EX-99.1 12 ex991-kosmosenergylimitedx.htm EX-99.1 REPORT OF RYDER SCOTT Document


Exhibit 99.1







KOSMOS ENERGY LIMITED





Estimated

Future Reserves and Income

Attributable to Certain Interests


Proved Reserves




SEC Parameters




As of

December 31, 2021




/s/ Tosin Famurewa/s/ Victor A. Abu
Tosin Famurewa, P.E., S.P.E.C.Victor A. Abu, P.E., S.P.E.C.
TBPELS License No. 100569TBPELS License No. 132717
Managing Senior Vice President / DirectorVice President
[SEAL]                                             [SEAL]


/s/ Christine E. Neylon/s/ Amara N. Okafor
Christine E. Neylon, P.E.Amara N. Okafor, P.E.
TBPELS License No. 122128TBPELS License No. 113166
Vice PresidentVice President
[SEAL]                         [SEAL]
RYDER SCOTT COMPANY, L.P.
TBPELS Firm Registration No. F-1580
RYDER SCOTT COMPANY PETROLEUM CONSULTANTS


image_0a.jpgimage_1b.jpg



    TBPELS REGISTERED ENGINEERING FIRM F-1580        FAX (713) 651-0849
    1100 LOUISIANA SUITE 4600    HOUSTON, TEXAS 77002-5294    TELEPHONE (713) 651-9191



        January 21, 2022



Kosmos Energy Limited
8176 Park Lane, Suite 500
Dallas, Texas 75231


Ladies and Gentlemen:

At your request, Ryder Scott Company, L.P. (Ryder Scott) has prepared an estimate of the proved reserves, future production, and income attributable to certain interests of Kosmos Energy Limited (Kosmos) as of December 31, 2021. The subject properties are located in Ghana, offshore West Africa, in the West Cape Three Points (WCTP) and Deep Water Tano (DWT) blocks, hereafter referred to as the “Greater Jubilee and TEN Project Areas,” Equatorial Guinea, offshore Central Africa, in the G and F blocks, hereafter referred to as the “Ceiba and Okume Project Areas” Mauritania and Senegal, offshore Northwest Africa, in the C-8 and St. Louis Offshore Profond blocks, hereafter referred to as the “Greater Tortue Project Area” and United States of America, federal waters offshore Louisiana and Texas, hereafter referred to as the “Gulf of Mexico Project Area.” The reserves and income data were estimated based on the definitions and disclosure guidelines of the United States Securities and Exchange Commission (SEC) contained in Title 17, Code of Federal Regulations, Modernization of Oil and Gas Reporting, Final Rule released January 14, 2009 in the Federal Register (SEC regulations). Our third party study, completed on January 17, 2022 and presented herein, was prepared for public disclosure by Kosmos in filings made with the SEC in accordance with the disclosure requirements set forth in the SEC regulations.

The properties evaluated by Ryder Scott in this report represent 100 percent of the total net proved liquid hydrocarbon reserves and 100 percent of the total net proved gas reserves of Kosmos as of December 31, 2021.

The estimated reserves and future net income amounts presented in this report, as of December 31, 2021, are related to hydrocarbon prices. The hydrocarbon prices used in the preparation of this report are based on the average prices during the 12-month period prior to the “as of date” of this report, determined as the unweighted arithmetic averages of the prices in effect on the first-day-of-the-month for each month within such period, unless prices were defined by contractual arrangements, as required by the SEC regulations. Actual future prices may vary considerably from the prices required by SEC regulations. The recoverable reserves volumes and the income attributable thereto have a direct relationship to the hydrocarbon prices actually received; therefore, volumes of reserves actually recovered and the amounts of income actually received may differ significantly from the estimated quantities presented in this report. At Kosmos’ request, we have included estimated gross (100%) reserves, along with the estimated net reserves and income data. The results of this study are summarized as follows.

    SUITE 2800, 350 7TH AVENUE, S.W.    CALGARY, ALBERTA T2P 3N9    TEL (403) 262-2799
    633 17TH STREET, SUITE 1700    DENVER, COLORADO 80202    TEL (303) 339-8110

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 2


SEC PARAMETERS
Estimated Gross Reserves1 Data
Derived Through Certain Interests of
Kosmos Energy Limited
As of December 31, 2021
Proved
Developed
ProducingNon-ProducingUndevelopedTotal
Gulf of Mexico Project Area
Gross Reserves




  Oil/Condensate – Mbbl
86,37319,58329,833135,789
  Plant Products2 – Mboe
7,6942,6215,34115,656
  Sales Gas3 – MMcf
68,61628,78042,115139,511
  Fuel Gas – MMcf
0000

Greater Jubilee and TEN Project Areas
Gross Reserves




  Oil/Condensate – Mbbl
152,4190187,959340,378
  Plant Products2 – Mboe
0000
  Sales Gas3 – MMcf
95,516043,984139,500
  Fuel Gas – MMcf
86,6800086,680

Ceiba and Okume Project Areas
Gross Reserves




  Oil/Condensate – Mbbl
52,4227,78514,35674,563
  Plant Products2 – Mboe
0000
  Sales Gas3 – MMcf
0000
  Fuel Gas – MMcf
25,4200025,420

Greater Tortue Project Area
Gross Reserves




  Oil/Condensate – Mbbl
0034,12534,125
  Plant Products2 – Mboe
00375,418375,418
  Sales Gas3 – MMcf
0000
  Fuel Gas – MMcf
00215,690215,690

Total
Gross Reserves




  Oil/Condensate – Mbbl
291,21427,368266,273584,855
  Plant Products2 – Mboe
7,6942,621380,759391,074
  Sales Gas3 – MMcf
164,13228,78086,099279,011
  Fuel Gas – MMcf
112,1000215,690327,790

1These volumes are 100% gross and do not represent net volumes to Kosmos’ interests. Net reserves and income are shown below.
2Plant Products includes Natural Gas Liquids (NGL) in Mbbl from the Gulf of Mexico Project Area and Liquefied Natural Gas (LNG) in Mboe from the Greater Tortue Area
RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 3


3Sales gas represents gross sales that is gas produced at the wellhead, after the extraction of plant products, consumed fuel gas and gas flared as part of operations.


SEC PARAMETERS
Estimated Net Reserves and Income Data
Derived Through Certain Interests of
Kosmos Energy Limited
As of December 31, 2021
Proved
Developed
Producing4
Non-ProducingUndevelopedTotal
Gulf of Mexico Project Area
Net Reserves




  Oil/Condensate – Mbbl
20,6034,8313,15728,591
  Plant Products2 – Mboe
1,7953818703,046
  Sales Gas – MMcf
15,9664,4716,44726,884
  Fuel Gas – MMcf
0000



Income Data ($M)
  Future Gross Revenue
$1,402,186$331,697$246,863$1,980,746
  Deductions
385,209151,06382,016618,288
  Future Net Income (FNI)
$1,016,977$180,634$164,847$1,362,458
  Discounted FNI @ 10%
$ 845,514$ 95,322$122,836$1,063,672

Greater Jubilee and TEN Project Areas5
Net Reserves




  Oil/Condensate – Mbbl
52,122067,757119,879
  Plant Products2 – Mboe
0000
  Sales Gas – MMcf
25,989011,96737,956
  Fuel Gas – MMcf
29,9630029,963



Income Data ($M)
  Future Gross Revenue
$3,602,115$0$4,682,809$8,284,924
  Deductions
1,359,86102,354,2263,714,087
  Future Net Income (FNI)
$2,242,254$0$2,328,583$4,570,837
  Discounted FNI @ 10%
$1,779,193$0$1,299,419$3,078,612





RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 4


Proved
Developed
Producing4
Non-ProducingUndevelopedTotal
Ceiba and Okume Project Areas
Net Reserves




  Oil/Condensate – Mbbl
17,1822,5594,72424,465
  Plant Products2 – Mboe
0000
  Sales Gas – MMcf
0000
  Fuel Gas – MMcf
10,8040010,804



Income Data ($M)
  Future Gross Revenue
$1,168,958$174,084$321,364$1,664,406
  Deductions
652,657158,009290,2451,100,911
  Future Net Income (FNI)
$ 516,301$ 16,075$ 31,119$ 563,495
  Discounted FNI @ 10%
$ 467,910$ 33,245$ 18,141$ 519,296

Greater Tortue Project Area
Net Reserves




  Oil/Condensate – Mbbl
008,1618,161
  Plant Products2 – Mboe
0089,74889,748
  Sales Gas – MMcf
0000
  Fuel Gas – MMcf
0051,46151,461



Income Data ($M)
  Future Gross Revenue
$0$0$4,313,617$4,313,617
  Deductions
003,724,5743,724,574
  Future Net Income (FNI)
$0$0$ 589,043$ 589,043
  Discounted FNI @ 10%
$0$0$ (65,381)$ (65,381)

Total
Net Reserves




  Oil/Condensate – Mbbl
89,9077,39083,799181,096
  Plant Products2 – Mboe
1,79538190,61892,794
  Sales Gas – MMcf
41,9554,47118,41464,840
  Fuel Gas – MMcf
40,767051,46192,228



Income Data ($M)
  Future Gross Revenue
$6,173,259$505,781$9,564,653$16,243,693
  Deductions
2,397,727309,0726,451,0619,157,860
  Future Net Income (FNI)
$3,775,532$196,709$3,113,592$ 7,085,833
  Discounted FNI @ 10%
$3,092,617$128,567$1,375,015$ 4,596,199

2Plant Products includes Natural Gas Liquids (NGL) in Mbbl from the Gulf of Mexico Project Area and Liquefied Natural Gas (LNG) in Mboe from the Greater Tortue Area
4Proved depleted summary consisting of certain P&A liability costs are included with the proved developed producing summary for the Gulf of Mexico Project Area
RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 5


5Following Kosmos’ acquisition of Anadarko West Cape Three Points Company (“AWCTP”), Kosmos sent a notice to partners and the Ghanaian government informing them of the name change from AWCTP to Kosmos Energy Ghana Investments (“KEGIN”). Kosmos continues to hold its Ghana equity in the two separate companies, the original Kosmos Energy Ghana Holding Company (“KEGHC”) and the new Kosmos Energy Ghana Investments (“KEGIN”). The net reserves above represent a summation of both companies. Detailed splits of these interests can be seen in the accompanying cashflow tables.


Liquid hydrocarbons are expressed in standard 42 U.S. gallon barrels and shown herein as thousands of barrels (Mbbl). Fuel gas volumes are attributed to those volumes of gas that are consumed for fuel in field operations, while sales gas volumes are reported on an “as sold basis.” Kosmos elected not to report fuel gas for the Gulf of Mexico Project Area. All gas volumes are expressed in millions of cubic feet (MMcf) at the official temperature and pressure bases of the areas in which the gas reserves are located. The plant products include Natural Gas Liquids (NGL) from the Gulf of Mexico Project Area and Liquefied Natural Gas (LNG) from the Greater Tortue Area. The LNG plant products are shown herein on an equivalent unit basis wherein natural gas is converted to oil equivalent using a factor of 6,000 cubic feet of natural gas per one barrel of oil equivalent. Mboe means thousand barrels of oil equivalent. In this report, the revenues, deductions, and income data are expressed as thousands of U.S. dollars ($M).

The estimates of the reserves, future production, and income attributable to properties in this report were prepared using the economic software package PHDWin Petroleum Economic Evaluation Software, a copyrighted program of TRC Consultants L.C. and economic models developed in Microsoft EXCEL. These programs were used at the request of Kosmos. Ryder Scott has found these programs to be generally acceptable, but notes that certain summaries and calculations may vary due to rounding and may not exactly match the sum of the properties being summarized. Furthermore, one line economic summaries may vary slightly from the more detailed cash flow projections of the same properties, also due to rounding. The rounding differences are not material.

The deductions incorporate the normal direct costs of operating the wells, recompletion costs, development costs, and certain abandonment costs net of salvage. “Other deductions”, in the Greater Tortue Project Area, consist of BP’s carry balance credit to Kosmos, joint operating agreement (JOA) overhead cost and training cost. Deductions in the Greater Jubilee and TEN project areas include Additional Oil Entitlements (AOE). AOE is a contractual mechanism that prevents the contractor group from collecting “windfall profits” and is treated herein as a deduction to the future gross revenue; however, for the Greater Jubilee and TEN Project Areas our economic analysis indicates there are no AOE deductions for the proved reserves. The AOE calculation is determined at the block level and includes a rate of return calculation that is derived on an after corporate income tax basis based on interpretations of tax considerations made by Kosmos. In the Greater Jubilee and TEN Project Areas, abandonment costs (included in the “Development Costs” column of the cash flow projections) are triggered and escrowed several years before the economic limit is reached, and this may result in negative FNI values for certain years prior to abandonment.

Certain gas, oil and condensate processing and handling fees, including compression fees where applicable are included as “Other” and “Ad Valorem Taxes” deductions in the cash flows. The later are not true ad valorem taxes but represent Kosmos’ throughput fee to Talos for processing and handling of the production volumes from the Tornado field in the Gulf of Mexico Project Area. The separate tracking of this throughput fee in the “Ad Valorem Taxes” column of the cash flows was done at Kosmos’ request.

There are no production taxes associated with the Greater Jubilee, TEN, Ceiba, Okume and Gulf of Mexico Project Areas. The future net income is before the deductions of U.S. state and federal or foreign income taxes and general administrative overhead, and has not been adjusted for outstanding loans that may exist, nor does it include any adjustment for cash on hand or undistributed income.

    The discounted future net income shown above was calculated using a discount rate of 10 percent per annum compounded annually. Future net income was discounted at four other discount rates which were also compounded annually. These results are shown in summary form as follows.

RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 6



Discounted Future Net Income ($M)
As of December 31, 2021
Discount RateTotal
PercentProved
5$5,592,682
15$3,887,567
20$3,359,784
25$2,952,849


The results shown above are presented for your information and should not be construed as our estimate of fair market value.


Reserves Included in This Report

The proved reserves included herein conform to the definition as set forth in the Securities and Exchange Commission’s Regulations Part 210.4-10(a). An abridged version of the SEC reserves definitions from 210.4-10(a) entitled “PETROLEUM RESERVES DEFINITIONS” is included as an attachment to this report.

The various reserves status categories are defined in the attachment entitled “PETROLEUM RESERVES STATUS DEFINITIONS AND GUIDELINES” in this report. The proved developed non-producing reserves included herein consist of the shut-in and behind pipe status categories.

No attempt was made to quantify or otherwise account for any accumulated gas production imbalances that may exist.

Reserves are “estimated remaining quantities of oil and gas and related substances anticipated to be economically producible, as of a given date, by application of development projects to known accumulations.” All reserves estimates involve an assessment of the uncertainty relating the likelihood that the actual remaining quantities recovered will be greater or less than the estimated quantities determined as of the date the estimate is made. The uncertainty depends chiefly on the amount of reliable geologic and engineering data available at the time of the estimate and the interpretation of these data. The relative degree of uncertainty may be conveyed by placing reserves into one of two principal classifications, either proved or unproved. Unproved reserves are less certain to be recovered than proved reserves, and may be further sub-categorized as probable and possible reserves to denote progressively increasing uncertainty in their recoverability. At Kosmos’ request, this report addresses only the proved reserves attributable to the properties evaluated herein.

Proved oil and gas reserves are “those quantities of oil and gas which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be economically producible from a given date forward.” The proved reserves included herein were estimated using deterministic methods. The SEC has defined reasonable certainty for proved reserves, when based on deterministic methods, as a “high degree of confidence that the quantities will be recovered.”

Proved reserves estimates will generally be revised only as additional geologic or engineering data become available or as economic conditions change. For proved reserves, the SEC states that “as changes due to increased availability of geoscience (geological, geophysical, and geochemical), engineering, and economic data are made to the estimated ultimate recovery (EUR) with time, reasonably certain EUR is much more likely to increase or remain constant than to decrease.” Moreover, estimates of proved reserves may be revised as a result of future operations, effects of regulation by governmental agencies or geopolitical or economic risks. Therefore, the proved reserves included in this report are estimates only and should not be construed as being exact quantities, and if
RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 7


recovered, the revenues therefrom, and the actual costs related thereto, could be more or less than the estimated amounts.

The proved reserves reported herein are limited to the period prior to expiration of current contracts providing the legal rights to produce, or a revenue interest in such production unless evidence indicates that contract renewal is reasonably certain. Furthermore, the subject properties located in Ghana and Equatorial Guinea may be subjected to substantially varying contractual fiscal terms that affect the net revenue to Kosmos for the production of these volumes. The prices and economic return received for these net volumes can vary materially based on the terms of these contracts. Therefore, when applicable, Ryder Scott reviewed the fiscal terms of such contracts and discussed with Kosmos the net economic benefit attributed to such operations for the determination of the net hydrocarbon volumes and income thereof. Ryder Scott has not conducted an exhaustive audit or verification of such contractual information. Neither our review of such contractual information nor our acceptance of Kosmos representations regarding such contractual information should be construed as a legal opinion on this matter.

Ryder Scott did not evaluate the country and geopolitical risks in the countries where Kosmos operates or has interests. Kosmos operations may be subject to various levels of governmental controls and regulations. These controls and regulations may include, but may not be limited to, matters relating to land tenure and leasing, the legal rights to produce hydrocarbons, drilling and production practices, environmental protection, marketing and pricing policies, royalties, various taxes and levies including income tax and are subject to change from time to time. Such changes in governmental regulations and policies may cause volumes of proved reserves actually recovered and amounts of proved income actually received to differ significantly from the estimated quantities.

The estimates of proved reserves presented herein were based upon a detailed study of the properties in which Kosmos owns an interest; however, we have not made any field examination of the properties. No consideration was given in this report to potential environmental liabilities that may exist nor were any costs included for potential liabilities to restore and clean up damages, if any, caused by past operating practices.



RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 8


Estimates of Reserves

The estimation of reserves involves two distinct determinations. The first determination results in the estimation of the quantities of recoverable oil and gas and the second determination results in the estimation of the uncertainty associated with those estimated quantities in accordance with the definitions set forth by the Securities and Exchange Commission’s Regulations Part 210.4-10(a). The process of estimating the quantities of recoverable oil and gas reserves relies on the use of certain generally accepted analytical procedures. These analytical procedures fall into three broad categories or methods: (1) performance-based methods; (2) volumetric-based methods; and (3) analogy. These methods may be used individually or in combination by the reserves evaluator in the process of estimating the quantities of reserves. Reserves evaluators must select the method or combination of methods which in their professional judgment is most appropriate given the nature and amount of reliable geoscience and engineering data available at the time of the estimate, the established or anticipated performance characteristics of the reservoir being evaluated, and the stage of development or producing maturity of the property.

In many cases, the analysis of the available geoscience and engineering data and the subsequent interpretation of this data may indicate a range of possible outcomes in an estimate, irrespective of the method selected by the evaluator. When a range in the quantity of reserves is identified, the evaluator must determine the uncertainty associated with the incremental quantities of the reserves. If the reserves quantities are estimated using the deterministic incremental approach, the uncertainty for each discrete incremental quantity of the reserves is addressed by the reserves category assigned by the evaluator. Therefore, it is the categorization of reserves quantities as proved, probable and/or possible that addresses the inherent uncertainty in the estimated quantities reported. For proved reserves, uncertainty is defined by the SEC as reasonable certainty wherein the “quantities actually recovered are much more likely to be achieved than not.” The SEC states that “probable reserves are those additional reserves that are less certain to be recovered than proved reserves but which, together with proved reserves, are as likely as not to be recovered.” The SEC states that “possible reserves are those additional reserves that are less certain to be recovered than probable reserves and the total quantities ultimately recovered from a project have a low probability of exceeding proved plus probable plus possible reserves.” All quantities of reserves within the same reserves category must meet the SEC definitions as noted above.

Estimates of reserves quantities and their associated reserves categories may be revised in the future as additional geoscience or engineering data become available. Furthermore, estimates of reserves quantities and their associated reserves categories may also be revised due to other factors such as changes in economic conditions, results of future operations, effects of regulation by governmental agencies or geopolitical or economic risks as previously noted herein.

The proved reserves for the properties included herein were estimated by performance methods, the volumetric method, analogy, or a combination of methods. Approximately 12 percent of the proved producing reserves attributable to producing wells and/or reservoirs were estimated by performance methods. The performance methods include, but may not be limited to, decline curve analysis, material balance and/or reservoir simulation which utilized extrapolations of historical production and pressure data available through December 2021 in those cases where such data were considered to be definitive. The data utilized in this analysis were furnished to Ryder Scott by Kosmos and were considered sufficient for the purpose thereof. The remaining 88 percent of the proved producing reserves were estimated by the volumetric method, analogy, or a combination of methods. These methods were used where there were inadequate historical performance data to establish a definitive trend and where the use of production performance data as a basis for the reserves estimates was considered to be inappropriate. However, available performance data were used to ensure the volumetric parameters in our estimates derived from the volumetric method were appropriate.
Approximately 2 percent of the proved developed non-producing reserves included herein were estimated by the performance method. The remaining 98 percent of the proved developed non-producing reserves and all of the proved undeveloped reserves for the properties included herein were estimated by a combination of the volumetric method, analogy and performance method. The volumetric analysis utilized pertinent well and seismic data furnished to Ryder Scott by Kosmos or obtained from public data sources that were available through December 2021. The data utilized from
RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 9


the analogues as well as well and seismic data incorporated into our volumetric analysis were considered sufficient for the purpose thereof.

To estimate economically recoverable proved oil and gas reserves and related future net cash flows, we consider many factors and assumptions including, but not limited to, the use of reservoir parameters derived from geological, geophysical and engineering data which cannot be measured directly, economic criteria based on current costs and SEC pricing requirements, and forecasts of future production rates. Under the SEC regulations 210.4-10(a)(22)(v) and (26), proved reserves must be anticipated to be economically producible from a given date forward based on existing economic conditions including the prices and costs at which economic producibility from a reservoir is to be determined. While it may reasonably be anticipated that the future prices received for the sale of production and the operating costs and other costs relating to such production may increase or decrease from those under existing economic conditions, such changes were, in accordance with rules adopted by the SEC, omitted from consideration in making this evaluation.

Kosmos has informed us that they have furnished us all of the material accounts, records, geological and engineering data, and reports and other data required for this investigation. In preparing our forecast of future proved production and income, we have relied upon data furnished by Kosmos with respect to property interests owned, contractual terms that govern future net income, production and well tests from examined wells, normal direct costs of operating the wells or leases and all the required facilities such as the FPSO, other costs such as transportation and/or processing fees, recompletion and development costs, development plans, abandonment costs after salvage, product prices based on the SEC regulations, adjustments or differentials to product prices, geological structural and isochore maps, well logs, core analyses, and pressure measurements. Ryder Scott reviewed such factual data for its reasonableness; however, we have not conducted an independent verification of the data furnished by Kosmos. We consider the factual data used in this report appropriate and sufficient for the purpose of preparing the estimates of reserves and future net revenues herein.

In summary, we consider the assumptions, data, methods and analytical procedures used in this report appropriate for the purpose hereof, and we have used all such methods and procedures that we consider necessary and appropriate to prepare the estimates of reserves herein. The proved reserves included herein were determined in conformance with the United States Securities and Exchange Commission (SEC) Modernization of Oil and Gas Reporting; Final Rule, including all references to Regulation S-X and Regulation S-K, referred to herein collectively as the “SEC Regulations.” In our opinion, the proved reserves presented in this report comply with the definitions, guidelines and disclosure requirements as required by the SEC regulations.


Future Production Rates

For wells currently on production, our forecasts of future production rates are based on historical performance data. If a decline trend has been established, this trend was used as the basis for estimating future production rates.  If no production decline trend has been established, one of the following occurred:

future production rates were held constant, or adjusted for the effects of curtailment where appropriate, until a decline in ability to produce was anticipated. An estimated rate of decline was then applied until depletion of the reserves.

future production rates were projected based on a type well derived from analogy to surrounding historical well production. 

future production rates were based on a combination of historical performance data, volumetric analysis and a robust numerical simulation model. Future production rates were held constant, or adjusted for the effects of curtailment where appropriate, until a decline in ability to produce was anticipated. An estimated “simulation based decline rate” was then applied until depletion of the reserves.

RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 10


Test data and other related information were used to estimate the anticipated initial production rates for those wells or locations that are not currently producing. For reserves not yet on production, sales were estimated to commence at an anticipated date furnished by Kosmos. Wells or locations that are not currently producing may start producing earlier or later than anticipated in our estimates due to unforeseen factors causing a change in the timing to initiate production. Such factors may include delays due to weather, the availability of rigs, the sequence of drilling, completing and/or recompleting wells and/or constraints set by regulatory bodies.

The future production rates from wells currently on production or wells or locations that are not currently producing may be more or less than estimated because of changes including, but not limited to, reservoir performance, operating conditions related to surface facilities, compression and artificial lift, pipeline capacity and/or operating conditions, producing market demand and/or allowables or other constraints set by regulatory bodies.


Hydrocarbon Prices

The hydrocarbon prices used herein are based on SEC price parameters using the average prices during the 12-month period prior to the “as of date” of this report, determined as the unweighted arithmetic averages of the prices in effect on the first-day-of-the-month for each month within such period, unless prices were defined by contractual arrangements. For hydrocarbon products sold under contract, the contract prices, including fixed and determinable escalations, exclusive of inflation adjustments, were used until expiration of the contract.

Kosmos furnished us with the above mentioned average prices in effect on December 31, 2021. These initial SEC hydrocarbon prices were determined using the 12-month average first-day-of-the-month benchmark prices appropriate to the geographic area where the hydrocarbons are sold. These benchmark prices are prior to the adjustments for differentials as described herein. The table below summarizes the “benchmark prices” and “price reference” used for the geographic area included in the report. In certain geographic areas, the price reference and benchmark prices may be defined by contractual arrangements.

The product prices which were actually used to determine the future gross revenue for each property reflect adjustments to the benchmark prices for gravity, quality, local conditions, gathering and transportation fees and/or distance from market, NGL processing fees, referred to herein as “differentials.” The differentials used in the preparation of this report were furnished to us by Kosmos. The differentials furnished to us were accepted as factual data and reviewed by us for their reasonableness; however, we have not conducted an independent verification of the data used by Kosmos to determine these differentials.

In addition, the table below summarizes the net volume weighted benchmark prices adjusted for differentials and referred to herein as the “average realized prices.” The average realized prices shown in the table below were determined from the total future gross revenue before production taxes and the total net reserves for the geographic area and presented in accordance with SEC disclosure requirements for each of the geographic areas included in the report.


RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 11


Geographic AreaProduct
Price
Reference
Average
Benchmark
Price
Average Realized
Price
West Africa
Greater Jubilee and TEN Project Areas
OilBrent$69.47/BBL$68.92/BBL
GasContract$0.60/MCF$0.60/MCF
       Greater Tortue Project Area
    
CondensateBrent$69.47/Bbl$69.47/Bbl
LNG
(6)
$6.60/MMbtu$41.75/BOE
Central Africa
Ceiba and Okume Project Areas
OilBrent$69.47/BBL$68.04/BBL
North America
Gulf of Mexico Project Area
Oil/
Condensate
Heavy Louisiana Sweet$67.33/BBL$64.42/BBL
NGLsHeavy Louisiana Sweet$67.33/BBL$21.76/BBL
GasHenry Hub$3.60/MMBTU$2.70/MCF

6The future LNG prices, as specified by Kosmos, are based on the Sales Purchase Agreement (SPA), which is indexed to Brent crude, with a specified heating value of 1.065 MMbtu/scf.


The effects of derivative instruments designated as price hedges of oil and gas quantities are not reflected in our individual property evaluations.


Costs

Operating costs for the contract areas and wells in this report were furnished by Kosmos and are based on their operating expense reports and include only those costs directly applicable to the contract areas or wells. The operating costs include a portion of general and administrative costs allocated directly to the contract areas and wells. For operated properties, the operating costs include an appropriate level of corporate general administrative and overhead costs. The operating costs for non-operated properties include the COPAS overhead costs that are allocated directly to the leases and wells under terms of operating agreements. Certain gas, oil and condensate processing and handling fees, including compression fees where applicable are included as “other” and “Ad Valorem Taxes” deductions in the cash flows. The later are not true ad valorem taxes but represent Kosmos’ throughput fee to Talos for processing and handling of the production volumes from the Tornado field. The separate tracking of this throughput fee in the “Ad Valorem Taxes” column of the cash flows was done at Kosmos’ request. For some Gulf of Mexico Project Area assets, we calculated their operating costs using Lease Operating Statements (LOE) provided by Kosmos. For the remaining assets, the operating costs furnished to us were accepted as factual data and reviewed by us for their reasonableness; however, we have not conducted an independent verification of the operating cost data used by Kosmos. No deduction was made for loan repayments, interest expenses, or exploration and development prepayments that were not charged directly to the contract areas or wells.

Development costs were furnished to us by Kosmos and are based on authorizations for expenditure for the proposed work or actual costs for similar projects. The development costs furnished to us were accepted as factual data and reviewed by us for their reasonableness; however, we have not conducted an independent verification of these costs. The estimated net cost of abandonment after salvage was included for properties where abandonment costs net of salvage were material. The estimates of the net abandonment costs furnished by Kosmos were accepted without independent verification. Kosmos advises that their contractual share of Mississippi Canyon 697/698/741/742 (Big Bend) field, in the Gulf of Mexico Project Area, Plug and Abandonment (P&A) liability is zero.

RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 12


The proved developed non-producing and undeveloped reserves in this report have been incorporated herein in accordance with Kosmos’ plans to develop these reserves as of December 31, 2021. The implementation of Kosmos’ development plans as presented to us and incorporated herein is subject to the approval process adopted by Kosmos’ management. As the result of our inquiries during the course of preparing this report, Kosmos has informed us that the development activities included herein have been subjected to and received the internal approvals required by Kosmos management at the appropriate local, regional and/or corporate level. In addition to the internal approvals as noted, certain development activities may still be subject to specific partner AFE processes, Joint Operating Agreement (JOA) requirements or other administrative approvals external to Kosmos. Kosmos has provided written documentation supporting their commitment to proceed with the development activities as presented to us. Additionally, Kosmos has informed us that they are not aware of any legal, regulatory or political obstacles that would significantly alter their plans. While these plans could change or evolve from those under existing economic conditions as of December 31, 2021, such changes were, in accordance with rules adopted by the SEC, omitted from consideration in making this evaluation.

According to Item 1203 (d) of the SEC Regulations, an explanation should be included for the reasons “…why material amounts of proved undeveloped reserves … remain undeveloped for five years or more after disclosure as proved undeveloped reserves.”  A material amount of proved undeveloped reserves in the Greater Tortue Project Area of this report are forecast to be converted to developed status beyond the five-year time frame.  A five-year time frame for converting undeveloped to developed reserves was adopted by the SEC, “unless specific circumstances justify a longer time frame.”  The Greater Tortue Project, a multi-billion dollar investment, is a partnership between BP Mauritania Investments Limited (BPMIL), BP Senegal Investments Limited (BPSIL), Kosmos Energy Mauritania (KEM), Kosmos Energy Investments Senegal Limited (KEISL), La Societe Mauritanienne Des Hydrocarbures et de Patrimione Miner (SMHPM), and La Societe Des Petroles du Senegal (PETROSEN), the last two being the National Oil Companies (NOC) of the governments of the Islamic Republic of Mauritania and the Republic of Senegal respectively. There are several long lead items including major equipment, pipelines, infrastructure for facilities that include a floating liquefied natural gas (FLNG) vessel, a deep-water floating production storage and offloading (FPSO) facility, and LNG gas processing facilities in a deep offshore environment. The project has partnership commitment and alignment with about $4.2 Billion spent as at November 2021. The project is proceeding on schedule, as all 4 major project segments – Subsea, FPSO, Hub Terminal and FLNG are within 3% of the execution timeline. It is Ryder Scott’s opinion that these special circumstances allow for the recognition of proved reserves for locations that will be developed beyond the five-year time frame.

Current costs used by Kosmos were held constant throughout the life of the properties. However, in some contract areas, anticipated changes to operations during the field life-ramp-down, specifically consolidation of activates, reduced well count and/or fluid handling, and other synergies, are projected to result in certain cost reductions.


Standards of Independence and Professional Qualification

Ryder Scott is an independent petroleum engineering consulting firm that has been providing petroleum consulting services throughout the world since 1937. Ryder Scott is employee-owned and maintains offices in Houston, Texas; Denver, Colorado; and Calgary, Alberta, Canada. We have approximately eighty engineers and geoscientists on our permanent staff. By virtue of the size of our firm and the large number of clients for which we provide services, no single client or job represents a material portion of our annual revenue. We do not serve as officers or directors of any privately-owned or publicly-traded oil and gas company and are separate and independent from the operating and investment decision-making process of our clients. This allows us to bring the highest level of independence and objectivity to each engagement for our services.

Ryder Scott actively participates in industry-related professional societies and organizes an annual public forum focused on the subject of reserves evaluations and SEC regulations. Many of our staff have authored or co-authored technical papers on the subject of reserves related topics. We encourage our staff to maintain and enhance their professional skills by actively participating in ongoing continuing education.
RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 13



Prior to becoming an officer of the Company, Ryder Scott requires that staff engineers and geoscientists have received professional accreditation in the form of a registered or certified professional engineer’s license or a registered or certified professional geoscientist’s license, or the equivalent thereof, from an appropriate governmental authority or a recognized self-regulating professional organization. Regulating agencies require that, in order to maintain active status, a certain amount of continuing education hours be completed annually, including an hour of ethics training. Ryder Scott fully supports this technical and ethics training with our internal requirement mentioned above.

We are independent petroleum engineers with respect to Kosmos Energy Limited. Neither we nor any of our employees have any financial interest in the subject properties and neither the employment to do this work nor the compensation is contingent on our estimates of reserves for the properties which were reviewed.

The results of this study, presented herein, are based on technical analysis conducted by teams of geoscientists and engineers from Ryder Scott. The professional qualifications of the undersigned, the technical person primarily responsible for overseeing, reviewing and approving the evaluation of the reserves information discussed in this report, are included as an attachment to this letter.


Terms of Usage

The results of our third party study, presented in report form herein, were prepared in accordance with the disclosure requirements set forth in the SEC regulations and intended for public disclosure as an exhibit in filings made with the SEC by Kosmos.
Kosmos makes periodic filings on Form 10-K with the SEC under the 1934 Exchange Act. Furthermore, Kosmos has certain registration statements filed with the SEC under the 1933 Securities Act into which any subsequently filed Form 10-K is incorporated by reference. We have consented to the incorporation by reference in the registration statements on Forms S-3 and S-8 of Kosmos Energy Limited of the references to our name as well as to the references to our third party report for Kosmos Energy Limited, which appears in the December 31, 2021 annual report on Form 10-K of Kosmos Energy Limited. Our written consent for such use is included as a separate exhibit to the filings made with the SEC by Kosmos Energy Limited.

We have provided Kosmos with a digital version of the original signed copy of this report letter. In the event there are any differences between the digital version included in filings made by Kosmos and the original signed report letter, the original signed report letter shall control and supersede the digital version.

The data and work papers used in the preparation of this report are available for examination by authorized parties in our offices. Please contact us if we can be of further service.


Very truly yours,

RYDER SCOTT COMPANY, L.P.
TBPELS Firm Registration No. F-1580


/s/ Tosin Famurewa

Tosin Famurewa, P.E., S.P.E.C.
TBPELS License No. 100569
Managing Senior Vice President    [SEAL]


/s/ Victor A. Abu
RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

Kosmos Energy Limited – SEC Parameters
January 21, 2022
Page 14



Victor A. Abu, P.E., S.P.E.C.
TBPELS License No. 132717
        Vice President                [SEAL]


/s/ Christine E. Neylon

Christine E. Neylon, P.E.
TBPELS License No. 122128
        Vice President                [SEAL]


        /s/ Amara N. Okafor

Amara N. Okafor, P.E.
TBPELS License No. 113166
        Vice President             [SEAL]

TF-VAA-CEN-ANO (DCR)/pl



RYDER SCOTT COMPANY PETROLEUM CONSULTANTS










Professional Qualifications of Primary Technical Person

The conclusions presented in this report are the result of technical analysis conducted by teams of geoscientists and engineers from Ryder Scott Company, L.P. (Ryder Scott). Tosin Famurewa was the primary technical person responsible for overseeing the estimate of the reserves, future production and income prepared by Ryder Scott presented herein.

Mr. Famurewa, an employee of Ryder Scott since 2006, is a Managing Senior Vice President responsible for coordinating and supervising staff and consulting engineers of the company in ongoing reservoir evaluation studies worldwide. Mr. Famurewa is also a member of Ryder Scott’s Board of Directors. Before joining Ryder Scott, Mr. Famurewa served in a number of engineering and management positions with Chevron and Texaco. For more information regarding Mr. Famurewa’s geographic and job specific experience, please refer to Ryder Scott’s website at www.ryderscott.com/Employees.

Mr. Famurewa earned double Bachelor of Science degrees in Chemical Engineering and Material Science and Engineering from University of California at Berkeley in 2000 and a Master of Science degree in Petroleum Engineering from University of Southern California in 2007. He is a licensed Professional Engineer (P.E.) in the State of Texas and a SPE Certified Petroleum Engineer (S.P.E.C.). He is also a member of the Society of Petroleum Engineers (SPE) and the Society of Petroleum Evaluation Engineers (SPEE).

In addition to gaining experience and competency through prior work experience, the Texas Board of Professional Engineers requires a minimum of fifteen hours of continuing education annually, including at least one hour in the area of professional ethics, which Mr. Famurewa fulfills. Mr. Famurewa is a regular speaker on reserve related topics at the annual Sub-Saharan Africa Oil and Gas Conference in Houston, Texas USA.

Based on his educational background, professional training and more than 20 years of practical experience in the estimation and evaluation of petroleum reserves, Mr. Famurewa has attained the professional qualifications as a Reserves Estimator and Reserves Auditor as set forth in Article III of the “Standards Pertaining to the Estimating and Auditing of Oil and Gas Reserves Information” promulgated by the Society of Petroleum Engineers as of June 2019.



RYDER SCOTT COMPANY PETROLEUM CONSULTANTS






PETROLEUM RESERVES DEFINITIONS

As Adapted From:
RULE 4-10(a) of REGULATION S-X PART 210
UNITED STATES SECURITIES AND EXCHANGE COMMISSION (SEC)


PREAMBLE

On January 14, 2009, the United States Securities and Exchange Commission (SEC) published the “Modernization of Oil and Gas Reporting; Final Rule” in the Federal Register of National Archives and Records Administration (NARA). The “Modernization of Oil and Gas Reporting; Final Rule” includes revisions and additions to the definition section in Rule 4-10 of Regulation S-X, revisions and additions to the oil and gas reporting requirements in Regulation S-K, and amends and codifies Industry Guide 2 in Regulation S-K. The “Modernization of Oil and Gas Reporting; Final Rule”, including all references to Regulation S-X and Regulation S-K, shall be referred to herein collectively as the “SEC regulations”. The SEC regulations take effect for all filings made with the United States Securities and Exchange Commission as of December 31, 2009, or after January 1, 2010. Reference should be made to the full text under Title 17, Code of Federal Regulations, Regulation S-X Part 210, Rule 4-10(a) for the complete definitions (direct passages excerpted in part or wholly from the aforementioned SEC document are denoted in italics herein).

Reserves are estimated remaining quantities of oil and gas and related substances anticipated to be economically producible, as of a given date, by application of development projects to known accumulations. All reserve estimates involve an assessment of the uncertainty relating the likelihood that the actual remaining quantities recovered will be greater or less than the estimated quantities determined as of the date the estimate is made. The uncertainty depends chiefly on the amount of reliable geologic and engineering data available at the time of the estimate and the interpretation of these data. The relative degree of uncertainty may be conveyed by placing reserves into one of two principal classifications, either proved or unproved. Unproved reserves are less certain to be recovered than proved reserves and may be further sub-classified as probable and possible reserves to denote progressively increasing uncertainty in their recoverability. Under the SEC regulations as of December 31, 2009, or after January 1, 2010, a company may optionally disclose estimated quantities of probable or possible oil and gas reserves in documents publicly filed with the SEC. The SEC regulations continue to prohibit disclosure of estimates of oil and gas resources other than reserves and any estimated values of such resources in any document publicly filed with the SEC unless such information is required to be disclosed in the document by foreign or state law as noted in §229.1202 Instruction to Item 1202.

Reserves estimates will generally be revised only as additional geologic or engineering data become available or as economic conditions change.

Reserves may be attributed to either natural energy or improved recovery methods. Improved recovery methods include all methods for supplementing natural energy or altering natural forces in the reservoir to increase ultimate recovery. Examples of such methods are pressure maintenance, natural gas cycling, waterflooding, thermal methods, chemical flooding, and the use of miscible and immiscible displacement fluids. Other improved recovery methods may be developed in the future as petroleum technology continues to evolve.

Reserves may be attributed to either conventional or unconventional petroleum accumulations. Petroleum accumulations are considered as either conventional or unconventional based on the nature of their in-place characteristics, extraction method applied, or degree of processing prior to sale. Examples of unconventional petroleum accumulations include coalbed or coalseam methane (CBM/CSM), basin-centered gas, shale gas, gas hydrates, natural bitumen and oil shale deposits. These unconventional accumulations may require specialized extraction technology and/or significant processing prior to sale.
RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

PETROLEUM RESERVES DEFINITIONS
Page 2



Reserves do not include quantities of petroleum being held in inventory.

Because of the differences in uncertainty, caution should be exercised when aggregating quantities of petroleum from different reserves categories.


RESERVES (SEC DEFINITIONS)

Securities and Exchange Commission Regulation S-X §210.4-10(a)(26) defines reserves as follows:

Reserves. Reserves are estimated remaining quantities of oil and gas and related substances anticipated to be economically producible, as of a given date, by application of development projects to known accumulations. In addition, there must exist, or there must be a reasonable expectation that there will exist, the legal right to produce or a revenue interest in the production, installed means of delivering oil and gas or related substances to market, and all permits and financing required to implement the project.

Note to paragraph (a)(26): Reserves should not be assigned to adjacent reservoirs isolated by major, potentially sealing, faults until those reservoirs are penetrated and evaluated as economically producible. Reserves should not be assigned to areas that are clearly separated from a known accumulation by a non-productive reservoir (i.e., absence of reservoir, structurally low reservoir, or negative test results). Such areas may contain prospective resources (i.e., potentially recoverable resources from undiscovered accumulations).


PROVED RESERVES (SEC DEFINITIONS)

Securities and Exchange Commission Regulation S-X §210.4-10(a)(22) defines proved oil and gas reserves as follows:

Proved oil and gas reserves. Proved oil and gas reserves are those quantities of oil and gas, which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be economically producible—from a given date forward, from known reservoirs, and under existing economic conditions, operating methods, and government regulations—prior to the time at which contracts providing the right to operate expire, unless evidence indicates that renewal is reasonably certain, regardless of whether deterministic or probabilistic methods are used for the estimation. The project to extract the hydrocarbons must have commenced or the operator must be reasonably certain that it will commence the project within a reasonable time.

(i) The area of the reservoir considered as proved includes:

(A) The area identified by drilling and limited by fluid contacts, if any, and

(B) Adjacent undrilled portions of the reservoir that can, with reasonable certainty, be judged to be continuous with it and to contain economically producible oil or gas on the basis of available geoscience and engineering data.
(ii) In the absence of data on fluid contacts, proved quantities in a reservoir are limited by the lowest known hydrocarbons (LKH) as seen in a well penetration unless geoscience, engineering, or performance data and reliable technology establishes a lower contact with reasonable certainty.

(iii) Where direct observation from well penetrations has defined a highest known oil (HKO) elevation and the potential exists for an associated gas cap, proved oil reserves may be assigned in the structurally higher portions of the reservoir only if geoscience, engineering, or performance data and reliable technology establish the higher contact with reasonable certainty.

RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

PETROLEUM RESERVES DEFINITIONS
Page 3


(iv) Reserves which can be produced economically through application of improved recovery techniques (including, but not limited to, fluid injection) are included in the proved classification when:
(A) Successful testing by a pilot project in an area of the reservoir with properties no more favorable than in the reservoir as a whole, the operation of an installed program in the reservoir or an analogous reservoir, or other evidence using reliable technology establishes the reasonable certainty of the engineering analysis on which the project or program was based; and

(B) The project has been approved for development by all necessary parties and entities, including governmental entities.

(v) Existing economic conditions include prices and costs at which economic producibility from a reservoir is to be determined. The price shall be the average price during the 12-month period prior to the ending date of the period covered by the report, determined as an unweighted arithmetic average of the first-day-of-the-month price for each month within such period, unless prices are defined by contractual arrangements, excluding escalations based upon future conditions.




RYDER SCOTT COMPANY PETROLEUM CONSULTANTS






PETROLEUM RESERVES STATUS DEFINITIONS AND GUIDELINES

As Adapted From:
RULE 4-10(a) of REGULATION S-X PART 210
UNITED STATES SECURITIES AND EXCHANGE COMMISSION (SEC)

and

2018 PETROLEUM RESOURCES MANAGEMENT SYSTEM (SPE-PRMS)
Sponsored and Approved by:
SOCIETY OF PETROLEUM ENGINEERS (SPE)
WORLD PETROLEUM COUNCIL (WPC)
AMERICAN ASSOCIATION OF PETROLEUM GEOLOGISTS (AAPG)
SOCIETY OF PETROLEUM EVALUATION ENGINEERS (SPEE)
SOCIETY OF EXPLORATION GEOPHYSICISTS (SEG)
SOCIETY OF PETROPHYSICISTS AND WELL LOG ANALYSTS (SPWLA)
EUROPEAN ASSOCIATION OF GEOSCIENTISTS & ENGINEERS (EAGE)


Reserves status categories define the development and producing status of wells and reservoirs. Reference should be made to Title 17, Code of Federal Regulations, Regulation S-X Part 210, Rule 4-10(a) and the SPE-PRMS as the following reserves status definitions are based on excerpts from the original documents (direct passages excerpted from the aforementioned SEC and SPE-PRMS documents are denoted in italics herein).


DEVELOPED RESERVES (SEC DEFINITIONS)

Securities and Exchange Commission Regulation S-X §210.4-10(a)(6) defines developed oil and gas reserves as follows:

Developed oil and gas reserves are reserves of any category that can be expected to be recovered:

(i) Through existing wells with existing equipment and operating methods or in which the cost of the required equipment is relatively minor compared to the cost of a new well; and

(ii) Through installed extraction equipment and infrastructure operational at the time of the reserves estimate if the extraction is by means not involving a well.

Developed Producing (SPE-PRMS Definitions)

While not a requirement for disclosure under the SEC regulations, developed oil and gas reserves may be further sub-classified according to the guidance contained in the SPE-PRMS as Producing or Non-Producing.

Developed Producing Reserves
Developed Producing Reserves are expected quantities to be recovered from completion intervals that are open and producing at the effective date of the estimate.

Improved recovery reserves are considered producing only after the improved recovery project is in operation.

RYDER SCOTT COMPANY PETROLEUM CONSULTANTS

PETROLEUM RESERVES STATUS DEFINITIONS AND GUIDELINES
Page 2


Developed Non-Producing
Developed Non-Producing Reserves include shut-in and behind-pipe Reserves.

Shut-In
Shut-in Reserves are expected to be recovered from:
(1)completion intervals that are open at the time of the estimate but which have not yet started producing;
(2)wells which were shut-in for market conditions or pipeline connections; or
(3)wells not capable of production for mechanical reasons.

Behind-Pipe
Behind-pipe Reserves are expected to be recovered from zones in existing wells that will require additional completion work or future re-completion before start of production with minor cost to access these reserves.

In all cases, production can be initiated or restored with relatively low expenditure compared to the cost of drilling a new well.


UNDEVELOPED RESERVES (SEC DEFINITIONS)

Securities and Exchange Commission Regulation S-X §210.4-10(a)(31) defines undeveloped oil and gas reserves as follows:

Undeveloped oil and gas reserves are reserves of any category that are expected to be recovered from new wells on undrilled acreage, or from existing wells where a relatively major expenditure is required for recompletion.

(i)Reserves on undrilled acreage shall be limited to those directly offsetting development spacing areas that are reasonably certain of production when drilled, unless evidence using reliable technology exists that establishes reasonable certainty of economic producibility at greater distances.

(ii) Undrilled locations can be classified as having undeveloped reserves only if a development plan has been adopted indicating that they are scheduled to be drilled within five years, unless the specific circumstances, justify a longer time.

(iii) Under no circumstances shall estimates for undeveloped reserves be attributable to any acreage for which an application of fluid injection or other improved recovery technique is contemplated, unless such techniques have been proved effective by actual projects in the same reservoir or an analogous reservoir, as defined in paragraph (a)(2) of this section, or by other evidence using reliable technology establishing reasonable certainty.


RYDER SCOTT COMPANY PETROLEUM CONSULTANTS