, may adversely affect our growth and financial condition. Future economic shocks may be precipitated by a number of causes, including government debt levels, fluctuations in the price of oil and other commodities, the volatility of metal prices, geopolitical instability, changes in laws or governments, war, terrorism, the volatility of currency exchanges, inflation or deflation, the devaluation and volatility of global stock markets, pandemics and natural disasters. Any sudden or rapid destabilization of global economic conditions could impact our ability to obtain equity or debt financing in the future on terms favourable to us or at all. In such an event, our operations and financial condition could be adversely impacted.

 

Public Health Crises

 

Our business, operations and financial conditions could be materially adversely affected by the outbreak of epidemics, pandemics or other public health crises, such as COVID-19, and by reactions from government and private actors to such outbreaks. Such public health crises can result in disruptions and extreme volatility in financial markets and global supply chains as well as declining trade and market sentiment and reduced mobility of people, all of which could impact commodity prices, interest rates, credit ratings, credit risk, availability of financing and inflation. The risks to the Company of such public health crises also include risks to employee health and safety and may result in a slowdown or temporary suspension of operations at some or all of our mineral properties as well as our head office. Although we have the capacity to continue certain administrative functions remotely, many other functions, including the conduct of exploration and development programs, cannot be conducted remotely and may be impacted or delayed if we experience additional limitations on employee mobility.

 

There can be no assurances that the Company will not be required to demobilize its personnel or contractors at any of its mineral projects due to a public health crisis. Any such demobilization may have an adverse impact on the Company’s ability to conduct exploration and further advance its work programs on the affected properties and on the Company’s business, financial condition or results of operations.

 

 
111 | Page

 

 

Equity Interests in Other Issuers

 

We may from time to time hold shares or other financial interests in other companies, including publicly listed companies. In particular, we currently hold common shares of Treasury Metals and Big Ridge. As a significant shareholder, we are subject to the risk that these companies may make business, financial or management decisions with which we do not agree or may take risks or otherwise act in a manner that does not serve our interests. In addition, the market price of the shares of such companies may be highly volatile and will be subject to many of the same factors as apply to our common shares. These shares may also be subject to restrictions on resale or may be illiquid. We may therefore have difficulty in selling such securities or realizing value for them.

 

Dividends

 

To date, we have not paid any dividends on our outstanding common shares and we have no plans to declare or pay dividends in the near future. Any decision to pay dividends on our shares will be made by our board of directors (“Board”) on the basis of our earnings, financial requirements and other conditions.

 

Dilution

 

The number of common shares we are authorized to issue is unlimited. We may, in our sole discretion, issue additional common shares from time to time, and the interests of the shareholders may be diluted thereby.

 

Political risks

 

Indigenous peoples

 

Various international and national laws, codes, court decisions, resolutions, conventions, guidelines, and other materials (collectively, the “Instruments”) relate to the rights of Indigenous peoples, including the First Nations and Métis of Canada. We operate in some areas presently or previously inhabited or used by Indigenous peoples including areas in Canada over which Indigenous peoples have established or asserted Aboriginal treaty rights, Aboriginal title, or Aboriginal rights. Many of these rights or titles impose obligations on governments and private parties as they relate to the rights of Indigenous people concerning resource development. Some mandate that government consult with, and if required, accommodate Indigenous people for government actions which may affect Indigenous people, including actions to approve or grant mining rights or exploration, development or production permits. The obligations of government and private parties under the various international and national Instruments pertaining to Indigenous people continue to evolve and be defined.

 

Government policy and its implementation regarding Indigenous consultation (including the requirements that are imposed on the mining industry) and accommodation continue to change. In certain circumstances, Indigenous communities are entitled to be consulted prior to, and during, resource development. The consultation and accommodation process and expectations of parties (government, Indigenous communities and industry proponents) involved can vary considerably from project to project, within stages of the project life and among Indigenous communities. There can be overlapping or inconsistent Indigenous or treaty claims respecting a project. These can contribute to process uncertainty, increased costs, delay in receiving required approvals, and potentially, an inability to secure the required approvals for a project, each of which could have a material adverse effect on the Company’s business, operations, results of operations, financial condition and future prospects.  In addition, the federal government has committed to introducing legislation to implement the United Nations Declaration on the Rights of Indigenous Peoples (“UNDRIP”)Some provinces and territories are also considering, or have introduced, similar legislation. It is uncertain how the federal and other governments intend to implement UNDRIP.  Implementation may add additional uncertainty as to the nature and extent of Aboriginal rights or title and may also include new processes and additional consultation requirements for project development and operations, which may increase costs, increase approval timelines and impose development and operational additional obligations or restrictions.

 

 
112 | Page

 

 

Our current operations and current and future exploration program may be subject to a risk that one or more groups of Indigenous people may oppose the operations or development of any of our properties or on properties in which we hold a direct or indirect interest, even where we have entered into agreements with applicable Indigenous and non-Indigenous authorities. Such opposition may be directed through legal or administrative proceedings or expressed in manifestations such as protests, roadblocks or other forms of public expression against our activities. Opposition by Indigenous people to our operations may require modification of or preclude development of our projects or may require us to enter into agreements with Indigenous people with respect to projects on such properties. Such agreements or restrictions on operations may have a material adverse effect on our business, financial condition and results of operations. Even where such agreements have been entered into, there can be no certainty that there will not be disagreements between the Company and groups or sub-groups of Indigenous persons which may result in project delays or have other material adverse effects on the Company. In January 2022, we became aware that the Cat Lake First Nation and certain other parties filed a Statement of Claim against the Crown seeking an order from the Ontario Superior Court of Justice that all mineral tenure over which the Cat Lake First Nation claim exclusive aboriginal title (which includes the land where the Springpole Project is situated) be returned to them and all mining permits, leases, licenses and patents in respect of such lands be cancelled. We recently became aware that the Crown’s Statement of Defence was filed on February 10, 2023, with the Crown seeking a dismissal of the Cat Lake Claim and putting forward a cross-claim against the Province of Ontario for contribution and indemnity in the event Canada is found liable to pay monies to the Cat Lake First Nation as a result of the Cat Lake Claim. We are continuing to monitor this claim but there is no assurance it will be resolved in favour of the Crown. If the claim is resolved in favour of the Cat Lake First Nation this could have a material and adverse effect on our ability to operate and develop the Springpole Project. In addition, even if the Cat Lake First Nation’s claim is not wholly successful, it could result in process uncertainty, increased costs, delay in receiving required approvals, and potentially, an inability to secure the required approvals for the Springpole Project.

 

 
113 | Page

 

 

Regulatory risks

 

Government approvals

 

Our activities are subject to government approvals, various laws governing prospecting, development, land resumptions, production taxes, labour standards and occupational health, mine safety, toxic substances and other matters, including issues affecting local Indigenous populations. The costs associated with compliance with these laws and regulations can be substantial. Although we believe our activities are carried out in accordance with all applicable rules and regulations, no assurance can be given that new rules and regulations will not be enacted or that existing rules and regulations will not be applied in a manner which could limit or curtail production or development, or cause additional expense, capital expenditures, restrictions or delays in the development of our properties. Amendments to current laws and regulations governing operations and activities of exploration and mining, or more stringent implementation thereof, could have a material adverse impact on our business, operations and financial performance. Further, the mining licenses and permits issued in respect of our projects may be subject to conditions which, if not satisfied, may lead to the revocation of such licenses. In the event of revocation, the value of our investments in such projects may decline.

 

Mineral claims, licenses and permitting

 

Our mineral claims, licenses and permits are subject to periodic renewal and may only be renewed a limited number of times for a limited period of time. While we anticipate that renewals will be given as and when sought, there is no assurance that such renewals will be given as a matter of course and there is no assurance that new conditions will not be imposed in connection therewith. Our business objectives may also be impeded by the costs of holding and/or renewing the mineral claims, licenses and permits. In addition, the duration and success of efforts to obtain and renew mineral claims, licenses and permits are contingent upon many variables not within our control.

 

Our current and anticipated future operations, including further exploration, development activities and commencement of production on our properties, require licenses and permits from various governmental authorities. Our business requires many environmental, construction and mining permits, each of which can be time-consuming and costly to obtain, maintain and renew. In connection with our current and future operations, we must obtain and maintain a number of permits that impose strict conditions, requirements and obligations on the Company, including those relating to various environmental and health and safety matters. To obtain, maintain and renew certain permits, we are required to conduct environmental assessments pertaining to the potential impact of our operations on the environment and to take steps to avoid or mitigate those impacts. We cannot be certain that all licenses and permits that we may require for our operations will be obtainable on reasonable terms or at all. Delays or a failure to obtain such licenses and permits, or a failure to comply with the terms of any such licenses and permits that we have obtained, could have a material adverse impact on First Mining.

 

On August 28, 2019, the Impact Assessment Act came into force and replaced the Canadian Environmental Assessment Act, thereby establishing a new environmental assessment process. It is uncertain how the new assessment process adopted by the federal government will result in a more efficient approval process. The Impact Assessment Act broadens the assessment factors to include health, economy, social, gender, and sustainability considerations. On October 13, 2023, the Supreme Court of Canada ruled that sections of the federal Impact Assessment Act are unconstitutional, and the federal government has indicated that it will make changes to align the Act with the Supreme Court’s ruling. The lack of regulatory certainty is likely to have an influence on investment decisions for major projects. Even when projects are approved on a federal level, such projects often face further delays due to interference by provincial and municipal governments, as well as court challenges related to issues such as Indigenous rights, the government’s duty to consult and accommodate Indigenous peoples and the sufficiency of the relevant environmental review processes. Such political and legal opposition creates further uncertainty.

 

 
114 | Page

 

 

Anti-bribery legislation

 

Our activities are subject to a number of laws that prohibit various forms of corruption, including domestic laws, that prohibit both commercial and official bribery and anti-bribery laws that have a global reach such as the Corruption of Foreign Public Officials Act. The increasing number and severity of enforcement actions in recent years present particular risks with respect to our business activities, to the degree that any employee or other person acting on our behalf might offer, authorize, or make an improper payment to a government official, party official, candidate for political office, or political party, an employee of a state-owned or state-controlled enterprise, or an employee of a public international organization.

 

Environmental risks

 

Environmental laws and regulations

 

All phases of the mining business present environmental risks and hazards and are subject to environmental regulation pursuant to a variety of international conventions and state and municipal laws and regulations. Environmental legislation provides for, among other things, restrictions, conditions and prohibitions on, amongst other things, spills, releases or emissions of various substances produced in association with mining operations and development. The legislation also requires that mines and exploration sites be operated, maintained, abandoned and reclaimed to the satisfaction of applicable regulatory authorities and may require the deposit of adequate reclamation and remediation security. Compliance with such legislation can require significant expenditures and a breach may result in the imposition of fines and penalties, some of which may be material. Environmental legislation is evolving in a manner expected to result in stricter standards and enforcement, larger fines and liability and potentially increased capital expenditures and operating costs. Environmental assessments of proposed projects carry a heightened degree of responsibility for companies and directors, officers and employees. Companies engaged in exploration and development of mineral properties may from time to time experience increased costs and delays in exploration and production as a result of the need to comply with applicable laws, regulations and permits. The cost of compliance with changes in governmental regulations has a potential to reduce the profitability of operations.

 

We believe we are in substantial compliance with all material laws and regulations which currently apply to our activities. We cannot give any assurance that, notwithstanding our precautions and limited history of activities, breaches of environmental laws (whether inadvertent or not) or environmental pollution will not result in additional costs or curtailment of planned activities and investments, which could have a material and adverse effect on our future cash flows, earnings, results of operations and financial condition. Failure to comply with applicable laws, regulations, and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Companies engaged in mining operations may be required to compensate those suffering loss or damage by reason of the mining activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations and, in particular, environmental laws even where there has been no intentional wrong-doing.

 

 
115 | Page

 

 

Amendments to current laws, regulations and permits governing operations and activities of mining companies, or more stringent implementation thereof, could have a material adverse impact on us and cause increases in capital expenditures or any future production costs or require abandonment or delays in the development of new mining properties.

 

Compliance with emerging climate change regulations

 

Climate change is an international concern and poses risks to issuers of both direct and indirect effects of physical climate changes and government policy including climate change legislation and treaties. Both types of risks could result in increased costs, and therefore decreased profitability of our operations. Governments at all levels may be moving towards enacting legislation to address climate change concerns, such as requirements to reduce emission levels and increase energy efficiency, and political and economic events may significantly affect the scope and timing of climate change measures that are ultimately put in place. Where legislation has already been enacted, such regulations may become more stringent, which may result in increased costs of compliance. There is no assurance that compliance with such regulations will not have an adverse effect on our results of operations and financial condition. Furthermore, given the evolving nature of the debate related to climate change and resulting requirements, it is not possible to predict the impact on our results of operations and financial condition.

 

Physical impacts of climate change

 

Climate change may result in a number of physical impacts on our business, including an increasing frequency of extreme weather events (such as increased periods of snow and increased frequency and intensity of storms), water shortages and extreme temperatures, which have the potential to disrupt our exploration and development plans and may have other impacts on our business, including transportation difficulties and supply disruptions for, amongst other things, consumables (diesel, tires, sodium cyanide, etc.) and reagents. There can be no assurance that efforts to mitigate the risks of climate changes will be effective and that the physical risks of climate change will not have an adverse effect on the Company’s operations and profitability.

 

Industry risks

 

Speculative nature of mineral development activities

 

Resource exploration and development is a speculative business, characterized by a number of significant risks including, among other things, unprofitable efforts resulting not only from the failure to discover mineral deposits but from finding mineral deposits which, though present, may, for a variety of factors not be economic to produce.

 

The marketability of minerals acquired or discovered by us may be affected by numerous factors which are beyond our control and which cannot be accurately predicted, such as:

 

 

market fluctuations;

 

 

 

 

the proximity and capacity of milling facilities;

 

 

 

 

mineral markets;

 

 

 

 

processing equipment; and

 

 

 

 

government regulations, including regulations relating to royalties, allowable production, importing and exporting of minerals and environmental protection.

 

 
116 | Page

 

 

Estimates of Mineral Resources, Mineral Reserves, mineral deposits and production costs can also be affected by such factors as:

 

 

environmental permitting regulations and requirements;

 

 

 

 

weather;

 

 

 

 

environmental factors;

 

 

 

 

unforeseen technical difficulties;

 

 

 

 

unusual or unexpected geological formations; and

 

 

 

 

work interruptions.

 

In addition, the grade of mineralized material ultimately mined may differ from that indicated by drilling results.

 

Short term factors relating to mineral properties, such as the need for orderly development of mineralized bodies or the processing of new or different grades, may also have an adverse effect on mining operations and on the results of operations. Material changes in Mineral Reserves, grades, stripping ratios or recovery rates may affect the economic viability of any project.

 

Our mineral properties are all in the exploration stage only and are without known bodies of commercial mineralized material. Few properties which are explored are ultimately developed into producing mines. Major expenses may be required to establish Mineral Reserves, develop metallurgical processes and construct mining and processing facilities at a particular site. There is no assurance that our mineral exploration activities will result in any discoveries of new commercial bodies of mineralized material. There are no reassurances that commercial production activities will commence on any of our properties.

 

Competition

 

The mining industry is highly competitive. We compete with companies for the acquisition, exploration and development of gold and other precious and base metals, and for capital to finance such activities, and such companies may have similar or greater financial, technical and personnel resources available to them.

 

Other risks

 

Reliance on key employees

 

We manage our business with a number of key personnel, including key contractors, the temporary or permanent loss or unavailabilityof a number of whom could have a material adverse effect on us. In addition, as our business develops and expands, we believe that our future success will depend greatly on our continued ability to attract and retain highly-skilled and qualified personnel and contractors. In assessing the risk of an investment in our shares, potential investors should realize that they are relying on the experience, judgment, discretion, integrity and good faith of our management team and board of directors. We cannot be certain that key personnel will continue to be employed by us or that we will be able to attract and retain qualified personnel and contractors in the future. Failure to retain or attract key personnel could have a material adverse effect on us. We do not maintain “key person” insurance policies in respect of our key personnel.

 

 
117 | Page

 

 

Conflicts of interest

 

Certain directors and officers will be engaged in, and will continue to engage in, other business activities on their own behalf and on behalf of other companies (including mineral companies) and, as a result of these and other activities, such directors and officers may become subject to conflicts of interest from time to time. In addition, Keith Neumeyer, a director of the Company, is the Chief Executive Officer of First Majestic and Raymond Polman, a director of the Company, is a director of First Majestic, and accordingly, may be considered to have a conflict of interest with respect to First Majestic and the Springpole Stream Agreement. The BCBCA provides that if a director or senior officer has a material interest in a contract or proposed contract or agreement that is material to the issuer, the director or senior officer must disclose their interest in such contract or agreement and must refrain from voting on any matter in respect of such contract or agreement, subject to and in accordance with the BCBCA. To the extent that conflicts of interest arise, such conflicts will be resolved in accordance with the provisions of the BCBCA and in accordance with our Code of Business Conduct and Ethics. As a result of a conflict of interest, we may miss the opportunity to participate in certain transactions, which may have a material adverse effect on our financial position.

 

Uninsured risks

 

Our business is subject to a number of risks and hazards, including adverse environmental conditions, industrial accidents, labour disputes, unusual or unexpected geological conditions, ground or slope failures, cave-ins, changes in the regulatory environment and natural phenomena, such as inclement weather conditions, floods and earthquakes. Such occurrences could result in damage to our properties, personal injury or death, delays in program development, monetary losses and possible legal liability.

 

Despite efforts to attract and retain qualified personnel, as well as the retention of qualified consultants, to manage our interests, even when those efforts are successful, people are fallible and human error and mistakes could result in significant uninsured losses to us. These could include, but are not limited to, loss or forfeiture of mineral claims or other assets for non‐payment of fees or taxes, erroneous or incomplete filings or non‐fulfillment of other obligations, significant tax liabilities in connection with any tax planning effort we might undertake or mistakes in interpretation and implementation of tax laws and practices, and legal claims for errors or mistakes by our personnel.

 

Although we maintain insurance to protect against certain risks in amounts that we consider reasonable, our insurance will not cover all the potential risks associated with our operations. We may also be unable to maintain insurance to cover these risks at economically feasible premiums. Insurance coverage may not continue to be available or may not be adequate to cover any resulting liability. Moreover, insurance against certain risks, such as environmental pollution or other hazards as a result of exploration and production, is not generally available to us or to other mineral exploration companies on acceptable terms. We may also become subject to liability for pollution or other hazards which may not be insured against or which we may elect not to insure against because of premium costs or other reasons. Losses from these events may cause us to incur significant costs that could have a material adverse effect upon our financial performance, results of operations and business outlook.

 

Litigation and regulatory proceedings

 

We may be subject to civil claims (including class action claims) based on allegations of negligence, breach of statutory duty, public nuisance or private nuisance or otherwise in connection with our operations, or investigations relating thereto. While we are presently unable to quantify any potential liability under any of the above heads of damage, such liability may be material to us and may materially adversely affect our ability to continue operations. In addition, we may be subject to actions or related investigations by governmental or regulatory authorities in connection with our business activities, including, but not limited to, current and historic activities at our mineral properties. Such actions may include prosecution for breach of relevant legislation or failure to comply with the terms of our licenses and permits and may result in liability for pollution, other fines or penalties, revocations of consents, permits, approvals or licenses or similar actions, which could be material and may impact the results of our operations. Our current insurance coverage may not be adequate to cover any or all the potential losses, liabilities and damages that could result from the civil and/or regulatory actions referred to above.

 

 
118 | Page

 

 

Future Acquisitions and Dispositions

 

As part of our business strategy, we have sought and may continue to seek new mining and exploration opportunities in the mining industry and may dispose of certain of our properties in the future. In pursuit of acquisition opportunities, we may fail to select appropriate acquisition targets or negotiate acceptable arrangements, including arrangements to finance acquisitions or integrate the acquired businesses into us. Ultimately, any acquisitions would be accompanied by risks, which could include:

 

 

a significant change in commodity prices after we have committed to complete the transaction and established the purchase price or exchange ratio;

 

 

 

 

a material ore body could prove to be below expectations;

 

 

 

 

difficulty in integrating and assimilating the operations and workforce of any acquired companies;

 

 

 

 

realizing anticipated synergies and maximizing the financial and strategic position of the combined enterprise;

 

 

 

 

the bankruptcy of parties with whom we have arrangements;

 

 

 

 

maintaining uniform standards, policies and controls across the organization;

 

 

 

 

disruption of our ongoing business and its relationships with employees, suppliers, contractors and other stakeholders as we integrate the acquired business or assets;

 

 

 

 

the acquired business or assets may have unknown liabilities which may be significant;

 

 

 

 

delays as a result of regulatory approvals; and

 

 

 

 

exposure to litigation (including actions commenced by shareholders) in connection with the transaction.

 

Any material issues that we encounter in connection with an acquisition could have a material adverse effect on our business, results of operations and financial position. In addition, when negotiating disposition arrangements we may be required to provide a potential purchaser with contractual indemnities which could lead to potential liability and have a material adverse impact on our financial performance, cash flow and results of operations.

 

The Company cannot assure that it can complete any acquisition, disposition or business arrangement that it pursues on favourable terms, or that any acquisitions, dispositions or business arrangements completed will ultimately benefit the Company. In addition, future acquisitions by the Company may be completed through the issuance of debt or equity, and in the case of equity, the interests of shareholders in the net assets of the Company may be diluted.

 

 
119 | Page

 

 

Joint ventures

 

Our business plan anticipates that we may retain interest in properties which we have transferred in whole or in part to other parties who may choose to establish mining operations, and that interest may be in the form of a joint venture or earn-in arrangement, such as the Pickle Crow Earn-In Agreement entered into in relation to the Pickle Crow Project and the Hope Brook Earn-In Agreement entered into in relation to the Hope Brook Project. The existence or occurrence of one or more of the following circumstances and events could have a material adverse impact on our profitability or the viability of our interests that may be held through joint venture arrangements, including the Pickle Crow Project and Hope Brook Project, which could have a material adverse impact on our future cash flows, earnings, results of operations and financial condition:

 

 

disagreements with joint venture partners on how to develop and operate mines efficiently;

 

 

 

 

inability to exert influence over certain strategic decisions made in respect of joint venture properties;

 

 

 

 

inability of joint venture partners to meet their obligations to the joint venture or third parties; and

 

 

 

 

litigation between joint venture partners regarding joint venture matters.

 

We are not to be the operator of the Pickle Crow Project or the Hope Brook Property and therefore the success of any operations will be dependent on our joint venture partner (who will act as operator). We are subject to the decisions made by the operator in the operation of the Pickle Crow Project and the Hope Brook Property and we will have to rely on the operator for accurate information about the project. Failure by the operator to prudently manage the operations of the Pickle Crow Project could have a material adverse effect on our business, results of operations and financial position. In addition, in the future, we may become responsible for funding our pro rata share of expenditures at the Pickle Crow Project, in the event we do not fund these expenditures, our interest in the Pickle Crow Project will be diluted which could have a material adverse effect on our business, results of operations and financial position.

 

Future Sales of Shares

 

Sales of a substantial number of our shares in the public market could occur at any time following, or in connection with, the completion of any offering. These sales, or the market perception that the holders of a large number of our shareholders intend to sell our shares, could reduce the market price of our shares. A decline in the market price of the shares could impair our ability to raise additional capital through the sale of securities should we desire to do so.

 

The issuance of shares to shareholders whose investment profile may not be consistent with our business may lead to significant sales of our shares or a perception that such sales may occur, either of which could have a material adverse effect on the market for and market price of our shares. In addition, exchange traded funds may from time to time rebalance their portfolio holdings which could result in the sale of a significant number of our shares in a short period. We are unable to predict the effect that sales may have on the then prevailing market price of our shares.

 

 
120 | Page

 

 

Reputation Loss

 

Reputation loss may result in decreased investor confidence, increased challenges in developing and maintaining community relations and an impediment to our overall ability to advance our projects, thereby having a material adverse impact on our financial performance, financial condition and growth prospects. Damage to our reputation can be the result of the actual or perceived occurrence of any number of events, and could include any negative publicity (for example, with respect to our handling of environmental matters or our dealings with community groups), whether true or not. The increased usage of social media and other web-based tools used to generate, publish and discuss user-generated content and to connect with other users has made it increasingly easier for individuals and groups to communicate and share opinions and views in regards to us and our activities, whether true or not. We do not ultimately have direct control over how we are perceived by others and reputational loss could have a material adverse impact on our financial performance, financial condition and growth prospects.

 

Equity Price Risk

 

The Company is exposed to equity price risk as a result of holding investments in equity securities of several other mineral property related companies.

 

Interest Rate Risk

 

Interest rate risk is the risk that future cash flows will fluctuate as a result of changes in market interest rates. The Company does not have any borrowings that are subject to fluctuations in market interest rates. Accordingly, the Company’s interest rate risk is limited to potential decreases on the interest rate offered on cash and cash equivalents held with chartered Canadian financial institutions.

 

Commodity Price Risk

 

The Company is subject to commodity price risk from fluctuations in the market prices for gold and silver. Commodity price risks are affected by many factors that are outside the Company’s control including global or regional consumption patterns, the supply of and demand for metals, speculative activities, the availability and costs of metal substitutes, inflation, and political and economic conditions. The changes in commodity prices could have a material adverse effect on the business, operations and financial condition of the Company.

 

Credit Risk

 

Credit risk is the risk of financial loss to the Company if a counterparty to a financial instrument fails to meet its contractual obligations. Financial instruments which are potentially subject to credit risk for the Company consist primarily of cash and cash equivalents, accounts and other receivables, and the reclamation deposit. The Company seeks to manage credit risk with respect to its cash and cash equivalents by holding its cash and cash equivalents through high credit quality major Canadian financial institutions as determined by rating agencies.

 

Liquidity Risk

 

Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they become due.  The Company’s policy is to ensure that it will have sufficient cash to allow it to meet its liabilities when they become due, under both normal and stressed conditions, without incurring unacceptable losses or risking damage to the Company’s reputation.  The Company manages its liquidity risk by preparing annual estimates of exploration and administrative expenditures and monitoring actual expenditures compared to the estimates to endeavour to ensure that there is sufficient capital on hand to meet ongoing obligations.

 

 
121 | Page

 

 

Capital Risk Management

 

The Company’s objectives when managing capital are to safeguard the Company’s ability to continue as a going concern in order to pursue the exploration and retention of its mineral properties.  The Company has historically demonstrated the ability to raise new capital through equity issuances and/or through surplus cash as part of its acquisitions.  In the management of capital, the Company includes the components of shareholders’ equity as well as cash. The Company prepares annual estimates of exploration and administrative expenditures and monitors actual expenditures compared to the estimates of ensure that there is sufficient capital on hand to meet ongoing obligations.  Despite this, there can be no assurance that the Company will be able to continue to secure additional financing in the future on terms that are favourable. This gives rise to a material uncertainty that may cast substantial doubt upon the Company’s ability to continue as a going concern, which would adversely affect its ability to realize its assets and discharge its liabilities in the normal course of business.  The annual consolidated financial statements do not give effect to any adjustments to the carrying values of the assets and liabilities, the reported expenses, and the statements of financial position classifications used that would be necessary should the Company be unable to continue as going concern. Such adjustments could be material.

 

Financing Risks

 

The Company has finite financial resources, has no current source of operating cash flow and has no assurance that additional funding will be available to it for its future activities, including exploration or development of mineral projects. Such further activities may be dependent upon the Company’s ability to obtain financing through equity or debt financing or other means. Global financial markets, and the economy in general, are continuing to experience extreme volatility which may impact our ability to obtain financing. Failure to obtain additional financing could result in delay or indefinite postponement of exploration and development of the Company’s existing mineral projects and could result in the loss of one or more of its properties.

 

Legal proceedings

 

There are no material legal proceedings which we are or were a party to or to which our properties are or were subject, either during the financial year ended December 31, 2023 or as of the date of this AIF, nor are we aware that any material proceedings are contemplated.

 

During the financial year ended December 31, 2023, and as of the date of this AIF, we have not had any penalties or sanctions imposed by a court relating to securities legislation or by a securities regulatory authority, or by a court or regulatory body. We have also never been involved in a settlement agreement before a court relating to securities legislation or with a securities regulatory authority.

 

Information Security

 

We have become increasingly dependent upon the development and maintenance of information technology systems that support the general operation of our business. Exposure of our information technology infrastructure to external threats poses a risk to the security of these systems. Such cyber security threats include unauthorized access to information technology systems due to hacking, viruses and other deliberate or inadvertent causes that can result in service disruptions, system failures and the disclosure of confidential business information. Any such information security risks may be increased given the increased remote access to our information and technology systems.

 

The Company applies risk management controls in line with industry accepted standards to protect our information assets and systems; however, these controls may not adequately protect against cyber security breaches. There is no assurance that we will not suffer losses associated with cyber security breaches in the future, including with respect to negative effects on our operational performance, the incurrence of regulatory penalties, reputational damage and costs required to investigate, mitigate and remediate any potential vulnerabilities.

 

 
122 | Page

 

 

Internal Controls

 

Effective internal controls are necessary for the Company to provide reliable financial reports and to help prevent fraud. Although we undertake a number of procedures in order to help ensure the reliability of our financial reports, including those imposed on us under Canadian and United States securities laws, we cannot be certain that such measures will ensure that the Company will maintain adequate control over financial processes and reporting. Failure to implement required new or improved controls, or difficulties encountered in their implementation, could impact the Company's results of operations or cause it to fail to meet its reporting obligations. If the Company or its independent auditors discover a material weakness, the disclosure of that fact, even if quickly remedied, could reduce the market’s confidence in the Company’s financial statements and reduce the trading price of the common shares.

 

Investor information

 

Share capital

 

Our authorized share capital consists of:

 

an unlimited number of common shares; and

an unlimited number of preferred shares, issuable in series.

 

Common shares

 

We can issue an unlimited number of common shares with no nominal or par value. As of December 31, 2023 we had 916,414,375 common shares outstanding and as of the date of this AIF we had —--- common shares outstanding. All of our outstanding common shares are fully paid and non-assessable.

 

The following is a summary of the principal attributes of our common shares:

 

Voting rights

 

Holders of our common shares are entitled to vote on all matters that are to be voted on at any shareholder meeting, other than meetings that are only for holders of another class or series of shares. Each common share you own represents one vote. There are no cumulative voting rights, and directors do not stand for re-election at staggered intervals.

 

Dividends

 

Holders of our common shares are entitled to share pro ratain any profits of First Mining to the extent that such profits are distributed either through the declaration of dividends by our Board or otherwise distributed to shareholders. There are no indentures or agreements limiting the payment of dividends. The Company has not paid any dividends since incorporation and it has no plans to pay dividends for the foreseeable future.

 

 
123 | Page

 

 

Rights on dissolution

 

In the event of the liquidation, dissolution or winding up of First Mining, the holders of our common shares will be entitled to receive, on a pro rata basis, all of our assets remaining after payment of all of our liabilities.

 

Pre-emptive, conversion and other rights

 

Holders of our common shares have no pre-emptive, redemption, purchase or conversion rights attaching to their shares, and our common shares, when fully paid, will not be liable to further call or assessment. No other class of shares may be created without the approval of the holders of our common shares. There are no provisions discriminating against any existing or prospective holder of our common shares as a result of such shareholder owning a substantial number of common shares. In addition, non-residents of Canada who hold our common shares have the same rights as shareholders who are residents of Canada.

 

Preferred shares

 

We can issue an unlimited number of preferred shares with no nominal or par value. As of the date of this AIF, we did not have any preferred shares outstanding.

 

The preferred shares are issuable in series. The preferred shares of each series rank in parity with the preferred shares of every other series with respect to dividends and return of capital and are entitled to a preference over the common shares and any other shares ranking junior to the preferred shares with respect to priority in the payment of dividends and the distribution of assets in the event of the liquidation, dissolution or winding-up of First Mining.

 

Our Board is empowered to fix the number of shares and the rights to be attached to the preferred shares of each series, including the amount of dividends and any conversion, voting and redemption rights. Subject to our articles of incorporation and to applicable law, the preferred shares as a class are not entitled to receive notice of or attend or vote at meetings of the Company’s shareholders.

 

Security-based compensation and convertible securities

 

Security-based compensation

 

The Company’s amended & restated share-based compensation plan (the “Amended and Restated Share-Based Compensation Plan”) dated April 29, 2022, and the unallocated entitlements under the plan were most recently approved by the Company’s shareholders on June 9, 2022. The maximum number of common shares issuable under the Amended and Restated Share-Based Compensation Plan, together with the number of common shares issuable under any other security-based compensation arrangement of the Company, shall not in the aggregate exceed 10% of our issued and outstanding common shares.

 

The Amended and Restricted Share-Based Compensation Plan allows for the issuance of up to 10% of our issued and outstanding common shares as incentive share options (“Options”), bonus shares, restricted share units (“RSUs”), performance share units (“PSUs”) and deferred share units (“DSUs”) to our directors, officers, employees and consultants.

 

For a full description of the Amended and Restated Share-Based Compensation Plan, see Appendix A of our management information circular dated April 29, 2022, a copy of which can be found under our SEDAR+ profile at www.sedarplus.ca.

 

 
124 | Page

 

 

As of December 31, 2023 there were 45,060,000 Options outstanding, with exercise prices ranging from $0.155 to $0.435 and expiry dates ranging from January 7, 2024 to August 15, 2028. As of the date of this AIF there were 65,405,000 Options outstanding, with exercise prices ranging from $0.117 to $0.435 and expiry dates ranging from January 31, 2025 to February 14, 2029.

 

As of December 31, 2023 and as of the date of this AIF, there were 3,613,715 and 10,551,283 RSUs outstanding, respectively.

 

As of December 31, 2023 and as of the date of this AIF, there were 6,813,000 and 10,466,000 PSUs outstanding, respectively.

 

As of December 31, 2023 and as of the date of this AIF, there were 1,109,000 and 1,509,000 DSUs outstanding, respectively.

 

As of December 31, 2023, there were 84,639,987 share purchase warrants outstanding to acquire First Mining Shares at exercise prices ranging from $0.20 to $0.374, and with expiry dates ranging from July 2, 2025 to December 7, 2026. As of the date of this AIF, there were 84,639,987 share purchase warrants outstanding.

 

Escrowed securities

 

As at December 31, 2023, no First Mining Shares were subject to a contractual restriction on transfer and the following First Mining Shares, held by a vendor of a property the Company had acquired in February 2022, were held in escrow pursuant to the terms of an escrow agreement:

 

Designation of Class

Number of Securities Subject to Escrow

Percentage of Class

Common Shares

500,000(1)

0.05%

 

Notes:

 

 

(1)

As of the date of this AIF, 500,000 First Mining Shares remain in escrow, and will be released from escrow on the earlier of January 31, 2026 and the date a joint written direction is provided to the escrow agent by the parties to the escrow agreement.

            

Material contracts

 

With the exception of contracts made in the ordinary course of business, as of the date of this AIF, we have no material contracts other than the following:

 

Hope Brook Earn-In Agreement

 

On April 5, 2021, we entered into the Hope Brook Earn-In Agreement with Big Ridge pursuant to which Big Ridge may earn up to an 80% interest in the Hope Brook Project through a two-stage earn-in over five years. As upfront consideration, we received $500,000 cash and 11,500,000 common shares of Big Ridge (“Big Ridge Shares”) upon closing in June 2021.

   

On September 13, 2021, Big Ridge completed the Stage 1 Earn-In, increasing its ownership interest in Hope Brook to 51%.

 

On March 21, 2024, we entered into an Amending Agreement (“Amending Agreement”) with Big Ridge for the Stage 2 Earn-In.

 

The key terms of the Hope Brook Earn-In Agreement and Amending Agreement are as follows:

 

 
125 | Page

 

 

Stage 1 Earn-In (51% earn-in)

 

Up Until June 8, 2024 (the third anniversary of the closing date), Big Ridge can acquire a 51% interest in the Hope Brook Project and form a joint venture with First Mining by:

 

 

incurring $10 million in qualifying expenditures on the Hope Brook Project;

 

 

 

 

issuing an additional 15 million Big Ridge Shares to First Mining; and

 

 

 

 

granting to First Mining a 1.5% NSR royalty on the Hope Brook Project (Big Ridge can buy-back 0.5% of the NSR royalty for $2 million).

 

Big Ridge satisfied the Stage 1 Earn-In conditions on September 13, 2022 and accordingly now owns 51% of the Hope Brook Project.

 

Stage 2 Earn-In (additional 29% to earn-in to 80%) – Original Agreement

 

Following completion of the Stage 1 Earn-In, and up until June 8, 2026 (the fifth anniversary of the closing date), Big Ridge can increase its ownership interest in Hope Brook to 80% by:

 

 

incurring an additional $10 million in qualifying expenditures on the Hope Brook Project; and

 

 

 

 

issuing to First Mining the lesser of: (i) 10 million Big Ridge Shares; and (ii) such number of Big Ridge Shares that would result in First Mining owning 19.9% of the issued and outstanding Big Ridge Shares (post-issuance).

  

Stage 2 Earn-In (additional 29% to earn-in to 80%) – Amending Agreement

 

Following completion of the Stage 1 Earn-In, and up until April 2, 2024, Big Ridge can increase its ownership interest in Hope Brook to 80% by notifying First Mining of the exercise of the Second Earn-In right by no later than March 21, 2024 and by:

 

 

·

issuing to First Mining 10 million Big Ridge shares

 

 

 

 

·

arranging for the purchase of all of First Mining’s common shares of Big Ridge, totaling 36.5 million, inclusive of the 10 million shares to be issued in the Stage 2 Earn-In

   

If the Amending Agreement is not completed by April 2, 2024, the Stage 2 Earn-In will revert to the Original Agreement.

  

Additional Terms

 

 

For so long as we own at least 10% of the issued and outstanding Big Ridge Shares:

 

 

(i)

we are entitled to have one nominee elected or appointed to Big Ridge’s board of directors;

 

 

 

 

(ii)

we have the right to participate in any equity financings undertaken by Big Ridge so as to maintain our percentage ownership of Big Ridge; and

 

 

(iii)

we have agreed to certain resale restrictions on any Big Ridges Shares issued to us under the Hope Brook Agreement pursuant to which we are required to first notify Big Ridge of our intent to sell, after which Big Ridge shall have ten business days to arrange the sale of the Big Ridge Shares that we wish to sell as a block to one purchaser (if they cannot arrange this within that time period, we will have 60 days within which to sell in pre-arranged blocks of any size and at any price; for on-market sales, we have agreed to limit daily sales to 10% of the 10-day trailing average of Canadian consolidated trading volumes for Big Ridge Shares).

 

 

We are free carried until Big Ridge announces the results of a feasibility study for the Hope Brook Project, after which we will be responsible for our pro rata share of expenditures in accordance with the percentage of our joint venture interest at that time.

 

 

 

 

Upon the commencement of commercial production at the Hope Brook Project, Big Ridge will pay us $2 million cash.

 

 
126 | Page

 

 

 

The joint venture entity that is formed will be required to pay us a royalty of US$1 per tonne of aggregate material sold from the Hope Brook Project pursuant to the terms of a royalty agreement, the form of which was agreed to with Big Ridge at closing and that will be entered into between us and the joint venture entity prior to the sale of any aggregate material from the Hope Brook Project.

 

 

 

 

Big Ridge has a right of first refusal with respect to any retained project interest that First Mining wishes to sell, and a “tag-along” right for First Mining in the event Big Ridge wishes to sell its interest in the Hope Brook Project to a third party (this right does not apply in the context of a merger, takeover bid, amalgamation or any other change of control transaction of Big Ridge)

 

Pickle Crow Earn-In Agreement

 

On March 12, 2020, we entered into the Pickle Crow Earn-In Agreement with FireFly pursuant to which FireFly may earn up to an 80% interest in PC Gold, a wholly-owned subsidiary of First Mining that owns the Pickle Crow Project.  As of December 31, 2023 and as of the date of this AIF, FireFly had satisfied the Stage 1 and Stage 2 earn-in conditions and has accordingly acquired a 70% interest in PC Gold.  During the term of the Pickle Crow Earn-In Agreement, FireFly will be the operator of the Pickle Crow Project and will be responsible for all project expenditures.

 

As upfront consideration, we received $50,000 cash in January 2020 (as consideration for entering into a term sheet as a precursor to the definitive agreement), and we received $50,000 in cash concurrently with the execution of the Pickle Crow Earn-In Agreement. In addition, First Mining received 25,000,000 shares of FireFly (“FireFly Shares”) in connection with the execution of the Pickle Crow Earn-In Agreement.

 

The key terms of the Pickle Crow Earn-In Agreement are as follows:

 

Stage 1 Earn-In (51% earn-in)

 

Three-year initial earn-in period for FireFly to acquire a 51% interest in PC Gold (and thereby a 51% interest in the Pickle Crow Project) by:

 

 

incurring $5 million of exploration and environmental expenditures on the Pickle Crow Project, of which $750,000 in exploration expenditures must be incurred within the first 12 months; and

 

 

 

 

issuing an additional 100,000,000 FireFly Shares to First Mining (the “Stage 1 Earn-In Shares”).

 

FireFly satisfied the Stage 1 Earn-In conditions on June 4, 2021.

 

Stage 2 Earn-In (additional 19% to earn-in to 70%)

 

Upon completion of the Stage 1 Earn-In, FireFly had a two-year follow-on period to acquire an additional 19% interest in PC Gold (and thereby an additional 19% interest in the Pickle Crow Project), by:

 

 

incurring a further $5 million of exploration expenditures on the Pickle Crow Project;

 

 

 

 

paying First Mining $1 million in cash payment within 90 days of incurring the above-mentioned additional exploration expenditures; and

 

 

 

 

granting First Mining a 2% NSR royalty on the Pickle Crow Project (1% of which can be bought back by FireFly for US$2.5 million).

 

 
127 | Page

 

 

FireFly satisfied the Stage 2 earn-in conditions on August 26, 2021.

 

Buy-In (additional 10% to earn-in to 80%)

 

With the Stage 2 Earn-In having been completed, FireFly now has an option to acquire an additional 10% of PC Gold (and thereby an additional 10% interest in the Pickle Crow Project), exercisable at any time after completion of the Stage 2 Earn-In, by paying First Mining $3 million in cash (the “Buy-In”).  In the event FireFly provides notice that it does not wish to proceed with the Buy-in, the Pickle Crow Earn-In Agreement will terminate and FireFly will retain its 70% interest in the property.

 

Joint Venture Shareholders’ Agreement

 

As required by the Pickle Crow Earn-In Agreement First Mining and FireFly executed a a joint venture shareholders’ agreement (the “Joint Venture Shareholders Agreement”) with respect to PC Gold on June 4, 2021.

 

The Joint Venture Shareholders Agreement provides that, until the Pickle Crow Earn-In Agreement is terminated or a decision to mine is made, FireFly will fund all exploration expenditures. Following this, each of First Mining and FireFly must fund expenditures pro rata in accordance with their respective interests or be diluted pursuant to a customary dilution formula. If a party’s interest is diluted below 5%, the other party will have the right to acquire such party’s interest at the fair market value (as determined in accordance with the Joint Venture Shareholders Agreement).

 

Currently First Mining is entitled to nominate two directors to the five-person board of PC Gold. The Joint Venture Shareholders Agreement provides that certain decisions must be made by shareholders with different approval thresholds (80%, 85% and unanimous respectively) for different matters.

 

The Joint Venture Shareholders Agreement also contains customary provisions, such as restrictions on the transfer of the interest of a party, a right of first refusal in favour of each party and tag-along and drag-along provisions.

 

A copy of the Pickle Crow Earn-In Agreement (which includes the Joint Venture Shareholders Agreement as a schedule) is available under our SEDAR+ profile at www.sedarplus.ca.

 

Silver Stream Agreement

 

On June 10, 2020, First Mining and its wholly-owned subsidiary, Gold Canyon, entered into the Silver Stream Agreement with First Majestic pursuant to which First Majestic agreed to purchase 50% of the payable silver produced from Springpole for the life of the project.

 

The key terms of the Silver Stream Agreement are as follows:

 

 
128 | Page

 

 

Consideration Details

 

 

In return for its share of payable silver produced from the Springpole Project once production has commenced, First Majestic will make ongoing cash payments to First Mining equal to 33% of the lesser of the average spot price of silver for the applicable calendar quarter, and the spot price of silver at the time of delivery, subject to a price cap of US$7.50 per ounce of silver (the “Price Cap”). The Price Cap is subject to annual inflation escalation of 2%, commencing at the start of the third year of commercial production at Springpole.

 

 

 

 

First Majestic agreed to pay US$10,000,000 to First Mining upon closing of transaction, with US$2,500,000 of this amount payable in cash, and the remaining US$7,500,000 payable in First Majestic Shares based on the volume-weighted average trading price (“VWAP”) of the First Majestic Shares on the TSX for the 20 trading days up to the day immediately prior to the closing date. These cash and share payments were made to First Mining when the Silver Stream transaction closed on June 10, 2020.

 

 

 

 

First Majestic agreed to pay First Mining an additional US$7,500,000 within five business days of a public announcement by First Mining of the completion of a positive PFS for Springpole, with US$3,750,000 of this amount payable in cash, and the remaining US$3,750,000 payable in First Majestic Shares (based on the 20-day VWAP of First Majestic Shares as of the date of First Mining’s public announcement). These cash and share payments were made to First Mining five business days after the Company’s news release in January 2021 announcing the positive results of a PFS for the Springpole Project.

 

 

 

 

First Majestic will pay a final amount of US$5,000,000 to First Mining upon the Company receiving approval of either a federal or provincial Environmental Assessment for Springpole, with US$2,500,000 million of this amount payable in cash, and the remaining US$2,500,000 million payable in First Majestic Shares (based on the 20-day VWAP of First Majestic Shares as of the date of such approval).

 

Other Transaction Terms

 

First Mining agreed to issue 30 million Warrants to First Majestic on the closing date of the Silver Stream Transaction, with each Warrant entitling First Majestic to purchase one common share of First Mining at an exercise price of $0.40 for a period of five years. These warrants were issued to First Majestic when the Silver Stream transaction closed on June 10, 2020. The Treasury Metals Distribution resulted in the adjustment provisions for these Warrants being triggered, and as a result, the exercise price of these Warrants was reduced to $0.374 and an additional 2,050,228 Warrants with a $0.374 exercise price were issued to First Majestic. As a result, First Majestic now holds a total of 32,050,228 Warrants at an exercise price of $0.374 which expire on July 2, 2025.

We have the right to repurchase 50% of the Silver Stream by paying US$22,500,000 to First Majestic at any time prior to the commencement of commercial production at Springpole.

We have granted a right of first refusal to First Majestic with respect to any future silver stream financings for Springpole.

First Mining and First Majestic agreed to form a three-member technical committee (the “Technical Committee”) comprised of two members from First Mining and one member from First Majestic. The Technical Committee will advise First Mining on metallurgical testing, process flow sheet development and through the completion of the PFS and Feasibility studies for Springpole. This Technical Committee was established following the closing of the Silver Stream transaction on June 10, 2020.

 

 
129 | Page

 

 

Market for our securities

 

Our common shares are listed and traded on the TSX under the symbol “FF”, on the OTC-QX under the symbol “FFMGF”, and on the Frankfurt Stock Exchange under the symbol “FMG”.

 

We have a registrar and transfer agent for our common shares:

 

Computershare Investor Services Inc.

510 Burrard Street, 2nd Floor

Vancouver, British Columbia V6C 3B9.

 

Prior sales

 

During our most recently completed financial year we issued the following securities which are not listed or quoted on a marketplace:

 

Stock Options

 

Date of Issuance

Number of Stock Options Issued

Exercise Price ($)

Expiry Date

February 14, 2023

16,075,000 (1)

0.19

February 14, 2028

April 18, 2023

60,000 (2)

0.19

April 18, 2028

June 7, 2023

200,000 (3)

0.185

June 7, 2028

July 5, 2023

575,000 (2)

0.175

July 5, 2028

August 15, 2023

50,000 (2)

0.155

August 15, 2028

TOTAL

16,960,000

 

 

Notes:

 

 

(1)

Issued to directors, officers, employees and consultants of First Mining.

 

(2)

Issued to employee(s) of First Mining.

 

(3)

Issued to a new employee of First Mining.

 

Restricted Share Units

 

Date of Issuance

Number of

Restricted Share Units Issued

February 14, 2023

2,817,045 (1)

 

Notes:

 

 

(1)

Issued to officers of First Mining.

 

 
130 | Page

 

 

Performance Share Units

 

Date of Issuance

Number of

Performance Share Units Issued

February 14, 2023

4,900,000 (1)

 

Notes:

 

 

(1)

Issued to certain officers and employees of First Mining.

 

Deferred Share Units

Date of Issuance

Number of

Deferred Share Units Issued

February 14, 2023

450,000 (1)

 

Notes:

 

 

(1)

Issued to two directors of First Mining.

          

Trading activity

 

The table below shows the high and low closing prices and trading volumes of our common shares on the TSX for each month of our most recently completed financial year.

 

2023

High ($)

Low ($)

Volume

January

0.245

0.205

10,205,700

February

0.213

0.18

5,808,030

March

0.19

0.165

11,704,080

April

0.19

0.17

8,784,670

May

0.19

0.175

9,483,774

June

0.185

0.16

8,017,743

July

0.18

0.16

7,981,573

August

0.165

0.135

11,158,820

September

0.145

0.13

9,165,440

October

0.155

0.12

13,914,955

November

0.14

0.115

12,848,556

December

0.14

0.125

10,611,179

 

 
131 | Page

 

 

               

 
132 | Page

 

 

Our team

 

Directors

 

All our directors are elected for a one-year term, and hold office until our next annual shareholder meeting, unless he or she resigns before that time or steps down, as required by corporate law. The information below as to principal occupation and shares beneficially owned has been furnished by the respective individuals. The directors of First Mining as of the date of this AIF are as follows:

 

Director

Board committees

Principal occupation or employment

for past five years

 

Keith Neumeyer

Zug, Switzerland

 

Chairman since

March 30, 2015

 

Audit Committee

 

Compensation Committee (Chair)

 

Corporate Governance &

Nominating Committee

 

 

Director and Chairman of First Mining since March 30, 2015 (founder of the Company)

 

November 2001 to present – Founder, President and Chief Executive Officer; December 1998 to present – Director, First Majestic Silver Corp. (mining company)

 

 

Ownership of Securities:

29,905,313 shares

4,037,500 options

 

 

969,500 DSUs

5,000,000 warrants

 

 

Director

Board committees

Principal occupation or employment

for past five years

 

Leanne Hall

Ontario, Canada

 

Director since

October 30, 2020

 

Compensation Committee

 

Director of First Mining since October 30, 2020

 

December 2019 to present – Chief Executive Officer of Creative Fire (100% owned Indigenous strategy, engagement, research and data analytics firm)

 

August 2019 to present – Vice President of Des Nedhe Development Corporation (Indigenous economic development corporation)

 

February 2016 to August 2019 – Partner and National Leader of Indigenous practice group at Deloitte Canada (professional services firm)

 

Ownership of Securities:

NIL shares

2,475,000 options

 

 

40,000 DSUs

 

 

 

 
133 | Page

 

 

Director

Board committees

Principal occupation or employment

for past five years

 

Richard Lock

Utah, U.S.A.

 

Director since

April 1, 2020

 

 

Audit Committee

 

Compensation Committee

 

Corporate Governance &

Nominating Committee (Chair)

 

Director of First Mining since April 1, 2020

 

April 2022 to present – Chief Executive Officer and a Director of Oroco Resource Corp. (mining company)

 

January 2020 to April 2022 – Senior Vice President and Project Director (NorthMet Project) of Poly Met Mining, Inc., a wholly-owned subsidiary of PolyMet Mining Corp. (mining company)

 

March 2019 to October 2019 – Construction Director of the Peschanka open pit copper mine owned by KAZ Minerals Projects BV (mining company)

 

September 2018 to December 2019 – Senior Vice President of Arizona Mining Inc. (mining company)

 

 

Ownership of Securities:        255,553 shares  

2,550,000 options

 

NIL DSUs

                                                                        

 

 

Director

Board committees

Principal occupation or employment

for past five years

 

Raymond L. Polman, CPA, CA

British Columbia, Canada

 

Director since

March 30, 2015

 

 

Audit Committee

(Chair)

 

Corporate Governance & Nominating Committee

 

Director of First Mining since March 30, 2015

 

May 2022 to present – Director of First Majestic Silver Corp. (mining company)

 

February 2007 to December 2021 – Chief Financial Officer of First Majestic Silver Corp. (mining company)

 

Ownership of Securities:

1,525,333 shares

3,807,500 options

 

499,500 DSUs

400,000 warrants

 

 

 
134 | Page

 

 

Director

Board committees

Principal occupation or employment

for past five years

 

 

Daniel W. Wilton

British Columbia, Canada

 

Director since

January 7, 2019

 

None

 

 

Chief Executive Officer and a Director of First Mining since January 7, 2019

 

December 2018 to present – Director of South Star Mining Corp. (mining company)

 

September 2021 to present – Director of Providence Living (non-profit residential care provider)

 

August 2020 to June 2022 – Director of Treasury Metals Inc. (mining company)

 

September 2010 to June 2021 – Director and Vice Chair of Providence Health Care (non-profit health care provider)

 

February 2013 to April 2018 – Partner of Pacific Road Capital Management Pty Ltd. (global private equity investment firm)

 

Ownership of Securities:

10,166,666 shares

9,150,000 options

 

 

5,385,151 RSUs

3,406,000 PSUs

 

 

2,000,000 warrants

 

 

 

 
135 | Page

 

 

Officers

 

Our officers are appointed by our board of directors. The information below as to principal occupation and shares beneficially owned has been furnished by the respective individuals. The officers of our Company as of the date of this AIF are as follows:

  

Officer

Principal occupation or employment for past five years

 

 

Daniel W. Wilton

Chief Executive Officer

 

British Columbia, Canada

 

CEO and a Director of First Mining since January 7, 2019

 

December 2018 to present – Director of South Star Mining Corp. (mining company)

 

September 2021 to present – Director of Providence Living (non-profit residential care provider)

 

August 2020 to June 2022 – Director of Treasury Metals Inc. (mining company)

 

September 2010 to June 2021 – Director and Vice Chair of Providence Health Care (non-profit health care provider)

 

Ownership of Securities:

10,166,666 shares

9,150,000 options

 

 

5,385,151 RSUs

3,406,000 PSUs

 

 

2,000,000 warrants

 

 

 

 
136 | Page

 

 

Officer

Principal occupation or employment for past five years

 

Lisa M. Peterson, CA

Chief Financial Officer and Corporate Secretary

 

British Columbia, Canada

 

Chief Financial Officer of First Mining since September 2022 and Corporate Secretary since July 21, 2023.

 

July 2021 to September 2022 – Chief Financial Officer of Slater Corporate Services Corporation (private company providing professional services to various mining companies)

 

October 2018 to June 2021 – Vice President, Corporate Reporting of SkyPower Services ULC (renewable energy company)

 

 

Ownership of Securities:

40,000 shares

2,550,000 options

 

 

1,843,590 RSUs

2,000,000 PSUs

 

 

20,000 warrants

 

 

 

 
137 | Page

 

 

Officer

Principal occupation or employment for past five years

  

 

James Maxwell, P. Geo

VP, Exploration and Project Operations

 

British Columbia, Canada

 

VP Exploration and Project Operations of First Mining since January 2024

 

October 2021 to January 2024 – VP Exploration of First Mining (promoted to VP Exploration and Project Operations in January 2024)

 

May 2008 to October 2021 – Director of Exploration ,

Exploration Manager of Sabina Gold & Silver Corp.

 

 

 

Ownership of Securities:

130,000 shares

2,500,000 options

 

 

1,710,000 PSUs

40,000 warrants

 

 

1,005,128 RSUs

 

 

 

Officer

Principal occupation or employment for past five years

 

Stephen Lines

VP, Sustainability

 

Quebec, Canada

 

VP Sustainability of First Mining since January 2024

 

December 2020 to January 2024 – VP Environment and

Community Relations of First Mining (promoted to VP Sustainability in January 2024)

 

January 2019 to December 2020 – Director Environment and

Community Relations of Greenstone Gold Mines

 

Ownership of Securities:

32,890 shares

3,000,000 options

 

1,710,000 PSUs

1,005,128 RSUs

 

 

 
138 | Page

 

 

To our knowledge, the total number of common shares that the directors and officers as a group either: (i) beneficially owned; or (ii) exercised direction or control over, directly or indirectly, as at the date of this AIF was 42,055,755- common shares. This represents approximately 4.6% of our outstanding common shares as at the date of this AIF (on an undiluted basis).

 

Interest of management and others in material transactions

 

To our knowledge, other than as disclosed herein, no director, executive officer or shareholder that either: (i) beneficially owns; or (ii) controls or directs, directly or indirectly, over 10% of any class of our outstanding securities, nor their associates or affiliates, have or have had within the three most recently completed financial years, any material interests, direct or indirect, in any transaction that has materially affected, or is reasonably expected to materially affect, our Company.

 

Conflicts of interest

 

Certain directors and officers will be engaged in, and will continue to engage in, other business activities on their own behalf and on behalf of other companies (including mineral companies) and, as a result of these and other activities, such directors and officers may become subject to conflicts of interest. The BCBCA provides that if a director has a material interest in a contract or proposed contract or agreement that is material to the issuer, the director must disclose his interest in such contract or agreement and must refrain from voting on any matter in respect of such contract or agreement, subject to and in accordance with the BCBCA. To the extent that conflicts of interest arise, such conflicts will be resolved in accordance with the provisions of the BCBCA and in accordance with our Code of Business Conduct and Ethics.

 

Other information about our directors and officers

 

None of our directors or officers, or a shareholder holding a sufficient number of securities of First Mining to affect materially the control of our Company, is or was a director or executive officer of another company (including our Company) in the past 10 years that:

 

 

·

was subject to a cease trade or similar order, or an order denying that company any exemption under securities legislation that was in effect for more than 30 consecutive days, while the director or executive officer held that role with the company;

 

·

was involved in an event while the director or executive officer was acting in that capacity that resulted in the company being subject to one of the above orders after the director or executive officer no longer held that role with the company; or

 

·

while acting in that capacity, or within a year of acting in that capacity, became bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency or was subject to or instituted any proceedings, arrangement or compromise with creditors or had a receiver, receiver manager or trustee appointed to hold the assets of that company.

 

 
139 | Page

 

 

None of them in the past 10 years:

 

 

·

became bankrupt;

 

·

made a proposal under any legislation relating to bankruptcy or insolvency;

 

·

has been subject to or launched any proceedings, arrangement or compromise with any creditors; or

 

·

had a receiver, receiver manager or trustee appointed to hold any of their assets.

 

None of them has ever been subject to:

 

 

·

penalties or sanctions imposed by a court relating to securities legislation or by a securities regulatory authority or has entered into a settlement agreement with a securities regulatory authority; or

 

·

any other penalties or sanctions imposed by a court or regulatory body that would likely be considered important to a reasonable investor in making an investment decision.

 

Audit Committee information

 

National Instrument 52-110 Audit Committees (“NI 52-110”) requires us to have an audit committee (the “Audit Committee”) comprised of not less than three directors all of whom are “independent” and “financially literate” (as such terms are defined in NI 52-110). NI 52-110 also requires us to disclose in this AIF certain information regarding the Audit Committee. That disclosure is set out below.

 

Overview

 

The Company’s Audit Committee is principally responsible for:

 

 

·

recommending to our Board the external auditor to be nominated for election by the shareholders at each annual general meeting and negotiating the compensation of such external auditor;

 

·

overseeing the work of the external auditor;

 

·

reviewing our annual and interim financial statements, MD&A and press releases regarding earnings before they are reviewed and approved by our Board and publicly disseminated; and

 

·

reviewing our financial reporting procedures and internal controls to ensure adequate procedures are in place for our public disclosure of financial information extracted or derived from our financial statements.

 

Committee charter

 

A copy of the Audit Committee’s charter is attached as Appendix “A” to this AIF.

 

Composition of the Audit Committee

 

Our current Audit Committee consists of Raymond Polman (current chairman of the Audit Committee), Keith Neumeyer and Richard Lock.

 

NI 52-110 provides that a member of an audit committee is “independent” if the member has no direct or indirect material relationship with the Company, which could, in the view of our Board, reasonably interfere with the exercise of the member’s independent judgment. All of the members of our Audit Committee are “independent” within the meaning of NI 52-110.

 

 
140 | Page

 

 

NI 52-110 provides that an individual is “financially literate” if he or she has the ability to read and understand a set of financial statements that present a breadth and level of complexity of accounting issues that are generally comparable to the breadth and complexity of the issues that can reasonably be expected to be raised by the Company’s financial statements. All of the members of our Audit Committee are “financially literate” as that term is defined in NI 52-110.

 

Relevant education and experience

 

The following is a description of the skills and experience of each member of the Audit Committee that is relevant to the performance of their responsibilities as a member of the Audit Committee:

 

Raymond Polman (Chairman of Audit Committee)

 

Mr. Polman has over 35 years of public accounting and corporate finance experience in the Canadian and US financial markets and was the Chief Financial Officer of First Majestic Silver Corp. from February 2007 to December 2021. Prior to First Majestic, Mr. Polman had been a Chief Financial Officer for six years with a number of publicly traded technology companies, prior to which he served several years as the Director of Finance for Rescan Environmental, a large privately-owned company serving the global mining community. Mr. Polman has a Bachelor of Science Degree from the University of Victoria and he is a member of the Institute of Chartered Accountants of British Columbia. Mr. Polman also began his public accounting experience with Deloitte LLP before venturing into private industry.

 

Keith Neumeyer

 

Mr. Neumeyer has worked in the investment community for over 30 years.  He began his career at a number of Canadian national brokerage firms.  Mr. Neumeyer moved on to work with several publicly traded companies in the resource and high technology sectors.  His roles have included senior management positions and directorships responsible in areas of finance, business development, strategic planning and corporate restructuring.  Mr. Neumeyer was the original and founding President of First Quantum Minerals Ltd.  He also founded and is currently the Chief Executive Officer of First Majestic Silver Corp., and he is the founder of First Mining.  Mr. Neumeyer has also listed a number of companies on the Toronto Stock Exchange and as such has extensive experience dealing with the financial, regulatory, legal and accounting issues that are relevant in the investment community.

 

Richard Lock

 

Mr. Lock is a veteran mining executive with more than 30 years of experience in project management, development and operations for major mining companies including Rio Tinto, Western Potash, DeBeers and Anglo American.  Mr. Lock is currently the Chief Executive Officer and a Director of Oroco Resource Corp.  His most recent prior roles include Senior Vice President and Project Director for the NorthMet mining project in Minnesota being developed by PolyMet Mining Corp., Construction Director for KAZ Minerals’ Peschanka open pit copper mine in Russia and executive and project director roles at Arizona Mining’s Hermosa Zinc Project in the United States.  Mr. Lock has been involved with numerous projects including Yara International’s Dallol potash project in Ethiopia, Western Potash’s Milestone potash project in Canada, and several of Rio Tinto’s projects including the Resolution and Keystone copper assets in the U.S. and the Diavik diamond mine in Canada’s Northwest Territories.  Mr. Lock holds a Bachelor of Science in Mining Engineering from Cardiff University in the United Kingdom.

 

 
141 | Page

 

 

Audit Committee oversight

 

At no time since the commencement of the Company’s most recently completed financial year was a recommendation of the Audit Committee to nominate or compensate an external auditor not adopted by the Board.

 

Reliance on certain exemptions

 

Since the commencement of the Company’s most recently completed financial year, the Company has not relied on the exemptions in section 2.4 (De Minimis Non-audit Services), section 3.2 (Initial Public Offerings), section 3.4 (Events Outside Control of Member) or section 3.5 (Death, Disability or Resignation of Audit Committee Member) of NI 52-110, or an exemption from NI 52-110, in whole or in part, granted under Part 8 (Exemptions).

 

Since the commencement of the Company’s most recently completed financial year, the Company has not relied on the exemption in subsection 3.3(2) (Controlled Companies), section 3.6 (Temporary Exemption for Limited and Exceptional Circumstances) or the exemption in section 3.8 (Acquisition of Financial Literacy) of NI 52-110.

 

Pre-approval policies and procedures

 

The Audit Committee has not adopted specific policies and procedures for the engagement of non-audit services; however, the Audit Committee approves all non-audit services in advance.

 

External auditor service fees (by category)

 

PricewaterhouseCoopers LLP served as the Company’s external auditor for the years ended December 31, 2023 and December 31, 2022. The aggregate fees billed by our external auditor during the years ended December 31, 2023 and December 31, 2022 are set out in the table below:

 

 

Year Ended

December 31, 2022

Year Ended

December 31, 2023

Audit fees (1)

$251,620

$306,997

Audit-related fees (2)

Nil

$Nil

Tax fees (3)

$101,562

$146,355

Total

$353,182

$453,352

 

 

(1)

Represents the aggregate fees billed and expected to be billed by our external auditor for audit and audit related services.

 

(2)

Represents the aggregate fees billed for assurance and related services by our external auditor that are reasonably related to the performance of the audit or review of our financial statements and are not included under “Audit Fees”.

 

(3)

Represents the aggregate fees billed for professional services rendered by our external auditor for tax compliance, tax advice and tax planning.

 

 
142 | Page

 

 

Interests of experts

 

Auditor

 

The Company’s independent registered public accounting firm is PricewaterhouseCoopers LLP, Chartered Professional Accountants, who have issued a Report of Independent Registered Public Accounting Firm dated March 27, 2024, in respect of the Company’s consolidated financial statements as at December 31, 2023 and December 31, 2022 and for each of the years then ended. PricewaterhouseCoopers LLP has advised that they are independent with respect to the Company within the meaning of the Chartered Professional Accountants of British Columbia Code of Conduct and the rules of the US Securities and Exchange Commission (SEC) and the Public Company Accounting Oversight Board (PCAOB) on auditor independence.

 

Qualified persons

 

All technical and scientific information discussed in this AIF, including Mineral Resource and Mineral Reserve estimates for our material properties other than the Duparquet Project, has been reviewed and approved by Hazel Mullin, P. Geo., our Director, Data Management and Technical Services, who is a Qualified Person for the purposes of NI 43-101.

 

All technical and scientific information discussed in this AIF that relates to the Duparquet Project, has been reviewed and approved by Louis Martin, P. Geo., a consultant of First Mining, who is a Qualified Person for the purposes of NI 43-101.

 

The following individuals prepared the Springpole Technical Report:

 

 

·

Dr. Gilles Arseneau, Ph.D., P.Geo., of SRK Consulting (Canada) Inc.;

 

·

Gordon Zurowski, P.Eng., of AGP Mining Consultants Inc.;

 

·

Roland Tosney, P.Eng., of AGP Mining Consultants Inc.;

 

·

Cameron McCarthy, P.Eng., P.Geo., P.Tech., of Swiftwater Consulting Ltd.;

 

·

Duke Reimer, P.Eng., Knight Pièsold Consulting Ltd.; and

 

·

Dr. Adrian Dance, P.Eng., of SRK Consulting (Canada) Inc.

 

The following individuals prepared the Duparquet Technical Report:

 

 

·

Carl Michaud, P.Eng. of G Mining Services Inc.;

 

·

Alexandre Dorval, P. Eng. of G Mining Services Inc.;

 

·

Neil Lincoln, P. Eng., of G Mining Services Inc.;

 

·

Philip Rodrigue, P. Eng. of G Mining Services Inc.;

 

·

Marina Iund. P.Geo. of InnovExplo Inc.;

 

·

Olivier Vadnais-Leblanc, P.Geo. of InnovExplo Inc.;

 

·

Carl Pelletier. P.Geo. of InnovExplo Inc.;

 

·

Simon Boudreau, P. Eng. of InnovExplo Inc.;

 

·

Sheldon Smith MES, P. Geo., of Stantec Consulting Ltd;

 

·

Guy Comeau, P.Eng., of Soutex ; and

 

 
143 | Page

 

 

 

·

Mark Drabble, B.App.Sci (Geology), MAIG, MAusIMM prepared the Cameron Gold Technical Report.

 

Each of the abovementioned firms or persons named in this section, “Qualified persons”, hold, as either a registered or beneficial holder, less than one percent of the outstanding securities of First Mining or of any associate or affiliate of First Mining. None of the aforementioned firms or persons named in this section, “Qualified persons”, received any direct or indirect interest in any securities of First Mining or of any associate or affiliate of First Mining in connection with the preparation and review of any technical report or this AIF. None of the aforementioned firms or persons named in this section, “Qualified persons”, nor any directors, officers or employees of such firms or persons, are currently expected to be elected, appointed or employed as a director, officer or employee of the Company or of any associate or affiliate of First Mining.

 

Additional information

 

You can find more information about First Mining under our SEDAR+ profile at www.sedarplus.ca and on our website at www.firstmininggold.com.

 

Our most recent management information circular dated May 1, 2023 contains additional information on how our directors and officers are compensated, the principal holders of our securities, and the securities that are authorized for issuance under our equity compensation plans, and is available under our SEDAR+ profile at www.sedarplus.ca.

 

For additional financial information about First Mining, see our audited consolidated annual financial statements and management’s discussion and analysis for the financial year ended December 31, 2023, which are also available under our SEDAR+ profile at www.sedarplus.ca and on our website at www.firstmininggold.com.

 

Copies of the above documents may be obtained from First Mining by contacting us at Suite 2070 – 1188 West Georgia Street, Vancouver, British Columbia V6E 4A2, telephone: 1.844.306.8827.

 

 
144 | Page

 

 

Appendix A

 

FIRST MINING GOLD CORP.

 

AUDIT COMMITTEE CHARTER

 

    

1.

INTRODUCTION

 

 

(a)

The audit committee (the “Committee”) is appointed by the board of directors (the “Board”) of First Mining Gold Corp. (the “Company”) to be responsible for the oversight of the accounting and financial reporting process and financial statement audits of the Company.

 

 

(b)

This charter is prepared to assist the Committee, the Board and management in clarifying responsibilities and ensuring effective communication between the Committee, the Board and management.

 

 

2.

COMPOSITION

 

 

(a)

The Committee will be composed of three or more directors as determined by the Board, from time to time.

 

 

(b)

Each member of the Committee will meet the criteria for independence and financial literacy established by National Instrument 52-110 Audit Committees and any other applicable laws as well as the rules of any stock exchanges upon which the Company’s securities are listed.  At least one member of the Committee will have experience as a Chartered Professional Accountant, Chief Financial Officer (“CFO”) or Corporate Controller of similar experience, or demonstrably meaningful experience, overseeing such functions as a senior executive officer.

 

 

(c)

Each member of the Committee will sit on the audit committees of no more than three reporting issuers, or four if the director has demonstrable financial expertise (for example, if the director is a former CFO).

 

 

(d)

The Board will appoint a Chair of the Committee who shall:

 

 

(i)

convene and preside over Committee meetings and ensure they are conducted in an efficient, effective and focused manner;

 

 

145 | Page

 

 

 

(ii)

assist with the preparation of an agenda and ensure that meeting materials are prepared and disseminated in a timely manner;

 

 

 

 

(iii)

ensure that the Committee has sufficient time and information to make informed decisions; and

 

 

 

 

(iv)

provide leadership to the Committee and management with respect to maters covered by this Charter.

 

3.

RESPONSIBILITIES

 

The Committee has the responsibility to:

 

 

(i)

review and recommend for approval by the Board the following before they are publicly disclosed:

 

 

(A)

the financial statements and MD&A (management discussion and analysis) (as defined in National Instrument 51-102 Continuous Disclosure Obligations) of the Company;

 

 

 

 

(B)

the auditor’s report, if any, prepared in relation to those financial statements; and

 

 

 

 

(C)

the Company’s annual and interim earnings press releases;

 

 

(ii)

satisfy itself that adequate procedures are in place for the review of the Company’s public disclosure of financial information extracted or derived from the Company’s financial statements and periodically assess the adequacy of those procedures;

 

 

 

 

(iii)

recommend to the Board:

 

 

(A)

the external auditor to be nominated for the purpose of preparing or issuing an auditor’s report or performing other audit, review or attest services for the Company; and

 

 

 

 

(B)

the compensation of the external auditor,

 

 

(iv)

oversee the work of the external auditor engaged for the purpose of preparing or issuing an auditor’s report or performing other audit, review or attest services for the Company, including the resolution of disagreements between management and the external auditor regarding financial reporting;

 

 

 

 

(v)

monitor, evaluate and report to the Board on the integrity of the financial reporting process and the system of internal controls that management and  the Board  has established;

 

 

146 | Page

 

 

 

(vi)

monitor the management of the principal risks that could impact the financial reporting of the Company;

 

 

 

 

(vii)

establish procedures for:

 

 

(A)

the receipt, retention and treatment of complaints received by the Company regarding accounting, internal accounting controls, or auditing matters; and

 

 

 

 

(B)

the confidential, anonymous submission by employees of the Company of concerns regarding questionable accounting or auditing matters.

 

 

(viii)

pre-approve all non-audit services to be provided to the Company or its subsidiary entities by the Company’s external auditor;

 

 

 

 

(ix)

review and approve the Company’s hiring policies regarding partners, employees and former partners and employees of the present and former external auditor of the Company;

 

 

 

 

(x)

with respect to ensuring the integrity of disclosure controls and internal controls over financial reporting, understand the process utilized by the Chief Executive Officer and the Chief Financial Officer to comply with National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings;

 

 

 

 

(xi)

review and report to the Board on its concurrence with the disclosure required by Form 52-110F1 in any annual information form or management information circular; and

 

 

 

 

(xii)

periodically review and update the Company’s Whistleblower Policy and administer the procedures set out in the Whistleblower Policy.

 

The Committee will meet as often as it deems necessary to fulfil the foregoing duties, but not less frequently than quarterly.

  

4.

AUTHORITY

 

The Committee has the authority to:

 

(a)

engage independent counsel and other advisors as it deems necessary to carry out its duties and the Committee will set the compensation for such advisors.

 

 

(b)

The Committee has the authority to communicate directly with and to meet with the external auditor, without management involvement. This extends to requiring the external auditor to report directly to the Committee.

 

 

147 | Page

 

 

5.

REPORTING

  

The Committee will prepare and maintain minutes of its meetings and report to the Board on the

 

proceedings of each Committee meeting and on the Committee’s recommendations at the next regularly scheduled Board meeting.

  

6.

ANNUAL REVIEW

  

The Committee will review this charter annually and will consider whether any amendments or updates are warranted.

 

7.

EFFECTIVE DATE

  

This Charter was implemented by the Board on May 19, 2015, as amended by the Board on June 14, 2023, and on March 27, 2024.

 

 

148 | Page