EX-99.2 3 silef_ex992.htm MANAGEMENTS DISCUSSION AND ANALYSIS silef_ex992
  Exhibit 99.2
 
 
 
 
 
 
         
 
 
 
 
 
 
 
 
 
Management’s Discussion and Analysis of Financial
Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
 
 
 
 
 
 
 
 
 

 

TABLE OF CONTENTS
 
1
INTRODUCTION
3
2
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
4
3
FIRST QUARTER HIGHLIGHTS AND SIGNIFICANT EVENTS
5
4
PROPERTY SUMMARY
7
5
SUMMARY OF QUARTERLY RESULTS
39
6
DISCUSSION OF OPERATIONS
39
7
PROPOSED TRANSACTIONS
42
8
LIQUIDITY AND CAPITAL RESOURCES
42
9
CONTINGENCIES
44
10
RELATED PARTY DISCLOSURES
45
11
CRITICAL ACCOUNTING POLICIES AND ESTIMATES
46
12
FINANCIAL INSTRUMENTS AND RELATED RISKS
48
13
RISKS AND UNCERTAINTIES
50
14
DISCLOSURE CONTROLS AND PROCEDURES
50
15
CHANGES IN INTERNAL CONTROL OVER FINANCIAL REPORTING
51
16
DISCLOSURE OF OUTSTANDING SHARE DATA
52
17
OFF-BALANCE SHEET ARRANGEMENTS
52

 
2
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
1.
INTRODUCTION
 
This Management’s Discussion and Analysis (“MD&A”) of Silver Elephant Mining Corp. (formerly “Prophecy Development Corp.”) and its subsidiaries (the “Company” or “Silver Elephant”) was prepared by management as at August 12, 2020 and was reviewed, approved, and authorized for issue by the Company’s Audit Committee. The following discussion of performance, financial condition and future prospects should be read in conjunction with the unaudited condensed interim consolidated financial statements of the Company and notes thereto for the six months ended June 30, 2020 prepared in accordance with International Financial Reporting Standards (“IFRS”), applicable to the preparation of interim financial statements, including International Accounting Standard (“IAS”) 34 Interim Financial Reporting, as issued by the International Accounting Standards Board. This MD&A should be read also in conjunction with both the audited annual consolidated financial statements for the year ended December 31, 2019 (prepared in accordance with IFRS) (“Annual Financial Statements”) and the related annual MD&A (“Annual MD&A”) dated March 30, 2020, and the 2019 Annual Report (“Form 20-F”), all of which are available under the Company’s SEDAR profile at www.sedar.com.
 
The information provided herein supplements but does not form part of the financial statements. Financial information is expressed in Canadian Dollars, unless stated otherwise. Readers are cautioned that this MD&A contains “forward-looking statements” and that actual events may vary from management’s expectations. Readers are encouraged to read the cautionary note contained herein regarding such forward-looking statements. Information on risks associated with investing in the Company’s securities as well as information about mineral resources and reserves under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) are contained in the Company’s most recently filed Form 20-F which is available on the Company’s website at www.silverelef.com and on SEDAR at www.sedar.com and on Edgar at www.sec.gov.
 
Description of Business
 
The Company amalgamated under the laws of the Province of British Columbia, Canada. The Company’s Common Shares (the “Shares”, and each, a “Share”) are listed for trading on the Toronto Stock Exchange (the “TSX”) under the symbol “ELEF”, the OTCQX under the symbol “SILEF” and the Frankfurt Stock Exchange under the symbol “1P2N”.
 
The Company is an exploration stage company specializing in mine permitting, construction, and operations. The Company holds a mining joint venture interest in the Pulacayo Paca silver-lead-zinc property located in Bolivia (the “Pulacayo Project”). Silver Elephant’s 2020 objective is to explore Pulacayo and Triunfo districts with the potential for silver and gold discoveries. The Company also has a 100% interest in two vanadium projects in North America including the Gibellini Vanadium Project which is comprised of the Gibellini and Louie Hill vanadium deposits and associated claims located in the State of Nevada, USA (the “Gibellini Project”) and the Titan vanadium-titanium-iron project comprised of the Titan vanadium-titanium-iron deposit and related claims located in the Province of Ontario, Canada (the “Titan Project). The Company is permitting the Gibellini Project and aims to be the first primary vanadium producer in the USA by 2023.The Company also owns a 100% interest in three coal properties in Mongolia which are the Ulaan Ovoo property, the Khavtgai Uul property and the Chandgana Tal property. In addition, the Company also has the land use right and construction license for the Chandgana power plant project.
 
General Corporate Information:
 
At June 30, 2020 and August 12, 2020, the Company had: (i) 138,272,408 and 142,294,048 Shares issued and outstanding respectively; (ii) 12,252,500 and 10,358,750 stock options for Shares outstanding respectively; (iii) 39,675,827 and 36,347,837 Share purchase warrants for Shares outstanding respectively.
Transfer Agent and Registrar
Computershare Investor Services Inc.
3rd Floor, 510 Burrard Street,
Vancouver, BC, Canada, V6C 3B9
Tel: +1 (604) 661-9400
 
 
Investor and Contact Information
All financial reports, news releases and corporate information can be accessed by visiting the Company’s website at: www.silverelef.com
Investor & Media requests and queries:
Email: ir@silverelef.com
Head Office and Registered Office
Suite 1610 - 409 Granville Street,
Vancouver, BC, Canada, V6C 1T2
Tel: +1 (604) 569-3661
 

 
3
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Directors and Officers
 
As at the date of this MD&A, The Company’s directors and officers were as follows:
 
Directors
 
Officers
John Lee, Executive Chairman
Ronald Espell, Vice-President, Environment and Sustainability
Greg Hall
Danniel Oosterman, Vice-President, Exploration
Masa Igata
Joaquin Merino-Marquez, Vice-President, South American Operations
Marc Leduc
David Smith
Irina Plavutska, Chief Financial Officer
Brigitte McArthur, Corporate Secretary
 
 
Audit Committee
 
Corporate Governance and Compensation Committee
 
Greg Hall (Chair)
Greg Hall (Chair)
Masa Igata
Masa Igata
Marc Leduc
Marc Leduc
 
Qualified Persons
 
Danniel Oosterman, B.Sc.(Hons), P.Geo., is a “qualified person” as defined under NI 43-101. Mr. Oosterman serves as the Company’s Vice-President, Exploration and qualified person. He is not considered independent of the Company given the large extent that his professional time is dedicated solely to the Company. Mr. Oosterman has reviewed and approved the technical and scientific disclosure regarding the mineral properties of the Company contained in this MD&A.
 
2.
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
 
This MD&A contains” forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities legislation concerning anticipated developments in the Company’s continuing and future operations in the United States, Canada, Bolivia and Mongolia, and the adequacy of the Company’s financial resources and financial projections. Such forward-looking statements include but are not limited to statements regarding the permitting, feasibility, plans for development of the Gibellini Project; development of the Titan Project; development of the Pulacayo project; development and production of electricity from the Company’s Chandgana power plant, including finalizing of any power purchase agreement; the likelihood of securing project financing; estimated future coal production at the Chandgana project; and coal production at the Ulaan Ovoo coal property and the Chandgana project, and other information concerning possible or assumed future results of operations of the Company. Refer to Section 4 – Property Summary.
 
Forward-looking statements in this document are frequently identified by words such as “expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, “potentially” or similar expressions, or statements that events, conditions or results “will”, “may”, “would”, “could”, “should” occur or are “to be” achieved, and statements related to matters which are not historical facts. Information concerning management’s expectations regarding the Company’s future growth, results of operations, performance, business prospects and opportunities may also be deemed to be forward-looking statements, as such information constitutes predictions based on certain factors, estimates and assumptions subject to significant business, economic, competitive and other uncertainties and contingencies, and involve known and unknown risks which may cause the actual results, performance, or achievements to be different from future results, performance, or achievements contained in such forward-looking statements made by the Company.
 
In making the forward-looking statements in this MD&A, the Company has made several assumptions that it believes are appropriate, including, but not limited to assumptions that: all required third party contractual, regulatory and governmental approvals will be obtained for the development, construction and production of the Company’s properties and the Chandgana power plant; there being no significant disruptions affecting operations, whether due to labour disruptions or other causes; currency exchange rates being approximately consistent with current levels; certain price assumptions for vanadium, silver, other metals and coal, prices for and availability of fuel, parts and equipment and other key supplies remain consistent with current levels; production forecasts meeting expectations; the accuracy of the Company’s current mineral resource estimates; labour and materials costs increasing on a basis consistent with the Company’s current expectations; and any additional required financing will be available on reasonable terms; market developments and trends in global supply and demand for vanadium, silver, other metals, coal and energy meeting expectations. The Company cannot assure you that any of these assumptions will prove to be correct.
      
 
4
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
Numerous factors could cause the Company’s actual results to differ materially from those expressed or implied in the forward-looking statements, including the following risks and uncertainties, which are discussed in greater detail under the heading “Risks and Uncertainties” in this MD&A and “Risk Factors” in the Company’s most recent Form 20-F as filed under the Company’s SEDAR profile at www.SEDAR.com and posted on the Company’s website: the Company’s history of net losses and lack of foreseeable positive cash flow; exploration, development and production risks, including risks related to the development of the Company’s mineral properties; the Company not having a history of profitable mineral production; commencing mine development without a feasibility study; the uncertainty of mineral resource and mineral reserve estimates; the capital and operating costs required to bring the Company’s projects into production and the resulting economic returns from its projects; foreign operations and political conditions, including the legal and political risks of operating in Bolivia and Mongolia, which are developing countries and being subject to their local laws; the availability and timeliness of various government approvals, permits and licenses; the feasibility, funding and development of the Company’s projects; protecting title to the Company’s mineral properties; environmental risks; the competitive nature of the mining business; lack of infrastructure; the Company’s reliance on key personnel; uninsured risks; commodity price fluctuations; reliance on contractors; the Company’s need for substantial additional funding and the risk of not securing such funding on reasonable terms or at all; foreign exchange risk; anti-corruption legislation; recent global financial conditions; the payment of dividends; the inability of insurance to cover all potential risks associated with mining operations; conflicts of interest; reliance on information systems with exposure to cyber-security risks, and global outbreaks, including the COVID-19 pandemic; the impact of COVID-19 on our workforce, suppliers and other essential resources and what effect those impacts, if they occur, would have on our business.
 
Factors that could cause actual results to differ materially from those in forward-looking statements include potential impacts of COVID-19 on the Company’s operations, ability to obtain required third party approvals, market prices, exploitation and exploration results, continued availability of capital and financing and general economic, market or business conditions
 
In light of the risks and uncertainties inherent in all forward-looking statements, the inclusion or incorporation by reference of forward-looking statements in this MD&A should not be considered as a representation by the Company or any other person that the Company’s objectives or plans will be achieved.
 
These factors should be considered carefully, and readers should not place undue reliance on the Company’s forward-looking statements. The Company believes that the expectations reflected in the forward-looking statements contained in this MD&A and the documents incorporated by reference herein are reasonable, but no assurance can be given that these expectations will prove to be correct. In addition, although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. The Company undertakes no obligation to publicly update any future revisions to forward-looking statements to reflect events or circumstances after the date of this MD&A or to reflect the occurrence of unanticipated events, except as expressly required by law.
 
3.
SECOND QUARTER HIGHLIGHTS AND SIGNIFICANT EVENTS
 
On May 4, 2020, the Company has granted in aggregate, 3,000,000 incentive stock options to certain directors, officers, employees and consultants of the Company. These options are exercisable at a price of $0.22 per Share for a term of five years expiring on May 4, 2025 and vest at 12.5% per quarter for the first two years following the date of grant.
 
On May 20, 2020, the Company closed its non-brokered private placement for $1,976,000 through the issuance of 15,200,000 Units at a price of $0.13 per Unit. Each Unit is comprised of one Share and one Share purchase warrant (the “Warrants”). Each Warrant entitles the holder to purchase an additional Share of the Company at an exercise price of $0.16 for a period of three years from the closing of the Placement. The Company paid $3,250 in cash and issued 156,900 Units as finder’s fee.
 

      
 
5
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
The Placement proceeds are expected to be used for the Company’s mineral project development and for general working capital purposes.
 
Subsequent to period end
 
On July 7, 2020, the Company reported that all proposed resolutions were approved at the Company’s Annual General and Special Meeting of shareholders held on July 7, 2020. The Company had previously received conditional approval from the TSX to amend the exercise price of an aggregate of 24,318,927 previously issued common share purchase warrants (the “Original Warrants”) of the Company to $0.26 (the “Amendment”) pending shareholder approval of the Amendment. Pursuant to the passing of the ordinary resolution approving the Amendment, the Original Warrants will be cancelled and replaced with amended common share purchase warrants repriced to $0.26 (the “Amended Warrants”), which Amended Warrants shall become effective 10 days from the date of this news release being July 7, 2020. All other terms of the Amended Warrants are unchanged from the Original Warrants and remain in full effect.
 
On July 13, 2020, the Company announced that it has entered into a binding sales and purchase agreement (“SPA”) with a private party (“Vendor”) to acquire the El Triunfo Gold-Silver-Lead-Zinc Project in La Paz District, Bolivia (“Triunfo Project”). Subject to the provisions of the SPA, the Vendor irrevocably agrees to sell, assign, and transfer to Silver Elephant, and Silver Elephant agrees to purchase from the Vendor, the mining rights of the Triunfo Project upon Silver Elephant’s paying the Vendor the sum of US$1,100,000, consisting of US$100,000 on SPA signing (paid), and US$1,000,000 on or before June 15, 2025 (Final Closing Date).
 
On July 16, 2020, the Company announced that the Notice of Intent (“NOI”) to prepare an Environmental Impact Statement (“EIS”) for the Gibellini Project was published on July 14, 2020 in the Federal Register. The NOI formally commences the 12-month timeline to complete the National Environmental Policy Act (“NEPA”) review and EIS preparation by the U.S. Department of the Interior Bureau of Land Management (“BLM”).
 
On July 20, 2020, the Company announced it has engaged Mercator Geological Services Limited (“Mercator”) to prepare an updated Technical Report (the “Report”) as defined under NI 43-101 for the Pulacayo Project. The Company also reported that it expects to receive assay results later this month from 2 infill drill holes completed within the Pulacayo resource in February 2020.
 
On July 20, 2020, the Company announced the departure of Michael Doolin, the Company’s interim CEO and Chief Operating Officer. This change is not expected to affect the Company’s operations.   John Lee, Joaquin Merino, and Ron Espell, respectively the Company’s executive chairman, VP of South America operations, and VP of environment and sustainability will assume his duties and ensure an orderly transition.
 
On August 3, 2020, the Company announced the appointment of David Smith as an Independent Director. The Company also announced that Ronald Clayton had resigned from the Board of Directors.
 
Also, after the period end, 3,327,990 Share purchase warrants and 693,750 stock options were exercised for total proceeds of $1,037,715.
 
For further information please view the Company’s 2020 news releases under the Company’s SEDAR profile at www.sedar.com.

      
 
6
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
4.
PROPERTY SUMMARY
 
Gibellini Project, Nevada, USA
 
The Company’s principal asset is its interest in the Gibellini Project. The Company holds a 100% interest in the properties by way of a lease agreement and staked claims. Claims are in the name of the Company’s indirect, wholly-owned Nevada subsidiaries, VC Exploration (US), Inc. (“VC Exploration”) and Nevada Vanadium, LLC (“Nevada Vanadium”).
 
The Gibellini Project consists of a total of 354 unpatented lode mining claims that include: the Gibellini group of 40 claims, the VC Exploration group of 105 claims, and the Company group of 209 claims. All the claims are located in Eureka County, Nevada, approximately 25 miles south of the town of Eureka and are easily accessed from US Highway 50 to a paved road that becomes a graded, gravel road.
 
 
The Gibellini Project is situated on the south east flank of the Fish Creek Range in the Fish Creek Mining District, about 25 miles south of Eureka, Nevada and is accessed by dirt road extending westward from State Route 379.
 
The Gibellini group of claims were acquired on June 22, 2017, through lease from the claimant and current holder of the Gibellini mineral claims (the “Gibellini Lessor”) and includes an area of approximately 771 acres. Under the Gibellini mineral lease agreement (the “Gibellini MLA”), The Company leased the core group of claims which originally constituted the Gibellini Project by among other things, agreeing to pay to the Gibellini Lessor, annual advance royalty payments which will be tied, based on an agreed formula (not to exceed USD$120,000 per year), to the average vanadium pentoxide price of the prior year. Upon commencement of production, The Company will maintain its acquisition through lease of the Gibellini group of claims by paying to the Gibellini Lessor, a 2.5% Net Smelter Return (NSR) until a total of USD$3 million is paid. Thereafter, the NSR will be reduced to 2% over the remaining life of the mine (and referred to thereafter, as “Production Royalty Payments”). All advance royalty payments made, will be deducted as credits against future Production Royalty Payments. The lease is for a term of 10 years, which can be extended for an additional 10 years at the Company’s option. 
 
On April 19, 2018, the Gibellini MLA was amended to grant the Company the option, at any time during the term of the agreement, to require the Gibellini Lessor to transfer their title over all of the leased mining claims (excluding four claims which will be retained by the Gibellini Lessor and which contain minimal resource) to the Company in exchange for USD1,000,000, to be paid as an advance royalty payment.
 
On July 10, 2017, the Company acquired (through lease) from the holders (the “Former Louie Hill Lessors”) 10 unpatented lode claims totaling approximately 207 gross acres that comprised the Louie Hill group of claims located approximately 1600 feet south of the Gibellini group of claims. These claims were subsequently abandoned by the Former Louie Hill Lessors, and on March 11 and 12, 2018, the Company staked the area within and under 17 new claims totaling approximately 340 gross acres which now collectively comprise the expanded Louie Hill group of claims.
 
 
7
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
On October 22, 2018, the Company entered into a royalty agreement (the “Royalty Agreement”) with the Former Louie Hill Lessors to replace on substantially similar terms, the former Louie Hill Mineral Lease Agreement dated July 10, 2017, wherein the Company will pay an advance royalty and a net smelter royalty on vanadium pentoxide produced from the area of the 10 unpatented lode claims originally acquired through lease from the Former Louie Hill Lessors that is now contained within 17 lode claims since staked by the Company’s subsidiaries. The annual advance royalty payments will be tied, based on an agreed formula (the total amount not to exceed USD$28,000 per year), to the average vanadium pentoxide price for the prior year.
 
Upon commencement of production, the Company will pay to the Former Louie Hill Lessors, a 2.5% NSR of which, 1.5% of the NSR may be purchased at any time by the Company for USD$1 million, leaving the total NSR to be reduced to 1% over the remaining life of the mine (and referred to thereafter, as “Production Royalty Payments”). All advance royalty payments made, will be deducted as credits against future Production Royalty Payments. The Royalty Agreement shall be for an indefinite period and shall be valid and in full force and effect for as long as the Company, its subsidiaries, or any of their permitted successors or assigns holds a valid and enforceable mining concession over the area.
On December 5, 2017, the Company announced that it had significantly expanded the land position at the Gibellini Project, by staking a total of 198 new claims immediately adjacent to the Gibellini claim group covering 4091 acres that are sufficient to enable future vanadium mining, processing and extraction.
 
On February 15, 2018, the Company indirectly acquired an additional 105 unpatented lode mining claims located adjacent to its existing Gibellini Project in Nevada, USA through the indirect acquisition of VC Exploration (US) Inc, by paying a total of $335,661 in cash and issuing the equivalent of 500,000 Share purchase warrants to arm’s-length, private parties.
 
The Gibellini Project is situated entirely on public lands that are administered by the BLM. No easements or rights of way are required for access over public lands. Rights-of-way would need to be acquired for future infrastructure requirements, such as pipelines and powerlines.
 
On November 20, 2017, the Company received an independent technical report titled “Gibellini Vanadium Project Nevada, USA NI 43-101 Technical Report” with an effective date of November 10, 2017 (the ”Gibellini Report”) prepared by Wood The Gibellini Report was filed with Canadian securities regulatory authorities on SEDAR (available at www.sedar.com).
 
On June 25, 2018, the Company released the “Gibellini Vanadium Project, Eureka County, Nevada, NI 43-101 Technical Report on Preliminary Economic Assessment” (the “PEA”), with an effective date of May 29, 2018 and signed June 25, 2018 authored by Independent Qualified Persons Kirk Hanson, P.E.; Edward J.C. Orbock III, RM SME; Edwin Peralta, P.E.; and Dr. Lynton Gormely, P. Eng. of Wood and is in accordance with NI 43-101. The PEA was filed with Canadian securities regulatory authorities on SEDAR (available at www.sedar.com).
 
Gibellini Deposit
 
On May 29, 2018, the Company received an independent technical report providing an updated the resource on the Gibellini project. The report is titled “Gibellini Vanadium Project Eureka County, Nevada, NI 43-101 Technical Report on Preliminary Economic Assessment” prepared by Mr. Kirk Hanson, P.E., Technical Director, Open Pit Mining; Mr. Edward J.C. Orbock III, RM SME, Principal Geologist and US Manager of Consulting; Mr. Edwin Peralta, P.E., Senior Mining Engineer; and Mr. Lynton Gormely, P.Eng., Consultant Metallurgist of Wood. The report has an effective date of May 29, 2018.
 
     
 
8
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
The PEA replaces the technical report entitled “Gibellini Vanadium Project, Nevada, USA, NI 43-101 Technical Report”, effective November 10, 2017 and filed November 20, 2017. The PEA is preliminary in nature and includes inferred mineral resources that are too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA results will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
 
The PEA disclosed an estimated 7.94 million tons at a weighted average grade of 0.314% vanadium pentoxide (“V2O5”) in the Measured category and 15.02 million tons at a weighted average grade of 0.271% V2O5 in the Indicated category leading to a total combined Measured and Indicated Mineral Resource of 22.95 million tons at a weighted average grade of 0.286% V2O5. Total contained metal content of the Measured and Indicated Mineral Resources is 131.34 million pounds V2O5. The Inferred Mineral Resource estimate is 14.97 million tons at a weighted average grade of 0.175% V2O5. The total contained metal content of the Inferred Mineral Resource estimate is 52.30 million pounds V2O5. The table below contains a summary of the Gibellini deposit resource estimate:
 
Table 1: Mineral Resource Statement, Gibellini
 
 
 
 
Cut-off
 
 
Tons
 
 
Grade
 
 
Contained
 
 
  Confidence Category
 
 
  Domain
 
 
V2O5 (%)
 
 
(Mt)
 
 
V2O5 
 
 
V2O5 (Mlb)
 
asd
(%)
 
 
 
 
Measured
Oxide
  0.101 
  3.96 
  0.251 
  19.87 

Transition
  0.086 
  3.98 
  0.377 
  29.98 
Indicated
Oxide
  0.101 
  7.83 
  0.222 
  34.76 
 
Transition
  0.086 
  7.19 
  0.325 
  46.73 
Total Measured and Indicated
  22.95 
  0.286 
  131.34 
Inferred
Oxide
  0.101 
  0.16 
  0.17 
  0.55 
 
Transition
  0.086 
  0.01 
  0.18 
  0.03 
 
Reduced
  0.116 
  14.8 
  0.175 
  51.72 
Total Inferred
    
  14.97 
  0.175 
  52.3 
 
Notes to accompany Mineral Resource table for Gibellini:
 
1. 
The Qualified Person for the estimate is Mr. E.J.C. Orbock III, RM SME, an employee of the Wood Group of companies. The Mineral Resources have an effective date of May 29, 2018.
2. 
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
3. 
Mineral Resources are reported at various cut-off grades for oxide, transition, and reduced material.
4. 
Mineral Resources are reported within a conceptual pit shell that uses the following assumptions: Mineral Resource V2O5 price: $14.64/lb.; mining cost: $2.21/ton mined; process cost: $13.62/ton; general and administrative (“G&A”) cost: $0.99/ton processed; metallurgical recovery assumptions of 60% for oxide material, 70% for transition material and 52% for reduced material; tonnage factors of 16.86 ft3/ton for oxide material, 16.35 ft3/ton for transition material and 14.18 ft3/ton for reduced material; royalty: 2.5% net smelter return (NSR); shipping and conversion costs: $0.37/lb. An overall 40º pit slope angle assumption was used.
5. 
Rounding as required by reporting guidelines may result in apparent summation differences between tons, grade and contained metal content. Tonnage and grade measurements are in US units. Grades are reported in percentages.
 
Louie Hill Deposit
 
The Louie Hill deposit lies approximately 1,600 ft south of the Gibellini deposit.
 
The Gibellini Technical Report provides an Inferred Mineral Resource of 7.52 million tons at a weighted average grade of 0.276% vanadium pentoxide (V2O5). The oxidation domains were not modeled. The total contained metal content of the estimate is 41.49 million pounds V2O5. The table below summarizes the Louie Hill deposit resource estimate:
 
     
 
9
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Table 2: Mineral Resources Statement, Louie Hill
 
Confidence Category
 
Cut-offV2O5 (%)
 
 
Tons(Mt)
 
 
GradeV2O5 (%)
 
 
ContainedV2O5 (Mlb)
 
Inferred
  0.101 
  7.52 
  0.276 
  41.49 
 
Notes to accompany Mineral Resource table for Louie Hill:
 
1. 
The Qualified Person for the estimate is Mr. E.J.C. Orbock III, RM SME, an employee of the a Wood Group of companies . The Mineral Resources have an effective date of May 29, 2018. The resource model was prepared by Mr. Mark Hertel, RM SME.
2. 
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
3. 
Oxidation state was not modeled.
4. 
Mineral Resources are reported within a conceptual pit shell that uses the following assumptions: Mineral Resource V2O5 price: $14.64/lb; mining cost: $2.21/ton mined; process cost: $13.62/ton; general and administrative (G&A) cost: $0.99/ton processed; metallurgical recovery assumptions of 60% for mineralized material; tonnage factors of 16.86 ft3/ton for mineralized material, royalty: 2.5% net smelter return (NSR); shipping and conversion costs: $0.37/lb. For the purposes of the resource estimate, an overall 40º slope angle assumption was used.
5. 
Rounding as required by reporting guidelines may result in apparent summation differences between tons, grade and contained metal content. Tonnage and grade measurements are in US units. Grades are reported in percentages.
 
A total of 280 drill holes (about 51,265 ft) have been completed on the Gibellini Project since 1946, comprising 16 core holes (4,046 ft), 169 rotary drill holes (25,077 ft; note not all drill holes have footages recorded) and 95 reverse circulation holes (22,142 ft).
 
The vanadium-hosted argillite unit ranges from 175 to over 300 ft thick and overlies gray mudstone and black shales. The argillite has been oxidized to various hues of yellow and orange to a depth of 100 ft and is believed to have been part an overall homogenous black shale unit. Alteration (oxidation) of the rocks is classified as one of three oxide codes: oxidized, transitional, and reduced.
 
No significant work has been conducted on the Gibellini Project since 2015 with some minor prospecting completed in October of 2018. The Company has not completed trenching or drilling activities since the Gibellini Project acquisition.
 
The power supply for the Gibellini Project site is assumed to be at 24.9 kV and supplied from a planned substation to be located near Fish Creek Ranch. This substation would tap and step-down the 69kV supply carried by the line to the nearby Pan Mine to 24.9kV and place it on a line to the Gibellini Project. Negotiations with the power utility, Mt. Wheeler Power will need to be undertaken to secure any future power supply contract and transmission line to the site.
 
In conformance with Nevada BLM permitting requirements and Secretarial Order 3355, the company submitted a package of Enhanced Baseline Reports on March 22, 2019. Following BLM review of the baseline reports, , the Company submitted the Gibellini Mine Plan of Operations (the “MPO”) to the Bureau of Land Management (BLM) and the Reclamation Permit Application to the Nevada Division of Environmental Protection Bureau of Mining Regulation and Reclamation (BMRR) on June 28, 2019.
 
The Enhanced Baseline Reports were completed using data primarily collected by the previous operator between 2010 and 2012, and included studies of biological resources, air resources, cultural resources, surface water resources, ground water resources, noise, wild horses, paleontological resources, geological resources, socioeconomic and environmental justice, soil resources, visual resources, wetlands and riparian resources, and geochemical characterization for ore and overburden. The baseline data was updated with data collection completed in 2019 that validated the previous data. The reports included a review of potential environmental impacts and proposed Environmental Protection Measures to avoid or minimize these impacts. The MPO was then prepared by integrating the information developed in the baseline reports to guide the Project design to avoid or minimize potential environmental impacts.
 
The MPO includes over 1,100 pages of detailed development plans for the Project exploration activities, open pit mining operations and processing facilities to extract and recover vanadium from the Gibellini Deposit with stated average mine production during the seven-year mine life of 15.7 million tons of ore material containing 120.5 million pounds of vanadium. The primary facilities include the: pit, waste rock disposal facility, mine office, auxiliary facilities such as water and power, crushing facilities and stockpile, heap leach pad, process facility, water ponds, borrow areas, and mine and access roads.
 
     
 
10
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 

A map of the proposed facilities is available at www.silverelef.com.
 
In addition, the MPO includes the following management plans and engineering studies:
 
1.
Quality Assurance Plan
2.
Storm Water Management Plan
3.
Adaptive Waste Rock Management Plan
4.
Monitoring Plan
5.
Noxious Weed Management Plan
6.
Spill Contingency Plan
7.
Feasibility Study Level Pit Slope Design
8.
Heap Leach and Waste Rock Dump Facility Stability Report
9.
Closure Plan
10.
Water Management Plan
11.
Interim Closure Plan
12.
Transportation Plan
13.
Radiation Protection Plan
14.
Climate Data and Surface Water Hydrology,
15.
Seismic Hazard Analyses
16.
Engineering Design Criteria
 
In August 2018, NewFields completed the Gibellini heap leach pad and waste dump designs as part of an overall basic engineering design lead by M3 Engineering.
 
On October 31, 2019 the Water Pollution Control Permit and Air Permit applications were submitted to NDEP incorporating the Newfields and M3 Engineering Design packages. The draft air permit was posted for public comment on July 13, 2020.
 
PEA
 
On May 29, 2018, the Company received results of the PEA for the Gibellini Project. The PEA reported an after-tax cumulative cash flow of $601.5 million, an internal rate of return of 50.8%, a net present value of $338.3 million at a 7% discount rate and a 1.72 years payback on investment from start-up assuming an average vanadium pentoxide price of $12.73 per pound. As of May 29, 2018, the price of vanadium pentoxide was $14.20 per pound according to www.asianmetal.com. The PEA was prepared by Amec Foster Wheeler E&C Services Inc, part of the Wood Group (“Wood”) and is based on the NI 43-101 compliant resource calculations reported above.
 
Table 3: Highlights of the PEA (after tax)
 
All dollar values are expressed in US dollars unless otherwise noted
 
Internal rate of return
50.8%
Net present value (“NPV”)
$338.3 million at 7% discount rate
Payback period
1.72 years
Average annual production
9.65 million lbs V2O5
Average V2O5 selling price
$12.73 per lb
Operating cash cost
$4.77 per lb V2O5
All-in sustaining costs*
$6.28 per lb V2O5
Breakeven price**
$7.76 per lb V2O5
Initial capital cost including 25% contingency
$116.76 million
Average grade
0.26% V2O5
Strip ratio
0.17 waste to leach material
Mining operating rate
3.4 million tons (leach material and waste) per year
Average V2O5 recovery through Direct Heap Leaching
62%
Life of mine
13.5 years
*includes selling costs, royalties, operating cash cost, reclamation, exploration and sustaining capital costs.
**includes selling costs, royalties, operating cash costs, taxes (local, state, and federal), working capital, and sustaining and capital costs.
 
11
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
The PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
 
Sensitivity Analysis
 
The tables below show the sensitivity analysis to the vanadium pentoxide price, grade, and to the PEA capital cost and operating costs. This sensitivity analysis indicates strong project economics even in very challenging conditions, and that the project is well positioned to benefit from the current rising vanadium price environment. A 20% increase in the vanadium price relative to the base case translates to a USD$491.3 million after-tax NPV at a 7% discount rate.
 
Table 4: Sensitivity Analysis
 
All dollar values are expressed in US dollars unless otherwise noted
 
 
 V2O5 price
change
 
 
V2O5 
price USD$/lb
 
 
After-tax
IRR
 
 
After-tax NPV
USD$M @ 7%
 
 
After-tax
cashflow
USD$M
 
  30%
  16.55 
  69%
  568.0 
  996.0 
  20%
  15.28 
  63%
  491.3 
  864.4 
  10%
  14.00 
  57%
  415.2 
  733.2 
  Base Price 
  12.73 
  51%
  338.3 
  600.4 
  -10%
  11.46 
  44%
  261.0 
  467.2 
  -20%
  10.18 
  36%
  183.1 
  333.2 
  -30%
  8.91 
  26%
  103.9 
  196.9 
 
 
 
V2O5 grade
change
 
 
V2O5
grade
 
 
After-tax
IRR
 
 
After-tax NPV
USD$M @ 7%
 
 
After-tax
cashflow
USD$M
 
  30%
  0.34%
  68%
  554.4 
  972.8 
  20%
  0.31%
  63%
  482.4 
  849.0 
  10%
  0.28%
  57%
  410.7 
  725.4 
  Base Grade 
  0.26%
  51%
  338.3 
  600.4 
  -10%
  0.23%
  44%
  265.6 
  475.0 
  -20%
  0.21%
  37%
  192.2 
  348.9 
  -30%
  0.18%
  28%
  118.3 
  221.6 
 
 
12
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
  
 
Capex
change
 
 
Capex
USD$M
 
 
After-tax
IRR
 
 
After-tax NPV
USD$M @ 7%
 
 
After-tax
cashflow
USD$M
 
  30%
  151.8 
  40%
  307.2 
  564.3 
  20%
  140.1 
  43%
  317.6 
  576.3 
  10%
  128.4 
  47%
  328.0 
  588.4 
  Base Capex 
  116.8 
  51%
  338.3 
  600.4 
  -10%
  105.1 
  55%
  348.6 
  612.5 
  -20%
  93.4 
  61%
  358.9 
  624.6 
  -30%
  81.7 
  67%
  369.3 
  636.8 
 
 
Opex
change

 
 
Opex
USD$M
 
 
After-tax
IRR
 
 
After-tax NPV
USD$M @ 7%
 
 
After-tax
cashflow
USD$M
 
  30%
  6.20 
  45%
  257.9 
  450.2 
  20%
  5.72 
  47%
  284.8 
  500.3 
  10%
  5.25 
  49%
  311.6 
  550.4 
  Base Capex 
  4.77 
  51%
  338.3 
  600.4 
  -10%
  4.29 
  53%
  364.8 
  650.0 
  -20%
  3.82 
  55%
  390.7 
  698.4 
  -30%
  3.34 
  56%
  416.0 
  745.4 
 
Mining & Processing
 
Mining at the Gibellini and Louie Hill projects is planned to be a conventional open pit mine utilizing a truck and shovel fleet comprised of 100-ton trucks and front-end loaders. Average mine production during the 13.5 year mine life is 3.4 million tons of leach material (3 million tons) and waste (0.4 million tonnes) per year at a strip ratio of 0.17. Mining is to be completed either in-house or through contract, with the Company’s mining staff overseeing the contracted mining operation and performing the mine engineering and survey work if contract mining is selected.
 
Table 5
 
 
 
Oxide
‘000
tons
 
 
Transition
‘000
tons
 
 
Reduced
‘000
tons
 
 
Grade
%
V2O5
 
 
Metal
contained
V2O5 (Mlb)
 
 
Metal
Produced
V2O5 (Mlb)
 
YR 1
  2,600 
  400 
   
  0.291 
  17.440 
  10.633 
YR 2
  2,400 
  600 
   
  0.278 
  16.690 
  10.480 
YR 3
  1,760 
  1,240 
   
  0.310 
  18.580 
  12.067 
YR 4
  650 
  2,350 
   
  0.372 
  22.320 
  15.217 
YR 5
  310 
  2,680 
  10 
  0.366 
  21.950 
  15.185 
YR 6
  2,240 
  750 
  10 
  0.315 
  18.920 
  11.928 
YR 7
  3,000 
   
   
  0.316 
  18.980 
  11.394 
YR 8
  1,910 
  700 
  380 
  0.189 
  11.310 
  7.085 
YR 9
  690 
  1,220 
  1,090 
  0.216 
  12.940 
  8.023 
YR 10
  110 
  370 
  2,520 
  0.208 
  12.480 
  6.898 
YR 11
  450 
  360 
  2,180 
  0.182 
  10.910 
  6.103 
YR 12
  50 
  140 
  2,820 
  0.166 
  9.980 
  5.349 
YR 13
  390 
  10 
  2,600 
  0.183 
  10.970 
  5.839 
YR 14
  1,710 
   
   
  0.195 
  6.670 
  4.096 
Totals:
  18,290 
  10,830 
  11,590 
  0.258 
  210.15 
  130.297 
 
 
13
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
The processing method envisioned for the Gibellini Project will be to feed leach material from the mine via loader to a hopper that feeds the crushing plant. The leach material will then be fed to an agglomerator where sulfuric acid, flocculent and water will be added to achieve adequate agglomeration. The agglomerated leach material will be transported to a stacker on the leach pad, which will stack the material to a height of 15 feet. Once the material is stacked, solution will be added to the leach heap at a rate of 0.0025 gallons per minute per square foot. The solution will be collected in a pond and this pregnant leach solution will be sent to the process building for metal recovery where it will go through solvent extraction and stripping processes to produce the vanadium pentoxide and a secondary yellowcake uranium.
 
Vanadium Recoveries and Metallurgical Testing
 
Approximately 130.3 million pounds of V2O5 and 336,000 pounds of uranium is expected to be produced from Gibellini and Louie Hill leaching operations at an average vanadium recovery of 62% (oxide: 60%, transition: 70% and reduced: 52%). The heap leaching is performed at ambient temperature and atmospheric pressure without pre-roasting or other beneficiation process. The pregnant leach solution is continuously collected with leach material undergoing, on average, a 150-day heap-leaching cycle. Table 6 below summarizes the projected metallurgical recoveries used in the PEA for the three defined oxidation-type domains.
 
Table 6
 
Mill Feed Material Type
 
Direct Leaching Recovery
 
Oxide
  60%
Transition
  70%
Reduced
  52%
 
The direct heap leach vanadium recovery estimates used in the PEA were based on extensive metallurgical testing work performed by SGS Lakefield Research Laboratories, Dawson Minerals Laboratories, and McClelland Laboratories. Samples were selected from a range of depths within the deposit, representative of the various types and styles of mineralization. Samples were obtained to ensure that tests were performed on a sufficient sample mass. The end results demonstrated low acid consumption (less than 100 lb acid consumption per ton leached) and high recovery through direct leaching. Notable test results included the following:
 
Acid Heap Leach Testing of a Gibellini Bulk Sample, McClelland Laboratories, September 4, 2013
 
A series of trenches were excavated and approximately 18 tons of material were sent to McClelland Laboratories for pilot testing.
 
Solvent Extraction (SX) Test Work
 
The design parameters from this test work are:
 
 SX Extraction pH Range 1.8 to 2.0
 Di-2-Ethyl Hexyl Phosphoric Acid Concentration 0.45 M (~17.3% by weight) Cytec
 923 Concentration 0.13 M (~5.4% by weight)
 The Organic Diluent is Orform SX-12 (high purity kerosene)
 
 
 
14
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
 SO2 addition of 1.0 to 1.5 g/l
 Strip Solution Sulfuric Acid Concentration 225 to 250 g/l SX
 Extraction Efficiency ~97%
 SX Strip Efficiency ~98%
 
Pilot Scale Solvent Extraction Testing on Vanadium Bearing Solutions from Two Gibellini Project Column Leach Tests, McClelland Laboratories, September 16, 2013
Solvent extraction (“SX”) processing was conducted to recover vanadium from sulfuric acid pregnant leach solution (“PLS”) generated during pilot column testing on bulk leach samples from the Gibellini project. Laboratory scale testing was conducted on select solutions generated during the pilot SX processing, to optimize the SX processing conditions. Additional laboratory scale testing was conducted on the loaded strip solution generated during the pilot SX testing, to evaluate methods for upgrading and purifying it to levels that may be required for sale of a final vanadium bearing product.
 
In August of 2018, the Company received metallurgical results from its technology partner, NWME from samples collected during a site visit in March of 2018. Tests were performed at its laboratory testing facilities located in Xi’an, China. NWME utilized a SX processing method to recover vanadium from sulfuric acid PLS generated by bottle roll and column test acid leaching on Gibellini samples. The solution was reduced and then precipitated using ammonia to make AMV. The AMV was calcined and heated then cooled and pulverized. A vanadium pentoxide with 98.56 % purity content was produced. The assay for this work is shown below:
 
Table 8
 
V2O5 %
SI %
Fe %
P %
S %
As %
Na2O %
K2O %
Al %
U %
98.56
0.0078
0.88
0.058
0.47
0.0026
0.43
0.052
0.22
0.0001
 
Uranium content is less than 0.0001% which does not affect the marketability of the product.
 
The PLS was produced with very low deleterious elements which enabled using an efficient SX process. The PLS V2O5 concentration was 1.15 gram per liter and the Pregnant Strip Solution V2O5 concentration was 39.61 grams per liter.
 
Capital and Operating Costs
 
The projected capital costs for the Gibellini vanadium project over a 1 ½ year construction period and mine life average operating costs are summarized in Tables 9 and 10 below. The capital cost includes 25% contingency or USD23.4 million.
 
 
15
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Table 9: Pre-Production Capital Cost
All dollar values are expressed in US dollars unless otherwise noted
 
Cost Description
Total
(USD$000s)
Open Pit Mine
Open pit mine development
1,412
Gibellini incremental WRSF
212
Mobile equipment
111
Infrastructure-On Site
Site prep
2,431
Roads
1,391
Water supply
2,007
Sanitary system
61
Electrical – on site
2,052
Communications
165
Contact water ponds
174
Non-process facilities – buildings
7,583
Process Facilities
Mill feed handling
15,380
Heap leach system
20,037
Process plant
14,441
Off-Site Infrastructure
Water system
4,495
Electrical supply system
3,227
First fills
860
Subtotal Total Direct Cost
76,039
Construction indirect costs
4,254
Sales tax / OH&P
4,236
EPCM
8,879
Total Before Contingency
93,409
Contingency (25%)
23,352
Total Project Cost
116,761
 
Table 10: Operating Costs
 
Total Cash Operating Cost
 
USD$ per Ton Leached
 
 
USD$ per lb of V2O5 Produced
 
G&A
  0.99 
  0.31 
Mining Cost
  2.72 
  0.85 
Total Processing Cost
  11.54 
  3.61 
Total
  15.26 
  4.77 
(All dollar values are expressed in US dollars unless otherwise noted)
 
 
16
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
The cash operating costs in the first half of the project covering years 1-7 is USD$3.59 per lb of V2O5 produced and for the years 8-14 is USD$7.12 per lb of V2O5 produced, resulting in the weighted average cash cost of USD$4.77 per lb of V2O5 produced. The cash operating cost is lower in the first half of the project due to processing higher grade material.
 
Engineering Procurement Construction Management:
 
On August 15, 2018, the Company issued a request for proposal (the “RFP”) for EPCM from qualified bidders. In December 2018 the Company selected M3 Engineering & Technology Corporation (M3) of Tucson, Arizona to provide engineering, procurement, construction and management services (EPCM) for its Gibellini Vanadium Project in response to its Request for Proposal. M3 was selected for its specific experience in heap leach engineering, and construction expertise in arid environments such as Nevada and Arizona.
 
The EPCM consists of three phases:
 
Phase 1 includes updating and simplifying previous basic engineering as well as mine design, waste dump design, road design, borrow pit design, buildings and infrastructure designs will not be substantially changed.
Phase 2 will consist of procurement of the required equipment, services and developing the detailed engineering design required to build the project facilities.
Phase 3 will outline construction management services to build the facilities to accomplish the actual work.
 
The Company expects Phase 1 of the EPCM to be completed in 2020; Phase 2, to be completed in 2021; Phase 3, to commence in 2022, completed in 2022 and the Gibellini Project wet commissioning expected to be in 2023.
 
To try to minimize technical and implementation risk, the Company is working closely with its chosen technology partner, NWME, to fine tune metallurgy, process design and engineering, and ensure maximum vanadium recovery and high-grade vanadium pentoxide commercial product on site. NWME owns and is currently operating the world’s largest black-shale vanadium mine in China with an environmentally friendly, hydrometallurgical leach processing technology without the need of a pre-roasting step (see the Company’s news release dated March 12, 2018 for more details.
 
NWME conducted a Gibellini site visit in March 2018 and analyzed Gibellini samples in its laboratories. The results of this work are discussed in the following section.
 
Test Results
 
Samples collected by NWME’s technical team during their visit to the Project’s site in February 2018 were analyzed at NWME’s facility in Xi’an, China. Approximately 250 kg of material was submitted for analysis. The results are described herein.
 
98.6% V2O5 Produced on the 1st Run with Simple Conventional Flowsheet
 
NWME used SX processing method to recover vanadium from sulfuric acid PLS generated by bottle roll and column test acid leaching on Gibellini samples. The solution was reduced and then precipitated using ammonia to make AMV. The AMV was calcined and heated then cooled and pulverized. A vanadium pentoxide with 98.56 % purity content was produced. The assay for this work is shown in Table 11 below:
 
Table 11: Gibellini Vanadium Pentoxide Assay
 
V2O %
SI %
Fe %
P %
S %
As %
Na2O %
K2O %
Al %
U %
98.56
0.0078
0.88
0.058
0.47
0.0026
0.43
0.052
0.22
0.0001
 
Uranium content is less than 0.0001% which does not affect the marketability of the product.
 
The PLS was produced with very low deleterious elements which enabled using an efficient SX process. The PLS V2O5 concentration was 1.15 gram per liter and the Pregnant Strip Solution V2O5 concentration was 39.61 grams per liter.
 
Overall Vanadium Recovery of Over 60% and Low Acid Consumption
 
PLS was produced from both bottle roll and column tests. Sulfuric acid was added to the feed material with the bottle rolling for 1 hour, then the open bottle was allowed to cure for 24 hours and water was added to the bottle to attain the desired density (40%). Initial samples were taken at 6 hours, 12 hours, 24 hours, 36 hours, 48 hours and then once a day until the bottle roll was completed.
 
 
17
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
In column tests, sulfuric acid was added to the feed material and the material was allowed to cure for 24 hours before initiating the leaching. Leaching was conducted by applying 108 grams per liter acid solution over the material. PLS was collected every 24 hours and samples were taken for vanadium analysis. All the tests were performed at room temperature and at atmospheric pressure. The results of the tests are given in Table 12:
 
Table 12
 
Test
Leach
Time
Vanadium
Recovery
%
Sulfuric
Acid
Consumed
kg/t
Column Test
21 days
70.74
100
Bottle Roll Test - investigate the effect of the curing method and increase of sulfuric acid addition on the vanadium recovery
50 hours
62.8
150
Bottle Roll Test - investigate addition of NWME prepared leaching agent on the vanadium recovery
144 hours
66.5
100
Bottle Roll Test - investigate the leaching of coarse feed (2mm) on the vanadium recovery
216 hours
63.7
100
 
The results of the bottle roll and column leach tests performed by NWME largely validate the results of previous tests performed by McClelland Laboratories (“McClleland”) on the Gibellini bulk sample in 2013 (18 tons of material).
 
The NWME test samples were not agglomerated and were on short leach time of 21 days for column tests and 5 days for bottle roll tests. The Company studied both the NWME test and McClleland test in detail and believe the results were consistent, whereby 70% recovery can be achieved with longer leach cycle (over 100 days McClelland Laboratories vs 21 days NWME) and less acid consumption (50 kg of acid per tonne of material McClelland Laboratories vs 100 kg of acid per tonne of material NWME).
 
A summary of acid heap leach tests of a Gibellini bulk sample, completed at McClelland Laboratories, September 4, 2013 is tabulated in Table 13 below:
 
Table 13
 
Size
Test Type
Time (Days)
Vanadium Recovery %
Head Grade % V2O5
Sulfuric Acid
Consumed kg/t


50 mm (2”)
Column, open circuit
123
76.6
0.53
39.9
12.5 mm (1/2”)
Column, open circuit
123
80.2
0.56
32.7
12.5 mm (1/2”)
Column, closed circuit
230
68.3
0.51
38.1
12.5 mm (1/2”)
Column, closed circuit
198
74.0
0.56
43.5
12.5 mm (1/2”)
Bottle Roll
4
67.1
0.51
33.6
1.7 mm (-10m)
Bottle Roll
4
66.3
0.51
29.9
-75µ
Bottle Roll
4
67.6
0.50
28.1
-75µ
Bottle Roll
30
74.2
0.53
24.5
 
Representative Feed Grade with Benign Test Conditions that Can be Replicated in Commercial Setting
 
The leaching bottle roll and column tests were performed at room temperature and at atmospheric pressure based on Gibellini’s representative grade from grab sampling method across the width of the mineralization at various locations of the Project. These samples are characterized in Table 14:
 
 
18
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Table 14
 
Sample Number
Sample ID
Weight kg
Head Grade V2O5 (%)
1
18-L6-28
17.0
0.665
2
18-L6-29
17.0
0.885
3
18-L6-30
12.5
0.370
4
18-L6-31
18.0
0.210
5
18-L6-32
13.5
0.420
6
18-L6-33
22.5
0.280
7
18-L6-34
19.0
0.315
8
18-L6-35
20.0
0.185
9
18-L6-36
18.0
0.165
10
18-L6-37
20.0
0.195
Total

177.5

 
For the purpose of metallurgical testing, the samples were mixed to produce a composite material with the average grade of 0.30% V2O5 which is representative of Gibellini resource grade. The composite material was ground to -75 lm feed. The Company believes the test conditions can easily be replicated in a commercial heap leach setting with low technical and implementation risk.
 
Vanadium Mineralogy in Achieves Recovery at Room Temperature and Atmospheric Pressure
 
NWME performed detailed mineralogical analysis which included microscope identification using a Carl Zeiss Axioskop, XRD analysis on Bruker D8-A25 XRD, multi-element analysis, electron probe X-ray microanalysis on JEOL JXA 8230, scanning electron microscopy/energy dispersive X-ray spectroscopy analysis on Mineral Liberation Analizer 650 and V element phase analysis. This mineralogical analysis confirmed that the Gibellini resource has a high percentage of independent vanadium minerals (“IVM”) such as kazakhstanite, shubnelite, sherwoodite, bokite, which can be leached easily at room temperature and atmospheric pressure within a short time frame.
 
NWME noted the unique nature of the Gibellini samples with over 45% IVM versus numerous other typical black shale deposits which they have encountered containing less than 10% IVM.
 
All of the test work carried out on the material from the Gibellini Project indicate that there is a two-stage leaching phenomenon in Gibellini ore - approximately 50% of the vanadium leaches in the first 96 hours (independent vanadium minerals), and the remaining leaching approximately 15 to 20% occurs over a longer time horizon.
 
Heap leaching is the lowest-cost recovery method compared to roasting, and pressured container VAC leaching; whereby capital costs can compound to multiple times greater for the same throughput. Gibellini’s high IVM content is a key competitive differentiator which places the deposit in the top tier of black shale deposits in terms of pre-production capital cost required based on NWME’s research. The mineralogical results of the Gibellini ore as characterized by NWME’s test work is shown in Table 15:
 
 
 
19
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Table 15
 
Mineral composition
Mineral content %
V content in minerals %
V distribution %
Independent vanadium minerals
45.2% of vanadium content
Kazakhstanite
              0.15
               40.91
                19.77
Shubnelite
              0.13
               27.86
                11.67
Sherwoodite
              0.08
               34.54
                  8.90
Bokite
              0.03
               36.51
                  3.53
Melanovanadite
              0.01
               41.27
                  1.33
Vanadium-bearing layered aluminosilicate minerals
20.8% of vanadium content
Sericite
              8.59
                  0.57
                14.63
Illite
              5.58
                  0.28
                  5.03
Chlorite
              0.81
                  0.44
                  1.14
Nacrite-palygorskite
              0.70
                      -
                       -
Vanadium-bearing layered iron oxide, sulfate 34% of vanadium content
Limonite
              1.76
                  5.48
                31.07
Strengite
              0.64
                  0.49
                  1.01
Jarosite
              0.48
                  1.24
                  1.92
Gangue
Quartz
            75.88
                      -
                       -
Apatite
              2.83
                      -
                       -
Potassium feldspar
              0.73
                      -
                       -
Dolomite
              0.66
                      -
                       -
Carbonaceous
              0.45
                      -
                       -
Rutile
              0.25
                      -
                       -
Barite
              0.04
                      -
                       -
Pyrite
              0.20
                      -
                       -
Total
         100.00
 
             100.00
 
Low Carbonate Content Results in Low Acid Consumption.
 
NWME detailed mineralogical analysis which included microscope identification using a Carl Zeiss Axioskop, XRD analysis on Bruker D8-A25 XRD, multi-element analysis, electron probe X-ray microanalysis on JEOL JXA 8230, scanning electron microscopy/energy dispersive X-ray spectroscopy analysis on Mineral Liberation Analyzer 650 and V element phase analysis, confirmed the extremely low carbonaceous content of Gibellini’s oxide and transition samples. This explains the low acid consumption (less than 50 kg per tonne) compared to other average black shale deposits of 200 kg to 300 kg per tonne based on extensive NWME data compilation. Given acid cost accounts for approximately 50% of the Project’s operating expenses, Gibellini’s low carbon content is a key competitive differentiator which places it in the top tier of black shale deposits in terms of processing cost based on NWME’s findings.
 
 
20
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
The following table is a generalized comparison of Gibellini’s deposit to a composite of typical black shale vanadium deposits:
 
Table 16
 
 
Gibellini Vanadium Deposit
Black Shale Series Vanadium Deposits
Host Rock
Silica State
Carbon Siliceous Rocks with Mudstone
The Mineral Composition
High Silica, Low Aluminium and Low Carbonaceous. SiO2-78.40%; Al2O3 - 4.13%; T(C) - 0.47%
High Silica, High Aluminum and High Carbonaceous. SiO2-62-93%; Al2O3 > 7%; T(C) > 10%
 
On March 26, 2019, the Company announced vanadium assay results from its Fall 2018 exploration reconnaissance program on the Gibellini Project. The 155 assays are taken from three prospective exploration areas all within 5km to existing Gibellini vanadium NI43-101 compliant resource pit outline. Surface grab samples assay as high as 2% vanadium pentoxide (V2O5) and 75 samples (48% of total 155) have V2O5 grades greater than the Gibellini deposit’s cut-off grade of 0.101% V2O5 at $12.5/lb V2O5.
 
The high vanadium assay results along the 5-kilometer northeast-southwest trend which line-up the Northeast Prospect, through Gibellini Hill, Louie Hill, Middle Earth Prospect, and Big Sky Prospect providing an indication of potential and possibly significant future expansion of vanadium mineralization along this corridor.
 
Detailed maps are available at www.silverelef.com.
 
Big Sky Prospect (300m by 50m)
 
The Big Sky prospect occurs 3.1 km southwest of the Gibellini Hill measured and indicated resource and 1.8 km southwest of Louie Hill inferred resource. A total of 62 samples were taken, of which 40% (n=25) returned assays greater than Gibellini cut-off grade. Sixteen (16) samples returned assays >0.200 V2O5. The distribution of samples occurs along a 300-meter exposure of the Woodruff Formation. Assays showing >0.200 V2O5 are shown in Table 17.
 
Table 17. V2O5% grab sample assay results at Big Sky prospect for samples with >0.200%
 
SAMPLE ID
Prospect
V2O5 %
301910
Big Sky
0.261
301913
Big Sky
0.223
301915
Big Sky
0.346
301916
Big Sky
0.400
301918
Big Sky
0.712
301920
Big Sky
0.264
301926
Big Sky
0.580
301927
Big Sky
2.008
301928
Big Sky
0.848
301944
Big Sky
0.264
301946
Big Sky
0.280
301947
Big Sky
0.218
301950
Big Sky
0.261
302050
Big Sky
0.214
302054
Big Sky
0.787
302055
Big Sky
1.982
 
 
21
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Middle Earth Prospect (200m by 70m)
 
The Middle Earth prospect occurs 1.7 km southeast of the Gibellini Hill deposit and 300 meters south of the Louie Hill deposit. A total of 50 samples were collected of which 68% (n=34) returned assays >0.101% V2O5 or the Gibellini cut-off grade. Twenty-seven (27) samples returned assays >0.200 V2O5. The samples are distributed over 3 road cuts of exposed Woodruff Formation making up a 200 meter by 70-meter areal footprint. Assays showing >0.200 V2O5 are shown in Table 18.
 
Table 18. V2O5% grab sample assay results at Middle Earth prospect for samples with >0.200%
 
SAMPLE ID
Prospect
V2O5 %
301951
Middle Earth
0.350
301952
Middle Earth
0.482
301968
Middle Earth
0.628
301969
Middle Earth
0.605
301970
Middle Earth
0.634
301972
Middle Earth
0.252
301973
Middle Earth
0.687
301974
Middle Earth
0.470
301975
Middle Earth
0.612
301976
Middle Earth
0.637
301978
Middle Earth
0.559
301979
Middle Earth
0.557
301980
Middle Earth
0.259
301981
Middle Earth
0.405
301983
Middle Earth
0.255
301984
Middle Earth
0.303
301985
Middle Earth
0.434
301987
Middle Earth
0.291
301988
Middle Earth
1.294
301989
Middle Earth
0.261
301991
Middle Earth
0.314
301992
Middle Earth
0.457
301993
Middle Earth
0.380
301995
Middle Earth
0.302
301998
Middle Earth
0.539
301999
Middle Earth
0.618
302000
Middle Earth
0.532
 
Northeast Trench Prospect (500m by 300m)
 
The Northeast Trench prospect occurs 1.2 km northeast of the Gibellini Hill deposit and 2.5 km northeast of the Louie Hill deposit. A total of 43 samples were collected of which 37% (n=16) returned assays >0.101% V2O5 or the Gibellini cut-off grade. Three (3) samples returned assays >0.200 V2O5. The samples are distributed through road cuts (“trenches”) and dry gulches of exposed Woodruff Formation making up a 500 meter by 350-meter areal footprint. The exposure at the Northeast Trench is greatly obscured by colluvium material however the extent where it is exposed might indicate a large volume of Woodruff Formation yet to be explored. Assays showing >0.200 V2O5 are shown in Table 19.
 
 
22
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Table 19. V2O5% grab sample assay results at Northeast Trench prospect for samples with >0.200%
 
SAMPLE ID
Prospect
V2O5 %
302004
NE Trench
0.239
302005
NE Trench
0.380
302016
NE Trench
0.303
 
Water supply
 
On August 20, 2018, the Company secured water supply for the Gibellini Project construction and operation. The Company signed a 10-year Agreement with the owner of a private ranch, located approximately 14.5 km from the Gibellini Project. The Agreement can be extended for any number of additional 7-year terms, not to exceed (with the primary term) a total of 99 years.
 
Per the terms of the Agreement, the lessor granted to the Company the rights to 805 acre-feet (approximately 262.4 million gallons) of water per year for the Gibellini Project, at a minimum flow rate of 500 gallons per minute (“gpm”) from its year-round springs surface water stream. The water flow rate was measured at the ranch springs in 1965, in 1981, from December 2011 to September 2013, and most recently, in 2017. The water flow rate ranges from 1,000 to 3,900 gpm with an average flow rate of 2,690 gpm, which exceeds the project’s maximum water operational requirement of 420 gpm based on the process engineering design prepared by Scotia International of Nevada, Inc. as a part of engineering, procurement, construction and management work done in 2014.license
The Gibellini Project completed water-related baseline studies including the drilling of water-test wells, water source data collection, characterization, flow rate testing and modeling. Due to the fact that the Agreement provides a source of water from surface springs located on a private ranch and baseline studies related to it have been completed, the Company expects to significantly expedite the permitting process by eliminating the need to appropriate water rights from the Nevada Division of Water Resources (“DWR”).
 
Offtake and project financing
 
The Company has received unsolicited expressions of interest from various potential investment sources and is currently engaged in discussions with potential cornerstone investors, vanadium product off-takers and banks on potential equity, debt and prepaid off-take financing possibilities. The Company expects to report material progress in due course.
 
On October 31, 2019, the Company submitted permit applications for the Water Pollution Control Permit and the Class II Air Quality Permit. These Nevada state permits have been developed to provide construction level engineering that supports the mine plan previously submitted to the BLM in the Plan of Operations. Comments received from the BLM were used as guidance in the engineering design to ensure the State and Federal Permits are aligned and reflect the most current guidance provided by both the NDEP and BLM.
 
NDEP Water Pollution Control Permit
 
Mining in Nevada is regulated under the authority of the Nevada Revised Statutes (NRS) 445A.300-NRS 445A.730 and the Nevada Administrative Code (NAC) 445A.350-NAC 445A.447. Water Pollution Control Permits (WPCP) are issued to an operator prior to the construction of any mining, milling, or other beneficiation process activity. Facilities utilizing chemicals for processing ores are required to meet a zero-discharge performance standard such that Waters of the State will not be degraded.
 
The engineering design for heap leaching, the processing facility, and the mine design (M3 Engineering and Newfields Companies, LLC) was integrated into to the site Closure Plan that was also submitted as part of the WPCP application. This design will facilitate concurrent closure of the heap as each heap cell is finished leaching. This will allow the Closure Plan to be initiated during operations. At the end of active mining, the site can be closed at minimal technical risk. This reduces the closure duration and liability and the commensurate reclamation bond.
 
 
23
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Air Quality Class II Permit
 
The Nevada Bureau of Air Pollution Control issues air quality operating permits to stationary and temporary mobile sources that emit regulated pollutants to ensure that these emissions do not harm public health or cause significant deterioration in areas that presently have clean air. This is achieved by stipulating specific permit conditions designed to limit the amount of pollutants that sources may emit into the air as a regular part of their business processes.
 
Any process/activity that is an emission source requires an air quality permit. Nevada Revised Statute (NRS) 445B.155 defines an emission source as “any property, real or personal, which directly emits or may emit any air contaminant.”
 
The Class II Permit for Gibellini is for facilities that emit less than 100 tons per year for any one regulated pollutant. Since the vanadium processing will utilize a heap leach, the emissions will be under the threshold for more complex air permits. The engineering design incorporates stringent emission control technology to minimize emissions. The modeled emissions from the entire Gibellini Project are well below the National Ambient Air Quality Standards (NAAQS).
 
The Enhanced Baseline Reports (EBR’s) were extensively used in the Project engineering design to ensure that potential environmental impacts identified in the EBR’s would be avoided or minimized by facility design. These engineering controls help ensure that avoidance of potential environmental impacts is “built into” the project from the start of the design process. Doing so will allow Environmental Protection Measures to be taken to minimize the risk of impacts that cannot be completely avoided in the design and ensure up-front project planning that is sensitive to all environmental resources.
 
Integration with BLM 12-month 3355 EIS Process
 
The Nevada state permit applications were brought forward in the permitting process to identify any issues resulting from NDEP review that could affect the project design in the Plan of Operations early. By resolving the State permitting issues prior to the start of the EIS, it will help ensure that the 12-month schedule mandated by the BLM Secretarial Order 3355 (S.O. 3355) can be met and interruptions to the schedule can be avoided.
 
On July 14, 2020, the NOI to prepare an Environmental Impact Statement was published in the Federal Register.
The NOI formally commences the 12-month timeline to complete the National Environmental Policy Act review and EIS preparation by the BLM. The NEPA process is designed to help public officials complete permitting decisions that are protective of the environment and includes a public engagement process.
 
Per news release from The Bureau of Land Management (BLM) Mount Lewis Office: “If approved, this project would provide hundreds of jobs and will contribute to the nation’s domestic source of critical minerals,” said Doug Furtado, Battle Mountain District Manager. “The Gibellini mine would also be the first vanadium mine in the U.S. and, in accordance with Secretarial Order 3355, we anticipate having a record of decision in 12 months.
 
As there is currently no primary domestic production of vanadium, the United States is dependent on foreign sources of vanadium; this creates a strategic vulnerability for both the economy and military to adverse government action or other events that can disrupt the supply of this key mineral.”
 
The Company continues with its EPCM work and expects Phase 1 of the EPCM, updating basic engineering design, to be completed by 2020; Phase 2, equipment procurement and detailed engineering design, to be completed in 2021; Phase 3, facilities construction, to start in 2022 and be completed in 2023 with the Gibellini Project wet commissioning expected to be in 2023.
 
 
24
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
During the six months ended June 30, 2020, the Company incurred total costs of $1,260,844 (same period 2019 - $2,333,203) for the Gibellini Project including for $488,392 (same period 2019 - $1,303,462) for geological and engineering services, and $704,706 (same period 2019 - $756,671) for personnel, legal, general and administrative expenses, and $67,746 (same period 2019 - $273,069) for fees and permits.
2020-2021 Outlook
 
The Company intends to spend the available funds as set forth above based on annual budgets approved by the Board of Directors consistent with established internal control guidelines, and programs recommended in the Gibellini PEA. However, there may be circumstances where, for sound business reasons, a reallocation of the net proceeds may be necessary. The actual amount that the Company spends in connection with each of the intended uses of proceeds may vary significantly from the amounts specified above and will depend on a number of factors, including those referred to under “Risk Factors”.
 
The Company’s 2020-2021 Gibellini objectives are:
 
Develop strategy with State of Nevada to potentially fill US Critical Mineral Inventory;
Explore off-take options for vanadium products; and
Complete all Nevada permits.
 
Pulacayo-Paca Property, Bolivia
 
On January 2, 2015, pursuant to the terms of the acquisition agreement entered into between the Company and Apogee Silver Ltd. (“Apogee”), the Company acquired the Pulacayo Project in Bolivia through the acquisition of the issued and outstanding shares of ASC Holdings Limited and ASC Bolivia LDC, which together, hold the issued and outstanding shares of ASC Bolivia LDC Sucursal Bolivia. ASC Bolivia LDC Sucursal Bolivia controls the mining rights to the concessions through a separate joint venture agreement with the Pulacayo Ltda. Mining Cooperative who hold the mining rights through a lease agreement with state owned Mining Corporation of Bolivia, COMIBOL.
 
The Pulacayo Project comprises seven concessions covering an area of approximately 3,550 hectares of contiguous mining concessions centered on the historical Pulacayo mine and town site. The Pulacayo Project is located 18 km east of the town of Uyuni in the Department of Potosi in southwestern Bolivia. The Project is also located 107 km northeast of Sumitomo Corporation’s San Cristobal silver mine, 185 km southwest of Coeur Mining, Inc.’s San Bartolome silver mine, and 139 km north of Pan American Silver Corp.’s San Vicente silver mine.
 
 
On October 7, 2019, the Company announced that the Pulacayo Mining Production Contract (“MPC”) between the Company and COMIBOL which was executed on October 3, 2019. The MPC grants the Company the 100% exclusive right to develop and mine at the Pulacayo and Paca concessions for up to 30 years. It is comparable to a mining license in Canada or the United States.
 
 
25
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
In November 2017, the Company received an independent technical report with an effective date of October 20, 2017 titled “Updated Mineral Resource Estimate and Technical Report for the Pulacayo Project” (the “Report”). The Report was prepared by Mercator Geological Services Limited (“Mercator”) on the Company’s Pulacayo Project and has been filed under the Company’s profile on the System for Electronic Document Analysis and Retrieval (“SEDAR”) at www.sedar.com.
 
The Report describes resources estimated following the guidelines of the CIM Definition Standards for Mineral Resources and Mineral Reserves.
 
Two mineral resource estimates were disclosed according to the requirements NI 43-101. The first for the Pulacayo deposit and the second for the Paca deposit.
 
Pulacayo Deposit
 
Results of the mineral resource estimate prepared by Mercator for the Pulacayo deposit are presented below in Table 20 and filed via SEDAR at www.sedar.com.
 
The Report outlined 2.08 million tonnes at a weighted average grade of Ag 455 g/t, Pb 2.18%, Zn 3.19% (Ag Eq. 594 g/t) in the indicated category and 0.48 million tonnes at a weighted average grade of Ag 406 g/t, Pb 2.08%, Zn 3.93% (Ag Eq. 572 g/t) in the inferred category. The contained metal content estimated by the Company, of the indicated category resources is 30.4 million ounces of silver, 100.0 million pounds of lead, 146.3 million pounds of zinc. The contained metal content estimated by the Company, of the inferred category resource is 6.3 million ounces of silver, 22.0 million pounds of lead, and 41.6 million pounds of zinc (more resource details in the table below).
 
Table 20. Pulacayo Indicated and Inferred Mineral Resource Statement Details
 
Pulacayo Mineral Resource Statement – Effective October 20, 2017
Ag Eq. Cut-Off (g/t)
Category
Tonnes*
Ag (g/t)
Pb (%)
Zn (%)
Ag Eq. (g/t)
400
Indicated
2,080,000
455
2.18
3.19
594
Inferred
480,000
406
2.08
3.93
572
 
Notes:
 
(1) 
Mineral resources are estimated in conformance with the CIM Standards referenced in NI 43-101.
(2) 
Raw silver assays were capped at 1,700 g/t, raw lead assays were capped at 15% and raw zinc assays were capped at 15%.
(3) 
Silver equivalent Ag Eq. (g/t) = Ag (g/t)*89.2% + (Pb% *(US$0.94/ lb. Pb /14.583 Troy oz./lb./US$16.50 per Troy oz. Ag)*10,000*91.9%) + (Zn% *(US$1.00/lb. Zn/14.583 Troy oz./lb./US$16.50 per Troy oz. Ag)*10,000*82.9%)
(4) 
Metal prices used in the silver equivalent calculation are US$16.50/Troy oz. Ag, US$0.94/lb Pb and US$1.00/lb. Zn. Metal recoveries used in the silver equivalent equation reflect historic metallurgical results disclosed by Apogee Silver Ltd. (Porter et al., 2013).
(5) 
Metal grades were interpolated within wire-framed, three-dimensional silver domain solids using Geovia-Surpac Ver. 6.6.1 software and inverse distance squared interpolation methods. Block size is 10m(X) by 10m(Z) by 2m(Y). Historic mine void space was removed from the model prior to reporting of resources.
(6) 
Block density factors reflect three-dimensional modeling of drill core density determinations.
(7) 
Mineral resources are considered to have reasonable expectation for economic development using underground mining methods based on the deposit history, resource amount and metal grades, current metal pricing and comparison to broadly comparable deposits elsewhere.
(8)     
Rounding of figures may result in apparent differences between tonnes, grade and contained ounces.
(9)     
Mineral resources that are not mineral reserves do not have demonstrated economic viability.
(10)     
Tonnes are rounded to nearest 10,000.
 
 
26
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
The contained metals estimated by the Company based on in the October 20, 2017 resource estimate by Mercator are presented in Table 21.
 
Table 21: Contained Metals Based on October 20, 2017 Pulacayo Deposit** Mineral Resource Estimate
 
Metal
Indicated Resource
Inferred Resource
Silver
30.4 million oz.
6.3 million oz.
Lead
100.0 million lbs.
22.0 million lbs.
Zinc
146.3 million lbs.
41.6 million lbs.
 
**Based on the resource estimate Ag Eq. cut-off value of 400 g/t and 100% recovery; figures are rounded to the nearest 100,000th increment
 
Between 2006 and 2012, a total of 69,739 metres of diamond drilling (226 surface and 42 underground drill holes) was conducted at Pulacayo, results of which support the mineral resource estimate reported in this news release. The Pulacayo site is currently permitted for production at a milling rate of 560 tonnes per day and no known legal, political, environmental, or other risks that would materially affect potential future development have been identified by the Company at the effective date of the current (October 20, 2017) mineral resource estimate.
 
Approximately 85% of the resource tonnage identified at the 400 g/t Ag Eq. cut-off value occurs within 150 meters vertical distance from the main San Leon tunnel, which may facilitate future mineral extraction.
 
Paca Deposit
 
The Paca deposit is located in Bolivia approximately 7 km north of the Pulacayo deposit.
 
Results of the mineral resource estimate prepared by Mercator for the Paca deposit are presented below in Table 3. The Report described previously and filed on SEDAR documents the resource estimate.
 
The Report outlined 2.54 million tonnes at a weighted average grade of Ag 256 g/t, Pb 1.03%, Zn 1.10% (Ag Eq. 342 g/t) in the inferred category. The contained metal content estimated by the Company, of the inferred category resources is 20.9 million ounces of silver, 57.7 million pounds of lead, 61.6 million pounds of zinc. (more resource details in the table below).
 
Table 22. Paca Inferred Mineral Resource Statement Details
 
Paca Mineral Resource Statement – Effective October 20, 2017
Ag Eq. Cut-Off (g/t)
Category
Tonnes*
Ag (g/t)
Pb (%)
Zn (%)
Ag Eq. (g/t)
200
Inferred
2,540,000
256
1.03
1.10
342
 
Notes
 
(1) 
Mineral resources are estimated in conformance with the CIM Standards referenced in NI 43-101.
(2) 
Raw silver assays were capped at 1,050 g/t, raw lead assays were capped at 5% and raw zinc assays were capped at 5%.
(3) 
Silver equivalent Ag Eq. (g/t) = Ag (g/t) + (Pb% *(US$0.94/ lb. Pb /14.583 Troy oz./lb./US$16.50 per Troy oz. Ag)*10,000) + (Zn% *(US$1.00/lb. Zn/14.583 Troy oz./lb./US$16.50 per Troy oz. Ag)*10,000). 100 % metal recoveries are assumed based on lack of comprehensive metallurgical results.
(4) 
Metal prices used in the silver equivalent calculation are US$16.50/Troy oz. Ag, US$0.94/lb Pb and US$1.00/lb Zn and reflect those used for the Pulacayo deposit mineral resource estimate reported above.
(5) 
Metal grades were interpolated within wire-framed, three-dimensional solids using Geovia-Surpac Ver. 6.7 software and inverse distance squared interpolation methods. Block size is 5m (X) by 5m (Z) by 2.5m (Y). Historic mine void space was removed from the model prior to reporting resources.
(6) 
A block density factor of 2.26g/cm³ was used and reflects the average of 799 density measurements.
(7) 
Mineral resources are considered to have reasonable expectation for economic development using combined underground and open pit methods based on the deposit history, resource amount and metal grades, current metal pricing and comparison to broadly comparable deposits elsewhere.
(8) 
Mineral resources that are not mineral reserves do not have demonstrated economic viability.
(9) 
Tonnes are rounded to nearest 10,000.
 
 
27
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
The contained metals estimated by the Company based on the October 20, 2017 resource estimate by Mercator are presented in Table 23.
 
Table 23. Contained Metals Based on October 20, 2017 Paca Deposit** Mineral Resource Estimate
 
Metal
Inferred Resource
Silver
20.9 million oz.
Lead
57.7 million lbs.
Zinc
61.6 million lbs.
 
**Based on the resource estimate Ag Eq. cut-off value of 200 g/t and 100% recovery; figures are rounded to the nearest 100,000th increment.
 
The resource estimate is based on results of 97 diamond drill holes and 1 reverse circulation drill hole totaling 18,160 meters completed between 2002 and 2007.
 
The geology of the Paca deposit includes a core zone of feeder-style mineralization associated predominantly with brecciated andesite, plus additional zones of shallowly dipping mantos-style mineralization that are hosted by the surrounding volcano-sedimentary sequence. The Paca deposit remains open at depth and along strike.
The Paca mineralization starts from surface and the deposit may be amenable to open-pit mining and this will be evaluated further in the future.
The Company’s research has shown that relatively few silver open pit deposits have been defined at resource cut-off values of 200 g/t Ag Eq. or more.
 
Permitting and Licensing
 
Pulacayo MPC between the Company and COMIBOL was executed on October 3, 2019.
 
The Company was notified of final government resolution approving the MPC on September 27, 2019. The MPC grants the Company the 100% exclusive right to develop and mine at the Pulacayo and Paca concessions for up to 30 years. It is comparable to a mining license in Canada or the United States.
 
Exploration
 
On September 30, 2019, the Company announced a 5,000-meter diamond drilling at Pulacayo has started with first set of assay results reported in November 2019. Pictures of core samples are available on the Company’s website at www.silverelef.com.
 
Phase 1 drilling is comprised of surface drilling to expand the NI43-101 compliant Paca resource (see the Company’s news release dated November 22, 2017) in the northern and eastern directions where previous drill holes encountered high grade surface intercepts, including PND-062, which included 42 meters of 406 g/t Ag located on the edge of the resource envelope. The Company will also evaluate upgrading the Paca resource from an Inferred category to Measured and Indicated categories through infill drilling. Some of the high-grade zone extensions being explored are shown below:
 
 
 
28
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Table 24
 
hole Nº
from – to (m)
int (m)
Ag(g/t)
Pb(%)
Zn
PND008
18.0 – 33.5
15.5
314
1.0
0.4
PND029
12.0 – 22.3
10.3
436
0.0
0.0
PND062
10.0 – 52.0
42.0
406
0.8
0.1
ESM2
0.0 – 38.0
38.0
411
1.4
1.2
 
The geology of the Paca deposit includes a core zone of feeder-style mineralization associated predominantly with brecciated andesite, plus additional zones of shallowly dipping mantos-style mineralization that are hosted by the surrounding volcano-sedimentary sequence. The Paca deposit remains open at depth and along strike. The Paca mineralization starts from surface, and the deposit may be amenable to open-pit mining which will be evaluated in the future.
 
Phase 2 drilling commenced in December 2019. The plan was to expand the Pulacayo resource base along strike from 1km to 3km and at depth from 300m to 600m. There will also be infill drilling to confirm the geological model and test continuity of shallow high grade indicated resource blocks that are near the San Leon tunnel and accessible through the existing adit. Some of the high-grade zone extensions being explored are shown in Table 25.
 
Table 25
 
Hole Nº
from – to (m)
int (m)
Ag(g/t)
Pb(%)
Zn %
Distancefrom adit (m)
PUD005
96.2 – 108.0
11.9
689
1.9
1.4
-67.5
PUD007
70.0 – 96.8
26.8
517
2.3
4.2
-44.5
PUD057
374.0 – 378.0
4.0
1,184
0.8
2.3
-137.5
PUD069
281.0 – 294.0
13.0
624
2.1
4.2
-46.0
PUD109
293.6 – 298.4
4.8
3,607
3.8
4.1
-30.4
PUD118
174.0 – 184.0
10.0
1,248
1.7
2.6
-93.9
PUD134
128.2 – 151.5
23.3
514
1.3
1.9
-55.7
PUD150
290.0 – 302.0
11.2
882
0.4
0.6
-75.2
PUD159
343.0 – 354.0
11.0
790
0.6
0.6
-116.6
PUD170
237.0 – 239.0
2.0
3,163
0.1
0.9
-32.5
 
On October 28, 2019, the Company announced the diamond drilling results from Phase 1 drilling at Paca. Borehole PND 110 intersected 89 meters grading 378 g/t Ag-Equivalent (“AgEq;” 279 g/t Ag, 1.28% Zn, 1.17% Pb) starting from 9 meters downhole, including 12 meters grading 1,085 g/t Ag starting at just 16 meters downhole.
 
Phase 1 Drill highlights included:
 
PND107: 54.0 meters of 238 g/t AgEq (151 g/t Ag, 1.01% Zn, 1.17% Pb) from 55.0 to 109.0 meters;
PND108: 24.0 meters of 307 g/t AgEq (200 g/t Ag, 0.60% Zn, 2.12% Pb) from 33.0 to 57.0 meters;
PND109: 28.0 meters of 281 g/t AgEq (242 g/t Ag, 0.27% Zn, 0.69% Pb) from 15.0 to 43.0 meters;
PND110: 89.0 meters of 378 g/t AgEq (279 g/t Ag, 1.28% Zn, 1.17% Pb) from 9.0 to 98.0 meters;
PND112: 1.0 meters of 904 g/t AgEq (890 g/t Ag, 0.05% Zn, 0.31% Pb) from 21.0 to 22.0 meters;
PND 113: 25.0 meters of 209 g/t AgEq (196 g/t Ag, 0.04% Zn, 0.29% Pb) from 3.0 to 28.0 meters.
 
Reported widths are intercepted core lengths and not true widths, as relationships with intercepted structures and contacts vary. Based on core-angle measurements, true widths are estimated at approximately 77% of reported core lengths.
 
 
29
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Silver equivalent (“AgEq”) calculation is based on NI43-101 compliant 2017 resource report completed for the Paca deposit by Mercator Geological Services (see the Company’s news release dated November 22, 2017). Silver equivalent is calculated as follows: Ag Eq. (g/t) = Ag (g/t) + (Pb% *(US$0.94/ lb. Pb /14.583 Troy oz./lb./US$16.50 per Troy oz. Ag)*10,000) + (Zn% *(US$1.00/lb. Zn/14.583 Troy oz./lb./US$16.50 per Troy oz. Ag)*10,000). 100 % metal recoveries are assumed based on lack of comprehensive metallurgical results
 
PUD110 reported the highest silver width-grade intercept at the Paca project to date, which now has over 19,000 drill meters completed between the Company and the previous operator since 2002. These Phase 1 drill results are anticipated to increase the overall tonnage and upgrade the confidence level of the current NI43-101 compliant resource estimate prepared independently by Mercator in 2017 (Effective from October 20th, 2017; available on www.SEDAR.com):
 
Table 26.  Paca Inferred Mineral Resource Statement Details
 
Paca Mineral Resource Statement – Effective October 20, 2017
 
Ag Eq. Cut-Off (g/t)
Category
Tonnes*
Ag (g/t)
Pb (%)
Zn (%)
Ag Eq. (g/t)
200
Inferred
2,540,000
256
1.03
1.10
342
Contained Metals(million oz,lb,lb)
 
 
20.9
57.7
61.6
 
 
Notes:
 
(1) 
Mineral resources are estimated in conformance with the CIM Standards referenced in NI 43-101.
(2) 
Raw silver assays were capped at 1,050 g/t, raw lead assays were capped at 5% and raw zinc assays were capped at 5%.
(3) 
Silver equivalent Ag Eq. (g/t) = Ag (g/t) + (Pb% *(US$0.94/ lb. Pb /14.583 Troy oz./lb./US$16.50 per Troy oz.Ag)*10,000) + (Zn% *(US$1.00/lb. Zn/14.583 Troy oz./lb./US$16.50 per Troy oz. Ag)*10,000). 100 % metal recoveries are assumed based on lack of comprehensive metallurgical results.
(4) 
Metal prices used in the silver equivalent calculation are US$16.50/Troy oz. Ag, US$0.94/lb Pb and US$1.00/lb Zn and reflect those used for the Pulacayo deposit mineral resource estimate reported above.
(5) 
Metal grades were interpolated within wire-framed, three-dimensional solids using Geovia-Surpac Ver. 6.7 software and inverse distance squared interpolation methods. Block size is 5m (X) by 5m (Z) by 2.5m (Y). Historic mine void space was removed from the model prior to reporting resources.
(6) 
A block density factor of 2.26g/cm³ was used and reflects the average of 799 density measurements.
(7) 
Mineral resources are considered to have reasonable expectation for economic development using combined underground and open pit methods based on the deposit history, resource amount and metal grades, current metal pricing and comparison to broadly comparable deposits elsewhere.
(8) 
Mineral resources that are not mineral reserves do not have demonstrated economic viability.
(9) 
Tonnes are rounded to nearest 10,000.
(10) 
Contained Metals Based on October 20, 2017 Paca Deposit  Mineral Resource Estimate.
(11) 
Based on the resource estimate Ag Eq. cut-off value of 200 g/t and 100% recovery; figures are rounded to the nearest 100,000th increment.
(12) 
The resource estimate is based on results of 97 diamond drill holes and 1 reverse circulation drill hole totaling 18,160 meters completed between 2002 and 2007.
 
On December 18, 2019, the Company announced that phase two drilling which is a 5,000-meter program that will consist mainly of wide step-out drilling up to 1.5km west (Western Block) of the current 43-101 Pulacayo resource, has started the Pulacayo Project. That current Pulacayo resource covers 1.4 km in strike and represents only a small portion of the Tajo vein system which is over 3 km in strike and open to least 1,000 meters at depth, according to historical records of underground mining.
 
 
30
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
 
The complete detailed composited drill intersections of mineralization are tabulated as below:
 
Table 27
 
Hole
From(m)
To (m)
Length(m)
Ag (g/t)
Zn %
Pb %
AgEq
PND107
 
 
55.0
109.0
54.0
151
1.01
1.17
238
incl …
70.0
77.0
7.0
178
0.97
1.37
271
and …
70.0
109.0
39.0
180
1.20
1.34
283
and …
87.0
109.0
22.0
240
1.23
1.65
355
PND108
 
 
15.0
65.0
50.0
135
0.40
1.42
208
incl …
33.0
57.0
24.0
200
0.60
2.12
307
and …
33.0
43.0
10.0
257
0.41
1.49
333
 
94.0
96.0
2.0
160
0.94
0.52
220
PND109
 
 
15.0
43.0
28.0
242
0.27
0.69
281
incl …
20.0
29.0
9.0
391
0.26
1.10
445
and …
24.0
26.0
2.0
1223
0.42
3.20
1365
and …
37.0
43.0
6.0
282
0.31
0.52
315
 
75.0
173.0
98.0
15
2.47
1.28
168
incl …
93.0
94.0
1.0
167
3.64
1.24
367
PND110
 
 
9.0
182.0
173.0
95
1.63
1.40
273
incl…
9.0
98.0
89.0
279
1.28
1.17
378
and…
9.0
28.0
19.0
718
0.05
0.74
749
and…
9.0
12.0
3.0
145
0.07
0.90
183
and…
16.0
28.0
12.0
1085
0.04
0.71
1115
and…
44.0
180.0
138.0
87
1.59
2.01
233
and…
44.0
46.5
2.5
111
0.61
1.09
179
and…
44.0
98.0
54.0
98.0
2.03
1.52
343
and…
52.0
54.0
2.0
115
1.61
1.33
234
and…
60.0
82.0
22.0
328
1.98
1.43
466
and…
61.0
65.0
4.0
1248
1.93
2.88
1441
and…
86.0
94.0
8.0
270
2.83
2.74
495
and…
97.0
98.0
1.0
155
3.26
3.03
409
PND111
 
 
0.0
2.4
2.4
110
0.16
0.58
139
PND112
 
 
12.0
28.0
16.0
154
0.08
0.39
173
incl…
21.0
22.0
1.0
890
0.05
0.31
904
 
33.0
36.0
3.0
120
0.07
2.40
216
 
43.0
44.6
1.6
100
0.23
1.58
171
PND113
 
 
3.0
28.0
25.0
196
0.04
0.29
209
incl…
3.0
17.0
14.0
185
0.04
0.38
202
and…
21.0
28.0
7.0
310
0.04
0.19
320
 
 
31
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Reported widths are intercepted core lengths and not true widths, as relationships with intercepted structures and contacts vary. Based on core-angle measurements, true widths are estimated at approximately 77% of reported core lengths.
 
During the year ended December 31, 2019, the Company assessed whether there was any indication that the previously recognized impairment loss in connection with the Pulacayo Paca property may no longer exist or may have decreased. The Company noted the following indications that the impairment may no longer exist:
 
The Company signed a mining production contract granting the Company the 100% exclusive right to develop and mine at the Pulacayo Paca property;
The Company renewed its exploration focus to develop the Pulacayo Paca property in the current year;
The Company re-initiated active exploration and drilling program on the property; and
Completed a positive final settlement of Bolivian tax dispute.
 
As the Company identified indications that the impairment may no longer exist, the Company completed an assessment to determine the recoverable amount of the Pulacayo Paca property.
 
In order to estimate the fair-value of the property the Company engaged a third-party valuation consultant and also utilized level 3 inputs on the fair value hierarchy to estimate the recoverable amount based on the property’s fair value less costs of disposal determined with reference to dollars per unit of metal in-situ.
 
With reference to metal in-situ, the Company applied US$0.79 per ounce of silver resource to its 36.8 million ounces of silver resources and US$0.0136 per pound of zinc or lead in resource to its 303 million pounds of zinc and lead.
 
The Company also considered data derived from properties similar to the Pulacayo Paca Property. The data consisted of property transactions and market valuations of companies holding comparable properties, adjusted to reflect the possible impact of factors such as location, political jurisdiction, commodity, geology, mineralization, stage of exploration, resources, infrastructure and property size.
 
As the recoverable amount estimated with respect to the above was $31.4 million an impairment recovery of $13,708,200 was recorded during the year ended December 31, 2019.
 
2020
 
In January 2020, the Company has completed the first 3 holes of the planned 17 drill holes at the Pulacayo Project. These step-out drill holes are located 25-, 50- and 115 meters west of the existing Pulacayo resource model. The Company has also mobilized a second drilling rig to Pulacayo and expects to complete the proposed 5,000-meter drill program in February 2020. The remainder step out drill holes are collared up to 2km west from the existing resource model.
 
On January 21, 2020, the Company announced the first step-out diamond drilling results. Borehole PUD 267 intercepted 10 meters of mineralization grading 147 g/t silver, 9.8% zinc, and 2.0% lead (539 g/t AgEq) within 35.5 meter mineralization grading 230 g/t AgEq starting 31.5 meters downhole.
 
 
32
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
PUD 267 marks the Company’s first Pulacayo drill hole of the 2020 drilling campaign and the first drilling to be conducted on the property since 2012. A total of 268 historic Pulacayo drill holes were completed between 2008 and 2012 by the previous operator. The results of PUD 267 comes on the back of the success of the Company’s first drill campaign at Paca (7km north of Pulacayo), where PND 110 intersected highest-ever grade at Paca of 12 meters of mineralization grading 1,085g/t silver, starting 16 meters downhole (see the Company’s news release dated October 28, 2019). These near-surface, high-grade intersections contribute positively to a potential district-style project economic assessment with consideration of open-pit mining scenarios. There are several other targets controlled by the Company within the district that are yet to be drilled but highly promising (e.g., Pacamayo, Al Abra, and Pero).
 
PUD 267 intercepted the Tajo vein system 83 meters west from PUD 041 which intersected 20 meters of mineralization grading 15.1g/t Ag, 2.43%Zn, 0.76% Pb at a similar depth to the mineralization encountered at PUD 267. PUD 041 (drilled in 2008) represents the westernmost drillhole that comprises the Company’s 2017 NI43-101 compliant Pulacayo resource (“Eastern Block”). These results confirm that the Tajo vein system extends westward and occurs near-surface, with a probable thickening component for a minimum 83-meter extension to the west of the Eastern Block.
 
The Eastern Block spans 1.4 km in strike, roughly 300 meters of vertical section and contains 30.4 million indicated silver oz and 6.4 million inferred silver oz estimated in the independent NI 43-101 report by Mercator of October 2017 (see the Company’s news release dated November 22, 2017).
 
PUD 267 was planned based on a vertical projection of Pulacayo’s historic underground workings which followed the Tajo vein system. These workings exist between 400 meters and 1,000 meters from the surface with mined grades of 10% to 25% Zn and 300g/t to 800g/t Ag (according to Hochschild mining records from 1914 to 1960). The results of PUD 267 reveal strong potential for existing mineralization from near-surface in the intervening depths to the workings approximately 400 meters below.
 
On March 6th, 2020, the Company released the results of its first 2,598 meters of drilling which focused on the western portion of the Pulacayo property.
 
Complete composited drill intersections of mineralization (in meters) for this portion of the program are tabulated below:
 
Table 28
 
Hole ID
From (m)
To (m)
Interval (m)
Ag (g/t)
Zn (%)
Pb (%)
AgEq
Target
PUD267*
31.5
67
35.5
54.3
4.31
0.92
229.6
West
 
117
123
6.0
47.8
1.11
0.25
89.7
West
PUD268
21
23
2
20
1.34
0.77
92.6
West
PUD274
75
77
2
93.5
 
0.42
98.8
East
PUD274
82
83
1
83
 
0.09
77.4
East
 
Reported widths are intercepted core lengths and not true widths, as relationships with intercepted structures and contacts vary. Based on core-angle measurements, true widths are estimated at approximately 61% of reported core lengths.
 
Silver equivalent is calculated as follows: Ag Eq. (g/t) = Ag (g/t)*89.2% + (Pb% *(US$0.94/ lb. Pb /14.583 Troy oz/lb./US$16.50 per Troy oz. Ag)*10,000*91.9%) + (Zn% *(US$1.00/lb. Zn/14.583 Troy oz/lb./US$16.50 per Troy oz. Ag)*10,000*82.9). This calculation incorporates metallurgical recoveries from test work completed for Pulacayo in 2013.
 
 
33
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Table 29 Header information for Drillhole
 
Hole ID
Azimuth
Dip
Depth (m)
Easting
Northing
AMSL
PUD267
180
-45
180
739823.4
7744735
4336
PUD268
180
-45
192
739866
7744723
4366
PUD269
180
-45
210
739750
7744727
4321
PUD270
0
-45
201
739626
7744618
4284
PUD271
180
-45
156
739670
7744655
4293
PUD272
180
-45
300
739540
7744860
4329
PUD273
180
-45
201
739343
7744869
4385
PUD274
200
-65
95
741031
7744391
4237
PUD275
180
-45
161
739481
7744625
4357
PUD276
0
-45
201
739467
7744416
4267
PUD277
21
-55
72
741196
7744229
4181
PUD278
0
-45
120
739170
7744599
4317
PUD279
180
-45
130
737933
7744679
4346
PUD280
0
-45
113
739024
7744538
4344
PUD281
0
-45
180
739661
7745113
4396
PUD282
0
-45
86.4
739180
7744380
4296
 
Complete drill map and result cross sections can be accessed at www.silverelef.com/company-presentation  and  https://www.silverelef.com/projects/pulacayo-silver-lead-zinc/.
 
During the six months ended June 30, 2020, the Company incurred total costs of $1,092,548 (same period 2019 - $395,979) for the Pulacayo Project including for $939,675 (2019 - $144,951) for geological and engineering services, and $152,873 (2019 - $251,028) for personnel, legal, general and administrative expenses.
 
On July 20, 2020, the Company announced announces it has engaged Mercator to prepare an updated Technical Report (the “Report”) as defined under NI 43-101 for the Pulacayo Project.
 
Between 2008 and 2017, there has been cumulative of 69,739 meters of drilling at Pulacayo and 18,160 meters of drilling at Paca. The Mineral Resource Estimate (“MRE”) will function as an update to the Company’s currently filed technical report dated October 20, 2017, taking into account changes in metal prices, the results from recent drilling campaigns in late 2019 and early 2020, and constraint optimization such as cut-off grades and strip ratios. The Report will include separate NI 43-101 MRE’s for both the Pulacayo and Paca mineral deposits that comply with the reporting guidelines of the CIM Definitions Standards for Mineral Resources and Reserves.
 
The Company also reports that the national COVID-19 quarantine in Bolivia was lifted in late-June. While the Company has access to the Pulacayo Paca Project, restrictions remain within the nearest Town of Uyuni, which is still under quarantine. This limits the Company’s ability to provide safe and adequate work environment for its team at this time. Silver Elephant will resume exploration activities at Pulacayo when it is safe and practical to do so.
 
On August 11, 2020, the Company announced diamond infill drilling results from its 100%-controlled Pulacayo silver project in the Potosi department of Bolivia. Notable highlights include:
 
 
34
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
PUD 283
 
Hole ID
 
From
 
To
 
Length
 
Ag (g/t)
 
Pb%
 
Zn%
 
AgEq
 
PUD283
248.0
350.0
102.0
145
1.05
2.56
255
including…
310.0
322.0
12.0
784
4.11
3.79
977
and…
317.0
322.0
5.0
1565
8.25
3.85
1825
 
PUD 284
 
Hole ID
 
From
 
To
 
Length
 
Ag (g/t)
 
Pb%
 
Zn%
 
AgEq
 
PUD284
55.0
65.0
10.0
113
1.93
2.11
243
PUD284
206.3
273.0
66.7
112
0.46
1.94
182
including...
240.0
273.0
32.0
178
0.50
1.73
241
and…
256.0
273.0
17.0
274
0.33
1.13
295
 
Reported widths are intercepted core lengths and not true widths, as relationships with intercepted structures and contacts vary. Based on core-angle measurements, true widths are estimated at approximately 72% of reported core lengths for PUD283 and 57% of the reported core lengths for PUD284.
 
Silver equivalent is calculated using the formula adopted in its 2017, NI43-101 compliant Mineral Resource Estimate (see Company’s press release dated November 22nd, 2017) as follows: AgEq. (g/t) = Ag (g/t)*89.2% + (Pb% *(US$0.94/ lb. Pb /14.583 Troy oz/lb./US$16.50 per Troy oz. Ag)*10,000*91.9%) + (Zn% *(US$1.00/lb. Zn/14.583 Troy oz/lb./US$16.50 per Troy oz. Ag)*10,000*82.9). This calculation incorporates metallurgical recoveries from test work completed for Pulacayo in 2013.
 
These results demonstrate broad continuity of mineralization and grade starting from near-surface and is consistent with historic Hochschild mining records which indicate high grade mineralization with increasing depth to more than 1,000 meters from surface. Detailed Assay results are detailed in the table below:
 
Hole ID
 
From
 
To
 
Length
 
Ag (g/t)
 
Pb%
 
Zn%
 
AgEq
 
PUD283
248.0
350.0
102.0
145
1.05
2.56
255
 
248.0
282.0
34.0
9
0.22
1.05
52
 
282.0
297.0
15.0
35
0.40
2.99
148
 
Hole ID
 
From
 
To
 
Length
 
Ag (g/t)
 
Pb%
 
Zn%
 
AgEq
 
 
297.0
310.0
13.0
157
1.47
5.15
370
 
310.0
317.0
7.0
225
1.15
3.74
371
 
317.0
322.0
5.0
1565
8.25
3.85
1825
 
322.0
329.0
7.0
134
1.18
1.73
222
 
329.0
350.0
21.0
76
0.82
2.65
188
PUD284
30.5
204.2
173.7
15
0.28
0.67
46
 
30.5
55.0
24.5
3
0.10
2.45
20
 
55.0
65.0
10.0
113
1.93
2.11
243
 
65.0
79.0
14.0
13
0.44
1.20
69
 
79.0
101.0
22.0
4
0.11
0.36
20
 
101.0
204.2
103.2
10
0.18
0.59
36
PUD284
206.3
273.0
66.7
112
0.46
1.94
182
 
206.3
240.0
33.7
46
0.41
2.12
129
 
240.0
256.0
16.0
79
0.72
2.70
189
 
256.0
273.0
17.0
274
0.33
1.13
295
PUD284
282.0
318.0
36.0
26
0.34
1.01
70
 
282.0
288.0
6.0
13
0.27
0.94
54
 
288.0
300.0
12.0
60
0.61
1.48
127
 
300.0
318.0
18.0
7
0.18
0.72
38
 
 
35
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Reported widths are intercepted core lengths and not true widths, as relationships with intercepted structures and contacts vary. Based on core-angle measurements, true widths are estimated at approximately 72% of reported core lengths for PUD283 and 57% of the reported core lengths for PUD284.
 
Collar data is tabulated below:
 
Hole ID
 
Easting
 
Northing
 
Elevation
 
Azimuth
 
Dip
 
Length (m)
 
PUD283
740116
7744469
4336
0
-55
352
PUD284
740373
7744512
4266
19
-65
327
 
Results of these two holes will be incorporated into the Mineral Resource Estimate scheduled to be released in September 2020, as defined under National Instrument 43-101 (NI43-101) for the Pulacayo-Paca Project by Mercator Geological Services Limited.
 
The completion of these 2 holes marks the conclusion of the first phase of 2020 drilling. Per the Company’s news release dated March 9, 2020 Silver Elephant continues its district exploration at Pulacayo project with intermittent access due to COVID-19. The Company will announce any material update, including commencement of new round of Pulacayo-Paca drilling scheduled by year end, in due course.
 
The Company adopts industry recognized best practices in its implementation of QA/QC methods. A geochemical standard control sample and one blank sample is inserted into the sample stream every 20th sample. Duplicates are taken at every 40th sample. Standards and duplicates including lab duplicates and standards and are analyzed using Thompson-Howarth plots. Samples are shipped to ALS Global Laboratories in Ururo, Bolivia for preparation, and then shipped to ALS Global laboratories for analysis in Lima, Peru. Samples were analyzed using Intermediate Level Four Acid Digestion. Silver overlimits (“ore grade”) are analyzed using fire assay with a gravimetric finish. ALS Laboratories sample management system meets all requirements of International Standards ISO/IEC 17025:2017 and ISO 9001:2015. All ALS geochemical hub laboratories are accredited to ISO/IEC 17025:2017 for specific analytical procedures.
 
All samples are taken from HQ-diameter core which split in half by a diamond-blade masonry saw. One-half of the core is submitted for laboratory analysis and the other half is preserved on the Company’s secured core facility for reference. All core is geotechnically analyzed, photographed and then logged by geologists prior to sampling.
2020 Outlook
 
The Company’s objectives in 2020 is to drill and expand the Pulacayo silver resource base which open to the west and at depth, as well as drill district-scale targets (Paca, Al Abra, Pero, Pacamayo) and to increase investor awareness.
 
The Company’s current goals for 2020 include:
 
Expand the Pulacayo resource footprint
Phase I drill program
Expand the Paca resource footprint
Phase II drill program
Test extent of manto/conglomerate formation
Update Pulacayo/Paca Technical Report
Geological mapping and geophysical surveys over the district.
 
Ulaan Ovoo Coal, Property
 
On October 16, 2018, the Company announced that it had executed a lease agreement (the “Lease”) with an arms-length private Mongolian company (the “Lessee”) whereby the Lessee plans to perform mining operations at the Company’s Ulaan Ovoo coal mine and will pay the Company USD$2.00 (the “Production Royalty”) for every tonne of coal shipped from the Ulaan Ovoo site premises. The Lessee has paid the Company USD$100,000 in cash, as a non-refundable advance royalty payment and is preparing, at its own and sole expense, to restart and operate the Ulaan Ovoo mine with its own equipment, supplies, housing and crew. The Lessee will pay all government taxes and royalties related to its proposed mining operation.
 
 
36
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
The Lease is valid for 3 years with an annual advance royalty payment (“ARP”) for the first year of $100,000 (paid), and USD$150,000 and USD$200,000 due on the 1st and 2nd anniversary of the Lease, respectively. The ARP can be credited towards the USD$2.00 per tonne Production Royalty payments to be made to the Company as the Lessee starts to sell Ulaan Ovoo coal. The 3-year Lease can be extended upon mutual agreement.
 
The Ulaan Ovoo mine was commissioned in March 2019, however the operation was stopped in April and May due to the late approval of 2019 environmental plan. The approval was issued in June 2019.
 
During the period ended June 30, 2020, modest coal sales revenue has been recorded against costs incurred at the mine, classified as costs in excess of recovered coal of $135,405 on the consolidated statement of operations and comprehensive loss. Revenue generating and cost reduction efforts continued.
 
Chandgana Coal, Properties
 
For more information about the Chandgana coal properties and power plant project, please refer to the relevant sections of the Company’s Annual Report on Form 20-F for the year ended December 31, 2019.
 
The Company has successfully converted its Chandgana Khavtgai (Khavtgai Uul) coal exploration license to a mining license. For the Chandgana Tal project, the Company intends to discuss the need to update the detailed environmental impact assessment and mining feasibility study with the relevant ministries and complete the requirements to maintain the licenses.
 
Acquisition of EI Triunfo Project, Bolivia
 
 On July 13, 2020, the Company announced that it has entered into a binding sales and purchase agreement (“SPA”) with a private party (“Vendor”) to acquire the El Triunfo Gold-Silver-Lead-Zinc Project in La Paz District, Bolivia (“Triunfo Project”).
 
Proposed Transaction Summary
 
Subject to the provisions of the SPA, the Vendor irrevocably agrees to sell, assign, and transfer to Silver Elephant, and Silver Elephant agrees to purchase from the Vendor, the mining rights of the Triunfo Project upon Silver Elephant’s paying the Vendor the sum of US$1,100,000, consisting of US$100,000 on SPA signing (paid), and US$1,000,000 on or before June 15, 2025 (“Final Closing Date”).
 
Joaquin Merino, VP South America Operations, states, “We are positioning Silver Elephant as a premier mining company for silver investors. We want our shareholders to own as much silver in the ground as possible by sizing up Pulacayo and Triunfo and by acquiring more pre-production-stage silver deposits. Looking at the geological data, we believe there is the potential for significant gold and silver resource development at the Triunfo Project. The Triunfo Project is a great addition to Silver Elephant’s portfolio, which currently features Pulacayo and Paca silver projects with 31 million oz indicated at 455g/t and 27 million oz inferred silver source estimated by Mercator Geological Partners in November 2017.”
 
Several dozen chip samples were taken from the surface and tunnels at Triunfo. Those samples have already been delivered to ALS laboratory in Oruro Bolivia, with gold assay results expected in late July, 2020.
 
El Triunfo Project Summary
 
The Triunfo Project area covers approximately 256 hectares located in the La Paz Department, which is located about 75km to the east of the city of La Paz, Bolivia. The Triunfo Project has access to power and water and is accessible by road year-round. The Vendor maintains a positive relationship with the local community.
 
Exploration was conducted in 2005–07 by Solitario Resources, who completed 3 drill holes in that time, all of which intercepted mineralization. Historical hole TR-001 returned 94.2 meters grading 0.39 g/t Au, 21.8 g/t Ag, 0.65%Pb, 0.39%Zn, , (0.95 g/t AuEq*), according to Solitario Resources SEC 10K filings. Only 20% of the property was explored by Solitario.
 
The mineralization is characterized by pyrite, arsenopyrite, galena, and sphalerite and carries gold, silver, and zinc and lead in various proportions.
 
Mineralization outcrops at the surface and continues for at least 750 meters in three discrete topographical features that can be categorized as blocks A, B, and C. The mineralized blocks have widths varying from 20m to 150m and are locally displaced for several meters by north-east trending faults.
 
 
37
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
In the past decade, some artisanal mining has been developed where gold mineralization has been identified. Those areas have been principally mined for gold. They demonstrate a continuity of mineralization along the strike and to modest depths. The Triunfo Project contains polymetallic vein-style mineralization hosted in metasediments of the Silurian and Devonian periods. The metasediments were intruded by nearby plutonic batholiths which are likely related to the mineralizing event. This style of mineralization is well documented in Bolivia. Examples include Cerro Rico and Porco, located in and around Potosi.
 
The mineralization is characterized by multiple veins (up to 1.0m wide) and veinlets. They are emplaced along fractures and faults that have developed on the flanks of an east-west trending anticlinal-synclinal sequence. Mineralization is also noted to occur in the sedimentary planes between slate layers. The slate layers can manifest as stockwork-style mineralization which tends to be elongated parallel to the anticlinal axis.
 
(*) Gold equivalent calculation uses a gold price of $1,795, a zinc price of $0.93, a lead price of $0.80, and a silver price of $18.30, and assumes a 100% metallurgical recovery. Gold equivalent values can be calculated using the following formula: AuEq = Au g/t + (Ag g/t x 0.2243) + (Zn % x 1.385) + (Pb % x 0.3055).
 
Further Details Regarding the Proposed Transaction
 
If the Final Closing Date does not occur on or before the date set out in column (A) below, the Purchaser will pay to the Vendor on or before that date the amount corresponding to that date in column (B) below
 
Column (A)
Column (B)
June 15, 2021
US$50,000
June 15, 2022
US$50,000
June 15, 2023
US$50,000
June 15, 2024
US$50,000
 
The Vendor will maintain a 5% interest in the profits, net of taxes and royalties derived from the sale of concentrate produced from the Triunfo project (the “Residual Interest”). The Residual Interest can be purchased by Silver Elephant for US$300,000 at any time before or after the Final Closing Date.
 
The Triunfo Project presentation including maps are available at www.silverelef.com.
 
 
38
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
5.
SUMMARY OF QUARTERLY RESULTS
 
The following table summarizes selected consolidated financial information for the eight most recently completed quarters:
 
 
The fluctuation on quarterly net loss is primarily due to Share-based compensation expenses recognized as stock options granted to directors, officers, employees and consultants of the Company are earned, advertising and promotion expenses, the impairment losses recognized on resource properties, and debt settlements.
 
6.
DISCUSSION OF OPERATIONS
 
The reader is encouraged to refer to Note 6 of the Company’s Annual Financial Statements for the year ended December 31, 2019 for the Company’s IFRS accounting policies. For discussion on each project, the reader is encouraged to refer to the “Business Overview” section of this MD&A.
 
Six Months Ended June 30, 2020 and 2018 (2020 period and 2019 period)
 
 
The Company had an operating loss of $1,805,872 for the six months ended June 30, 2020, compared with an operating loss of $1,614,991 for the 2019 period.
 
In late January 2020, the Company initiated measures, including travel restrictions, remote work, and supplemental health care for our Bolivian, Mongolian, and USA staff in response to the reported spread of COVID-19 virus.  Theses measures included our Canadian head office staff.  The Company followed the Canadian Federal and Provincial Government Workplace Policies and Procedures Guidelines which was established to address the COVID-19 pandemic response.
 
 
39
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Of note for 2020 period are the following items:
 
advertising and promotion expenses decreased by $261,978 from $344,856 in the 2019 period to $82,878 in the 2020 period due to decreased promotional activities and restricted travels during the COVID-19 pandemic;
 
Consulting and management fees increased by $322,948 from $117,052 in the 2019 period to $440,000 in the 2020 period due to the issuance of a share bonus granted in the amount of $324,000 to management/consultants of the Company;
 
general and administrative fees consisted of general office expenses and administrative services related to maintaining the Company’s exchange listings and complying with securities regulations and also included insurance, salaries and directors’ fees.  General and administrative expenses decreased by $158,727 from $778,186 in the 2019 period to $619,459 in the 2020 period. The decrease is a result of cost cutting initiatives across the Company;
 
professional fees increased by $147,352, from $95,645 in the 2019 period to $242,997 in the 2020 period due to 2019 annual audit fees which were recognized in 2020, while the 2018 audit fees were recognized in 2018.
 
share-based payments costs are non-cash charges which reflect the estimated value of stock options granted. The Company uses the fair value method of accounting for stock options granted to directors, officers, employees and consultants whereby the fair value of all stock options granted is recorded as a charge to operations over the period from the grant date to the vesting date of the option. The fair value of common share options granted is estimated on the date of grant using the Black-Scholes option pricing model. Share-based payments increased in the 2020 period by $174,903 compared to the 2020 period.  The increase was primarily related to the increase in the number of options earned during the 2020 period compared to the 2019 period; and
 
travel and accommodation expenses decreased by $33,617 from $111,130 in the 2019 period to $77,513 in the 2020 period due to decreased property site visits and restricted travels during the COVID-19 pandemic.
 
For the six months ended June 30, 2020, the Company’s “Other Items” amounted to a loss of $400,978 compared to a gain of $7,672,161 in 2019 the period. During the period ended June 30, 2019, the Company has written off the Bolivian tax liability due to receiving a Resolution issued by the Supreme Court of Bolivia which declared the tax claim brought by Bolivia’s General Revenue Authority against the Company’s Bolivian subsidiary as not proven.
The Company recorded a debt settlement gain in the amount of $7,952,700 on its consolidated statements of operations and comprehensive loss.
 
Other Items
 
Six Months Ended June 30,
 
 
 
2020
 
 
2019
 
Costs in excess of recovered coal
 $135,405 
 $63,364 
Debt settlement gain
  - 
  (7,952,700)
Foreign exchange (gain)/loss
  (536,383)
  (178,804)
Impairment of mineral property
  - 
  395,979 
 
 $(400,978)
 $(7,672,161)
 
 
40
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
Three Months Ended June 30, 2020 and 2019 (Q2 2020 and Q2 2019)
 
Operating Expenses
 
Three Months Ended June 30,
 
 
 
2020
 
 
2019
 
Advertising and promotion
 $32,253 
 $210,808 
Consulting and management fees
  52,500 
  58,500 
General and administrative expenses
  268,543 
  364,905 
Professional fees
  152,752 
  37,315 
Share-based payments
  139,834 
  117,037 
Travel and accommodation
  21,992 
  32,328 
 
 $667,874 
 $820,893 
 
The Company had an operating loss of $667,874 for Q2 2020, compared with an operating loss of $820,893 for Q2 2019. In late January 2020, the Company initiated measures, including travel restrictions, remote work, and supplemental health care for our Bolivian, Mongolian, and USA staff in response to the reported spread of COVID-19 virus. Theses measures include our Canadian head office staff following Canadian federal and provincial Government advice.
 
Of note are the following items:
 
advertising and promotion expenses decreased by $178,555 from $210,808 in Q2 2019 to $32,253 in Q2 2020 due to restricted travels and promotional meetings during the COVID-19 pandemic;
 
Consulting and management fees decreased by $6,000 from $58,500 in Q2 2019 to $52,500 in Q2 2020 due to decreased consulting services;
 
general and administrative fees consisted of general office expenses and administrative services related to maintaining the Company’s exchange listings and complying with securities regulations and also included insurance, salaries and directors’ fees.  General and administrative expenses decreased by $96,362 from $364,905 in Q2 2019 to $268,543 in Q2 2020. The decrease was a result of cost cutting initiatives across the Company;
 
professional fees increased by $115,437, from $37,315 in Q2 2019 to $152,752 in Q2 2020 due to 2019 annual audit fees were recognized in the 2020 period, while the 2018 audit fees were recognized in the 2018 period;
 
share-based payments costs are non-cash charges which reflect the estimated value of stock options granted. The Company uses the fair value method of accounting for stock options granted to directors, officers, employees and consultants whereby the fair value of all stock options granted is recorded as a charge to operations over the period from the grant date to the vesting date of the option. The fair value of common share options granted is estimated on the date of grant using the Black-Scholes option pricing model. Share-based payments increased in Q2 2020 by $22,797 compared to Q2 2019.  The increase was primarily related to the increase in the number of options earned during the 2020 period compared to the 2019 period; and
 
travel and accommodation expenses decreased by $10,336 from $32,328 in Q2 2019 to $21,992 in Q2 2020 due to decreased property site visits and restricted travels during the COVID-19 pandemic.
 
For the three months ended June 30, 2020, the Company’s “Other Items” amounted to a loss of $464,770 compared to a gain of $6,966,029 in Q2 2019.
 
During the period ended June 30, 2019, the Company has written off the Bolivian tax liability due to receiving a Resolution issued by the Supreme Court of Bolivia which declared the tax claim brought by Bolivia’s General Revenue Authority against the Company’s Bolivian subsidiary as not proven. The Company recorded a debt settlement gain in the amount of $7,952,700 on its consolidated statements of operations and comprehensive loss.
 
 
41
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Other Items
 
Three Months Ended June 30,
 
 
 
2020
 
 
2019
 
Costs in excess of recovered coal
 $16,602 
 $42,362 
Debt settlement gain
  - 
  (7,952,700)
Foreign exchange (gain)/loss
  (219,706)
  (159,255)
Impairment of mineral property
  - 
  282,671 
 
 $(203,104)
 $(7,786,922)
 
7.
PROPOSED TRANSACTIONS
 
As at the date of this MD&A there are no proposed transactions where the Board of Directors or senior management believes that confirmation of the decision by the Board is probable or with which the Board and senior management have decided to proceed.
 
8.
LIQUIDITY AND CAPITAL RESOURCES
 
Working Capital
 
The Company utilizes existing cash received from prior issuances of equity instruments to provide liquidity to the Company and finance exploration projects.
 
At June 30, 2020, the Company had cash flow of $1,342,672 representing a decrease of $1,675,032 from $3,017,704 held at December 31, 2019. The Company’s working capital at June 30, 2020 was $175,928 compared to a working capital of $947,465 at December 31, 2019.
 
On May 20, 2020, the Company closed its non-brokered private placement for $1,976,000 through the issuance of 15,200,000 Units at a price of $0.13 per Unit. Each Unit is comprised of one Share and one Share purchase warrant (the “Warrants”). Each Warrant entitles the holder to purchase an additional Share of the Company at an exercise price of $0.16 for a period of three years from the closing of the Placement. The Company paid $3,250 in cash and issued 156,900 Units as finder’s fee. The placement proceeds are expected to be used for the Company’s mineral project development and for general working capital purposes.
 
Also, after the period end, 3,327,990 Share purchase warrants and 693,750 stock options were exercised for total proceeds of $1,037,715.
 
As at this MD&A date, the Company has cash flow of $1.34 million and the Company’s working capital is $0.9 million.
 
The Company’s cash flow highlights for the six months ended June 30, 2020, are presented in the table below.
 
Cash Flow Highlights
       
 
Operating activities: During the six months ended June 30, 2020, cash used in operating activities was $504,409 compared to $1,992,297 cash used during the six months ended June 30, 2019. The decreased outflows in 2020 period related to decreased activities of the Company due to COVID-19 pandemic.
 
 
42
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Investing activities: During the six months ended June 30, 2020, the Company used $3,127,949 in investing activities (2019 - $2,079,573). During 2020 period, the Company spent $3,087,273 (2019 - $2,002,770) on the Pulacayo and Gibellini Projects exploration activities and $40,676 (2019 - $76,803) on purchase of equipment.
 
Financing activities: During the six months ended June 30, 2020, a total of $1,957,325 was provided by financing activities (2019 – used $17,595) including net proceeds from the Company’s share issuance of $1,972,749 (2019 - $Nil), an additional $3,000 from exercise of stock options (2019 - $Nil). The Company spent $18,424 (2019 - $17,595) for corporate office lease payments.
 
Capital Resources
 
As an exploration and development company, The Company has no regular cash in-flow from operations, and the level of operations is principally a function of availability of capital resources. The Company’s capital resources are largely determined by the strength of the junior resource markets and by the status of the Company’s projects in relation to these markets, and its ability to compete for investor support of its projects. See Section “Risk Factors” set out in the Company’s AR. To date, the principal sources of funding have been equity and debt financing. Many factors influence the Company’s ability to raise funds, and there is no assurance that the Company will be successful in obtaining adequate financing and at favourable terms for these or other purposes including general working capital purposes.
 
For the foreseeable future, as existing properties are explored, evaluated and developed, the Company will continue to seek capital through the issuance of equity, strategic alliances or joint ventures, and debt, of which the Company currently has none.
 
The Company expects to continue requiring cash for operations and exploration and evaluation activities as expenditures are incurred while no revenues are generated. Therefore, its continuance as a going concern is dependent upon its ability to obtain adequate financing to fund future exploration, evaluation and development of the Gibellini Project and the potential construction of a mine, in order to reach profitable levels of operation. The Company has managed its working capital by controlling its spending on its properties and operations. Due to the ongoing planned advancement of project milestones for the Gibellini Project and for the Pulacayo Project, the Company will continue to incur costs associated with exploration, evaluation and development activities, while no revenues are being generated.
 
The condensed interim consolidated financial statements for the three months ended June 30, 2020 have been prepared under the assumption that the Company is a going concern, which contemplates the realization of assets and the payment of liabilities in the ordinary course of business.
 
In March 2020 the World Health Organization declared coronavirus COVID-19 a global pandemic. This contagious disease outbreak, which has continued to spread, and any related adverse public health developments, has adversely affected workforces, economies, and financial markets globally, potentially leading to an economic downturn. It is not possible for the Company to predict the duration or magnitude of the adverse results of the outbreak and its effects on the Company’s business or results of operations at this time.
 
Contractual Commitments
 
The Company’s commitments related to mineral properties are disclosed in Note 13 to the Annual Financial Statements. The Company has no commitments for capital expenditures. The Company’s other commitments include a corporate office lease:
 
 
 
2020
 
 
2021
 
 
2022
 
 
Total
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Office Lease Obligations
 $16,636 
 $24,574 
 $9,540 
 $50,750 
 
 $16,636 
 $24,574 
 $9,540 
 $50,750 
 
Capital Risk Management
 
The Company considers its capital structure to consist of Share capital, stock options and Share purchase warrants. The Company manages its capital structure and makes adjustments to it, based on the funds available to the Company, in order to support the exploration and development of its projects and to pursue and support growth opportunities. The Board of Directors does not establish quantitative returns on capital criteria for management. The Company is not subject to externally imposed capital requirements. There has been no change in the Company’s approach to capital management during the six months ended June 30, 2020.
 
 
43
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Management is aware that market conditions, driven primarily by vanadium, silver, other metal and coal prices, may limit the Company’s ability to raise additional funds. These factors, and others, are considered when shaping the Company’s capital management strategy.
 
9.
CONTINGENCIES
 
ASC tax claim
 
On January 2, 2015, the Company acquired ASC Holdings Limited and ASC Bolivia LDC (which together, hold ASC Bolivia LDC Sucursal Bolivia, which in turn, held Apogee Silver Ltd.’s (“Apogee”) joint venture interest in the Pulacayo Project) and Apogee Minerals Bolivia S.A. Pursuant to the terms of the Agreement, the Company agreed to assume all liabilities of these former Apogee subsidiaries, including legal and tax liabilities associated with the Pulacayo Project.  During Apogee’s financial year ended June 30, 2014, it received notice from the Servicio de Impuestos Nacionales, the national tax authority in Bolivia, that ASC Bolivia LDC Sucursal Bolivia, now the Company’s wholly-owned subsidiary, owed approximately Bs42,000,000 in taxes, interest and penalties relating to a historical tax liability in an amount originally assessed at approximately $760,000 in 2004, prior to Apogee acquiring the subsidiary in 2011. 
 
Apogee disputed the assessment and disclosed to the Company that it believed the notice was improperly issued.  The Company continued to dispute the assessment and hired local legal counsel to pursue an appeal of the tax authority’s assessment on both substantive and procedural grounds. The Company received a positive Resolution issued by the Bolivian Constitutional Court that among other things, declared null and void the previous Resolution of the Bolivian Supreme Court issued in 2011 (that imposed the tax liability on ASC Bolivia LDC Sucursal Bolivia) and sent the matter back to the Supreme court to consider and issue a new resolution.
 
On November 18, 2019 the Company received Resolution No. 195/2018 issued by the Supreme Court of Bolivia which declared the tax claim brought by Bolivia’s General Revenue Authority against the Company’s Bolivian subsidiary as not proven.
 
The Resolution is final and binding. Hence neither the Company nor the Company’s Bolivian subsidiaries owe any outstanding back taxes to the Bolivian General Revenue Authority.
During the year ended December 31, 2019, the Company and legal counsel reassessed the status of tax rulings and determined that the probability of a re-issuance of a tax claim against the Company in connection with the above was remote. As a result, the Company has written off the tax liability and recorded a debt settlement gain in the amount of $7,952,700 on its consolidated statements of operations and comprehensive loss.
 
Red Hill tax claim
 
During the year ended December 31, 2014, the Company’s wholly-owned subsidiary, Red Hill Mongolia LLC (“Red Hill”) was issued a letter from the Sukhbaatar District Tax Division notifying it of the results of the Sukhbaatar District Tax Division’s VAT inspection of Red Hill’s 2009-2013 tax imposition and payments that resulted in validating VAT credits of only MNT235,718,533 from Red Hill’s claimed VAT credit of MNT2,654,175,507. Red Hill disagreed with the Sukhbaatar District Tax Division’s findings as the tax assessment appeared to the Company to be unfounded.  The Company disputed the Sukhbaatar District Tax Division’s assessment and submitted a complaint to the Capital City Tax Tribunal.  On March 24, 2015, the Capital City Tax Tribunal resolved to refer the matter back to the Sukhbaatar District Tax Division for revision and separation of the action between confirmation of Red Hill’s VAT credit, and the imposition of the penalty/deduction for the tax assessment. Due to the uncertainty of realizing the VAT balance, the Company has recorded an impairment charge for the full VAT balance in the year ended December 31, 2015.
 
In June 2019, the Company received a positive resolution issued from the City tax tribunal regarding the Company’s VAT dispute with the Mongolia tax office. The resolution, which is binding and final, affirmed Red Hill’s outstanding VAT credit of 1.169 billion MNT resulted from past mining equipment purchases.
 
 
44
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
The VAT credit can be used to offset Red Hill’s taxes and royalty payments; or be refunded in cash by Mongolia’s Ministry of Finance within 12 to 24 months processing time. Due to the credit risk associated with the VAT credit, the Company has provided a full valuation provision against the balance.
 
10.
RELATED PARTY DISCLOSURES
 
The Company had related party transactions with the following companies, related by way of directors and key management personnel:
 
Linx Partners Ltd., a private company controlled by John Lee, Director, CEO and Executive Chairman of the Company, provides management and consulting services to the Company.
MaKevCo Consulting Inc., a private company 50% owned by Greg Hall, Director of the Company, provides consulting services to the Company.
Sophir Asia Ltd., a private company controlled by Masa Igata, Director of the Company, provides consulting services to the Company.
 
A summary of amounts paid or accrued to related parties is as follows:
 
 
 
Three Months Ended June 30,
 
 
Six Months Ended June 30,
 
Related parties
 
2020
 
 
2019
 
 
2020
 
 
2019
 
Directors and officers
 $340,922 
 $467,820 
 $981,957 
 $935,283 
Linx Partners Ltd.
  105,000 
  84,000 
  530,000 
  168,000 
MaKevCo Consulting Inc.
  5,500 
  4,700 
  17,000 
  10,400 
Sophir Asia Ltd.
  4,900 
  4,400 
  15,800 
  9,800 
 
 $456,322 
 $560,920 
 $1,544,757 
 $1,123,483 
 
 
A summary of the transactions by nature among the related parties is as follows:
 
 
 
 
Three Months Ended June 30,
 
 
Six Months Ended June 30,
 
Related parties
 
2020
 
 
2019
 
 
2020
 
 
2019
 
Consulting and management fees
 $52,500 
 $106,950 
 $265,000 
 $213,900 
Directors' fees
  20,200 
  16,900 
  63,400 
  39,400 
Mineral properties
  286,872 
  277,967 
  940,457 
  453,877 
Salaries
  96,751 
  159,103 
  275,900 
  416,306 
 
 $456,323 
 $560,920 
 $1,544,757 
 $1,123,483 
 
As at June 30, 2019, amounts due to related parties totaled $62,087 (December 31, 2019 – $30,533).
 
Key management personnel are those persons having authority and responsibility for planning, directing and controlling the activities of the Company, including directors of the Company. The amounts due to related parties is summarized below:
 
 
 
Three Months Ended June 30,
 
 
Six Months Ended June 30,
 
Key Management Personnel
 
2020
 
 
2019
 
 
2020
 
 
2019
 
Salaries and short term benefits
 $104,365 
 $163,564 
 $310,678 
 $453,483 
Directors' fees
  20,200 
  16,900 
  63,400 
  39,400 
Share-based payments
  171,712 
  102,207 
  310,122 
  223,303 
 
 $296,277 
 $282,671 
 $684,200 
 $716,186 
 
 
 
45
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
11.
CRITICAL ACCOUNTING POLICIES AND ESTIMATES
 
The Company’s consolidated financial statements are prepared in accordance with IFRS as issued by the International Accounting Standards Board. The Company followed the same accounting policies and methods of computation in the Annual Financial Statements for the six months ended June 30, 2020. The significant accounting policies applied, and recent accounting pronouncements are described in Notes 4 and 6 to the Annual Financial Statements.
 
In preparing the condensed consolidated interim financial statements in accordance with IFRS, management is required to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements, and the reported amounts of revenues and expenses during the reporting period. Areas requiring the use of estimates include the rates of amortization for property and equipment, the useful life and recoverability of long-lived assets, the recoverability of accounts receivable, determination of environmental obligation provision for closure and reclamation, accounts payable and accrued liabilities, the assumptions used in the determination of the fair value of financial instruments and share-based payments, and the determination of the recoverability of deferred income tax assets bases its estimates and assumptions on current and various other factors that it believes to be reasonable under the circumstances. Management believes the estimates are reasonable; however, actual results could differ from those estimates and could impact future results of operations and cash flows.
 
Significant Accounting Judgments and Estimates
 
The Company bases its estimates and assumptions on current and various other factors that it believes to be reasonable under the circumstances. Management believes the estimates are reasonable; however, actual results could differ from those estimates and could impact future results of operations and cash flows. The areas which require management to make significant judgements, estimates and assumptions in determining carrying values include, but are not limited to:
 
The significant judgments that the Company’s management has made in the process of applying the Company’s accounting policies, apart from those involving estimation uncertainties (Note 5 to the Annual Financial Statements ), that have the most significant effect on the amounts recognized in the Annual Financial Statements include, but are not limited to:
 
(a)
Functional currency determination
 
The functional currency for each of the Company’s subsidiaries is the currency of the primary economic environment and the Company reconsiders the functional currency of its entities if there is a change in events and conditions which determined the primary economic environment. Management has determined the functional currency of all entities to be the Canadian dollar.
 
(b)
Economic recoverability and probability of future economic benefits of exploration, evaluation and development costs
 
Management has determined that exploratory drilling, evaluation, development and related costs incurred which have been capitalized are economically recoverable. Management uses several criteria in its assessments of economic recoverability and probability of future economic benefit including geologic and metallurgic information, history of conversion of mineral deposits to proven and probable reserves, scoping, prefeasibility and feasibility studies, assessable facilities, existing permits and life of mine plans.
 
Management has determined that during the year ended December 31, 2019, none of the Company’s silver and vanadium projects have reached technical feasibility and commercial viability and therefore remain within Mineral Properties on the Statement of Financial Position.
 
(c)
 Impairment (recovery) assessment of deferred exploration interests
 
The Company considers both external and internal sources of information in assessing whether there are any indications that mineral property interests are impaired. External sources of information the Company considers include changes in the market, economic and legal environment in which the Company operates that are not within its control and affect the recoverable amount of mineral property interest. Internal sources of information the Company considers include the manner in which mineral properties and plant and equipment are being used or are expected to be used and indications of economic performance of the assets.
 
 
46
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
(d)
Deferred Tax Liability
 
Judgement is required to determine which types of arrangements are considered to be a tax on income in contrast to an operating cost. Judgement is also required in determining whether deferred tax liabilities are recognised in the statement of financial position. Deferred tax liabilities, including those arising from un-utilised tax gains, require management to assess the likelihood that the Company will generate sufficient taxable losses in future periods, in order to offset recognised deferred tax liabilities. Assumptions about the generation of future taxable losses depend on management’s estimates of future cash flows. These estimates of future taxable losses are based on forecast cash flows from operations (which are impacted by production and sales volumes, commodity prices, reserves, operating costs, closure and rehabilitation costs, capital expenditure, and other capital management transactions) and judgement about the application of existing tax laws in each jurisdiction. To the extent that future cash flows and taxable losses differ significantly from estimates, the ability of the Company to offset the net deferred tax liabilities recorded at the reporting date could be impacted.
 
(e)
 Mineral reserves
 
The recoverability of the carrying value of the mineral properties is dependent on successful development and commercial exploitation, or alternatively, sale of the respective areas of interest.
 
(f)
Depreciation
 
Significant judgment is involved in the determination of useful life and residual values for the computation of depreciation, depletion and amortization and no assurance can be given that actual useful lives and residual values will not differ significantly from current assumptions.
 
(g)
 Impairment
 
The carrying value of long-lived assets are reviewed each reporting period to determine whether there is any indication of impairment. If the carrying amount of an asset exceeds its recoverable amount, the asset is impaired, and an impairment loss is recognized in the consolidated statement of operations. The assessment of fair values, including those of the cash generating units (the smallest identifiable group of assets that generates cash inflows that are largely independent of the cash inflow from other assets or groups of assets) (“CGUs”) for purposes of testing goodwill, require the use of estimates and assumptions for recoverable production, long-term commodity prices, discount rates, foreign exchange rates, future capital requirements and operating performance. Changes in any of the assumptions or estimates used in determining the fair value of goodwill or other assets could impact the impairment analysis.
 
(h)
 Allowance for doubtful accounts, and the recoverability of receivables and prepaid expense amounts.
 
Significant estimates are involved in the determination of recoverability of receivables and no assurance can be given that actual proceeds will not differ significantly from current estimations. Similarly, significant estimates are involved in the determination of the recoverability of services and/or goods related to the prepaid expense amounts, and actual results could differ significantly from current estimations.
 
(i)
Provision for closure and reclamation
 
The Company assesses its mineral properties’ rehabilitation provision at each reporting date or when new material information becomes available. Exploration, development and mining activities are subject to various laws and regulations governing the protection of the environment. In general, these laws and regulations are continually changing, and the Company has made, and intends to make in the future, expenditures to comply with such laws and regulations. Accounting for reclamation obligations requires management to make estimates of the future costs that the Company will incur to complete the reclamation work required to comply with existing laws and regulations at each location. Actual costs incurred may differ from those amounts estimated.
 
 
47
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
 
Also, future changes to environmental laws and regulations could increase the extent of reclamation and remediation work required to be performed by the Company. Increases in future costs could materially impact the amounts charged to operations for reclamation and remediation. The provision represents management’s best estimate of the present value of the future reclamation and remediation obligation. The actual future expenditures may differ from the amounts currently provided.
 
(f)
Share-based payments
 
Management uses valuation techniques in measuring the fair value of share purchase options granted. The fair value is determined using the Black Scholes option pricing model which requires management to make certain estimates, judgement, and assumptions in relation to the expected life of the share purchase options and share purchase warrants, expected volatility, expected risk-free rate, and expected forfeiture rate. Changes to these assumptions could have a material impact on the Annual Financial Statements.
 
(f)
Contingencies
 
The assessment of contingencies involves the exercise of significant judgment and estimates of the outcome of future events. In assessing loss contingencies related to legal proceedings that are pending against the Company and that may result in regulatory or government actions that may negatively impact the Company’s business or operations, the Company and its legal counsel evaluate the perceived merits of the legal proceeding or unasserted claim or action as well as the perceived merits of the nature and amount of relief sought or expected to be sought, when determining the amount, if any, to recognize as a contingent liability or when assessing the impact on the carrying value of the Company’s assets. Contingent assets are not recognized in the Annual Financial Statements.
 
(g)
Fair value measurement
 
The Company measures financial instruments at fair value at each reporting date. The fair values of financial instruments measured at amortized cost are disclosed in Note 20. Also, from time to time, the fair values of non-financial assets and liabilities are required to be determined, e.g., when the entity acquires a business, completes an asset acquisition or where an entity measures the recoverable amount of an asset or cash-generating unit at fair value less costs of disposal. Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date.
 
The fair value of an asset or a liability is measured using the assumptions that market participants would use when pricing the asset or liability, assuming that market participants act in their economic best interest. A fair value measurement of a non-financial asset takes into account a market participant’s ability to generate economic benefits by using the asset in its highest and best use or by selling it to another market participant that would use the asset in its highest and best use. The Company uses valuation techniques that are appropriate in the circumstances and for which sufficient data are available to measure fair value, maximising the use of relevant observable inputs and minimising the use of unobservable inputs. Changes in estimates and assumptions about these inputs could affect the reported fair value.
 
12.
FINANCIAL INSTRUMENTS AND RELATED RISKS
 
The Board of Directors, through the Audit Committee is responsible for identifying the principal risks of the Company and ensuring that risk management systems are implemented. The Company manages its exposure to financial risks, including liquidity risk, foreign exchange rate risk, interest rate risk, and credit risk in accordance with its risk management framework. The Company’s board of directors’ reviews the Company’s policies on an ongoing basis.
 
Financial Instruments
 
A description of financial instruments is included in Note 21 to the Annual Financial Statements and Note 11 to the Company’s unaudited condensed interim consolidated financial statements for the three and six months ended June 30, 2020.
 
 
48
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
Related Risks
 
(a)
Liquidity risk
 
Liquidity risk is the risk that an entity will be unable to meet its financial obligations as they fall due. The Company manages liquidity risk by preparing cash flow forecasts of upcoming cash requirements. As at June 30, 2020, the Company had a cash balance of $1,342,672 (December 31, 2019 – $3,017,704). As at June 30, 2020, the Company had accounts payable and accrued liabilities of $1,633,958 (December 31, 2019 - $2,420,392), which have contractual maturities of 90 days or less.
 
(b)
Credit risk
 
Credit risk is the risk that one party to a financial instrument will fail to discharge an obligation and cause the other party to incur a financial loss. The Company is exposed to credit risk primarily associated to cash and restricted cash equivalents and receivables, net of allowances. Management believes that the credit risk concentration with respect to these financial instruments is remote as the balances primarily consist of amounts on deposit with a major financial institution and amounts receivable from the Government of Canada. The carrying amount of assets included on the statements of financial position represents the maximum credit exposure.
 
(c)
Market risk
 
The significant market risks to which the Company is exposed are interest rate risk, foreign currency risk, and commodity and equity price risk. The objective of market risk management is to manage and control market risk exposures within acceptable limits, while maximizing returns.
 
(i)
  Interest rate risk
 
Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate due to changes in market interest rates. The Company’s cash and restricted cash equivalents primarily include highly liquid investments that earn interest at market rates that are fixed to maturity. Due to the short term nature of these financial instruments, fluctuations in market rates do not have significant impact on the fair values of the financial instruments as of June 30, 2020
 
(ii)
Foreign currency risk
 
The Company is exposed to foreign currency risk to the extent that monetary assets and liabilities held by the Company are not denominated in Canadian dollars. The Company has exploration and development projects in the United States, Mongolia and Bolivia and undertakes transactions in various foreign currencies. The Company is therefore exposed to foreign currency risk arising from transactions denominated in a foreign currency and the translation of financial instruments denominated in US dollars, Mongolian tugrik, and Bolivian boliviano into its functional and reporting currency, the Canadian dollar.
 
Based on the above, net exposures as at June 30, 2020, with other variables unchanged, a 10% (December 31, 2018 – 10%) strengthening (weakening) of the Canadian dollar against the Mongolian tugrik would impact net loss with other variables unchanged by $25,000. A 10% strengthening (weakening) of the Canadian dollar against the Bolivian boliviano would impact net loss with other variables unchanged by $41,000. A 10% strengthening (weakening) of the US dollar against the Canadian dollar would impact net loss with other variables unchanged by $30,000. The Company currently does not use any foreign exchange contracts to hedge this currency risk.
 
(iii)
 Commodity and equity price risk
 
Commodity price risk is defined as the potential adverse impact on earnings and economic value due to commodity price movements and volatilities. Commodity prices fluctuate on a daily basis and are affected by numerous factors beyond the Company’s control. The supply and demand for these commodities, the level of interest rates, the rate of inflation, investment decisions by large holders of commodities including governmental reserves and stability of exchange rates can all cause significant fluctuations in prices. Such external economic factors are in turn influenced by changes in international investment patterns and monetary systems and political developments.
The Company is also exposed to price risk with regards to equity prices. Equity price risk is defined as the potential adverse impact on the Company’s earning due to movements in individual equity prices or general movements in the level of the stock market.
 
 
49
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
The Company closely monitors commodity prices, individual equity movements and the stock market to determine the appropriate course of action to be taken by the Company. Fluctuations in value may be significant.
 
13.
RISKS AND UNCERTAINTIES
 
The Company’s business is the exploration, evaluation and development of mining properties. Thus, the Company’s operations are speculative due to the high-risk nature of its business. The following list details existing and future material risks to the Company. The risks described below are not listed in any particular order and are not meant to be exhaustive. Additional risks and uncertainties not currently known to the Company, or those that it currently deems to be immaterial, may become material and adversely affect the Company. The realization of any of these risks may materially and adversely impact the Company’s business, financial condition or results of operations and/or the market price of the Company’s securities. Each of these risk factors is discussed in more detail under “Risk Factors” in the Company’s AR for the year ended December 31, 2019, which is available under the Company’s SEDAR profile at www.sedar.com.
 
Global outbreaks including COVID-19;
History of net losses;
Capital costs, operating costs, production and economic returns;
Exploration and development risks;
No history of profitable mineral production;
Mineral reserves / mineral resources;
Environmental risks;
Foreign operations;
Reform of the General Mining Law in the U.S;
Government approvals and permits;
Property interests;
Mineral claims, mining leases, licenses and permitting;
Title risks;
First Nation;
Competition;
Inherent risks;
Reliance on key personnel;
Volatility of mineral prices,
Currency fluctuations;
Global and local financial conditions;
Third-party contractors;
Andy-bribery legislations;
Uninsured risks;
No dividend payments;
Related party transactions;
Litigation and regulatory proceedings;
Cyber security;
Foreign private issuer;
Non-Canadian investors;
Emerging growing company;
Additional risks.
 
14.
DISCLOSURE CONTROLS AND PROCEDURES
 
Design of Internal Controls over Financial Reporting
 
Disclosure controls and procedures are designed to provide reasonable assurance that information required to be disclosed by the Company in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in the securities legislation and include controls and procedures designed to ensure that information required to be disclosed by the Company in its annual filings, interim filings or other reports filed or submitted under securities legislation is accumulated and communicated to the Company’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
 
 
50
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
The Company’s disclosure committee is comprised of the Chief Executive Officer and senior members of management. The disclosure committee’s responsibilities include determining whether information is material and ensuring the timely disclosure of material information in accordance with securities laws. The board of directors is responsible for reviewing the Company’s disclosure policy, procedures and controls to ensure that it addresses the Company’s principal business risks, and changes in operations or structure, and facilitates compliance with applicable legislative and regulatory reporting requirements.
 
The Company’s Chief Executive Officer and Chief Financial Officer, after participating with the Company’s management in evaluating the effectiveness of the Company’s disclosure controls and procedures, have concluded that the Company’s disclosure controls and procedures were effective during the six months June 30, 2020.
 
Design of Internal Controls over Financial Reporting
 
The Company’s management, with the participation of the Chief Executive Officer and Chief Financial Officer, is responsible for establishing and maintaining adequate internal control over financial reporting. The Company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with IFRS. The Company’s internal control over financial reporting includes those policies and procedures that:
 
pertain to the maintenance of records that, in reasonable detail accurately and fairly reflect the transactions, acquisition and disposition of assets and liabilities;
 
provide reasonable assurance that transactions are recorded as necessary to permit preparation of the financial statements in accordance with IFRS and that receipts and expenditures are being made only in accordance with the authorization of management and directors of the Company; and
 
provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of assets, and incurrence of liabilities, that could have a material effect on the financial statements.
 
The Company’s management, with the participation of the Chief Executive Officer, the Chairman of the Board and Chief Financial Officer, assessed the effectiveness of the Company’s internal control over financial reporting using the criteria set forth in the Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, management concluded that the Company’s internal control over financial reporting was effective during the six months ended June 30, 2020.
 
15.
CHANGES IN INTERNAL CONTROL OVER FINANCIAL REPORTING
 
There were no changes to the Company’s internal control over financial reporting during the six months ended June 30, 2020, that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.
 
Limitations of controls and procedures
 
The Company’s management, including the Chief Executive Officer and the Chief Financial Officer, believe that any disclosure controls and procedures or internal controls over financial reporting, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, they cannot provide absolute assurance that all control issues and instances of fraud, if any, within the Company have been prevented or detected. These inherent limitations include the realities that judgements in decision-making can be faulty, and that breakdowns can occur because of simple error or mistake. Additionally, controls can be circumvented by the individual acts of some persons, by collusion of two or more people, or by unauthorized override of the control. The design of any systems of controls also is based in part upon certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions. Accordingly, because of the inherent limitations in a cost-effective control system, misstatements due to error or fraud may occur and not be detected.
 
 
51
SILVER ELEPHANT MINING CORP.
Management’s Discussion and Analysis of Financial Condition and Results of Operations
For the six months ended June 30, 2020
(Expressed in Canadian Dollars, except where indicated)
 
 
16.
DISCLOSURE OF OUTSTANDING SHARE DATA
 
As at the date of this MD&A, the Company had a total of:
 
142,294,048 Shares outstanding with recorded value of $184,880,340;
 
10,358,750 stock options outstanding with a weighted average exercise price of $0.26. The options are exercisable to purchase one Share at prices ranging from $0.20 to $0.49 and expire between June 2021 and May 2025; and
 
36,347,837 Share purchase warrants outstanding with a weighted average exercise price the equivalent of $0.22. The Share purchase warrants are exercisable to purchase one Share at prices ranging from the equivalent of $0.16 to $0.26 and expire between September 2020 and May 2023.
 
17.
OFF-BALANCE SHEET ARRANGEMENTS
 
During the six months ended June 30, 2020, the Company was not a party to any off-balance sheet arrangements that have, or are reasonably likely to have, a current or future effect on the results of operations, financial condition, revenues or expenses, liquidity, capital expenditures or capital resources of the Company.
 
52