EX-99.1 2 fnv-20191231ex9916543f2.htm EX-99.1 fnv_Ex99_1

Exhibit 99.1

Picture 18

 

 

TABLE OF CONTENTS

 

 

 

Page

GENERAL MATTERS 

1

 

 

FORWARD LOOKING STATEMENTS 

1

 

 

EXCHANGE RATE INFORMATION 

3

 

 

COMMODITY PRICE INFORMATION 

3

 

 

THE CORPORATION 

3

 

 

GENERAL DEVELOPMENT OF FRANCO-NEVADA’S BUSINESS 

4

 

 

EXPLANATION OF ROYALTIES, STREAMS AND OTHER INTERESTS 

11

 

 

TECHNICAL AND THIRD PARTY INFORMATION 

13

 

 

FRANCO-NEVADA’S ASSETS 

15

 

 

ANTAMINA MINING AND TECHNICAL INFORMATION 

20

 

 

ANTAPACCAY MINING AND TECHNICAL INFORMATION 

26

 

 

CANDELARIA MINING AND TECHNICAL INFORMATION 

31

 

 

COBRE PANAMA MINING AND TECHNICAL INFORMATION 

38

 

 

RISK FACTORS 

45

 

 

DIVIDENDS 

58

 

 

CAPITAL STRUCTURE 

58

 

 

MARKET FOR SECURITIES 

59

 

 

DIRECTORS AND OFFICERS 

60

 

 

LEGAL PROCEEDINGS AND REGULATORY ACTIONS 

63

 

 

INTERESTS OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS 

63

 

 

REGISTRAR AND TRANSFER AGENT 

64

 

 

MATERIAL CONTRACTS 

64

 

 

EXPERTS 

64

 

 

ADDITIONAL INFORMATION 

64

 

 

AUDIT AND RISK COMMITTEE INFORMATION 

64

 

 

APPENDIX A FRANCO-NEVADA CORPORATION AUDIT AND RISK COMMITTEE CHARTER 

A-1

 

 

i

GENERAL MATTERS

Unless otherwise noted or the context otherwise indicates, the terms “Franco-Nevada”, “FNV”, “Company”, “Corporation”,  “our” and “we” refer to Franco-Nevada Corporation and its subsidiaries.  For reporting purposes, the Corporation presents its financial statements in United States dollars and in conformity with International Financial Reporting Standards as issued by the International Accounting Standards Board (“IFRS”).  All dollar amounts in this Annual Information Form (“AIF”) are expressed in United States dollars, except as otherwise indicated.  References to “US$”, “$” or “dollars” are to United States dollars,  references to “C$” are to Canadian dollars and references to “A$” are to Australian dollars.

The information contained in this AIF is as of December 31, 2019, unless otherwise indicated.  More current information may be available on our public website at www.franco-nevada.com or on the System for Electronic Document Analysis and Retrieval (“SEDAR”) at www.sedar.com or on the website of the United States Securities and Exchange Commission (the “SEC”) at www.sec.gov.  In addition, we generally maintain supporting materials on our website which may assist in reviewing (but are not to be considered part of) this AIF including Franco-Nevada’s most recent Asset Handbook and Environmental, Social and Governance (ESG) Report (which contains a discussion of environmental, social and governance issues, including climate change),   a Glossary of Non-Technical Terms, Glossary of Technical Terms, Certain Oil & Natural Gas Terms and a Metric Conversion Table.

FORWARD LOOKING STATEMENTS

This AIF contains “forward looking information” and “forward looking statements” within the meaning of applicable Canadian securities laws and the United States Private Securities Litigation Reform Act of 1995, respectively, which may include, but are not limited to, statements with respect to future events or future performance, management’s expectations regarding Franco‑Nevada’s growth, results of operations, estimated future revenues, carrying value of assets, future dividends and requirements for additional capital, mineral reserve and mineral resource estimates, production estimates, production costs and revenue, future demand for and prices of commodities, expected mining sequences, business prospects and opportunities, audits being conducted by the Canada Revenue Agency (“CRA”), the expected exposure for current and future assessments and available remedies, the remedies relating to and consequences of the ruling of the Supreme Court of Panama in relation to the Cobre Panama project, the aggregate value of common shares which may be issued pursuant to its at-the-market equity program (the “ATM Program”), the Corporation’s expected use of the net proceeds of the ATM Program, and expected succession planning.  In addition, statements (including data in tables) relating to reserves and resources and gold equivalent ounces are forward looking statements, as they involve implied assessment, based on certain estimates and assumptions, and no assurance can be given that the estimates and assumptions are accurate and that such reserves and resources and gold equivalent ounces (“GEOs”) will be realized. Such forward looking statements reflect management’s current beliefs and are based on information currently available to management. Often, but not always, forward looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budgets”, “scheduled”, “estimates”, “forecasts”, “predicts”, “projects”, “intends”, “targets”, “aims”, “anticipates” or “believes” or variations (including negative variations) of such words and phrases or may be identified by statements to the effect that certain actions “may”, “could”, “should”, “would”, “might” or “will” be taken, occur or be achieved. Forward looking statements involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements of Franco‑Nevada to be materially different from any future results, performance or achievements expressed or implied by the forward looking statements. A number of factors could cause actual events or results to differ materially from any forward looking statement, including, without limitation: fluctuations in the prices of the primary commodities that drive royalty and stream revenue (gold, platinum group metals, copper, nickel, uranium, silver, iron-ore and oil and gas); fluctuations in the value of the Canadian and Australian dollar, Mexican peso and any other currency in which revenue is generated, relative to the U.S. dollar; changes in national and local government legislation, including permitting and licensing regimes and taxation policies and the enforcement thereof; regulatory, political or economic developments in any of the countries where properties in which Franco-Nevada holds a royalty, stream or other interest are located or through which they are held; risks related to the operators of the properties in which Franco-Nevada holds a royalty, stream or other interest, including changes in the ownership and control of such operators; influence of macroeconomic developments; business opportunities that become available to, or are pursued by Franco-Nevada; reduced access to debt and equity capital; litigation; title, permit or license disputes related to interests on any of the properties in which Franco-Nevada holds a royalty, stream or other interest; whether or not the Corporation is determined to have “passive foreign investment company” (“PFIC”) status as defined in Section 1297 of the United States Internal Revenue Code of 1986, as amended; potential changes in Canadian tax treatment of offshore streams; excessive cost escalation as well as development, permitting, infrastructure, operating or technical difficulties on any of the properties in which Franco-Nevada holds a royalty, stream or other interest; access to sufficient pipeline capacity; actual mineral content may differ from the reserves and resources contained in technical reports; rate and timing of production differences from resource estimates, other technical reports and mine plans; risks and hazards associated with the business of development and mining on any of the properties in which Franco‑Nevada holds a royalty, stream or other interest, including, but not limited to unusual or unexpected geological and metallurgical conditions, slope failures or cave-ins, flooding and other natural disasters, terrorism, civil unrest or an outbreak of contagious disease; and the integration of acquired assets.  The forward looking statements contained in this AIF are based upon assumptions management believes to be reasonable, including, without limitation: the ongoing operation of the properties in which Franco‑Nevada holds a royalty, stream or other interest by the owners or operators of such properties in a manner consistent with past practice; the accuracy of public statements and disclosures made by the owners or operators of such underlying properties; no material adverse change in the market price of the commodities that underlie the asset portfolio; the Corporation’s ongoing income and assets relating to determination of its PFIC status; no material changes to existing tax treatment; the expected application of tax laws and regulations by taxation authorities; the expected assessment and outcome of any audit by any taxation authority; no adverse development in respect of any significant property in which Franco-Nevada holds a royalty, stream or other interest; the accuracy of publicly disclosed expectations for the development of underlying

properties that are not yet in production; integration of acquired assets; and the absence of any other factors that could cause actions, events or results to differ from those anticipated, estimated or intended. However, there can be no assurance that forward looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements and investors are cautioned that forward looking statements are not guarantees of future performance.  In addition, there can be no assurance as to the outcome of the ongoing audit by the CRA or the Company’s exposure as a result thereof.  Franco-Nevada cannot assure investors that actual results will be consistent with these forward looking statements.  Accordingly, investors should not place undue reliance on forward looking statements due to the inherent uncertainty therein.  For additional information with respect to risks, uncertainties and assumptions, please refer to the “Risk Factors” section of this AIF filed with the Canadian securities regulatory authorities on www.sedar.com and the U.S. Securities and Exchange Commission (the “SEC”) on www.sec.gov.  The forward looking statements herein are made as of the date of this AIF only and Franco-Nevada does not assume any obligation to update or revise them to reflect new information, estimates or opinions, future events or results or otherwise, except as required by applicable law.

CAUTIONARY NOTE REGARDING MINERAL RESERVE AND RESOURCE ESTIMATES

This AIF has been prepared in accordance with the requirements of Canadian securities laws in effect in Canada, which differ from the requirements of U.S. securities laws.  Unless otherwise indicated, all mineral resource and reserve estimates included in this AIF have been prepared by the owners or operators of the relevant properties (as and to the extent indicated by them) in accordance with National Instrument 43-101 — Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining and Metallurgy Classification System. NI 43-101 is a rule developed by the Canadian securities regulatory authorities which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. NI 43-101 permits a historical estimate made prior to the adoption of NI 43-101 that does not comply with NI 43-101 to be disclosed using the historical terminology if, among other things, the disclosure: (a) identifies the source and date of the historical estimate; (b) comments on the relevance and reliability of the historical estimate; (c) states whether the historical estimate uses categories other than those prescribed by NI 43-101; and (d) includes any more recent estimates or data available.

Canadian standards, including NI 43-101, differ significantly from the requirements of the SEC under SEC Industry Guide 7, and reserve and resource information contained herein may not be comparable to similar information disclosed by U.S. companies. In particular, and without limiting the generality of the foregoing, the term “resource” does not equate to the term “reserves”. Under SEC Industry Guide 7, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. The SEC’s disclosure standards normally do not permit the inclusion of information concerning “measured mineral resources”, “indicated mineral resources” or “inferred mineral resources” or other descriptions of the amount of mineralization in mineral deposits that do not constitute “reserves” by U.S. standards in documents filed with the SEC in compliance with SEC Industry Guide 7. U.S. investors should also understand that “inferred mineral resources” have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an “inferred mineral resource” will ever be upgraded to a higher category. Under Canadian rules, estimated “inferred mineral resources” may not form the basis of feasibility or pre-feasibility studies except in rare cases. Investors are cautioned not to assume that all or any part of an “inferred mineral resource” exists or is economically or legally mineable. Disclosure of “contained ounces” in a mineral resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” under SEC Industry Guide 7 as in-place tonnage and grade without reference to unit measures. The requirements of NI 43-101 for identification of “reserves” are also not the same as those of the SEC, and reserves reported by the Corporation in compliance with NI 43-101 may not qualify as “reserves” under SEC standards. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.    SEC Industry Guide 7, the existing standard for the SEC, is being replaced following the adoption of new legislation under sub-part 1300 of Regulation S-K under the U.S. Securities Act (“Modernization of Property Disclosure of Mining Registrants Standards”) which will be mandatory for issuers subject to U.S. reporting standards for the first fiscal year beginning on or after January 1, 2021.    None of the reserve or resource estimates presented herein have been prepared in accordance with the Modernization of Property Disclosure of Mining Registrants Standards.

In addition to NI 43-101, a number of resource and reserve estimates have been prepared in accordance with the JORC Code or the SAMREC Code (as such terms are defined in NI 43-101), which differ from the requirements of NI 43-101 and U.S. securities laws.  Accordingly, information containing descriptions of the Corporation’s mineral properties set forth herein may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the U.S. federal securities laws and the rules and regulations thereunder.  For more information, see “Reconciliation to CIM Definitions”.

2

 

EXCHANGE RATE INFORMATION

The following table sets out the high and low rates of exchange for one U.S. dollar expressed in Canadian dollars during each of the following periods; the average rate of exchange for those periods; and the rate of exchange in effect at the end of each of those periods, each based on the exchange rate published by the Bank of Canada. 

 

 

 

 

 

 

 

 

 

 

 

 

 

Years ended December 31,

 

 

    

2019(1)

    

2018(1)

    

2017(2)

 

High

 

$

1.3600

 

$

1.3642

 

$

1.3743

 

Low

 

$

1.2988

 

$

1.2288

 

$

1.2128

 

Average for the Period

 

$

1.3269

 

$

1.2957

 

$

1.2986

 

End of Period

 

$

1.2988

 

$

1.3642

 

$

1.2545

 

 

(1)Based on the daily rate published by the Bank of Canada.

(2)As of March 1, 2017, the Bank of Canada began to publish new foreign exchange rates once a day, by 16:30 ET, in the form of a single indicative rate per currency pair, which represents a daily rate for that currency against the Canadian dollar. The Bank of Canada ceased to publish the noon rate as of April 28, 2017.

On March 17, 2020 the daily exchange rate was US$1.00 = C$1.4175  as published by the Bank of Canada.

COMMODITY PRICE INFORMATION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Spot Commodity Prices

 

    

Gold/oz

    

Silver/oz

    

Platinum/oz

    

Palladium/oz

    

Oil/C$ bbl

    

Gas/C$ mcf

    

Oil/$ bbl

    

Gas/$ mcf

 

 

(LBMA Gold Price PM)

 

(LBMA Silver Price)

 

(London PM Fix)

 

(London PM Fix)

 

(Edmonton Light)

 

(AECO-C)

 

(WTI)

 

(Henry Hub)

Average for 2017

 

$

1,257

 

$

17.05

 

$

948

 

$

870

 

$

63

 

$

2.09

 

$

51

 

$

2.96

Average for 2018

 

$

1,268

 

$

15.71

 

$

881

 

$

1,028

 

$

69

 

$

1.46

 

$

65

 

$

3.07

Average for 2019

 

$

1,392

 

$

16.20

 

$

863

 

$

1,539

 

$

69

 

$

1.70

 

$

57

 

$

2.53

THE CORPORATION

Name, Address and Incorporation

Franco-Nevada was incorporated under the Canada Business Corporations Act on October 17, 2007 and was amalgamated with Franco-Nevada Canada Corporation, its wholly-owned subsidiary, on January 1, 2008. Franco-Nevada’s head office and registered office is currently located at Suite 2000, Commerce Court West, 199 Bay Street, Toronto, Ontario  M5L 1G9.  Franco-Nevada has additional offices in (i) Hastings, Christ Church, Barbados, (ii) Denver, Colorado and (iii) Perth, Australia, all of which are used to manage its asset portfolio and pursue new investment opportunities.

Intercorporate Relationships

The chart below depicts significant subsidiaries that are wholly-owned by Franco-Nevada either directly or indirectly and are existing under the laws of the jurisdictions set out therein.  Intermediate holding companies have been omitted.

 

Picture 3

 

3

GENERAL DEVELOPMENT OF FRANCO-NEVADA’S BUSINESS

Overview

Franco-Nevada is the leading gold-focused royalty and streaming company with the largest and most diversified portfolio of royalties and streams by commodity, geography, revenue type and stage of project.  The portfolio is actively managed to maintain a focus on precious metals (gold, silver and PGM) and a diversity of revenue sources with a target of not more than 20% of revenue from energy (oil, gas and NGLs).

Franco-Nevada’s shares are listed on the Toronto and New York stock exchanges under the symbol FNV.  An investment in Franco‑Nevada’s shares is expected to provide investors with yield and exposure to commodity price and exploration optionality while limiting exposure to many of the risks of operating companies. Since its Initial Public Offering over twelve years ago, Franco‑Nevada has increased its dividend annually and its share price has outperformed the gold price and all relevant gold equity benchmarks.

Franco-Nevada’s Relative Share Price Performance

Picture 2

Franco-Nevada’s revenue is generated from various forms of agreements, ranging from net smelter return royalties, streams, net profits interests, net royalty interests, working interests and other types of arrangements.

The Company does not operate mines, develop projects or conduct exploration.  Franco-Nevada’s business model is focused on managing and growing its portfolio of royalties and streams. The advantages of this business model are:

Exposure to commodity price optionality;

A perpetual discovery option over large areas of geologically prospective lands;

No additional capital requirements other than the initial investment;

Limited exposure to many of the risks associated with operating companies; 

A free cash-flow business with limited cash calls;

A high-margin business that can generate cash through the entire commodity cycle;

A scalable and diversified business in which a large number of assets can be managed with a small stable overhead; and

Management that focuses on forward-looking growth opportunities rather than operational or development issues.

Franco-Nevada’s financial results in the short-term are primarily tied to the price of commodities and the amount of production from its portfolio of producing assets. Financial results have also been supplemented by acquisitions of new producing assets.  Over the longer-term, results are impacted by the availability of exploration and development capital applied by other companies to expand or extend Franco-Nevada’s producing assets or to advance Franco-Nevada’s advanced and exploration assets into production.

Franco-Nevada has a long-term investment outlook and recognizes the cyclical nature of the industry. Franco-Nevada has operated by maintaining a strong balance sheet so that it can make investments during commodity cycle downturns.

Franco-Nevada currently operates a small organization.  As of March 18, 2020, Franco-Nevada has 38 full-time employees and 4 part-time contractors.  As such, Franco-Nevada is dependent upon the continued availability and commitment of its key management, whose contributions to the immediate and future operations of Franco-Nevada are of significant importance. From time to time, Franco-Nevada may also need to identify and retain additional skilled management and specialized technical personnel to efficiently operate its business.  For additional information, see “Risk Factors”.

4

Investment Process and Corporate Policies

Franco-Nevada currently does not operate any of the mining or energy assets in which it has royalty, stream or other interests.  However, Franco-Nevada recognizes its business model is dependent on the industry operating in a responsible fashion and actively supports the industry in its efforts and initiatives.  Franco-Nevada may from time to time engage in exploration efforts as part of advancing a property or to conduct due diligence in advance of undertaking an investment.  When doing so, Franco-Nevada undertakes to be guided by the Principles and Guidance for a Framework of Responsible Exploration as set forth by the e3Plus program of the Prospectors and Developers Association of Canada.    A detailed description of Franco-Nevada’s investment process and a discussion of environmental, social and governance issues, including climate change, is contained in Franco-Nevada’s most recent Environmental, Social and Governance (ESG) Report, which can be found on the Corporation’s website at www.franco‑nevada.com but is not to be considered part of this AIF.

Franco-Nevada has adopted policies relating to its business conduct, including a code of business conduct and ethics, a business integrity policy, a whistleblower policy, a policy concerning confidentiality, fair disclosure and trading in securities, a human rights policy, a discrimination, harassment and equal opportunity policy, a diversity and inclusion policy, an investment principles (environmental, social and governance) policy, a supplier code of conduct, a corporate responsibility policy and a health and safety policy.  Additional information relating to these and other policies can be found on the Corporation’s website at www.franco-nevada.com and are also contained in Franco-Nevada’s most recent Environmental, Social and Governance (ESG) Report and its management information circular dated March 20, 2020 for its annual and special meeting of shareholders scheduled to be held on May 6, 2020 (the “2020 Annual Meeting”).  See “Statement of Governance Practices” in such circular.

 

5

Three-Year History

2017

Acquisition of Midland Basin Royalty Portfolio

On March 13, 2017, Franco-Nevada, through a wholly-owned U.S. subsidiary, entered into an agreement to purchase a royalty portfolio in the Midland Basin of West Texas for $110.0 million.  Following completion of title due diligence, the first part of the portfolio was acquired for $89.8 million and closed on May 24, 2017.  The acquisition of the second part of the portfolio closed on August 8, 2017. The total purchase price was $114.6 million, including adjustments for title due diligence and the acquisition of the second part of the portfolio.  The Midland Basin forms the eastern half of the broader Permian Basin.

FN Barbados Credit Facility

On March 20, 2017, the Company’s wholly-owned subsidiary, FN Barbados, entered into an unsecured revolving credit facility (the “FNBC Revolver”).  The FNBC Revolver provides for the availability over a one-year period of up to $100.0 million in borrowings.  On March 10, 2020, FN Barbados extended the FNBC Revolver to March 20, 2021.

Acquisition of Additional STACK Royalty Portfolio and Mineral Title

On June 30, 2017, Franco-Nevada, through a wholly-owned U.S. subsidiary, entered into an agreement to purchase for $27.6 million, a package of mineral title in the core of the Sooner Trend, Anadarko Basin, Canadian and Kingfisher counties (“STACK”) shale play in Oklahoma from a private company.  The transaction closed on November 1, 2017.  The mineral title provides a perpetual ownership interest in assets which have a significant inventory of undeveloped well locations which will support production for many years.

Acquisition of Royalty on the Orion Thermal Project

On September 29, 2017, Franco-Nevada acquired a 4% GORR applicable to the Clearwater Formation within the Orion Thermal Project (“Orion”) in the Cold Lake region of Alberta from Osum Oil Sands Corp. (“Osum”) for cash consideration of C$92.5 million. Osum used a portion of the proceeds to fund expansions at Orion and, as at year-end 2019, have achieved a production capacity of ~19,000 barrels per day of bitumen. Future expansion of up to 25,000 barrels per day is being contemplated by Osum as they pursue further facility debottlenecking, cost reduction and staged growth opportunities.

2018

Additional Acquisition and Funding of Cobre Panama

On January 19, 2018, the Company, through a wholly-owned subsidiary, entered into an amended and restated stream agreement with First Quantum Minerals Ltd. (“First Quantum”) and Korea Resources Corp. (“KORES”). The amended and restated stream agreement covers 100% of the Cobre Panama project (“Cobre Panama”). Cobre Panama, which is located in Panama, is 90% owned by First Quantum and 10% by KORES.

The amended and restated stream agreement comprises two distinct precious metals streams: the original stream covering First Quantum’s initial 80% interest in Cobre Panama (the “Fixed Payment Stream”) and a new stream covering (i) First Quantum’s additional 10% interest in the project acquired from LS-Nikko Copper Inc. in Q4/2017 and (ii) KORES’ 10% interest in Cobre Panama (the “Floating Payment Stream”).

Fixed Payment Stream

Under the terms of the Fixed Payment Stream, Franco-Nevada has funded a deposit of $1.0 billion against future deliveries of gold and silver from Cobre Panama. The deposit was funded on a pro-rata basis of 1:3 to First Quantum’s share of the capital costs for Cobre Panama in excess of $1.0 billion.  Franco-Nevada fulfilled its $1.0 billion commitment in October 2018.

Under the terms of the amended and restated stream agreement, the fixed price for the Fixed Payment Stream is $418 per ounce of gold and $6.27 per ounce of silver (each increased by a 1.5% annual inflation factor), until 1,341,000 ounces of gold and 21,500,000 ounces of silver have been delivered. Thereafter, the ongoing payment will be the greater of 50% of the fixed price and 50% of the spot price.

Floating Payment Stream

The purchase price of the Floating Payment Stream was $356.0 million and was funded upfront upon closing on March 16, 2018. The terms of the Floating Payment Stream, other than the ongoing price, are similar to the Fixed Payment Stream, including initially linking precious metals deliveries to copper in concentrate shipped. Under the Floating Payment Stream, the ongoing price per ounce for deliveries is 20% of the spot price until 604,000 ounces of gold and 9,618,000 ounces of silver have been delivered. Thereafter, the ongoing payment will be 50% of the spot price.

6

Project Update

First Quantum reported that Cobre Panama had achieved commercial production effective September 1, 2019, one month earlier than previously expected, and that copper production in 2019 was 147,480 tonnes of copper, within its guidance of 140,000 – 170,000 tonnes. First Quantum expects the mill to be running at an annualized throughput rate of 100 million tonnes per annum (“mtpa”) by 2023, resulting in copper production of over 350,000 tonnes per year. The final mill (8th mill), came on line in mid-December 2019, providing additional capacity on the third milling train, and First Quantum expects that mill throughput can now ramp-up to annualized production of 85 million tonnes.

Franco-Nevada received its first gold and silver ounces from Cobre Panama in July 2019.  Total GEOs sold in 2019 were 43,554 GEOs, exceeding our guidance of 20,000 – 40,000 GEOs.

In September 2018, First Quantum addressed the announcement of the Supreme Court of Panama ruling in connection with the constitutionality of Law 9 of 1997 (“Law 9”). According to First Quantum, Law 9 granted the status of national law to the mining concession contract, establishing a statutory legal and fiscal regime for the development of the Cobre Panama project. Minera Panama SA (“MPSA”), the operating subsidiary of First Quantum, understands that the Supreme Court ruling with respect to the constitutionality of Law 9 relates to the enactment of Law 9 and does not affect the legality of the MPSA mining concession contract itself, which remains in effect, and allows continuation of the development of Cobre Panama project by MPSA.

In respect of the Supreme Court ruling on Law 9, which remains subject to various procedural processes, First Quantum has noted the following:

The ruling is not yet in effect.

The Supreme Court decision was in respect of ongoing legal filings made since 2009 with regard to specific environmental petitions.

In reviewing the process of approval of Law 9, the Supreme Court found that the National Assembly had failed to consider whether Law 9 complied with applicable legislation at the time, namely Cabinet Decree 267 of 1969.

The applicable Cabinet Decree of 1969, which was repealed in 1997 by Law 9, required the Ministry of Commerce and Industry (“MICI”) to issue a request for proposals before awarding the Law 9 mining concession.

The Attorney General of Panama has provided two formal opinions favourable to the constitutionality of Law 9 as required in this type of proceedings by Panamanian law.

The Supreme Court ruling did not make a declaration as to the annulment of the MPSA mining concession contract.

Subsequently, MPSA has submitted filings to the Supreme Court for ruling, which the Supreme Court has accepted, prior to the ruling in relation to the constitutionality of Law 9 taking effect. On September 26, 2018 the Government of Panama issued a news release affirming support for the Cobre Panama project.    MICI considers that the MPSA mining concession contract, and its extension, remains in effect in all its parts while First Quantum seeks to clarify the legal position.

The newly elected Government of Panama, inaugurated on July 1, 2019, has established a multidisciplinary high-level commission including the Minister of Commerce and Industries (mining regulator), Minister of Environment, and Minister of Employment to discuss the Law 9 matter and seek resolution. Based on support from the Government of Panama, the Chamber of Commerce and Industries of Panama, the Panamanian Mining Chamber, other Panamanian business and industry chambers and its legal advice, First Quantum reported that discussions with the commission have been productive.

Acquisition of U.S. Oil & Gas Royalties in Delaware Basin, Texas

On February 20, 2018, the Company, through a wholly-owned subsidiary, closed the acquisition of a royalty portfolio in the Delaware Basin, which represents the western portion of the Permian Basin, for $101.3 million.  The royalties are derived principally from mineral title which provides a perpetual interest in royalty lands.

Acquisition of U.S. Oil & Gas Royalty Rights and Strategic Relationship with Continental Resources, Inc. in SCOOP and STACK, Oklahoma

On October 23, 2018, the Company, through a wholly-owned subsidiary, entered into a strategic relationship with Continental Resources, Inc. (“Continental”) to jointly acquire, through a newly-formed entity (the “Royalty Acquisition Venture”), royalty rights in the South Central Oklahoma Oil Province (“SCOOP”) and Sooner Trend Anadarko Basin Canadian and Kingfisher Counties (“STACK”) plays of Oklahoma. The relationship is intended to capitalize on Continental’s land and exploration expertise and focus predominantly on acquiring royalty rights under Continental’s drill plan.

In addition to its initial contribution of $218.5 million spent at closing, to grow the Royalty Acquisition Venture portfolio, Franco-Nevada also committed to spend up to $300 million over 2019-2021 to acquire additional royalty rights, subject to satisfaction of agreed upon development thresholds, bringing the total commitment to $520 million. Continental committed to spend up to $75 million over the same three-year period through contributions to the Royalty Acquisition Venture.  

7

Revenue distribution from the Royalty Acquisition Venture varies depending on production volumes, with Franco Nevada entitled to a minimum of 50% of revenue and up to 75% of revenue at certain production volumes. The assets subject to the initial investment have an anticipated life of 30+ years from current wells and future development.

Given a favourable acquisition pace in 2019, Franco-Nevada advanced the capital funding spending schedule and increased its 2019 capital commitment to the Royalty Acquisition Venture to $120.0 million, up from $100.0 million. Contributions recorded by Franco-Nevada in 2019 were $114.4 million. Since the inception of the Royalty Acquisition Venture, Franco-Nevada has contributed a cumulative amount of $376.2 million, with up to $143.8 million in remaining commitments.

2019 & 2020 Recent Developments

Acquisition of Salares Norte Royalty Interest

On January 31, 2019, Franco-Nevada, through a wholly-owned subsidiary, acquired an existing 2% NSR on Gold Fields’ Salares Norte project in the Atacama region of northern Chile for $32.0 million, comprised of $27.0 million of Franco-Nevada common shares (366,499 common shares) and $5.0 million in cash.  Gold Fields has an option to buy back 1% of the NSR for $6.0 million within 24 months of the commencement of commercial production.

Acquisition of Valentine Lake Royalty Interest

On February 21, 2019, Franco-Nevada acquired a 2% NSR on Marathon Gold Corporation’s (“Marathon”) Valentine Lake Gold Camp in central Newfoundland for C$18.0 million.  Marathon has an option to buy back 0.5% of the NSR for US$7.0 million until December 31, 2022.

ATM Program

On July 19, 2019, Franco-Nevada established the ATM Program whereby the Company is permitted to issue up to an aggregate of $200 million worth of common shares from treasury at prevailing market prices to the public through the Toronto Stock Exchange, the New York Stock Exchange or any other marketplace on which the common shares are listed, quoted or otherwise trade. The volume and timing of distributions under the ATM Program is determined at the Company’s sole discretion, subject to applicable regulatory limitations and blackout periods. The ATM Program is effective until July 18, 2020, unless terminated prior to such date by the Company.

In 2019, the Company issued 1,433,400 common shares under the ATM Program at an average price per common share of $96.56. The gross proceeds to the Company from these issuances were $138.4 million, and the net proceeds were $136.0 million after deducting agent commission costs of $1.4 million and other share issuance costs of $1.0 million.

Acquisition of Marcellus Royalty Interest

On July 22, 2019, Franco-Nevada acquired from Range Resources Corporation (“Range”) an overriding royalty interest on acreage in the Marcellus shale play in Pennsylvania for a gross purchase price of $300.0 million. The royalty is calculated as 1% of gross production, less allowed deductions from approximately 350,000 net acres of Range’s working interest position in Washington, Western Allegheny and Southern Beaver Counties in Pennsylvania. The royalty applies to existing production and future development from the Marcellus formation as well as future potential development from the Utica and Upper Devonian formations. The royalty provides exposure to a significant inventory of undeveloped drilling locations that is expected to be capable of supporting cash flow for several decades. The royalty is registered on title and is a direct interest in real property.

Acquisition of Premier Gold Royalty Interests

On September 25, 2019, Franco-Nevada acquired two royalties from Premier Gold Mines Limited for $6.0 million, including a 2% NSR on property owned by Newmont Corporation adjoining its Musselwhite Mine in Northwestern Ontario and a 1.5% NSR on Nevada Gold Mines LLC’s Rain/Emigrant and Saddle properties located at the south end of the Carlin Trend in Nevada.

Acquisition of Project 81 Royalty Interest and Noble Common Shares

On November 22, 2019, Franco-Nevada acquired a 2% NSR on Noble Mineral Exploration’s (“Noble”) 55,000 hectare patented land package known as Project 81 in the Timmins-Cochrane area of Ontario, Canada, in exchange for Franco-Nevada agreeing to waive its pre-emptive and buy-back rights in respect of a historical third party royalty on Project 81, which was subsequently terminated. Franco‑Nevada’s 2% NSR covers the Crawford Nickel-Sulphide Project, which was recently spun out by Noble to Canada Nickel Company Inc. As part of the arrangement, Noble issued C$500,000 of Noble common shares to Franco-Nevada.

Acquisition of Eagle’s Nest Royalty Interest and Extension of Noront Loan

On December 23, 2019, Franco-Nevada acquired a 1%  gross royalty on Noront Resources Ltd.’s (“Noront”) Eagle’s Nest nickel, copper and PGM deposit in the Ring of Fire mining district of Ontario, Canada, for C$5.0 million ($3.8 million).

Franco-Nevada also extended the term of its $25 million loan to Noront to September 30, 2022, from its original maturity of April 28, 2020, under substantially the same terms and conditions. The loan bears annual interest at 7%, and amounted to $34.6 million including accrued interest as at December 31, 2019.

8

Credit Facilities

During 2019, the Company drew down $275.0 million from its $1.0 billion revolving credit facility (the “Corporate Revolver”) to finance the acquisition of the Marcellus royalty. This amount was fully repaid by December 31, 2019.  The Corporate Revolver has a maturity date of March 22, 2024, which the Company expects to extend by an additional year.

The Company also drew down $160.0 million from its unsecured, non-revolving credit facility (the “Corporate Term Loan”) in 2019, and used the proceeds to pay down borrowings previously drawn against the Corporate Revolver. The amount outstanding under the Corporate Loan was reduced to $80.0 million by December 31, 2019.    Subsequent to year-end, on February 14, 2020, the Corporate Term Loan was fully repaid.

The FNBC Revolver was undrawn during the year. The FNBC Revolver has a maturity date of March 20, 2021.

As of the date of this AIF, the Company has repaid all amounts borrowed against its credit facilities.

CRA Review

The CRA is conducting an audit of Franco-Nevada’s 2012-2015 taxation years and has issued a series of reassessments to the Company. A description of the matters and amounts at issue is included in the notes to Franco-Nevada’s financial statements for the year ended December 31, 2019.

2020 Guidance

The following contains forward looking statements about our guidance for 2020.  Reference should be made to the “Forward Looking Statements” section at the beginning of this AIF.  For a description of material factors that could cause our actual results to differ materially from the forward looking statements below, please see the “Forward Looking Statements” section of this AIF and the “Risk Factors” section of this AIF filed with the Canadian securities regulatory authorities on www.sedar.com and our most recent Form 40-F filed with the SEC on www.sec.gov.  2020 guidance is based on assumptions including the forecasted state of operations from our assets based on the public statements and other disclosures by the third-party owners and operators of the underlying properties (subject to our assessment thereof).

For 2020, the Company is pleased to provide the following guidance for its mining and energy segments, respectively:

 

 

 

 

 

 

 

 

 

 

 

 

  

 

2020 guidance

 

 

2019 Actual

 

 

2018 Actual

 

Gold & Gold Equivalent sales(1),(2)

 

 

550,000 - 580,000 GEOs

 

 

516,438 GEOs sold

 

 

447,902 GEOs sold

 

Energy revenue(3)

 

 

$80.0 - $95.0 million

 

 

$115.9 million

 

 

$86.1 million

 

(1)

Of the 550,000 to 580,000 GEOs, Franco-Nevada expects to receive 375,000 to 405,000 GEOs under its various streams. For the year ended December 31, 2019, the Company earned 345,466 GEOs from its streams.

(2)

In forecasting GEOs for 2020, gold, silver, platinum and palladium metals have been converted to GEOs using commodity prices of $1,500 Au, $17.00 Ag, $900 Pt and $2,000 Pd.

(3)

In forecasting revenue from Energy assets for 2020, the Company assumed a WTI oil price of $45 per barrel and a Henry Hub natural gas price of $2.00 per mcf.

Gold equivalent sales: GEO sales in 2019 exceeded our guidance, with strong production from our Cobre Panama, Candelaria, and Guadalupe-Palmarejo streams, as well as higher than anticipated royalties from our Hemlo NPI. For 2020, we continue to expect significant growth in GEO sales based on the following:

Latin America: We expect sales from Cobre Panama to range between 90,000 and 110,000 GEOs as the mine continues to ramp up in 2020. Sales in 2020 for Candelaria are expected to range between 70,000 and 80,000 GEOs, as production from the mine is expected to increase with improving copper head grades, the Candelaria South Sector underground mine now operational and the mill optimization project on-track to be completed in Q1/2020. Antamina silver ounces sold are expected to increase compared to 2019, as we anticipate the mid-point of our long-term expected annual range of 2.8 million to 3.2 million silver ounces. Increases from these assets are expected to be partly offset by a decrease from Antapaccay based upon lower head grades as per the life of mine plan, where we expect between 60,000 and 70,000 GEOs in sales.

U.S.: We expect higher production from South Arturo, where commercial production at the El Nino underground mine was ahead of schedule in Q3/2019, and from Stillwater, where production continues to benefit from the Blitz project and high palladium prices. Bald Mountain experienced delays with the construction and commissioning of the heap leach pad at the Vantage Complex and production at Marigold is transitioning away from higher royalty grounds. Royalties from the Goldstrike NPI are also expected to decrease.

Canada: We expect a first full year of production from Dublin Gulch (Eagle) where first gold was poured in September 2019 and higher royalties from our Hemlo NPI. Production from Sudbury is expected to decrease, with Levack-Morrison mine being placed on care and maintenance in March 2019, and we expect no revenue from Musselwhite as the mine continues to recover from a fire early in April 2019.

9

Rest of World: Production from Sabodala is expected to decrease, having fulfilled its fixed deliveries requirements in 2019, with future stream deliveries now being based on a trailing 6% of gold production. Royalties from Subika are also expected to decrease based on mine sequencing in the Subika open pit and a change in mining method at Subika Underground.

Energy revenue: Revenue from our Energy assets also exceeded our 2019 guidance, reflecting the addition of the Marcellus royalty as well as strong performances from our existing U.S. and Canadian assets. In 2020, based on a more conservative outlook, we expect revenue from Energy to decrease year-over-year based on weaker prices and the following additional factors:

U.S.: We expect revenue from the SCOOP/STACK to be flat compared to 2019, reflecting additional royalty rights acquired through the Royalty Acquisition Venture with Continental, partly offset by the impact of a downturn in gas and NGL prices and a decrease in rig activity in the basin. Royalties from the Marcellus asset, acquired effective March 1, 2019, are expected to increase modestly year-over-year, reflecting a first full year of production, partly offset by lower prices for gas and NGLs which are at historic lows at the beginning of 2020. Revenue from the Permian Basin is expected to decrease compared to 2019, reflecting the decline of some high-royalty interest wells which came online in 2019. We also have not included lease bonus revenue in our 2020 guidance, which amounted to $2.0 million in 2019.

Canada: We expect revenue for the Weyburn NRI to be lower than last year due to an increase in capital spending budgeted by the operator as they bring new wells online, which will help bolster future production levels. For Orion, in 2020, we assumed a higher differential for the Western Canada Select benchmark price (versus WTI) than what was realized in 2019. The differential in 2019 benefited from government-imposed production curtailments in Alberta which have since been reduced.

Depletion: The Company has estimated depletion and depreciation expense to be between $260.0 million to $290.0 million for 2020.

Capital commitments: With respect to the Royalty Acquisition Venture held with Continental, the Company is expected to contribute, subject to satisfaction of agreed upon development thresholds, up to $100.0 million in 2020.

10

EXPLANATION OF ROYALTIES, STREAMS AND OTHER INTERESTS

A royalty is a payment to a royalty holder by a property owner or an operator of a property and is typically based on a percentage of the minerals or other products produced or the revenues or profits generated from the property. The granting of a royalty to a person usually arises as a result of: (i) paying part of the consideration payable to land owners, prospectors or junior mining companies for the purchase of their property interests; (ii) providing capital in exchange for granting a royalty; or (iii) converting a participating interest in a joint venture relationship into a royalty.

Royalties are not typically working interests in a property.  Therefore, depending on the nature of the royalty interest and the laws applicable to the royalty and project, the royalty holder is generally not responsible for, and has no obligation to contribute, additional funds for any purpose, including, but not limited to, operating or capital costs, or environmental or reclamation liabilities. Typically, royalty interests are established through a contract between the royalty holder and the property owner, although many jurisdictions permit the holder to also register or otherwise record evidence of a royalty interest in applicable mineral title or land registries. The unique characteristics of royalties may provide royalty holders with special commercial benefits not available to the property owner because the royalty holder may enjoy the upside potential of the property with reduced risk.

Revenue-based Royalties:  The majority of royalty revenues that Franco-Nevada receives are royalties based on revenues from the value of production. The key types of revenue-based royalties are described in general terms below:

Net Smelter Return (“NSR”) royalties are based on the value of production or net proceeds received by the operator from a smelter or refinery. These proceeds are usually subject to deductions or charges for transportation, insurance, smelting and refining costs as set out in the royalty agreement. For gold royalties, the deductions are generally minimal, while for base metal projects the deductions can be much more substantial. This type of royalty generally provides cash flow that is free of any operating or capital costs and environmental liabilities. A smaller percentage NSR in a project can effectively equate to the economic value of a larger percentage profit or working interest in the same project.

Gross Royalties (“GR”) or Gross Overriding Royalties (“GORR”) are based on the total revenue stream from the sale of production from the property with few, if any, deductions.  Some contracts refer to gross proceeds (“GP”) which have been characterized as comparable to GRs in this document.

Overriding Royalties (“ORR”) and Lessor or Freehold Royalties (“FH”) are based on the proceeds from gross production and are usually free of any operating, capital and environmental costs. These terms are usually applied in the oil & gas industry.

Profit-based Royalties: Franco-Nevada also receives a portion of its revenues from royalties that are calculated based on profits, as described below:

Net Profit Interest (“NPI”) is based on the profit realized after deducting costs related to production as set out in the royalty agreement.  NPI payments generally begin after payback of capital costs.  Although the royalty holder is generally not responsible for providing capital, covering operating losses or environmental liabilities, increases in production costs will affect net profits and royalties payable.

Net Royalty Interest (“NRI”) is paid net of operating and capital costs similar to an NPI.

Fixed Royalties:  Franco-Nevada has a small number of fixed royalties. These are royalties that are paid based on a set rate per tonne mined, produced or processed or even a minimum for a period of time rather than as a percentage of revenue or profits. These types of royalties are more common for iron ore, coal and industrial minerals and usually do not have exposure to changes in the underlying commodity price.

The royalty types listed above can include additional provisions that allow them to change character in different circumstances or have varying rates. Some examples are as follows:

Minimum Royalty (“MR”) is a provision included in some royalties that requires fixed payments at a certain level even if the project is not producing, or the project is producing at too low a rate to achieve the minimum.

Advance Minimum Royalty (“AMR”) is similar to an MR except that, once production begins, the minimum payments already paid are often credited against subsequent royalty payments from production that exceeds the minimum.

Sliding Scale Royalty (“Sliding Scale or ss”) refers to royalties where the royalty percentage is variable. Generally this royalty percentage is indexed to metal prices or a production threshold.  Generally, a minimum or maximum percentage would be applied to such a royalty.

Capped Royalty (“Capped”) refers to royalties that expire or cease payment after a particular cumulative royalty amount has been paid or a set production volume threshold or time period has been reached.

Royalties can be commodity specific and, for instance, apply only to gold or hydrocarbons or have varying royalty structures for different commodities from the same property. Royalties can be restricted or varied by metallurgy, ore type or even by stratigraphic

11

horizon. Generally, the contract terms for royalties in the oil & gas business are more standardized than those found in the mineral business.

Streams:  Streams are distinct from royalties.  They are metal purchase agreements where, in exchange for an upfront deposit and ongoing payments for metal delivered, the holder purchases all or a portion of one or more metals produced from a mine, at a preset price.  In the case of gold, the agreements typically provide for the purchase price to be the spot price at the time of delivery with a fixed price per ounce (typically $400 with a small inflationary adjustment or a percentage of the spot price for gold) payable in cash and the balance paid by applying the upfront deposit.  Once the upfront deposit is fully applied, the purchase price is typically, in the case of streams which provide for a fixed price per ounce as opposed to a percentage of the spot price, the lesser of the fixed price per ounce payable in cash and the spot price at the time of delivery.  Precious metals streams are well suited to co-product production providing incentive to the operator to produce the precious metals.  Because streams can also be used as a form of financing a project, the stream structure may also help maintain the borrowing capacity for the project.  Streams can provide higher leverage to commodity price changes as a result of the fixed purchase price per ounce.

Working Interests (“WI”):  A working interest is significantly different than a royalty or stream in that a holder of a WI owns an undivided possessory interest in the land or leasehold itself, and is liable for its share of capital, operating and environmental costs, usually in proportion to its ownership percentage, and it receives its pro-rata share of revenue. Minority working or equity interests are not considered to be royalties because of the ongoing funding commitments, although they can be similar in their calculations to NPIs.

Example Economics of a Royalty (NSR or NPI) versus a Stream

The example below compares the value per ounce to Franco-Nevada of a 4% NSR, a 4% stream or a 4% NPI or WI. Assume for one ounce of gold, a sales price of $1,500, a “stream cost” of $400 per ounce and that the “all-in sustaining cost”(1) of the mine is $894 per ounce.

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

    

 

 

    

Developed

 

 

 

NSR

 

Stream

 

NPI or WI

 

One ounce sold at

 

$

1,500

 

$

1,500

 

$

1,500

 

Applicable cost

 

 

 

$

400

 

$

894

(1)  

Margin for calculation

 

$

1,500

 

$

1,100

 

$

606

 

 

 

 

 

 

 

 

 

 

 

 

NSR, Stream or NPI %

 

 

 4

%  

 

 4

%  

 

 4

%  

Revenue per ounce to FNV

 

$

60

 

$

44

 

$

24

 


(1)

For applicable costs for a developed NPI or WI, Franco-Nevada is, for illustrative purposes, assuming Barrick Gold Corporation’s (“Barrick”) 2019 all-in sustaining cash cost measure, as Barrick is the operator of two assets at which Franco-Nevada has NPI interests.

Based on the above economics, a comparable percentage NSR is almost 2.5 times more valuable than an equivalent Developed NPI or WI and almost 1.4 times more valuable than a stream interest. The NSR provides the highest margins and most downside protection to changes in the commodity price. The stream provides commodity price leverage similar to a low cost operating company with certainty as to future costs. The NPI or WI provides the most leverage to commodity price.

12

TECHNICAL AND THIRD PARTY INFORMATION

Except where otherwise stated, the disclosure in this AIF relating to properties and operations on the properties in which Franco-Nevada holds royalty, stream or other interests is based on information publicly disclosed by the owners or operators of these properties and information/data available in the public domain as at March 6, 2020 (except where stated otherwise), and none of this information has been independently verified by Franco-Nevada.  Specifically, as a royalty or stream holder, Franco-Nevada has limited, if any, access to properties included in its asset portfolio.  Additionally, Franco-Nevada may from time to time receive operating information from the owners and operators of the properties, which it is not permitted to disclose to the public.  Franco‑Nevada is dependent on the operators of the properties and their qualified persons to provide information to Franco‑Nevada or on publicly available information to prepare disclosure pertaining to properties and operations on the properties on which Franco-Nevada holds royalty, stream or other interests and generally has limited or no ability to independently verify such information.  Although Franco-Nevada does not have any knowledge that such information may not be accurate, there can be no assurance that such third party information is complete or accurate.  Some information publicly reported by operators may relate to a larger property than the area covered by Franco-Nevada’s royalty, stream or other interest. Franco-Nevada’s royalty, stream or other interests often cover less than 100% and sometimes only a portion of the publicly reported mineral reserves, mineral resources and production of a property.

Except where otherwise noted, the disclosure in this AIF relating to mineral reserve and mineral resource statements for individual properties is made as at December 31, 2019.  In addition, numerical information presented in this AIF which has been derived from information publicly disclosed by owners or operators may have been rounded by Franco-Nevada and, therefore, there may be some inconsistencies between the significant digits presented in this AIF and the information publicly disclosed by owners and operators.

Franco-Nevada considers its stream interests in the Antapaccay project, the Antamina project, the Candelaria project and the Cobre Panama project to be its only material mining projects for the purposes of NI 43-101.  Franco-Nevada will continue to assess the materiality of its assets as new assets are acquired or move into production.    During 2020, Franco-Nevada intends to evaluate whether the inclusion of the Summary of Mineral Reserves and Mineral Resources contained in this AIF should be continued to be included going forward.  For additional information, please refer to Franco-Nevada’s most recent Asset Handbook which can be found on our website.

Information contained in this AIF with respect to each of the Antamina project, the Antapaccay project, the Candelaria project and the Cobre Panama project has been prepared in accordance with the exemption set forth in section 9.2 of NI 43-101.

Unless otherwise noted, the disclosure contained in this AIF of a scientific or technical nature for the Antamina project is based on (i) the technical report entitled “Technical Report, Mineral Reserves and Resources, Antamina Deposit, Peru 2010” and dated January 31, 2011, which technical report was prepared for Compañía Minera Antamina S.A. (“CM Antamina”), and filed under Teck’s SEDAR profile on March 22, 2011; (ii) the news release dated February 4, 2020 of Glencore containing the Glencore 2019 Production Report, available on Glencore’s website, and which reports silver production for the Antamina project; and (iii) the information disclosed in the annual information form of Teck Resources Limited (“Teck”) dated February 26, 2020 and filed under Teck’s SEDAR profile on February 26, 2020.

The disclosure contained in this AIF of a scientific or technical nature for the Antapaccay project is based on (i) the information disclosed in the document entitled “Antapaccay Mining and Technical Information” and dated effective February 10, 2016, which document was prepared by Compañía Minera Antapaccay S.A. (“CM Antapaccay”), the owner and operator of the Antapaccay project and an indirect wholly-owned subsidiary of Glencore, available on CM Antapaccay’s website at www.glencoreperu.pe; (ii) the Glencore Statement of Resources & Reserves as at December 31, 2019; and (iii) the news release dated February 4, 2020 of Glencore containing the Glencore 2019 Production Report, each available on Glencore’s website.

The disclosure contained in this AIF of a scientific or technical nature for the Candelaria project is based on (i) the technical report entitled “Technical Report for the Candelaria Copper Mining Complex, Atacama Province, Region III, Chile” dated November 28, 2018 which technical report was prepared for Lundin Mining Limited (“Lundin”) and filed under Lundin’s SEDAR profile on November 28, 2018 (the “Candelaria Technical Report”); (ii) the information disclosed in the annual information form of Lundin dated March 29, 2019 and filed under Lundin’s SEDAR profile on March 29, 2019;  (iii) Lundin’s press release dated September 5, 2019 announcing Mineral Reserves and Mineral Resources as of June 30, 2019; and (iv) the management’s discussion and analysis of Lundin for the year ended December 31, 2019, dated as of February 20, 2020 and filed under Lundin’s SEDAR profile on February 20, 2020.

The disclosure contained in this AIF for the Cobre Panama project is based on (i) the technical report entitled “Cobre Panamá Project -- Colón Province, Republic of Panamá -- NI 43‑101 Technical Report” and dated March 2019, which was prepared for First Quantum and filed under First Quantum’s SEDAR profile on March 29, 2019 (“Cobre Panama Technical Report”) and (ii) the management’s discussion and analysis of First Quantum for the year ended December 31, 2019 and filed under First Quantum’s SEDAR profile on February 14, 2020.

13

The technical and scientific information contained in this AIF relating to the Antamina project, the Antapaccay project, the Candelaria project and the Cobre Panama project was reviewed and approved in accordance with NI 43-101 by Phil Wilson, C.Eng., Vice President, Technical of the Corporation and a “Qualified Person” as defined in NI 43-101.

Reconciliation to CIM Definitions

In this AIF, Franco-Nevada has disclosed a number of resource and reserve estimates covering properties related to the mining assets that are not based on Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) definitions, but instead have been prepared in reliance upon JORC, SAMREC and SEC Industry Guide 7 (collectively, the “Acceptable Foreign Codes”).  Estimates based on Acceptable Foreign Codes are recognized under NI 43-101 in certain circumstances.    SEC Industry Guide 7, the existing standard for the SEC, is being replaced by the adoption of the Modernization of Property Disclosure of Mining Registrants Standards, which will be mandatory for issuers subject to U.S. reporting standards for the first fiscal year beginning on or after January 1, 2021.  None of the reserve or resource estimates presented herein have been prepared in accordance with the Modernization of Property Disclosure of Mining Registrants Standards.

In each case, the mineral resources and mineral reserves reported in this AIF are based on estimates previously disclosed by the relevant property owner or operator, without reference to the underlying data used to calculate the estimates.  Accordingly, Franco-Nevada is not able to reconcile the resource and reserve estimates prepared in reliance on an Acceptable Foreign Code with that of CIM definitions.  Franco-Nevada previously sought confirmation from one of its technical advisory firms, that is comprised of engineers experienced in the preparation of resource and reserve estimates using CIM and each of the Acceptable Foreign Codes, of the extent to which an estimate prepared under an Acceptable Foreign Code would differ from that prepared under CIM definitions.  Franco-Nevada was advised that, while the CIM definitions are not identical to those of the Acceptable Foreign Codes, the resource and reserve definitions and categories are substantively the same as the CIM definitions mandated in NI 43-101 and will typically result in reporting of substantially similar reserve and resource estimates.  Such advisors further confirmed, without reference to the procedures in which the estimates prepared using Acceptable Foreign Codes that are reproduced in this AIF were conducted, that in the course of their preparation of a resource or reserve estimate they would effectively use the same procedures to prepare and report the resource or reserve estimate regardless of the reliance on CIM or any of the Acceptable Foreign Codes.  Such advisors noted two provisos to this confirmation, being (i) SEC Industry Guide 7 prohibits the reporting of resources, and will only permit reporting of reserves, and (ii) it is now generally accepted practice that staff at the SEC expect to see metals prices based on historic three year average prices, while each of CIM and the other Acceptable Foreign Codes permits the author of a resource or reserve estimate to use his or her discretion to establish a reasonable assumed metal price in such calculations.  See “Cautionary Note Regarding Mineral Reserve and Resource Reporting Estimates”.

14

FRANCO-NEVADA’S ASSETS

Franco-Nevada’s assets are categorized by commodity and stage of development.  By commodity, assets are characterized as “Gold & Gold Equivalent” or “Energy”.  “Gold & Gold Equivalent” includes gold, silver, PGM and other mining assets.  “Energy” encompasses oil, gas and natural gas liquids.  “Producing”  assets are those that have generated revenue from steady-state operations for Franco Nevada or are expected to in the next year.   “Advanced”  assets are interests on projects which are not yet producing, but where in management’s view, the technical feasibility and commercial viability of extracting a mineral resource are demonstrable.    “Exploration” assets represent interests on projects where technical feasibility and commercial viability of extracting a mineral resource are not demonstrable.

Management uses the following criteria in its assessment of technical feasibility and commercial viability:

(i)Geology: there is a known mineral deposit which contains mineral reserves or resources; or the project is adjacent to a mineral deposit that is already being mined or developed and there is sufficient geologic certainty of converting the deposit into mineral reserves or resources.

(ii)Accessibility and authorization: there are no significant unresolved issues impacting the accessibility and authorization to develop or mine the mineral deposit, and social, environmental and governmental permits and approvals to develop or mine the mineral deposit appear obtainable.

For accounting purposes, the number of assets has been counted in different manners depending on the category.  Royalties on a producing or advanced property are generally counted as a single asset even if Franco-Nevada has multiple different royalties on the property, such as at the Goldstrike complex.  Streams covering a group of mines in close proximity and operated by a common operator such as the Sudbury streams have also been counted as one asset.  However, royalties and streams on producing properties that have significant co-products have been counted twice, such as the Robinson royalties for gold and copper or the Sudbury streams for gold and PGM.  Exploration royalties are simply counted by the number of royalty contracts and no effort has been made to consolidate royalties on the same property.  Franco-Nevada’s energy interests are subdivided into Producing Assets, which are assets that are currently producing oil or natural gas, or Exploration Assets, which are undeveloped assets that are not producing oil or natural gas.  Franco-Nevada’s energy interests consist of a variety of working interests and royalty interests which are derived from a large number of underlying leases, contractual agreements and mineral title covering land positions in western Canada, the Canadian Arctic and Oklahoma, Pennsylvania and Texas in the United States.  For accounting purposes, these leases, contracts and mineral title have been grouped into distinct land areas and tabulated as individual assets.  In many cases, Franco-Nevada owns multiple royalties or working interests that pertain to the same land area, and in these circumstances, the interests are counted as a single asset.

As of March 18, 2020, Franco-Nevada estimates that it holds 295 mining assets and 79 energy assets for a total of 374 assets.

 

 

 

 

 

 

 

 

 

 

 

Franco-Nevada Asset Tabulation at March 18, 2020

 

  

  

Mining

  

  

Energy

  

  

TOTAL

 

Producing

 

 

55

 

 

56

 

 

111

 

Advanced

 

 

34

 

 

 —

 

 

34

 

Exploration

 

 

206

 

 

23

 

 

229

 

TOTAL

 

 

295

 

 

79

 

 

374

 

 

 

 

 

 

15

Summary of Mineral Reserves and Mineral Resources

The mineral reserves and mineral resources tabulated in this AIF reflect the most recent publicly disclosed figures by the operators of the assets (converted to a 100% basis where appropriate) in which Franco-Nevada has interests.  However, Franco-Nevada’s interests often do not cover the entire mineral reserve and mineral resource that is publicly reported by the operator.  In such cases, Franco-Nevada has provided its best approximation as to the appropriate percentage of mineral reserves and mineral resources covered by Franco-Nevada’s interests.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mineral Reserves

 

 

Est. % of Mineral

 

 

 

 

 

 

Proven

 

 

Probable

 

 

Proven & Probable

 

 

Reserves &

 

 

 

 

 

 

Tonnes

  

Grade

  

Contained

  

  

Tonnes

  

Grade

  

Contained

  

  

Tonnes

  

Grade

  

Contained

  

  

Resources Covered

 

GOLD - LATIN AMERICA

 

Notes

 

 

000s

 

g/t

 

000 oz

 

 

000s

 

g/t

 

000 oz

 

 

000s

 

g/t

 

000 oz

 

 

by FNV Interest

 

Cobre Panama

 

4

 

 

323,200

 

0.11

 

1,106

 

 

2,823,800

 

0.07

 

6,014

 

 

3,147,000

 

0.07

 

7,120

 

 

100

%

Candelaria

 

1,5

 

 

550,685

 

0.12

 

2,200

 

 

113,013

 

0.17

 

600

 

 

663,696

 

0.13

 

2,700

 

 

80

%

Antapaccay

 

6

 

 

244,000

 

0.09

 

693

 

 

422,000

 

0.09

 

1,199

 

 

666,000

 

0.09

 

1,892

 

 

100

%

Guadalupe-Palmarejo

 

1,3,7

 

 

992

 

3.20

 

102

 

 

9,594

 

1.92

 

591

 

 

10,586

 

2.04

 

693

 

 

81

%

Cerro Moro

 

8

 

 

12

 

5.99

 

 2

 

 

1,518

 

10.79

 

526

 

 

1,530

 

10.75

 

529

 

 

100

%

Salares Norte

 

9

 

 

 —

 

 —

 

 —

 

 

21,079

 

5.13

 

3,476

 

 

21,079

 

5.13

 

3,476

 

 

100

%

Taca Taca

 

10

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

CentroGold (Gurupi)

 

11

 

 

 —

 

 —

 

 —

 

 

19,800

 

1.68

 

1,070

 

 

19,800

 

1.68

 

1,070

 

 

100

%

Calcatreu

 

12

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

San Jorge

 

13

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

Volcan

 

1,14

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

25

%

GOLD - UNITED STATES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Carlin Trend

 

1,15

 

 

91,057

 

4.37

 

12,846

 

 

105,691

 

2.42

 

8,293

 

 

195,122

 

3.32

 

21,138

 

 

32

%

Marigold

 

1,16

 

 

 —

 

 —

 

 —

 

 

228,763

 

0.53

 

3,887

 

 

228,763

 

0.53

 

3,887

 

 

98

%

Bald Mountain

 

1,17

 

 

 —

 

 —

 

 —

 

 

63,999

 

0.60

 

1,277

 

 

63,999

 

0.60

 

1,277

 

 

92

%

Mesquite

 

18

 

 

1,167

 

0.62

 

23

 

 

53,468

 

0.57

 

981

 

 

54,635

 

0.57

 

1,004

 

 

100

%

Castle Mountain

 

19

 

 

136,611

 

0.58

 

2,559

 

 

60,977

 

0.51

 

1,004

 

 

197,589

 

0.56

 

3,563

 

 

100

%

Midas/Fire Creek

 

3,20

 

 

20

 

51.43

 

33

 

 

34

 

19.46

 

21

 

 

54

 

31.38

 

54

 

 

100

%

Hollister

 

3,21

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

Stibnite Gold

 

3,22

 

 

 —

 

 —

 

 —

 

 

88,964

 

1.60

 

4,578

 

 

88,964

 

1.60

 

4,578

 

 

100

%

Sandman

 

23

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

Pinson

 

1,3,24

 

 

5,717

 

0.91

 

168

 

 

1,056

 

5.19

 

176

 

 

6,856

 

1.56

 

344

 

 

 —

 

Robinson

 

25

 

 

110,513

 

0.15

 

533

 

 

8,860

 

0.12

 

34

 

 

119,374

 

0.15

 

576

 

 

100

%

GOLD - CANADA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sudbury

 

1,26

 

 

not available

 

 

not available

 

 

not available

 

 

not available

 

Detour Lake

 

27

 

 

81,050

 

1.24

 

3,240

 

 

396,400

 

0.91

 

11,606

 

 

477,450

 

0.97

 

14,846

 

 

100

%

Hemlo

 

1,28

 

 

910

 

4.94

 

150

 

 

9,700

 

3.81

 

1,200

 

 

11,000

 

3.90

 

1,300

 

 

20

%

Golden Highway - Holt Complex

 

29

 

 

2,507

 

3.70

 

296

 

 

2,925

 

4.30

 

406

 

 

5,432

 

4.00

 

702

 

 

100

%

Golden Highway - Hislop

 

30

 

 

 —

 

 —

 

 —

 

 

176

 

5.80

 

33

 

 

176

 

5.80

 

33

 

 

100

%

Brucejack

 

31

 

 

3,400

 

9.50

 

1,000

 

 

12,600

 

13.40

 

5,400

 

 

16,000

 

12.60

 

6,400

 

 

100

%

Kirkland Lake

 

32

 

 

383

 

20.30

 

250

 

 

2,930

 

22.40

 

2,110

 

 

3,320

 

22.11

 

2,360

 

 

100

%

Dublin Gulch (Eagle Deposit)

 

33

 

 

30,000

 

0.71

 

694

 

 

118,000

 

0.63

 

2,366

 

 

148,000

 

0.64

 

3,061

 

 

100

%

Musselwhite

 

34

 

 

4,900

 

6.48

 

1,020

 

 

5,000

 

6.57

 

1,070

 

 

9,900

 

6.52

 

2,090

 

 

100

%

Timmins West

 

35

 

 

407

 

3.59

 

47

 

 

6,055

 

3.11

 

606

 

 

6,462

 

3.14

 

653

 

 

100

%

Canadian Malartic

 

1,36

 

 

47,694

 

0.83

 

1,270

 

 

86,114

 

1.27

 

3,508

 

 

133,808

 

1.11

 

4,778

 

 

12

%

Hardrock

 

37

 

 

 —

 

 —

 

 —

 

 

141,700

 

1.02

 

4,648

 

 

141,700

 

1.02

 

4,648

 

 

100

%

Valentine Lake

 

38

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

Red Lake (Phoenix)

 

39

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

Courageous Lake

 

40

 

 

12,000

 

2.41

 

1,000

 

 

79,000

 

2.17

 

5,500

 

 

91,000

 

2.20

 

6,500

 

 

100

%

Goldfields

 

41

 

 

1,228

 

1.90

 

75

 

 

21,105

 

1.39

 

945

 

 

22,333

 

1.42

 

1,020

 

 

100

%

Monument Bay

 

42

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

Red Mountain

 

43

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

GOLD - AUSTRALIA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Duketon

 

1,44

 

 

9,800

 

0.90

 

285

 

 

38,700

 

1.29

 

1,606

 

 

48,600

 

1.21

 

1,892

 

 

93

%

Henty

 

45

 

 

55

 

4.90

 

 8

 

 

10

 

5.20

 

 2

 

 

65

 

5.40

 

10

 

 

100

%

Aphrodite

 

46

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

Yandal (Bronzewing)

 

47

 

 

5,200

 

2.00

 

332

 

 

10,800

 

1.40

 

487

 

 

16,000

 

1.59

 

820

 

 

100

%

Bullabulling

 

1,48

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

50

%

Edna May

 

1,49

 

 

1,700

 

0.46

 

25

 

 

420

 

4.67

 

63

 

 

2,120

 

1.29

 

88

 

 

 2

%

Glenburgh

 

50

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

Red October

 

51

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

South Kalgoorlie

 

1,52

 

 

599

 

3.32

 

64

 

 

2,701

 

2.92

 

254

 

 

3,300

 

2.99

 

317

 

 

82

%

Matilda (Wiluna)

 

53

 

 

550

 

0.80

 

15

 

 

24,100

 

1.80

 

1,366

 

 

24,600

 

1.70

 

1,381

 

 

100

%

GOLD - REST OF WORLD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MWS

 

54

 

 

106,230

 

0.21

 

730

 

 

172,790

 

0.26

 

1,440

 

 

279,020

 

0.24

 

2,180

 

 

fixed interest

 

Sabodala

 

55

 

 

13,590

 

1.06

 

460

 

 

37,550

 

1.43

 

1,730

 

 

51,140

 

1.33

 

2,190

 

 

100

%

Karma

 

56

 

 

1,300

 

0.63

 

24

 

 

26,200

 

0.88

 

740

 

 

27,500

 

0.86

 

764

 

 

100

%

Tasiast

 

57

 

 

46,561

 

1.40

 

2,103

 

 

69,280

 

2.10

 

4,680

 

 

115,841

 

1.80

 

6,783

 

 

100

%

Subika

 

1,58

 

 

51,900

 

1.37

 

2,290

 

 

58,100

 

2.08

 

3,880

 

 

110,000

 

1.74

 

6,170

 

 

66

%

Edikan

 

59

 

 

18,300

 

1.02

 

601

 

 

27,400

 

1.14

 

1,007

 

 

45,700

 

1.10

 

1,608

 

 

100

%

Ity

 

1,60

 

 

 —

 

2.90

 

 2

 

 

60,700

 

1.56

 

3,036

 

 

60,800

 

1.55

 

3,039

 

 

fixed interest

 

Perama Hill

 

61

 

 

3,120

 

4.02

 

403

 

 

6,590

 

2.63

 

557

 

 

9,710

 

3.08

 

960

 

 

100

%

Kiziltepe

 

62

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

Agi Dagi

 

63

 

 

1,450

 

0.76

 

36

 

 

52,911

 

0.66

 

1,130

 

 

54,361

 

0.67

 

1,166

 

 

100

%

Sissingue

 

64

 

 

3,430

 

2.15

 

237

 

 

100

 

3.11

 

10

 

 

3,630

 

2.12

 

247

 

 

100

%

TOTAL GOLD MINERAL RESERVES

 

 

 

 

 

 

 

 

36,922

 

 

 

 

 

 

95,114

 

 

 

 

 

 

131,907

 

 

 

 

 

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mineral Resources - Inclusive of Reserves

 

 

Mineral Resources

 

 

Est. % of Mineral

 

 

 

 

 

 

Measured (M)

 

 

Indicated (I)

 

 

(M)+(I)

 

 

Inferred

 

 

Reserves &

 

 

  

 

  

  

Tonnes

  

Grade

  

Contained

  

  

Tonnes

  

Grade

  

Contained

  

  

Contained

 

  

Tonnage

  

Grade

  

Contained

  

  

Resources Covered

 

GOLD - LATIN AMERICA

 

Notes

 

 

000s

 

g/t

 

000 oz

 

 

000s

 

g/t

 

000 oz

 

 

000 oz

 

 

000s

 

g/t

 

000 oz

 

 

by FNV Interest

 

Cobre Panama

 

4

 

 

310,000

 

0.11

 

1,096

 

 

3,346,000

 

0.06

 

6,562

 

 

7,658

 

 

1,097,000

 

0.04

 

1,307

 

 

100

%

Candelaria

 

1,5

 

 

765,552

 

0.15

 

3,600

 

 

233,082

 

0.17

 

1,300

 

 

4,900

 

 

67,355

 

0.14

 

300

 

 

80

%

Antapaccay

 

6

 

 

263,000

 

0.10

 

852

 

 

682,000

 

0.10

 

2,229

 

 

3,082

 

 

132,000

 

0.06

 

265

 

 

100

%

Guadalupe-Palmarejo

 

1,2,3,7

 

 

1,781

 

2.62

 

150

 

 

16,756

 

1.80

 

968

 

 

1,118

 

 

5,869

 

1.95

 

367

 

 

96

%

Cerro Moro

 

1,2,8

 

 

30

 

7.26

 

 7

 

 

2,752

 

7.89

 

698

 

 

706

 

 

2,175

 

3.90

 

273

 

 

95

%

Salares Norte

 

9

 

 

 —

 

 —

 

 —

 

 

23,700

 

4.99

 

3,800

 

 

3,800

 

 

1,800

 

1.84

 

110

 

 

100

%

Taca Taca

 

10

 

 

 —

 

 —

 

 —

 

 

2,165,000

 

0.08

 

5,560

 

 

5,560

 

 

921,000

 

0.05

 

1,570

 

 

100

%

CentroGold (Gurupi)

 

11

 

 

 —

 

 —

 

 —

 

 

29,200

 

1.84

 

1,732

 

 

1,732

 

 

10,400

 

1.66

 

555

 

 

100

%

Calcatreu

 

2,12

 

 

 —

 

 —

 

 —

 

 

9,841

 

2.11

 

669

 

 

669

 

 

8,078

 

1.34

 

348

 

 

100

%

San Jorge

 

13

 

 

79,518

 

0.22

 

584

 

 

104,091

 

0.19

 

626

 

 

1,211

 

 

11,235

 

0.16

 

59

 

 

100

%

Volcan

 

1,14

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 

18,600

 

0.85

 

510

 

 

25

%

GOLD - UNITED STATES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Carlin Trend

 

1,15

 

 

110,569

 

4.35

 

15,447

 

 

227,642

 

1.93

 

14,472

 

 

29,268

 

 

24,390

 

2.60

 

1,951

 

 

32

%

Marigold

 

1,16

 

 

 —

 

 —

 

 —

 

 

301,760

 

0.51

 

4,942

 

 

4,942

 

 

16,194

 

0.35

 

182

 

 

98

%

Bald Mountain

 

1,2,17

 

 

8,556

 

0.84

 

232

 

 

253,547

 

0.60

 

4,907

 

 

5,139

 

 

47,936

 

0.50

 

808

 

 

98

%

Mesquite

 

18

 

 

6,567

 

0.45

 

96

 

 

175,968

 

0.49

 

2,793

 

 

2,902

 

 

15,000

 

0.38

 

184

 

 

100

%

Castle Mountain

 

19

 

 

160,711

 

0.58

 

2,989

 

 

81,377

 

0.51

 

1,344

 

 

4,333

 

 

171,395

 

0.40

 

2,210

 

 

100

%

Midas/Fire Creek

 

2,3,20

 

 

184

 

22.80

 

135

 

 

784

 

15.48

 

390

 

 

524

 

 

68,654

 

1.20

 

2,639

 

 

100

%

Hollister

 

2,3,21

 

 

93

 

19.64

 

59

 

 

165

 

19.78

 

105

 

 

164

 

 

423

 

13.61

 

185

 

 

100

%

Stibnite Gold

 

3,22

 

 

4,623

 

2.54

 

377

 

 

100,289

 

1.62

 

5,234

 

 

5,610

 

 

23,174

 

1.29

 

959

 

 

100

%

Sandman

 

2,23

 

 

 —

 

 —

 

 —

 

 

1,200

 

1.23

 

50

 

 

50

 

 

1,100

 

1.85

 

60

 

 

100

%

Pinson

 

1,3,24

 

 

19,223

 

1.21

 

746

 

 

4,130

 

2.54

 

338

 

 

1,085

 

 

1,080

 

4.88

 

169

 

 

 —

 

Robinson

 

25

 

 

317,942

 

0.18

 

1,840

 

 

40,173

 

0.15

 

194

 

 

2,072

 

 

11,942

 

0.18

 

69

 

 

100

%

GOLD - CANADA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sudbury

 

1,26

 

 

not available

 

 

not available

 

 

 —

 

 

not available

 

 

not available

 

Detour Lake

 

2,27

 

 

97,750

 

1.26

 

3,962

 

 

494,900

 

0.96

 

15,300

 

 

19,261

 

 

43,900

 

0.90

 

1,273

 

 

100

%

Hemlo

 

1,28

 

 

1,800

 

4.25

 

250

 

 

41,000

 

2.18

 

2,900

 

 

3,150

 

 

9,100

 

3.50

 

1,000

 

 

20

%

Golden Highway - Holt Complex

 

2,29

 

 

6,826

 

3.91

 

859

 

 

6,358

 

4.35

 

890

 

 

1,749

 

 

9,097

 

4.42

 

1,294

 

 

100

%

Golden Highway - Hislop

 

2,30

 

 

 —

 

 —

 

 —

 

 

1,323

 

3.88

 

165

 

 

165

 

 

800

 

3.89

 

100

 

 

100

%

Brucejack

 

31

 

 

4,200

 

11.11

 

1,500

 

 

14,400

 

15.34

 

7,100

 

 

8,500

 

 

7,800

 

11.96

 

3,000

 

 

100

%

Kirkland Lake

 

2,32

 

 

694

 

18.38

 

410

 

 

17,021

 

7.21

 

3,947

 

 

4,356

 

 

23,009

 

4.21

 

3,114

 

 

100

%

Dublin Gulch (Eagle Deposit)

 

33

 

 

37,400

 

0.71

 

850

 

 

180,000

 

0.61

 

3,547

 

 

4,397

 

 

21,500

 

0.52

 

361

 

 

100

%

Musselwhite

 

2,34

 

 

6,700

 

5.80

 

1,250

 

 

9,600

 

5.41

 

1,670

 

 

2,920

 

 

3,200

 

4.28

 

440

 

 

100

%

Timmins West

 

35

 

 

247

 

4.91

 

39

 

 

7,814

 

3.99

 

1,001

 

 

1,040

 

 

6,391

 

5.65

 

1,161

 

 

100

%

Canadian Malartic

 

1,2,36

 

 

51,734

 

0.87

 

1,454

 

 

99,554

 

1.31

 

4,186

 

 

5,640

 

 

30,228

 

3.01

 

2,922

 

 

12

%

Hardrock

 

37

 

 

5,700

 

1.30

 

237

 

 

141,800

 

1.51

 

6,868

 

 

7,105

 

 

25,500

 

3.78

 

3,095

 

 

100

%

Valentine Lake

 

38

 

 

31,690

 

1.86

 

1,900

 

 

23,170

 

1.60

 

1,190

 

 

3,090

 

 

16,770

 

1.78

 

960

 

 

100

%

Red Lake (Phoenix)

 

39

 

 

665

 

6.53

 

140

 

 

3,243

 

6.44

 

671

 

 

811

 

 

2,073

 

6.97

 

464

 

 

100

%

Courageous Lake

 

40

 

 

13,401

 

2.53

 

1,090

 

 

93,914

 

2.28

 

6,884

 

 

7,974

 

 

53,227

 

2.29

 

3,914

 

 

100

%

Goldfields

 

41

 

 

858

 

2.04

 

56

 

 

20,002

 

1.51

 

971

 

 

1,027

 

 

4,564

 

1.54

 

226

 

 

100

%

Monument Bay

 

2,42

 

 

 —

 

 —

 

 —

 

 

36,581

 

1.52

 

1,787

 

 

1,787

 

 

41,946

 

1.32

 

1,781

 

 

100

%

Red Mountain

 

43

 

 

1,920

 

8.81

 

544

 

 

1,271

 

5.85

 

239

 

 

783

 

 

405

 

5.32

 

69

 

 

100

%

GOLD - AUSTRALIA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Duketon

 

1,44

 

 

16,000

 

0.84

 

434

 

 

126,200

 

0.97

 

3,939

 

 

4,373

 

 

24,500

 

0.95

 

749

 

 

91

%

Henty

 

45

 

 

846

 

4.60

 

125

 

 

423

 

4.30

 

58

 

 

183

 

 

297

 

5.00

 

48

 

 

100

%

Aphrodite

 

46

 

 

 —

 

 —

 

 —

 

 

15,080

 

2.18

 

1,055

 

 

1,055

 

 

9,067

 

2.15

 

628

 

 

100

%

Yandal (Bronzewing)

 

47

 

 

4,600

 

2.42

 

358

 

 

16,500

 

1.91

 

1,015

 

 

1,373

 

 

3,930

 

1.80

 

228

 

 

100

%

Bullabulling

 

1,48

 

 

 —

 

 —

 

 —

 

 

68,805

 

0.99

 

2,190

 

 

2,190

 

 

26,595

 

1.19

 

1,020

 

 

50

%

Edna May

 

1,49

 

 

1,700

 

0.46

 

25

 

 

21,310

 

0.95

 

650

 

 

675

 

 

5,112

 

0.81

 

133

 

 

 2

%

Glenburgh

 

50

 

 

2,900

 

1.94

 

181

 

 

4,600

 

1.56

 

231

 

 

412

 

 

13,900

 

1.32

 

591

 

 

100

%

Red October

 

51

 

 

 —

 

 —

 

 —

 

 

1,299

 

2.49

 

104

 

 

104

 

 

6,718

 

3.20

 

691

 

 

100

%

South Kalgoorlie

 

1,52

 

 

1,758

 

3.26

 

184

 

 

8,522

 

2.97

 

813

 

 

997

 

 

11,719

 

2.86

 

1,076

 

 

75

%

Matilda (Wiluna)

 

53

 

 

620

 

0.95

 

19

 

 

66,300

 

1.70

 

3,633

 

 

3,652

 

 

26,300

 

3.23

 

2,728

 

 

100

%

GOLD - REST OF WORLD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MWS

 

54

 

 

105,960

 

0.21

 

730

 

 

172,570

 

0.26

 

1,440

 

 

2,180

 

 

 —

 

 —

 

 —

 

 

fixed interest

 

Sabodala

 

55

 

 

16,367

 

1.23

 

645

 

 

59,919

 

1.60

 

3,085

 

 

3,729

 

 

16,742

 

1.81

 

976

 

 

100

%

Karma

 

56

 

 

1,300

 

0.63

 

28

 

 

74,000

 

1.10

 

2,627

 

 

2,655

 

 

17,900

 

1.34

 

772

 

 

100

%

Tasiast

 

2,57

 

 

51,026

 

1.35

 

2,207

 

 

134,134

 

1.67

 

7,210

 

 

9,417

 

 

5,478

 

2.00

 

353

 

 

100

%

Subika

 

1,2,58

 

 

52,900

 

1.36

 

2,310

 

 

99,100

 

2.16

 

6,880

 

 

9,190

 

 

19,700

 

2.56

 

1,620

 

 

77

%

Edikan

 

59

 

 

28,400

 

0.93

 

852

 

 

54,800

 

1.05

 

1,848

 

 

2,699

 

 

7,300

 

1.48

 

348

 

 

100

%

Ity

 

1,60

 

 

1,400

 

0.97

 

44

 

 

72,200

 

1.55

 

3,602

 

 

3,646

 

 

19,100

 

1.34

 

823

 

 

fixed interest

 

Perama Hill

 

61

 

 

3,126

 

4.10

 

412

 

 

10,164

 

3.00

 

980

 

 

1,392

 

 

28,698

 

1.42

 

1,312

 

 

100

%

Kiziltepe

 

62

 

 

922

 

3.34

 

99

 

 

1,342

 

1.89

 

82

 

 

181

 

 

1,549

 

1.53

 

76

 

 

100

%

Agi Dagi

 

1,2,63

 

 

2,516

 

0.74

 

60

 

 

104,453

 

0.63

 

2,132

 

 

2,192

 

 

19,551

 

0.52

 

330

 

 

98

%

Sissingue

 

64

 

 

6,430

 

1.68

 

347

 

 

500

 

1.37

 

22

 

 

369

 

 

100

 

0.93

 

 3

 

 

100

%

TOTAL GOLD MINERAL RESOURCES*

 

 

 

 

 

 

 

 

51,811

 

 

 

 

 

 

161,823

 

 

212,943

 

 

 

 

 

 

54,759

 

 

 

 

 

*Total excludes New Prosperity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Silver Mineral Reserves

 

 

Est. % of Mineral

 

 

 

 

 

 

Proven

 

 

Probable

 

 

Proven & Probable

 

  

Reserves &

 

 

  

 

  

  

Tonnes

  

Grade

  

Contained

 

 

Tonnes

  

Grade

  

Contained

 

 

Tonnes

  

Grade

  

Contained

 

 

Resources Covered

 

Silver

 

Notes

 

 

000s

 

g/t

 

000 oz

  

  

000s

 

g/t

 

000 oz

  

  

000s

 

g/t

 

000 oz

  

  

by FNV Interest

 

Cobre Panama

 

65

 

 

323,200

 

1.43

 

14,887

 

 

2,823,900

 

1.37

 

124,101

 

 

3,147,100

 

1.37

 

138,932

 

 

100

%

Candelaria

 

1,66

 

 

550,685

 

1.69

 

30,000

 

 

113,013

 

1.93

 

7,000

 

 

663,696

 

1.78

 

38,000

 

 

80

%

Antapaccay

 

67

 

 

244,000

 

1.53

 

12,032

 

 

422,000

 

1.94

 

26,254

 

 

666,000

 

1.79

 

38,286

 

 

100

%

Antamina

 

1,68

 

 

224,200

 

9.10

 

65,166

 

 

205,400

 

10.59

 

69,925

 

 

429,700

 

9.78

 

135,073

 

 

22.5

%

Cerro Moro

 

69

 

 

12

 

1,158.50

 

456

 

 

1,518

 

614.80

 

30,005

 

 

1,530

 

619.20

 

30,461

 

 

100

%

Salares Norte

 

70

 

 

 —

 

 —

 

 —

 

 

21,079

 

57.94

 

39,263

 

 

21,079

 

57.94

 

39,263

 

 

100

%

Calcatreu

 

71

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

Fire Creek

 

3,72

 

 

20

 

43.64

 

28

 

 

34

 

21.31

 

23

 

 

54

 

29.64

 

51

 

 

100

%

TOTAL SILVER MINERAL RESERVES

 

 

 

 

 

 

 

 

122,569

 

 

 

 

 

 

296,570

 

 

 

 

 

 

420,066

 

 

 

 

 

17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Silver Mineral Resources - Inclusive of Reserves

 

 

 

 

 

 

 

 

Est. % of Mineral

 

 

 

 

 

 

Measured (M)

 

 

Indicated (I)

 

 

(M)+(I)

 

 

Silver Inferred Mineral Resources

 

 

Reserves &

 

 

  

 

  

 

Tonnes

  

Grade

  

Contained

  

  

Tonnes

  

Grade

  

Contained

  

  

Contained

  

  

Tonnage

  

Grade

  

Contained

  

  

Resources Covered

 

Silver

 

Notes

 

 

000s

 

g/t

 

000 oz

 

 

000s

 

g/t

 

000 oz

 

 

000 oz

 

 

000s

 

g/t

 

000 oz

 

 

by FNV Interest

 

Cobre Panama

 

65

 

 

310,000

 

1.44

 

14,352

 

 

3,346,000

 

1.33

 

142,706

 

 

157,059

 

 

1,097,000

 

1.08

 

38,176

 

 

100

%

Candelaria

 

1,66

 

 

765,552

 

2.03

 

50,000

 

 

233,082

 

2.14

 

16,000

 

 

66,000

 

 

67,355

 

1.85

 

4,000

 

 

80

%

Antapaccay

 

67

 

 

263,000

 

1.75

 

14,788

 

 

682,000

 

2.37

 

51,886

 

 

66,674

 

 

132,000

 

0.88

 

3,718

 

 

100

%

Antamina

 

1,2,68

 

 

343,600

 

9.42

 

104,111

 

 

650,100

 

10.98

 

229,582

 

 

333,675

 

 

1,325,591

 

10.88

 

463,623

 

 

22.5

%

Cerro Moro

 

1,2,69

 

 

30

 

1,081.37

 

1,043

 

 

2,752

 

488.56

 

43,227

 

 

44,270

 

 

2,175

 

222.26

 

15,542

 

 

95

%

Salares Norte

 

70

 

 

 —

 

 —

 

 —

 

 

23,700

 

56.29

 

42,910

 

 

42,910

 

 

1,800

 

12.62

 

750

 

 

100

%

Calcatreu

 

2,71

 

 

 —

 

 —

 

 —

 

 

9,841

 

19.83

 

6,275

 

 

6,275

 

 

8,078

 

13.09

 

3,399

 

 

100

%

Fire Creek

 

2,3,72

 

 

184

 

167.04

 

989

 

 

784

 

128.13

 

3,229

 

 

4,217

 

 

68,654

 

3.18

 

7,016

 

 

100

%

TOTAL SILVER MINERAL RESOURCES

 

 

 

 

 

 

 

 

185,283

 

 

 

 

 

 

535,815

 

 

721,079

 

 

 

 

 

 

536,224

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PGM Mineral Reserves

 

 

Est. % of Mineral

 

 

 

 

 

 

Proven

 

 

Probable

 

 

Proven & Probable

 

 

Reserves &

 

 

  

 

 

 

Tonnes

  

Grade

  

Contained

 

 

Tonnes

  

Grade

  

Contained

 

 

Tonnes

  

Grade

  

Contained

 

 

Resources Covered

 

PGM

 

Notes

 

 

000s

 

g/t

 

000 oz

 

 

000s

 

g/t

 

000 oz

 

 

000s

 

g/t

 

000 oz

 

 

by FNV Interest

 

Sudbury

 

1,73

 

 

not available

 

 

not available

 

 

not available

 

 

not available

 

Stillwater

 

1,74

 

 

6,300

 

17.11

 

3,465

 

 

40,200

 

17.14

 

22,149

 

 

46,400

 

17.17

 

25,614

 

 

97

%

Pandora

 

1,75

 

 

2,195

 

4.25

 

244

 

 

19,756

 

4.08

 

2,683

 

 

21,951

 

4.09

 

2,927

 

 

80

%

Eagle's Nest

 

76

 

 

5,264

 

4.65

 

787

 

 

5,867

 

3.72

 

702

 

 

11,131

 

4.16

 

1,489

 

 

100

%

TOTAL PGM MINERAL RESERVES

 

 

 

 

 

 

 

 

4,496

 

 

 

 

 

 

25,534

 

 

 

 

 

 

30,030

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PGM Mineral Resources - Inclusive of Reserves

 

 

 

 

 

 

 

 

Est. % of Mineral

 

 

 

 

 

 

Measured (M)

 

 

Indicated (I)

 

 

(M)+(I)

 

 

PGM Inferred Mineral Resources

 

 

Reserves &

 

 

 

 

 

 

Tonnes

 

Grade

 

Contained

 

 

Tonnes

 

Grade

 

Contained

 

 

Contained

 

 

Tonnage

 

Grade

 

Contained

 

 

Resources Covered

 

PGM

 

Notes

 

 

000s

 

g/t

 

000 oz

 

 

000s

 

g/t

 

000 oz

 

 

000 oz

 

 

000s

 

g/t

 

000 oz

 

 

by FNV Interest

 

Sudbury

 

1,73

 

 

not available

 

 

not available

 

 

 

 

 

not available

 

 

not available

 

Stillwater

 

1,74

 

 

9,000

 

17.50

 

5,063

 

 

55,400

 

16.22

 

28,887

 

 

33,950

 

 

87,300

 

16.36

 

45,910

 

 

97

%

Pandora

 

1,75

 

 

22,195

 

4.81

 

3,415

 

 

147,317

 

4.60

 

21,707

 

 

25,122

 

 

21,220

 

4.72

 

3,171

 

 

80

%

Eagle's Nest

 

76

 

 

5,346

 

4.79

 

823

 

 

5,643

 

4.41

 

800

 

 

1,627

 

 

10,581

 

4.29

 

1,459

 

 

100

%

TOTAL PGM MINERAL RESOURCES

 

 

 

 

 

 

 

 

9,301

 

 

 

 

 

 

51,394

 

 

60,699

 

 

 

 

 

 

50,539

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Copper Mineral Reserves

 

 

Est. % of Mineral

 

 

 

 

 

 

Proven

 

 

Probable

 

 

Proven & Probable

 

 

Reserves &

 

 

 

 

 

 

Tonnes

 

Grade

 

Contained

 

 

Tonnes

 

Grade

 

Contained

 

 

Tonnes

 

Grade

 

Contained

 

 

Resources Covered

 

Copper

 

Notes

 

 

000s

 

%

 

Mlbs

 

 

000s

 

%

 

Mlbs

 

 

000s

 

%

 

Mlbs

 

 

by FNV Interest

 

Rosemont

 

77

 

 

426,100

 

0.48

%

4,509

 

 

111,000

 

0.31

%

759

 

 

537,100

 

0.45

%

5,328

 

 

100

%

NuevaUnion (Relincho)

 

78

 

 

576,400

 

0.34

%

4,320

 

 

977,400

 

0.35

%

7,542

 

 

1,553,800

 

0.35

%

11,862

 

 

100

%

Taca Taca

 

79

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

Robinson

 

80

 

 

110,513

 

0.42

%

1,023

 

 

8,860

 

0.28

%

55

 

 

119,373

 

0.41

%

1,078

 

 

100

%

Vizcachitas

 

81

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

TOTAL COPPER MINERAL RESERVES

 

 

 

 

 

 

 

 

9,853

 

 

 

 

 

 

8,355

 

 

 

 

 

 

18,269

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Copper Mineral Resources - Inclusive of Reserves

 

 

 

 

 

 

 

 

 

Est. % of Mineral

 

 

 

 

 

 

Measured (M)

 

 

Indicated (I)

 

 

(M)+(I)

 

 

Copper Inferred Mineral Resources

 

 

Reserves &

 

 

 

 

 

 

Tonnes

 

Grade

 

Contained

 

 

Tonnes

 

Grade

 

Contained

 

 

Contained

 

 

Tonnage

 

Grade

 

Contained

 

 

Resources Covered

 

Copper

 

Notes

 

 

000s

 

%

 

Mlbs

 

 

000s

 

%

 

Mlbs

 

 

Mlbs

 

 

000s

 

%

 

Mlbs

 

 

by FNV Interest

 

Rosemont

 

2,77

 

 

587,400

 

0.45

%

5,860

 

 

485,900

 

0.26

%

2,825

 

 

8,757

 

 

62,300

 

0.30

%

412

 

 

100

%

NuevaUnion (Relincho)

 

2,78

 

 

895,400

 

0.29

%

5,657

 

 

1,440,400

 

0.32

%

10,196

 

 

15,852

 

 

724,700

 

0.36

%

5,752

 

 

100

%

Taca Taca

 

79

 

 

 —

 

 —

 

 —

 

 

2,165,000

 

0.44

%

21,150

 

 

21,150

 

 

921,000

 

0.37

%

7,550

 

 

100

%

Robinson

 

80

 

 

317,943

 

0.47

%

3,294

 

 

40,173

 

0.34

%

301

 

 

3,596

 

 

11,942

 

0.38

%

100

 

 

100

%

Vizcachitas

 

81

 

 

254,400

 

0.44

%

2,462

 

 

1,029,670

 

0.39

%

8,740

 

 

11,202

 

 

788,820

 

0.34

%

5,861

 

 

100

%

TOTAL COPPER MINERAL RESOURCES

 

 

 

 

 

 

 

 

17,273

 

 

 

 

 

 

43,212

 

 

60,556

 

 

 

 

 

 

19,675

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nickel Mineral Reserves

 

 

Est. % of Mineral

 

 

 

 

 

 

Proven

 

 

Probable

 

 

Proven & Probable

 

 

Reserves &

 

 

 

 

  

  

Tonnes

 

Grade

 

Contained

  

  

Tonnes

 

Grade

 

Contained

  

  

Tonnes

 

Grade

 

Contained

  

  

Resources Covered

 

Nickel

 

Notes

 

 

000s

 

%

 

Mlbs

 

 

000s

 

%

 

Mlbs

 

 

000s

 

%

 

Mlbs

 

 

by FNV Interest

 

Mt Keith

 

82

 

 

73,700

 

0.57

%

920

 

 

22,700

 

0.53

%

267

 

 

96,400

 

0.56

%

1,187

 

 

100

%

Falcondo

 

83

 

 

44,900

 

1.28

%

1,267

 

 

26,300

 

1.36

%

789

 

 

71,200

 

1.31

%

2,056

 

 

100

%

Eagle's Nest

 

84

 

 

5,264

 

2.02

%

234

 

 

5,867

 

1.38

%

178

 

 

11,131

 

1.68

%

413

 

 

100

%

TOTAL NICKEL MINERAL RESERVES

 

 

 

 

 

 

 

 

2,421

 

 

 

 

 

 

1,234

 

 

 

 

 

 

3,656

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nickel Mineral Resources - Inclusive of Reserves

 

 

 

 

 

 

 

 

 

Est. % of Mineral

 

 

 

 

 

 

Measured (M)

 

 

Indicated (I)

 

 

(M)+(I)

 

 

Nickel Inferred Mineral Resources

 

 

Reserves &

 

 

 

 

 

  

Tonnes

 

Grade

 

Contained

 

 

Tonnes

 

Grade

 

Contained

 

 

Contained

  

  

Tonnage

 

Grade

 

Contained

 

 

Resources Covered

 

Nickel

 

Notes

 

 

000s

 

%

 

Mlbs

 

 

000s

 

%

 

Mlbs

 

 

Mlbs

 

 

000s

 

%

 

Mlbs

 

 

by FNV Interest

 

Mt Keith

 

82

 

 

142,400

 

0.54

%

1,684

 

 

67,000

 

0.52

%

768

 

 

2,452

 

 

24,000

 

0.52

%

275

 

 

100

%

Falcondo

 

83

 

 

40,500

 

1.42

%

1,268

 

 

31,100

 

1.53

%

1,049

 

 

2,320

 

 

4,900

 

1.40

%

151

 

 

100

%

Eagle's Nest

 

84

 

 

5,346

 

2.08

%

245

 

 

5,643

 

1.50

%

187

 

 

432

 

 

8,966

 

1.16

%

228

 

 

100

%

TOTAL NICKEL MINERAL RESOURCES

 

 

 

 

 

 

 

 

3,197

 

 

 

 

 

 

2,004

 

 

5,204

 

 

 

 

 

 

655

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Chromite Mineral Reserves

 

 

Est. % of Mineral

 

 

 

 

 

 

Proven

 

 

Probable

 

 

Proven & Probable

 

 

Reserves &

 

 

 

 

  

  

Tonnes

 

Grade

 

Contained

  

  

Tonnes

 

Grade

 

Contained

  

  

Tonnes

 

Grade

 

Contained

  

  

Resources Covered

 

Chromite

 

Notes

 

 

000s

 

% Cr2O3

 

Mt

 

 

000s

 

% Cr2O3

 

Mt

 

 

000s

 

% Cr2O3

 

Mt

 

 

by FNV Interest

 

Ring of Fire

 

85

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

 —

 

 —

 

 —

 

 

100

%

TOTAL CHROMITE MINERAL RESERVES

 

 

 

 

 

 

 

 

 —

 

 

 

 

 

 

 —

 

 

 

 

 

 

 —

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Chromite Mineral Resources - Inclusive of Reserves

 

 

 

 

 

 

 

 

 

Est. % of Mineral

 

 

 

 

 

 

Measured (M)

 

 

Indicated (I)

 

 

(M)+(I)

 

 

Chromite Inferred Mineral Resources

 

 

Reserves &

 

 

 

 

 

  

Tonnes

 

Grade

 

Contained

 

 

Tonnes

 

Grade

 

Contained

 

 

Contained

  

  

Tonnage

 

Grade

 

Contained

 

 

Resources Covered

 

Chromite

 

Notes

 

 

000s

 

% Cr2O3

 

Mt

 

 

000s

 

% Cr2O3

 

Mt

 

 

Mt

 

 

000s

 

% Cr2O3

 

Mt

 

 

by FNV Interest

 

Ring of Fire

 

85

 

 

140,200

 

32.53

%

45.6

 

 

52,600

 

29.83

%

15.7

 

 

61.3

 

 

54,600

 

30.77

%

16.8

 

 

100

%

TOTAL CHROMITE MINERAL RESOURCES

 

 

 

 

 

 

 

 

45.6

 

 

 

 

 

 

15.7

 

 

61.3

 

 

 

 

 

 

16.8

 

 

 

 

 

18

Notes and Sources

 

All Mineral Reserves and Resources have been calculated in accordance with acceptable foreign codes, including CIM, SEC, JORC, or SAMREC guidelines

Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability

Unless otherwise noted, Mineral Resources were reported by the operator inclusive of Mineral Reserves

Contained ounces do not take into account recovery losses

Mineral Reserves and Resources based on publicly disclosed information as of March  6, 2020

Rows and columns may not add up due to rounding

 

Inferred Resources are in addition to Measured and Indicated Resources.  Inferred Resources have a great amount of uncertainty as their existence and whether they can be mined legally or economically.  It cannot be assumed that all or any part of the Inferred Resources will ever be upgraded to a higher category.  See "Cautionary Note to US Investors Regarding Reserve and Resource Reporting Standards".

 

1Franco-Nevada's royalties or stream interests may not cover the operator's entire property or all estimated Mineral Reserves and Resources or a combination of both

2Mineral Resources shown by operator exclusive of Mineral Reserves. The Company's QP determined the inclusive Mineral Resources by adding the exclusive Measured and Indicated Mineral Resources to the Proven and Probable Reserves

3Mineral Reserves and Resources are reported by the operator in non-metric units. The Company's QP calculated the metric conversion using 1 opt=34.286 g/t, 1 short ton = 0.9018 metric tonnes, 1 oz = 31.1035 g

4First Quantum Minerals Ltd.; NI 43-101 Technical Report, Cobre Panama Project March 2019

5Lundin Mining Corp.; Company Press Release, September 5, 2019

6Glencore; Resources & Reserves as at 31 December 2019

7Coeur Mining Inc.; News Release, February 18, 2020

8Yamana Gold; Summary of Mineral Reserves and Mineral Resources as of December 31, 2019

9Goldfields Ltd; Corporate Presentation, April 10, 2019

10First Quantum Minerals Ltd.; Annual Information Form March 29, 2019

11Oz Minerals Ltd.; Mineral Resource Estimate and Ore Reserve Statement as at 6 May 2019 and 24 June 2019 & Investor Presentation, March 27, 2018

12Patagonia Gold Plc; NI 43-101 Technical Report, Mineral Resource Estimate as at 31 December 2018

13Coro Mining Corp.; NI 43-101 Technical Report, Preliminary Feasibility Study, San Jorge 25kt/y Copper Leach Project, March 2012

14Hochchild Mining Plc; Corporate Website, February 2019

15Barrick Gold Corporation; Reserves and Resources Year End 2019. Carlin Trend includes Goldstrike, Gold Quarry and South Arturo as well as other properties where Franco-Nevada has no royalties or stream interests

16SSR Mining Inc.; Statement of Mineral Reserves and Resources December 31, 2019

17Kinross Gold Corporation; News Release, February 12, 2020

18Equinox Gold Corp.; Corporate Presentation, January 2020

19Equinox Gold Corp.; Corporate Presentation, January 2020

20Hecla Mining Company; Company Press Release, February 5, 2020

21Hecla Mining Company; Company Press Release, February 5, 2020

22Midas Gold Corp.; News Releases December 15, 2014 and February 15, 2018

23Newmont Mining Corporation; News Release February 13, 2020

24Atna Resources; NI 43-101 Technical Report, Pinson Project, Preliminary Feasibility Study, June 30, 2014

25KGHM; Mineral Resources and Reserves Report, December 31, 2014

26KGHM does not provide updated Mineral Reserve and Mineral Resource estimates.  As such, Franco-Nevada has chosen not to display the historical figure moving forward

27Kirkland Lake Gold; News Release February 19, 2020

28Barrick Gold Corporation; Reserves and Resources Year End 2019

29Kirkland Lake Gold Inc.; News Release February 19, 2020

30Kirkland Lake Gold Inc.; News Release February 19, 2020

31Pretium Resources Inc.; News Release, April 04, 2019

32Kirkland Lake Gold Inc. - News Release February 19, 2020; Agnico Eagle Mines Limited, Mineral Reserves and Resources as of December 31, 2019

33Victoria Gold Corp.; Technical Report for the Eagle Gold Mine, December 6, 2019

34Newmont Corporation; Press Release, February 13, 2020

35Tahoe Resources Inc.; News Release February 15, 2018

36Yamana Gold; Summary Mineral Reserves and Mineral Resources, December 31, 2019

37Premier Gold Mines Ltd.; Mineral Reserve  - Press Release,  February 25, 2019 and Mineral Resource  - Press Release,  October 3, 2019

38Marathon Gold Corp.; News Release, January 20, 2020

39Rubicon Minerals Corp.; NI 43-101 Technical Report, December 6, 2019

40Seabridge Gold Inc.; Mineral Reserves and Resources updated March 11, 2014

41Fortune Bay Corp.; 43-101 Technical Report Pre-feasibility Study, Re-issue March 13, 2014

42Yamana Gold Inc.; Summary Mineral Reserves and Mineral Resources, December 31, 2019

43Ascot Resources Ltd.; 2019 Mineral Resource Update for the Red Mountain Gold Project, November 22, 2019

44Regis Resources Limited; Mineral Resource and Ore Reserve Statement Announcement dated July 19, 2019

45Unity Mining Limited; Annual Reserves and Resources Update, September 11, 2015

46Bardoc Gold Ltd.; Company Press Release, September 30, 2019

47Echo Resources Limited; ASX Announcement, June 25, 2019

48Norton Gold Fields Ltd.; Corporate Website, January 8, 2020

49Ramelius Resources Ltd.; Company Press Release, September 10, 2019

50Gascoyne Resources Ltd.; Company Press Release, August 28, 2019

51Matsa Resources Ltd.; Corporate Website, February 11, 2020 & Saracen Mineral Holdings Ltd.; Company Press Release, August 1, 2019

52Northern Star Resources Ltd.; ASX Announcement, August 1, 2019

53Blackham Resources Ltd.; Company Press Release, September 27, 2019

54AngloGold Ashanti Ltd.; Mineral Resource and Ore Reserve Report 2018

55Teranga Gold Corporation; MD&A for the years ending 31 December 2019 and 2018

56Endeavour Mining Corp.; News Release March 5, 2019

57Kinross Gold Corporation; News Release, February 12, 2020

58Newmont Corporation; Press Release, February 13, 2020

59Perseus Mining Ltd.; Company Press Release, February 20, 2020

60Endeavour Mining Corp.; News Release March 5, 2019

61Eldorado Gold Corp.; News Release November 15, 2019

62Ariana Resources plc; Press Release May 3, 2017

63Alamos Gold Inc.; Press Release February 18, 2020

64Perseus Mining Ltd.; Company Press Release, August 28, 2019

65First Quantum Minerals Ltd.; NI 43-101 Technical Report, Cobre Panama Project March 2019

66Lundin Mining Corp.; Company Press Release, September 5, 2019

67Glencore; Resources & Reserves as at December 31, 2019

68Teck Resources Limited; Annual Information Form February 26, 2020

69Yamana Gold; Summary of Mineral Reserves and Mineral Resources as of December 31, 2019

70Goldfields Ltd; Corporate Presentation, April 10, 2019

71Patagonia Gold Plc; NI 43-101 Technical Report, Mineral Resource Estimate as at 31 December 2018

72Hecla Mining Company; Company Press Release, February 5, 2020

73KGHM; Mineral Resources and Reserves Report, December 31, 2014

74Sibanye-Stillwater; Mineral Resources and Mineral Reserves Report 2018

75Lonmin Plc; Mineral Resource and Mineral Reserve Statement 2017

76Noront Resources Ltd.; NI 43-101 Technical Report Feasibility Study, October 19, 2012

77Hudbay Minerals Inc.; Investor Presentation, February 2020

78Teck Resources Limited; Annual Information Form, February 26, 2020

79First Quantum Minerals Ltd.; Annual Information Form March 29, 2019

80KGHM; Mineral Resources and Reserves Report, December 31, 2014

81Los Andes Copper Ltd.; PEA of the Vizcachitas Project, June 13, 2019

82BHP Billiton Ltd.; Annual Report 2019

83Glencore; Resources & Reserves Report as at December 31, 2014

84Noront Resources Ltd.; NI 43-101 Technical Report Feasibility Study, October 19, 2012

85Noront Resources Ltd.; Corporate Presentation 4Q2019

 

 

 

19

ANTAMINA MINING AND TECHNICAL INFORMATION

Description and Location

The Antamina project is owned and operated by CM Antamina, a Peruvian Sociedad Anonima indirectly owned by BHP Billiton plc (33.75%), Glencore (33.75%), Teck (22.5%) and Mitsubishi Corporation (10%).

The Antamina property consists of numerous mining concessions and mining claims covering an area of approximately 82,200 hectares and an area of approximately 15,000 hectares of surface rights.  These rights, concessions and claims can be held indefinitely, contingent upon the payment of annual license fees and provision of certain production and investment information. All of the mining concessions are located in the San Marcos District, Province of Huari, Ancash Department, Peru, and constitute all of the mineral rights that are required to permit exploitation of the deposit for which Mineral Reserves and Mineral Resources are stated.  CM Antamina has sufficient surface rights for mining, tailings disposal, waste disposal, processing and required infrastructure, based on the current life-of-mine plan.

CM Antamina also owns a port facility located at Huarmey and an electrical substation located at Huallanca. CM Antamina holds title to all easements and rights of way for the 302 kilometre concentrate pipeline from the mine to CM Antamina’s port at Huarmey.

In Peru, the mining tax regime includes the Special Mining Tax and the Modified Mining Royalty which apply to CM Antamina’s operating margin based on a progressive sliding scale ranging from 3% to 20.4%. CM Antamina is also subject to Peruvian income tax.

In addition to Franco-Nevada’s stream, Teck’s interest is subject to a net profits royalty of 1.667% payable in respect of all of CM Antamina’s free cash flow. In addition, certain of Antamina’s unexploited concessions are subject to a contractual 2.5% NSR royalty. The concessions are otherwise free of any contractual royalties or back-in rights.

Accessibility, Climate, Local Resource, Infrastructure and Physiography

The Antamina deposit is located at an average elevation of 4,200 metres, 385 kilometres by road and 270 kilometres by air north of Lima, Peru. Antamina lies on the eastern side of the Western Cordillera in the upper part of the Rio Marañon basin. Mine personnel live in a camp facility while at work and commute from both local communities and larger population centres, including Lima.

The mine is accessible via an all-weather chip sealed access road maintained by CM Antamina. The mine road connects at the Peruvian National Highway 14 at Conococha Lake. The closest town to the mine site is San Marcos, 38 kilometres by dirt road. Huaraz is the closest city to the mine site, 200 kilometres by paved road or 156 kilometres by partial dirt road.

Power for the mine is taken from the Peru national energy grid through an electrical substation constructed at Huallanca. Fresh water requirements are sourced from a dam-created reservoir upstream from the tailings impoundment facility. The tailings impoundment facility is located next to the mill. Water reclaimed from the tailings impoundment is used as process water in the mill operation. The operation is subject to water and air permits issued by the Government of Peru and is in material compliance with those permits. The operation holds all of the permits that are material to its current operations.

The topography in the area of the Antamina property is characterized by steep, sharp limestone ridges and peaks, generally at 4,500 to 4,800 metres altitude, but up to a maximum of 5,073 metres. There are short glacial valleys with lakes and deep, steep-sided river canyons and valleys. The ambient air temperatures at the Antamina property range from an hourly maximum of 15.3°C to an hourly minimum of -0.1°C and the rainfall averages 1,870 millimetres per year. These conditions are appropriate to conduct mining operations throughout the year. Occasional interruptions in mining activities may occur due to strong lightning storms.

History

The Antamina valley has seen limited mineral production by indigenous peoples for centuries. The Cerro de Pasco Corporation (“Cerro”) was the first company to carry out exploratory work of any magnitude on the Antamina project, beginning in 1952. Cerro defined over one million tonnes averaging better than 3.0% copper and a lower grade reserve of 10 million tonnes. In 1970, all of the mining assets owned by Cerro were transferred to the Government of Peru. Following expropriation, Minero Perú, the Peruvian mining administration agency, formed the Empresa Minera Especial (“EME”) in partnership with Geomin, the Romanian mining agency. EME carried out a work program on the property culminating in a series of feasibility studies based on the proven and probable reserves determined from drilling and underground sampling. The basic mining plan involved an initial open pit producing 10,000 tonnes per day of ore for seven years then 20,000 tonnes per day for 13 years. EME updated the initial study in 1978, 1979 and 1982. EME was disbanded in the 1981-1982 period due to its failure to finance the project.

In 1996, Rio Algom Limited and Inmet Mining Corporation acquired the Antamina project and shortly afterward formed CM Antamina to hold their interest in the project. In 1998, Inmet Mining Corporation sold its interest in CM Antamina, and CM Antamina was restructured under the ownership of Rio Algom Limited (37.5%), Noranda Inc. (37.5%) and Teck Corporation

20

(25%). In 1999, the ownership was further modified as each of the three partners sold 10% of their interest to Mitsubishi Corporation, resulting in the ownership of Rio Algom Limited (33.75%), Noranda Inc. (33.75%), Teck Corporation (22.5%) and Mitsubishi Corporation (10%). As a result of various corporate transactions involving its parent owners, the current ownership of CM Antamina is BHP Billiton plc (33.75%), Glencore (33.75%), Teck (22.5%) and Mitsubishi Corporation (10%).

Geological Setting, Mineralization and Deposit Type

The Antamina deposit sits at the bottom of a glacial valley surrounded by limestone ridges. It is hosted in a sequence of limestones and sediments, which were strongly deformed by thrusting and folding, then later intruded by intermediate to felsic stocks.

The Antamina polymetallic deposit is skarn-hosted. It is unusual in its persistent mineralization and predictable zonation, and has a SW-NE strike length of more than 2,500 metres and a width of up to 1,000 metres. The skarn is well-zoned symmetrically on either side of the central intrusion with the zoning used as the basis for four major subdivisions, being a brown garnet skarn, green garnet skarn, wollastonite/diopside/green garnet skarn and a marbleized limestone with veins or mantos of wollastonite. Other types of skarn, including the massive sulphides, massive magnetite, and chlorite skarn, represent the remainder of the skarn and are randomly distributed throughout the deposit. The variability of ore types can result in significant changes in the relative proportions of copper and zinc produced in any given year.

Copper occurs mainly as chalcopyrite except for two areas of bornite, representing approximately five percent of the deposit. Zinc generally occurs as sphalerite. Other significant sulphides include molybdenite and pyrite, while trace amounts of silver and bismuth bearing minerals and local areas of galena are found.

Metal zonation is quite distinctive within the deposit. Copper occurs relatively evenly distributed from endoskarn to the limestone contact. Zinc and bismuth tend to occur within 70 metres of the contact of green garnet skarn with limestone/marble/hornfels. Molybdenite is generally located within the intrusive core and the surrounding endoskarn. Silver is present in any of the skarn lithologies. Lead is generally located in green garnet exoskarn, diopside exoskarn and hornfels. However, veins and blebs of tennantite and other minerals can be found as rare occurrences in any rock type at Antamina.

Exploration

Commencing in 1996, CM Antamina performed an extensive exploration and development program to define the deposit. A resource model was built in 1997 to provide input to the feasibility study. The Antamina deposit had been drilled and underground sampled to the level that a resource and reserve model was constructed and a feasibility study undertaken in 1998. Work performed on the property up to 1999 includes metallurgical testing, check assaying of previous drill hole and underground tunnel pulps, geologic mapping, geotechnical core logging and mapping, 135 kilometres of core drilling, 6 kilometres underground tunnels and 225 metres of drifting for bulk sampling. As well, during the development and feasibility work, over 400 tonnes of metallurgical samples, representing all parts of the deposit, were taken and shipped to labs for various bench scale flotation and milling tests as well as pilot plant tests. Project construction was commenced in 1999 with initial production realized in June 2001. Since production, additional exploration studies have associated satellite areas of the property with the main intrusive and Antamina skarn through geochronology, isotopic and alteration patterns. In addition, a series of potential areas for grass-roots exploration have been identified based on stratigraphic, structural and morphological patterns.

Drilling

The Antamina data set contains core drill data, reverse circulation drill data, and data from underground drifts. EME drilled 174 core holes for 19,885 metres and extended the underground drifts driven by Cerro to a total of 6,000 metres. In addition, the entire 6,000 metres of underground drifts were channel sampled. Between 1996 and 2008, CM Antamina drilled an additional 1,905 core holes for 580,060 metres. The drill hole and underground data has been entered into AcQuire database software for validation and storage. The Antamina resource model is updated on an annual basis to incorporate new available drilling data and improved understanding of the orebody.

In 2019, a total of 95 drillholes were completed within the Antamina pit, for a total of approximately 41,334 metres. This included 44 conventional infill holes totalling approximately 15,328 metres, 16 primary infill holes totalling approximately 5,512 metres, 32 branch infill holes totalling approximately 17,674 metres and three conventional deep holes totalling approximately 2,820 metres. Quick logs and assay results of these holes indicate no material impacts on the quantity or grade of reserves and resources. For diamond core, three-metre samples of half core (HQ or NQ) are collected and prepared for assay at an external laboratory. The remaining half of the core is retained for future reference. The assay program includes approximately 20% of quality-control samples, comprising reference materials, duplicates and blanks as well as samples for external control at a secondary laboratory. The reference materials consist of matrix-matched material from Antamina, homogenized and certified in accordance with industry practice.

21

Sampling, Analysis and Data Verification

More than 280,000 samples have been analyzed. Assay data used for resource modeling is predominately from drill core samples (95%), with a lesser amount of underground channel (4%) and reverse circulation (1%) samples. No bias was noted for particular minerals with respect to core recovery and the samples used for the resource estimation are considered representative. Drill core sampling methodology for all Antamina drilling campaigns was the same: the drill core was cut in half, and sample intervals were set at three metres in length; however, the length of samples were adjusted to start and end at major geologic alteration and lithology contacts. All efforts were made to collect samples with a minimum length not less than 1 metre, except for density samples which average approximately 0.15 metre in length. The whole length of the drill hole was sampled, whether mineralized or not, except where low recovery prevented the collection of a representative sample. Most of the density data has been collected using two methods: caliper and wax-coat water immersion (which were determined to produce equivalent datasets). Additional studies were performed to determine correction factors for the bias between the whole core density and the in-situ density. Those factors were subsequently used during the resource estimation procedures. A bulk metallurgical sample was taken for pilot plant testing to determine grinding and bulk flotation characteristics of the ores. A drift location for the bulk sample was selected in the likely starter pit area. Approximately 400 tonnes of material was shipped for testing.

For all drilling programs run by CM Antamina, sample preparation, assaying, analytical and quality control procedures have followed acceptable industry standard practices. The procedures followed included the use of independent assay labs for all sample preparation and assays and the use of QA/QC protocols in all drilling campaigns. Additionally, most of the drilling programs included an independent audit of the QA/QC program and results. All original data (geological logs, field forms, printed assay certificates, core photographs, and all other types of paper forms) have been archived at the mine site, inventoried and filed by hole. All of the paper forms have been scanned and electronically stored, together with all of the information that was originally received in an electronic form. A backup copy of all electronically-stored data (including backups of the SQL-based resource database) is stored in the CM Antamina vault in Lima. Industry accepted procedures were utilized for sampling, sample preparation, security and analytical procedures.  Sample checks have demonstrated that the samples are representative of the mineralization and that there is no bias in the sampling.

Mineral Processing and Metallurgical Testing

Extensive metallurgical testing was conducted on the Antamina ore body from November 1996 to December 1997. The work was carried out by reputable metallurgical laboratories under the direction of a committee of experienced metallurgical experts from within the ownership group supported by independent consultants. Much of the critical initial work was carried out in duplicate at different laboratories. Concentrator operations were started in May 2001. Over ten years of operational and metallurgical data have been realized since the original feasibility test work. The operational data and metallurgical relationships developed subsequent to the feasibility study have been applied to the current resource model.

Mineral Resource and Reserve Estimates

The Mineral Reserves and Mineral Resources for the Antamina deposit as of December 31, 2019 are as follows:

Mineral Reserves as at December 31, 2019 (100% basis)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Proven

 

 

Probable

 

 

Total

 

 

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

 

Copper

 

 

‘000

 

 

Cu %

 

 

‘000

 

 

Cu %

 

 

‘000

 

 

Cu %

 

Copper Only Ores OP

 

 

148,300

 

 

0.94

 

 

107,100

 

 

0.99

 

 

255,400

 

 

0.96

 

Copper Zinc Ores OP

 

 

75,900

 

 

0.88

 

 

98,300

 

 

0.82

 

 

174,300

 

 

0.85

 

Total

 

 

224,200

 

 

0.92

 

 

205,500

 

 

0.91

 

 

429,700

 

 

0.91

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Proven

 

 

Probable

 

 

Total

 

 

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

 

Zinc

 

 

‘000

 

 

Zn %

 

 

‘000

 

 

Zn %

 

 

‘000

 

 

Zn %

 

Total

 

 

75,900

 

 

2.1

 

 

98,300

 

 

2.2

 

 

174,300

 

 

2.2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Proven

 

 

Probable

 

 

Total

 

 

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

 

Silver

 

 

‘000

 

 

Ag g/t

 

 

‘000

 

 

Ag g/t

 

 

‘000

 

 

Ag g/t

 

Copper Only Ores OP

 

 

148,300

 

 

6.4

 

 

107,100

 

 

8.1

 

 

255,400

 

 

7.1

 

Copper Zinc Ores OP

 

 

75,900

 

 

14.2

 

 

98,300

 

 

13.3

 

 

174,300

 

 

13.7

 

Total

 

 

224,200

 

 

9.1

 

 

205,500

 

 

10.6

 

 

429,700

 

 

9.8

 

 

22

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Proven

 

 

Probable

 

 

Total

 

 

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

 

Molybdenum

 

 

‘000

 

 

Mo %

 

 

‘000

 

 

Mo %

 

 

‘000

 

 

Mo %

 

Total

 

 

148,300

 

 

0.037

 

 

107,100

 

 

0.033

 

 

255,400

 

 

0.035

 

 

Mineral Resources (Exclusive of Mineral Reserves) as at December 31, 2019 (100% basis)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Measured

 

 

Indicated

 

 

Inferred

 

 

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

 

Copper

 

 

‘000

 

 

Cu %

 

 

‘000

 

 

Cu %

 

 

‘000

 

 

Cu %

 

Copper Only Ore OP

 

 

90,800

 

 

0.68

 

 

311,900

 

 

0.77

 

 

588,300

 

 

0.81

 

Copper Zinc Ore OP

 

 

28,600

 

 

0.79

 

 

132,800

 

 

1.00

 

 

234,800

 

 

1.00

 

Copper Only Ore UG

 

 

 —

 

 

 —

 

 

 —

 

 

 —

 

 

300,700

 

 

1.31

 

Copper Zinc Ore UG

 

 

 —

 

 

 —

 

 

 —

 

 

 —

 

 

171,400

 

 

1.28

 

Total

 

 

119,400

 

 

0.70

 

 

444,800

 

 

0.84

 

 

1,295,200

 

 

1.02

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Measured

 

 

Indicated

 

 

Inferred

 

 

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

 

Zinc

 

 

‘000

 

 

Zn %

 

 

‘000

 

 

Zn %

 

 

‘000

 

 

Zn %

 

Copper Zinc Ore OP

 

 

28,600

 

 

1.4

 

 

132,800

 

 

1.7

 

 

234,800

 

 

1.5

 

Copper Zinc Ore UG

 

 

 —

 

 

 —

 

 

 —

 

 

 —

 

 

171,400

 

 

1.5

 

Total

 

 

28,600

 

 

1.4

 

 

132,800

 

 

1.7

 

 

406,200

 

 

1.5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Measured

 

 

Indicated

 

 

Inferred

 

 

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

 

Silver

 

 

‘000

 

 

Ag g/t

 

 

‘000

 

 

Ag g/t

 

 

‘000

 

 

Ag g/t

 

Copper Only Ore OP

 

 

90,800

 

 

6.6

 

 

311,900

 

 

8.3

 

 

588,300

 

 

7.6

 

Copper Zinc Ore OP

 

 

28,600

 

 

21.4

 

 

132,800

 

 

17.9

 

 

234,800

 

 

15.2

 

Copper Only Ore UG

 

 

 —

 

 

 —

 

 

 —

 

 

 —

 

 

300,700

 

 

11.3

 

Copper Zinc Ore UG

 

 

 —

 

 

 —

 

 

 —

 

 

 —

 

 

171,400

 

 

17.4

 

Total

 

 

119,400

 

 

10.1

 

 

444,800

 

 

11.2

 

 

1,295,200

 

 

11.2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Measured

 

 

Indicated

 

 

Inferred

 

 

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

  

  

Tonnes

  

  

Grade

 

Molybdenum

 

 

‘000

 

 

Mo %

 

 

‘000

 

 

Mo %

 

 

‘000

 

 

Mo %

 

Copper Only OP

 

 

90,800

 

 

0.018

 

 

311,900

 

 

0.024

 

 

588,300

 

 

0.029

 

Copper Only UG

 

 

 —

 

 

 —

 

 

 —

 

 

 —

 

 

300,700

 

 

0.021

 

Total

 

 

90,800

 

 

0.018

 

 

311,900

 

 

0.024

 

 

889,000

 

 

0.026

 

 

 

Notes:

(1)

Source: Teck AIF dated February 26, 2020.

(2)

Columns and rows may not add up due to rounding.

(3)

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

(4)

Zinc is not recovered from copper ores and molybdenum is not usually recovered from copper-zinc ores or from copper ores with high bismuth.

(5)

Open pit reserve estimates were prepared assuming long term metal prices of: $3.084/lb copper, $1.08/lb zinc, $8.70/lb molybdenum and $17.39/oz silver.  Open pit and underground resource estimates were prepared assuming long-term metal prices of:  $3.30/lb copper, $1.23/lb zinc, $10.00/lb molybdenum and $19.95/oz silver.

(6)

The cut-off grades at Antamina are based on the net value before taxes that the material is expected to generate per hour of concentrator operation at assumed prices, and varies by year in an effort to maximise the net present value of the pit.

 

Mineral Reserves are limited by the current operation tailings dam capacity.

Mining Operations

Project construction commenced in 1999 with initial production realized in June 2001. Antamina is currently a producing property, with the mine and concentrator operating at the designed capacity.

The mine is an open-pit, truck/shovel operation.

Processing and Recovery

The ore is crushed within the pit and conveyed through a 2.7 kilometre tunnel to a coarse ore stockpile at the mill. It is then processed utilizing two SAG mills, followed by ball mill grinding and flotation to produce separate copper, zinc, molybdenum and lead/bismuth concentrates.  The mill has the capacity to process approximately 145,000 tonnes per day depending on ore hardness.  Silver is predominantly contained within the copper concentrates, with additional silver contained within the

23

lead-bismuth concentrate. The concentrator processes multiple ore types on a campaign basis. These campaigns range from a number of days to an entire month or longer depending upon ore development and concentrate marketing requirements.

The last five years of production of metal in concentrates on a 100% basis, from Antamina is shown in the table below:

 

 

 

 

 

 

 

 

 

 

 

Metal Produced in Concentrates

 

    

Cu

    

Zn

    

Mo

    

Ag

 

 

(kt)

 

(kt)

 

(Mlbs)

 

(Moz)*

2015

 

391

 

235

 

4.4

 

17.7

2016

 

431

 

198

 

10.3

 

20.1

2017

 

422

 

372

 

8.7

 

19.5

2018

 

446

 

409

 

10.2

 

16.5

2019

 

449

 

303

 

7.8

 

16.3

*    Calculated from Glencore’s 33.75% interest in Antamina.

On a 100% basis, Antamina’s 2020 production is expected to be in the range of approximately 390,000-410,000 tonnes of copper, 445,000-465,000 tonnes of zinc and approximately 9 million pounds of molybdenum in concentrate.

Between 2021 and 2023, Antamina is expected to produce an average of 400,000 tonnes of copper, 400,000–445,000 tonnes of zinc and 9–13 million pounds of molybdenum in concentrate on a 100% basis, although annual production will fluctuate due to feed grades and the amount of copper-zinc ore processed.

Infrastructure, Permitting and Compliance

A 302 kilometre-long slurry concentrate pipeline, approximately 22 centimetres in diameter with a single pump station at the mine site, transports copper and zinc concentrates to the Huarmey port, where they are dewatered and stored prior to loading onto vessels for shipment to smelters and refineries world-wide. CM Antamina has entered into long-term off-take agreements with affiliates of the Antamina shareholders on market terms for copper, zinc and molybdenum concentrates.

A closure plan complying with Peruvian law is currently on file with the Ministry of Energy and Mines. Included in the closure plan are details for facility dismantling, demolition, post-closure stability and long term maintenance (water management/treatment systems, socio-economic support, land use/reclamation, schedules and financial provisions). Engineering and designs are required to be provided to a feasibility level and must be updated every five years or within 12 months of any environmental impact assessment or modification thereto.

Based on current designed tailings storage capacity, the mine life is expected to continue until 2028. CM Antamina is currently conducting engineering studies for additional tailings storage options and alternative mine plans that could result in significant mine life extensions. Any mine life extension will require a modification of Antamina’s current Environmental Impact Assessment certificate, a process which began in October 2019 with the submission of the study area and common terms of reference to Peruvian regulators for a mine life extension to 2036. A decision in respect of the requested modification is anticipated in 2022.

In June 2019, CM Antamina signed a new three-year collective agreement which will expire on July 31, 2021.

Operating and Capital Costs

Total 2020 projected cash operating costs for the project (shown on a 100% basis, calculated from Teck’s attributable 22.5% share) are tabulated below.

 

 

 

 

    

Approximated Projected Cost,

Component

 

$ million

Labour

 

365

Supplies

 

404

Energy

 

218

Other (including general & administrative, inventory changes)

 

71

Less amounts associated with projected capitalized stripping

 

(253)

Total

 

805

 

The cash operating costs presented above do not include transportation or royalties.

Under a long-term streaming agreement with the Company, Teck has agreed to deliver silver to the Company equivalent to 22.5% of the payable silver sold by CM Antamina.    The Company will pay 5% of the spot price at the time of the delivery for each ounce of silver delivered under the agreement. After 86 million ounces of silver have been delivered under the agreement, the stream will be reduced by one-third. A total of 15.2 million ounces of silver have been delivered under the agreement from the effective date in 2015 to December 31, 2019.

24

Total 2020 projected capital costs for the project (shown on a 100% basis, calculated from Teck’s attributable 22.5% share) are tabulated below:

 

 

 

 

    

Approximated Projected Cost,

Component

 

$ million

Sustaining

 

347

Major Enhancement

 

89

Total

 

436

 

25

ANTAPACCAY MINING AND TECHNICAL INFORMATION

Property Description, Location and Access

The Antapaccay project is owned and operated by CM Antapaccay, a Peruvian company that is an indirect wholly-owned subsidiary of Glencore.  Glencore indirectly acquired CM Antapaccay in May 2013 as a result of its acquisition of Xstrata.

The Antapaccay project is located in southern Peru in the Cusco Region, Espinar District and Province, approximately 250 kilometres from the cities of Cusco and Arequipa.  The project is accessed by paved and dirt roads (approximately 5 hours by road from Cusco and Arequipa) and is between 3,800 and 4,000 metres above sea level.  Mine personnel live at the mine’s facilities while at work and commute from both local communities and larger population centres.

The Antapaccay mine is located 9.4 kilometres southwest of CM Antapaccay’s past-producing Tintaya mine, and the Antapaccay concentrator is located 4.5 kilometres south of the Tintaya concentrator.

The CM Antapaccay property consists of numerous mining concessions and mining claims covering an area of 99,766 hectares, which includes the former Tintaya mine, current Antapaccay mine and Coroccohuayco project (as described below). These concessions and claims can be held indefinitely, contingent on the payment of the annual license fees and provision of certain production and investment information.  The Antapaccay project itself covers 13 mining concessions with a total effective area of 7,944 hectares. These mining concessions constitute all of the mineral rights that are required to permit exploitation of the deposit for which Mineral Reserves are stated.

The CM Antapaccay property also includes the Coroccohuayco project, a satellite deposit that is located within 10 kilometres of the Antapaccay plant. At this stage, exploration, drilling and engineering studies at Coroccohuayco have focused on defining Mineral Resources and Mineral Reserves and no mining activities are being undertaken.

As of February 10, 2016 CM Antapaccay held surface rights over approximately 10,321 hectares of the total concession area and continues to acquire additional surface rights.  Surface rights have been acquired for all current operating needs in respect of the Antapaccay project. Additional surface rights would be necessary for the development of certain Mineral Reserves and Mineral Resources.

CM Antapaccay is operating under a tax stability agreement with the government of Peru, pursuant to which it pays a royalty of 1% of net income up to $60 million, 2% of net income between $60 million and $120 million, and 3% of net income in excess of $120 million.  CM Antapaccay is also subject to the Special Mining Contribution which applies to its operating income based on a progressive sliding scale ranging from 4% to 13%.

History

Mining activities at the Tintaya mine began in 1984 by the state-owned mining company, Empresa Minera Especial Tintaya SA (“Empresa”). The Tintaya mine produced over 1.6 million tonnes of copper and 500,000 ounces of gold until operations ceased in 2012.

Initial exploration activities outside of the Tintaya mine area focussed on the Antapaccay concessions as well as the concessions comprising the Coroccohuayco project.  The existence of copper-bearing mineralization in the area of the Antapaccay project was known, with a history of artisanal mining close to the surface at the old Atalaya mine in the same area.

In October 1994, Magma Copper Company (“Magma”) purchased Empresa, and in 1995 geologists from Magma revised the then existing information on Atalaya (geology and geophysics) and completed mapping of the site, and estimated the potential for 68 million tonnes of skarn-type mineralization grading 1.50% copper.

In July 1998, Broken Hill Proprietary Company Limited (“BHP”) acquired Atalaya, following which exploration commenced.  Two copper-gold porphyry-type orebodies were discovered in addition to the skarn-type mineralization, and, in February 2000, Mineral Resources of 285 million tonnes grading 0.95% copper and 0.19 grams per tonne gold were reported.

The Antapaccay project was managed by BHP Billiton (formed by the merger of BHP with Billiton plc) until 2006, when Xstrata acquired properties in Peru, including the Tintaya mine and plant that were operating at the time and the Antapaccay project. Following the acquisition, further project and infill drilling work was completed on Antapaccay, and construction of the mine and related infrastructure started in 2010. Mining operations commenced in 2012 with first concentrate production in November 2012 and initial design capacity of 70,000 tonnes per day reached in February 2013.

Geological Setting, Mineralization and Deposit Type

Antapaccay

The Antapaccay project contains a porphyry-skarn type (copper-silver-gold) deposit located in the Eocene-Oligocene Andahuaylas-Yauri strip, 9.4 kilometres southwest in a straight line from the Tintaya mine, in the area of the old Atalaya mine.  The Eocene-Oligocene Andahuaylas-Yauri strip is located 250 to 300 kilometres west of the current Peru-Chile Trench, above a thick cap of sialic crust (50 to 60 kilometres), in a transitory zone between the flat subduction slab of central Peru and the

26

normal subduction of southern Peru and northern Chile and immediately to the southeast of the Abancay deflection.  It consists geologically of a thick cretaceous sedimentary sequence folded during the Andean deformations and widely intruded by stocks, sills and dykes of Andahuaylas-Yauri batholith, covered by Cenozoic lacustrine and volcanic deposits and quaternary deposits.

The copper mineralization at Antapaccay is mainly contained in intermediate intrusive rocks with dissemination, veinlets, hydrothermal breccias which are in contact with pre-mineral rocks such as diorites and sedimentary rocks (limestones, calcareous shales, siltstones and sandstones), forming contact mineralized breccias, exoskarn and stockwork in sedimentary bodies with a clear predominance of chalcopyrite over bornite up to 350 metres; the roles reverse at a greater depth and are associated with a level of anhydrite-gypsum.

The dominant mineralization within the porphyry is chalcopyrite, followed by bornite and chalcocite.  Mineralization consists of both disseminations and veinlets, with the highest grades of gold corresponding to intense bornite rich stockwork zones.  The dominant alteration type within the porphyry is a potassic alteration of the host diorite. The porphyry is also in contact with cretaceous sedimentary rocks, which have formed irregular skarn (limestones) and stockwork (hornfels and quartzites) containing high copper values, but represent a minor component of all the resources.

The conditions for the occurrence of a metasomatic process exist in contact with limestones, generating irregular garnet-magnetite +/-pyroxene exoskarn, mainly with chalcopyrite patches.  Extensive areas of intense grey quartz veinlet stockwork with a high bornite and chalcopyrite content were identified always near the hornfels-intrusive rock contact, expanding into the hornfels for several metres.

Coroccohuayco

The main copper bearing minerals at Coroccohuayco are bornite, chalcopyrite and chalcocite, with the host rock consisting of Cretaceous sedimentary rocks of the Ferrobamba and Mara formation intruded by monzonitic plutons of the Eocene—Oligocene Andahuaylas—Yauri batholiths. The Coroccohuayco deposit is dominantly a skarn-hosted deposit, whereas the Antapaccay deposit is dominantly porphyry-hosted.

Exploration

General geological techniques utilized at the Antapaccay project include geological mapping, soil geochemistry, geophysical studies (magnetic and induced polarization), cartography, diamond drilling, sampling and interpretation.  In addition, up-to-date aerial photographs of the project have been collected to generate digital topographical reliefs to 5 metres.  Exploration work undertaken to date indicates the potential for additional copper discoveries within the CM Antapaccay property area.

Drilling

Antapaccay

The Antapaccay resource model is updated on an annual basis to incorporate new available drilling data and improved understanding of the orebody.  The orebody model and Mineral Resource estimate for 2019 was updated using a drill hole database that now includes over 329,494m  and 982 drill holes.

The 2019 infill drilling programme completed 40,254m in 115 holes and mainly focussed on increasing the density of drilling. This resulted in an increase in Indicated Resources and confirmed continuity of the orebody at depth.

Coroccohuayco

The orebody model and Mineral Resource estimate for Coroccohuayco was updated in 2018 using a database that now includes over 245,849m of total drilling data.

Sampling, Analysis and Data Verification

Samples of diamond drill hole cores were collected in carton boxes in the drilling area and the logging area to record geological, geo-mechanical and geotechnical data and to be photographed.  Sampling intervals of 2, 2.5 and 3 metres were predominantly used, and 2-metre intervals were standard for mineralized rocks. Samples were sent to the Tintaya sampling area for preparation in accordance with standard protocols. The remaining materials, being half core samples and coarse and fine pulps, were stored in the enclosed areas located at the Tintaya camp.

Drill core sampling methodology for Antapaccay drilling campaigns followed a standardized procedure for copper. The drill core was split in half, respecting the distribution of the mineralization indicated by the logging geologist, and the sample was then reduced by up to 90% of its size with progressively smaller meshes (down to 2 millimetre sieve size). The sample was then reduced with a Jones Riffle quarterer, obtaining 2 kilograms of sample, which was bagged to be kept in the respective file. The rest of the sample was quartered to obtain four 0.5 kilogram samples, which were then dried and pulverized up to 95% of their size with a #140 mesh (0.106 millimetre sieve size). The pulverized samples were put in jars and placed in a homogenizer for 5 minutes and then placed in envelopes, with one envelope sent to the laboratory and the remaining 3 envelopes stored for future requirements. A duplicate was taken every 20 intervals of samples with copper grading more than 0.30%. Upon

27

obtaining 30 samples, the samples were re-encoded and sent to the same laboratory. Standard samples were placed at intervals indicated by CM Antapaccay geologists.

For all drilling programs run by CM Antapaccay, sample preparation, assaying, analytical and quality control procedures have followed acceptable industry standard practices. Current quality control of the chemical analysis procedures include, standard sample preparation of low, middle and high grade material from the deposit, fine white sample preparation, protocols for blast holes, drill holes, specific gravity for diamond drill programs, and a general quality assurance and quality control (“QA/QC”) program, based on the latest developments in the industry.

Mineral Processing and Metallurgical Testing

Extensive metallurgical test work and studies have been completed on Antapaccay ore, both prior to the construction of the Antapaccay plant and since commissioning in 2012.  The work was completed by a number of reputable engineering and metallurgical laboratories.

Mineral Resource and Mineral Reserve Estimates

The Mineral Resources for the Antapaccay project were estimated from core drilling information and were evaluated using standard geological and geostatistical block modelling methodologies. The primary estimation methodology was Ordinary Kriging. The Mineral Reserve estimate is based on a mine plan and open pit designs developed using modifying parameters including metal prices, metal recovery, operating costs and sustaining capital cost estimates based on the production schedule and equipment requirements.

The Mineral Reserves and Mineral Resources for the Antapaccay, Tintaya Expansion and Coroccohuayco deposits are as follows:

 

 

 

 

 

 

 

 

 

Mineral Reserve Statement as of December 31, 2019

 

 

 

 

 

    

 

    

Proved Ore Reserves

    

Probable Ore Reserves

    

Total Ore Reserves

Antapaccay OC

 

Ore (Mt)

 

210

 

267

 

477

 

 

Copper (%)

 

0.49

 

0.41

 

0.45

 

 

Gold (g/t)

 

0.09

 

0.08

 

0.08

 

 

Silver (g/t)

 

1.29

 

1.14

 

1.21

Tintaya Expansion OC

 

Ore (Mt)

 

 3

 

 2

 

 5

 

 

Copper (%)

 

0.89

 

0.86

 

0.88

 

 

Gold (g/t)

 

0.03

 

0.02

 

0.03

 

 

Silver (g/t)

 

5.22

 

3.84

 

4.78

Coroccohuayco OC

 

Ore (Mt)

 

22

 

41

 

63

 

 

Copper (%)

 

0.75

 

0.56

 

0.63

 

 

Gold (g/t)

 

0.08

 

0.06

 

0.07

 

 

Silver (g/t)

 

2.75

 

1.57

 

1.98

Coroccohuayco UG

 

Ore (Mt)

 

 9

 

112

 

121

 

 

Copper (%)

 

0.82

 

1.25

 

1.22

 

 

Gold (g/t)

 

0.09

 

0.12

 

0.12

 

 

Silver (g/t)

 

3.02

 

3.93

 

3.86

 

 

 

 

 

 

 

 

 

 

 

 

Mineral Resource Statement as of December 31, 2019

 

 

 

 

 

 

 

    

 

    

Measured Mineral

    

Indicated Mineral

    

Measured and Indicated

    

Inferred Mineral

 

 

 

 

Resources

 

Resources

 

Mineral Resources

 

Resources

Antapaccay OC

 

Ore (Mt)

 

218

 

432

 

650

 

119

 

 

Copper (%)

 

0.49

 

0.39

 

0.42

 

0.30

 

 

Gold (g/t)

 

0.10

 

0.08

 

0.09

 

0.05

 

 

Silver (g/t)

 

1.30

 

1.10

 

1.17

 

0.67

Tintaya Expansion OC

 

Ore (Mt)

 

 3

 

 2

 

 5

 

 1

 

 

Copper (%)

 

0.89

 

0.86

 

0.88

 

0.20

 

 

Gold (g/t)

 

0.03

 

0.02

 

0.03

 

 —

 

 

Silver (g/t)

 

5.23

 

3.88

 

4.80

 

0.02

Coroccohuayco OC/UG

 

Ore (Mt)

 

42

 

248

 

290

 

12

 

 

Copper (%)

 

0.97

 

1.25

 

1.21

 

1.13

 

 

Gold (g/t)

 

0.11

 

0.14

 

0.14

 

0.19

 

 

Silver (g/t)

 

3.83

 

4.56

 

4.45

 

2.99

Notes:

(1)

Source: Glencore Statement of Resources & Reserves as at December 31, 2019. Mineral Resources and Mineral Reserves are reported in accordance with the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code).

(2)

Columns and rows may not add up due to rounding.

(3)

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

28

(4)

Commodity prices and exchange rates used to establish the economic viability of Mineral Reserves are based on long term forecasts applied at the time the Mineral Reserve was estimated.

(5)

Mineral Resources and Mineral Reserves for Antapaccay were estimated using the economic best destination concept and consider 0.1% Cu as minimum recoverable head grade to plant which considers the valuation of Cu, Au and Ag. Mineral Reserves are then derived from Measured and Indicated Resources after applying economical and technical modifying factors. Mineral Resources and Mineral Reserves for the Coroccohuayco deposit are reported on an economic cut off grade of 0.40% Cu for underground Mineral Resources and 0.49% Cu for underground Mineral Reserves, and cut off grade for open pit Mineral Resources and Mineral Reserves is 0.2% Cu.

The Lerchs-Grossman pit optimization method was used to determine the economic pit shell for Measured, Indicated and Inferred Mineral Resources.  This method was selected over the floating cone since it provides for improved optimization for discontinuous orebodies in which a mineral area may share some waste material extraction expenses.  This situation exists at Antapaccay with the monzonitic porphyry that has a prophylitical alteration and the waste rock area between the North and South pits, separating part of the orebody.

The calculated profit values per block were directly used in the Lerchs-Grossman process for the required economic data. The inter-ramp slope angles recommended by engineering consultants and metallurgical recovery were used to control the walls during the optimization process. The Lerchs-Grossman algorithm finds the most profitable pit surface based on the three-dimensional graph theory, block-by-block economic values and pit slope data.

The resulting life of mine plan and Mineral Reserve estimates consider only Measured and Indicated Mineral Resources, with all Inferred Mineral Resources within the design pit being treated as waste.

The underground Mineral Reserve estimate is based on mine plans and designs using modifying parameters including mining recovery and dilution applied to Measured and Indicated Mineral Resources.

Mining Operations

The Antapaccay mine is an open pit mine (consisting of a North pit and a South pit) with truck and shovel operations that provide a total annual material handling capacity of approximately 165 million tonnes of material. Major equipment includes a fleet of owner-operated 400 short ton class trucks, 48 cubic metre and 35 cubic metre rope shovels, dozers and loaders, as well as support equipment. Ore is mined and sent to the primary crusher located at the mine and the crushed ore is subsequently transported to the coarse ore stockpile by an overland conveyor of approximately 6.8 kilometres. The feeders at the coarse ore stockpile convey the crushed ore to the Antapaccay plant for processing. A portion of the material from the coarse ore stockpile is currently transported to the Tintaya plant using mining trucks pending completion of an overland conveyor to fulfill this purpose.

The Antapaccay metallurgical plant consists of a semi-autogenous grinding mill and two ball mills to prepare feed for a conventional flotation circuit to recover the copper, gold and silver contained in the feed ore into a copper concentrate.  The Tintaya metallurgical plant consists of multi-stage crushing followed by ball-milling to prepare feed for a conventional flotation circuit to recover the copper, gold and silver contained in the feed ore into a copper concentrate.  The nominal throughput of the Antapaccay and Tintaya plants are currently approximately 85,000 and 20,000 tonnes per day, respectively. The copper concentrate produced from both processing plants is thickened and filtered on site prior to being trucked approximately 355 kilometres to port facilities at the Port of Matarani, operated by TISUR, for shipment to smelters. The road from Tintaya to the port has been expanded to accommodate the shipment of concentrates originating from the Antapaccay project.

Flotation tailings are thickened and delivered to the Tintaya open pit for disposal.  The fully-permitted tailings dam storage capacity is sufficient for the current Antapaccay life of mine plan and options to increase height for extended capacity are being studied.

The last five years of production (metal in concentrates) from Antapaccay is shown in the table below:

 

 

 

 

 

 

 

 

 

Metal Produced in Concentrates

 

 

Cu

    

Au

    

Ag

 

    

(kt)

 

(koz)

 

(koz)

2015

 

202

 

122

 

1,315

2016

 

220

 

115

 

1,536

2017

 

207

 

139

 

1,455

2018

 

205

 

132

 

1,523

2019

 

197

 

85

 

1,576

 

The current life of mine plan contemplates that the Antapaccay mine will operate for 11 years ending in 2030, with ore processed through the Tintaya and Antapaccay plants, and includes the Tintaya pit expansion.  There is the potential to extend the mine life beyond 2030 through additional exploration on the CM Antapaccay property and the development of the Coroccohuayco deposit.

The material produced from the Antapaccay project is marketable in the main international concentrate markets based on its specifications.  Payments made to CM Antapaccay are based on the copper, gold and silver contained in concentrates typical for the international concentrate markets.

29

Infrastructure, Permitting and Compliance Activities

Power for the Antapaccay project is supplied from the Peru national energy grid through an electrical substation constructed at Tintaya.  Water consumption is primarily sourced from recycled water from the tailings facility, and the balance of the project’s water requirements are sourced from the Salado River. The Antapaccay project currently has water rights which are sufficient for its requirements and is a zero discharge site.

CM Antapaccay holds all of the permits that are material to the Antapaccay operations, operating permits are valid until the end of the life of the mine and a closure plan complying with Peruvian law has been approved by the relevant authorities. Included in the closure plan are details for facility dismantling, demolition, post-closure stability and long term maintenance, including socio-economic support, reclamation, schedules and financial provisions.

Capital and Operating Costs

The main capital expenditure for 2020 is sustaining capital costs.

The Antapaccay project is a low cost copper project.  Fluctuations in the cash operating costs are largely driven by the changes in the copper head grade in the open pit over the life of mine.

Exploration and Development

Ongoing drilling campaigns are planned to further define the lithology of the resource at depth and for exploratory drilling.  Beyond the estimated Mineral Resources and Mineral Reserves of Antapaccay and Coroccohuayco, there are a number of regional targets and prospects for exploration across the 99,766 hectares of concessions held by CM Antapaccay.

30

CANDELARIA MINING AND TECHNICAL INFORMATION

Property Description, Location and Access

The Candelaria Copper Mining Complex comprises two adjacent copper mining operations, Compañia Contractual Minera Candelaria (“Minera Candelaria”) and Compañia Contractual Minera Ojos del Salado (“Minera Ojos del Salado”), that produce copper concentrates from open pit and underground mines. Minera Candelaria is an open pit and underground mine (“Candelaria Underground”) providing copper ore to an on-site concentrator with a nominal processing capacity of 75,000 tonnes per day, and Minera Ojos del Salado comprises two underground mines: Santos and Alcaparrosa. The Santos mine provides copper ore to an on-site concentrator with a capacity of 3,800 tonnes per day, while ore from the Alcaparrosa mine is treated at the Minera Candelaria processing plant. The Candelaria Copper Mining Complex is indirectly owned by Lundin Mining Corporation (“Lundin Mining”) (80%) and Sumitomo Corporation (“Sumitomo”) (20%).

Candelaria Copper Mining Complex is located in Chile’s Atacama Region, at an elevation of approximately 650 metres above sea level, 20 kilometres south of the city of Copiapó and 650 kilometres north of Santiago. The properties are easily accessed using the public road system. Employees and contractors come primarily from the Copiapó region. Copiapó is a modern city with all regular services and a population of approximately 160,000.  The regional Atacama airport is serviced by daily commercial flights from Santiago and other destinations.

The mineral concentrate products from the two processing plants are transported by road to either a  domestic smelter in Chile or to Candelaria’s concentrate storage facility and marine terminal at Punta Padrones, located approximately 110 km from the mining complex on the Pacific coast and adjacent to the community of Caldera. Punta Padrones is also the site of a desalination plant that Minera Candelaria built in 2013, that supplies process water to Candelaria via a dedicated pipeline.

As of March 2019, the Minera Candelaria property comprised  210 mining exploitation concessions (approximately 5,991 ha) and 32 mining exploration concessions (approximately 6,680 ha) and the Minera Ojos del Salado property comprised 195 mining exploitation concessions (approximately 9,287 ha) and 57 mining exploration concessions (approximately 10,748 ha). The tenements are free of mortgages, encumbrances, prohibitions, injunctions, and litigation. The tenements containing the active and future mining activities are not affected by royalties.

Exploration concessions have a duration of two years and the titleholder must pay a fee of approximately $1.60 per hectare to the Chilean Treasury. At the end of this period, they may: (i) be renewed as an exploration concession for two additional years in which case at least 50% of the surface area must be renounced, or (ii) be converted, totally or partially, into exploitation concessions. Exploitation concessions are of indefinite duration and an annual fee is payable to the Chilean Treasury of approximately $8 per hectare.

History

The Candelaria sulphide deposit was discovered by Phelps Dodge Corporation (“Phelps Dodge”) in 1987. A feasibility study was completed in 1990 and, following approval by the Chilean government, construction started in October of 1992. Sumitomo acquired a 20% stake in the property in 1992. Production commenced in early 1995.

In 2007, property ownership changed when Freeport-McMoRan Inc. (“Freeport”) acquired Phelps Dodge.

During 2011, a pipeline was completed to bring water from a nearby sewage treatment facility to the Candelaria Copper Mining Complex. A desalination plant at the port of Caldera was built and commissioned in 2013 at a capacity of 500 litres per second.

The Santos underground mine has been in production since 1929, with processing taking place at what is now called the Pedro Aguirre Cerda (“PAC”) plant. Phelps Dodge became sole owner of Minera Ojos del Salado and the Santos mine and the PAC plant in 1985. The PAC plant has been expanded several times to its current capacity of 3,800 tonnes per day. Sumitomo acquired its 20% interest in Minera Ojos del Salado in 2005.

In early 1996, production from the Alcaparrosa underground mine commenced.

In November 2014, Lundin Mining acquired Freeport’s interest in the Candelaria Copper Mining Complex.

In 2015, the Candelaria 2030 project, including the new Los Diques tailings management facility, received environmental approval from Chilean regulators. Construction of Los Diques commenced in 2016 after the receipt of the major construction permits. Construction continued throughout 2017 and first tailings were placed during the first quarter 2018.

During 2018, exploration success led to the first declaration of Mineral Resource and Mineral Reserves on the Española open pit project.

Candelaria Copper Mining Complex has been a significant producer of copper since the mid-1990s. In the last four years, annual contained copper and gold metal in concentrates has averaged approximately 174 kilotonnes and 100,000 ounces respectively.

31

Geological Setting, Mineralization and Deposit Type

The Candelaria sulphide deposit is located at the boundary between the Coastal Cordillera and the Copiapó Precordillera. The Coastal Cordillera of Chañaral and Copiapó is composed of Permian to Lower Cretaceous intrusions within a basement of metasedimentary rocks of Devonian to Carboniferous age. Volcanic, volcaniclastic, and marine carbonate rocks represent intra- and back-arc sequences that were deposited during early to mid-Cretaceous period.

The Candelaria, Santos, and Alcaparrosa mines are located in the district of Punta del Cobre. The polymetallic sulphide deposits are hosted in volcanic rocks of the Punta del Cobre Formation. Polymetallic sulphide deposits in the Punta del Cobre district are located to the east of the main branches of the Atacama fault zone, a subduction-linked strike-slip fault system stretching over 1,000 kilometres along the Chilean coast and active at least since the Jurassic period. The dominant structural elements of the Punta del Cobre area are the northeast-trending Tierra Amarilla Anticlinorium, a southeast verging fold-and-thrust system, and a series of north-northwest to northwest-trending high-angle faults.

The copper-gold sulphide mineralization found at the Candelaria Copper Mining Complex, which is generally referred to as iron oxide copper gold (“IOCG”) mineralization, is located within the thermal aureole of the Lower Cretaceous magmatic arc plutonic suite in the Candelaria-Punta del Cobre district. Depending on lithology and the structural setting, the polymetallic sulphide mineralization can occur as veins, hydrothermal breccias, replacement mantos, and calcic skarns within andesite and tuff units. There are also some localized controls to mineralization in the form of faults, breccias, veins, and foliation. Candelaria has become an exploration model for Andean-type IOCG deposits that display close relationships to the plutonic complexes and broadly coeval fault systems.

The main mineralized body at the Candelaria mine is up to 400 m thick in its central part and thins towards the edges. In east-west sections, the mineralization has a lenticular, downward concave shape with a steep eastern limb and a shallowly dipping western limb. The shape of the mineralized body in north-south section is irregular. In plan view, the extent of the mineralization is approximately 1,400 m by 2,400 m. The mineralized body was folded after its formation. The north-northeast-trending fold axis corresponds to the Tierra Amarilla Anticline.

In the Santos mine, three styles of mineralized bodies are observed: veins, mantos, and breccia bodies. An important vein in the Santos mine is the Isabel Vein, which has a northwest striking orientation, and extends over 1 km in length and between 4 and 30 m in width. Manto-type mineralization occurs as tabular bodies located at two sedimentary horizons located in the floor and roof of the albitophyre. The manto mineralization is characterized by variable iron contents with magnetite common in the north and deeper areas, and specular hematite in the south. Mineralization occurs within breccia bodies which are typically contained with the albitoforo and lower andesite and is formed by steeply west-dipping and north-northwest to northwest-striking bodies.

Mineralization at the Alcaparrosa mine principally occurs as mantos that trend to the northeast and dip to the west. Ore mineralogy consists of chalcopyrite, pyrite, and magnetite, with trace pyrrhotite, molybdenite, and arsenopyrite. Mineralization at the Alcaparrosa mine also occurs as veinlets defining dense stockwork, breccias as well as fine dissemination in biotite meta-andesites. High-grade bodies are also found in massive veins striking north-northwest, north, and east.

In the Española project area, mineralization occurs within mantos hosted mainly in a brown garnet skarn, and in lesser proportions within silica hornfels. Chalcopyrite is the primary copper sulphide mineral found as clusters and in disseminated form, commonly associated with brown garnet porphyroblasts. Near the surface and down to a depth of approximately 70 m, the mineralization is oxidized, characterized by the presence of chrysocolla, malachite, native copper, diogenite and bornite.

Exploration

Ongoing exploration is conducted at the Candelaria Copper Mining Complex with the primary purpose of supporting mining and increasing estimated Mineral Resources and Mineral Reserves. Exploration is focused on the known mantos, veins, and breccia masses in proximity to existing underground infrastructure. Historically, this strategy has proven very effective in defining new estimated Mineral Resources and Mineral Reserves available for underground mining. Much of the exploration is conducted from underground, requiring significant underground development to provide adequate drilling stations. Regional exploration is also undertaken on the large properties surrounding the mines to identify targets and define new areas with Mineral Resource potential. All existing exploration information is compiled into a comprehensive 3D model to allow for evaluation and prioritization of exploration efforts.

From 2010 to December 2018, more than US$229 million was invested in exploration in proximity to the Candelaria open pit, the Española project area, and at the three underground mines. This exploration has resulted in a significant expansion of the Mineral Resource and Mineral Reserve estimates of the underground mines and contributed to an extended mine life for the Candelaria Copper Mining Complex.

Drilling

Mineral Resources are estimated from information obtained from surface and underground boreholes. In 2018, 21 diamond drill holes were drilled in and around the Candelaria open pit mine. In the Santos and Alcaparrosa mines, 87 and 86 diamond

32

drill holes were drilled respectively, and 176 holes were drilled in Candelaria Underground (North and South Sectors). There were also 85 brownfield exploration holes drilled in the district during 2018 with 77 of those in the Espanola project area. Up to 15 drill rigs were employed during 2018 and a total of 127,794 m was drilled. Drilling information for the 2019 calendar year was not publicly available as of the effective date of this AIF.

The drilling and sampling procedures used are consistent with generally recognized industry best practices.

Sampling, Analysis and Data Verification

Analytical samples informing the Candelaria open pit Mineral Resources were prepared and assayed at the Candelaria mine site. Analytical samples informing the Ojos del Salado Mineral Resource estimates were prepared and assayed by Intertek (formerly Vigalab) in Paipote, Chile, an independent laboratory. Minera Candelaria uses Intertek in Paipote as an umpire laboratory. Assays are conducted for copper, silver, gold, zinc and iron. Specific gravity is measured systematically over the full sample intervals. The results of the drill program are described in the Candelaria Technical report.

All drilling assay samples are collected by a contractor under the direct supervision of a mine geologist. Samples from Candelaria are processed and analyzed entirely at the mine site. Samples from Ojos del Salado are shipped directly from the property to the Intertek laboratory in Paipote. In each case, established procedures were used to ensure the security of samples during transportation between the drill rig and the laboratories. Quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling conform to industry accepted quality control methods.

The analytical quality control program implemented at Candelaria and Ojos del Salado includes the use of control samples (coarse and pulp duplicate samples and reference material samples) inserted within all batches submitted for assaying.

Since 2016, exploration data are managed through an AcQuire database, which includes quality control management features for sample coordinates from borehole surveys and data management tools. Sample numbering and labelling is controlled through AcQuire, including insertion of quality control samples and consignment notes to the primary laboratories. Analytical results are received electronically and managed through AcQuire with quality control filters. Samples outside defined limits are rejected by AcQuire and flagged for further investigation. The AcQuire system includes features for reporting analytical results and preparing bias charts and time series plots.

Mineral Processing and Metallurgical Testing

The Candelaria Copper Mining Complex maintains regular metallurgical testing programs that are incorporated with historical testing results and mill performance into a statistical model to predict and improve the complex’s processing performance in terms of mill throughput, metal recovery to concentrate, and final concentrate grade. Metallurgical tests are executed in a number of specialized in-house and commercial facilities. Testing includes rock hardness classification, mineralogy using QEMSCANTM technology and bench scale flotation testing that is correlated with industrial scale performance in order to predict mill throughput and metallurgical performance. A similar but less intense program is underway for the PAC plant.

New metallurgical tests were initiated in late 2016 as part of a feasibility study to evaluate potential throughput increases at the Candelaria mill. The material tested was a blend of ore considered representative of future feedstock. Testwork included SAG and ball mill pilot testing, specific SAG design tests, bench scale flotation kinetic modelling and automated scanning electron microscopy. Results and analysis from this testwork programme were evaluated using the Ausenco Ausgrind methodology to improve confidence in the estimated throughput for the Life of Mine plan.

In parallel with the mill expansion study, a number of process initiatives have commenced focusing on debottlenecking and improving the existing facilities. As a part of these initiatives, further variability testwork programs were initiated. The Mine-to-Mill study is evaluating potential improvements in primary crusher feed size from blasting (both underground and the open pit) and the effect on overall comminution specific energy. This is combined with a geo-metallurgical initiative to characterize different geological zones, adding to the existing database and incorporating more underground sections. The Candelaria Mill optimization project includes upgrades in grinding, classification and flotation circuit capacity. The anticipated improvement in copper recovery will substantially address the shortfalls associated with previous expansions in plant throughput.

Mineral Resource and Mineral Reserve Estimates

The Mineral Resources at the Candelaria Copper Mining Complex are estimated from core drilling information stored in a secure central database and were evaluated using a geostatistical block modelling approach. Separate Mineral Resource models were prepared for the areas comprising the Candelaria Open Pit mine and Española open pit project and the three underground mines (Candelaria Underground (North and South Sectors),  Santos, and Alcaparrosa) using slightly different methodologies and assumptions. The block models comprising the Candelaria Underground, Santos and Alcaparrosa underground deposits have been integrated since 2017. 

The open pit Mineral Reserve estimates for both Candelaria and Española are based on a mine plan and open pit designs developed using modifying parameters including metal prices, metal recovery based on performance of the processing plant,

33

actual operating and sustaining capital cost estimates based on the production schedule and equipment requirements. Open pit optimizations are carried out using Minesight® and Datamine software.

Underground Mineral Reserve estimates at Candelaria Underground (North and South Sectors), Alcaparrosa and Santos are based on mine plans and designs developed using modifying parameters including metal prices, metal recovery based on performance of the processing plant, actual operating and sustaining capital cost estimates based on the production schedule and equipment requirements. Stope layouts and development plans are developed in MineSight® software with CAE Mine Stope Optimizer used for stope design.

Factors which may affect the Mineral Resources and Mineral Reserve estimates include: dilution and mining recovery, metal prices, smelter, refining and shipping terms, metallurgical performance, geotechnical characteristics of the rock mass, capital and operating cost estimates, and the likelihood of obtaining land title, required permits and environmental, social and legal licenses.

Details of the June 30, 2019 Mineral Resource and Mineral Reserve estimate for the Candelaria Copper Mining Complex are set forth below:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Consolidated Mineral Resource Statement as of June 30, 2019 (100% Basis)*

 

 

 

 

 

 

 

 

 

 

 

 

 

Classification

 

Quantity

 

Cu

 

Au

 

Ag

 

Cu

 

Au

 

Ag

 

 

 

 

‘000 t

 

%

 

g/t

 

g/t

 

‘000 t

 

Moz

 

Moz

Candelaria Open Pit

    

Measured

    

444,447

    

0.5

    

0.1

    

 2

    

2,091

    

1.6

    

23

 

 

Measured Stockpile

 

72,888

 

0.3

 

0.1

 

 1

 

234

 

0.2

 

 3

 

 

Indicated

 

35,722

 

0.3

 

0.1

 

 1

 

121

 

0.1

 

 2

 

 

Inferred

 

5,274

 

0.2

 

0.1

 

 1

 

13

 

 —

 

 —

Candelaria La Espanola

 

Measured

 

35,474

 

0.4

 

0.1

 

 —

 

147

 

0.1

 

 —

 

 

Indicated

 

37,598

 

0.4

 

0.1

 

 —

 

148

 

0.1

 

 —

 

 

Inferred

 

15,985

 

0.4

 

0.1

 

 —

 

63

 

 —

 

 —

Underground

 

Measured

 

212,709

 

1.1

 

0.2

 

 3

 

2,236

 

1.7

 

24

 

 

Measured Stockpile

 

34

 

1.0

 

0.2

 

 2

 

 —

 

 —

 

 —

 

 

Indicated

 

159,762

 

1.0

 

0.2

 

 3

 

1,519

 

1.1

 

14

 

 

Inferred

 

46,096

 

1.0

 

0.2

 

 2

 

458

 

0.3

 

 4

 

*     Reported within the boundaries of the Compañia Contractual Minera Candelaria and Compañia Contractual Ojos del Salado properties. Mineral Resources are not Mineral Reserves and have not demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimates. Mineral Resources include Mineral Reserves. Open pit Mineral Resources are reported at a cut-off grade of 0.15 percent copper for the Candelaria Open Pit and 0.20 percent copper for the Española project, within conceptual pit shells based on metal prices of US$3.16 per pound of copper and US$1,000 per ounce of gold and current topography. Underground Mineral Resources are reported at a cut-off grade of 0.55 percent copper. Franco-Nevada’s stream covers only Lundin’s 80% indirect interest in the Candelaria Copper Mining Complex.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Consolidated Mineral Reserve Statement as of June 30, 2019 (100% Basis)*

 

 

 

 

 

 

 

 

 

 

 

 

 

Classification

 

Quantity

 

Cu

 

Au

 

Ag

 

Cu

 

Au

 

Ag

 

 

 

 

‘000 t

 

%

 

g/t

 

g/t

 

‘000 t

 

Moz

 

Moz

Candelaria Open Pit

    

Proven

    

365,434

 

0.5

 

0.1

 

 2

 

1,816

 

1.4

 

19

 

 

Proven Stockpile    

 

72,888

 

0.3

 

0.1

 

 1

 

234

 

0.2

 

 3

 

 

Probable

 

21,318

 

0.3

 

0.1

 

 1

 

67

 

0.1

 

 1

 

 

Total

 

459,639

 

0.5

 

0.1

 

 2

 

2,116

 

1.6

 

23

Candelaria La Espanola

 

Proven

 

32,308

 

0.4

 

0.1

 

 —

 

135

 

0.1

 

 —

 

 

Probable

 

23,511

 

0.4

 

0.1

 

 —

 

95

 

0.1

 

 —

 

 

Total

 

55,818

 

0.4

 

0.1

 

 —

 

230

 

0.2

 

 1

Underground

 

Proven

 

80,021

 

0.9

 

0.2

 

 3

 

713

 

0.5

 

 8

 

 

Proven Stockpile

 

34

 

1.0

 

0.2

 

 2

 

 —

 

 —

 

 —

 

 

Probable

 

68,184

 

0.8

 

0.2

 

 3

 

545

 

0.4

 

 6

 

 

Total

 

148,239

 

0.8

 

0.2

 

 3

 

1,257

 

0.9

 

14

 

*     Mineral Reserves included in Mineral Resources. Mineral Reserves have been prepared using metal prices of US$2.75 per pound of copper, US$900 per ounce of gold. All figures have been rounded to reflect the relative accuracy of the estimates. Mineral Reserves for the Candelaria Open Pit, Espanola Open Pit and underground for the Candelaria property are estimated at cut-off grades of 0.17 percent copper, 0.20 percent copper and  0.57 percent copper respectively. Underground Mineral Reserves for Santos and Alcaparrosa mines are both estimated at cut-off grades of 0.63 percent copper.

Mining Operations

The Candelaria and Española open pits will operate with an overall mining rate of approximately 310,000 tonnes per day for the next ten years. As the final waste stripping is completed, the overall mining rate will decline. A stockpile strategy has been developed to maximize the grade of material going to the processing facility. Direct milling ore will average 0.59% Cu from Candelaria and 0.43% Cu from Española.  Lower grade stockpile ore will be recovered to meet the plant capacity as required.  The mine operates five electric shovels, approximately forty haulage trucks, eight production drills, and a fleet of support equipment. A major mine equipment re-capitalization programme is substantially complete and has seen the existing rope shovels replaced with new hydraulic units and the majority of the truck fleet changed for latest generation Cat 793F trucks. Similar upgrades and replacements have been completed to the mine’s service and ancillary vehicle fleet.

34

The Candelaria open pit was designed to be mined in several phases of development. Five phases of development remain in the life-of-mine plan (Phases 9 to 13). The overall strip ratio is expected to be 2.45:1 including ore that is initially delivered to stockpiles. The total in-pit waste is 939.6 million tonnes and the life of mine of the open pit mine is 17 years. The Española total in-pit waste is 83.2 million tonnes and the overall life of mine estimated in 7 years.

Pre-production development of the Candelaria Underground South Sector was completed in the third quarter of 2019. Combined production from the Candelaria North and South Sector underground mines increased to 13,500 tonnes per day in the fourth quarter, approaching the 14,000 tonnes per day permitted. Studies completed to date show potential to add value in further expansion of the Candelaria underground mines and a feasibility study on expanding the underground mine has commenced. Baseline environmental data has been collected in support of an updated Environmental Impact Assessment which is to be submitted to the Chilean authorities in early 2020.

The Candelaria Underground (North and South Sectors) is planned to ramp up to a steady state of 14,000 ore tonnes per day by 2021. In both sectors, 60 tonne capacity underground trucks have been introduced to replace the existing contractor operated 30 tonne capacity fleet. The estimated average grade of the combined Candelaria underground mines is 0.85% Cu in the life of mine plan.

The Alcaparrosa underground mine produces 4,300 tonnes per day of ore and the average life of mine grade is 0.79 percent copper. The Santos mine produces 5,200 tonnes per day of ore with an average life of mine grade of 0.91% Cu.

The four underground mines utilize a sublevel stoping mining method for ore extraction. This method is ideal for relatively large, vertical, as well as thick deposits with favourable and stable host rock.

Processing and Recovery Operations

Minera Candelaria and Minera Ojos del Salado operate their own processing plants. The Candelaria processing plant receives ore from the open pit and Candelaria, Alcaparrosa and Santos underground mines. It has a nominal capacity of 75,000 tonnes per day. The PAC processing plant receives ore from the Santos underground mine and has a design capacity of 3,800 tonnes per day.

The Candelaria processing plant flowsheet is conventional comprising two parallel process lines for grinding and flotation followed by common final concentrate filtration and shipping of bulk copper concentrates. Run of mine ore is trucked to a primary gyratory crusher which then feeds a SAG grinding mill – ball mill circuit with pebble extraction and crushing. The secondary ball mill cyclone overflow constitutes feed to the rougher flotation bank. Rougher concentrate is reground prior to two stage cleaning in column flotation cells. Final flotation copper concentrate with gold and silver by-product metals is thickened, filtered, and stored on site. Final flotation tails are conventionally thickened and disposed in the Los Diques tailings storage facility. Typical metallurgical recoveries average 94% for copper, 75% for gold and 83% for silver.

The Candelaria Mill Optimization Project designed to increase throughput capacity, improve metal recoveries and reduce maintenance costs for the mill is progressing and now expected to be completed in the first quarter of 2020, corresponding with the expected timing of mill maintenance down-time to minimize disruption to production. Primary crusher re-powering is complete; three of the four ball mill motor replacements have been installed and installation of new cyclones is on-going. All remaining equipment to be installed is on site.

The PAC concentrator has been in operation since 1929. The PAC concentrator flowsheet comprises a conventional three stage crushing plant. The grinding circuit has three closed circuit ball mills operating in parallel. The ball mill cyclone overflow constitutes feed to the rougher flotation bank. Rougher concentrates are reground prior to cleaning in a column cell with the tailings scavenged with conventional mechanical flotation cells. Final concentrate is thickened and filtered using a ceramic disc filter. Plans are in place to extend the PAC tailings pipeline to Los Diques. Typical metallurgical recoveries average 94% for copper, 72% for gold and 72% for silver.

Copper concentrates containing precious metals are sold on contract to local smelters or trucked to the Punta Padrones port, near Caldera, for export to overseas smelters.

Candelaria Copper Mining Complex has an agreement with a third-party company to process Candelaria’s flotation tailings to produce a magnetite concentrate and this produces an additional source of by-product revenue subject to favourable iron ore prices.

Infrastructure, Permitting and Compliance Activities

The mines of the Candelaria Copper Mining Complex receive electrical power through long-term contracts with AES Gener S.A., a local energy company. The main water supply comes from a desalination plant, which was commissioned in 2013 and is located adjacent to the Punta Padrones port facility. Local treated sewage water is also used by the mines. Copper concentrate is shipped from the Punta Padrones port facility at the port of Caldera. Both the desalination plant and the Punta Padrones port are owned by Minera Candelaria.

35

The Candelaria tailings storage facility currently receives the flotation tails from the PAC processing plants. The remaining tailings storage capacity at the end of June 2018 was estimated at 16 million cubic metres including the additional storage obtained by a reduction in the freeboard from 5.0 to 1.5 metres that was permitted in 2016.  Plans are in place to extend the PAC tailings pipeline to Los Diques.

A new tailings storage facility, known as Los Diques, has been constructed to replace the original Candelaria tailings storage facility. The Los Diques facility is located to the southwest of the open pit and plant sites and has a designed capacity of approximately 600 million tonnes. The Los Diques tailings management facility was a key part of the Candelaria 2030 EIA that was submitted to the environmental authorities in September 2013 and was approved in July 2015. Engineering was completed during 2016, and after receipt of key sectorial permits, construction of the starter dam was initiated. During 2018, the initial construction and commissioning phases of the Los Diques tailings facility were completed and first tailings were placed. Los Diques can now receive the full flotation tailings from the Candelaria processing plant. Future phases of the Los Diques Main dam planned to start in 2019 have been initiated ahead of schedule, taking advantage of synergies with the project and the availability of mine waste from the open pit. This is expected to lead to capital cost savings on future embankment raises. 

Chile has established a comprehensive regulatory framework for mining and other industrial activities, dating from the mid-1990’s that has been updated several times since then. Although the Candelaria and Ojos de Salado facilities were permitted and developed prior to the modern framework being in place, both hold numerous environmental approvals stemming from modifications to the original developments and are compliant with current regulatory requirements. In addition, Minera Candelaria and Minera Ojos del Salado hold more than 1,000 permits for construction and operation of the mining and milling facilities, and related infrastructure.

The most recently completed major environmental assessment process was initiated in September 2013 with the submittal of the Candelaria 2030 EIA. This included, among other things, an extension of the operating life of the facilities and the Los Diques tailings storage facility.  The EIA received regulatory approval with conditions in July 2015. Following receipt of the necessary permits, the Company built and commissioned Los Diques, and received the final operating permit during 2018.

The Alcaparrosa mine received environmental approval in 1996 with subsequent amendments, most recently an EIA to support the extension of the mine operation through 2022. Candelaria is now preparing the next major environmental permitting exercise, which may include an extension to the mine life, expanded underground mining production, development of the La Española satellite deposit and other mine optimization initiatives. The new EIA is expected to be submitted in early 2020.

The Environmental Management Systems of Minera Candelaria and Minera Ojos del Salado have been certified for many years under the international ISO 14001 Standard. Minera Candelaria and Ojos del Salados’s re-certifications (completed in March 2018), are valid until March 2021.

In June 2018 Candelaria was notified of the rejection of an appeal in the Environmental Court filed in June 2017 in connection with alleged non-compliance with its environmental approvals. In July 2018, Candelaria paid a fine (5,049 annual tax units, equivalent to approximately US$4 million) and appealed to the Supreme Court (Corte Suprema). In March 2017, the SMA rejected a third-party claim related to the initial charges. The Candelaria Copper Mining Complex does not foresee any impact of this legal process on production.

Separate mine closure plans (“MCP”) are in place for Minera Candelaria and Minera Ojos del Salado and both have been approved by the Chilean National Geology and Mining Service (“SERNAGEOMIN”).

The approved closure cost estimates are $153.3 million for Minera Candelaria and $7.9 million for Minera Ojos del Salado.  The closure cost estimate for Minera Candelaria reflects the developments recently permitted under the Candelaria 2030 EIA, including the Los Diques tailings facility, and was approved in September 2018. The Ojos del Salado MCP does not include Alcaparrosa, which was recently re-approved to 2022.  The associated Alcaparrosa MCP update was submitted for regulatory review in December 2017 and was expected to be approved in 2019. The financial guarantees for both MCPs were updated.    

Social and Community

The social performance team engages with stakeholders in the communities nearest the mine and port facilities, namely Tierra Amarilla, Caldera and Copiapó. Outreach offices are located in each of these municipalities; engagement occurs throughout the year and is focused on managing social impacts, risks and opportunities specific to each community. The team bases its activities on a 5-year social performance strategic plan and systems which reflect best practice and international standards in stakeholder engagement, grievance procedures, risk management and community investment.

In 2018, Minera Candelaria dedicated over $8.3 million to strategic community investments focused on education, health services, housing, economic development and cultural heritage.  

36

Capital and Operating Costs

For 2019, the combined Candelaria Copper Mining Complex cash operating cost were US$1.54/lb and for 2020 the cash operating cost is forecast to be $1.45/lb.

Capital expenditure during 2019 was $367 million. Delivery of new open pit mine fleet equipment under the Mine Fleet Investment program is substantially complete, with 99% of the equipment received and placed into service. The final two pieces of equipment will be delivered in 2021 and 2022.  Forecast capital costs for Candelaria for 2020 is estimated at $265 million. Expenditure will continue on the new replacement open pit equipment fleet and on the mill optimisation project. Future lifts of the Los Diques TSF will continue to take advantage of synergies with the initial project and the availability of mines waste.

Lundin Mining capitalizes waste stripping costs when experienced strip ratios are above the average planned strip ratio for each open pit phase under development. During the production phase of the Candelaria open pit mine, waste stripping costs, which provide probable future economic benefits and improved access to the orebody are capitalized to mineral properties.

Exploration, Development, and Production

During 2019, exploration drilling was undertaken within the underground mines, on surface at La Española and strategically throughout the district. Total exploration expenditure for 2020 is estimated at $20 million.

The last five years of production of metal contained in concentrate from the Candelaria Complex is shown in the table below:

 

 

 

 

 

 

 

 

 

Metal Produced in Concentrates

 

    

Cu

    

Au

    

Ag

 

 

(kt)

 

(Koz)

 

(Moz)

2015

 

181

 

102

 

1.9

2016

 

166

 

97

 

1.7

2017

 

183

 

104

 

1.8

2018

 

134

 

78

 

1.2

2019

 

146

 

88

 

1.3

 

For 2020, forecast production is 165 - 175 thousand tonnes copper,  and 100 – 105 thousand ounces of gold. 

The current forecast LOM of the Candelaria open pit and stockpiles is to 2040, the Espanola open pit is to 2030 while the underground mines, Candelaria (North and South Sectors), Alcaparrosa and Santos, have LOM to 2037, 2027 and 2028, respectively.

37

COBRE PANAMA MINING AND TECHNICAL INFORMATION

Project Description, Location and Access

The Cobre Panama property is 120 kilometres west of Panama City and 25 kilometres from the Caribbean Sea coast, in the Donoso and Omar Torrijos Herrera Districts of Colon Province, in the Republic of Panama. Previously the Cobre Panama Project was located completely within the Donoso District however, following district realignment, the Project now lies partly within each of the amended Districts.

The Cobre Panama property consists of four concessions covering an area of 12,955.1 hectares.  There is no other industrial development in the area of the concessions and the region is sparsely populated. The primary occupation of the local residents is subsistence farming. The nearest community, the village of Coclecito (population 900), is 12 kilometres southeast of the plant site. The city of Penonomé, which has a population of 25,000, is 49 kilometres southeast of Coclecito.

Access to the Cobre Panama property is via the southern Pan-American Highway from Panama City to Penonomé, all-weather roads to La Pintad and then sealed roads from Coclecito to the mine site. Helicopter pads have been retained for occasional use and there is a runway at Coclecito however frequent thick cloud cover impedes aircraft visibility and therefore limits its availability.

The topography in the concession area is rugged with considerable local relief covered by dense forest. The area to the north is a lowland with minimal relief extending to the Caribbean coast. Climatic conditions are tropical with high precipitation levels, high humidity and relatively high temperatures year-round of 25 to 30 degrees Celsius.

On February 9, 1997, Minera Panama S.A., (“MPSA”) was granted the mineral concession to explore and exploit Cobre Panama under Contract Law No. 9 of February 26, 1997 (“Law 9”). The legal regime established by Law 9 for the development of the Cobre Panama concession is supplemented by the Mineral Resources Code of Panama (the “Panama Mining Code”).

On December 30, 2016 the Government of Panama signed and issued Resolution No. 128 by which it extended the Law 9 mining concession for a second 20 year term which commenced March 1, 2017 up to February 28, 2037. MPSA remains eligible for consideration of a third 20 year term of the Law 9 mining concession commencing March 1, 2037.

Under Law 9, MPSA has the rights to explore for, extract, exploit, beneficiate, process, refine, transport, sell and market the gold, copper and other mineral deposits on the Cobre Panama concession.  MPSA is required to pay a 2% royalty on “Negotiable Gross Production” which is defined as “the gross amount received from the buyer due to the sale (of concentrates) after deductions of all smelting costs, penalties and other deductions, and after deducting all transportation costs and insurance incurred in their transfer from the mine to the smelter” to the Government of Panama.  Law 9 also grants to MPSA rights of way on state-owned lands and easements to use surface lands on concessions adjacent to the Cobre Panama concession; the right to build, maintain and use such lands; and easements for use to build, install, maintain and use facilities and installations that MPSA deems convenient for the development of the Cobre Panama concession.

Corporate income tax under Law 9 is payable at a rate of 25% on taxable earnings which is exempted for the period during which MPSA has outstanding debt relating to the construction and development of the project.

In September 2018, First Quantum became aware of a ruling of the Supreme Court of Panama (“Supreme Court”) in relation to the constitutionality of Law 9. First Quantum understands that the ruling of the Supreme Court with respect to the constitutionality of Law 9 relates to the enactment of Law 9 and does not affect the legality of the MPSA mining concession contract itself, which remains in effect, and allows continuation of the development and operation of the Cobre Panama project by MPSA.

In respect of the Supreme Court ruling on Law 9, which remains subject to various procedural processes, First Quantum has noted that the ruling is not yet in effect and that the Supreme Court did not make a declaration as to the annulment of the MPSA mining concession contract. The Supreme Court decision was in respect of ongoing legal filings made since 2009 with regard to specific environmental petitions.

Subsequently, MPSA has submitted filings to the Supreme Court for a ruling, which it has accepted, prior to the ruling in relation to the constitutionality of Law 9 taking effect. On September 26, 2018, the Government of Panama issued a news release affirming support for Cobre Panama. The release confirmed that Ministry of Commerce and Industries, (the mining regulator in Panama), considers that the MPSA mining concession contract, and its extension, remains in effect in all its parts while the Company seeks to clarify the legal position.

The newly elected Government of Panama, inaugurated on July 1, 2019, has established a multidisciplinary high-level commission including the Minister of Commerce and Industries (mining regulator), Minister of Environment, and Minister of Employment to discuss the Law 9 matter and seek resolution. Based on support from the Government of Panama, the Chamber of Commerce and Industries of Panama, the Panamanian Mining Chamber, other Panamanian business and industry chambers and its legal advice, First Quantum has expressed confidence in resolving the Law 9 matter in the near-medium term.

38

History

In August 2012, MPSA entered into a precious metals stream agreement with a subsidiary of Franco-Nevada Corporation for the delivery of precious metals based on production of the Cobre Panama project, which was amended and restated on November 2, 2015 (the “PSA”).

In 2013, First Quantum acquired an indirect 80% interest in MPSA, which holds the Cobre Panama concession, through its acquisition of Inmet Mining Corporation (“Inmet”). At that time the remaining 20% interest in MPSA was held by KPMC, a 50/50 joint venture company whose ultimate shareholders were LS-Nikko Copper Inc. and KORES. In August 2017, First Quantum increased its effective ownership of MPSA to 90% by acquiring LS-Nikko’s 50% holding of KPMC which was payable in six installments over a five-year period.

On January 19, 2018, Franco-Nevada, through a wholly-owned subsidiary, entered into an amended and restated stream agreement with First Quantum and KORES which covers 100% of Cobre Panama.

Geological Setting and Mineralization

Mineralization at Cobre Panama consists of disseminated copper-gold-molybdenum deposits. Known geologically as porphyry copper deposits, these are typical of the Western Cordillera of the Americas and other regions around the Pacific Ocean basin.

The porphyry deposits occur at the southern margin of a large granodioritic batholith of mid-Oligocene age. The main deposits are Balboa, Botija, Colina and Valle Grande. There are also a number of smaller zones, the most significant being Brazo and Botija Abajo (collectively “BABR”) and Medio.

All of the porphyry style mineralization on the property is hosted in granodiorite, feldspar-quartz-hornblende porphyry and adjacent andesitic volcanic rocks. The porphyry at Balboa intruded passively toward the south from a source located northwest of the deposit and is also thought to be influenced by a high angle structure to the west of the deposit.

At Botija, a number of north dipping feldspar-quartz-hornblende dikes cut the granodiorite. Two roof pendants of andesitic volcanic rock occur in the central and eastern parts of the deposit. At Colina, mineralization is associated with an east-southeasterly trending, shallow north-dipping 2.5 kilometre by 1 kilometre feldspar-quartz-hornblende porphyry sill and dyke complex that intrudes granodiorite and andesitic volcanic rocks. The Valle Grande zone is associated with a southeast trending feldspar-quartz-hornblende porphyry lopolith that is bounded to the north and south by andesitic volcanics and minor granodioritic dykes. Mineralisation at Balboa is dominantly hosted by a feldspar-quartz-hornblende porphyry that intrudes the adjacent andesite. Medio is a low to moderate grade porphyry associated with silicified and sereticised porphyrytic intrusive rocks and brecciated andesite volcanics, and at Brazo and Botija Abajo mineralisation is primarily located within feldspar-quartz or feldspar-quartz-hornblende porphyry.

Hydrothermal alteration along the Cobre Panama mineral trend is primarily silica-chlorite which is interpreted to be a form of propylitic alteration. Potassic alteration, consisting of salmon coloured potassium feldspar and secondary biotite is seen in the central parts of Botija. Argillic and phyllic alteration is patchy in the three main deposits with the latter variety being most prevalent near the tops of the deposits. At Brazo, pervasive sericite, clay and pyrite is associated with well-developed quartz stockworks.

Hypogene sulphides occur as disseminations, micro-veinlets, fracture fillings and quartz-sulphide stockworks. Chalcopyrite is the dominant copper mineral with lesser bornite. Traces of molybdenite are commonly found in quartz veinlets. There is no significant zone of supergene enrichment at Botija, Colina and Valle Grande. At Brazo, supergene mineralization consisting of chalcocite-coated pyrite and rare native copper occurs to a depth of at least 150 metres.

Exploration and Drilling

During a regional survey in 1968, a United Nations Development Program team discovered copper, gold and molybdenum porphyry mineralization in the Petaquilla River region of north-central Panama. A total of 1,813 diamond drill holes totalling 348,775 metres have been drilled from discovery to February 2018.

Sampling, Analysis and Data Verification

Samples from MPSA drilling were placed within aluminum trays and dried in ovens. Once dry, the entire sample was crushed in a Rocklabs Boyd crusher, with sieve tests conducted regularly to ensure that the material was being crushed to the appropriate size. The equipment was cleaned after every sample using high-pressure air and after every tenth sample a coarse blank sample was passed through the crusher. The crushed sample material was split using a Jones rifle splitter and a 500 gram aliquot taken for assay. The aliquot was placed in a small plastic bag which was heat sealed and marked with a bar-coded sample tag. The reject material was returned to the original sample bag and stored on site.

The sample aliquots were shipped by air courier to ALS Chemex Lima in Lima, Peru, for analysis. Umpire assay checks and secondary assay work was conducted by Acme Santiago in Santiago, Chile. Both labs have ISO/IEC 17025-2005 certification. Residual pulps were stored at either ALS Chemex in Lima, Perú, or at a storage warehouse at First Quantum’s Minera Antares

39

office in Arequipa, Peru. Residual pulps were discarded after 3 years due to oxidation and a reduced ability to repeat the original assays. All MPSA drill core is however safely and securely stored in warehouses located on the Cobre Panama site.

All assay samples were kept in a locked facility on site until they were ready for shipment. Samples for a given hole were batched once the entire hole had been logged and sampled. Samples were collected into larger bags in batches of approximately 90 samples per bag. Samples to be assayed for sequential copper were batched into bags of 20 to 25 samples. Several times a week, the samples were dispatched by road to a secure warehouse in Penonomé by MPSA staff. While in storage, generally for less than two days, samples were kept under locked conditions until picked up by DHL cargo shipping. DHL then airfreighted the samples to ALS Chemex Laboratory in Lima, Peru.

A detailed review of all the historical and current QA/QC practices, QA/QC data and historical QA/QC reports at Cobre Panama has been undertaken by First Quantum in order to determine the accuracy, precision and bias present in the drillhole assay data for the project area, in order to determine suitability for mineral resource estimation. While a systemized program of QA/QC sampling was not fully implemented until 2006, numerous programs of check analysis were undertaken to compare each program of drilling to historic drilling undertaken by previous owners. Similarly, routine review of the QA/QC data and results did not occur until the MPSA drilling programs. Regular reviews of the QA/QC data have been undertaken by MPSA personnel and corrections made to the database when an error was identified. The sampling QA/QC results and the related studies demonstrate that sample assay data is representative of the mineralisation sampled and that it is appropriate for use in the Mineral Resource estimation. In addition, data verification completed by FQM supports that data used in the Mineral Resource estimate is similarly adequate.

Metallurgical Testing

Various metallurgical test work programs have been undertaken on the Cobre Panama project since 1968, commensurate with the various levels of preliminary feasibility and prefeasibility studies that were completed up until 1998.

In 1997, an extensive program of metallurgical testing was designed to confirm earlier studies on the metallurgical response of the Botija and Colina ores. Work included grinding, flotation, dewatering and mineralogical testing. Further testing was completed, including locked-cycle flotation testwork and modal analysis to assist in defining grind requirements for both rougher and cleaner flotation. Copper-molybdenum separation by means of differential flotation was also tested.

Confirmatory batch laboratory flotation testwork was conducted during 2014. Based on all of this testwork, variable processing recovery relationships were determined for copper and gold, while fixed recovery values were determined for molybdenum and silver.

During 2018, a confirmatory geometallurgical testwork programme was commenced using grade control samples to validate the processing recovery relationships especially in regard to ore from initial mining horizons. At that time an update to the processing recovery relationships was not warranted.

Mineral Resources

The Mineral Resource estimate for each of the Cobre Panama deposits was generated from the drillhole sample results and an interpretation of the relevant geology that relates to the spatial distribution of copper, molybdenum, gold and silver mineralization. Block grade estimation used ordinary kriging and was post processed by local uniform conditioning of the copper and gold panel estimates considered appropriate to the scale of mining, The Mineral Resource estimates were classified according to the drill hole spacing, sample QA/QC, geological confidence and confidence in the grade estimates.

The Mineral Resource estimate for Cobre Panama, inclusive of the Mineral Reserve inventory, is presented below.

40

Mineral Resource Statement - as at December 31, 2018, and reported using a 0.15% Cu cut-off grade

 

 

 

 

 

 

 

 

 

 

 

 

 

Deposit

    

Category

    

Tonnes (Mt)

    

TCu  %

    

Mo  %

    

Au g/t

    

Ag g/t

Botija

 

Measured

 

310

 

0.47

 

0.008

 

0.11

 

1.44

Botija

 

Indicated

 

660

 

0.36

 

0.007

 

0.07

 

1.13

Colina

 

Indicated

 

1,032

 

0.39

 

0.007

 

0.06

 

1.58

Medio

 

Indicated

 

63

 

0.28

 

0.004

 

0.03

 

0.96

Valle Grande

 

Indicated

 

602

 

0.36

 

0.006

 

0.04

 

1.37

Balboa

 

Indicated

 

647

 

0.35

 

0.002

 

0.08

 

1.37

Botija Abajo

 

Indicated

 

114

 

0.31

 

0.004

 

0.06

 

0.93

Brazo

 

Indicated

 

228

 

0.36

 

0.004

 

0.05

 

0.81

Total Measured and Indicated

 

 

 

3,657

 

0.37

 

0.006

 

0.07

 

1.34

Botija

 

Inferred

 

198

 

0.23

 

0.004

 

0.05

 

0.87

Colina

 

Inferred

 

125

 

0.26

 

0.006

 

0.05

 

1.20

Medio

 

Inferred

 

189

 

0.25

 

0.005

 

0.03

 

1.25

Valle Grande

 

Inferred

 

363

 

0.29

 

0.005

 

0.03

 

1.14

Balboa

 

Inferred

 

79

 

0.23

 

0.003

 

0.04

 

0.96

Botija Abajo

 

Inferred

 

67

 

0.27

 

0.005

 

0.06

 

1.25

Brazo

 

Inferred

 

76

 

0.21

 

0.003

 

0.01

 

0.73

Total Inferred

 

 

 

1,097

 

0.26

 

0.005

 

0.04

 

1.09

 

Stockpile Mineral Resource Statement - as at December 31, 2018

 

 

 

 

 

 

 

 

 

 

 

 

 

Deposit

    

Category   

    

Tonnes (Mt)

    

TCu  %

    

Mo  %

    

Au g/t

    

Ag g/t

Botija

 

Indicated

 

3.3

 

0.22

 

0.004

 

0.04

 

1.18

 

Mineral Reserves

The Mineral Reserve estimate for Cobre Panama is disclosed entirely within the Measured and Indicated Mineral Resource estimate in the table above. The actual cut-off grade for the estimate varies due to variable processing recovery, but otherwise reflects a longer-term consensus copper price of $3.00/lb, a molybdenum price of $13.50/lb, a gold price of $1,200/oz and a silver price of $16.00/oz.

Mineral Reserve at December 31, 2018 – In situ

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

In Situ Mining Inventory

Pit

  

Class

  

Tonnes (Mt)

  

TCu (%)

  

Mo (ppm)

  

Au (ppm)

  

Ag (ppm)

  

TCu metal (kt)

  

Mo metal (kt)

  

Au metal (koz)

  

Ag metal (koz)

Botija

 

Proved

 

323.2

 

0.45

 

75.98

 

0.11

 

1.43

 

1,467.0

 

24.6

 

1,106.3

 

14,886.7

 

 

Probable

 

641.4

 

0.35

 

68.28

 

0.08

 

1.13

 

2,220.2

 

43.8

 

1,512.4

 

23,357.7

 

 

Total P+P

 

964.6

 

0.38

 

70.86

 

0.09

 

1.23

 

3,687.2

 

68.4

 

2,669.6

 

38,188.5

Colina & Medio

 

Proved

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 

Probable

 

981.3

 

0.39

 

66.98

 

0.06

 

1.61

 

3,870.5

 

65.7

 

1,986.8

 

50,646.8

 

 

Total P+P

 

981.3

 

0.39

 

66.98

 

0.06

 

1.61

 

3,870.5

 

65.7

 

1,986.8

 

50,646.8

Valle Grande

 

Proved

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 

Probable

 

541.1

 

0.37

 

67.43

 

0.05

 

1.42

 

2,016.0

 

36.5

 

805.2

 

24,637.3

 

 

Total P+P

 

541.1

 

0.37

 

67.43

 

0.05

 

1.42

 

2,016.0

 

36.5

 

805.2

 

24,637.3

Balboa

 

Proved

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 

Probable

 

437.1

 

0.35

 

16.10

 

0.08

 

1.36

 

1,509.0

 

7.0

 

1,126.9

 

19,168.2

 

 

Total P+P

 

437.1

 

0.35

 

16.10

 

0.08

 

1.36

 

1,509.0

 

7.0

 

1,126.9

 

19,168.2

BABR

 

Proved

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 

Probable

 

219.7

 

0.40

 

41.31

 

0.07

 

0.87

 

882.1

 

9.1

 

527.5

 

6,163.9

 

 

Total P+P

 

219.7

 

0.40

 

41.31

 

0.07

 

0.87

 

882.1

 

9.1

 

527.5

 

6,163.9

TOTAL

 

Proved

 

323.2

 

0.45

 

75.98

 

0.11

 

1.43

 

1,467.0

 

24.6

 

1,106.3

 

14,886.7

 

 

Probable

 

2,820.5

 

0.37

 

57.48

 

0.07

 

1.37

 

10,497.7

 

162.1

 

6,009.6

 

123,918.1

 

 

Total P+P

 

3,143.7

 

0.38

 

59.38

 

0.07

 

1.37

 

11,964.7

 

186.7

 

7,116.0

 

138,804.8

 

Mineral Reserve at December 31, 2018 – Stockpiles

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Stockpile Inventory

Pit

  

Class

  

Tonnes (Mt)

  

TCu (%)

  

Mo (ppm)

  

Au (ppm)

  

Ag (ppm)

  

TCu metal (kt)

  

Mo metal (kt)

  

Au metal (koz)

  

Ag metal (koz)

Botija

 

Proved

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 —

 

 

Probable

 

3.3

 

0.22

 

43.12

 

0.04

 

1.18

 

7.4

 

0.1

 

4.5

 

126.9

 

 

Total P+P

 

3.3

 

0.22

 

43.12

 

0.04

 

1.18

 

7.4

 

0.1

 

4.5

 

126.9

An economic analysis, in the form of a simple cash-flow model to support the Mineral Reserve estimate is included in the current Cobre Panama Technical Report. The cashflow model forms part of a more comprehensive financial model that exists for the project, from which an accurate net present value and internal rate of return can be calculated.

41

Mining Operations

Mining at Cobre Panama will involve large scale and conventional open pit methods at up to approximately 83 Mbcm of ore and waste mined per annum.

The mine development approach for the open pits now follows a terracing strategy rather than using phased pit designs which would have the unintended consequence of creating deep sumps which could, when inundated, cut curtail all production until the water was cleared. The terracing strategy, where a low terrace can be maintained towards one side of the pit with wide, ascending terraces providing multiple mining horizons is considered more suitable for the high rainfall environment as in the event of excessive rainfall the low terrace can act as a sump and be pumped clear over a duration not impacting production from the upper benches.

The multiple pits will be mined in an optimized sequence with ore crushed in-pit and conveyed overland to the nearby processing plant. The Botija pit will be mined first, followed by the Colina and Media pits. Mining in the Valle Grande and BABR pits will commence towards the end of mining of the Colina pit, with the Balboa pit being mined last.

The crusher feed ramps up to 85 Mtpa in 2021 and ultimately to 100Mtpa in 2023 at which rate it remains until 2041 before dropping to 75Mtpa between 2042 and 2054. The overall life of mine strip ratio (tonnes) is 1:1.

From the pre-strip phase which commenced in July 2015, the project life extends for 39 years to 2054.

Processing and Recovery Operations

The processing plant design is based upon a conventional sulphide ore flotation circuit, with differential flotation to produce separate copper and molybdenum concentrate products. Plant tailings will be directed into areas of valley fill and into the depleted open pits.

The predominantly copper/molybdenum sulphide ore is amenable to conventional differential flotation processing, with lesser gold and silver recovered into the copper and gravity concentrate.

The copper concentrate product will be piped as a slurry to the port site on the northern side of the country (on the Caribbean Sea), from where it will be loaded onto vessels for shipping to world markets. The molybdenum concentrate will be delivered to the port by road and shipped in bulk bags.

While design recoveries vary for each deposit the average recoveries are expected to be as follows:

Copper:90.2%

Molybdenum:53.4%

Gold:55.9%

Silver:45.0%

Infrastructure, Permitting and Compliance Activities

The project has two main development areas - the mine and plant site within the concession boundaries, and the port and power station at Punta Rincon, approximately 25 kilometres north of the plant site on the Caribbean coast.

The port and power plant site comprises a deep water berth for concentrate, and coal shipments, a conventional ship landing site and a 300 megawatt coal fired power plant. An access corridor has been constructed between the mine and each of the power plant site and the port which also incorporates the concentrate pipeline. The port has been operational since 2015, and new access roads and improvements to the existing access roads from Penonomé through La Pintada and Coclecito to the site have been constructed to permit safe access to the mine and plant site from the Pan-American Highway via the existing road from Penonomé.

The project tailings management facility will eventually cover an area of approximately 20 km2 and required the construction of retaining walls on the northern and eastern sides to enclose a storage basin.

Water for the project, including the port site, is obtained from local rivers and treated prior to distribution.

In December 2011, the Government of Panama, through Autoridad Nacional del Ambiente (the Panamanian national environmental authority), approved the project environmental and social impact assessment required for development of the Cobre Panama copper project, including the mining operations and related infrastructure, the port facility, and the coal-fired power plant. Since then the Project definition and development scope has changed to include additional open pits and aspects that will need to be addressed in a new Environmental & Social Impact Assessment (“ESIA”). The expected timeframe for submitting the new ESIA is in mid-2024.

Cobre Panama continues to implement its environmental management plans to meet commitments made in the Project ESIA and comply with Panamanian environmental regulations, international standards including Equator Principles and IFC Performance Standards and internal environmental policies of First Quantum. First Quantum is implementing a Bio-diversity

42

action plan in line with IFC Performance Standard 6 to protect and conserve the sensitive bio-diversity of the Cobre Panama project area. Cobre Panama has implemented site-level water management plans to address concerns with high rainfall levels.

The project continues to be audited quarterly against ESIA commitments by a third party and the results provided to the environmental regulator Mi-AMBIENTE. Although some action items were identified, the project is largely in compliance with its ESIA commitments and an action plan is being implemented.

In 2017, First Quantum successfully obtained change applications relating to the siting of the process plant, decant tower and tunnel at the tailings storage facility (“TSF”) and above ground pipelines between the Mill and TSF and mine and port site and also lodged the necessary environmental permits to begin commissioning and operation of the power plant at the port.

The mine closure plan and costs were reviewed in 2018. The closure cost estimate as at December 31, 2018 was $73 million.

Capital and Operating Expenses

Project spending to completion amounted to $6.77 billion. The total project capital expenditure for the year ended December 31, 2019 was $697 million. The 2019 capital expenditure included commencement of the expansion to 100Mtpa capacity along with initial development and engineering work allowing mining to proceed at the Colina pit, completion of Botija pre-strip, mine dewatering expenses trolley assist haulage infrastructure.

The future capital development costs for the project, including the estimated capital costs for the ultimate expansion to 100Mtpa in 2023 and associated mine infrastructure and development are shown in the table below.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Capital Item

  

 

  

2020

  

2021

  

2022

  

2023

  

2024

  

2025

  

2026

100Mtpa plant upgrade

 

$M

 

87

 

110

 

40

 

 —

 

 —

 

 —

 

 —

Colina pioneering access, engineering, IPC and OVC

 

$M

 

6

 

 —

 

45

 

16

 

 —

 

 —

 

 —

River diversion works for Colina

 

$M

 

 —

 

 —

 

 —

 

 —

 

33

 

33

 

34

Site and other capital

 

$M

 

7

 

12

 

4

 

2

 

 —

 

 —

 

 —

Total Capital Development

 

$M

 

100

 

122

 

89

 

18

 

33

 

33

 

34

Future capital expenditure relates to completion of construction and commissioning of the Molybdenum plant, continuation of construction work for the tailings management facility and ongoing developmental work associated with the expansion to 100Mtpa capacity.

For 2019 copper C1 cash costs at Cobre panama were $1.29/lb, and copper AISC was $1.78/lb.

The overall average unit operating costs for the project are shown in the table below.

 

 

 

 

 

Item

    

 

    

 

Mining Waste

 

$/t waste

 

1.76

Mining Ore

 

$/t ore

 

1.94

Processing

 

$/t ore

 

3.84

G&A

 

$/t ore

 

0.62

Fixed Costs for Port Operations

 

$M per year

 

10.3

Stockpile Reclaim Costs

 

$/t reclaimed

 

1.19

Project Development and Production

Commercial production was achieved at Cobre Panama on September 1, 2019. Following the first ore to the Cobre Panama processing plant in the first quarter of 2019, operations ramped up with the commissioning of three milling trains, comprising seven mills, and an eighth mill introduced in December. In June 2019, the first shipment of concentrate was dispatched from the operation’s port. For the full year, Cobre Panama produced 147,480 tonnes of copper and 60,074 ounces of gold. The eighth (and final mill) came on-line in December 2019 completing the third train and annual milling capacity can now ramp up to 85 Mtpa.

Flotation capacity to support 100Mtpa is in place and the tailings management facility and mine trolley assist are operational.

Project construction and commissioning is essentially complete. The molybdenum plant is expected to be commissioned in 2020 and associated capital expenditure of approximately $12 million is included in total capital expenditure guidance. There was significant demobilization of the construction workforce during the year.

The operational workforce is in place, of which approximately 82% has been contracted as permanent employees with the remainder providing supplementary skills and labour from construction and commissioning assisting with initial operations. Approximately 88% of the current workforce is Panamanian.

43

The Company’s precious metals streams are linked to copper production from the Cobre Panama project.  Contained copper production is estimated at between 285,000 tonnes and 310,000 tonnes in 2020, between 310,000 and 330,000 tonnes in 2021, and between 310,000 and 340,000 tonnes in 2022. At the 100 Mtpa throughput rate Cobre Panama is expected to reach estimated copper production of over 350,000 tonnes per year.

Gold production in 2020 is estimated to be between 120,000 – 130,000 oz, between 125,000 – 135,000 ounces in 2021 and between 135,000 and 145,000 ounces in 2022.

On the basis of the current Mineral Reserves estimate and the planned processing capacity, the life of operations is approximately 39 years. During the period when processing at the 90 Mtpa rate, average annual copper production is approximately 311,000 tonnes of recovered metal (reaching a maximum of approximately 397,000 tonnes of recovered metal). The annual average metal production rate when processing at 90 Mtpa is around 17% higher than the initial project plan.

Over the life of operations, the average by-product production is expected to be 97,000 ounces of recovered gold, 1,570 thousand ounces of recovered silver and 2,570 tonnes of recovered molybdenum. The average copper feed grade is expected to be 0.42% total copper for the first 10 years and 0.35% total copper for the remaining operations life.

 

44

RISK FACTORS

Investors should carefully consider all of the information disclosed in this AIF prior to investing in the securities of Franco-Nevada. In addition to the other information presented in this AIF, the following risk factors should be given special consideration when evaluating an investment in such securities.

Risks Related to the Business of Franco-Nevada

Changes in the market price of the commodities that underlie the royalty, stream, working and other interests will affect the profitability of Franco-Nevada and the revenue generated therefrom

The revenue derived by Franco-Nevada from its asset portfolio will be significantly affected by changes in the market price of the commodities underlying the royalties, streams, working interests and investments. Franco-Nevada’s revenue is particularly sensitive to changes in the price of gold, silver, oil, natural gas, PGM and copper, as the revenue from these commodities represents substantially all of the cash flow derived from the asset portfolio. Commodity prices, including those to which Franco-Nevada is exposed, fluctuate on a daily basis and are affected by numerous factors beyond the control of Franco-Nevada, including levels of supply and demand, industrial development levels, inflation and the level of interest rates, the strength of the U.S. dollar and geopolitical events in significant oil & natural gas producing countries. Such external economic factors are in turn influenced by changes in international investment patterns, monetary systems and political developments.

All commodities, by their nature, are subject to wide price fluctuations and future material price declines will result in a decrease in revenue or, in the case of severe declines that cause a suspension or termination of production by relevant operators, a complete cessation of revenue from royalties, streams or working interests applicable to one or more relevant commodities. Moreover, despite Franco-Nevada’s commodity diversification, the broader commodity market tends to be cyclical, and a general downturn in overall commodity prices could result in a significant decrease in overall revenue. Any such price decline may result in a material adverse effect on Franco-Nevada’s profitability, results of operations and financial condition.

Gold, silver, and/or PGM are produced or will be produced as a by-product metal at some of the assets including the Antapaccay project, Antamina project, Candelaria project, Cobre Panama project, Guadalupe-Palmarejo project, Sudbury project and MWS project; therefore, production decisions and the economic cut-off applied to the reporting of gold, silver and PGM reserves and resources, as applicable, will be influenced by changes in the commodity prices of other metals at the mines.  To some extent risks related to this will be mitigated by Franco-Nevada in respect of each of Antapaccay and Cobre Panama as gold and silver deliveries under the stream are initially tied to the production of copper, the primary product to be produced at such projects.

For mining assets that are subject to stream agreements where there is a fixed price payable per ounce, in the event that the price of gold and/or silver falls below the fixed price per ounce (subject to inflation adjustment), Franco-Nevada would not realize any profits.

The operation of the properties in which Franco-Nevada holds an interest is generally determined by third party property owners and operators, and Franco-Nevada has no or limited decision making power as to how these properties are operated, and the operators’ failure to perform could affect the revenues generated by Franco-Nevada

Franco-Nevada is not directly involved in the operation of mines.  The revenue derived from the asset portfolio is based on production by third party property owners and operators.  The owners and operators generally will have the power to determine the manner in which the properties are exploited, including decisions to expand, continue or reduce, suspend or discontinue production from a property, decisions about the marketing of products extracted from the property and decisions to advance exploration efforts and conduct development of non-producing properties. The interests of third party owners and operators and those of Franco-Nevada on the relevant properties may not always be aligned. As an example, it will usually be in the interest of Franco-Nevada to advance development and production on properties as rapidly as possible in order to maximize near-term cash flow, while third party owners and operators may take a more cautious approach to development as they are at risk on the cost of development and operations.  Likewise, it may be in the interest of property owners to invest in the development of and emphasize production from projects or areas of a project that are not subject to streaming, royalty or working interest obligations.  The inability of Franco-Nevada to control the operations for the properties in which it has a royalty, stream or working interest may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations and financial condition.  In addition, the owners or operators may take action contrary to Franco-Nevada’s policies or objectives; be unable or unwilling to fulfill their obligations under their agreements with Franco-Nevada; have difficulty obtaining or be unable to obtain the financing necessary to move projects forward; or experience financial, operational or other difficulties, including insolvency, which could limit the owner or operator’s ability to perform its obligations under arrangements with Franco-Nevada.

Franco-Nevada may not be entitled to any material compensation if any of the properties in which it holds a royalty, stream or other interest shuts down or discontinues their operations on a temporary or permanent basis.  At any time, any of the

45

operators of the properties in which it holds a royalty, stream or other interest or their successors may decide to suspend or discontinue operations.

The owners or operators of the projects in which Franco-Nevada holds an interest may from time to time announce transactions, including the sale or transfer of the projects or of the operator itself, over which Franco-Nevada has little or no control.  If such transactions are completed it may result in a new operator controlling the project, who may or may not operate the project in a similar manner to the current operator which may positively or negatively impact Franco-Nevada.  If any such transaction is announced, there is no certainty that such transaction will be completed, or completed as announced, and any consequences of such non-completion on Franco-Nevada may be difficult or impossible to predict.

Franco-Nevada has limited access to data and disclosure regarding the operation of properties, which will affect its ability to assess the royalty’s/stream’s performance

As a royalty/stream holder, Franco-Nevada has limited access to data on the operations or to the actual properties themselves.  This could affect its ability to assess the performance of the royalty/stream.  This could result in deviations in cash flow from that which is anticipated by Franco-Nevada based on the stage of development of the properties covered by the asset portfolio.  In addition, some royalties/streams may be subject to confidentiality arrangements which govern the disclosure of information with regard to royalties/streams and, as such, Franco-Nevada may not be in a position to publicly disclose non-public information with respect to certain royalties/streams. The limited access to data and disclosure regarding the operations of the properties in which Franco-Nevada has an interest, may restrict Franco-Nevada’s ability to enhance its performance which may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations and financial condition.  Although when creating new royalty or stream agreements, we attempt to obtain these rights, there is no assurance that our efforts will be successful.

Franco-Nevada depends on its operators for the calculation of royalty/stream payments.  It may not be able to detect errors and payment calculations may call for retroactive adjustments

Franco-Nevada’s royalty/stream payments are calculated by the operators of the properties on which Franco-Nevada has royalties/streams based on the reported production.  Each operator’s calculation of our royalty/stream payments is subject to and dependent upon the adequacy and accuracy of its production and accounting functions, and errors may occur from time to time in the calculations made by an operator.  Certain royalty/stream agreements require the operators to provide Franco‑Nevada with production and operating information that may, depending on the completeness and accuracy of such information, enable Franco-Nevada to detect errors in the calculation of royalty/stream payments that it receives.  Franco‑Nevada does not, however, have the contractual right to receive production information for all of its royalty/stream interests.  As a result, Franco-Nevada’s ability to detect royalty/stream payment errors through its royalty/stream monitoring program and its associated internal controls and procedures is limited, and the possibility exists that Franco-Nevada will need to make retroactive royalty/stream revenue adjustments.  Some of our royalty/stream contracts provide the right to audit the operational calculations and production data for the associated royalty/stream payments; however, such audits may occur many months following our recognition of the royalty/stream revenue and may require us to adjust our revenue in later periods.

The Antamina, Antapaccay, Candelaria and Cobre Panama project streams are significant to Franco-Nevada and other assets and properties may become significant to Franco-Nevada from time to time and any adverse development related to any such assets will affect the revenue derived from such assets

The streams on the Antamina, Antapaccay, Candelaria and Cobre Panama projects are currently significant to Franco-Nevada, although as new assets are acquired or move into production, the materiality of each of our assets will be reconsidered.  Any adverse development affecting the operation of, production from or recoverability of mineral reserves from the Antamina, Antapaccay, Candelaria and Cobre Panama projects or any other significant property in the asset portfolio from time to time, such as, but not limited to, unusual and unexpected geologic formations, seismic activity, rock bursts, cave-ins, pit wall failures, tailings dam failures, flooding and other conditions involved in the drilling and removal of material, any of which could result in damage to, or destruction of, mines and other producing facilities, damage to life or property, environmental damage, or the inability to hire suitable personnel and engineering contractors or secure supply agreements on commercially suitable terms, may have a material adverse effect on Franco-Nevada’s profitability, financial condition and results of operations. As well, any adverse development in the resolution of issues with Law 9 with respect to Cobre Panama may have a material adverse effect on Franco-Nevada’s profitability, financial condition and results of operations. In addition, Franco-Nevada has no control over operational decisions made by the third party owners and operators of these projects. Any adverse decision made by the owners and operators, including for example, alterations to mine plans or production schedules, may impact the timing and amount of revenue that Franco-Nevada receives and may have a material and adverse effect on Franco-Nevada’s profitability, financial condition and results of operations.  As mines on which Franco-Nevada has royalties/streams mature, we can expect overall declines in production over the years unless operators are able to replace reserves that are mined through mine expansion or successful new exploration.

46

Franco-Nevada is dependent on the payment of royalties/streams by the owners and operators of the relevant properties and any delay in or failure of such royalty/stream payments will affect the revenues generated by the asset portfolio

Franco-Nevada is dependent to a large extent upon the financial viability and operational effectiveness of owners and operators of the relevant royalty/stream properties. Payments from production generally flow through the operator and there is a risk of delay and additional expense in receiving such revenues. Payments may be delayed by restrictions imposed by lenders, delays in the sale or delivery of products, the ability or willingness of smelters and refiners to process mine products, delays in the connection of wells to a gathering system, blowouts or other accidents, recovery by the operators of expenses incurred in the operation of the royalty/stream properties, the establishment by the operators of reserves for such expenses or the insolvency of the operator. Franco-Nevada’s rights to payment under the royalties/streams must, in most cases, be enforced by contract without the protection of the ability to liquidate a property.  This inhibits Franco-Nevada’s ability to collect outstanding royalties/streams upon a default.  Additionally, some agreements may provide limited recourse in particular circumstances which may further inhibit Franco-Nevada’s ability to recover or obtain equitable relief in the event of a default under such agreements.  In the event of a bankruptcy of an operator or owner, it is possible that an operator may claim that Franco-Nevada should be treated as an unsecured creditor and, therefore, have a limited prospect for full recovery of revenue and a possibility that a creditor or the operator may claim that the royalty or stream agreement should be terminated in the insolvency proceeding.  Failure to receive payments from the owners and operators of the relevant properties or termination of Franco-Nevada’s rights may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations and financial condition.

Certain royalty/stream interests and working interests are subject to rights in favour of others or third parties that could adversely affect the revenues generated from the asset portfolio

Some royalty/stream interests and working interests are subject to: (i) buy-down right provisions pursuant to which an operator may buy-back all or a portion of the royalty/stream or working interest, (ii) pre-emptive rights pursuant to which parties to operating and royalty/stream agreements have the right of first refusal or first offer with respect to a proposed sale or assignment of a royalty/stream by or to Franco-Nevada, or (iii) claw back rights pursuant to which the seller of a royalty/stream or working interest to Franco-Nevada has the right to re-acquire the royalty/stream or working interest. Holders may exercise these rights such that certain royalty/stream interests and working interests would no longer be held by Franco-Nevada.

The asset portfolio includes a number of royalty interests based on net profits, and the revenue derived from such royalty interests is dependent upon factors beyond the control of Franco-Nevada that may have an adverse effect on the overall revenues generated by the asset portfolio

Franco-Nevada holds a number of net profit royalties, equity interests and working interests in its asset portfolio. These royalties and other interests allow the operator to account for the effect of prevailing cost pressures on the project before calculating the royalty payable to Franco-Nevada. These cost pressures include costs of labour, equipment, fuel, electricity, environmental compliance, oil prices and numerous other capital, operating and production inputs. Such costs will fluctuate in ways that are unpredictable and are beyond the control of Franco-Nevada, and can have a dramatic effect on the revenue payable to Franco-Nevada on these royalties and other interests. Any increase in the costs incurred by the operators on the applicable properties will likely result in a decline in the revenue received by Franco-Nevada. This will affect overall revenue generated by the asset portfolio which may have a material and adverse effect on Franco-Nevada’s profitability, financial condition, and results of operations.

Franco-Nevada may enter into acquisitions or other material royalty or streaming transactions at any time

Franco-Nevada is continuously reviewing opportunities to acquire existing royalties or streams, to create new royalty interests or streaming arrangements through the financing of mining projects, financing of new acquisitions or to acquire companies that hold royalties or streams.  At any given time Franco-Nevada has various types of transactions and acquisition opportunities in various stages of active review, including submission of indications of interest and participation in discussions or negotiations in respect of such transactions.  This process also involves the engagement of consultants and advisors to assist in analyzing particular opportunities.  Any such acquisition or transaction could be material to Franco-Nevada and may involve the issuance of securities by Franco-Nevada or the incurring of indebtedness to fund any such acquisition.  In addition, any such acquisition or other royalty or streaming transaction may have other transaction specific risks associated with it, including risks related to the completion of the transaction, the project operators or the jurisdictions in which assets may be acquired.

Additionally, Franco-Nevada may consider opportunities to restructure its royalties or stream arrangements where it believes such a restructuring may provide a long-term benefit to Franco-Nevada, even if such restructuring may reduce near-term revenues or result in Franco-Nevada incurring transaction related costs.

Franco-Nevada may enter into one or more acquisitions, restructurings or other royalty and streaming transactions at any time.

47

Franco-Nevada may experience difficulty attracting and retaining qualified management and technical personnel to efficiently operate its business

Franco-Nevada is dependent upon the continued availability and commitment of its key management, whose contributions to immediate and future operations of Franco-Nevada are of significant importance. The loss of any such key management could negatively affect business operations. From time to time, Franco-Nevada may also need to identify and retain additional skilled management and specialized technical personnel to efficiently operate its business. The number of persons skilled in the acquisition, exploration and development of royalties/streams and interests in natural resource properties is limited and competition for such persons is intense. Recruiting and retaining qualified personnel is critical to Franco-Nevada’s success and there can be no assurance of such success. If Franco-Nevada is not successful in attracting and retaining qualified personnel, Franco-Nevada’s ability to execute its business model and growth strategy could be affected, which could have a material and adverse impact on its profitability, results of operations and financial condition. Franco-Nevada does not intend to maintain “key man” insurance for any members of its management.

Increased competition for royalty/stream interests and resource investments could adversely affect Franco-Nevada’s ability to acquire additional royalties, streams and other investments in mineral and oil & natural gas properties

Many companies are engaged in the search for and the acquisition of mineral and oil & natural gas interests, and there is a limited supply of desirable mineral and oil & natural gas interests. The mineral exploration and mining and oil & natural gas businesses are competitive in all phases. Many companies are engaged in the acquisition of mining and oil & natural gas interests, including large, established companies with substantial financial resources, operational capabilities and long earnings records. Franco-Nevada may be at a competitive disadvantage in acquiring those interests, whether by way of royalty, stream or other form of investment, as competitors may have greater financial resources and technical staffs. There can be no assurance that Franco-Nevada will be able to compete successfully against other companies in acquiring new natural resource properties and royalty/stream interests.  In addition, Franco-Nevada may be unable to acquire royalties or streams at acceptable valuations which may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations and financial condition.

Royalty/stream and other interests may not be honoured by operators of a project

Royalty/stream and other interests in natural resource properties are largely contractual in nature. Parties to contracts do not always honour contractual terms and contracts themselves may be subject to interpretation or technical defects. To the extent grantors of royalty/stream and other interests do not abide by their contractual obligations, Franco-Nevada would be forced to take legal action to enforce its contractual rights. Such litigation may be time consuming and costly and there is no guarantee of success.  Any pending proceedings or actions or any decisions determined adversely to Franco-Nevada, may have a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco‑Nevada securities.

There may be unknown defects in the asset portfolio

A defect in a royalty, stream, working interest or equity interest and/or the underlying contract may arise to defeat or impair the claim of Franco-Nevada to such royalty, stream, working interest or equity interest. When Franco-Nevada acquired assets from Newmont Mining Corporation (“Newmont”), it was not provided with title representations and warranties relating to the royalties and various equity interests in the Newmont acquisition agreement. Newmont only represented that it would transfer the extent of its interest in the assets to Franco-Nevada. If there was a defect in Newmont’s interest in the royalties, working interest or equity interest and/or the underlying contract, Franco-Nevada will not have any recourse against Newmont under the Newmont acquisition agreement.  Unknown defects in the royalty, stream or other assets of Franco-Nevada may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.

Current global financial conditions continue to be challenging

Global financial conditions have been characterized by ongoing volatility.  Global financial conditions could suddenly and rapidly destabilize in response to future events, as government authorities may have limited resources to respond to future crises.  Global capital markets have continued to display increased volatility in response to global events.  Future crises may be precipitated by any number of causes, including natural disasters, geopolitical instability, changes to energy prices or sovereign defaults.    

Any sudden or rapid destabilization of global economic conditions could negatively impact Franco-Nevada’s ability, or the ability of the operators of the properties in which Franco-Nevada holds royalties, streams or other interests, to obtain equity or debt financing or make other suitable arrangements to finance their projects.  Additionally, Franco-Nevada may be subject to counterparty risk and liquidity risk.  Franco-Nevada is exposed to various counterparty risks including, but not limited to (i) through financial institutions that hold Franco-Nevada’s cash, (ii) through companies that have payables to Franco-Nevada, (iii) through Franco-Nevada’s insurance providers, and (iv) through Franco-Nevada’s lenders. Franco-Nevada is also exposed to liquidity risks in meeting its operating expenditure requirements in instances where cash positions are unable to be

48

maintained or appropriate financing is unavailable.  These factors may impact the ability of Franco-Nevada to obtain loans or other credit facilities or obtain equity financing in the future or to obtain them on terms favourable to Franco-Nevada.  If increased levels of volatility continue or in the event of a rapid destabilization of global economic conditions, Franco-Nevada’s operations could be adversely impacted and the trading price of Franco-Nevada securities could be adversely affected.

The Impact of the current COVID-19 pandemic may significantly impact Franco Nevada

The current COVID-19 (corona virus) global health pandemic is significantly impacting the global economy and commodity and financial markets.  The full extent and impact of the COVID-19 pandemic is unknown and to date has included extreme volatility in financial markets, a slowdown in economic activity, extreme volatility in commodity prices (including gold, silver, palladium and oil and gas) and has raised the prospect of an extended global recession. As well, as efforts are undertaken to slow the spread of the COVID-19 pandemic, the operation and development of mining projects may be impacted.  To date, a number of mining projects have been suspended as cases of COVID-19 have been confirmed, for precautionary purposes or as governments have declared a state of emergency or taken other actions.  If the operation or development of one or more of the properties in which Franco-Nevada holds a royalty, stream or other interest and from which it receives or expects to receive significant revenue is suspended, it may have a material adverse impact on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada’s securities. The broader impact of the COVID-19 pandemic on investors, businesses, the global economy or financial and commodity markets may also have a material adverse impact on Franco-Nevada’s profitability, results of operations, financial conditions and the trading price of Franco-Nevada’s securities.

The impact of the Saudi-Russia oil price dispute will affect the revenue generated from Franco-Nevada’s oil and gas royalties and working interests

The current Saudi Arabia-Russia oil price dispute and its impact on global energy markets has resulted in a significant drop in the price of oil and gas (WTI, WCS and NYMEX). If this price impact continues (and if it is exacerbated by the impact of the COVID-19 pandemic), the oil and gas operations over which Franco-Nevada holds oil and gas royalties and working interests could be materially adversely affected.  The lower oil and gas prices (WTI, WCS and NYMEX) may adversely impact production and potential future development as well as operators’ cashflows and ability to access additional capital.  If this situation continues or worsens and results in low oil and gas prices (WTI, WCS and NYMEX) for a prolonged period, it may have a material adverse impact on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada’s securities.

Franco-Nevada’s revenue, earnings, the value of its treasury and the value it records for its assets are subject to variations in foreign exchange rates, which may adversely affect the revenue generated by the asset portfolio or cause adjustments to the recorded value of assets

Franco-Nevada’s royalty/stream interests are subject to foreign currency fluctuations and inflationary pressures, which may have a material and adverse effect on Franco-Nevada’s profitability, results of operations and financial condition. There can be no assurance that the steps taken by management to address variations in foreign exchange rates will eliminate all adverse effects and Franco-Nevada may suffer losses due to adverse foreign currency rate fluctuations.

The ability to pay dividends will be dependent on the financial condition of Franco-Nevada

Payment of dividends on the Common Shares is within the discretion of Franco-Nevada’s Board of Directors and will depend upon Franco-Nevada’s future earnings, cash flows, acquisition capital requirements and financial condition, and other relevant factors. Although Franco-Nevada currently pays a regular dividend, there can be no assurance that it will be in a position to declare dividends due to the occurrence of one or more of the risks described herein.

Changes in tax legislation or accounting rules could affect the profitability of Franco-Nevada

Changes to, or differing interpretation of, taxation laws or regulations in any of Canada, the United States, Mexico, Barbados, Australia, Chile, Peru or any of the countries in which Franco-Nevada’s assets or relevant contracting parties are located could result in some or all of Franco-Nevada’s profits being subject to additional taxation.  No assurance can be given that new taxation rules or accounting policies will not be enacted or that existing rules will not be applied in a manner which could result in Franco-Nevada’s profits being subject to additional taxation or which could otherwise have a material adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.  In addition, the introduction of new tax rules or accounting policies, or changes to, or differing interpretations of, or application of, existing tax rules or accounting policies could make royalties, streams or other investments by Franco-Nevada less attractive to counterparties.  Such changes could adversely affect Franco-Nevada’s ability to acquire new assets or make future investments.

Reviews conducted by tax authorities, now or in the future, may result in adverse tax consequences for Franco-Nevada

The CRA is conducting an audit of Franco-Nevada’s 2012-2015 taxation years and has issued a series of reassessments to the Company. A description of the matters and amounts at issue is included in the notes to Franco-Nevada’s financial statements for the year ended December 31, 2019.

49

Tax authorities in jurisdictions applicable to Franco-Nevada may periodically conduct reviews of Franco-Nevada’s tax filings and compliance.  Those reviews could result in adverse tax consequences and unexpected financial costs and exposure.

Management believes that the Company has filed its tax returns and paid all applicable taxes in compliance with Canadian and applicable foreign tax laws. The Company does not believe that the reassessments are supported by Canadian tax law and jurisprudence and intends to vigorously defend its tax filing positions.

The CRA audit is ongoing and there can be no assurance that the CRA will not further challenge the manner in which the Company or any of its subsidiaries has filed its income tax returns and reported its income.  In the event that the CRA successfully challenges the manner in which the Company or a subsidiary has filed its tax returns and reported its income, this could potentially result in additional income taxes, penalties and interest, which could have a material adverse effect on the Company.

Certain of Franco-Nevada’s directors and officers serve in similar positions with other public companies, which could put them in a conflict position from time to time

Certain of the directors and officers of Franco-Nevada also serve as directors or officers of, or have significant shareholdings in, other companies involved in natural resource exploration, development and production and, to the extent that such other companies may engage in transactions or participate in the same ventures in which Franco-Nevada participates, or in transactions or ventures in which Franco-Nevada may seek to participate, the directors and officers of Franco-Nevada may have a conflict of interest in negotiating and concluding terms respecting the extent of such participation. In all cases where directors and officers have an interest in other companies, such other companies may also compete with Franco-Nevada for the acquisition of royalties/streams, or mineral or oil & natural gas property investments. Such conflicts of the directors and officers may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.

Franco-Nevada can provide no assurance that it will be able to obtain adequate financing in the future or that the terms of such financing will be favourable and Franco-Nevada may have to raise additional capital through the issuance of additional equity, which could result in dilution to Franco-Nevada’s shareholders

There can be no assurance that Franco-Nevada will be able to obtain adequate financing in the future or that the terms of such financing will be favourable. Failure to obtain such additional financing could impede Franco-Nevada’s funding obligations, or result in delay or postponement of further business activities which may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations and financial condition. Franco-Nevada may require new capital to continue to grow its business and there are no assurances that capital will be available when needed, if at all. It is likely that, at least to some extent, such additional capital will be raised through the issuance of additional equity, which could result in dilution to shareholders.

If Franco-Nevada expands its business beyond the acquisition of royalty/stream interests, Franco-Nevada may face new challenges and risks which could affect its profitability, results of operations and financial condition

Franco-Nevada’s operations and expertise have been focused on the acquisition and management of royalty/stream interests.  Franco-Nevada may pursue acquisitions outside this area, including acquiring and/or investing in and/or developing resource projects.  Expansion of Franco-Nevada’s activities into new areas would present challenges and risks that it has not faced in the past, including many of the risks described under “Risks Related to Mining Operations and Oil & Natural Gas Operations”. The failure to manage these challenges and risks successfully may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.

Potential litigation affecting the properties in which Franco-Nevada holds its royalty/stream interests could have an adverse effect on Franco-Nevada

Potential litigation may arise on a property on which Franco-Nevada holds or has a royalty/stream interest (for example, litigation between joint venture partners or between operators and original property owners or neighbouring property owners).  As a royalty/stream holder, Franco-Nevada will not generally have any influence on the litigation and will not generally have access to data. Any such litigation that results in the cessation or reduction of production from a property (whether temporary or permanent) could have a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.

Information Systems and Cyber Security

Franco-Nevada’s operations depend, in part, on its information technology (“IT”) systems, networks, equipment and software and the security of these systems. The Company depends on various IT systems to estimate reserve and resource quantities, process and record financial data, analyze seismic information, administer its contracts with its counterparties and communicate with employees and third-parties. These IT systems, and those of its third-party service providers and vendors and the counterparties under its royalty/stream agreements may be vulnerable to an increasing number of continually evolving cyber security risks. Unauthorized third parties may be able to penetrate network security and misappropriate or compromise

50

confidential information, create system disruptions or cause shutdowns.  Any such breach or compromise may go undetected for an extended period of time.

A significant breach of Franco-Nevada’s IT systems or data security or misuse of data, particularly if such breach or misuse goes undetected for an extended period of time, could result in significant costs, loss of revenue, fines or lawsuits and damage to reputation. The costs to eliminate or alleviate cyber or other security problems, including bugs, viruses, worms, malware and other security vulnerabilities, could be significant, and our efforts to address these problems may not be successful.  The significance of any cyber-security breach is difficult to quantify, but may in certain circumstances be material and could have a material adverse effect on the Company’s business, financial condition and results of operations.

Risks Related to Mining Operations and Oil & Natural Gas Operations

Franco-Nevada is subject to the same risk factors as the owners and operators of properties in which it holds a royalty, stream or other interests

To the extent that they relate to the production of minerals or oil & natural gas from, or the continued operation of, the properties in which Franco-Nevada holds a royalty, stream or other interest, Franco-Nevada will be subject to the risk factors applicable to the owners and operators of such mines or projects.

The inability to add additional reserves to its asset portfolio through either the development of existing resources or the acquisition of new mineral or oil & natural gas producing assets could adversely affect Franco-Nevada

The revenue generated by Franco-Nevada is principally based on the exploitation of mineral and oil & natural gas reserves on assets underlying the royalty/stream interests and on which Franco-Nevada has a royalty, stream or other interest.  Reserves are continually being depleted through extraction and the long-term viability of Franco-Nevada’s asset portfolio depends on the replacement of reserves through new producing assets and increases in reserves on existing producing assets. While Franco-Nevada may be able to maintain all or a portion of its interest in its reserve inventory through acquisitions, its business model relies on the successful development of the non-producing properties in its asset portfolio. Exploration for minerals and energy resources is a speculative venture necessarily involving substantial risk. There is no certainty that the expenditures made by the operator of any given project will result in discoveries of commercial quantities of minerals or energy resources on properties underlying the asset portfolio. Even in those cases where a significant mineral or oil & natural gas deposit is identified, there is no guarantee that the deposit can be economically extracted. Substantial expenditures are required to establish reserves through drilling, to develop processes to extract the resources and, in the case of new properties, to develop the extraction and processing facilities and infrastructure at any site chosen for extraction. Although substantial benefits may be derived from the discovery of a major deposit, no assurance can be given that new reserves will be identified to replace or increase the amount of reserves currently in the asset portfolio. This includes mineral resources, as the resources that have been discovered have not been subjected to sufficient analysis to justify commercial operations or the allocation of funds required for development. The inability to add additional reserves or to replace existing reserves through either the development of existing resources or the acquisition of new mineral or oil & natural gas producing assets may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.

Reserves and resources are estimates based on interpretation and assumptions and actual production may differ from amounts identified in such estimates

The mineral and oil & natural gas reserves and resources on properties underlying Franco-Nevada’s royalty, stream or other interests are estimates only, and no assurance can be given that the estimated reserves and resources are accurate or that the indicated level of minerals and oil & natural gas will be produced. Such estimates are, in large part, based on interpretations of geological data obtained from drill holes and other sampling techniques. Actual mineralization or formations may be different from those predicted. Further, it may take many years from the initial phase of drilling before production is possible and during that time the economic feasibility of exploiting a discovery may change.

Market price fluctuations of the applicable commodity, as well as increased production and capital costs or reduced recovery rates, may render the proven and probable reserves on properties underlying Franco-Nevada’s royalty/stream interests unprofitable to develop at a particular site or sites for periods of time or may render reserves containing relatively lower grade mineralization uneconomic. Moreover, short-term operating factors relating to the reserves, such as the need for the orderly development of ore bodies or the processing of new or different ore grades, may cause reserves to be reduced or not extracted. Estimated reserves may have to be recalculated based on actual production experience.  The economic viability of a mineral deposit may also be impacted by other attributes of a particular deposit, such as size, grade and proximity to infrastructure, governmental regulations and policy relating to price, taxes, royalties, land tenure, land use permitting, the import and export of minerals and environmental protection and by political and economic stability.

Resource estimates in particular must be considered with caution. Resource estimates for properties that have not commenced production are based, in many instances, on limited and widely spaced drill hole or other limited information, which is not necessarily indicative of the conditions between and around drill holes. Such resource estimates may require

51

revision as more drilling or other exploration information becomes available or as actual production experience is gained. Further, resources may not have demonstrated economic viability and may never be extracted by the operator of a property. It should not be assumed that any part or all of the mineral resources on properties underlying Franco-Nevada’s royalty/stream interests constitute or will be converted into reserves.

Any of the foregoing factors may require operators to reduce their reserves and resources, which may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco‑Nevada securities.

The exploration and development of mining and resource properties is inherently dangerous and subject to risks beyond the control of Franco-Nevada

Companies engaged in mining and oil & natural gas activities are subject to all of the hazards and risks inherent in exploring for and developing natural resource projects. These risks and uncertainties include, but are not limited to, environmental hazards, industrial accidents, labour disputes, increases in the cost of labour, social unrest, changes in the regulatory environment, permitting and title risks, impact of non-compliance with laws and regulations, fires, explosions, blowouts, cratering, sour gas releases and spills, encountering unusual or unexpected geological formations or other geological or grade problems, unanticipated metallurgical characteristics or less than expected mineral recovery, encountering unanticipated ground or water conditions, cave-ins, pit wall failures, flooding, rock bursts, tailings dam failures, periodic interruptions due to inclement or hazardous weather conditions, earthquakes, seismic activity, other natural disasters or unfavourable operating conditions and losses. Should any of these risks or hazards affect a company’s exploration or development activities, it may (i) cause the cost of development or production to increase to a point where it would no longer be economic to produce the metal or oil & natural gas from the company’s resources or expected reserves, (ii) result in a write down or write-off of the carrying value of one or more projects, (iii) cause delays or stoppage of mining or processing, (iv) result in the destruction of properties, processing facilities or third party facilities necessary to the company’s operations, (v) cause personal injury or death and related legal liability, or (vi) result in the loss of insurance coverage. The occurrence of any of above mentioned risks or hazards could result in an interruption or suspension of operation of the properties in which Franco-Nevada holds a royalty/stream interest and have a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.

Title defects may result in a loss of entitlement to a property

A defect in the chain of title to any of the properties underlying the royalty, stream or other interests or necessary for the anticipated development or operation of a particular project to which a royalty, stream or other interest relates may arise to defeat or impair the claim of the operator to a property. In addition, claims by third parties or aboriginal groups in Canada and elsewhere may impact on the operator’s ability to conduct activities on a property to the detriment of Franco-Nevada’s royalty, stream or other interests. To the extent an owner or operator does not have title to the property, it may be required to cease operations or transfer operational control to another party. Many royalties, streams or other interests are contractual, rather than an interest in land, with the risk that an assignment or bankruptcy or insolvency proceedings by an owner will result in the loss of any effective royalty, stream or other interest in a particular property. Further, even in those jurisdictions where there is a right to record or register royalties, streams or other interests held by Franco-Nevada in land registries or mining recorders offices, such registrations may not necessarily provide any protection to the holder of such interests. Accordingly, the holder of such interests may be subject to risk from third parties. As a result, known title defects, as well as unforeseen and unknown title defects may impact operations at a project in which Franco-Nevada has a royalty, stream or other interest and may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.

The operations in which Franco-Nevada holds a royalty, stream or other interest require various property rights, permits and licenses in order to conduct current and future operations, and delays or a failure to obtain or maintain such property rights, permits and licenses, or a failure to comply with the terms of any of such property rights, permits and licenses could result in interruption or closure of operations or exploration on the properties

Exploration, development and operation of mining and oil & natural gas properties are subject to laws and regulations governing health and worker safety, employment standards, environmental matters, mine development, project development, mineral production, permitting and maintenance of title, exports, taxes, labour standards, reclamation obligations, heritage and historic matters and other matters. Franco-Nevada, in respect of its own assets and operations, as well as the owners and operators of the properties in which Franco-Nevada holds a royalty, stream or other interest, require licenses and permits from various governmental authorities in order to conduct their operations. Future changes in such laws and regulations or in such licenses and permits could have a material adverse impact on the revenue Franco-Nevada derives from the royalty/stream interests. Such licenses and permits are subject to change in various circumstances and are required to be kept in good standing through a variety of means, including cash payments and satisfaction of conditions of issue. Such licenses and permits are subject to expiration, relinquishment and/or termination without notice to, control of or recourse by Franco‑Nevada. There can be no guarantee that Franco-Nevada or the owners or operators of those properties in which

52

Franco‑Nevada holds a royalty, stream or other interest, will be able to obtain or maintain all necessary licenses and permits in good standing that may be required to explore, develop and operate the properties, commence construction or operation of mining or oil & natural gas facilities, or maintain operations that economically justify the cost. Any failure to comply with applicable laws and regulations, permits and licenses, or to maintain permits and licenses in good standing, even if inadvertent, could result in interruption or closure of exploration, development or mining operations or fines, penalties or other liabilities accruing to the owner or operator of the project. Any such occurrence could substantially decrease production or cause the termination of operations on the property and have a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.

Franco-Nevada is exposed to risks related to the permitting, construction, development and/or expansion in relation to the projects and properties in which it holds a royalty, stream or other interest

Many of the projects or properties in which Franco-Nevada holds an interest are in the permitting, construction, development and/or expansion stage and such projects are subject to numerous risks, including, but not limited to delays in obtaining equipment, materials and services essential to the construction and development of such projects in a timely manner, delays or inability to obtain required permits, changes in environmental or other regulations, currency exchange rates, labour shortages, cost escalations and fluctuations in metal prices. There can be no assurance that the owners or operators of such projects will have the financial, technical and operational resources to complete permitting, construction, development and/or expansion of such projects in accordance with current expectations or at all.

The operations in which Franco-Nevada holds an interest are subject to environmental and endangered species laws and regulations that may increase the costs of doing business and may restrict the operations

All phases of the mining and the oil & natural gas business present environmental risks and hazards and are subject to environmental regulation pursuant to a variety of government laws and regulations, including laws and regulations relating to the protection of endangered and threatened species.  Compliance with such laws and regulations can require significant expenditures and a breach may result in the imposition of fines and penalties, which may be material.  In addition, such laws and regulations can constrain or prohibit the exploration and development of new projects or the development or expansion of existing projects.  Environmental legislation is evolving in a manner expected to result in stricter standards and enforcement, increases in land use restrictions, larger fines and liability and potentially increased capital expenditures and operating costs. Any breach of environmental legislation by Franco-Nevada, as an owner or operator of a property, or by owners or operators of properties underlying the asset portfolio could have a material impact on the viability of the relevant property and impair the revenue derived from the owned property or applicable royalty/stream, which could have a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.

Additional costs may be incurred as a result of international climate change initiatives and may affect the availability of resources and cause business disruptions

Franco-Nevada acknowledges climate change as an international and community concern.  Franco-Nevada supports and endorses various initiatives for voluntary actions consistent with international initiatives on climate change.  In addition to voluntary actions, governments are moving to introduce climate change legislation and treaties at the international, national, state/provincial and local levels.  Where legislation already exists, regulation relating to emission levels and energy efficiency is becoming more stringent.  Some of the costs associated with reducing emissions can be offset by increased energy efficiency and technological innovation.  However, if the current regulatory trend continues, Franco-Nevada expects this may result in increased costs at some of the operations underlying its royalty/stream interests.

Risks relating to foreign jurisdictions

Many of the Corporation’s royalty and stream interests relate to properties outside of the United States and Canada, including Latin America and, to a lesser extent, Africa. In addition, future investments may expose the Corporation to new jurisdictions. The ownership, development and operation of these properties and the mines and projects thereupon by their owners and operators are subject to the risks normally associated with conducting business in foreign countries. These risks include, depending on the country, nationalization and expropriation, social unrest and political instability, less developed legal and regulatory systems, uncertainties in perfecting mineral titles, trade barriers, exchange controls and material changes in taxation. These risks may, among other things, limit or disrupt the ownership, development or operation of properties, mines or projects in respect of which the Corporation holds royalty and stream interests, restrict the movement of funds, or result in the deprivation of contractual rights or the taking of property by nationalization or expropriation without fair compensation.

The Corporation applies various methods, where practicable, to identify, assess and, where possible, mitigate these risks prior to entering into stream and royalty agreements. Such methods generally include: conducting due diligence on the political, social, legal and regulatory systems and on the ownership, title and regulatory compliance of the properties subject to the royalty or stream interest; engaging experienced local counsel and other advisors in the applicable jurisdiction; negotiating where possible so that the applicable royalty or stream agreement contains appropriate protections, representations, warranties and, in each case as the Corporation deems necessary or appropriate in the circumstances, all applied on a risk-

53

adjusted basis. There can be no assurance, however, that the Corporation will be able to identify or mitigate all risks relating to holding royalty and stream interests in respect of properties, mines and projects located in foreign jurisdictions, and the occurrence of any of the factors and uncertainties described above could have a material adverse effect on the Corporation’s business, results of operations, cash flows and financial condition.

Franco-Nevada is exposed to risks of changing political attitudes and stability and ensuing changes in government regulation in the countries in which it holds royalty, stream or other interests

The properties on which Franco-Nevada holds or will hold a royalty, stream or other interest are located in multiple legal jurisdictions and political systems. There is sovereign risk in investing in foreign countries, including the risk that the resource concessions may be susceptible to revision or cancellation by new laws, may not be renewed as anticipated or may otherwise be adversely impacted by changes in direction by the government in question. It is possible that changes in applicable laws, regulations, or in their enforcement or regulatory interpretation could result in adverse changes to mineral or oil & natural gas operations. These are matters over which Franco-Nevada has no control. There is no assurance that future political and economic conditions in such countries will not result in the adoption of different policies or attitudes respecting the development and ownership of resources. Any such changes in policy or attitudes may result in changes in laws affecting ownership of assets, land tenure and resource concessions, licensing fees, taxation, royalties, price controls, exchange rates, export controls, environmental protection, labour relations, foreign investment, nationalization, expropriation, repatriation of income and return of capital, which may affect both the ability to undertake exploration and development on, or production from, the properties in which Franco-Nevada holds a royalty, stream or other interest. In certain areas where Franco-Nevada holds a royalty, stream or other interest, the regulatory environment is in a state of continuing change, and new laws, regulations and requirements may be retroactive in their effect and implementation. Any changes in governmental laws, regulations, economic conditions or shifts in political attitudes or stability are beyond the control of Franco-Nevada and the owners and operators of the properties in which Franco-Nevada has an interest and such changes may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.

Additionally, Franco-Nevada is indirectly exposed to the risks faced by the owners and operators of the properties in which Franco-Nevada holds or will hold royalties, streams or other interests in foreign jurisdictions.  These include risks related to political and economic instability, under-developed legal systems, inconsistencies in the application of local laws and other legal uncertainty, terrorism, military repression, political violence, crime, corruption, infectious diseases, unsophisticated infrastructure and inaccessibility.

Changes to provincial and state royalty frameworks may have an adverse effect on the revenue generated by energy assets

In addition to federal regulation, each Canadian province and U.S. state has legislation and regulations that govern royalties, production rates and other matters.  The royalty regime in a given province or state is a significant factor in the profitability of crude oil, natural gas liquids, sulfur and natural gas production.  Royalties payable on production from lands other than Crown or U.S. federal government lands are determined by negotiation between the mineral freehold owner and the lessee, although production from such lands is subject to certain taxes and royalties.  Royalties from production on Crown or U.S. federal government lands are determined by governmental regulation and are generally calculated as a percentage of the value of gross production.  The rate of royalties payable generally depends in part on prescribed reference prices, well productivity, geographical location, field discovery date, method of recovery and the type or quality of the petroleum product produced.  Other royalties and royalty-like interests are, from time to time, carved out of the working interest owner’s interest through non-public transactions.  These are often referred to as overriding royalties, gross overriding royalties, net profits interests, or net carried interests.

Occasionally the governments of the western Canadian provinces create incentive programs for exploration and development.  Such programs often provide for royalty rate reductions, royalty holidays, or royalty tax credits and are generally introduced when commodity prices are low to encourage exploration and development activity by improving earnings and cash flow within the industry.

Any increased royalty burden may affect the operations of the owners or operators of properties underlying Franco-Nevada’s energy assets which may materially and adversely affect its profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.

Proposed changes to U.S. federal mining and public land law could impose, among other things, royalties and fees paid to the U.S. government by mining companies and royalty holders

Periodically, members of the U.S. Congress have introduced bills which would supplant or alter the provisions of The General Mining Law of 1872 which governs the disposition of metallic minerals on lands owned by the federal government.  Some of the production covered by Franco-Nevada’s royalties occurs on unpatented mining claims located on U.S. federal lands.  There have been recent proposals to amend the U.S. mining law to impose a royalty on the production of select hardrock minerals, such as silver, gold and copper, from U.S. federal lands, and a reclamation fee on production from federal and other lands. 

54

Any such proposal, if enacted by the U.S. Congress, could substantially increase the cost of holding mining claims and could reduce the revenue Franco-Nevada receives from royalties on unpatented mining claims, and to a lesser extent, on other lands in the United States.  Moreover, such legislation could significantly impair the ability of owners of properties subject to Franco‑Nevada’s royalties to develop mineral resources on unpatented mining claims.  Although it is impossible at this time to predict what royalties and fees may be imposed in the future, the imposition of such royalties and fees could adversely affect the potential for development of such mining claims and the economics of existing operating mines on federal lands.  Passage of such legislation may result in a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition and the trading price of Franco-Nevada securities.

Adequate infrastructure may not be available to develop the properties in which Franco-Nevada has an interest

Mining, processing, development and exploration activities depend, to one degree or another, on adequate infrastructure. Reliable roads, bridges, power sources and water supply are important determinants, which affect capital and operating costs. Unusual or infrequent weather phenomena, sabotage, government or other interference in the maintenance or provision of such infrastructure could adversely affect the operations in which Franco-Nevada has a royalty/stream interest.

North American crude oil price differentials are expected to continue to be volatile through 2020 which will have an impact on crude oil prices for Canadian producers. Overall, supply in excess of current pipeline and refining capacity is expected to exist. Material structural changes are required to reduce these bottlenecks and the resulting price discounts. There are numerous projects proposed to alleviate pipeline bottlenecks in Canada and the United States, expand refinery capacity and expand or build new pipelines in Canada and the United States to source new markets, some of which are in the regulatory application phase. There can be no assurance that such regulatory approvals will be secured on a timely basis or at all.

Production is dependent on operators’ employees

Production from the properties in which Franco-Nevada holds an interest depends on the efforts of operators’ employees.  There is competition for geologists and persons with mining and oil & gas expertise.  The ability of the owners and operators of such properties to hire and retain geologists and persons with mining expertise is key to those operations.  Further, relations with employees may be affected by changes in the scheme of labour relations that may be introduced by the relevant governmental authorities in the jurisdictions in which those operations are conducted.  Changes in such legislation or otherwise in the relationships of the owners and operators of such properties with their employees may result in strikes, lockouts or other work stoppages, any of which could have a material adverse effect on such operations, results of operations and financial condition of Franco-Nevada.  If these factors cause the owners and operators of such properties to decide to cease production at one or more of the properties, such decision could have a material adverse effect on the business and financial condition of Franco-Nevada.

Franco-Nevada is subject to risks related to certain operations in developing economies

Certain operators are subject to risks normally associated with the conduct of business in developing economies.  Risks may include, among others, problems relating to power supply, labour disputes, delays or invalidation of governmental orders and permits, corruption, uncertain political and economic environments, civil disturbances and crime, arbitrary changes in laws or policies, foreign taxation and exchange controls, nationalization of assets, opposition to mining from environmental or other non-governmental organizations or changes in the political attitude towards mining, empowerment of previously disadvantaged people, local ownership requirements, limitations on foreign ownership, power supply issues, limitations on repatriation of earnings, infrastructure limitations and increased financing costs.  The above risks may limit, disrupt or negatively impact the operator’s business activities.

Franco-Nevada’s assets may be subject to risks related to indigenous peoples

Various international and national, state and provincial laws, codes, resolutions, conventions, guidelines, treaties, and other principles and considerations relate to the rights of indigenous peoples. Franco-Nevada holds royalty/stream interests on operations located in some areas presently or previously inhabited or used by indigenous peoples. Many of these materials impose obligations on government to respect the rights of indigenous people. Some mandate consultation with indigenous people regarding actions which may affect indigenous people, including actions to approve or grant mining rights or permits. The obligations of government and private parties under the various international and national requirements, principles and considerations pertaining to indigenous people continue to evolve and be defined. Franco-Nevada’s current and future operations are subject to a risk that one or more groups of indigenous people may oppose continued operation, further development, or new development of those projects or operations on which Franco-Nevada holds a royalty, stream or other interest.  Such opposition may be directed through legal or administrative proceedings or protests, roadblocks or other forms of public expression against Franco-Nevada or the operators’ activities.  Opposition by indigenous people to such activities may require modification of or preclude operation or development of projects or may require the entering into of agreements with indigenous people.  Claims and protests of indigenous peoples may disrupt or delay activities of the operators of Franco‑Nevada’s royalty/stream assets.

55

Franco-Nevada’s assets may be subject to risks relating to environment, social and governance (ESG) matters

Mining, processing and development activities are subject to ESG risks which could have a significant impact on project development, operational performance, reputation and social license to operate. ESG issues at the properties underlying Franco-Nevada’s assets could have a material and adverse effect on Franco-Nevada’s profitability, results of operations, financial condition, the trading price of Franco-Nevada securities and Franco-Nevada’s reputation. Franco-Nevada’s corporate policies including Investment Principles Policy (Environmental, Social and Governance) set out the principles regarding ESG matters which guide our investment decisions and the ongoing management of our assets in an effort to mitigate these risks.

Risks Related to Franco-Nevada’s securities

Franco-Nevada’s securities are subject to price volatility

Securities markets have a high level of price and volume volatility, and the market price of securities of many companies have experienced wide fluctuations in price which have not necessarily been related to the operating performance, underlying asset values or prospects of such companies. Factors unrelated to the financial performance or prospects of Franco-Nevada include macroeconomic developments in North America and globally, and market perceptions of the attractiveness of particular industries or asset classes. There can be no assurance that continued fluctuations in mineral and oil & natural gas prices will not occur. As a result of any of these factors, the market price of Franco-Nevada’s securities at any given time may not accurately reflect the long term value of Franco-Nevada.

In the past, following periods of volatility in the market price of a company’s securities, shareholders have instituted class action securities litigation against them. Such litigation, if instituted, could result in substantial cost and diversion of management attention and resources, which could significantly harm profitability and the reputation of Franco-Nevada.

There may be limitations on enforcement of civil judgments

A substantial portion of the assets of Franco-Nevada are located outside of Canada.  As a result, it may not be possible for investors in Franco-Nevada’s securities to collect from Franco-Nevada judgments obtained in courts in Canada predicated on the civil liability provisions of securities legislation of certain of the provinces and territories of Canada. It may also be difficult for investors in Franco-Nevada’s securities to succeed in a lawsuit in the United States, based solely on violations of Canadian securities laws.

Additional issuance of securities by Franco-Nevada may dilute existing securityholders, reduce some or all of Franco-Nevada’s financial measures on a per share basis, reduce the trading price of the Common Shares or other Franco-Nevada securities or impede Franco-Nevada’s ability to raise future capital

Franco-Nevada may issue additional securities in the future in connection with acquisitions, strategic transactions, financings or for other purposes.  To the extent additional securities are issued, Franco-Nevada’s existing securityholders could be diluted and some or all of Franco-Nevada’s financial measures could be reduced on a per share basis.  Additionally, Franco-Nevada securities issued in connection with a transaction may not be subject to resale restrictions and, as such, the market price of Franco-Nevada’s securities may decline if certain large holders of Franco-Nevada securities or recipients of Franco-Nevada securities in connection with an acquisition, sell all or a significant portion of such securities or are perceived by the market as intending to sell such securities.  In addition, such issuances of securities may impede Franco-Nevada’s ability to raise capital through the sale of additional equity securities in the future.

Franco-Nevada may be, or may become, a “passive foreign investment company,” which may result in adverse tax consequences for United States investors

If Franco-Nevada were to constitute a PFIC for any year during a U.S. holder’s holding period, then certain potentially adverse U.S. federal income tax rules would affect the U.S. federal income tax consequences to such U.S. holder resulting from the acquisition, ownership and disposition of Common Shares.

The U.S. Treasury Department has not issued specific guidance on how the income and assets of a non-U.S. corporation such as Franco-Nevada will be treated under the PFIC rules. Franco-Nevada believes, on a more-likely-than-not basis, that it was not a PFIC for its taxable year ended December 31, 2019, and, based on its current and anticipated business activities and financial expectations, Franco-Nevada expects, on a more-likely-than-not basis, that it will not be a PFIC for its current taxable year and for the foreseeable future.  However, Franco-Nevada believes that it was a PFIC for its taxable year ended December 31, 2011, and prior taxable years.

The determination as to whether a corporation is, or will be, a PFIC for a particular taxable year depends, in part, on the application of complex U.S. federal income tax rules, which are subject to differing interpretations and uncertainty. In addition, there is limited authority on the application of the relevant PFIC rules to entities such as Franco-Nevada. Accordingly, there can be no assurance that the Internal Revenue Service will not challenge the views of Franco-Nevada concerning its PFIC status. In addition, whether any corporation will be a PFIC for any taxable year depends on its assets and income over the course of such taxable year, and, as a result, Franco-Nevada’s PFIC status for its current taxable year and any future taxable 

56

year cannot be predicted with certainty. Each U.S. holder should consult its own tax advisor regarding the PFIC status of Franco-Nevada.

This risk factor is qualified in its entirety by the discussion set forth under the heading, “United States Federal Income Tax Considerations” contained in Franco-Nevada’s Annual Report on Form 40-F which has been filed with the SEC and can be found at the SEC’s website www.sec.gov.

Franco-Nevada’s business is subject to evolving corporate governance and public disclosure regulations that have increased both Franco-Nevada’s compliance costs and the risk of noncompliance, which could have an adverse effect on the price of Franco-Nevada’s securities

Franco-Nevada is subject to changing rules and regulations promulgated by a number of United States and Canadian governmental and self-regulated organizations, including the SEC, the Canadian Securities Administrators, the NYSE, the TSX, and the Financial Accounting Standards Board.  These rules and regulations continue to evolve in scope and complexity making compliance more difficult and uncertain.  For example, new rules have been proposed and enacted that will require Franco-Nevada to disclose on an annual basis certain payments made by Franco-Nevada, its subsidiaries or entities controlled by it, to domestic and foreign governments, including sub-national governments.  Further, Franco-Nevada’s efforts to comply with these and other new and existing rules and regulations have resulted in, and are likely to continue to result in, increased general and administrative expenses and a diversion of management time and attention from revenue-generating activities to compliance activities.

Franco-Nevada may fail to maintain the adequacy of internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act

Section 404 of the Sarbanes-Oxley Act of 2002 (“SOX”) requires an annual assessment by management of the effectiveness of Franco-Nevada’s internal control over financial reporting and an attestation report by Franco-Nevada’s independent auditors addressing this assessment.  While Franco-Nevada’s internal controls over financial reporting for the year ended December 31, 2019 were effective, Franco-Nevada may in the future fail to achieve and maintain the adequacy of its internal control over financial reporting, as such standards are modified, supplemented or amended from time to time, and Franco-Nevada may not be able to ensure that it can conclude on an ongoing basis that it has effective internal control over financial reporting in accordance with Section 404 of SOX.  Franco-Nevada’s failure to satisfy the requirements of Section 404 of SOX on an ongoing, timely basis could result in the loss of investor confidence in the reliability of its financial statements, which in turn could harm Franco-Nevada’s business and negatively impact the trading price of its Common Shares.  In addition, any failure to implement required new or improved controls, or difficulties encountered in their implementation, could harm Franco-Nevada’s operating results or cause it to fail to meet its reporting obligations.  Future acquisitions of companies may provide Franco-Nevada with challenges in implementing the required processes, procedures and controls in its acquired operations.  Acquired companies may not have disclosure controls and procedures or internal control over financial reporting that are as thorough or effective as those required by securities laws currently applicable to Franco-Nevada.

No evaluation can provide complete assurance that Franco-Nevada’s internal control over financial reporting will detect or uncover all failures of persons within Franco-Nevada to disclose material information otherwise required to be reported.  The effectiveness of Franco-Nevada’s controls and procedures could also be limited by simple errors or faulty judgments.  In addition, should Franco-Nevada expand in the future, the challenges involved in implementing appropriate internal control over financial reporting will increase and will require that Franco-Nevada continue to improve its internal control over financial reporting.  Although Franco-Nevada intends to devote substantial time and incur substantial costs, as necessary, to ensure compliance, Franco-Nevada cannot be certain that it will be successful in complying with Section 404 on an ongoing basis.

Franco-Nevada may become subject to burdensome regulatory requirements under U.S. laws regulating pension plans

Franco-Nevada may not qualify as an “operating company” for purposes of the Employee Retirement Income Security Act of 1974 (United States), as amended (“ERISA”). Consequently, if 25% or more of the issued Common Shares were held by private pension plans subject to ERISA or plans subject to the U.S. Internal Revenue Code’s “prohibited transaction” rules (such as individual retirement accounts), then Franco-Nevada’s assets would be treated as ERISA “plan assets”.  As a result, Franco-Nevada could become subject to the ERISA regulatory regime, including, among other potentially burdensome regulatory requirements, heightened fiduciary duties owed to plan participants. While Franco-Nevada intends to monitor beneficial ownership of its Common Shares by ERISA plans, there can be no assurance that Franco-Nevada will not become subject to ERISA regulations in the future. If Franco-Nevada were subject to ERISA regulatory requirements, it could have a material and adverse effect on Franco-Nevada’s ability to manage its business and/or its results of operations and financial condition.

57

DIVIDENDS

Franco-Nevada declares its dividends in U.S. dollars.  The following tables set forth the dividends paid by Franco-Nevada for each of the three most recently completed financial years in U.S. dollars and the Canadian dollar equivalent.

 

 

 

 

 

 

 

 

 

 

 

Dividends Paid in US$ (in millions)

    

2019

    

2018

    

2017

 

Per Common Share (in dollars)

 

$

0.99

 

$

0.95

 

$

0.91

 

Cash payments

 

$

138.2

 

$

136.1

 

$

125.8

 

DRIP payments(1)

 

$

48.8

 

$

41.7

 

$

42.1

 

In aggregate(1)

 

$

187.0

 

$

177.8

 

$

167.9

 

 

(1)

For 2019, 2018 and 2017, includes DRIP payments which were satisfied by the issuance of 558,770,  615,250, and 575,553 Common Shares respectively.

 

 

 

 

 

 

 

 

 

 

 

Dividends Paid in C$ (in millions)

    

2019

    

2018

    

2017

 

Per Common Share (in dollars)(1)

 

$

1.31

 

$

1.25

 

$

1.17

 

Cash payments(1)

 

$

183.2

 

$

178.5

 

$

162.9

 

DRIP payments(1)(2)

 

$

64.5

 

$

55.4

 

$

54.4

 

In aggregate(1)(2)

 

$

247.7

 

$

233.9

 

$

217.3

 

 

(1)

The exchange rate used to convert the dividends to C$ is the daily exchange rate posted by the Bank of Canada on the record date.

(2)

For 2019, 2018 and 2017, includes DRIP payments which were satisfied by the issuance of 558,770, 615,250, and 575,553 Common Shares respectively.

Franco-Nevada has adopted a dividend policy to pay an adequate sustainable dividend as determined by its Board of Directors to qualify its Common Shares for large generalist institutional funds. In July 2010, Franco-Nevada began to declare and pay monthly dividends and, effective Q2 2014, the Board of Directors began to pay dividends on a quarterly basis.  The Board of Directors may change the dividend policy at any time at its sole discretion and there is no assurance that Franco-Nevada will be able to pay any dividends or sustain any level of dividend payments.  It is expected that the Board of Directors will conduct periodic reviews of Franco-Nevada’s dividend policy.

On July 9, 2013, Franco-Nevada adopted a DRIP to provide, among other things, eligible holders of Franco-Nevada’s Common Shares with a means to reinvest dividends declared and payable to them as shareholders (less any withholding tax) in additional Common Shares of Franco-Nevada.  Currently, such Common Shares are issued from treasury at a 3% discount to the market price.  The discount may be adjusted in future but cannot exceed 5%.  Shareholders were able to participate in the DRIP starting with the October 2013 dividend payment.    During Q2 2018, Franco-Nevada amended and restated the DRIP to allow for the participation of certain non-Canadian and non-U.S. shareholders, subject to the satisfaction of certain conditions.  Non-Canadian and non-U.S. shareholders who are interested in participating in the DRIP should contact Franco-Nevada to determine whether they satisfy the necessary conditions to participate in the DRIP.

CAPITAL STRUCTURE

The authorized share capital of Franco-Nevada consists of an unlimited number of Common Shares and an unlimited number of preferred shares of which, as of March 17, 2020,  189,406,718 Common Shares and no preferred shares were outstanding.

Common Shares

Each Common Share carries the right to one vote at all meetings of shareholders of Franco-Nevada. There are no special rights or restrictions of any nature attached to the Common Shares. All Common Shares rank equally as to dividends, voting powers and participation in assets upon liquidation of Franco-Nevada.

Preferred Shares

The preferred shares may be issued in one or more series, each series to consist of such number of shares as may, before the issue thereof, be fixed by resolution of the Board of Directors. The directors shall determine before the issue thereof the designations, rights, privileges, restrictions and conditions attaching to the preferred shares of each series including the rate or amount of dividends or the method of calculating dividends, the dates of payment thereof, the redemption and/or purchase prices and terms and conditions of redemption and/or purchase, any voting rights, any conversion rights and any sinking fund or other provisions.

The preferred shares of each series will, with respect to payment of dividends and the distribution of assets in the event of liquidation, dissolution or winding up, rank on a parity with the preferred shares of every other series and be entitled to preference over the Common Shares and over any other shares ranking junior to the preferred shares. The preferred shares of any series may also be given such other preferences over the Common Shares and over any other shares ranking junior to the preferred shares as may be fixed by the directors.

 

58

MARKET FOR SECURITIES

The Common Shares of Franco-Nevada are listed and posted for trading on the TSX and the New York Stock Exchange (“NYSE”) in each case under the symbol “FNV”.

Trading Price and Volume

The following table sets forth the high and low prices and volumes for the Common Shares traded on the TSX and on the NYSE for the most recently completed financial year.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Common Shares TSX

 

Common Shares NYSE

 

 

    

High C$

   

Low C$

    

Volume

    

High $

    

Low $

    

Volume

 

2019

 

 

 

 

 

 

 

 

 

 

 

 

 

January

 

102.44

 

90.20

 

10,568,576

 

77.92

 

67.97

 

11,206,820

 

February

 

103.23

 

97.83

 

7,574,668

 

77.84

 

73.45

 

9,089,263

 

March

 

105.04

 

94.64

 

12,408,857

 

78.82

 

70.95

 

13,619,589

 

April

 

101.82

 

93.24

 

10,260,040

 

76.34

 

69.16

 

10,317,154

 

May

 

105.10

 

93.68

 

11,294,210

 

77.75

 

69.58

 

11,805,316

 

June

 

114.36

 

100.74

 

12,205,582

 

86.81

 

75.93

 

11,240,804

 

July

 

119.50

 

107.36

 

10,152,629

 

90.78

 

81.79

 

10,781,946

 

August

 

131.65

 

113.18

 

12,261,735

 

99.14

 

85.44

 

14,842,620

 

September

 

133.92

 

118.73

 

14,247,194

 

101.19

 

89.46

 

13,897,773

 

October

 

128.60

 

119.63

 

10,347,005

 

97.73

 

90.09

 

11,615,157

 

November

 

133.15

 

124.57

 

11,730,116

 

100.70

 

94.58

 

10,446,193

 

December

 

135.26

 

126.90

 

10,044,158

 

104.07

 

96.26

 

11,317,277

 

2020

 

 

 

 

 

 

 

 

 

 

 

 

 

January

 

151.56

 

130.28

 

8,268,380

 

114.50

 

99.66

 

12,641,417

 

February

 

163.20

 

139.64

 

10,102,163

 

122.65

 

104.00

 

14,599,492

 

March (1-17)

 

163.80

 

105.93

 

17,439,991

 

122.31

 

77.18

 

20,834,377

 

 

 

59

DIRECTORS AND OFFICERS

The following table sets forth, as at the date hereof, the name, province or state and country of residence, position held with Franco-Nevada and principal occupation of each director and executive officer of Franco-Nevada:

 

 

 

 

 

Name and Municipality of Residence

   

Position with Franco-Nevada(1)

   

Principal Occupation

 

 

 

 

 

Pierre Lassonde(4) 

 

Director and Chair

 

Chair, Franco-Nevada

Toronto, Ontario, Canada

 

 

 

 

 

 

 

 

 

David Harquail(5)

 

Director, Chief Executive Officer 

 

Chief Executive Officer, Franco-Nevada

Toronto, Ontario, Canada

 

 

 

 

 

 

 

 

 

Tom Albanese(3)

 

Director

 

Corporate Director

Hillsborough, New Jersey, U.S.A.

 

 

 

 

 

 

 

 

 

Derek W. Evans(3)

 

Director

 

President, Chief Executive Officer and

Calgary, Alberta, Canada

 

 

 

Director, MEG Energy Corp.

 

 

 

 

 

Catharine Farrow(2)

 

Director

 

President, FarExGeoMine Ltd.

Toronto, Ontario, Canada

 

 

 

 

 

 

 

 

 

Louis Gignac(2)

 

Director

 

Chair, G Mining Services Inc.

Brossard, Quebec, Canada

 

 

 

 

 

 

 

 

 

Jennifer Maki(3)

 

Director

 

Corporate Director

Toronto, Ontario, Canada

 

 

 

 

 

 

 

 

 

Randall Oliphant(3)

 

Director

 

Corporate Director

Toronto, Ontario, Canada

 

 

 

 

 

 

 

 

 

Hon. David R. Peterson(2)

 

Director

 

Chairman Emeritus, Cassels Brock &

Toronto, Ontario, Canada

 

 

 

Blackwell LLP

 

 

 

 

 

Elliott Pew(2)

 

Director

 

Chair, Enerplus Corporation

Boerne, Texas, U.S.A.

 

 

 

 

 

 

 

 

 

Paul Brink(6)

 

President & Chief Operating Officer

 

President & Chief Operating Officer,

Toronto, Ontario, Canada

 

 

 

Franco-Nevada

 

 

 

 

 

Sandip Rana

 

Chief Financial Officer

 

Chief Financial Officer, Franco-Nevada

Oakville, Ontario, Canada

 

 

 

 

 

 

 

 

 

Lloyd Hong

 

Chief Legal Officer & Corporate Secretary

 

Chief Legal Officer & Corporate

Toronto, Ontario, Canada

 

 

 

Secretary, Franco-Nevada


(1)All of the directors have served since November 2007 with the exception of Derek Evans, Tom Albanese, Catharine Farrow, Jennifer Maki and Elliott Pew who were appointed in August 2008, August 2013,  May 2015, May 2019 and September 2019 respectively.

(2)Member of the Compensation and Corporate Governance Committee.  Effective March 9, 2020, the committee’s name has been changed to the Compensation and ESG Committee.

(3)Member of the Audit and Risk Committee.

(4)Pierre Lassonde is not standing for re-election at the 2020 Annual Meeting.    The Board intends to appoint Mr. Lassonde as Chair Emeritus at that time.

(5)Effective as of the 2020 Annual Meeting, the Board intends to appoint David Harquail as the non-executive Chair of its Board.

(6)Effective as of the 2020 Annual Meeting, the Board intends to appoint Paul Brink as President & Chief Executive Officer and nominate him for election as a director of Franco-Nevada at that time.

Each director’s term of office expires at the next annual meeting of shareholders of Franco-Nevada or when his or her successor is duly elected or appointed, unless his or her term ends earlier in accordance with the articles or by-laws of Franco-Nevada, he or she resigns from office or he or she becomes disqualified to act as a director of Franco-Nevada.

As of the date hereof, the directors and executive officers of Franco-Nevada, as a group, beneficially own, directly or indirectly, or exercise control or direction over an aggregate of 3,215,330  Common Shares, representing approximately 1.7% of the Common Shares outstanding.

60

Biographical information regarding the current directors and executive officers of Franco-Nevada is provided as follows:

Pierre Lassonde, Director and Chair —  Pierre Lassonde is the independent Chair of the Board.  Mr. Lassonde is past Chair and a past director of the World Gold Council, past Chair of the Quebec National Art Museum and a director of Enghouse Systems Limited.  Mr. Lassonde received his Chartered Financial Analyst designation from the CFA Institute in 1984, a P. Eng (Association of Professional Engineers of Ontario) in 1976, a Master of Business Administration from the University of Utah in 1973, a B.Sc. (Electrical Engineering) from Ecole Polytechnique in 1971 and a B.A. from Seminaire de St. Hyacinthe/Université de Montréal in 1967.  Mr. Lassonde was appointed a Member of the Order of Canada in 2002, was inducted into the Canadian Mining Hall of Fame in 2013, was appointed Chair of the Canadian Council for the Arts in July 2015 and was awarded the Mining and Metallurgical Society of America’s (the “MMSA”) gold medal in February 2019, the highest honor awarded by the MMSA.  Mr. Lassonde is not standing for re-election at the 2020 Annual Meeting.  The Board intends to appoint Mr. Lassonde as Chair Emeritus at that time.

David Harquail, Chief Executive Officer and Director — David Harquail is Chair Designate and is currently the Chief Executive Officer and a director of Franco-Nevada. The Board of Franco-Nevada intends to appoint David Harquail as Chair of its Board of Directors following the 2020 Annual Meeting. He serves as a director of the Bank of Montreal and is the former Chair of the World Gold Council (2017-2020). He has also held senior executive roles and served as a director of numerous public mining companies and has been actively involved in industry organizations. Mr. Harquail holds a B.A.Sc. in Geological Engineering from the University of Toronto, an MBA from McGill University and is a registered Professional Engineer in Ontario. He is also a major benefactor of the School of Earth Sciences and its Mineral Exploration Research Centre (MERC) at Laurentian University in Sudbury as well as the Centre for Neuromodulation at Sunnybrook Health Sciences in Toronto.

Tom Albanese, Director —  Tom Albanese is a director of Franco-Nevada. He served as CEO of Vedanta Resources plc (2014 to 2017), CEO of Vedanta Limited (2014 to 2017) and was CEO of Rio Tinto plc (2007 to 2013). Mr. Albanese is the lead independent director of Nevada Copper Corp. and previously served on the boards of Vedanta Resources plc, Vedanta Limited, Rio Tinto plc, Ivanhoe Mines Limited, Palabora Mining Company and Turquoise Hill Resources Limited. Mr. Albanese holds a Master’s of Science degree in Mining Engineering and a Bachelor of Science degree in Mineral Economics both from the University of Alaska Fairbanks.

Derek W. Evans, Director — Derek Evans is President & CEO of MEG Energy Corp. (a Canadian oil sands company) and is a director of Franco-Nevada. He served as President and CEO and a director of Pengrowth Energy Corporation (an oil and natural gas company) from 2009 until March 15, 2018. Mr. Evans has over 30 years of experience in a variety of operational and senior executive positions in the oil and gas business in Western Canada. Mr. Evans holds a Bachelor of Science degree in Mining Engineering from Queen’s University and is a registered Professional Engineer in Alberta. Mr. Evans is also a member of the Institute of Corporate Directors.

Dr. Catharine Farrow, Director — Catharine Farrow is a director of Franco-Nevada. She is a Professional Geoscientist (APGO) with more than 25 years of mining industry experience. She also serves as a Director of Centamin plc and is active in the mining industry in both private companies and academia. From 2012 to 2017 she was Founding CEO, Director and Co-Founder of TMAC Resources Inc. Catharine has served on the Board of a number of not-for-profit and government Advisory Boards. She has been honoured as one of the 100 Global Inspirational Women in Mining (2015 and 2018) and is a past recipient of the William Harvey Gross Medal of the Geological Association of Canada (2000). Catharine obtained her BSc (Hons) from Mount Allison University, her MSc from Acadia University and her PhD from Carleton University. She also holds the ICD.D designation.

Louis Gignac, Director — Louis Gignac is Chair of G Mining Services Inc. (a private consultancy) and is a director of Franco-Nevada. Mr. Gignac previously served as President, CEO and a director of Cambior Inc., from 1986 to 2006 and previously held management positions with Falconbridge Copper Company and Exxon Minerals Company and has served as a director of several public companies. Mr. Gignac is a member of the Ordre des ingénieurs du Québec. Mr. Gignac holds a Doctorate of Engineering in Mining Engineering from the University of Missouri Rolla, a Master’s degree in Mineral Engineering from the University of Minnesota, and a Bachelor of Science degree in Mining Engineering from Laval University. Mr. Gignac was inducted into the Canadian Mining Hall of Fame in 2016.

Jennifer Maki, Director — Jennifer Maki is a director of Franco-Nevada. She is also a director of Baytex Energy Corp. She previously served as Chief Executive Officer of Vale Canada and Executive Director of Vale Base Metals (2014 to 2017) and previously held several other positions with Vale Base Metals, including Chief Financial Officer & Executive Vice-President and Vice-President & Treasurer. She has also served on the boards of not-for-profit organizations. Ms. Maki has a Bachelor of Commerce degree from Queen’s University and a postgraduate diploma from the Institute of Chartered Accountants, both in Ontario, Canada. She also holds the ICD.D designation.

Randall Oliphant, Director — Randall Oliphant is a director of Franco-Nevada. He has worked in natural resources in many capacities for over 30 years. From 1999 to 2003, Mr. Oliphant was the President and Chief Executive Officer of Barrick Gold Corporation, and since that time he has served on the boards of numerous public companies and not-for-profit organizations. He served as Executive Chairman of New Gold from 2009 to 2017. Mr. Oliphant presently serves on the advisory board of Metalmark Capital LLC, a leading private equity firm. Mr. Oliphant also served as Chairman of the World Gold Council from

61

2013 to 2017. Mr. Oliphant is a CPA, CA and was granted the designation of FCPA in 2016 in recognition of his outstanding contribution to his profession.

Hon. David R. Peterson, Director — David Peterson is Chairman Emeritus at the law firm Cassels Brock & Blackwell LLP and is a director of Franco-Nevada. He was the Premier of the Province of Ontario from 1985 to 1990. He was the founding Chair of the Toronto Raptors of the National Basketball Association and was the Chair of the successful Toronto Bid for the 2015 Pan Am Games and was the Chair of the 2015 Pan American and Parapan American Games Organizing Committee. Mr. Peterson also serves as a director of Rogers Communications Inc. Mr. Peterson is Chancellor Emeritus of the University of Toronto and a director of St. Michael’s Hospital Foundation. Mr. Peterson holds an LL.B. from the University of Toronto, was called to the Bar of Ontario in 1969, appointed Queen’s Counsel in 1980 and summoned by Her Majesty to the Privy Council in 1992.

Elliott Pew, Director — Elliott Pew is a director of Franco-Nevada. He has over 38 years of diverse experience in the oil and gas industry and currently serves as Chair of Enerplus Corporation. Previously, Mr. Pew served as a director of Southwestern Energy Company and as co-founder, executive and member of the board of managers of Common Resources I, II and III (private E&P). Prior to that, Mr. Pew held senior executive positions with Newfield Exploration Company in Houston and was Senior Vice President, Exploration of American Exploration Company. He holds an M.A. in Geology from the University of Texas at Austin and an A.B. in Geology from Franklin and Marshall College.

Paul Brink, President & Chief Operating Officer — Paul Brink is CEO Designate and is currently the President & Chief Operating Officer of Franco-Nevada.  The Board intends to nominate Mr. Brink for election as a director of Franco-Nevada at the 2020 Annual Meeting and also intends to appoint him as President & Chief Executive Officer following the 2020 Annual Meeting.  He has been with Franco-Nevada since its IPO in 2007 and successfully led its business development activities as SVP Business Development from 2008 until his promotion to President & Chief Operating Officer in 2018. He previously had roles in corporate development at Newmont, investment banking at BMO Nesbitt Burns and project financing at UBS. Mr. Brink holds a Bachelor’s degree in Mechanical Engineering from the University of Witwatersrand and a Master’s degree in Management Studies from Oxford University.

Sandip Rana, Chief Financial Officer — Sandip Rana, Chief Financial Officer, joined Franco-Nevada in April 2010. He previously served in treasurer and controller roles at old Franco-Nevada until 2002 and then acted as an international controller for Newmont. From 2003 to April 2010, Mr. Rana held financial roles at Four Seasons Hotels Limited where he last served as Vice-President Corporate Finance. Mr. Rana holds a Bachelor of Business Administration degree from the Schulich School of Business and is a Chartered Professional Accountant, CA. In February 2019, Mr. Rana was recognized as a Top Gun CFO by Brendan Wood International.

Lloyd Hong, Chief Legal Officer & Corporate Secretary — Lloyd Hong, Chief Legal Officer & Corporate Secretary, joined Franco-Nevada in December 2012. He previously was the Senior VicePresident, Legal Counsel and Assistant Secretary of Uranium One Inc. Prior to that, he was a partner with the Canadian law firm of Davis LLP (now DLA Piper (Canada) LLP) with a practice focused on corporate finance and mergers and acquisitions. Mr. Hong holds a Bachelor of Commerce degree from the University of Alberta and a Bachelor of Laws degree from Queen’s University. Mr. Hong is a member of The Law Society of Ontario and The Law Society of British Columbia (non-practising).

Cease Trade Orders, Bankruptcies, Penalties or Sanctions

Except as set out below, no director or executive officer of Franco-Nevada (or where applicable, personal holding company of a director or executive officer):

(a)

is, as at the date hereof, or has been, within 10 years before the date hereof, a director, chief executive officer or chief financial officer of any company (including the Company) that:

(i)

was subject to an order that was issued while the director or executive officer was acting in the capacity as director, chief executive officer or chief financial officer, or

(ii)

was subject to an order that was issued after the director or executive officer ceased to be a director, chief executive officer or chief financial officer and which resulted from an event that occurred while that person was acting in the capacity as director, chief executive officer or chief financial officer; or

(b)

is, as at the date hereof, or has been, within 10 years before the date hereof, a director or executive officer of any company (including the Company) that, while that person was acting in that capacity, or within a year of that person ceasing to act in that capacity, became bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency or was subject to or instituted any proceedings, arrangement, or compromise with creditors or had a receiver, receiver-manager or trustee appointed to hold its assets; or

(c)

has, within 10 years before the date hereof, become bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency, or become subject to or instituted any proceedings, arrangement or compromise with creditors, or  had a receiver, receiver-manager or trustee appointed to hold the assets of the director or executive officer; or

62

(d)

has been subject to:

(i)

any penalties or sanctions imposed by a court relating to securities legislation or by a securities regulatory authority or has entered into a settlement agreement with a securities regulatory authority; or

(ii)

any other penalties or sanctions imposed by a court or regulatory body that would likely be considered important to a reasonable investor in making an investment decision.

Derek Evans was a director (until his resignation in January 2016) of a private oil and gas company that sought protection under the Companies’ Creditors Arrangement Act (Canada) in May 2016.

Under a settlement agreement dated November 30, 2017, Mr. Louis Gignac, a director of the Corporation, resolved concerns of the Authorité des marches financiers (“AMF”) regarding a trade in shares of another issuer made in 2015. The AMF and Mr. Gignac agreed in the settlement agreement that Mr. Gignac traded shares in error while in possession of privileged information, as defined in the Securities Act (Quebec) (the “Quebec Act”). The AMF and Mr. Gignac agreed that Mr. Gignac self-reported his trading to the AMF, fully cooperated with the AMF and that Mr. Gignac had no intention of trading with privileged information. Mr. Gignac agreed to pay an administrative fine of $94,369 under section 204 of the Quebec Act to fully resolve the matter.

For the purposes of the above, “order” means:  (i) a cease trade order; (ii) an order similar to a cease trade order, or (iii) an order that denied the relevant company access to any exemption under securities legislation, and, with respect to each, was in effect more than 30 consecutive days.

Other Disclosed Matters

On October 17, 2017, the SEC filed civil charges against each of Rio Tinto plc, Tom Albanese and the former CFO of Rio Tinto plc, alleging, among other things, violations of the anti-fraud, reporting, books and records and internal control provisions of U.S. federal securities laws in connection with conduct at Rio Tinto plc and certain of its subsidiaries while Mr. Albanese was the CEO of Rio Tinto plc and prior to his becoming a director of the Corporation.  On March 2, 2018, the Australian Securities and Investments Commission (“ASIC”) commenced proceedings in the Federal Court of Australia against each of Rio Tinto Limited, Tom Albanese and the former CFO of Rio Tinto Limited relating to statements which ASIC alleges were misleading contained in the annual report of Rio Tinto Limited for 2011.

The Corporation is aware of the allegations and will continue to monitor the progress of the situation.

Conflicts of Interest

In the opinion of management of Franco-Nevada, there are no existing or potential conflicts of interest among Franco-Nevada, its directors, officers or other insiders of Franco-Nevada, other than as described in the following paragraph.  Various officers, directors or other insiders of the Corporation may hold senior positions with other entities, including entities involved in the resource industry or may otherwise be involved in transactions within the resource industry and may develop other interests outside the Corporation.  In the event that any such conflict of interest arises (or could potentially arise) for a director, such director will be required to disclose the conflict to a meeting of the directors of the Corporation and abstain from voting for or against the approval of such participation or such terms.  In the event that any such conflict of interest arises (or could potentially arise) for an officer or other insider of the Corporation, such person will be required to disclose the conflict to the Chief Legal Officer and abstain from participating in any discussions related to such matter and the Board will be apprised of such conflict.  In appropriate cases, the Corporation will establish a special committee of independent directors to review a matter in which several directors, or management, may have a conflict.  Any decision made by any of such directors involving the Corporation will be required to be made in accordance with their duties and obligations to deal honestly and in good faith with a view to the best interests of the Corporation and its shareholders.

LEGAL PROCEEDINGS AND REGULATORY ACTIONS

There are no outstanding material legal proceedings to which Franco-Nevada or any of its subsidiaries is a party or was a party to during fiscal 2019 or that any of its properties or assets is subject or was subject to, during fiscal 2019, and no proceedings are known to be contemplated against Franco-Nevada, any of its subsidiaries or any of their property or assets.

There have been no penalties or sanctions imposed against Franco-Nevada by a court relating to securities legislation or by a securities regulatory authority during fiscal 2019 and there have been no other penalties or sanctions imposed by a court or regulatory body against Franco-Nevada that would likely be considered important to a reasonable investor in making an investment decision. Franco-Nevada has not entered into any settlement agreement before a court relating to securities legislation or with a securities regulatory authority during fiscal 2019.

INTERESTS OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS

No director or executive officer of Franco-Nevada, any other insider of Franco-Nevada or any associate or affiliate of any of such individuals or companies has any material interest, directly or indirectly, in any transaction within the three most recently

63

completed financial years or during the current financial year that has materially affected Franco-Nevada or is reasonably expected to materially affect Franco-Nevada.

REGISTRAR AND TRANSFER AGENT

The registrar and transfer agent for the Common Shares is Computershare Investor Services Inc. at its principal office in Toronto, Ontario.

MATERIAL CONTRACTS

Franco-Nevada has not entered into a material contract since October 17, 2007 (date of incorporation) that is still in effect other than material contracts entered into in the ordinary course of business (none of which are required to be disclosed).

EXPERTS

Certain technical and scientific information contained in this AIF, including in respect of the Antamina project, the Antapaccay project, the Candelaria project and the Cobre Panama project was reviewed and approved in accordance with NI 43-101 by Phil Wilson, C.Eng., Vice President, Technical of the Corporation and a “Qualified Person” as defined in NI 43-101.

To the knowledge of Franco-Nevada, this expert held less than 1% of the outstanding securities of the Corporation or of any associate or affiliate thereof as of the date hereof, when he prepared the technical information contained in this AIF or following the preparation of such technical information. No firm or person received, or will receive, any direct or indirect interest in any securities of the Corporation or of any associate or affiliate thereof in connection with the preparation of such technical information.

Franco-Nevada’s auditors are PricewaterhouseCoopers LLP, Chartered Professional Accountants, who have issued a report of an independent registered public accounting firm dated March 9, 2020 in respect of Franco-Nevada’s consolidated financial statements as at December 31, 2019 and 2018 and for each of the years then ended and on the effectiveness of Franco‑Nevada’s internal control over financial reporting as at December 31, 2019.  They have advised Franco-Nevada that they are independent with respect to Franco‑Nevada within the meaning of the Chartered Professional Accountants of Ontario CPA Code of Professional Conduct and Public Company Accounting Oversight Board Rule 3520 Auditor Independence.

ADDITIONAL INFORMATION

Additional information relating to Franco-Nevada is available electronically on SEDAR at www.sedar.com and on the website of the SEC at www.sec.gov and on its website at www.franco-nevada.com.  The metric conversion table, listing of certain oil & gas terms, glossary of non-technical terms and glossary of technical terms are generally available on Franco-Nevada’s website.

Additional information, including directors’ and officers’ remuneration and indebtedness, principal holders of Franco-Nevada’s securities and securities authorized for issuance under equity compensation plans, is contained in Franco-Nevada’s management information circular for its annual and special meeting of shareholders scheduled to be held on May 6, 2020.  For information relating to compensation and corporate governance related matters, please see “Statement of Executive Compensation” and “Statement of Governance Practices”, respectively, in such circular.

Additional financial information is provided in Franco-Nevada’s financial statements and MD&A for its most recently completed financial year.

AUDIT AND RISK COMMITTEE INFORMATION

The following information is provided in accordance with Form 52-110F1 under the Canadian Securities Administrators’ National Instrument 52-110 — Audit Committees (“NI 52-110”).

Audit and Risk Committee Charter

The Audit and Risk Committee Charter (the “Charter”) is attached as Appendix A to this AIF.  The Charter was last updated effective March 9, 2020 to remove oversight over oil and gas reserves disclosure as the Corporation ceased providing such disclosure in 2018 as it was no longer material.

With respect to risk management, the Charter provides that the Audit and Risk Committee (the “ARC”) will generally review with management the Company’s significant risks and exposures and the steps management has taken to manage, monitor and control such risks and exposures. The ARC will also more specifically review the Company’s principal business, political, financial, litigation and control risks and exposures with a view to ensuring that such risks and exposures are being effectively managed, monitored or controlled. For more information regarding the ARC’s responsibilities relating to risk management, please see Appendix A to this AIF.

64

Composition of the Audit and Risk Committee

As of December 31, 2019, the ARC was composed of the following four directors:  Tom Albanese, Derek Evans, Jennifer Maki and Randall Oliphant, Chair.  Each director was and is considered “independent” and “financially literate” (as such terms are defined in NI 52-110, the rules of the NYSE and Rule 10A-3 of the U.S. Securities Exchange Act of 1934).

Relevant Education and Experience

Each member of the ARC is financially literate, i.e., has the ability to read and understand financial statements. Collectively, the ARC has the education and experience to fulfill the responsibilities outlined in the Charter, including those relating to risk management. The education and current and past experience of each ARC member that is relevant to the performance of his responsibilities as an ARC member is summarized below:

Education and Experience (Past and Present)

 

 

Tom Albanese

Lead Independent Director of Nevada Copper Corp.

 

Previous CEO of Vedanta Resources plc and Vedanta Limited (formerly known as SesaSterlite Ltd.)

 

Previous Chair of Vedanta Limited’s Risk Management Committee

 

Previous Chief Executive Officer of Rio Tinto plc

 

Previous Chair of Rio Tinto plc Risk Committee

 

 

Derek Evans

President, Chief Executive Officer and Director, MEG Energy Corp.

 

Previous President, CEO and Director, Pengrowth Energy Corporation

 

Previous President, CEO and Director of Focus Energy Trust

 

Previous Senior Executive of Renaissance Energy

 

Member, Institute of Corporate Directors

 

 

Jennifer Maki

Director, Baytex Energy Corp.

 

Previous CEO, Vale Canada and Executive Director of Vale Base Metals

 

ICD.D, Institute of Corporate Directors (2019)

 

Chartered Professional Accountant, CA (1996)

 

Bachelor of Commerce, Queen’s University

 

 

Randall Oliphant

Previous Executive Chair and Director of New Gold Inc.

 

Previous President, CEO and Chief Financial Officer of Barrick Gold Corporation

 

Previous Director and Chair of the audit committee of WesternZagros Resources Ltd.

 

FCPA, FCA (2016)

 

Chartered Professional Accountant, CA (1986)

 

Bachelor of Commerce (with honours), University of Toronto, 1984

 

Pre-Approval Policies and Procedures

The Board of Directors, upon the recommendation of the ARC, has adopted policies and procedures regarding services provided by external auditors (collectively, the “Auditor Independence Policy”). Under the Auditor Independence Policy, specific proposals for audit services and permitted non-audit services must be pre-approved by the ARC. The ARC may delegate to any one or more of its members pre-approval authority (other than pre-approval of the annual audit service engagement). Any approvals granted under this delegated authority must be presented to the ARC at its next meeting. The Auditor Independence Policy also provides that the ARC may pre-approve services (other than the annual audit service engagement) without the requirement for a specific proposal where the scope and parameters of such services and their attendant fees are clearly defined. The ARC must be informed in writing at its next scheduled meeting of any engagement of the external auditor to provide services in such circumstances. The Auditor Independence Policy deems de minimus non-audit services to have been pre-approved by the ARC in limited circumstances and subject to certain conditions being met.

The Auditor Independence Policy prohibits the external auditors from providing any of the following types of non-audit services:

bookkeeping or other services related to the accounting records or financial statements;

financial information systems design and implementation;

appraisal or valuation services, fairness opinion, or contribution-in-kind reports;

actuarial services;

internal audit outsourcing services;

65

management functions or human resources services;

corporate finance or other services;

broker-dealer, investment advisor or investment banking services;

legal services; and

any other service that under applicable law and generally accepted auditing standards cannot be provided by an external auditor.

The Auditor Independence Policy provides that the external auditor should not be precluded from providing tax or advisory services that do not fall within any the categories described above, unless the provision of those services would reasonably be expected to compromise the independence of the external auditor.

Reliance on Certain Exemptions

At no time since the commencement of Franco-Nevada’s most recently completed financial year has Franco-Nevada relied on any exemption from NI 52-110.

Audit Committee Oversight

At no time since the commencement of Franco-Nevada’s most recently completed financial year was a recommendation of the ARC to nominate or compensate an external auditor not adopted by the Board of Directors of Franco-Nevada.

Fees

For the years ended December 31, 2019 and 2018, PricewaterhouseCoopers LLP was paid fees from the Corporation as detailed below:

 

 

 

 

 

 

 

 

 

 

 

 

 

  

  

December 31, 2019

 

  

  

December 31, 2018

 

 

Audit Fees

 

 

C$

1,066,098

(1)

 

 

C$

979,600

(1)

 

Audit-Related Fees

 

 

C$

133,350

 

 

 

C$

51,450

 

 

Tax Fees

 

 

C$

68,372

 

 

 

C$

52,497

 

 

Other Fees

 

 

C$

NIL

 

 

 

C$

NIL

 

 

Total Fees

 

 

C$

1,267,820

 

 

 

C$

1,083,547

 

 

 

(1)

Fees are reported on an accrual basis for the relevant year and include out-of-pocket expenses and administrative fees.

 

For the year ended December 31, 2019, “Audit-Related Fees” noted above are total fees incurred for the French translation of documents.    For the year ended December 31, 2018, “Audit-Related Fees” noted above consisted of $43,575 and $7,875 for services related to: (i) the French translation of documents and (ii) accounting assistance, respectively.

 

 

66

APPENDIX A

FRANCO-NEVADA CORPORATION

AUDIT AND RISK COMMITTEE CHARTER

PURPOSE

The Audit and Risk Committee is appointed by the Board of Directors of Franco-Nevada Corporation (the “Company”) to assist the Board of Directors in its oversight and evaluation of:

the quality and integrity of the financial statements of the Company,

the compliance by the Company with legal and regulatory requirements in respect of financial disclosure,

the qualification, independence and performance of the Company’s independent auditors,

the performance of the Company’s Chief Financial Officer, and

risk management oversight, including climate change risks.

In addition, the Audit and Risk Committee provides an avenue for communication between the independent auditor, financial management, other employees and the Board of Directors concerning accounting and auditing matters.

The Audit and Risk Committee is directly responsible for the appointment, compensation, retention (and termination) and oversight of the work of the independent auditor (including oversight of the resolution of any disagreements between management and the independent auditor regarding financial reporting) for the purpose of preparing audit reports or performing other audit, review or attest services for the Company.

The Audit and Risk Committee is not responsible for:

planning or conducting audits,

certifying or determining the completeness or accuracy of the Company’s financial statements or that those financial statements are in accordance with applicable accounting principles or standards, or

guaranteeing the report of the Company’s independent auditor.

The fundamental responsibility for the Company’s financial statements and disclosure rests with management. It is not the duty of the Audit and Risk Committee to conduct investigations, to itself resolve disagreements (if any) between management and the independent auditor or to ensure compliance with applicable legal and regulatory requirements.

REPORTS

The Audit and Risk Committee shall report to the Board of Directors of the Company on a regular basis and, in any event, before the public disclosure by the Company of its quarterly and annual financial results. The reports of the Audit and Risk Committee shall include any issues of which the Committee is aware with respect to the quality or integrity of the Company’s financial statements, its compliance with legal or regulatory requirements in respect of financial matters and disclosure, and the performance and independence of the Company’s independent auditor.

The Committee shall also prepare, as required by applicable law, any committee report required for inclusion in the Company’s publicly filed documents.

COMPOSITION

The members of the Audit and Risk Committee shall be three or more individuals who are appointed (and may be replaced) by the Board of Directors of the Company on the recommendation of the Company’s Compensation and Corporate Governance Committee. Each of the members of the Audit and Risk Committee shall be “independent” and “financially literate” within the meaning of National Instrument 52-110 — Audit Committees (“NI 52-110”) and any other securities legislation and stock exchange rules applicable to the Company, and as confirmed by the Board of Directors using its business judgment. In addition, at least one member of the Audit and Risk Committee shall be a “financial expert” as determined by the Board of Directors in its business judgment. No member of the Audit and Risk Committee shall accept (directly or indirectly) any consulting, advisory or other compensatory fee from the Company or any of its subsidiaries or affiliates (collectively, the “Franco-Nevada Group”) (other than remuneration for acting in his or her capacity as a director) or be an “affiliated entity” within the meaning of NI 52‑110.

A-1

RESPONSIBILITIES

Independent Auditors

The Audit and Risk Committee shall:

·

Recommend to the Board of Directors the independent auditor to be nominated for the purpose of preparing or issuing an auditor’s report or performing other audit, review or attest services for the Company and the compensation of the independent auditor;

·

Recommend to the Board of Directors any change of the independent auditor, and oversee any such change to ensure compliance with the provisions of the Canada Business Corporations Act and applicable securities legislation;

·

Require and obtain confirmation from the independent auditor that it ultimately is accountable, and will report directly, to the Audit and Risk Committee and the Board of Directors of the Company;

·

Oversee the work of the independent auditor engaged for the purpose of preparing or issuing an auditor’s report or performing other audit, review or attest services for the Company, including the resolution of disagreements between management and the external auditor regarding financial reporting;

·

Pre-approve all audit and permitted non-audit services provided to the Company and its subsidiary entities by the independent auditor, including adopting policies and procedures for the pre-approval of the retention thereof (subject to any restrictions on such services imposed by applicable securities legislation) and including procedures for the delegation of authority to provide such approval to one or more members of the Audit and Risk Committee; and

·

At least annually, review the qualifications, performance and independence of the independent auditor. In doing so, the Audit and Risk Committee should, among other things, undertake the measures set forth in Schedule “A”.

The Financial Statements, Audit Process and Related Disclosure

The Audit and Risk Committee shall:

·

As may be delegated by the Board of Directors, review, approve and authorize the issuance of the Company’s interim financial statements, MD&A and interim earnings press releases before the Company publicly discloses this information;

·

Review and recommend to the Board of Directors for approval the Company’s annual financial statements, MD&A and press releases before the Company publicly discloses the information; and

·

Be satisfied that adequate procedures are in place for the review of the Company’s public disclosure of financial information extracted or derived from the Company’s financial statements and will periodically assess the adequacy of those procedures.

The Audit and Risk Committee shall also, as it determines to be appropriate:

·

Review with management and the independent auditor,

·

the planning and staffing of the audit by the independent auditor,

·

financial information and any earnings guidance provided to analysts and rating agencies, recognizing that this review and discussion may be done generally (consisting of a discussion of the types of information to be disclosed and the types of presentations to be made) and need not take place in advance of the disclosure of each release or provision of guidance,

·

any significant financial reporting issues and judgments made in connection with the preparation of the Company’s financial statements, including any significant changes in the selection or application of accounting principles or standards, any major issues regarding auditing principles and practices, and the adequacy of internal controls that could significantly affect the Company’s financial statements, as raised by the independent auditor, and review management’s response thereto,

·

all critical accounting policies and practices used,

·

all alternative treatments of financial information by applicable accounting principles or standards that have been discussed with management, ramifications of the use of such alternative disclosures and treatments, and the treatment preferred by the independent auditor,

A-2

·

the use of “pro forma” or “adjusted” information that is not consistent with applicable accounting principles or standards,

·

the effect of regulatory and accounting initiatives, as well as any off-balance sheet structures, transactions, arrangements and obligations (contingent or otherwise), on the Company’s financial statements,

·

any disclosures concerning any weaknesses or any deficiencies in the design or operation of internal controls or disclosure controls made to the Audit and Risk Committee by the Chief Executive Officer and the Chief Financial Officer during their certification process for forms filed with applicable securities regulators, and

·

the adequacy of the Franco-Nevada Group’s internal accounting controls and management information systems and its financial, auditing and accounting organizations and personnel and any special steps adopted in light of any material control deficiencies.

·

Review with the independent auditor,

·

the quality as well as the acceptability of the accounting principles or standards that have been applied,

·

any problems or difficulties the independent auditor may have encountered during the provision of its audit-related services, including any restrictions on the scope of activities or access to requested information and any significant disagreements with management, any management letter provided by the independent auditor or other material communication (including any schedules of unadjusted differences) to management and the Company’s response to that letter or communication, and

·

any changes to the Company’s significant auditing and accounting principles, standards and practices suggested by the independent auditor to members of management.

Risk Management Oversight

The Audit and Risk Committee shall:

·

Generally review with management the Franco-Nevada Group’s significant risks and exposures and the steps management has taken to manage, monitor and control such risks and exposures.

·

More specifically review the Company’s principal business, political, financial, litigation and control risks and exposures with a view to ensuring that such risks and exposures are being effectively managed, monitored or controlled by:

·

reviewing the Company’s risk philosophy as set forth by management and the Board of Directors,

·

reviewing management’s assessment of the significant risks and exposures facing the Company, including climate change risks (where applicable),

·

reviewing management’s policies, plans, processes and programs to manage and control significant risks and exposures, including the Company’s loss prevention policies, disaster response and recovery programs, corporate liability protection programs for directors and officer and any other insurance programs, as applicable,

·

receiving regular reports from management regarding the development and implementation of its policies, plans, processes and programs to manage, monitor and control significant risks and exposures, and

·

if the Audit and Risk Committee deems it appropriate, requesting the independent auditor’s opinion of management’s assessment of significant risks facing the Company and how effectively they are managed, monitored and controlled.

Compliance

The Audit and Risk Committee shall:

·

Establish procedures for:

·

the receipt, retention and treatment of complaints received by the Company regarding accounting, internal accounting controls or auditing matters, and

A-3

·

the confidential, anonymous submission by employees of the Franco-Nevada Group of concerns regarding questionable accounting or auditing matters.

·

Review and approve clear policies for the hiring by the Franco-Nevada Group of partners, employees or former partners or employees of the present and former independent auditor of the Company.

The Audit and Risk Committee shall also, as it determines appropriate:

·

Obtain reports from the Chief Financial Officer, other members of management and the independent auditor that the Company’s subsidiary/foreign affiliated entities are in conformity with applicable legal requirements and the Company’s Code of Business Conduct and Ethics, including disclosures of insider and affiliated party transactions.

·

Review with the Chief Financial Officer, other members of management and the independent auditor any correspondence with regulators or governmental agencies and any employee complaints or published reports, which raise material issues regarding the Company’s financial statements or accounting policies.

·

Advise the Board of Directors of the Company with respect to the Franco-Nevada Group’s policies and procedures regarding compliance with applicable laws and regulations and with the Company’s Code of Business Conduct and Ethics.

·

Review with the Chief Financial Officer legal matters that may have a material impact on the financial statements, the Franco-Nevada Group’s compliance policies and any material reports or inquiries received from regulators or governmental agencies.

·

Periodically review with management the need for an internal audit function.

Delegation

To avoid any confusion, the Audit and Risk Committee responsibilities identified above are the sole responsibility of the Audit and Risk Committee and may not be delegated to a different committee.

MEETINGS

The Audit and Risk Committee shall meet at least quarterly and more frequently as circumstances require. All members of the Audit and Risk Committee should strive to be at all meetings. The Audit and Risk Committee shall meet separately, periodically, with management and the independent auditors and may request any officer or employee of the Franco-Nevada Group or the Franco-Nevada Group’s outside counsel or independent auditor to attend meetings of the Committee or with any members of, or advisors to, the Committee. The Audit and Risk Committee also may meet with the investment bankers, financial analysts and rating agencies that provide services to, or follow, the Franco-Nevada Group.

The Audit and Risk Committee may form and delegate authority to individual members and subcommittees where the Committee determines it is appropriate to do so.

INDEPENDENT ADVICE

In discharging its mandate, the Audit and Risk Committee shall have the authority to retain (and authorize the payment by the Company of) and receive advice from special legal, accounting or other advisors as the Audit and Risk Committee determines to be necessary to permit it to carry out its duties.

ANNUAL EVALUATION

At least annually, the Audit and Risk Committee shall, in a manner it determines to be appropriate:

·

Perform a review and evaluation of the performance of the Committee and its members, including the compliance of the Audit and Risk Committee with this Charter.

·

Review and assess the adequacy of its Charter and recommend to the Board of Directors any improvements to this Charter that the Committee determines to be appropriate.

A-4

SCHEDULE “A”

Qualifications, Performance and Independence of Independent Auditor

·

Review the experience and qualifications of the senior members of the independent auditor’s team.

·

Confirm with the independent auditor that it is in compliance with applicable legal, regulatory and professional standards relating to auditor independence.

·

Review annual reports from the independent auditor regarding its independence and consider whether there are any non-audit services or relationships that may affect the objectivity and independence of the independent auditor and, if so, recommend that the Board of Directors of the Company take appropriate action to satisfy itself of the independence of the independent auditor.

·

Obtain and review such report(s) from the independent auditor as may be required by applicable legal and regulatory requirements.

Updated:  March 9, 2020

 

 

A-5

 

Picture 17