XML 44 R25.htm IDEA: XBRL DOCUMENT v3.10.0.1
Subsequent Events (Notes)
12 Months Ended
Dec. 31, 2018
Subsequent Events [Abstract]  
SUBSEQUENT EVENTS
SUBSEQUENT EVENTS
On January 9, 2019, we entered into the first amendment (“First Amendment”) to the Second Amended and Restated Credit Facility, which extended the maturity date of Term Loan A to January 9, 2021, subject to three, one-year extension options.   Additionally, in connection with the First Amendment, borrowings under the Second Amended and Restated Credit Facility with respect to Term Loan bear interest at floating rates equal to, at our option, either (1) LIBOR, plus a spread which ranges from 1.20% to 1.70% based on our consolidated total leverage ratio, or (2) a base rate equal to the highest of (a) the prime rate, (b) the federal funds rate plus 50 bps or (c) the Eurodollar rate plus 100 bps, in each case plus a spread which ranges from 0.20% to 0.70% based on our consolidated total leverage ratio. The foregoing rates are more favorable than previously contained in the Second Amended and Restated Credit Facility (prior to entry into the First Amendment) with respect to Term Loan A. 

On January 23, 2019, we recorded the deed to the former Sears building at Carmel Mountain Plaza in connection with a ground lease termination agreement with the former ground lessee. In connection therewith, we recognized approximately $4.4 million of lease termination fees in January 2019.