EX-99.1 2 exhibit99-1.htm SOUTH RAILROAD PROJECT, FORM 43-101F1 TECHNICAL REPORT, UPDATED PRELIMINARY FEASIBILITY STUDY, ELKO COUNTY, NEVADA, DATED EFFECTIVE FEBRUARY 13, 2020 Exhibit 99.1
Exhibit 99.1




SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

DATE AND SIGNATURES PAGE

The effective date of this Technical Report is February 13, 2020. The issue date of this Technical Report is March 23, 2020.

(Signed) “Art S Ibrado” March 23, 2020
Art S. Ibrado, PE Date
 
(Signed) “Mathew Sletten” March 23, 2020
Mathew Sletten, PE Date
 
(Signed) “Steven Ristorcelli” March 23, 2020
Steven Ristorcelli, CPG Date
 
(Signed) “Michael B. Dufresne” March 23, 2020
Michael B. Dufresne, P.Geol., P.Geo. Date
 
(Signed) “Michael Lindholm” March 23, 2020
Michael Lindholm, CPG Date
 
(Signed) “Thomas Dyer” March 23, 2020
Thomas Dyer, PE Date
 
(Signed) “Gary L. Simmons” March 23, 2020
Gary L. Simmons, QP Date
 
(Signed) “Carl Defilippi” March 23, 2020
Carl Defilippi, PE Date
 
(Signed) “Richard DeLong” March 23, 2020
Richard DeLong, QP MMSA, RG, PG Date
 
(Signed) “Kenneth L. Myers” March 23, 2020
Kenneth L. Myers, PE Date

 


 

 

i

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SOUTH RAILROAD PROJECT FORM 43-101F1 TECHNICAL REPORT

TABLE OF CONTENTS

SECTION PAGE
DATE AND SIGNATURES PAGE i
TABLE OF CONTENTS ii
LIST OF APPENDICES iv
1 EXECUTIVE SUMMARY 1-1
2 INTRODUCTION 2-1
3 RELIANCE ON OTHER EXPERTS 3-1
4 PROPERTY DESCRIPTION AND LOCATION 4-1
5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY 5-1
6 HISTORY 6-1
7 GEOLOGICAL SETTING AND MINERALIZATION 7-1
8 DEPOSIT TYPES 8-1
9 EXPLORATION 9-1
10 DRILLING 10-1
11 SAMPLE PREPARATION, ANALYSES AND SECURITY 11-1
12 DATA VERIFICATION 12-1
13 MINERAL PROCESSING AND METALLURGICAL TESTING 13-1
14 MINERAL RESOURCE ESTIMATES 14-1
15 MINERAL RESERVE ESTIMATES 15-1
16 MINING METHODS 16-1
17 RECOVERY METHODS 17-1
18 PROJECT INFRASTRUCTURE 18-1
19 MARKET STUDIES AND CONTRACTS 19-1
20 ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL OR COMMUNITY IMPACT 20-1

 

 

ii

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

21 CAPITAL AND OPERATING COSTS 21-1
22 ECONOMIC ANALYSIS 22-1
23 ADJACENT PROPERTIES 23-1
24 OTHER RELEVANT DATA AND INFORMATION 24-1
25 INTERPRETATION AND CONCLUSIONS 25-1
26 RECOMMENDATIONS 26-1
27 REFERENCES 27-1

 

 

iii

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

LIST OF APPENDICES

APPENDIX DESCRIPTION PAGE
A PRELIMINARY FEASIBILITY STUDY CONTRIBUTORS AND PROFESSIONAL QUALIFICATIONS – CERTIFICATES OF QUALIFIED PERSONS A-1
B CLAIMS LIST B-1
C BREAKDOWN OF MINERAL RESOURCES BY AREA AND OXIDATION STATE C-1

 

 

iv

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 1 TABLE OF CONTENTS

SECTION     PAGE
1 SUMMARY 1-1
  1.1 PRINCIPAL FINDINGS 1-2
  1.2 PROPERTY DESCRIPTION AND OWNERSHIP 1-3
  1.3 EXPLORATION AND MINING HISTORY 1-3
  1.4 GEOLOGY AND MINERALIZATION 1-3
  1.5 DATA VERIFICATION 1-4
  1.6 MINERAL PROCESSING AND METALLURGICAL TESTING 1-5
    1.6.1 Pinion Deposit Tests 2016 – 2019 1-5
    1.6.2 Gold Standard Dark Star Deposit Metallurgical Testing 1-8
    1.6.3 Comminution Characterization and Load Permeability Tests 1-11
    1.6.4 Geo-metallurgy Characterization and Recovery Models 1-11
    1.6.5 Reagent Consumption 1-12
  1.7 RECOVERY METHODS 1-13
  1.8 MINERAL RESOURCE ESTIMATE AND MINERAL RESERVE ESTIMATE 1-13
    1.8.1 Mineral Resource Estimate 1-13
    1.8.2 Mineral Reserve Estimate 1-15
  1.9 MINING METHODS 1-16
  1.10 INFRASTRUCTURE 1-17
  1.11 ENVIRONMENT AND PERMITTING 1-17
  1.12 WATER MANAGEMENT 1-18
  1.13 CAPITAL COST SUMMARY 1-19
  1.14 OPERATING COST SUMMARY 1-19
  1.15 CONCLUSIONS AND RECOMMENDATIONS 1-19

SECTION 1 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 1-1: Key Project Data 1-2
Table 1-2: Head Assays and Geo-metallurgical Characterization of Pinion Samples 1-6
Table 1-3: Summary of Column Leach Test Results for Pinion 1-6
Table 1-4: Head Assays and Geo-metallurgical Characterization of Dark Star Samples 1-8
Table 1-5: Summary of Column Leach Test Results for Dark Star 1-9
Table 1-6: Dark Star, Pinion and Jasperoid Wash Estimated Mineral Resources 1-14

 

 

1-i

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Table 1-7: North Bullion Mineral Resources 1-15
Table 1-8: Total Railroad-Pinion Mineral Resources 1-15
Table 1-9 Proven and Probable Mineral Reserves 1-16
Table 1-10: Capital Expenditure Schedule 1-19
Table 1-11: LOM Operating Costs 1-19
Table 1-12: Economic Analysis Summary 1-20

SECTION 1 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 1-1: 2016-2017 Gold Extraction vs. Days under Leach for Column-Leach Tests 1-7
Figure 1-2: 2019 Pinion Gold Extraction vs. Days under Leach for Column-Leach Tests 1-7
Figure 1-3: Conventional Crush vs. HPGR Gold Extraction Comparison 1-8
Figure 1-4: 2017 Dark Star Column-Leach Gold Extraction vs. Days Under Leach 1-9
Figure 1-5: 2019 Dark Star Column-Leach Gold Extraction vs. Days under Leach 1-10
Figure 1-6: Conventional Crush vs. HPGR Gold Extraction Comparison, Dark Star Main 1-11

 

 

1-ii

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

1 SUMMARY

This updated Technical Report (“Technical Report”) has been prepared by M3 Engineering and Technology Corporation (“M3”) with Gold Standard Ventures Corp. (“Gold Standard” or “GSV”) in accordance with the National Instrument 43-101 Standards of Disclosures for Mineral Projects (“NI 43-101”). The Technical Report presents the results of the South Railroad preliminary feasibility study (“PFS”), incorporating new design-work, scheduling, and projected costs, in support of mineral resource and mineral reserve estimates in the Dark Star and Pinion gold deposits.

Gold Standard’s Railroad Pinion property is located in the Bullion mining district of the southern Carlin trend in Nevada. The property has two adjacent parts, the North Railroad portion (“North Railroad”), which includes POD, Sweet Hollow, and North Bullion (collectively called the North Bullion deposits, or the North Bullion area), and the South Railroad portion (“South Railroad”), which includes Dark Star, Pinion, and Jasperoid Wash.

Gold Standard has drilled 66 new holes on the Railroad-Pinion property in 2019, which post-dated the initial preliminary feasibility study. This drilling was primarily focused on obtaining metallurgy samples, generating geotechnical data, or for exploration of secondary targets. The new drilling at Dark Star and Pinion was evaluated with respect to the mineral resource models and it was determined there would be minimal to no impact on estimated volumes and grades as reported in this Technical Report.

Trade-off studies were conducted after the initial preliminary feasibility study. The results of these studies were incorporated in this update, including the following:

  • The base case was revised with a lease-to-own strategy for mining equipment.

  • Optimized mine plan to improve ounce production schedule that enhance net present value (“NPV”) and lower pre-stripping costs. The optimized mine design reduced pre-stripping to accelerate run-of-mine (“ROM”) leach production from Dark Star.

  • The heap leach pad closure plan was changed to incorporate a clay cover rather than the higher-cost, high- density polyethylene cover option. This change is in line with Nevada permitting requirements.

  • Included salvage value at the end of mine life for major mining equipment and power generation units.

  • Toll milling costs for sulfide ore were captured.

  • Power generation on-site has been incorporated instead of the original line power from Nevada Energy (“NVE”). This increases capital and operating costs for liquified natural gas (“LNG”).

  • Gold ounces produced decrease slightly (936,000 ounces to 923,000 ounces) as a result of mine plan optimization which defers high-pressure grinding rolls (“HPGR”) processing. Silver ounces produced remains the same.

Extensive metallurgical testing has been completed for the Dark Star and Pinion deposits and is ongoing for the Jasperoid Wash deposit. On the other hand, the North Railroad portion of the property has not been tested comprehensively for metallurgical response.

Gold Standard reports mineral reserves for Dark Star and Pinion deposits in this Technical Report. The PFS, which includes the mine schedule, process-plant design, and financial analysis, covers only these two deposits.

The proposed project is an open-pit gold mine operation that will deliver ore to a 47.2 million-tonne heap leach facility over 8 years of mine life. The heap leach facility will treat the ore with three stages of crushing, agglomeration, and leaching on a dedicated leach pad. Tertiary crushing is planned to be accomplished with HPGR. Approximately 65% of the ore will be stacked and leached as ROM ore after blasting optimized to produce a fragmentation that has a P80 of about 6 inches (150 mm).

 

1-1

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Gold Standard selected M3 and other third-party consultants to prepare mineral resource/reserve estimates, mine plans, process plant design, and to complete environmental studies and cost estimates used for this Technical Report. All consultants have the capability to support the project, as required and within the confines of their expertise, from preliminary feasibility study to full operation.

1.1 PRINCIPAL FINDINGS

The key project parameters and findings are presented in Table 1-1, including a summary of the project size, productions, capital and operating costs, metal prices, and financial indicators.

Table 1-1: Key Project Data

Mine Life 8 Years + pre-strip (8 months)
Mine Type Open Pit
Process Description 30.7 M tonnes ROM heap leach; 16.1 M tonnes 3-stage crush with HPGR and agglomeration to heap leach, 0.37 M tonnes sulfide ores to toll milling.
Gold recovery by carbon columns, ADR plant
Total Mineral Reserve Estimate 47.2 M Tonnes
Average Grade 0.82 g Au/t Au; 4.70 g Ag/t Ag (Pinion)
Contained Gold / Silver Ounces 1.246 M oz Au; 2.705 M oz Ag (Pinion)
Average Recovery ROM: 72% Au, 22% Ag; HPGR: 76% Au, 43% Ag
Annual Tonnes Moved 24 Million Tonnes
Annual Mineral Reserve Estimate 5.9 Million Tonnes
Sulfide Ore to Toll Milling 373 Million Tonnes
Strip Ratio 3.07:1
Design Process Throughput (tonnes/day) 10,000 crushing/agglomeration; 22,500 stacking
Initial Capital Expenditures $132.9 M
Expansion Capital Expenditures $64.8 M
Sustaining Capital Expenditures $87.9 M
 
Payable Metals  
Gold, oz 918,000
Silver, oz 1,040,000
 
Unit Operating Costs  
Average Life of Mine (“LOM”) Mining Costs $1.75/tonne
Average LOM Processing Costs $1.83/tonne ROM, $4.95/tonne HPGR
G & A $0.70 /ore tonne
Cash Costs $601/oz
Cash Costs After By-Product Credit $582/oz
All in Sustaining Costs (“AISC”) $707/oz

 

Financial Indicators Base +200 Base +100 Base Case Base -100 Base -200
Gold Price (per troy oz) $1,600 $1,500 $1,400 $1,300 $1,200
Silver Price (per troy oz) $19.56 $18.33 $17.11 $15.89 $14.67
Pre-tax Cash Flow, $M $623.0 $531.3 $439.7 $348.1 $256.5
Pre-tax NPV (5%) in $M $481.2 $406.3 $331.4 $256.5 $181.6
Pre-tax Internal Rate of Return (IRR) 61.3% 53.8% 46.1% 38.1% 29.6%
Pre-tax Payback (Years) 1.8 1.9 3.2 3.4 3.7
After-tax Cash Flow, $M $506.3 $432.1 $357.6 $282.9 $207.6
After-tax NPV (5%) in $M $386.5 $325.9 $265.0 $204.0 $142.4
After-tax IRR 53.3% 46.8% 40.0% 33.0% 25.4%
After-tax Payback (Years) 1.9 3.1 3.3 3.5 3.8

The effective dates of the Pinion and Dark Star databases on which the mineral resources described in this Technical Report are estimated are May 31, 2019 and April 26, 2019, respectively. The effective date of both the Pinion and Dark Star mineral resource estimates is August 7, 2019. The effective dates of the Jasperoid Wash database and mineral

 

1-2

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

resource estimate are October 6, 2018 and November 15, 2018, respectively. The effective date of the North Bullion mineral database and mineral resource estimates are August 18, 2017 and September 15, 2017, respectively. The effective date of the Pinion and Dark Star mineral reserve estimates is February 13, 2020.

1.2 PROPERTY DESCRIPTION AND OWNERSHIP

The Railroad Pinion property is in the Piñon Range in Nevada, accessed primarily from U.S. Interstate 80 (“I-80”), approximately 442 km west of Salt Lake City, Utah, and 467 km east of Reno, Nevada. The property is located between 13 and 29 km south of I-80 and can be reached by a series of paved and gravel roads from Elko, Nevada (population 18,300). The property is centered approximately at UTM NAD27 Zone 11 coordinates of 585,000E and 4,480,000N.

Gold Standard’s contiguous North and South Railroad portions of the Railroad-Pinion property constitute a combined land position totaling 21,679 hectares in Elko County, Nevada, centered approximately at UTM NAD27 Zone 11 with coordinates of 585,000E and 4,480,000N. This includes 1,454 claims owned by Gold Standard and 207 claims held under lease, a total of 30 claims are patented. There is also a total of 9,562 gross hectares of private lands of which Gold Standard’s ownership of the subsurface mineral rights varies from 49.2% to 100%.

1.3 EXPLORATION AND MINING HISTORY

The Railroad–Pinion property is being explored on an ongoing basis by Gold Standard using geological mapping, geochemical and geophysical surveying, and drilling. Exploration work by Gold Standard commenced in 2010 and has resulted in the identification of 17 prospect areas or zones of mineralization within the property.

Twenty-one different historical operators are known to have drilled 1,084 holes, for a total of 152,566.1 m, from 1969 through 2008. As of the database effective dates, Gold Standard has drilled 848 holes for a total of 248,227.1 m. At least 74% of all drilling used RC methods. However, the amount of RC drilling may be understated because the hole-types are not known for a substantial number of holes drilled in the late 1980s and 1990s, when RC drilling was common.

1.4 GEOLOGY AND MINERALIZATION

The Railroad-Pinion property is located in the southern portion of the Carlin trend, centered on the Railroad dome in the Piñon Range, which is comprised of Ordovician through Permian marine sedimentary rocks. Eastern assemblage formations throughout the property include the Pogonip, Hanson Creek, Eureka Quartzite, Lone Mountain Dolomite, Oxyoke, Beacon Peak, Sentinel Mountain Dolomite, and Devils Gate Limestone and Tripon Pass formations. Siliceous clastic units include those of the Webb, Chainman, and Tonka formations. The north-south-striking Bullion fault corridor separates Tertiary volcanic rocks to the east from the Paleozoic sedimentary units in the range, which have been intruded by a complex of Eocene igneous rocks centered south of Bald Mountain, in the core and east flank of the range.

The gold-silver deposits within the Railroad-Pinion property that are the focus of this Technical Report are considered to be Carlin-type, sedimentary-rock-hosted deposits. Precious metal mineralization is generally submicroscopic, disseminated, and hosted principally in sedimentary rocks, with some mineralization in felsic dikes and sills as well.

In the South Railroad portion of the property, the Dark Star Main (“Dark Star Main”) and Dark Star North (“Dark Star North”) zones, which comprise the Dark Star deposit are hosted primarily within Pennsylvanian-Permian rocks, with minor amounts of gold mineralization found in the Chainman Formation and Tertiary conglomerates. The deposits are centered along the roughly north-south Dark Star fault corridor, within which is a horst block and associated silicified zone bounded by the West fault and Dark Star fault. Gold mineralization in the horst block is hosted in the middle, coarse-grained conglomeratic and bioclastic limestone-bearing unit of a Pennsylvanian-Permian undifferentiated

 

1-3

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

sequence interpreted to be equivalent to the Tomera Formation. Mineralization dips steeply to the west near the surface at Dark Star Main and Dark Star North, but dips less steeply at depth at Dark Star Main.

Also, in the South Railroad portion of the property, the Pinion deposit is situated in a sequence of Paleozoic sedimentary rocks exposed within large horst blocks in which the sedimentary rocks have been broadly folded into a south- to southeastward-plunging, asymmetric anticline. The axis of this Pinion anticline trends approximately N50ºW to N60ºW and can be traced for approximately 3.2 km. The limbs of the anticline dip shallowly at 10° to 25° to the west, and more steeply at 35° to 50° to the east. Disseminated gold and silver mineralization at the Pinion deposit is strongly controlled by a 3 m to 120 m-thick dissolution-collapse breccia at the contact between calcarenite of the Devils Gate Limestone and the overlying silty micrite of the Tripon Pass Formation. Gold deposition was contemporaneous with breccia development, quartz veins formation, silica ± barite replacement and infill of open spaces.

The Jasperoid Wash disseminated gold deposit, also located in the South Railroad portion of the property, is hosted by altered Tertiary feldspar porphyry dikes and their host Pennsylvanian-Permian conglomeratic rocks of a Tomera Formation equivalent. The deposit has approximate extents of 1,400 m to the north and a width of about 1,100 m, and is partially contained within an elongate, north to south, steeply dipping structural corridor. Drilling shows the deposit dips steeply to the west nearby and within Tertiary dikes; east of the dikes, the deposit dips gently to the west. The gold is inferred to be submicroscopic in grain size, however, petrographic studies have yet to be performed.

In the North Railroad portion of the property, disseminated gold mineralization has been defined by drilling in the North Bullion, POD, and Sweet Hollow zones. The mineralization is focused in the footwall of the Bullion fault zone. Faults appear to be important controls on mineralization. In general, gold-silver mineralization is localized in gently to moderately dipping, strongly sheared rocks of the Webb and Tripon Pass formations, in dissolution-collapse breccia developed above and within silty micrite of the Tripon Pass Formation, and calcarenite of the Devils Gate Limestone. The top of gold mineralization varies from 105 m to 400 m below the surface and varies in dip from 10° to 45° to the east. Gold is associated with “sooty” sulfide minerals, silica, carbon, clay, barite, realgar, and orpiment.

1.5 DATA VERIFICATION

Mr. Ristorcelli is satisfied that the Pinion, Dark Star, and Jasperoid Wash drilling databases are in good condition. Various audits and checks were performed by Mine Development Associates Inc. (“MDA”) to verify collar coordinates, down-hole deviation surveys, geology and assay data in the drill-hole database. All Gold Standard gold assay data was verified using digital laboratory certificates. However, about one third of the Pinion assays and one quarter of the Dark Star assays from historical drill campaigns were unsupported with original assay certificates. Drill-hole data lacking adequate supporting documentation, as well as data from holes observed during sectional modeling to be inconsistent with surrounding holes, were treated as lower confidence, or excluded from use in modeling and estimation. Mr. Dufresne states the North Bullion area database has undergone extensive verification.

In 2019, Gold Standard supplemented their Pinion silver database with re-assayed individual samples for which composites of multiple intervals had previously been analyzed. Over 50% of the original certificates were available for all silver data and were used for verification. Quality assurance/quality control (“QA/QC”) data was also evaluated, and the silver data was deemed acceptable for use in estimation of classified mineral resources.

Cyanide-soluble gold assays at Dark Star and Pinion were not verified, and no QA/QC data was available for evaluation. Inorganic carbon and sulfide sulfur data were audited and determined to be adequate for use in their respective estimates done for metallurgical characterization. Carbonate carbon was also verified as adequate. No QA/QC data was associated with the carbon and sulfur analyses.

There is no evidence of significant historical QA/QC programs for drilling in the South Railroad portion of the property prior to 2014. For Gold Standard programs, the QA/QC program was minimal in 2014 through 2016 but was more

  

1-4

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

comprehensive in 2017 and 2018. The results and amount of QA/QC data, as well as non-remedied QA/QC “failures,” were considered in mineral resource classification for the Dark Star, Pinion, and Jasperoid Wash deposits. Mr. Ristorcelli concludes that the Dark Star, Pinion, and Jasperoid Wash analytical data are adequate for the purposes used in this Technical Report, subject to issues described in Section 12.

Mr. Dufresne concludes that the QA/QC protocols employed by Gold Standard throughout the 2010 to 2017 drilling programs at the North Bullion deposits were adequate and appropriate for ensuring high accuracy and precision in the sample assays. However, no QA/QC evaluations were done on historical drill campaigns. Mr. Dufresne considers the North Bullion area drill database sufficiently verified for use in the mineral resource estimation discussed in Section 14.5.

Barium was estimated in the Pinion deposit block model for metallurgical characterization. Barium analyses were done using pressed-powder energy-dispersive x-ray fluorescence (“XRF-ED”) and loose-powder NITON XRF analytical methods. These methods were evaluated by running additional analyses on duplicate pulp samples by various methods. Mr. Ristorcelli believes that the data can be used to estimate NITON XRF-derived barium grades into the model.

1.6 MINERAL PROCESSING AND METALLURGICAL TESTING

The current study of the South Railroad portion of the Railroad-Pinion project focuses on two main sources of ore, for which mineral reserves are declared in this study: The Pinion and Dark Star deposits. These deposits have different geo-metallurgical characteristics, which are briefly summarized as follows:

The Pinion deposit can be characterized as hard and abrasive material, with a steep feed P80 vs. gold recovery response. Much of the gold is contained in the rock ground mass and requires fine crushing (-1/4” inch) to liberate gold for the most efficient cyanide-leach extraction. Gold recovery has proven to be sensitive to high barite/silica content. Materials with higher barite content demonstrate significantly lower gold recovery than low-barite materials. Gold recovery from the high-barite materials benefits the most from fine crushing. This deposit can be heap leached without crushing, at low gold recovery, conventionally crushed and leached at modestly higher gold recovery, or HPGR-crushed at significantly higher gold recovery. Additional metallurgical testing and trade-off economic analysis of the three heap-leach flowsheet options will be required to make the final decision on how to proceed at Pinion.

The Dark Star deposit can be characterized as hard and moderately abrasive material, with a flat feed P80 vs. gold recovery response. Most of the gold is contained in fractures that have been oxidized and accessible to cyanide solutions that easily pass through the rock matrix. Consequently, high gold extractions are achieved at coarse particle size, requiring no crushing prior to heap leaching.

Due to the multiple material types, and the dependence of gold recoveries on head grades and crush size, 66 gold and silver recovery vs head grade equations were developed, along with recovery vs solution-to-ore ratio equations. These equations were used to develop ore routing, optimize the mine schedule, and estimate gold and silver production over the LOM.

1.6.1 Pinion Deposit Tests 2016 – 2019

Gold Standard commissioned bottle-roll test and column leach test programs in 2015-2016, 2016-2017, 2018, and 2019 on the Pinion deposit. Table 1-2 shows the head assays of the samples used.

 

1-5

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 1-2: Head Assays and Geo-metallurgical Characterization of Pinion Samples

Component 2015-2016 2016-2017 2018 2019
Range Average Range Average Average Range Average
Au grade, ppm 0.19 - 4.4 0.81 0.23 - 1.82 0.76 0.736 0.25 - 2.87 0.85
Ag grade, ppm 0.62 - 72.3 6.9 3.3 - 38.7 10.4 4.53 0.5 - 29.1 7.7

1.6.1.1 Column Leach Testing

Column leach tests were performed on 12.5-mm and 25-mm materials in 2016-2017, and in 2019. A summary of the tests results is shown in Table 1-3. Gold extraction plotted by days under leach for the column-leach tests are shown graphically in Figure 1-1 and Figure 1-2.

Table 1-3: Summary of Column Leach Test Results for Pinion

  P80, mm 2016-2017 2019
  Range Average Range Average
Au Recovery, % 12.5 55.8 – 90.4 70 29.8 - 80 63
25 51.5 - 69.5 56.4 30.5 – 81.2 59.9
Ag Recovery, % 12.5 5.4 – 47.3 22.7 9.5 – 76.4 30.6
25 9.7 – 44.8 22.6 9.5 – 76.4 30.6
CN-, kg/t     1.0   0.76
Lime, kg/t     0.56   0.93

The plots show kinetics of heap leaching that could be expected, as well as the variability of the samples within the Pinion orebody.

1.6.1.2 Pinion Deposit HPGR Testing

Gold Standard commissioned Kappes, Cassiday & Associates (“KCA”) to perform HPGR-crush column-leach testing on a drill core composite sample from the Pinion Main zone. The results of the tests are included in Figure 1-2. HPGR crushing showed improvement in gold and silver extraction compares to conventionally crushed ore, as shown in Figure 1-3 for gold.

Cyanide consumption was low to moderate. Lime consumption ranged from 0.5 to 1.2 kg/tonne.

 

1-6

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 1-1: 2016-2017 Gold Extraction vs. Days under Leach for Column-Leach Tests

Figure 1-2: 2019 Pinion Gold Extraction vs. Days under Leach for Column-Leach Tests

 

1-7

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 1-3: Conventional Crush vs. HPGR Gold Extraction Comparison

1.6.2 Gold Standard Dark Star Deposit Metallurgical Testing

Head assays and geo-metallurgical characterization analyses were obtained for 68 composites in 2017 and 50 composites in 2019, using a combination of four separate laboratories: KCA, ALS Minerals (“ALS”), The University of British Columbia (UBC), and FLSmidth (FLS). Table 1-4 shows the results of the head assays and geo-metallurgical characterization.

Table 1-4: Head Assays and Geo-metallurgical Characterization of Dark Star Samples

Component 2017 2019
Range Average Range Average
Au grade, ppm 0.177 - 7.35 1.59 0.182 - 5.62 1.23
Ag grade, ppm 0.27 - 5.07 0.71 0.50 - 3.50 1.01

Drill core composites from the Dark deposit were subjected to bottle-roll leach testing at target P80 sizes of 75 µm and 1,700 µm in 2017 and 2019. Percentage of gold recoveries where in the low to mid 80s. Cyanide consumption ranged from 0.4 to 1.8 kg/tonne, while lime consumption ranged from 0.8 to 1.3 kg/tonne.

1.6.2.1 Dark Star Column-Leach Tests

Forty-one (41) 2017 composites and fifty 2019 composites were column leached utilizing material crushed to 100% passing 19 mm (target P80 = 12.5 mm), and 100% passing 37.5 mm (target P80 = 25 mm). The results of the tests, are summarized in Table 1-5 below, and plotted in Figure 1-4 and Figure 1-5, show good recoveries for transition and oxide ores.

 

1-8

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 1-5: Summary of Column Leach Test Results for Dark Star

  P80, mm
or Type
2017 2019
  Range Average Range Average

Au Recovery, %

12.5 15.0 - 94.8 78.9    
25        
Sulfide 15 – 25.5 20.3 28.4 – 39.9 35.1
Transition 57.8 – 85.8 69.7 47.5 – 84.7 67.2
Oxide 56.3 – 94.9 84.1 63.3 – 94.7 84.4

CN-, kg/t

    1.07   0.95

Lime, kg/t

    1.15   0.92

Figure 1-4: 2017 Dark Star Column-Leach Gold Extraction vs. Days Under Leach

 

1-9

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 1-5: 2019 Dark Star Column-Leach Gold Extraction vs. Days under Leach

1.6.2.2 Dark Star HPGR Metallurgical Test Work

Column-leach tests were performed on eight HPGR composite-sample charges, four from Dark Star Main and four from Dark Star North. The Dark Star Main HPGR column-leach gold extractions are significantly higher than the conventional-crushed column charge as shown in Figure 1-6. The Dark Star North HPGR gold extractions are only marginally higher than the conventional-crushed composite at similar crush size (see Section 13).

 

1-10

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 1-6: Conventional Crush vs. HPGR Gold Extraction Comparison, Dark Star Main

1.6.3 Comminution Characterization and Load Permeability Tests

The testing programs included comminution characterization using JK SMC testing and Bond abrasion measurements, as well as load permeability testing on column leach tailing. Details are included in Section 13.

1.6.4 Geo-metallurgy Characterization and Recovery Models

Large geo-metallurgy databases have been developed for the Pinion and Dark Star deposits to assist in evaluating material type selections, representing different Au and Ag recovery response. The corresponding geo-metallurgical analysis has identified key variables, within both deposits, that were used to select the different metallurgical recovery zones requiring separate gold recovery modeling.

1.6.4.1 Pinion Deposit Geo-Metallurgy

The following is a summary of the four gold and silver recovery zones in the Pinion deposit:

  • Mtp (Tripon Pass) – Tripon Pass mineralization is a formation unit that sits on top of the multi-lithic breccia (mlbx) which hosts the majority of the Au mineralization at Pinion.

  • Mlbx Pinion East (Ba > 4.0%, Hi SiO2 ) – The Pinion East Zone is carved out of a larger mlbx zone that is characterized by high barium (Ba) > 4.0% and high quartz (SiO2 ) > 65%.

  • Mlbx Pinion West – The Pinion West Zone captures all the remaining Pinion mlbx zone of mineralization that is not contained within the Pinion East (Ba > 4.0%, Hi SiO2 ) zone.

  • Ddg (Devils Gate) – Devils Gate mineralization is stratigraphically positioned underneath the Pinion mlbx.

 

1-11

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

1.6.4.2 Dark Star Deposit Geo-Metallurgy

The Dark Star mineralization is hosted in two connected zones: Dark Star North and Dark Star Main. Dark Star North can be characterized as a relatively high-grade heap leachable zone, whereas Dark Star Main is lower grade and contains more transitional mineralization. Within both zones, gold mineralization is mainly contained within three formation units: ST-U (upper siltstone), CGL (middle conglomerate), and ST-L (lower siltstone). Geo-metallurgical evaluations did not detect significant variation in gold recovery based upon the host formation but did identify a significant difference is gold recovery response in local regions of low and high silica intensity (SI), as logged by the geologists. SI is characterized by the geologists using a scale of 0 to 3, with 0 indicating no (or low) silica and 3 being the highest silica.

Recovery models for silver were not developed for Dark Star because of its low silver contents.

The following is a summary of the four gold recovery zones, in the Dark Star deposit:

  • Dark Star Main (SI<2.0)

  • Dark Star Main (SI>2.0)

  • Dark Star North (SI<2.0)

  • Dark Star North (SI>2.0)

1.6.4.3 Au and Ag Recovery Methodology

Four steps were used in developing final Au and Ag recovery models for Pinion and Dark Star:

Step 1: Determining the gold extraction for each variability composite using a combination of fine grind/crush bottle rolls and medium/coarse crush column tests.
Step 2: Develop head grade vs. tails grade models to use in final development of the gold recovery equations.
Step 3: Build a database of the laboratory solution: ore (S/O) ratio data at various percentages of total extractable gold. A correction factor is applied to each laboratory S/O ratio data point to scale up the laboratory data to commercial scale. Typical laboratory S/O ratio data is tabulated for the following percentages of total extractable gold: 60%, 70%, 80%, 90%, 95%, and 99%.
Step 4: Incorporating steps 1-3 into final recovery models that reflect commercial scale inefficiencies and deductions for solution losses, plus application of cumulative S/O ratios over the life of the project to predict timing of gold recovery.

Details of this methodology are included in Section 13 and will not be repeated here to save space. Sixty-four (64) recovery vs. grade equations were developed of the form

Recovery % = k1 ln(head grade) + k2,

which were used with the recovery vs solution:ore ratio relationships to predict metal production over the LOM. These equations are listed in Section 13 and in the Metallurgy Report (Simmons, 2019).

1.6.5 Reagent Consumption

Reagent consumptions and requirements, including cyanide, lime and cement were estimated by KCA based on metallurgical test work completed to date for the Pinion and Dark Star material. Reagent consumptions are summarized below.

  

1-12

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

In KCA’s experience, field cyanide consumptions are typically 25% to 33% of observed laboratory consumptions. Cyanide consumptions for the ROM and HPGR-crushed Pinion and Dark Star material have been estimated at 33% of the laboratory consumptions for this study.

As there were no column leach tests performed on ROM material, cyanide consumptions have been estimated based on column leach tests on 37.5-mm crushed materials from Pinion and Dark Star. ROM cyanide consumption in the field are typically be 80% less than crushed ore consumption. Laboratory cyanide consumptions for Pinion material at 37.5 mm crush ranged from 0.66 kg/t to 1.19 kg/t, with an average consumption of 0.85 kg/t. Dark Star laboratory cyanide consumptions at 37.5 mm crush ranged from 0.46 kg/t to 1.31 kg/t, with an average consumption of 0.87 kg/t. Based on this data, field cyanide consumptions are estimated at 0.22 kg/t and 0.23 kg/t for ROM Pinion and Dark Star material, respectively.

Laboratory cyanide consumption for Pinion material ranged from 0.48 kg/t to 0.89 kg/t with an average consumption of 0.67 kg/t. Dark Star laboratory cyanide consumption ranged from 0.63 kg/t to 0.89 kg/t with an average consumption of 0.76 kg/t. Based on this data, field cyanide consumptions are estimated at 0.22 kg/t and 0.25 kg/t for Pinion and Dark Star HPGR crushed material, respectively.

Lime is required for pH control for the ROM ore during leaching. Because hydrated lime was utilized in the lab leach tests, the laboratory lime consumptions are adjusted to predict consumptions of quicklime (pebble lime, CaO) in the field. Estimated quicklime consumption for Pinion and Dark Star ROM ores is 1.0 kg/t of ore.

Cement is required for heap permeability and pH control during leaching for the Pinion and Dark Star HPGR crushed material. Based on compacted permeability tests, cement requirements are estimated at 2.0 kg/t ore and 7.0 kg/t ore for Pinion and Dark Star HPGR crushed material, respectively for a maximum heap height of 60 m.

1.7 RECOVERY METHODS

The process selected for recovery of gold and silver from the Pinion and Dark Star ore is a conventional heap-leach recovery circuit. Ore will be mined by standard open pit mining methods from two separate pits. Lower-grade Pinion and Dark Star ore will be truck-stacked on the heap as ROM ore directly, without crushing, at an average rate of 12,500 tonnes of ore per day in 9 m lifts; lime will be added directly to the haul trucks for pH control. Higher grade Pinion and Dark Star (low clay) ore will be processed in a three-stage crushing circuit with a HPGR at an average rate of 10,000 tonnes of ore per day. Ore will be crushed to 100% passing 14 mm, treated with cement and agglomerated, then conveyor-stacked onto heap leach pad in 7 m lifts. Lime will be added to crushed Pinion ore for additional pH control.

Stacked ore will be leached with a dilute cyanide solution using a drip irrigation system. After percolating through the ore, the pregnant gold and silver bearing solution will flow by gravity to a pregnant solution tank where it is pumped to a carbon adsorption circuit to recover the precious metal from solution. The gold and silver will be stripped from the loaded carbon using a desorption process, followed by electrowinning to produce a precipitate sludge. The precipitate sludge will be processed using a retort oven for drying and mercury recovery, and then refined in a melting furnace to produce gold and silver doré bars.

1.8 MINERAL RESOURCE ESTIMATE AND MINERAL RESERVE ESTIMATE

1.8.1 Mineral Resource Estimate

The estimated mineral resources presented in this Technical Report were classified in order of increasing geological and quantitative confidence into inferred, indicated, and measured categories to be in accordance with the “CIM Definition Standards - For Mineral Resources and Mineral Reserves” (2014) and therefore Canadian National Instrument 43-101. Mineral resources are reported at cutoffs that are reasonable for deposits of this nature given anticipated mining methods and plant processing costs, while also considering economic conditions, because of the

 

1-13

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

regulatory requirements that a mineral resource exists “in such form and quantity and of such a grade or quality that it has reasonable prospects for eventual economic extraction.

MDA modeled geology and metal domains for the Dark Star, Pinion, and Jasperoid Wash deposits, then estimated and classified gold mineral resources. A silver estimate was also produced for the Pinion deposit. Gold Standard provided the geologic modeling for the various deposits and were intimately involved with metal domain modeling. Block sizes were 9 m x 9 m x 9 m for Dark Star and Pinion, and 6 m x 6 m x 6 m for Jasperoid Wash. Estimation was done using inverse-distance methods with powers ranging from two to four. Multiple models were estimated in order to optimize the estimation parameters.

The estimate of mineral resources for the Railroad-Pinion property, excluding North Bullion, is the block-diluted inverse-distance estimate and is reported at variable cutoffs for open-pit mining. The cutoff for oxidized and transitional redox material is 0.14 g Au/t, whereas the cutoff for sulfide material is 1.0 g Au/t. Mineral resources were classified as Measured, Indicated or Inferred for each deposit separately. Factors considered for classification include results of data verification and QA/QC results, the level of geologic understanding of each deposit, and performance of past mineral resource block models with new drilling. Sulfide material at Dark Star was reported at a higher cutoff grade of 1.0 g Au/t. Table 1-6 presents the pit-constrained estimated mineral resources for the Dark Star, Pinion, and Jasperoid Wash deposits based on a $1,500/oz gold price. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Table 1-6: Dark Star, Pinion and Jasperoid Wash Estimated Mineral Resources

Dark Star Mineral Resources
  Cutoff      
   g Au/t Tonnes g Au/t oz Au
Measured* 0.140 5,857,000 1.31 246,000
Indicated* variable** 26,860,000 0.78 675,000
Measured &
Indicated*
variable** 32,717,000 0.88 921,000
Inferred variable** 2,479,000 0.70 56,000

*Mineral resources are inclusive of mineral reserves
**South Railroad - Cutoff for oxide and transitional resources is 0.14g Au/t, and for sulfide resources at 1.0g Au/t

 
Pinion Mineral Resources
  Cutoff          
  g Au/t Tonnes g Au/t oz Au g Ag/t oz Ag
Measured* 0.140 1,304,000 0.64 27,000 5.15 216,000
Indicated* 0.140 27,621,000 0.58 517,000 4.18 3,713,000
Measured &
Indicated*
0.140 28,925,000 0.58 544,000 4.22 3,929,000
Inferred 0.140 10,810,000 0.64 224,000 3.80 1,322,000
    *mineral resources are inclusive of mineral reserves    

 

Jasperoid Wash Mineral Resources
  Cut off, g Au/t Tonnes g Au/t oz Au
Inferred 0.140 10,569,000 0.33 111,000

Barium was estimated into the Pinion deposit block model for use in metallurgical characterization of the Pinion mineralized material. The average barium grade is ~1.7% for the gold mineralization grading at least 0.14 g Au/t. Factoring between barium analytical results were required, which added some uncertainty to the model.

 
  1-14

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Cyanide-soluble gold block models were produced for the Pinion and Dark Star deposits. These estimates appear reasonable in areas with Gold Standard drilling, however, there is less confidence in some areas where cyanide-soluble gold data is lacking, such as where historical drilling is predominant.

An acid-base accounting (“ABA”) model was generated for Pinion and Dark Star to characterize waste material for mine planning and handling. Because of limited data, these estimates can only be considered as guides for environmental planning.

The North Bullion area gold mineral resources were estimated within modeled mineralized lode solids using variable search ellipsoids by Mr. Dufresne of APEX Geoscience Ltd. (“APEX”), of Edmonton, Alberta. The reported mineral resource was estimated using inverse distance squared, and the parent block size for the sub-blocked model was 10 m x 10 m x 3 m. Table 1-7 presents the pit-constrained estimated mineral resources for North Bullion based on a $1,350/oz gold price, and Table 1-8 combines all mineral resources for the entire Railroad-Pinion project.

Table 1-7: North Bullion Mineral Resources

North Bullion Indicated
Cut off, g Au/t Tonnes g Au/t oz Au
0.140 2,920,000 0.96 90,100
North Bullion Inferred
Cut off, g Au/t Tonnes g Au/t oz Au
variable* 10,970,000 2.28 805,800
*Cutoff for potential underground sulfide mineral resources at North Bullion are reported at 2.25 g Au/t

Table 1-8: Total Railroad-Pinion Mineral Resources

All Railroad-Pinion Measured and Indicated*
Cut off, g Au/t Tonnes g Au/t oz Au
variable** 64,562,000 0.75 1,555,100
All Railroad-Pinion Inferred
Cut off, g Au/t Tonnes g Au/t oz Au
variable*** 34,828,000 1.07 1,196,800
* mineral resources are inclusive of mineral reserves
**South Railroad - Cutoff for oxide and transitional mineral resources is 0.14 g Au/t, and for sulfide mineral resources at 1.0 g Au/t;
***Cutoff for potential underground sulfide mineral resources at North Bullion are reported at 2.25 g Au/t

1.8.2 Mineral Reserve Estimate

Measured and Indicated mineral resources were used as the basis to define mineral reserves for both the Dark Star and Pinion deposits. Mineral reserve definition was done by first identifying ultimate pit limits using economic parameters and applying pit optimization techniques. The resulting optimized pit shells were then used for guidance in pit design to allow access for equipment and personnel. Modifying factors including mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social, and governmental factors have been applied in the estimate of mineral reserves.

MDA provided the final production schedule to M3 who developed the final cash-flow model which demonstrates that the Pinion and Dark Star deposits make a positive cash flow and are reasonable with respect to statement of mineral reserves for these deposits.

 

1-15

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The total Proven and Probable mineral reserves reported for the PFS are shown in Table 1-9. Within the designed pits there are a total of 145.0 million tonnes of waste associated with the in-pit mineral reserves. This results in an overall project strip ratio of 3.07 tonnes of waste for each tonne of material processed.

Table 1-9 Proven and Probable Mineral Reserves

Dark Star K Tonnes g Au/t K Ozs Au
Proven 5,430 1.39 243
Probable 23,881 0.83 640
P&P 29,311 0.94 883

 

Pinion K Tonnes g Au/t K Ozs Au g Ag/t K Ozs Ag
Proven 1,073 0.66 23 5.52 191
Probable 16,814 0.63 341 4.65 2,515
P&P 17,887 0.63 364 4.70 2,705

 

Consolidated Gold Reserves
Dark Star & Pinion K Tonnes g Au/t K Ozs Au
Proven 6,503 1.27 266
Probable 40,695 0.75 980
P&P 47,198 0.82 1,246

Note: cutoff grades are applied by material type as described in Section 15.2.3;
Proven and Probable mineral reserves for Pinion include silver as reported above; and
Due to lack of silver at Dark Star, consolidated gold reserves are reported without silver to avoid reporting erroneous average silver grade.

1.9 MINING METHODS

The PFS includes mining at both the Dark Star and Pinion deposits; both are planned as open-pit, truck and shovel operations. The truck and shovel method provides reasonable costs and selectivity for these deposits.

The production schedule considers the processing of material by ROM, HPGR, and toll processing. HPGR stockpiles of lower-grade material will be utilized to ensure that higher-grade material is processed first. The stockpiles will be maintained near the crusher. All ROM material will be dumped in place directly on the ROM leach pad. Monthly periods were used to create the production schedule with pre-stripping starting in Dark Star at month -8. Start of ROM processing is assumed to be month 1. HPGR processing is started three years after the start of ROM processing. Prior to that time, the ROM material will be processed up to the maximum spray capacity of 22,500 tonnes per day of material or up to 8.2 million tonnes per year. Once HPGR processing starts, the maximum HPGR rate is targeted at 10,000 tonnes per day or 3,650,000 tonnes per year on a 365 day per year basis, and ROM processing is reduced as to not exceed the total spray processing available.

Toll processing occurs from Year 2 through Year 5, and the rate is limited to 500 tonnes per day. Only Dark Star sulfide material with greater than 1.17 g Au/t would be toll processed, and the material would be stockpiled near Dark Star prior to being loaded in a contractor’s over-the-road haul truck.

The total Dark Star mining rate would ramp up from 20,000 tonnes per day to about 60,000 tonnes per day over a period of 5 months. A maximum of 120,000 tonnes per day is used in the production schedule during the peak mining

 

1-16

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

of deeper Dark Star material. Mining is to start in Dark Star North and Dark Star Main and then progress to Pinion in Year 4.

The PFS has assumed owner mining in order to keep the cost lower than it would be with contract mining. The production schedule was used along with additional efficiency factors, cycle times, and productivity rates to develop the first principle hours required for primary mining equipment to achieve the production schedule. Primary mining equipment includes drills, loaders, hydraulic shovels, and 136-tonne (150-ton) capacity haul trucks.

Waste storage facility designs were created for the PFS to contain the material that is not processed. A 1.3 swell factor was assumed which provides for both swell when mined and compaction when placed into the facility.

1.10 INFRASTRUCTURE

Project infrastructure for South Railroad has been developed to support the mining and heap leaching operations. Access to the site will be provided by a new ten-mile access road to the facility following an existing dirt road east of highway 278. Electrical power will be generated onsite by generators powered by liquified natural gas (LNG). Project buildings located at the site will include Security and Emergency services, Administration, Change House, Crushing, Truck Shop, ADR/Refinery Plant, and Laboratory buildings. These will mainly be located between Pinion and Dark Star pits for ease of access and be connected by local roads and haul routes.

1.11 ENVIRONMENT AND PERMITTING

Gold Standard has been conducting environmental baseline studies over the past several years as part of their ongoing permitting efforts and in preparation for the submittal of permit applications for conduct mining operations. The main portion for the project area has been surveyed for surface water resources, including Waters of the United States (“WOTUS”), biological resources, and cultural resources. The project access road, and the water management area remain to be surveyed. In 2018, Gold Standard commenced material characterization testing of the mineralized material and waste rock to determine the metal leaching and acid generation potential. Additionally, an evaluation of the groundwater resources was commenced to determine groundwater supply potential, as well as the potential impacts from groundwater pumping and pit lake development. Gold Standard had a meeting with the United States Bureau of Land Management (“BLM”) in January 2019 to determine any additional baseline data collection needs for the permitting process.

Within and adjacent to the project area there are Greater Sage Grouse and Golden Eagles. These species will have an effect on how the project is permitted and what mitigation in required or proposed. Gold Standard is working with the BLM on the management of these species.

The review and approval process for the Plan Application by the BLM constitutes a federal action under the National Environmental Policy Act (“NEPA”) and BLM regulations. Thus, for the BLM to process the Plan Application the BLM is required to comply with the NEPA and prepare either an Environmental Assessment (“EA”), or an Environmental Impact Statement (“EIS”). Gold Standard anticipates that the BLM will require an EIS, due to the mine dewatering and potential pit lake. Gold Standard will also need an Individual Section 404 Permit from the United States Army Corps of Engineers, and this agency will be a cooperating agency on the NEPA documents.

There are a number of environmental permits issued by the Nevada Department of Environmental Protection (“NDEP”) that are necessary to develop the project and which Gold Standard needs to permit the project. The NDEP issues permits that address water and air pollution, as well as land reclamation. The Nevada Division of Water Resources (“NDWR”) issues water rights for the use and management of water.

The SRMP (as defined below) is a previously explored minerals property with exploration related disturbance. However, there have been very long periods of non-operation. There are no known ongoing environmental issues with any of the

 

1-17

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

regulatory agencies. Gold Standard has been conducting baseline data collection for a couple of years for environmental studies required to support the Plan Application and permitting process. The waste and mineralized material characterization and the hydrogeologic evaluation are currently in their latter stages of development. Material characterization indicates the need to manage a significant portion of the waste rock as potentially acid generating in engineered facilities. Additional results to date indicate limited cultural issues, air quality impacts appear to be within State of Nevada standards, traffic and noise issues are present but at low levels, and socioeconomic impacts are positive.

Social and community impacts have been and are being considered and evaluated for the Plan Amendment and Plan Application performed for the project in accordance with the NEPA and other federal laws. Potentially affected Native American tribes, tribal organizations and/or individuals are consulted during the preparation of all plan amendments to advise on the proposed projects that may have an effect on cultural sites, resources, and traditional activities.

Potential community impacts to existing population and demographics, income, employment, economy, public finance, housing, community facilities and community services are evaluated for potential impacts as part of the NEPA process. There are no known social or community issues that would have a material impact on the project’s ability to extract mineral resources. Identified socioeconomic issues (employment, payroll, services and supply purchases, and state and local tax payments) are anticipated to be positive.

A Tentative Plan for Permanent Closure (“TPPC”) for the project would be submitted to the NEDP with the Water Pollution Control Permit (“WPCP”) application. In the TPPC, the proposed heap leach closure approach would consist of fluid management through evaporation, covering the heap leach growth media, and then revegetating. The design of the process components is not sufficiently advanced to determine the closure costs. Any residual heap leach drainage will be managed with evaporation cells.

1.12 WATER MANAGEMENT

Gold Standard developed a Water Management Plan for South Railroad in support of the PFS. The Water Management Plan formed the basis for evaluating the infrastructure and associated cost to manage water through the life cycle of the mine. The purpose of the Water Management Plan is to present the water management strategies that focus on water as an asset and allow Gold Standard to proactively plan and manage water from development to post-closure such that operational and stakeholder water needs are met, and that human health and the environment are protected.

To support the development of water management strategies for the project, the following pre-design studies/activities were completed:

  • Analytical and numerical groundwater model to estimate pit dewatering requirements and potential impacts for the Dark Star North pit;

  • Evaluation and modeling of long-term climate records and 24-hour design storms used as input for event- based stormwater modeling, continuous water balance modeling, and infiltration modeling;

  • Stormwater modeling and calculations for locating and sizing stormwater management infrastructure;

  • Infiltration modeling to predict the amount of seepage from the Water Rock Disposal Facility (“WRDF”s) that will require management during operation, closure, and post-closure periods;

  • Water balance modeling to evaluate the supplies of and demands of site water over the LOM;

  • Evaluation of water disposal alternatives; and

  • Closure cover assessment to limit or eliminate post-closure water handling and treatment demands.

The water management strategy and technical investigations to support the Water Management Plan resulted in the following PFS level infrastructure:

 

1-18

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT
  • Stormwater management and seepage collection facilities, such as channels, ponds, culverts, tanks, attenuation structures, down drains, and other related open-channel stormwater controls;

  • A groundwater dewatering system needed to mine ore below the groundwater table in the Dark Star pits; and

  • A Rapid Infiltration Basin (“RIB”) for water disposal to handle excess water generated by the Dark Star groundwater dewatering system.

1.13 CAPITAL COST SUMMARY

The capital expenditure schedule for the LOM is shown in Table 1-10 below.

Table 1-10: Capital Expenditure Schedule

Capital
Expenditure
($000)
Initial Expansion Sustaining     Total
Year -1 Year 3 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Pre-stripping $20,559                       $20,559
Mine $15,542   $7,251 $6,596 $6,728 $7,016 $7,410 $7,826 $8,265 $6,106 $1,127 $329 $74,196
Process $92,615 $61,873 $12,678 $6,031   $4,912 $1,501 $1,593 $1,691 $793     $183,687
Owner's Cost $4,160 $2,971                     $7,131
Total $132,877 $64,844 $19,930 $12,627 $6,728 $11,928 $8,911 $9,419 $9,956 $6,899 $1,127 $329 $285,573

1.14 OPERATING COST SUMMARY

The total production cost includes mine operations, process plant operations, general administration, reclamation and closure, and government fees. Table 1-11 below shows the operating costs over the LOM by area.

Table 1-11: LOM Operating Costs

LOM Operating Cost ($000)
Mining $336,365
Process Plant $157,412
G&A $33,120
Toll Processing $13,063
Refining $4,612
Total Operating Cost $544,573
Royalty $20,149
Salvage Value -$20,329
Reclamation/Closure $33,094
Total Production Cost $577,487

1.15 CONCLUSIONS AND RECOMMENDATIONS

The results of this study indicate that South Railroad is both technically and economically feasible and demonstrates robust returns, even at the conservative metal prices. The authors recommend that the South Railroad be advanced to feasibility level, with a list of specific recommendations to achieve that goal (see Section 26).

Presently, there are 1.25 million probable and proven ounces of gold in the Dark Star and Pinion deposits estimated mineral reserves combined, 1.55 million measured and indicated ounces of gold in the Dark Star, Pinion and North Bullion deposits estimated mineral resources combined, inclusive of mineral reserves in the Dark Star and Pinion deposits, and there are 1.20 million inferred ounces in the Dark Star, Pinion, Jasperoid Wash and North Bullion deposits estimated mineral resources combined. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

 

1-19

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The PFS indicates an average gold production over the estimated 8-year LOM of about 114,420 ounces per year, with peak production in Year 5 of 209,189 ounces of gold. Cash costs are estimated to be $582 per ounce of gold after byproduct credit, and AISC are estimated to be $707 per ounce of gold. The resulting after-tax cash flow is $357.6 million, for an after-tax NPV (5%) of $265.0 million and an estimated payback period of 3.3 years. A summary of the pre-tax and after-tax PFS economic indicators is shown in Table 1-12.

Table 1-12: Economic Analysis Summary

Indicators Before-Tax After-Tax
LOM Cash Flow ($000) $439,733 $357,611
NPV @ 5% ($000) $331,423 $265,045
NPV @ 10% ($000) $249,453 $195,068
IRR 46.1% 40.0%
Payback (years) 3.2 3.3

 

  

1-20

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 2 TABLE OF CONTENTS

SECTION   PAGE
2 INTRODUCTION AND TERMS OF REFERENCE 2-1
  2.1 PURPOSE OF REPORT 2-1
  2.2 SOURCES OF INFORMATION 2-1
  2.3 PROJECT SCOPE AND TERMS OF REFERENCE 2-2
  2.4 FREQUENTLY USED ACRONYMS, ABBREVIATIONS, DEFINITIONS, AND UNITS OF MEASURE 2-3

SECTION 2 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 2-1: List of Qualified Persons 2-2
Table 2-2: Acronyms and Abbreviations 2-4

 

 

2-i

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

2 INTRODUCTION AND TERMS OF REFERENCE

2.1 PURPOSE OF REPORT

This NI 43-101 Technical Report was prepared by M3 for Gold Standard of Vancouver, British Columbia, a corporation that is listed in TSX Venture Exchange (TSX.V: GSV) and the New York Stock Exchange (NYSE: GSV).

Gold Standard owns the Railroad-Pinion project in the southern Carlin trend, in Elko County, Nevada, USA.

This updated Technical Report for the Railroad-Pinion project describes the preliminary feasibility of extracting and processing the oxide mineral reserve at the South Railroad property, which includes the Dark Star and Pinion gold deposits. This study incorporates new design-work, scheduling, and projected costs.

This update is based on the same resource estimates and pit optimizations as were reported in the previous Technical Report dated October 24, 2019. They include the updated 2019 mineral resource and mineral reserve estimates for the Dark Star and Pinion gold deposits, and initial mineral resource estimate for the Jasperoid Wash deposit. The estimate supersedes the 2018 mineral resource estimate, as well as previous mineral resource estimates reported by Dufresne et al. (2017) and Dufresne and Nicholls (2018), APEX of Edmonton, Alberta (Dufresne and Nicholls, 2016), Dufresne and Nicholls (2017a; 2018), and APEX (Dufresne et al., 2015).

Gold Standard has drilled 66 new holes on the Railroad-Pinion property in 2019, which post-dated the initial PFS. That drilling was primarily focused on obtaining metallurgy samples, generating geotechnical data, or for exploration of secondary targets. The new drilling at Dark Star and Pinion were evaluated with respect to the mineral resource models and it was determined there would be minimal to no impact on estimated volumes and grades as reported in this report. Further discussion is given in Section 14.

The North Railroad portion of Gold Standard’s property includes the POD (formerly Railroad deposit), Sweet Hollow, and North Bullion cluster of gold deposits. Together these three deposits are referred to as the North Bullion deposits or North Bullion area. The first-time estimates of POD, Sweet Hollow, and North Bullion gold mineral resources were originally reported by Dufresne and Nicholls (2017b). The POD, Sweet Hollow, and North Bullion mineral resources, as amended and restated in Dufresne and Nicholls (2018) remain current and are presented herein.

Other targets mentioned in this Technical Report include Bald Mountain, in the North Railroad portion of the Railroad-Pinion property, and JR Buttes, Dixie, Irene, Sentinel, Ski Track, and East Jasperoid in the South Railroad portion of the Railroad-Pinion project.

References to Tomera Formation equivalent stratigraphy have been noted historically. However, recent work suggests these units in the Railroad-Pinion area may not be of equivalent age, so all usage of Tomera Formation equivalent in this Technical Report refer to units that are Pennsylvanian-Permian undifferentiated.

This Technical Report has been prepared in accordance with the disclosure and reporting requirements set forth in NI 43-101 Companion Policy 43-101CP, and Form 43-101F1, as well as with the Canadian Institute of Mining, Metallurgy and Petroleum’s “CIM Definition Standards - For Mineral Resources and Reserves, Definitions and Guidelines” (“CIM Standards”) adopted by the CIM Council on May 10, 2014.

2.2 SOURCES OF INFORMATION

In compiling the background information for this Technical Report, the authors fully relied on information provided by Gold Standard and on other references as cited in Section 3, including technical reports by APEX (Dufresne and Turner, 2014; Dufresne et al., 2014; Dufresne et al., 2015; Dufresne and Nicholls, 2016; Dufresne et al., 2017; and Dufresne and Nicholls, 2017a, 2017b, 2018).

 

2-1

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The Pinion, Dark Star, and Jasperoid Wash mineral resource estimates presented in this Technical Report were estimated and classified under the supervision of Mr. Steven J. Ristorcelli, C.P.G. and Principal Geologist for MDA. Mr. Thomas L. Dyer, P.E., Senior Engineer for MDA, prepared the mining and economic studies for the PFS.

Table 2-1 is a list of qualified persons who contributed to this Technical Report.

Table 2-1: List of Qualified Persons

QP Name Company Qualification Site Visit Date Area of Responsibility
Art S. Ibrado M3 Engineering & Technology Corporation, Tucson, AZ PE September 25, 2019 Sections 1.1 to 1.3, 1.15, 2 to 5, 21.5.3.3, 21.5.4, 23 to 26
Mathew Sletten M3 Engineering & Technology Corporation, Chandler, AZ PE No site visit Sections 1.10, 1.12 to 1.14, 17.11, 18.1 to 18.5, 19, 21.3, 21.5.4, 21.6 & 22
Steven Ristorcelli Mine Development Associates, Reno, NV CPG November 18, 2016 Sections 1.4, 1.5, 1.8, 6, 7, 8, 9, 10, 11, 12, 14.1, 14.3 & 14.4
Michael Lindholm Mine Development Associates, Reno, NV CPG September 19, 2018 Sections 1.4, 1.5, 1.8, 6, 7, 8, 9, 10, 11, 12, 14.1 & 14.2
Michael B. Dufresne APEX Geoscience Ltd., Edmonton, AB P.Geol., P.Geo. June 7, 2017 Sections 1.4, 1.5, 10.2, 10.6.1, 10.6.3, 10.8, 11.1, 11.2, 11.5, 12.3, 12.8, 12.9 & 14.5
Thomas Dyer Mine Development Associates, Reno, NV PE November 18, 2016 Sections 1.8, 1.9, 15, 16, 21.1 & 21.4
Gary L. Simmons GL Simmons Consulting, LLC QP-MMSA June 22, 2017 Sections 1.6, & 13
Carl Defilippi Kappes, Cassiday & Associates, Reno, NV RM-SME August 28, 2019 Sections 1.6.5, 1.7, 13.10, 17.1 to 17.7, 17.9, 17.10, 21.2, & 21.5 except Sections 21.5.3.3 & 21.5.4
Richard DeLong EM Strategies, Inc., Reno, NV QP-MMSA, RG, PG No site visit Sections 1.11 & 20
Kenneth L. Myers The MINES Group, Reno, NV PE October 22, 2019 Sections 17.8, 18.6, 18.7 & 18.8

2.3 PROJECT SCOPE AND TERMS OF REFERENCE

Gold Standard has been actively exploring the North Railroad portion of the property since 2010 and the South Railroad portion of the property since 2014 (Koehler et al., 2014; Turner et al., 2015).

The North Bullion deposits’ mineral resource estimates (POD, North Bullion, and Sweet Hollow deposits) were prepared and classified under the supervision of Mr. Michael B. Dufresne, M.Sc., P. Geol., of APEX.

The scope of this study includes a review of pertinent technical reports and data provided to MDA by Gold Standard relative to the general setting, geology, project history, exploration activities and results, methodology, quality assurance, interpretations, drilling programs, metallurgy, and estimated mineral resources.

The authors have relied almost entirely on data and information derived from work done by Gold Standard and its predecessor operators of the amalgamated South Railroad and North Railroad portions of the Railroad-Pinion property. The authors have reviewed much of the available data and made site visits and have made judgments about the general reliability of the underlying data. Where deemed either inadequate or unreliable, the data were either eliminated from use or procedures were modified to account for lack of confidence in that specific information. The authors have made such independent investigations as deemed necessary in their professional judgment to be able to reasonably present the conclusions discussed herein.

 

2-2

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The effective date of this PFS is February 13, 2020, and the issue date of the Technical Report is March 23, 2020. The effective dates of the Pinion and Dark Star databases on which the mineral resources described in this Technical Report are estimated are May 31, 2019 and April 26, 2019, respectively. The effective dates of the Pinion and Dark Star mineral resource estimates are both August 7, 2019. The effective dates of the Jasperoid Wash database and mineral resource estimate are October 6, 2018 and November 15, 2018, respectively. The effective date of the North Bullion deposits database and mineral resource estimates are August 18, 2017 and September 15, 2017, respectively. The effective date of the Pinion and Dark Star mineral reserve estimates is February 13, 2020.

2.4 FREQUENTLY USED ACRONYMS, ABBREVIATIONS, DEFINITIONS, AND UNITS OF MEASURE

In this Technical Report, measurements are generally reported in metric units. Where information was originally reported in imperial units, MDA has made the conversions as shown below. In the case of metallurgical test data and historical mineral resource estimates the units are as originally reported in order to preserve historical accuracy and avoid errors that can result from rounding converted data.

Currency, units of measure, and conversion factors used in this Technical Report include:

Linear Measure    
1 centimeter = 0.3937 inch  
1 meter = 3.2808 feet = 1.0936 yard
1 kilometer = 0.6214 mile  
 
Area Measure    
1 hectare = 2.471 acres = 0.0039 square mile
 
Capacity Measure (liquid)    
1 liter = 0.2642 US gallons  
 
Weight    
1 ton = 1 imperial short ton = 2,000 pounds
1 tonne = 1.1023 short tons = 2,205 pounds or
    = 1,000 kilograms
1 kilogram = 2.205 pounds  

Regarding currency, unless otherwise indicated, all references to dollars ($) in this Technical Report refer to currency of the United States.

Frequently used acronyms and abbreviations are as shown in Table 2-2.

 

2-3

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 2-2: Acronyms and Abbreviations

Abbreviation Description
2SD two times the standard deviation
3SD three times the standard deviation
AA atomic absorption spectrometry
ABA acid-base accounting
Ag silver
AgCN cyanide-soluble silver
AgFA silver analysis by fire assay, total silver content
Au gold
AuCN cyanide-soluble gold
AuFA gold analysis by fire assay, total gold content
Calc, calc calculated
CINO inorganic carbon
cm centimeters
core diamond core-drilling method
°C degrees Celsius
Ext extracted
°F degrees Fahrenheit
FA fire assay
ft foot or feet
gal gallon(s)
g gram
gpl grams per liter
g/t grams per metric tonne
Ha hectares
hd head
Hr., hr., hrs hour, hours
ICP inductively-coupled plasma-emission spectrometric method
ICP-MS inductively-coupled plasma-emission and mass spectrometry
in inch or inches
kg kilograms
km kilometers
kWh/m3 kilowatt-hours per cubic meter
l liter (L in metallurgical use)
lb or lbs. Pounds
m Meters
Ma million years
mi mile or miles
mm millimeters
µm micron or 10-6 meters
NAG non-acid generating, (neutralizing potential)
NSR net smelter return
opt troy ounce per short ton
org Organic
oz troy ounce
P80 the theoretical square screen-opening, through which 80 weight percent of the particles will pass.
PAG potential acid generating
ppm parts per million
ppb parts per billion
QA/QC quality assurance and quality control
RC reverse-circulation drilling method

 

 

2-4

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Abbreviation Description
RQD rock-quality designation
SO4 Sulfate
st Imperial short ton (2,000 pounds)
SSUL sulfide sulfur
t metric tonne or tonnes
tot total

 

 

2-5

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 3 TABLE OF CONTENTS

SECTION PAGE
3 RELIANCE ON OTHER EXPERTS 3-1

 

 

3-i

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

3 RELIANCE ON OTHER EXPERTS

Mr. Ekins, who is an independent registered professional landman (RPL#32306) and president of GIS Land Services in Reno, Nevada, assisted with the preparation of the summary land description and property maps discussed below. Mr. Ekins and Gold Standard have relied upon title opinions prepared by Mr. Jeff N. Faillers of Erwin Thompson Faillers, of Reno, Nevada, Mr. Richard Thompson of Harris & Thompson, of Reno, Nevada, and Ms. Tracy Guinand, an independent registered professional landman of Tracy Guinand Land LLC, of Reno, Nevada. The most recent of these title opinions are dated September 5, 2018. The opinions provided on surface ownership and subsurface mineral ownership, along with royalty information, are current as of the effective date of this Technical Report. Additional details with respect to the surface and subsurface ownership are provided in Gold Standard’s most recent Annual Information Form (“AIF”), which can be found on the SEDAR website at www.sedar.com.

The sample collection, security, transportation, preparation, and analytical procedures are judged by the authors to be acceptable and to have produced data suitable for use in the estimation of the mineral resources reported in Section 11, subject to those exclusions or modifications discussed in Section 14. The authors consider the procedures utilized by Gold Standard and the assay laboratories to be appropriate for use as described.

 

3-1

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 4 TABLE OF CONTENTS

SECTION     PAGE
4 PROPERTY DESCRIPTION AND LOCATION 4-1
  4.1 LOCATION AND LAND AREA 4-1
  4.2 AGREEMENTS AND ENCUMBRANCES 4-3
  4.3 ENVIRONMENTAL PERMITS 4-5
    4.3.1 Other Permits 4-5
    4.3.2 Private Land Disturbance 4-5

SECTION 4 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 4-1: Location Map for the Railroad-Pinion Property 4-2
Figure 4-2: Railroad-Pinion Property with Ownership Percentages, Elko County, Nevada 4-2
Figure 4-3: Railroad-Pinion Property Map with Royalty Encumbrances 4-4
Figure 4-4: Property Map with Railroad- Pinion Permit Boundaries 4-6

 

  

4-i

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

4 PROPERTY DESCRIPTION AND LOCATION

4.1 LOCATION AND LAND AREA

The property that is the subject of this Technical Report comprises two contiguous areas of mineral tenure held by Gold Standard (Figure 4-1) that straddle the Piñon Range in the Railroad mining district at the southeast end of the Carlin trend, a northwest-southeast trending belt of prolific gold endowment in northern Nevada. In previous Technical Reports, the northern portion of the land holdings, now referred to as the North Railroad portion of the property (Figure 4-1), has been referred to as the Railroad project and the Railroad property (Dufresne et al., 2017). The southern portion of the Railroad-Pinion property, now referred to as the South Railroad portion of the property (Figure 4-1), was referred to as the Pinion project and the Pinion property in previous technical reports (Dufresne et al., 2017). In November 2017, Gold Standard published a technical report on the Railroad-Pinion property, which included a mineral resource estimate for the North Bullion, POD, and Sweet Hollow gold deposits (Dufresne and Nicholls, 2017b), located in the North Railroad portion of the Railroad-Pinion property, approximately 10 km north of the Dark Star and Pinion deposits. Based on available information, North Bullion, POD, and Sweet Hollow would not likely share a common mining infrastructure with Dark Star and Pinion.

The Railroad-Pinion property in the Piñon Range is accessed primarily from the four-lane transcontinental U.S. Interstate 80 (“I-80”), approximately 442 km west of Salt Lake City, Utah, and 467 km east of Reno, Nevada (Figure 4-1). The project is located between 13 and 29 km south of I-80 and can be reached by a series of paved and gravel roads from Elko, Nevada (population 18,300). The property is centered approximately at UTM NAD27 Zone 11 coordinates of 585,000E and 4,480,000N.

The North and South Railroad properties combined constitute a land position totaling 21,679 hectares, and with partial interests taken into consideration, 20,477 net hectares of land in Elko County, Nevada. The properties are located within Section 13 in Township (“T”) 28N, Range (“R”) 52E; Sections 10, 11, 14, 16, 17, 18, 23, and 24 in T28N, R53E; Sections 1 to 21, 23, 24, 25, 29, 30, 31, 33, 35, and 36 in T29N, R53E; Sections 7, 18, 19, and 30 in T29N, R54E; Section 12 in T30N, R52E; Sections 1 to 10, 13 to 33, and 36 in T30N, R53E; Sections 24 and 36 in T31N, R52E; and Sections 8, 10, 14 to 22 and 26 to 35 in T31N, R53E, as shown in Figure 4-2. Gold Standard owns, or otherwise controls 100% of the subsurface mineral rights on a total of 12,117 gross hectares of land held as patented and unpatented lode claims. This includes 1,455 unpatented claims owned by Gold Standard and 207 unpatented claims held under lease (Appendix B). Gold Standard also owns or leases 30 patented claims (Appendix B).

There is also a total of 9,562 gross hectares of private lands of which Gold Standard’s ownership of the subsurface mineral rights varies from 49.2% to 100% (Figure 4-2), for a net position of approximately 8,360 gross hectares.

 

4-1

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 4-1: Location Map for the Railroad-Pinion Property Figure 4-2: Railroad-Pinion Property with Ownership Percentages, Elko County, Nevada
(from Dufresne and Nicholls, 2017b) (from Dufresne and Nicholls, 2017b)

 

 

4-2

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Private surface and private mineral property are wholly owned and subject to lease agreement payments (see Section 4.2) and property taxes (paid on an annual basis) as determined by Elko County. The estimated holding cost for the patented claims, unpatented claims, and private lands held by Gold Standard is $1,103,402 per annum. Unpatented lode mining claims grant the holder 100% of the mineral rights and access to the surface for exploration activities which cause insignificant surface disturbance. Ownership of the unpatented mining claims is in the name of the holder (locator), subject to the paramount title of the United States of America, under the administration of the BLM. Under the Mining Law of 1872, which governs the location of unpatented mining claims on federal lands, the locator has the right to explore, develop, and mine minerals on unpatented mining claims without payments of production royalties to the U.S. government, subject to the surface management regulation of the BLM. Currently, annual claim-maintenance fees are the only federal payments related to unpatented mining claims. The mineral rights do not expire if the unpatented claims are maintained by paying an annual fee of $165 per claim to the U.S. Department of Interior, BLM prior to the end of the business day on August 31 every year. A notice of intent to hold must also be filed with the Elko County Recorder on or before November 1 annually, along with a filing fee of $12.00 per claim, plus a $4.00 document fee.

Gold Standard has completed its federal claim maintenance fee obligations for the owned and leased unpatented claims for 2019-2020 assessment year. The federal claim maintenance fees for the claims for the 2020-2021 assessment year are due on or before September 1, 2020. Gold Standard’s estimated claim maintenance fee cost for the owned and leased unpatented claims is $274,230 per annum, and the company’s total estimated annual cost to maintain its property package is $1,377,632.

4.2 AGREEMENTS AND ENCUMBRANCES

Portions of the unpatented and private lands are encumbered with royalties predominantly in the form of standard Net (or Gross) Smelter Return (“NSR” or “GSR”) and Mineral Production (“MP”) royalty agreements, or Net Profit Interest (“NPI”) agreements. The locations and aerial distribution of the currently relevant royalty encumbrances for the Railroad-Pinion property are shown in Figure 4-3. These are summarized as follows:

  • 1.0% NSR royalty to Royal Standard Minerals, Inc. and Manhattan Mining Co. on the portion of the property acquired by statutory plan of arrangement;

  • 1.5% MP royalty to Kennecott Holdings Corporation on claims noted as the Selco Group;

  • 5.0% NSR royalty to the owners of the undivided private mineral interests;

  • Gold Standard owns an approximate 99.2% mineral interest in Sections 21 and 27 by way of several lease agreements. Pursuant to the terms of the relevant lease agreements, Sections 21 and 27 are subject to a 5.0% NSR royalty to the lessors of the leased property;

  • Section 22 is comprised of the TC 1 through 39, and TC 37R and 38R unpatented lode mining claims owned by Gold Standard. The TC claims are subject to the following royalties: (1) an unknown/unspecified NSR royalty to "GSI, Inc., of Virginia"; and (2) a 2.0%) NSR royalty to Waterton Global Value LP;

  • 1.0% NSR royalty to Aladdin Sweepstake Consolidated Mining Company on the portion of the property acquired by statutory plan of arrangement, specifically the PIN#1 to PIN#12 lode mining claims;

  • 4.0% NSR royalty to ANG Pony LLC for mining claims acquired by Gold Standard in Sections 34 and 36 in T30N, R53E, and Sections 2 and 4 in T29, R53E;

  • 3.0% NSR royalty to Peter Maciulaitis for certain mining claims in Sections 24 and 26 in T30N, R53E;

  • A 3.0% NSR royalty (relative to mineral interest) to Linda Zunino and Tony Zunino, Trustees of the Delert J. Zunino and Linda Zunino Family Trusts dated October 11, 1994, and a 3.0% NSR royalty (relative to

 

4-3

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT
    mineral interest) to John C. Carpenter and Roseann Carpenter, husband and wife, on Section 23 in T29N, R53E;
  • A 3.0% NSR royalty to Nevada Sunrise LLC on the 14 WMH claims situated in Sections 1, 2, 3, and 11 in T29N, R53E; and

  • A 3.5% NSR royalty (relative to mineral interest) to Dominek Pieretti and Tusca Sullivan on Sections 3, 5, 7, 8, 9, 10, 15, 17, 19, 21, 29, 31, and 33 in T29N, R53E, and Section 33 in T30N, R53E.

Thus, the estimated total annual cost for maintaining the Railroad-Pinion property is $1,377,632, including lease payments and claims maintenance.

Figure 4-3: Railroad-Pinion Property Map with Royalty Encumbrances

(from Dufresne & Nicholls, 20147b)

 

4-4

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

4.3 ENVIRONMENTAL PERMITS

As of the effective date of this Technical Report, the authors are not aware of any significant factors or risks that may affect access, title, or the right or ability to perform work on the property. Gold Standard controls sufficient ground and has sufficient permitting in place to access the project and continue future exploration programs. Details on permitting are provided below. The following section discusses land use permitting and other regulatory information specific to the South Railroad portion of the property.

Gold Standard currently has three Plans of Operations (“PoO’s”) and two Notices of Intent (“NOI’s”) in place with the BLM for the Dark Star and Pinion areas of the South Railroad portion of the property (Figure 4-4). Gold Standard has drafted a Historic Properties Treatment Plan (“HPTP”) for archaeological sites within the Railroad Exploration Project Plan of Operations. The draft HPTP is currently being evaluated by the BLM.

Gold Standard represents that the PoO for the “South Railroad” portion of the Railroad-Pinion project was approved by the BLM on July 2016. The approved PoO covers a total of 3,422 ha with 2,119 ha of public land and 1,243 ha of private land located in Section 2 in T29N, R53E, and Sections 20, 21, 22, 23, 24, 25, 27, 28, 34, 35, and 36, and portions of Sections 14, 16, and 26 in T30N, R53E. Within the area of the PoO exploration-related disturbance and reclamation bonding can be conducted in two phases of up to 100 acres in Phase I and 150 acres in Phase II. A reclamation bond in the amount of $315,021 has been posted with the BLM.

The South Railroad PoO has encompassed two earlier Plans of Operation (Pinion and Greater Pinion), and two notices (Dark Star and Irene). These two plans and notices will be closed by the respective agency, either the BLM or the Nevada Department of Environmental Protection (“NDEP”), and the associated reclamation bonds will be returned to the Company. The bond amounts for these PoO’s and NOI’s are, respectively: $90,849, $40,241, $25,955, and $30,482.

Activities in Jasperoid Wash are permitted with an approved BLM NOI for an area situated in Section 16 in T29N, R53E. The bond for this NOI has been posted in the amount of $31,956.

4.3.1 Other Permits

Gold Standard has received a Water Pollution Control Permit (“WPCP”) issued by the NDEP for North Bullion that expires in November 2019. There is also a Surface Area Disturbance Permit (“SADP”) issued by NDEP for North Bullion.

4.3.2 Private Land Disturbance

As of the effective date of this Technical Report, Gold Standard has received a Reclamation Permit (“RP”) that includes the Pinion, Dark Star, and Irene reclamation plans. This RP covers both private land and public land disturbances. Previously approved reclamation plans associated with these areas will be closed by the respective permitting agency, either BLM or NDEP. These operated under an Interim Reclamation Permit (“IRP”) issued by the State of Nevada for disturbance greater than five acres on private land. The IRP allowed up to 11 acres of surface disturbance and covered portions of Sections 21 and 27 (not included in the PoO) in T30N, R53E. Gold Standard is in the process of applying for a permanent Reclamation Permit, and as of the effective date of this Technical Report, is permitted to operate in Section 25 in T30N, R53E at Dark Star as long as it keeps the total disturbance to less than five acres at any given time.

For the South Railroad portion of the Railroad-Pinion property, Gold Standard has received an SADP and Environmental Assessment (“EA”) (Figure 4-4) that covers approximately 19.3 km2 and allows up to 101 ha of disturbance. The SADP EA expires on July 2022.

 

4-5

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 4-4: Property Map with Railroad- Pinion Permit Boundaries

(from Gold Standard, 2018)

 

4-6

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 5 TABLE OF CONTENTS

SECTION   PAGE
5 Accessibility, Climate, Local Resources, Infrastructure and Physiography 5-1
  5.1 Access to Property 5-1
  5.2 Climate 5-1
  5.3 Physiography 5-1
  5.4 Local Resources and Infrastructure 5-1

 

 

5-i

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY

5.1 ACCESS TO PROPERTY

The Railroad-Pinion property in the Piñon Range is accessed primarily from the four-lane transcontinental U.S. Interstate 80 (“I-80”), approximately 442 km west of Salt Lake City, Utah, and 467 km east of Reno, Nevada. The project is located between 13 and 29 km south of I-80 and can be reached by a series of paved and gravel roads from Elko, Nevada (population 18,300). From Elko, access is via I-80 west for 32 km to the town of Carlin (population 2,400), and then south on State Highway 278 for 24 km, turning east on a gravel road immediately north of Trout Creek and driving for another 13 km. Alternatively, the project area may also be reached during the summer and autumn months by traveling 48 km southwest from Elko on the Bullion Road, a county-maintained dirt and gravel road. Travel within the project area is via a network of historical and recently constructed dirt roads and four-wheel drive tracks.

5.2 CLIMATE

The project area has a relatively dry and cool, high-desert climate. Weather records from the Newmont Mining Corporation (“Newmont”) Carlin mine, 55 km to the north, indicate that from 1966 through 2002, the average January maximum and minimum temperatures were 1.3°C and -6.9°C, respectively. July average maximum and minimum temperatures were 28.4°C and 14.6°C, respectively.

Rainfall in the region is generally light and infrequent between May and October. At Emigrant Pass, 16 km west of the town of Carlin, Nevada and 20 km northwest of the property, average annual precipitation has been 32.8 cm with average precipitation on January and July of 3.7 cm and 0.6 cm, respectively (US Climate Data). Much of the annual precipitation occurs as snowfall during the winter months.

Precipitation can vary dramatically with changes in elevation and season. Moist airflow from the south brings summer thunderstorms from July through September. A small number of these storms may carry heavy rains that can cause localized flooding in creeks and drainages. Winter snow and spring runoff may temporarily limit local access with respect to drilling and other geological fieldwork activities between November and April each year but are not considered to be significant issues. Mining and exploration can be conducted year-round with adequate snow removal and maintenance of access roads.

5.3 PHYSIOGRAPHY

Northern Nevada is within the Basin and Range physiographic province, an area characterized by gently sloping valleys bounded by generally north-south-trending mountain ranges. The project area is located within and adjacent to the Piñon Range at elevations ranging from 1,770 m to nearly 2,650 m above sea level. Lower elevations consist of gentle, rolling hills with little to no bedrock exposure. Higher elevations are characterized by steeper slopes, deeply incised drainages, and an increase in bedrock exposure.

Vegetation largely consists of sagebrush, rabbit brush, small cacti, and bunch grass communities, consistent with a high-desert climate. Cottonwood trees are present in canyon and creek bottoms, and near springs. Pinyon pine, juniper, mountain mahogany, and aspen trees are present in some areas at higher elevations.

5.4 LOCAL RESOURCES AND INFRASTRUCTURE

Elko, Nevada is a small, full-service city based on mining, ranching, and transportation that has served as the center for northern Nevada mining and exploration for more than half a century. Housing, hotels, groceries, restaurants, clinics, and a hospital, industrial supplies, a regional airport with daily flights to and from Salt Lake City, Utah, interstate highway and railway, local, state and federal government offices, fuel, telecommunications, engineering services, light and heavy equipment sales and services, and a community college are all present.

 

5-1

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

In this part of Nevada, there are local, regional, and international exploration and mining service companies, including assay laboratories, surveyors, suppliers, drilling contractors, and heavy equipment vendors supporting the exploration and mining industry. These companies are served by a skilled and experienced local labor force accustomed to the mining and exploration industries.

The North Railroad and South Railroad portions of the property are within 65 km of several large, active open-pit and underground mines operated by Newmont and Barrick Gold Corp. (“Barrick”) along the Carlin trend. These mine sites also include fully operational mill complexes designed to treat sulfide and/or carbon-sulfide refractory gold ores.

Water for drilling at Pinion, Dark Star, and Jasperoid Wash is available at the project site. For communications, a commercial cellular telephone and data network is available in select locations. There are sufficient and appropriate sites within the property to accommodate exploration and potential mining facilities, including waste rock disposal, heap-leach pads, and processing infrastructure. Surface rights controlled by Gold Standard are sufficient for potential mining operations.

 

5-2

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 6 TABLE OF CONTENTS

SECTION     PAGE
6 HISTORY   6-1
  6.1 NORTH RAILROAD PORTION OF THE PROPERTY 6-1
  6.2 SOUTH RAILROAD PORTION OF THE PROPERTY 6-3
    6.2.1 Pinion Area Exploration History 6-3
    6.2.2 Dark Star Area Exploration History 6-4
    6.2.3 Jasperoid Wash 6-5
    6.2.4 Other Prospects in the South Railroad Portion of the Property 6-6
  6.3 HISTORICAL MINERAL RESOURCE ESTIMATES 6-7
    6.3.1 Pinion Deposit Historical Estimates 6-7
    6.3.2 Dark Star Deposit Historical Estimates 6-8
    6.3.3 POD (Railroad) Deposit Historical Mineral Resources 1985 - 2003 6-10
  6.4 HISTORICAL MINE PRODUCTION 6-11
    6.4.1 North Railroad 6-11
    6.4.2 South Railroad 6-11

SECTION 6 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 6-1: Summary of Historical Exploration, Pinion Area 6-4
Table 6-2: Summary of Historical Exploration in the Dark Star Area 6-5
Table 6-3: Historical Pinion Deposit Estimated Mineral Resources 6-7
Table 6-4: 1994 Dark Star Historical Crown Mineral Resource Estimate 6-9
Table 6-5: Dark Star Deposit 1995-1996 Cyprus Mineral Resource Estimate 6-10
Table 6-6: POD Deposit Historical Mineral Resource Estimates 1985 - 2003 6-11

 

 

6-i

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

6 HISTORY

Historical exploration conducted at the North Railroad and South Railroad portions of the Railroad-Pinion property is summarized below and is largely derived from Dufresne and Nicholls (2016), Dufresne et al. (2017), Dufresne and Nicholls (2017b), Dufresne and Nicholls (2018), and other sources as cited. The authors have reviewed this information and believe it accurately represents the history of the property as presently understood. MDA has added details of drilling types, meterage and number of holes based on Gold Standard’s recently compiled project-wide database.

6.1 NORTH RAILROAD PORTION OF THE PROPERTY

This portion of the report is extracted and modified from Dufresne and Nicholls (2018) who provided the most recent summary of historical exploration in the North Railroad portion of the property using information taken largely from Hunsaker (2010, 2012a, 2012b), Shaddrick (2012), Koehler et al. (2014), and sources as cited. Details of types and amounts of drilling were derived from Gold Standard’s project-wide drill database.

The earliest prospecting and mineral exploration in the North Railroad portion of the property likely dates to the mid-1860s. In 1869, the Railroad mining district was established in the area of Bunker Hill and the district was also known as the Bullion or Empire City district (LaPointe et al., 1991). Initially silver, lead, and copper ore was shipped to Chicago and San Francisco. A smelter was built in 1872 at the nearby town of Bullion. Beginning in 1905, shipments from operating mines, old dumps, and slag were sent to Salt Lake City (Ketner and Smith, 1963).

Early production in the district was mainly silver, lead, and copper extracted from numerous underground mines on the northern flank of Bunker Hill. Emmons (1910) reported that the mines were reopened in 1906 and at the time of his review the Standing Elk, Tripoli, Red Bird, Copper Belle, and Delmas mines were accessible. The most important mines exploited replacement and skarn-type deposits in marbleized and dolomitized rocks in the vicinity of the Bullion stock (see Section 7.3). There were also minor, undeveloped gold veins in intrusive rocks.

Beginning in 1910, and until the mines quit production in the 1960s, zinc became the prominent metal mined (LaPointe et al., 1991). In 1905, the Davis tunnel was started from a location approximately 1,340 m northeast and 305 m below the 600 level of the Standing Elk mine. Many lessors worked at extending the tunnel, which was driven southwest to reach a zone beneath the Standing Elk. In 1959, the zone was reached but no ore was found. Numerous oxidized faults and oxidized zones of base-metal mineralization were crossed.

Modern-era exploration began in 1967 when American Selco optioned claims from Aladdin Sweepstake Consolidated Mining, launching a period of surface sampling, geophysics, geological mapping, and surface drilling in the Railroad district and the North Railroad portion of the property that has continued to the date of this Technical Report. Records are incomplete but historical exploration was likely conducted in various areas at various times by 15 companies. These companies collected 6,260 soil samples, 3,508 rock samples, and drilled 382 holes, according to Dufresne and Nicholls (2018). Drilling in the North Railroad portion of the property by these operators is discussed in Section 10.2.

American Selco, Placer Amex, and El Paso Natural Gas Company with Louisiana Land and Exploration Company explored for porphyry copper and molybdenum in the Bullion stock and Grey Eagle intrusive rocks. They also looked for replacement sulfide “lenses” in limestone and “unknown replacement or disseminated” mineralization west of the Bullion stock (American Selco, 1970). American Selco completed an induced potential (“IP”) and magnetic geophysical surveys and drilled seven core holes and seven holes of unknown type. Subsequent core holes, and several of the rotary holes completed to the desired depths, intersected up to 50% sulfides as well as molybdenum, copper, silver, and gold.

Placer Amex drilled a single 365.8 m hole in 1972. In 1974, El Paso Natural Gas Company drilled 671.5 m in five holes of unknown type with the Louisiana Land and Exploration Company. In 1975, AMAX Inc. (“AMAX”) optioned the claims and explored for tungsten, molybdenum, and base metals until 1980. Detailed mapping was completed in Sections 27,

 

6-1

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

28, 29, 32, 33, and 34 in T31N, R53E, and in Sections 3, 4, 5, 6, 8, and 9 in T30N, R53E (Dufresne and Nicholls, 2017b). AMAX also conducted surface dump and rock chip sampling, soil sampling, a vegetation geochemical survey, a ground magnetometer survey and drilled two core holes and 13 holes of unknown type in 1977 through 1980.

In 1980, Homestake Mining Company (“Homestake”) entered into a joint venture arrangement with AMAX and exploration was focused on gold in the North Railroad area, particularly after Newmont discovered the Rain gold deposit about 10 km north of Bunker Hill. Homestake drilled 22 holes (Galey, 1983) and collected rock and soil samples. The Homestake work identified what later became known as the POD deposit.

NICOR Mineral Ventures, Inc. (“NICOR”) became AMAX’s joint venture partner in 1983. As operator, NICOR continued the geologic mapping, soil geochemistry, and drilling initiated by Homestake. NICOR drilled 102 rotary and reverse-circulation holes (“RC”) in 1983 through 1986, expanding the drill coverage at the POD deposit and estimating a mineral resource (see Section 6.3.3).

In 1986, Westmont Mining Inc. (“Westmont”) took over NICOR’s interests and operated until 1993. Some of NICOR’s rock and soil sample data are recorded as Westmont data. Westmont drilled 42 RC holes and 31 holes of unknown type in the POD, North Bullion, Bald Mountain, and north of North Bullion areas during 1987-1992 and collected rock and soil samples. They developed a detailed stratigraphic interpretation for the late Paleozoic sedimentary units and also began to recognize low-angle reverse and low-angle normal faults, as well as prominent north-south-trending and northwest-trending high-angle normal and reverse faults. The interplay of the Webb-Devils Gate contact and complex faulting as controls to the mineralization were also identified late in the Westmont tenure.

At some time prior to 1993, Corona Gold (“Corona”) reported on land held jointly with Pezgold mineral resource Corporation (“Pezgold”) in Sections 16 and 20 in T31N, R53E, and which later became part of the Railroad-Pinion property. Available data indicate that six holes were drilled and geologic mapping, soil and rock sampling, and geophysics were conducted. Gold Standard’s drilling database does not contain drill holes attributed to Corona or Pezgold. Specific drill locations are not known, and drill data indicates all the holes remained in the Mississippian Webb Formation above the target horizons. A northeast-trending corridor of subtle Carlin or Rain-type alteration and weak geochemistry was noted.

The Corona Gold area was acquired by Newmont in 1993. According to Dufresne and Nicholls (2017b), two holes were drilled, and additional geophysical surveys were conducted. The drilling reached as deep as 425 m, but this was not deep enough to reach the target horizon in those locations. These holes are not in Gold Standard’s drilling database. Gravity data outlined the northeast-trending zone and indicated a significant fault in the northeast corridor.

Ramrod Gold (“Ramrod”) became operator in 1993 and drilled 10 RC holes in the POD-North Bullion area in 1994. Newmont drilled one hole north of the POD-North Bullion deposit in 1995.

Mirandor Exploration (U.S.A.) Inc. (“Mirandor”) operated the project in 1996-1997 and drilled 42 RC holes in the POD-North Bullion, Bald Mountain, and north of North Bullion areas. The exploration for Ramrod and Mirandor was carried out by geologists who were previously employed by Westmont.

The Ramrod and Mirandor drilling tested greater depths than their predecessors and showed encouraging results along the northwest-trending POD zone. Elsewhere, the EMRR series of drill holes returned favorable results adjacent to the historic Sylvania mine which had historic production from replacement/skarn mineralization. Ramrod and Mirandor’s deeper drilling and drill hole placement encountered higher gold values than earlier drilling.

Kinross Gold U.S.A, Inc. (“Kinross”) took over the project during 1998 and 1999 under the terms of an earn-in agreement with Mirandor. Kinross drilled 64 RC holes and one core hole in the POD-North Bullion and Bald Mountain areas, according to the Gold Standard database and collected 871 rock and 2,531 soil samples according to Dufresne

 

6-2

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

and Nicholls (2017b). The soil samples were collected using a uniform collection process and the analysis of both soils and rocks was consistent in analytical laboratory and procedures.

The Kinross surface-sample results were consistent with known mineralization geology across most of the historical project area. Gold in soil anomalies from the Kinross samples generally coincides with the known historical drilling. Ag, As, Sb, and Hg also gave a similar pattern and highlight the known areas. Cu, Pb, Zn, and Mo highlight the historical skarn and replacement area (Dufresne and Nicholls, 2017b). The Kinross drilling tested within the areas of historical estimates, on the extensions of those zones, as well as newer target areas. The results in the areas of known gold returned similar results (Bartels, 1999). Step-out drilling appeared to be encouraging. Kinross drilled deeper holes, and in many cases, tested more of the stratigraphy than had been tested by previous operators.

The authors have no information on historical exploration, if any, carried out in the North Railroad portion of the property from 1999 until 2007. In 2007 and 2008, Royal Standard Minerals (“RSM”) drilled four core holes in the Bald Mountain area.

RSM, or its North Railroad property, was acquired by Scorpio Gold Corporation (“Scorpio”). In 2009, Gold Standard acquired the North Railroad property of Scorpio Gold and various private investors. MDA is not aware if this was the entire North Railroad portion of the current property, or if parts of the current North Railroad portion were acquired subsequent to 2009.

Gold Standard commenced exploration in the North Railroad portion of the property in 2009 (see Section 9.1 and Section 9.3) and began drilling in the North Bullion area in 2010 (see Section 10.4.1.1).

6.2 SOUTH RAILROAD PORTION OF THE PROPERTY

Various parts of the current South Railroad portion of the property have been held by at least 15 different successive operators at various times. The summaries in Table 6-1 and Table 6-2 provide a timeline of the historical operators that held ownership of various portions and conducted historical exploration work. In some cases, historical project and property names, and boundaries have been applied in different forms than have been in use by Gold Standard over the last several years. Drilling by historical operators is summarized in Section 10.

6.2.1 Pinion Area Exploration History

Exploration activity at the Pinion area dates back to the discovery of the Pinion prospect by Newmont in 1980. Newmont referred to the prospect as Trout Creek. The majority of the historical work was conducted in the late 1980s and early to mid-1990s and overlaps somewhat with that of the adjacent North Railroad portion of the property. Historical exploration work conducted in the Pinion area is summarized in Table 6-1. This work identified a Carlin-type gold deposit at the Pinion prospect in Sections 22 and 27 in T30N and R53E, which for a time was known as the South Bullion deposit. An additional zone of gold-silver mineralization was discovered and partly delineated at the Dark Star prospect in Section 25 in T30N, R53E.

Historical drilling began in 1980 with RC methods. Drilling by historical operators is summarized in Section 10. The mineral resource estimates mentioned in Table 6-1 and in Section 6.3 were estimated prior to the introduction of the standards set forth in NI 43-101 and are not in accordance with NI 43-101. The authors of this Technical Report have referred to these estimates as “historical resources” and are not treating them, or any part of them, as current mineral resources or mineral reserves. There is insufficient information available to properly assess data quality, estimation parameters, and standards by which the estimates were categorized, and the authors have not done sufficient work to classify these historical mineral resources as current mineral resources. The historical mineral resource estimates described above should not be relied upon and are relevant only for historical completeness.

 

6-3

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Historical exploration in the Pinion area identified two discrete zones of mineralization (Main and North) with the majority of the historical drilling having been completed at the Main zone, including the testing of the jasperoid breccia outcrops located near the southern boundary of Section 22 in T30N and R53E. Historical drilling extended the Main zone gold mineralization well into Section 27 to the southeast. The north zone is located approximately ~300 m northeast of the Jasperoid outcrops of the Main zone.

In 2014, Gold Standard acquired a large portion of the Pinion and surrounding area mineral rights from Scorpio. Subsequently, Gold Standard expanded their land position to include all of South Railroad.

Table 6-1: Summary of Historical Exploration, Pinion Area

(modified from DeMatties, 2003; Dufresne and Nicholls, 2017; and with data from Gold Standard, 2018 and 2019)

Year Company Exploration Work Performed
1980 Newmont - Conducted a regional stream sediment survey within the Piñon Range, which revealed a geochemical anomaly along Trout Creek.
- Further prospecting and discovery of the baritic jasperoid, Pinion Main zone.
1980-1981 Cyprus Exploration Co. (“Cyprus”)/ AMOCO - 31 RC drill holes in Au-bearing jasperoid outcrops and soil geochemical anomalies.
1983 Freeport-McMoRan (“Freeport”) - 8 RC holes; each intersected gold.
1985 Santa Fe Mining (“Santa Fe”) - 14 RC holes were drilled
1987-1989 Newmont - 61 RC holes, estimation of historical mineral resource known as South Bullion, 20 million tons grading 0.89 g Au/t * (see discussion below in Section 6.2.4).
1988 Battle Mountain Gold (“Battle Mountain”) 12 holes of unknown type were drilled.
1987-1989 Teck Resources (“Teck”) - 39 RC drill holes, geological mapping, and performed a soil geochemical survey.
1989-1991 Westmont Resources (“Westmont”) 11 holes of unknown type were drilled.
1990-1994 Crown Resources (“Crown”) - 130 RC holes, conducted metallurgical testing, detailed mapping, rock chip sampling, 800 soil samples, controlled-source audio-magnetotelluric (“CSAMT”), and an airborne magnetic-electromagnetic-radiometric survey.
- Defined two small and shallow mineralized zones: Pinion Main and “Central" zone, also known as Pinion North zone; estimated historical mineral resource of 8.1 million tons @ 0.026 oz Au/ton* (see discussion below in Section 6.2.4).
1994-1995 Cyprus Mining (“Cyprus”) - 914 rock samples, compiled geochemical results of previous exploration, identified Au anomalies defining the Ridge zone and Northern Extension.
- 74 RC holes in the South Bullion mineral resource area, expanded the historical mineral resource to 31 million tons at 0.89 g Au/t * (see discussion below in Section 6.2.4).
1996 Crown/Royal Standard Minerals Inc. (“RSM”) - 225 rock chip samples along 100 ft spaced lines; conducted geologic mapping, drilled 7 diamond-core holes at the Main zone and North (Pod) zone not in the Gold Standard database; produced a historical mineral resource and preliminary scoping study.
1997-1999 Crown/RSM/Cameco - Conducted geologic mapping, CSAMT surveys, rock chip sampling. Cameco drilled 18 RC holes and 8 core holes were completed; some may have started with RC.
1998-1998 Kinross Gold - 1 RC hole and 1 hole of unknown type were drilled.
2002-2011 RSM - 2003 drilled 10 RC holes, conducted metallurgy work with samples from drilling and trenches; obtained density measurements indicating historical mineral resources could have been understated. In 2007, 5 core holes drilled to determine the water table and to characterize the neutralization and acid generating potential of the mineralized and waste rocks.
- Proposed leach pad drill testing was completed in 2007, holes not in database.

6.2.2 Dark Star Area Exploration History

The Dark Star deposit is located approximately 3 km east of the Pinion Main zone (Figure 4-1). Historical exploration work was conducted at the Dark Star area from 1990 through 1999 by Crown, Westmont, Cyprus, Cameco and RSM,

 

6-4

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Mirandor, and Kinross, as summarized in Table 6-2. In 1990, Crown identified a surface gold anomaly through rock and soil sampling in what became the Dark Star deposit.

Drilling in 1991 confirmed the presence of subsurface gold mineralization at Dark Star. Further historical drilling identified an approximately north-south-trending mineralized zone that became known as the Dark Star Corridor. Historical drilling is summarized in Section 10.

Table 6-2: Summary of Historical Exploration in the Dark Star Area

Year Company Exploration
1984 Cyprus-AMAX - 9 rotary holes drilled
1990 Crown - Discovery and definition of Dark Star surface mineralization with rock chip and soil samples.
1991 Crown, Westmount Resources Inc. - 38 holes; detailed rock and soil sampling; geologic mapping; drilled 6 reconnaissance holes peripheral to the Dark Star deposit.
- 3 holes north of the Dark Star mineralized zone.
1992 Crown - 33 holes; detailed CSAMT survey; detailed palynology studies to better define Dark Star stratigraphy;
- Estimated mineral resource of 7.0 million tons at 0.75 g Au/t or 154,00 oz of Au* in Section 25 (Calloway, 1992).
1994 Crown - updated estimated mineral resource of Pan Antilles Resources of 7.5 million tons 0.69 g Au/t or 151,000 oz Au* (McCusker and Drobeck, 2012).
1994-1995 Cyprus - 9 holes drilled to the north of the Dark Star mineralized zone (not in Gold Standard’s database);
- Estimated a mineral resource of 7.7 million tons at 0.69 g Au/t or 170,000 oz Au*.
1997 Cameco, RSM - Gradient IP/Resistivity survey completed between Dark Star and Dixie
1997 Mirandor - 11 holes drilled north and west of Dark Star mineralized zone.
1998 Kinross, Mirandor - 7 holes drilled just north of mineralized zone.
1999 Kinross, Mirandor - 6 holes drilled northwest of mineralized zone.
* The mineral resource estimates summarized in Table 6-2 were calculated prior to the introduction of the standards set forth in NI 43-101 and are not in accordance with that Instrument. The authors of this Technical Report have referred to these estimates as “historical resources” and are not treating them, or any part of them, as current mineral resources. There is insufficient information available to properly assess data quality, estimation parameters and standards by which the estimates were categorized, and the authors have not done sufficient work to classify these historical mineral resources as current mineral resources. The historical mineral resource estimates described above should not be relied upon and are relevant only for historical completeness.

6.2.3 Jasperoid Wash

The Jasperoid Wash prospect is located 7.5 km southwest of the Dark Star deposit (Figure 4-1). In 1988, Westmont conducted geologic mapping, and rock and soil sampling over the Jasperoid Wash and Black Creek regional area. The geochemical sampling identified a large anomalous mineralized system and a 13-hole RC drilling program followed in 1989. Nine of the 13 holes drilled in 1989 intersected intervals of ≥0.01 to 0.03 oz Au/ton (0.34 to 1.03 g Au/t). Follow-up drilling programs were conducted in 1990, 1991, and 1992 by drilling 34 RC and three core holes. Low-grade gold mineralization was intersected in 22 of the holes (Jones and Postlethwaite, 1992). This historical drilling is summarized in Section 10.1.

In 1997, Cameco collected 35 rock-chip samples to test the anomaly within the hydrothermally altered Diamond Peak and Chainman-Dale Canyon formations of the Jasperoid Wash prospect. Four RC holes were drilled, totalling 556.3 m, targeting structural intersections. Significant gold mineralization was not intersected in the 1997 drilling at Jasperoid Wash, although two of the holes intersected low-grade, anomalous mineralization (Parr, 1998).

 

6-5

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

In 1998, Cameco completed gradient IP/Resistivity geophysical surveys over the Jasperoid Wash area and identified a large zone of low chargeability and high resistivity in the western part of the survey area. This was reportedly tested in 1998 by four RC holes totalling 677 m. Significant gold mineralization was not intersected in the drilling, although two of the drill holes intersected low-grade anomalous gold (Parr, 1999).

6.2.4 Other Prospects in the South Railroad Portion of the Property

Historical exploration has taken place intermittently since 1980 at several locations approximately 3.5 to 7.5 km southwest and south of the Dark Star and Pinion deposits as summarized below, and at the Irene prospect west of the Pinion deposit.

6.2.4.1 Dixie

The Dixie or Dixie Creek area, which is located 3.6 km south of the Dark Star deposit (Figure 4-1), has been explored intermittently since 1980 by various operators. The majority of the historical exploration work has been regional to semi-detailed in nature. In 1997, Cameco conducted rock sampling at the Pinion, Dark Star, and Dixie areas. The 1997 rock sampling at the Dixie area was intended to examine the nature of surface mineralization, in greater detail, and to compare this data with results of the then recently completed drill holes at the prospect. At the main Dixie area, a group of 32 rock samples defined a distinct, >1,500 ppb Hg anomaly with elevated Au, As, Sb, and Ag (Parr, 1999). This anomaly was found to roughly correspond with gold mineralization in the subsurface. Immediately to the north, a North Dixie anomaly was identified that was characterized by similar chemistry (elevated Hg, Au, As, and Sb). Farther north, a group of 15 rock samples collected between the Pinion and Dark Star areas defined a similar zone at the “CISS” area where six samples contained 20-135 ppb Au, including As values up to 940 ppm, Sb up to 161 ppm, and Hg up to 15 ppm.

In addition to the rock sampling, Cameco completed limited induced potential and resistivity (“IP/Resistivity”) geophysical surveys at several prospects including the Dixie area in 1997 and 1998. The IP/Resistivity surveys at Dixie identified broad zones of contrasting high and low resistivity, and corresponding zones of high chargeability (Parr, 1999).

The first documented drill program at the Dixie prospect was conducted by Freeport in 1988 and 1989, during which 26 holes were drilled in a joint venture with Crown. In 1991, Crown completed seven RC holes and later Cameco drilled 11 RC holes at the Dixie prospect. This historical drilling is summarized in Section 10. The drilling identified a zone of low-grade gold mineralization within Pennsylvanian siliciclastic and carbonate rocks above the contact between the Webb Formation and the underlying Devils Gate Limestone. This important contact between the Webb Formation and the underlying Devils Gate Limestone was not intersected by any of the historical Dixie Creek drilling (Redfern, 2002). The mineralization intersected at Dixie Creek is hosted in rocks that are similar in nature to the host rocks for the Dark Star gold mineralization (see Section 7.2.2.2).

6.2.4.2 JR Buttes

The JR Buttes prospect is located 4.5 km southwest of the Dark Star deposit. Geological mapping was completed over the JR Buttes area by an unknown company in 1977. This work outlined a zone of intense silicification over an interpreted graben structure (Dufresne and Nicholls, 2017a). In 1992, Westmount conducted rock chip, reconnaissance soil sampling, and detailed mapping, followed by a 19-hole RC drill program of 2,549.6 m. The drilling was designed to test for mineralization adjacent to the graben structural zone. Mineralization defined by silicification, arsenic, and gold concentrations was intersected along the western boundary fault of the graben. No mineralization was intersected along the eastern side of the graben (Jones and Postlethwaite, 1992). In 1994, Cyprus drilled three RC holes, and Cameco drilled one RC hole in 1998. The JR Buttes drilling is summarized in Section 10.3.

 

 

6-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT


6.2.4.3 Irene

Newmont carried out drilling in the Irene area during 1981-1982 and 1987-1989. Altogether, a total of 42 holes were drilled as summarized in Section 10.3.2 and Section 10.3.6.

6.3 HISTORICAL MINERAL RESOURCE ESTIMATES

Several historical mineral resource estimates have been estimated by a variety of companies for the Pinion and Dark Star deposits prior to the implementation of NI 43-101. The reader is advised that the historical mineral resource estimates are not in accordance with NI 43-101 and should therefore not be relied upon. A qualified person has not done sufficient work to classify the historical mineral resources as current mineral resources or mineral reserves. Historical mineral resources at Dark Star and Pinion are superseded by the current mineral resources estimated by MDA and presented in this Technical Report. At POD, North Bullion, and Sweet Hollow the mineral resources by APEX presented in Section 13 of this Technical Report are current mineral resources. The historical mineral resources described below are relevant only for historical completeness and are not being treated as current mineral resources or mineral reserves by Gold Standard.

6.3.1 Pinion Deposit Historical Estimates

The first documented historical mineral resource estimate for the Pinion deposit was completed by Crown in 1991 (Calloway, 1992). The 1991 estimate included information from 194 drill holes in the Main zone and North zone. The estimate used a cross-sectional polygonal method, a gold cutoff grade of 0.34 g Au/t, and a density of 2.464 g/cm3 (tonnage factor of 13.0 ft3/ton). A “geologic” mineral resource of 7.36 million tonnes of material averaging 0.89 g Au/t was calculated, containing approximately 210,000 troy ounces of gold (Table 6-3). The authors have not done sufficient work to classify these historical estimates as current mineral resources or mineral reserves, and Gold Standard is not treating these historical estimates as current estimates. These historical mineral resource estimates are superseded by the current mineral resource estimate described in Section 14.3 and are relevant only for historical completeness.

Table 6-3: Historical Pinion Deposit Estimated Mineral Resources

Mineral
Resource*
Year Tons
(x106)
Tonnes
(x106)
Gold Grade Silver Grade Cut-off Grade Contained Ounces
(opt) (g/t) (opt) (g/t) (opt Au) Au Ag
Crown (Calloway, 1992a) 1991 8.11 7.36 0.026 0.891 - - 0.01 210,860 -
Polygonal (Wood,1995) 1995 30.64 27.8 0.026 0.89 - - 0.01 796,640 -
MIK (Wells, 1995) 1995 18.26 16.56 0.0269 0.92 - - 0.01 491,194 -
Bharti (Bharti Eng., 1996) 1996 10.8 9.8 0.025 0.857 0.157 5.383 - 270,000 1,695,600

*The mineral resource estimates summarized in Table 6-3 are not consistent with current CIM standards for mineral resource estimation and classification. The authors have not done sufficient work to classify these historical estimates as current mineral resources or mineral reserves, and Gold Standard is not treating these historical estimates as current estimates. These historical mineral resource estimates are superseded by the current mineral resource estimate described in Section 14.3 and are relevant only for historical completeness. Calloway (1992a) in table is Calloway (1992) of this Technical Report.

Historical mineral resource estimates were updated for the Pinion deposit in 1995 by Cyprus (Table 6-3). They comprise a polygonal estimate (Wood, 1995) and a Multiple Indicator Kriging (“MIK”) estimate that used Mintec’s MED System software (Wells, 1995). The polygonal estimate incorporated high-density and low-density drilling at, and surrounding, the two zones of mineralization and utilized a density of 2.563 g/cm3 (tonnage factor of 13.50 ft3/ton). Polygons were constructed using cross-sectional drill-hole information and were classified as “proven” in areas where drill density was 30.48 m, and where polygons were projected 15.24 m on either side of a section. Polygons with drill-hole spacing

 

 

6-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

between 30 m and 60 m were classified as “probable” and those with drill hole spacing over 61 m, were classified as “inferred.” The mineral resource was calculated by summing all polygons with an average grade above a cutoff of 0.34 g Au/t. The original classification of the 1995 polygonal Pinion mineral resource is not consistent with CIM standards. The summary provided in Table 6-3 is taken from the original report and represents a summation of all three of the historical mineral resource categories into a global historical mineral resource.

The 1995 Cyprus polygonal mineral resource (Table 6-3) was calculated using ~350 drill holes, but the estimate incorporated very few density measurements and a very limited amount of quality control/quality assurance (“QA/QC”) data were available. The Cyprus historical mineral resources included drill-hole data and estimates for mineral resources in Section 27. Cyprus also produced an MIK estimate for the Pinion deposit in 1995 utilizing a similar database to that of the 1995 Cyprus polygonal mineral resource described above. The same 2.563 g/cm3 as the polygonal mineral resource was used and grade was applied to a 15.24 m x 15.24 m x 6.1 m block model using Mintec’s MED System software and an MIK grade-estimation algorithm. Following the estimation process, Lerchs-Grossman pit models were run for $400/oz and $700/oz gold price scenarios using various parameters including: a) 45o maximum pit slopes; b) a $2.51/short ton crushed ore cost (crushing processing, pad construction, and G&A); c) 48% recovery for ROM material; and d) 62% recovery for crushed material. A lower cutoff grade of 0.274 g Au/t was employed for the ROM material and 0.49 g Au/t was utilized for the crushed material for the $700/oz scenario. A lower cutoff of 0.31 g Au/t was utilized for the combined ROM/crush material for the $400/oz scenario. In a mineral resource summary document by Wells (1995), it is clearly stated that the mineral resource work relied on estimations for key factors such as density, recovery, and optimal crush size due to limited test work.

In 1996, RSM contracted Bharti Engineering (“Bharti”) of Toronto, Canada, to conduct mineral resource estimation on the Pinion Main and North zones within Section 22 in T30N, R53E and excluded data within Section 27 (Table 6-3; Bharti Engineering, 1996). The mineral resource estimate utilized GEMCOM mining software and although not clearly stated, it is thought that the Inverse Distance Squared (ID2) grade-estimation algorithm was used to apply grade to a 15.24 m x 15.24 m x 6.1 m block model. Samples (~1.524 m average length) were uncapped and composited (to 6.1 m), with a minimum of two and a maximum of 12 data points required for modeling. The Bharti estimate (Table 6-3) comprised a “global resource”, without cutoff grade, of 9.8 million tonnes at 0.86 g Au/t, representing a total of 273,800 contained ounces of gold. A qualified person has not done sufficient work to classify the historical mineral resources as current mineral resources or mineral reserves and the historical mineral resources are superseded by the current mineral resource estimates presented in Section 14.3 of this Technical Report. The historical mineral resources described above are relevant only for historical completeness and are not being treated as current mineral resources or mineral reserves by Gold Standard. This estimate incorporated more data but is otherwise comparable to the 1991 Crown polygonal estimate discussed above. A Whittle pit was run for the 1996 mineral resource estimate using a gold price of $390/oz, a recovery of 67%, total operating costs of $5.75/ton, a 4% Royalty, 50° maximum pit slope and dilution estimated at 10%. Using these values, two potential pits were generated for the Main zone and North zone totaling only 2.99 million tonnes and averaging 0.89 g Au/t, which represented approximately 85,750 ounces of gold. Of that, 57,400 ounces was considered recoverable. A qualified person has not done sufficient work to classify the historical mineral resources as current mineral resources ore mineral reserves and historical mineral resources are superseded by the current mineral resource estimates presented in Section 14.3 of this Technical Report. The historical mineral resources described above are relevant only for historical completeness and are not being treated as current mineral resources or mineral reserves by Gold Standard. As with the previously discussed historical mineral resource estimates, this 1996 estimate incorporated limited density, QA/QC and recovery information and its geographic limitation to Section 22 in turn limited the applicability of the mineral resource estimate as it excluded a significant amount of drill data in the northern part of Section 27.

6.3.2 Dark Star Deposit Historical Estimates

Based upon the 1991 to 1993 drilling results, Crown and Cyprus estimated mineral resources in 1992 and 1994, prior to the 1997 to 1999 drill holes completed by Mirandor and Kinross. The historical mineral resource estimates discussed

 

 

6-8

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

below should not be relied upon and they are superseded by the current mineral resources estimate presented in Section 14.2 of this Technical Report.

Calloway (1992) described the 1992 Crown estimate for the Dark Star deposit as follows:

Crown Resources has delineated a geologic resource in the Dark Star discovery area of approximately 7.0 MT @ 0.022 opt Au, or 154,000 oz of contained gold. Mineralization remains open in three directions. Calculations of the Dark Star geological resource utilized nearest neighbor and ordinary kriging methods, with a 0.010 opt cutoff, minimal 15 ft benches, and a 13.5 ft3/st density factor.

There are no other details provided for the 1992 Crown estimate by Calloway (1992). The estimate is considered historical and should not be relied upon. The authors have not done sufficient work to classify these historical estimates as current mineral resources or mineral reserves, and Gold Standard is not treating these historical estimates as current estimates. These historical mineral resource estimates are superseded by the current mineral resource estimate described in Section 14.2 and are relevant only for historical completeness.

In 1994, a consultant on behalf of Crown constructed a polygonal mineral resource estimate for the Dark Star deposit (Table 6-4) using GEO-MODEL and PC-XPLOR modules of GEMCOM (Peek, 1994; McCusker and Drobeck, 2012). The estimated mineral resource was based upon a polygonal methodology using composited drill-hole intervals and cross sections at 30.48 m intervals. Tonnages, grade, and total ounces were calculated using polygons of 15.24 m width on either side of each cross-section. The 1994 estimate did not include any geostatistics on variability or capping, no geologic constraints, no down-hole surveys, no QA/QC data evaluation, and no mention of density measurements. Peek (1994) utilized an assumed density of 2.375 g/cm3 for the estimate. No economic constraints other than a lower-grade cutoff were applied to the mineral resource estimate.

Table 6-4: 1994 Dark Star Historical Crown Mineral Resource Estimate

Mineral Resource Tons Tonnes Gold Grade Gold Cut-off Grade Cut-off Grade Contained Au
(Reference) (x 106) (x 106) (opt) Grade (g/t) (opt Au) (g/t Au) (oz)
Polygonal (Peek, 1994) 11.5 10.43 0.0168 0.576 0.010 0.343 193,709
7.55 6.85 0.0201 0.689 0.013 0.446 151,481

Note: The authors have not done sufficient work to classify these historical estimates as current mineral resources or mineral reserves, and Gold Standard is not treating these historical estimates as current estimates. These historical mineral resource estimates are superseded by the current mineral resource estimate described in Section 14.2, are relevant only for historical completeness and should not be relied upon.

In December 1995 to January 1996, Cyprus personnel estimated a polygonal mineral resource estimate for the Dark Star deposit with data from ~81 drill holes, utilizing a lower-grade cutoff, a pit shell, internal dilution, and a stripping ratio of 1.5:1, in a manner that was consistent with industry standards at that time (DeMatties, 2003). Polygons were constructed on cross sections using drill-hole information and were classified as “proven” in areas where drill density was 30.48 m and polygons were projected 15.24 m on either side of a section. Polygons with drill-hole spacing between 30 m and 60 m were classified as “probable” and those with spacing >61 m were classified as “inferred”. The Dark Star mineral resource was estimated by summing all polygons with an average grade 0.34 g Au/t (cutoff grade). A density of 2.563 g/cm3 was used. Very few density measurements and little or no QA/QC data were incorporated (DeMatties, 2003).

The 1995-1996 Cyprus estimate for Dark Star is summarized in Table 6-5. It represents a global historical “geological” mineral resource as of January 1996 and does not include the drilling by Mirandor and Kinross in Section 24. Although the Dufresne and Nicholls (2016) review established a high quality for the data used in the 1995-1996 estimate, there is insufficient information available to properly assess all of the estimation parameters and the standards by which the estimate for Dark Star was categorized. The authors have not done sufficient work to classify these historical estimates

 

 

6-9

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

as current mineral resources or mineral reserves, and Gold Standard is not treating these historical estimates as current estimates. The historical mineral resource estimate for Dark Star should not be relied upon, it is relevant only for historical completeness, and it is superseded by the current mineral resource estimate presented in Section 14.2 of this Technical Report.

Table 6-5: Dark Star Deposit 1995-1996 Cyprus Mineral Resource Estimate

Mineral Resource Tons Tonne Gold Grade Cut-off Grade Contained
(Reference) (x 106) (x 106) (opt) (g/t) (opt Au) (g/t Au) Au (oz)
Polygonal
DeMatties 2003; Cyprus 1995-1996
7.72 7.00 0.020 0.690 0.01 0.34 151,365

6.3.3 POD (Railroad) Deposit Historical Mineral Resources 1985 - 2003

The first estimate of gold mineral resources at the POD deposit was made by Kuhl (1985) using the data from NICOR’s drilling (Table 6-6). A rectangular-block polygonal estimate was used with the following parameters:

  • Data projected half way to the adjoining drill hole or 30.5 m;

  • Inclusion of intercepts less than 1.03 g Au/t if the outlying intervals brought the overall average to equal 1.03 g Au/t;

  • Minimum 3.05 m intercept in the drill hole;

  • All calculations made using fire assay intervals;

  • No stripping ratio calculated; and

  • No metallurgical recovery information utilized.

Bartels (1999) re-estimated the gold mineral resource at the POD (Railroad) deposit (Table 6-6) with a cross-sectional method based on 58 holes on 27 cross sections spaced 30.5 m apart using the following assumptions:

  • Tonnages were calculated using a density of 2.563 g/cm3;

  • Assay values include silver credits at a 60:1 ratio;

  • Compositing of assay values was done according to the following conventions:

  • Intervals of low grade (<1.030 g Au/t) up to 4.6 m thick, bound on both sides by >1.030 g Au/t values were included within the “ore” envelope only if the average of the low grade and the upper- and lower-bounding values were >=1.030 g Au/t;

  • No capping of high-grade assay values was done;

  • Volumes were determined by projecting the contoured “ore” areas 15.24 m on either side of the section plane;

  • An average grade was assigned to each area by determining the weighted average grade of all drill intercepts within the “ore” envelope; and

  • Average grade was assigned to the respective volume and contained ounces were calculated.

Masters (2003a) re-estimated the gold contained within the POD (a.k.a. Railroad) zone (Table 6-6) utilizing a cross-sectional polygonal method with 71 holes on 15 cross sections approximately spaced 30.5 m apart using the following methodology and assumptions:

  • Tonnages were calculated using a density of 2.563 g/cm3;

  • Mineralization was categorized as oxidized (cyanide soluble gold within the Webb siltstone) and refractory gold (primarily within carbonaceous, sulfidic, unoxidized Webb siltstone);

  • The oxidized and refractory gold categories were sub-divided into grade shells of 0.34 g Au/t to 0.69 g Au/t and >0.69 g Au/t, and an additional category of mineralization for refractory gold at depths above 91.4 m depth was also considered; and

 

 

6-10

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT
  • Each mineralization category was estimated separately for tons, ounces and grade.

Masters (2003b) also presented the first estimation for gold contained within the East Jasperoid zone (Table 6-6) located immediately to the east of the POD zone, located immediately to the east of the POD zone. Estimation was completed utilizing a cross-sectional method on four sections spaced 30.5 m apart.

Table 6-6: POD Deposit Historical Mineral Resource Estimates 1985 - 2003

Resource
Area
Tons Tonnes Contained
Ounces Au
Average Au Grade Cutoff Au Grade Reference
(opt) (g/t) (opt) (g/t)
POD 1,197,400 1,086,280 107,766 0.090 3.09 0.030 1.03 Kuhl, 1985
POD 1,400,000 1,270,080 112,000 0.080 2.74 0.020 0.69 Kuhl, 1985
POD 1,006,665 913,250 89,731 0.089 3.05 0.030 1.03 Bartels, 1999
POD 2,654,112 2,407,810 134,445 0.0506 1.73 0.010 0.34 Masters, 2003a
East Jasperoid 1,013,808 919,727 31,742 0.031 1.06 0.010 0.34 Masters, 2003b

Note: The historical mineral resource estimates summarized in Table 6-4 were performed prior to the implementation of the standards set forth in NI 43-101 and are relevant only for historical completeness. There is insufficient information available to properly assess the estimation parameters and the standards used. The authors have not done sufficient work to classify these as current mineral resources, Gold Standard is not treating them as current mineral resources and they have been superseded by the current resources presented in Section 13. These historical mineral resources should not be relied upon.

6.4 HISTORICAL MINE PRODUCTION

6.4.1 North Railroad

The North Railroad portion of the property covers the historic Railroad district. Ketner and Smith (1963) suggested that historic production records for the district are not very reliable for the period between 1869 and 1905. Only the total volumes of tons mined, and commodity produced were reported, if they were reported. They estimated the total value of production through 1956 to be worth $2 million using the value of the commodity produced for the year it was produced. Ketner and Smith (1963) reported 43,940 total tons of ore were mined with mineral production distributed as follows:

  • Gold - 6,918 ounces

  • Silver - 382,000 ounces

  • Copper - 2,850,000 pounds

  • Lead - 4,340,000 pounds

  • Zinc - 372,000 pounds

6.4.2 South Railroad

There has been no mineral production reported for the South Railroad portion of the property.

 

 

6-11

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 7 TABLE OF CONTENTS

SECTION     PAGE
7 GEOLOGICAL SETTING AND MINERALIZATION 7-1
  7.1 REGIONAL GEOLOGIC SETTING 7-1
  7.2 LOCAL AND PROPERTY GEOLOGY 7-4
    7.2.1 North Railroad Portion of the Property 7-6
    7.2.2 South Railroad Portion of the Property 7-8
  7.3 MINERALIZATION 7-11
    7.3.1 North Bullion Deposits 7-11
    7.3.2 Pinion Deposit 7-13
    7.3.3 Dark Star Deposit 7-14
    7.3.4 Jasperoid Wash Deposit 7-15

SECTION 7 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 7-1: Regional Geology of the Railroad-Pinion Property 7-2
Figure 7-2: Long Section through the Carlin Trend 7-3
Figure 7-3: Gold Standard Property Geologic Map 7-5
Figure 7-4: North Bullion Stratigraphic Column 7-7
Figure 7-5: Stratigraphic Column for the Pinion, Dark Star, and Jasperoid Wash Deposit Areas 7-9
Figure 7-6: North Bullion Cross Section N4488800 7-12
Figure 7-7: Pinion Deposit Geology, Section 4479380N 7-14
Figure 7-8: Dark Star Geologic Cross Section N4479600 7-15
Figure 7-9: Jasperoid Wash Geologic Cross Section 4473200N 7-16

 

 

 

7-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

7 GEOLOGICAL SETTING AND MINERALIZATION

This section summarizes the geologic setting and mineralization of the Pinion-Railroad property, which includes the Dark Star, Pinion, Jasperoid Wash, and North Bullion area deposits. This section is based on the descriptions and information provided by Dufresne and Nicholls (2016), Hunsaker (2010; 2012a; 2012b), Koehler et al. (2014), Shaddrick (2012), and sources cited therein. The authors have reviewed this information and believe it accurately represents the geology and mineralization as currently understood.

References to Tomera Formation equivalent stratigraphy have been noted historically. However, recent work suggests these units in the Railroad-Pinion property may not be of equivalent age, so all usage of Tomera Formation equivalent in this Technical Report refer to units that are Pennsylvanian-Permian undifferentiated.

7.1 REGIONAL GEOLOGIC SETTING

The Railroad-Pinion property is located in the southern portion of the Carlin trend, a northwest-southeast alignment of sedimentary-rock hosted gold deposits and mineralization, as shown in Figure 7-1. The property is centered on the Railroad dome, or “window” in the Piñon Range (Mathewson, 2002) as shown in Figure 7-2. Such domes or “windows” consist of upright folds in horsts of Paleozoic rocks of the Roberts Mountains autochthon, exposed by erosion, that were favorable for the formation of Carlin-style gold deposits (Jackson and Koehler, 2014). In the case of the Railroad and other “windows” within the Carlin trend, pulses of Mesozoic and Cenozoic magmatism intruded the folds and related faults (Figure 7-2).

The Carlin trend was within the passive, western continental margin of North America during the early and middle Paleozoic time, which is the time of deposition of the oldest rocks observed in the area (Stewart, 1980). A westward-thickening wedge of sediments was deposited at and west of the continental margin, in which the eastern depositional facies tend to be coarser and carbonate-rich (shelf and slope deposits, carbonate platform deposits) while the western facies are primarily fine-grained siliciclastic sediments (deeper basin deposits). The Carlin trend is proximal to the shelf-slope break, although this break was not static over time.

In the Late Devonian through Middle Mississippian, east-west compression during the Antler Orogeny produced folds and thrust faults, the most significant manifestation of which is the Roberts Mountain Thrust. This regional, low-angle fault placed western facies siliciclastic rocks over eastern facies carbonate rocks across the region. In this Technical Report the western facies are referred to as allochthonous whereas the eastern facies are autochthonous. As a result of this tectonism, the Mississippian and Pennsylvanian overlap assemblage of clastic rocks was deposited across the region (Smith and Ketner, 1975). Late Paleozoic sedimentary rocks in the Piñon Range are interpreted as structurally interleaved allocthonous and autochthonous sequences (Longo et al., 2002; Mathewson, 2001; Rayias, 1999; Smith and Ketner, 1975).

Multiple igneous intrusions occur along the Carlin trend. The oldest igneous rocks are reported to be Late Triassic in age (Teal and Jackson, 2002).

 

 

7-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Figure 7-1: Regional Geology of the Railroad-Pinion Property

(from Dufresne and Nicholls, 2017a; after Crafford, 2007)

 

 

7-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 7-2: Long Section through the Carlin Trend

Other igneous rocks include: a Late Jurassic dioritic intrusion documented at the Goldstrike gold deposit (Bettles, 2002); intermediate to mafic dikes of Jurassic and Cretaceous age; the Cretaceous, quartz monzonite Richmond stock; the Eocene age Welches Canyon stock; and hydrothermally altered and locally gold-bearing felsic to mafic dikes of Eocene age (Ressel, 2000). The Eocene-age Bullion stock (Henry et al., 2015) is situated between the North Bullion and Pinion gold deposits within the Railroad-Pinion property (Figure 7-1 and Figure 7-2).

Late Eocene and Miocene volcanic rocks were erupted over large areas of the region. These predominantly consist of ash-flow tuffs and lava flows, mainly of rhyolitic compositions, as well as volumetrically smaller amounts of andesitic and basaltic lavas. Sequences of lacustrine sedimentary and volcanic-sedimentary rocks, as young as Pliocene in age, interfinger with and overlie the Cenozoic volcanic cover rocks.

Major regional extension commenced in mid-Miocene time. The extension was generally east-west directed, has continued to the present, and is manifested in the Basin and Range topography. The extensional faulting varies from normal-displacement, block faulting to listric-style faulting with progressively greater extension. The significant consequence of extensional faulting has been the dismemberment and tilting of pre-existing rocks, and development of range-scale horsts and grabens.

 

 

7-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

7.2 LOCAL AND PROPERTY GEOLOGY

The property is within the central part of the Piñon Range, which is comprised of Ordovician through Permian marine sedimentary rocks (Smith and Ketner, 1975; Figure 7-3) that form a structural dome. At least one large-scale, asymmetric anticline is present, but younger horst and graben structure developed within a framework of overprinted high-angle faults is a prominent feature of the range. Tertiary sedimentary rocks deposited in shallow, freshwater lakes and overlying intermediate to felsic Tertiary volcanic rocks are present on the flanks of the range and within adjacent grabens (Figure 7-3).

Four prominent high-angle fault directions have been identified including west-northwest, north-south, northwest, and northeast-striking faults. The north-south-striking Bullion fault corridor separates the Tertiary volcanic rocks to the east from the Paleozoic sedimentary units in the range. Northwest- and west-northwest-striking faults occur across the project area and include the South and Main faults at Pinion and the Saddle fault at Dark Star. Some of the faults are low-angle. Drilling indicates that multiple episodes of low-angle fault displacements have juxtaposed Devonian carbonate rocks and Mississippian rocks, resulting in interleaved sections of the Devonian Devils Gate Limestone and Webb Formation, as well as Webb age-equivalent rocks of the Tripon Pass Formation (Hunsaker, 2012b).

A complex of Eocene igneous rocks, centered south of Bald Mountain, have intruded the Paleozoic sedimentary units in the core and east flank of the range (Figure 7-3). Twenty-four samples of intrusive and volcanic rocks from the project area have been studied by Dr. Christopher Henry of the Nevada Bureau of Mines and Geology. Petrography, chemical analyses, and 40Ar/39Ar and U-Pb zircon age dates have led to an interpretation that at least 10 distinct igneous rock types at the project were emplaced during at least four distinct episodes between 38.9 and 37.5 Ma, associated with the Indian Well volcanic field (Henry et al., 2015).

The Railroad-Pinion area geology is summarized in two parts that correspond to the North Railroad portion of the property, and the South Railroad portion of the property.

 

 

7-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 7-3: Gold Standard Property Geologic Map

(from Dufresne et al., 2017; modified after Smith and Ketner, 1978)

 

 

7-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

7.2.1 North Railroad Portion of the Property

7.2.1.1 North Bullion Area Geology

The North Bullion horst is bounded to the east and northwest by younger, generally flat lying, dacitic to rhyolitic tuffs of the Indian Well Formation (Figure 7-3; Henry et al., 2015). The Indian Well Formation contains phenocrysts of quartz, sanidine, hornblende, and biotite within a pink to grey groundmass, and rests on top of an angular unconformity above the underlying, Eocene-age Elko Formation in the eastern hanging wall of the North Bullion fault zone (“NBFZ”). The Elko Formation is exposed within the eastern hanging wall of the NBFZ in the northern part of the property, as shown in Figure 7-3, and consists of thick- to thinly bedded mudstone, sandstone, chert pebble conglomerate, freshwater limestone, and tuffaceous sediments (Stewart, 1980; Smith and Ketner, 1976).

The North Bullion horst consists of thick bedded, fining upward, conglomerate, and mudstone of the Mississippian Chainman Formation which contains 1 m to 7 m thick dacite sills from 100 m to 200 m below the surface. Dacite dikes occur along steeply dipping faults within the NBFZ (Jackson et al., 2015). In between the upper and lower Chainman Formation is a sequence of mixed carbonate and siliciclastic rocks, which are interpreted to belong to the Mississippian Tripon Pass Formation (Longo et al., 2002; Matthewson, 2001; Oversby, 1973). Two limestones within the Tripon Pass Formation act as informal marker units. Limestone 1 is a dark-grey, laminated to thinly bedded micrite located at the top of the Tripon Pass Formation, and limestone 2 is a grey, medium- to thick-bedded calcisiltite to calcarenite located approximately 55 m below limestone1 (Figure 7-4). The Tripon Pass Formation hosts the upper gold zone of the North Bullion deposit and locally contains >6 g Au/t. The Tripon Pass Formation is underlain by the variably bedded sandstone, conglomerate, and silty mudstones of the Mississippian Chainman Formation.

Underlying the Chainman Formation, in low-angle fault contact, is the Devonian Devils Gate Limestone (Devils Gate Limestone of Figure 7-3). It is composed of grey, thick-bedded calcarenite and minor micrite, between 60 to 150 m in thickness. Dissolution-collapse breccia developed at the top of the Devils Gate Limestone is host to high-grade gold within the lower zone at North Bullion (Jackson et al., 2015). In the northern portion of the deposit, silty mudstone of the Mississippian Webb Formation and silty micrite of the Mississippian Tripon Pass Formation (Figure 7-4), are important hosts to gold, and are preserved along the low-angle fault contact between the Chainman Formation and the Devils Gate Limestone. Beneath the Devils Gate Limestone there is a transitional contact into the Sentinel Mountain Dolomite, which has an average thickness of 150 m, and is in transitional contact with calcareous sandstone of the underlying Oxyoke Formation (Oxyoke Sandstone in Figure 7-4). The cross-bedded Oxyoke is approximately 120 m in thickness and consists of well-rounded quartz grains, which are either matrix- or grain-supported. There is tectonic and dissolution-collapse breccia that extends from the lower contact of Tripon Pass limestone to the top of the Devils Gate Limestone between the Massif and West Strand faults. The deepest drill holes at North Bullion bottomed in thin-to thick-bedded dolomite of the Devonian Beacon Peak Dolomite (Figure 7-4).

 

 

7-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 7-4: North Bullion Stratigraphic Column

(from Jackson et al., 2015)

 

 

7-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Jackson et al. (2015) described the structural effect on geology at North Bullion as follows:

“North Bullion (gold deposit) occurs in a triangular shaped horst in the footwall of the major north-striking, steeply east-dipping, North Bullion Fault Zone (NBFZ). The western edge of the horst is bounded by a northeast-striking, northwest-dipping fault. The NBFZ is 300 m wide and apparent normal displacement across the NBFZ is greater than 600 m, as constrained by the deepest holes into the Indian Well Formation volcanic rocks that fill the Bullion graben to the east. Chainman sandstone occupies the center of the horst, and the variable strikes and dips at the surface indicate an open fold is centered on the horst. The western edge of the horst is bounded by a N50E striking, northwest-dipping fault. The triangular shape of the horst is well represented in structure contours on the top of the Devils Gate Limestone.”

... “Intrusive relationships and tilting of units indicate the deposit formed during an Eocene event with synchronous intrusion, hydrothermal activity and extensional movement on graben-bounding faults. Dacite sills, dated at 38.8-38.2 Ma, intruded steeply dipping faults within the NBFZ and low angle, bedding parallel faults, capping the gold system. The margins of dacite dikes and sills are commonly sheared and some dacite occurs as clasts within mineralized dissolution-collapse breccia, indicating continued movement along faults and hydrothermal activity after emplacement of the dacite. In fault steps within the NBFZ, the Eocene Elko Formation has the same moderate eastward dip as the underlying Paleozoic rocks. The collapse breccia generally exhibits a flat-tabular textural fabric subparallel to today’s surface. All of this evidence supports the Formation of North Bullion during a very dynamic, focused Eocene event with synchronous extension, intrusion and Carlin-style mineralization.”

7.2.2 South Railroad Portion of the Property

7.2.2.1 Pinion Deposit Area Geology

The geological setting, stratigraphic units and the overall tectonic history of the Pinion area is the same as that described for the adjacent North Railroad area by Hunsaker (2010, 2012a, 2012bb), Shaddrick (2012), Koehler et al. (2014), Turner et al. (2015), Dufresne and Koehler (2016), and Dufresne and Nicholls (2018). The geology is illustrated in Figure 7-3. A stratigraphic column for the project area is presented in Figure 7-5.

The Pinion deposit area encompasses a sequence of Paleozoic sedimentary rocks exposed within large horst blocks in which the sedimentary rocks have been broadly folded into a south- to southeastward-plunging, asymmetric anticline. The axis of the Pinion anticline can be traced for approximately 3.2 km, trends N20°W, and plunges approximately 25° to 30° to the south-southeast (DeMatties, 2003). The apparent dip of the western fold limb ranges from 10° to 35° and the steeper eastern limb dips 25º to 50º. Eastern assemblage formations including the Oxyoke, Beacon Peak, Sentinel Mountain, and Devils Gate formations form the core of the anticline. Siliceous clastic units of the Tripon Pass, Webb, Chainman, and Tonka formations form its limbs (Calloway, 1992a).

The contact between the Devils Gate and Tripon Pass (Figure 7-5) is characterized by a multi-lithic dissolution-collapse breccia (“mlbx”) that ranges from 3 m to 120 m in thickness. The mlbx is characterized by multi-lithic clasts, barite, clay matrix with a silica overprint, and infrequent banded quartz veins. The breccia is thickest on the east limb of the fold and thins along the crest and along the west limb.

 

 

7-8

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 7-5: Stratigraphic Column for the Pinion, Dark Star, and Jasperoid Wash Deposit Areas

(from Gold Standard 2019; Undifferentiated Pennsylvanian-Permian units are those at Dark Star and Jasperoid Wash)

The Pinion deposit is contained within a northwest-trending horst. Faults on the northeast horst margin are linking structures to the more northerly striking, range-bounding Bullion fault corridor (Norby et al., 2015) and include the locally named Bullion, Linkage, N10E, and Tonka faults. Older N50°W- to N60°W-striking faults (South and Main faults) transect the Pinion deposit and offset the anticline.

At depth, the Devils Gate, Tripon Pass, and Webb formations overlie Mississippian-aged Chainman Formation. This contact was defined by Norby et al. (2015) as gently west-dipping Pinion thrust fault between the overlying Devils Gate to Chainman sequence and the underlying Chainman sequence. On the east limb of the fold, additional localized thrust faults occur above the Pinion thrust fault, resulting in locally repeated sections of Chainman, Webb, and Tripon Pass.

Alteration associated with gold-silver mineralization is primarily silicification of the breccia. There are also zones of abundant disseminated and vein barite, with up to 75% barium determined from x-ray fluorescence analysis. Decalcification of the Tripon Pass and Devils Gate formations along the margins of the breccia have also been observed. Minor clay alteration can be seen along the Main, South, and Bullion faults. Elements associated with gold are silver, antimony, arsenic, barium, and mercury. A type of mineralization with more typically epithermal-like textures

 

 

7-9

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

is also present at Pinion. Banded fine-grained to fine-cockscomb silica occurs throughout the deposit, locally with stibnite (or oxidized to stibiconite) and elevated silver to 70 ppm.

Gold and silver mineralization at the Pinion deposit is strongly controlled by the dissolution-collapse breccia at the contact between calcarenite of the Devils Gate Limestone and the overlying silty micrite of the Tripon Pass Formation (Norby et al., 2015). Approximately 90% of the mineralization is hosted within the breccia and is defined locally as the Main zone. The Pinion deposit extends northwards, along the Bullion fault corridor, and is referred to as the North zone. The North zone appears to be a fault offset of the east limb of the Pinion anticline. Low-grade mineralization extends into the footwall of the Bullion fault and is hosted in Sentinel Mountain Dolomite.

7.2.2.2 Dark Star Geology

The Dark Star deposit is located east of the Pinion deposit (Figure 7-3) and occurs in a 400 m- to 600 m-wide structural block of Pennsylvanian-Permian rocks (Harp et al., 2016). A generalized stratigraphic column for the Dark Star area is illustrated in Figure 7-5.

Dark Star lies along the north-south Dark Star fault corridor that has Mississippian Chainman Formation and unconformably overlying Tertiary Conglomerate to the west, and Eocene Indian Wells Formation to the east. These formations are fault bounded by the West fault and Dark Star fault, respectively. Pennsylvanian-Permian undifferentiated conglomerate and calcareous bioclastic units are interpreted to be a Tomera Formation equivalent, a localized unit that occurs at Dark Star and possibly Jasperoid Wash, comprise the horst between these faults. The Pennsylvanian-Permian undifferentiated section is informally broken down into the uppermost unit of siltstone (generally calcareous), a middle unit of calcareous conglomerate (with minor interbedded sandstone), and a lower unit of calcareous siltstone (Figure 7-5). These units are gently folded in a north-south-trending syncline-anticline pair between the West and Dark Star faults.

The Dark Star fault corridor is a prominent north-south-trending fault system consisting of the West, Ridgeline, IDK, East, and Dark Star faults. The corridor has a surface expression of greater than 12 km in length. All but the West fault are steeply east-dipping normal faults with 15 m to 200 m of offset. The West fault is a moderately west-dipping fault with displacement of the Chainman Formation over the Pennsylvanian-Permian rocks and may be a continuation or age equivalent to the Pinion thrust fault.

An older set of N°40W- to N60°W-striking faults, the Saddle and Outcrop faults, transect the Dark Star deposit, and appear to offset the mineralization. These appear to be contemporaneous with the N60°W-striking faults at Pinion. Surface mapping has indicated the presence of regional N55°E- to N60°E-striking faults north and south of the Dark Star deposit.

Alteration at Dark Star is dominated by decalcification and silicification of the Pennsylvanian-Permian rocks. Small areas of clay alteration associated with faults have been observed, along with localized barite veins and widespread disseminated barite (Harp et al., 2016). Quartz veinlets, drusy-quartz lining fractures, and banded-quartz occur in the silicified rocks. Several stages of tectonic, collapse, and hydrothermal breccia are recognized throughout the mineralized zone. Alteration of the upper and lower siltstone units is characterized by decalcification, overprinted by argillic and weak silicic alteration.

7.2.2.3 Jasperoid Wash Geology

The Jasperoid Wash deposit is located south of the Pinion deposit in a structural block of Pennsylvanian-Permian rocks (Figure 7-3). These rocks are similar to those at the Dark Star deposit as illustrated in Figure 7-5.

The Jasperoid Wash deposit occurs along a linear, north-south-striking structural corridor which is bounded on its east and west sides by major faults. The west-bounding fault juxtaposes Mississippian Tonka Formation against the

 

 

7-10

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Pennsylvanian-Permian rocks to the east. A horst block of Pennsylvanian-Permian conglomerate and clastic units is between the two main faults. The Pennsylvanian-Permian rocks are informally assigned to an upper unit of silty limestone, a middle unit of calcareous sandstone and conglomerate, a lower unit of calcareous siltstone, and an underlying conglomerate composed of chert pebbles and a sandstone matrix. These rocks are similar to and may correlate with Tomera Formation equivalent units at Dark Star, but the stratigraphic position relative to known formations is not known at Jasperoid Wash.

At Jasperoid Wash, the middle sandstone and conglomerate unit crops out at the surface in small crags that are resistant to weathering. This unit is mostly composed of thick beds of debris-flow conglomerate containing clasts of chert and cherty bio-micrite in a silicified, sandy calcarenite to silty-micrite matrix. The lower calcareous siltstone unit is composed of varying thicknesses of interbedded calcisiltite, calcarenite, bioclastic limestone, calcareous sandstone, and minor beds of conglomerate. Outcrops of this unit tend to be less resistant to weathering and are smooth and low-lying.

Dikes of “quartz-eye” rhyolite and feldspar porphyry with a composition close to dacite are present within the Jasperoid Wash deposit and are inferred to be of Tertiary age. These intrusions occur within the structural corridor and at fault intersections. A third type of dike, composed of intensely silicified quartz-feldspar porphyry, crops out north of the deposit. At a fault intersection within the deposit, some outcrops consist of a multi-phased, hydrothermally altered breccia consisting of younger quartz-feldspar porphyry matrix and clasts of dacite and rhyolite. Also, strongly clay-altered and mineralized dacite porphyries with very fine-grained pyrite has been encountered in drilling.

Structurally, the Jasperoid Wash deposit is bounded to the west by the north-south-striking, 65°W-dipping Westport fault. This is interpreted to be a reactivated thrust fault and is similar to the West fault at Dark Star. The Eastport fault of the Jasperoid Wash structural corridor also strikes north-south, and dips 78°W. The Eastport fault truncates a syncline-anticline pair that also trends north within the structural corridor. There are also east-west-trending faults within the north-south fault corridor that bound a horst block and define the southern extent of the deposit.

Alteration of the middle conglomerate and lower siltstone units includes moderate to strong silicification, decalcification, and argillization. Quartz veinlets and drusy quartz on fractures occur with silicification. Small pods of unoxidized sulfide minerals are preserved within the sedimentary rocks where oxidizing fluids did not permeate the rock. Vugs formed by decalcification of limestone and dolostone are present. Hydrothermal alteration is mostly seen in the feldspar porphyry, calcisiltite, calcarenite, calcareous sandstone, and bioclastic limestone units, and is marked by strong clay development and/or disseminated sulfide grains with a sooty appearance that are mostly oxidized to limonite and hematite. Hydrothermal alteration of the feldspar porphyry dike is distinct and defined by disseminated sulfide grains with a sooty appearance. The lower siltstone unit is commonly decalcified and becomes more calcareous with depth.

7.3 MINERALIZATION

The Railroad-Pinion property includes demonstrated Carlin-type gold mineralization in at least four deposit areas: North Bullion, Pinion, Dark Star, and Jasperoid Wash. These deposits are similar in setting and style to that of other deposits in the region, including Rain and Emigrant (Koehler et al., 2014; Norby et al., 2015; Turner et al., 2015; Dufresne and Koehler, 2016). Mineralization occurs mainly as finely disseminated, submicroscopic gold in largely stratiform bodies in Devonian, Mississippian, and Pennsylvanian-Permian rocks. The following subsections describe the mineralization in the North Bullion, Pinion, Dark Star, and Jasperoid Wash deposits and are modified from Dufresne and Nicholls (2016; 2017a; 2017b; and 2018).

7.3.1 North Bullion Deposits

The North Bullion deposits, which includes North Bullion, POD, and Sweet Hollow zones, contains Carlin-type disseminated-gold mineralization that is largely not exposed at the surface. The bulk of the geological understanding

 

 

7-11

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

and interpretation of the North Bullion deposits has come from core drilling that was guided by interpretations of gravity and CSAMT data. Gold mineralization is focused in the footwall of the NBFZ, a north-south-striking zone of normal faults with an overall down-to-the-east displacement. North-south-, northwest-, west-northwest-, and northeast-striking faults appear to be important controls on mineralization. In general, gold-silver mineralization is localized in gently to moderately dipping, strongly sheared Webb and Tripon Pass formation rocks, and dissolution-collapse breccia developed above and within silty micrite of the Tripon Pass Formation and calcarenite of the Devils Gate Limestone (Figure 7-6) (Jackson and Koehler, 2014; Jackson et al., 2015).

The upper limit of gold mineralization at the North Bullion deposit varies from 105 m to 400 m in depth. The dip of the mineralized material steepens from 10° to 45° to the east as the eastern strand of the NBFZ is approached. Gold is associated with sooty-looking, very fine-grained sulfide minerals, silica, carbon, clay, barite, realgar, and orpiment in addition to elevated arsenic, mercury, antimony, and thallium. Gold grades >6 g Au/t have been intercepted.

The North Bullion deposit, as currently defined, is approximately 750 m in length, 600 m in width and as much as 500 m in vertical extent.

Figure 7-6: North Bullion Cross Section N4488800

(from Jackson et al., 2015)

 

 

7-12

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Mineralization at the nearby POD zone is restricted to a steeply dipping shear zone which trends west-northwest and is situated in rocks stratigraphically higher than the lower mineralization at North Bullion (Hunsaker, 2012b; Masters, 2003). Mineralization at POD is hosted by the upper siltstones of the Webb Formation. The core of the mineralized body contains carbon and fine-grained, disseminated pyrite, and accounts for approximately 15% of the mineralization. This is surrounded by strongly oxidized mineralization. Gold grains are in the range of 5 to 20 microns, and are associated with oxidized pyrite, stibnite, and arsenopyrite (Masters, 2003). Additionally, gold mineralization at POD is associated with silicified rock, including jasperoid, argillized rock, pyrite, barite, and some minor dolomite replacement of calcite (Hunsaker, 2012b).

As currently defined, the POD zone is approximately 650 m in length, 150 m in width, and as much as 200 m in vertical extent.

The Sweet Hollow zone is situated about 200 m southeast of the POD zone and about 600 m south of the North Bullion deposit. As currently defined, the Sweet Hollow zone is approximately 1,050 m in length, 250 m in width, and as much as 100 m in vertical extent.

7.3.2 Pinion Deposit

The Pinion gold deposit is located along the west-northwest-trending Pinion anticline and proximal to the Bullion fault. The Main zone trends approximately N50°W to N60°W, is approximately 1,000 m long by 1,000 m wide, and varies in thickness between ~15 to 150 m vertically. Mineralization at the Main zone has been intersected to a depth of 200 m below surface. Mineralization is hosted primarily along the crest of the Pinion anticline, but also along the east and west limbs. The multi-lithic dissolution-collapse breccia at the Devils Gate-Tripon Pass contact hosts the majority of mineralization, with minor amounts associated with decalcified limestone and dolostone above and below the breccia.

The North zone is approximately 1,100 m long, along a roughly north-northwest trend, varies from 45 m to 100 m in width, and ranges from 35 m to 135 m in vertical thickness. Lateral continuity of mineralization is shown in a representative Gold Standard cross section (Figure 7-7). Mineralization at the North zone is hosted primarily in multi-lithic breccia and appears to be an offset of the east limb of the anticline. Low-grade mineralization has also been noted in the Sentinel Mountain Dolomite.

 

 

7-13

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 7-7: Pinion Deposit Geology, Section 4479380N

(from Gold Standard, 2018)

Mineralization at Pinion occurs mainly as submicroscopic disseminated gold in the largely stratiform, multi-lithic, dissolution-collapse breccia developed along the contact between silty micrite of the Tripon Pass Formation and calcarenite of the underlying Devils Gate Limestone (Figure 7-5). Important structural controls are west-northwest and north- to northeast-striking folds and faults. Gold deposition is thought to have been contemporaneous with breccia development and with quartz vein formation and silica ± barite replacement and infill of open spaces. Some free gold in 2 to 20 micron-size grains has been noted in 2018 mineral liberation studies (AMTEL, 2018). Barite was deposited as both massive and disseminated forms and is found most often in the multi-lithic, dissolution-collapse breccia. Barite appears to be paragenetically late, overprinting both the breccia and silica events.

7.3.3 Dark Star Deposit

The Dark Star deposit is hosted primarily within Pennsylvanian-Permian undifferentiated units possibly equivalent to the Tomera Formation, with minor amounts of gold mineralization found in the Chainman Formation. The deposit is centered along the north-south-striking Dark Star fault corridor and is elongate in the N5°E direction. As presently defined by drilling, the deposit consists of the Dark Star Main and Dark Star North zones, and has dimensions of approximately 1,400 m in length, up to 700 m in width, and to a depth of 450 m below surface. A representative geologic cross section is shown in Figure 7-8.

 

 

7-14

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 7-8: Dark Star Geologic Cross Section N4479600

Gold mineralization at Dark Star is submicroscopic and disseminated within a north- to north-northeast-striking zone of silicification within the middle coarse conglomeratic and bioclastic limestone-bearing unit. This unit is between the upper and lower silty limestone and calcisiltite units (see stratigraphic column in Figure 7-5, Section 7.2.2.2, and geology cross sections in Figure 7-8). At Dark Star Main the mineralization dips steeply to the west near the surface to sub-horizontal at depth; at Dark Star North the mineralization dips steeply to the west.

Oxidation is pervasive at Dark Star Main to a depth of 450 m in the middle conglomeratic unit. At Dark Star North, oxidation is pervasive to a depth of 330 m in the middle conglomeratic and lower silty limestone and calcisiltite units. Oxidation products are primarily limonite with lesser hematite. However, thin zones of unoxidized sulfide minerals are present; pyrite is the principal sulfide mineral.

7.3.4 Jasperoid Wash Deposit

The Jasperoid Wash deposit has approximate extents of 1,400 m in a north direction and a width of about 1,100 m. Drilling shows the deposit dips west gently to steeply at least 400 m. Gold is disseminated within altered feldspar porphyry dikes and adjacent conglomeratic rocks, possibly the same units that host mineralization at Dark Star. The gold is inferred to be submicroscopic, though no petrographic studies have been done. Higher-gold grades are associated with drusy quartz in fractures, which have a varnish of limonite and/or hematite and with zones of very fine-grained disseminated sulfide minerals that have a sooty appearance in the argillized feldspar porphyry. A representative Gold Standard cross section is shown in Figure 7-9.

 

 

7-15

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 7-9: Jasperoid Wash Geologic Cross Section 4473200N

 

 

7-16

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 8 TABLE OF CONTENTS

SECTION PAGE
8 Deposit Types 8-1

 

SECTION 8 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 8-1: Regional-Scale Carlin-Type Deposit Model 8-3

 

 

 

8-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

8 DEPOSIT TYPES

Gold deposits known and being explored for in the Railroad-Pinion property area are sedimentary-rock hosted, disseminated, Carlin-type gold deposits. These types of gold deposit were first recognized in the 1960s in northern Nevada, and were named for the town of Carlin, Nevada. Since then, over 100 geologically similar deposits, containing approximately 200 million ounces of gold, have been discovered in northern Nevada (Hofstra and Cline, 2000), making it one of the most significant gold regions in the world.

Carlin-type deposits are epithermal deposits with characteristics sufficiently different from typical epithermal deposits that they are considered a distinct deposit type. When first discovered, these deposits were often informally referred to as “no-see-um” gold deposits or “micron” gold deposits because the gold is rarely visible to the naked eye and cannot be recovered by panning.

These deposits are distinctive from typical epithermal deposits because they form replacement bodies with structural and stratigraphic controls, contain primary gold that is restricted to ionic substitution and sub-micron-sized grains in arsenian pyrite, and have alteration that is subtle but dominated by carbonate dissolution of calcareous host rocks (Cline, 2004). Gold did not precipitate in response to boiling or fluid cooling, but instead precipitated in response to sulfidation of iron in the host rock or in a second iron-bearing fluid (Muntean et al., 2011). Host rocks for Carlin-type deposits in Nevada are primarily Paleozoic carbonate rocks. Other host rocks include calcsilicate hornfels, chert, argillite, and igneous dikes.

Most systems exhibit a main stage of alteration and mineralization characterized by acid dissolution and replacement of the calcareous host rock. If the host rock is composed of relatively pure carbonate without quartz silt or sand-grain support, dissolution of the carbonate can result in the formation of open space, leading to collapse and breccia formation. Main-stage decarbonatization of carbonate host rocks is typically accompanied by clay alteration (argillization) of silicate minerals, sulfidation of available reactive iron, and silicification of limestone. Alteration is characterized by an assemblage of quartz, illite, and dolomite with the edges of the system marked by an increase in calcite (Kuehn and Rose, 1992). In gold-enriched zones, dissolution of carbonates, and argillization of silicate minerals is accompanied by sulfidation of iron released by mineral alteration, resulting in precipitation of disseminated auriferous-and arsenian-pyrite, marcasite, or arsenopyrite. These iron sulfide minerals commonly occur as rims on preexisting pyrite. The most important consequence of the pyrite-forming sulfidation reaction is the coupled precipitation of gold with this pyrite (Hofstra and Cline, 2000). It is well-documented that most of the gold in Carlin-type deposits initially resides in arsenian pyrite, arsenian marcasite, and arsenopyrite (Hofstra and Cline, 2000), occurring as sub-micron inclusions of native gold or as structurally bound gold. Pervasive silica replacement (silicification) of the various host rocks is also common.

A distinctive suite of late-stage minerals is commonly present in open cavities and fractures. Textural relationships demonstrate that these minerals precipitated after the main-stage alteration and mineralization. In proximal zones, open cavities and fractures may be filled with orpiment and/or realgar, in places accompanied by quartz, barite, fluorite, pyrite, marcasite, cinnabar, barite, or thallium and antimony sulfides. More distal veins are dominantly calcite ± orpiment and realgar. The geochemistry of Carlin-type deposits is characterized by a distinctive suite of gold, arsenic, antimony, thallium, and mercury ± tungsten (Hofstra and Cline, 2000). These elements are frequently used as pathfinder elements for surface geochemical surveys and as vectors toward mineralization in drill-hole geochemical studies.

Carlin-type deposits vary greatly in size and contained gold. Areal footprints of district deposit clusters range from about 20 to 120 km2. Mineralization within a deposit can extend laterally more than 1,500 m and over vertical intervals greater than 1000 m. The larger deposits in Nevada occur within linear districts, or “trends” extending up to more than 20 km and are often controlled by regional structures. Some of these structures probably resulted from reactivation of much older basement normal faults that originated during Proterozoic rifting of western North America (Lund, 2008). These

 

 

8-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

old faults are inferred to have served as conduits for deep-crustal hydrothermal fluids responsible for formation of Carlin deposits.

The varied forms of individual deposits reflect local zones of high porosity and permeability that result from favorable lithologic and structural features. Permeable features frequently associated with orebodies include high-angle faults, thrust faults, low-angle normal faults, hinge zones of anticlines, lithologic contacts, reactive carbonate units, debris-flow facies carbonate rocks, lithologic facies changes, breccia zones of all types, and contacts of sedimentary rock with metamorphic aureoles (Cline et al., 2005).

Carlin-type deposits share many features in common, that include (Muntean et al., 2011):

  • Middle to late Eocene ages (42 and 36 Ma.) (Cline, 2004), a time that corresponds to a change from tectonic compression to extension and renewed felsic to intermediate magmatism;

  • Deposits occur in linear clusters along old reactivated structures that are probably linked at depth to crustal- scale Proterozoic basement rift structures;

  • Deposits are preferentially hosted in carbonate rocks within or adjacent to structures in the lower plate of a regional thrust fault;

  • Deposits exhibit very similar paragenesis, characterized by decarbonatization, argillization, silicification, and sulfidation that results in the formation of gold-bearing arsenian pyrite, which initially hosts the vast majority of the gold in the deposits. This replacement mineralization was followed by open-space deposition of minor amounts of drusy quartz with pyrite, followed by orpiment, realgar, stibnite, and other sulfides. Oxidation often removes the initial sulfide formed in the deposit;

  • Deposits have low concentrations of silver and base metals, and have an elemental signature of predominantly Au-Tl-As-Hg-Sb;

  • Deposits were formed by non-boiling ore-forming fluids that ranged from 180°C to 240°C during mineralization, were of low to moderate salinity (mostly ≤6 wt% NaCl equivalent), and CO2 -bearing (<4 mol%); kaolinite and illite indicate that fluids were acidic;

  • There is a lack of mineral or elemental zoning at the district scale that suggest minor temperature gradients. There are no coeval associated porphyry copper, skarn, or distal Au-Pb-Zn-Mn zones; and

  • Evidence suggests deposit formation by largely fracture-controlled fluid flow from multiple upwelling zones with little evidence for significant lateral fluid flow or spaced convection cells.

A schematic regional deposit model cross-section is shown in Figure 8-1 from Muntean (2018).

 

 

8-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 8-1: Regional-Scale Carlin-Type Deposit Model

(from Muntean and Cline, 2018)

These features strongly suggest Carlin-type deposits, which formed over a broad region of northern Nevada during a relatively narrow time interval, shared common underlying processes for the formation and transport of gold-bearing hydrothermal fluids and the deposition of gold.

Carlin systems can be large deposits with high concentrations of gold. Deposits frequently occur in clusters and can occur at depth with subtle or no surface evidence. It is notable that although the original Carlin deposit in Nevada was discovered in 1960, exploration continues, and discoveries continue to be made.

The Dark Star, Pinion, Jasperoid Wash, and North Bullion gold deposits present characteristics similar to other Carlin-type gold deposits of the Carlin trend. Specific geologic features in these deposits include:

  • Deposits occur in relatively close proximity to a multi-phase Eocene igneous center with associated igneous stocks, dikes and sills; gold mineralization is of Eocene age;

  • Deposits occur in a linear zone;

  • Deposits are hosted in or adjacent to carbonate rock types;

  • Deposits exhibit strong structural control, localized in areas with greater fault density and occur in either hanging wall or footwall settings of high-angle faults;

  • Alteration is characterized by decarbonatization, dolomitization, argillization, silicification, barite, and sulfidation;

  • Gold generally occurs initially as a chemical impurity or as micron-scale particles of arsenian pyrite. Later oxidation has generally removed most sulfides at Dark Star, Pinion, and Jasperiod Wash.

 

 

8-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 9 TABLE OF CONTENTS

SECTION   PAGE
9 EXPLORATION 9-1
  9.1 2009 - 2019 GEOPHYSICS 9-1
  9.2 2010 - 2018 GEOCHEMISTRY 9-3
  9.3 2009 - 2019 GEOLOGIC MAPPING 9-4
  9.4 2014 - 2016 DARK STAR AND PINION PETROGRAPHY 9-6

SECTION 9 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 9-1: Ground-based Geophysical Surveys by Gold Standard 2009 to 2015 9-2
Figure 9-2: Rock and Soil Sample Locations 2010 - 2018 9-5

 

 

 

9-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

9 EXPLORATION

The Railroad-Pinion property is being explored on an ongoing basis by Gold Standard using geological mapping, geochemical and geophysical surveying, and drilling. This section of the report is largely drawn from Dufresne and Nicholls (2016), Dufresne et al. (2017), Dufresne and Nicholls (2017a), and Dufresne and Nicholls (2018). The authors have reviewed this information and believe it accurately represents the exploration work done by Gold Standard.

Prior to 2015, exploration activities by Gold Standard were focused in the North Railroad portion of the property. Work completed in 2015 was largely focused on the Pinion area in the South Railroad portion of the property, after its acquisition in 2014. A thorough discussion of these work programs and their results and interpretations is available in previous Technical Reports by Hunsaker (2010, 2012a, 2012); Shaddrick (2012); Koehler et al. (2014); Turner et al. (2015); Dufresne and Koehler (2016); and Dufresne et al. (2017).

Exploration work by Gold Standard since 2010 has resulted in the identification of 17 prospect areas or zones of mineralization within the overall property position, including the Bald Mountain area and North Bullion deposits in the North Railroad-Pinion portion of the property, the Pinion, Dark Star, and Jasperoid Wash deposits, and other areas of the South Railroad portion of the property. Drilling conducted by Gold Standard is summarized in Section 10.

9.1 2009 - 2019 GEOPHYSICS

There is a significant and growing body of geophysical information for the Railroad-Pinion property that includes gravity, controlled-source audio magneto-telluric (“CSAMT”), and ground magnetic surveys. These surveys have been employed to aid in identifying geological structures, key lithologies, and zones of hydrothermal alteration related to mineralization. Additionally, the geophysical surveys have aided in drill-hole targeting and have assisted in the definition of multiple exploration targets.

A ground magnetic survey was completed over the Bullion stock area in 2014 (Figure 9-1). A total of 197 line-km was surveyed with total magnetic intensity recorded in continuous mode at 2-second intervals on lines 100 m apart. The lines were oriented east-west.

Gold Standard completed six gravity surveys from 2009 to 2015, collecting measurements from 3,991 stations covering a large portion of the property as shown in Figure 9-1. The gravity surveys were designed to delineate structures, particularly those in areas lacking bedrock exposures, and/or those areas under cover, and to identify rock types and alteration related to sedimentary-rock hosted and skarn-type mineralization (Wright, 2013). During 2017, gravity measurements at an additional 1,027 stations were taken, covering 23 km2 in the South Railroad portion of the property. The 2017 gravity survey was conducted by Magee Geophysical Services LLC and was interpreted by Wright Geophysics.

Seven CSAMT surveys were completed by Gold Standard from 2012 to 2016, covering the Bullion fault corridor, the North Bullion, Pinion, and Dark Star deposits, and the Dark Star fault corridor (Figure 9-1). A total of 85 line-km of CSAMT data were collected during the seven CSAMT surveys. The 2016 CSAMT survey involved 21.2 line-km focused on the Dark Star fault corridor, with nine east-west lines at variable spacing from 200 m to 500 m, that were oriented perpendicular to the main fault trend in the area.

 

 

9-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 9-1: Ground-based Geophysical Surveys by Gold Standard 2009 to 2015

(from Dufresne et al. 2017 with 2016 property outline)

 

 

9-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

During 2017, another 68 line-km of CSAMT were surveyed with 21 lines across the Dark Star fault corridor, Ski Track and Bullion to East Pine Mountain areas. The data were acquired by Zonge International Inc. and interpreted by Wright Geophysics.

James Wright of Wright Geophysics designed, supervised, and interpreted the 2016 CSAMT survey. An interpretation of the results by Wright (2016a) is summarized as follows:

  • A major north-south-oriented structural zone-the Dark Star fault corridor-exists along the east side of all 2016 sections, juxtaposing Tertiary rocks against older sedimentary rocks. The zone has two major normal faults bounding a predominantly Pennsylvania-Permian horst block. Both bounding faults have multiple parallel faults and lesser splays;

  • A north-south-oriented horst of Pennsylvania-Permian clastic rocks beneath approximately 80 m of Tertiary and Quaternary cover is bounded by two major faults and runs parallel to and 450 m west of the Dark Star fault corridor;

  • The above horst is terminated to the north by a north-northeast-trending fault and is divided to the south by a major cross-cutting west-northwest-trending fault. South of that the two horsts appear to merge to the south of this cross-cutting structure; and

  • The Dark Star Main and Dark Star North deposits correlate with high resistivity from a depth of 0 to 25 m to a depth of 200 to 400 m, respectively. The near-surface high resistivity features may be related to alteration.

In 2016, Gold Standard purchased a portion of an airborne magnetic survey from EDCON-PRJ that covered the entire Piñon Range including the North Railroad and South Railroad portions of the property and their surroundings. The Bullion stock forms a strong and large magnetic high, and several of the major structures were extended by the airborne interpretation of Wright (2016b).

Seismic surveys were performed in 2017 and 2018 at Pinion, Dark Star, and North Bullion. In total, three east-west-oriented lines for 37.2 line-km were surveyed. In 2019 three additional seismic lines, totaling 21 line-km, were surveyed directly over and to the north of the North Bullion deposit. The seismic data were acquired by Bird Seismic Services and processed and interpreted by Columbia Geophysical, Sterling Seismic Services Ltd., and Wright Geophysics.

9.2 2010 - 2018 GEOCHEMISTRY

Historical data and subsequent work by Gold Standard has shown there is a positive correlation between anomalous gold and arsenic concentrations in soil samples, and near-surface gold mineralization confirmed with drilling. Gold Standard collected approximately 7,450 soil samples from 2010 to 2015. These were collected over grids in six areas (Figure 9-2) with lines 50 m to 100 m apart and samples taken at spacings of 50 m. During 2017 and 2018, a total of 7,823 soil samples were collected from the South Railroad portion of the property in the Ski Track, Dixie, and Jasperoid Wash areas, and near the southern limit of the property. Samples were taken at intervals of 50 m along lines spaced 100 m apart.

To expand the rock geochemistry database in areas that lacked historical sampling, Gold Standard collected approximately 3,500 rock samples throughout the Dark Star, Pinion, and North Bullion deposit areas from 2010 to 2015 (Figure 9-2). Samples were collected from outcrops, road cuts, and field traverses parallel with topography. The majority of these rock samples comprise simple “grab” samples, but chip, channel and scoop sampling techniques were employed to a lesser degree.

Gold Standard did not collect any rock, soil, or scoop samples in 2016. During 2017 and 2018, a total of 1,550 rock samples were collected from the Ski Track, Dixie, and Jasperoid Wash areas of the property. The geochemical

 

 

9-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

exploration work described above identified eight drill targets, some of which have returned significant intercepts of gold, silver, copper, lead, and zinc.

The authors have not analyzed the sampling methods, quality, and representativity of surface sampling at the Railroad-Pinion property because drilling results form the basis for the mineral resource estimates described in Section 14. Drilling is described in Section 10.

9.3 2009 - 2019 GEOLOGIC MAPPING

During 2009 through 2016, Gold Standard geologists carried out Anaconda-style, layer-based geological mapping that covers a total of 150 km2 within and near the Railroad-Pinion property. The mapping was done at scales of 1:6,000 to 1:2,000. The cumulative results of that mapping, combined with published mapping by the U.S.G.S. and the Nevada Bureau of Mines and Geology, as well as certain mapping by historical operators, are shown in Figure 7-3. During 2016-2018, approximately 53.5 km2 were mapped in the Dark Star, Dixie, Jasperoid Wash, Ski Track, Elliot Dome, and east Pine Mountain areas. Additional mapping was conducted at a scale of 1:2,000 in the Ski Track and LT areas during 2018.

 

 

9-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 9-2: Rock and Soil Sample Locations 2010 - 2018

 

 

9-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

9.4 2014 - 2016 DARK STAR AND PINION PETROGRAPHY

Petrographic analysis systematically describes mineralogical and textural details of rock samples, commonly using thin-section optical microscopy. Consultant Mark McComb of McComb Petrographics performed a petrographic analysis on one sample of Pinion area drill core in 2014, and 14 samples of Dark Star area drill core in 2016. The 2016 samples were from drill hole DS15-13 (Dufresne et al., 2017). McComb (2016) summarized his findings as follows:

“Rock types found in this suite of samples generally include silicified biomicrite, silicified silty to sandy biomicrite, silicified siltstone and sandstone, and decalcified siltstone and sandstone. Gold grades are the highest in samples that contain the most decalcified siltstone and sandstone and were logged as debris flow. Debris flow samples often contain clasts of silicified silty to sandy biomicrite in a decalcified siltstone/sandstone matrix. Decalcified siltstone/sandstone usually has wispy stylolaminated texture attesting to the removal of carbonate and generally comprises detrital quartz in a matrix of low birefringent clay that is often iron stained and contains extremely fine-grained iron oxides. Low birefringent clay appears to be kaolinite, where it is not highly iron stained. Gold mineralization is interpreted to occur in iron oxides, which are interpreted to be oxidized arsenian pyrite. Silica locked extremely fine-grained pyrite can still be observed locally. Mineralized debris flow samples are similar to what is described in the Roberts Mountain DSr3 unit in the northern Carlin Trend.” (pp.1).

 

 

9-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 10 TABLE OF CONTENTS

SECTION     PAGE
10 DRILLING   10-1
  10.1 SUMMARY   10-1
  10.2 HISTORICAL NORTH RAILROAD DRILLING 10-4
    10.2.1 1969-1974 American Selco, Placer Amex and El Paso Gas Company 10-4
    10.2.2 1977-1980 AMAX 10-4
    10.2.3 1980-1981 Homestake 10-4
    10.2.4 1983 and 1985-1986 NICOR 10-4
    10.2.5 1987-1992 Westmont 10-4
    10.2.6 1994 Ramrod 10-4
    10.2.7 1995 Newmont 10-4
    10.2.8 1996-1997 Mirandor 10-4
    10.2.9 1998-1999 Kinross 10-5
    10.2.10 2005-2008 Royal Standard Minerals 10-5
  10.3 HISTORICAL SOUTH RAILROAD DRILLING 10-5
    10.3.1 1980-1981 AMOCO Minerals 10-5
    10.3.2 1981-1982 Newmont 10-5
    10.3.3 1983 Freeport 10-5
    10.3.4 1984 Cyprus-AMAX 10-5
    10.3.5 1985 Santa Fe Mining 10-5
    10.3.6 1987-1989 Newmont 10-5
    10.3.7 1987-1989 Teck Resources 10-5
    10.3.8 1988 Battle Mountain 10-5
    10.3.9 1989-1992 Westmont 10-6
    10.3.10 1988-1989 Freeport 10-6
    10.3.11 1990-1993 Crown Resources 10-6
    10.3.12 1994-1995 Cyprus Mining 10-6
    10.3.13 1997 Mirandor 10-6
    10.3.14 1997-1999 Cameco 10-6
    10.3.15 1998-1999 Kinross 10-6
    10.3.16 2003 and 2007 Royal Standard Minerals 10-6
  10.4 GOLD STANDARD DRILLING, NORTH RAILROAD AREA 2010 - 2017 10-6
    10.4.1 North Bullion Deposits Drilling by Gold Standard 10-8
    10.4.2 Bald Mountain Drilling by Gold Standard 10-11
  10.5 GOLD STANDARD DRILLING, SOUTH RAILROAD AREA 2012-2019 10-11
    10.5.1 Dark Star Area Drilling by Gold Standard 10-12
    10.5.2 Pinion Area Drilling by Gold Standard 10-12
    10.5.3 Jasperoid Wash Area Drilling by Gold Standard 10-13
    10.5.4 Irene Area Drilling by Gold Standard 10-14
    10.5.5 Dixie Area Drilling by Gold Standard 10-14
    10.5.6 Ski Track Drilling by Gold Standard 10-14
  10.6 DRILL-HOLE COLLAR SURVEYS 10-14

 

 

 

10-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

  10.6.1 Historical Collar Surveys, North Railroad Portion of the Property 10-14
  10.6.2 Historical Collar Surveys, South Railroad Portion of the Property 10-14
  10.6.3 Gold Standard Collar Surveys, North Railroad Portion of the Property 10-15
  10.6.4 Gold Standard Collar Surveys, South Railroad Portion of the Property 10-15
10.7 DOWN-HOLE SURVEYS 10-15
  10.7.1 Historical Down-Hole Surveys, North and South Railroad Portions of the Property 10-15
  10.7.2 Gold Standard Down-Hole Surveys, North and South Railroad Portions of the Property 10-15
10.8 SUMMARY STATEMENT 10-15

SECTION 10 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 10-1: All Railroad-Pinion Drilling 1969 - 2019 10-1
Table 10-2: Historical Drilling Summary 10-3
Table 10-3: Summary of Gold Standard Drilling 2010 - 2019 10-8
Table 10-4: Bald Mountain Drilling Contractors and Methods 10-11
Table 10-5: Gold Standard’s Dark Star Drilling Contractors and Methods 10-12
Table 10-6: Gold Standard Pinion Area Drilling Contractors and Methods 10-13

SECTION 10 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 10-1: Railroad-Pinion Drill Hole Map (1969 - 2018) 10-2
Figure 10-2: Map of North Railroad Property Drill Collar Locations 10-10

 

 

 

10-ii

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

10 DRILLING

The information presented in Section 10 is derived from multiple sources, as cited. The authors have reviewed this information and believe this summary accurately represents the drilling conducted at the Railroad-Pinion property.

Gold Standard has drilled 66 new holes on the Railroad-Pinion property in 2019 that are not included in Table 10-1, or subsequent figures, tables, and discussions in this section. Most were drilled following the effective dates of the databases for Dark Star (23), Pinion (19), and Jasperoid Wash (10), and the remaining few were exploration holes drilled at Bullion (2), Dixie (8), and Ski Track (4). The new holes at Dark Star and Pinion, many of which were drilled to collect metallurgical samples and geotechnical data, were evaluated with respect to their respective resource models. All were determined to have minimal to no impact on estimated volumes and grades as reported in Section 14. See Sections 14.2.8 and 14.3.9 for further discussion of the drilling since the initial Railroad-Pinion PFS was completed.

10.1 SUMMARY

MDA received from Gold Standard three separate mineral resource-area databases for the Pinion, Dark Star, and Jasperoid Wash deposits, as well as data from other drilling outside the mineral resource areas but within the South Railroad portion of the property. The effective dates of the Pinion and Dark Star databases on which the mineral resources described in this Technical Report are estimated are May 31, 2019 and April 26, 2019, respectively. The effective dates of the Pinion and Dark Star mineral resource estimates are both August 7, 2019. The effective dates of the Jasperoid Wash database and mineral resource estimate are October 6, 2018 and November 15, 2018, respectively. The effective dates of the North Bullion database and mineral resource estimates are August 18, 2017 and September 15, 2017, respectively.

On August 12, 2019 Gold Standard sent a Railroad-Pinion property-wide database containing records from a total of 400,793 m drilled in 1,932 holes since drilling commenced in 1969 (Table 10-1). These totals exclude two holes for which MDA has collar locations, but no depths drilled, hole type, company or assays. Twenty-one different historical operators are known to have drilled 1,084 holes, for a total of 152,566.1 m, from 1969 through 2008. As of the effective dates of the databases, Gold Standard has drilled 848 holes for a total of 248,227 m (Table 10-1). The drilling was done using Imperial units of measure. These were converted to metric measurements. Figure 10-1 shows the distribution of all known drill collar locations in the property.

Approximately 80% of the holes have records to indicate they were drilled with RC methods. There is a total of 10,167 m drilled in 88 historical holes for which MDA has no reliable information on the type of hole or drilling methods used. The authors believe the amount of RC drilling may be understated because the historical holes with no hole-type attribute were drilled in the late 1980s and 1990s when RC drilling was common.

Table 10-1: All Railroad-Pinion Drilling 1969 - 2019

Period Rotary
& RC
Holes
Rotary &
RC
Meters
Core
Holes
Core
Meters
RC+Core
Tail
Holes
RC+Core
Tail
Meters
Unknown Unknown Total
Holes
Total
Meters
Historical Drilling 1969-2008 938 131,854.1 58 10,544.7     88 10,167.4 1,084 152,566.1
Gold Standard 2010-2019 636 164,627.5 171 61,085.0 41 22,514.6     848 248,227.1
Totals 1,574 296,481.6 229 71,629.7 41 22,514.6 88 10,167 1,932 400,793.2

A summary of historical drilling by operator, area and year is presented in Table 10-2. Unless given in the report, the authors are not aware of information on the drilling contractors, rig makes, bit diameters, or specific drilling, logging, and sampling methods and procedures used during any of the historical drilling from 1969 through 2008.

 

 

10-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 10-1: Railroad-Pinion Drill Hole Map (1969 - 2018)

Note: For more detailed depictions of drill holes and mineral resource outlines, see Figure 14-1, Figure 14-10, and Figure 14-22 in Mineral Resource Estimates, Section 14.

 

 

10-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 10-2: Historical Drilling Summary

Year Company Area Drilled Rotary
Holes
Rotary
Meters
RC
Holes
RC Meters Core
Holes
Core
Meters
? Type
Holes
? Type
Meters
Total
Holes
Total
Meters
1969-1970 American Selco Bald Mountain         7 2,619.0 7 1,205.5 14 3,824.5
1972 Placer Amex Bald Mountain     1 365.8         1 365.8
1974 El Paso-LLE Bald Mountain, Pinion     1 254.5 4 618.6     5 873.1
1977-1980 AMAX Bald Mountain         15 1,893.4     15 1,893.4
1980-1981 AMOCO Pinion     31 2,897.1         31 2,897.1
1980-1981 Homestake POD-N.Bullion, Bald Mountain     22 1,764.2         22 1,764.2
1981-1982 Newmont Irene     6 381.0     23 2,016.9 29 2,397.9
1983 Freeport Pinion     8 821.4         8 821.4
1983 NICOR POD-N.Bullion, Bald Mountain     98 11,766.8         98 11,766.8
1984 Cyprus-AMAX Dark Star 9 1,127.8             9 1,127.8
1985 Santa Fe Mining Pinion     14 1,543.8         14 1,543.8
1985-1986 NICOR POD-N.Bullion, Bald Mountain     12 1,880.6         12 1,880.6
1987-1989 Newmont Irene, Pinion     65 11,314.8     11 559.3 76 11,874.1
1987-1989 Teck Pinion     39 3,807.0         39 3,807.0
1987-1992 Westmont POD-N.Bullion, Bald Mountain, Jasperoid
Wash, Pinion, Dark Star, JR Buttes
    144 18,348.4 3 294.6 9 1,150.6 156 19,793.6
1988 Battle Mountain Pinion             12 1,159.8 12 1,159.8
1988-1989 Freeport Dixie     26 3,730.7         26 3,730.7
1990-1993 Crown Resources Pinion, Dark Star, Dixie     205 25,007.6         205 25,007.6
1993 Unknown Pinion             2 378.0 2 378.0
1994 Ramrod POD-N.Bullion, Pinion     13 2,831.6         13 2,831.6
1994-1995 Cyprus JR Buttes, Pinion     77 13,102.4         77 13,102.4
1995 Newmont N of N.Bullion             1 425.2 1 425.2
1996 Royal Standard Pinion         6 358.1     6 358.1
1996-1997 Mirador Bald Mountain, Pinion, Dark Star,
POD-N.Bullion
    53 7,743.3     4 283.5 57 8,017.8
1997-1999 Cameco Dixie, Jasperoid Wash, Pinion, JR Buttes     36 8,533.2 8 3,006.2     44 11,539.3
1998-1999 Kinross Dark Star, Pinion, POD-N.Bullion, Bald
Mountain
    68 13,842.5 2 329.2 12 2,639.6 82 16,811.3
2003 Royal Standard Pinion     10 798.6 4 323.1 3 213.4 17 1,335.1
2005 Unknown Pinion, POD-N.Bullion             4 135.6 4 135.6
2007-2008 Royal Standard Pinion, Bald Mountain         9 1,102.5     9 1,102.5
  Grand Total   9 1,127.8 929 130,726.3 58 10,544.7 88 10,167.4 1,084 152,566.1

 

 

 

10-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

10.2 HISTORICAL NORTH RAILROAD DRILLING

10.2.1 1969-1974 American Selco, Placer Amex and El Paso Gas Company

American Selco drilled 7 core holes and 7 holes of unknown type, for a total of 3,824.5 m, exploring for porphyry copper and molybdenum in the general Bald Mountain area in 1969-1970.

In 1972, Placer Amex drilled a single RC hole to a down-hole depth of 365.8 m in the Bald Mountain area exploring for porphyry-type mineralization.

The El Paso Natural Gas Company and Louisiana Land and Cattle Company drilled one RC hole and four core holes for 873.1 m in the Bald Mountain and Pinion areas in 1974.

10.2.2 1977-1980 AMAX

AMAX drilled 15 core holes in the Bald Mountain area in 1977-1980 for a total of 1,893.4 m (Table 10-2). Drill hole AR-7 intersected 29.9 m that averaged 3.77 g Au/t from 11.3 m to 41.1 m near the historic replacement and skarn mines.

10.2.3 1980-1981 Homestake

Homestake drilled 1,764.2 m in 22 RC holes in 1980 and 1981 (Table 10-2). Four of these were drilled in the Bald Mountain area and 18 holes were drilled in the POD-North Bullion area. Homestake’s drilling produced the first significant results in the North Bullion area when hole BDH05 returned 13.1 m with an average of 1.58 g Au/t starting at a down-hole depth of 2.1 m.

10.2.4 1983 and 1985-1986 NICOR

From 1983 through 1986, NICOR drilled a total of 110 RC holes for 13,647.4 m. This included 21 RC holes in the Bald Mountain area for 2,028.4 m. During this period, NICOR also drilled 99 RC holes for 11,619 m in the North Bullion area and north of North Bullion. This drilling expanded the drill coverage at North Bullion and resulted in the first historical mineral resource estimate for the POD portion of the North Bullion deposits.

10.2.5 1987-1992 Westmont

Westmont drilled 58 RC holes for 6,616.6 m in the POD-North Bullion area from 1987 through 1992. Three RC holes for 330.7 m were drilled north of the North Bullion deposit area in 1987 and 1990. A total of 1,594.1 m were drilled in 12 RC holes in the Bald Mountain area in 1987-1992.

10.2.6 1994 Ramrod

Ramrod Gold drilled 13 RC holes in the POD-North Bullion area in 1994 for a total of 2,831.6 m.

10.2.7 1995 Newmont

One hole of unknown type was drilled by Newmont north of the deposits in 1995 for 425.2 m.

10.2.8 1996-1997 Mirandor

During 1996 and 1997, Mirandor drilled 28 RC holes in the POD-North Bullion and north of North Bullion areas for a total of 4,157.5 m. Fourteen RC holes were drilled in 1997 in the Bald Mountain area. Hole EMRR-9722 penetrated 21.3 m that averaged 3.81 g Au/t from 4.6 m to 25.9 m, including 13.7 m at a grade of 5.62 g Au/t from 10.7 m to 21.3

 

 

10-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

m, and 6.1 m at 8.09 g Au/t from 16.8 m to 22.9 m. This hole was drilled near AMAX hole AR-7, adjacent to the historic Sylvania mine, which had historic production from replacement and/or skarn mineralization.

10.2.9 1998-1999 Kinross

Kinross drilled 37 RC holes and one core hole for 6,652.3 m in the POD-North Bullion deposit area in 1998 and 1999. During this period, 27 RC holes were drilled in the Bald Mountain area for 6,324.6 m. Hole K98-49 intersected 21.3 m with a grade of 3.70 g Au/t at 260.6 m to 281.9 m, including 1.52 m at 13.27 g Au/t from 268.2 m. Hole K99-19 returned a significant interval well away from any previously targeted areas with 3.05 m at 0.89 g Au/t from 185.6 m and 3.05 m at a grade of 0.62 g Au/t from 367.3 m.

10.2.10 2005-2008 Royal Standard Minerals

In 2005, RSM drilled a total of 536.5 m in four core holes and three holes of unknown type in the POD-North Bullion area. At the Bald Mountain area, RSM drilled three core holes in 2007 and one core in 2008 for 692.5 m.

10.3 HISTORICAL SOUTH RAILROAD DRILLING

10.3.1 1980-1981 AMOCO Minerals

AMOCO drilled 31 RC holes for 2,897.1 m in the Pinion area in 1980 and 1981.

10.3.2 1981-1982 Newmont

The Irene prospect was tested by Newmont in 1981 and 1982 when six RC holes and 21 holes of unknown type were drilled for 2,397.2 m.

10.3.3 1983 Freeport

In 1983, Freeport drilled eight RC holes for 821.4 m in the Pinion deposit area.

10.3.4 1984 Cyprus-AMAX

The Dark Star area was first tested by Cyprus-AMAX with nine rotary holes for 1,127.8 m in 1984.

10.3.5 1985 Santa Fe Mining

Santa Fe Mining drilled 14 RC holes for 1,543.8 m in the Pinion deposit in 1985.

10.3.6 1987-1989 Newmont

Newmont drilled four RC holes and 11 holes of unknown type for 1,371.6 m in the Irene prospect during 1987 through 1989. During this same time period, Newmont drilled 61 RC holes in the Pinion deposit and vicinity.

10.3.7 1987-1989 Teck Resources

Teck drilled 39 RC holes for 3,807 m in the Pinion deposit.

10.3.8 1988 Battle Mountain

A total of 12 holes of unknown type and 1,159.8 m were drilled at the Pinion area by Battle Mountain Gold Corp. (“BMGC”) or Battle Mountain Exploration Co. (“BMEC”) in 1988.

 

 

10-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

10.3.9 1989-1992 Westmont

Westmont first drilled in the Jasperoid Wash area with 48 RC holes and two core holes for 6,800.5 m in 1989 through 1992. The Pinion area was drilled by Westmont in 1989 with nine holes of unknown type for 1,150.6 m. In 1991, Westmont drilled two RC holes at Pinion for 207.3 m. Three RC holes for 544.1 m were drilled at Dark Star by Westmont in 1991. Westmont tested the JR Buttes prospect in 1992 with 19 RC holes for 2,549.6 m.

10.3.10 1988-1989 Freeport

The Dixie prospect was tested by Freeport with 26 RC holes for 3,730.7 m drilled.

10.3.11 1990-1993 Crown Resources

In 1990, Crown began drilling in the Pinion deposit and by 1993 had drilled 12,297.1 m in 130 RC holes. Crown also drilled 11,235.2 m in 69 RC holes at the Dark Star deposit in 1991 through 1993. A total of 1,554.5 m in seven RC holes were also drilled by Crown at the Dixie prospect in 1991, following up on the drilling done there by Freeport.

10.3.12 1994-1995 Cyprus Mining

During 1994 and 1995, Cyprus drilled at total of 12,441 m in 73 RC holes in the Pinion deposit area. Cyprus also drilled three RC holes for a total of 464.8 m at the JR Buttes prospect.

10.3.13 1997 Mirandor

Mirandor drilled a total of 2,203.7 m in 11 RC holes at the Dark Star deposit in 1997. A total of 283.5 m in four holes of unknown type were also drilled in the Pinion deposit area.

10.3.14 1997-1999 Cameco

Cameco’s drilling during this period was focused at the Pinion deposit area with a total of 8,76.8 m drilled in 20 RC holes and eight core holes. A total of 2,685.3 m in 11 RC holes were drilled by Cameco in the Dixie prospect in 1997 and 1998, and one RC hole for 221.0 m was drilled in 1998 at JR Buttes. In 1997, Cameco also drilled 556.3 m in four RC holes at the Jasperoid Wash area.

10.3.15 1998-1999 Kinross

Kinross focused their 1998 and 1999 drilling in the South Railroad portion of the property at Dark Star with one core hole, three RC holes and 11 holes of unknown type for a total of 3,378.7 m. A total of 455.7 m were also drilled in two RC holes in the Pinion deposit area.

10.3.16 2003 and 2007 Royal Standard Minerals

In 2003, RSM drilled a total of 798.6 m in 10 RC holes in the Pinion deposit area. RSM subsequently drilled five core holes at the Pinion deposit area in 2007, for a total of 410.0 m.

10.4 GOLD STANDARD DRILLING, NORTH RAILROAD AREA 2010 - 2017

Gold Standard’s drilling in the North Railroad portion of the property commenced in 2010. As summarized in Table 10-3, a total of 79,550.4 m have been drilled in 154 holes as of the effective date of the database of this Technical Report. Approximately 31% of the meters and 34% of the holes were drilled with RC methods. Diamond-core drilling accounts for 43% of the meters and 42% of the holes; the balance of the drilling was done using RC followed by core tails.

 

 

10-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Gold Standard’s RC holes were drilled wet; water was always injected. Face-return bits were only used when interchanges were flooded out. Tri-cone bits were only used when the hammer bits were ineffective due to too much water.

For core drilling, Gold Standard geologists completed paper or digital logs on the whole core. The logs captured and illustrated core recovery, sample intervals, lithologic data, hydrothermal alteration, mineralogy, and structural features. Structural features were measured with respect to the core axis. When available, structural features were measured on core oriented using a Reflex Act 2 orienting device. Photographs were taken of all drill core, labeled with drill hole footages and sample intervals. RC drill chips were also logged on paper or digital logs by Gold Standard geologists. The data from the paper drill logs were later captured in electronic spreadsheets for both core and RC drill holes.

 

 

10-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 10-3: Summary of Gold Standard Drilling 2010 - 2019

Year Area RC
Holes
RC Meters Core*
Holes
Core*
Meters
RC + Core
Holes
RC + Core
Meters
Total
Holes
Total
Meters
North Railroad
2010 POD-N. Bullion 6 2,843.8 5 2,237.7 4 1,857.8 15 6,939.2
2011 N of N. Bullion 1 609.6         1 609.6
POD-N. Bullion 5 1,693.6 5 2,897.1 7 4,063.9 17 8,654.6
Bald Mountain     4 1,483.8     4 1,483.8
N of N. Bullion 2 1,549.9 1 1,105.7     3 2,655.6
2012 POD-N. Bullion 4 1,824.2 25 13,267.5 2 1,396.9 31 16,488.6
Bald Mountain     3 1,770.9     3 1,770.9
2013 POD-N. Bullion 5 2,308.9 15 8,202.5     20 10,511.3
Bald Mountain 4 2,436.9 3 1,582.5     7 4,019.4
2014 Bald Mountain 5 1,895.9         5 1,895.9
2015 POD-N. Bullion     2 958.0 2 708.4 4 1,666.4
2016 Bald Mountain 9 5,010.9         9 5,010.9
POD-N. Bullion 1 666.0     9 5,255.4 10 5,921.4
2017 Bald Mountain 4 1,623.1         4 1,623.1
POD-N. Bullion 6 2,384.0 1 440.4 14 7,475.4 21 10,299.8
2010-
2017
N. Railroad
Totals
52 24,846.7 64 33,946.0 38 20,757.7 154 79,550.4
South Railroad
2012 Pinion & Vicinity 6 3,026.7         6 3,026.7
2014 Pinion & Vicinity 53 12,608.1 4 482.8     57 13,090.9
2015 Pinion & Vicinity 23 8,804.2         23 8,804.2
Dark Star 13 5,048.1         13 5,048.1
Irene 1 605.0         1 605.0
2016 Pinion & Vicinity 17 5,952.7 6 752.2     23 6,704.9
Dark Star 17 7,726.7 19 7,987.4 2 947.6 38 16,661.7
Dixie 2 1,190.2         2 1,190.2
Irene 2 1,356.4         2 1,356.4
2017 Pinion & Vicinity 16 1,917.2 3 420.6     19 2,337.8
Dark Star 36 13,059.9 11 2,378.4     47 15,438.3
Jasperoid Wash 10 3,555.5 2 790.0     12 4,345.5
Dixie 16 7,287.8 2 850.1     18 8,137.9
2018 Pinion & Vicinity 109 13,214.6 35 4,128.5     144 17,343.1
Dark Star 117 21,755.1 19 3,933.6     136 25,688.7
Jasperoid Wash 44 8,945.2 4 4,706.7     48 13,652.0
Dixie 25 10,962.1 1 475.8 1 809.2 27 12,247.2
Ski Track 6 2,036.1         6 2,036.1
2019 Dark Star 71 10,729.2 1 232.9     72 10,962.0
2012-
2019
S. Railroad
Totals
584 139,780.8 107 27,139.1 3 1,756.9 694 168,676.7
  Grand Totals 636 164.627.5 171 61,085.0 41 22,514.6 848 248,227.1

10.4.1 North Bullion Deposits Drilling by Gold Standard

Drilling by Gold Standard in the North Bullion area commenced in 2010 and a total of 60,481.4 m had been drilled in 119 holes through the end of 2016. An additional 25 holes were completed in 2017 for a total of 10,299.8 m. Drill collar locations in the North Bullion area are shown in Figure 10-2.

10.4.1.1 2010-2013 North Bullion Deposits Drilling

From 2010 through 2013, Gold Standard drilled 83 holes totalling 42,593.8 m in the North Bullion area (Table 10-3; Figure 10-2; Hunsaker, 2012a, b; Shaddrick, 2012; Koehler et al., 2014). In 2010, Gold Standard utilized gravity data and geological models to identify an untested target that lead to intercepts of 32 m of 1.39 g Au/t and 43.6 m of 1.21

 

 

10-8

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

g/t Au in hole RR10-8 at the North Bullion deposit (Jackson et al., 2015). This discovery of blind, sedimentary-rock hosted, Carlin-style gold mineralization lead to additional drilling conducted from 2010 to 2013 within the North Bullion deposit area and eventually to the estimated gold mineral resources presented in Section 14. The true thickness of mineralization in the POD deposit and North Bullion deposit, and its relationship to drill interval lengths, is discussed in Section 14 of this Technical Report.

Gold Standard’s 2010 and 2013 RC drilling was conducted by Hard Rock Exploration Inc. (“Hardrock”) and National Exploration Wells and Pumps (“National”), using a TH75 and 685 Schramm, respectively. Bit sizes were 5 ¼ in. to 6 ½ in. diameter bits. The rig was operated on one or two 12 hr shifts per day. RC samples were collected continuously over 1.524 m (5 ft) intervals and split with a rotating wet splitter located beneath the cyclone. A drilling technician placed a few grams of each 1.524 m interval in plastic chip trays for logging.

Core drilling in 2010 to 2013 was done by Redcor Drilling Inc. with an LF-230 rig. Core sizes were PQ3, HQ3, and NQ3.

No drilling was done in 2014.

10.4.1.2 2015 North Bullion Deposits Drilling

In 2015, Gold Standard drilled two core holes and two RC holes with core tail holes totalling 1,666.4 m (Table 10-3; Figure 10-2; Turner et al., 2015; Dufresne and Koehler, 2016). The RC drilling was conducted by National using a 685 Schramm. Bit sizes were 5 ¼ in. to 6 ½ in. diameter bits. The rig was operated on one or two 12-hr shifts per day. RC samples were collected continuously over 1.524 m (5 ft) intervals and split with a rotating wet splitter located beneath the cyclone. A drilling technician placed a few grams of each 1.524 m interval in plastic chip trays for logging.

 

 

10-9

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 10-2: Map of North Railroad Property Drill Collar Locations

 

 

10-10

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The 2015 core drilling was performed by Timberline Drilling (“Timberline”) of Elko Nevada using an LF90 drill rig Core sizes were PQ3, HQ3, and NQ3. Core was also drilled by TonaTec Exploration LLC (“TonaTec”) of Utah. The rig may have been a CS2000. Core sizes were PQ3, HQ3, and NQ3.

10.4.1.3 2016-2017 North Bullion Deposits Drilling

A total of 16,221.1 m were drilled in 31 holes in 2016 and 2017 (Table 10-3; Figure 10-2). Most of the RC drilling was conducted by National using a 685 Schramm. Bit sizes were 5 ¼ in. to 6 ½ in. diameter bits. The rig was operated on one or two 12-hr shifts per day. RC samples were collected continuously over 1.524 m (5 ft) intervals and split with a rotating wet splitter located beneath the cyclone. A drilling technician placed a few grams of each 1.524 m interval in plastic chip trays for logging.

Boart Longyear of Elko, Nevada was the contractor for four RC holes drilled in 2017. A track-mounted drill of unknown type was used; specific methods and procedures are not reported.

The 2015 core drilling was performed by Timberline of Elko Nevada using an LF90 drill rig. Core sizes were PQ3, HQ3, and NQ3. Core was also drilled by First Drilling (“First Drilling”) of Elko Nevada. The rig was an LF90. Core sizes were PQ3, HQ3, and NQ3.

The results from drilling completed prior to August 18, 2017 were used to estimate the current gold mineral resources presented in Section 14.5 of this Technical Report.

10.4.2 Bald Mountain Drilling by Gold Standard

A total of 15,803.9 m were drilled by Gold Standard in 22 RC and 10 core holes in the Bald Mountain area from 2011 through 2017 (Table 10-3; Figure 10-2). Drilling contractors, rig types and diameters for the Bald Mountain area drilling are summarized in Table 10-4.

All 2011-2017 core drilling was done with two 12-hr shifts per day. The RC drills operated for one or two 12-hr shifts per day. RC samples were collected continuously over 1.524 m (5 ft) intervals and split with a rotating wet splitter located beneath the cyclone.

Table 10-4: Bald Mountain Drilling Contractors and Methods

Year 2011 to 2013 2014 2016 2017
RC Contractor NA Hardrock National Boart Longyear
RC Drill Rig NA TH75 685 Schramm MPD 1500
RC Diameter NA 5¼ in. to 6½ in. 5¼ in. to 6½ in. 5¼ in. to 6½ in.
Core Contractor Redcor NA NA NA
Core Drill Rig LF-230 NA NA NA
Core Diameter PQ3, HQ3, and NQ3 NA NA NA

10.5 GOLD STANDARD DRILLING, SOUTH RAILROAD AREA 2012-2019

Drilling in the South Railroad portion of the property by Gold Standard commenced in 2012. As summarized in Table 10-3, a total of 168,676.7 m were drilled in 694 holes (Figure 10-1). Approximately 83% of the meters and 84% of the holes were drilled with RC methods. Diamond-core drilling accounts for about 16% of the meters and 15% of the holes; the balance of the drilling was done using RC followed by core tails. Both angle and vertical drilling was done.

A Gold Standard representative checked each drill rig at least once per day during drilling to monitor sample collection. For core drilling, Gold Standard geologists completed paper or digital logs on the whole core. The logs captured and illustrated core recovery, sample intervals, lithologic data, hydrothermal alteration, mineralogy, and structural features.

 

 

10-11

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Structural features were measured with respect to the core axis. When available, structural features were measured on core oriented using a Reflex Act 2 orienting device. Photographs were taken of all drill core, labeled with drill hole footages and sample intervals. RC drill chips were also logged on paper or digital logs by Gold Standard geologists. The data from the paper drill logs were later captured in electronic spreadsheets for both core and RC drill holes.

Gold Standard’s RC holes were drilled with water injection. Face-return bits were utilized when not impeded by excess water. Tri-cone bits were only used when the hammer bits were unable to function due to excessive water pressure.

10.5.1 Dark Star Area Drilling by Gold Standard

In 2015, Gold Standard began drilling in the Dark Star deposit area to extend historically known shallow oxidized gold mineralization and to test other exploration targets. In 2015 through 2019, Gold Standard drilled a total of 73,798.9 m in 306 holes (Table 10-3). RC drilling accounts for about 83% of the holes and 79% of the meters drilled by Gold Standard. Collar locations for the Gold Standard drilling at Dark Star are shown in Figure 10-2 and in greater detail in Figure 14-1.

Drilling contractors, rig types and diameters for the Dark Star area drilling are summarized in Table 10-5. All 2015-2019 core drilling was done with two 12-hr shifts per day. The RC drills operated for one or two 12-hr shifts per day. RC samples were collected continuously over 1.524 m (5 ft) intervals and split with a rotating wet splitter located beneath the cyclone.

Table 10-5: Gold Standard’s Dark Star Drilling Contractors and Methods

Year 2015 2016 2017 2018
RC Contractor National National National; Boart Longyear National; Boart Longyear
RC Drill Rig T450GT, 685
Schramm
685 Schramm 685 Schramm, T450GT;
685 Schramm, MPD1500
685 Schramm, T450GT,
EDM95; 685 Schramm,
MPD1500
RC Diameter 5¼ in. to 6½ in. 5¼ in. to 6½ in. 5¼ in. to 6½ in. 5¼ in. to 6½ in.
Core Contractor National National; Timberline First Drilling; National First Drilling; National;
Boart Longyear
Core Drill Rig CT14 CT14; LF90 LF90; CT14 LF90; CT14; LF90
Core Diameter PQ3, HQ3, and NQ3 PQ3, HQ3, and NQ3 PQ3, HQ3, and NQ3 PQ3, HQ3, and NQ3

 

Highlights from the 2016 drill program at Dark Star and an updated mineral resource estimate were presented by Dufresne and Nicholls (2017a). The true thickness of mineralization in the Dark Star deposit, and its relationship to drill interval lengths, is shown in Section 14.2 of this Technical Report.

10.5.2 Pinion Area Drilling by Gold Standard

Gold Standard’s drilling in the Pinion deposit area (Figure 10-1) has totalled 51,307.5 m in 272 holes drilled from 2012 through the effective date of the database (Table 10-3). The great majority of the drilling, approximately 90% of the meters drilled, was done with RC methods. Contractors, rig types, and hole diameters for the Pinion area drilling by Gold Standard are summarized in Table 10-6.

Following acquisition of the Pinion deposit area in 2014, in the South Railroad part of the property, Gold Standard focused their drilling on the expansion and infill drilling of various zones of what is now the Pinion gold deposit. The 2014 drilling (Table 10-3) produced significant gold intervals at the Pinion deposit indicating that gold mineralization associated with multi-lithic breccia and certain structures remained open along and across strike. Further drilling of 23 holes in 2015 also provided significant gold intercepts indicating the mineralized system was still open in a number of directions.

 

 

10-12

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 10-6: Gold Standard Pinion Area Drilling Contractors and Methods

Year 2014 2015 2016 2017 2018
RC Contractor Hard Rock; Major Hard Rock;
National
National Boart Longyear National; Boart
Longyear
RC Drill Rig TH75; T450GT TH75; T450GT,
685 Schramm
685 Schramm 685 Schramm,
MPD1500
450 Schramm; 685
Schramm
RC Diameter 5¼ in. to 6½ in. 5¼ in. to 6½ in. 5¼ in. to 6½ in. 5¼ in. to 6½ in. 5¼ in. to 6½ in.
Core Contractor Major NA National; Timberline National First Drilling; Boart
Longyear
Core Drill Rig LF230 NA CT14; LF90 CT14 LF90; LF90
Core Diameter PQ3, HQ3, and NQ3 NA PQ3, HQ3, and NQ3 PQ3, HQ3, and NQ3 PQ3, HQ3, and NQ3

In 2016, Gold Standard drilled a total of 23 holes in the Pinion deposit area for a total of 8,804.2 m. This drilling was designed to extend known zones of mineralization, provide infill data for specific zones, and provide material for metallurgical testing. Several holes were drilled to test the Irene geological and geochemical target 2.0 km west of the Pinion deposit (Figure 10-1) and at the Sentinel target to the north of the Pinion deposit.

The 2016 Pinion drilling resulted in several significant gold intersections, defined as averaging greater than the 0.14 g Au/t cut-off grade that was used previously for the 2016 estimate of Pinion gold mineral resources (Dufresne and Nicholls, 2016). Most significantly, the 2016 drilling identified a new stratigraphic target called the Sentinel zone, which is located at the north end of the Pinion deposit area and comprises gold hosted within the Sentinel Mountain dolomite and the top of the underlying Oxyoke sandstone, below the Devils Gate Limestone. The Sentinel gold mineralization is shallow, oxidized, and open to the north and west.

Gold Standard’s 2014 through 2018 RC drilling was conducted on one or two 12-hr shifts per day. RC samples were collected continuously over 1.524 m (5 ft) intervals and split with a rotating wet splitter located beneath the cyclone. The splitter reduced the samples to approximately 2.3 to 9.1 kg, which were collected in pre-numbered sample bags. A few grams of each 1.524 m interval were placed in chip trays for logging.

Results from the 2014 through 2018 Gold Standard drilling were used with data from historical drilling to estimate the current gold mineral resources presented in Section 14.3 of this Technical Report. The true thickness of mineralization in the Pinion deposit, and its relationship to drill interval lengths, is discussed in Section 14 of this Technical Report.

10.5.3 Jasperoid Wash Area Drilling by Gold Standard

Gold Standard’s drilling at the Jasperoid Wash deposit area commenced in 2017. Since then a total of 17,997.5 m have been drilled in 60 holes (Table 10-3). RC drilling accounts for about 90% of the holes and 70% of the meters drilled by Gold Standard. Collar locations for the Gold Standard drilling at Jasperoid Wash are shown in Figure 10-1 (see Section 14.4 and Figure 14-22 for a detailed map).

The 2017 and 2018 RC drilling were conducted by National using a 450 Schramm, 685 Schramm, and an EDM 95. Major also drilled at Jasperoid Wash and used a 455 Schramm. Bit sizes were 5¼ in. to 6½ in. in diameter. The rig was operated on two 12-hr shifts per day. RC samples were collected continuously over 1.524 m (5 ft) intervals and split with a rotating wet splitter located beneath the cyclone. A drilling technician placed a few grams of each 1.524 m interval in plastic chip trays for logging.

Core drilling in 2017 and 2018 was carried out by National and First Drilling using a CT14 and an LF90, respectively. Core sizes drilled were PQ3, HQ3, and NQ3.

The results of the Gold Standard drilling, together with historical drill data from Jasperoid Wash, have been used to estimate the current gold mineral resources presented in Section 14.4 of this Technical Report. The true thickness of

 

 

10-13

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

mineralization in the Jasperoid Wash deposit, and its relationship to drill interval lengths, is shown in Section 14.4 of this Technical Report.

After the 2018 estimate was completed (reported in this Technical Report in 2019), 21 additional drill holes (5,210.3 m) were completed at Jasperoid Wash, two were core holes (610.8 m) and the remainder were RC (4,599.5 m). These holes data were received on April 24, 2019 and evaluated on April 29, 2019. No auditing or QA/QC evaluations were done on this post-model drill-hole data set.

10.5.4 Irene Area Drilling by Gold Standard

Three RC holes for a total of 1,961.4 m were drilled at the Irene prospect about 2 km west of the Pinion deposit in 2015 and 2016 (Table 10-3). Drilling done at Irene used drill rigs similar to those used for the Pinion drilling.

10.5.5 Dixie Area Drilling by Gold Standard

The Dixie prospect, including Arturus and Elliot Dome targets, located about 3 km south of Dark Star, was drilled by Gold Standard in 2016, 2017, and 2018. A total of 19,440.1 m were drilled in 43 RC holes, three core holes, and one RC pre-collar holes with a core tail (Table 10-3). This drilling was conducted by National using a 685 Schramm, 450 Schramm, and EDM 95, and Boart Longyear using a 685 Schramm or MPD1500. Major also drilled at Dixie in 2018 using a 455 and a 685 Schramm. Bit sizes were 5¼ in. to 6½ in. diameter. The rigs operated on two 12-hr shifts per day. RC samples were collected continuously over 1.524 m (5 ft) intervals and split with a rotating wet splitter located beneath the cyclone. A drilling technician placed a few grams of each 1.524 m interval in plastic chip trays for logging.

Core drilling was conducted by National and First Drilling using a CT14 and LF90, respectively. Core sizes drilled were PQ3, HQ3, and NQ3.

10.5.6 Ski Track Drilling by Gold Standard

Six RC holes were drilled in 2018 at the Ski Track prospect for a total of 2,036.1 m. This drilling was done by Major using a 685 Schramm. Bit sizes were 5¼ in. to 6½ in. in diameter. The rigs operated on two 12-hr shifts per day. RC samples were collected continuously over 1.524 m (5 ft) intervals and split with a rotating wet splitter located beneath the cyclone. A drilling technician placed a few grams of each 1.524 m interval in plastic chip trays for logging.

10.6 DRILL-HOLE COLLAR SURVEYS

10.6.1 Historical Collar Surveys, North Railroad Portion of the Property

APEX stated that collar locations were rectified to a satellite orthophoto with one-meter contours (Dufresne and Nicholls, 2017b). Elevations for all the remaining holes were adjusted to a topographic surface created from the orthophoto.

10.6.2 Historical Collar Surveys, South Railroad Portion of the Property

Mr. Ristorcelli has no information on the methods used to survey the locations of the historical drill collar locations in the South Railroad portion of the property. Coordinates for historical drill holes at the Pinion, Dark Star, and Jasperoid Wash deposits were obtained from old records, resurveying in the field, and taken from historical maps. Much work was done by Gold Standard and APEX resolving collar location issues. However, those few that did contradict surrounding holes, or whose geology and grades were improbable, were eliminated from use in modeling and estimation.

 

 

10-14

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

10.6.3 Gold Standard Collar Surveys, North Railroad Portion of the Property

Gold Standard has performed differential Global Positioning System (“GPS”) surveys of all collar locations for holes drilled from 2010 through 2017. The surveys were carried out by Apex Surveying LLC out of Spring Creek Nevada using a Trimble differential GPS. Where possible, the locations of historical drill collars were also surveyed. During the site visits, Mr. Dufresne located some historical and Gold Standard drill collars using a hand-held GPS, along with tracks representing drill roads and trails. Although unmarked in the field, several drill collars were ascertained due to their unique location, which were found to be consistent with historically recorded location information. Further work on refining the collar positions has been performed by Gold Standard personnel and reviewed by the author of this section of the report.

The most significant problem with the historical drill locations are collar elevations which initially had obvious errors. With near flat-lying mineralized zones it was imperative to obtain a reliable dataset of collar elevations that were internally consistent from one hole to the next. Once accurate real-world coordinates were obtained for the historical collars, elevations were obtained by projecting the collars to a digital elevation model that was generated by Pacific Geomatics from ortho-rectified satellite imagery with ~1 m elevation and horizontal resolution.

10.6.4 Gold Standard Collar Surveys, South Railroad Portion of the Property

As stated in Section 10.6.3, the collar locations for all Gold Standard holes drilled through 2018 were surveyed by differential GPS. After the holes were abandoned, the collars were marked by wooden lath with the hole name on a wire and aluminum tag placed in the cement collar plug. Apex Surveying, LLC, of Spring Creek, Nevada professionally surveyed the Gold Standard drill collars at the Pinion and Dark Star deposits using a “differential GPS” according to APEX.

10.7 DOWN-HOLE SURVEYS

10.7.1 Historical Down-Hole Surveys, North and South Railroad Portions of the Property

APEX reported that most of the deeper historical drill holes in the Railroad-Pinion property were downhole surveyed (Dufresne and Nicholls, 2017b). Survey equipment used is unknown. During 1999, at least a portion of the Kinross drill holes in various areas of the property were surveyed down-hole by Silver State Surveys of Elko, Nevada (Jones et al., 1999), but the type of instrument and methods and procedures are not known.

10.7.2 Gold Standard Down-Hole Surveys, North and South Railroad Portions of the Property

Gold Standard contracted International Directional Services (“IDS”), who used Stockholm Precision Tools with a continuous-read, north-seeking gyro down-hole surveying tool named Memory North Seeking Gyroscopic Inclinometer. IDS has also used an Axis Champ Navigator, supplied by Axis Mine Tech. In 2017, Gold Standard contracted Minex, using a MEMS continuous-read, north-seeking gyro down-hole surveying tool. All holes longer than ~100 m were down-hole surveyed for azimuth and dip.

10.8 SUMMARY STATEMENT

The authors believe that the drilling, sampling, and logging methods and procedures provided samples that are representative and of sufficient quality for use in the mineral resource estimations subject to the elimination of some drill holes and some samples, and to the downgrading of mineral resource classification when blocks were dominantly estimated by historical drilling (discussed in Section 14). The authors are aware of sampling or recovery factors that impact the reliability of the samples for use in a mineral resource estimate. Those samples were removed from use in estimation (discussed in Section 14).

 

 

10-15

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 11 TABLE OF CONTENTS

SECTION     PAGE
11 SAMPLE PREPARATION, ANALYSES AND SECURITY 11-1
  11.1 HISTORICAL OPERATORS’ DRILLING SAMPLES - NORTH RAILROAD PORTION OF THE PROPERTY 11-1
  11.2 GOLD STANDARD’S DRILLING SAMPLES - NORTH RAILROAD PORTION OF THE PROPERTY 11-2
  11.3 HISTORICAL OPERATORS - SOUTH RAILROAD PORTION OF THE PROPERTY 11-3
  11.4 GOLD STANDARD - SOUTH RAILROAD PORTION OF THE PROPERTY 11-5
    11.4.1 Pinion Deposit Area Drill Samples 11-5
    11.4.2 Dark Star Deposit Area Drill Samples 11-6
    11.4.3 Jasperoid Wash Area Drill Samples 11-7
    11.4.4 Dixie Area Drill Samples 11-7
    11.4.5 Ski Track Area Drill Samples 11-7
  11.5 AUTHOR’S OPINION 11-7

 

 

 

11-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

11 SAMPLE PREPARATION, ANALYSES AND SECURITY

The information presented in Section 11 is derived by MDA from Dufresne et al., 2017, Dufresne and Nicholls (2017b), data received directly from Gold Standard and other sources, as cited. The authors have reviewed this information and believe this summary accurately represents the methods, procedures and analyses used for the drilling samples on which the estimated mineral resources presented in Section 14 of this Technical Report are based.

Documentation of the methods and procedures used for historical surface and drilling sample collection, preparation, analyses, and sample security at the Railroad-Pinion property is incomplete and in many cases is not available. MDA recommends that Gold Standard compile and evaluate the information contained in records that are available.

Methods and procedures used for the security, preparation, and analysis of surface samples collected by historical operators and Gold Standard have not been evaluated for this Technical Report because the results have not been used in the estimation of the mineral resources presented in Section 14. While useful for identifying drilling targets and planning exploration drilling, the results and representativity of the Gold Standard surface sampling are not of material importance to the interpretations and conclusions of this Technical Report. The reader is referred to Koehler et al. (2014), Dufresne et al. (2014; 2015; 2017) and references cited in those reports for information on Gold Standard’s soil- and rock-sample collection, security, preparation, and analyses.

11.1 HISTORICAL OPERATORS’ DRILLING SAMPLES - NORTH RAILROAD PORTION OF THE PROPERTY

Historical drill logs and reports in the possession of Gold Standard have not been evaluated. MDA recommends that Gold Standard extract and compile information from available documents regarding logging methods, and where available information on core diameters, RC-bit diameters, and sample splitting prior to shipment to the analytical laboratories.

The authors and Gold Standard are not aware of the methods and procedures used by American Selco, Placer Amex, El Paso, AMAX, Homestake, and NICOR for historical drill-sample collection, splitting, preparation, analyses, and sample security during drilling at Bald Mountain and North Bullion from 1969 through 1986.

Samples from the Westmont drilling in the North Bullion area in 1987 were analyzed for gold and silver by fire assay methods at Universal Laboratory, Inc. (“Universal”), in Elko, Nevada. It is not known if this laboratory was independent of Westmont, or if any certifications were held. Samples from Westmont’s drilling at North Bullion in 1990 and 1992 were analyzed at Cone Geochemical Inc. (“Cone”), in Lakewood, Colorado. Gold was determined by fire-assay fusion of 30 g aliquots. Cone was independent of Westmont, but MDA is not aware if any certifications were held by Cone at that time. MDA is not aware of sample security measures taken or the details of transport from the drill sites to the laboratories.

Samples from Ramrod’s drilling in the North Bullion area in 1994 were assayed at Cone and at Monitor Geochemical Laboratory Inc. (“Monitor), in Elko, Nevada. At Cone, gold was determined by fire-assay fusion of 20 g and 30 g aliquots with an atomic adsorption (“AA”) finish. At Monitor, Ramrod’s samples were analyzed for gold and silver by 30 g fire-assay fusion and some were analyzed by cyanide-leach with an AA finish. Some composited pulps representing 8.7 m (25 ft) lengths were analyzed for arsenic, antimony and mercury by unspecified method(s). Monitor and Cone were independent of Ramrod. It is not known if any certifications were held by these laboratories at the time. MDA is not aware of sample-security measures taken or the details of transport from the drill sites to the laboratories.

In 1997, Mirandor’s drill samples from north of North Bullion and the Bald Mountain areas were analyzed by Interteck Testing Services, a division of Bondar-Clegg & Company Ltd. (“Bondar-Clegg”), in North Vancouver, British Columbia. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Some samples were re-analyzed for gold by 30 g fire assay with a gravimetric finish. Silver was determined by AA and inductively-coupled plasma-emission spectrometry (“ICP). Some samples were analyzed for copper, lead, zinc, molybdenum, arsenic, and antimony by AA,

 

 

11-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

and for mercury by cold-vapor AA (“CVAA”). Bondar-Clegg was independent of Mirandor. MDA is not aware if any certifications were held by Bondar-Clegg at that time. MDA is not aware of sample-security measures taken or the details of transport from the drill sites to the laboratory.

Samples from Kinross’ drilling in 1998 and 1999 at North Bullion and Bald Mountain were analyzed at Chemex Labs, Inc. (“Chemex”), in Sparks, Nevada. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Some samples were re-analyzed for gold by 30 g fire assay with a gravimetric finish. Composited pulps representing 8.7 m (25 ft) sample lengths were analyzed ICP for 35 minor, major, and trace elements, including silver. Chemex was independent of Kinross. MDA is not aware if any certifications were held by Chemex at that time. MDA is not aware of sample-security measures taken and the details of transport from the drill sites to the laboratory.

11.2 GOLD STANDARD’ S DRILLING SAMPLES - NORTH RAILROAD PORTION OF THE PROPERTY

Commencing in 2010, drilling company employees collected Gold Standard s RC samples at the rig. Those samples were then picked up at the drill sites by representatives of ALS Minerals (“ALS”) or Inspectorate America Corporation (“Inspectorate”), a division of Bureau Veritas Mineral Laboratories USA (“Bureau Veritas”) and transported by truck to their respective laboratories in either Elko or Reno, Nevada (for ALS), or Elko (for Bureau Veritas). Excessively wet samples were kept at the drill sites for a few days to drain and dry prior to collection by the laboratory staff.

ALS and Bureau Veritas were, and continue to be, commercial laboratories independent of Gold Standard. ALS is accredited to the standard ISO/IEC 17025:2005 for specific analytical procedures, while most of their laboratories have attained ISO 9001:2008 certification. Bureau Veritas’ laboratories in Sparks, Nevada is accredited to the standard ISO/IEC 17025:2017, RG- MINERAL:2017. The Bureau Veritas laboratory in Vancouver, British Columbia is accredited to the standard ISO/IEC 17025:2005 and ISO 9001:2008.

Core samples were transported daily from the drill sites to Gold Standard’s logging and core-cutting facility in Elko by Gold Standard personnel. After logging and marking core-sample intervals by Gold Standard geologists, the core was photographed prior to being sawed lengthwise by contractor technicians. Whole HQ-size core was sawed in half. Whole PQ-size core was sawed in quarters. One half of the HQ core, and three quarters of the PQ core, were returned to the core boxes and the remainder was placed in pre-numbered sample bags that were closed with ties. Following insertion of quality assurance/quality control (“QA/QC”) blanks and certified reference materials (“CRMs”), the core samples were transported by representatives of ALS or Bureau Veritas to their respective laboratories for preparation and analysis.

Samples from Gold Standard’s RC and core drilling at North Bullion in 2010 through 2014, and at Bald Mountain in 2014, were prepared at the ALS laboratories in Elko and Reno, Nevada. The samples were dried and crushed in their entirety to 70% at less than 2 mm. The crushed samples were riffle-split to obtain 250 g subsamples that were pulverized to 85% less than 75 microns. The pulps were shipped by air freight by ALS to the ALS laboratory in North Vancouver, British Columbia, for analysis. Gold was determined by 30 g fire-assay fusion with an AA finish (method code Au-AA23). Samples assayed at ≥10 g Au/t were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish (method code Au-GRA21). Separate aliquots of 0.5 g were analyzed for silver and 34 major, minor and trace elements by ICP following an aqua regia digestion. In some cases, the ICP analyses were conducted on pulps from 1.524 m drill samples. In other cases, ICP analyses were conducted on composited pulps representing 6.008 m (20 ft) drill intervals. Samples that assayed >10,000 ppm for silver or zinc by ICP were re-analyzed using AA following aqua regia digestion of 0.1 g aliquots.

A minority of the 2010 through 2012 drill samples were analyzed by SGS Canada Inc. (“SGS”) of Vancouver, British Columbia. The assay certificates do not indicate how or where the samples were prepared for analysis. At the SGS laboratory in Burnaby, British Columbia, gold was determined by 30 g fire-assay fusion with an AA finish and separate

 

 

11-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

aliquots were analyzed by ICP for 35 major, minor and trace elements. SGS was a commercial laboratory independent of Gold Standard. MDA is not aware of certifications held by SGS at that time.

In 2013, pulps from previously prepared samples from North Bullion were analyzed by Bureau Veritas in Sparks, Nevada. Gold was determined by 30 g fire-assay fusion with an AA finish. Some of the samples were analyzed using a 30 g aliquot by fire-assay fusion and gravimetric finish. In 2014, some of the Bald Mountain drill sample pulps were re-analyzed at Bureau Veritas’ laboratory in Vancouver, British Columbia for copper by cyanide-H2SO4 leach. Other pulps were analyzed for 45 major, minor and trace elements by a combination of ICP and mass spectrometry (“ICP-MS”) after 4-acid digestion.

Samples from the 2015, 2016. and 2017 drilling at North Bullion and Bald Mountain were analyzed at ALS and Bureau Veritas. At ALS the methods and procedures of preparation were the same as those used in 2010 through 2014. Gold was determined using ALS method code Au-AA23 and Au-GRA21 principally in the ALS laboratory in North Vancouver. Most gold assays on 2017 North Bullion samples were performed in the ALS laboratory in Reno with the same methods (Au-AA23; Au-GRA21). Separate aliquots of 0.5 g were analyzed for silver and 34 major, minor and trace elements by ICP following an aqua regia digestion in the North Vancouver laboratory. In some cases, these were composited pulps representing 6.008 m (20 ft) drill intervals.

A significant portion of the samples from the 2016 North Bullion drilling, and the majority of the 2017 North Bullion samples, were prepared and analyzed by Bureau Veritas. These samples were prepared in the Bureau Veritas laboratory in Elko. Following crushing, a 250 g riffle-split subsample was obtained from each drill sample. These subsamples were pulverized to 200-mesh size and the pulps were shipped to the Bureau Veritas laboratory in Sparks, Nevada. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. The pulps were shipped via air freight by Bureau Veritas to their analytical laboratory in Vancouver where they were analyzed for 45 major, minor and trace elements by ICP-MS after four-acid digestion.

11.3 HISTORICAL OPERATORS - SOUTH RAILROAD PORTION OF THE PROPERTY

AMOCO and Cyprus’ drilling samples from the Pinion area in 1980 and 1981 were mainly analyzed at Barringer Resources, Inc. (“Barringer”) in Sparks, Nevada. Gold and silver were determined by fire-assay fusion of 30 g aliquots. Some samples were also analyzed for arsenic and mercury, but no other information is available. In 1980, some of AMOCO’s samples were analyzed for silver and gold at Monitor, but the methods of analysis are not available. Barringer and Monitor were independent of AMOCO and Cyprus. MDA is not aware of any certifications that may have been held by these laboratories at that time.

In 1981, Newmont’s drilling samples from the Irene area were analyzed at Monitor in Elko. Gold and silver were determined by fire-assay fusion, but MDA has no other information on the methods and procedures used. Newmont’s 1982 drilling samples from the Pinion area were analyzed at Skyline Labs Inc. (“Skyline”), in Tucson, Arizona. Gold was determined by fire-assay fusion, but no other information is available. Skyline and Monitor were independent of Newmont, but MDA is not aware of any certifications that may have been held by these laboratories at that time.

Santa Fe’s samples from their 1985 drilling in the Pinion area were analyzed by Monitor in Elko. Gold was determined by fire-assay fusion of 30 g aliquots, but no other information is available. Monitor was independent of Santa Fe, but MDA is not aware of any certifications that may have been held by Monitor at that time.

Samples from Teck Resource’s drilling in the Pinion area in 1987 and 1989 were analyzed by Chemex in Sparks, Nevada. Gold was determined by fire-assay fusion with an AA finish. Some samples were analyzed for silver using AA after an aqua regia digestion. In 1988, Teck’s samples from Pinion were analyzed at American Assay Laboratories (“AAL”) in Sparks. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Silver was determined by AA following aqua regia digestion. Some samples were analyzed for gold by fire-assay fusion of 60 g aliquots.

 

 

11-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Chemex and AAL were independent of Teck, but MDA is not aware of certifications held by these laboratories at that time.

Newmont’s 1987 and 1988 drilling samples from the Pinion area, and some of their 1989 Pinion samples, were analyzed at Geochemical Services, Inc. (“GSI”). MDA is not aware of the location(s) of the GSI laboratory. Gold was determined by fire-assay fusion of 30 g aliquots with both gravimetric and AA finish. Samples were also analyzed for silver, arsenic and antimony by ICP. In 1989, Newmont also sent drilling samples from the Pinion area to be analyzed at Bondar-Clegg in Sparks. Following crushing, a subsample was pulverized to -150 mesh. Gold was determined by fire-assay fusion of 30 g aliquots with and AA finish. Silver, arsenic, antimony, molybdenum, and thallium were analyzed by direct-current plasma emission (“DCP”) and mercury was determined by CVAA. Bondar-Clegg and GSI were independent of Newmont, but MDA is not aware of certifications held by these laboratories at that time.

In 1989, Westmont’s drilling samples from the Pinion area were analyzed at Universal in Elko, Nevada. Gold and silver were analyzed by fire-assay fusion, but MDA has no further information on the methods and procedures used. Westmont’s 1991 and 1992 drill samples from the JR Buttes, Jasperoid Wash, and Black Rock areas were analyzed by Cone in Lakewood, Colorado. Gold was determined by fire-assay fusion of 30 g aliquots with a gravimetric finish. Silver, arsenic, antimony, and mercury were determined by AA. Universal and Cone were independent of Westmont, but MDA is not aware of certifications held by these laboratories at that time.

Crown Resources’ samples from their 1991 drilling at Pinion, Dixie, and Dark Star were in part analyzed for gold at AAL in Sparks using fire-assay fusion of 30 g aliquots. Arsenic and antimony were also analyzed, but MDA has no information on the methods and procedures used. Some of the samples from Crown’s drilling at Dark Star in 1991 were analyzed at Activation Laboratories Ltd (“ActLabs”). Composited pulps from prior assays were analyzed for gold, silver and 34 other elements. MDA is not aware of the location of the ActLabs laboratory or the methods and procedures used for the analyses. Samples from Crown’s drilling at the Dark Star and Pinion areas in 1993 were analyzed for gold at AAL in Sparks using fire-assay fusion of 30 g aliquots. AAL and ActLabs were independent of Crown, but MDA is not aware of certifications held by these laboratories at that time.

In 1995, samples from the Cyprus drilling in the Pinion area were analyzed at Chemex in Sparks. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Some 1.524 m samples and composited pulps of up to 15.24 m (50 ft) lengths were analyzed for silver, arsenic, antimony, mercury, and barium by AA following digestion in aqua regia. Chemex was independent of Cyprus, but MDA is not aware of certifications held by Chemex at that time.

RSM’s 1996 drill samples from the Pinion area were analyzed at Chemex in Sparks. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Silver was determined by AA following digestion in aqua regia. In 2014, pulps from some of these 1996 RSM Pinion area samples were re-analyzed by ALS in North Vancouver, British Columbia. At ALS, gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Separate aliquots of 0.5 g were analyzed for silver and 34 major, minor and trace elements by ICP following an aqua regia digestion. Portions of remaining drill core from RSM’s 1996 drilling at Pinion were also analyzed at ALS in 2014. These samples were crushed in their entirety to 70% at less than 2 mm. The crushed samples were riffle-split to obtain 250 g subsamples that were pulverized to 85% at less than 75 microns. Gold was determined by 30 g fire-assay fusion with an AA finish. Separate aliquots of 0.5 g were analyzed for silver and 34 major, minor and trace elements by ICP following an aqua regia digestion. Chemex was independent of RSM, but MDA is not aware of certifications held by Chemex at that time.

In 1997, Mirandor’s drilling samples from the Pinion and Dark Star areas were analyzed at Intertek Testing Services (“ITS”) in North Vancouver, British Columbia. At that time, ITS was a division of Bondar-Clegg. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Some samples were analyzed for gold by fire-assay fusion of 30 g aliquots with a gravimetric finish. Arsenic, antimony, and barium were determined in some of the samples by AA. Mercury was determined by CVAA. ITS and Bondar-Clegg were independent of Mirandor, but MDA is not aware of certifications held by ITS or Bondar-Clegg at that time.

 

 

11-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Cameco’s 1997 drill samples from the Pinion and Dixie areas were analyzed at Chemex and AAL, both in Sparks. At both laboratories, gold was determined by fire-assay fusion of 30 g aliquots. At Chemex these fire assays were finished with AA. Copies of the AAL assay records do not indicate the type of finish. The samples assayed at AAL were also analyzed for silver and 29 major, minor and trace elements by ICP following aqua regia digestion of 0.5 g aliquots. In 1999, Cameco’s drill samples from the Pinion area were analyzed for gold at AAL by fire-assay fusion of 30 g aliquots. Chemex and AAL were independent of Cameco, but MDA is not aware of certifications held by Chemex or AAL at that time.

In 1998 and 1999, the Kinross drill samples from Dark Star and Pinion were analyzed at Chemex in Sparks. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Composited pulps representing 7.62 m (25 ft) drill intervals were analyzed for 34 major, minor and trace elements by ICP. Chemex was independent of Kinross, but MDA is not aware of certifications held by Chemex at that time.

RSM’s 2003 drill samples from the Pinion area were analyzed by ALS Chemex in North Vancouver, British Columbia. The samples were prepared in the ALS Chemex laboratory in Elko, Nevada, where they were crushed in their entirety to 70% at less than 2 mm. The crushed samples were riffle-split to obtain 250 g subsamples that were pulverized to 85% at less than 75 microns. Gold was determined by 30 g fire-assay fusion with an AA finish. In 2007, RSM’s drill samples from the Pinion area were also analyzed by ALS Chemex. MDA is not aware of how or where these samples were prepared, but silver plus 34 major, minor and trace elements were assayed by ICP following aqua regia digestion of 0.5 g aliquots. Pulps from the 2007 RSM drilling at Pinion were re-analyzed in 2014 at ALS in North Vancouver for gold by 30 g fire-assay fusion with an AA finish.

11.4 GOLD STANDARD - SOUTH RAILROAD PORTION OF THE PROPERTY

MDA has not reviewed and evaluated the methods and procedures used for the collection and analysis of surface samples by Gold Standard as these samples were not used to prepare the mineral resource estimates and mineral reserve estimates presented in later sections of this Technical Report. While useful for purposes of exploration, the surface soil and rock samples of Gold Standard are not material to the interpretations and conclusions of this Technical Report.

Commencing in 2012, Gold Standard’s RC samples stored by the drill rig were collected at the drill sites by representatives of ALS or Bureau Veritas and transported via truck to their respective laboratories in Elko, Nevada. Excessively wet samples were kept at the drill sites for a few days to drain and dry prior to collection by the laboratory staff.

Core samples were transported daily from the drill sites to Gold Standard’s logging and core cutting facility in Elko by Gold Standard personnel. After logging and marking core-sample intervals by Gold Standard geologists, the core was photographed prior to being sawed lengthwise by contractor technicians. Whole HQ-size core was sawed in half. Whole PQ-size core was sawed in quarters. One half of the HQ core, and three quarters of the PQ core, were returned to the core boxes and the remainder was placed in pre-numbered sample bags that were closed with ties. Following insertion of QA/QC blanks and CRM, the core samples were transported by representatives of ALS or Bureau Veritas to their respective laboratories for preparation and analysis.

11.4.1 Pinion Deposit Area Drill Samples

Samples from Gold Standard’s drilling in 2012, 2014, 2015, 2016, and 2017 were analyzed by ALS. The samples were prepared at the ALS laboratory in Elko, Nevada. The samples were dried and crushed in their entirety to 70% at less than 2 mm. The crushed samples were riffle-split to obtain 250 g subsamples that were pulverized to 85% at less than 75 microns. The pulps were shipped via air freight by ALS to the ALS laboratory in North Vancouver, British Columbia, for analysis. Gold was determined by 30 g fire-assay fusion with an AA finish (method code Au-AA23). Samples assayed at ≥10 g Au/t were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish (method

 

 

11-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

code Au-GRA21). Separate aliquots of 0.5 g were analyzed for silver and 34 major, minor and trace elements by ICP following an aqua regia digestion. In some cases, the ICP analyses were conducted on pulps from 1.524 m drill samples. In other cases, ICP analyses were conducted on composited pulps representing 6.096 m (20 ft) drill intervals. Some samples in 2014 were analyzed for silver by fire-assay fusion of 30 g aliquots with a gravimetric finish. In 2014, some samples were also assayed for 48 major, minor and trace elements by ICP-MS after four-acid digestions. During 2017, samples were analyzed for gold by cyanide leach with an AA finish.

In 2018, Pinion area drill samples were analyzed at Bureau Veritas and AAL. At the Bureau Veritas laboratory in Sparks, Nevada, samples were crushed in their entirety and riffle-split to obtain 250 g subsamples. These subsamples were pulverized to 200-mesh size. Gold was determined by 30 g fire-assay fusion with an AA finish. Some samples were analyzed for gold by cyanide leach with an AA finish. The pulps were shipped to the Bureau Veritas laboratory in Vancouver, British Columbia. Carbon, CO2 and sulfur were determined by induction-furnace infrared absorption and thermal conductivity (“LECO”) analyses of 0.1 g aliquots. Gold, silver and 35 major, minor and trace elements were assayed by ICP following aqua regia digestion of 0.5 g aliquots. Additional silver assays were completed in 2019 at Bureau Veritas using drill-sample pulps from previous analyses. Silver was determined by AA following four-acid digestion of 1.0 g aliquots.

At AAL in Sparks, Nevada, composited pulps of 2018 Pinion area drill samples were analyzed for gold by 30 g fire-assay fusion with an AA finish, and in some cases, with a gravimetric finish. Some of the samples were analyzed for gold by cyanide leach and an AA finish. Gold, silver and 49 major, minor and trace elements were determined in some samples by ICP-MS following digestion in aqua regia.

AAL also analyzed selected, previously assayed drill-sample pulps for elemental barium using an energy-dispersive, x-ray fluorescence (“XRF-ED”) procedure. Pressed-powder pellets made from 2 g aliquots of sample pulps were used for the XRF-ED analyses, which were performed in 2018 and 2019. Other selected sample pulps were analyzed for barium using XRF-ED with 2 g pressed-powder pellets. Some of these were also analyzed for barite using wave-length dispersive x-ray fluorescence (“XRF-WD”) following lithium metaborate fusion of 0.5 g aliquots. Other sample pulps were analyzed for elemental barium by NITON hand-held XRF on both loose-powder aliquots. These were also analyzed by x-ray diffraction (“XRD”) for barite, witherite and calcite, as well as sulfur and carbon by induction-furnace infrared (LECO).

Gold Standard also performed assays of elemental barium together with 39 major, minor and trace elements using hand-held NITON XRF analyzers. These assays were done in 2018 in Elko, Nevada by independent contractor Rangefront Geological using selected drill-sample pulps in loose powder form.

11.4.2 Dark Star Deposit Area Drill Samples

Gold Standard’s 2015 drilling samples from the Dark Star area were mostly analyzed by Bureau Veritas after preparation in the Bureau Veritas laboratory in Elko, Nevada. The samples were crushed in their entirety and riffle-split to obtain 250 g subsample. These subsamples were pulverized to 200-mesh size. Gold was determined by 30 g fire-assay fusion with an AA finish in Bureau Veritas’ laboratory in Sparks, Nevada. Composited pulps were analyzed in Bureau Veritas’ laboratory in Vancouver, British Columbia, for gold, silver and 35 major, minor and trace elements by ICP-MS following aqua regia digestion of 0.5 g aliquots. Some of the 2015 pulps were re-analyzed by ALS in in North Vancouver, British Columbia, for gold by 30 g fire-assay fusion with an AA finish.

The 2016 and 2017 drilling samples from the Dark Star area were analyzed in part by Bureau Veritas and in part by ALS, with sample preparation in their respective laboratories in Elko, Nevada, using the same procedures that were used for the Pinion area samples as summarized in Section 11.4.1. The ALS assays were carried out in their Reno and North Vancouver laboratories where gold was determined by 30 g fire-assay fusion with an AA finish. Samples

 

 

11-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

with ≥10 g Au/t were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish. Silver and 34 major, minor, and trace elements were assayed by ICP following aqua regia digestion of 0.5 g aliquots.

The Bureau Veritas assays of the 2016 and 2017 Dark Star drilling samples were performed in Bureau Veritas’ laboratories in Sparks, Nevada, and Vancouver, British Columbia. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish and in some cases with a gravimetric finish. Some samples were analyzed for gold by cyanide leach and an AA finish, and some samples were analyzed for gold with a screen-fire assay procedure. Gold, silver, and 35 major, minor, and trace elements were assayed in the Vancouver laboratory by ICP-MS following aqua regia digestion of 0.5 g aliquots.

The 2018 and 2019 drilling samples from the Dark Star area were prepared in either Bureau Veritas’ Elko or Sparks, Nevada, laboratories and analyzed in their Sparks and Vancouver laboratories. Gold and multi-element assays were carried out with the same methods and procedures used for the 2016-2017 samples. In addition, some samples were analyzed for carbon, sulfur and CO2 by LECO methods.

11.4.3 Jasperoid Wash Area Drill Samples

The 2017 drilling samples from the Jasperoid Wash area were analyzed in part by Bureau Veritas and in part by ALS following preparation at their respective laboratories in Elko, Nevada. Gold and multi-element analyses were performed at their respective laboratories in Sparks, Nevada, Vancouver and North Vancouver, British Columbia, using the same methods and procedures used for the 2016-2018 Dark Star samples as summarized in Section 11.4.2.

All of the 2018 drill samples from Jasperoid Wash were prepared and analyzed by Bureau Veritas in Sparks, Nevada and Vancouver, British Columbia, using the same methods and procedures used for the 2016-2019 Dark Star samples as summarized in Section 11.4.2.

11.4.4 Dixie Area Drill Samples

Gold Standard’s 2017 and 2018 drilling samples from the Dixie area were prepared by Bureau Veritas in Sparks, Nevada and Elko, Nevada. Analyses were conducted in the Bureau Veritas Sparks and Vancouver laboratories. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Some samples were analyzed for gold by cyanide leach and an AA finish. Gold, silver and 35 major, minor and trace elements were assayed in the Vancouver laboratory by ICP-MS following aqua regia digestion of 0.5 g aliquots. Composited pulps from the 2018 drilling were analyzed for carbon, sulfur and CO2 by LECO methods in the Vancouver laboratory.

11.4.5 Ski Track Area Drill Samples

Most RC samples from Gold Standard’s 2018 drilling at the Ski Track area were prepared by Bureau Veritas in Sparks, Nevada and Elko, Nevada. Analyses were conducted in the Bureau Veritas Sparks and Vancouver laboratories. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Some samples were analyzed for gold by cyanide leach and an AA finish. Gold, silver, and 35 major, minor and trace elements were assayed in the Vancouver laboratory by ICP-MS following aqua regia digestion of 0.5 g aliquots. Composited pulps from the 2018 drilling were analyzed for carbon, sulfur, and CO2 by LECO methods in the Vancouver laboratory.

11.5 AUTHORS OPINION

The sample collection, security, transportation, preparation, and analytical procedures are judged by the authors to be acceptable and to have produced data suitable for use in the estimation of the mineral resources reported in Section 14, subject to those exclusions or modifications discussed in Section 14. The authors consider the procedures utilized by Gold Standard and the assay laboratories to be appropriate for use as described.

 

 

11-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 12 TABLE OF CONTENTS

SECTION     PAGE
12 DATA VERIFICATION 12-1
  12.1 DARK STAR AND PINION DATABASE AUDITS 12-1
    12.1.1 2019 Audit of Dark Star Carbon, CO2 and Sulfur Data 12-3
    12.1.2 2019 Audit of Pinion Carbon, CO2 and Sulfur Data 12-4
  12.2 JASPEROID WASH DATABASE AUDIT 12-4
  12.3 NORTH BULLION DEPOSITS DATABASE AUDIT 12-5
    12.3.1 Drill-Hole Collar Locations and Down-Hole Survey Data 12-5
    12.3.2 Drill-Hole Assay Audit 12-5
  12.4 GOLD STANDARD QA/QC PROCEDURES 12-6
  12.5 DARK STAR DRILL PROGRAM QA/QC 12-6
    12.5.1 Dark Star Drill Program QA/QC 1991 12-7
    12.5.2 Dark Star Drill Program QA/QC 1997 12-8
    12.5.3 Dark Star Drill Program QA/QC 2015 12-11
    12.5.4 Dark Star Drill Program QA/QC 2016 12-12
    12.5.5 Dark Star Drill Program QA/QC 2017 12-15
    12.5.6 Dark Star Drill Program QA/QC 2018 12-16
    12.5.7 Dark Star Drill Program QA/QC 2019 12-18
  12.6 GOLD STANDARD’S PINION DRILL PROGRAM QA/QC 12-19
    12.6.1 Pinion Drill Program QA/QC CRMs 12-20
    12.6.2 Pinion Drill Program QA/QC Field Duplicates 12-26
    12.6.3 External Check Assays for Pinion Drilling 12-28
    12.6.4 Pinion Drill Program QA/QC Blanks 12-29
    12.6.5 Twin Holes 12-32
    12.6.6 Pinion Drill Program QA/QC on Barite 12-33
  12.7 GOLD STANDARD’S JASPEROID WASH DRILL PROGRAM QA/QC 12-34
  12.8 NORTH BULLION DEPOSITS DRILL PROGRAM QA/QC 12-35
    12.8.1 Blanks 12-35
    12.8.2 Certified Reference Materials 12-35
  12.9 SUMMARY STATEMENT ON DATA VERIFICATION 12-38

SECTION 12 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 12-1: MDA Verification GPS Checks of Dark Star Drill Collars 12-3
Table 12-2: Dark Star Carbon and Sulfur Records Checked and Analytical Procedures 12-3
Table 12-3: Pinion Carbon and Sulfur Records Checked and Analytical Procedures 12-4

 

 

 

12-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Table 12-4: Summary Counts of Dark Star QA/QC Analyses 12-7
Table 12-5: Summary of Dark Star Results Obtained for Certified Reference Materials, 1997 12-9
Table 12-6: List of Dark Star Failed Certified Reference Materials, 1997 12-10
Table 12-7: Summary of Dark Star Results Obtained for Certified Reference Materials, 2015 12-11
Table 12-8: List of Dark Star Failed Certified Reference Materials, 2015 12-11
Table 12-9: Summary of Dark Star Results Obtained for Certified Reference Materials, 2016 12-13
Table 12-10: List of Dark Star Failed Certified Reference Materials, 2016 12-13
Table 12-11: Summary of Dark Star Results Obtained for Certified Reference Materials, 2017 12-15
Table 12-12: List of Dark Star Failed Certified Reference Materials, 2017 12-15
Table 12-13: Summary of Dark Star Results Obtained for Certified Reference Materials, 2018 12-16
Table 12-14: List of Dark Star Failed Certified Reference Materials, 2018 12-17
Table 12-15: Summary of Dark Star Results Obtained for Standards, 2019 12-18
Table 12-16: Summary of Results Obtained for CRMs, 2014 - 2015 12-20
Table 12-17: List of Failed CRM Analyses, 2014 - 2015 12-20
Table 12-18: Summary of Results Pinion for CRMs, 2016 12-23
Table 12-19: Summary of Results for Pinion CRMs, 2017 12-23
Table 12-20: Summary of Results for Pinion CRMs, 2018 12-23
Table 12-21: List of Failed Pinion CRMs, 2018 12-24
Table 12-22: Summary of 2019 Analyses of Silver CRMs 12-25
Table 12-23: List of Failed Silver CRMs 12-25
Table 12-24: Summary of Results for Pinion Field Duplicates 12-26
Table 12-25: Summary of Results for Duplicates in Silver Re-Assays 12-27
Table 12-26: Summary of Results for 2018 Re-Assays of 2017 Pinion Samples 12-29
Table 12-27: Comparison of Original Assays and Re-Runs in Part of PIN15-14 12-31
Table 12-28: Results of Silver Analyses of Pulp Blanks 12-32
Table 12-29: Summary of Counts of Jasperoid Wash QA/QC Analyses 12-33
Table 12-30: Summary Counts of Jasperoid Wash QA/QC Analyses 12-34

SECTION 12 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 12-1: Dark Star Assay Comparison - AAL vs. MBA - 1991 CDS Holes 12-8
Figure 12-2: Dark Star Assay Comparison - AAL vs Actlabs - 1991 CDS Holes 12-8
Figure 12-3: Dark Star Check Assays - ALS Assay vs. Bureau Veritas (Inspectorate), 2015 12-12

 

 

 

12-ii

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Figure 12-4: Dark Star Check Assays - ALS Assay vs. Bureau Veritas (Inspectorate) 2016 12-14
Figure 12-5: Scatter Plot of Twin-Hole Analysis - DC18-09 (core) vs DR18-44 (RC) 12-18
Figure 12-6: Control Chart for MEG-Au.11.34 12-21
Figure 12-7: Control Chart for MEG-S107007X 12-21
Figure 12-8: Control Chart for MEG-Au.11.19 - 2018 12-24
Figure 12-9: Grade Ranges and Dates of 2018 Pinion CRMs 12-24
Figure 12-10: Gold Relative Percent Difference - Pinion Duplicate vs. Original 12-27
Figure 12-11: Gold Relative Percent Difference - ALS vs. Bureau Veritas, 2017 Pulps 12-28
Figure 12-12: Gold in Blanks and Preceding Samples 2014 12-30
Figure 12-13: Gold in Blanks and in Preceding Samples 2015 12-30
Figure 12-14: Gold in Pulp Blanks and in Preceding Samples 2017 - 2018 12-31
Figure 12-15: Gold in Coarse Blanks and in Preceding Samples 2017 - 2018 12-32
Figure 12-16: Histogram of 2018 Twin Drill-Hole Samples 12-33
Figure 12-17: Analyses of CRMs in North Railroad Drilling 2010 to 2015 12-36
Figure 12-18: Analytical Results from Standard MEG-S107007X 12-37
Figure 12-19: Analytical Results from Standard MEG-Au.11 12-37
Figure 12-20: 2010 to 2015 North Railroad Portion Field Duplicate Assays 12-38

 

 

 

12-iii

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

12 DATA VERIFICATION

Data verification, as defined in NI 43-101, is the process of confirming that data have been generated with proper procedures, have been accurately transcribed from the original sources and are suitable to be used. Additional confirmation of the drill data’s reliability is based on the authors’ evaluations of the Dark Star, Pinion, Jasperoid Wash, and North Bullion area QA/QC procedures and results, as described below, and in general working with the data. No separate evaluations of QA/QC procedures and results were done on data from drilling outside the mineral resource areas.

Prior to MDA’s involvement, as part of the data verification process, APEX visited the Railroad-Pinion property in May 2013, April 2014, and October 2014. Mr. Dufresne conducted several additional site visits from May 31 to June 4, 2015, August 30 to September 2, 2015, and most recently June 7 to 9, 2017. During all site visits, the project geology was reviewed, which included: a) a field tour of the deposit area; b) visual inspection of core holes; and c) discussion with Gold Standard personnel of the current geologic interpretations. Drill site and mineralization verification procedures were conducted, and core drilling and sampling procedures were appraised.

Mr. Dyer and Mr. Ristorcelli visited the Pinion and Dark Star deposit sites on November 18, 2016. This site visit included reviews of core, examination of drill-hole cross sections with the geologic model, and investigations of representative exposures in road cuts and outcrops. Mr. Ristorcelli also visited the Gold Standard office in Elko, Nevada on June 21, 2018. Mr. Lindholm and Mr. Mijal, Senior Geologists with MDA, visited the Dark Star and Jasperoid Wash sites, respectively, on September 18 and 19, 2018. Their work included review of core, checking collar locations, and visiting the site to see the geology.

12.1 DARK STAR AND PINION DATABASE AUDITS

Beginning in March 2018, MDA conducted verification of Gold Standard’s Pinion and Dark Star drilling databases. The databases consisted of Excel spreadsheets, exported from Micromine’s GeoBank secure database software, with collar, survey, assay, and geologic information. MDA decided the best approach to validation was to import the data into a SQL database (GeoSequel) and use the built-in data validation routines. Collar, survey, assay interval, geologic interval, and geologic measurements were imported into GeoSequel directly from the spreadsheet data for both Dark Star and Pinion (see Section 12.2 for Jasperoid Wash and Section 12.3 for North Bullion). The following validation tests were conducted to identify:

  • Collars: collars with missing depths, collars with missing coordinates, coordinates that might be swapped, drill holes without assay intervals, drill holes without collar survey information, drill holes with nearly duplicate coordinates, drill holes without assays, drill holes without geology, and drill holes with geotechnical information (core holes only);

  • Surveys: survey depths greater than total depth, survey points missing azimuth or dip values, surveys where azimuth readings were not between 0° and 360°, surveys with flat dip angles (< ~ -45°); and

  • Assay interval: “excessively” large or small sample intervals, “excessively” large or small geologic intervals, assay intervals that are greater than collar total depth, geologic intervals that are greater than total depth, geotechnical intervals that are greater than total depth, gaps and overlaps in sample intervals, gaps and overlaps in geologic intervals, gaps and overlaps in geotechnical intervals.

Errors found during these tests were iteratively corrected in the database by Gold Standard staff or by MDA with input from Gold Standard.

The next step was to verify the assay data by comparison to the original assay certificates. Because Gold Standard provided electronic copies of certificates for their own drilling, and electronic copies of historical certificates for the pre-Gold Standard holes were incomplete, MDA split the assay validation into two parts. About 58.9% of Pinion drilling

 

 

12-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

assays were backed by certificates, and 73.5% of the Dark Star assay data could be tracked back to scanned copies of physical certificates.

The digital data were verified against any physical data that Gold Standard had obtained. Collar information and collar coordinate data were largely validated in their entirety, while the assay data was validated using a representative subset of the data. Collar data were found to be reasonably accurate.

Down-hole survey data from original sources were available for the Gold Standard core holes and some of the historical drill holes, and these too were loaded into GeoSequel for comparison. Eight core holes were evaluated for improbable rates of change of azimuth and dip in down-hole surveys, however, none could be shown to be incorrect and were left in the database.

The first portion of the assay verification was comparing the databases to a random sampling of 10% of the certificate-backed assays. For the Pinion database, thirty certificates with 3,120 sample intervals were randomly selected and checked against the database. The database entries largely compared very well, with only three significant errors, all of which were in the silver values. For the Dark Star database, MDA randomly selected fourteen certificates with 2,391 sample intervals and compared these to the database. These database entries also held up very well, with no significant errors. Insignificant errors for both deposits were found, including rounding the detection limit values to half the detection limit, rounding errors due to conversion of units, and not storing the values in the original reported units.

The second portion of the assay verification involved a random selection of 10% of the drill holes for the two deposits and checking the database entries against all available information in the Gold Standard files. For the Pinion property, this involved 35 drill holes with 2,756 sample intervals. For the Dark Star property, 11 holes with 887 sample intervals were compared. No significant assay errors were found.

For both deposits, MDA found omitted assay values for Ag, As, and other geochemical analyses, and numerous issues with rounding errors. These were not corrected but other, albeit minor, errors with the gold data were corrected with Gold Standard.

In May of 2019, MDA was given a database containing 47,550 silver values for the Pinion project. Using digital certificates supplied by GSV, 24,523 rows of silver data (51.6%) had an error rate of less than 0.01%. Of these errors, all were rounding errors and very minor. These errors were all corrected in the database being used by MDA.

MDA randomly selected a group of certificates to manually spot-audit the remaining rows. Most of these certificates were supplied by Gold Standard as pdf files. Over five percent of these remaining rows were audited with an error rate of 1.1%, of which only a few were important. Most of the errors were in rounding or dropping the detection limit negative sign.

Additional checking was accomplished by working with the data, particularly while working on cross sectional modeling. Suspect data included samples with no gold detected in the middle of intervals of mineralization, assay values where NS (“no sample”) was recorded, and potential down-hole contamination. Issues were resolved most often by considering the samples not reliable and therefore not usable in estimation. While working with the cross sections, MDA also found significant discrepancies between some TCX holes (drilled by Amoco) and surrounding drill holes. The TCX holes were determined to be unreliable and were not used in either domain modeling or estimation.

All the above issues were presented to Gold Standard for corrections in their databases. MDA found that the updated databases contained the corrections and made a few more minor changes.

For non-analytical field data, Gold Standard has instituted protocols to ensure data integrity. For example, during surface geochemical sampling (rock grab and soil sampling), samplers are required to enter sample locations and descriptive information into computers daily and locations are checked to eliminate data input errors. For non-analytical

 

 

12-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

drill hole information, Gold Standard employs a similar protocol of continuous data checking to ensure the accurate recording within the project drilling database, which includes all geological and geotechnical information from both core and RC chip logging. The procedures employed are considered reasonable and adequate with respect to insuring data integrity.

During the Dark Star site visit in September 2018, Gold Standard, with MDA present, took GPS measurements on six drill pads and seven drill-hole collars in the field to spot-check coordinates in Gold Standard’s collar tables (see Table 12-1). A Garmin - Rino 530 non-differential GPS was used to measure coordinates at the drill collars. The Garmin website indicates it is accurate to within 3 m to 5 m. Only one easting exceeded the maximum range of accuracy of the GPS by less than a meter; all other readings were within acceptable limits.

Table 12-1: MDA Verification GPS Checks of Dark Star Drill Collars

  MDA GPS Location Surveyed Location   Difference (GPS - Survey)
Drill Hole East North Elev. East North Elev. East North Elev.
DR18-71 588,001 4,480,319 2,067 588,000.3 4,480,316.1 2,067.7 0.70 2.90 -0.70
DS17-37 588,063 4,480,104 2,049 588,064.9 4,480,106.4 2,048.4 -1.90 -2.40 0.60
DR18-68 588,015 4,479,846 2,015 588,014.9 4,479,844.0 2,012.4 0.10 2.00 2.60
DC18-15 587,920 4,479,606 2,072 587,921.4 4,479,605.3 2,073.2 -1.40 0.70 -1.20
DR18-58 587,783 4,479,476 2,078 587,788.8 4,479,472.6 2,077.3 -5.80 3.40 0.70
DR18-95 587,865 4,479,361 2,108 587,865.8 4,479,360.4 2,110.8 -0.80 0.60 -2.80
DR18-96 587,861 4,479,329 2,110 587,861.4 4,479,328.0 2,111.6 -0.40 1.00 -1.60

12.1.1 2019 Audit of Dark Star Carbon, CO2 and Sulfur Data

Gold Standard provided MDA with assay tables containing 7,081 records of analyses and calculated values for carbon and sulfur in the chemical forms listed in Table 12-2. Most of the analyses were done by Bureau Veritas in Vancouver, British Columbia. A smaller number were done by AAL in Sparks, Nevada. The records verified are summarized in Table 12-2.

Table 12-2: Dark Star Carbon and Sulfur Records Checked and Analytical Procedures

Laboratory No. of
Records
C Total %
Method
CO2 %
Method
C InOrganic %
Method
C Organic %
Method
S Total %
Method
S Sulfide %
Method
Bureau Veritas 7,062 TC003 TC006 calculated calculated TC003 TC009
AAL 19 ELTRA C n/a calculated ELTRA C ELTRA C n/a

Note: n/a indicates “not applicable” as in not analyzed and not calculated; TC003 and TC006 are Bureau Veritas method codes for LECO analyses. ELTRA C is AAL method code for LECO-type analyses. On the Bureau Veritas certificates, the TC00x codes on the data listings and cover pages are not the same. The codes listed in the table above are from the cover pages.

MDA compared the measured values in the assay tables from Gold Standard to copies of the laboratory certificates.

Gold Standard’s calculated values were checked using the equations of Gold Standard as follows:

  • When C Inorganic was not directly assayed

    • C Inorganic = CO2 Percent / 3.666

      Or

    • C_Inorganic = C Total - C Organic

  • C Organic = C Total - C Inorganic

MDA found that all the measured values in the assay tables were the same as those in the laboratory certificates, and all the calculations were done correctly.

 

 

12-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

12.1.2 2019 Audit of Pinion Carbon, CO2 and Sulfur Data

Gold Standard provided MDA with assay tables containing 4,050 records of analyses and calculated values for carbon and sulfur in the chemical forms listed in Table 12-3. Most of the analyses were done by Bureau Veritas in Vancouver, British Columbia. A smaller number were done by AAL if Sparks, Nevada. The records verified are summarized in Table 12-3.

Table 12-3: Pinion Carbon and Sulfur Records Checked and Analytical Procedures

Laboratory No. of
Records
C Total %
method
CO2 %
method
C InOrganic
% method
C Organic
% method
S Total %
method
S Sulfide
% method
Bureau
Veritas
3,941 TC003 TC006 calculated calculated TC003 TC009
AAL 93 ELTRA C n/a calculated ELTRA C ELTRA C ELTRA C
AAL 16 ELTRA C n/a calculated ELTRA C ELTRA C ELTRA C

Note: n/a indicates ”not applicable” as in not analyzed and not calculated; TC003, TC006 and TC009 are Bureau Veritas method codes for LECO analyses. ELTRA C is AAL method code for LECO-type analyses. On the Bureau Veritas certificates, the TC00x codes on the data listings and cover pages are not the same. The codes listed in the table above are from the cover pages.

MDA compared the measured values in the assay tables from Gold Standard to copies of the laboratory certificates.

Gold Standard’s calculated values were checked using Gold Standard’s equations as follows:

  • When C Inorganic was not directly assayed

    • C Inorganic = CO2 Percent / 3.666

    • Or

    • C Inorganic = C Total - C Organic

  • C Organic = C Total - C Inorganic

MDA found that all the measured values in the assay tables were the same as those in the laboratory certificates, and all the calculations were done correctly. The only errors that MDA found were 36 assay intervals from hole DS18-07 for which the starting and/or ending depths had been entered incorrectly. MDA corrected these in consultation with Gold Standard.

12.2 JASPEROID WASH DATABASE AUDIT

The drilling database for Jasperoid Wash contained 10,147 assay intervals in 97 drill holes. Gold Standard had good documentation for the 40 of those holes drilled by Gold Standard. Fourteen of the 40 Gold Standard holes did not have assay data associated with them. Historical data for 43 holes came from several sources, mostly written reports, database printouts and previous compilations. Because of the differences in the data, the audit of the Jasperoid Wash assay data involved two parts. In the first part, MDA compared digital certificates supplied by Gold Standard to the existing data compilation using database queries written to compare the two sets. No significant issues were found in the Jasperoid Wash drilling database.

In the second part of the test, MDA compared some of the older drill samples with two annual reports from Westmont, an assay compilation from Cameco, and an assay compilation called PHOLASAY.txt (origin unknown), which contains the JW-8910 and JW-8911, and JW-9001 to JW-9014 holes. Only one sample was identified to be a minor typographical error and corrected, and other than minor rounding issues, the verification demonstrated the database properly reflects the underlying data sources.

 

 

12-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The drill-hole survey data for the 2017 and 2018 Gold Standard holes were verified against down-hole survey instrument files obtained from Gold Standard. No issues were found between the compiled data set and the source survey data.

12.3 NORTH BULLION DEPOSITS DATABASE AUDIT

This subsection is modified from Dufresne and Nicholls (2017b).

12.3.1 Drill-Hole Collar Locations and Down-Hole Survey Data

Gold Standard’s North Bullion-Bald Mountain database has undergone extensive verification prior to the 2017 mineral resource estimate (Dufresne, 2017b). The confirmation and verification of historical drill hole collar locations was addressed during site visits conducted by Mr. Dufresne. During the site visits, Mr. Dufresne located a number of historical and Gold Standard drill collars using a hand-held GPS, along with tracks representing drill roads and trails. Although unmarked in the field, the identity of several drill collars was ascertained due to their unique location, which were found to be consistent with historically recorded location information. Further work on refining the collar positions and validation of the drill hole database has been performed by Gold Standard personnel and reviewed by Mr. Dufresne.

A total of 170 of the 503 drill holes in the North Bullion-Bald Mountain database have down-hole survey data, including Gold Standard’s 128 holes completed between 2010 and 2017. The database contains 42 holes drilled by Kinross during 1998 and 1999. All available historical documentation was searched with respect to identifying down-hole orientation survey data. No additional down-hole orientation survey data were obtained. Of the 503 drill holes in the database, 297 drill holes were drilled vertically (-85° to -90° dip), with the remaining inclined holes (206 holes) drilled along easterly or westerly azimuths or 040°/ 220° in the case for the POD zone with dips (inclinations) ranging from -30° to -85° from horizontal. A total of 33 of the 333 historical holes without down-hole survey information were drilled to depths greater than 200 m and only 13 of the 33 holes were drilled to greater than 300 m. Based upon the abundance of shallow vertical holes in the historical drill hole database, the amount of down-hole deviation from collar setups for the historical holes is uncertain but is considered likely to be minimal. As such, this has been taken into consideration with the classification of the North Bullion area mineral resources.

12.3.2 Drill-Hole Assay Audit

The assay portion of the North Bullion-Bald Mountain drilling database has also undergone rigorous verification. To date APEX personnel have validated the drill-hole assay database data with all available original assay certificates that could be located. Assay certificates were available for all 135 Gold Standard holes completed between 2010 and 2017. Gold Standard and APEX personnel located the original laboratory assay certificates for 140 of the 368 historical drill holes. The original assay data for all historical drill holes were compared to the Gold Standard database and other historical databases in Gold Standard’s possession that had been compiled by companies such as Newmont, Kinross, and Royal Standard. No assay issues were identified with Gold Standard’s historical assay database. This provided APEX confidence in the validity of the Gold Standard assay database used for the mineral resource estimation presented in Section 14.5.

In order to understand the geological model and place the mineralization in context with the geology, Gold Standard personnel initiated a re-logging program using a) historical drill logs and b) archived RC drilling chips from the historical drill holes. This has resulted in an increased level of confidence in the geological controls of mineralization. Out of the 503 drill holes in the database, 101 historical holes have been “re-interpreted” by Gold Standard personnel in 2016 and 2017 as of the date of this Technical Report, seven historical holes have been re-interpreted from cross sections by Gold Standard personnel, and 135 holes have been drilled and logged by Gold Standard from 2010 through 2017.

 

 

12-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Based upon the core drilling and the improved understanding of the geology, the 2010 to 2017 and historical drill holes have been re-logged and re-interpreted.

12.4 GOLD STANDARD QA/QC PROCEDURES

No QA/QC data was available or evaluated for historical drilling programs in the South Railroad portion of the property. The analytical portion of the QA/QC program employed by Gold Standard aimed to provide a means by which the accuracy and precision of the assaying that was performed on the drilling samples (core and RC chip) can be assessed to ensure the highest possible data quality. In order to achieve this goal, Gold Standard personnel inserted samples of CRMs (standards), which are commercially available pulverized materials certified to contain a known concentration of an element (or elements) - in this case gold. The Gold Standard protocol was to use several CRMs of varying gold concentration during a drilling campaign and randomly insert one CRM sample pulp into the stream of actual drill samples at a rate of approximately one in 10. These were alternately inserted with a blank material with gold below detectable limits. The analytical QA/QC measures employed by Gold Standard are sufficient to properly monitor analytical accuracy and precision, and possible in-lab contamination.

CRMs refers to “certified reference materials.” Those used in mineral exploration are usually powders comprised of rock-forming minerals, including the metal of interest in known concentrations. They are analyzed along with batches of samples, and the resulting analyses are evaluated using criteria for passing or failing. CRMs are usually obtained from commercial suppliers. The suppliers provide specifications including the average of many analyses by multiple labs, and the standard deviation of the analyses. In the years 2014 through 2018 Gold Standard has used CRMs obtained from MEG Inc., of Reno, Nevada.

A typical criterion for accepting the analyses of CRMs in the mineral industry is that they should fall within a range determined by the average or expected value ± three standard deviations. Gold Standard uses a stricter criterion, the expected value ± two standard deviations. In the evaluation described here, MDA has used the expected value ± three standard deviations.

Blanks are samples known or thought to contain little or no gold. They are inserted into the sample stream and the results are monitored to be sure that the lab does not report significant gold values when little or no gold should be present.

12.5 DARK STAR DRILL PROGRAM QA/QC

MDA has QA/QC data for the years 1997 and 2015 through 2019, and a very small amount of data for 1991. The types of QA/QC data vary from year to year, but in general there is a substantial suite of QA/QC data available to support the assays used in the Dark Star mineral resource estimate. Table 12-4 summarizes the quantities of each type of data by year.

 

 

12-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 12-4: Summary Counts of Dark Star QA/QC Analyses

QA/QC Type 1991 1997 2015 2016 2017 2018 2019
Standard              
Number in Use   14 6 5* 5 5 3
Number of Analyses   285 150 708* 310 594 201
Number of Failures   2 1 2 3 3 0
               
Field Duplicate   56**     322 714 301
Coarse (Preparation) Duplicate   105 58 185      
Pulp Duplicate or Replicate   248 59 198      
External Check 133   443 1,376 175    
               
Pulp Blank   300 148 1107 170 364 153
Coarse Blank       205 111 158 10
Notes: * A single analysis of a sixth standard is not included in the counts for 2016.
  ** A description of the 1997 duplicates is not available to MDA, so it is only an assumption that they are field duplicates.

The QA/QC data summarized in Table 12-4 are comprised of some QA/QC samples that were part of the project operators’ QA/QC programs, and some that were part of the internal QA/QC protocols of the laboratories that were used.

The QA/QC data available to MDA, including “historical” data inherited from the former project operators of 1997, are adequate to support the use of the Dark Star assay database in a mineral resource estimate. Current QA/QC protocols are adequate to support on-going exploration. MDA has not seen any coarse duplicate data for 2017, 2018, and 2019. Data for coarse duplicates may be available from the laboratories for those years, and if so, MDA suggests that they be acquired and compiled by Gold Standard. Coarse duplicates would be a useful addition to future QA/QC protocols.

During the 2018 and 2019 drilling, Gold Standard has submitted only pulp blanks with samples from RC drilling and only coarse marble blanks with samples of drill core. It would be ideal to submit both types of blanks with both types of samples. If only one type of blank is used, coarse blanks are the best choice.

The following sections contain brief summaries of the QA/QC results by year.

12.5.1 Dark Star Drill Program QA/QC 1991

Very little QA/QC data are available for any holes drilled prior to 1997. However, for 1991 there is a comparison between assays of composited intervals by AAL, which was apparently the original laboratory used, MBA Lab and Actlabs, each using a different analytical method. The composites were made from material drawn from 10 of the 63 holes known to have been drilled that year. AAL and MBA used variations of the atomic absorption analytical method, and their results compare well. Actlabs used the instrumental neutron activation method, a very different analytical method, and obtained results biased significantly high relative to the other two labs (Figure 12-1 and Figure 12-2). Thus, for a small subset of the 1991 drill holes there is some validation of the assay results, based on the AAL vs. MBA comparison. The analyses in the assay table used for estimation are those of AAL.

 

 

12-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 12-1: Dark Star Assay Comparison - AAL vs. MBA - 1991 CDS Holes

Figure 12-2: Dark Star Assay Comparison - AAL vs Actlabs - 1991 CDS Holes

12.5.2 Dark Star Drill Program QA/QC 1997

12.5.2.1 Standards

The quantity of data available for CRMs in 1997 is ample, although much of the data came from the laboratory’s internal QA/QC. Only two failures were noted, and they are not from holes that are included in the Dark Star mineral resource estimate. Results for CRM analyses are summarized in Table 12-5, and the two failed analyses are detailed in Table 12-6.

 

 

12-8

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 12-5: Summary of Dark Star Results Obtained for Certified Reference Materials, 1997

Standard ID Grades in ppm Au Count Dates Used Failure Counts Bias Comment
Target Average Maximum Minimum First Last High Low pct
C1 n/a 1.931 2.095 1.668 18 29-Aug-97 13-Nov-97 0 0 n/a target value not known
C2 n/a 1.541 1.830 1.181 29 29-Aug-97 13-Nov-97 0 0 n/a target value not known
C3 n/a 0.765 0.910 0.663 13 29-Aug-97 07-Nov-97 0 0 n/a target value not known; too few samples to chart
C4 n/a 0.718 0.767 0.663 2 16-Sep-97 14-Nov-97 0 0 n/a target value not known
Gannet_192 0.192 0.188 0.262 0.166 49 29-Aug-97 13-Nov-97 1 0 -2.08 target value known, spec. limits not known
Gannet_394 0.394 0.391 0.436 0.358 31 29-Aug-97 07-Nov-97 0 0 -1.27 target value known, spec. limits not known
Gannet_415 0.415 0.456 0.473 0.435 3 14-Nov-97 13-Nov-97 0 0 9.88 target value known, spec. limits not
known; too few samples to chart
Gannet_1585 1.585 1.557 1.709 1.365 48 29-Aug-97 13-Nov-97 0 0 -1.70 target value known, spec. limits not known
Gannet_1050 1.05 1.038 1.185 0.944 48 29-Aug-97 13-Nov-97 1 0 -1.14 target value known, spec. limits not known
Gannet_2450 2.45 2.405 2.593 2.263 45 29-Aug-97 13-Nov-97 0 0 -1.24 target value known, spec. limits not known
Gannet_9900 9.9 9.641 10.29 9.06 8 3-Oct-97 14-Nov-97 0 0 -1.84 target value known, spec. limits not known
Gannet_13800 13.8 14.055 14.39 13.72 2 26-Oct-97 9-Nov-97 0 0 1.85 target value known, spec. limits not
known; too few samples to chart
BCC_Gold_STD_90-1 6.32 6.693 7.32 5.67 3 25-Sep-97 21-Oct-97 0 0 5.9 target value known, spec. limits not
known; too few samples to chart
FA_Synthetic n/a 1.47 1.47 1.47 1 10-Oct-97 10-Oct-97 0 0 n/a target value not known; too few samples
to chart
 
Count or Sum 14       285     2 0    
Percent         100     0.7 0    

 

 

 

12-9

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 12-6: List of Dark Star Failed Certified Reference Materials, 1997

Standard ID Drill Hole ID Target for Std Fail Type High/Low Fail Limit Failed Value Comment
Gannet_192 EMRR-9714 0.192 High 0.26 0.262 This drill hole is not in MDA’s data set.
Gannet_1050 EMRR-9713 1.05 High 1.158 1.185 This drill hole is not in MDA’s data set.

The main issue with the CRMs is that the available records do not include specifications for the CRMs used by Mirandor the operator. MDA had to interpret how many different CRMs had been used. The ten used by the laboratory Intertek have known expected values, but the expected standard deviations are not known. MDA used statistics derived from the gold assay data set to characterize the expected standard deviations.

12.5.2.2 Field Duplicates

The 1997 assay certificates available to MDA include results for 56 samples with a suffix “D”. It is assumed that these are field duplicates, but specific information is lacking.

Based on relative differences, at grades below about 0.036 g Au/t, the “D” duplicates are on average biased 26% high relative to the original samples. At higher grades, the high bias of the duplicates averages only about 3.8%, within the range of biases that MDA typically finds in such data sets.

12.5.2.3 Preparation Duplicates

The 1997 assay certificates contain results for 105 samples described as “Prep Duplicate”, which MDA takes to mean preparation or coarse crush duplicates. MDA’s evaluation of these revealed no cause for concern.

12.5.2.4 Pulp Duplicates

The 1997 assay certificates contain results for 58 pulp duplicates analyzed using a gravimetric finish and 190 pulp duplicates analyzed using an atomic absorption finish. MDA’s evaluation of these showed the results to be acceptable.

12.5.2.5 Comment on Grade Ranges

Two subsets of gold grade ranges were recognized and evaluated for each of the three duplicate types that were analyzed using an AA finish in 1997, namely the “D” duplicates, preparation duplicates and most of the pulp duplicates. The subsets were selected based on visual inspection of relative difference graphs. Notably, the divisions between lower- and higher-grade subsets chosen in this way all fall in the range 0.036 to 0.040 g Au/t. It appears that the relative precision of the analytical method was substantially better at grades higher than approximately 0.040 g Au/t than it was at lower grades. This is expected, and any likely mineral resource cutoff grades would fall in the higher-grade range in which the analyses are more precise.

12.5.2.6 Mirandor “B” Blanks

In 1997, Mirandor inserted blanks into the sample stream at intervals of approximately 76.2 m (250 ft), for 62 insertions. MDA does not know the nature of this blank material. The results showed no issues of note or concern.

12.5.2.7 Intertek Analytical Blanks

The Intertek assay certificates from 1997 contain results for 238 analyses of material that Intertek labelled “Analytical Blank”. MDA reviewed these and found no issues of note or concern.

 

 

12-10

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

12.5.3 Dark Star Drill Program QA/QC 2015

12.5.3.1 Dark Star CRMs

Gold Standard used Bureau Veritas as its primary laboratory in 2015, and for the Bureau Veritas assays the quantity of analyses of CRMs is ample, with only one failure recorded. The single failure is not material to the mineral resource estimate. Results for CRM analyses are summarized in Table 12-7, and the failed analysis is detailed in Table 12-8.

Table 12-7: Summary of Dark Star Results Obtained for Certified Reference Materials, 2015

Standard ID Grades in ppm Au Count Dates Used Failure Counts Bias pct Comment
Target Average Maximum Minimum First Last High Low
MEG-Au.10.02 0.035 0.034 0.054 0.024 31 Jun-15 Nov-15 1 0 -2.86  
MEG-Au.10.04 0.078 0.078 0.095 0.063 24 Jun-15 Nov-15 0 0 0  
MEG-Au.11.29 3.689 3.702 4.166 3.478 16 Jun-15 Nov-15 0 0 0.35  
MEG-Au.13.02 0.746 0.753 0.811 0.697 31 Jun-15 Nov-15 0 0 0.94  
MEG-S107007X 1.526 1.560 1.665 1.475 27 Jun-15 Nov-15 0 0 2.23  
MEG-Au.11.17 2.693 2.723 3.033 2.510 21 Jun-15 Oct-15 0 0 1.11  
 
 Count or Sum 6       150     1 0    
Percent         100     0.67 0    

Table 12-8: List of Dark Star Failed Certified Reference Materials, 2015

Standard ID Drill Hole ID Target for Std Fail Type
High/Low
Fail Limit Failed Value Comment
MEG-Au.10.02 EMRR-9714 0.035 High 0.047 0.054  

In 2017, “A comprehensive assay check (umpire) program” was completed by ALS on original sample pulps from the Gold Standard s 2015 and 2016 drilling at the Dark Star deposit which had reported values at or above the 0.14 g Au/t cut-off grade...” On reviewing the results, Gold Standard elected to use the assays from ALS for the 2015 and 2016 samples.

Consequently, while most of the assays in MDA’s database for the 2015 drill holes are the original Bureau Veritas assays, the majority of the assays at or above 0.14 g Au/t are those from ALS. There are 376 such assays, out of a total of 3,426 assays from the 2015 drill holes. MDA’s review of standards for 2015 applies only to the Bureau Veritas assays. MDA has no QA/QC data for the assays of 2015 samples from ALS, which is to say, no QA/QC data applying to most of the mineral resource-grade samples from 2015.

12.5.3.2 Bureau Veritas Duplicates

One of two Excel files provided to MDA, containing QA/QC data for 2015, contains a compilation of analytical results for Bureau Veritas’ internal-preparation duplicates and Bureau Veritas’ pulp duplicates, relating to holes DS15-06 through DS15-12. MDA does not have any duplicate data for other holes drilled in 2015.

MDA evaluated the results for these two types of duplicates and found them to be generally as expected. One somewhat surprising finding is that the within-laboratory pulp duplicates or replicates have, on average, a stronger than expected negative bias with respect to the original analyses, based on the relative differences. Pulp duplicates at grades exceeding 0.04 g Au/t have an average difference, relative to the originals, of -5.5%.

 

 

12-11

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

12.5.3.3 ALS vs. Bureau Veritas Checks

In 2017, Gold Standard obtained re-analyses of pulps from the 2015 samples at ALS, for comparison with the original Bureau Veritas assays. MDA evaluated these as check assays, as shown in Figure 12-3. They amount to 443 pairs. ALS’ analyses are biased on average about 4.7% high relative to Bureau Veritas’.

Figure 12-3: Dark Star Check Assays - ALS Assay vs. Bureau Veritas (Inspectorate), 2015

12.5.3.4 Blanks

In 2015, Gold Standard used pulp blanks obtained from a vendor of standard reference materials. No issues of note or concern were revealed by the 148 analyses of this blank.

12.5.3.5 Assay Substitution

The QA/QC data available for 2015 support the original assays for that year by Bureau Veritas. Subsequent to 2015, later check assays by ALS were substituted for some of the original Bureau Veritas assays. MDA has little or no QA/QC data that directly relates to the ALS assays, but they compare well enough to the Bureau Veritas assays, albeit with a high bias in the order of 4%, to be accepted.

12.5.4 Dark Star Drill Program QA/QC 2016

12.5.4.1 CRMs

The number of CRMs in use and the number of analyses from 2016 are ample. Two failures occurred but are not of material concern with respect to the mineral resource estimate. Results for CRM analyses are summarized in Table 12-9, and the two failed analyses are detailed in Table 12-10.

 

 

12-12

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 12-9: Summary of Dark Star Results Obtained for Certified Reference Materials, 2016

Laboratory Standard ID Grades in ppm Au Count Dates Used Failure Counts Bias pct
Target Average Maximum Minimum First Last High Low
Inspectorate MEG-Au.10.02 0.035 0.035 0.041 0.028 156     0 0 0
ALS MEG-Au.10.02 0.035 0.036 0.041 0.032 11     0 0 2.86
Inspectorate MEG-Au.10.04 0.078 0.078 0.092 0.057 142     0 2 0
ALS MEG-Au.10.04 0.078 0.082 0.084 0.079 8     0 0 5.13
Inspectorate MEG-Au.13.02 0.746 0.749 0.804 0.7 141     0 0 0.40
ALS MEG-Au.13.02 0.746 0.759 0.768 0.74 6     0 0 1.74
Inspectorate MEG-S107007X 1.526 1.557 1.691 1.378 114     0 0 2.03
ALS MEG-S107007X 1.526 1.503 1.55 1.475 7     0 0 -1.51
Inspectorate MEG-Au.11.17 2.693 2.773 3.017 2.543 110     0 0 2.97
ALS MEG-Au.11.17 2.693 2.824 2.93 2.71 13     0 0 4.86
Inspectorate MEG-Au.11.29 3.689 4.135 4.135 4.135 1     0 0 12.09
ALS MEG-Au.11.29 3.689 n/a n/a n/a 0     0 0 n/a
 
Inspectorate   664  
ALS   45  
 
Count or Sum 6   263   0 2  
Percent     100   0 0.28  

Table 12-10: List of Dark Star Failed Certified Reference Materials, 2016

Standard ID Laboratory Drill Hole ID Target for Std Fail Type
High/Low
Fail Limit Failed Value Comment
MEG-Au.10.04 Inspectorate DS16-08 651A 0.078 low 0.06 0.058  
MEG-Au.10.04 Inspectorate DS16-38 1650A 0.078 low 0.06 0.057  

In addition to the analyses of CRMs by Bureau Veritas, some analyses of the CRMs by ALS are available in the 2016 data set. While the ALS analyses of CRMs are few relative the number of Bureau Veritas analyses, and thus statistics for the ALS assays are less robust than those for the Bureau Veritas assays, it is noteworthy that ALS’ biases relative to the expected values for four of five CRMs were higher than Bureau Veritas’. Bureau Veritas’ assays were, on average, closer to the expected values for the CRMs. Note that in 2016, some ALS check assays have been substituted for the original Bureau Veritas assays, and for these MDA has no data for CRMs.

12.5.4.2 Bureau Veritas Duplicates

MDA was provided with a compilation of Bureau Veritas’ internal preparation duplicate and replicate data, comprised of 185 preparation duplicate pairs and 198 pulp duplicate or replicate pairs. MDA’s evaluation of these revealed no issues of concern.

 

 

12-13

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

12.5.4.3 ALS vs. Bureau Veritas Checks on Pulps

In 2017, Gold Standard obtained re-analyses of the 2016 samples at ALS, for comparison with the original Bureau Veritas assays. MDA evaluated these as check assays, as shown in Figure 12-4. They amount to 1,376 pairs. ALS’ analyses are biased on average about 3.8% high relative to Bureau Veritas.

Figure 12-4: Dark Star Check Assays - ALS Assay vs. Bureau Veritas (Inspectorate) 2016

12.5.4.4 Gold Standard Pulp Blanks

In 2016, Gold Standard used a commercial pulp blank obtained from a vendor of CRMs, obtaining 572 analyses. No issues were revealed by these analyses.

12.5.4.5 Bureau Veritas Pulp Blanks

The data package for 2016 contains 535 analyses of a pulp blank used by Bureau Veritas as part of their internal QA/QC program. MDA evaluated these and found no issues of note or concern.

12.5.4.6 Bureau Veritas Coarse Blanks

The data available to MDA include a compilation of results from 205 coarse blanks analyzed by Bureau Veritas as part of their internal QA/QC protocol. MDA has no information as to where in the sequence of analyses these blanks were placed, so the data are not useful for checking on the possibility of contamination in the sample preparation process. Viewed without sequential context, the analyses revealed no issues of concern.

12.5.4.7 Assay Substitution

The QA/QC data available for 2016 support the original assays for that year by Bureau Veritas. Subsequent to 2015, later check assays by ALS were substituted for some of the original Bureau Veritas assays. MDA has only a small

 

 

12-14

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

amount of QA/QC data that directly relates to the ALS assays, but they compare well enough to the Bureau Veritas assays, albeit with a high bias in the order of 4%, to be accepted.

12.5.5 Dark Star Drill Program QA/QC 2017

12.5.5.1 CRMs

The number of CRMs in use and the number of analyses from 2017 are sufficient. Of 310 analyses of CRMs, 180 were done at ALS and 130 were done at Bureau Veritas. Both ALS and Bureau Veritas analyses of the lowest-grade CRM, which has an expected value of 0.078 g Au/t, were biased high by more than 6%, and three of ALS’s analyses were high-side failures. Because the expected value and even the highest-grade of the failures are below likely mineral resource cutoff grades, the failures and the high biases have little if any impact on confidence in the mineral resource estimate. Results for CRM analyses are summarized in Table 12-11, and the three failed analyses are detailed in Table 12-12.

Table 12-11: Summary of Dark Star Results Obtained for Certified Reference Materials, 2017

Laboratory Standard ID Grades in ppm Au Count Dates Used Failure Counts Bias pct
Target Average Maximum Minimum First Last High Low
ALS MEG-Au.10.04 0.078 0.083 0.099 0.073 135 16-Jul-17 27-Oct-17 3 0 6.41
Inspectorate MEG-Au.10.04 0.078 0.084 0.095 0.071 64 8-Aug-17 2-Nov-17 0 0 7.69
ALS MEG-Au.13.02 0.746 0.751 0.763 0.742 8 2-Aug-17 10-Jan-18 0 0 0.67
Inspectorate MEG-Au.13.02 0.746 0.749 0.768 0.723 6 12-Jan-18 27-Feb-18 0 0 0.4
ALS MEG-Au.12.11 1.465 1.518 1.53 1.495 3 30-Jul-17 30-Jul-17 0 0 3.62
Inspectorate MEG-Au.12.11 1.465 1.469 1.544 1.349 11 19-Jan-18 27-Feb-18 0 0 0.27
ALS MEG-Au.12.21 0.143 0.138 0.147 0.127 34 30-Dec-17 15-Jan-18 0 0 -3.5
Inspectorate MEG-Au.12.21 0.143 0.139 0.155 0.121 44 27-Nov-17 27-Feb-18 0 0 -2.8
Inspectorate MEG-Au.11.19 0.12 0.120 0.123 0.112 5 27-Feb-18 27-Feb-18 0 0 0
Totals or Averages
ALS 4         180     3 0 1.80
Inspectorate 5         130     0 0 1.11
                       
All 9         310     3 0  
Percent           100     0.97 0  

Table 12-12: List of Dark Star Failed Certified Reference Materials, 2017

Standard ID Laboratory Sample ID Target for Std Fail Type
High/Low
Fail Limit Failed Value Comment
MEG-Au.10.04 ALS DS17-15 2045-2050-A2 0.078 high 0.096 0.099 no follow-up
MEG-Au.10.04 ALS DS17-15 1045-1050-A2 0.078 high 0.096 0.096 no follow-up
MEG-Au.10.04 ALS DS17-15 1245-1250-A2 0.078 high 0.096 0.098 no follow-up

For three of four CRMs that have data allowing comparisons between results from Bureau Veritas and results from ALS, Bureau Veritas’ assays are closer, on average, to the expected values than ALS’. This differs from the comparison for the 2016 analyses of CRMs when ALS was biased low compared to Bureau Veritas.

12.5.5.2 Gold Standard Duplicates

The 322 field duplicates available in the 2017 data set reveal no issues of note or concern.

 

 

12-15

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

12.5.5.3 External Checks of 2017 Assays in 2018

In April and August 2018, Gold Standard selected pulps from three holes drilled in 2017 and sent them to a lab other than the original for check assays. One hole was originally assayed by ALS and was sent to Bureau Veritas (a.k.a. Inspectorate) for check assays. The other two holes were originally assayed by Bureau Veritas and were sent to ALS for checks. In total, 175 usable original/check assay pairs were produced. MDA evaluated the results as a comparison between ALS and Bureau Veritas.

At grades up to about 3 g Au/t, the two labs’ results compare well. Between about 3 g Au/t and 10 g Au/t, which is the upper limit for ALS’ Au-AA23 analytical method, ALS is biased about 6.8% low relative to Bureau Veritas, based on relative differences of 14 pairs of analyses. Conversely, at grades above 10 g Au/t, for which both labs used a gravimetric finish, ALS is biased on average about 4.6% high relative to Bureau Veritas, based on relative differences of only five pairs of analyses. With such small sample populations, no important conclusions can be drawn based on these results.

12.5.5.4 Gold Standard Pulp Blanks

In 2017, Gold Standard inserted 170 pulp blanks, obtained from a supplier of CRMs, into the sample stream. The analyses of these revealed no important issues.

12.5.5.5 Gold Standard Coarse Blanks

Gold Standard inserted 111 samples of a coarse marble blank into the sample stream in 2017. In three holes analyzed on October and November 2017, there is a significant correlation between analyses of blanks that reported detectable gold, and high gold values in adjacent real samples. The highest gold assay in a marble blanks is 0.021 g Au/t; not high enough to cause concern about using related assays of real samples in a mineral resource estimate. Such correlations between low levels of detectable gold in coarse blanks and adjacent samples containing high gold grades are common and are not necessarily a problem but must be monitored.

12.5.6 Dark Star Drill Program QA/QC 2018

12.5.6.1 CRMs

The number of CRMs used, and the number of analyses is ample. Three total failures occurred, two on the high-side, and one on the low-side. The latter may be due to a sample mix-up rather than an analytical issue. Results for CRM analyses are summarized in Table 12-13, and the three failed analyses are detailed in Table 12-14.

Table 12-13: Summary of Dark Star Results Obtained for Certified Reference Materials, 2018

Laboratory Standard ID Grades in ppm Au Count Dates Used Failure Counts Bias pct
Target Average Maximum Minimum First Last High Low
Inspectorate MEG-Au.11.19 0.12 0.115 0.139 0.091 76 14-Mar-18 16-Apr-18 0 0 -4.17
AAL MEG-Au.11.19 0.12 0.099 0.105 0.003 16 24-Apr-18 30-Apr-18 0 1 -17.5
Inspectorate MEG-Au.17.06 0.098 0.102 0.123 0.082 376 26-Jun-18 14-Feb-19 1 0 4.08
Inspectorate MEG-Au.13.02 0.746 0.750 0.788 0.727 10 17-Aug-18 06-Sep-18 0 0 0.54
Inspectorate MEG-Au.12.11 1.465 1.486 1.595 1.358 66 17-Aug-18 14-Feb-19 0 0 1.43
Inspectorate MEG-Au.17.07 0.188 0.201 0.225 0.184 50 06-Sep-18 14-Feb-19 1 0 6.91
Totals or Averages
Inspectorate 5         578     2 0 0.47
AAL 1         16     0 1 -17.5
 
All 6         594     2 1  
Percent           100     0.34 0.17  

 

 

 

12-16

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 12-14: List of Dark Star Failed Certified Reference Materials, 2018

Standard ID Lab Sample ID Target for Std Fail Type Fail Limit Failed Value Comment
MEG-Au.11.19 AAL DR18-25 545-550 A9 0.120 low 0.081 <0.005 blank?
MEG-Au.17.06 Insp. DS18-02 1845-1850-L1 0.098 high 0.119 0.123 insufficient sample
MEG-Au.17.07 Insp. DC18-04 490-495-A12 0.188 high 0.221 0.225 deemed OK by GSV*

Note: * This failure was accepted because it is in an unmineralized geotechnical drill hole, not material to the block model.

Most of the analyses in 2018 were done by Bureau Veritas, but there are sixteen analyses by AAL of a CRM having an expected value of 0.12 g Au/t. The average of AAL’s analyses of this CRM are biased 17.5% low. This magnitude of bias is unusual. Only one of the AAL analyses is a failure, and as mentioned in the preceding paragraph, that may not be an analytical failure, but such a low bias merits investigation.

Two high-side failures occurred in Inspectorate’s analyses of CRMs in 2018. One of these involved a case of insufficient sample material. Both failed analyses were 0.004 g Au/t above the upper failure limit. Gold Standard did not take any corrective action in either case.

12.5.6.2 Gold Standard Duplicates

The 714 field duplicates available in the 2018 data set reveal no issues of note or concern.

12.5.6.3 Gold Standard Pulp Blanks

During the 2018 drill program, Gold Standard inserted pulp blanks into the stream of samples from RC drilling. Pulp blanks have not been used with the samples from core drilling.

Most of the 364 analyses of pulp blanks have reported acceptable results. Gold Standard flagged one pulp blank, with a gold analysis of 0.028 g Au/t, for re-analysis of part of the sample batch. Successful re-analyses were received in September 2018.

12.5.6.4 Gold Standard Coarse Blanks

The 158 analyses of coarse marble blanks in 2018 show that during the mid-July to mid-October period, there was a correlation between higher-grade samples and instances of detectable gold in the marble blank, similar to that which was noted in the 2017 samples. The same conclusion applied in 2018 as in 2017; if the detectable gold in the marble blank was due to contamination from adjacent gold-bearing samples, the degree of contamination was not so high as to cause concern about using the assays in a mineral resource estimate, but this issue should be closely monitored.

12.5.6.5 Twin-Hole Analysis

Gold Standard drilled one core hole twin (DC18-09) of a RC drill hole (DR18-44). The holes were collared 5.7 m apart and intersected a significant amount of low- and high-grade mineralization. Core intervals were composited to 3.05 m to match the RC intervals to facilitate a more direct comparison of the data. Viewed on-screen, the higher-grade intercepts are wider in the core hole, although the relative positions of mineralization are similar in the two holes. Average gold grade is higher in the core hole at 1.95 g Au/t, compared to 1.50 g Au/t in the RC hole (Figure 12-5). The core hole roughly confirms the data in the RC hole, but general conclusions about the rest of the drilling from this one pair of holes cannot be made. The single twin-hole comparison also suggests that grades of mineralization can vary rapidly over short distances within the Dark Star deposit.

 

 

12-17

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 12-5: Scatter Plot of Twin-Hole Analysis - DC18-09 (core) vs DR18-44 (RC) 12.5.7 Dark Star Drill Program QA/QC 2019

12.5.7.1 CRMs

The number of CRMs used and the number of analyses during the first quarter of 2019 were ample. No failures occurred. Results for one CRM were on average biased close to 6% above the expected value. The same standard had a similar bias in 2018. While the results for the CRM are within acceptable limits, MDA suggests doing some test analyses of the CRM at a different laboratory, to see if a similar bias is obtained. It may be that the characterization of the standard should be modified. Results for CRM analyses are summarized in Table 12-15.

Table 12-15: Summary of Dark Star Results Obtained for Standards, 2019

Laboratory Standard ID Grades in ppm Au Count Dates Used Failure Counts Bias pct
Target Average Maximum Minimum First Last High Low
Inspectorate MEG-Au.17.06 0.098 0.100 0.113 0.090 92 08-Feb-19 24-Apr-19 0 0 2.04
Inspectorate MEG-Au.12.11 1.465 1.496 1.578 1.385 66 08-Feb-19 24-Apr-19 0 0 2.12
Inspectorate MEG-Au.17.07 0.188 0.199 0.215 0.181 43 08-Feb-19 24-Apr-19 0 0 5.85
Totals or Averages
All 3         201     0 0  
Percent           100     0 0  

 

 

 

12-18

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

12.5.7.2 Duplicates

The field duplicates collected in 2019 returned results within the normal range that MDA expects for such field duplicates. The results were acceptable.

12.5.7.3 2019 Pulp Blanks

The results for the pulp blanks analysed during the first quarter of 2019 were acceptable, revealing no causes for concern.

12.5.7.4 2019 Coarse Blanks

Results are available for 10 analyses of coarse blanks analysed in a shipment of samples from one core hole. The results were acceptable.

12.6 GOLD STANDARD’S PINION DRILL PROGRAM QA/QC

The lack of QA/QC before 2014 has impacted the mineral resource classification as described in Section 14.3.

During the period 2014 through 2016, Gold Standard’s QA/QC program involved the use of pulp blanks and CRMs. No coarse blanks or duplicates were used during those years. In 2017 and 2018, Gold Standard’s QA/QC program was the same as in 2014-2016, but with the addition of coarse blanks and RC rig (field) duplicates. MDA’s evaluation of Gold Standard’s QA/QC data revealed these issues:

  • In the latter half of 2014, six of 52 analyses of one CRM, having a target grade of close to 2 g Au/t, were high- side failures for a high-side failure rate of about 12%;

  • In April 2018, seven sequential analyses of a CRM, with a target grade of 0.12 g Au/t, were biased low by an average of about 18.5%;

  • Among samples from hole PIN15-14, ten of the blanks assayed gold in the range 0.032 to 0.083 g Au/t. Gold Standard obtained re-analyses of 14 mineralized samples analyzed in the same batch as the blanks in question. In a 16.76 m interval, the re-run assays averaged 0.35 g Au/t, whereas the original assays averaged 0.41 g Au/t. The rerun assays are used in the project database;

  • There are some indications in the data that occasional sample mix-ups of QA/QC samples have occurred. This is, however, unprovable; and

  • The data provided to MDA, particularly prior to 2016, do not contain consistent records of actions that may have been taken to investigate QA/QC failures. The example of PIN15-14 shows that Gold Standard does monitor and take action on some QA/QC failures, but records of these activities were not readily accessible in the data sets provided to MDA.

The issues that MDA has identified are not sufficient to preclude the use of Gold Standard’s gold assays in a mineral resource estimate. Their effect on the estimate would not be material. However, the lack of QA/QC from before 2014, which still is the majority of drilling, and the minimal QA/QC samples prior to 2016 are considered in mineral resource classification.

MDA strongly suggests that, in the future, Gold Standard’s QA/QC program should include the use of coarse (preparation) duplicates, to monitor the consistency of the laboratory’s sample preparation procedures and possible contamination during preparation.

 

 

12-19

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

12.6.1 Pinion Drill Program QA/QC CRMs

12.6.1.1 CRMs 2014 - 2015

For drilling during 2014 and 2015, Gold Standard supplied MDA with the analyses of CRMs but did not have evaluations available. MDA did the evaluations, putting the data for 2014 and 2015 together to make a single two-year time period, and preparing control charts for each of the eight CRMs used in those two years. The results are summarized in Table 12-16. Details of the 11 failures are listed in Table 12-17.

Table 12-16: Summary of Results Obtained for CRMs, 2014 - 2015

CRM ID Grades in g Au/t Count Dates Used Failure Counts Bias pct
Target Average Maximum Minimum First Last High Low
MEG-Au.10.02 0.035 0.034 0.079 0.022 180 Apr 2014 Dec 2015 1 1 -2.86
MEG-Au.10.04 0.078 0.079 0.089 0.064 123 Apr 2014 Dec 2015 0 0 1.28
MEG-Au.11.19 0.120 0.117 0.137 0.096 20 Apr 2014 July 2014 0 0 -2.50
MEG-Au.11.29 3.689 3.730 4.470 3.170 86 Apr 2014 Dec 2015 0 0 1.11
MEG-Au.13.02 0.746 0.759 0.825 0.679 164 July 2014 Dec 2015 0 0 1.74
MEG-S107007X 1.526 1.535 1.660 1.185 112 Apr 2014 Dec 2015 0 3 0.59
MEG-Au.11.34 2.114 2.300 5.410 1.840 52 July 2014 Dec 2014 6 0 -0.95
MEG-Au.11.17 2.693 2.798 2.990 2.630 36 June 2015 Dec 2015 0 0 3.90
 
Sum         773     7 4  
Percent         100     0.91 0.52  

Table 12-17: List of Failed CRM Analyses, 2014 - 2015

CRM ID Sample ID Cert. Grade
g Au/t
Fail Type
High/Low
Fail Limit
g Au/t
Failed Value
g Au/t
Comment
MEG-Au.10.02 PIN14-20 650A 0.035 Low 0.023 0.022  
MEG-Au.10.02 PIN14-44 100B 0.035 High 0.047 0.079 mis-identification?
MEG-S107007X PIN14-06 302A 1.526 Low 1.322 1.310  
MEG-S107007X PIN14-09 350A 1.526 Low 1.322 1.310  
MEG-S107007X PIN14-11 150A 1.526 Low 1.322 1.185  
MEG-Au.11.34 PIN14-11 450A 2.114 High 2.630 2.850  
MEG-Au.11.34 PIN14-18 250A 2.114 High 2.630 3.310  
MEG-Au.11.34 PIN14-34 250A 2.114 High 2.630 2.780  
MEG-Au.11.34 PIN14-38 250A 2.114 High 2.630 5.410 mis-identification?
MEG-Au.11.34 PIN14-52 250A 2.114 High 2.630 5.340 mis-identification?
MEG-Au.11.34 PIN14-56 250A 2.114 High 2.630 3.590  

Multiple high-side failures were observed with one CRM, MEG-Au.11.34, for which six analyses were failures, amounting to almost 12% of the analyses. This is a high failure rate. The control chart for this CRM is shown in Figure 12-6. MDA suspects, but cannot prove, that some of the very high failures listed in Table 12-17 and illustrated in Figure 12-6 reflect sample numbering mix-ups rather than analytical failures.

 

 

12-20

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Another control chart, for MEG-S107007X, is shown in Figure 12-7. It is included to point out the first 10 analyses, highlighted in red on the chart. They are biased consistently low, and three are low enough that they qualify as analytical failures, as listed in Table 12-17. MDA suspects, but again cannot prove, that the CRM analyzed in those 10 cases has been mis-identified. An alternative interpretation is that for a period in 2014, the laboratory had a significantly low analytical bias. However, such a consistent low bias wasn’t identified in other CRMs analyzed during the same time period.

Regardless of the explanations for the failures described above, whether they are due to analytical issues, mis-identifications or other unidentified causes, they were failures.

Figure 12-6: Control Chart for MEG-Au.11.34

Note: data points shown as hollow squares were not used in calculating the average and bias listed in Table 12-16.

Figure 12-7: Control Chart for MEG-S107007X

 

 

12-21




SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Explanations for Figure 12-6 and Figure 12-7
Items Obtained from Certificate for CRM  
USL Upper Specification Limit Target + 3 Std Dev
Target Expected Value  
LSL Lower Specification Limit Target - 3 Std Dev
Items Calculated using Gold Standard Data  
UCL Upper Control Limit Avg + 3 Std Dev
Avg Mean Value  
LCL Lower Control Limit Avg - 3 Std Dev

12.6.1.2 CRMs Used in 2016, 2017 and 2018

Gold Standard has provided MDA with evaluations containing sets of control charts for the CRMs that were used during the 2016, 2017, and 2018 drilling campaigns. The results obtained are summarized in Table 12-18, Table 12-19, and Table 12-20.

No failures were identified in the data for CRMs in 2016 and 2017. Three high-side failures occurred in 2018, as indicated in Table 12-20 and listed in Table 12-21. One of those is exactly at the failure limit and is accepted by Gold Standard and MDA. The other two high-side failures do not relate to any samples that influence the mineral resource, as indicated in the “Comment” column of Table 12-21.

The biases listed in Table 12-18 and Table 12-19 are within the range that MDA typically finds. There is, however, an issue with bias for CRM MEG-Au.11.19 in 2018, shown in Table 12-20. Two sets of data for this CRM are shown in the table, because the first 13 analyses of MEG-Au.11.19 are on average biased 2.3% low, within the range of biases that MDA expects. However, the seven latest analyses of MEG-Au.11.19 are biased 18.5% low, well outside the expected range. This is illustrated on Figure 12-8.

MDA cannot explain the very low bias in the seven most recent analyses of MEG-Au.11.19. Possible explanations include a change in the character of the CRM itself, or a change in some aspect of the laboratory’s analytical process. While none of the seven low-biased analyses is technically a failure using the usual criteria of expected value ± three standard deviations, a low bias of this magnitude could indicate a systematic low analytical bias that could potentially have had a negative effect on the mineral resource estimate.

The period during which the low bias in analyses of MEG-Au.11.19 occurred was April 10 through April 29, 2018. Another CRM having a gold grade with a similar order of magnitude, MEG-Au.17.06, was analyzed during the period April 11 through June 13, 2018. Analyses of MEG-Au.17.06 have a slight positive bias. This suggests that the laboratory was not producing results with a consistent strong low bias in the grade range near 0.1 g Au/t.

12.6.1.3 Grade Ranges of CRMs Used in 2018

Although the number of CRMs in use has varied over the years, generally with fewer CRMs in use as time progressed, Gold Standard has typically used one or more low-grade CRMs, one or more mid-grade CRMs, and one or more high-grade CRMs, relative to the grades of mineralized samples encountered at Pinion. In 2018, except for a period in mid-April, Gold Standard used only one of two low-grade CRMs, both having grades below the likely mineral resource cutoff. In mid-April of 2018, Gold Standard also used a high-grade CRM. Since April 20, 2018 the only CRM in use at Pinion has a certified grade below the likely mineral resource cutoff. This is illustrated in Figure 12-9.

The low-grade CRMs are useful in that they test the analytical method used for most of the mineral resource-grade samples. However, a single analytical method can yield different accuracies and precisions over its useful range. Using

 

 

12-22

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

at least one each of mid-grade and high-grade CRMs, along with the low-grade CRM, would yield greater confidence in the related assays.

Table 12-18: Summary of Results Pinion for CRMs, 2016

CRM ID Grades in g Au/t Count Dates Used Failure Counts Bias pct
Target Average Maximum Minimum First Last High Low
MEG-Au.10.02 0.035 0.034 0.039 0.029 73 June 2016 Jan 2017 0 0 -2.86
MEG-Au.10.04 0.078 0.080 0.090 0.070 68 June 2016 Jan 2017 0 0 2.32
MEG-Au.11.29 3.689 3.708 4.120 3.520 15 June 2016 July 2016 0 0 0.52
MEG-Au.13.02 0.746 0.759 0.782 0.731 25 June 2016 Jan 2017 0 0 1.73
MEG-S107007X 1.526 1.526 1.630 1.420 39 June 2016 Oct 2016 0 0 0
MEG-Au.11.17 2.693 2.786 3.000 2.430 43 June 2016 Jan 2017 0 0 3.44
 
Sum         263     0 0  
Percent         100     0 0  

Table 12-19: Summary of Results for Pinion CRMs, 2017

CRM ID Grades in g Au/t Count Dates Used Failure Counts Bias pct
Target Average Maximum Minimum First Last High Low
MEG-Au.10.02 0.035 0.034 0.040 0.008 11 Nov 2017 Nov 2017 0 1 -2.86
MEG-Au.10.04 0.078 0.081 0.085 0.076 8 Nov 2017 Nov 2017 0 0 3.85
MEG-Au.12.21 0.143 0.136 0.151 0.122 31 Nov 2017 Dec 2017 0 0 -4.90
 
Sum         50     0 1  
Percent         100     0 2  

Table 12-20: Summary of Results for Pinion CRMs, 2018

CRM ID Grades in g Au/t Count Dates Used Failure Counts Bias pct
Target Average Maximum Minimum First Last High Low
MEG-Au.17.06 0.098 0.100 0.126 0.084 258 11 Apr 2018 6 Jul 2018 3 0 2.32
MEG-Au.11.19 0.120 0.117 0.138 0.096 13 29 Mar 2018 9 Apr 2018 0 0 -2.31
MEG-Au.11.19 0.120 0.098 0.102 0.091 7 10 April 2018 29 Apr 2018 0 0 -18.45
MEG-Au.11.29 3.689 3.849 4.348 3.392 16 5 April 2018 20 Apr 2018 0 0 5.41
 
Sum         115     0 0  
Percent         100     0 0  

 

 

 

12-23

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

at least one each of mid-grade and high-grade CRMs, along with the low-grade CRM, would yield greater confidence in the related assays.

Table 12-21: List of failed Pinion CRMs, 2018

CRM ID Sample ID Target for Std
g Au/t
Fail Type
High/Low
Fail Limit
g Au/t
Failed Value
g Au/t
Comment
MEG-Au.17.06 PR18-78 245-250-L1 0.098 High 0.119 0.119 accepted by Gold Standard
MEG-Au.17.06 PR18-89 45-50-L1 0.098 High 0.119 0.126 accepted by Gold Standard; does not affect any mineral resource blocks
MEG-Au.17.06 PC18-03 32-34.5-L1 0.098 High 0.119 0.122 samples re-run by Gold Standard; related assays not used in mineral resource estimate

Note: Limiting lines such as “USL” are explained immediately following Table 12-7.

Figure 12-8: Control chart for MEG-Au.11.19 - 2018

Figure 12-9: Grade Ranges and Dates 2018 of 2018 Pinion CRMs

 

 

12-24




SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

12.6.1.4 CRMs for Drill Sample Silver Analyses in 2019

In 2019, Gold Standard sent drill-sample pulps for silver assays. The samples consisted of pulps from 1.524 m (5.0 ft) intervals of holes drilled by Gold Standard. These intervals were previously analyzed for gold at either ALS or Bureau Veritas. In conjunction with the silver analyses done in March and April of 2019, Gold Standard inserted 765 silver CRMs. Three different CRMs certified for silver were utilized. They are listed, with their target values, in the first two columns of Table 12-22. MDA evaluated the results for the CRMs using a variation of Shewhart-type charts, prepared by Gold Standard. The results of the 765 analyses of standards for silver are summarized in Table 12-22 and Table 12-23.

Table 12-22: Summary of 2019 Analyses of Silver CRMs

Standard ID Grades in Ag g/t Count Dates Used Failure Counts Bias pct
Target Average Maximum Minimum First Last High Low
MEG-LWA-34 1.9 1.3 3 0.5 331 20-Mar-19 10-Apr-19 0 33* -31.6
MEG-Au.11.29 13.4 13.8 20 2 336 20-Mar-19 15-Apr-19 7 1 3.0
MEG-Au.13.03 4.5 4.8 6 2 98 18-Apr-19 27-Apr-19 0 1 6.7
Totals
counts         765     7 2*  
percentages         100     0.9 0.3  
Note: * the 33 “failures” of MEG-LWA-34 are not included in the calculations of failure percentages. See the discussion following Table 12-23.
  MEG-LWA-34 and MEG-Au.11.29 were used with samples from holes drilled in 2014 through 2018.
  MEG-Au.13.03 was used with samples from holes drilled in 2014 through 2016.

Table 12-23: List of Failed Silver CRMs

Standard ID Sample ID Target for Std
(g/t)
Fail Type Fail Limit
(g/t)
Failed Value
(g/t)
Comment
MEG-LWA-34 33 samples 1.9 low 0.7 <1 below detection limit;
not material
MEG-Au.11.29 PR18-52 245-250-S2 13.4 high 16.1 20  
MEG-Au.11.29 PR18-01 245-250-S2 13.4 high 16.1 17  
MEG-Au.11.29 PR18-80 245-250-S2 13.4 high 16.1 20  
MEG-Au.11.29 PIN16-19 245-250-S2 13.4 high 16.1 20  
MEG-Au.11.29 PIN15-09 1845-1850-S2 13.4 high 16.1 18  
MEG-Au.11.29 PIN15-19 245-250-S2 13.4 high 16.1 20  
MEG-Au.11.29 PIN14-07 645-650-S2 13.4 high 16.1 19  
MEG-Au.11.29 PR18-74 645-650-S2 13.4 low 10.7 2 sample mix-up?
MEG-Au.13.03 PIN14-27 45-50-S3 4.5 low 2.7 2  

MEG-LWA-34 is a low-grade standard whose expected value is close to the 1.0 g Ag/t lower detection limit of the analytical method. The 33 low-side “failures” are not material in light of the precision of the analytical method, and they are not included in the calculations of low-side failure percentages in Table 12-22.

MDA evaluated the seven high-side failures of MEG-Au.11.29 in the context of adjacent silver assays in the same drill holes and the locations of mineral domains. MDA concluded that the failures are not material with respect to the silver estimate.

The QA/QC data includes another 17 silver analyses of a CRM certified for gold but not for silver. The information characterizing the CRM notes an expected silver value of 0.07 g Ag/t. The 17 analyses, reported in ppb silver and converted to g Ag/t, fell in the range 0.015 to 0.030 g Ag/t. Given the low silver grades involved and the fact that the standard is not certified for silver, MDA does not believe that significant conclusions should be drawn from these results.

 

 

12-25

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Gold Standard did not re-analyze any of the analytical batches containing failed silver standards.

12.6.2 Pinion Drill Program QA/QC Field Duplicates

In 2017 and 2018, Gold Standard collected field duplicates or rig duplicates, at what appear to be 30.48 m (100-foot) intervals. In most holes these amount to two or occasionally three duplicates per hole. Duplicates were obtained by collecting two samples simultaneously from a rotating wet splitter. Gold Standard did not collect duplicate samples in prior years.

MDA prepared three types of charts for the duplicates:

  • A scatterplot, showing an RMA regression;

  • A quantile/quantile plot; and

  • Several relative difference plots (see explanation, below).

MDA used a relative difference expressed as a percentage for each duplicate pair calculated as follows:

Equation 1 100 x    (Duplicate - Original)  
Lesser of (Duplicate, Original)

Table 12-24 summarizes the results for the field duplicates. The average of the relative difference listed in Table 12-24 is based on Equation 1 above and is an indication of the bias between the duplicates and the originals. The “Abs Rel Pct Diff” is the average of the absolute relative differences and gives an indication of the degree of variability between the duplicates and originals.

Table 12-24: Summary of Results for Pinion Field Duplicates

Type Period Corr.
Coeff.*
Counts RMA Regression
(y = dup, x = orig)
Averages as Percent
All Used Outliers Rel Pct Diff Abs Rel Pct Dif
Field Dup 2017 - 2018 0.95 331 277 2 y = 1.059x - 0.010 -4.8 27.6

MDA also performed an alternative calculation as part of the evaluation of duplicates, but whose results are not listed in Table 12-24, using the following:

Equation 2 100 x    (Duplicate - Original)  
Mean of (Duplicate, Original)

The disparity in Table 12-24 between the total number of pairs (“All”) and the number of pairs used (“Used”) exists because MDA did not include in calculations those pairs in which one or both analyses fell below the analytical detection limit. Two “outlier” pairs were also excluded because their differences were so great as to skew the statistics of the data set. Note that the average reported in the table is for all grades above the detection limit, excluding the outliers. Reporting single averages for the entire set of duplicates masks different responses in different grade ranges. See the chart in Figure 12-10 for a more complete view of the relative difference data.

As indicated by the relative difference shown in Table 12-24, and shown in more detail by the red moving average line in Figure 12-10, there is a tendency for the field duplicate samples to have slightly lower grades than the originals. Figure 12-10 shows the low bias of the duplicates to be most pronounced at mean grades below about 0.2 g Au/t, and almost absent at higher grades.

MDA does not have information on which to base any opinion as to the cause of the low bias in the duplicates at lower grades. MDA suggests that Gold Standard review procedures used for sampling, sample preparation, and analysis to determine if a cause can be identified and take corrective action if necessary.

 

 

12-26

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 12-10: Gold Relative Percent Difference - Pinion Duplicate vs. Original

The 2019 silver assays of pulps from earlier Gold Standard drill-hole samples included 309 samples having the suffix “dup.” MDA matched these to the original sample assays and evaluated the matched duplicate pairs. A summary of the evaluation appears in Table 12-25.

The set of silver duplicate assays includes 202 pairs for which both analyses were below the lower detection limit of the analytical method, and 12 pairs for which one of the analyses is below the lower detection limit. These 214 pairs were not used in the calculations of the statistics that appear in Table 12-25, leaving 95 pairs containing detectable silver in the evaluation. The results indicated in Table 12-25 are acceptable.

Table 12-25: Summary of Results for Duplicates in Silver Re-Assays

Type Comment Corr.
Coeff.
Ag Grade
Averages (g/t)
Counts RMA
Regression
(y = dup, x
= orig)
Averages as Percent
Mean
of Pair
Dup -
Original
All Used Outliers Rel Pct
Diff
Abs Rel Pct
Dif
Field
Dup
all available
excluding outliers
0.93 6.1 -0.2   95 0 y = 0.987x -
0.219
-3.2 30.3
Notes: The differences between the numbers of duplicate pairs available (“All”) and those “Used” occurs because pairs in which one or both analyses fell below the method detection limit were excluded.
  Mop indicates mean of pair
  Relative differences shown in the last two columns of Table 12-25 are averages of those calculated using Equation 1. A negative relative difference indicates that, on average, the duplicate analyses were lower than the originals.

12.6.3 External Check Assays for Pinion Drilling

In April and August 2018, Gold Standard selected pulps from two holes drilled in 2017 that were originally assayed by ALS and sent them to Bureau Veritas for check assays. In total, 95 usable original and check assay pairs were produced. MDA evaluated the results as a comparison between ALS and Bureau Veritas. MDA evaluated these using

 

 

12-27

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

the same suite of charts and statistics used to evaluate the other types of duplicates described herein. Differences were calculated as the ALS value less the value reported by Bureau Veritas; in other words, where an ALS assay was higher than a Bureau Veritas assay, the difference is positive, and vice-versa.

The results of MDA’s evaluation are summarized in Table 12-26. The relative differences are illustrated in Figure 12-11. Thirteen pairs having a mean grade less than 0.033 g Au/t were excluded from the comparison because at such low grades small differences are large in relative terms and skew the statistics of the data set.

As with the other types of duplicates, MDA looked at grade subranges, in this case two, each having its own distinct characteristic statistics. Pairs having mean grades less than 0.033 g Au/t were ignored.

For sample pairs having mean grades between 0.033 g Au/t and 0.2 g Au/t, ALS was, on average, biased higher than Bureau Veritas, with an average relative difference of +4.7%. For pairs having mean grades greater than 0.2 g Au/t, a range comprising about 60% of the pairs, there was effectively no overall bias, although smaller subsets of the data can be seen on Figure 12-11 with biases of a few percentage points high or low.

In summary, the check assays done in 2018 on 2017 assay pulps revealed no issues of concern.

Figure 12-11: Gold Relative Percent Difference - ALS vs. Bureau Veritas, 2017 Pulps

 

 

12-28

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 12-26: Summary of Results for 2018 Re-Assays of 2017 Pinion Samples

Type Comment Corr.
Coeff.
Grade Averages as g Au/t
Mean of Pair Dup - Original
Check all available excluding Au < 0.033 0.999 1.072 -0.004
Check subrange 0.040 ≤ mop < 0.2 0.986 0.101 0.006
Check subrange mop > 0.20 0.999 1.473 -0.009
Type Counts RMA Regression
(y = ALS, x = bv)
Averages as Percent
All Used Outliers Rel Pct Diff Abs Rel Pct Dif
Check 95 82 - y = 0.976x + 0.021 1.4 4.4
Check 24 24 - y = 1.136x - 0.007 4.7 7.2
Check 58 58 - y = 0.971x + 0.034 0.0 3.3
Notes: The differences between the number of duplicate pairs available (“All”) and those “Used” occurs because very low-grade pairs were excluded from statistical calculations, as were outliers. “mop” indicates mean of pair.
  Pairs in which one or both assays are below detection limit are not used in statistical calculations.
  < means “less than”; > means “greater than”; ≤ means “less than or equal to”; ≥ means “greater than or equal to”.
  Relative differences in these tables are those calculated using Equation 1.

12.6.4 Pinion Drill Program QA/QC Blanks

In the period 2014-2018, Gold Standard used pulp blanks, obtained from a supplier of CRMs, and certified as containing gold below the usual laboratory detection limits. This type of blank tests the analytical process in the laboratory, but not the sample preparation process.

In 2017 and 2018, Gold Standard also used a blank consisting of coarse marble. This type of blank undergoes the full sample preparation and analytical process and can show if any sample-to-sample contamination takes place in the sample preparation process.

12.6.4.1 Blanks Used in 2014

In 2014 drilling at Pinion, Gold Standard used pulp blanks. In the data available to MDA there are 422 analyses of these blanks. The blanks were inserted into the sample stream every 30.48 m (100 feet). Five of the blanks, all in drill hole PIN14-44, are marked in the database as “labelled wrong,” so MDA did not use them in this evaluation. Among the 417 blank analyses that MDA did evaluate, six were reported to have detectable gold, with the maximum gold analysis reported being 0.017 g Au/t.

Figure 12-12 shows the gold analyses of the blanks, and in the adjacent drill samples in the sample stream. There is no meaningful evidence that the grades reported for the blanks are related to the grades in the adjacent samples, so there is no evidence of between-sample contamination in the analytical process. Pulp blanks are not useful for checking for contamination in the sample preparation process.

 

 

12-29

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 12-12: Gold in Blanks and Preceding Samples 2014

12.6.4.2 Blanks Used in 2015

In 2015, Gold Standard used a pulp blank for drilling at Pinion. There are 296 analyses of the blank available, at downhole intervals of 30.48 m (100 feet). A chart of the blank analyses plotted along with the immediately preceding samples (pulps are assumed to be analyzed in sequence, but this was not directly assessed), is shown in Figure 12-13.

Figure 12-13: Gold in Blanks and in Preceding Samples 2015

Nineteen of the 296 analyses of pulp blanks in 2015 reported some detectable gold. In nine cases this was in the range 0.005 to 0.007 g Au/t. However, ten of the analyses of blanks, among samples from drill hole PIN15-14, reported gold in the range 0.032 to 0.083 g Au/t. These are noted on Figure 12-13, but do not seem to correlate with gold-rich samples. Gold Standard obtained re-analyses of fourteen mineralized samples analyzed in the same batch as the blanks in question. Table 12-27 summarizes a comparison between the original gold analyses and the re-run assays.

 

 

12-30

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 12-27: Comparison of Original Assays and Re-Runs in Part of PIN15-14

From-To in feet Length in feet Average grade original
(Au-AA23?)
Average grade re-runs
(Au-AA23)
710 - 765 16.68 m (55 ft) 0.415 g Au/t 0.35 g Au/t
800 - 815 4.57 m (15 ft) 0.098 g Au/t 0.10 g Au/t

Table 12-27 shows that the re-run assays for the interval from 216.41 to 233.17 m (710 to 765 ft) are on average lower than the original assays. In the Pinion database used for the estimation of mineral resources, the rerun assays were used.

12.6.4.3 Blanks Used in 2016

During the 2016 drilling campaign Gold Standard used a pulp blank having a certified value of “<0.003 ppm Au.” This pulp was inserted into the analytical stream every 30.48 m (100 feet), for 255 analyses of the pulp. Only once was detectable gold reported, at 0.006 g Au/t. The analyses of blanks in the 2016 campaign revealed no causes for concern.

12.6.4.4 Blanks Used in 2017 and 2018

During the 2017-2018 period two blanks were used. One was a pulp blank obtained from a commercial supplier, labelled as MEG-Blank.14.03. The other is described as “Gold Standard marble”, which MDA understands to be a coarse blank. Both have an expected value less than the lower detection limit for the analytical method in use, which is 0.005 g Au/t.

MDA prepared charts for both of these blanks. The charts are shown in Figure 12-14 and Figure 12-15. In the case of the pulp blanks shown in Figure 12-14, only four of 159 analyses reported gold exceeding the detection limit, and the highest grade reported was 0.009 g Au/t. There is no evidence that the analyses of the pulp blanks are affected by the grades of the samples that numerically precede them.

Eleven of the 58 analyses of coarse blanks were reported to contain detectable gold, with the highest reported grade being 0.011 g Au/t. Figure 12-15 gives a visual impression that blanks that follow higher-grade samples in numerical sequence are more likely to have reported gold analyses exceeding the lower detection limit. The correlation coefficient between the blanks and the preceding samples is a statistically significant 0.5. This suggests low-level contamination of blanks that follow higher-grade samples through the crushing and grinding process in the laboratory. The degree of contamination is not sufficient to be of concern in terms of using the gold analyses for a mineral resource estimate.

Figure 12-14: Gold in Pulp Blanks and in Preceding Samples 2017 - 2018

 

 

12-31

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 12-15: Gold in Coarse Blanks and in Preceding Samples 2017 - 2018

12.6.4.5 Blanks Used in Silver Analyses

Pulp Blanks

The QA/QC data for silver include 646 analyses of pulp blanks, analysed with batches of samples from the 2014 through 2018 drill campaigns. The results are summarized in Table 12-28. They are acceptable.

Table 12-28: Results of Silver Analyses of Pulp Blanks

Analytical Result Count of Analyses
below detection limit of 1 g Ag/t 632
at detection limit of 1 g Ag/t 13
2 g Ag/t 1

Coarse Blanks

Data for 15 silver analyses of coarse blanks are included in the QA/QC package that MDA obtained from Gold Standard. One of the 15 was from a series of samples in a 2014 drill hole. It was analysed using Bureau Veritas’ method MA401, with a lower detection limit of 1 g Ag/t and returned a result below the detection limit.

The other 14 analyses of coarse blanks were from a series of samples from 2018 core holes. The analytical method was Bureau Veritas’ AQ250, having a lower detection limit of 0.002 g Ag/t. All the 14 samples returned results above the lower detection limit, in the range 0.005 to 0.026 g Ag/t (0.005 g Au/t to 0.026 g Ag/t). MDA compared the results for the analyses of coarse blanks to the results for the immediately preceding real samples and found no statistically meaningful correlation.

12.6.5 Twin Holes

In 2018, four core holes were drilled into the Pinion deposit to obtain material for metallurgical testing. These four holes were twins of previously drilled holes. A comparison of length and grade of the intersected mineralization was made between these four pairs of twin holes. For the 172 m of drilling in the mineralized zones, the grade was 21% higher in the newer drill holes (Table 12-29). A histogram of the two sets of data show more low-grade samples in the older four holes (Figure 12-16).

 

 

12-32

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 12-29: Summary of Counts of Jasperoid Wash QA/QC Analyses

  Older Holes Diff. 2018 holes Units
Count 185   120  
Length 172.0 0% 172.5 g Au/t
Grade 0.5 21% 0.6 g Au/t
Metal 84.4 21% 102.3 (Model/Actual)

Figure 12-16: Histogram of 2018 Twin Drill-Hole Samples

12.6.6 Pinion Drill Program QA/QC on Barite

Prompted by metallurgical data showing that the presence of barite affects gold recovery, Gold Standard analyzed samples for additional and different barium analyses. Specifically, barium grades of over around four percent were found to negatively affect metallurgical recovery (see Section 13). Consequently, there is a need to assess the quality of the barium analyses which are used to define the locations and quantity of barite in the Pinion deposit.

Initial barium analyses by ICP methods with two-acid digestion have been shown to be incorrect in grades above ~0.1% to ~0.2%. Later barium analyses were done at AAL on existing pulps using a pressed-powder XRF-ED analysis (method Ba ED-XRF E5 with a lower detection limit of 0.003% Ba). There were 938 barium assays done at AAL with this method. In addition, 21,747 loose-powder NITON XRF measurements of barium were made on drill-sample pulps by independent contractor Rangefront Geological.

A total of 4,235 duplicate readings of barium content by the NITON XRF instrument were also taken by independent contractor Rangefront Geological. MDA compared 4,091 of these duplicate loose-powder NITON XRF readings to

 

 

12-33

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

determine variability of results. Seventeen pairs were deemed to be extreme outliers and removed from the calculations. No significant biases were noted, and reproducibility was shown to be just over 10%.

For comparison to the Gold Standard loose-powder NITON XRF data, only 32 sample pulps were analyzed at AAL by a) ICP following a two-acid digestion, by b) ICP following a five-acid digestion, c) loose-powder NITON-XRF, d) pressed-powder XRF-ED, and e) XRF-WD (lithium metaborate fusion). The two-acid ICP analyses were 95% lower than the loose-powder NITON-XRF measurements, and the five-acid ICP analyses were 91% lower. The pressed-powder XRF-ED and XRF-WD analyses were 86% and 87% higher than the corresponding loose-powder NITON-XRF measurements. While 32 samples are not a statistically significant data set, the results do indicate good correlation with the XRF-ED analyses but with a slope to the regression line of 0.55. The XRF-ED analyses are being applied in the metallurgical test work (see Section 13.1).

12.7 GOLD STANDARD’S JASPEROID WASH DRILL PROGRAM QA/QC

Table 12-30 summarizes the types and quantities of QA/QC data that are available to MDA for the Jasperoid Wash drill samples.

Table 12-30: Summary Counts of Jasperoid Wash QA/QC Analyses

QA/QC Type 2017 2018
CRM    
Number in Use 2 1
Number of Analyses 93 93
Number of Failures 1 1
Field Duplicate 113 153
Pulp Blank 66 75
Coarse Blank - 10

The QA/QC data from Jasperoid Wash for 2017 and 2018 do not reveal any issues that would preclude use of any assays from the same time period in a mineral resource estimate, or that would reduce the confidence in those assays. The main issues noted by MDA are as follows:

  • In 2017 and 2018, although three separate CRMs were used, only one CRM was in use at Jasperoid Wash at any given time. The expected values for all three CRMs were either below or very close to any likely cutoff grade for a mineral resource. It would be prudent to use more than one CRM at a time, and to use CRMs with expected values that span the range of grades of likely economic importance;

  • In addition to field duplicates, the following additional types of duplicates, replicates or check assays are useful:

    • Preparation duplicates, also called coarse crush duplicates, that are useful for monitoring the laboratory’s sample-preparation circuit;

    • Analytical duplicates, sometimes called replicates, which are second splits from the original pulp; and

    • Check assays done at a different lab than the original assays.

  • Only pulp blanks were used at Jasperoid Wash in 2017. In 2018, pulp blanks and coarse blanks were both used, but the latter were only used with samples from one drill hole. Both types of blanks are useful, but if only one type is to be used, coarse blanks are the most useful, in that they provide information about potential contamination in the sample preparation process, which cannot be obtained from pulp blanks.

 

 

12-34

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

12.8 NORTH BULLION DEPOSITS DRILL PROGRAM QA/QC

All North Railroad drilling, including exploration and within the three deposit areas collectively called the North Bullion deposits, were evaluated together. Approximately 43% of the historical drill holes at North Railroad have paper lab reports/certificates that have been utilized in part to validate the assay database. A number of these lab reports/certificates contain obvious QA/QC data. However, none were in digital format and in many cases are of unknown origin and quality, and therefore were not evaluated for the historical drilling programs. These data should be compiled and evaluated where possible.

Drilling between 2010 and 2017 at North Railroad by Gold Standard, including exploration and deposit drilling, included a substantial number of blanks, CRMs, and duplicates (including samples inserted by Gold Standard and the laboratory). There has been no umpire assaying/sampling conducted with the 2010 to 2017 North Bullion, Sweet Hollow, and POD mineral resource drilling. It is not known if any failures occurred, or if failed batches were re-assayed and corrected in the database used for mineral resource estimation.

12.8.1 Blanks

A total of 1,244 blank pulp samples were inserted in the drilling sample stream from the North Railroad portion of the property between 2010 and 2017 by Gold Standard. In total, 114 of the 1,244 blank pulp samples returned a gold assay result above detectable limits (<5 ppb Au), or 9.2 % of the blank samples. Blanks were purchased from MEG Inc.

The 2010 to 2015 North Railroad drilling included 976 blank pulp samples inserted by Gold Standard personnel. There were 114 “failures” (11.7 %), which is much higher than one would normally expect in such a dataset. The maximum value detected was only 0.037 g Au/t, well below the mineral resource lower cut-off grade, therefore the results were considered immaterial. There were no issues with the blank pulps during the 2016 to 2017 North Railroad drilling.

12.8.2 Certified Reference Materials

A total of 1,477 CRMs was inserted in the sample stream for the North Railroad 2010 to 2017 drilling.

12.8.2.1 2010 to 2015 North Railroad CRMs

Between 2010 and 2015 a total of 1,073 CRM samples were inserted in the sample stream. Results from these CRMs are presented in Figure 12-17, which illustrates that there were no significant issues in fire assaying of the ten CRMs inserted by Gold Standard during the 2010 to 2015 North Railroad drilling programs. It is likely that at least some of the failures shown in Figure 12-17 were sample handling, labelling, and control problems since their assay values correspond with values of other CRMs. The total number of “failures” among CRMs was 35 out of the total of 1,073 samples, or 3.3%. The fail rate drops to 2.7% if one considers the data for the five CRMs with a “statistically significant” number of analyses (i.e., >50 analyses).

 

 

12-35

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 12-17: Analyses of CRMs in North Railroad Drilling 2010 to 2015

12.8.2.2 2016 to 2017 North Railroad Standards

During the 2016 and 2017 drilling at the North Railroad portion of the property, a total of 404 CRMs were inserted in the drill-sample stream by Gold Standard. The analytical data for each of the six CRMs have been graphed separately but one graph is presented here for an example (Figure 12-18). The total number of outside-two standard deviations “failures” was 13 of 404 assays (3.2%). A slight positive bias was observed for this CRM; however, the results overall are considered acceptable.

The most significant issue recognized in the 2016 to 2017 North Railroad CRM-sample dataset was a slight, but consistent, positive bias with a 15% “failure” rate in CRM MEG-Au.11.17 (Figure 12-19). The 60 analyses were completed at both ALS and Bureau Veritas and both laboratories showed a similar positive bias thereby making the CRM sample suspect and minimizing the significance of the “failures” and “bias”. The results overall are considered acceptable.

 

 

12-36

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 12-18: Analytical Results from Standard MEG-S107007X

Figure 12-19: Analytical Results from Standard MEG-Au.11

12.8.2.3 Duplicate Core-Sample Assays

There were 352 field duplicate samples analyzed during the 2010 to 2015 North Railroad drilling programs. The one-half cut core was cut in half and both quarter-core samples were sent for analysis. The duplicate assay data are illustrated in Figure 12-20, which shows good correlation (0.9777) between the duplicate and original samples.

 

 

12-37

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 12-20: 2010 to 2015 North Railroad Portion Field Duplicate Assays

12.8.2.4 Lab-Inserted Standard Reference Materials

Bureau Veritas in Sparks, NV inserted internal laboratory QA/QC samples into the sample stream. Bureau Veritas reported the results for 45 CRMs, 35 blank pulps, and 17 replicate pulps during the 2010 to 2015 North Bullion-Bald Mountain drilling programs. During the 2016 drilling Bureau Veritas reported results for 144 blank pulps, 57 coarse blanks, 293 CRMs, 100 replicates, and 99 duplicates. While these lab-controlled QA/QC programs are not independent, they do add information. After detailed statistical evaluations and utilizing graphical displays, APEX concluded that the results yield acceptable failure rates, reasonable precision, and excellent correlation.

12.8.2.5 Summary of North Railroad Portion QA/QC

The QA/QC protocols employed by Gold Standard throughout the 2010 to 2017 drilling programs at the North Railroad portion of the property were adequate and appropriate for ensuring high accuracy and precision in the sample assays. Although there appear to have been sporadic and generally minor issues with QA/QC results, the 2010 to 2017 QA/QC sampling did not identify any significant issues with respect to the overall accuracy and precision of analytical results in the North Railroad drill assay database. APEX considers the North Railroad drill database sufficiently validated for use in the mineral resource estimation discussed Section 14.

12.9 SUMMARY STATEMENT ON DATA VERIFICATION

It is Mr. Ristorcelli’s opinion that the Dark Star, Pinion, and Jasperoid Wash analytical data are adequate for the purposes used in this Technical Report, subject to those samples removed and issues described above. The issues

 

 

12-38

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

described above have been considered in assigning levels of confidence and the classification of the mineral resources estimated in Section 14.

There is no evidence of significant QA/QC programs in the North Railroad portion of the property prior to 2014 when Gold Standard began drilling. The QA/QC program was minimal in 2014 through 2016 having only had CRMs and pulp blanks. In 2017 and 2018, field duplicates and coarse blanks were inserted into the sample stream. In 2016 and 2017, some Dark Star pulps were sent out to secondary laboratories. The level of, and amount of QA/QC data, as well as non-remedied QA/QC “failures” was considered in mineral resource classification.

It is Mr. Dufresne’s opinion that the QA/QC protocols employed by Gold Standard throughout the 2010 to 2017 drilling programs at North Railroad are adequate and appropriate for ensuring high accuracy and precision in the sample assays. However, no QA/QC evaluations were done on historical drill campaigns. Mr. Dufresne considers the North Railroad drill database sufficiently validated for use in the mineral resource estimation discussed in Section 14.

   

12-39

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 13 TABLE OF CONTENTS

SECTION     PAGE
13 MINERAL PROCESSING AND METALLURGICAL TESTING 13-1
  13.1 2015 - 2016 GOLD STANDARD PINION DEPOSIT CYANIDE BOTTLE-ROLL LEACH 13-3
    13.1.1 2015 - 2016 Pinion Head Assays 13-3
    13.1.2 2015 - 2016 Pinion Bottle-Roll Test Results 13-3
  13.2 2016 - 2017 GOLD STANDARD PINION DEPOSIT METALLURGICAL TESTING 13-5
    13.2.1 2017 Pinion Head Assays 13-6
    13.2.2 2016 - 2017 Bottle Roll and Column Leach Testing (KCA) 13-6
    13.2.3 2017 Pinion Comminution Characterization at HRI 13-8
    13.2.4 2017 Pinion Load Permeability Test Work on Column Tailings 13-9
  13.3 GOLD STANDARD 2018 PINION DEPOSIT HIGH PRESSURE GRINDING ROLL (HPGR) TESTING 13-9
    13.3.1 2018 Head Assays Pinion Main Zone HPGR Composite 13-10
    13.3.2 2018 Pinion Main Zone HPGR Bottle-Roll and Column-Leach Testing 13-10
    13.3.3 2018 Pinion Main Zone HPGR Agglomeration and Load Permeability Testing 13-12
  13.4 2019 GOLD STANDARD PINION DEPOSIT METALLURGICAL TEST WORK 13-12
    13.4.1 2019 Pinion Head Assays 13-14
    13.4.2 2019 Pinion Bottle Roll and Column Leach Testing at KCA 13-14
    13.4.3 2019 Pinion Comminution Characterization at HRI 13-16
    13.4.4 2019 Pinion Load Permeability Test Work on Column Tailings 13-17
  13.5 1991 DARK STAR DEPOSIT METALLURGICAL TESTING 13-17
  13.6 2017 GOLD STANDARD DARK STAR DEPOSIT METALLURGICAL TESTING 13-18
    13.6.1 2017 Dark Star Head Assays for Bottle-Roll and Column-Leach Tests 13-18
    13.6.2 2017 Dark Star Bottle-Roll and Column-Leach Tests at KCA 13-19
    13.6.3 2017 Dark Star Comminution Characterization at HRI 13-22
    13.6.4 2017 Dark Star Load Permeability Testing 13-23
  13.7 2018 GOLD STANDARD DARK STAR HPGR METALLURGICAL TEST WORK 13-23
    13.7.1 2018 Dark Star HPGR Head Assays 13-24
    13.7.2 2018 Dark Star HPGR Composite Bottle-Roll and Column-Leach Tests 13-24
    13.7.3 2018 Dark Star Main & North HPGR-Crushed Load Permeability Testing 13-26
  13.8 2019 GOLD STANDARD DARK STAR DEPOSIT METALLURGICAL TEST WORK 13-26
    13.8.1 2019 Dark Star Head Assays for Bottle-Roll and Column-Leach Tests 13-27
    13.8.2 2019 Dark Star Bottle-Roll and Column-Leach Tests at KCA 13-27
    13.8.3 2019 Dark Star Comminution Characterization at HRI 13-31
    13.8.4 2019 Dark Star Load Permeability Testing 13-32
  13.9 GEO-METALLURGY CHARACTERIZATION 13-32
    13.9.2 Au and Ag Recovery Methodology 13-33
    13.9.3 Pinion Deposit Recovery Models 13-38
    13.9.4 Dark Star Main and Dark Star North Deposit Recovery Models 13-44
    13.9.5 ROM and HPGR Dark Star Gold Recovery Equations (Transition) 13-50

 

   

13-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

  13.9.6 ROM and HPGR Pinion Gold Recovery Equations (Transition) 13-50
13.10 REAGENT CONSUMPTIONS SOUTH RAILROAD PROPERTY 13-51
  13.10.1 Cyanide 13-51
  13.10.2 Lime 13-52
  13.10.3 Cement 13-52
13.11 METALLURGICAL TESTING ON JASPEROID WASH AND NORTH BULLION SAMPLES 13-56
  13.11.1 Jasperoid Wash Deposit Metallurgical Testing 13-56
  13.11.2 North Railroad Deposits Metallurgical Testing 13-56

SECTION 13 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 13-1: Summary of Metallurgical Tests Prior to Gold Standard Ventures Tests 13-2
Table 13-2: Summary of Nominal Feed P80 for Column and Bottle-Roll Leach Tests 13-6
Table 13-3: Pinion Main Zone HPGR Composite Head Assays 13-10
Table 13-4: 2018 Pinion Main Zone HPGR-Crushed Bottle-Roll Results 13-10
Table 13-5: 2018 Pinion Main Zone HPGR-Crushed Column Leach Test Results 13-11
Table 13-6: Example: Dark Star Composite MDS #9C Gold Extraction 13-35
Table 13-7: Example: Dark Star Gold Extraction Model Results 13-35
Table 13-8: Modeled Pinion S/O Ratios at Various P80 Particle Size 13-41
Table 13-9: mlbx Pinion West Zone - Modeled Head Grade vs. Gold Recovery 13-42
Table 13-10: ROM Pinion Gold and Silver Recovery Equations (Oxide) 13-43
Table 13-11: HPGR Pinion Gold and Silver Recovery Equations (Oxide) 13-44
Table 13-12: Modeled Pinion S/O Ratios at Various P80 Particle Size 13-47
Table 13-13: Dark Star North (SI<2.0) - Modeled Head Grade vs. Gold Recovery 13-48
Table 13-14: ROM - Dark Star Gold Recovery Equations (Oxide) 13-49
Table 13-15: HPGR - Dark Star Gold Recovery Equations (Oxide) 13-50
Table 13-16: ROM - Dark Star Gold Recovery Equations (Transition) 13-50
Table 13-17: HPGR - Dark Star Gold Recovery Equations (Transition) 13-50
Table 13-18: ROM - Pinion Gold Recovery Equations (Transition) 13-51
Table 13-19: HPGR - Pinion Gold Recovery Equations (Transition) 13-51
Table 13-20: Pinon Compacted Permeability Test Results 13-53
Table 13-21: Dark Star Compacted Permeability Test Results 13-54

 

   

13-ii

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 13 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 13-1: Plot of Column P80 (microns) vs. Gold Extraction (%) 13-1
Figure 13-2: Pinion Zone Location Map for 2015 - 2016 Metallurgical Composites 13-4
Figure 13-3: 2016 - 2017 Pinion Metallurgical Core Hole Locations 13-6
Figure 13-4: 2016 - 2017 Gold Extraction vs. Days Under Leach for Column-Leach Tests 13-9
Figure 13-5: Conventional Crush vs. HPGR Gold Extraction Comparison 13-13
Figure 13-6: Conventional Crush vs. HPGR Silver Extraction Comparison 13-13
Figure 13-7: Pinion Deposit Metallurgical Core Location Map 13-15
Figure 13-8: 2019 Pinion Gold Extraction vs. Days under Leach for Column-Leach Tests 13-18
Figure 13-9: RC Drill Hole Locations for the 1991 Dark Star Bottle-Roll Tests 13-20
Figure 13-10: Location Map for 2017 Dark Star Metallurgical Composites 13-22
Figure 13-11: 2017 Dark Star Column-Leach Gold Extraction vs. Days under Leach 13-24
Figure 13-12: 2018 Dark Star Main - Conventional Crush vs. HPGR Gold Extraction 13-27
Figure 13-13: Dark Star North - Conventional Crush vs. HPGR Gold Extraction 13-28
Figure 13-14: Location Map for 2017-8 Dark Star Metallurgical Composites 13-30
Figure 13-15: 2019 Dark Star Column-Leach Gold Extraction vs. Days under Leach 13-33
Figure 13-16: Dark Star Composite #9C:P80 vs. Au Extraction (%) 13-36
Figure 13-17: Example Pinion Feed P80 vs. S/O Ratio Plot, 70% Recovery of Total Extractable Gold 13-39
Figure 13-18: Example Pinion Mineral Resource S/O Ratio vs. % Recovery of Total Extractable Gold 13-39
Figure 13-19: Pinion Head/Tails Grade 13-41
Figure 13-20: P80 vs. S/O Ratio for 70% Recovery of Total Extractable Gold 13-42
Figure 13-21: P80 vs. S/O Ratio for 90% Recovery of Total Extractable Gold 13-42
Figure 13-22: Percent Recovery of Pinion Total Extractable Gold vs. Heap-Leach Feed Size 13-43
Figure 13-23: Pinion mlbx Pinion West Zone - Gold Recovery Model 13-45
Figure 13-24: Dark Star Head Grade vs. Tails Grade Plot 13-47
Figure 13-25: P80 vs. S/O Ratio for 90% Recovery of Total Extractable Gold 13-48
Figure 13-26: Percent Recovery of Pinion Total Extractable Gold vs. Heap-Leach Feed Size 13-48
Figure 13-27: Dark Star North (SI<2.0) - Gold Recovery Model 13-51

 

   

13-iii

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13 MINERAL PROCESSING AND METALLURGICAL TESTING

The current study of the South Railroad portion of the Railroad-Pinion property focuses on two main sources of ore: The Pinion and Dark Star deposits. Prior to acquisition of the property by GSV, numerous bottle roll and column leach tests were performed on these deposits using RC cuttings, diamond drill hole samples, and trench samples. A summary of these early tests is presented in Table 13-1.

Column leach tests on Pinion samples attained gold recoveries as high as 69% (trench samples, -¼” crush). In general, bottle roll tests achieved higher maximum gold recoveries: 80.6% for Pinion and 82.2% for Dark Star.

Bottle roll and column leach recoveries for Pinion trench samples were inversely proportional to logarithm of particle size, as shown in Figure 13-1.

Figure 13-1: Plot of Column P80 (microns) vs. Gold Extraction (%)

   

13-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 13-1: Summary of Metallurgical Tests Prior to Gold Standard Ventures Tests.

Company Lab and Test Sample Time
h
P80 (P100)
mm
Au Rec
%
Ag Rec
%
Calc Heads NaCN
lb/t
Lime
lb/t
Comments
oz/t
Au
oz/t
Ag
PINION 1994-1995                      
Cyprus McClelland BR 35 Composite of
RC cuttings
  1.68 66.10%           Rapid reaction, low
CN, moderate lime
  0.21 60.6 - 68            
  0.074 3.8% Incr           Fine grind had little
effect
COL 880 kg bulk
surface samples
  (-2" & -3/4") 52.8 - 61.5            
BR 880 kg bulk
surface samples
  (-1/2"-100
mesh)
55.9- 80.6            
PINION 2004                      
RSM KCA BR 5 trench samples 72 0.075 78% 54% 0.048 0.670 0.63 4  
COL 5 trench samples   0.53 " (-1.5") 57% 31% 0.046 0.29 1.35 2  
  0.35" (-0.5") 59% 33% 0.049 0.42 1.08 2  
  0.04 (-0.25) 69% 62% 0.048 0.37 1.88 2  
DARK STAR 1991                      
Crown McClelland BR 158 RC cuttings
(1.52 m drill
intervals), 8
comps
96 59.8% -10
mesh
82.2   0.011-
0.043
  0.27 10.5 most of Au leached
after 24 h

 

   

13-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.1 2015 - 2016 GOLD STANDARD PINION DEPOSIT CYANIDE BOTTLE-ROLL LEACH

Gold Standard commissioned three related bottle-roll test programs at KCA on a large number of samples extracted from composites made from Pinion drill intervals. The results were documented in three separate reports as follows: KCA (2016a), KCA (2016b), and KCA (2016c).

KCA (2016c) documented test results for 90 RC variability composites and KCA (2016b) reported results for 10 of the original 90 composites that were selected for re-run cyanide bottle-roll leach testing due to insufficient leach time. KCA (2016a) reported results on an additional 12 RC variability composites. Composites consisted of mostly oxide materials with some transition and sulfide samples.

13.1.1 2015 - 2016 Pinion Head Assays

Head assays and geo-metallurgical characterization were obtained for all 90 composites using a combination of three separate laboratories: KCA, ALS, and FL Schmidt (Simmons, 2019, Appendices 1,2, and 3), with the following results:

  • Gold grade ranged from 0.19 to 4.41 ppm and averaged 0.81 ppm;

  • Silver grade ranged from 0.62 to 72.3 ppm and averaged 6.9 ppm;

  • Organic carbon (not preg-robbing) ranged from 0.02 to 3.68% and averaged 0.18%;

  • Sulfide sulfur ranged from <0.01 to 4.18% (in the sulfide sample) and averaged 0.19%;

  • Preg-robbing analysis ranged from -1.70 to 35.2% and averaged 2.2%, which is considered non-preg robbing;

  • Copper values by ICP were very low, ranging from 5 to 39 ppm;

  • Cyanide solubility of gold ranged from 7.4 to 100% and averaged 78.3%;

  • Concentrations of the deleterious elements by ICP were: <5 ppm selenium, mercury ranged from 0.02 to 7.7 ppm, and arsenic was low at 47 to 1,360 ppm and averaged 280 ppm;

  • Concentrations of the primary cyanide consumers were low and suggest minimum potential for affecting cyanide-consumption rates. Copper averaged 17 ppm, nickel averaged 22 ppm, and zinc averaged 67 ppm; and

  • Silica content ranged from 28.1 to 96.7% by whole-rock analysis and averaged 81.4%.

13.1.2 2015 - 2016 Pinion Bottle-Roll Test Results

Bottle-roll leach cyanidation testing was conducted on 102 drill-core composites to evaluate the general leachability character of the Pinion geologic mineral resource. By design, these composites are not constrained by any pit shapes and therefore many of the composites may be located outside of any future economic pit limit. Bottle-roll testing was conducted at two targeted particle sizes: 80% passing 1,700 µm (10 mesh) and 80% passing 75 µm (200 mesh). Initially, retention times were 48-hrs for the 75 µm samples and 96-hrs for the 1,700 µm samples. Gold extraction results revealed that a significant number of samples were not completely leached in the allotted time frames.

Obvious under-leached samples were selected for re-leaching. The 75 µm samples were re-leached for 96 hours and the 1,700 µm samples were re-leached for 144 hours. All subsequent bottle-roll testing in a later program, KCA (2016a), were conducted at the longer retention times.

The 1,700 µm bottle-roll testing followed a standard procedure that is described in detail by the final KCA reports (KCA 2016a). The 75 µm bottle-roll procedure was the same as for the 1,700 µm bottle rolls, except the retention time was reduced to 96 hours. Results for the 1,700 µm bottle-roll test and 75 µm bottle-roll procedure are shown in Appendix 4 and 5 from the Metallurgy Report (Simmons, 2019).

For metallurgical testing, the Pinion mineral resource was divided into 12 zones. These are the Far North Zone (“FNZ”), North Zone North (“NZ-N”), North Zone Central (“NZ-C”), North Zone South (“NZ-S”), Main Zone (“MZ”), South East

   

13-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Central Zone (“SE-CZ”), East Pinion North Zone (“EP-NZ”), SE South Zone (“SE-SZ”), Central South Zone (“C-SZ”), NW South Zone (“NW-SZ”), NW Pinion West Zone (“NWP-WZ”), and the NW Pinion and East Zone (“NWP-EZ”). The zones from which each of the 102 composited sample material originated are shown in Figure 13-2 and listed in Metallurgical Report (Simmons, 2019, Appendices 4 and 5).

Figure 13-2: Pinion Zone Location Map for 2015 - 2016 Metallurgical Composites

Direct agitated cyanidation (bottle roll) tests were conducted on each of the 102 drill-core composites at particle size 80% passing 1.7 mm (10 mesh) and 75 µm (200 mesh), to determine gold extraction, extraction rate, reagent consumption, and sensitivity to feed size. The following is a summary of the findings from the bottle-roll test results:

13.1.2.1 10-Mesh Bottle-Roll Results 2015 - 2016

Gold head grades for the composites ranged from 0.15 to 4.65 ppm Au (average = 0.74 ppm Au). Gold extraction results ranged between 0.0 and 86.2 % (average = 65.0%). Three of the composites were sulfide (74852L, 74852M, and 74863I), and after removing them from the data set, the remaining transition and oxide composites ranged from 40.7 to 86.2% gold extraction (average = 66.7%).

Silver head grades for the composites ranged from 0.53 to 67.97 ppm Ag (average = 6.70 ppm Ag). Silver extraction results ranged from 3.1 to 69.4% (average = 24.3%). Three of the composites were sulfide (74852L = 10.5%, 74852M = 8.9%, and 74853I = 12.3%), and after removing them from the data set, the remaining transition and oxide composites averaged 24.7% silver extraction.

Cyanide consumption averaged 0.48 kg/t and lime consumption averaged 1.66 kg/t, with the three sulfide composites excluded from the averages.

   

13-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.1.2.2 200-Mesh Bottle-Roll Results

Gold head grades for the composites ranged from 0.16 to 4.19 ppm Au (average = 0.75 ppm Au). Gold extraction results ranged from 0.0 to 94.0% (average = 76.1%). Three of the composites were sulfide (74852L, 74852M, and 74863I), and after removing them from the data set, the remaining transition and oxide composites had gold extractions from 44.3 to 94.0% (average = 77.9%).

Silver head grades for the composites ranged from 0.55 to 53.3 ppm Ag (average = 6.37 ppm Ag). Silver extraction results ranged between 13.0 and 83.0% (average = 46.8%). Three of the composites were sulfide (74852L = 23.5%, 74852M = 20.0%, and 74853I = 24.5%), and after removing them from the data set, the remaining transition and oxide composites averaged 47.5% silver extraction.

Cyanide consumption averaged 3.15 kg/t and lime consumption averaged 1.18 kg/t, with the three-sulfide composited excluded from the averages.

13.2 2016 - 2017 GOLD STANDARD PINION DEPOSIT METALLURGICAL TESTING

In 2016 - 2017, a total of 33 composites were made from intervals selected from 10 core holes, on two cross-sections, located in the Pinion North and NW Pinion Main zones. The drill hole locations for the 2016 - 2017 composites are shown in Figure 13-3. These composites were used for column-leach, bottle-roll, and load permeability testing at KCA in Reno, Nevada, and results are documented in a final report by KCA (2017a).

Fourteen of the 33 composites were selected and shipped to Hazen Research, Inc. (“HRI”) in Golden, Colorado, for SMC testing (SMC Test®) and Ai testing. Comminution and abrasion final test results were reported in KCA (2017a) and in a separate letter report from HRI (Stepperud, 2017a).

Figure 13-3: 2016 - 2017 Pinion Metallurgical Core Hole Locations

(from Gold Standard 2017)

   

13-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.2.1 2017 Pinion Head Assays

Head assays and geo-metallurgical characterization were conducted on all composites using a combination of three separate laboratories: KCA, ALS, and UBC.

Head assays are tabulated for gold, silver, copper, cyanide gold solubility, carbon and sulfur species, and preg-robb analysis (Simmons, 2019, Appendix 6). ICP multi-element analyses and whole-rock analyses are shown in Appendix 7 and 8, respectively, in Metallurgical Report (Simmons, 2019). Gold cyanide-solubility ( AuCN ) assays presented are the average of two ALS assay procedures: AuAA13 and AuAA13s. The results for the 2016 - 2017 drill core composites are summarized below:

  • Gold grades ranged from 0.23 to 1.82 ppm and averaged 0.76 ppm;

  • Silver grades ranged from 3.3 to 38.7 ppm and averaged 10.4 ppm;

  • Organic carbon ranged from 0.04 to 0.218% and averaged 0.10%;

  • Sulfide sulfur ranged from <0.01 to 0.11% and averaged 0.03%;

  • Preg-robb analyses ranged from -6.20 to 18.2% and averaged 2.8% (considered non-preg robbing);

  • Copper values were very low, ranging from 1.5 to 74.8 ppm and averaged 6.1 ppm;

  • Gold cyanide solubility ranged from 70.2 to 94.4% and averaged 84.2%;

  • Concentrations of the deleterious elements were: selenium averaged 7 ppm, mercury ranged from 0.3 to 10.1 ppm with an average of 3.6 ppm, and arsenic levels were low ranging from 63 to 815 ppm with an average of 277 ppm;

  • Concentrations of the primary cyanide consumers were low and suggest minimum potential for affecting cyanide consumption rates. Copper averaged 22 ppm, nickel averaged 46 ppm, and zinc averaged 139 ppm;

  • Whole-rock silica content ranged from 25.7 to 89.1% and averaged 66.6%.

13.2.2 2016 - 2017 Bottle Roll and Column Leach Testing (KCA)

Twenty-four of the 33 drill core composites were subjected to bottle-roll leach testing at target P80 sizes of 75 µm and 1,700 µm, and to column-leach testing at either 12.5 mm or 25.0 mm crush sizes. The remaining nine composites were only bottle-roll leached at target P80 sizes of 75 µm and 1,700 µm. The testing program is summarized in Table 13-2. The main objective of these tests was to evaluate the laboratory-scale leachability character of the Pinion mineral resource in terms of gold extraction, extraction rate, reagent consumption, and sensitivity to feed size.

Table 13-2: Summary of Nominal Feed P80 for Column and Bottle-Roll Leach Tests

Pinion North Zone Pinion NW Main Zone
Columns Bottle Rolls Columns Bottle Rolls
12.5 mm 25 mm 75 µm 1,700 µm 12.5 mm 25 mm 75 µm 1,700 µm
13 1 20 20 9 3 13 13

The bottle-roll testing used a standard procedure that is described in the final laboratory report (KCA 2017), using 144 hours of retention time for 1,700 µm tests, and 96 hours for 75 µm tests.

Column-leach tests were conducted utilizing material crushed to target P80’s and placed in columns of 10 and 15 cm diameters. During testing the material was leached for 60, 90 or 121 days with a dilute NaCN solution. After leaching, each column was washed for four days with water. A portion of the leached and washed material (“tailings”) from each column was assayed for “tail screen” analyses by size fraction.

   

13-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Tailings material from 12 columns was utilized for compacted permeability test work. Additionally, tailings material from seven columns was submitted to Western Environmental Testing Laboratory (“WETLAB”) in Sparks, Nevada, for acid-base accounting (“ABA”) and meteoric-water mobility tests (“MWMT”).

Geologic information for selected metallurgical composites, together with feed sizes, retention times, reagent consumptions, and gold and silver extraction balances can be found in the Metallurgical Report (Simmons, 2019, Appendix 9). The geologic information provided is part of the geo-metallurgical characterization of the Pinion mineral resource.

The following is offered as a summary of the findings from the 2016 - 2017 column and bottle-roll test results:

13.2.2.1 2017 Bottle-Roll Tests on 1,700 µm Composite Samples

Gold head grades for the composites ranged from 0.064 to 1.78 ppm Au, with an average of 0.74 ppm Au. From this material the gold extraction ranged from 49.0 to 86.0%, with an average extraction rate of 68.4%.

Silver head grades for the composites ranged from 3.4 to 40.4 ppm Ag, with an average of 10.4 ppm Ag. Silver extraction from this material ranged from 5.0 to 85.0%, with an average extraction rate of 26.9%.

Cyanide consumption averaged 0.18 kg/t and lime consumption averaged 0.78 kg/t.

13.2.2.2 2017 Bottle-Roll Tests on 75 µm Composite Samples

Gold head grades for the composites ranged from 0.13 to 1.85 ppm Au, with an average of 0.78 ppm Au. Gold extraction from this material ranged from 66.0 to 90.0%, with an average of 81.3%.

Silver head grades for the composites ranged from 3.49 to 103.1 ppm Ag, with an average of 13.7 ppm Ag. Silver extraction from this material ranged from 16.0 to 95.0%, with an average of 49.0%.

Cyanide consumption averaged 0.88 kg/t and lime consumption averaged 0.60 kg/t.

13.2.2.3 2017 Column-Leach Tests on Composite Samples

Column-leach test extraction results were calculated based upon loaded carbon assays and tails assays. Gold head grades for the twenty-two 12.5 mm column composites ranged from 0.26 to 1.88 ppm Au (Average = 0.76 ppm Au). Gold extraction results ranged between 55.8 and 90.4%, with an average of 70.0%.

Silver head grades for the twenty-two 12.5 mm column composites ranged from 1.44 to 41.6 ppm Ag, with an average of 9.54 ppm Ag. Silver extraction results ranged between 5.4 and 47.3%, with an average of 22.7%.

Cyanide consumption averaged 0.96 kg/t and lime consumption averaged 0.59 kg/t.

Gold head grades for the four 25.0 mm columns ranged from 0.44 to 0.90 ppm Au, with an average of 0.67 ppm Au. Gold extraction results ranged from 51.5 to 69.5%, with an average of 56.4%.

Silver head grades for the four 25.0 mm column composites ranged from 6.0 to 11.9 ppm Ag, with an average of 8.3 ppm Ag. Silver extraction results ranged between 9.7 and 44.8%, with an average of 22.6%.

Cyanide consumption averaged 1.0 kg/t and lime consumption averaged 0.56 kg/t.

KCA advises that commercial-scale, operational cyanide consumption typically runs in the range of 25 to 33% of laboratory consumption.

   

13-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Gold extraction plotted by days under leach for the column-leach tests are shown graphically in Figure 13-4.

Figure 13-4: 2016 - 2017 Gold Extraction vs. Days Under Leach for Column-Leach Tests

13.2.3 2017 Pinion Comminution Characterization at HRI

Fourteen drill core samples were selected for comminution test work. These samples were limited to where sufficient material was available from the 2016 - 2017 metallurgical composites and represented major material types. They were subjected to the modified SMC Test at HRI to generate data for SAG mill comminution parameters, crushing index (“Mic”) by JKTech, and Ai testing. A final letter report was issued by HRI (Stepperud, 2017a).

13.2.3.1 2017 SMC Test Results

The 2017 HRI SMC Test® results for the 14 samples are given in the Metallurgical Report (Simmons, 2019, Appendix 10). This table includes the average rock density, A x b (a measure of resistance to impact breakage) and drop-weight index (“Dwi”) values that are the direct result of the SMC Test® procedure. The values determined for the Mia, Mih, and Mic parameters and the definitions of these abbreviations developed by SMCT are also presented in this table.

The DWi ranged from 2.13 to 8.02 kWh/m3, indicating soft to medium-hard material, and is tabulated along with other parameters of the SMC evaluation in the Metallurgical Report (Simmons, 2019, Appendix 10). In summary:

The Pinion samples A x b and Dwi values can be categorized as soft to moderate in comparison to the SMC worldwide database values. Although the Pinion oxide mineral resource material is not envisioned to require a milling circuit, the SAG comminution parameters are a primary component (output) of the SMC test, which also provides crushing parameters that can be used to design conventional crushing circuits.

   

13-8

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.2.3.2 2017 Pinion Bond Abrasion Index (Ai) Tests

Bond Abrasion index tests were performed at HRI on 14 composite samples. The Metallurgical Report (Simmons, 2019, Appendix 11) lists the Ai values for the 14 composites that were tested. Ai values ranged from a low of 0.4591 g to a high of 1.5548 g, indicating moderate to very high abrasiveness of the materials tested. The silica content of the Pinion mineral resource is the inferred rock component that contributes to the corresponding high Ai test results.

13.2.3.3 2017 Pinion Comminution Test Summary

The Pinion comminution samples tested can be considered amenable to conventional, multi-stage crushing and screening circuit design. Mic, the SMC crusher component value, with an average of 5.9 kWh/t, would be ranked in the lower mid-range of the SMC worldwide database.

The Ai values (average = 0.9725 g) are modest to very high (see Simmons, 2019, Appendix 11) and represent the potential for high rates of wear on crusher liners, screen panels and conveyor drop boxes. The high Ai values of this material will likely translate into high wear rates on all ground-engaging equipment used for mining, including dozer tracks and blades, blast-hole drills, shovel and loader buckets, bucket teeth, and haul truck tires and bed liners.

13.2.4 2017 Pinion Load Permeability Test Work on Column Tailings

A portion of tailings material from each column-leach test was utilized for load permeability test work. The purpose of the load permeability test work was to examine the permeability of the crushed material under compaction loading equivalent to heap heights of 25 m, 50 m, 75 m, and 100 m.

The test cell utilized for modeling the permeability of stacked material at various heap heights, was a steel column or cell. Staged axial (vertical) loading of the test material was utilized to simulate the incrementally increased pressure obtained when loading the heap. Drainage layers were installed at the top and at the base of the column. External load was applied to the charge of material in the column utilizing a perforated steel plate that moved freely within the walls of the column.

A brief version of the guidelines that KCA utilizes when reviewing the results from this type of test are as follows:

  1.     

A slump of over 10% is generally an indication of failure.

  2.     

A measured flow of 10 times the heap design flow (10 to 12 li/h/m2) is considered a pass for a bed of agglomerate material. However, lower flows are not necessarily a failure if there are enough consistently passing tests.

  3.     

“Pellet breakdown” within the column of about 15% is marginally acceptable and anything higher is a failure. However, in general, a higher range may be allowable due to the subjective nature of the test, being based on visual observation. The tests only apply to materials agglomerated with cement.

  4.     

Solution color and clarity is typically an indicator of agglomerate failure and fines migration. This information is utilized in coordination with both slump as well as pellet breakdown to determine if the test column passes.

All twelve column residues that were tested passed using KCA’s criteria. The results of the load permeability test work are summarized in the Metallurgical Report (Simmons, 2019, Appendix 12).

13.3 GOLD STANDARD 2018 PINION DEPOSIT HIGH PRESSURE GRINDING ROLL (HPGR) TESTING

Gold Standard commissioned KCA to perform bottle roll, conventional-crush column-leach and HPGR-crush column-leach testing on a drill core composite sample from the Pinion Main zone, here termed the “HPGR composite.” Test results were documented in KCA (2018a).

   

13-9

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.3.1 2018 Head Assays Pinion Main Zone HPGR Composite

The HPGR composite sample was comprised of intervals from two PQ-diameter core holes: PIN17-12, 42.7 m to 53.8 m and PIN17-13, 114.3 m to 159.1 m. Head assays are presented in Table 13-3. The sulfide sulfur (S=) head assay of 0.02% demonstrates the oxide character of this sample. The presence of C(org) (0.11%) and the preg-robb assay of 9.5% indicate that this composite may be mildly preg-robbing.

Table 13-3: Pinion Main Zone HPGR Composite Head Assays

KCA
Sample
No.
Description Au & Ag Assays Sulfur and Carbon Species Preg-
robb, %
Au
ppm
Ag
ppm
AuCN
%
AgCN
%
C(tot)
%
C(org)
%
S (tot) S= SO4
% % %
Pinion HPGR Composite Sample                    
78508C Pin 17-12 140’ to 176.5’ and
Pin 17-13 375’ to 522’
0.736 4.53 80.2 73.5 0.19 0.11 3.07 0.02 3.05 9.5%

13.3.2 2018 Pinion Main Zone HPGR Bottle-Roll and Column-Leach Testing

The Pinion Main zone HPGR composite was also subjected to bottle-roll leach testing at target P80 sizes of 38 µm, 75 µm and 1,700 µm. Conventional column-leach testing was conducted at target P80 of 12.5 mm and HPGR column-leach testing was done on sub-samples subjected to low, medium, and high HPGR press forces. The main objective of these bottle-roll and column-leach tests was to evaluate the differences in gold extraction, comparing conventional-crush laboratory column-leach results to those from material crushed using HPGR.

13.3.2.1 2018 Bottle-Roll Tests, Pinion Main Zone HPGR Composite Sample

Bottle-roll leach testing was performed on 500 g or 1,000 g portions of head material comminuted to a P80 target size of 1,700 microns (1.70 mm), 75 microns (0.075 mm), and 38 microns (0.038 mm). Bottle-roll testing, wet screening and assay methods were performed utilizing the same procedures as outlined in Section 13.2.2. Bottle-roll cyanide-leach test results are shown in Table 13-4.

Table 13-4: 2018 Pinion Main Zone HPGR-Crushed Bottle-Roll Results

KCA
Sample
No.
Test No Comp ID GSV Geology Feed Size Leach
Time
(hrs)
Au Balance Ag Balance Reagents
Zone Subunit Rock
Type 1
Vein 1 Target
P80(µm)
Screen
P80(µm)
Au
Ext %
Calc
Hd Au
(ppm)
Ag Ext
%
Calc
Hd Ag
(ppm)
Na CN
kg/t
Lime
kg/t
                               
78508C 78525 A HPGR Comp Pinion Main CGL car qzv 1,700 1,860 144 53.8 0.630 32.5 4.640 0.11 0.50
78508C 78526 A HPGR Comp Pinion Main CGL car qzv 75 69 72 72.5 0.803 58.3 4.940 0.50 0.50
78508C 78526 B HPGR Comp Pinion Main CGL car qzv 38 40 72 69.8 0.758 59.9 4.810 0.27 0.50

The reported bottle-roll cyanide-leach gold extractions are low for an oxide sample. This is an indication of refractoriness due to factors other than sulfide sulfur or C(org) contents.

13.3.2.2 Column-Leach Tests on Pinion Main Zone HPGR Composite

Column-leach tests were performed on four samples of the HPGR composite that were prepared in the following manner:

1 - Conventional crush to target P80 = 12.5 mm;

2 - HPGR crushed at low press force (2.20 N/mm2) setting, P80 = 7,000 µm;

   

13-10

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

3 - HPGR crushed at medium press force (3.35 N/mm2) setting, P80 = 6,500 µm;

4 - HPGR crushed at high press force (4.30 N/mm2) setting, P80 = 5,000 µm

The column-leach tests were conducted for 65 days with a dilute sodium cyanide solution utilizing the same procedures as outlined in Section 13.2.2. The results are summarized in Table 13-5.

Table 13-5: 2018 Pinion Main Zone HPGR-Crushed Column Leach Test Results

KCA Test
No
Comp ID GSV Geology Feed Size Leach
Time
(days)
Au Balance Ag Balance Reagents
Zone Subunit Rock
Type 1
Vein 1 Target
P80
(µm)
Screen
P80
(µm)
Au
Ext,
%
Calc
Hd Au
(ppm)
Ag
Ext
%
Calc Hd
Ag
(ppm)
NaCN
kg/t
Lime
kg/t
78509B 78516 HPGR - Low Pinion Main CGL car gzv N/A 7,000 65 53.3 0.846 37.4 4.6 0.54 1.01
78510B 78519 HPGR - Med Pinion Main CGL car gzv N/A 6,500 65 65.5 0.722 39.9 4.56 0.57 1.01
78511B 78522 HPGR - High Pinion Main CGL car gzv N/A 5,000 65 64 0.708 42.8 4.07 0.61 1.01
                               
78508C 78513 Conventional
Crush
Pinion Main CGL car gzv 12,500 12,200 65 43.8 0.864 21.6 3.99 0.54 1.02

The column-test extractions in Table 13-5 are based upon pregnant solution carbon assays using the calculated head (carbon assays + tails assays), which ranged from 0.71 g Au/t to 0.85 g Au/t. Gold extractions ranged from 44% (conventional crush) to 66% (HPGR medium pressure). Sodium cyanide consumption ranged from 0.54 to 0.61 kg/t and hydrated lime consumption ranged from 1.01 to 1.02 kg/t.

Graphical comparisons for gold and silver extraction between conventionally crushed and HPGR-crushed sample charges are shown in Figure 13-5 and Figure 13-6.

Figure 13-5: Conventional Crush vs. HPGR Gold Extraction Comparison

   

13-11

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-6: Conventional Crush vs. HPGR Silver Extraction Comparison

The data demonstrate that the HPGR-crushed column charges, at medium and high press force, provide a significant gold extraction advantage over the conventionally crushed sample. While it is relatively simple to design a flowsheet to produce any specific P80 particle size from conventional crushing, it is not for HPGR comminution. The P80’s shown in Figure 13-5 and Figure 13-6 represent a close approximation to the product size that would be produced in a commercial HPGR comminution circuit.

13.3.3 2018 Pinion Main Zone HPGR Agglomeration and Load Permeability Testing

Preliminary agglomeration testing was performed on the low, medium, and high press-force HPGR-comminuted samples before being loaded into columns. All charges passed the KCA agglomeration criteria except the medium press-force sample at “0” kg/t cement addition. It was decided to column leach the HPGR samples without any cement addition or agglomeration for this phase of test work.

All column-leach residue charges were subjected to evaluation of percent slump, maximum percolation rate and load permeability tests. The results are shown respectively in Appendix 13, 14, and 15 from the Metallurgical Report (Simmons, 2019).

The medium and high press-force HPGR column-leach residues failed load permeability testing at 50 m height. Based upon these results it is recommended that future testing continue to evaluate cement agglomeration on HPGR-comminuted samples to support heap heights of at least 50 m and possibly 75 m.

13.4 2019 GOLD STANDARD PINION DEPOSIT METALLURGICAL TEST WORK

Gold Standard drilled additional met core holes in the Pinion North and Main zones in 2017-2018, that were tested in 2019. A total of 26 composites were made from intervals selected from 22 core holes. Metallurgical core drill hole locations, for all phases of work, is shown in Figure 13-7, and the 2017- 2018 composites are shown in green and blue. These composites were used for geo-metallurgical characterization, comminution testing, column-leach, bottle-roll,

   

13-12

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

load permeability testing, and environmental characterization, at KCA in Reno, Nevada, and results are documented in a final report by KCA (2019a).

Nine of the 26 composites were selected and shipped to HRI”) in Golden, Colorado, for SAG mill comminution (“SMC”) testing (SMC Test®) and Bond Abrasion index (“Ai”) testing. Comminution and abrasion final test results were reported in KCA (2019a) and in a separate letter report from HRI (Stepperud, 2019a).

Figure 13-7: Pinion Deposit Metallurgical Core Location Map

   

13-13

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.4.1 2019 Pinion Head Assays

Head assays and geo-metallurgical characterization were conducted on all composites using a combination of three separate laboratories: KCA, ALS, and University of British Columbia (“UBC”).

Head assays are tabulated for gold, silver, copper, cyanide gold solubility, carbon and sulfur species, and preg-robb analysis (Simmons, 2019, Appendix 16). In the Metallurgical Report, ICP multi-element analyses are shown in Appendix 17, whole-rock analyses are shown in Appendix 18 and QXRD analysis in Appendix 19 (Simmons, 2019). Gold cyanide-solubility (“AuCN”) assays presented are the average of two ALS assay procedures: AuAA13 and AuAA13s. The results for the 2017 - 2018 drill core composites are summarized below:

  • Gold grades ranged from 0.25 to 2.87 ppm and averaged 0.85 ppm;

  • Silver grades ranged from 0.5 to 29.1 ppm and averaged 7.7 ppm;

  • Organic carbon ranged from 0.08 to 0.45% and averaged 0.25%;

  • Sulfide sulfur ranged from 0.005 to 0.67% and averaged 0.078%;

  • Preg-robb analyses ranged from -4.0 to 16.7% and averaged 4.5% (considered non-preg robbing);

  • Copper values were very low, ranging from 1.2 to 38.9 ppm and averaged 6.0 ppm;

  • Gold cyanide solubility ranged from 43.6 to 87.3% and averaged 74.8%;

  • Concentrations of the deleterious elements were: selenium averaged 8.4 ppm, mercury ranged from 0.2 to 4.3 ppm with an average of 1.4 ppm, and arsenic levels were low ranging from 1 to 607 ppm with an average of 273 ppm;

  • Concentrations of the primary cyanide consumers were low and suggest minimum potential for affecting cyanide consumption rates. Copper averaged 119 ppm (with 1 composite containing 2260 ppm), nickel averaged 29 ppm and zinc averaged 134 ppm;

  • Whole-rock SiO2 content ranged from 11.0 to 94.8% and averaged 73.3%.

13.4.2 2019 Pinion Bottle Roll and Column Leach Testing at KCA

Twenty-six drill core composites were subjected to bottle-roll leach testing at target P80 sizes of 75 µm and 1,700 µm, and to column-leach testing at 12.5 mm or 25.0 mm crush sizes. The main objective of these tests was to evaluate the laboratory-scale leachability character of the Pinion mineral resource in terms of gold extraction, extraction rate, reagent consumption, and sensitivity to feed size.

Geologic information for selected metallurgical composites, together with feed sizes, retention times, reagent consumptions, and gold and silver extraction balances are shown in the Metallurgical Report (Simmons, 2019, Appendix 20).

The bottle-roll testing used a standard procedure that is described in the final laboratory report (KCA 2019a), using 144 hours of retention time for 1,700 µm tests, and 96 hours for 75 µm tests.

Column-leach tests were conducted utilizing material crushed to target P80’s and placed in columns of 10 and 15 cm diameters. During testing the material was leached for 59, 70, 94 or 130 days with a dilute NaCN solution. After leaching, each column was washed for four days with water. A portion of the leached and washed material (“tailings”) from each column was assayed for “tail screen” analyses by size fraction.

Tailings material from 19 columns was utilized for compacted permeability test work. Additionally, tailings material from the same 19 columns was submitted to Western Environmental Testing Laboratory (“WETLAB”) in Sparks, Nevada for environmental characterization.

The following is offered as a summary of the findings from the 2019 column and bottle-roll test results:

   

13-14

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.4.2.1 2019 Pinion Bottle Roll Tests on 75-µm Composite Samples

Gold head grades for the composites ranged from 0.138 to 2.63 ppm Au, with an average of 0.81 ppm Au. From this material the gold extraction ranged from 30.1 to 87.4%, with an average extraction rate of 68.4%.

Silver head grades for the composites ranged from 0.60 to 32.0 ppm Ag, with an average of 7.6 ppm Ag. Silver extraction from this material ranged from 31.7 to 84.3%, with an average extraction rate of 56.2%.

Cyanide consumption averaged 0.30 kg/t and lime consumption averaged 0.64 kg/t.

13.4.2.2 2019 Pinion Bottle-Roll Tests on 1,700 µm Composite Samples

Gold head grades for the composites ranged from 0.156 to 2.59 ppm Au, with an average of 0.78 ppm Au. Gold extraction from this material ranged from 37.5 to 79.0%, with an average of 61.5%.

Silver head grades for the composites ranged from 0.55 to 31.8 ppm Ag, with an average of 7.63 ppm Ag. Silver extraction from this material ranged from 12.0 to 82.2%, with an average of 30.7%.

Cyanide consumption averaged 0.22 kg/t and lime consumption averaged 1.07 kg/t.

13.4.2.3 2019 Pinion Column-Leach Tests on Conventional Crushed Composite Samples

Column-leach test extraction results were calculated based upon loaded carbon assays and tails assays. Gold head grades for the sixteen 12.5 mm column composites ranged from 0.198 to 3.19 ppm Au (average = 0.95 ppm Au). Gold extraction results ranged between 29.8 and 80.0%, with an average of 63.0%.

Silver head grades for the sixteen 12.5 mm column-leach composites ranged from 0.65 to 27.9 ppm Au, with an average of 7.84 ppm Ag. Silver extraction results ranged between 9.5 and 76.4%, with an average of 30.6%.

Cyanide consumption averaged 0.92 kg/t and lime consumption averaged 1.06 kg/t.

Gold head grades for the ten 25.0 mm column-leach composites ranged from 0.313 to 1.65 ppm Au, with an average of 0.72 ppm Au. Gold extraction results ranged between 30.5 and 81.2%, with an average of 59.9%.

Silver head grades for the ten 25.0 mm column-leach composites ranged from 1.94 to 22.2 ppm Ag, with an average of 7.0 ppm Ag. Silver extraction results ranged between 9.3 and 25.0%, with an average of 18.2%.

Cyanide consumption averaged 0.76 kg/t and lime consumption averaged 0.93 kg/t.

KCA advises that commercial-scale, operational cyanide consumption typically runs in the range of 25 to 33% of laboratory consumption.

Gold extraction plotted by days under leach for the column-leach tests are shown graphically in Figure 13-8.

13.4.2.4 2019 Pinon Column Leach Tests on HPGR Crushed Composite Samples

Column-leach test extraction results were calculated based upon loaded carbon assays and tails assays. Gold head grades for the five HPGR crush column-leach composites ranged from 0.467 to 0.891 ppm Au (average = 0.65 ppm Au). Gold extraction results ranged between 56.6 and 78.3%, with an average of 70.3%.

Silver head grades for the five HPGR crush column-leach composites ranged from 1.72 to 28.0 ppm Au, with an average of 7.27 ppm Ag. Silver extraction results ranged between 27.9 and 58.3%, with an average of 40.4%.

   

13-15

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Cyanide consumption averaged 0.73 kg/t and lime consumption averaged 0.31 kg/t.

Gold extraction plotted by days under leach for the column-leach tests are shown graphically in Figure 13-8.

Figure 13-8: 2019 Pinion Gold Extraction vs. Days under Leach for Column-Leach Tests

13.4.3 2019 Pinion Comminution Characterization at HRI

Nine drill core samples were selected for comminution test work and were subjected to the modified SMC Test at HRI to generate data for SAG mill comminution parameters, crushing index (“Mic”) by JKTech, and Ai testing. A final letter report number 12635 was issued by HRI, March 6, 2019 (Stepperud, 2019a).

13.4.3.1 2019 Pinion SMC Test Results

The 2019 HRI SMC Test® results for the 9 samples are given in the Metallurgical Report (Simmons, 2019, Appendix 21). This table includes the average rock density, A x b (a measure of resistance to impact breakage) and drop-weight index (“Dwi”) values that are the direct result of the SMC Test® procedure. The values determined for the Mia, Mih and Mic parameters, and the definitions of these abbreviations developed by SMCT, are also presented in this table.

   

13-16

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The DWi ranged from 5.34 to 7.30 kWh/m3, indicating soft to medium-hard material, and is tabulated along with other parameters of the SMC evaluation.

The Pinion samples A x b and DWi values can be categorized as moderate in comparison to the SMC worldwide database values. Although the Pinion oxide mineral resource material is not envisioned to require a milling circuit, the SAG comminution parameters are a primary component (output) of the SMC test, which also provides conventional crushing parameters that can be used to design conventional crushing circuits.

The 2019 Pinion comminution samples can be considered in line with previous testing and is amenable to conventional, multi-stage crushing and screening circuit design. Mic, the SMC crusher component value, with an average of 6.8 kWh/t, would be ranked in the mid-range of the SMC worldwide database.

13.4.3.2 2019 Pinion Bond Abrasion Index (Ai) Tests

Bond Abrasion index tests were performed at HRI on 9 composite samples. The Metallurgical Report (Simmons, 2019, Appendix 22) lists the Ai values for the 9 composites that were tested. Ai values ranged from a low of 0.4005 g to a high of 0.8481 g, indicating moderate to above average abrasiveness of the materials tested. The silica content of the Pinion mineral resource is the inferred rock component that contributes to the corresponding high Ai test results.

The 2019 Pinion Ai values (average = 0.6948 g) are lower than the Phase one samples (0.9725 g) and can be considered as moderate to above average (see Appendix 22, Simmons, 2019) and represent the potential for slightly elevated rates of wear on crusher liners, screen panels, and conveyor drop boxes.

13.4.4 2019 Pinion Load Permeability Test Work on Column Tailings

A portion of tailings material from ten 12.5 mm, five 25 mm, and five 4 HPGR column-leach test residues was utilized for load permeability test work. The purpose of the load permeability test work was to examine the permeability of the crushed material under compaction loading equivalent to heap heights of 25 m, 50 m, 75 m, and 100 m.

Load Permeability Test procedures and guidelines have been described earlier in this Technical Report. Refer to Section 13.2.4 for details.

All ten 12.5 mm and five 25 mm conventional crush columns passed load permeability test criteria up to 100-meter heap height, except for PM #59, which failed at 100 meters. The conventional crushed column load permeability test results are summarized in the Metallurgical Report, Appendix 23 (Simmons, 2019).

All five of the HPGR crushed columns passed load permeability test criteria at 75 meters and two of the five (PM #37 and PM #56) failed at 100 meters. 2.0 kg/t of cement was added to PM #51 and 6.0 kg/t to PM #59. The HPGR crushed column load permeability test results are summarized in the Metallurgical Report, Appendix 24 (Simmons, 2019).

13.5 1991 DARK STAR DEPOSIT METALLURGICAL TESTING

Figure 13-9 shows drill hole locations for samples used for Dark Star bottle roll tests conducted by McClelland Laboratories for Crown Resources in 1991. Bottle roll test results are summarized in Table 13-1.

   

13-17

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-9: RC Drill Hole Locations for the 1991 Dark Star Bottle-Roll Tests

13.6 2017 GOLD STANDARD DARK STAR DEPOSIT METALLURGICAL TESTING

In 2017 Gold Standard commissioned KCA to complete a metallurgical testing program on drill core composite samples from the Dark Star Main and North mineral resources. Test results were documented in KCA (2017b).

13.6.1 2017 Dark Star Head Assays for Bottle-Roll and Column-Leach Tests

Head assays and geo-metallurgical characterization analyses were obtained for 68 composites using a combination of four separate laboratories: KCA, ALS, UBC, and FLS. The head assays are tabulated in Appendix 25, 26, and 27 (Simmons, 2019) and show:

  • Gold grade ranged from 0.177 to 7.35 ppm and averaged 1.59 ppm;

  • Silver grade ranged from 0.27 to 5.07 ppm and averaged 0.71 ppm;

  • Organic carbon ranged from <0.10 to 2.14% (sulfide sample) and averaged 0.24%;

  • Sulfide sulfur ranged from <0.01 to 2.14% (sulfide sample) and averaged 0.21%;

  • Preg-robb analysis ranged from 0.0 to 19.2% and averaged 1.6%;

  • Copper values were very low, ranging from 5 to 42 ppm;

  • Gold cyanide solubility ranged from 25.7% (sulfide sample) to 100% and averaged 88.3%;

   

13-18

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT
  • Concentrations of deleterious elements by ICP were low: <5 ppm selenium on average, mercury ranged from 0.99 to 127.4 ppm (sulfide sample) and averaged 9.54 ppm, and arsenic ranged from 61 to 605 ppm with an average of 196 ppm;

  • Concentrations of the primary cyanide consumers were low and suggest minimum potential for effecting cyanide consumption rates. Copper averaged 18 ppm, nickel averaged 32 ppm and zinc averaged 126 ppm.

  • Whole-rock quartz (SiO2 ) analyses were high ranging from 42.4 to 95.8% and averaged 85.0%.

13.6.2 2017 Dark Star Bottle-Roll and Column-Leach Tests at KCA

Sixty-eight drill core composites were subjected to bottle-roll leach testing at target P80 sizes of 75 µm and 1,700 µm. A subset of 41 of the 68 composites were subjected to column-leach testing at crush sizes of 12.5 mm (on all 41 composites) and 25.0 mm (six of the 41 composites), depending upon available mass. The main objective of the bottle-roll and column-leach testing was to evaluate laboratory-scale leachability of the Dark Star mineral resource in terms of gold extraction, extraction rate, reagent consumption, and sensitivity to feed size.

13.6.2.1 2017 Dark Star Bottle Roll Tests

Bottle-roll leach testing was conducted on portions of material from each of the 68 composites. A 500 or 1,000 g portion of head material was crushed to a nominal size of 1,700 µm (1.70 mm) and utilized for leach testing. A second portion of material was milled in a laboratory rod mill to a target size of 80% passing 75 µm (0.075 mm). The milled slurry was then utilized for leach testing. The tests, which are described in detail by the laboratory report (KCA 2017), employed retention times of 144 hours for the 1,700 µm material and 72 hours for the 75 µm material.

The tailing material from the 1,700 µm tests was wet screened at 0.075 mm. The undersized material was dried and set aside. The oversized material was dried and dry screened at 4.75, 3.35, 2.36, 1.70, 1.18, 0.850, 0.600, 0.425, 0.300, 0.212, 0.150, 0.106, and 0.075 mm. The dry-screened -0.075 mm material was then combined with the wet screened material. Each separate size fraction was then weighed and reported. The material was then recombined. From the recombined material, three portions were split out and individually ring and puck pulverized to 80% passing 0.075 mm. The pulverized portions were then assayed for residual gold and silver content. The reject material was stored.

The tailing material from the 75 µm tests was wet screened at 0.038 mm. The undersized material was dried and set aside. The oversized material was dried and dry screened at 0.212, 0.150, 0.106, 0.075, 0.053, and 0.038 mm. The dry-screened, -0.038 mm material was then combined with the wet-screened material. Each separate size fraction was then weighed and reported. The material was then recombined. From the recombined material, three portions were split out and individually ring and puck pulverized to 80% passing 0.075 mm. The pulverized portions were then assayed for residual gold and silver content. The reject material was stored.

Gold Standard has divided the Dark Star deposit into two zones for metallurgical testing: Dark Star Main and Dark Star North. The drill holes, shown with numbers in Figure 13-10, are core holes from 2015-2016 drilling, from which metallurgical composites were compiled. Dark Star bottle-roll gold and silver extraction results are summarized in Appendix 28 and 29 from the Metallurgical Report (Simmons, 2019). The zones from which the 2015-2016 composite sample material originated are listed in Appendix 30 and 31 (Simmons, 2019).

   

13-19

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-10: Location Map for 2017 Dark Star Metallurgical Composites

Note: BR = bottle roll test; COL = column-leach test.

The following is a summary of the findings from the Dark Star bottle roll test results.

13.6.2.2 2017 Dark Star 1.70 mm (10 Mesh) Bottle-Roll Results

Dark Star 10-mesh bottle-roll gold and silver extraction results are shown in the Metallurgical Report (Simmons, 2019, Appendix 28). Gold head grades for the 10-mesh composite samples ranged from 0.18 to 6.22 ppm Au, with an average of 1.56 ppm Au. Gold extraction ranged between 26.1 and 97.7% and averaged 81.8%. Five of the composites were sulfide/carbon refractory, with gold cyanide solubility <60%, nine of the composites were transitional with gold cyanide solubility >60% and <85%, and 54 of the composites were oxide with AuCN solubility >85%.

Silver grades are very low at Dark Star. Silver head grades for the 10-mesh composites ranged from 0.31 to 5.01 ppm Ag with an average of 0.71 ppm Ag. Silver extraction ranged from 0.0 to 83.6% and averaged 20.2%. Cyanide consumption averaged 0.42 kg/t and lime consumption averaged 1.11 kg/t.

13.6.2.3 2017 Dark Star 0.74 mm (200 Mesh) Bottle-Roll Results

Dark Star 200-mesh bottle roll gold and silver extraction results are shown in the Metallurgical Report (Simmons, 2019, Appendix 29). Gold head grades for the 200-mesh composite samples ranged from 0.22 to 6.48 ppm Au with an average of 1.55 ppm Au. Gold extraction ranged between 30.9 and 97.9% and averaged 85.6%. Five of the composites were sulfide/carbon refractory with gold cyanide solubility <60%, nine of the composites were transitional with gold cyanide solubility >60% and <85%, and 54 of the composites were oxide with gold cyanide solubility >85%.

Silver grades are very low at Dark Star. Silver head grades for the 200-mesh composites ranged from 0.24 to 5.06 ppm Ag with an average of 0.69 ppm Ag. Silver extraction ranged from 5.6 to 85.8% and averaged 31.5%.

   

13-20

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Cyanide consumption averaged 1.79 kg/t and lime consumption averaged 0.77 kg/t.

13.6.2.4 2017 Dark Star 12.5 mm and 25.0 mm Column Leach Results

Forty-one of the 2017 composites were column leached utilizing material crushed to 100% passing 19 mm (target P80 = 12.5 mm), and six of the 41 composites were crushed to 100% passing 37.5 mm (target P80 = 25 mm). During testing the material was leached for 60, 90 or 121 days with dilute NaCN solution and placed, respectively, in columns of 100 mm and 150 mm diameters. After leaching, each test was washed for four days with water. A portion of the tailings material from each column-leach test was utilized for tail screen analyses with assays by size fraction. Column-leach gold and silver extraction results are summarized in the Metallurgical Report (Simmons, 2019, Appendix 32).

None of the columns required agglomeration in the laboratory column set-up. Column-leach extraction results were calculated based upon loaded carbon assays and tails assays. Calculated gold head grades for the 41 columns ranged from 0.18 to 6.39 ppm Au with an average of 1.58 ppm Au. Gold extraction ranged between 15.0 and 94.8% with an average of 78.9%.

  • Two of the column-leach composites were sulfide/carbon refractory with gold cyanide solubility <60% and gold extraction ranged from 15.0 to 25.5% and averaged 20.3%.

  • Eight of the column-leach composites were transitional with gold cyanide solubility >60% and <85%. Gold extraction for these columns ranged from 57.8 to 85.8% and averaged 69.7%.

  • Thirty-seven of the column-leach composites were oxide with gold cyanide solubility >85%. Gold extraction for these columns ranged from 56.3 to 94.9% and averaged 84.1%.

Calculated silver head grades for the 47 columns ranged from 0.30 to 2.54 ppm Ag with an average of 0.58 ppm Ag. Silver extraction ranged between 14.3 and 68.0% with an average of 31.1%. Silver head grades for Dark Star are very low and of minimal economic significance.

Cyanide consumption averaged 1.07 kg/t and lime consumption averaged 1.15 kg/t. Commercial scale ROM cyanide consumptions are expected to be in the range of 25 to 33% of laboratory-scale test results. Laboratory lime consumptions are assumed to be similar to commercial-scale consumptions.

Gold extraction versus days under leach for the 47 column-leach tests are shown graphically in Figure 13-11. The two low gold extraction plots show in Figure 13-11, are for the sulfide composites discussed in the first bullet above.

   

13-21

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-11: 2017 Dark Star Column-Leach Gold Extraction vs. Days under Leach

13.6.3 2017 Dark Star Comminution Characterization at HRI

Twelve Dark Star drill core samples were selected for comminution test work. These samples were splits from metallurgical composites and represent major material types. They were subjected to the modified SMC Test at HRI to generate data for SMC parameters; Mic by JKTech and Ai testing was also completed. A final letter report was issued: Comminution Testing, Hazen Project 12391 Report and Appendices A and B - July 5, 2017 (Stepperud, 2017b).

13.6.3.1 2017 Dark Star SMC Test Results

The 2017 Hazen SMC Test® results for the twelve samples are given in the Metallurgical Report (Simmons, 2019, Appendix 33). The table includes the average rock density, A x b and drop-weight index values that are the direct result of the SMC Test® procedure. The values determined for the Mia, Mih, and Mic parameters and the definitions of these abbreviations developed by SMCT are also presented in the table.

13.6.3.2 2017 Dark Star SAG Mill Comminution Test

The drop weight index ranged from 2.57 to 8.53 kWh/m3, indicating soft to medium-hard material, and is tabulated along with other parameters of the SMC evaluation in Appendix 33 (Simmons, 2019). The range of A x b for the 12 composites spanned a low of 30.7 (moderately hard) to a high of 99.4 (soft) and averaged 49.6.

   

13-22

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.6.3.3 2017 Dark Star Bond Abrasion Index (Ai) Tests

Bond Abrasion index testing was performed at Hazen on 12 Dark Star composite samples. The Metallurgical Report (Simmons, 2019, Appendix 34) lists the Ai values for the 12 composites that were tested. Ai values ranged from a low of 0.2432 g to a high of 1.2381 g, indicating moderate to high abrasiveness of the materials tested. The silica content of the Dark Star mineralized material is the inferred rock component that contributes to the corresponding high Ai test results.

13.6.3.4 2017 Dark Star Comminution Test Summary

The Dark Star comminution samples tested can be considered amenable to conventional, multi-stage crushing and screening circuit design. Mic, the SMC crusher-component value (average = 6.8 kWh/t), would be ranked in the midrange of the SMC worldwide database.

The Ai values are modest to high (average = 0.7864 g) and represent the potential for above average rates of wear on crusher liners, screen panels, and conveyor drop boxes.

13.6.4 2017 Dark Star Load Permeability Testing

A portion of tailings material from twenty-four (24) column-leach test was utilized for load permeability test work. The purpose of the load permeability test work was to examine the permeability of the crushed material under compaction loading equivalent to heap heights of 25, 50, 75, and 100 m.

The test cell utilized for modeling the permeability of stacked material at various heap heights was a steel column or cell. Staged axial (vertical) loading of the test material was utilized to simulate the incrementally increased pressure obtained when loading the heap.

Drainage layers were installed at the top and at the base of the column. External load was applied to the charge of material in the column utilizing a perforated steel plate that moved freely within the walls of the column.

Guidelines that KCA utilizes when reviewing the results from this type of test were listed in Section 13.2.4. The results of the Dark Star load permeability test work are summarized in the Metallurgical Report (Simmons, 2019, Appendix 35).

Twenty of the 24 column residues that were tested passed using KCA’s criteria at all simulated heap heights. One sample failed at the 100 m simulated height and three samples failed at the 25 m simulated height.

The Metallurgical Report (Simmons, 2019, Appendix 36) summarizes geologic information and column-residue screen analysis data for the three column residue samples that failed load permeability testing at the 25 m height. Of specific note, these three column-residue samples had the highest percentage of -200-mesh (75 µm) fines reported in the column residue screen analysis, of all 24 residue samples that were tested, and geologic logging of two of the samples identified appreciable amounts of fault and clay material. It is unknown at this time how much of the total mineral resource tonnage may be represented by these three samples, but it is believed to be minor and it is assumed that this material can be blended during mining and processing.

13.7 2018 GOLD STANDARD DARK STAR HPGR METALLURGICAL TEST WORK

Two Dark Star HPGR composite samples were comprised of selected core samples (Simmons, 2019, Appendix 37) remaining from the 2017 Dark Star bottle-roll and column-leach test program.

   

13-23

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.7.1 2018 Dark Star HPGR Head Assays

Geological information and head assays for the two 2018 Dark Star HPGR Master Composites are shown in Appendix 37 and 38 (Simmons, 2019).

13.7.2 2018 Dark Star HPGR Composite Bottle-Roll and Column-Leach Tests

The Dark Star HPGR composite samples were subjected to bottle-roll leach testing at target P80 sizes of 38 µm, 75 µm, and 1,700 µm. Column-leach testing was conducted on conventional-crushed material at a P80 of 12.5 mm and on HPGR-crushed samples subjected to low, medium, and high HPGR press forces. The objective of this bottle-roll and column-leach testing was to evaluate the differences in gold extraction, comparing conventional-crush results to HPGR-crush results.

13.7.2.1 2018 Dark Star Bottle-Roll Tests on HPGR Composite Samples

Bottle-roll leach tests were performed on 500 g or 1,000 g portions of head material comminuted to a P80 target size of 1,700 microns (1.70 mm), 75 microns (0.075 mm), and 38 microns (0.038 mm). Bottle-roll tests, wet screening and assay methods were performed with the same procedures outlined in Section 13.6.2. The 2018 bottle-roll results are shown in the Metallurgical Report (Simmons, 2019, Appendix 39).

Bottle-roll cyanide-leach gold extractions are lower for the Dark Star Main composite but appear to be in line with the lower gold head grade. Silver extractions are low for both Dark Star Main and North composites, this is expected for low silver head grades which are of minimal economic significance.

13.7.2.2 2018 Dark Star Column-Leach Tests on HPGR Composite Samples

Column-leach tests were performed on eight HPGR composite-sample charges, four from Dark Star Main and four from Dark Star North, prepared in the following manner sample:

  • Conventional crush to target P80 = 12.5 mm

  • HPGR crush at low press force (2.20 N/mm2) setting, P80 = 7,000 µm

  • HPGR crush at medium press force (3.35 N/mm2) setting, P80 = 6,500 µm

  • HPGR crush at high press force (4.30 N/mm2) setting, P80 = 5,000 µm

The column tests were leached for 80 days with a dilute sodium cyanide solution, utilizing the same procedures as outlined in Section 13.2.2. Column-leach test results are summarized in the Metallurgical Report (Simmons, 2019, Appendix 40); extractions results are based upon the calculated head derived from the loaded carbon assays + tails assays.

For the Dark Star “Main Master Composite #1” gold extractions ranged from 81% (conventional crush) to 86% (HPGR average, all pressure settings) based upon calculated heads ranging from 0.709 g Au/t to 0.736 g Au/t. Sodium cyanide consumption ranged from 0.76 kg/t to 0.84 kg/t and hydrated-lime consumption ranged from 1.01 kg/t to 1.04 kg/t.

For the Dark Star “North Master Composite #2” gold extractions ranged from 86% (conventional crush) to 91% (HPGR high pressure) based upon calculated heads ranging from 1.20 g Au/t to 1.70 g Au/t. Sodium cyanide consumption ranged from 0.59 kg/t to 0.89kg/t and hydrated lime consumption ranged from 1.00 kg/t to 1.03 kg/t.

A graphical comparison of gold extraction from conventionally-crushed versus HPGR-crushed sample charges, from the Dark Star Main Master Composite #1, is shown in Figure 13-12.

   

13-24

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-12: 2018 Dark Star Main - Conventional Crush vs. HPGR Gold Extraction

The green line in Figure 13-12 is provided for benchmarking purposes and represents the original 2017 Phase 1 conventional-crush gold extraction results by weight-averaging the variability composite samples that were included in the Dark Star Main Master Composite #1. The blue line represents conventional-crush gold extraction results on HPGR Master Composite #1 from the 2018 HPGR tests. The magenta triangles represent gold-extraction results for the three HPGR Master Composite #1 column-leach tests at low, medium, and high HPGR press forces.

A graphical comparison of gold extraction from conventionally-crushed versus HPGR-crushed sample charges from the Dark Star North Master Composite #2 is shown in Figure 13-13. The green and blue lines and the magenta triangles represent, respectively: the original 2017, Phase 1, conventional-crush gold-extraction results by weight averaging the variability composite samples that were included in the Dark Star North Master Composite #2, the conventional-crush gold extraction results from HPGR Master Composite #2 in the 2018 HPGR tests, and gold extraction results from the three HPGR Master Composite #2 column-leach tests at low, medium, and high HPGR press forces.

   

13-25

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-13: Dark Star North - Conventional Crush vs. HPGR Gold Extraction

The Dark Star Main HPGR column-leach gold extractions are significantly higher than the conventional-crushed column charge. The Dark Star North HPGR gold extractions are only marginally higher than the conventional-crushed composite at similar P80’s. While it is relatively simple to design a flowsheet to produce any specific P80 particle size from conventional crushing, it is not for HPGR comminution. The P80’s shown in Figure 13-12 and Figure 13-13 represent a close approximation to the product size that would be produced in a commercial HPGR comminution circuit.

13.7.3 2018 Dark Star Main & North HPGR-Crushed Load Permeability Testing

All column-leach charges were leached without cement addition or agglomeration for this phase of testing. Column-leach residues were subjected to evaluation of percent slump maximum percolation rate and load permeability tests. Results are shown respectively in Appendix 41, 42, and 43 (Simmons, 2019).

The medium press-force column-leach residue from Dark Star Main HPGR Master Composite #1 failed load permeability testing at all heights. The medium and high press-force column-leach residues from two of the Dark Star North HPGR Master Composite #2 charges failed at all heights. All other column-leach residues passed at all heights tested. It is recommended that future testing continue to evaluate cement agglomeration on HPGR-comminuted samples to support heap heights of at least 50 m, and possibly 75 m.

13.8 2019 GOLD STANDARD DARK STAR DEPOSIT METALLURGICAL TEST WORK

In 2018 Gold Standard commissioned KCA to complete a bottle roll, conventional crush and HPGR crush column leach metallurgical test program on 2017-2018 drill core composite samples from the Dark Star Main and North deposits. Test results are documented in KCA (2019b).

   

13-26

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.8.1 2019 Dark Star Head Assays for Bottle-Roll and Column-Leach Tests

Head assays and geo-metallurgical characterization analyses were obtained for 50 composites using a combination of four separate laboratories: KCA, ALS, UBC, and FLS. The head assays are tabulated in Appendix 44 through 47 (Simmons, 2019) showing that:

  • Gold grade ranged from 0.182 to 5.62 ppm and averaged 1.23 ppm.

  • Silver grade ranged from 0.50 to 3.50 ppm and averaged 1.01 ppm.

  • Organic carbon ranged from 0.01 to 1.13% (sulfide sample) and averaged 0.16%.

  • Sulfide sulfur ranged from <0.01 to 0.83% (sulfide sample) and averaged 0.18%.

  • Preg-robbing analysis ranged from 0.0 to 5.3% and averaged 0.7% (non-preg-robbing).

  • Copper values were very low, ranging from 9 to 43 ppm and averaged 18 ppm.

  • Gold cyanide solubility ranged from 33.4% (sulfide sample) to 100% and averaged 83.2%.

  • Concentrations of deleterious elements by ICP were low: <5 ppm selenium on average, mercury ranged from 0.1.3 to 63.0 ppm (sulfide sample) and averaged 7.8 ppm, and arsenic ranged from 1.1 to 562 ppm with an average of 198 ppm.

  • Concentrations of the primary cyanide consumers were low and suggest minimum potential for effecting cyanide consumption rates. Copper averaged 18 ppm, nickel averaged 36 ppm, and zinc averaged 131 ppm.

  • Whole-rock quartz (SiO2 ) analyses were high, ranging from 51.4 to 93.7% and averaged 88.3%.

13.8.2 2019 Dark Star Bottle-Roll and Column-Leach Tests at KCA

Fifty drill core composites were subjected to bottle-roll leach testing at target P80 sizes of 75 µm and 1,700 µm, conventional crush column-leach testing at crush sizes of 12.5 mm and 25.0 mm and six of the fifty composites were HPGR crushed (at medium press) force and column leached. The main objective of the bottle-roll and column-leach testing was to evaluate laboratory-scale leachability of the Dark Star mineral resource in terms of gold extraction, extraction rate, reagent consumption, sensitivity to feed size, and to evaluate comparative differences between conventional crush and HPGR crush Au recovery.

13.8.2.1 2019 Dark Star Bottle Roll Tests

Bottle-roll leach testing was conducted on portions of material from each of the 50 composites. A 500 or 1,000 g portion of head material was crushed to a nominal size of 1,700 µm (1.70 mm) and utilized for leach testing. A second portion of material was milled in a laboratory rod mill to a target size of 80% passing 75 µm (0.075 mm). The milled slurry was then utilized for leach testing. The tests which are described in detail by the laboratory report (KCA 2019b), employed retention times of 144 hours for the 1,700 µm material and 72 hours for the 75 µm material.

Gold Standard has divided the Dark Star deposit into two zones for metallurgical testing: Dark Star Main and Dark Star North. Dark Star metallurgical core holes are color coded by year in Figure 13-14 (below). The 2017 (green) and 2018 (blue) core holes were used in the 2019 bottle-roll and column leach test work.

Gold and silver extraction results are summarized in Appendix 48(75 µm Bottle Rolls), Appendix 49(1,700 µm Bottle Rolls), Appendix 50 (Conventional Crush Columns), and Appendix 51(HPGR Crush Columns) from the Metallurgical Report (Simmons, 2019). Dark Star zones from which composite sample material originated is shown in Figure 13-10.

   

13-27

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-14: Location Map for 2017-8 Dark Star Metallurgical Composites

   

13-28

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The following is a summary of the findings from the 2019 Dark Star bottle roll test results:

13.8.2.2 2019 Dark Star 75 µm (200 Mesh) Bottle-Roll Results

Dark Star 200-mesh bottle-roll gold and silver extraction results are shown in the Metallurgical Report (Simmons, 2019, Appendix 48). Gold head grades for the 200-mesh composite samples ranged from 0.18 to 5.85 ppm Au with an average of 1.19 ppm Au. Gold extraction ranged between 24.7 and 96.1% and averaged 80.8%. Three of the composites were sulfide/carbon refractory with gold cyanide solubility <60%, 20 of the composites were transitional with gold cyanide solubility >60% and <85%, and 27 of the composites were oxide with AuCN solubility >85%.

Silver grades are very low at Dark Star. Silver head grades for the 75 µm composites ranged from 0.31 to 2.81 ppm Ag with an average of 0.87 ppm Ag. Silver extraction ranged from 7.3 to 85.4% and averaged 42.7%. Cyanide consumption averaged 0.90 kg/t and lime consumption averaged 1.08 kg/t.

13.8.2.3 2019 Dark Star 1,700 µm (10 Mesh) Bottle-Roll Results

Dark Star 10-mesh bottle roll gold and silver extraction results are shown in the Metallurgical Report (Simmons, Appendix 49). Gold head grades for the 1,700 µm composite samples ranged from 0.15 to 5.89 ppm Au with an average of 1.15 ppm Au. Gold extraction ranged between 26.0 and 94.5% and averaged 75.0%. Three of the composites were sulfide/carbon refractory with gold cyanide solubility <60%, 20 of the composites were transitional with gold cyanide solubility >60% and <85%, and 27 of the composites were oxide with AuCN solubility >85%.

Silver grades are very low at Dark Star. Silver head grades for the 1,700 µm composites ranged from 0.38 to 2.77 ppm Ag with an average of 1.25 ppm Ag. Silver extraction ranged from 4.3 to 67.1% and averaged 24.9%.

Cyanide consumption averaged 0.59 kg/t and lime consumption averaged 1.27 kg/t.

13.8.2.4 2019 Dark Star 12.5 mm and 25.0 mm Conventional Crush Column Leach Results

Eleven of the 2019 composites were column leached utilizing material crushed to 100% passing 19 mm (target P80 = 12.5 mm), and thirty-nine composites were crushed to 100% passing 37.5 mm (target P80 = 25 mm) for column leach testing. During testing, the material was leached for 66, 95, 98 or 99 days with NaCN solution and placed, respectively, in columns of 100 mm and 150 mm diameters. After leaching, each test was washed for four days with water. A portion of the tailings material from each column-leach test was utilized for tail screen analyses with assays by size fraction. Column-leach gold and silver extraction results are based upon pregnant solution carbon assays and tails screen assays and are summarized in the Metallurgical Report (Simmons, 2019, Appendix 50).

Seven of the columns were agglomerated with 2 kg/t of cement in the laboratory column set-up. Column-leach extraction results were calculated based upon loaded carbon assays and tails screen assays. Calculated gold head grades for the 50 columns ranged from 0.19 to 5.39 ppm Au with an average of 1.32 ppm Au. Gold extraction ranged between 28.4 and 94.7% with an average of 74.5%.

  • Three of the column-leach composites were sulfide/carbon refractory with gold cyanide solubility <60%. Gold extraction ranged from 28.4 to 39.9% and averaged 35.1%.

  • Twenty of the column-leach composites were transitional with gold cyanide solubility >60% and <85%. Gold extraction for these columns ranged from 47.5 to 84.7% and averaged 67.2%.

  • Twenty-seven of the column-leach composites were oxide with gold cyanide solubility >85%. Gold extraction for these columns ranged from 63.3 to 94.7% and averaged 84.4%.

   

13-29

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Calculated silver head grades for the 50 columns ranged from 0.41 to 2.90 ppm Ag with an average of 1.17 ppm Ag. Silver extraction results ranged between 12.0 and 76.1% with an average of 35.5%. Silver head grades for Dark Star are very low and of minimal economic significance.

Cyanide consumption averaged 0.95 kg/t and lime consumption averaged 0.92 kg/t. Commercial scale ROM cyanide consumptions are expected to be in the range of 25 to 33% of laboratory-scale test results. Laboratory lime consumptions are assumed to be similar to commercial-scale consumptions.

Gold extraction versus days under leach for the 50 column-leach tests are shown graphically in Figure 13-15.

13.8.2.5 2019 Dark Star HPGR Crush (Medium Press Force) Column Leach Results

Seven duplicate splits from the fifty 2019 composites were HPGR Crushed using medium press force conditions and column leached under the same conditions as their conventional crush column pairs. After leaching, each test was washed for four days with water. A portion of the tailing material from each column-leach test was utilized for tail screen analyses with assays by size fraction.

Column-leach gold and silver extraction results are based upon pregnant solution carbon assays and tails screen assays and are summarized in the Metallurgical Report (Simmons, 2019, Appendix 51).

Plots of the laboratory column leach gold extractions, for the HPGR and conventionally crushed composites are shown in Figure 13-15.

   

13-30

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-15: 2019 Dark Star Column-Leach Gold Extraction vs. Days under Leach

13.8.3 2019 Dark Star Comminution Characterization at HRI

Thirteen of the 2019 Dark Star drill core samples were selected for comminution test work. These samples were splits from metallurgical composites and represent major material types. They were subjected to the modified SMC Test at HRI to generate data for SMC parameters; Mic by JKTech and Ai testing was also completed. A final letter report was issued: Comminution Testing, Hazen Project 12620 Report and Appendices A and B - February 11, 2019 (Stepperud, 2019b).

13.8.3.1 2019 Dark Star SMC Test Results

The 2019 Hazen SMC Test® results for the thirteen samples are given in the Metallurgical Report (Simmons, 2019, Appendix 52). This table includes the average rock density, A x b and drop-weight index values that are the direct result

   

13-31

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

of the SMC Test® procedure. The values determined for the Mia, Mih, and Mic parameters, and the definitions of these abbreviations developed by SMCT are also presented in this table.

13.8.3.2 2019 Dark Star SAG Mill Comminution Test

The drop weight index ranged from 2.05 to 9.62 kWh/m3, indicating soft to medium-hard material, and is tabulated along with other parameters of the SMC evaluation in Appendix 52 (Simmons, 2019). The range of A x b for the 12 composites spanned a low of 34.6 (moderately hard) to a high of 123.3 (soft) and averaged 49.3.

13.8.3.3 2019 Dark Star Bond Abrasion Index (Ai) Tests

Bond Abrasion index testing was performed at Hazen on thirteen Dark Star composite samples. Appendix 53 from the Metallurgical Report (Simmons, 2019) lists the Ai values for the 13 composites that were tested. Ai values ranged from a low of 0.0306 g to a high of 1.1656 g, indicating very soft to high abrasiveness of the materials tested. The silica content of the Dark Star mineralized material is the inferred rock component that contributes to the corresponding high Ai test results.

13.8.3.4 2019 Dark Star Comminution Test Summary

The Dark Star comminution samples tested can be considered amenable to conventional, multi-stage crushing and screening circuit design. Mic, the SMC crusher-component value (average = 6.8 kWh/t), would be ranked in the midrange of the SMC worldwide database.

The Ai values range from low to high (average = 0.6895 g) and represent the potential for average to above average rates of wear on crusher liners, screen panels and conveyor drop boxes.

13.8.4 2019 Dark Star Load Permeability Testing

A portion of material from fifteen (15) conventionally crushed column-leach residues and four (4) HPGR crushed column residues were utilized for load permeability testing. The purpose of the load permeability test work was to examine the permeability of the crushed material under compaction loading equivalent to heap heights of 25, 50, 75, and 100 m.

Test cell set up and guidelines for interpreting load permeability results have been described earlier in this Technical Report. Refer to Section 13.2.4 for details.

All fifteen conventional crush column residues passed at simulated heap heights up to 100 meters except for the column residue from composite DS17-07 #94, which failed at 75 and 100-meter simulated heap height, using the KCA criteria. See Appendix 54 in the Metallurgical Report (Simmons, 2019) for a summary of the conventional crush load permeability test results.

All four HPGR crush column residues passed at simulated heap heights of 75 meters. Three of the four column residues were agglomerated with 6 kg/t of cement and failed at 100 meters, using the KCA criteria. See Appendix 55 in the Metallurgical Report (Simmons, 2019) for a summary of the HPGR load permeability test results.

13.9 GEO-METALLURGY CHARACTERIZATION

13.9.1.1 Pinion Deposit Geo-Metallurgy

Large geo-metallurgy databases have been developed for the Pinion and Dark Star deposits to assist in evaluating material type selections, representing different Au and Ag recovery response. The corresponding geo-metallurgical

   

13-32

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

analysis has identified key variables, within both deposits, that were used to select the different metallurgical recovery zones requiring separate gold recovery modeling.

The following is a summary of the four gold and silver recovery zones in the Pinion Deposit:

  1.     

Mtp (Tripon Pass) - Tripon Pass mineralization is a formation unit that sits on top of the multi-lithic breccia (mlbx) which hosts the majority of the Au mineralization at Pinion.

  2.     

Mlbx Pinion East (Ba > 4.0%, Hi SiO2 ) - The Pinion East Zone is carved out of a larger mlbx zone that is characterized by high barium (Ba) > 4.0% and high quartz (SiO2 ) > 65%.

  3.     

Mlbx Pinion West - The Pinion West Zone captures all the remaining Pinion mlbx zone of mineralization that is not contained within the Pinion East (Ba > 4.0%, Hi SiO2 ) zone.

  4.     

Ddg (Devils Gate) - Devils Gate mineralization is stratigraphically positioned underneath the Pinion mlbx.

13.9.1.2 Dark Star Deposit Geo-Metallurgy

The Dark Star mineralization is hosted in two connected deposits: Dark Star North and Dark Star Main. Dark Star North can be characterized as a relatively high-grade heap leachable deposit, whereas Dark Star Main is lower grade and contains more transitional mineralization. Within both deposits, gold mineralization is mainly contained within three formation units: ST-U (upper siltstone), CGL (middle conglomerate), and ST-L (lower siltstone). Geo-metallurgical evaluations did not detect significant variation in gold recovery based upon the host formation but did identify a significant difference is gold recovery response in local regions of low and high silica Intensity (SI), as logged by the geologists. Silica Intensity (SI) is characterized by the geologists using a scale of 0 to 3, with 0 indicating no (or low) silica and 3 being the highest silica.

Recovery models for silver were not developed for Dark Star because of its low silver contents.

The following is a summary of the four gold recovery zones, in the Dark Star deposit:

1. Dark Star Main (SI<2.0)
2. Dark Star Main (SI>2.0)
3. Dark Star North (SI<2.0)
4. Nrth Dark Star North (SI>2.0)

13.9.2 Au and Ag Recovery Methodology

The following is a brief description of the methodology used to derive the Pinion and Dark Star gold-recovery models. Four steps were used in developing final Au recovery models for Pinion and Dark Star:

Step 1: Determining the gold extraction for each variability composite using a combination of fine grind/crush bottle rolls and medium/coarse crush column tests.

Step 2: Develop head grade vs. tails grade models to use in final development of the gold recovery equations.

Step 3: Build a database of the laboratory solution: ore (S/O) ratio data at various percentages of total extractable gold. A correction factor is applied to each laboratory S/O ratio data point to scale up the laboratory data to commercial scale. Typical laboratory S/O ratio data is tabulated for the following percentages of total extractable gold: 60%, 70%, 80%, 90%, 95%, and 99%.

Step 4: Incorporating steps 1-3 into final recovery models that reflect commercial scale inefficiencies and deductions for solution losses, plus application of cumulative S/O ratios over the life of the project to predict timing of gold recovery.

   

13-33

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.9.2.1 Step 1: Determining the Gold Extraction for Each Composite

  • For each composite sample perform a series of bottle-roll and column-leach tests at a range of reasonable P80 particle sizes, typically 75 um, 1,700 m, 12.5 mm (minimum) or larger column feed sizes;

  • Determine gold extraction as a percent (%) of the fire assay and cyanide-solubility value at each feed size and plot gold extraction versus particle size on a log-normal graph;

  • Fit an equation through the data; and

  • Use the equation to calculate and extrapolate gold extraction to the desired ore-particle size, e.g. ROM size at 150 mm (150,000 microns).

An example log-normal plot for the Dark Star Main composite (MDS) #9C is provided in Figure 13-16.

Figure 13-16: Dark Star Composite #9C:P80 vs. Au Extraction (%)

Gold extractions at various P80 particle sizes are calculated (projected) using the gold fire assay (black) and gold cyanide solubility (green) equations in Figure 13-16. The results for composite MDS #9C are presented in Table 13-6. Only the fire assay gold extraction model equation is used for projection of heap-leach gold recovery for the Pinion and Dark Star mineral resources.

   

13-34

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 13-6: Example: Dark Star Composite MDS #9C Gold Extraction

P80 Au Rec Au Rec
µm Inches % of FA % of AuCN
75   86.2 93.9
1700   85.3 92.9
12,500 0.50 84.7 92.3
25,000 1.0 84.5 92.0
50,000 2.0 84.3 91.8
150,000 6.0 84.0 91.5

Using the example Figure 13-16 and Table 13-6, projected gold extraction will be 84.0% at a ROM size P80 of 150,000 microns (150 mm). Corresponding gold extraction at a P80 of 12,500 microns (12.5 mm) will be 84.7%. Note that the gold extractions shown here have not been corrected for commercial-scale operation inefficiencies, which typically fall in the range of negative 1 to 3% depending upon head grade, solution to ore (“S/O”) application ratios, and process soluble losses.

As an example, the summary of the gold extraction model results derived from the 2017-8 Dark Star Main bottle roll and column-leach testing is presented in Table 13-7.

Table 13-7: Example: Dark Star Gold Extraction Model Results

Comp ID Zone Mat'l
Type
Modeled Au Extraction %
Calc Hd
Au(ppm)
P80=
75 µ
P80=
1700µ
P80=
12.5 mm
P80=
25 mm
P80=
50
mm
P80
150 mm
DS16-17 #1(C) DS Main Oxide 0.330 82.5 81.1 80.3 80.0 79.7 79.2
DS16-17 #2(C) DS Main Oxide 0.911 93.5 91.8 90.7 90.3 89.9 89.3
DS16-17 #3(C) DS Main Oxide 0.915 84.4 73.0 65.7 63.2 60.6 56.6
DS16-17 #5(C) DS Main Oxide 0.899 92.5 92.5 92.5 92.5 92.5 92.5
DS16-18 #9(C) DS Main Oxide 0.877 86.2 85.3 84.7 84.5 84.3 84.0
DS16-18 #11(C) DS Main Oxide 1.173 89.8 89.2 88.9 88.7 88.6 88.4

13.9.2.2 Step 2: Head and Tail Grades and Recovery Models

Head grade vs. Tails grade plots and the resulting gold recovery equations are first developed in the absence of consideration for commercial scale inefficiencies and system losses.

Final gold recovery models are derived by applying commercial scale heap leach inefficiencies and system losses to the gold extraction models discussed in the Methodology Section of this Technical Report, which explains the development of the head and tails relationship, S/O Ratio models, commercial scale heap leach inefficiencies, and solution losses.

Using this approach, a head grade and recovery relationship can be developed by incorporating the following components:

   

13-35

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Equation 1:

Au Rec = HG - TG =  HG - (a x HG + b) + system losses) (1)
HG HG  
  • Where HG = head grade in ppm (g/t);

  • TG = tail grade in ppm (g/t);

  • Where a and b are constants from the tails grade fitted equation. This example assumes a linear equation, but it can also be a natural log, power function, or polynomial equation whichever provides the best fit of the data; and

  • System losses are the losses due to solution hold up in the heap at the end of economic gold recovery from the heap.

Equation 1 calculates the expected gold recovery that can be achieved from a reasonably well operated heap leach. Under commercial heap-leach conditions, recovery takes place over an extended period of time and must be known as a function of time for planning purposes. To achieve this, the solution:ore ratio (S/O) concept is used.

13.9.2.3 Step 3: Solution to Ore Ratio Models

Determine the % recovery of extractable gold, as a function of time, as represented by the S/O ratio.

  • Since commercial heap-leach, coarse-particle material sizes, are not normally tested under laboratory conditions, S/O ratio requirements vs. P80 particle size, need to be established to derive a value at the operational coarse-particle or ROM size;

  • Select percentages of the total extraction that will be used, typically 60%, 70%, 80%, 90%, 95%, and 99% of total gold extraction;

  • Construct a graph of particle size vs. S/O (normal/normal) and obtain a graphical relationship.

  • From this, the S/O ratio required at a specific particle size to achieve a target % of total gold extraction can be calculated;

  • Data points are collected for all percentages of total extraction for all ore types;

These values are graphed on a P80 (particle size in microns or mm) versus S/O ratio plots for the various percentages of total extractable gold content, i.e., 60%, 70%, 80%, 90%, 95%, and 99% (ultimate recovery) of total extractable gold content. An example S/O Ratio plot for achieving 70% recovery of total extractable gold is shown in Figure 13-17.

   

13-36

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-17: Example Pinion Feed P80 vs. S/O Ratio Plot, 70% Recovery of Total Extractable Gold

By using the equations from all the plots at 60%, 70%, 80%, 90%, 95%, and 99% (ultimate recovery) of total extractable-gold content, a relationship can be developed to predict the percent recovery of total extractable gold as a function of S/O ratio, for all potential heap-leach feed P80 particle sizes. An example plot is provided in Figure 13-18.

Figure 13-18: Example Pinion Mineral Resource S/O Ratio vs. % Recovery of Total Extractable Gold

13.9.2.4 Step 4: Bringing the Two Together

  • To relate recovery as a function of time, the above two parameters (recovery as a function of head grade and recovery as a function of time, S/O Ratio) need to be incorporated together; and

   

13-37

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT
  • From the % recovery of total extractable gold vs. S/O ratio graphs, a linear or natural log equation can be developed of the format used in Equation 2 to represent the ROM heap-leach option.

Equation 2:

% of maximum recovery achieved at a given time = d x (S/O) + f (linear shown) (2)

The variables d and f are constants from the fitted equation, in Figure 13-18, with d = 0.1385 and f = 0.4514 in the example for a ROM heap leach with P80 = 150,000 microns (150 mm).

To determine the S/O ratio at any given time, the loading schedule, application rates, and application schedules need to be combined and interpreted.

The final recovery equation is then of the format:

Equation 3:

Recovery % = HG - ((a x HG +b) + system losses) x (d x (S/O) + f) (3)
HG  

13.9.3 Pinion Deposit Recovery Models

Metal recovery, head grade vs. tail grade, and S/O ratio models were developed from the data derived from reconstructed historical column-leach testing and from the 2016-2019 metallurgical test programs commissioned by Gold Standard and carried out by KCA.

13.9.3.1 Head Grade vs. Tail Grade Models

Metallurgical data used for developing the overall Pinion mineral resource head-tails gold-recovery relationship and S/O ratio models have been reported in the Pinion deposit metallurgical section in this Technical Report (above) and details can be found in the Appendix tables.

Head grade versus tails grade models were developed for four geo-metallurgy recovery zones, based upon differences in lithology/formation, barium content, silica intensity (SI), and gold recovery response:

  • Mtp - Tripon Pass Formation;

  • Ddg - Devils Gate Formation;

  • Mlbx Pinion West Zone, and

  • Mlbx Pinion East Zone (Ba >4.0%, Hi SiO2 )

The mlbx Pinion West models (and graphs) were developed for multiple crush and ROM P80 feed sizes. The model for ROM P80 = 150,000 microns (150 mm) is shown in Figure 13-19. Similar models were developed for the mlbx Pinion East (Ba>4.0%, Hi SiO2), Mtp and Ddg geo-metallurgy material types.

   

13-38

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-19: Pinion Head/Tails Grade

13.9.3.2 Pinion Solution:Ore Ratio Model

The laboratory S/O data reported by KCA was adjusted to 9.0 m to represent commercial-scale ROM heap height. The column-leach data from two bulk-sampling programs designated as composites SBBO and PMZ, tested in 1995 by Cyprus and in 2004 by RSM, were reconstructed and used to assist in projecting S/O ratio requirements at coarser particle size.

Figure 13-20 and Figure 13-21: are plots of heap-leach feed P80 versus S/O ratio required to achieve 70% and 90% recovery of total extractable gold. These plots show a typical progression of the increased S/O ratio required to achieve higher recovery of total extractable gold content at increasing feed size. The fitted straight-line equations obtained from the graphs in Figure 13-20 and Figure 13-21, with similar graphs plotted for 60%, 80%, 95%, and 99% recovery of total extractable gold, are all used to model S/O ratios for the deposit at any heap-leach feed particle size. The results of this model are shown graphically in Figure 13-22.

   

13-39

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-20: P80 vs. S/O Ratio for 70% Recovery of Total Extractable Gold

Figure 13-21: P80 vs. S/O Ratio for 90% Recovery of Total Extractable Gold

   

13-40

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-22: Percent Recovery of Pinion Total Extractable Gold vs. Heap-Leach Feed Size

Note: feed sizes shown by symbols are in micrometers.

For a ROM heap leach, 99% recovery of total extractable gold is achieved at S/O ratio = 3.56, as shown in Table 13-8. If crushing were to be used at Pinion, S/O ratios required to recover 99% of total extractable gold would be significantly lower depending upon the degree of particle size reduction.

Table 13-8: Modeled Pinion S/O Ratios at Various P80 Particle Size

% of Extractable
Au
S/O Ratios: P80 Particle Size (microns)
12,500 50,000 100,000 150,000
60% 0.04 0.23 0.48 0.73
70% 0.06 0.35 0.73 1.11
80% 0.12 0.54 1.09 1.65
90% 0.29 0.81 1.50 2.19
95% 0.44 1.14 2.08 3.03
99% 0.85 1.59 2.57 3.56

The ROM (P80 = 150 mm) trend line equation fitted to the data in Table 13-8, and shown graphically in Figure 13-22 above, was used to obtain the linear equation constants d and f to be used in Equation 2: and Equation 3:. In the Pinion case d = 0.250 and f = 0.6798.

Since the commercial scale design criteria for the Pinion ROM heap leach uses a S/O ratio of 3.6 - by default Equation 2 = 0.98 (by assuming a 2.0% loss of solubilized gold in the heap leach that is not recovered). This simplifies Equation 3 as shown in Equation 4 below:

Equation 4:

Recovery % = HG - ((a*HGb) + system losses) x 0.98 (4)
HG  

 

   

13-41

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.9.3.3 Summary of Pinion Gold and Silver Recovery Models

The heap leach values for the constants a, b, d, and f, which are needed for Equation 4, are summarized in Appendix 56 in the Metallurgical Report (Simmons, 2019) for the Mtp, Ddg, mlbx Pinion West, and mlbx Pinion East (Ba>4.0%, Hi SiO2) material types. The values associated with solution losses in the heap have been estimated to be 0.0008 g/t Au.

Constants in (Simmons, 2019, Appendix 56) were used to calculate commercial-scale gold recovery for a heap leach using ROM P80 = 150,000 microns for all material types. This takes into account the models derived for tails grade, S/O ratio losses, commercial scale inefficiencies, and system solution losses. The gold recovery model predicted results for mlbx Pinion West is shown in Table 13-9. Similar tables were developed for the Mtp, Ddg, and mlbx Pinion East (Ba>4.0%, Hi SiO2) recovery zones.

Table 13-9: mlbx Pinion West Zone - Modeled Head Grade vs. Gold Recovery

Au (g/t) ROM HL (150 mm)
Tail Grade Au(g/t) Au Rec %
0.100 0.0539 44.3
0.200 0.0930 52.0
0.400 0.1605 58.5
0.600 0.2207 61.8
0.800 0.2767 64.0
1.000 0.3298 65.6
1.500 0.4537 68.3
1.750 0.5121 69.3
2.000 0.5688 70.1
3.000 0.7824 72.4

13.9.3.4 ROM Pinion Gold Recovery Equations (Oxide)

ROM - mlbx Pinion West zone oxide gold recoveries shown in Table 13-9 are presented graphically in Figure 13-23 Final gold model recovery equations are shown for two gold grade ranges: <0.40 g Au/t (natural log function) and >0.40 g Au/t (natural log function). See Table 13-10 for all of the Pinion (Oxide) gold recovery zone equations.

ROM Pinion Silver Recovery Equations (Oxide)

Pinion silver recovery models were developed using the same techniques as for gold recovery and are not shown here for brevity. Refer to Table 13-10 for all of the Pinion (Oxide) silver recovery zone equations.

HPGR Pinion Gold and Silver Recovery Equations (Oxide)

The Pinion HPGR gold and silver recovery equations were developed by testing column pairs, one column feed was prepared using laboratory jaw and/or cone crushing equipment and a second column feed prepared by using laboratory scale HPGR equipment. The differences in gold extraction between the conventionally crushed and HPGR crushed composite samples, after commercial scale modeling, was used to factor the HPGR Au recovery model/equations. See Table 13-11 for the Pinion (Oxide) gold and silver recovery equations using HPGR crushing.

   

13-42

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-23: Pinion mlbx Pinion West Zone - Gold Recovery Model

The Pinion ROM and HPGR gold and silver recovery equations tabulated below should be used for mine and process modeling and for economic evaluation.

Table 13-10: ROM Pinion Gold and Silver Recovery Equations (Oxide)

Geomet Rec Zone Equation Gold Recovery, % Range
ROM - mlbx Pinion West 5 =10.203*ln(HG) + 68.038 Au HG < 0.40 g/t
6 =6.9059*ln(HG) + 65.295 Au HG ≥ 0.40 g/t
ROM - mlbx Pinion East (Ba>4.0%, Hi SiO2 ) 7 =8.3765*ln(HG) + 52.119 Au HG < 0.40 g/t
8 =1.612*ln(HG) + 45.803 Au HG ≥ 0.40 g/t
ROM - Mtp (Tripon Pass) 9 =6.7859*ln(HG) + 66.608 Au HG < 0.40 g/t
10 =1.3059*ln(HG) + 61.492 Au HG ≥ 0.40 g/t
ROM - Ddg (Devils Gate) 11 =11.823*ln(HG) + 81.691 Au HG < 0.40 g/t
12 =2.257*ln(HG) + 72.763 Au HG ≥ 0.40 g/t
       
Geomet Rec Zone Equation Silver Recovery, % Range
ROM-mlbx Pinion West 13 =6.1173*ln(HG) + 0.1598 Ag HG < 6.0 g/t
14 =1.5839*ln(HG + 8.264) Ag HG ≥ 6.0 g/t
ROM-mlbx Pinion East (Ba>4.0%, Hi SiO2 ) 15 =3.7645*ln(HG) - 1.686 Ag HG < 6.0 g/t
16 =0.9747*ln(HG) + 4.8186 Ag HG ≥ 6.0 g/t
ROM - Mtp (Tripon Pass) 17 =0.2926*ln(HG) + 4.2102 All Ag grades
ROM - Ddg (Devils Gate) 18 =8.0095*ln(HG) + 27.973 All Ag grades

 

   

13-43

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 13-11: HPGR Pinion Gold and Silver Recovery Equations (Oxide)

Geomet Rec Zone Equation Gold Recovery, % Range
HPGR - mlbx Pinion West 19 =10.203*ln(HG) + 75.119 Au HG < 0.40 g/t
20 =6.9059*ln(HG) + 2.292 Au HG ≥ 0.40 g/t
HPGR - mlbx Pinion East (Ba>4.0%, Hi SiO2 ) 21 =8.3765*ln(HG) + 75.119 Au HG < 0.40 g/t
22 =1.612*ln(HG) + 69.023 Au HG ≥ 0.40 g/t
HPGR - Mtp (Tripon Pass) 23 =6.7859*ln(HG) + 79.446 Au HG < 0.40 g/t
24 =1.3059*ln(HG) + 74.330 Au HG ≥ 0.40 g/t
HPGR - Ddg (Devils Gate)   (High clay, not suitable for HPGR)  
       
Geomet Rec Zone Equation Silver Recovery, % Range
HPGR - mlbx Pinion West 25 =3.043*ln(HG) + 37.246 All Ag grades
HPGR - mlbx Pinion East (Ba>4.0%, Hi SiO2 ) 26 =3.7645*ln(HG) + 38.289 Ag HG ≥ 6.0 g/t
27 =0.8298*ln(HG) + 43.623 Ag HG < 6.0 g/t
HPGR - Mtp (Tripon Pass) 28 =0.2926*ln(HG) + 19.546 All Ag grades
HPGR - Ddg (Devils Gate)   (High clay, not suitable for HPGR)  

The Ddg formation is high clay and is not suitable for HPGR crushing.

13.9.4 Dark Star Main and Dark Star North Deposit Recovery Models

Dark Star head grade vs. tails grade, S/O ratio and metal recovery models were developed using the same methodology applied to the Pinion deposit. Actual data extracted for developing the models were taken from the 2017-2019 metallurgical test programs commissioned by Gold Standard and carried out by KCA.

13.9.4.1 Head Grade vs. Tail Grade Models

Metallurgical data used for developing the overall Dark Star mineral resource head-tails gold-recovery relationship and S/O ratio models have been reported in the Dark Star metallurgical sections of this Technical Report (above) and details can be found in the corresponding Appendices to this Technical Report.

Dark Star head grade vs. tails grade models were developed for four geo-metallurgy recovery zones based upon deposit location and silica intensity (SI):

  • Dark Star Main (SI<2.0)

  • Dark Star Main (SI>2.0)

  • Dark Star North (SI<2.0)

  • Dark Star North (SI>2.0)

The Dark Star North (SI<2.0) zone Head Grade vs. Tails Grade models (graphs) was developed for multiple crush size, up to ROM feed sizes but only the ROM P80 = 150,000 microns (150 mm) is shown below in Figure 13-24. Similar models were developed for the Dark Star Main (SI<2.0), Dark Star Main (SI>2.0), and Dark Star North (SI>2.0) gold recovery zones and are not shown for brevity.

   

13-44

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-24: Dark Star Head Grade vs. Tails Grade Plot

13.9.4.2 Dark Star Solution: Ore Ratio Model

The laboratory S/O data, reported by KCA, was adjusted to 9.0 m to represent commercial-scale ROM heap height.

Figure 13-25 is a plot of heap-leach feed P80 versus S/O ratio required to achieve 90% recovery of total extractable gold. The largest columns tested were crushed to a target P80 = 25 mm. It is recommended that future test work include columns with larger feed P80 size to develop a more accurate S/O ratio model. The fitted straight-line equations obtained from the graph in Figure 13-25, along with accompanying graphs plotted for 60%, 70%, 80%, 95%, and 99% recovery of total extractable gold, is used to model S/O ratio for the Dark Star deposit at any feed particle size. The results of this model are shown graphically in Figure 13-26.

   

13-45

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-25: P80 vs. S/O Ratio for 90% Recovery of Total Extractable Gold

Figure 13-26: Percent Recovery of Pinion Total Extractable Gold vs. Heap-Leach Feed Size

For a ROM heap leach, 99% recovery of total extractable gold is achieved at S/O ratio = 3.49, as shown in Table 13-12. If crushing were to be used at Dark Star, S/O ratios required to recover 99% of total extractable gold would be significantly lower, depending upon the degree of particle size reduction.

   

13-46

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 13-12: Modeled Pinion S/O Ratios at Various P80 Particle Size

% Extractable
Au
S/O Ratios: P80 Particle Size (microns)
12,500 25,000 50,000 100,000 150,000
60% 0.03 0.05 0.10 0.20 0.29
70% 0.05 0.09 0.18 0.36 0.54
80% 0.07 0.18 0.39 0.81 1.23
90% 0.18 0.37 0.75 1.50 2.25
95% 0.44 0.68 1.15 2.10 3.05
99% 0.89 1.13 1.60 2.54 3.49
P80 (Inches) 0.5 1.0 2.0 4.0 6.0

The ROM (P80 = 150,000 mm) trend line equation fitted to the data in Table 13-12, and shown graphically in Figure 13-22, was used to obtain the power function equation constants d and f to be used in Equation 2: and Equation 3:. In the Dark Star North (SI<2.0) case d = 0.7717 and f = 0.1935.

Since the design criteria for the Pinion ROM heap leach uses a S/O ratio of 3.5 - by default Equation 2: = 0.98 (assuming a 2.0% commercial scale heap leach inefficiency vs. laboratory testing results). Assuming that the LOM S/O ratio function (d x (S/O) + f ) is never less than 3.5. This simplifies Equation 3: as shown in Equation 4 below:

Equation 4:

Recovery % = HG - ((a*HGb) + system losses) x 0.98  
  HG  

13.9.4.3 Summary of Dark Star Gold Recovery Models

The heap leach values for the constants a, b, d, and f, which are needed for Equation 4, are summarized in the Metallurgical Report (Simmons, 2019, Appendix 57) for Dark Star North (SI<2.0) and Dark Star North (SI>2.0) gold recovery zones. Appendix 58 in the Metallurgical Report (Simmons, 2019) is a summary for the Dark Star Main (SI<2.0) and Dark Star Main (SI>2.0) gold recovery zones. The values associated with solution losses in the heap have been estimated to be 0.0008 ppm (g/t) Au.

Constants (Simmons, 2019, Appendix 57 and 58) were used to calculate commercial-scale gold recovery for a heap leach using ROM P80 = 150,000 microns for all gold recovery zones. This takes into account the models derived for head grade vs. tails grade, S/O ratio, commercial heap inefficiencies, and system solution losses. The gold recovery model predicted results for Dark Star North (SI<2.0) is shown in Table 13-13. Similar tables were developed for Dark Star North (SI>2.0), Dark Star Main (SI<2.0), and Dark Star Main (SI>2.0).

   

13-47

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 13-13: Dark Star North (SI<2.0) - Modeled Head Grade vs. Gold Recovery

Au (g/t) ROM HL (150mm)
Tail Grade Au(g/t) Au Rec %
0.100 0.0172 80.4%
0.200 0.0310 82.4%
0.400 0.0560 84.1%
0.600 0.0791 84.9%
0.800 0.1011 85.5%
1.000 0.1223 85.9%
1.500 0.1728 86.7%
2.000 0.2208 87.1%
3.000 0.3119 87.8%
4.000 0.3986 88.2%
5.000 0.4820 88.5%

ROM Dark Star Silver Recovery Equations (Oxide)

Silver grades are very low in the Dark Star deposit and are considered to have no economic value. Therefore, silver recovery models were not developed for Dark Star.

HPGR Dark Star Gold and Silver Recovery Equations (Oxide)

The Dark Star HPGR gold recovery equations were developed by testing column pairs; one column feed was prepared using laboratory jaw and/or cone crushing equipment and a second column feed prepared by crushed using laboratory scale HPGR equipment. The differences in gold extraction between the conventionally crushed and HPGR crushed composite samples, after commercial scale modeling, was used to develop the HPGR Au recovery model/equations.

13.9.4.4 ROM Dark Star Gold Recovery Equations (Oxide)

ROM - Dark Star North (SI<2.0) oxide gold recovery is shown in Table 13-13 and presented graphically in Figure 13-27. Final gold recovery equations are shown for two gold grade ranges: <0.40 g/t (natural log function) and >0.40 g/t (natural log function).

   

13-48

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 13-27: Dark Star North (SI<2.0) - Gold Recovery Model

ROM and HPGR equations for all Dark Star oxide gold recovery zones are provided in the tables below and should be used for mine and process modeling and for economic evaluation.

Table 13-14: ROM - Dark Star Gold Recovery Equations (Oxide)

Geomet Rec Zone Equation Gold Recovery, % Range
ROM - Dark Star North (SI<2.0) 29 =2.675*ln(HG) + 86.591 Au HG < 0.40 g/t
30 =1.746*ln(HG) + 85.848 Au HG ≥ 0.40 g/t
ROM - Dark Star North (SI>2.0) 31 =13.047*ln(HG) + 79.527 Au HG < 0.40 g/t
31 =6.736*ln(HG) + 74.5923 Au HG ≥ 0.40 g/t
ROM - Dark Star Main (SI<2.0) 33 =3.656*ln(HG) + 90.398 Au HG < 0.40 g/t
34 =0.559*ln(HG) + 87.606 Au HG ≥ 0.40 g/t
ROM - Dark Star Main (SI>2.0) 35 =2.544*ln(HG) + 78.065 Au HG < 0.40 g/t
36 =0.389*ln(HG) + 76.104 Au HG ≥ 0.40 g/t

Silver grade at Dark Star is very low and of no economic importance. Silver recovery was not modelled.

   

13-49

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 13-15: HPGR - Dark Star Gold Recovery Equations (Oxide)

Geomet Rec Zone Equation Gold Recovery, % Range
HPGR - Dark Star North (SI<2.0) 37 =2.6752*ln(HG) + 88.622 Au HG < 0.40 g/t
38 =1.7497*ln(HG) + 87.881 Au HG ≥ 0.40 g/t
HPGR - Dark Star North (SI>2.0) 39 =13.047*ln(HG) + 83.459 Au HG < 0.40 g/t
40 =6.7285*ln(HG) + 78.602 Au HG ≥ 0.40 g/t
HPGR - Dark Star Main (SI<2.0) 41 =3.6583*ln(HG) + 91.795 Au HG < 0.40 g/t
42 =0.5637*ln(HG) + 89.007 Au HG ≥ 0.40 g/t
HPGR - Dark Star Main (SI>2.0) 43 =2.5449*ln(HG) + 83.174 Au HG < 0.40 g/t
44 =0.3879*ln(HG) + 81.244 Au HG ≥ 0.40 g/t

Silver grade at Dark Star is very low and of no economic value. HPGR silver recovery was not modelled.

13.9.5 ROM and HPGR Dark Star Gold Recovery Equations (Transition)

ROM and HPGR gold recovery equations were developed for Dark Star North and Dark Star Main transition zones (mixed oxide and sulfide). These are presented in Table 13-16 and Table 13-17 below. Mine planning used the oxide equations to calculate Ag recovery from transition ores. The approach is conservative because transition silver typically leaches better than oxide silver.

Table 13-16: ROM - Dark Star Gold Recovery Equations (Transition)

Geomet Rec Zone Equation Gold Recovery, % Range
ROM - Dark Star North (SI<2.0) 45 =5.7255*ln(HG) + 69.711 Au HG < 0.40 g/t
46 =0.8755*ln(HG) + 65.341 Au HG ≥ 0.40 g/t
ROM - Dark Star North (SI>2.0) 47 =3.1157*ln(HG) + 59.947 Au HG < 0.40 g/t
48 =2.4395*ln(HG) + 59.396 Au HG ≥ 0.40 g/t
ROM - Dark Star Main (SI<2.0) 49 =4.665*ln(HG) + 70.373 Au HG < 0.40 g/t
50 =0.7134*ln(HG) + 66.812 Au HG ≥ 0.40 g/t
ROM - Dark Star Main (SI>2.0) 51 =8.8543*ln(HG) + 66.87 Au HG < 0.40 g/t
52 =5.8832*ln(HG) + 64.6 Au HG ≥ 0.40 g/t

Table 13-17: HPGR - Dark Star Gold Recovery Equations (Transition)

Geomet Rec Zone Equation Gold Recovery, % Range
HPGR - Dark Star North (SI<2.0) 53 No Data Available Au HG < 0.40 g/t
54 No Data Available Au HG ≥ 0.40 g/t
HPGR - Dark Star North (SI>2.0) 55 =3.1163*ln(HG) + 69.073 Au HG < 0.40 g/t
56 =2.43575*ln(HG) + 68.524 Au HG ≥ 0.40 g/t
HPGR - Dark Star Main (SI<2.0) 57 No Data Available Au HG < 0.40 g/t
58 No Data Available Au HG ≥ 0.40 g/t
HPGR - Dark Star Main (SI>2.0) 59 =8.8549*ln(HG) + 71.84 Au HG < 0.40 g/t
60 =5.8732*ln(HG) + 69.683 Au HG ≥ 0.40 g/t

13.9.6 ROM and HPGR Pinion Gold Recovery Equations (Transition)

ROM and HPGR gold recovery equations were developed for Pinion transition zones (mixed oxide and sulfide). These are presented in Table 13-18 and Table 13-19 below. As in the Dark Star transition ores, mine planning used the oxide

   

13-50

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

equations to calculate Ag recovery from transition ores - a conservative approach because transition silver typically leaches better than oxide silver.

Table 13-18: ROM - Pinion Gold Recovery Equations (Transition)

Geomet Rec Zone Equation Gold Recovery, % Range
ROM - mlbx Pinion West 61 =10.203*ln(HG) + 57.371 Au HG ≥ 0.40 g/t
62 =6.9059*ln(HG) + 54.627 Au HG < 0.40 g/t
ROM - mlbx Pinion East (Ba>4.0%, Hi SiO2 ) 63 =8.3765*ln(HG) + 42.53 Au HG ≥ 0.40 g/t
64 =1.612*ln(HG) + 36.214 Au HG < 0.40 g/t
ROM - Mtp (Tripon Pass) 65 =6.7859*ln(HG) + 58.057 Au HG ≥ 0.40 g/t
66 =1.3059*ln(HG) + 52.941 Au HG < 0.40 g/t
ROM - Ddg (Devils Gate) 67 =11.823*ln(HG) + 53.897 Au HG ≥ 0.40 g/t
68 =2.257*ln(HG) + 44.969 Au HG < 0.40 g/t

Table 13-19: HPGR - Pinion Gold Recovery Equations (Transition)

Geomet Rec Zone Equation Gold Recovery, % Range
ROM - mlbx Pinion West 69 =10.203*ln(HG) + 64.368 Au HG ≥ 0.40 g/t
70 =6.9059*ln(HG) + 61.624 Au HG < 0.40 g/t
ROM - mlbx Pinion East (Ba>4.0%, Hi SiO2 ) 71 =8.3765*ln(HG) + 65.75 Au HG ≥ 0.40 g/t
72 =1.612*ln(HG) + 59.434 Au HG < 0.40 g/t
ROM - Mtp (Tripon Pass) 73 =6.7859*ln(HG) + 70.896 Au HG ≥ 0.40 g/t
74 =1.3059*ln(HG) + 65.779 Au HG < 0.40 g/t
ROM - Ddg (Devils Gate) 75 No Data Available Au HG ≥ 0.40 g/t
76 No Data Available Au HG < 0.40 g/t

13.10 REAGENT CONSUMPTIONS SOUTH RAILROAD PROPERTY

Reagent consumptions and requirements, including cyanide, lime, and cement were estimated by KCA based on metallurgical test work completed to date for the Pinion and Dark Star material. Reagent consumptions are summarized below.

13.10.1 Cyanide

The column leach test cyanide consumptions were studied for the ROM and HPGR crushed Pinion and Dark material and adjusted to provide a basis for the expected field cyanide consumptions. In KCA’s experience, field cyanide consumptions are typically 25% to 50% of observed lab consumptions and have been estimated at 33% of the lab consumptions for this study.

ROM cyanide consumptions have been estimated based on column leach tests at 37.5 mm crush size for the Pinion and Dark Star materials. Because there are no ROM column leach test data available and ROM cyanide consumptions in the field are typically less than crushed ore consumptions, the estimated field cyanide consumptions for the ROM material is considered to be 80% of the crushed material cyanide consumptions. Lab cyanide consumptions for Pinion material at 37.5 mm crush ranged from 0.66 kg/t to 1.19 kg/t with an average consumption of 0.85 kg/t. Dark Star lab cyanide consumptions at 37.5 mm crush ranged from 0.46 kg/t to 1.31 kg/t with an average consumption of 0.87 kg/t. Based on this data, field cyanide consumptions are estimated at 0.22 kg/t and 0.23 kg/t for ROM Pinion and Dark Star material, respectively.

   

13-51

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Cyanide consumptions for the Pinion and Dark Star HPGR crushed material has been estimated based on the average cyanide consumptions from the HPGR column leach tests; only the “Master Composite” HPGR column leach tests were considered for the Dark Star material as these tests are considered to be most representative. Lab cyanide consumptions for Pinion material ranged from 0.48 kg/t to 0.89 kg/t with an average consumption of 0.67 kg/t. Dark Star lab cyanide consumptions ranged from 0.63 kg/t to 0.89 kg/t with an average consumption of 0.76 kg/t. Based on this data, field cyanide consumptions are estimated at 0.22 kg/t and 0.25 kg/t for Pinion and Dark Star HPGR crushed material, respectively.

13.10.2 Lime

Lime is required for pH control for the ROM and Pinion crushed ore during leaching. Because hydrated lime was utilized in the lab leach tests, the laboratory lime consumptions are adjusted to accurately predict consumptions of quicklime (pebble lime, CaO) in the field. Estimated quicklime consumptions for the Pinion and Dark Star ROM ores are 1.0 kg/t of ore and 0.5 kg/t of ore for Pinion crushed ore.

13.10.3 Cement

Cement is required for heap permeability and pH control during leaching for the Pinion and Dark Star HPGR crushed material. Compacted permeability test work results for HPGR crushed Pinion and Dark Star material is presented in Table 13-20 and Table 13-21. Cement consumption in the field for Pinion and Dark Star HPGR-crushed ores are expected to 2.0 kg/t and 7.0 kg/t, respectively.

   

13-52

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 13-20: Pinon Compacted Permeability Test Results

KCA
Sample
No.
Sample
Description
Crush
Type
Test
Phase
Cement
Added,
kg/MT
Effective Height, meter Flow
Rate,
LpHr/m2
Flow
Result
Pass/Fail
Saturated Permeability,
cm/sec
Incremental
Slump, %
Cum.
Slump,
% Slump
Slump
Result
Pass/Fail
Overall
Pass/Fail
78516 Pin 17-12 140’ to 176.5’ and Pin 17-13
375’ to 522’
HPGR - Low Primary 0 25 364 Pass 1.0E-02 3% 3% Pass Pass
Stage Load 50 336 Pass 9.3E-03 2% 5% Pass Pass
Stage Load 75 329 Pass 9.1E-03 1% 6% Pass Pass
Stage Load 100 260 Pass 7.2E-03 2% 8% Pass Pass
78519 Pin 17-12 140’ to 176.5’ and Pin 17-13
375’ to 522’
HPGR - Med Primary 0 25 134 Pass 3.7E-03 3% 3% Pass Pass
Stage Load 50 93 Fail 2.6E-03 3% 6% Pass Fail
Stage Load 75 46 Fail 1.3E-03 1% 7% Pass Fail
Stage Load 100 33 Fail 9.2E-04 2% 9% Pass Fail
78522 Pin 17-12 140’ to 176.5’ and Pin 17-13
375’ to 522’
HPGR - High Primary 0 25 38 Fail 1.1E-03 5% 5% Pass Fail
Stage Load 50 3 Fail 8.3E-05 3% 8% Pass Fail
Stage Load 75 0 Fail 0.0E+00 N/A N/A N/A Fail
Stage Load 100 0 Fail 0.0E+00 N/A N/A N/A Fail
84134 A PM#51-mlbx-ls/HiBa HPGR Primary 2 25 3,976 Pass 0.110 2% 2% Pass Pass
Stage Load 50 984 Pass 0.027 2% 4% Pass Pass
Stage Load 75 461 Pass 0.013 2% 6% Pass Pass
Stage Load 100 293 Pass 0.008 2% 8% Pass Pass
84137 A PM#59-MTP=stmic, stls/LowBa HPGR Primary 4 25 1,344 Pass 0.037 3% 3% Pass Pass
Stage Load 50 261 Pass 0.007 4% 7% Pass Pass
Stage Load 75 112 Pass 0.003 2% 9% Pass Pass
Stage Load 100 73 Fail 0.002 1% 10% Pass Fail

 

   

13-53

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 13-21: Dark Star Compacted Permeability Test Results

KCA Sample No. Sample
Description
Crush
Type
Test
Phase
Cement
Added,
kg/MT
Effective
Height,
meter
Flow
Rate,
LpHr/m2
Flow
Result
Pass/Fail
Saturated Permeability,
cm/sec
Incremental
Slump, %
Cum.
Slump,
% Slump
Slump
Result
Pass/Fail
Overall
Pass/Fail
79268 DSMain-HPGR Master Comp
#1
HPGR - Low Primary 0 25 403 Pass 1.1E-02 5% 5% Pass Pass
Stage Load 50 472 Pass 1.3E-02 2% 7% Pass Pass
Stage Load 75 355 Pass 9.9E-03 2% 9% Pass Pass
Stage Load 100 327 Pass 9.1E-03 1% 10% Pass Pass
79271 DSMain-HPGR Master Comp
#1
HPGR - Med Primary 0 25 93 Fail 2.6E-03 5% 5% Pass Fail
Stage Load 50 64 Fail 1.8E-03 2% 7% Pass Fail
Stage Load 75 44 Fail 1.2E-03 1% 8% Pass Fail
Stage Load 100 39 Fail 1.1E-03 1% 9% Pass Fail
79274 DSMain-HPGR Master Comp
#1
HPGR - High Primary 0 25 314 Pass 8.7E-03 5% 5% Pass Pass
Stage Load 50 221 Pass 6.1E-03 2% 7% Pass Pass
Stage Load 75 181 Pass 5.0E-03 2% 9% Pass Pass
Stage Load 100 151 Pass 4.2E-03 1% 10% Pass Pass
79277 DSNorth-HPGR Master Comp
#2
HPGR - Low Primary 0 25 338 Pass 9.4E-03 2% 2% Pass Pass
Stage Load 50 358 Pass 9.9E-03 2% 4% Pass Pass
Stage Load 75 288 Pass 8.0E-03 1% 5% Pass Pass
Stage Load 100 347 Pass 9.6E-03 1% 6% Pass Pass
79280 DSNorth-HPGR Master Comp
#2
HPGR - Med Primary 0 25 81 Fail 2.3E-03 6% 6% Pass Fail
Stage Load 50 43 Fail 1.2E-03 1% 7% Pass Fail
Stage Load 75 44 Fail 1.2E-03 1% 8% Pass Fail
Stage Load 100 43 Fail 1.2E-03 1% 9% Pass Fail
79283 DSNorth-HPGR Master Comp
#2
HPGR - High
HPGR
Primary 0 25 3 Fail 8.3E-05 8% 8% Pass Fail
Stage Load 50 0 N/A N/A N/A N/A N/A N/A
Stage Load 75 0 N/A N/A N/A N/A N/A N/A
Stage Load 100 0 N/A N/A N/A N/A N/A N/A
84446 A DS17-34 #102 HPGR - High Primary 4 25 912 Pass 0.025 1% 1% Pass Pass
Stage Load 50 148 Pass 0.004 2% 3% Pass Pass
Stage Load 75 0 Fail 0.000 2% 5% Pass Fail
Stage Load 100 0 Fail 0.000 N/A N/A N/A Fail
84446 A DS17-34 #102 HPGR Primary 6 25 2,187 Pass 0.061 1% 1% Pass Pass

 

   

13-54

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

KCA Sample No. Sample
Description
Crush
Type
Test
Phase
Cement
Added,
kg/MT
Effective
Height,
meter
Flow
Rate,
LpHr/m2
Flow
Result
Pass/Fail
Saturated Permeability,
cm/sec
Incremental
Slump, %
Cum.
Slump,
% Slump
Slump
Result
Pass/Fail
Overall
Pass/Fail
      Stage Load   50 165 Pass 0.005 2% 3% Pass Pass
Stage Load 75 0 Fail 0.000 2% 5% Pass Fail
Stage Load 100 0 N/A N/A N/A N/A N/A N/A
84447 A DS17-22 #104 HPGR Primary 4 25 8,341 Pass 0.232 0% 0% Pass Pass
Stage Load 50 1,014 Pass 0.028 2% 2% Pass Pass
Stage Load 75 515 Pass 0.014 1% 3% Pass Pass
Stage Load 100 298 Pass 0.008 1% 4% Pass Pass
84447 A DS17-22 #104 HPGR Primary 2 25 8,429 Pass 0.234 1% 1% Pass Pass
Stage Load 50 3,196 Pass 0.089 1% 2% Pass Pass
Stage Load 75 2,225 Pass 0.062 1% 3% Pass Pass
Stage Load 100 695 Pass 0.019 2% 5% Pass Pass
84448 A DS18-03 #109 HPGR Primary 4 25 4,951 Pass 0.138 0% 0% Pass Pass
Stage Load 50 422 Pass 0.012 3% 3% Pass Pass
Stage Load 75 199 Pass 0.006 2% 5% Pass Pass
Stage Load 100 105 Fail 0.003 1% 6% Pass Fail
84448 A DS18-03 #109 HPGR Primary 6 25 1,947 Pass 0.054 1% 1% Pass Pass
Stage Load 50 210 Pass 0.006 3% 4% Pass Pass
Stage Load 75 111 Fail 0.003 1% 5% Pass Fail
Stage Load 100 0 Fail 0.000 3% 8% Pass Fail
84449 A DS18-07 #116 HPGR Primary 4 25 7,208 Pass 0.200 0% 0% Pass Pass
Stage Load 50 1,934 Pass 0.054 3% 3% Pass Pass
Stage Load 75 999 Pass 0.028 2% 5% Pass Pass
Stage Load 100 589 Pass 0.016 1% 6% Pass Pass

 

   

13-55

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

13.11 METALLURGICAL TESTING ON JASPEROID WASH AND NORTH BULLION SAMPLES

13.11.1 Jasperoid Wash Deposit Metallurgical Testing

In 2017, Gold Standard commissioned KCA to complete metallurgical testing of composited core samples from the Jasperoid Wash deposit (KCA 2018c). Drill-core composites were subjected to bottle-roll cyanide-leach testing at target P80 sizes of 75 μm (200 mesh) and 1,700 μm (10 mesh), column-leach testing at eighty percent passing (P80) 12.5 mm, and one column leach testing at P80 = 25 mm. Additionally, three (3) metallurgical core holes were drilled in 2018, from which composites will be tested at a later date. Jasperoid Wash was not included in the current financial model. Accordingly, only a brief summary of the 2017 test results is presented below.

Gold extraction in the 200-mesh bottle rolls ranged from 67.7 and 96.6%, while Silver extraction ranged from 15.6 to 43.1%. Cyanide consumption averaged 0.46 kg/t for the eight oxide composites.

Gold extraction from the 10-mesh bottle rolls ranged between 52.6 and 93.7% (average = 76.1%). Silver extraction ranged from 12.8 to 83.6%. Silver grades are considered low at Jasperoid Wash. Cyanide consumption averaged 0.24 kg/t for the eight oxide samples.

A composite that was classified as sulfide carbon refractory had one of the lowest recoveries and the highest cyanide consumption.

Column-leach gold extractions ranged between 65.3 and 95.3% and averaged 82.9%. Silver head grades for Jasperoid Wash are low and of minimal economic significance. Cyanide consumption averaged 1.01 kg/t and lime consumption averaged 1.23 kg/t for the five oxide composites.

One of the composites, despite being a sulfide/carbon refractory material (AuCN = 38.2%), achieved a high gold extraction of 90.1%. NaCN and lime consumptions were high, 3.12 kg/t and 10.95 kg/t respectively, which is expected due to its high sulfide sulfur content (1.6%).

Other tests on the Jasperoid Wash samples were performed to characterize the comminution, abrasion, and load permeability properties of the materials. Details on these may be found in the metallurgical report (KCA 2018c).

13.11.2 North Railroad Deposits Metallurgical Testing

Two separate preliminary metallurgical tests were performed on the North Bullion (POD deposit) and Bald Mountain areas, which are part of the North Railroad portion of the property (Dufresne et al. 2017b).

In 2006, a total of 63 bottle-roll tests and three column-leach tests were completed by KCA on core material from the POD prospect located in the North Railroad portion of the property (KCA 2006). The results of the 63 individual bottle roll tests were highly variable, yielding gold extractions from 0% to 83%. The high variability of the extraction results was attributed to carbonaceous materials in the samples. The column-leach tests at 1.5, 0.5, and 0.25-inch crusher resulted in an average gold recovery of 85%.

Bench-top roasting tests were conducted by Newmont on North Bullion drill-core samples. Gold recoveries from three calcined samples were 83%, 90%, and 79%, with high lime demands of 15 to 22 lb/ton (Arthur, 2013).

Fourteen agitated cyanide leach tests were performed on samples from one drill hole in the Bald Mountain target.

The average gold recovery attained was 82.2%, with better recoveries resulting from higher-grade samples.

   

13-56

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 14 TABLE OF CONTENTS

SECTION     PAGE
14  MINERAL RESOURCE ESTIMATES 14-1 
    INTRODUCTION   14-1 
    DARK STAR MINERAL RESOURCES 14-3 
      Dark Star Database 14-3 
      Dark Star Geologic Model 14-5 
      Dark Star Gold Modeling and Estimation 14-6 
      Dark Star Gold Mineral Resources 14-14 
      Dark Star Cyanide-Soluble Gold and Geo-Metallurgical Models 14-22 
      Dark Star Acid-Base Accounting Model and Estimation 14-23 
      Dark Star Density 14-26 
      Discussion of Dark Star Estimated Gold Mineral Resource and Supporting  
      Models 14-27 
    PINION DEPOSIT MINERAL RESOURCES 14-30 
      Pinion Database 14-30 
      Pinion Geologic Model 14-32 
      Pinion Gold Modeling and Estimation 14-32 
      Pinion Silver Modeling and Estimation 14-39 
      Pinion Gold and Silver Resources 14-43 
      Pinion Geo-Metallurgical Model 14-49 
      Pinion Acid-Base Accounting Model and Estimation 14-55 
      Pinion Density 14-58 
      Discussion of Pinion Estimated Mineral Resources and Supporting Models 14-59 
    JASPEROID WASH MINERAL RESOURCES 14-62 
      Jasperoid Wash Database 14-62 
      Jasperoid Wash Geologic Model 14-65 
      Jasperoid Wash Gold Modeling and Estimation 14-65 
      Jasperoid Wash Gold Mineral Resources 14-71 
      Jasperoid Wash Geo-Metallurgical Model 14-74 
      Jasperoid Wash Clay Model 14-76 
      Jasperoid Wash Density 14-76 
      Discussion of Jasperoid Wash Estimated Mineral Resources 14-76 
    NORTH BULLION DEPOSITS MINERAL RESOURCES 14-78 
      North Bullion Deposits Data 14-78 
      North Bullion Deposits Lithological Setting of Mineralized Zones 14-79 
      North Bullion Deposits Geological Models 14-80 
      North Bullion Cyanide-Soluble Model 14-83 
      North Bullion Deposits Sample and Composite Statistics and Grade Capping 14-84 
      North Bullion Deposits Grade Continuity 14-85 
      North Bullion Deposits Density 14-86 
      North Bullion Deposits Grade Estimation 14-86 
      North Bullion Block Model Validation 14-87 
      North Bullion Deposits Mineral Resources 14-88 

 

   

14-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 14 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 14-1: Summary of Drilling at Dark Star 14-3 
Table 14-2: Descriptive Statistics of Sample Assays in Dark Star Drill-Hole Database 14-4 
Table 14-3: Dark Star Descriptive Statistics by Domain 14-7 
Table 14-4: Dark Star Capping Levels for Gold by Domain 14-11 
Table 14-5: Dark Star Descriptive Composite Statistics by Domain 14-12 
Table 14-6: Dark Star Estimation Areas, Search-Ellipse Orientations and Maximum Search Distances by Domain 14-13 
Table 14-7: Dark Star Estimation Parameters 14-14 
Table 14-8: Dark Star Classification Parameters 14-15 
Table 14-9: Dark Star Total In-Pit Gold Mineral Resources - Measured* 14-17 
Table 14-10: Dark Star Total In-Pit Gold Mineral Resources - Indicated* 14-18 
Table 14-11: Dark Star Total In-Pit Gold Mineral Resources - Measured and Indicated* 14-18 
Table 14-12: Dark Star Total In-Pit Gold Mineral Resources - Inferred* 14-19 
Table 14-13: Number of Samples and Mean Inorganic Carbon Values for Dark Star Estimation Categories 14-24 
Table 14-14: Number of Samples and Mean Sulfide Sulfur Values for Dark Star Estimation Categories 14-24 
Table 14-15: PAG/NAG Designation Criteria 14-25 
Table 14-16: Density Values Applied to the Dark Star Block Model 14-26 
Table 14-17: Drill Holes at Pinion 14-30 
Table 14-18: Descriptive Statistics - Exploration and Mineral Resource Drill-Hole Database 14-32 
Table 14-19: Pinion Deposit Descriptive Gold Statistics by Domain 14-33 
Table 14-20: Pinion Gold Capping Levels for Gold by Domain 14-36 
Table 14-21: Pinion Deposit Descriptive Gold Assay Composite Statistics by Domain 14-36 
Table 14-22: Pinion Estimation Areas 14-37 
Table 14-23: Pinion Gold Estimation Parameters 14-38 
Table 14-24: Pinion Deposit Descriptive Silver Statistics by Domain 14-40 
Table 14-25: Pinion Capping Levels for Silver by Domain 14-42 
Table 14-26: Pinion Deposit Descriptive Silver Assay Composite Statistics by Domain 14-42 
Table 14-27: Pinion Silver Estimation Parameters 14-43 
Table 14-28: Pinion Classification Parameters 14-44 
Table 14-29: Pinion Measured Gold and Silver Resources* 14-45 
Table 14-30: Pinion Indicated Gold and Silver Resources* 14-45 
Table 14-31 Pinion Measured and Indicated Gold and Silver Resources* 14-46 

 

   

14-ii

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Table 14-32 Pinion Inferred Gold and Silver Resources 14-46 
Table 14-33: Pinion Samples Barium Statistics by Domain 14-50 
Table 14-34: Pinion Composites Barium Statistics by Domain 14-51 
Table 14-35: Pinion Barium Estimation Parameters 14-53 
Table 14-36: Number of Samples and Mean Inorganic Carbon Values for Pinion Estimation Categories 14-55 
Table 14-37: Number of Samples and Mean Sulfide Sulfur Values for Pinion Estimation Categories 14-56 
Table 14-38: Assigned Inorganic Carbon and Sulfide Sulfur Values for Pinion Estimation Categories 14-57 
Table 14-39: Sulfide Sulfur Capping Values for Pinion Estimation Categories 14-58 
Table 14-40: Density Values Applied to the Pinion Block Models 14-59 
Table 14-41: Comparison of 2019 Drilling Gold Assays to 2018 Coincident Model Block Grades 14-62 
Table 14-42: Summary of Drilling at Jasperoid Wash 14-62 
Table 14-43: Descriptive Statistics of Sample Assays in Jasperoid Wash Mineral Resource Database 14-63 
Table 14-44: Jasperoid Wash Descriptive Statistics by Gold Domain 14-67 
Table 14-45: Descriptive Composite Statistics by Domain for Jasperoid Wash 14-69 
Table 14-46: Jasperoid Wash Search Ellipse Orientations and Maximum Search Distances by Estimation Area 14-70 
Table 14-47: Jasperoid Wash Estimation Parameters 14-71 
Table 14-48: Jasperoid Wash Inferred Gold Mineral Resources 14-72 
Table 14-49: Density Values Applied to the Jasperoid Wash Block Model 14-76 
Table 14-50: Summary Statistics Sample Gold Grades within the Mineralized Zones 14-84 
Table 14-51: North Bullion Area Semi-Variogram Parameters of Composited Gold Grades 14-86 
Table 14-52: North Bullion Area Density Measurements by Zone 14-86 
Table 14-53: North Bullion Area Estimation and Search Ellipsoid Criteria (from Dufresne and Nicholls, 2018) 14-87 
Table 14-54: North Bullion Area Estimated Gold Grades vs. Average Composite Grades 14-88 
Table 14-55: North Bullion Deposits Classification Criteria 14-89 
Table 14-56: Parameters Used in Whittle Pit Optimization Studies 14-90 
Table 14-57: North Bullion Mineral Resources with Cutoff Grades* 14-91 
Table 14-58: Cutoff Sensitivity Analysis of the Sweet Hollow and POD Oxide Mineral Resources* 14-91 
Table 14-59: Cutoff Sensitivity Analysis of the North Bullion, Sweet Hollow and POD Sulfide Mineral Resources* 14-92 

 

   

14-iii

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 14 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 14-1: Dark Star Deposit Drill-Hole Map and Mineral Resource Outline 14-5 
Figure 14-2: Cumulative Probability Plot of Dark Star Gold Assays 14-6 
Figure 14-3: Dark Star Main Zone Gold Domains and Geology - Section N4479600 14-9 
Figure 14-4: Dark Star North Zone Gold Domains and Geology - Section N4480080 14-10 
Figure 14-5: Dark Star Spatial Relationship Between Estimation Areas and Drill Holes 14-13 
Figure 14-6: Dark Star Main Zone Gold Domains and Block Model - Section N4479600 14-20 
Figure 14-7: Dark Star North Zone Gold Domains and Block Model - Section N4480080 14-21 
Figure 14-8: Cumulative Probability Plot of Dark Star AuCN/Au Ratios 14-22 
Figure 14-9: Dark Star Optimized Pit and Additional Mineralization 14-29 
Figure 14-10: Pinion Deposit Drill-Hole Map and Mineral Resource Outline 14-31 
Figure 14-11: Cumulative Probability Plot of Pinion Deposit Gold Assays 14-33 
Figure 14-12: Pinion Gold Domains and Geology - Section N4479230 14-35 
Figure 14-13: Pinion Estimation Areas 14-38 
Figure 14-14: Cumulative Probability Plot of Pinion Deposit Silver Assays 14-39 
Figure 14-15: Pinion Silver Domains and Geology - Section N4479230 14-41 
Figure 14-16: Pinion Gold Domains and Block Model- Section N4479230 14-47 
Figure 14-17: Pinion Silver Domains and Block Model- Section N4479230 14-48 
Figure 14-18: Cumulative Probability plot of Barium (NITON XRF) Sample Grades at Pinion 14-50 
Figure 14-19: Pinion Barium Domains and Geology - Section N4479230 14-52 
Figure 14-20: Cumulative Probability Plot of Pinion AuCN/AuFA Ratios 14-54 
Figure 14-21: Pinion Optimized Pit and Additional Mineralization 14-60 
Figure 14-22: Jasperoid Wash Deposit Drill-hole Map and Mineral Resource Outline 14-64 
Figure 14-23: Cumulative Probability Plot of Jasperoid Wash Gold Assays 14-66 
Figure 14-24: Jasperoid Wash Zone Gold Domains and Geology - Section N4473200 14-68 
Figure 14-25: Jasperoid Wash Estimation Areas and Gold Domains in Cross Section 14-70 
Figure 14-26 Jasperoid Wash Gold Domains and Block Model - Section N4473200 14-73 
Figure 14-27: Cumulative Probability Plot of Jasperoid Wash AuCN/AuFA Ratios 14-74 
Figure 14-28: Jasperoid Wash Deposit Rock Type and Metallurgical Models 14-75 
Figure 14-29: Jasperoid Wash Optimized Pits and Additional Mineralization 14-77 
Figure 14-30: POD Deposit Geologic Cross Section 14-78 
Figure 14-31: Plan View of North Bullion Deposits Mineralization and Structure Model 14-81 

 

   

14-iv

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Figure 14-32: POD Zone Cross Section of Wire-Frame Interpretations 14-82 
Figure 14-33: Sweet Hollow Zone Cross Section of Wire-Frame Interpretations 14-82 
Figure 14-34: North Bullion Zone Cross Section of Wire-Frame Interpretations 14-83 
Figure 14-35: Probability Plot of Sample Gold Grades in the Mineralized Zones 14-84 
Figure 14-36: North Bullion Area Constrained Mineral Resource Blocks 14-90 

 

   

14-v

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14 MINERAL RESOURCE ESTIMATES

14.1 INTRODUCTION

The statistical analysis, geological modeling, and mineral resource estimation were performed under the supervision of Mr. Ristorcelli (Pinion and Jasperoid Wash deposits), Mr. Lindholm (Dark Star deposit), and Mr. Dufresne (North Bullion deposits). These estimated mineral resources were classified in order of increasing geological and quantitative confidence into inferred, indicated, and measured mineral resource categories to be in accordance with the “CIM Definition Standards - For Mineral Resources and Mineral Reserves” (2014) and therefore Canadian National Instrument 43-101. CIM mineral resource definitions are given below, with CIM’s explanatory material shown in italics:

Mineral Resource

Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories. An Inferred Mineral Resource has a lower level of confidence than that applied to an Indicated Mineral Resource. An Indicated Mineral Resource has a higher level of confidence than an Inferred Mineral Resource but has a lower level of confidence than a Measured Mineral Resource.

A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction.

The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.

Material of economic interest refers to diamonds, natural solid inorganic material, or natural solid fossilized organic material including base and precious metals, coal, and industrial minerals.

The term Mineral Resource covers mineralization and natural material of intrinsic economic interest which has been identified and estimated through exploration and sampling and within which Mineral Reserves may subsequently be defined by the consideration and application of Modifying Factors. The phrase ‘reasonable prospects for eventual economic extraction’ implies a judgment by the Qualified Person in respect of the technical and economic factors likely to influence the prospect of economic extraction. The Qualified Person should consider and clearly state the basis for determining that the material has reasonable prospects for eventual economic extraction. Assumptions should include estimates of cutoff grade and geological continuity at the selected cut-off, metallurgical recovery, smelter payments, commodity price or product value, mining and processing method and mining, processing and general and administrative costs. The Qualified Person should state if the assessment is based on any direct evidence and testing.

Interpretation of the word ‘eventual’ in this context may vary depending on the commodity or mineral involved. For example, for some coal, iron, potash deposits and other bulk minerals or commodities, it may be reasonable to envisage ‘eventual economic extraction’ as covering time periods in excess of 50 years. However, for many gold deposits, application of the concept would normally be restricted to perhaps 10 to 15 years, and frequently to much shorter periods of time.

Inferred Mineral Resource

An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity.

An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated

   

14-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

An Inferred Mineral Resource is based on limited information and sampling gathered through appropriate sampling techniques from locations such as outcrops, trenches, pits, workings and drill holes. Inferred Mineral Resources must not be included in the economic analysis, production schedules, or estimated mine life in publicly disclosed Pre-Feasibility or Feasibility Studies, or in the Life of Mine plans and cash flow models of developed mines. Inferred Mineral Resources can only be used in economic studies as provided under NI 43-101.

There may be circumstances, where appropriate sampling, testing, and other measurements are sufficient to demonstrate data integrity, geological and grade/quality continuity of a Measured or Indicated Mineral Resource, however, quality assurance and quality control, or other information may not meet all industry norms for the disclosure of an Indicated or Measured Mineral Resource.

Under these circumstances, it may be reasonable for the Qualified Person to report an Inferred Mineral Resource if the Qualified Person has taken steps to verify the information meets the requirements of an Inferred Mineral Resource.

Indicated Mineral Resource

An Indicated Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit.

Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation.

An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Mineral Reserve.

Mineralization may be classified as an Indicated Mineral Resource by the Qualified Person when the nature, quality, quantity and distribution of data are such as to allow confident interpretation of the geological framework and to reasonably assume the continuity of mineralization. The Qualified Person must recognize the importance of the Indicated Mineral Resource category to the advancement of the feasibility of the project. An Indicated Mineral Resource estimate is of sufficient quality to support a Pre-Feasibility Study which can serve as the basis for major development decisions.

Measured Mineral Resource

A Measured Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed mine planning and final evaluation of the economic viability of the deposit.

Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation.

A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral Resource. It may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve.

Mineralization or other natural material of economic interest may be classified as a Measured

   

14-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Mineral Resource by the Qualified Person when the nature, quality, quantity and distribution of data are such that the tonnage and grade or quality of the mineralization can be estimated to within close limits and that variation from the estimate would not significantly affect potential economic viability of the deposit. This category requires a high level of confidence in, and understanding of, the geology and controls of the mineral deposit.

Modifying Factors

Modifying Factors are considerations used to convert Mineral Resources to Mineral Reserves. These include, but are not restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors.

The authors of this section report mineral resources at cutoffs that are reasonable for deposits of this nature given anticipated mining methods and plant processing costs, while also considering economic conditions, because of the regulatory requirements that a mineral resource exists “in such form and quantity and of such a grade or quality that it has reasonable prospects for eventual economic extraction.”

14.2 DARK STAR MINERAL RESOURCES

The Dark Star gold mineral resource estimate was completed on May 15, 2019 based on data derived from drilling completed in 2019 up through drill holes DR19-74, DC19-01, DS19-01, and MW19-01. The drill-hole database has an effective date of April 26, 2019. The Dark Star mineral resource estimate has an effective date of August 7, 2019.

References to Tomera Formation equivalent stratigraphy have been noted historically. However, recent work suggests these units in the Railroad-Pinion deposit may not be of equivalent age, so all usage of Tomera Formation equivalent in this Technical Report refer to units that are Pennsylvanian-Permian undifferentiated.

14.2.1 Dark Star Database

Six companies have conducted exploration drilling programs in the Dark Star deposit area since 1984, including Gold Standard, which began drilling in 2015. In all, 425 holes totaling 95,748.9 m have been drilled (see Table 14-1). These drill holes, as well as Gold Standard’s property limits and the Dark Star mineral resource outline, are shown in Figure 14-1. RC drill holes account for 82% of the meters drilled and core holes account for the balance.

Table 14-1: Summary of Drilling at Dark Star

Type of hole Count Drilled Meters
Core 60 16,851.0
RC 365 78,897.9
Grand Total 425 95,748.9

Table 14-2 presents descriptive statistics of all Dark Star drill-hole analytical sample data audited and imported into MineSight by MDA. Measured density and core geotechnical data are also summarized. Rejected sample assay data have been excluded from the table. Trace element and whole-rock geochemical data have also been provided by Gold Standard but are not shown in Table 14-2.

   

14-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-2: Descriptive Statistics of Sample Assays in Dark Star Drill-Hole Database
(accepted sample data only)

  Valid Median Mean Std. Dev. C. of Var. Minimum Maximum Units
From 61,049         0.0 944.9 m
To 61,049         0.3 946.4 m
Length 61,049 1.5 1.6     0.0 45.7 m
Au 58,969 0.020 0.236 0.860 3.7 0.003 22.3 g/t
Ag 25,425 0.171 0.307 2.158 7.0 0.000 136.4 g/t
AuCN 12,681 0.250 0.709 1.394 2.0 0.015 22.4 g/t
AuCN/AuFA ratio 12,681 86.0 76.8 24.9 0.3 0.000 100.0 g/t
Specific Gravity 1,023 2.520 2.456 0.247 0.1 1.540 4.5 g/cm3
Core Recovery 6,238 100.000 90.680 20.160 0.2 0.000 409.3 %
RQD 6,238 40.000 50.860 55.150 1.1 0.000 409.3 %

The Dark Star database contains 58,969 accepted gold assay records (Table 14-2). The total number of rejected gold assays is 425. These records from five Dark Star North RC drill holes were rejected due to suspected down-hole contamination as demonstrated by cyclicity of assay grades relative to depths of drill-rod changes.

Only 25,425 (43%) of the accepted gold assay samples were analyzed for silver, and 12,681 samples (22%) were analyzed for AuCN. Of the silver assays, 21,403 (84%) are repeated values. A few of these could be individual assays with coincidentally the same assay value, but nearly all represent assays of composited samples for which the silver assay was assigned to multiple individual sample intervals. The composites with a single silver value are generally about 6 m long and composed of four samples.

Collar locations, downhole survey data, and gold analyses were audited for verification purposes. Logged core recovery and RQD were loaded into the database but were not verified. A few RQD values greater than 100% were noted, but not investigated. The database also contains logged geologic features, including rock types, formations, faults, vein type, silicification, clay, dolomite, barite, limonite, hematite, carbonate, sulfide percent, and percent reduced (unoxidized), all of which were imported. The logged geology was reviewed and used in modeling the gold domains.

Analyses of various carbon and sulfur species were also provided by Gold Standard, verified, and loaded into the mineral resource database. Metallurgical bottle-roll, column-leach, comminution, specific gravity, and flotation test results were compiled and loaded, but not verified.

   

14-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-1: Dark Star Deposit Drill-Hole Map and Mineral Resource Outline

Figure 14.2.2 Dark Star Geologic Model

Gold Standard provided geologic interpretations as surfaces and solids for faults, formation contacts, silicification, and metallurgically refractive material. MDA combined the formation and fault surfaces into solids that represent each formation, which includes the Chainman Formation (Mississippian), undifferentiated section of Pennsylvanian-Permian units, and Tertiary conglomerates and Indian Well Formation tuffs and sediments. The Pennsylvanian-Permian undifferentiated is further divided into lower siltstone, middle conglomerate (which is the primary host for Dark Star mineralization), and upper siltstone units. All formational units and faults are summarized in Section 7 of this Technical

   

14-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Report. MDA determined that Quaternary colluvium is present in sufficient quantities to be distinguished from heavier bedrock, so it was modeled on section and as solids to potentially improve stripping costs.

MDA reviewed silicification solids provided by Gold Standard. The solids compare well with logged silicification values of ‘2’ and ‘3’ (‘3’ representing the strongest silicification). Continuity in the modeled solids was broadly established by default as a function of the logged data, although continuity was lacking somewhat between sections where silicification was more localized.

All geologic interpretations, in combination with assays and logged data, were used to guide metal domain modeling and to define metallurgical domains.

14.2.3 Dark Star Gold Modeling and Estimation

14.2.3.1 Gold Domain Model

Gold domains defined from sample assay ranges were explicitly modeled on sections spaced 30 m apart, oriented east-west and looking north. Domains were defined based on population breaks on the cumulative probability plot (“CPP”) for all gold data (Figure 14-2). The following grade ranges were identified and used to model gold:

  • Outer shell domain: ~0.04 g Au/t to ~0.3 g Au/t;

  • Low-grade domain: ~0.3 g Au/t to ~2.5 g Au/t; and

  • High-grade domain: >~2.5 g Au/t.

A higher-grade domain >~10.5 g Au/t was considered, but there was insufficient continuity for modeling, and it would contain less than 0.1% of the assays. Descriptive statistics of assays by the modeled domains are presented in Table 14-3.

Figure 14-2: Cumulative Probability Plot of Dark Star Gold Assays

   

14-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-3: Dark Star Descriptive Statistics by Domain
(accepted sample data only)

Outer Shell Gold Domain
  Valid Median Mean Std Dev C. of V. Minimum Maximum Units
Length 11,939 1.5 1.5     0.0 45.7 m
Au 11,848 0.088 0.106 0.074 0.69 0.003 2.3 g/t
Au capped 11,848 0.088 0.106 0.074 0.69 0.003 2.3 g/t
AuCN 4,250 0.120 0.125 0.076 0.61 0.015 1.6 g/t
AuCN/AuFA ratio 4,250 80 74 24 0.30 4 100 %
Specific Gravity 194 2.54 2.46 0.23 0.10 1.78 4.00 g/cm3
Core Recovery 1,278 100 89 21 0.23 0 120 %
RQD 1,278 40 49 51 1.03 0 344 %
Low-Grade Gold Domain
  Valid Median Mean Std Dev C. of V. Minimum Maximum Units
Length 8,643 1.5 1.6     0.0 8.6 m
Au 8,613 0.494 0.675 0.538 0.80 0.016 8.2 g/t
Au capped 8,613 0.494 0.675 0.538 0.80 0.016 8.2 g/t
AuCN 6,686 0.400 0.565 0.528 0.93 0.015 7.6 g/t
AuCN/AuFA ratio 6,686 87 78 25 0.30 1 100 %
Specific Gravity 203 2.56 2.54 0.26 0.10 1.72 4.36 g/cm3
Core recovery 1,178 100 92 18 0.19 0 313 %
RQD 1,178 38 55 61 1.13 0 409 %
High-Grade Gold Domains
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 1,469 1.5 1.5     0.3 3.4 m
Au 1,461 3.352 4.266 3.042 0.71 0.155 22.3 g/t
Au capped 1,461 3.352 4.266 3.042 0.71 0.155 22.3 g/t
AuCN 1,339 2.750 3.463 2.848 0.82 0.015 22.4 g/t
AuCN/AuFA ratio 1,339 92 82 26 0.30 3 100 %
Specific Gravity 92 2.56 2.54 0.19 0.07 1.93 3.43 g/cm3
Core Recovery 466 100 93 16 0.18 0 100 %
RQD 466 54 69 69 1.01 0 409 %
Outside Modeled Gold Domains
  Valid Median Mean Std Dev C. of V. Minimum Maximum Units
Length 38,998 1.5 1.6     0.0 39.6 m
Au 37,047 0.008 0.016 0.059 3.73 0.003 3.8 g/t
Au capped 37,047 0.008 0.015 0.028 1.92 0.003 0.6 g/t
AuCN 406 0.040 0.113 0.244 2.15 0.015 2.6 g/t
AuCN/AuFA ratio 406 85 71 33 0.50 0 100 %
Specific Gravity 534 2.48 2.41 0.24 0.10 1.54 4.47 g/cm3
Core Recovery 3,316 100 91 21 0.23 0 409 %
RQD 3,316 38 48 52 1.08 0 409 %

MDA reviewed core from DC18-05, DC18-07, and DC18-09 during a site visit on September 18 and 19, 2018 in an effort to determine the geologic characteristics of each domain. Gold Standard staff geologists provided guidance and expertise with respect to the geology of the deposits and the nature of gold mineralization. The following characteristics were observed with respect to gold domains, and mineralization in general:

  • The middle conglomerate of the Pennsylvanian-Permian undifferentiated (or Tomera Formation age equivalent) is the primary host for mineralization. The upper and lower siltstone units are mineralized as well, but to a lesser degree.

   

14-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT
  • One of the primary characteristics associated with gold grade is the presence and quantity of limonite on fractures.

  • Gold grade increases with increased fracture permeability (structural preparation).

  • More porous, coarser-grained sedimentary lithologies tend to be better hosts. Some porous zones were created by decalcification of calcareous sedimentary rocks.

  • Gold mineralization is commonly confined between less permeable lithologies, such as argillized fault gouges or stratigraphic horizons.

  • Grade decreases from relatively coarse-grained rocks in the low-grade domain, to more fine-grained micritic lithologies in the outer-shell domains.

  • Barite, scorodite, and jarosite were observed at moderate to higher grades, above ~1.0 g Au/t.

  • Degree of silicification does not seem to be associated with strong gold mineralization. Where rocks are silicified, grades of ~1.0 to 6.0 g Au/t were found in zones of increased limonite on fractures; and

  • Some pervasive, very fine-grained pyrite was observed with moderate gold grades, particularly in gouge zones.

To summarize, gold mineralization increases with increasing limonite on fractures, and increasing porosity. More favorable porosity is inherent in coarser-grained sedimentary lithologies or developed by structural preparation and/or decalcification. Structural preparation ranges from localized fractures to wider gouge zones, and to broad zones of fractures and stockwork breccias. Silicification and argillic alteration may be indirectly associated with gold grade, i.e. clay can be abundant in structurally deformed zones, but may or may not be related to gold deposition.

As noted in the previous section, geologic logging and interpretations, along with observations of core directly or in photos, were used to guide mineral-domain modeling. Mineral domains were generally drawn parallel to stratigraphic contacts, per guidance from Gold Standard. Gold domains were offset across faults according to sense-of-movement indicated by Gold Standard interpretations. Schematic cross sections in the Dark Star Main zone and Dark Star North zone are given in Figure 14-3 and Figure 14-4, respectively.

   

14-8

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-3: Dark Star Main Zone Gold Domains and Geology - Section N4479600

   

14-9

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-4: Dark Star North Zone Gold Domains and Geology - Section N4480080

   

14-10

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The relationship between gold mineralization and major faults mapped on the surface or interpreted on section is not well understood. The primary bounding structures of the major horst block are the West and Dark Star faults, although some mineralization does cross the West Fault into the Chainman Formation and appears to terminate against an unrecognized barrier somewhere to the west of the East fault. The Ridgeline and IDK faults are located within the deposits, and gold grades appear to be strongest and more widespread between them.

Some significant gold grades have been intercepted in multiple drill holes extending downward between the Ridgeline and IDK faults in the Dark Star North zone (see Figure 14-4). Gold Standard describes and interprets the mineralization in this area as follows:

“The zone between the Ridgeline and IDK faults appear to be [a] highly brecciated structural corridor. The gold zone follows down between these two faults, but generally has a floor at/near the Conglomerate and underlying ST-L [lower Tomera Formation equivalent siltstone] contact. The contact is likely a chemistry change from high to low carbonate, causing mineralization above the contact, and much weaker below. We suspect both faults are feeders and long term might see a small breccia pipe or feeder along one or both faults to some depth“

The unusual occurrence and precise geometry of mineralization in this deeper area is still not fully understood, however, new drilling between the faults continues to confirm the existence of relatively high gold grades in the zone.

Gold grade decreases in intensity and thickness down-dip and up-dip along stratigraphy from the Ridgeline and IDK faults. The relationship between mineralization in the footwall and hanging wall of the Ridgeline fault in particular is not well understood. In the current model, domains were drawn as if the fault is a hard boundary to mineralization, with no continuity across the fault, although as noted above, Gold Standard suspects the faults may ultimately prove to be feeders. No domains were drawn along the fault, because it is unclear at this time whether gold was deposited along the structure. The IDK fault does not appear to be a barrier to mineralization as significantly in Dark Star North, so domains were drawn more continuously across it.

After gold domain interpretations were completed on 30 m spaced cross sections oriented east-west, the domain interpretations were snapped to drill holes in three dimensions and sliced for modeling on mid-bench level plans. The modeled level plans are spaced at 9 m and are located at the midpoint of each bench. Silver was not modeled or estimated.

14.2.3.2 Gold Sample and Composite Statistics

The modeled gold mineral domains were used to assign codes to drill-hole samples. Quantile plots were made of the coded assays. Potential capping levels for each domain were assessed by identifying the grade above which outlier values occur. Applied capping grades (Table 14-4) were then determined after reviewing the outlier samples on screen with respect to grade and proximity of surrounding samples, geology, general location, and materiality. Descriptive statistics of sample assays by domain were also considered to evaluate the necessity for capping of assays (Table 14-3).

Table 14-4: Dark Star Capping Levels for Gold by Domain

Domain Capping Grade (g Au/t)
Outer Shell 0.85
High-Grade None
Low-Grade None
Outside Domains 0.55

 

   

14-11

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Once the capping was completed, the drill holes were down-hole composited to 3.05 m intervals honoring domain boundaries. The 3.05 m length was chosen to avoid de-compositing small fractions of the original 5 ft (1.524 m) drilled sample intervals, which represent the vast majority of the sample lengths. Descriptive statistics by domain of the composited database are given in Table 14-5.

Table 14-5: Dark Star Descriptive Composite Statistics by Domain

Outer Shell Gold Domains
  Valid Median Mean Std Dev C. of V. Minimum Maximum Units
Length 6,353 3.05 2.83     0.00 3.05 m
Au 6,281 0.093 0.107 0.064 0.60 0.003 1.89 g/t
Au capped 6,281 0.09 0.11 0.06 0.57 0.00 0.85 g/t
AuCN 3,043 0.120 0.121 0.064 0.53 0.015 1.28 g/t
AuCN/AuFA ratio 3,043 80 74 24 0.30 4 110 %
Low-grade Gold Domains
  Valid Median Mean Std Dev C. of V. Minimum Maximum Units
Length 4,720 3.05 2.85     0.00 3.05 m
Au 4,715 0.510 0.668 0.468 0.70 0.050 5.66 g/t
Au capped 4,715 0.51 0.67 0.47 0.70 0.05 5.66 g/t
AuCN 3,521 0.410 0.560 0.465 0.83 0.015 5.34 g/t
AuCN/AuFA ratio 3,521 87 78 24 0.30 1 110 %
High-grade Gold Domains
  Valid Median Mean Std Dev C. of V. Minimum Maximum Units
Length 787 3.05 2.70     0.00 3.05 m
Au 786 3.476 4.205 2.507 0.60 0.629 20.30 g/t
Au capped 786 3.476 4.205 2.507 0.60 0.629 20.30 g/t
AuCN 715 2.850 3.427 2.396 0.70 0.115 14.83 g/t
AuCN/AuFA ratio 715 92 82 25 0.30 4 110 %
Outside Modeled Gold Domains
  Valid Median Mean Std Dev C. of V. Minimum Maximum Units
Length 20,119 3.05 2.80     0.00 3.05 m
Au 19,063 0.008 0.016 0.042 2.70 0.003 3.03 g/t
Au capped 19,063 0.008 0.015 0.024 1.59 0.003 0.52 g/t
AuCN 287 0.060 0.108 0.214 1.99 0.015 2.08 g/t
AuCN/AuFA ratio 287 83 72 35 0.50 3 110 %

Correlograms were generated from the composited gold grades to evaluate grade continuity. Correlogram parameters were determined and applied to the kriged estimate, against which the reported inverse distance estimate was compared. The evaluated continuity of grade also contributed to classification of mineral resources. The correlogram results by domain are summarized as follows:

Outer shell gold domain - The nugget is 45% of the total sill. The first sill is 30% of the total sill with a range of 10 m to 40 m depending on direction. The remaining 25% of the total sill has a range of 110 m to 230 m depending on direction.

Low-grade gold domain - The nugget is 50% of the total sill. The first sill is 35% of the total sill with a range of 20 m to 30 m depending on direction. The remaining 15% of the total sill has a range of 160 m to 280 m depending on direction.

High-grade gold domain - The nugget is 40% of the total sill. The first sill is 40% of the total sill with a range of 10 m to 45 m depending on direction. The remaining 20% of the total sill has a range of 30 m to 60 m depending on direction

   

14-12

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14.2.3.3 Gold Estimation

The mineral resource block model is not rotated, and the blocks are 9 m north-south by 9 m vertical by 9 m east-west. Four gold estimates were completed: a polygonal, nearest neighbor, inverse distance, and kriged, with the inverse-distance estimate being reported. All the estimates, excluding the polygonal, were run several times in order to determine sensitivity to estimation parameters, and to evaluate and optimize results. The inverse distance power was three (“ID3”). The model was divided into nine estimation areas (“ESTAR”) to control search anisotropy, orientation, and distances according to the differing geometries of mineralization in each area during estimation. Table 14-6 summarizes the estimation areas and associated search orientations and maximum search distances by domain. Figure 14-5 depicts the spatial relationship of the estimation areas to the drilling and the gold domains.

Table 14-6: Dark Star Estimation Areas, Search-Ellipse Orientations and Maximum Search Distances by Domain

Estimation
Area
Search Ellipse Orientation Maximum Search Distance
Azimuth Dip Rotation Outer Shell Low-grade High-grade Outside Domains
1 12.5 0 0 250 200 150 50
2 12.5 0 27.5 250 270 150 50
3 12.5 0 52.5 250 220 150 50
4 12.5 0 77.5 200 150 150 50
5 0 0 50 200 150 150 50
6 0 0 0 200 150 150 50
7 0 0 27.5 200 150 150 50
8 0 0 52.5 200 150 150 50
9 0 0 77.5 200 150 150 50
Note: Semi-major search distance = major search distance ÷ 1, 1.5 or 2, and the vertical search distance = major search distance ÷ 4

Figure 14-5: Dark Star Spatial Relationship Between Estimation Areas and Drill Holes

   

14-13

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

One estimation pass was run for each domain, up to a maximum anisotropic search distance of 270 m along the major axis. Search ellipse anisotropy varies from 1:1:4 to 1:2:4 (major versus semi-major versus minor axes). Composite-length weighting was applied to all estimation runs. Estimation parameters for each domain are given in Table 14-7.

Table 14-7: Dark Star Estimation Parameters
(for search orientations and maximum distances, see Table 14-6)

Description Parameter
Outer Shell Gold Domain
Samples: minimum/maximum/maximum per hole 1 / 12 / 3
Search anisotropies: major/semimajor/minor (vertical) 1 / varies 0.5 to 1 / 0.25
Inverse distance power 3
High-grade restrictions (grade in g/t, distance in m) None
Low-grade Gold Domain
Samples: minimum/maximum/maximum per hole 1 / 12 / 3
Search anisotropies: major/semimajor/minor (vertical) 1 / varies 0.5 to 1 / 0.25
Inverse distance power 3
High-grade restrictions (grade in g/t, distance in m) 2.7 / half max search
High-grade Gold Domain
Samples: minimum/maximum/maximum per hole 1 / 12 / 4
Search (m): major/semimajor/minor (vertical) 1 / 0.5* / 0.25
Inverse distance power 3
High-grade restrictions (grade in g/t, distance in m) 10.0 / 75
Outside Modeled Gold Domains
Samples: minimum/maximum/maximum per hole 2 / 12 / 3
Search (m): major/semimajor/minor (vertical) 1 / 0.5 / 0.25
Inverse distance power 2
High-grade restrictions (grade in g/t, distance in m) 0.1 / 9
* - Exception, ESTAR 5 major to semi-major axis search anisotropy is 1

14.2.4 Dark Star Gold Mineral Resources

Mr. Lindholm classified the Dark Star mineral resources giving consideration to confidence in the underlying database, sample integrity, analytical precision/reliability, QA/QC results, and confidence in geologic interpretations. The classification parameters are given in Table 14-8.

   

14-14

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-8: Dark Star Classification Parameters

Measured
In modeled domain, and
*Drill-hole confidence code ≥ 0.9, and
Number of holes ≥ 3, and average distance ≤ 35 m; Or
Number of samples ≥ 3, and closest distance ≤ 15 m
Indicated
In modeled domain and Main area, and
Isotropic distance ≤ 20 m; Or
Number of Samples ≥ 7 and isotropic distance ≤ 60 m; Or
Number of Samples ≥ 4 and average distance ≤ 70 m; Or
Number of Samples ≥ 4 and closest distance ≤ 25 m; Or
Number of Samples ≥ 2 and closest distance ≤ 15 m
Or
In modeled domain and North area, and
Isotropic distance ≤ 20 m; Or
Number of Samples ≥ 7 and isotropic distance ≤ 50 m; Or
Number of Samples ≥ 4 and average distance ≤ 60 m; Or
Number of Samples ≥ 4 and closest distance ≤ 20 m; Or
Number of Samples ≥ 2 and closest distance ≤ 10 m
Measured Reduced to Indicated if:
Metallurgy code indicates refractory or uncategorized material (METC = 100-199)
Measured and Indicated Reduced to Inferred if:
Reduced-class area code 3 and closest distance ≥ 15 m; Or
In modeled domain and closest distance ≥ 30 m and drill-hole confidence code ≤ 0.5*; Or
In Tertiary conglomerates and modeled domain, and closest distance ≥ 30 m
Inferred
In modeled domain that is not Measured or Indicated; Or
All estimated blocks outside modeled domains, and isotropic distance ≤ 20 m**
*Confidence code of '1' assigned to holes drilled by Gold Standard with collar surveys, '0.5' to Gold Standard holes with no collar surveys, and '0' to non-Gold Standard drill holes
**A strong search restriction on composites 0.1 g Au/t within this distance (at 9 m) was applied

Holes drilled at the end of 2018 and early 2019 were compared to an unpublished mineral resource block model produced by MDA in September of 2018. The majority of the drill holes that were considered as infill confirmed the September 2018 model, showing at most small increases or decreases in the volume of domains. As a result of the favorable comparisons of more recent drilling to the 2018 block model, confidence was increased, and therefore the amount of Measured and Indicated mineral resource material in the model was increased.

As described in Table 14-8, the amount of influence that historical data has on a given block decreases confidence in the estimated grade and consequently the classification. For a block to be classified as Measured mineral resources, 90% or more of the estimating composite grades must be derived from Gold Standard data. Similarly, block grades estimated with all composites beyond 30 m based on 50% or more historical data are classified as Inferred mineral resources.

The results of the QA/QC evaluation warrant additional comment. The major project risk shown by these evaluations is that there is no historical QA/QC except for 11 Mirandor drill holes. Consequently, the reliability of pre-Gold Standard data, and therefore model block grades derived predominantly from historical data, is diminished and supports the reduction in classification. Gold Standard did infill drill areas where historical drilling dominated, so the risk is mitigated in these areas.

   

14-15

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Due to excessive snow conditions following the 2019 drilling program, none of the newer 2018-2019 drill collars were surveyed. In all, 81 drill holes in the Dark Star database do not have surveyed collars. The assays associated with these holes were assigned confidence codes of 0.5. The net effect for classification is that Measured and Indicated mineral resources beyond 30 m from a composite is reduced to Inferred mineral resource if the block is estimated using a combination of unsurveyed Gold Standard and historical drill holes.

Gold Standard surveyed 69 of the unsurveyed holes after the current mineral resource estimate was completed. Although the model was not updated with the new information due to time constraints, MDA did compare the new hole locations to modeled domains. Only seven holes would have caused more than very small adjustments to domains boundaries, essentially all within the 9 m3 model block dimension. Of the few cases where domain changes would extend more than a few blocks, none were significant, and would probably cause only localized changes to pit shapes, if any. In some cases, a volume of mineralized material would be added, in others material would be lost, but the net impact on the mineral resources would likely be negligible.

In addition to the 69 newly surveyed drill-hole collars obtained since the Dark Star mineral resource estimate was completed, 23 new holes were drilled. Additionally, assays were received for core hole DC19-01, which was drilled prior to mineral resource estimation. Of the 24 new assay sets, 14 would likely cause incremental changes to modeled gold domains and would impact in-pit mineral resources locally. Of these 14 holes, four are effectively twins of previously drilled holes. These would have minimal impact on estimated mineralized volumes and grades. Core hole, DC19-01 was not a twin, but was drilled in an area within the Dark Star North zone pit with closely spaced drilling, and although domains of all grades would be modified, the effect on the resource would be minimal and limited to the immediate vicinity of the hole. Four RC holes were drilled as step-outs between ~45 m and 150 m east of the Dark Star Main zone mineral resource pit. These contained some significant near-surface low-grade intercepts, which would not cause the mineral resource pit to expand eastward but could contribute a small amount of new mineral resource material. Five new holes were drilled at the south end of the Dark Star North zone mineral resource pit, with the intent of finding additional mineral resources between the Dark Star North and Main deposits. All of these holes intercepted gold mineralization within and below the optimized pit which would cause changes to low-grade mineral resources, however, none of these changes would likely materially alter to the shape of the mineral resource pit and would only minimally add to mineral resources.

The exact nature of deep high-grade mineralization protruding down between the Ridgeline and IDK faults in the Dark Star North zone is not completely understood. Gold Standard interprets the zone as a possible breccia pipe or feeder for gold mineralization, although drilling does not yet confirm the hypothesis. However, despite this uncertainty, drilling consistently intersected mineralization in deep Dark Star North, and continues to confirm the presence of relatively high-grade mineralization in the zone.

Greater restrictions were applied to Measured and Indicated mineral resource material in specific areas of the model due to locally limited understanding of geology and/or gold mineralization (excluding Dark Star North area discussed in the previous paragraph), or suspected (but not proven) down-hole contamination. For example, classification was restricted for mineralization associated with deep, isolated intercepts on the West fault.

A small amount of mineralization has been intercepted in drilling near the surface in Tertiary conglomerates at the southwest end of Dark Star Main. Although the mineralization is present in rocks younger than the bulk of the Dark Star deposit, Gold Standard has observed similar occurrences in Tertiary rocks in other areas of the district. No metallurgical test work has been performed on this material, although there are cyanide-soluble assays that provide a measure of gold recovery. The existence and shape of this mineralization has been confirmed in numerous drill holes, but because the exact nature of gold mineralization in Tertiary conglomerates is not understood, Indicated material was limited to within 30 m of a composite.

   

14-16

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

MDA reported the Dark Star mineral resources at cutoffs that are reasonable for Carlin-type deposits of comparable size and grade. Technical and economic factors likely to influence the requirement “in such form and quantity and of such a grade or quality that it has reasonable prospects for eventual economic extraction” were evaluated using the best judgement of the author responsible for this section of the report. For evaluating the open-pit potential, MDA modeled a series of optimized pits using variable gold prices, mining costs, processing costs, and anticipated metallurgical recoveries. MDA used costs appropriate for open-pit mining in Nevada, estimated processing costs and metallurgical recoveries related to heap leaching, and G&A costs. The factors used in defining cutoff grades are based on a gold price of $1,500/oz.

The Dark Star mineral resource estimate is the fully block diluted ID3 estimate and is reported at variable cutoffs for open-pit mining. The cutoff for oxidized and transitional material is 0.14 g Au/t, whereas the cutoff for sulfide material is 1.0 g Au/t. No reported sulfide material is classified as Measured mineral resources. Table 14-9 through Table 14-12 present the estimates of the Measured, Indicated, combined Measured, and Indicated and Inferred gold mineral resources within the $1,500/oz Au pits. The breakdown of mineral resources by area and oxidation state is given in Appendix C. Representative cross sections of the gold block model in the Dark Star Main and North zones are given in Figure 14-6 and Figure 14-7, respectively. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Table 14-9: Dark Star Total In-Pit Gold Mineral Resources - Measured*

Cutoff
g Au/t
Tonnes g Au/t oz Au
0.100 6,732,000 1.15 249,000
0.120 6,227,000 1.23 247,000
0.140 5,857,000 1.31 246,000
0.160 5,585,000 1.36 245,000
0.180 5,373,000 1.41 243,000
0.200 5,189,000 1.46 243,000
0.220 5,051,000 1.48 241,000
0.240 4,887,000 1.53 240,000
0.260 4,755,000 1.56 239,000
0.280 4,638,000 1.60 238,000
0.300 4,530,000 1.63 237,000
0.400 3,939,000 1.82 230,000
0.500 3,510,000 1.98 224,000
0.600 3,110,000 2.17 217,000
0.700 2,793,000 2.35 211,000
0.800 2,538,000 2.50 204,000
0.900 2,355,000 2.63 199,000
1.000 2,197,000 2.76 195,000

*mineral resources are inclusive of mineral reserves.

   

14-17

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-10: Dark Star Total In-Pit Gold Mineral Resources - Indicated*

Cutoff
g Au/t
Tonnes g Au/t oz Au
0.100 30,176,000 0.73 706,000
0.120 28,039,000 0.77 698,000
0.140 26,320,000 0.82 690,000
variable 26,860,000 0.78 675,000
0.160 24,929,000 0.85 684,000
0.180 23,735,000 0.89 676,000
0.200 22,668,000 0.92 669,000
0.220 21,728,000 0.95 663,000
0.240 20,803,000 0.98 655,000
0.260 20,083,000 1.01 649,000
0.280 19,354,000 1.03 642,000
0.300 18,644,000 1.06 635,000
0.400 15,017,000 1.23 592,000
0.500 11,999,000 1.42 546,000
0.600 9,552,000 1.63 501,000
0.700 7,766,000 1.85 463,000
0.800 6,458,000 2.07 429,000
0.900 5,531,000 2.27 403,000
1.000 4,832,000 2.45 381,000

*mineral resources are inclusive of mineral reserves.

Table 14-11: Dark Star Total In-Pit Gold Mineral Resources - Measured and Indicated*

Cutoff
g Au/t
Tonnes g Au/t oz Au
0.100 36,908,000 0.80 955,000
0.120 34,266,000 0.86 945,000
0.140 32,177,000 0.90 936,000
variable 32,717,000 0.88 921,000
0.160 30,514,000 0.95 928,000
0.180 29,108,000 0.98 919,000
0.200 27,857,000 1.02 911,000
0.220 26,779,000 1.05 904,000
0.240 25,690,000 1.08 895,000
0.260 24,838,000 1.11 887,000
0.280 23,992,000 1.14 880,000
0.300 23,174,000 1.17 869,000
0.400 18,956,000 1.35 820,000
0.500 15,509,000 1.54 768,000
0.600 12,662,000 1.76 717,000
0.700 10,559,000 1.98 672,000
0.800 8,996,000 2.19 632,000
0.900 7,886,000 2.37 602,000
1.000 7,029,000 2.55 576,000

*mineral resources are inclusive of mineral reserves.

   

14-18

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-12: Dark Star Total In-Pit Gold Mineral Resources - Inferred*

Cutoff
g Au/t
Tonnes g Au/t oz Au
0.100 2,901,000 0.61 57,000
0.120 2,719,000 0.65 57,000
0.140 2,579,000 0.69 57,000
0.160 2,471,000 0.69 55,000
0.180 2,370,000 0.72 55,000
0.200 2,249,000 0.75 54,000
0.220 2,154,000 0.78 54,000
0.240 2,044,000 0.82 54,000
variable 2,479,000 0.70 56,000
0.260 1,952,000 0.83 52,000
0.280 1,883,000 0.86 52,000
0.300 1,795,000 0.88 51,000
0.400 1,446,000 1.01 47,000
0.500 1,148,000 1.19 44,000
0.600 853,000 1.35 37,000
0.700 690,000 1.53 34,000
0.800 571,000 1.69 31,000
0.900 499,000 1.81 29,000
1.000 430,000 2.03 28,000

*mineral resources are inclusive of mineral reserves.

   

14-19

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-6: Dark Star Main Zone Gold Domains and Block Model - Section N4479600

   

14-20

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-7: Dark Star North Zone Gold Domains and Block Model - Section N4480080

   

14-21

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Although the authors are not experts with respect to environmental, permitting, legal, title, taxation, socio-economic, marketing, or political matters, the authors are not aware of any unusual factors relating to these matters that may materially affect the Dark Star mineral resources as of the effective date of this Technical Report.

14.2.5 Dark Star Cyanide-Soluble Gold and Geo-Metallurgical Models

A cyanide-soluble gold block model was produced to characterize the spatial variability of cyanide solubility of gold at Dark Star. The model was estimated using the ratio of cyanide-soluble gold assays to fire-assay gold contents (“AuCN/AuFA”). These ratios are graphically depicted in the cumulative probability plot in Figure 14-8, were capped at 110% in samples because using data capped at 100% would introduce a low bias in the estimated ratio values.

Composites were also not modified, but all estimated values in the block model were capped at 100%. Two distinct AuCN/AuFA ratio populations, separated by a broad gradational zone from 65% to 90% cyanide-solubility, are apparent in the plot.

Figure 14-8: Cumulative Probability Plot of Dark Star AuCN/Au Ratios

AuCN/AuFA ratios were estimated by rock units separately within the Chainman Formation, within each of the lower siltstone, middle conglomerate, and upper siltstone units of the Pennsylvanian-Permian undifferentiated, and within the Tertiary conglomerates. Ratios were not estimated in the post-mineralization Tertiary Indian Well Formation and Quaternary rocks, which contain no gold. ID3 methodology was used, and only AuCN/AuFA ratios with fire-assay gold grades >0.05 g Au/t were included in the estimate. Maximum major and semi-major search distances applied were 350 m, with strong anisotropy of 4:1 relative to the minor search axis. Estimated block AuCN/AuFA ratios were capped at 100%.

Refractory solids were modeled by Gold Standard to segregate zones in the deposit for which gold will not likely be extractable by cyanide heap-leach methods. MDA evaluated the solids and determined that they appear reasonable

   

14-22

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

compared to AuCN/AuFA ratios, assayed sulfide-sulfur percent, and logged redox and sulfide percentages. Assayed total-sulfur percent correlates moderately well, but there is relatively high total sulfur with correspondingly low sulfide sulfur percent (presumably representing sulfate minerals) outside the refractory solid. The correlation between refractory solids and logged oxide minerals in drill holes is not as good, because there are zones of mixed iron oxide and sulfide material outside the solids that do not represent completely non-refractory material. In summary, the refractory solids represent material that contains little or no oxidation, whereas the areas outside the solids are mixed oxide and sulfide, or predominantly oxidized rock.

As per metallurgical guidance provided in Section 13, unique metallurgical codes were assigned to the block model based on estimated AuCN/AuFA ratios, refractory zones, rock units, and silicification solids (discussed in Section 14.2.2). Cyanide solubilities and refractory zones were used to define the base metallurgical code group, whereas rock units and silicification were used to further sub-divide those groups of codes. Metallurgical codes were assigned as follows:

  • Sulfide, low gold recovery: AuCN/AuFA ratios less than 60% or greater than 50% of block is in refractory solid; gold recovery is low;

  • Transitional, moderate gold recovery: AuCN/AuFA ratios between 60% and 85%, moderate gold recovery; and

  • Oxide, high gold recovery: AuCN/AuFA ratios greater than 85%.

14.2.6 Dark Star Acid-Base Accounting Model and Estimation

An acid-base accounting (“ABA”) block model was produced to characterize the spatial variability of potential acid-generating (“PAG”) or neutralizing potential (“NAG”) for mine planning and handling of mined material. MDA estimated inorganic carbon (“CINO”) and sulfide sulfur (“SSUL”) into this block model, and designated model blocks as either PAG or NAG. All calculations and PAG/NAG designation criteria were provided by Stantec.

Gold Standard provided LECO analyses of carbon and sulfur species for samples that varied between those on original core intervals (1 ft to 6 ft) to RC sample composites (10 ft to 35 ft). Assayed CINO values were used, or the values were converted from assayed CO2%. The relationship between total organic and inorganic carbon was applied as well where necessary. In the data received from Gold Standard, below-detection limit values were substituted for assays below detection. MDA modified the below-detection assays per Stantec guidance, so that carbon species assays were equal to one-half the below-detection value, and sulfur species assays below detection were set to ‘0’.

MDA evaluated CINO and SSUL statistics by rock unit, refractory zone and silicified zone (Table 14-13 and Table 14-14). The statistics in the tables are summarized according to categories chosen for estimation into the block model.

   

14-23

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-13: Number of Samples and Mean Inorganic Carbon Values for Dark Star Estimation Categories
(by rock unit, zones inside [refractory] or outside [oxide and transitional] refractory solids, and in/out of silicified zones)

Estimation Category Chainman Formation Lower Siltstone
# of Samples Mean Value (%) # of Samples Mean Value %)
Oxide and Transitional, not silicified 73 0.167 417 0.946
Oxide and Transitional, Silicified 101 0.269
Refractory, not silicified 285 0.796 247 2.351
Refractory, Silicified 22 0.060

 

Estimation Category Middle Conglomerate Upper Siltstone Tertiary Conglomerates
# of Samples Mean Value (%) # of Samples Mean Value (%) # of Samples Mean Value (%)
Not silicified 961 0.776 490 0.189 118 0.176
Silicified 3,449 0.102 520 0.035 110 0.008

 

Estimation Category Indian Wells Formation Quaternary Alluvium
# of Samples Mean Value (%) # of Samples Mean Value (%)
All Data 110 0.051 27 0.148

Table 14-14: Number of Samples and Mean Sulfide Sulfur Values for Dark Star Estimation Categories
(by rock unit, zones inside [refractory] or outside [oxide and transitional] refractory solids)

Estimation Category Chainman Formation All Tomera Formation eq. Tertiary Conglomerates
# of Samples Mean Value (%) # of Samples Mean Value (%) # of Samples Mean Value (%)
Oxide and Transitional 73 0.539 5,562 0.093 215 0.194
Refractory 285 2.034 645 0.877 13 0.946

 

Estimation Category Indian Wells Formation Quaternary Alluvium
# of Samples Mean Value (%) # of Samples Mean Value (%)
All Data 110 0.037 27 0.051

CINO statistics varied systematically by rock unit in combination with silicification for the middle conglomerate, upper siltstone, and Tertiary conglomerate. This correlation is indicative of the inverse relationship between silica and carbonate contents in increasingly altered and mineralized rocks due to silicification and decarbonization. CINO in the lower siltstone showed similar trends, but statistics also indicated differences inside and outside the modeled refractory solids. In the Chainman Formation, which is only locally mineralized, the variability observed was by refractory zone only. SSUL statistics indicated strong relationships by refractory zone within each of the Chainman Shale, all units of the Tomera Formation equivalent together, and the Tertiary conglomerate. No systematic differences were observed in CINO or SSUL for the Indian Well Formation or the Quaternary colluvium, so each was estimated using all respective contained data.

CINO and SSUL were estimated independently into the block model, according to the categories described above. CPPs for each species estimated were evaluated by category for potential capping of assays, but none was warranted.

Nearly half the sample composites are 9.144 m (30 ft) in length. Given the model block dimension of 9 m3, and the adverse effect of de-compositing to shorter interval lengths, assay data were composited to 9.14 m.

All estimates were done using the same search orientations and associated estimation areas as applied to the gold estimate (Table 14-6). The maximum search distance applied for both CINO and SSUL estimates was 300 m. Search ellipses were moderately anisotropic, with major, semi-major and minor search distances at 300 m, 240 m, and 120 m, respectively, and inverse distance squared methodology was used. Due to the relatively long composite length, the

   

14-24

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

maximum number of composites, and maximum composites per hole allowed to estimate a block were limited to five and two, respectively. Review of CPP s did justify search restrictions for a limited number of the estimated CINO categories, which were applied; however, none were necessary for SSUL estimates.

Correlograms were generated to evaluate continuities in the data with respect to distance. These demonstrated reasonable continuity at ranges up to 400 m, depending on rock unit, refractory type, and/or silicification zones. However, the LECO data is not evenly distributed within the deposits. The data at Dark Star Main is relatively well-distributed, but at Dark Star North, data is concentrated in the central portion of the gold mineralization. As a result, there are significant volumes of rock within potentially mined areas, particularly to the east and west of Dark Star North, where data is sparse or absent. Estimated grades of CINO and SSUL in these areas are relatively far from data. To flag model blocks that are at relatively greater distances from data, MDA assigned confidence codes (value of ‘0’) to all estimated blocks with closest composite greater than 180 m away. Because CINO and SSUL were estimated according to different criteria, these codes were assigned separately for each, and a combined code was assigned if either CINO or SSUL confidence codes was ‘0’.

Model blocks were designated as PAG (code of 1’) or NAG (code of 2’) according to criteria as defined by Stantec.

First, acid-neutralizing potential (“ANP”), acid-generating potential (“AGP”), and net neutralizing potential (“NNP”) values were calculated from estimated CINO and SSUL values. Next, PAG/NAG designation was assigned according to criteria for three potential waste-characterization scenarios in Table 14-15.

Table 14-15: PAG/NAG Designation Criteria

PAG/NAG Designation - Scenario 1
Designate as NAG if
NNP ≥ 20 and ANP/AGP ≥ 3
Designate as PAG if
NNP < 20 or ANP/AGP < 3
PAG/NAG Designation - Scenario 2
Designate as NAG if
SSUL ≥ 0.1% and NNP ≥ 20 and ANP/AGP ≥ 3; Or
SSUL < 0.1% and ANP/AGP ≥ 3
Designate as PAG if
SSUL ≥ 0.1%, and NNP < 20 or ANP/AGP < 3; Or
SSUL < 0.1% and ANP/AGP < 3
PAG/NAG Designation - Scenario 3
Designate as NAG if
NNP ≥ 0.92 and ANP/AGP ≥ 0.77
Designate as PAG if:
NNP < 0.92 or ANP/AGP < 0.77

In Dark Star North there are areas in the upper reaches of potentially mineable pits, along the east and west sides, where no CINO or SSUL composite data was within 300 m, and either or both of these species remained un-estimated. As a result, designation as PAG or NAG was not possible using the above criteria. In agreement with Stantec, MDA assigned PAG or NAG designations for each of the three options described by rock unit, based on the PAG/NAG designation of adjacent blocks. The assignments were only necessary for blocks in Upper Siltstone, Tertiary conglomerate, and Quaternary colluvium. These assigned designations represent about one percent of the model tonnage within potential pits, nearly all of which is in Dark Star North.

   

14-25

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14.2.7 Dark Star Density

Application of density values to the block model is dependent on numerous modeled criteria that have been discussed in various prior sections. There are 1,023 density measurements in the Dark Star database. All samples were measured using the immersion method by an independent laboratory. The values assigned to the model, by rock unit (Section 14.2.2), gold domains (Section 14.2.3), and refractory zone (Section 14.2.5), are summarized in Table 14-16. Spatially, the Dark Star North zone is well represented; however, there is no density data in the northern 200 m of the deposit.

The Dark Star Main zone is moderately well-represented, although core holes are somewhat clustered locally so that there are areas with no density data.

Table 14-16: Density Values Applied to the Dark Star Block Model

Formation Gold Domains Refractory Zone Number of Samples Density (g/cm3)
Chainman Fm All All 27 2.45
Tomera Fm eq. - STL OS and Outside Domains Out 72 2.28
Tomera Fm eq. - STL LG and HG Out 4 2.40
Tomera Fm eq. - STL OS and Outside Domains In 167 2.48
Tomera Fm eq. - STL LG and HG In 0 2.60
Tomera Fm eq. - CGL OS and Outside Domains Out 290 2.40
Tomera Fm eq. - CGL LG and HG Out 238 2.50
Tomera Fm eq. - CGL OS and Outside Domains In 30 2.42
Tomera Fm eq. - CGL LG and HG In 17 2.56
Tomera Fm eq. - STU OS and Outside Domains Out 93 2.40
Tomera Fm eq. - STU LG and HG Out 20 2.54
Tomera Fm eq. - STU OS and Outside Domains In 0 2.47
Tomera Fm eq. - STU LG and HG In 14 2.59
Tertiary conglomerates All All 29 2.45
Tertiary Indian Well Formation All All 20 2.27
Quaternary colluvium All All 2 1.90
Formation acronyms: STL - lower siltstone, CGL - middle conglomerate, STU - upper siltstone
Gold Domain acronyms: OS - outer shell, LG - low-grade, HG - high-grade

The middle conglomerate unit of the Pennsylvanian-Permian undifferentiated (possibly Tomera Formation equivalent), the primary host of gold at Dark Star, is well-represented with nearly 600 density samples. There are at least 70 density samples within the outer shell/outside domains in the lower siltstone unit, a secondary host. However, there are only four samples in the low- or high-grade domains of the lower siltstone. Where a low number of density samples (<~20) were measured for a given category, the density values were evaluated and modified using data from units with similar geological characteristics that are based on more density measurements. A density value of 2.45 g/cm3 was assigned to the Chainman Formation based on 27 measurements; a similar value was assigned to the same unit for the Pinion deposit, which was based on more measurements.

Lower densities are associated with clay alteration. However, Gold Standard has indicated that clay zones are not common or pervasive in the Dark Star deposit. Therefore, although there are some density measurements of clay material that have been included in the statistical groupings in Table 14-16; density values that represent clay zones were not assigned locally in the block model. As a result, there are likely some inaccuracies with respect to tonnages in parts of the block model. Significant clay alteration or weathering is considered to be responsible for the variable density values observed for the Tertiary Indian Well Formation. However, drilling is limited in the unit, and although Gold Standard believes the unit consists primarily of unwelded tuffs that are weathered to clays, the clay zones and associated densities cannot be properly represented. Of 20 samples measured, seven density values ranged from 1.73 to 2.07 (presumably clay) and seven between 2.34 and 2.58 (presumably unaltered). A value of 2.27 was assigned to the unit as a whole, based on data localized in one area over the deposit. However, given the actual variability in

   

14-26

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

densities in the formation, and since the rock unit is entirely waste material, local tonnages are probably not well-defined, and total waste tonnes in the model may be overstated.

14.2.8 Discussion of Dark Star Estimated Gold Mineral Resource and Supporting Models

Holes drilled at the end of 2018 and early 2019 were compared to an earlier, unpublished gold block model produced by MDA in September of 2018. Of the drill holes that are considered only as infill, the block model was confirmed in most holes in the Main area. The gold block model was confirmed in the majority of cases at Dark Star North, but to a lesser extent. As a result of the comparisons of drilling done since September 2018 to the older gold block model, confidence in the current model was increased, and the distances for assigning Indicated classification were increased by 5 m to 10 m in the Dark Star Main zone. Distances for Measured mineral resource classification were extended by 5 m in all areas as well.

Dark Star has a long history of exploration drilling dating back to 1984, and consequently there are many drill holes of varying quality and reliability, and with varying amounts of supporting documentation. In all, six companies, including Gold Standard, have performed exploration drilling on the property. Nearly 70% of the holes were drilled by Gold Standard, for which QA/QC procedures were consistently performed. About 75% of the assay certificates exist for all data, and MDA had access to essentially 100% of Gold Standard certificates. There is a lack of documentation for historical drilling, and QA/QC exists for only 11 holes drilled by Mirandor. As a result, classification of the mineral resource was reduced in areas relying predominantly on historical data. Overall, this reduction did not significantly affect the mineral resource because Gold Standard compensated for the lack of confidence by infill drilling in areas that are predominantly defined by historical drilling. However, there are still a few areas, e.g. the southeast part of Dark Star Main, where little or no Gold Standard drilling exists, and classification is consequently lower.

In general, the geology of gold mineralization is well understood. The geometry of mineralized zones is generally well defined, particularly in shallow areas between the Ridgeline and IDK faults in the Dark Star Main and North zones, as well as in the footwall of the Ridgeline fault in the Main zone, where drilling is relatively dense. However, the relationship between mineralization and the Ridgeline fault is not well understood.

Some significant gold grades have been intercepted in multiple drill holes extending downward between the Ridgeline and IDK faults in Dark Star North. Although the geometry and occurrence of this mineralization is not fully understood, drilling has continued to intersect relatively high-grade mineralization in the area. Measured and Indicated mineral resource classification consistent with the bulk of the Dark Star deposit has been applied to most of this deep Dark Star North mineralization.

Classification as Indicated mineral resource was made more restrictive in the deepest zones, where the general depth below the water table and the presence of anomalous cyanide-soluble gold ratios support the possibility of down-hole contamination. Because potential contamination is suspected by some geologists, it remains a risk, which is represented by the slightly stricter classification criteria.

One obvious association between faults and mineralization is the consistent occurrence of gold along the West fault.

Mineralization has been intercepted in drill holes down-dip along this fault and represents potential for additional mineralization at depth.

The cyanide-soluble gold block model appears reasonable in areas with Gold Standard drilling. In some areas, such as where historical drilling is predominant, AuCN assays are lacking and there is less confidence in the block model. Also, the AuCN data has not been verified and lacks QA/QC support. The refractory solids as modeled are sufficient for use in the block model to define refractory material. It is believed that there is enough data to further refine the refractory model by delineating transitional oxide/sulfide from generally completely oxidized material.

   

14-27

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The ABA block model estimate is reasonable within data limits, although the estimate may be too smooth because of long 9.14 m composites. This was somewhat offset by limiting the maximum number of composites to estimate a block.

Distribution of LECO data in Dark Star Main is reasonable. However, there are significant areas in Dark Star North that are at extreme distances from assayed samples. To help qualify risks relative to distance from data, estimated model blocks >180 m from the nearest LECO composite are flagged with a confidence code. Also, CINO and/or SSUL are not estimated at all in some of areas of the model, and therefore, blocks cannot be designated as PAG or NAG using the criteria applied to the rest of the model. PAG or NAG was assigned to these unclassified blocks according to the designation of the nearest groups of blocks with similar geologic characteristics where CINO and SSUL were both estimated.

For all classified material, MDA’s mineral resource tonnes at 0.14 g Au/t were larger by ~8.5%, gold grade was lower by ~10.5%, and total gold ounces were lower by ~3% compared to the last Dark Star mineral resource estimate reported by Dufresne and Nicholls (2018). Approximately 265 holes, a significant number of which are considered infill and delineation holes, have been drilled since the 2018 mineral resource estimate was published. However, that estimate (in $1,250/oz gold pit, reported at 0.2 g Au/t) and MDA’s reported mineral resources (in $1,500 gold pit, reported at 0.14 g Au/t) are not directly comparable. Still, it has been demonstrated at Dark Star that optimized pits increase in size only incrementally with changes in gold price, generally less than 1% for each $25 increase in the price of gold, so the difference between the $1,250 and $1,500 pits is relatively small. More significantly, the block dimensions were changed from 6 m x 6 m x 6 m in the APEX model, to 9 m x 9 m x 9 m in MDA’s update of this Technical Report. Additional dilution was incorporated in the current mineral resource estimate as a result of using the larger block sizes. MDA performed a bench-height study on composite data to evaluate the potential changes to the mineral resource attributed to the additional dilution with the changed bench height, and showed that, at the cutoff of 0.2 g Au/t, the gold grade would decrease by about 2% and tonnes would increase by about 6%.

In addition to the mineral resources reported herein, there is mineralization that continues beyond and contiguous with the reported mineral resources. The reported mineral resources are pit-constrained and therefore most of the estimated contiguous mineralization outside the pits (tonnes, grade, and ounces) is unreported. That additional mineralization is shown graphically in Figure 14-9.

   

14-28

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-9: Dark Star Optimized Pit and Additional Mineralization

Although most drilling performed during the 2018-2019 campaign was infill of the known deposit area, some step-out drilling was conducted. Only small areas of low-grade mineralization were defined by the step-out holes. This was primarily along strike to the north and south, and on the east, up-dip side of Dark Star Main and along the conglomerate/lower siltstone contact within a Tomera Formation equivalent. A small amount of low-grade mineralization was also delineated in the Tertiary conglomerates at the southwest end of Dark Star Main.

The Dark Star deposit has clustered drill data, which lies primarily within the optimized-pit limits where mining would likely take place. This area also contains a large proportion of the highest-grade material, particularly in the Dark Star North zone. Gold grades from clustered data will tend to project into areas with sparse, non-clustered data during estimation, and a large number of block grades are attributed to only a small number of samples. This effect, which was noted to some extent during gold domain model checking, is mitigated somewhat by estimating with ID3 rather than ID2. De-clustering of composite data was not necessary because the majority of the adverse effect in the estimate occurs outside potential open pits and is not part of the reported mineral resource. Also, new drilling in 2018 and 2019 has mitigated the effects of clustered data, although it is still evident.

   

14-29

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Significant clay alteration or weathering is likely responsible for the variable density values observed for the Tertiary Indian Well Formation. Of 20 samples measured, seven values ranged from 1.73 to 2.07 (presumably clay) and seven between 2.34 and 2.58 (presumably unaltered). A value of 2.27 was assigned to the unit as a whole, based on data localized in one area over the deposit. Given the variability in densities in the Indian Well Formation, local tonnages of the unit are probably not well-defined. However, Gold Standard believes the unit consists primarily of unwelded tuffs that are weathered to clays, so total waste tonnes in the model may be overstated.

There are likely some inaccuracies with respect to tonnages in parts of the block model associated with clay material. Drilling is limited in the Tertiary Indian Well Formation, and although Gold Standard believes the unit consists primarily of unwelded tuffs that are weathered to clays, the clay zones and associated densities cannot be properly represented.

A value representative of relatively unaltered tuffs was assigned to the unit as a whole, however, given the actual variability and potential abundance of clay alteration in the formation, local tonnages are probably not well-defined, and total tonnes in the current gold block model may be overstated.

A minor reduction in classification was applied due to the lack of surveys for 81 drill collars. However, a comparison of newly received surveys of 69 of these collars to the gold domains revealed only a few cases where the location of domain boundaries would change more than the dimensions of one model block. None of these cases were significant, and the net impact on pit shapes and the total mineral resources would likely be negligible. Still, it is recommended that the gold block model be updated when the remaining new drill collars have been surveyed.

14.3 PINION DEPOSIT MINERAL RESOURCES

This Pinion mineral resource estimate is based on data derived from drilling initially completed in 2018, up through drill hole PR18-100. The 2018 drilling database was received on July 5, 2018, and the initial Pinion mineral resource estimate was completed on July 24, 2018. On May 9, 2019, new silver assays were received from Gold Standard. Also, on May 31, 2019, the Pinion database was updated with gold and silver assays from 12 additional drill holes totaling 2,716 m. Gold and silver mineral resources are herein reported.

This Pinion estimate is based on data derived from drilling initially completed in 2018, up through drill hole PR18-100. The 2018 drilling database was received on July 5, 2018, and the initial Pinion mineral resource estimate was completed on July 24, 2018. On May 9, 2019, new silver assays were received from Gold Standard. Also, on May 31, 2019, which is the effective date of the database, the Pinion database was updated with gold and silver assays from 12 additional drill holes totaling 2,716 m. Gold and silver resources are herein reported and have an effective date of August 7, 2019.

14.3.1 Pinion Database

The Pinion drilling mineral resource database received from Gold Standard and then audited by MDA contains 689 drill holes with 136,430 m of drilling (Table 14-17). That drilling was done by twelve companies since 1981, including Gold Standard, which began drilling in 2014. Of those holes, 87% are RC and 12% are core; the remainder is of unknown type. A drill-hole map is given in Figure 14-10.

Table 14-17: Drill Holes at Pinion

Hole Type Count Drilled meters
Core 66 16,596
RC 611 118,674
Other 12 1,160
Grand Total 689 136,430

 

   

14-30

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-10: Pinion Deposit Drill-Hole Map and Mineral Resource Outline

Table 14-18 presents descriptive statistics of all usable analytical or measured Pinion drill-hole sample data audited and imported into MineSight by MDA, except for the geochemical trace elements.

   

14-31

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The Pinion drill database contains 60,273 assay records, of which 59,635 were accepted and are summarized in Table 14-18. There were 638 records rejected due to suspected down-hole contamination, core recovery of less than 50% or intervals having geology and mineralization that conflicted with surrounding holes. There are fewer silver assays than gold because many previous operators, and in some cases Gold Standard, did not analyze for silver. Besides gold and silver, other elements were analyzed. Logged core recovery and RQD were loaded into the database but were not audited. A few recoveries and RQD values >100% exist. The database also contains logged geologic features, of which rock types, formation, faults, vein type and intensity, silicification, clay, dolomite, barite, limonite, hematite, carbon, sulfide percent, and percent reduced were imported and at least reviewed, if not used in modeling. Only the collar location and downhole survey data, and the gold analyses, were verified.

Table 14-18: Descriptive Statistics - Exploration and Mineral Resource Drill-Hole Database
(accepted sample data only)

  Valid Median Mean Std Dev CV Minimum Maximum Units
FROM 61,087         0.0 777.2 m
To 61,087         0.9 778.8 m
Length 61,087 1.5 1.7     0.0 57.0 m
Au 59,635 0.012 0.144 0.439 3.1 0.000 12.3 g/t
Ag 47,101 0.253 1.242 8.614 6.9 0.000 1531.0 g/t
AuCN 6,132 0.210 0.388 0.595 1.5 0.015 10.8 g/t
AgCN 3,265 0.510 1.593 4.129 2.6 0.001 144.8 g/t
Density 443 2.600 2.578 0.233 0.1 1.750 4.0 g/cm3
Core Rec.* 3,235 98.300 91.260 15.600 0.2 0.000 166.6 %
RQD 3,235 24.600 34.080 35.030 1.0 0.000 204.5 %
*Core recovery and RQD data have not been audited and contain values exceeding 100%.

14.3.2 Pinion Geologic Model

Gold Standard built interpretations for faults, formations, rock units, occurrence of logged barite, silicification, and metallurgically refractive material. MDA made solids of the formation and rock unit surfaces and rebuilt new barite solids. Silicification solids provided by Gold Standard were used to define a silicified zone inside the solids, and zones where silicification is weak or absent outside the solids. These geologic interpretations were used to guide the metal domain modeling and define metallurgical domains.

Gold Standard’s geologic model of the formations defines contacts of the multi-lithic breccia, Sentinel Mountain, Devils Gate, Webb, Chainman, and Tripon Pass formations. Alluvial cover at Pinion is minimal and was not modeled. Fault surfaces were also defined by Gold Standard. Those fault surfaces were used to explain offsets in the formations, guide geometries of the gold domains, and in some cases explain deeper mineralization that may be structurally controlled. These units and faults are summarized in Section 7 of this Technical Report.

14.3.3 Pinion Gold Modeling and Estimation

14.3.3.1 Gold Domain Model

Gold domains based on sample assays were modeled on cross sections spaced 30 m apart, oriented east-west and looking north. The geologic model guided interpretation and explicit modeling of the gold domains. These domains were defined based on population breaks on cumulative probability plots of the gold assays prior to compositing (Figure 14-11). The following grade ranges were identified and used for the gold domains:

  • Low-grade gold domain: ~0.04 g Au/t to ~0.3 g Au/t, and

  • High-grade gold domain >~0.3 g Au/t.

   

14-32

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Descriptive statistics are presented in Table 14-19. Core photos, where available, were reviewed, and proved to be helpful in interpretations.

Figure 14-11: Cumulative Probability Plot of Pinion Deposit Gold Assays

Table 14-19: Pinion Deposit Descriptive Gold Statistics by Domain
(accepted sample data only)

Low-grade Gold Domain
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 6,191 1.5 1.5     0.3 6.1 m
TYPE 6,191         1 9  
Au 6,084 0.086 0.114 0.189 1.7 0.000 6.7 g/t
Au capped 6,084 0.086 0.110 0.119 1.1 0.000 1.3 g/t
AuCN 1,403 0.110 0.152 0.300 2.0 0.015 6.4 g/t
AuCN/AuFA ratio 1,403 80 77 30 0.4 2 253 %
Density 57 2.58 2.54 0.19 0.1 1.88 2.79 g/cm3
Core Rec. 382 96 88 20 0.2 0 125 %
RQD 382 40 39 33 0.9 0 125 %
High-grade Gold Domain
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 10,817 1.5 1.5     0.0 4.6 m
TYPE 10,816         1 9  
Au 10,597 0.497 0.742 0.849 1.1 0.000 12.3 g/t
Au capped 10,597 0.497 0.742 0.849 1.1 0.000 12.3 g/t
AuCN 3,713 0.340 0.538 0.676 1.3 0.015 10.8 g/t
AuCN/AuFA ratio 3,713 82 77 23 0.3 1 253 %
Density 136 2.62 2.69 0.30 0.1 2.00 4.00 g/cm3
Core Rec. 883 96 88 18 0.2 0 127 %
RQD 883 25 34 34 1.0 0 100 %

 

   

14-33

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Outside Gold Domains
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 44,079 1.5 1.8     0.0 57.0 m
TYPE 44,073         1 9  
Au 42,954 0.008 0.020 0.092 4.6 0.000 9.4 g/t
Au capped 42,954 0.008 0.019 0.055 2.9 0.000 0.9 g/t
AuCN 1,016 0.110 0.187 0.406 2.2 0.015 6.6 g/t
AuCN/AuFA ratio 1,016 80 86 55 0.6 1 253 %
Density 250 2.55 2.53 0.18 0.1 1.75 2.88 g/cm3
Core Rec. 1,970 100 93 13 0.1 0 167 %
RQD 1,970 19 33 36 1.1 0 205 %
*Core recovery and RQD data have not been audited and contain values exceeding 100%.

In spite of the CPP plot showing such a prominent domain beginning around 0.02 g Au/t, the low-grade domain was modeled excluding many 0.02 to 0.05 g Au/t samples, particularly beneath the deposit where the boundary of the mineralization is not defined by abrupt grade changes. It is difficult to determine whether or not this deep halo of low-grade mineralization is real or due to drilling conditions or both, because the grades are so low. This material, deliberately left outside the modeled domains, is classified as Inferred mineral resource and is estimated with strong restrictions placed on the rare high-grade sample assays found within it. The gold grades are mostly low and sub-economic under current economic conditions.

The high-grade domain greater than ~0.3 g Au/t lies almost exclusively within the multi-lithic breccia. It shows excellent continuity between drill holes, although the continuity of the actual grades within this domain is more variable, and, based on variography studies (Section 14.2.3.2), that continuity ranges from 45 m to 60 m. The highest grades within the high-grade domain are not sufficiently continuous to be explicitly modeled, so such grades are estimated with the rest of this domain. There is little risk in not explicitly modeling these high-grade values because they are not extreme in grade and this domain has a low coefficient of variation (Table 14-3), even without excluding these higher-grade assays. There is high confidence in this zone based on its geologic support and on analytical distributions lying within it. A typical cross section is given in Figure 14-12.

There are some zones of mineralization that seem to follow high-angle structures. The modeled fault surfaces were used to guide definition of high-angle mineralized domains. Because these are poorly defined and poorly understood, these high-angle volumes are classified as Inferred.

A number of holes have significant, often isolated intersections below the multi-lithic breccia contact and within the Devils Gate Formation. The lack of continuity of this mineralization, coupled with the lack of drill density in the Devils Gate requires that this mineralization in almost all cases be projected short distances and be classified as Inferred.

After sectional interpretations were completed, the gold domains were snapped to drill holes and sliced for modeling on north-south-oriented long sections. The long sections are spaced at 9 m, are located at each midblock in the block model, and are perpendicular to the 30 m spaced sections. In June of 2019, the 30 m cross sections and 9 m long sections were updated with new assay data from 12 drill holes. The changes made were generally minor, and a few low- and high-grade domains were extended downdip to the northeast.

   

14-34

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-12: Pinion Gold Domains and Geology - Section N4479230

   

14-35

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14.3.3.2 Gold Sample and Composite Statistics

Once the mineral domains were defined and modeled on 30 m spaced cross sections, the domains were used to assign gold-domain codes to drill-hole samples. Quantile plots were made of the coded assays. Capping for each domain was determined by first assessing the grade above which the outliers occur. Then the outlier grades were reviewed on screen to determine materiality, grade, and proximity of the closest samples and general location. Descriptive statistics were generated and considered with respect to capping levels. Capping values were determined for each of the gold domains separately. Capping levels and number of samples capped are presented in Table 14-20.

Table 14-20: Pinion Gold Capping Levels for Gold by Domain

Domain Number* g Au/t
Low grade 18 1.3
High grade none na
Outside 53 0.9
* Excludes No Use samples (USEG = 1)

Once the capping was completed, the assays were down-hole composited to 3.05 m intervals honoring domain boundaries. The composite length of 3.05 m was selected because the majority of samples are 1.524 m in length, and the slight deviation from an even three meters was done to honor more precisely the conversion from the original interval unit in feet. Descriptive statistics of the composite database are given in Table 14-21.

Table 14-21: Pinion Deposit Descriptive Gold Assay Composite Statistics by Domain

Low-grade Gold Domain
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 3,442 3.05 2.70     0.00 3.05 m
Au 3,407 0.091 0.114 0.169 1.5 0.000 5.8 g/t
Au capped 3,407 0.09 0.11 0.10 0.9 0.00 1.3 g/t
AuCN 953 0.120 0.150 0.246 1.6 0.015 5.5 g/t
AuCN/AuFA ratio 953 80 77 25 0.3 7 253 %
High-grade Gold Domain
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 5,505 3.05 2.86     0.00 3.05 m
Au 5,467 0.530 0.742 0.752 1.0 0.003 11.0 g/t
Au capped 5,467 0.53 0.74 0.75 1.0 0.00 11.0 g/t
AuCN 1,883 0.363 0.532 0.579 1.1 0.015 6.7 g/t
AuCN/AuFA ratio 1,883 82 77 21 0.3 2 199 %
Outside Gold Domains
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 25,698 3.05 2.85     0.00 3.05 m
Au 24,571 0.008 0.020 0.068 3.5 0.000 4.035 g/t
Au capped 24,571 0.008 0.019 0.049 2.6 0.000 0.900 g/t
AuCN 740 0.115 0.167 0.255 1.5 0.015 3.4 g/t
AuCN/AuFA ratio 740 80 82 47 0.6 1 253 %

Correlograms were built from the composited gold grades in order to evaluate grade continuity. Correlogram parameters were used in the kriged estimate, which was used as a check on the reported inverse distance estimate, and also to give guidance to the classification of mineral resources. The correlogram results by area and domain are summarized as follows:

 

14-36

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Low-grade gold domain – The nugget is 40% of the total sill. The first sill is 85% of the total sill with a range of 7 to 15 m depending on direction. The remaining sill (15%) has a range of around 25 m to 40 m depending on direction.

High-grade gold domain – The nugget is 55% of the total sill. The first sill is 90% of the total sill with a range of 16 to 20 m depending on direction. The remaining sill (10%) has a range of around 45 m to 60 m depending on direction.

14.3.3.3 Gold Estimation

The block model is not rotated, and the blocks are 9 m north-south by 9 m vertical by 9 m east-west.

Four estimates were completed: a polygonal, nearest neighbor, inverse distance, and kriged, with the inverse-distance estimate being reported. The nearest neighbor, inverse distance and kriged estimates were run several times in order to determine sensitivity to estimation parameters, and to evaluate and optimize results. The inverse distance power was three (“ID3”) and four (“ID4”) for the low- and high-grade domain estimates, respectively. The model was divided into 11 estimation areas (“ESTAR”) to control search anisotropy, orientation and distances according to the differing geometries of mineralization in each area during estimation. Table 14-22 lists these areas along with the search orientations and the maximum search per area by low-grade and high-grade domains. Figure 14-13 presents the spatial relationship of those estimation areas to the drilling and the gold domains.

Table 14-22: Pinion Estimation Areas

Area Azimuth Dip Rotation LG-Max
Search
HG-Max
Search
1 320 0 35 350 350
2 310 0 35 300 300
3 0 0 0 200 200
4 0 0 -20 300 300
5 30 0 -35 250 250
6 320 8 0 150 100
7 340 0 -20 200 150
8 295 0 -40 100 100
9 0 0 10 200 150
10 340 0 -30 200 100
11 15 0 -60 200 150
Note: maximum distance allowable for Indicated is 60 m

 

 

14-37

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-13: Pinion Estimation Areas

One estimation pass was run for each domain ranging up to 350 m along the primary axis with a 4:1 anisotropy (major axis versus minor axis). All estimates and estimation runs weighted the samples by the sample lengths. Estimation parameters are given in Table 14-23.

Table 14-23: Pinion Gold Estimation Parameters
(for all rotations/dip/tilt values, see Table 14-22)

Domain Parameter
Low-grade Gold Domain
Samples: minimum/maximum/maximum per hole 1 / 12 / 3
Search anisotropies: major/semimajor/minor (vertical) 1 / 0.5 / 0.25
Inverse distance power 3
High-grade restrictions (grade in g Au/t) 0.3 / 0.5 x max search
High-grade Gold Domain
Samples: minimum/maximum/maximum per hole 1 / 12 / 3
Search (m): major/semimajor/minor (vertical) 1 / 0.5 / 0.25
Inverse distance power 4
High-grade restrictions (grade in g Au/t) 6.0 / 0.66 x max search
Outside Modeled Gold Domains
Samples: minimum/maximum/maximum per hole 2 / 12 / 3
Search (m): major/semimajor/minor (vertical) 1 / 0.5 / 0.25
Inverse distance power 2
High-grade restrictions (grade in g Au/t and distance in m) 0.1 / 9

 

 

14-38

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14.3.4 Pinion Silver Modeling and Estimation

14.3.4.1 Silver Domain Model

Silver domains based on sample assays were modeled on cross sections spaced 30 m apart, oriented east-west and looking north. The geologic model and gold domains guided the explicit modeling of the silver domains. Domains were defined based on population breaks on cumulative probability plots (Figure 14-11). The following grade ranges were identified and used for silver domains:

  • Low-grade silver domain: ~0.04 g Ag/t to ~2.0 g Ag/t, and

  • High-grade silver domain >~2.0 g Ag/t.

Descriptive statistics are presented in Table 14-24. Core photos, where available, were reviewed, and proved to be helpful in interpretations.

Figure 14-14: Cumulative Probability Plot of Pinion Deposit Silver Assays

 

14-39

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-24: Pinion Deposit Descriptive Silver Statistics by Domain
(accepted sample data only)

Low-grade Silver Domain
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 6,532 1.5 1.5     0.0 6.1 m
TYPE 6,531         1 9  
Ag 4,497 0.896 1.116 1.345 1.2 0.000 22.0 g/t
Ag capped 4,497 0.900 1.093 1.106 1.0 0.000 10.0 g/t
AgCN 1,173 0.361 0.487 0.475 1.0 0.007 7.1 g/t
AgCN/AgFA ratio 1,173 40 42 25 0.6 1 253 %
Density 65 2.59 2.61 0.26 0.1 1.88 3.53 g/cm3
Core Rec. 429 94 86 19 0.2 0 127 %
RQD 429 26 34 32 1.0 0 125 %
High-grade Silver Domain
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 7,935 1.5 1.5     0.0 4.6 m
TYPE 7,934         1 9  
Ag 5,562 4.203 7.668 23.826 3.1 0.000 1531.0 g/t
Ag capped 5,562 4.200 7.085 8.582 1.2 0.000 60.0 g/t
AgCN 1,126 2.270 3.824 6.316 1.7 0.047 144.8 g/t
AgCN/AgFA ratio 1,126 50 48 15 0.3 1 116 %
Density 101 2.63 2.69 0.29 0.1 2.06 4.00 g/cm3
Core Rec. 622 95 86 20 0.2 0 117 %
RQD 622 3 26 33 1.3 0 100 %
Outside Silver Domains
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 46,620 1.5 1.8     0.0 57.0 m
TYPE 46,615         1 9  
Ag 37,042 0.253 0.401 3.196 8.0 0.000 213.4 g/t
Ag capped 37,042 0.250 0.312 0.513 1.6 0.000 4.0 g/t
AgCN 966 0.149 0.438 1.871 4.3 0.001 45.8 g/t
AgCN/AgFA ratio 966 32 36 27 0.8 0 253 %
Density 277 2.56 2.53 0.18 0.1 1.75 2.88 g/cm3
Core Rec. 2,184 100 93 13 0.1 0 167 %
RQD 2,184 32 36 36 1.0 0 205 %
*Core recovery and RQD data have not been audited and contain values exceeding 100%.

Gold Standard re-assayed pulps from the original, un-composited intervals for all samples within the modeled deposit area. The horizontal shift in Figure 14-14 at 0.25 g Ag/t represents an abundance (~19,000) of values at one-quarter of the 1 g Ag/t detection limit of the re-assayed samples. Original silver assays were performed using different analytical procedures at various detection limits of 0.5 g Ag/t or less.

For the most part, silver grades are generally similar in morphology and location to the gold and therefore also the multi-lithic breccia. However, the silver domains swell and pinch or diminish in some areas where gold is continuous. Some low-grade to anomalous silver mineralization exists below the multi-lithic breccia but is modeled as distinct zones in only one area. Elsewhere the drill-hole spacing is too wide to define continuity.

 

14-40

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-15: Pinion Silver Domains and Geology – Section N4479230

 

14-41

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14.3.4.2 Silver Sample and Composite Statistics

Once the silver mineral domains were defined and modeled on 30 m spaced cross sections, the domains were used to assign silver-domain codes to drill-hole samples. Quantile plots were made of the coded assays. Capping for each domain was determined by first assessing the grade above which the outliers occur. Then the outlier grades were reviewed on screen to determine materiality, grade and proximity of the closest samples, and general location. Descriptive statistics were generated and considered with respect to capping levels. Capping values were determined for each of the silver domains separately. Capping levels and number of samples capped are presented in Table 14-25.

Table 14-25: Pinion Capping Levels for Silver by Domain

Domain Number Capped* g Ag/t
Low grade 4 10
High grade 43 60
Outside 91 4
Excludes No Use samples (USES = 1)

Once the capping was completed, the silver assays were down-hole composited to 3.05 m intervals honoring domain boundaries. The composite length of 3.05 m was selected because the majority of samples are ~1.524 m in length. The slight deviation from an even three meters was done to honor more precisely the conversion from the original interval unit in feet. Descriptive statistics of the composite database are given in Table 14-26.

Table 14-26: Pinion Deposit Descriptive Silver Assay Composite Statistics by Domain

Low-grade Silver Domain
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 26,284 3.05 2.26     0.00 3.05 m
Ag 19,811 0.250 0.334 3.114 9.3 0.000 213.4 g/t
Ag capped 19,811 0.25 0.28 0.33 1.2 0.00 4.0 g/t
AgCN 639 0.185 0.458 1.340 2.9 0.001 26.3 g/t
AgCN/AgFA ratio 639 33 37 25 0.7 0 140 %
High-grade Silver Domain
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 3,506 3.04 1.87     0.00 3.05 m
Ag 2,415 0.951 1.040 0.781 0.8 0.000 12.7 g/t
Ag capped 2,415 0.95 1.03 0.73 0.7 0.00 8.6 g/t
AgCN 674 0.390 0.500 0.433 0.9 0.008 6.4 g/t
AgCN/AgFA ratio 674 40 43 23 0.5 2 253 %
Outside Silver Domains
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 4,014 3.05 2.01     0.00 3.05 m
Ag 2,829 4.654 7.711 17.639 2.3 0.025 770.0 g/t
Ag capped 2,829 4.65 7.11 7.24 1.0 0.03 60.0 g/t
AgCN 1,567 82.000 79.700 15.300 0.2 2.000 199.0 %
AgCN/AgFA ratio 586 49 48 14 0.3 1 93 %
*Core recovery and RQD data have not been audited and contain values exceeding 100%.

Correlograms were built from the composited silver grades in order to evaluate grade continuity. For the combined low-grade and high-grade domains, the nugget is 40% of the total sill. The first sill is 85% of the total sill, with a range of 5 m to 55 m depending on direction. The remaining sill (15%) has a range of around 100 m to 250 m depending on direction.

 

14-42

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14.3.4.3 Silver Estimation

Four estimates were completed for silver as was done for gold: a polygonal, nearest neighbor, inverse distance, and kriged, with the inverse-distance estimate being reported. The nearest neighbor, inverse distance and kriged estimates were run several times in order to determine sensitivity to estimation parameters, and to evaluate and optimize results. ID3 and ID4 for the low and high-grade domain estimates, respectively. The same 11 estimation areas used for gold to control search anisotropy, orientation and distances during estimation were used for silver (Table 14-22). One estimation pass was run for each domain ranging up to 300 m along the primary axis with a 4:1 anisotropy (major axis versus minor axis). Composite assay values were weighted by interval lengths for all silver estimation runs. Estimation parameters are given in Table 14-27.

Table 14-27: Pinion Silver Estimation Parameters
(for all rotations/dip/tilt values, see Table 14-22)

Domain Parameter
Low-grade Silver Domain
Samples: minimum/maximum/maximum per hole 1 / 9 / 3
Search anisotropies: major/semimajor/minor (vertical) 1 / 0.5 / 0.25
Inverse distance power 3
High-grade restrictions (grade in g Ag/t) 3.0 / 0.33 x max search
High-grade Silver Domain
Samples: minimum/maximum/maximum per hole 1 / 9 / 3
Search (m): major/semimajor/minor (vertical) 1 / 0.5 / 0.25
Inverse distance power 4
High-grade restrictions (grade in g Ag/t) None
Outside Modeled Silver Domains
Samples: minimum/maximum/maximum per hole 2 / 12 / 3
Search (m): major/semimajor/minor (vertical) 1 / 0.5 / 0.25
Inverse distance power 2
High-grade restrictions (grade in g Ag/t and distance in m) 0.8 / 9

14.3.5 Pinion Gold and Silver Resources

Mr. Ristorcelli classified the Pinion mineral resources considering the confidence in the underlying database, sample integrity, analytical precision/reliability, QA/QC results, and confidence in geologic interpretations. The gold classification was applied to the reported mineral resources, including for silver. The classification parameters for gold are given in Table 14-28. Although the author of this section is not an expert with respect to environmental, permitting, legal, title, taxation, socio-economic, marketing or political matters, the author is not aware of any unusual factors relating to these matters that may materially affect the Pinion mineral resources as of the effective date of this Technical Report.

As described in the table, the amount of influence that historical data has on a block affects the classification. For a block to be classified as Measured mineral resources, more than 90% of the sample influence must be derived from Gold Standard data. On the other hand, no block with the closest sample beyond 30 m and entirely based on historical data may be classified as Measured or Indicated mineral resources. Under most circumstances the confidence of a block would be lower if it were based entirely on historical data. However, the drilling is very dense in areas dominated by historical drill holes, the suspect holes and samples have been culled, and the multiple drill campaigns support each other. There are also areas where the geology and domains are more speculative, e.g., the northern area and root zones. The classification in these areas, which are defined in the block model using solids, is reduced.

The results of the QA/QC evaluation warrant additional comment. The major project risk shown by these evaluations, and taken into account in mineral resource classification, is that there is no QA/QC for the historical drilling, and some

 

14-43

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

of those data do not have supporting documentation. Consequently, the reliability of those data is based on their corroboration from nearby Gold Standard data, support from 10 other exploration company drilling campaigns, and the rather loose statement that most of the previous exploration companies are well known.

Table 14-28: Pinion Classification Parameters

Measured
Inside a domain Yes Or Yes        
Minimum holes 3 N/A        
Minimum composites 3 3        
Average distance ≤30 N/A        
Closest distance N/A <10        
Gold Standard drill hole influence ≥90% ≥90%        
Indicated
Inside a domain Yes Or Yes Or Yes Or Yes
Minimum holes 3 2 2 1
Minimum composites 7 4 4 2
Closest distance ≤50 N/A ≤20 ≤10
Average distance N/A ≤60 N/A N/A
Inferred
Inside a domain Yes Or No*        
Minimum composites N/A 1        
Closest distance N/A ≤20        
Measured and Indicated Reduced to Inferred if:
Closest distance ≥30 Or north area;
high-angle areas
       
Gold Standard drill hole influence ≤1% N/A        
*extreme pullbacks are applied on higher grades outside domains

For reporting, the technical and economic factors likely to influence the requirement “reasonable prospects for eventual economic extraction” were evaluated using the best judgement of the author responsible for this section of the report. For evaluating the open-pit potential, MDA modeled a series of optimized pits using variable gold prices. MDA used costs appropriate for open-pit mining in Nevada, estimated processing costs and metallurgical recoveries related to heap leaching, and G&A costs. The cutoff grades are based on a gold price of $1,500/oz.

The reported Pinion mineral resource estimate is the fully block diluted ID3 and ID4 estimate. The blocks are 9 m cubed. The mineral resources are reported at a cutoff of 0.14 g Au/t for open-pit mining. No sulfide mineralization is reported at Pinion. Table 14-29 to Table 14-32 present the estimated Measured, Indicated, and Inferred gold and silver mineral resources at Pinion within the $1,500/oz Au pits. The breakdown of mineral resources by area and oxidation state is given in Appendix C. Representative cross sections of the gold and silver block models are shown in Figure 14-16 and Figure 14-17, respectively. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

 

14-44

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-29: Pinion Measured Gold and Silver Resources*

Cutoff          
g Au/t Tonnes g Au/t oz Au g Ag/t oz Ag
0.100 1,368,000 0.61 27,000 4.98 219,000
0.120 1,341,000 0.63 27,000 5.06 218,000
0.140 1,304,000 0.64 27,000 5.15 216,000
0.160 1,274,000 0.66 27,000 5.25 215,000
0.180 1,239,000 0.65 26,000 5.32 212,000
0.200 1,197,000 0.65 25,000 5.43 209,000
0.220 1,139,000 0.68 25,000 5.60 205,000
0.240 1,089,000 0.71 25,000 5.77 202,000
0.260 1,044,000 0.72 24,000 5.81 195,000
0.280 996,000 0.75 24,000 5.90 189,000
0.300 959,000 0.78 24,000 6.00 185,000
0.400 765,000 0.89 22,000 6.30 155,000
0.500 585,000 1.01 19,000 6.75 127,000
0.600 460,000 1.15 17,000 7.30 108,000
0.700 363,000 1.20 14,000 7.71 90,000
0.800 303,000 1.33 13,000 7.70 75,000
0.900 247,000 1.51 12,000 7.93 63,000
1.000 205,000 1.67 11,000 8.19 54,000
*mineral resources are inclusive of mineral reserves.

Table 14-30: Pinion Indicated Gold and Silver Resources*

Cutoff          
g Au/t Tonnes g Au/t oz Au g Ag/t oz Ag
0.100 29,496,000 0.55 524,000 4.00 3,797,000
0.120 28,518,000 0.57 521,000 4.09 3,754,000
0.140 27,621,000 0.58 517,000 4.18 3,713,000
0.160 26,751,000 0.60 512,000 4.27 3,673,000
0.180 25,959,000 0.61 508,000 4.36 3,637,000
0.200 25,112,000 0.62 503,000 4.45 3,593,000
0.220 24,295,000 0.64 497,000 4.54 3,545,000
0.240 23,502,000 0.65 492,000 4.62 3,488,000
0.260 22,774,000 0.66 486,000 4.69 3,434,000
0.280 21,838,000 0.68 478,000 4.77 3,350,000
0.300 21,015,000 0.70 470,000 4.85 3,274,000
0.400 16,897,000 0.78 424,000 5.23 2,841,000
0.500 13,176,000 0.87 370,000 5.54 2,348,000
0.600 9,859,000 0.98 311,000 5.80 1,840,000
0.700 7,318,000 1.10 259,000 5.96 1,402,000
0.800 5,421,000 1.22 213,000 5.94 1,035,000
0.900 4,131,000 1.33 177,000 6.04 802,000
1.000 3,103,000 1.46 146,000 6.11 610,000
*mineral resources are inclusive of mineral reserves.

 

 

14-45

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-31 Pinion Measured and Indicated Gold and Silver Resources*

Cutoff          
g Au/t Tonnes g Au/t oz Au g Ag/t oz Ag
0.100 30,864,000 0.56 551,000 4.05 4,016,000
0.120 29,859,000 0.57 548,000 4.14 3,972,000
0.140 28,925,000 0.58 544,000 4.22 3,929,000
0.160 28,025,000 0.60 539,000 4.32 3,888,000
0.180 27,198,000 0.61 534,000 4.40 3,849,000
0.200 26,309,000 0.62 528,000 4.49 3,802,000
0.220 25,434,000 0.64 522,000 4.59 3,750,000
0.240 24,591,000 0.65 517,000 4.67 3,690,000
0.260 23,818,000 0.67 510,000 4.74 3,629,000
0.280 22,834,000 0.68 502,000 4.82 3,539,000
0.300 21,974,000 0.70 494,000 4.90 3,459,000
0.400 17,662,000 0.79 446,000 5.28 2,996,000
0.500 13,761,000 0.88 389,000 5.59 2,475,000
0.600 10,319,000 0.99 328,000 5.87 1,948,000
0.700 7,681,000 1.11 273,000 6.04 1,492,000
0.800 5,724,000 1.23 226,000 6.03 1,110,000
0.900 4,378,000 1.34 189,000 6.15 865,000
1.000 3,308,000 1.48 157,000 6.24 664,000
*mineral resources are inclusive of mineral reserves.

Table 14-32 Pinion Inferred Gold and Silver Resources

Cutoff          
g Au/t Tonnes g Au/t oz Au g Ag/t oz Ag
0.100 11,607,000 0.61 228,000 3.64 1,358,000
0.120 11,254,000 0.62 226,000 3.72 1,345,000
0.140 10,810,000 0.64 224,000 3.80 1,322,000
0.160 10,452,000 0.66 222,000 3.89 1,306,000
0.180 10,091,000 0.68 221,000 3.97 1,289,000
0.200 9,769,000 0.70 219,000 4.04 1,270,000
0.220 9,454,000 0.71 216,000 4.12 1,252,000
0.240 9,134,000 0.73 214,000 4.20 1,234,000
0.260 8,816,000 0.75 212,000 4.27 1,211,000
0.280 8,512,000 0.76 209,000 4.33 1,186,000
0.300 8,203,000 0.78 206,000 4.38 1,156,000
0.400 6,830,000 0.87 191,000 4.64 1,019,000
0.500 5,624,000 0.96 173,000 4.81 870,000
0.600 4,525,000 1.05 153,000 4.89 711,000
0.700 3,609,000 1.16 135,000 4.88 566,000
0.800 2,871,000 1.27 117,000 4.84 447,000
0.900 2,187,000 1.39 98,000 4.69 330,000
1.000 1,697,000 1.52 83,000 4.60 251,000

 

 

14-46

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-16: Pinion Gold Domains and Block Model– Section N4479230

 

14-47

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-17: Pinion Silver Domains and Block Model– Section N4479230

 

14-48

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14.3.6 Pinion Geo-Metallurgical Model

Three additional models, collectively called the Pinion geo-metallurgy model, were produced based on guidelines given from metallurgical test work and interpretations presented in Section 13: barium concentration (estimated within modeled domains), cyanide-soluble gold grade (estimated by rock units), and refractory material (modeled solids).

14.3.6.1 Pinion Barium Modeling and Estimation

The occurrence of barite and silicification seems to have significant impacts on gold recoveries. Consequently, a barium concentration (in lieu of barite) model was necessary for assigning gold recoveries to the deposit. The estimation of a silicification block model was also considered, but the available qualitative and logged geologic data was determined to be insufficient. There was no correlation demonstrated in a comparison of SiO2 assays from metallurgical composites and the relatively larger XRF data set.

Metallurgical testing of drill samples included the ED-XRF-E5 method of analysis for barium; there are 938 analyses of this type that were performed at AAL on press powder pulp material. In addition, 21,747 NITON XRF analyses of barium were taken by independent contractor Rangefront Geological on loose powder pulp material. A significant low bias was noted in the NITON XRF compared to the ED-XRF-E5 analyses (Section 12.6.6) but since there are substantially more NITON XRF values, the larger data set was chosen for modeling and estimation. MDA developed a regression equation to factor the 938 ED-XRF-E5 measurements to NITON XRF equivalents and merge them with the 21,747 NITON XRF barium analyses as follows:

NITON XRFeq = 0.5682 x ED-XRF-E5

The R² for this equation is 0.96 but there are only 32 samples from which the relationship was built. After estimation into the geo-metallurgical block model, the estimated NITON XRF barium grades were refactored to ED-XRF-E5 equivalents to be comparable to the metallurgical data, using the following equation:

ED-XRF-E5eq = 1.760 x NITON XRF

There is a total of 22,653 samples analyzed for barium by either NITON XRF, ED-XRF-E5, or by both methods, which compares to 57,738 gold samples. All NITON XRF barium analyses were plotted in a cumulative probability plot (Figure 14-18) and was used to define domains. No values factored from ED-XRF-E5 analyses are included on the plot. The resulting high-grade (>~6% Ba) and low-grade (~0.3 to ~6% Ba) domains were then modeled on 30 m spaced east-west sections, as was done for gold and silver. The geologic model was the primary guide for barium domain modeling. Barium is spatially related to the multi-lithic breccia, which is generally tabular and folded into the Pinion anticline. Gold domains correlate reasonably well with the barium domains and were used as guides as well. The high-grade domain is spatially restricted to the with a north- to northwest-trending axis of the Pinion anticline, and within the mineral resource pit. Logged barite intensity data was used to augment the analytical barium data in supporting the domain interpretations. Sectional interpretations were then snapped to drill holes and sliced to north-south sections on every 9 m mid-block in the block model.

  

14-49

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-18: Cumulative Probability plot of Barium (NITON XRF) Sample Grades at Pinion

Descriptive statistics of the sample barium grades by domain are given in Table 14-33. These samples were composited to 3.05 m lengths. Descriptive statistics of the composited barium grades by domain are given in Table 14-34. A representative cross section showing geology and barium domains is given in Figure 14-19. Estimation parameters are presented in Table 14-35.

Table 14-33: Pinion Samples Barium Statistics by Domain

Low-grade Barium Domain
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 4,294   1.49     0.34 15.1 %
Ba 4,294 0.36 0.83 1.19 1.4 0.00 14.0 %
Ba Capped 4,294 0.36 0.76 0.90 1.2 0.00 3.5 %
High-grade Barium Domain
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 259   1.35     2.45 52.2 %
Ba 259 8.32 9.41 4.55 0.5 1.19 29.3 %
Ba Capped 259 8.32 8.98 3.49 0.4 1.19 15.0 %
Outside Barium Domains
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 17,325   1.52     0.16 2.6 %
Ba 17,325 0.07 0.16 0.52 3.3 0.00 18.1 %
Ba Capped 17,325 0.07 0.15 0.35 2.3 0.00 4.0 %

 

 

14-50

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-34: Pinion Composites Barium Statistics by Domain

Low-grade Barium Domain
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 2,273   2.80     0.0 3.1 m
Ba 2,273 0.42 0.84 1.08 1.3 0.00 11.4 %
Ba capped 2,273 0.42 0.77 0.83 1.1 0.00 3.5 %
High-grade Barium Domain
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 143   2.44     0.43 3.1 m
Ba 143 8.40 9.45 3.90 0.4 2.87 24.8 %
Ba capped 143 8.40 9.03 3.10 0.3 2.87 15.0 %
Outside Barium Domains
  Valid Median Mean Std Dev CV Minimum Maximum Units
Length 8,805   2.97     0.02 3.1 m
Ba 8,805 0.07 0.16 0.45 2.8 0.00 11.2 %
Ba capped 8,805 0.07 0.15 0.32 2.1 0.00 4.0 %

 

 

14-51

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-19: Pinion Barium Domains and Geology – Section N4479230

 

14-52

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-35: Pinion Barium Estimation Parameters
(for all rotations/dip/tilt values, see Table 14-22)

Domain Parameter
Low-grade Barium Domain
Samples: minimum/maximum/maximum per hole 1 / 12 / 3
Search anisotropies: major/semimajor/minor (vertical) 1 / 0.5 / 0.25
Inverse distance power 3
High-grade restrictions (grade in %Ba) N/A
High-grade Barium Domain
Samples: minimum/maximum/maximum per hole 1 / 12 / 3
Search (m): major/semimajor/minor (vertical) 1 / 0.5 / 0.25
Inverse distance power 4
High-grade restrictions (grade in %Ba) N/A
Outside Modeled Barium Domains
Samples: minimum/maximum/maximum per hole 2 / 12 / 3
Search (m): major/semimajor/minor (vertical) 1 / 1 / 0.5
Inverse distance power 3
High-grade restrictions (grade in %Ba and distance in m) 0.15 / 9

The average barium grade for the gold mineralization grading at least 0.14 g Au/t in potentially mineable material is ~1.7%. There are substantially fewer barium analyses than gold analyses, so the barium estimate has lower confidence than the gold estimate. If precision of barium grades is critical to the economics of the deposit, then additional samples with barium grades should be obtained.

14.3.6.2 Pinion Cyanide-Soluble Gold Model

A cyanide-soluble gold block model was produced using cyanide-recoverable gold shaker test results and fire assays of sample pulps (Figure 14-20). AuCN/AuFA ratios were calculated from these two types of assays. ID3 was used to estimate the AuCN/AuFA ratio grades. Only AuCN/AuFA ratios in which the fire-assay gold grades were greater than or equal to 0.05 g Au/t were used in the estimation. Due to the relatively few cyanide-shaker tests and the fact that no quality control or database auditing was done on these analyses, the AuCN/AuFA ratio block model is lower in confidence than the gold and silver block models. Otherwise, the estimation procedures, block dimensions, and methodology were generally the same as those used for the gold and silver models, with the exception of the items noted below in this section.

 

14-53

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-20: Cumulative Probability Plot of Pinion AuCN/AuFA Ratios

The AuCN/AuFA ratio block model augments the barite block model to further define metallurgical domains applicable to estimating gold recovery. Referencing Section 13 again, blocks having estimated AuCN/AuFA ratios of less than 50% are deemed to have gold that is not sufficiently recoverable with cyanide processing; this material is not reported in the estimated mineral resources. Blocks with estimated AuCN/AuFA ratios of between 50 and 70% are categorized as transitional, are considered be to have moderate recovery, and are included in the reported mineral resources. Blocks with estimated AuCN/AuFA ratios of 70% or greater are classified as having relatively good recovery and are categorized as oxidized. These three categories are further subdivided using estimated barium values above or below 4%.

14.3.6.3 Refractory Solids Model

The term “refractory” technically refers to material that contains sulfur and carbon species that render gold extraction difficult with cyanide processing. Refractory solids were therefore modeled in order to provide input into metallurgical characterization and potential acid-generating properties. The refractory solids modeled at Pinion delineate unoxidized, sulfide-bearing material with carbon. Refractory zones within the solids generally correlate with material from which gold recovery is difficult as defined above using estimated barite grades and AuCN/AuFA ratios. Zones outside the solids are generally consistent with the oxide and transitional metallurgical domains defined above.

Gold Standard initially modeled solids using a combination of logged data, which represents the most abundant data set, augmented by AuCN/AuFA ratios. MDA modified these solids to include LECO sulfide-sulfur analyses. The contact of the resulting refractory solids is commonly abrupt and readily defined by the multiple data sets, which are rarely contradictory. Within the refractory solids, logged data indicates material is 30% or more refractory, AuCN/AuFA ratios are generally much lower than 50%, and sulfide-sulfur grades are mostly in the tenths of a percent or higher. By far the largest volume of refractory material is deep, below the multi-lithic breccia and outside the pit defining potentially minable mineral resources. Within the volume of the potential open-pit, refractory material is mostly coincident with the Chainman and to a lesser extent the Tripon Pass Formation, but a small amount is also in the Webb Formation in the southwest part of the pit. All refractory material within a potential pit lies above the multi-lithic breccia that hosts the

 

14-54

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

gold mineralization. There is some known refractory material which is not modeled within the solids below mineralization in the Devils Gate Limestone, because of the limited drilling, but that material lies below and is immaterial to the estimated mineral resources.

The refractory solids model and the data on which it is based support the inference that potentially lower-recovery material, or material with the potential for having acid producing qualities, are properly represented.

14.3.7 Pinion Acid-Base Accounting Model and Estimation

An acid-base accounting block model was produced to characterize the acid-generating or neutralizing potential of mined waste material. MDA estimated CINO and SSUL into the ABA block model, and designated model blocks as either PAG or NAG. All ABA calculations and PAG/NAG designation criteria were provided by Stantec.

Gold Standard provided LECO analyses of carbon and sulfur species. The analyses were done on samples that varied at 1 ft (0.3048 m) to 6 ft (1.829 m) between those on original core intervals, and between RC sample composites at 10 ft (3.048 m) to 35 ft (10.668 m).

MDA evaluated the CINO and SSUL statistics by rock unit, barium domain and in/out of the refractory solids (Table 14-36 and Table 14-37). The statistics in the tables are summarized according to categories chosen for estimation.

Because relationships between silica and barium contents relative to CINO and SSUL are similar, subsequent discussions regarding statistics and estimates in terms of barium domain also apply to the silica zones.

Table 14-36: Number of Samples and Mean Inorganic Carbon Values for Pinion Estimation Categories
(by rock unit, barium domain, and zones inside [refractory] or outside [oxide and transitional] refractory solids)

Estimation Category Multi-lithic Breccia
# of Samples Mean Value (%)
Low-Grade Barium, and Outside Barium Domains, Oxide and Transitional 914 1.958
High-Grade Barium, Oxide and Transitional 113 0.495
 
Estimation Category Sentinel Mountain Dolomite and Devil's
Gate Limestone
# of Samples Mean Value (%)
Low-Grade Barium, and Outside Barium Domains 762 9.084
 
Estimation Category Chainman and Webb Formations
# of Samples Mean Value (%)
Low-Grade Barium, and Outside Barium Domains, Oxide and Transitional 1,250 0.553
Low-Grade Barium, and Outside Barium Domains, Refractory 259 2.653
 
Estimation Category Tripon Pass Formation
# of Samples Mean Value (%)
Low-Grade Barium, and Outside Barium Domains 740 4.299

 

 

14-55

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-37: Number of Samples and Mean Sulfide Sulfur Values for Pinion Estimation Categories
(by rock unit, barium domain, and zones inside [refractory] or outside [oxide and transitional] refractory solids)

Estimation Category Multi-lithic Breccia
# of Samples Mean Value (%)
Oxide and Transitional 1,020 0.026
 
Estimation Category Sentinel Mountain Dolomite and Devil's Gate Limestone
# of Samples Mean Value (%)
All Data 770 0.006
 
Estimation Category Webb Formation
# of Samples Mean Value (%)
Oxide and Transitional, Outside Barium Domains 313 0.022
Oxide and Transitional, Low- and High-Grade Barium Domains 8 0.000
Refractory, Outside Barium Domains 37 0.101
Refractory, Low- and High-Grade Barium Domains 3 0.457
 
Estimation Category Chainman Formation
# of Samples Mean Value (%)
Oxide and Transitional, Outside Barium Domains 917 0.069
Oxide and Transitional, Low- and High-Grade Barium Domains 10 0.000
Refractory, Outside Barium Domains 215 0.403
Refractory, Low- and High-Grade Barium Domains 4 1.445
 
Estimation Category Tripon Pass Formation
# of Samples Mean Value (%)
Oxide and Transitional, Outside Barium Domains 432 0.024
Oxide and Transitional, Low- and High-Grade Barium Domains 122 0.038
Refractory, Outside Barium Domains 160 0.145
Refractory, Low- and High-Grade Barium Domains 25 0.158

Categories represented by only a small number of samples were evaluated on-screen with respect to location and volume of material to be estimated. If the volume in the block model to be estimated could be reasonably estimated without projecting CINO and SSUL grades over extreme distances, they were estimated and are included in Table 14-36 and Table 14-37. However, if unreasonable distances were required to estimate grades into model blocks, then values were assigned to those blocks rather than estimated. The assigned values (Table 14-38) were determined based on relationships between mean CINO and SSUL values for categories that are well represented by data.

 

14-56

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-38: Assigned Inorganic Carbon and Sulfide Sulfur Values for Pinion Estimation Categories
(by formation, barium domain and zones inside [refractory] or outside [oxide and transitional] refractory solids)

Assigned CINO
Formation Barium Domain Refractory Zone Assigned
Value
Multi-lithic Breccia Low-Grade Refractory 2.67
Multi-lithic Breccia High-Grade Oxide and
Transitional
0.49
Multi-lithic Breccia High-Grade Refractory 0.74
Multi-lithic Breccia Outside Domains Refractory 3.86
Sentinel Mountain Dolomite and Devil's Gate Limestone High-Grade All 3.07
Chainman and Webb Formations High-Grade All 0.46
Chainman and Webb Formations Low-Grade and Outside Domains All 1.28
Tripon Pass Formation High-Grade All 1.39
 
Assigned SSUL
Formation Barium Domain Refractory Zone Assigned
Value
Multi-lithic Breccia Low-Grade Refractory 0.07
Multi-lithic Breccia High-Grade and Outside Domains Refractory 0.16

CINO statistics varied inversely and systematically by rock unit in combination with barium domain and silica zone (in/out of modeled solids) for the all units. The inverse correlation is indicative of increasingly altered and mineralized rocks due to baritization, silicification, and decarbonization. CINO values in the multi-lithic breccia and Webb and Chainman Formations differ in each barium domain. In low-grade barium and outside the barium domains, CINO also varies by refractory zone (in/out of modeled solids). CINO contents in low-grade barium domains and outside modeled barium domains behave similarly compared to high-grade barium domains in the Sentinel Mountain Dolomite, Devil’s Gate Limestone, and Tripon Pass Formation, and there is no distinction by refractory zone. SSUL statistics show strong relationships by refractory zone within the multi-lithic breccia. In the Webb, Chainman, and Tripon Pass Formations, SSUL varies by both refractory zone and barium domain. Statistics for SSUL in low- and high-grade barium domains are similar compared to outside barium domains in these units. No systematic differences were observed in SSUL values for the Sentinel Mountain Dolomite or Devil’s Gate Limestone, so both were estimated together using all respective contained data.

CINO and SSUL contents were estimated independently into the ABA block model, according to the categories described above. CPPs for each species estimated were evaluated by category for potential capping of assays. None was warranted for CINO, but several caps were applied to the SSUL data (Table 14-39). Half the sample composites are ~1 m in length. However, about one-quarter of the lengths are 9.144 m (30 ft). Given the model block dimension of 9 m3, assay sample data were composited to 9.14 m.

 

14-57

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-39: Sulfide Sulfur Capping Values for Pinion Estimation Categories
(by formation, barium domain, and zones inside [refractory] or outside [oxide and transitional] refractory solids)

Capped SSUL
Formation Barium Domain Refractory Zone Capping Value (%)
Multi-lithic Breccia All Oxide and Transitional 0.50
Sentinel Mountain Dolomite and Devil's Gate Limestone All All 0.40
Webb Formation Outside Domains Oxide and Transitional 0.60
Webb Formation Outside Domains Refractory 0.30
Chainman Formation Outside Domains Oxide and Transitional 0.70
Tripon Pass Formation Low- and High-Grade Oxide and Transitional 0.30
Tripon Pass Formation Outside Domains Oxide and Transitional 0.40

All estimates were done using the same search orientations and associated estimation areas as were applied to the gold and silver estimates (Table 14-6). The maximum search distance applied to most estimates for both CINO and SSUL was 300 m. The maximum distance for a few runs were extended to 350 m on a limited basis to fill in a small number of unestimated blocks. Search ellipses were strongly anisotropic, with major, minor, and vertical search distances at 300 m, 300 m, and 75 m, respectively, and ID2 methodology was used. Due to the relatively long composite length, the maximum number of composites, and maximum composites per hole allowed to estimate a block were limited to five and two, respectively. No search restrictions were applied to either CINO or SSUL estimates.

Correlograms were generated to evaluate continuities in the data with respect to distance. These demonstrated reasonable continuity for CINO at ranges up to 370 m data in low-grade and outside the barium domains. There was not enough data to build meaningful correlograms in the high-grade barium domain.

Correlograms of SSUL data indicate continuity to a maximum of 100 m, depending on refractory zone. As noted above, the maximum search distance applied to most estimates for CINO and SSUL was 300 m. The maximum distance for estimation applied to SSUL was the same as applied to CINO. The relatively short continuity indicated by correlograms might preclude the application of longer search distances, but PAG/NAG designation is dependent on the estimated grades of both CINO and SSUL, and a significant portion of blocks would not be characterized as PAG or NAG. So, although there is lower confidence in the SSUL estimated values beyond distances of 100 m, most blocks within potential open pits are able to be designated as PAG or NAG. This added risk was recorded as a block attribute.

The LECO data is relatively well-distributed within the deposit in potentially mineable pits at lower gold prices, but there are localized areas that lack data. Also, significant areas of pits at higher gold prices contain no LECO data at all. Estimated grades of CINO and SSUL in these areas can be relatively far from data. To flag model blocks that are at relatively greater distances from data, MDA assigned a confidence code of ‘0’ to all estimated blocks with closest composite more distant than 130 m. This confidence code compensates for the shorter continuities demonstrated in correlograms for SSUL. Because CINO and SSUL were estimated according to different criteria, these codes were assigned separately for each, and a combined code was assigned if either CINO or SSUL confidence codes was ‘0’.

Like Dark Star, model blocks were designated as PAG (code of ‘1’) or NAG (code of ‘2’) according to criteria as defined by Stantec. First, ANP, AGP, and NNP values were calculated from estimated CINO and SSUL values. Next, a PAG/NAG designation was assigned according to criteria for three potential waste characterization scenarios, as shown in Table 14-15 located in Dark Star Section 14.2.6.

14.3.8 Pinion Density

All densities were measured using the immersion method by an independent laboratory. There are 440 density-sample measurements in the Pinion database within assayed intervals. However, once these samples are parsed out by formation/rock unit and barite domains, the geologic features that most affect density, there are only a small number

 

14-58

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

(in the tens) of samples representing each category. The mean density values, and the values assigned to the units in the model, are summarized in Table 14-40. Application of density values to the Pinion gold block model was dependent on numerous supporting modeled (formation/rock unit and silicification zone in/out of solids) and estimated (barium grade) criteria that have been discussed in various prior sections.

Table 14-40: Density Values Applied to the Pinion Block Models

Formation/Rock Unit Barite Domain Silicification
Zone
Density Applied
to Model
Multi-lithic breccia Outside Outside 2.52
Multi-lithic breccia Low-barite Any 2.60
Multi-lithic breccia Low- and High-barite* Any 2.83
Multi-lithic breccia High-barite Any 3.05
Multi-lithic breccia Outside High-silica 2.54
Sentinel Mountain Any Any 2.56
Devils Gate Outside Outside 2.62
Devils Gate Low-barite Any 2.62
Devils Gate Low- and High-barite* Any 2.68
Devils Gate High-barite Any 2.74
Devils Gate Outside High-silica 2.56
Webb Outside Outside 2.42
Webb Low-barite Any 2.70
Webb Low- and High-barite* Any 2.71
Webb High-barite Any 2.72
Webb Outside High-silica 2.53
Chainman Outside Outside 2.45
Chainman Low-barite Any 2.40
Chainman Low- and High-barite* Any 2.55
Chainman High-barite Any 2.70
Chainman Outside High-silica 2.46
Tripon Outside Outside 2.49
Tripon Low-barite Any 2.57
Tripon Low- and High-barite* Any 2.64
Tripon High-barite Any 2.70
Tripon Outside High-silica 2.61
(* in the same block)

14.3.9 Discussion of Pinion Estimated Mineral Resources and Supporting Models

Pinion has a long history of exploration drilling dating back to 1981 and consequently the project has many drill holes of varying quality and reliability. On the one hand, having twelve different companies drilling with twelve different procedures, documentation, and general quality makes the database difficult to verify and reduces the confidence. On the other hand, results from so many companies drilling over such a long period of time that corroborate each other add significant confidence. Consequently, the estimators spent much time auditing, evaluating QA/QC, sample integrity, and comparing drill campaigns through explicit modeling of domains. Because of these tasks, many of the TCX holes drilled by Amoco in 1981 were eliminated from use in estimation.

None of the historical drilling has supporting QA/QC and not all have supporting assay certificates. This lower-confidence data set was taken into account during mineral resource classification by downgrading some of the blocks that were entirely dependent on the historical data. However, the downgrade was not severe because all historical data was mutually supportive, except for the 1981 Amoco drilling.

 

14-59

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

There is some contamination noted and those samples deemed likely contaminated by both MDA and Gold Standard were eliminated from estimation. However, below the main mineralized multi-lithic breccia body, there are many samples with low grades of gold. It is presently impossible to determine if these represent contaminated samples, so many of these blocks were classified as Inferred. Little of this is economic under today’s economic conditions.

The AuCN/AuFA ratios are based on relatively fewer cyanide-shaker test assays relative to fire assays that are unaudited and lack QA/QC. The cyanide-soluble gold block model, while likely reasonable, is a global estimate and the ability to produce reliable estimates on a block by block basis is improbable. The AuCN/AuFA ratio block model is lower in confidence than the gold and silver block models.

In addition to the mineral resources reported herein, there is mineralization that continues beyond, and is contiguous with the reported mineral resources. The reported mineral resource estimate is pit-constrained and therefore some of the estimated mineralization (tonnes, grade and ounces) is unreported. That additional mineralization is shown graphically in Figure 14-21.

(gray lines are drill holes; blue solid is the 0.14 g Au/t grade shell; red is the mineral resource pit shell)

Figure 14-21: Pinion Optimized Pit and Additional Mineralization

 

14-60

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Where silver was modeled, the ratio of silver grade to gold grade is around 7:1.

The Pinion deposit has clustered drill data, which if not taken into consideration during estimation, imparts risk to the estimate. Fortunately, the clustering of the data lies within the open-pit limits and where mining will potentially take place. This area is also, for the most part, the highest-grade area. For that reason, any estimation, except for nearest-neighbor type, will have a tendency to “push” those clustered-sample grades out beyond where they should be. Because that effect was noted during checking, the inverse-distance power for the low-grade gold domain estimate was changed to three, and to four for the high-grade gold domain. De-clustered composite data is better reflected in a nearest-neighbor grade than the inverse-distance estimated grade. There is a chance that these outer-area Inferred mineral resource grades may end up being slightly lower than what is presented herein.

Previously reported mineral resources for Pinion were smaller than what is reported herein. Globally estimated mineralization, but not reported, is similar. However, the constraints placed on the estimated tonnes and grade in order to determine “…reasonable prospects for eventual economic extraction” are substantially more rigorous in this Technical Report than were used previously. It should also be noted that the mineral resource contained within any given optimized pit can increase significantly with small increases in gold price. For example, with a price increase of $25/ounce, the mineral resources increase by 50%, 81%, and 18% in the $1,150, $1,400, and $1,700 optimized pits, respectively. The step-like pit expansions are due primarily to the flat-lying, anticlinal nature of the deposit, and occur in a roughly southward direction along the axis of the anticline.

The block dimensions were changed from 6 m x 6 m x 6 m in the APEX model, to 9 m x 9 m x 9 m in MDA’s preparation of this Technical Report. Additional dilution was incorporated in the current mineral resource estimate as a result of using the larger block sizes. MDA performed a bench-height study on composite data to evaluate the potential changes to the mineral resource attributed to the additional dilution with the changed bench height, and showed that, at the cutoff of 0.2 g Au/t, the gold grade would decrease by about 3% and tonnes would increase by about 2%.

Since Gold Standard became the operator, a QA/QC program was initiated, but there is no evidence of a QA/QC program prior to that. The QA/QC program was minimal in 2014 – 2016, with only CRMs and pulp blanks. In 2017 and 2018, field duplicates and coarse blanks were inserted into the sample stream. In 2018, pulps were sent out to secondary laboratories for check assays. As of May 2018, the percent of drill holes, including historical drilling, with QA/QC was 23% and the percent of total meters drilled in those campaigns with QA/QC was 37%. The lack of QA/QC data were accounted for during classification of the current mineral resources.

Nineteen new holes were drilled in the Pinion mineral resource area since the Pinion resource estimate was completed. Eighteen were core holes, of which only four were assayed. Three of the assayed core holes were drilled for metallurgical samples within the mineral resource pit and are effectively twins of previously drilled holes. If used in a mineral resource update, these core holes would have minimal impact on estimated mineralized volumes and grades. The fourth core hole was drilled outside modeled domains, and intercepted negligible grades. A sonic hole was drilled ~200 m west of modeled gold domains, and ~500 m west of the resource pit. Six meters of low-grade mineralization was intercepted at top of this hole, which would not cause the current optimized pit to expand but could define new mineral resources.

Gold grades from the four assayed metallurgical holes drilled in 2019 and totaling 552.3 m were compared to estimated gold grades in coincident model blocks from a previous, unpublished block model produced by MDA in 2018. The mean and median gold grades of the 2018 model blocks intersected by the 2019 drill holes was 6% higher and 11% lower, respectively, compared to newly drilled grades. A few blocks with relatively extreme gold grades are skewing the mean higher. For blocks and drill-hole intervals with grades over 0.14 g Au/t, the mean and median gold grades of the drill holes were 7% higher and 10% lower, respectively, than estimated block model grades.

 

14-61

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-41: Comparison of 2019 Drilling Gold Assays to 2018 Coincident Model Block Grades

All Coincident Blocks
  Valid Median Mean Std. Dev. CV Min. Max. Units
Au 58 0.011 0.187 0.278 1.484 0.004 1.119 g Au/t
Au-ID 58 0.010 0.199 0.334 1.677 0.002 1.655 g Au/t
Diff   -11% 6% 20% 13% -63% 48% (Model/Actual)
All Coincident Blocks 0.14 g Au/t
  Valid Median Mean Std. Dev. CV Min. Max. Units
Au 21 0.504 0.499 0.245 0.491 0.008 1.119 g Au/t
Au-ID 21 0.454 0.533 0.366 0.686 0.058 1.655 g Au/t
    -10% 7% 49% 40% 586% 48% (Model/Actual)

14.4 JASPEROID WASH MINERAL RESOURCES

The Jasperoid Wash mineral resource estimate was completed on November 15, 2018, which is the effective date of the estimate. The Jasperoid Wash mineral resource estimate is based on drilling through September 6, 2018; however, a minor number of drill holes were updated with new collar surveys and geology as late as October 6, 2018, which makes it effective date for the Jasperoid Wash database.

A total of 21 additional drill holes (5,210.3 m) were drilled at Jasperoid Wash after the effective date of the mineral resource estimate. Two were core holes for 610.8 m, and the remainder were RC for 4,599.5 m. Data for these holes were received on April 24, 2019 and evaluated on April 29, 2019. No auditing or QA/QC evaluations were done on this data set. The impacts of these holes on the reported mineral resource estimate are described in Section 14.4.3.

References to Tomera Formation equivalent stratigraphy have been noted historically. However, recent work suggests these units in the Railroad-Pinion property may not be of equivalent age, so all usage of Tomera Formation equivalent in this Technical Report refer to units that are Pennsylvanian-Permian undifferentiated.

14.4.1 Jasperoid Wash Database

Since 1989, three companies have conducted exploration drilling at Jasperoid Wash. Gold Standard began drilling in 2017. In all, 91 RC holes (92% of meterage) and 6 core holes (8% of meterage) totaling 17,407 m have been drilled (see Table 14-42 and Figure 14-22). There are no historical QA/QC data for the historical holes, which currently represent 46% (8,031 m) of the holes in the mineral resource database.

Descriptive statistics of all Jasperoid Wash drill-hole analytical data audited and imported into MineSight by MDA are summarized in Table 14-43. There are no density measurements at Jasperoid Wash. Because there are so few core holes, core recovery and RQD data were not imported.

Table 14-42: Summary of Drilling at Jasperoid Wash

Company Type Number Total Meters
Cameco RC 7 1,230
  Total 7 1,230
Westmont Core 3 295
  RC 47 6,506
  Total 50 6,801
Gold Standard Core 3 1,070
  RC 37 8,306
  Total 40 9,376
Total Core 6 1,365
  RC 91 16,042
Grand Total   97 17,407

 

 

14-62

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-43: Descriptive Statistics of Sample Assays in Jasperoid Wash Mineral Resource Database

  Valid Median Mean Std Dev CV Min Max Units
From 10,387         0 589.8 m
To 10,387         1.52 589.8 m
Length 10,387 1.52 1.68     0.01 46.5 m
Type 10,341         1 2.0  
Au 10,147 0.043 0.101 0.178 1.77 0.003 2.88 g/t
CN-sol 1,498 0.130 0.194 0.241 1.24 0.015 2.80 g/t
CN:FA Au 1,498 74 63 30 0.50 2 100 %

The Jasperoid Wash database contains 10,147 gold assay records (Table 14-43). No explicit determination of sample reliability was made because the intent here is to only report Inferred mineral resources, and there was nothing indicating serious problems with sample reliability. However, three holes have long intercepts of mineralization that are somewhat anomalous to adjacent holes. These were used in the mineral resource estimate, but additional work or drilling should be done to ensure that these results are reliable. If deemed not reliable, the impact on the mineral resource estimate would be small.

Gold Standard’s drill-hole collar locations, downhole survey data, and gold analyses were audited for verification. There are few supporting certificates for any historical drilling. The database also contains logged geologic features, including rock types, formations, faults, vein type, silicification, clay, dolomite, barite, limonite, hematite, carbonate, sulfide percent, and percent reduced, all of which were imported. The logged geology was reviewed and used in modeling but was not audited.

  

14-63

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT


Note: hachured area shows third-party inlier claims not controlled by Gold Standard.

Figure 14-22: Jasperoid Wash Deposit Drill-hole Map and Mineral Resource Outline

 

14-64

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14.4.2 Jasperoid Wash Geologic Model

Gold Standard provided geologic interpretations as surfaces and solids for faults, formation contacts, alteration and shapes defining areas of high AuCN/AuFA ratios. All geologic surfaces were interpreted on east-west cross-sections by use of surface maps and downhole drill data. MDA reviewed all sections and models provided by Gold Standard, and when problematic areas were encountered, MDA worked with Gold Standard geologists to produce a coherent, agreed upon cross-section or model.

MDA combined appropriate upper and lower geologic rock unit surfaces, fault surfaces, and intrusive cross-sectional interpretations to produce geologic solids for coding the block model. Coded rock units include: the Mississippian Tonka Formation (a conglomerate), the Pennsylvanian-Permian undifferentiated units (from oldest to youngest - lower conglomerate, lower siltstone, middle conglomerate, and upper siltstone), and Tertiary intrusive bodies. The middle conglomerate of the undifferentiated Pennsylvanian-Permian units, which may correlate with units at Dark Star that are possibly Tomera Formation age equivalent rocks, is the primary host for mineralization. The Tertiary conglomerates and Elko Formation is recognized as a secondary host, and the lower siltstone contains some less extensive gold mineralization. Limited mineralization is found in the lower conglomerate, and additional mineralization can be encountered within the intrusive bodies. MDA determined that Quaternary colluvium exists in insufficient quantities to impact mining and mineral resources, so it was not modeled. All geologic interpretations, in combination with assays and logged data, were used to guide metal domain modeling and to define metallurgical domains of cyanide solubility and clay zones.

14.4.3 Jasperoid Wash Gold Modeling and Estimation

14.4.3.1 Gold Domain Model

Gold domains based on sample assay ranges were interpreted on sections spaced 100 m apart, oriented east-west and looking north. Domains were defined based on population breaks on the CPP for all gold data (Figure 14-23). Two domains, even if indistinct on the CPP plots, were needed to control what was clearly a higher-grade portion of the deposit and maintain its likely geometry. The lowest-grade domain limit is at about 0.05 g Au/t, but its definition is unclear because of the high and variable gold-assay detection limits. The higher-grade domain boundary is ~0.15 g Au/t to 0.2 g Au/t, where a very subtle break occurs in the line on the CPP plot in Figure 14-23. While there is a higher-grade domain greater than ~1.5 g Au/t, there are so few samples that there is no evidence of continuity. There are no outlier grades in either domain at Jasperoid Wash. Descriptive statistics of assays by the modeled domains are presented in Table 14-44.

 

14-65

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-23: Cumulative Probability Plot of Jasperoid Wash Gold Assays

During a site visit in September 2018, Mr. Lindholm reviewed core from JW17-01 and JW18-01. Gold Standard staff geologists provided guidance and expertise with respect to the geology of the deposit and the nature of gold mineralization. As is common with Carlin-type, sedimentary-rock hosted epithermal gold deposits, the relationships between gold mineralization and rock, alteration and/or mineral assemblages can be subtle and inconsistent. However, the following characteristics were commonly observed with respect to gold mineralization:

  • In Carlin-type systems, higher porosity can be attributed to decalcification of calcareous sedimentary rocks and coarser-grained sedimentary units. At Jasperoid Wash, the middle conglomerate is typically more decalcified than other units above and below;

  • Gold mineralization is commonly confined between less permeable units, such as argillized fault gouges or stratigraphic horizons;

  • Argillized areas often occur adjacent to felsic intrusive bodies and related zones of structural movement or weakness. No visible sulfides were observed in argillized areas; however, a distinct and strong sulfur smell was noted in argillized zones of JW17-01; and

  • Mineralized areas outside of argillic zones are dominated by limonite in fractures and moderate hematization of host rock.

 

14-66

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-44: Jasperoid Wash Descriptive Statistics by Gold Domain

Low-Grade Gold Domain
  Valid Median Mean Std. Dev. CV Min Max Units
From 2,062           313.64 m
To 2,062         1.52 315.16 m
Length 2,062 1.52 1.54     0.01 22.65 m
Type 2,050         1 2  
Au 2,037 0.101 0.111 0.070 0.63 0.003 0.720 g/t
Au Capped 2,037 0.101 0.111 0.070 0.63 0.003 0.720 g/t
AuCN 633 0.100 0.101 0.064 0.63 0.015 0.630 g/t
AuCN/AuFA ratio 633 71 64 28 0.40 6 100 %
High-Grade Gold Domain
  Valid Median Mean Std. Dev. CV Min Max Units
From 1,345           242.32 m
To 1,345         1.52 243.84 m
Length 1,345 1.52 1.50     0.02 2.59 m
Type 1,343         1 2 0
Au 1,338 0.290 0.402 0.327 0.81 0.010 2.884 g/t
Au Capped 1,338 0.290 0.402 0.327 0.81 0.010 2.884 g/t
AuCN 774 0.200 0.282 0.302 1.07 0.015 2.800 g/t
AuCN/AuFA ratio 774 78 65 32 0.50 2 100 %
Outside Gold Domains
  Valid Median Mean Std. Dev. CV Min Max Units
From 6,980         0 589.79 m
To 6,980         1.52 589.8 m
Length 6,980 1.52 1.75     0.01 46.46 m
Type 6,948         1 2 0
Au 6,772 0.026 0.038 0.057 1.49 0.003 1.543 g/t
Au Capped 6,772 0.026 0.038 0.048 1.27 0.003 0.600 g/t
AuCN 91 0.070 0.090 0.122 1.35 0.015 1.090 g/t
AuCN/AuFA ratio 91 45 45 26 0.60 2 100 %

Geologic interpretations provided guidance into the definition of the domains. The mineralization is very much stratiform on the east, whereas it dips gently to the west. The mineralization becomes more steeply dipping to the west where faults cause the stratigraphy to drop down. This steep-to-the-west-dipping structural corridor, defined by surface mapping, seems to have controlled the tertiary intrusions. Often, mineralization is found within the intrusive bodies and along their contacts. Gold mineral domains were generally drawn parallel to stratigraphic contacts in the east and parallel to the intrusions to the west. Silver was not modeled.

The MT thrust fault is located west of the mineralization and is considered a hard boundary, with no mineralization extending beyond it to the west. The MT thrust fault is interpreted to dip about 60° to the west, parallel to the interpreted dips of the intrusive rocks and other faults.

After sectional interpretations were completed, gold domains were snapped to drill holes in three dimensions and sliced to mid-bench level plans for modeling. The modeled level plans are spaced at 6 m and are located the middle of each bench. A cross section showing the interpreted gold domains is given in Figure 14-24.

 

14-67

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-24: Jasperoid Wash Zone Gold Domains and Geology – Section N4473200

 

14-68

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14.4.3.2 Gold Composites Statistics and Capping

Jasperoid Wash gold domains were defined and modeled on 100 m spaced cross sections and each domain was used to code the drill-hole samples. Cumulative probability plots were made of the coded assays, which were reviewed to determine appropriate capping limits. Capping for each domain was determined by first assessing the grade above which outliers occur. Capping values were determined for each of the gold domains separately. Assays in the Jasperoid Wash gold domains required no capping but samples outside of the domains were capped to 0.6 g Au/t.

Once capping was completed, drill-hole samples were down-hole composited to 3.05 m to respect the original 5 ft drilled intervals, which honors domain boundaries. The composite length was chosen because the majority of samples are 1.52 m in length. Descriptive statistics were generated for all composites and were considered with respect to capping levels (Table 14-45).

Table 14-45: Descriptive Composite Statistics by Domain for Jasperoid Wash

Low-Grade Domain
  Valid Median Mean Std. Dev. CV Min Max Units
To 1,091           315.16 m
Length 1,091         0.01 3.05 m
Au 1,091 0.103 0.111 0.058 0.52 0.0025 0.583 g/t
Au Capped 1,091 0.103 0.111 0.058 0.52 0.0025 0.583 g/t
AuCN/AuFA ratio 481 71 64 28 0.4 7 100 %
High-Grade Domain
  Valid Median Mean Std. Dev. CV Min Max Units
To 702           243.84 m
Length 702         0.57 3.05 m
Au 702 0.291 0.396 0.296 0.75 0.02 2.51 g/t
Au Capped 702 0.291 0.396 0.296 0.75 0.02 2.51 g/t
AuCN/AuFA ratio 416 78 65 31 0.5 2 100 %
Outside Gold Domains
  Valid Median Mean Std. Dev. CV Min Max Units
To 3,398         1.52 589.8 m
Length 3,398         0.01 3.05 m
Au 3,398 0.028 0.038 0.050 1.30 0.00 1.14 g/t
Au Capped 3,398 0.028 0.038 0.043 1.14 0.00 0.60 g/t
AuCN/AuFA ratio 87 44 43 26 0.6 2 100 %

Correlograms were built from the composited gold grades in order to evaluate grade continuity. Correlogram parameters were used in the kriged estimate, which was used as a check on the reported inverse distance estimate, and also to give guidance to the classification of mineral resources. The correlograms for the mineralized domains have a nugget at 30% of the total sill. The first sill is 30% of the total sill with a range of 25 m to 30 m depending directions. The second sill is 40% of the total sill with a range of 35 m to 55 m depending directions.

14.4.3.3 Gold Estimation

The block model is not rotated, and the blocks are 6 m north-south by 6 m vertical by 6 m east-west. The block dimensions are smaller than those for Pinion and Dark Star because the deposit is both smaller and more lenticular. Only gold was estimated and is being reported.

Multiple iterations of four types of estimates were completed: polygonal, nearest neighbor, inverse distance, and kriged with the inverse-distance estimate being reported. The nearest neighbor, inverse distance and kriged estimates were

 

14-69

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

run several times in order to determine the optimum estimation parameters. ID3 was used for the outside and low-grade domains. ID2 was used for high-grade domains.

The model was divided into three estimation areas (Figure 14-25) to control search anisotropy, orientation, and distances according to the differing geometries of mineralization in each area. Table 14-46 lists these areas along with the search orientations and the maximum search per area by low-grade and high-grade gold domains. Figure 14-22 presents the spatial relationship of those estimation areas to the drilling and the gold domains.


Figure 14-25: Jasperoid Wash Estimation Areas and Gold Domains in Cross Section
(looking north)

Table 14-46: Jasperoid Wash Search Ellipse Orientations and Maximum Search Distances by Estimation Area

Estimation Area Search Ellipse Orientation Maximum Search Distance
Azimuth Dip Rotation Low-
Grade
Mid-
Grade
Outside
Domains
1 90o 30o 0o 300 250 50
2 90o 75o 0o 300 250 50
3 90o 15o 0o 300 250 50
Note: Semi-major search distance = major search distance; vertical (or minor) search distance = major search distance ÷ 2 (area 1) and ÷ 4 (areas 2 and 3)

One estimation pass of up to 300 m was run for each domain. All estimation runs weighted the samples by the sample lengths. Estimation parameters are given in Table 14-47.

 

14-70

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-47: Jasperoid Wash Estimation Parameters
(for search orientations and maximum distances, see Table 14-6)

Description Parameter
Low-grade Gold Domain
Samples: minimum/maximum/maximum per hole 1 / 12 /2
Search anisotropies: major/semimajor/minor (vertical) 1 / 0.5 / 0.25
Inverse distance power 3
High-grade restrictions (grade in g/t, distance in m) NA
High-grade Gold Domain
Samples: minimum/maximum/maximum per hole 1 / 12 / 2
Search (m): major/semimajor/minor (vertical) 1 / 0.5 / varies 0.5 to 0.25
Inverse distance power 2
High-grade restrictions (grade in g/t, distance in m) NA
Outside Modeled Gold Domains
Samples: minimum/maximum/maximum per hole 1 / 12 / 3
Search (m): major/semimajor/minor (vertical) 1 / 0.5 / 0.25
Inverse distance power 3
High-grade restrictions (grade in g/t, distance in m) 0.1 / 6

14.4.4 Jasperoid Wash Gold Mineral Resources

Mr. Ristorcelli reports mineral resources at cutoffs that are reasonable for deposits of this nature, given anticipated mining and processing methods and approximate though current operating costs, while also considering economic conditions, because of the regulatory requirements that a mineral resource exists “in such form and quantity and of such a grade or quality that it has reasonable prospects for eventual economic extraction.” Although the author of this section is not an expert with respect to environmental, permitting, legal, title, taxation, socio-economic, marketing, or political matters, the author is not aware of any unusual factors relating to these matters that may materially affect the Jasperoid Wash mineral resources as of the date of this Technical Report.

Mr. Ristorcelli classified the Jasperoid Wash mineral resources giving consideration to the confidence in the underlying database, sample integrity, analytical precision/reliability, QA/QC results, and confidence in geologic interpretations.

The classification parameters are given in Table 14-8. Since there is a large amount of historical data, and because the geologic model is still evolving, all mineral resources at Jasperoid Wash are classified as Inferred.

For reporting, technical, and economic factors likely to influence the “reasonable prospects for eventual economic extraction” were evaluated using the best judgement of the author responsible for this section of the report. For evaluating the open-pit potential, MDA modeled a series of optimized pits using variable gold prices, mining costs, processing costs, and anticipated metallurgical recoveries. MDA used costs appropriate for open-pit mining in Nevada, estimated processing costs and metallurgical recoveries related to heap leaching, and G&A costs. The cutoff grades are based on $1,500/oz Au.

The Jasperoid Wash reported mineral resource estimate is the block diluted ID estimate, comprised of ID3 estimates for outside and low-grade domains, and by ID2 for high-grade domains. The mineral resources are reported at a cutoff of 0.14 g Au/t for open-pit mining. Table 14-48 presents the estimate of the Inferred gold mineral resources at Jasperoid Wash. A representative cross section of the gold block model is shown in Figure 14-26.

 

14-71

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-48: Jasperoid Wash Inferred Gold Mineral Resources

Cutoff      
g Au/t Tonnes g Au/t oz Au
0.100 12,955,000 0.29 120,000
0.120 11,637,000 0.31 115,000
0.140 10,569,000 0.33 111,000
0.160 9,681,000 0.34 107,000
0.180 9,237,000 0.35 105,000
0.200 8,825,000 0.36 102,000
0.220 8,139,000 0.37sf 97,000
0.240 6,627,000 0.40 86,000
0.260 5,330,000 0.44 75,000
0.280 4,580,000 0.47 69,000
0.300 4,024,000 0.49 64,000
0.400 2,219,000 0.63 45,000
0.500 1,529,000 0.69 34,000
0.600 1,010,000 0.77 25,000
0.800 322,000 0.97 10,000
1.000 80,000 1.17 3,000

 

 

14-72

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Figure 14-26 Jasperoid Wash Gold Domains and Block Model – Section N4473200

 

14-73

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14.4.5 Jasperoid Wash Geo-Metallurgical Model

A cyanide-soluble gold block model was estimated using AuCN/AuFA ratios calculated from AuCN shaker test and total fire-assay gold assays. The AuCN/AuFA ratios are plotted in the CCP shown in Figure 14-27. First, a cyanide-soluble gold domain was interpreted on east-west cross sections spaced at 100 m intervals. The logged percent reduced (not oxidized) attribute was used when no AuCN values were available. A cross section showing the cyanide-soluble gold domains is given in Figure 14-28.

Figure 14-27: Cumulative Probability Plot of Jasperoid Wash AuCN/AuFA Ratios

Only about 15% of all fire-assay gold values in the database have corresponding AuCN analyses. Of the samples with AuFA assays inside modeled AuCN/AuFA ratio domains, approximately 23% have AuCN analyses. Within the high-grade gold domain, which is a proxy for economic mineralization, 58% of the gold assays have corresponding AuCN analyses.

ID3 was used to estimate the ratios. Only AuCN/AuFA ratios were used in the estimate for samples whose fire-assay gold grades were ≥0.05 g Au/t. Due to the relatively few cyanide-shaker assays, and the fact that no quality control or database auditing was done on these analyses, the AuCN/AuFA ratio block model is lower in confidence than the gold and silver block models.

  

14-74

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-28: Jasperoid Wash Deposit Rock Type and Metallurgical Models
(Note: clay zones tend to follow faults and intrusives)

 

14-75

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

As per metallurgical guidance given in Section 13, blocks:

  • lying outside the cyanide-soluble solid were coded refractory with no gold recovery;

  • with estimated AuCN/AuFA ratios of less than 50%, were also coded to no gold recovery and assigned to “sulfide”;

  • blocks with estimated AuCN/AuFA ratios of ≥50% and <70%, were coded moderate recovery, and assigned to “transitional”; and

  • blocks with estimated AuCN/AuFA ratios of ≥70%,were coded good recovery, and assigned to “oxide”.

Search ellipses, orientations, and distances similar to those used for the Jasperoid Wash gold block model were used to estimate the cyanide-soluble ratios. The geo-metallurgical model can only be considered preliminary and is not sufficiently reliable to be used for mineral reserves.

14.4.6 Jasperoid Wash Clay Model

Clay contents were logged in intensities of 1 through 3, with 3 being the highest. Metallurgical work indicates that logged clay of 2 and 3 may require agglomeration. Consequently, Gold Standard constructed a 3D solids model that delineates the majority of samples with logged clay intensities of 2 and 3. These solids project the high-clay zones in a manner consistent with the geology at Jasperoid Wash. Typically, these clay zones parallel the steeply dipping modeled dikes and faults. Overall, this model is considered adequate for a geologically Inferred mineral resource, but confirmation of the clay geometries is needed.

14.4.7 Jasperoid Wash Density

There were no density measurements at Jasperoid Wash as of receipt of the database. Consequently, MDA assigned density values to the gold block model based on similar rock units with measurements at Dark Star. The values assigned to the units in the block model are presented in Table 14-49.

Table 14-49: Density Values Applied to the Jasperoid Wash Block Model

Formation AuCN /AuFA Domain Density
g/cm3
Tomera Fm eq. - Siltstone In 2.45
Tomera Fm eq. - Siltstone Out 2.55
Tomera Fm eq. – Conglomerate In 2.5
Tomera Fm eq. – Conglomerate Out 2.55
Intrusive Rocks In 2.4
Intrusive Rocks Out 2.5
Tonka Fm – Conglomerate Out 2.5

Following the application of the density values given in Table 14-49, MDA reduced those values to account for the clay alteration, which in some cases is both strong and pervasive. The density value of those blocks lying 50% within the clay solid (Section 14.4.4) were assumed to have 50% clay at a density of 2.2 g/cm3.

14.4.8 Discussion of Jasperoid Wash Estimated Mineral Resources

The Inferred mineral resource classification reflects the current level of geologic understanding and support for Jasperoid Wash. It is likely, however, that the estimated mineral resources are fairly estimated in the area of drilling. However, the mineral resources are likely understated because the deposit is open to the south, north and east. All

 

14-76

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

checks – volumes, cumulative probability plots, quantile plots, polygonal check, kriged, and nearest neighbor checks – indicated that the mineral resource is reliable. The biggest risk in this estimate is the geologic interpretation and in particular the orientations and continuity of the dikes. While the total metal may not change with further updates, the location due to geologic interpretations may change. The same risk exists with the clay zones. There are no density measurements and relatively few cyanide-soluble gold assays.

Optimized pits increase in size incrementally with gold price, generally 1% to 7% for each $25 increase in price per ounce. A significant increase in contained ounces of gold occurs in the pit using a $1,725/oz Au price.

Figure 14-29 shows the pit surface above which mineral resources are reported and the grade shell of the reported Inferred mineral resources. The figure also shows the extent of mineralization that exists below the reporting surface.

Figure 14-29: Jasperoid Wash Optimized Pits and Additional Mineralization
(blue lines are drill holes; blue solid is the 0.14 g Au/t grade shell; orange is the mineral resource pit shell; green is the optimized pit shell)

After the 2018 estimate was completed, 21 additional drill holes (5,210.3 m) were completed at Jasperoid Wash; two were core holes (610.8 m) and the remainder were RC (4,599.5 m). These holes were received on April 24, 2019 and evaluated on April 29, 2019. MDA did not audit or review the QA/QC evaluations done on these data because these data were not used to update the mineral resource estimate.

Those post-2018 model drill holes located north and south of the current mineral resource extended mineralization by 100 m to the south, 200 m southeast and 250 m north. New drilling internal to the current block model substantially confirmed the estimation, although with some local changes in location. It is interesting to note that two new core holes essentially twinning two 2018-model RC holes did return higher grades than their corresponding RC holes. The defined area of mineralization would likely be slightly larger if the new drilling was incorporated, but not materially different within the mineral resource pit from the current estimate in this Technical Report.

 

14-77

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14.5 NORTH BULLION DEPOSITS MINERAL RESOURCES

This sub-section is modified from Dufresne and Nicholls (2017b), where additional details were reported. The North Bullion area mineral resource estimate was completed under the direct supervision of Mr. Michael B. Dufresne, M.Sc., P. Geol., with APEX. The North Bullion mineral resource estimate was completed on September 15, 2017, which is the effective date of the estimate, and is based on drill data as of August 18, 2017.

A parent block size of 10 m (X) by 10 m (Y) by 3 m (Z), with sub-blocking down to 5 m (X) by 5 m (Y) by 1.5 m (Z), was applied in order to best honor interpreted wireframe solids that were constructed for the gold mineralization. Only gold was estimated and is being reported.

14.5.1 North Bullion Deposits Data

The North Bullion area database consists of 503 drill holes, many of which were used to guide the geological and mineralization interpretation, of which, 232 drill holes completed from 1980 to 2017 were used in the mineral resource estimation. The extensive historical data compilation and data validation process described in Section 12.3 resulted in a compiled drill database for the North Bullion area that is considered by Mr. Dufresne to be sufficiently reliable for use in the mineral resource estimation described below. The database incorporates all available RC drilling and core drilling completed. Those drill data were imported into Micromine where modeling was initially conducted in cross-sectional view (Figure 14-30).

 

Figure 14-30: POD Deposit Geologic Cross Section
(looking northwest, from Dufresne and Nicholls, 2018)

 

14-78

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

A total of 503 drill holes guided the mineralization interpretation and estimation of the North Bullion area estimate. This total comprises 95 core holes completed by Gold Standard from 2010 to 2017, 40 RC drill holes also completed by Gold Standard from 2010 to 2014, along with 40 historical core holes and 328 historical RC holes that were completed from 1969 to 1999. Spacing between drill holes over the main mineral resource area varies from 2 m to 120 m. Drilling has been completed on roughly east-west sections that range in spacing from 25 to 120 m, with an average spacing of around 25 m through Sweet Hollow. The exception to this is the POD zone of mineralization, for which drilling was completed on 40° oriented drill sections that were roughly spaced 25 m apart. All drill holes were used to guide the mineralization model that was ultimately used in the mineral resource estimation.

The North Bullion area assay file comprises 75,890 analyses of variable lengths, of which 75,724 samples have been assayed for gold. Of the 75,890 samples in the database, roughly nine percent (6,941 assays) are in the gold mineralized zones. Within the original assay database there were assay intervals with codes describing the interval as a “missing sample” (e.g., “NS”, “MS” or “#value!”). There were eight NS samples situated with mineralized wireframes and were assigned a nominal gold value of 0.0025 g Au/t, which corresponded to half the lower detection limit.

The drill hole database was validated using the validation functions within the Micromine modeling software. No significant errors or issues were noted.

14.5.2 North Bullion Deposits Lithological Setting of Mineralized Zones

14.5.2.1 North Bullion Zone

Carlin-style disseminated gold mineralization in the North Bullion zone is not exposed at surface. The bulk of the geological understanding and interpretation of the North Bullion zone has come from core drilling of gravity and CSAMT features. Gold mineralization is focused in the footwall of the NBFZ, a north-south-striking zone of normal faults with an overall, down-to-the-east sense of motion. The footwall is a horst of Paleozoic siliciclastic and carbonate rocks, whereas the hanging wall is a deep graben filled with Tertiary volcanic rocks. In the footwall north-south-, northwest-, west-northwest-, and northeast-striking faults appear to be important controls on mineralization.

The North Bullion mineralization occurs in a triangular shaped horst in the footwall of the major north-south-striking, steeply east-dipping, NBFZ. The western edge of the horst is bounded by a northeast-striking, northwest-dipping fault. The deposit is capped by gently east-dipping dacite sills. In general, gold is hosted in two principal subzones, a gently-to moderately-dipping upper subzone of strongly sheared siliciclastic and carbonate rocks (a mixed composite of Mississippian Webb and Tripon Pass formations), and a flat-lying, lower subzone of dissolution-collapse breccia developed above and within silty micrite of the Mississippian Tripon Pass Formation and calcarenite of the Devonian Devils Gate Limestone (Jackson and Koehler, 2014; Jackson et al., 2015). Another, smaller volume of mineralization along the Massif fault is known as the Massif subzone. Between strands of the NBFZ, breccia with both collapse and tectonic features propagated upwards through the Mississippian section incorporating Webb Formation silty mudstone, Tripon Pass Formation silty micrite and Chainman Formation sandstone.

Gold mineralization ranges from 105 to 400 m in depth and steepens from nearly flat (10°) to moderate dip of 45° to the east as the subzones approach the eastern strand of the NBFZ. Gold is associated with sulfide minerals with a sooty appearance, silica, carbon, clay, barite, realgar and orpiment, in addition to elevated arsenic, mercury, antimony, and thallium. High-grade gold (> 6 g Au/t) has been intercepted in both the upper and lower subzones.

14.5.2.2 POD Zone

Gold mineralization at the POD zone is restricted to a steeply-dipping shear zone which trends west-northwest and is situated in rocks stratigraphically higher than the lower zone at North Bullion. The POD gold zone is hosted by silty mudstone of the Mississippian Webb Formation (Masters, 2003; Hunsaker, 2012b). Additionally, gold mineralization at

 

14-79

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

POD is associated with silicification including jasperoid, argillic alteration, pyrite, barite, and some minor dolomitic alteration (Hunsaker, 2012b).

14.5.2.3 Sweet Hollow Zone

The Sweet Hollow gold zone is the up-plunge, shallow portion of the upper gold zone of the North Bullion deposit and is located in the footwall of the NBFZ. Sweet Hollow mineralization is hosted in strongly sheared siliciclastic and carbonate rocks of the Mississippian Webb and Tripon Pass formations. Alteration consists of decalcification, silicification, and minor argillization. Dissolution-collapse breccia is developed in carbonate rocks.

14.5.3 North Bullion Deposits Geological Models

Using Micromine 3-D software, a sectional approach was utilized for the initial examination of the drill hole database.

A series of east-west and transform geology sections looking north and northwest were compiled by Gold Standard at 20 to 60 m intervals through the POD zone, at 100 m intervals through the Sweet Hollow zone and at 20 to 90 m intervals through the North Bullion zone. These were registered into Micromine to guide the interpretation of geology and mineralization. In addition, a series of surface and subsurface string files of the interpreted faults and top of formation boundaries were also compiled by Gold Standard personnel. From these sections and strings a geological model was built for the North Bullion, Sweet Hollow, and POD zones of mineralization.

In order to construct mineralized envelopes for mineral resource estimation, the gold assay data were examined relative to the geological model. A sectional approach was utilized for the initial examination of the data with a 30 m transform spacing, looking northwest, through the more densely drilled POD zone, a 20 m to 60 m spacing for the Sweet Hollow zone, and 40 to 60 m spacings at the northern end of the deposit (North Bullion zone). These sectional spacings correlate roughly to the 30 m to 60 m drill spacings. The interpretation of the mineralized horizons was guided by the revised geological model and restricted, where necessary, by late high-angle, cross-cutting faults as illustrated in Figure 14-31.

 

14-80

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Figure 14-31: Plan View of North Bullion Deposits Mineralization and Structure Model
(from Dufresne and Nicholls, 2018)

Upon closer examination of the sample population and anticipated economic parameters, it was decided to model the mineralization into two domains. These include a greater than 0.5 g Au/t higher-grade envelope and a lower-grade 0.1 to 0.5 g Au/t envelope. The higher-grade of 0.5 g Au/t is thought to better reflect the anticipated mining constraints for the sulfide-rich mineralization. This was completed by interpreting the entire deposit at a 0.1 g Au/t lower cutoff grade. Following this, a higher-grade >0.5 g Au/t envelope was created within this >0.1 g Au/t interpretation. Wireframe solids of both the >0.1 g Au/t low-grade and >0.5 g Au/t interpretations were then created. This produced a set of >0.5 g Au/t wireframes and an outer skin of 0.1 to 0.5 g Au/t wireframes (Figure 14-32, Figure 14-33, and Figure 14-34). For the North Bullion mineralized zone, which only contains sulfide material, a 0.3 to 0.5 g/t Au lower grade envelope was constructed around the >0.5 g/t Au mineralization.

The lower- and higher-grade interpreted wireframes were used to constrain the mineralization for the open-pit-constrained and underground-constrained potential mineral resources. The wireframes were interpreted using a minimum down-hole width of 3 m. Due to the grade, depth and the sulfidic nature of the North Bullion deposits mineralization, it was decided to create another set of wire frames at a 1 g Au/t lower cutoff that could be used for the underground-constrained potential mineral resource.

 

14-81

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Figure 14-32: POD Zone Cross Section of Wire-Frame Interpretations

(looking northwest, showing the interpreted 0.1 to 0.5 g Au/t and >0.5 g Au/t Au shells, from Dufresne and Nicholls, 2018)

Figure 14-33: Sweet Hollow Zone Cross Section of Wire-Frame Interpretations

(looking north, cross 4488015N showing the interpreted 0.1 to 0.5 g Au/t and >0.5 g Au/t gold shells, from Dufresne and Nicholls, 2018)

 

14-82

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 14-34: North Bullion Zone Cross Section of Wire-Frame Interpretations

(looking north, cross section 4488700N showing the interpreted 0.3 to 0.5 g Au/t and >0.5 g Au/t gold shells, from Dufresne and Nicholls, 2018)

14.5.4 North Bullion Cyanide-Soluble Model

Little to no cyanide-soluble gold assay data exists in the North Bullion area database. Re-logging and re-interpretation of the historical and more recent Gold Standard drill-hole logs was completed with a focus on the oxidation state of the material logged. The degree of oxidation within mineralized zones was a key aspect of the re-logging and reinterpretation. Due to the block size of 10 m x 10 m x 3 m, a generalized approach of mapping zones of oxide, mixed or sulfide material was completed with minimum thicknesses of at least 3 m. Where there was no cyanide-soluble gold-recovery information available, the re-logged sulfide mineralization in conjunction with the intensity of hematization, and/or iron limonite alteration were utilized to determine the oxidation state of the material.

The entire North Bullion zone is classified as sulfide (reduced). Drill intersections at the Sweet Hollow and POD deposits comprise both oxide, mixed, and sulfide (reduced) mineralization. For Sweet Hollow and POD, historical logs along with RC chips and core, where available, were reviewed and re-interpreted to determine the percent down-hole sulfide, and intensity of hematite and iron limonite being the primary focus. Based on the current information, the mineralized wire-frame volumes at Sweet Hollow and POD comprise 64% oxide, 1% mixed, and 35% sulfide mineralization.

The areas of sulfide mineralization at Sweet Hollow and POD were modeled with the aim of identifying the proportion that is sulfide and would likely require higher-cost processing in the future. These areas of sulfide mineralization are mainly situated in the deeper portion of the POD zone, and in isolated areas of the Sweet Hollow zone.

 

14-83

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

14.5.5 North Bullion Deposits Sample and Composite Statistics and Grade Capping

A probability plot and summary statistics for the North Bullion area un-composited samples lying within the interpreted mineralized zone are presented in Figure 14-35 and Table 14-50. The gold assays exhibit a single population of data. Due to the single population present, linear estimation techniques are deemed suitable for statistical estimation of the North Bullion, Sweet Hollow, and POD gold zones.

Figure 14-35: Probability Plot of Sample Gold Grades in the Mineralized Zones
(from Dufresne and Nicholls, 2018)

Table 14-50: Summary Statistics Sample Gold Grades within the Mineralized Zones
(from Dufresne and Nicholls, 2018)

Statistic Global Units
Mean 0.945 g Au/t
Median 0.377 g Au/t
Std Dev 1.900 g Au/t
Variance 3.609  
Std Error 0.023 g Au/t
Coeff Var 2.01  
Minimum 0.00 g Au/t
Maximum 30.199 g Au/t
Total data 6,941  

Drill hole samples situated within the mineralized wireframe solids were selected and coded with the wireframe name. The coded samples were checked visually next to the drill hole to check that the automatic flagging process worked correctly. All samples were correctly flagged and there was no need to manually flag or remove any samples.

A review of the sample lengths was conducted on the samples that were situated within the mineralized wireframes. The drill-hole sample-width analysis results showed a variable sample length from 0.15 m to 27.43 m. Looking at all

 

14-84

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

sample widths, there is one dominant sample length population at 1.52 m. Of the 6,941 un-composited samples within the mineralization wireframes, 99.84 % of the samples were less than 3.05 m in length. In order to honor the wire-frame zones of mineralization, with some thinning to 3 m, composting was done to 3.05 m lengths. Length-weighted composites were calculated for all of the North Bullion area assay samples. The compositing process started from the first point of intersection between the drill hole and the mineralized wire frame and was stopped at the end of the mineralized wireframe.

The “orphan” composites greater than 1.5 m in length were retained and used in the estimate. This provided the best reflection of grade from the un-composited assays to the composite file. The composited samples were used for all sample statistics, capping, estimation input file, and validation comparisons.

Outlier grades in the gold composite file were used for the capping analysis. The composited gold grades were displayed using a log probability plot (very similar to the probability plot shown in Figure 14-35) and a log histogram plot. Both graphs show gold values belong to one single population. This is evident from the straight nature of the line in the log probability plot below. There is a suggestion of a smaller higher-grade population but due to limited data the composite dataset has been treated as one population. Inflection points along the log probability plot line are normally used to govern an appropriate capping level to apply. There is an inflection point located at the 99th percentile which is 9.0 g/t Au. After analysis of the composite file distribution, examination of the log histogram, log probability plot and the coefficients of variations of the composite statistics, it was decided not to cap the composite file.

14.5.6 North Bullion Deposits Grade Continuity

Variography to examine grade continuity was conducted on the North Bullion area composite assays located within the mineralized wireframes and log-spherical semi-variogram’s were produced. The variography of the gold composites in the POD zone suggest a maximum continuity of grade along a 296° strike orientation, with a 0° plunge and a 70° tilt to the east. This is in line with the geological model. The variography of the gold composites in the Sweet Hollow zone suggest a maximum continuity of grade along a 002° strike orientation, with a 0° plunge and a 10° tilt to the west. This is in line with the geological model. The variography of the gold composites in the North Bullion zone suggest a maximum continuity of grade along a 006° strike orientation, with a 15° plunge to the north and a 11° tilt to the east. This is in line with the geological model. The variography of the gold composites in the Massif subzone suggest a maximum continuity of grade along a 172° strike orientation, with a 31° plunge to the north and a 50° tilt to the east. This is in line with the geological model.

A variable search orientation approach was adopted for the orientation of the search ellipsoids during grade estimation. This variable search was adopted to account for varying dips and strikes of the mineralization. This was accomplished by creating a three-dimensional surface of the general orientation of the folded/linear mineralization wire frames across the entire deposit area. This surface showing the trend of the mineralization was then used to orient the search ellipsoid for the nearest block. This was done by obtaining the dip and dip direction of the individual triangles for this trend surface, which were then used to code the blank block model using inverse distance to the power of one, which essentially coded the model with the dip and dip direction information from the trend surface. This dip and dip direction information in the block model was then used to orient the search ellipsoid based upon the orientation of the mineralized zone. That is, if a mineralized volume was folding over, then the search ellipsoid would cater to this change for each block in the block model. The ranges of the search ellipsoid were sourced from the suggested ranges from the variographic analysis and are summarized in Table 14-51.

 

14-85

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-51: North Bullion Area Semi-Variogram Parameters of Composited Gold Grades

(from Dufresne and Nicholls, 2018)

Zone ID # C0 Azimuth Dip Tilt Structure 1 Structure 2
Type C1 Direction Ranges Type C2 Direction Ranges
1 2 3 1 2 3
Pod 24 0 296 0 70 sph 0.43 22.5 10 25 sph 2.183 150 85 80
Sweet Hollow 25 & 26 0 2 0 10 sph 0.792 70 50 22          
North Bullion 18, 19 & 21 0 6 15 11 sph 0.945 60 70 23          
Massif 17 0 172 31 50 sph 0.539 69 69 33 sph 0.611 160 160 160

sph - spherical; C0 - nugget effect; C1 - covariance contribution of Structure 1; and C2 - covariance contribution of Structure 2.

14.5.7 North Bullion Deposits Density

A total of 988 density samples were collected from a variety of sources including bulk sampling, surface rock-chip samples, and drill core. A total of 272 density samples were situated within the mineralized wireframes. Those within the mineralized zones were examined on a zone by zone basis. The average density determined from the analytical work for each zone was assigned to all the blocks within that zone. The average density ranges from 2.33 g/cm3 to 2.71 g/cm3 with an average density of 2.68 g/cm3 for the North Bullion, Sweet Hollow, and POD zones. The density values were determined using the Archimedes (weight in air/weight in water) method. Summary statistics of this analysis is shown in Table 14-52. Most density samples were collected from the North Bullion zone. Further measurements are recommended for collection in the other zones of mineralization. Assigned density values of the individual zones are presented in Table 14-52.

Table 14-52: North Bullion Area Density Measurements by Zone

(from Dufresne and Nicholls, 2018)

Mineralized Zone NB Massif NB Lower NB Mid NB North NB Top NB Upper POD Sweet Hollow
Lode Code 1, 17, & 42 2, 18 & 43 3, 19, 44 & 45 4, 20 & 47 5 & 22 6, 21 & 46 23, 24 & 41 25 to 30, 32, 33, 35 to 38, 39 & 40
Normal Statistics
Mean 2.676 2.707 2.702 2.573 2.622 2.682 2.326 2.411
Median 2.665 2.695 2.67 1.27 2.58 2.65 2.33 2.42
Std Dev 0.14 0.188 0.156 0.095 0.035 0.152 0.064 0.144
Variance 0.02 0.035 0.024 0.009 0.001 0.023 0.004 0.021
Std Error 0.019 0.033 0.015 0.055 0.014 0.024 0.02 0.046
Coeff Var 0.052 0.069 0.058 0.037 0.014 0.057 0.028 0.06
Minimum 2.42 2.27 2.53 2.5 2.58 2.21 2.21 2.16
Maximum 3.15 3.31 3.79 2.68 2.67 3.18 2.43 2.57
Number of Points 55 33 115 3 6 40 10 10

14.5.8 North Bullion Deposits Grade Estimation

A parent block size of 10 m x 10 m x 3 m is deemed appropriate based on the drill-hole spacing, which ranges from 2 to 120 m in the mineral resource area. Sub-blocking was used to more effectively honor the volumes and shapes created during the geological interpretation of the mineralized zones. Grade was interpolated for the parent blocks and assigned to the sub-blocks. Each block was coded with a “lode” number, representing the different mineralized wire-frame volumes, so that grade could be estimated as hard boundaries.

   

14-86

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The estimation of gold grades into the blocks was done using inverse distance squared (“ID2”) for each of the zones, and with ordinary kriging. Due to the resultant validation of the block models showing a better correlation of the input composites grades, it was decided to use the ID2 estimation technique for reporting. Each wire-frame zone was estimated with ‘hard boundaries’, which means that only composite assays located within each zone were used to estimate the grade of the blocks within that zone.

There were four estimation passes run for each zone. The size of the anisotropic search ellipsoid was based on the ranges obtained from the variography. The orientation of the search ellipsoid was based on the orientation of the mineralized zones. Estimation runs 1 to 3 equated to ranges less than or equal to the maximum range observed in the variography. The final estimation run search range was expanded to ensure all blocks were estimated with grade. The criteria for the number of composites selected from the number of drill holes decreased with each run, as the search ellipsoid size increased. The estimation criteria for each pass are provided in Table 14-53. The number of composites used for the estimation of each block was capped to 20 composites and a maximum of three composites from any given hole was used.

Table 14-53: North Bullion Area Estimation and Search Ellipsoid Criteria

(from Dufresne and Nicholls, 2018)

Zone Run No. Minimum No.
of Holes
Minimum No.
of Samples
Maximum No. of
Composites from
any drill hole
Max No. of
Composites
Search
Ellipsoid
Radius (m)
North Bullion 1 6 12 3 20 50 x 50 x 15
2 6 12 3 20 50 x 50 x 15
3 2 2 3 20 70 x 70 x 23
4 1 1 3 20 280 x 280 x 100
Massif Subzone 1 6 12 3 20 120 x 1200x 25
2 6 12 3 20 120 x 1200x 25
3 2 2 3 20 160 x 160 x 33
4 1 1 3 20 320 x 320 x 66
Sweet Hollow 1 6 12 3 20 50 x 40 x 15
2 6 12 3 20 50 x 40 x 15
3 2 2 3 20 70 x 50 x 22
4 1 1 3 20 280 x 200 x 88
POD 1 6 12 3 20 110 x 65 x 60
2 6 12 3 20 110 x 65 x 60
3 2 2 3 20 150 x 85 x 80
4 1 1 3 20 300 x 170 x 160

14.5.9 North Bullion Block Model Validation

The blocks were visually validated on cross sections comparing block grades to the sample grades for all sections and drill holes. In addition, the block and sample data were compared by zone, easting, northing, and elevation in swath plots. Table 14-54 shows the average gold grade of the composited sample data versus the estimated block-model grade by zone. It can be concluded that the mean grade of the ID2 block model data is very close to, or generally slightly lower than, the composited sample data.

   

14-88

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-54: North Bullion Area Estimated Gold Grades vs. Average Composite Grades

(from Dufresne and Nicholls, 2018)

Zone No. of Composites Composite Mean
Au g/t
ID2 Model
Au g/t
1 45 0.32 0.34
2 67 0.33 0.34
3 269 0.33 0.34
4 3 0.37 0.36
5 15 0.36 0.38
6 43 0.36 0.36
17 183 2.02 1.31
18 53 0.84 0.81
19 405 1.52 1.41
20 15 3.15 2.66
21 132 2.51 1.98
22 2 0.90 0.90
23 2 0.79 0.79
24 410 2.23 1.97
25 69 0.64 0.68
26 213 1.06 1.00
27 9 1.25 1.02
28 7 1.10 1.08
29 2 0.59 0.59
30 11 0.78 0.73
32 51 0.81 0.79
33 12 0.95 0.80
34 286 0.25 0.25
35 860 0.20 0.20
36 107 0.17 0.17
37 26 0.21 0.21
38 21 0.19 0.18
40 86 0.22 0.23
41 6 0.29 0.32
42 139 2.44 1.65
43 12 1.45 1.46
44 221 2.29 2.24
45 7 1.44 1.41
46 88 3.39 2.71
47 12 3.73 3.32

14.5.10 North Bullion Deposits Mineral Resources

The North Bullion area mineral resource estimate has been classified in accordance with guidelines established by the CIM as comprising both Indicated and Inferred mineral resources. The classification was based on geological confidence, data quality and grade continuity (Table 14-55). The most relevant factors used in the classification process were:

  • Drill hole spacing;

  • Level of confidence in the geological interpretation;

  • Estimation parameters (i.e., continuity of mineralization);

   

14-88

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT
  • Proximity to the recently completed Gold Standard drill holes; and

  • Drill-hole database data density.

Table 14-55: North Bullion Deposits Classification Criteria

(from Dufresne and Nicholls, 2018)

Criteria Pod Sweet Hollow North Bullion
(open pit & UG)
Massif Subzone
(open pit & UG)
Indicated Inferred Indicated Inferred Inferred Inferred
Gold Search Distance Ranges (m) 110 x 65 x 60 150 x 85 x 80 to
300 x 170 x 160
50 x 40 x 15 70 x 50 x 22 to
280 x 200 x 88
50 x 50 x 15 to
280 x 280 x 100
120 x 120 x 25 to
320 x 320 x 66
Estimation Run Number 1 or 2 3 or 4 1 or 2 3 or 4 1 to 4 1 to 4
Minimum number of composites used to guide the estimation 12 1 or 2 12 1 or 2 12 to 1 12 to 1
Minimum number of holes used to guide the estimation 3 or 6 1 or 2 3 or 6 1 or 2 1 to 6 1 to 6

Based on the criteria noted above, a polygonal area was chosen for the area with Indicated mineral resources at Sweet Hollow and POD. The blocks in this area were mostly made up of blocks estimated in runs 1 and 2, which utilized a search ellipsoid with a range of three quarters of the maximum range of continuity based on the variography and the highest number of composites and drill holes (Table 14-55). This, in conjunction with the proximity of Gold Standard drilling and level of confidence in the geological interpretation, allowed for assigning a classification of Indicated to this area. The remaining mineral resource was classified as Inferred mineral resources. Although the author of this section is not an expert with respect to environmental, permitting, legal, title, taxation, socio-economic, marketing or political matters, the author is not aware of any unusual factors relating to these matters that may materially affect the North Bullion mineral resources as of the effective date of this Technical Report.

In order to demonstrate that the North Bullion deposits have potential for future economic extraction, the estimate was subjected to a series of Whittle pit optimizations and potential underground mining scenarios. The criteria used in the Whittle pit optimizer were considered reasonable for deposits in Nevada using open-pit mining and heap-leach processing as well as conventional sulfide processing. All reported mineral resources lie within an optimized pit shell and/or underground shell constrained using $1,350/ounce for gold. The criteria used for the $1,350/ounce pit shell and underground optimization are shown in Table 14-56. The open-pit and oxide-constrained mineral resource utilized a >0.1 g Au/t interpreted zone and a 0.14 g Au/t lower cutoff for the POD and Sweet Hollow deposits. The open-pit constrained sulfide (reduced) mineral resource utilized a >0.5 g Au/t interpreted wireframe cutoff and a 1.25 g Au/t lower cutoff. For the North Bullion deposit the open-pit, sulfide-constrained mineral resource utilized a >0.3 g Au/t interpreted wireframe/zone cutoff and a 1.25 g Au/t lower cutoff. The underground mineral resource was constrained using a 1 g Au/t interpreted lower cutoff zone. The blocks within this were then estimated and reported at a cutoff of 2.25 g Au/t, which represents expected underground costs associated with a potential block and cave mining scenario. The mineral resource block model and optimized pit shell is illustrated in Figure 14-36.

   

14-89

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-56: Parameters Used in Whittle Pit Optimization Studies

(from Dufresne and Nicholls, 2018)

Parameter Unit Pit Oxide Cost Pit Sulfide Cost UG Sulfide Cost
Gold price $/ounce $1,350 $1,350 $1,350
Gold recover % 80% 88% 88%
Pit wall angles 50° 50° 50° NA
Mining Cost $/tonne $1.75 $1.75 $50
Ore Density kg/m3 Ranged from 2.33 to 2.71 2.33 to 2.71 2.33 to 2.71
Waste Density kg/m3 2.60 2.60 2.60
Processing Rate 5 Mtpa 5 Mtpa 5 Mtpa 5 Mtpa
Processing Cost & Hauling $/tonne $3.25 $45 $45
G & A Cost $/tonne $0.50 $0.50 $0.50
Discount Rate 5% 5% 5% 5%

Figure 14-36: North Bullion Area Constrained Mineral Resource Blocks

(within the $1,350/oz Au pit and underground mineral resource, from Dufresne and Nicholls, 2018)

The Indicated and Inferred mineral resources are constrained within a drilled area that extends approximately 2.75 km along strike to the north, 0.95 km to the east and 600 m below surface. The North Bullion area mineral resource estimate is reported at a range of gold cutoff grades in Table 14-57.

   

14-90

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-57: North Bullion Mineral Resources with Cutoff Grades*

(from Dufresne and Nicholls, 2018)

Classification Type Au Cutoff Grade
(g/t)
Tonnes
(millions)
Au Grade
(g/t)
Contained Au**
(troy oz)***
Pit Constrained
Indicated Oxide (SH,POD) 0.14 2.92 0.96 90,100
Inferred Oxide (SH,POD) 0.14 3.36 0.43 46,600
  Sulfide (SH,POD, NB) 1.25 2.05 2.60 171,400
Inferred Subtotal 0.14, 1.25 5.42 1.25 218,000
Underground
Inferred Sulfide 2.25 5.55 3.29 587,700
Pit Constrained and Underground Inferred Total
Oxide/Sulfide 0.14, 1.25, 2.25 10.97 2.28 805,800

* Mineral resources are not mineral reserves. Mineral resources which are not mineral reserves do not have demonstrated economic viability. There has been insufficient exploration to define the Inferred mineral Resources tabulated above as an Indicated or Measured mineral resource, however, it is reasonably expected that the majority of the Inferred mineral resources could be upgraded to Indicated mineral resources with continued exploration. There is no guarantee that any part of the mineral resources discussed herein will be converted into a mineral reserve in the future.

**The recommended reported mineral resources are highlighted in bold and have been constrained within a $US1,350/ounce of gold optimized pit shell and/or an underground mining scenario utilizing a 2.25 g/t Au lower cutoff.

***Contained troy ounces may not add due to rounding.

The Sweet Hollow and POD oxide Indicated and Inferred mineral resources use a cutoff grade of 0.14 g Au/t, which is constrained within an optimized pit shell. The base-case cutoff grades of 0.14 g Au/t for open-pit oxide and 1.25 g Au/t for open-pit sulfide material, and 2.25 g Au/t for underground sulfide material are highlighted in Table 14-57. Other cutoff grades are presented for review ranging from 0.14 g Au/t to 0.5 g Au/t for oxide are presented in Table 14-58. Other cutoff grades are presented in Table 14-59 for review ranging from 1.0 g Au/t to 2.0 g Au/t for sulfide open-pit-constrained material and 2.0 g Au/t to 3.0 g Au/t for sulfide underground-constrained material. The open pit and underground mineral resources are constrained within a $1,350/oz Au pit shell and a 2.25 g Au/t cutoff for the underground.

Table 14-58: Cutoff Sensitivity Analysis of the Sweet Hollow and POD Oxide Mineral Resources*

(from Dufresne and Nicholls, 2018)

Classification* Au Cutoff Grade
(g/t)
Tonnes
(millions)
Average Au Grade
(g/t)
Contained Au**
(troy oz)***
Indicated
(Oxide)
0.14** 2.92 0.96 90,100
0.2 2.51 1.09 87,800
0.3 1.64 1.53 80,800
0.4 1.41 1.73 78,400
0.5 1.40 1.74 78,200
Inferred
(Oxide)
0.14** 3.36 0.43 46,600
0.2 2.71 0.49 43,000
0.3 1.47 0.70 33,200
0.4 1.14 0.81 29,700
0.5 1.09 0.82 28,800

* Mineral resources are not mineral reserves. Mineral resources which are not mineral reserves do not have demonstrated economic viability. There has been insufficient exploration to define the Inferred mineral resources tabulated above as an Indicated or Measured mineral resource, however, it is reasonably expected that the majority of the Inferred mineral resources could be upgraded to Indicated mineral resources with continued exploration. There is no guarantee that any part of the mineral resources discussed herein will be converted into a mineral reserve in the future.

**The recommended reported mineral resources are highlighted in bold and have been constrained within a $US1,350/ounce of gold optimized pit shell.

***Contained troy ounces may not add due to rounding.

   

14-91

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 14-59: Cutoff Sensitivity Analysis of the North Bullion, Sweet Hollow and POD Sulfide Mineral Resources*

(from Dufresne and Nicholls, 2018)

Classification Au Cutoff Grade
(g/t)
Tonnes
(millions)
Average Au Grade
(g/t)
Contained Au
(troy ounces)****
Inferred
(Near Surface Sulfide)
1.0 2.20 2.50 176,700
1.25** 2.05 2.60 171,400
1.5 1.85 2.73 162,200
1.75 1.66 2.86 152,400
2.0 1.35 3.09 133,800
Inferred
(Underground Sulfide)
2.0 6.87 3.07 678,000
2.25*** 5.55 3.29 587,700
2.5 4.31 3.55 492,800
2.75 3.15 3.90 394,900
3.0 2.52 4.16 336,300

*Mineral resources are not mineral reserves. Mineral resources which are not mineral reserves do not have demonstrated economic viability. There has been insufficient exploration to define the Inferred mineral resources tabulated above as an Indicated or Measured mineral resource, however, it is reasonably expected that the majority of the Inferred mineral resources could be upgraded to Indicated mineral resources with continued exploration. There is no guarantee that any part of the mineral resources discussed herein will be converted into a mineral reserve in the future.

**The recommended reported mineral resources are highlighted in bold and have been constrained within a $US1,350/ounce of gold optimized pit shell.

***The recommended reported mineral resources are highlighted in bold and have been constrained within a $US1,350/ounce of gold underground mining scenario.

****Contained troy ounces may not add due to rounding.
 
   

14-92

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 15 TABLE OF CONTENTS

SECTION     PAGE
15 MINERAL RESERVE ESTIMATES 15-1
  15.1 INTRODUCTION   15-1
  15.2 PIT OPTIMIZATION 15-2
    15.2.1 Economic Parameters 15-3
    15.2.2 Geometric Parameters 15-5
    15.2.3 Cutoff Grades 15-8
    15.2.4 Pit Optimization Methods and Results 15-10
  15.3 PIT DESIGNS   15-17
    15.3.1 Road and Ramp Design 15-17
    15.3.2 Dark Star Pit Designs 15-18
    15.3.3 Pinion Pit Designs 15-21
  15.4 DILUTION   15-25
  15.5 PROVEN AND PROBABLE MINERAL RESERVES FOR DARK STAR AND PINION 15-25

SECTION 15 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 15-1: South Railroad Economic Parameters 15-3
Table 15-2: On-Site Dark Star ROM Recovery Equations for Gold 15-4
Table 15-3: Dark Star HPGR Recovery Equations for Gold 15-4
Table 15-4: Pinion ROM Recovery Equations 15-5
Table 15-5: Pinion HPGR Recovery Equations 15-5
Table 15-6: Dark Star Slope Recommendations by Sector 15-6
Table 15-7: Pinion Slope Recommendations by Sector 15-8
Table 15-8: Dark Star Cutoff Grades 15-9
Table 15-9: Pinon Breakeven Cutoff Grades 15-9
Table 15-10: Dark Star Pit Optimization Results 15-11
Table 15-11: Dark Star Pit by Pit Results 15-12
Table 15-12: Pinion Pit Optimization Results 15-14
Table 15-13: Pinion Pit by Pit Results 15-15
Table 15-14: Road and Ramp Design Parameters 15-18
Table 15-15: Dark Star In-Pit Proven and Probable Mineral Reserves 15-25
Table 15-16: Pinion In-Pit Mineral Reserves 15-25

 

   

15-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Table 15-17: Total Dark Star and Pinion Proven and Probable Mineral Reserves 15-26

SECTION 15 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 15-1: Dark Star Slope Sectors 15-6
Figure 15-2: Pinion Slope Sectors 15-7
Figure 15-3: Dark Star Pit by Pit Graph 15-13
Figure 15-4: Pinion Pit by Pit Graph 15-16
Figure 15-5: Dark Star Ultimate Pit Design 15-19
Figure 15-6: Dark Star North (Phase 1) and Main (Phase 2) Initial Pits 15-20
Figure 15-7: Pinion Ultimate Pit Design 15-22
Figure 15-8: Pinion Phase 1 Pit Design 15-23
Figure 15-9: Pinion Phase 2 Pit Design 15-24

 

   

15-ii

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

15 MINERAL RESERVE ESTIMATES

15.1 INTRODUCTION

Mr. Dyer classifies mineral reserves in order of increasing confidence into Probable and Proven categories to be in accordance with the “CIM Definition Standards - For Mineral Resources and Mineral Reserves” (2014), and therefore NI 43-101. Mineral reserves for the Pinion and Dark Star deposits were developed by applying relevant economic criteria in order to define the economically extractable portions of the current mineral resources. CIM standards require that modifying factors be used to convert mineral resources to mineral reserves. The standards define modifying factors and Proven and Probable mineral reserves with CIM’s explanatory material shown in italics as follows:

Mineral Reserve

Mineral reserves are sub-divided in order of increasing confidence into Probable mineral reserves and Proven mineral reserves. A Probable mineral reserve has a lower level of confidence than a Proven mineral reserve.

A mineral reserve is the economically mineable part of a Measured and/or Indicated mineral resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at preliminary feasibility or feasibility level as appropriate that include application of modifying factors. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified.

The reference point at which mineral reserves are defined, usually the point where the ore is delivered to the processing plant, must be stated. It is important that, in all situations where the reference point is different, such as for a saleable product, a clarifying statement is included to ensure that the reader is fully informed as to what is being reported.

The public disclosure of a mineral reserve must be demonstrated by a preliminary feasibility study or feasibility study.

Mineral Reserves are those parts of Mineral Resources which, after the application of all mining factors, result in an estimated tonnage and grade which, in the opinion of the Qualified Person(s) making the estimates, is the basis of an economically viable project after taking account of all relevant Modifying Factors. Mineral Reserves are inclusive of diluting material that will be mined in conjunction with the Mineral Reserves and delivered to the treatment plant or equivalent facility. The term ‘Mineral Reserve’ need not necessarily signify that extraction facilities are in place or operative or that all governmental approvals have been received. It does signify that there are reasonable expectations of such approvals.

‘Reference point’ refers to the mining or process point at which the Qualified Person prepares a Mineral Reserve. For example, most metal deposits disclose mineral reserves with a “mill feed” reference point. In these cases, mineral reserves are reported as mined ore delivered to the plant and do not include reductions attributed to anticipated plant losses. In contrast, coal reserves have traditionally been reported as tonnes of “clean coal”. In this coal example, mineral reserves are reported as a “saleable product” reference point and include reductions for plant yield (recovery). The Qualified Person must clearly state the ‘reference point’ used in the Mineral Reserve estimate.

Probable Mineral Reserve

A Probable mineral reserve is the economically mineable part of an Indicated mineral resources, and in some circumstances, a Measured mineral resource. The confidence in the modifying

   

15-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

factors applying to a Probable mineral reserve is lower than that applying to a Proven mineral reserve.

The Qualified Person(s) may elect, to convert Measured Mineral Resources to Probable Mineral Reserves if the confidence in the Modifying Factors is lower than that applied to a Proven Mineral Reserve. Probable Mineral Reserve estimates must be demonstrated to be economic, at the time of reporting, by at least a preliminary feasibility study.

Proven Mineral Reserve

A Proven mineral reserve is the economically mineable part of a Measured mineral resource. A Proven mineral reserve implies a high degree of confidence in the modifying factors.

Application of the Proven mineral reserve category implies that the Qualified Person has the highest degree of confidence in the estimate with the consequent expectation in the minds of the readers of the report. The term should be restricted to that part of the deposit where production planning is taking place and for which any variation in the estimate would not significantly affect the potential economic viability of the deposit. Proven mineral reserve estimates must be demonstrated to be economic, at the time of reporting, by at least a preliminary feasibility study. Within the CIM Definition standards the term Proved Mineral Reserve is an equivalent term to a Proven Mineral Reserve.

Modifying Factors

Modifying Factors are considerations used to convert mineral resources to mineral reserves. These include, but are not restricted to mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors.

The author of this section has used Measured and Indicated mineral resources as the basis to define mineral reserves for both the Dark Star and Pinion deposits. Mineral reserve definition was done by first identifying ultimate pit limits using economic parameters and pit optimization techniques. The resulting optimized pit shells were then used for guidance in pit design to allow access for equipment and personnel. Mr. Dyer then considered mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social, and governmental factors for defining the estimated mineral reserves.

Mineral reserves in this Technical Report have been modified based on modified pit designs in comparison to the preliminary feasibility study completed in 2019. Dark Star mining has been designed using four pit phases. The modifications were applied to the Dark Star pit designs and include:

  • The creation of initial pit designs for both Dark Star North and Dark Star Main areas.

  • An update to the Dark Star North ultimate pit design to eliminate one switchback reducing the overall stripping.

Pinion mining has been designed using three pit phases. Mr. Dyer used the phased pit designs for both the Dark Star and Pinion deposits to define the project production schedule, which was then used for cash-flow analysis for the preliminary feasibility study. The final cash-flow model was produced by M3 and demonstrates that the deposits make a positive cash flow and are reasonable with respect to statement of mineral reserves for those deposits.

The effective date of the Pinion and Dark Star mineral reserve estimates in this Technical Report is February 13, 2020.

15.2 PIT OPTIMIZATION

Pit optimizations were completed by first identifying economic and geometrical parameters. This was followed by evaluating cutoff grades, and then running pit optimizations and economic analysis within various optimized pit shells.

   

15-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

15.2.1 Economic Parameters

Economic parameters were used to generate optimized pits using a Lerchs-Grossman algorithm within Whittle™ software (Version 4.7). The economic parameters include: mining costs, process cost, general and administrative costs (“G&A”), refining costs, royalties, and metal recoveries. Mine planning is an iterative process, and initial costs and recoveries were assumed to determine how large pits would be. The economic parameters were refined as concepts were developed on how material would be processed from the different deposits. The methods for processing that were determined include:

  • Use of ROM (no crushing) for lower grade oxide and transition material from Dark Star and Pinion;

  • Using HPGR, or primary crushing followed by HPGR, for higher grade oxide and transition material from Dark Star and Pinion; and

  • Toll processing of high-grade sulfide material from Dark Star that would be sent to a roaster-type process facility.

The economic parameters used are shown in Table 15-1. The overall process rate is assumed to be 20,000 tonnes per day or 7,200,000 tonnes per year. This is used for each process, though the final processing rates vary between the various process types and deposits on a monthly basis. The assumption here is only used to convert the fixed G&A component to a cost per tonne for the purpose of pit optimization. The G&A cost is later applied as a fixed cost in the cash-flow model.

Table 15-1: South Railroad Economic Parameters

  Dark Star Pinion  
  ROM HPGR Toll Roasting ROM HPGR Units
Mining - Waste $ 2.00 $ 2.00 $ 2.00 $ 2.00 $ 2.00 $/tonne Mined
Incremental Ore Mining Cost $ 0.20 $ 0.20   NA $ 0.20 $ 0.20 $/tonne Processed
Crushing & Stack   NA $ 0.20   NA   NA $ 0.20 $/tonne Processed
Leaching $ 1.90 $ 4.28   NA $ 1.90 $ 4.28 $/tonne Processed
Toll Processing   NA   NA $ 38.00   NA   NA $/tonne Processed
G&A Cost per Tonne $ 0.56 $ 0.56 $ 0.56 $ 0.56 $ 0.56 $/tonne Processed
Refining - Au $ 5.00 $ 5.00 $ - $ 5.00 $ 5.00 $/oz Produced
Refining - Ag   NA   NA   NA $ 0.50 $ 0.50 $/oz Produced
Royalty       By Area       By Area       By Area       By Area       By Area  

Royalties were applied by royalty area or region as provided by Gold Standard. These are described in Section 4.2.

Recoveries were applied in detail based on recommendations by Mr. Gary Simmons, the Qualified Person for Section 13 of this Technical Report. Most of the recoveries used are based on grade-dependent equations. In order to simplify the equations, they were separated into various ROM and HPGR equations for the different deposits and material types.

For the purpose of pit optimizations and pit designs, metal prices of $1,275 per ounce Au and $16.50 per ounce Ag were used. These are lower than the final economic analysis prices used of $1,400 and $17.11 per ounce of gold and silver respectively. While this leaves a bit of upside potential, the final ultimate pits are reasonable with respect to reporting of mineral reserves.

   

15-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

15.2.1.1 Dark Star Recoveries

Off-site roaster toll processing is assumed for the Dark Star sulfide material, which would be shipped to one of several existing Nevada mines that has available capacity. This uses a straight 85% recovery for gold.

Dark Star recovery equations were provided based on mineral resource model blocks classified as low- and high- silica in the deposit. Separate equations were provided for both Dark Star North and Dark Star Main and were also varied for oxide and transition material. Thus, there are eight separate gold recovery equations for Dark Star material referred to as ROM1, ROM2, etc.

The same scheme was used for the recoveries for HPGR material, thus defining equations for HPGR1, HPGR2, etc. The definitions follow those of the ROM for the material shown above.

The resulting ROM equations are shown in Table 15-2 and the HPGR equations are provided in Table 15-3. “HG” in the equations to follow equals “head grade”.

Table 15-2: On-Site Dark Star ROM Recovery Equations for Gold

North Dark Star Oxidation Lith/Material Equation
ROM1 Oxide Low Silc IF(HG<=0.4,0.0267*LN(HG)+0.8659,0.01746*LN(HG)+0.85848)
ROM2 Oxide High Silc IF(HG<=0.4,0.1305*LN(HG)+0.7953,0.06736*LN(HG)+0.74592)
ROM3 Transition Low Silc IF(HG<=0.4,0.0573*LN(HG)+0.6971,0.0088*LN(HG)+0.6534)
ROM4 Transition High Silc IF(HG<=0.4,0.0312*LN(HG)+0.5995,0.0244*LN(HG)+0.5940)
Dark Star Main      
ROM5 Oxide Low Silc IF(HG<=0.4,0.0366*LN(HG)+0.9040,0.00559*LN(HG)+0.87606)
ROM6 Oxide High Silc IF(HG<=0.4,0.0254*LN(HG)+0.7805,0.00389*LN(HG)+0.76104)
ROM7 Transition Low Silc IF(HG<=0.4,0.0467*LN(HG)+0.7037,0.0071*LN(HG)+0.6681)
ROM8 Transition High Silc IF(HG<=0.4,0.0885*LN(HG)+0.6687,0.0588*LN(HG)+0.646)

 

Table 15-3: Dark Star HPGR Recovery Equations for Gold

North Dark Star Oxidation Lith/Material Equation
HPGR1 Oxide Low Silc IF(HG<=0.4,0.0268*LN(HG)+0.8862,0.0175*LN(HG)+0.8788)
HPGR2 Oxide High Silc IF(HG<=0.4,0.1305*LN(HG)+0.8346,0.0673*LN(HG)+0.786)
HPGR3 Transition Low Silc IF(HG<=0.4,0.0573*LN(HG)+0.6971,0.0088*LN(HG)+0.6534)+0.091
HPGR4 Transition High Silc IF(HG<=0.4,0.0312*LN(HG)+0.6907,0.0244*LN(HG)+0.6852)
Dark Star Main      
HPGR5 Oxide Low Silc IF(HG<=0.4,0.0366*LN(HG)+0.918,0.0056*LN(HG)+0.8901)
HPGR6 Oxide High Silc IF(HG<=0.4,0.0254*LN(HG)+0.8317,0.0039*LN(HG)+0.8124)
HPGR7 Transition Low Silc IF(HG<=0.4,0.0467*LN(HG)+0.7037,0.0071*LN(HG)+0.6681)+0.051
HPGR8 Transition High Silc IF(HG<=0.4,0.0885*LN(HG)+0.7194,0.0587*LN(HG)+0.6968)

15.2.1.2 Pinion Recoveries

Pinion recoveries are based on block model rock types, modeled barium content, modeled silica zones, and oxidation types. All Pinion sulfide materials are considered as waste. Block model rock type codes used to define the various recovery equations include MLBX, Devil’s Gate (“DgD”), MTP, and Other (not MLBX, DgD, or MTP). For Pinion ROM material, a total of four oxide equations and four transition equations were used. Table 15-4 shows the recovery equation names and a description of the material they are applied to along with the equations used.

   

15-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 15-4: Pinion ROM Recovery Equations

Equation Oxidation Lith/Material Equation
ROM1 Oxide DgD IF(HG<0.4,11.823*LN(HG)+81.691,2.257*ln(HG)+72.763)/100
ROM2 Oxide MlBx Lo Si IF(HG<0.4,10.203*LN(HG)+68.038,6.9059*ln(HG)+65.295)/100
ROM3 Oxide MlBx Hi Si IF(HG<0.4,8.3765*LN(HG)+52.119,1.612*ln(HG)+45.803)/100
ROM4 Oxide MTP IF(HG<0.4,6.7859*LN(HG)+66.608,1.3059*ln(HG)+61.492)/100
ROM5 Transition DgD IF(HG<0.4,11.823*LN(HG)+53.897,2.257*ln(HG)+44.969)/100
ROM6 Transition MlBx Lo Si IF(HG<0.4,10.203*LN(HG)+57.371,6.9059*ln(HG)+54.627)/100
ROM7 Transition MlBx Hi Si IF(HG<0.4,8.3765*LN(HG)+42.53,1.612*ln(HG)+36.214)/100-0.10
ROM8 Transition MTP IF(HG<0.4,6.7859*LN(HG)+58.057,1.3059*ln(HG)+52.941)/100-0.10

HPGR equations were provided using the same material criteria as the ROM recoveries, with the exception of DgD material which is only considered for ROM processing. Table 15-5 shows the equations names, material criteria, and equations used for HPGR recoveries.

Table 15-5: Pinion HPGR Recovery Equations

Equation Oxidation Lith/Material Equation
HPGR1 Oxide DgD None to use on DgD
HPGR2 Oxide MlBx Lo Si IF(HG<0.4,10.203*LN(HG)+75.036,6.9059*ln(HG)+72.292)/100
HPGR3 Oxide MlBx Hi Si IF(HG<0.4,8.3765*LN(HG)+75.339,1.612*ln(HG)+69.023)/100
HPGR4 Oxide MTP IF(HG<0.4,6.7859*LN(HG)+79.446,1.3059*ln(HG)+74.33)/100
HPGR5 Transition DgD None to use on DgD
HPGR6 Transition MlBx Lo Si IF(HG<0.4,10.203*LN(HG)+64.368,6.9059*ln(HG)+61.624)/100
HPGR7 Transition MlBx Hi Si IF(HG<0.4,8.3765*LN(HG)+42.53,1.612*ln(HG)+36.214)/100
HPGR8 Transition MTP IF(HG<0.4,6.7859*LN(HG)+70.896,1.3059*ln(HG)+65.779)/100

15.2.2 Geometric Parameters

Geometric parameters include land constraints and slope parameters. No land boundaries were used other than royalty areas as required to apply NSR royalties to the economics.

Slope recommendations were provided by Golder Associates (“Golder”) (Golder, 2019). These were given using different sectors for both the Dark Star and Pinion deposits. Golder provided two sets of recommendations for each deposit based on whether or not best-case blasting practices are used. MDA has applied the recommendations assuming best blasting practices will be used to protect high walls from damage.

15.2.2.1 Dark Star Slope Recommendations

Dark Star slope sectors provided by Golder (2019) are shown in Figure 15-1. Recommended bench heights, catch bench widths, bench face angles (“BFA”), and inner-ramp slope angles (“IRA”) are shown in Table 15-6.

The recommended bench heights and bench widths were provided in feet; however, the project and designs were completed in metric units. MDA used 9 m bench heights for design with 2 benches between catch benches making the geotechnical bench height 18 m. Catch benches 8.2 m wide were applied along with the BFA to achieve the corresponding IRA from the Golder recommendations.

   

15-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The slope sectors were flagged into the mineral resource block model and exported to Whittle. For pit optimizations, the sectors were used with the recommended IRA. However, the slopes on the west side of Dark Star North were flattened by 5° to provide a more realistic representation of the flattening due to inclusion of ramps on the west side of the pit.

(from Golder, February 2019)

Figure 15-1: Dark Star Slope Sectors

Table 15-6: Dark Star Slope Recommendations by Sector

Dark Star Golder Recommendations in Feet

Sector Bench Height * Bench Width * BFA (°) IRA (°)
NP1 60 27 63 46
NP2 60 27 72 52
NP3 60 27 69 52
NP4 60 27 72 52
NP5 60 27 69 50
SP6 60 27 69 50
SP7 60 27 72 52
SP8 60 27 67 49
SP9 60 27 63 46

*Bench height and widths were provided in feet

   

15-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

15.2.2.2 Pinion Slope Recommendations

Pinion slope sectors provided by Golder are shown in Figure 15-2 and the recommended bench heights, catch bench widths, BFA, and IRA are shown in Table 15-7.

As with Dark Star, the recommended bench heights and bench widths were provided in feet, but the project and designs are in metric units. MDA used 9 m bench heights for deign with 2 benches between catch benches making the geotechnical bench height 18 m. Catch benches 8.2 m wide were applied along with the BFA to achieve the corresponding IRA from Golder recommendations.

For Whittle pit optimizations, the IRA was applied. Unlike Dark Star North, the final designs for Pinion were completed without leaving a ramp in the high wall. Thus, no additional flattening of the IRA was required for the pit optimization runs.


(from Golder, February 2019)

Figure 15-2: Pinion Slope Sectors

   

15-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 15-7: Pinion Slope Recommendations by Sector

Sector Bench Height Bench Width BFA IRA
1 60 27 69 50
2 60 27 72 52
3 60 27 72 52
4 60 27 63 46
5 60 27 72 52
6 60 27 72 52
7 60 27 63 46
8 60 27 69 50
9 60 27 72 52

Sector 9 was not established as there was not significant highwall. Slopes are assumed based on the steeper sectors in the table above.
(from Golder, February 2019)

15.2.3 Cutoff Grades

Cutoff grades were calculated based on the economic parameters shown in Table 15-1. These were calculated for the different deposits and material types for the various potential processing methods. ROM and toll processing cutoff grades were each calculated as internal break-even cutoffs. The internal cutoff grade calculation eliminates the mining cost in the calculation. The pit designs are based on economical pits and the materials inside of the pits are assumed to be mined whether the material is waste or ore. The decision on whether to process the material is made at the point where the truck needs to turn either to the waste dump or the process facility. Thus, the mining cost is a sunk cost. The basic equation for the cutoff grade calculation is shown in Equation 1.

Equation 1 Breakeven Cutoff Grade Calculation (g Au/t)

  Costs  
  ( Au$ - RefCst ) * 1 oz * (1 - Roy%) * Rec%  
  oz 31.10348g  

Where costs are all processing costs plus G&A costs in $/t, RefCst is the refining cost in $/oz gold produced, Roy% is the NSR royalty, and Rec% is the calculated recovery at the cutoff grade.

HPGR break-even cutoff grades were also calculated, however, most material fed through the HPGR process could also be fed through the ROM process. Therefore, the cutoff grade for HPGR material was estimated based on where the material would create the most value. As HPGR has higher recoveries, higher-grade material will likely benefit by being processed using HPGR. However, when the higher costs are considered, there will typically be some material that will benefit more by being processed by ROM.

For this reason, the “crossover” cutoff grade has been calculated. The crossover cutoff grade is the grade where the value of material sent to the HPGR process is equal to the value that is created if the same grade is sent to the ROM pad. This is based on the delta of the operating costs and the recoveries at a specified metal price.

   

15-8

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Equation 2 Crossover Cutoff Grade Calculation

  (CostsHPGR - CostsROM)  
  ( Au$ - RefCst ) * 1 oz * (1 - Roy%) * (Rec%HPGR - Rec%HPGR)  
  oz 31.10348g  

Of note, when calculating the breakeven cutoff grades for ROM material, the cutoff grade can be very low and approach assay detection limits. Processing material with grades at the detection limits runs the risk that material may be sent to the leach pad that will incur more costs than the value it creates. Due to this lack of confidence in assays for the lower grades, the PFS uses a minimum grade of 0.17 g Au/t.

The calculated ROM breakeven cutoff grades range between 0.08 and 0.12 g Au/t. As such, the reporting cutoff grades used are 0.17 g Au/t for all Dark Star ROM material processed. While the HPGR breakeven cutoff grades are still fairly low, the crossover cutoff grades were used. Table 15-8 shows the crossover cutoff grades for Dark Star.

Table 15-8: Dark Star Cutoff Grades

North Dark Star Oxidation Lith/Material COG g Au/t
HPGR1 Oxide Low Silc 0.83
HPGR2 Oxide High Silc 0.36
HPGR3 Transition Low Silc 0.39
HPGR4 Transition High Silc 0.48
Dark Star Main      
HPGR5 Oxide Low Silc 0.82
HPGR6 Oxide High Silc 0.69
HPGR7 Transition Low Silc 0.55
HPGR8 Transition High Silc 0.41

The Pinion cutoff grades are shown in Table 15-9 by oxidation, rock type, barite content, and silica reference. ROM cutoff grades are shown as either the breakeven cutoff grades or the 0.17 g Au/t minimum cutoff, whichever is greater. The HPGR cutoff grades are calculated as crossover cutoff grades. As noted with recoveries, DgD material is not processed in the HPGR, thus no cutoff grade is given for this material.

Table 15-9: Pinon Breakeven Cutoff Grades

        COG (g Au/t)
ROM Eq HPGR Eq Oxidation Lith/Material ROM HPGR COG
ROM1 HPGR1 Oxide DgD 0.17 NA
ROM2 HPGR2 Oxide MlBx Lo Si 0.17 0.37
ROM3 HPGR3 Oxide MlBx Hi Si 0.17 0.24
ROM4 HPGR4 Oxide MTP 0.17 0.33
ROM5 HPGR5 Transition DgD 0.19 NA
ROM6 HPGR6 Transition MlBx Lo Si 0.21 0.30
ROM7 HPGR7 Transition MlBx Hi Si 0.29 0.49
ROM8 HPGR8 Transition MTP 0.18 0.36

 

   

15-9

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The ROM cutoff grades described above were used for minimum values in the Whittle optimizations. Both the ROM and HPGR cutoff grades above were used for final mineral reserve definition.

15.2.4 Pit Optimization Methods and Results

Pit optimizations were run using Whittle™ software (version 4.7). Inputs into Whittle included the mineral resource block model along with the economic and geometric parameters previously discussed. Pit optimizations used for mineral reserve definition used only Measured and Indicated mineral resources for processing and all Inferred material is considered as waste. Each deposit was run separately, and ultimate pit shells were selected from the Whittle results for final design. For Dark Star and Pinion, additional pit shells were considered for guidance of interior pit phases.

The selections of ultimate pits and pit phases were done as a two-step process. The first step was to optimize a set of pit shells based on varying a revenue factor. This was done in Whittle using a Lerchs-Grossman algorithm. The revenue factor was multiplied by the recovered ounces and the metal prices, creating a nested set of pit shells based on different metal prices. Revenue factors for each of the deposits were varied from 0.30 to 2.0 in increments of 0.025. With a base price of $1,000 per ounce of gold, the resulting pit shells represent gold prices from $300 to $2,000 per ounce in increments of $25.00. This has the potential of generating up to 69 different pit shells that can be used for analysis.

The second step of the process was to use the Pit by Pit (“PbP”) analysis tool in Whittle to generate a discounted operating cash flow (note that capital is not included). This used a rough scheduling for each pit shell to generate the discounted value for the pit. The program develops three different discounted values: best, worst, and specified. The best-case value uses each of the pit shells as pit phases or pushbacks. For example, when evaluating pit 20, there would be 19 pushbacks mined prior to pit 20, and the resulting schedule takes advantage of mining more valuable material up front to improve the discounted value. Evaluating pit 21 would have 20 pushbacks; pit 22 would have 21 pushbacks and so on. Note that this is not a realistic case as the incremental pushbacks would not have enough mining width between them to be able to mine appropriately, but this does help to define the maximum potential discounted operating cash flow.

The worst case does not use any pushbacks in determining the discounted value for each of the pit shells. Thus, each pit shell is evaluated as if mining a single pit from top to bottom. This does not provide the advantage of mining more valuable material sooner, and it generally provides a lower discounted value than that of the best case.

The specified case allows the user to specify pit shells to be used as pushbacks and then schedules the pushbacks and calculates the discounted cash flow. This is more realistic than the base case as it allows for more mining width, though the final pit design will have to ensure that appropriate mining width is available. The specified case has been used for each mine to determine the ultimate pit limits to design to, as well as to specify guidelines for designing pit phases.

15.2.4.1 Dark Star Pit Optimization

The previously discussed parameters were used along with gold prices varying from $300 to $2,000 per ounce to create the pit optimization results. These results are shown in Table 15-10 using $100 gold price increments with the addition of the $1,275 pit shell which is highlighted as the base price used for pit designs. The pit optimization used the IRA slopes provided by Golder, but the slopes on the west side of the pit were flattened by 5° to better represent the ramp design.

Table 15-11 lists the PbP results by process type and these are also shown graphically in Figure 15-3. Pit 39 is highlighted as having the best discounted operating cash flow for the specified case. This pit was used as a guide for the ultimate pit design. The final design was done using four pit phases, two for Dark Star North, which has the higher value, and two for Dark Star Main.

   

15-10

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 15-10: Dark Star Pit Optimization Results

  Price
$/os Au
Material Processed Waste
K Tons
Total
K Tons
Strip
Ratio
Pit K Tons g Au/t K Ozs Au
1 $ 300 7,564 1.65 401 22,698 30,262 3.00
5 $ 400 11,532 1.54 570 35,702 47,234 3.10
9 $ 500 14,049 1.39 628 38,472 52,522 2.74
13 $ 600 17,085 1.24 682 41,226 58,312 2.41
17 $ 700 19,126 1.17 722 45,202 64,328 2.36
21 $ 800 22,149 1.08 769 49,760 71,909 2.25
25 $ 900 23,943 1.04 799 53,932 77,875 2.25
29 $ 1,000 26,980 0.97 845 62,163 89,142 2.30
33 $ 1,100 27,747 0.96 860 65,596 93,343 2.36
37 $ 1,200 28,656 0.95 876 69,362 98,018 2.42
40 $ 1,275 29,122 0.95 887 72,505 101,626 2.49
41 $ 1,300 29,276 0.95 892 73,809 103,086 2.52
45 $ 1,400 29,696 0.94 899 75,148 104,844 2.53
49 $ 1,500 30,105 0.93 905 76,674 106,779 2.55
53 $ 1,600 30,724 0.93 915 80,394 111,118 2.62
57 $ 1,700 30,971 0.92 919 81,435 112,406 2.63
61 $ 1,800 31,102 0.92 921 81,893 112,995 2.63
65 $ 1,900 31,260 0.92 924 82,670 113,930 2.64
69 $ 2,000 31,468 0.92 928 83,928 115,395 2.67

 

   

15-11

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 15-11: Dark Star Pit by Pit Results

  HPR Material Processed ROM Material Processed Toll Material Processed Total Material Processed Waste
K Tons
Total
K Tons
Strip
Ratio
Disc. Op Cash Flow (M USD)
Pit K Tons g Au/t K Ozs Au K Tons g Au/t K Ozs Au K Tons g Au/t K Ozs Au K Tons g Au/t K Ozs Au Best Specified Worst
22 2,911 3.14 294 19,765 0.73 461 310 2.85 28 22,987 1.06 783 50,623 53,534 2.20 $ 510.02 $ 486.49 $ 476.48
23 2,943 3.12 295 19,981 0.72 464 314 2.85 29 23,238 1.05 788 51,349 54,292 2.21 $ 511.19 $ 487.65 $ 476.86
24 2,950 3.12 296 20,371 0.72 469 319 2.82 29 23,641 1.04 794 52,190 55,141 2.21 $ 512.57 $ 488.98 $ 476.69
25 2,996 3.10 298 20,725 0.71 475 330 2.80 30 24,051 1.04 803 53,824 56,820 2.24 $ 514.52 $ 490.87 $ 477.21
26 3,028 3.08 300 20,910 0.71 477 334 2.81 30 24,271 1.03 807 54,747 57,775 2.26 $ 515.44 $ 491.77 $ 477.41
27 3,030 3.08 300 22,138 0.69 493 338 2.79 30 25,505 1.00 824 57,522 60,552 2.26 $ 518.45 $ 494.46 $ 474.42
28 3,068 3.06 302 22,394 0.69 497 345 2.79 31 25,807 1.00 830 58,947 62,014 2.28 $ 519.55 $ 495.53 $ 474.37
29 3,084 3.05 303 23,593 0.68 512 358 2.81 32 27,035 0.97 847 62,108 65,192 2.30 $ 522.35 $ 498.13 $ 472.68
30 3,137 3.03 305 23,767 0.67 514 365 2.79 33 27,269 0.97 852 63,329 66,466 2.32 $ 523.11 $ 498.85 $ 472.89
31 3,137 3.03 305 23,838 0.67 515 365 2.79 33 27,340 0.97 853 63,422 66,559 2.32 $ 523.19 $ 498.93 $ 472.78
32 3,139 3.03 305 23,965 0.67 517 365 2.79 33 27,469 0.97 855 63,778 66,917 2.32 $ 523.39 $ 499.09 $ 472.52
33 3,198 3.00 308 24,221 0.67 520 376 2.76 33 27,796 0.96 862 65,546 68,745 2.36 $ 524.14 $ 499.79 $ 472.31
34 3,198 3.00 308 24,380 0.67 522 376 2.76 33 27,955 0.96 864 65,988 69,186 2.36 $ 524.32 $ 499.91 $ 471.78
35 3,200 2.99 308 24,486 0.67 524 380 2.75 34 28,066 0.96 865 66,350 69,550 2.36 $ 524.43 $ 499.98 $ 471.40
36 3,236 2.97 309 24,828 0.66 528 389 2.74 34 28,453 0.95 872 68,081 71,316 2.39 $ 524.84 $ 500.32 $ 470.46
37 3,270 2.96 311 25,015 0.66 531 400 2.72 35 28,685 0.95 877 69,333 72,603 2.42 $ 525.04 $ 500.47 $ 469.81
38 3,283 2.95 312 25,036 0.66 531 404 2.71 35 28,723 0.95 878 69,535 72,818 2.42 $ 525.07 $ 500.48 $ 469.72
39 3,365 2.92 316 25,285 0.66 535 426 2.68 37 29,076 0.95 887 72,399 75,763 2.49 $ 525.20 $ 500.53 $ 468.74
40 3,365 2.92 316 25,327 0.66 535 430 2.66 37 29,122 0.95 887 72,505 75,869 2.49 $ 525.21 $ 500.51 $ 468.54
41 3,399 2.90 317 25,418 0.66 536 444 2.64 38 29,262 0.95 892 73,824 77,223 2.52 $ 525.16 $ 500.45 $ 468.05
42 3,401 2.90 318 25,505 0.66 537 446 2.64 38 29,352 0.95 893 74,149 77,550 2.53 $ 525.13 $ 500.41 $ 467.57
43 3,404 2.90 318 25,603 0.65 539 446 2.64 38 29,454 0.94 894 74,564 77,968 2.53 $ 525.08 $ 500.34 $ 467.03
44 3,406 2.90 318 25,770 0.65 541 448 2.63 38 29,625 0.94 896 75,169 78,575 2.54 $ 524.97 $ 500.20 $ 466.08
45 3,406 2.90 318 25,783 0.65 541 452 2.62 38 29,641 0.94 897 75,202 78,608 2.54 $ 524.95 $ 500.18 $ 466.00
46 3,410 2.90 318 26,003 0.65 543 452 2.62 38 29,864 0.94 899 75,918 79,328 2.54 $ 524.74 $ 499.94 $ 464.77
47 3,411 2.90 318 26,079 0.65 544 452 2.62 38 29,943 0.94 900 76,372 79,783 2.55 $ 524.62 $ 499.81 $ 464.21
48 3,417 2.90 318 26,149 0.65 545 452 2.62 38 30,018 0.93 902 76,736 80,153 2.56 $ 524.51 $ 499.68 $ 463.83
49 3,417 2.90 318 26,153 0.65 545 452 2.62 38 30,022 0.93 902 76,758 80,175 2.56 $ 524.50 $ 499.68 $ 463.80

 

   

15-12

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 15-3: Dark Star Pit by Pit Graph

   

15-13

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

15.2.4.2 Pinion Pit Optimization

The Pinion optimization parameters were used along with variable gold prices to create the pit optimization results. These results are shown in Table 15-12 using $100 gold price increments with the addition of the $1,275 pit shell, which is highlighted as the base price used to determine the ultimate pit limits. Pit optimizations used the previously discussed Golder IRA slope criteria.

Table 15-13 shows the PbP results and these are also shown graphically in Figure 15-4. This shows the material processing type as selected by Whittle. Pit 39 is highlighted as having the best discounted operating cash flow for the specified case and pit 40 is highlighted as the $1,275 Au price pit shell which was chosen as the basis for pit designs.

It is worth noting the various steps in Figure 15-4 which illustrates the difficulty in overcoming stripping at certain metal prices. One of the larger jumps is between pit shells 35 and 36. The incremental change in contained ounces of gold between those pits is approximately 100,000 ounces.

Table 15-12: Pinion Pit Optimization Results

          Material Processed Waste
K Tons
Total
K Tons
Strip
Ratio
Pit Au Price Ag Price K Tons oz Au/ton K Ozs Au oz Ag/ton K Ozs Ag
1 $ 300 $ 3.88 709 1.341 31 6.29 143 466 1,175 0.66
5 $ 400 $ 5.18 1,635 1.072 56 6.38 335 1,099 2,734 0.67
9 $ 500 $ 6.47 2,474 0.947 75 6.27 499 1,691 4,165 0.68
13 $ 600 $ 7.76 3,321 0.874 93 6.28 671 2,692 6,013 0.81
17 $ 700 $ 9.06 4,235 0.812 111 6.03 821 3,865 8,100 0.91
21 $ 800 $ 10.35 4,919 0.780 123 5.74 908 5,233 10,152 1.06
25 $ 900 $ 11.65 5,732 0.748 138 5.38 991 7,129 12,860 1.24
29 $ 1,000 $ 12.94 8,027 0.712 184 5.01 1,292 14,864 22,892 1.85
33 $ 1,100 $ 14.24 9,459 0.706 215 4.93 1,499 21,666 31,125 2.29
37 $ 1,200 $ 15.53 17,303 0.635 353 4.65 2,584 50,828 68,131 2.94
40 $ 1,275 $ 16.50 18,444 0.623 370 4.60 2,729 54,416 72,861 2.95
41 $ 1,300 $ 16.82 18,659 0.621 373 4.61 2,763 55,066 73,725 2.95
45 $ 1,400 $ 18.12 19,652 0.611 386 4.53 2,863 58,127 77,779 2.96
49 $ 1,500 $ 19.41 20,389 0.601 394 4.47 2,931 59,965 80,354 2.94
53 $ 1,600 $ 20.71 21,296 0.593 406 4.40 3,015 63,186 84,483 2.97
57 $ 1,700 $ 22.00 22,600 0.581 423 4.31 3,129 68,300 90,900 3.02
61 $ 1,800 $ 23.29 23,856 0.575 441 4.23 3,245 75,311 99,167 3.16
65 $ 1,900 $ 24.59 26,621 0.566 485 4.15 3,556 94,217 120,839 3.54
69 $ 2,000 $ 25.88 27,683 0.558 497 4.10 3,652 99,127 126,810 3.58

 

   

15-14

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 15-13: Pinion Pit by Pit Results

  HPGR Processed ROM Processed Total Material Processed Waste
K Tonnes
Total
K Tonnes
Strip
Ratio
Disc. Op Cash Flow (M USD)
Pit K Tonnes g Au/t K Ozs Au g Ag/t K Ozs Ag K Tonnes g Au/t K Ozs Au g Ag/t K Ozs Ag K Tonnes g Au/t K Ozs Au g Ag/t K Ozs Ag Best Specified Worst
22 2,841 0.97 89 7.91 723 2,335 0.49 36 2.64 198 5,176 0.75 125 5.53 921 5,042 10,218 0.97 $ 67.01 $ 67.00 $ 67.00
23 2,929 0.96 91 7.83 737 2,479 0.48 38 2.59 206 5,408 0.74 129 5.42 943 5,498 10,905 1.02 $ 68.11 $ 68.10 $ 68.10
24 3,034 0.96 94 7.75 756 2,633 0.48 40 2.55 216 5,667 0.74 134 5.34 972 6,269 11,936 1.11 $ 69.40 $ 69.37 $ 69.37
25 3,164 0.95 97 7.62 775 2,739 0.48 42 2.52 222 5,903 0.73 139 5.25 997 6,953 12,856 1.18 $ 70.54 $ 70.49 $ 70.49
26 3,240 0.95 99 7.56 788 2,796 0.47 43 2.51 226 6,036 0.73 141 5.22 1,013 7,306 13,342 1.21 $ 71.09 $ 71.03 $ 71.03
27 3,410 0.95 104 7.52 824 3,117 0.47 47 2.43 244 6,527 0.72 151 5.09 1,068 8,904 15,431 1.36 $ 73.04 $ 72.94 $ 72.94
28 3,475 0.94 105 7.51 839 3,192 0.46 48 2.42 248 6,667 0.71 153 5.07 1,087 9,183 15,850 1.38 $ 73.45 $ 73.33 $ 73.33
29 4,330 0.91 127 7.21 1,004 3,836 0.47 58 2.36 291 8,166 0.70 184 4.93 1,295 14,629 22,795 1.79 $ 78.72 $ 78.49 $ 78.25
30 4,370 0.91 128 7.19 1,011 3,878 0.47 58 2.36 294 8,248 0.70 186 4.92 1,305 14,966 23,214 1.81 $ 78.99 $ 78.75 $ 78.49
31 4,885 0.91 143 7.15 1,122 4,203 0.46 63 2.38 322 9,088 0.70 205 4.94 1,444 19,161 28,248 2.11 $ 81.76 $ 81.45 $ 80.88
32 5,015 0.91 147 7.11 1,147 4,358 0.46 65 2.41 338 9,373 0.70 211 4.93 1,484 20,665 30,038 2.20 $ 82.60 $ 82.27 $ 81.61
33 5,080 0.91 149 7.09 1,157 4,483 0.46 66 2.39 345 9,562 0.70 215 4.89 1,502 21,474 31,036 2.25 $ 82.98 $ 82.65 $ 81.94
34 5,148 0.91 151 7.04 1,165 4,622 0.46 68 2.36 351 9,769 0.70 219 4.83 1,516 22,246 32,016 2.28 $ 83.31 $ 82.96 $ 82.20
35 5,218 0.91 153 7.01 1,177 4,720 0.45 69 2.34 356 9,938 0.69 221 4.80 1,532 22,698 32,636 2.28 $ 83.50 $ 83.14 $ 82.33
36 8,481 0.82 223 6.58 1,795 7,126 0.43 99 2.58 591 15,607 0.64 322 4.75 2,386 43,678 59,284 2.80 $ 87.56 $ 87.17 $ 84.19
37 8,759 0.82 231 6.53 1,840 7,728 0.43 107 2.58 641 16,487 0.64 338 4.68 2,481 47,283 63,770 2.87 $ 88.22 $ 87.52 $ 84.27
38 9,103 0.82 240 6.52 1,907 8,402 0.43 115 2.56 692 17,505 0.63 355 4.62 2,599 51,246 68,751 2.93 $ 88.86 $ 87.98 $ 84.61
39 9,122 0.82 241 6.51 1,909 8,490 0.42 116 2.55 696 17,612 0.63 357 4.60 2,605 51,417 69,029 2.92 $ 88.88 $ 87.99 $ 84.61
40 9,394 0.82 247 6.57 1,984 8,840 0.42 120 2.57 730 18,234 0.63 367 4.63 2,714 54,113 72,347 2.97 $ 88.89 $ 87.69 $ 84.13
41 9,444 0.82 249 6.57 1,995 8,925 0.42 121 2.57 737 18,370 0.63 369 4.63 2,732 54,630 73,000 2.97 $ 88.86 $ 87.63 $ 84.05
42 9,515 0.82 250 6.58 2,012 9,022 0.42 122 2.57 744 18,538 0.62 372 4.62 2,756 55,345 73,883 2.99 $ 88.80 $ 87.47 $ 83.85
43 9,726 0.82 255 6.53 2,041 9,294 0.42 125 2.56 764 19,019 0.62 380 4.59 2,805 57,287 76,307 3.01 $ 88.51 $ 86.93 $ 83.17
44 9,732 0.82 255 6.53 2,042 9,350 0.42 125 2.56 770 19,081 0.62 381 4.58 2,812 57,407 76,489 3.01 $ 88.48 $ 86.90 $ 83.12
45 9,789 0.82 257 6.52 2,052 9,562 0.42 128 2.57 790 19,351 0.62 384 4.57 2,842 58,365 77,716 3.02 $ 88.23 $ 86.52 $ 82.68
46 9,808 0.82 257 6.51 2,054 9,622 0.41 128 2.56 793 19,430 0.62 386 4.56 2,847 58,691 78,121 3.02 $ 88.15 $ 86.41 $ 82.54
47 9,839 0.81 258 6.51 2,060 9,741 0.41 130 2.56 802 19,580 0.62 387 4.55 2,862 59,093 78,673 3.02 $ 87.99 $ 86.21 $ 82.32
48 9,875 0.81 258 6.51 2,067 9,886 0.41 132 2.56 813 19,761 0.61 390 4.53 2,881 59,819 79,580 3.03 $ 87.73 $ 85.85 $ 81.91
49 9,895 0.81 259 6.51 2,070 9,943 0.41 132 2.56 818 19,838 0.61 391 4.53 2,888 59,966 79,804 3.02 $ 87.64 $ 85.74 $ 81.79

 

   

15-15

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 15-4: Pinion Pit by Pit Graph

   

15-16

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

15.3 PIT DESIGNS

Detailed pit designs were completed for Dark Star and Pinion using Surpac™ software (version 6.7). Each of the designs utilize 9 m benches with a catch bench installed every other bench, or 18 m. All catch benches were designed with a width of 8.2 m and the BFA’s used are shown in Table 15-6 and Table 15-7.

15.3.1 Road and Ramp Design

Road designs have been completed for the PFS to allow primary access for people, equipment, and consumables to the site. This includes haul roads between the designed pits, dumps, and proposed leach facility. Within the pit designs, ramps have been established for haul truck and equipment access. The in-pit ramps will only require a single berm. Ramps outside of the pit will require two safety berms. The design parameters for ramps and roads are shown in Table 15-14. Note that these also show parameters for one-lane traffic. One-lane traffic would be used near the bottom of pits where the strip ratio is minimal, and the traffic requirements are low.

The ramps and haul roads assume the use of 136-tonne capacity haul trucks with an operating width of 6.64 m. For two-way access the goal of the road design is to allow a running width of near 3.5 times the width of the trucks. Mine Safety and Health Administration (“MSHA”) regulations specify that safety berms be maintained with heights at least ½ of the diameter of the tires of the haul trucks that will travel on roads. The ½ height of the 136-tonne haul trucks tires is 1.52 m. An extra 10% was added to berm height design to ensure that all berms are a sufficient height.

Safety berms assume a slope of 1.5 horizontal to 1.0 vertical. Considering that ramps in the pit only need one berm, the road width of 28 m was determined for two-lane traffic, which allows for 3.42 times the operating width of the haul trucks. Single-lane traffic roads are estimated to require 18 m which allows 1.92 times the operating width of haul trucks.

Roads outside of the pit will require two berms and widths are estimated to be 34 m allowing 3.53 times the width of haul trucks.

Road designs are intended to have a maximum of 10% gradient, though some may exceed this for short distances around inside turns. Where switchbacks are utilized, the centerline gradient is reduced to about 8%. This keeps the inside gradient approximately 12%. Switchback designs have not added the detail for super elevation through the curves, but is it assumed that this will be done when they are constructed.

   

15-17

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 15-14: Road and Ramp Design Parameters

  Two-Lane   Two-Lane   One-Lane
  In-Pit   Ex-Pit   In-Pit
  Meters   Meters   Meters
Truck Width 6.64   6.64   6.64
Running / Truck Width Ratio 3.50   3.50   2.00
Road Running Width 23.24   23.24   13.28
Tire Size 33.00R51   33.00R51   33.00R51
Tire 1/2 Height 1.52   1.52   1.52
Berm Height 1.67   1.67   1.67
Berm Top Width 0.25   0.25   0.25
Berm Slope 1.50   1.50   1.50
Berm Bottom Width 5.27   5.27   5.27
# Berms 1.00   2.00   1.00
Total Berm Width 5.27   10.53   5.27
Overall Width 28.51   33.77   18.55
Design Width 28.00   34.00   18.00
Running Width After Berms 22.73   23.47   12.73
Running Width / Truck Width 3.42   3.53   1.92

15.3.2 Dark Star Pit Designs

Dark Star pit designs were completed using four pit phases. Phase 1 mines an initial pit in Dark Star North and Phase 2 mines an initial pit in Dark Star Main. Ultimate pits are mined in Phase 3 (Dark Star North) and Phase 4 (Dark Star Main). Dark Star North has generally higher grades and better value, however it also has a higher strip ratio. Note that even though Phase 3 was used to achieve the ultimate Dark Star North pit, it was designed to be mined after Phase 4 Dark Star Main, due to the heavy stripping in Phase 3. This study found that there is value in mining Phase 3 last. This helps to delay stripping requirements and higher mining costs.

Figure 15-5 shows the ultimate Dark Star pit designs (Phases 3 and 4). Figure 15-6 shows the initial Dark Star pit designs (Phases 1 and 2).

   

15-18

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 15-5: Dark Star Ultimate Pit Design

   

15-19

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 15-6: Dark Star North (Phase 1) and Main (Phase 2) Initial Pits

   

15-20

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

15.3.3 Pinion Pit Designs

The Pinion ultimate pit design was achieved using three pit phases. The ultimate pit design is shown in Figure 15-7. The Pinion Phase 1 pit is in the north part of the deposit and mines near surface oxide materials. Due to the lower strip ratio in this area, the Phase 1 pit provides good initial value from the deposit. The Pinion Phase 1 pit design is shown in Figure 15-8.

The Pinion Phase 2 pit is located just south of Phase 1 and mines into the major portion of the deposit from north to south. This pit phase was designed based on the optimized pit shell number 35 as described in Section 15.2.4.2. The Pinion Phase 2 design is shown in Figure 15-9.

   

15-21

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 15-7: Pinion Ultimate Pit Design

   

15-22

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 15-8: Pinion Phase 1 Pit Design

   

15-23

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 15-9: Pinion Phase 2 Pit Design

   

15-24

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

15.4 DILUTION

The mineral resource block models were completed for both deposits using 9 m x 9 m x 9 m block sizes which is appropriate for use as a selective mining unit. The estimates for gold (and silver at Pinion) have been block diluted to the mineral resource block size. Mr. Dyer believes that this dilution is appropriate to represent the dilution and ore loss that will be experienced when the deposits are mined.

15.5 PROVEN AND PROBABLE MINERAL RESERVES FOR DARK STAR AND PINION

In-pit Measured and Indicated mineral resources above the cutoff grades used were converted to Proven and Probable mineral reserves respectively. Dark Star Proven and Probable mineral reserves are shown in Table 15-15. The Dark Star pits have a total of 84.3 million tonnes of waste associated with the mineral reserves, and thus have an overall strip ratio of 2.86 tonnes of waste per tonne processed. The in-pit oxide and transition mineral reserves are reported using the 0.17 g Au/t cutoff grade. The sulfide mineral reserves are reported using a 1.17 g Au/t cutoff grade.

Table 15-15: Dark Star In-Pit Proven and Probable Mineral Reserves

  Oxide Material Transition Material Sulfide Material Total Proven & Probable
Phase K Tonnes g Au/t K Ozs Au K Tonnes g Au/t K Ozs Au K Tonnes g Au/t K Ozs Au K Tonnes g Au/t K Ozs Au
Phase 1 5,709 1.33 243 2,114 0.79 53 38 1.56 2 7,861 1.18 299
Phase 2 3,842 0.60 74 4,486 0.47 68 11 1.48 1 8,340 0.53 143
Phase 3 5,675 1.44 263 2,784 0.98 87 320 2.89 30 8,779 1.35 380
Phase 4 1,935 0.46 29 2,393 0.41 31 4 1.54 0 4,331 0.43 60
Total 17,161 1.10 610 11,776 0.64 241 373 2.70 32 29,311 0.94 883

Pinion Proven and Probable mineral reserves are shown in Table 15-16. The Pinion mineral reserves are associated with a total of 63.0 million tonnes of waste, resulting in a stripping ratio of 3.52 waste tonnes to processed tonnes. Cutoff grades used for reporting are variable based on the material type, oxidation, barite, and silica content.

The reference point for the Dark Star Proven and Probable mineral reserves is at the process facility. The Dark Star Proven and Probable mineral reserves are entirely within the current Measured and Indicated Dark Star mineral resources.

For the Pinion Proven and Probable mineral reserves the reference point is at the process facility, and the mineral reserves are entirely within the current Measured and Indicated Pinion mineral resources.

Table 15-16: Pinion In-Pit Mineral Reserves

  Oxide Material Transition Material Total Processed
Phase K Tonnes g Au/t K Ozs Au g Ag/t K Ozs Ag K Tonnes g Au/t K Ozs Au g Ag/t K Ozs Ag K Tonnes g Au/t K Ozs Au g Ag/t K Ozs Ag
Pin_Ph_1 2,573 0.66 55 3.75 311 67 0.52 1 3.03 7 2,640 0.66 56 3.74 317
Pin_Ph_2 6,810 0.69 150 5.08 1,112 492 0.74 12 6.86 109 7,301 0.69 162 5.20 1,221
Pin_Ph_3 7,186 0.56 129 4.50 1,040 759 0.67 16 5.23 128 7,946 0.57 146 4.57 1,168
Total 16,569 0.63 334 4.62 2,463 1,319 0.69 29 5.73 243 17,887 0.63 364 4.70 2,705

The total Proven and Probable mineral reserves reported for the PFS are shown in Table 15-17. Within the designed pits there are a total of 145.0 million tonnes of waste associated with the in-pit mineral reserves. This results in an overall project strip ratio of 3.07 tonnes of waste for each tonne of material processed.

   

15-25

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 15-17: Total Dark Star and Pinion Proven and Probable Mineral Reserves

Dark Star K Tonnes g Au/t K Ozs Au
Proven 5,430 1.39 243
Probable 23,881 0.83 640
P&P 29,311 0.94 883

 

Pinion K Tonnes g Au/t K Ozs Au g Ag/t K Ozs Ag
Proven 1,073 0.66 23 5.52 191
Probable 16,814 0.63 341 4.65 2,515
P&P 17,887 0.63 364 4.70 2,705

 

Consolidated Gold Reserves    
Dark Star & Pinion K Tonnes g Au/t K Ozs Au
Proven 6,503 1.27 266
Probable 40,695 0.75 980
P&P 47,198 0.82 1,246

Note: cutoff grades are applied by material type as described in Section 15.2.3
Proven and Probable mineral reserves for Pinion include silver as reported above; and
Due to lack of silver at Dark Star, consolidated gold reserves are reported without silver to avoid reporting erroneous average silver grade.

   

15-26

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 16 TABLE OF CONTENTS

SECTION     PAGE
16 MINING METHODS   16-1
  16.1 WASTE ROCK STORAGE AREAS 16-1
  16.2 STOCKPILES   16-3
  16.3 MINE-PRODUCTION SCHEDULE 16-3
  16.4 EQUIPMENT SELECTION AND PRODUCTIVITIES 16-21
  16.5 EQUIPMENT REQUIREMENTS 16-22
    16.5.1 Drilling Equipment 16-23
    16.5.2 Loading Equipment 16-24
    16.5.3 Haulage Productivity 16-24
    16.5.4 Support and Maintenance Equipment 16-24
  16.6 MINING PERSONNEL AND STAFFING 16-25

SECTION 16 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 16-1: Waste Containment Requirements (Thousands, Cubic Meters) 16-2
Table 16-2: Dark Star Mine Production Schedule 16-4
Table 16-3: Pinion Mine Production Schedule 16-5
Table 16-4: Total Project Mine Production Schedule 16-6
Table 16-5: Recovery of Recoverable Gold by Month 16-19
Table 16-6: Railroad-Pinion Process Production Schedule 16-20
Table 16-7: ROM Stockpile Balance 16-21
Table 16-8: HPGR Stockpile Balance 16-21
Table 16-9: Dark Star Toll Roasting Stockpile Balance 16-21
Table 16-10: Schedule Efficiency 16-22
Table 16-11: Mine Equipment Placed Into Service 16-23
Table 16-12: Personnel Requirements 16-25

SECTION 16 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 16-1: Dark Star Pit Design, Year -1 16-7
Figure 16-2: Dark Star Pit Design, Year 1 16-8

 

   

16-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

Figure 16-3: Dark Star Pit Design, Year 2 16-9
Figure 16-4: Dark Star Pit Design, Year 3 16-10
Figure 16-5: Dark Star Pit Design, Year 4 16-11
Figure 16-6: Dark Star Pit Design, Year 5 16-12
Figure 16-7: Pinion Pit Design, Year 3 16-13
Figure 16-8: Pinion Pit Design, Year 4 16-14
Figure 16-9: Pinion Pit Design, Year 5 16-15
Figure 16-10: Pinion Pit Design, Year 6 16-16
Figure 16-11: Pinion Pit Design, Year 7 16-17
Figure 16-12: Pinion Pit Design, End of Mine Life 16-18

 

   

16-ii

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

16 MINING METHODS

The PFS for the Railroad-Pinion project includes mining at both the Dark Star and Pinion deposits. These are planned as open-pit, truck and shovel operations. The truck and shovel method provides reasonable costs and selectivity for these deposits.

The methodology used for mine planning to define the economics for the PFS includes:

  • Define assumptions for the economic parameters;

  • Define geometric parameters and constraints;

  • Run pit optimizations;

  • Define road and ramp parameters;

  • Create pit designs;

  • Create dump designs;

  • Produce mine and process production schedules;

  • Define personnel and equipment requirements;

  • Estimate mining costs; and

  • Perform an economic analysis.

Parameters, pit optimizations, and pit designs are discussed in Section 15.

16.1 WASTE ROCK STORAGE AREAS

Waste storage facility (“WSF”) designs were created for the PFS to contain mined material that is not processed. MDA has defined NAG and PAG waste, and coded it into the mineral resource block models, based on definitions provided by Stantec. PAG waste material has been handled separately to avoid storage issues with potential acid drainage. A 1.3 swell factor was assumed which provides for both swell when mined and compaction when placed into the facility. The total requirements for containment of waste and leach material are shown in Table 16-1.

   

16-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 16-1: Waste Containment Requirements (Thousands, Cubic Meters)

Dark Star PAG NAG UnKnown Total
Phase 1 9,117 2,017 - 11,134
Phase 2 4,689 136 1 4,827
Phase 3 17,961 5,587 0 23,548
Phase 4 5,110 62 4 5,176
Total 36,877 7,802 6 44,685
Pinion
Phase 1 1,054 4,395 112 5,560
Phase 2 6,845 6,570 3 13,418
Phase 3 7,862 6,085 181 14,128
Total Pinion 15,761 17,050 296 33,106
Total Project
Dark Star 36,877 7,802 6 44,685
Pinion 15,761 17,050 296 33,106
Total 52,638 24,851 302 77,791

WSF designs were completed for both Dark Star and Pinion. There is sufficient capacity for the required waste storage.

For Dark Star, it is assumed that two waste WSF’s will be constructed, one on the east side and one on the west side of the deposit. These are shown in Figure 15-5 along with the ultimate pit designs. Pinion will have a single exterior WSF and will also incorporate some minimal storage as backfill in Phase 1 and Phase 2. The WSF designs for Pinion is shown in Figure 15-7 along with the Pinion ultimate pit.

For production scheduling each WSF design was sequenced in order to reduce initial haulage requirements. The Dark Star West WSF was sequenced into two phases. The first phase will be placed in a single lift, dumping from the 2015m elevation with a maximum height of 38m. This allows for a flat haulage profile from the pit exits to the WSF. Once placed, concurrent reclamation of the dumping face can be completed.

The Dark Star East WSF will be placed in 5 different phases. The first phase is dumped in from the 2030m elevation and establishes a 30m high dump phase with a toe elevation of 2000m. The second phase is to be placed from the 2000m toe of Phase 1 and establishes another 30m high lift that has a toe elevation of 1970m. Phase 3 dumping takes place from the upper level and dumps onto the 2000m elevation of Phase 2. Phase 4 finishes off the lower and northern portions of the WSF from the 2030m elevation to the toe at the 1940m elevation. This will be placed in 30m high lifts from the bottom up. Phase 5 WSF completes the design in 15m high lifts to the 2075m elevation.

The Pinion WSF was sequenced using 4 Phases in a similar manner to how Dark Star East will be done. Phase 1 of the Pinion WSF is to be placed in a single 60m high lift starting from the pit exits. The upper elevation forms a ramp down from Pinion Phase 1 pit to the 2135m elevation. Phase 2 utilizes a ramp placed in Phase 1 to reach the toe elevation of 2075m from which Phase 2 is dumped in to complete the lower base of the Pinion WSF. Phase 3 completes construction of the WSF to the 2135m elevation and the final WSF construction occurs with Phase 4 dumping material on top of Phase 3.

   

16-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

16.2 STOCKPILES

Stockpiles of lower-grade HPGR material will be utilized to ensure that higher-grade material is processed first. The stockpiles will be maintained near the crusher. It is expected that a smaller portion of the stockpile will be utilized as a location for trucks to dump material when the crusher becomes temporarily unavailable.

All ROM material will be dumped in place directly on the ROM leach pad.

16.3 MINE-PRODUCTION SCHEDULE

Production scheduling was completed using Geovia’s MineSched™ (version 9.1) software. Proven and Probable mineral reserves were scheduled to process facilities or stockpiles, while waste material was scheduled to WSF’s or backfill locations.

The production schedule considers the processing of material by ROM, HPGR, and toll processing. Monthly periods were used to create the production schedule with pre-stripping starting in Dark Star at month -8. Start of ROM processing is assumed to be month 1. The maximum rate for ROM processing will be 22,500 tonnes per day or 8,212,500 tonnes per year on a 365-day basis. This represents the maximum assumed rate that material can be sprayed and processed, which would include both ROM and HPGR material. Note that the maximum spray capacity is only met in the second year. In other years, the maximum spray capacity is not met mostly due to the lack of available ROM material mined.

There is some material shown as being in a leach stockpile. The maximum stockpile is shown as 1,121,000 tonnes in the pre-production year, 441,000 tonnes in Year 1 and 48,000 tonnes at the end of Year 2. These tonnages are assumed to be placed directly on the leach pad and represent more material than there is spray capacity. Preproduction tonnage represents preloading of the leach pad prior to start of processing. A fair amount of this material would likely be crushed for over-liner material as part of the construction of the leach pad. The Year 2 and 3 material would be ROM material placed above the overall capacity and would represent material waiting to be sprayed and processed. It is assumed that there will be space on the leach pad area where this material can be placed prior to spraying. This will be detailed in a subsequent feasibility study in the form of a stacking and spraying plan.

HPGR processing is started in month 37, or nearly 3 years after the start of ROM processing. The delayed start of HPGR processing is primarily due to the higher cutoff grades associated with Dark Star HPGR material and the desire to process more ROM material in the initial years and delay the capital investment required for HPGR. The cutoff grade is higher due to good recoveries from ROM material, especially in Dark Star North. Thus, the amount of HPGR material is minimal during initial mining. A little over 12,000,000 tonnes of potential HPGR material from Dark Star is to be processed as ROM material prior to starting the HPGR process.

The maximum HPGR process rate is targeted at 10,000 tonnes per day or 3,650,000 tonnes per year on a 365-day per year basis. A material stockpile is planned to store some initial HPGR material before the process is started, and then through the mine life. The maximum size of the stockpile is 1,083,000 tonnes on a yearly basis.

The toll processing rate is limited to 500 tonnes per day as the amount to be hauled on the highways to another facility with a roaster. Only Dark Star sulfide material above 1.17 g Au/t would be toll processed and the material would be stockpiled on site near Dark Star prior to being loaded in a contractor’s over-the-road haul truck. Toll processing occurs from Year 2 through Year 5.

The total Dark Star mining rate would ramp up from 20,000 tonnes per day to about 60,000 tonnes per day over a period of 5 months during preproduction. A maximum of 120,000 tonnes per day is used in the production schedule during the deeper portions of North Dark Star. The maximum mining rate required in Pinion is 80,000 tonnes per day.

   

16-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The mining production for Dark Star and Pinion is summarized yearly in Table 16-2 and Table 16-3 respectively. Table 16-4 summarizes the yearly total mine production schedule. Figures showing yearly pit and WSF position maps are presented in Figure 16-1 through Figure 16-11.

Table 16-2: Dark Star Mine Production Schedule

    Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Total
Schedule Production Mine Star Dark Rom Mined K Tonnes 459 2,412 4,933 4,389 900 95 - - - - 13,188
  g Au/t 0.27 0.31 0.36 0.33 0.31 0.30 - - - - 0.33
  K Ozs Au 4 24 58 46 9 1 - - - - 142
  g Ag/t - - - - - - - - - - -
  K Ozs Ag - - - - - - - - - - -
Pit to HPGR StkPl K Tonnes 662 4,495 3,964 2,224 1,085 510 - - - - 12,941
  g Au/t 1.03 1.36 1.11 0.76 0.67 1.45 - - - - 1.11
  K Ozs Au 22 197 142 55 24 24 - - - - 463
  g Ag/t - - - - - - - - - - -
  K Ozs Ag - - - - - - - - - - -
Pit to HPGR StkPl K Tonnes - - - - 1,892 916 - - - - 2,808
  g Au/t - - - - 2.75 2.67 - - - - 2.72
  K Ozs Au - - - - 167 79 - - - - 246
  g Ag/t - - - - - - - - - - -
  K Ozs Ag - - - - - - - - - - -
Total HPGR K Tonnes 662 4,495 3,964 2,224 2,977 1,426 - - - - 15,749
  g Au/t 1.03 1.36 1.11 0.76 1.99 2.24 - - - - 1.40
  K Ozs Au 22 197 142 55 191 103 - - - - 709
  g Ag/t - - - - - - - - - - -
  K Ozs Ag - - - - - - - - - - -
Pit to Su StkPl K Tonnes - 36 13 11 182 130 - - - - 373
  g Au/t - 1.52 1.59 1.81 2.83 3.03 - - - - 2.70
  K Ozs Au - 2 1 1 17 13 - - - - 32
  g Ag/t - - - - - - - - - - -
  K Ozs Ag - - - - - - - - - - -
Total Mined K Tonnes 1,121 6,944 8,910 6,624 4,059 1,652 - - - - 29,311
Above COG g Au/t 0.72 1.00 0.70 0.48 1.66 2.19 - - - - 0.94
  K Ozs Au 26 223 200 101 216 116 - - - - 883
  g Ag/t - - - - - - - - - - -
  K Ozs Ag - - - - - - - - - - -
PAG to Dumps K Tonnes 7,718 12,204 17,610 24,681 4,849 523 - - - - 67,586
NAG to Dumps K Tonnes 1,923 1,832 1,820 7,818 891 101 - - - - 14,384
Un to Dumps K Tonnes - - 10 1 - - - - - - 10
Total to Dumps K Tonnes 9,641 14,036 19,440 32,500 5,740 624 - - - - 81,981
Total Mined K Tonnes 10,762 20,980 28,350 39,124 9,799 2,276 - - - - 111,292
Strip Ratio K Tonnes 8.60 2.02 2.18 4.91 1.41 0.38         2.80

 

   

16-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 16-3: Pinion Mine Production Schedule

    Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Total
Schedule Production Mine Pinion Rom Mined K Tonnes - - - 19 790 1,479 593 1,310 945 - 5,136
  g Au/t - - - 0.77 0.34 0.43 0.36 0.29 0.33 - 0.36
  K Ozs Au - - - 0 9 20 7 12 10 - 59
  g Ag/t - - - 1.15 2.13 2.52 3.06 3.05 2.54 - 2.66
  K Ozs Ag - - - 1 54 120 58 129 77 - 439
Pit to HPGR StkPl K Tonnes - - - 5 751 973 644 1,492 899 - 4,764
  g Au/t - - - 0.52 0.66 0.54 0.41 0.40 0.39 - 0.47
  K Ozs Au - - - 0 16 17 8 19 11 - 72
  g Ag/t - - - 0.91 4.22 5.63 4.48 4.35 3.44 - 4.43
  K Ozs Ag - - - 0 102 176 93 209 100 - 679
Pit to HPGR StkPl K Tonnes - - - - 720 1,954 2,017 2,055 1,241 - 7,988
  g Au/t - - - - 0.94 0.98 0.88 0.82 0.97 - 0.91
  K Ozs Au - - - - 22 61 57 54 39 - 233
  g Ag/t - - - - 5.20 6.49 6.26 6.86 5.03 - 6.18
  K Ozs Ag - - - - 120 408 406 453 200 - 1,588
Total HPGR K Tonnes - - - 5 1,471 2,927 2,661 3,547 2,140 - 12,752
  g Au/t - - - 0.52 0.80 0.83 0.77 0.64 0.72 - 0.74
  K Ozs Au - - - 0 38 78 66 73 50 - 305
  g Ag/t - - - 0.91 4.70 6.20 5.83 5.80 4.36 - 5.53
  K Ozs Ag - - - 0 222 584 499 662 300 - 2,267
Pit to Su StkPl K Tonnes - - - - - - - - - - -
  g Au/t - - - - - - - - - - -
  K Ozs Au - - - - - - - - - - -
  g Ag/t - - - - - - - - - - -
  K Ozs Ag - - - - - - - - - - -
Total Mined K Tonnes - - - 24 2,261 4,406 3,254 4,858 3,084 - 17,887
Above COG g Au/t - - - 0.72 0.64 0.70 0.69 0.55 0.60 - 0.63
  K Ozs Au - - - 1 47 99 72 86 60 - 364
  g Ag/t - - - 1.10 3.80 4.97 5.32 5.06 3.80 - 4.70
  K Ozs Ag - - - 1 276 704 557 790 377 - 2,705
PAG to Dumps K Tonnes - - - 1,335 6,121 7,156 13,268 1,704 108 - 29,693
NAG to Dumps K Tonnes - - - 1,834 7,473 8,051 6,837 6,678 1,857 - 32,730
Un to Dumps K Tonnes - - - 25 185 12 70 262 4 - 558
Total to Dumps K Tonnes - - - 3,194 13,779 15,218 20,176 8,644 1,969 - 62,981
Total Mined K Tonnes - - - 3,218 16,040 19,624 23,430 13,502 5,053 - 80,869
Strip Ratio K Tonnes       131.37 6.09 3.45 6.20 1.78 0.64   3.52

 

   

16-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 16-4: Total Project Mine Production Schedule

    Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Total
Schedule Production Mine Project Railroad South Total Rom Mined K Tonnes 459 2,412 4,933 4,408 1,690 1,574 593 1,310 945 - 18,324
  g Au/t 0.27 0.31 0.36 0.33 0.33 0.42 0.36 0.29 0.33 - 0.34
  K Ozs Au 4 24 58 46 18 21 7 12 10 - 200
  g Ag/t - - - 0.01 1.00 2.37 3.06 3.05 2.54 - 0.74
  K Ozs Ag - - - 1 54 120 58 129 77 - 439
Pit to HPGR StkPl K Tonnes 662 4,495 3,964 2,229 1,836 1,482 644 1,492 899 - 17,705
  g Au/t 1.03 1.36 1.11 0.76 0.67 0.85 0.41 0.40 0.39 - 0.94
  K Ozs Au 22 197 142 55 40 41 8 19 11 - 535
  g Ag/t - - - 0.00 1.72 3.69 4.48 4.35 3.44 - 1.19
  K Ozs Ag - - - 0 102 176 93 209 100 - 679
Pit to HPGR StkPl K Tonnes - - - - 2,612 2,871 2,017 2,055 1,241 - 10,796
  g Au/t - - - - 2.25 1.52 0.88 0.82 0.97 - 1.38
  K Ozs Au - - - - 189 140 57 54 39 - 479
  g Ag/t - - - - 1.43 4.42 6.26 6.86 5.03 - 4.57
  K Ozs Ag - - - - 120 408 406 453 200 - 1,588
Total HPGR K Tonnes 662 4,495 3,964 2,229 4,448 4,353 2,661 3,547 2,140 - 28,501
  g Au/t 1.03 1.36 1.11 0.76 1.60 1.29 0.77 0.64 0.72 - 1.11
  K Ozs Au 22 197 142 55 228 181 66 73 50 - 1,014
  g Ag/t - - - 0.00 1.55 4.17 5.83 5.80 4.36 - 2.47
  K Ozs Ag - - - 0 222 584 499 662 300 - 2,267
Pit to Su StkPl K Tonnes - 36 13 11 182 130 - - - - 373
  g Au/t - 1.52 1.59 1.81 2.83 3.03 - - - - 2.70
  K Ozs Au - 2 1 1 17 13 - - - - 32
  g Ag/t - - - - - - - - - - -
  K Ozs Ag - - - - - - - - - - -
Total Mined K Tonnes 1,121 6,944 8,910 6,649 6,320 6,058 3,254 4,858 3,084 - 47,198
Above COG g Au/t 0.72 1.00 0.70 0.48 1.29 1.10 0.69 0.55 0.60 - 0.82
  K Ozs Au 26 223 200 102 263 215 72 86 60 - 1,246
  g Ag/t - - - 0.00 1.36 3.61 5.32 5.06 3.80 - 1.78
  K Ozs Ag - - - 1 276 704 557 790 377 - 2,705
PAG to Dumps K Tonnes 7,718 12,204 17,610 26,017 10,970 7,679 13,268 1,704 108 - 97,279
NAG to Dumps K Tonnes 1,923 1,832 1,820 9,651 8,364 8,151 6,837 6,678 1,857 - 47,114
Un to Dumps K Tonnes - - 10 25 185 12 70 262 4 - 569
Total to Dumps K Tonnes 9,641 14,036 19,440 35,693 19,520 15,842 20,176 8,644 1,969 - 144,962
Total Mined K Tonnes 10,762 20,980 28,350 42,342 25,840 21,900 23,430 13,502 5,053 - 192,160
Strip Ratio K Tonnes 8.60 2.02 2.18 5.37 3.09 2.62 6.20 1.78 0.64   3.07

 

   

16-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 16-1: Dark Star Pit Design, Year -1

   

16-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 16-2: Dark Star Pit Design, Year 1

   

16-8

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 16-3: Dark Star Pit Design, Year 2

   

16-9

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 16-4: Dark Star Pit Design, Year 3

   

16-10

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 16-5: Dark Star Pit Design, Year 4

   

16-11

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 16-6: Dark Star Pit Design, Year 5

   

16-12

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 16-7: Pinion Pit Design, Year 3

   

16-13

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 16-8: Pinion Pit Design, Year 4

   

16-14

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 16-9: Pinion Pit Design, Year 5

   

16-15

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 16-10: Pinion Pit Design, Year 6

   

16-16

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 16-11: Pinion Pit Design, Year 7

   

16-17

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 16-12: Pinion Pit Design, End of Mine Life

   

16-18

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The process production schedule was created by MDA based on the mine production schedule and using recoveries and lag times estimated by Mr. Simmons. The recoveries are used to estimate recoverable gold. The lag time was generated by estimating the recovery of the recoverable ounces on a month by month basis after placement of material. Table 16-5 shows the assumed rate of recovery of the recoverable ounces by month for ROM, HPGR, crush and agglomeration, and toll roasting. In each case the recovery of gold is 0% for the month placed. This allows material to be placed, ripped as required, and then start leach spraying. The month after placement generally sees the most gold production with the exception of toll milling. ROM recovery is assumed to take place between the month after placement through the 31st month after placement. HPGR gold is anticipated to be recovered more quickly through a 13-month period. Toll processing is assumed to be paid to account during the third month after mining. This allows time for settlement of payments.

Table 16-5: Recovery of Recoverable Gold by Month

  ROM HPGR Toll Roasting
Mth Placed 0.0% 0.0% 0%
Mth 1 46.9% 67.5% 0%
Mth 2 2.5% 8.4% 100%
Mth 3 1.9% 4.8% 0%
Mth 4 1.9% 3.5%  
Mth 5 1.9% 2.7%  
Mth 6 1.9% 2.1%  
Mth 7 1.9% 1.9%  
Mth 8 1.9% 1.6%  
Mth 9 1.9% 1.4%  
Mth 10 1.9% 1.3%  
Mth 11 1.9% 1.3%  
Mth 12 1.9% 1.3%  
Mth 13 1.7% 1.3%  
Mth 14 1.7% 0.9%  
Mth 15 1.7%    
Mth 16 1.7%    
Mth 17 1.7%    
Mth 18 1.7%    
Mth 19 1.7%    
Mth 20 1.7%    
Mth 21 1.7%    
Mth 22 1.7%    
Mth 23 1.7%    
Mth 24 1.7%    
Mth 25 1.7%    
Mth 26 1.7%    
Mth 27 1.7%    
Mth 28 1.7%    
Mth 29 1.7%    
Mth 30 1.4%    
Mth 31 1.3%    
Total 100.0% 100.0% 100.0%

Table 16-6 shows the yearly process production summary by process type. The rows labeled “K Au Rec” shows the thousands of recoverable ounces of gold and the rows labeled “K Au Prod” are the thousands of ounces of gold

   

16-19

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

produced. MDA has put together the gold production plan, but ultimately the metallurgical and processing consultants are responsible for the final production numbers, which may differ from what is in the cash-flow model.

The PFS total LOM gold production is estimated to be 923,000 ounces with a LOM average recovery of 74%. From Pinion a total of 1,061,000 ounces of silver is recovered with an overall LOM recovery of 39%.

Table 16-6: Railroad-Pinion Process Production Schedule

  Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10 Total
Total ROM K Tonnes - 7,618 8,213 7,728 2,540 1,746 593 1,310 945 - - 30,691
  g Au/t - 0.98 0.71 0.49 0.40 0.44 0.36 0.29 0.33 - - 0.64
  K Ozs Au - 240 187 121 33 25 7 12 10 - - 634
  K Au Rec - 180 137 83 22 16 4 7 6 - - 455
  K Au Prod - 84 130 110 66 32 14 8 7 3 1 455
  g Ag/t - - - 0.00 0.66 2.14 3.06 3.05 2.54 - - 0.44
  K Ozs Ag - - - 1 54 120 58 129 77 - - 439
  K Ag Rec - - - 0 14 37 12 19 15 - - 96
  K Ag Prod - - - - 8 21 19 19 18 7 4 96
Total HPGR K Tonnes - - - - 3,052 3,650 3,650 3,642 2,140 - - 16,133
  g Au/t - - - - 2.04 1.49 0.69 0.64 0.72 - - 1.12
  K Ozs Au - - - - 200 174 81 75 50 - - 579
  K Au Rec - - - - 165 134 56 50 35 - - 440
  K Au Prod - - - - 117 162 66 49 43 3 - 440
  g Ag/t - - - - 1.60 4.00 5.66 5.78 4.36 - - 4.37
  K Ozs Ag - - - - 157 469 664 676 300 - - 2,267
  K Ag Rec - - - - 63 202 283 289 128 - - 965
  K Ag Prod - - - - 50 154 288 285 178 10 - 965
Dark Star Toll Process K Tonnes - - 23 38 171 141 - - - - - 373
  g Au/t - - 1.55 1.62 2.79 3.05 - - - - - 2.70
  K Ozs Au - - 1 2 15 14 - - - - - 32
  K Au Rec - - 1 2 13 12 - - - - - 28
  K Au Prod - - 0 2 11 15 - - - - - 28
  g Ag/t - - - - - - - - - - - -
  K Ozs Ag - - - - - - - - - - - -
  K Ag Rec - - - - - - - - - - - -
  K Ag Prod - - - - - - - - - - - -
Total Processed K Tonnes - 7,618 8,236 7,766 5,763 5,537 4,243 4,952 3,084 - - 47,198
  g Au/t - 0.98 0.71 0.49 1.34 1.20 0.64 0.55 0.60 - - 0.82
  K Ozs Au - 240 188 123 248 213 88 87 60 - - 1,246
  K Au Rec - 180 138 84 200 162 60 57 41 - - 923
  K Au Prod - 84 131 112 194 209 79 57 50 6 1 923
  g Ag/t - - - 0.00 1.14 3.31 5.29 5.06 3.80 - - 1.78
  K Ozs Ag - - - 1 212 589 722 805 377 - - 2,705
  K Ag Rec - - - 0 77 239 294 308 143 - - 1,061
  K Ag Prod - - - - 58 175 308 304 196 17 4 1,061

Table 16-7, Table 16-8, and Table 16-9 show the ROM, HPGR, and toll roasting stockpile balance sheets. As previously mentioned, the ROM stockpile is anticipated being placed on the pad and awaiting spray, so there would not be any physical stockpile or re-handle for the ROM material.

   

16-20

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 16-7: ROM Stockpile Balance

Total Leach Stockpiled Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9
Added to StkPl K Tonnes 1,121 3,462 2,830 67 - - - - - -
  g Au/t 0.72 1.61 1.33 0.40 - - - - - -
  K Ozs Au 26 179 121 1 - - - - - -
  g Ag/t - - - - - - - - - -
  K Ozs Ag - - - - - - - - - -
Removed from StkPl K Tonnes - 4,172 3,193 115 - - - - - -
  g Au/t - 1.47 1.24 0.37 - - - - - -
  K Ozs Au - 198 127 1 - - - - - -
  g Ag/t - - - - - - - - - -
  K Ozs Ag - - - - - - - - - -
StkPl Balance K Tonnes 1,121 411 48 - - - - - - -
  g Au/t 0.72 0.54 0.32 - - - - - - -
  K Ozs Au 26 7 1 - - - - - - -
  g Ag/t - - - - - - - - - -
  K Ozs Ag - - - - - - - - - -

Table 16-8: HPGR Stockpile Balance

Total HPGR Stockpiled Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9
Added to StkPl K Tonnes - - 1,047 1,571 955 1,311 65 0 0 -
  g Au/t - - 0.59 0.87 0.78 0.89 0.41 0.41 0.38 -
  K Ozs Au - - 20 44 24 37 1 0 0 -
  g Ag/t - - - 0.00 3.24 4.17 5.69 4.83 3.45 -
  K Ozs Ag - - - 0 99 176 12 0 0 -
Removed from StkPl K Tonnes - - - 2,614 408 779 1,054 94 0 -
  g Au/t - - - 0.75 0.80 1.37 0.47 0.42 - -
  K Ozs Au - - - 63 11 34 16 1 - -
  g Ag/t - - - - 2.65 2.43 5.01 7.24 - -
  K Ozs Ag - - - - 35 61 170 22 - -
StkPl Balance K Tonnes - - 1,047 5 551 1,083 94 - - -
  g Au/t - - 0.59 0.52 0.76 0.47 0.42 - - -
  K Ozs Au - - 20 0 13 16 1 - - -
  g Ag/t - - - 0.91 3.66 5.17 7.24 - - -
  K Ozs Ag - - - 0 65 180 22 - - -

Table 16-9: Dark Star Toll Roasting Stockpile Balance

Toll Ore Stockpile Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9
Added to StkPl K Tonnes - 15 67 280 11 0 - - - -
  g Au/t - 1.36 1.95 3.00 1.45 1.20 - - - -
  K Ozs Au - 1 4 27 1 0 - - - -
Removed from StkPl K Tonnes - - 23 91 175 83 - - - -
  g Au/t - - 1.72 2.70 2.80 2.76 - - - -
  K Ozs Au - - 1 8 16 7 - - - -
StkPl Balance K Tonnes - 15 58 246 82 - - - - -
  g Au/t - 1.36 1.89 2.85 2.76 - - - - -
  K Ozs Au - 1 4 23 7 - - - - -

16.4 EQUIPMENT SELECTION AND PRODUCTIVITIES

The PFS has assumed owner mining in order to keep the cost lower than it would be with contract mining, though the costs reflect a leasing option for primary mining equipment. The production schedule was used along with additional efficiency factors, cycle times, and productivity rates to develop the first principle hours required for primary mining

   

16-21

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

equipment to achieve the production schedule. Primary mining equipment includes: drills, loaders, hydraulic shovels, and 136-tonne (150-ton) capacity haul trucks.

The mine is anticipated to operate 24 hours per day utilizing four crews of workers, each working four days on and four days off. It is anticipated that these crews would rotate between day shift and night shift. The daily shift schedule would be 12 hours per day, reduced to account for standby time including startup/shutdown, lunch, breaks, and operational delays totaling 3.0 hours per day. This allows for 21 work hours in each day or an 87.5% schedule efficiency. The estimated schedule efficiency is shown in Table 16-10.

Table 16-10: Schedule Efficiency

  Units Value
Shifts per Day shift/day 2
Hours per Shift hr/shift 12
Theoretical Hours per Day hrs/day 24
Shift Startup / Shutdown hrs/shift 0.5
Lunch hrs/shift 0.5
Breaks hrs/shift 0.25
Operational Standby hrs/shift 0.25
Total Standby / shift hrs/shift 1.50
Total Standby / day hrs/day 3.00
Available Work Hours hrs/day 21.00
Schedule Efficiency % 87.5%

16.5 EQUIPMENT REQUIREMENTS

Mine equipment is planned to be put into service over a period of four years (pre-production through Year 3). This equipment is to be used through the LOM. Table 16-11 shows the yearly schedule for mining equipment to be put into service.

In order to reduce capital requirements, the equipment is assumed to be acquired through a combination of leasing for most production and support equipment, rentals for pioneering drills and peak demands for haul trucks, and purchase of some other equipment.

   

16-22

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 16-11: Mine Equipment Placed Into Service

Primary Mining Equipment Units Pre-Prod Yr 1 Yr 2 Yr 3 Total
Pioneer Drill # 1 - - 1 2
Production Drill # 2 1 1 - 4
26-yrd Loader # - 1 - - 1
PC4000 - 23 cu m Hyd. Shovel # 2 - - - 2
HD1500 - 136-tonne Haul Trucks # 7 2 3 5 17
Support Equipment            
430 Kw Dozer (D375A-8) # 2 - - - 2
300 Kw Dozer (D9) # 1 - - - 1
230 Kw Dozer (D8) # 1 - - - 1
16' Motor Grader (14M) # 2 - - - 2
Water Truck - 20,000 Gallon # 2 - - - 2
Pit Pumps (5299 lpm) # 2 - - - 2
50 ton Crane # 1 - - - 1
Flatbed # 2 - - - 2
Blasting            
Explosives Truck # 1 - - - 1
Skid Loader # 1 - - - 1
Mine Maintenance            
Lube/Fuel Truck # 1 - - - 1
Mechanics Truck # 2 - - - 2
Tire Truck # 2 - - - 2

16.5.1 Drilling Equipment

Pioneer drills would be smaller air-track drills with contained cabs and the production drills are anticipated to be 45,000lb-pulldown, track-mounted, rotary blast-hole drills. An 83% efficiency factor was used for pioneer drilling and 85% efficiency was used for production and controlled blast hole drilling. Penetration rates of 31.6, 31.6, 33.1, and 36.5 meters per hour were used along with 2.8, 2.8, 2.8, and 3.0 minutes per hole of non-drilling times for waste production, ore production, trim-rows, and pioneer drilling, respectively.

Based on the parameters used, only one pioneer drill would be required during startup of Dark Star and another at the startup of Pinion. Due to the short duration of the pioneer requirements these drills are assumed to be rented during the periods they are needed. Four production drills are estimated to be needed. It is assumed that these drills will last through the LOM with an availability that is assumed to be 85% for the life of the drill.

Drilling patterns were adjusted by material. The adjustments were made based on studies by Barr Engineering (“Barr”) (2019) to create a nominal size distribution with a P80 of 152mm (6”) minus. Based on that work, blast patterns where ore is anticipated are estimated to use 5.2m spacing and 4.5m burden with 1.52m sub drill. With 196mm diameter drill holes and stemming of 3m, this results in a powder factor of 0.368 kg of explosive per tonne of material blasted. This was determined to be beneficial for gold recovery.

Waste patterns are assumed to have 6.1m hole spacing and burden and 0.213 kg of explosive per tonne of material blasted. Since waste is not processed the additional breakage in the patterns is not needed. The increase spacing and

   

16-23

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

burden and the decrease in powder factors for the shot patterns reduces the overall cost of drilling and blasting while remaining reasonable for material handling with shovels, loaders, and trucks.

During pioneering operations at the start of each deposit, smaller drills will be used due to uneven terrain. At the start of Dark Star mining it is assumed that 50% of blasting will be done as pioneering for the first two months. At the start of Pinion, 10% of the blasting for the first two months is assumed to be done with pioneer drilling.

Trim row shot patterns are to be used with lower powder factors and tighter spacing of drill holes near pit high walls to minimize damage to the walls. The PFS assumes that 5% of the waste blasted will be in the form of trim row blasting. Trim row patterns are to be drilled using the production drills.

16.5.2 Loading Equipment

Loading equipment is anticipated to include one 21.5 cubic yard type loader and two 22.2 cubic yard type hydraulic shovels. The theoretical productivity for the loader was estimated to be 2,237 tonnes per hour or 1,860 tonnes per hour after an operating efficiency of 83%. The loader is primarily used for back-up mining production and re-handle of material from stockpiles. The assumed availability starts at 90% and is reduced 1% per year until it reaches 85%, and then is held constant through the life of the loader. No replacement loaders were assumed. The overall use of available hours is 36%.

Two hydraulic shovels will be used as the primary loading tool. The initial shovel starts operating in month -8 and the second shovel starts working in month -4. The theoretical productivity was estimated to be 3,132 tonnes per hour or 2,600 tonnes per hour after applying 83% efficiency. As with the loader, the assumed availability starts at 90% and declines at 1% per year to a low of 85% and then remains the same through the LOM. The overall use of operating hours is 65%.

16.5.3 Haulage Productivity

Haul trucks are assumed to be 136-tonne capacity, rigid frame trucks. Haulage profiles were used inside of MineSched based on effective haulage gradients for empty and full routes. A rolling resistance of 3% was also used for the haulage speed calculations. In addition, bench haulage strings were created which depict the planned haulage routes on each bench where mining occurs.

Hydraulic shovel loading time of 2.67 minutes was used, plus 0.5 minutes and a spot and dump time of 1.5 minutes was added. Loading time was adjusted in spreadsheets to 3.73 minutes plus 0.50 minutes for spotting at the loader for trucks that would be loaded using a loader.

A capacity of 131 tonnes per load was used as dry tonnage to reflect the dry densities in the mineral resource block model. The number of trucks was calculated to increase over time due to farther haulage with some pit phases. A total of 17 haul trucks are put into service to maintain the production schedule. This assumes a 1% per year declining availability from 90% down to 85%.

Out of the 17 life of mine trucks, nine would be purchased through a lease option during preproduction through Year 1. Due to increased haulage requirements for the deeper mining in North Dark Star, the remaining eight would be rented from the third quarter of Year 2 through the first quarter of Year 4.

16.5.4 Support and Maintenance Equipment

Support equipment is used to maintain the roads, pits, and dumps to enable mining equipment to operate in an efficient manner. The maintenance equipment is used on site to maintain the mining equipment. The total number of equipment to be put into service on the site is shown in Table 16-11.

   

16-24

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

16.6 MINING PERSONNEL AND STAFFING

Table 16-12 shows the estimated personnel requirements. This is based on the number of people that will be required to operate, supervise, maintain, and plan for operations to achieve the production schedule.

Table 16-12: Personnel Requirements

Mining General Personnel Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Max
Mine Superintendent # 1 1 1 1 1 1 1 1 1 - 1
Mine General Foreman # 1 1 1 1 1 1 1 1 1 - 1
Mine Foremen # 4 4 4 4 4 4 4 4 4 - 4
Chief Mine Engineer # 1 1 1 1 1 1 1 1 1 - 1
Mine Engineer # 2 2 2 2 2 2 2 2 2 - 2
Chief Surveyor # 1 1 1 1 1 1 1 1 1 - 1
Surveyor # 2 2 2 2 2 2 2 2 2 - 2
Chief Geologist # 1 1 1 1 1 1 1 1 1 - 1
Ore Control Geologist # 1 1 1 1 1 1 1 1 1 - 1
Samplers # 2 2 2 2 2 2 2 2 2 - 2
Total Mine General # 16 16 16 16 16 16 16 16 16 - 16
Mine Operations Hourly Personnel                        
Operators                        
Blasters # 2 2 2 2 2 2 2 2 2 - 2
Blaster's Helpers # 2 2 2 2 2 2 2 2 2 - 2
Drill Operators # 8 12 16 24 16 12 12 12 8 - 24
Loader Operators # 8 12 12 12 12 12 12 12 6 - 12
Haul Truck Operators # 28 36 48 68 56 36 32 32 16 - 68
Support Equipment Operators # 19 19 19 19 19 19 19 19 19 - 19
General Mine Labors # - - - - - - - - - - -
Total Operators # 67 83 99 127 107 83 79 79 53 - 127
Mechanics                        
Mechanics - Drilling # 4 6 8 12 8 6 6 6 4 - 12
Mechanics - Loading # 4 6 6 6 6 6 6 6 3 - 6
Mechanics - Haulage # 14 18 24 34 28 18 16 16 8 - 34
Mechanics - Support # 10 10 10 10 10 10 10 10 10 - 10
Total Mechanics # 32 40 48 62 52 40 38 38 25 - 62
Maintenance                        
Maintenance Superintendent # 1 1 1 1 1 1 1 1 1 - 1
Maintenance Foreman # 4 4 4 4 4 4 4 4 4 - 4
Maintenance Planners # 2 2 2 2 2 2 2 2 2 - 2
Light Vehicle Mechanic # 2 2 2 2 2 2 2 2 2 - 2
Welder # 4 4 4 4 4 4 4 4 4 - 4
Servicemen # 4 4 4 4 4 4 4 4 4 - 4
Tireman # 2 2 2 2 2 2 2 2 2 - 2
Maintenance Labor # 4 4 4 4 4 4 4 4 4 - 4
Total Maintenance # 23 23 23 23 23 23 23 23 23 - 23
Total Personnel - Mining Personnel # 138 162 186 228 198 162 156 156 117 - 228

 

   

16-25

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 17 TABLE OF CONTENTS

SECTION     PAGE
17 RECOVERY METHODS 17-1
  17.1 GOLD RECOVERY 17-1
  17.2 REAGENTS AND CONSUMPTIONS 17-1
    17.2.1 Sodium Cyanide 17-1
    17.2.2 Lime 17-2
    17.2.3 Cement 17-2
    17.2.4 Activated Carbon 17-2
    17.2.5 Sodium Hydroxide (Caustic) 17-2
    17.2.6 Hydrochloric Acid 17-2
    17.2.7 Fluxes 17-2
    17.2.8 Antiscalant 17-3
  17.3 PROCESS FLOWSHEET 17-3
  17.4 ROM TRUCK STACKING 17-5
  17.5 CRUSHING 17-5
  17.6 AGGLOMERATION AND CONVEYOR STACKING 17-7
  17.7 LEACHING AND SOLUTION HANDLING 17-8
  17.8 LEACH PAD PHASING AND CONSTRUCTION 17-8
    17.8.1 Solution Ponds 17-9
  17.9 ADR PLANT 17-10
    17.9.1 Adsorption 17-12
    17.9.2 Carbon Acid Wash 17-12
    17.9.3 Desorption 17-12
    17.9.4 Electrowinning 17-13
    17.9.5 Carbon Handling & Thermal Regeneration 17-14
    17.9.6 Refining & Smelting 17-14
  17.10 ADR REAGENTS AND UTILITIES 17-15
  17.11 LABORATORY FACILITIES 17-15

 

   

17-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 17 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 17-1: Process Flowsheet for the Pinion-Dark Star Project 17-4
Figure 17-2: Crushing General Arrangement 17-6
Figure 17-3: ADR Recovery Plant General Arrangement 17-11

 

   

17-ii

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

17 RECOVERY METHODS

The process selected for recovery of gold and silver from the Pinion and Dark Star ore is a conventional heap-leach recovery circuit. The ore will be mined by standard open pit mining methods from two separate pits. Lower-grade Pinion and Dark Star ore will be truck-stacked on the heap as ROM ore directly, without crushing. Higher grade Pinion and Dark Star (low clay) material will be processed in a three-stage crushing circuit with a high-pressure grinding roll (HPGR), treated with cement and agglomerated, then conveyor-stacked onto heap leach pads.

Oxide and transition material types will be leached with a dilute cyanide solution, and the leached gold and silver will be recovered from solution using a carbon adsorption circuit. The gold and silver will be stripped from carbon using a desorption process, followed by electrowinning to produce a precipitate sludge. The precipitate sludge will be processed using a retort oven for drying and mercury recovery, and then refined in a melting furnace to produce gold and silver doré bars.

The Pinion and Dark Star deposits have a total estimated mineral reserve of 47.3 million tonnes. Based on material grades within the Pinion and Dark Star mineral reserves, 24.3 million tonnes will be selected for ROM processing and 28.5 million tonnes will be selected for HPGR crushing. The total estimated mine life is 8 years. The nominal processing rate through the crushing circuit is 10,000 tonnes per day, and the design ROM processing rate (for the leaching and adsorption design basis) is 12,500 tonnes per day.

17.1 GOLD RECOVERY

The gold and silver recoveries for heap leaching of the Pinion and Dark Star ore have been taken from the recommendations detailed in Section 13 of this Technical Report.

For the Pinion and Dark Star mineral resources, the overall life-of-mine average gold recovery for the lower grade ROM ore is estimated at 69 percent. The overall life-of-mine average gold recovery for heap leaching of HPGR-crushed material is estimated at 77 percent.

For the Pinion and Dark Star mineral resources, the overall life-of-mine average gold recovery for the lower grade ROM ore is estimated at 69 percent. The overall life-of-mine average gold recovery for heap leaching of HPGR-crushed material is estimated at 77 percent.

17.2 REAGENTS AND CONSUMPTIONS

The major reagent consumptions for heap leaching of Pinion and Dark Star ore have been taken from available metallurgical test results from column leach tests on crushed material. No test data exists at the ROM particle size, so the selected reagent consumptions have been estimated based on test results on the coarsest samples tests, - 37 mm.

17.2.1 Sodium Cyanide

Sodium cyanide (NaCN) will be used in the leaching process and will be delivered in tanker trucks as a liquid at 30% concentration by weight (1.15 SG). Sodium cyanide will be stored in a 98 m3 steel tank at the ADR area within concrete containment and will be distributed by metering pumps to points of use.

All cyanide distribution lines will be double-containment, either by “pipe-within-pipe” or “pipe-over-liner” containment systems. Cyanide consumptions have been estimated as follows:

  • Pinion ROM - 0.22 kg/tonne ore

  • Dark Star ROM - 0.23 kg/tonne ore

  • Pinion HPGR Crushed - 0.22 kg/tonne ore

   

17-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT
  • Dark Star HPGR Crushed - 0.25 kg/tonne ore

17.2.2 Lime

Pebble quicklime (CaO) will be used to treat the ROM and Pinion crushed ore prior to cyanide leaching to maintain the alkaline pH. Lime will be delivered in bulk by 20-ton trucks, which will be off-loaded pneumatically into an 85 tonne storage silo with a variable speed feeder that will meter lime directly onto the ore being carried by haul trucks to the heap leach pad and will be added in proportion to the tonnage of ore in each truck. A 5 tonne lime silo will be added with the crushing expansion to allow for convenient lime addition to haul trucks from either Pinion or Dark Star pits as well as a 50 tonne lime silo for lime addition to crushed Pinion ore.

Lime will be consumed at an estimated 1.0 kg/tonne ore for the Pinion and Dark Star ROM ore and 0.5 kg/tonne ore for Pinion crushed ore.

17.2.3 Cement

Portland Type II cement will be used to agglomerate the crushed ore prior to cyanide leaching to maintain the permeability and alkaline pH. Cement will be delivered in bulk by 20-ton trucks, which will be off-loaded pneumatically into two-200 tonne storage silos with variable speed feeders that will meter cement directly onto the conveyor belt which feeds the agglomeration drum in proportion to the tonnage of ore.

Cement will be consumed at an estimated 2.0 kg/tonne ore for the Pinion ore and 7.0 kg/tonne for the Dark Star ROM ore. Based on this dosage, the approximate maximum heap height is 60 m.

17.2.4 Activated Carbon

Activated carbon will be used to adsorb precious metals from the leach solution in the adsorption columns. Make-up carbon will be 6 x 12 mesh and will be delivered in 1,000 kg supersacks. It is estimated that approximately 4% of the carbon stripped will have to be replaced due to carbon fines losses.

17.2.5 Sodium Hydroxide (Caustic)

Sodium hydroxide (caustic) will be delivered to site as a liquid at 50% caustic by weight (1.53 s.g.). Liquid caustic will be stored in a 100 m3 steel tank and metered to the strip solution tank and acid wash circuits by a caustic metering pump. Caustic has been estimated to be consumed at 340 kg per strip.

17.2.6 Hydrochloric Acid

Hydrochloric acid (32%) will be used in the acid wash section of the elution circuit prior to desorption. Hydrochloric acid (32% by weight, 1.16 s.g.) will be delivered in 1 m3 tote bins. Acid washing consists of circulating a dilute acid solution through the bed of carbon to dissolve and remove scale from the carbon. Carbon acid washing will be done before each desorption cycle. Hydrochloric acid has been estimated to be consumed at 200 L/tonne carbon stripped.

   

17-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

17.2.7 Fluxes

Various fluxes will be used in the smelting process to remove impurities from the bullion in the form of a glass slag. The normal flux components are a mix of silica sand, borax, and sodium carbonate (soda ash). The flux mix composition is variable and will be adjusted to meet individual project smelting needs: fluorspar and/or potassium nitrate (niter) are sometimes added to the mix. Dry fluxes will be delivered in 50 lb bags. Average consumption of fluxes has been estimated to be 1.0 kg per kg of gold and silver produced.

17.2.8 Antiscalant

Antiscalant will be used to prevent the build-up of scale in the process solutions and heap irrigation lines. Antiscalant will be added directly into pipelines or tanks, and consumption will vary depending on the concentration of scale-forming species in the process stream. Delivery will be in liquid form in 1 m3 tote bins.

Antiscalant will be added directly from the supplier tote bins into the pregnant, barren, and desorption pumping systems using variable speed chemical-metering pumps. On average, antiscalant consumption is expected to be about 6 ppm for leach solutions and 10 ppm for strip solutions to be treated.

17.3 PROCESS FLOWSHEET

An overall process flowsheet for the project is presented in Figure 17-1.

   

17-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 17-1: Process Flowsheet for the Pinion-Dark Star Project

   

17-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

17.4 ROM TRUCK STACKING

Excavation, loading, hauling, and dumping of ROM material will be conducted by the mining fleet. ROM ore will be loaded into 100-tonne haul trucks and transported to the active stacking face at an average rate of 12,500 tonnes/day. ROM production and stacking will vary based on the low-grade ore availability from the mine pits.

Quicklime (CaO) will be used for pH control of the process with an estimated consumption of 1.0 kg/tonne for both Pinion and Dark Star based on metallurgical test work. Pebble quicklime will be stored in 85-tonne silos which will be equipped with a variable speed feed system that will feed a clam gate for lime addition to the trucks. Once the haul trucks have been loaded, the lime will be metered directly into the loaded trucks which will then deliver the ore to the active stacking area. One lime silo will be installed at the haul road for both the Pinion and Dark Star mine pits with the Pinion lime silo being purchased as part of the crushing addition. Lime will be added in proportion to the tonnage of ore being hauled.

The ore haul trucks will operate on top of the lift being constructed. A ramp, or ramps, will be constructed to reach the top of each current lift. The trucks will direct-dump the ore on the current lift and a dozer will push the ore over the edge of the lift to form the expanding heap. The stacked ore will be deep-shank cross-ripped with the dozer prior to leaching. Ore will be stacked in 9 m high lifts with a maximum ore heap height of 100 m.

Prior to stacking a new lift over the top of an old one, the top of the old lift will be cross-ripped to break up any cemented/compacted sections and to redistribute any fines that may have been stratified by the irrigation solution or rainfall.

Following stacking, the ore will be drip irrigated with dilute cyanide leach solution and the resulting gold-bearing solutions collected in the pregnant solution tank. The leach pad will be a multiple-lift, single-use type pad.

17.5 CRUSHING

High grade ore from the Pinion and Dark Star pits (approximately 34.2% of the total mineral reserves) will be crushed beginning in Year 4 of operations in a three-stage crushing circuit. Ore will be transported from the mine in surface haul trucks and dumped either directly into the crusher dump hopper, or at the crusher area stockpile where it will be reclaimed and fed to the crusher hopper by a loader. The dump hopper will be equipped with a static grizzly with 762 mm openings to prevent oversize rocks from being fed to the crushing circuit. Blending will be required for some ore types, especially for higher clay areas. The crushing plant will process an average of 10,000 tonnes of ore per day. A preliminary crushing general arrangement is presented in Figure 17-2.

   

17-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 17-2: Crushing General Arrangement

   

17-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Ore will be fed from the ROM dump hopper to a vibrating grizzly feeder via an apron feeder. The vibrating grizzly feeder will have parallel bars spaced 100 mm apart with grizzly oversize being fed to the primary jaw crusher and the grizzly undersize being recombined with the jaw crusher product on the primary crusher discharge conveyor. The primary jaw crusher will operate with a 102 mm discharge setting. The primary crusher discharge conveyor transfers primary crushed ore to the primary crushed ore stockpile feed conveyor. The primary crushed ore stockpile has a total capacity of 16,000 tonnes with a live capacity of 4,100 tonnes (approximately 9 hours of operation).

Ore from the primary crushed ore stockpile will be reclaimed by two each vibrating pan feeders onto a secondary screen feed conveyor. A tramp metal electromagnet and metal detector will be installed on the secondary screen feed conveyor to protect the secondary crushers. The secondary screening circuit includes a single double-deck vibrating screen with 76 mm and 50 mm top and bottom deck openings, respectively. Oversize material (+50 mm) will be transferred to the secondary feed conveyor by the screen oversize conveyor and undersize (-50 mm) will be transferred to the secondary product stockpile feed conveyor by the secondary screen undersize conveyor. Oversize material will be crushed by a secondary standard cone crusher which will operate with a 50 mm closed side setting and will discharge onto the secondary crusher product conveyor. The secondary crushing circuit will be operated in closed circuit with the secondary crusher product conveyor feeding the secondary screen feed conveyor; a splitter chute with a flop gate is positioned at the discharge of the secondary crusher product conveyor to bypass secondary cone product from the secondary screen and tertiary crusher circuit by feeding material directly to the tertiary crusher product stacking conveyor. Due to the high abrasiveness of the ore, a second standby cone crusher is included in the design to meet plant availability requirements.

The secondary screen undersize (secondary product) will be stockpiled by the secondary stockpile feed conveyor. The secondary product stockpile will have a total capacity of 16,000 tonnes with a live capacity of 4,100 tonnes. Ore from the secondary product stockpile will be reclaimed by two vibrating pan feeders each onto the HPGR feed conveyor. A tramp metal electromagnet and metal detector will be installed on the HPGR feed conveyor to protect the HPGR (high pressure grinding roll) crusher.

The tertiary crushing circuit will consist of an HPGR crusher with partial recycle. Ore will be fed to the HPGR feed bin which choke feeds the HPGR unit. Approximately 20% of the HPGR product is recycled back to the HPGR feed conveyor. Crushed product from the HPGR, 100% passing 14 mm, is stockpiled by the tertiary crusher product stacking conveyor.

Modular motor control centers will be located in containers near the primary, secondary, and tertiary crushing circuits. A PLC control unit will be located in a central control room which will control and monitor all crushing equipment, as well as monitor the conveyor stacking equipment. All of the conveyors will be interlocked so that if one conveyor trips out, all upstream conveyors and the vibrating grizzly feeder will also trip. This interlocking is designed to prevent large spills and equipment damage. Both of these features are considered necessary to meet the design utilization for the system.

Water sprays will be located at all material transfer points to reduce dust generation by the crushing circuit.

17.6 AGGLOMERATION AND CONVEYOR STACKING

The high-grade crushed product stockpile is sized to accommodate a total capacity of approximately 16,000 tonnes (live capacity of approximately 4,100 tonnes). Crushed ore will be reclaimed from the stockpile by two vibrating pan feeders to a reclaim conveyor in a tunnel below the stockpile. Portland Type II cement (cement) will be added to the reclaim tunnel conveyor at an average rate of 2 kg per tonne of ore for Pinion material and 7 kg/tonne of ore for Dark Star material from one of two 200-tonne silos, each equipped with a bin activator, variable speed rotary feeder, screw conveyor, and dust collector. Pebble lime from a 50-tonne silo will be metered at a rate of 0.5 kg/tonne ore for Pinion ore for additional pH control. The reclaim conveyor feeds a 3.6 x 10 m agglomeration drum where ore and cement are

   

17-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

mixed with process solution to form agglomerates. Agglomerated ore discharges the agglomeration drum onto a transfer conveyor which feeds the heap leach overland conveyor and conveyor stacking system.

The heap stacking system consists of an overland conveyor (864 mm x 470 m), 19 grasshopper transfer conveyors (864 mm x 35 m), nine ramp grasshopper conveyors (864 mm x 35 m), an index feed conveyor (864 mm x 24 m), horizontal index conveyor (864 mm x 35 m), and a radial stacker (864 mm x 37 m). The overland conveyor feeds material to the grasshopper conveyors in the active stacking zone, which transfer the material to the conveyor stacking system. The conveyor stacking system includes the index feed conveyor, horizontal index, and radial stacker conveyors. The horizontal index and radial stacker are able to retreat and stack ore onto the heap. The number of grasshopper conveyors required varies depending on the area of the heap being stacked with a maximum of 28 grasshopper conveyors being required.

Once an area has finished leaching and is sufficiently drained and dry a new lift can be stacked over the top of the old lift. The old lift will be cross-ripped prior to stacking new material on top of any old heap area or access road/ramp to break up any compacted or cemented sections.

Stacked lifts will progress in a stair-step manner. The maximum planned heap height for crushed and agglomerated ore is 60 m over the composite leach pad liner.

17.7 LEACHING AND SOLUTION HANDLING

After each leach cell has been stacked and dozer ripped, the irrigation system will be installed. Dripline emitters will be used to apply a dilute cyanide solution, at an application rate of 8 L/hr/m2 for both ROM and crushed material. A leach cycle of 100 days has been selected for ROM and 50 days for crushed material, based on a review of the leach curves.

Barren leach pH solution will be maintained at a minimum value of 10 and will be controlled by the addition of lime and cement. Barren solution will be delivered from a barren tank located at the recovery plant, by high-flow high-head pumps at the initial nominal flow rate of 650 m3/hr. In Year 1 the nominal flow rate to the heap will increase to 1,000 m3/hr. This solution will be carried by a steel pipeline to the base of the heap and then to a network of sub-headers and risers to the top of the heap where it is finally applied to the material by drip emitters.

Solution passing through the heap will dissolve the values contained therein and be collect in a network of perforated solution collection pipes, which feed to a common discharge point at the base of the heap. The solution will then be carried by gravity to a pregnant solution tank. Excess solution from the heap will overflow from the pregnant tank to a lined process pond. Pregnant solution is pumped from the pregnant tank to the adsorption carbon column circuit at the recovery plant.

The carbon adsorption circuit consists of a series of cascade-style columns. Pregnant solution flows through the columns to load the soluble gold onto the carbon. Barren solution exiting the columns is directed to the barren tank where make up cyanide is added, and the solution returned to the heap for further leaching. Overflow from the barren tank is directed to a barren/event pond.

17.8 LEACH PAD PHASING AND CONSTRUCTION

It is assumed the leach pad will be constructed in four phases with a fifth phase that involves no new construction or liner deployment but consists of post mining gold recovery for a period of up to 2 years. The estimated cumulative lined areas for Phase 1, Phase 2, Phase 3, and Phase 4 are approximately 376,000 m2, 558,000 m2, 740,000 m2, and 923,000 m2 respectively, and will contain approximately 47.3 million tonnes of material at the end of Phase 4 with some potential to expand the total tonnage of ore stacking.

   

17-8

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

For the initial the first year ROM ore will be stacked with trucks in nominal 9 m thick lifts across the entire eastern toe are of Phase 1 leach pad. Barren solution containing cyanide will be irrigated onto the ore using drip irrigation. Pregnant solution will be collected at the base of the heap by the leach pad liner and collection system, which will route the pregnant solution to the process plant for gold recovery and reagent reconditioning. At the end of Year 4, higher grade ore will be crushed and agglomerated and stacked on a dedicated section of the pad closest to the crusher using conveyor stacking system in 7 m thick lifts. The ROM and HPGR ores have different leach cycles and times, hence the need to segregate them on the leach pad. Once an area has been leached for the target time or metal recovery, the next lift will be placed on top of the already leached ore and the process repeated. This will be continued until the heap is stacked to the design elevation of 2100 m for the 47.3 Mt capacity. A limiting total depth for crushed and agglomerated ore is 60m. With the overall side slopes of the heap ore material limited to 3H:1V, the depth of crushed ore limit of 60m is maintained to full build out of the heap facility.

An overliner layer will be provided to protect the geomembrane primary liner from mechanical damage during ore stacking as well as weather conditions before the geomembrane is covered with ore. The overliner will also provide drainage of leach solutions and storm water entering the system both through the permeability of the drainage gravel and a network of drainage pipes installed within the overliner. The overliner material will be 500 mm thick and consist of select, durable crushed ore screened to a P100 of 38 mm.

The primary geosynthetic liner will be a robust, 2.0 mm thick LLDPE material with the bottom side textured to provide an intimate bond with the underlying GCL. The two materials used on nearly every heap leach pad in the industry is high density polyethylene (HDPE) and linear low-density polyethylene (LLDPE). LLDPE has been chosen for its superior resistance to puncturing; overall durability; and proven performance in heap leach applications. LLDPE also maintains flexibility at lower temperatures and has a larger window of ambient temperatures during which it can be installed. Leaks through geomembranes occur through damage rather than inherent permeability or transmissivity. In other words, these materials are impermeable for most practical considerations as they are manufactured. The highest risk period of their service life is not the static load of the heap under leach, but rather construction stresses and especially those caused by installing the liner and placing the overliner. The installation specifications include performance of electrical leak location surveys at the completion of each stage of installation to give the highest assurance of a leak-free installation.

The compacted clay liner (CCL) layer will utilize an on-site clay source to produce a compacted clay liner with identified properties to have a maximum permeability of 10-6 cm/sec.

The leak detection system for the leach pad will consist of wick drains placed directly underneath the primary collection pipes between the prepared subgrade and the CCL liner in each of cells for the leach pad. These wick drains will be extended to and are booted through the perimeter solution collection trench liner system to discharge into the lined solution collection trench 1 m above the trench bottom. This will enable visual monitoring of the individual cells and sampling of the to enable visual monitoring and sampling of the leak detection ports as necessary.

17.8.1 Solution Ponds

Two storage ponds, the process pond and event pond, are planned for the management of solutions. The process pond will collect overflow from the pregnant solution tank and is sized to additionally contain 24 hours of pregnant solution working volume, essentially 24 hours of heap solution drain down in the event of barren pump failure or power loss. The event pond will collect overflow from the barren solution tank during process upsets and is sized to additionally handle storm water collection from a 100 yr., 24-hr storm event, plus the accumulation from a wet year snowpack over the ultimate pad lined area. Based on preliminary assumptions and data, the process and event ponds are sized at approximately 30,023 m3 and 97,067 m3 respectively for a total storage capacity of 127,090 m3 including free board.

   

17-9

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The pond lining system will consist of either a compacted clay soil or GCL underliner, overlain by two HDPE geomembrane liners separated by an HDPE geonet for leak detection and recovery. Solutions collected in these ponds will be pumped back to the corresponding barren or pregnant solution tanks using submersible pond pumps for distribution either to the recovery plant or to the heap.

17.9 ADR PLANT

The recovery plant at South Railroad has been designed to recover gold and silver values using an adsorption-desorption-recovery (“ADR”) process. Pregnant leach solution from the heap leach will be pumped to the carbon in column circuit (“CIC”) and adsorbed onto activated carbon (adsorption). Loaded carbon from the CIC circuit will be desorbed in a high-temperature elution process coupled to an electrowinning circuit (desorption), followed by retorting to remove mercury and smelting of the resulting sludge to produce doré bullion (recovery). Before elution, each batch of carbon will be acid washed to remove any scale and other inorganic contaminants that might inhibit gold adsorption on carbon. All or a portion of the carbon will be thermally reactivated using a rotary kiln.

The ADR plant General Arrangement is presented in Figure 17-3.

   

17-10

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 17-3: ADR Recovery Plant General Arrangement

   

17-11

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

17.9.1 Adsorption

Adsorption of gold and silver onto carbon will occur in the carbon adsorption circuit. The adsorption circuit will consist of two trains of five, cascade type open-top up-flow mild-steel CICs each. Each of the carbon columns are nominally 3.5 meters in diameter by 3.9 meters high and are sized to hold 5 tonnes of activated carbon.

For the first year and a half of operation when only ROM ore is being processed on the heap, pregnant solution from the pregnant solution tank will be pumped to the adsorption circuit at a nominal rate of 648 m3/h. Once crushing and agglomeration begins, the nominal flow to the adsorption circuit will increase to 1,000 m3/hr. Barren solution exiting the last carbon adsorption column in the train will flow through a static screen to separate any floating carbon from the solution, then flow by gravity into the barren tank.

Antiscalant will be added at the pregnant solution tank to prevent scaling of carbon and reduction of the carbon loading capability. Magnetic flowmeters equipped with totalizers will measure solution flow to the adsorption circuit. Pregnant solution will flow by gravity through each set of five columns in series, exiting the lowest column as barren solution. Pregnant and barren solution continuous samplers will be installed at the feed and discharge end of each carbon column train, respectively. Solution samples will be used to measure pregnant and barren solution gold and silver concentrations.

Adsorption of gold and silver from pregnant leach solutions from the heap circuit will be a continuous process. Once the carbon in the lead column achieves the desired precious metal load it will be advanced to the elution (desorption) circuit using screw type centrifugal pumps. Carbon in the remaining columns will be advanced counter current to the solution flow to the next column in series. New or acid washed/regenerated carbon will be added to the last column in the train.

Generally, the stripping of carbon will occur each day.

17.9.2 Carbon Acid Wash

Acid washing will consist of circulating a dilute acid solution through the bed of carbon to dissolve and remove scale from the carbon. Acid washing will be performed on a batch basis before every desorption cycle.

After carbon has been transferred into the acid wash column, but before any acid is introduced, fresh water will be circulated through the bed of carbon to remove any entrained caustic/cyanide solution. The rinse solution will be pumped to the carbon safety screen using the acid wash circulation pump. A dilute acid solution will then be prepared in the mix tank, and circulation established between the acid wash vessel and the acid mix tank. Concentrated acid will be injected into the recycle stream to achieve and maintain a pH ranging from 1.0 to 2.0. Completion of the cycle will be indicated when the pH stabilizes between 1.0 and 2.0 without acid addition for a minimum of one full hour of circulation.

After acid washing has been completed, the acid wash pump will pump spent acid solution from the acid mix tank and wash vessel to the carbon safety screen. The carbon will then be rinsed with raw water followed by rinsing with dilute caustic solution to remove any residual acid. Total time required for acid washing a batch of carbon will be four to six hours. After acid washing has been completed, a carbon transfer pump will transfer the carbon to the desorption circuit.

17.9.3 Desorption

A pressure Zadra hot caustic desorption circuit for the stripping of metal values from carbon has been selected for South Railroad, which requires 18 hours or less to complete a cycle. During the elution cycle, gold and silver are continuously extracted by electrowinning from the pregnant eluate concurrently with desorption.

   

17-12

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The desorption circuit is sized to strip gold and silver from carbon in 5-tonne batches and will be equipped with a strip solution tank, strip solution pump, primary (heat up), secondary (heat recovery), and tertiary (cooling) heat exchangers, hot water heater, elution column, and elution column drain pump. After carbon has been transferred to the elution column, barren strip solution (eluant) containing sodium hydroxide and sodium cyanide will be pumped through the heat recovery and primary heat exchangers and introduced to the elution vessel at a nominal temperature of 135°C and a nominal operating pressure of approximately 65 psig.

Under normal operating conditions, barren eluant solution from the solution storage tank will pass through the heat recovery exchanger to be preheated by hot pregnant eluate leaving the elution column. The barren eluant solution then passes through the primary heat exchanger to raise the temperature up to 135°C using pressurized hot water (~180°C) from the hot water heater system.

The elution column will contain internal stainless-steel inlet screens to hold carbon in the column and to distribute incoming stripping solution evenly in the column. Pregnant eluate leaving the elution column will pass through two external stainless-steel screens before passing through the heat recovery exchanger and the cooling heat exchanger to reduce the temperature to about 75°C (to prevent boiling). The cooled pregnant eluate solution will flow to the electrowinning cells.

After desorption is complete, the stripped carbon will be transferred to the carbon regeneration circuit by a carbon transfer pump.

17.9.4 Electrowinning

The electrowinning circuit will be operated in series with the elution circuit. Solution will be pumped continuously from the barren strip solution tank through the elution column, then through the electrowinning cells, and back to the strip solution tank in a continuous closed loop process.

The electrowinning circuit will include two each 2.3 m3 electrowinning cells, each equipped with a rectifier. The gold and silver-laden solution exiting the elution column will be filtered to trap any carbon escaping from the column; will pass through the heat recovery exchanger and the cooling exchanger to reduce the solution temperature to 75°C, then will flow to the electrowinning circuit.

Gold and silver will be won from the eluate in the electrowinning cells using stainless steel cathodes using a current density of approximately 50 amperes per square meter of anode surface. Caustic soda (sodium hydroxide) in the eluate solution will act as an electrolyte to encourage free flow of electrons and promote the precious metal winning from solution. To keep the electrical resistance of the solution low during desorption and the electrowinning cycle, make-up caustic soda will sometimes be added to the strip solution tank. Barren eluant solution leaving the electrolytic cells will discharge to the E-cell discharge tank from which it will be pumped back to the eluate storage tank for recycle through the elution column.

Periodically, all or part of the barren eluant will be dumped to the barren solution tank. Typically, about one-third of the barren eluant will be discarded after each elution or strip cycle. Sodium hydroxide and sodium cyanide will be added as required from the reagent handling systems to the barren eluant tank during fresh strip solution make-up.

The precious metal-laden cathodes in the electrolytic cells will be removed about once per week and processed to produce the final doré product. Loaded cathodes will be transferred to a cathode wash box where precipitated precious metals will be removed from the cathodes with a pressure washer. The resulting sludge will be pumped to a plate-and-frame filter press to remove water and the filter cake will be loaded into pans for retorting. After mercury has been removed in the retort, the dried gold and silver sludge will be mixed with fluxes and smelted in a propane-fired furnace to produce doré bullion.

   

17-13

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

17.9.5 Carbon Handling & Thermal Regeneration

The carbon handling and regeneration circuit will include all equipment required to store, prepare, transfer, and regenerate carbon.

The carbon preparation and storage system will include a 0.5 tonne agitated carbon attritioning tank, a 5-tonne carbon storage tank, carbon dewatering screen, carbon fines storage tank, carbon fines filter press, and carbon transfer pumps. New and acid washed/regenerated carbon will be stored in the carbon storage tank to be returned to the CIC circuit as makeup carbon. Carbon being transferred to the carbon storage tank will pass to a carbon fines/dewatering screen in order to remove any carbon fines from the system. Carbon fines will be stored in a carbon fines storage tank, which will be periodically pumped through the carbon fines filter press; carbon fines from the filter press will be stored in bulk bags for removal from the system.

New carbon being added to the system will first be attritioned in the carbon attritioning tank before being pumped to the carbon dewatering screen to remove carbon fines and is then transferred to the carbon storage tank.

Thermal regeneration will consist of drying the carbon thoroughly and heating it to approximately 700ºC for ten minutes in order to maintain carbon activity levels. The carbon regeneration circuit has been designed to regenerate 100% of the carbon.

Carbon from the elution circuit to be thermally reactivated will be dewatered on a static screen, transferred to the regeneration kiln feed hopper and fed to the regeneration kiln by a screw feeder. Hot, regenerated carbon leaving the kiln will pass into a water-filled quench tank for cooling before being transferred to the carbon dewatering screen and carbon storage tank. Ultimately, quenched regenerated carbon will be pumped to the CIC tanks to be loaded with precious metals.

17.9.6 Refining & Smelting

Cathode sludge from the filter press will be dried and treated in a mercury retort to remove and recover any mercury that may be present. The sludge will be placed into pans and heated in the retort for a minimum of 6 hours at 480ºC to volatilize the mercury. A vacuum system will remove mercury vapor from the retort and pass the vapor through a water-cooled mercury condenser. Condensed mercury will be collected in a trap, and then transferred and stored in flasks. Cooled, mercury-depleted vapor leaving the trap will be passed through a sulfur-impregnated carbon scrubber to remove any residual mercury.

After mercury removal, fluxes will be mixed with the cathode sludge and then fed to a propane-fired tilting crucible furnace. After melting, slag will be poured off into cast iron molds until the remaining molten furnace charge will be mostly molten metal (doré). Doré will poured off into bar molds, cooled, cleaned, and stored in a vault pending shipment to a third-party refiner. The doré poured from the furnace will represent the final product of the processing circuit.

Periodically, slag produced from the smelting operation will be re-smelted on a batch basis to recover residual metal values.

17.9.6.1 Mercury Abatement System

In addition to the mercury retort, the ADR facility will be fitted with an exhaust gas handling system to treat mercury emissions from the various pieces of equipment. The exhaust system will be designed to combine mercury-containing exhaust streams and treat them in two separate sulfur-impregnated carbon beds prior to discharge to the atmosphere.

The first carbon bed will be dedicated to treat fumes from the smelting furnace. The smelting furnace will be fitted with a hood which will collect fumes and direct them to a scrubber, which will remove suspended particles from the gas and

   

17-14

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

cool the gas before passing through the carbon bed. The carbon bed will collect traces of mercury vapor before exhausting the gas to atmosphere.

The second carbon bed will treat the combined exhaust gas streams from the electrowinning cells, eluant solution storage tank, elution vessel, and carbon regeneration kiln. The kiln exhaust gas will be first treated through a wet scrubber to remove particulates and cool the gas, which will then be combined with the remaining exhaust gas streams and pass through the carbon bed.

17.10 ADR REAGENTS AND UTILITIES

Recovery plant reagents will include cyanide, caustic, hydrochloric acid, antiscalant, activated carbon, and various furnace fluxes. Propane will be used to fuel thermal equipment in the plant.

17.11 LABORATORY FACILITIES

Analytical support, including fire assays and metallurgical testing required to support the project operations, will be conducted on-site using a dedicated laboratory. It is assumed that approximately 100 samples per day will be delivered from the mine for fire assay. A small number of fire assays, solutions, and carbon assays will be required for metallurgical control for processing. A metallurgical lab area is also included for running bottle roll and column tests.

   

17-15

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 18 TABLE OF CONTENTS

SECTION     PAGE
18 PROJECT INFRASTRUCTURE 18-1
  18.1 ACCESS ROAD   18-1
  18.2 POWER SUPPLY 18-1
  18.3 PROJECT BUILDINGS 18-2
    18.3.1 Crushing Buildings 18-4
    18.3.2 Security Building at Access Gate 18-4
    18.3.3 Administration Building 18-4
    18.3.4 Truck Shop Building 18-4
    18.3.5 ADR Plant 18-4
    18.3.6 Laboratory 18-4
  18.4 SITEWIDE WATER MANAGEMENT STRATEGY 18-5
    18.4.1 Source of Mine Water 18-5
    18.4.2 Beneficial Reuse 18-11
    18.4.3 Water Disposal 18-12
  18.5 WATER MANAGEMENT INFRASTRUCTURE 18-13
    18.5.1 Dark Star Groundwater Dewatering System 18-13
    18.5.2 Seepage and Stormwater Management System 18-17
    18.5.3 Beneficial Reuse System 18-18
  18.6 HEAP LEACH PAD FACILITY 18-19
  18.7 HEAP LEACH FACILITY WATER BALANCE ANALYSIS 18-20
  18.8 SEISMIC HAZARD ANALYSIS 18-24

 

SECTION 18 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 18-1: Current Modeled Pumping Rates for Dark Star Pit Dewatering System 18-6
Table 18-2: Expected Pumping Rates for Contact Water Ponds 18-18
Table 18-3: Summary of Phased Liner Deployment 18-22
Table 18-4: Results Summary from the Deterministic Model - Typical/Average Range Cycle 18-23
Table 18-5: Summary of Total Required Emergency Storage Volume for Pond Sizing by Phase 18-24
Table 18-6: Mean Deterministic Pseudo-Acceleration Response Spectrum by Seismic Source Zone 18-28
Table 18-7: 84th Percentile Deterministic Pseudo-Acceleration Response Spectrum by Seismic Source Zone 18-28

 

   

18-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 18 LIST OF FIGURES

FIGURE DESCRIPTION PAGE
Figure 18-1 Site Plan Drawing 18-3
Figure 18-2: Water Management Process Flow Diagram 18-7
Figure 18-3: Pipeline Plan General Arrangement 18-8
Figure 18-4: Stormwater Controls General Arrangement 18-10
Figure 18-5: Map Showing Locations of Dewatering Wells 18-14
Figure 18-6: Typical Dewatering Well Head Plan General Arrangement 18-15
Figure 18-7: Typical Dewatering Well Head Section 18-16
Figure 18-8: Plot of Historic Earthquake Events and Selected Seismic Source Zones within a 500 km Radius 18-25
Figure 18-9: Plot of PSHA Results and Comparison with DSHA Results 18-27
Figure 18-10: PSHA Results and Design Response Spectra 18-29

 

   

18-ii

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

18 PROJECT INFRASTRUCTURE

The infrastructure for South Railroad has been developed to support mining and heap leaching operations. This includes the access road to the facility, power supply, communication, heap leach pad, process plant and ancillary buildings. Water supply to the site including tanks, pipelines, ponds, and diversions are described in Section 18.5. Haul roads within the mining area as well as the mine waste storage facility are described in Section 16.

18.1 ACCESS ROAD

The infrastructure envisioned for South Railroad is shown in Figure 18-1.

Entrance to the site will be located approximately 20 miles south of Carlin, NV along Nevada State Highway 278 (Hwy-278). The main access road to the site will be along an existing 10-mile route east of Hwy-278, which is to be improved to a standard two-way road consisting of a 4-meter wide lane and 2-meter wide shoulder in each direction. The shoulders will provide area for any safety and drainage structures that will be needed along the route. New north-south turning lanes will be added to the highway to allow for safe access onto the new access road. Delivery of all personnel, operating equipment, consumables, and construction equipment will be along this primary access road.

The access road climbs gradually as it heads east and adjacent to an existing wash for approximately 5 miles. The remaining 5 miles to the site encounter mountainous grades and winding alignment of the existing dirt road. This road will be improved to straighten the alignment, where possible, and reduce grades to a maximum of 8-10 percent to allow for easier access to the site and promote safety. As the access road approaches the site all traffic will be required to check in at the security office located in the saddle before heading past Administration and down to the site facilities located between the Pinion and Dark Star pits.

18.2 POWER SUPPLY

The electrical power demand at the South Railroad Mine facility is currently estimated at 11.6 MW for initial operations, with loads decreasing in years six (6) through twelve (12) to a low of 8.3 MW. Utility electrical service at the site is not currently available. These load forecasts were provided to NV Energy to solicit costs for extending service to the site and were used as the basis for evaluating alternate methods of meeting the electrical demand.

This evaluation has been completed and presented is a report titled “South Railroad Mine Project Electric Service Study (Jan 2020)”. This study investigated meeting the demand by extending electric utility service to the site, as well as installing and operating on-site generation with either reciprocating engine generators or gas turbine generators. Fuel sources considered for the on-site generation included trucked diesel, a utility natural gas pipeline for gas service, and trucked Liquified Natural Gas (LNG) with on-site vaporizers. Additional factors considered in this evaluation included fuel cost including delivery, system efficiencies, air quality impacts and emissions treatment, maintenance costs, and salvage value. The capital and operating costs for six (6) suitable configurations were compared, establishing rates of return and break-even durations for each configuration pair.

For consistency, the 11.6 MW demand presented to NV Energy was used to compare alternatives. It is acknowledged that this demand will be affected by certain external influences, such as delayed crushing operations which will reduce demand in the early years of operation, the size scope of water treatment required with its impact on total demand, and further refinement of the process design.

The study concluded that, when considering all these factors, on-site generation utilizing reciprocating engine generators fueled by LNG delivered to the site provided the greatest value and operational flexibility to the project. This configuration produces lower emissions than diesel options with lower operating costs and lower effective cost per kWh than other on-site options. By installing multiple units operated in parallel, the system can be implementing with a unitized approach controlling initial capital costs - making infrastructure investments only when needed and avoiding

   

18-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

the large capital investment of a utility connection. Equipment salvage value can also be realized, a savings not available by selecting a utility approach.

The costs associated with this recommendation have been captured in the Capital and Operating Cost Estimates.

18.3 PROJECT BUILDINGS

The proposed heap-leach facility will be located just Northeast of the Pinion pit on the west side of the valley. The crusher will be located just south of the Heap Leach pad. From the HPGR facility the ore will be conveyed to the leach pad from an overland conveyor to a series of grasshopper conveyors that will distribute the ore onto the pad in the prescribed courses. The grasshopper conveyors are not demonstrated on the drawings at this time for clarity as they will be moved throughout the construction of the Heap Leach. Pregnant Leach Solution (PLS) will flow by gravity to the PLS Pond directly east of the Heap Leach Pad. An event pond will be located adjacent to the PLS Pond to allow for passive overflow if an excessive runoff event occurs. Road access is provided just along the west edge of the heap leach facility which will allow access onto the leach pad for ROM material. An access point is also provided at the base of the pad to allow for haul truck ingress for the initial ore placement on the pad.

A truck shop is planned northwest of the Dark Star waste dump. A fuel island will be constructed just west of the truck shop. Safety and training areas will be provided within the shop building. In addition, Mine Services offices are integral to the truck shop and a laydown yard is proposed directly east of the facility. The Pinion and Dark Star pits are tied to their respective waste dumps and the primary crusher by haul roads.

   

18-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 18-1: Site Plan Drawing

   

18-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

18.3.1 Crushing Buildings

The process infrastructure includes three buildings for the crushing circuit; Secondary Screen Building, Secondary Crusher Building, and HPGR Building. The crushing buildings will be uninsulated, engineered steel buildings and have been designed to protect the crushing and screening components from harsh weather elements. Each of the crushing buildings will have partial walls on all four sides of the building to facilitate access by maintenance and support equipment.

18.3.2 Security Building at Access Gate

The site Security Building is located at the top of a hill for optimal visibility, approximately 6 kilometers along the main access road from the west property line. The Security Building includes an entry access gate that will control all site ingress egress. From the entry gate a continuous security fence surrounds the active facilities on site.

18.3.3 Administration Building

The site Administration Building is just past the Security Building also on the main road. The building will be comprised of (12) 12’ x 60’ mobile units that will be assembled into a single unit divided for the variety of use. Ten of these units will be used for the Administration Building, while the remaining two will be used to house the Change House Facilities.

18.3.4 Truck Shop Building

As the road continues from the Administration Building to the northeast the Truck shop is located just past the Primary Mine Substation and Fueling Station. The Truck shop is a 260’ x 100’ facility that has 6 bays with 2 of them embedded rail to receive tracked vehicles or loaders with tire chains. The Mine Warehouse Facility is included within the footprint of the Truck Shop at the ground floor at the opposite of the bay side. The Mine Services Office and Training Space is designed to be included above the warehouse space.

18.3.5 ADR Plant

The ADR Plant is located directly to the north and west of the Truck Shop. PLS from the Heap Leach Pad will be processed in an ADR (adsorption, desorption and recovery) plant where gold and silver will be adsorbed onto activated carbon and recovered by stripping the carbon and eventually recovering the precipitate by electrowinning. The ADR facility includes an open CIC circuit consisting of two carbon column trains operated in parallel as well as an 807 m2 insulated, engineered steel walled building with an overall height of 14 meters. The building will contain the desorption, acid wash, and carbon handling and regeneration circuits, as well an office, break/lunch room, and men’s and women’s locker/bathroom facilities. The ADR facility also includes an attached refinery building which will be a 485 m2 insulated, engineered steel walled building with an overall height of 7.7 meters and will contain the electrowinning, mercury recovery, and smelting furnace. The ADR building includes two roll-up doors for forklift and maintenance vehicle access as well as man doors around building. The Refinery includes a secure man-door access as well as access for armored trucks via a roll-up door. The facility will include all necessary eyewash/safety shower water and fire protection systems.

18.3.6 Laboratory

The Laboratory building will be comprised of a series of mobile buildings that will be assembled into a single unit to allow for a more conventional layout. The layout will include (6) 12’ x 72’ buildings (60’ x72’ building footprint) and accommodate proper scrubbers, acid containment system, dust collection, and necessary sample processing equipment. Offices, restrooms, and change facilities for the Lab are incorporated into the layout.

   

18-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

18.4 SITEWIDE WATER MANAGEMENT STRATEGY

This section presents the overall strategy for managing the water produced from the mine as well as meet the demands of mine processes and supporting facilities. A process flow diagram illustrating how water will be managed at the site is presented in Figure 18-2 and locations of water management infrastructure, excluding stormwater controls, is shown in Figure 18-3. Further details, as well as the supporting studies and model results used to develop the strategy and cost estimate presented herein can be found in the Mine Water Management Plan South Railroad Project (in progress; Stantec, 2019).

18.4.1 Source of Mine Water

18.4.1.1 Dark Star Groundwater Dewatering System

The main source of water generated from the mine will be from the groundwater dewatering systems required to support the mining operation of the Dark Star North Pit (phase I). Pit dewatering wells located around the Dark Star North Pit will be connected to a 12-inch pipeline through a common header that will convey water to the 350,000-gallon Rapid Infiltration Basins (RIBs) Raw Water Tank (Tank 1). Water will be pumped from Tank 1 to either to the RIBs via a 12-inch pipeline or to the main 250,000-gallon Mine Raw Water Tank (Tank 2).

Based on current modeling, this system will consist of ten wells, each pumping between 55 and 275 gallons per minute (gpm) and will produce a total peak and sustained flow rate of approximately 1,430 gpm and 550 gpm, respectively. Refer to Table 18-1 below for pumping rates by year. Note that the required pumping rate for Years 1 - 3 is determined by the pit dewatering schedule. The pumping rates for Years -2 and -1 and Years 4 - 9 are provided to meet mine processes needs, rather than the dewatering schedule. Thus, pumping rates during these years will be variable and based on demand, and therefore, may be less on average than the listed 550 gpm.

The dewatering system will continue to operate for 6 years following cessation of dewatering of the Dark Star North Pit (phase I) to supply water to support the mine. Water generated from the groundwater dewatering system will be beneficially used in the mining, leaching and processing, and to support mine facilities as discussed below. Based on the groundwater modeling conducted and water demands that have been identified, the mine should have enough water to meet all water demands throughout the life cycle of the mine.

A portion of water collected in Tank 1 will be transferred to Tank 2 via an 8-inch HDPE pipeline at a rate maximum rate of 700 gpm. Water from Tank 2 will be:

  • Transferred to a 428,000-gallon Raw Water Tank (Tank 3) to supply make-up and fire water for the ADR, HLP, and crushing areas;

  • Diverted for non-potable mine water uses; and

  • Routed to the potable water treatment and distribution system.

All tanks will be fitted with a level sensor that will control the flow to the tanks.

   

18-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 18-1: Current Modeled Pumping Rates for Dark Star Pit Dewatering System

Well ID Depth (ft) Year -2
Pumping
(gpm)
Year -1
Pumping
(gpm)
Year 1
Pumping
(gpm)
Year 2
Pumping
(gpm)
Year 3
Pumping
(gpm)
Year 4
Pumping
(gpm)
Year 5
Pumping
(gpm)
Year 6
Pumping
(gpm)
Year 7
Pumping
(gpm)
Year 8
Pumping
(gpm)
Year 9
Pumping
(gpm)
Well 1 1200 220 275 220 220 220 275 275 275 275 275 275
Well 2 1000 110 0 110 110 110 0 0 0 0    
Well 3 1200 0 275 220 220 220 275 275 275 275 275 275
Well 4 1200 0 0 220 220 220 0 0 0 0    
Well 5 1200 0 0 220 220 220 0 0 0 0    
Well 6 1000 0 0 110 110 110 0 0 0 0    
Well 7 1200 0 0 0 110 110 0 0 0 0    
Well 8 1000 0 0 0 55 55 0 0 0 0    
Well 9 1000 0 0 0 55 55 0 0 0 0    
Well 10 (mine bottom) 200 0 0 0 0 110 0 0 0 0    
Total Pumping   330 550 1,100 1,320 1,430 550 550 550 550 550 550

 

   

18-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 18-2: Water Management Process Flow Diagram

   

18-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 18-3: Pipeline Plan General Arrangement

   

18-8

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

18.4.1.2 Stormwater Conveyance Facilities

Stormwater from the site will be managed as contact and non-contact stormwater. Non-contact stormwater are the flows that do not come in contact with ore or mine processing facilities. Non-contact flows will be collected and conveyed around the site and directly discharged to existing stream channels. Contact stormwater will be routed to the WRDF seepage ponds, the HLP Event Pond, and ponds near the Crusher Pad and Ore Stack Pad. Excluding the HLP Event Pond, contact water will be pumped and blended with other water sources in Tank 2. The operation of the WRDF collection ponds and the Crusher and Stacker Ponds are discussed in the following section. The HLP operations are discussed separately by others.

The collection and conveyance of stormwater runoff will be managed by the construction of stormwater channels, culverts, and energy dissipation structures. A total of 15 stormwater channels and 27 culverts will be used to convey stormwater around the site (non-contact water) or to lined storage ponds (contact water). The stormwater conveyance systems and collection ponds are shown on Figure 18-4.

   

18-9

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 18-4: Stormwater Controls General Arrangement

   

18-10

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

18.4.1.3 Seepage and Stormwater Collection Facilities

During operation, the WRDFs at Pinion and Dark Star will generate seepage water from precipitation migrating through the waste rock. Based on the water balance modeling conducted to date, maximum seepage rates of 115, 210, and 270 gpm are anticipated from the Pinion, Dark Star West, and Dark Star East WRDFs, respectively. The estimated seepage rates are influenced by the timing of the waste rock development and the anticipated concurrent reclamation of the facilities. The seepage from the WRDFs will be collected in lined collection ponds and pumped to Tank 2.

Due to the space limitations at the site, management of the WRDF seepage during operations by simple storage and evaporation alone is not practical. Therefore, the seepage collected from the ponds during operations will be blended with the groundwater in Tank 2.

In addition, potential runoff from the HLP, the Crushing Pad, and the Stacker Pad areas will also be collected as part the zero-discharge operating requirement. The 100-year, 24-hour stormwater volume reporting to the Crusher Pad Pond and the Stacker Pad Pond are 2.3 and 2.4 acre-feet, respectively. Stormwater from the Crushing Pad and Stacker Pad Areas are also routed to Tank 2 and recirculated in mine operations. The HLP water handling is discussed separately and is largely confined to the HLP and mineral processing areas in a self-contained system.

It is anticipated that stormwater and seepage from the WRDF ponds, the Crusher Pad Pond, and the Stacker Pad Pond (i.e., the ponds supplying Tank 2) will episodically supply all mine water needs with potential excess. During these events, all pit dewatering discharges will be sent to the RIB and any excess operating water will be sent to Tank 3. From Tank 3, it is assumed that excess water will be stored the HLP Event Pond and reused in mine operations. The excess water is generated due to pond size and pumping constraints to prevent overtopping and losing water to the environment.

These excess water periods would typically occur during winter or spring months, when operation water requirements are low. In early years of operation, these events would typically occur in 1- or 2-day periods, with average excess volumes being less than 1 acre-feet. This would be a small percentage of the total HLP event pond volume.

The greatest volume of excess water is currently expected in operating Year 8. This would be when operational water requirements decrease, thereby increasing the likelihood of generating excess water from Pinion WRDF seepage or stormwater runoff into the Crusher and Stacker Ponds. The operations in Year 8 would occur prior to full closure of the Pinion WRDFs and the Crusher and Stacker Ponds as described by the current mine schedule. Excess water generated in schedule Year 8 would be expected throughout the winter and spring runoff periods, with projected excess water reaching approximately 2 acre-feet per day. The projected future excess water rate is dependent on a number of conditions during the period of operation including the actual weather conditions at the site, the closure and construction of WRDFs, and the Crusher and Stacker Ponds, and the timing of mine water needs at the HLP and other facilities.

18.4.2 Beneficial Reuse

The main water demands at the site are associated with:

  • The ADR Plant (KCA, 2019),

  • The HLP (Mines Group, 2019),

  • The Crushing and Screening Plant (KCA, 2019),

  • Mine facilities such as water for dust suppression, operational drilling water, and the truck wash (GSV, 2018), and

  • Potable water for the administrative building (GSV, 2018).

Water from Tank 1 will be transferred at a rate of 700 gpm to Tank 2 to provide enough water for the mine facilities. Water in Tank 2 will either be conveyed to the mine facilities area via gravity or pumped to Tank 3 for make-up and fire

   

18-11

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

water for the ADR Plant, HLP, and Crushing Screening Plant. A description of the principal beneficial reuses for the site are presented below.

18.4.2.1 ADR Plant

The ADR Plant will require make-up water at a nominal rate of approximately 18 gpm (KCA, 2019). Water will be conveyed via gravity from Tank 3. Note that this water demand was incorporated into the overall HLP water demand estimate (Mines Group, 2019).

18.4.2.2 Heap Leach Pad

Based on water balance modeling for the HLP (Mines Group, 2019), water demands for the HLP will fluctuate significantly up to a maximum rate of 529 gpm, though a more typical make water demand is in the range of 100 to 300 gpm.

18.4.2.3 Crushing and Screening Plant

The crushing and screening plant will require water for dust suppression at a nominal flow rate of 20.4 gpm (KCA, 2019). Water will be conveyed from Tank 2 via gravity line to either a separate tank or directly into the water distribution plant for the area. Note that this water demand was incorporated into the overall HLP water demand estimate (Mines Group, 2019).

18.4.2.4 Mine Facilities

The mine facilities non-potable water demands (GSV, 2018) will consist of the following:

  • Dust Suppression - average and peak of 208 and 417 gpm, respectively;

  • Drilling and Construction - average and peak of 81 and 292 gpm, respectively; and

  • Vehicle Washdown - 10 gpm.

A series of distribution piping from Tank 2 will supply water to the mine facilities. Tank 2 has been located to supply water via gravity for these uses.

18.4.2.5 Potable Water

Potable water demands have been estimated at 10 gpm (GSV, 2018). Potable water will be required at both the mine facilities area, administration building, and ADR plant. Given that the source of potable water in Tank 2 will be blended from the WRDF seepage water and the mine dewatering system, treatment for potable use is required to meet potable water quality standards.

Treatment will be achieved by installation and operation of a 10 gpm packaged reverse osmosis (RO) system. Treated water from the RO system will be stored in the Potable Water Tank (Tank 4). From Tank 4 potable water will be pumped to the mine facilities, administration, or ADR buildings where water will be stored in a 1,500-gallon storage tank located at each area.

18.4.3 Water Disposal

The methods for disposal of excess water are discussed below.

   

18-12

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

18.4.3.1 Excess Mine Dewatering Disposal

Excess water generated from the dewatering system will be pumped from Tank 1 through a 12-inch pipeline into a series of RIBs for disposal. Based on the minimum permeability requirements for RIBs of 2 in/hr., it is estimated that a total surface area of 2 acres will be required to dispose of the estimated peak excess water flow rate of 1,430 gpm and incidental rainfall. To allow for maintenance of the RIBs, a minimum total area of 4 acres will be required to allow for maintenance of one 2-acre area while the other 2-acre area is available for operation.

18.4.3.2 Domestic Wastewater Disposal

Domestic wastewater will be disposed of in three septic systems: one located at the mine facilities area, another at the Administration Building and the third at the ADR plant. Based on the estimated domestic wastewater flow rate, each septic system will be 1,500 gallons.

18.5 WATER MANAGEMENT INFRASTRUCTURE

This section discusses the infrastructure required to manage mine water at the site.

18.5.1 Dark Star Groundwater Dewatering System

Infrastructure associated with the Dark Star dewatering system is described in the below section.

18.5.1.1 Wells

Groundwater modeling has indicated that ten wells installed to varying depths between 200 ft to 1,200 ft will be required to provide sufficient dewatering capacity. Threaded carbon steel piping will be used to connect the pump to the surface completion piping. Well locations are shown on Figure 18-5. Typical well construction details are shown on Figure 18-6 and Figure 18-7.

   

18-13

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 18-5: Map Showing Locations of Dewatering Wells

   

18-14

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 18-6: Typical Dewatering Well Head Plan General Arrangement

   

18-15

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 18-7: Typical Dewatering Well Head Section

   

18-16

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

18.5.1.2 Well Pumps

A total of 10 well pumps will be procured for the project. Based on the maximum flow rate, each well pump will be required to pump at a maximum rate between 55 to 275 gpm and will be installed to depths between 200 and 1,200 ft bgs.

18.5.1.3 Pipelines

Each well will be connected with a threaded, carbon-steel discharge pipe to a 12-inch header that will be connected to Tank 1 via 12-inch HDPE pipeline. The header network will be divided into two sections, one on the north side of the Dark Star North Pit and the other on the south side of the Dark Star North Pit. Each section will consist of 5 wells. Water from Tank 1 will be pumped to Tank 2 via an 8-inch pipeline for further use and the remaining water will be pumped to the RIBs via a 12-inch HDPE pipeline for disposal.

18.5.1.4 Tanks

Tank 1 will serve as a buffer tank. Water from Tank 1 will be pumped to Tank 2 for further use at the mine. The Tank 1 will be a carbon steel tank having capacity of 350,000 gallons.

18.5.1.5 Well Pumps

A submersible pump will be installed in each well. Due to the variations in pumping rates from each well, 55, 110, or 275 gpm pumps will be used in an effort to standardize.

18.5.1.6 Distribution Pump

There will be two sets of distribution pumps installed at Tank 1 that will be used to transfer water to either the RIBs or to Tank 2. The pumps have been sized to provide adequate pumping capacity to meet the expected peak flow rate to the RIBs or Tank 2.

18.5.1.7 Instrumentation and Controls

Each well will have a level sensor installed to control the pumps that will operate the pump between high and low level to maintain the groundwater level below the bottom of the pit.

Tank 1 will be installed with a level sensor that will control the flow and operate the pumps. The pumps will maintain designated operating levels in the tank by adjusting the flow rate to the RIB’s with a variable frequency drive (VFD) motor on the pump. The distribution pumps transferring water to the Tank 2 will be turned off at low water level in Tank 1.

18.5.1.8 Electrical

Electrical supply will be required to each of the well locations and to Tank 1 to power the actuating valves and two pumps. The total installed power will be 1285 HP including spares, whereas the energy demand for all conveyance systems will be 828 KW.

18.5.2 Seepage and Stormwater Management System

Infrastructure associated with the seepage and stormwater management system is described in the below section.

   

18-17

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

18.5.2.1 Ponds

Five ponds will be used to manage contact stormwater and seepage from the WRDFs and crushing and stacking area during operations. Pumping systems will be installed in each pond to pump water when the pond levels reach a predetermined level. During operations, the water pumped from the ponds will be discharged to the Tank 2. It should be noted that during certain times, water pumped from the ponds will make up 100% of the mine facility make-up water in Tank 2. As such, an assessment of the predicted water quality from the ponds will need to be performed to determine if any additional treatment is required.

18.5.2.2 Pipelines

The following pipeline will be used to transfer water from the ponds to Tank 2:

  • A 6-inch HDPE pipeline from Pinion WRDF Pond to Tank 2;

  • An 8-inch HDPE pipeline from Dark Star West and East WRDF Ponds to a common 10-inch HDPE connected to Tank 2;

  • An 8-inch HDPE pipeline from Crusher Pond to Tank 2; and

  • An 8-inch HDPE pipeline from Stacker Pond to Tank 2.

18.5.2.3 Pumps

Each pumping system will include two submersible pumps. The expected nominal and maximum flow rate for each system is shown in Table 18-2. The wide range of expected flow rates will be covered with VFDs that will control the speeds of the pumps. The pumps were standardized to reduce the number of spares and parts required.

Table 18-2: Expected Pumping Rates for Contact Water Ponds

Pond Nominal (gpm) Maximum
(gpm)
Dark Star East WRDF Pond 50 400
Dark Star West WRDF Pond 50 400
Pinion WRDF Pond 50 400
Crusher Pond 200 400
Stacker Pond 150 350

18.5.2.4 Instrumentation and Controls

The pond pumping system will be controlled using level sensors that will be used to turn on and off the pumps at preset high and low levels.

18.5.2.5 Electrical

Electrical power supply will be required to each of the pond locations to power the pressure transducers and two pumps. The total installed power will be 450 HP including spares, whereas the energy demand for all conveyance systems will be 216 KW.

18.5.3 Beneficial Reuse System

Infrastructure associated with the beneficial reuse system is described in the below section.

   

18-18

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

18.5.3.1 Pipelines

The following water distribution pipelines will be required to convey water for mining process and facilities:

  • An 8-inch pipeline to convey water from Tank 1 to Tank 2;

  • A 10-inch pipeline from Tank 2 to Tank 3;

  • A 6-inch pipeline to convey water from Tank 2 to the mine facilities; and

  • Ancillary smaller diameter distribution pipelines for potable water and the various mine facility uses.

18.5.3.2 Tanks

Three tanks, Tank 2, Tank 3, and Tank 4 will be installed to manage water discharged from the Tank 1 and flows from the ponds. Tank 2 will be the main mine facilities water tank and will serve as the primary storage for water for the mine. Tank 2 will be a 250,000-gallon carbon steel tank. Tank 3 will be the main make-up and fire water storage tank for the ADR, crushing and screening, and HLP areas. Tank 3 will be a 428,000-gallon carbon steel tank. Tank 4 will store treated potable water and will be a 15,000-gallon carbon steel tank.

18.5.3.3 Pumps

Two pumps will be located downstream of Tank 2 to pump water to Tank 3 at a maximum rate of 1200 gpm.

A third pump will be located downstream of Tank 4 to pump potable water to the other smaller potable water holding tanks located at the mine facilities area, administration building, and ADR plant.

18.5.3.4 Instrumentation and Controls

All tanks will include low-level, high-level, and high-high level sensors. These sensors will be used to control pumps and valves downstream of the various tanks feeding each system.

18.5.3.5 Treatment

A 10 gpm prefabricated RO system will be installed near the mine facilities area to treat water from Tank 2 at a rate of 10 gpm to supply potable water to the mine facilities, administration, and ADR Plant.

18.5.3.6 Electrical

Electrical power supply will be required at each of the distribution system to power the pumps. The total installed power will be 620 HP including spares, whereas the energy demand for all conveyance systems will be 238 KW.

18.6 HEAP LEACH PAD FACILITY

The heap leach facility consists of a conventional lined leach pad to support a multi-lift, free-draining heap, event and pregnant ponds, access roads, solution distribution piping (barren solution to the heap) and heap drainage solution collection piping (pregnant solution to the ponds and plant).

For the first year ROM ore will be stacked with trucks in nominal 9 m thick lifts. Barren solution containing cyanide will be irrigated onto the ore using drip irrigation. Pregnant solution will be collected at the base of the heap by the leach pad liner and collection system, which will route the pregnant solution to the process plant for gold recovery and reagent reconditioning. At the end of Year 1, higher grade ore will be crushed and agglomerated and stacked on a dedicated section of the pad closest to the crusher using conveyor stacking system in 7 m thick lifts. The ROM and Crushed ore (which includes HPGR ores have different leach cycles and times, hence the need to segregate them on the leach pad. Once an area has been leached for the target time or metal recovery, the next lift will be placed on top of the already

   

18-19

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

leached ore and the process repeated. This will be continued until the heap is stacked to the design elevation of 2100 m for the 47.3 Mt capacity.

The leach pad will consist of a graded area to the west of the ADR process plant and northwest of the Dark Star open pit. The leach pad will be constructed in phases, with each phase large enough to provide ore leaching capacity for 2 to 3 years. For each phase, topsoil will be removed and stockpiled for use in reclamation.

After removal of topsoil, the site will be graded by cutting and filling to achieve targeted slopes, elevations and grades. Cell separation berms will be constructed as part of the subgrade preparation. The resulting subgrade will then be prepared to make it suitable for supporting the liner system. Prior to laying of the synthetic liner system, a leak detection collection system consisting of a wick drain will be laid on the composite clay liner directly below the primary solution collection pipes for each cell and will report to the perimeter solution collection trench. The pad area will then be lined with a layer of primary geosynthetic liner (LLDPE) to form a composite liner system, consisting of a 2.0 mm-thick single-side textured LLDPE geomembrane overlying and in direct contact with the 300 mm-thick compacted clay liner (CCL). A network of drainage pipes and drainage gravel will be placed on top of the primary LLDPE to protect the liner and piping from damage, to limit the maximum hydraulic head over the liner system to an average of 0.3 m, and to collect the pregnant solution and direct it to ADR facility for processing.

The event and pregnant ponds will be located near and adjacent to the ADR process plant. A total of two ponds are planned for the HLF. The initial event pond will be single lined with the primary liner being a 1.5 mm thick smooth HDPE (or other suitable material). The pregnant pond will be double lined with both the primary and the secondary liner being a 1.5 mm HDPE. Drainage between the two liners for the pregnant pond can be provided by installing a geonet between the liners or one of the liners can be a drain liner (manufactured liner with separation knobs or buttons) to separate the two liners providing a drainage path to the leak detection sump. These two geomembranes will be underlain by a composite clay liner (CCL) to form a composite bottom system liner. A leak detection sump will be installed in the low corner of the pregnant pond. Operational solution will be routed via in tanks located at the process plant. There will be two tanks for pregnant solution, and one for the barren solution. The second pregnant tank is for maintenance which can also be used for maintenance of the barren tank. The solution tank sizes are included in process plant design report. The pregnant pond is designed to have the storage capacity for 24 hours of drain-down from the leach pad in the event of any issues with processing of operational solutions .The event pond will be sized for storage of the runoff from the 100-year, 24-hour storm event as well as the larger of the associated storm surge or the pond inflow from the wettest month timestep as determined from the deterministic water balance model for the leach pad (which would include snowmelt runoff). The ponds will have a dedicated generator and pump back system for moving solutions as needed during a “power outage.”

18.7 HEAP LEACH FACILITY WATER BALANCE ANALYSIS

Heap leaching involves the dissolving of precious metals contained in a low-grade ore using the application and circulation of a weak cyanide solution through the ore. An operational water balance model has been developed for the proposed HLF at the project site. The model provides output to evaluate meteoric (weather) impacts on the facility design and to predict the freshwater demand during operations and subsequent post mining freshwater circulation. The water balance model for a heap leach pad operation is essentially a water budget that tracks all of the water entering and leaving the lined containment system. Sources of water entering the system include pore water delivered with the ore, precipitation falling as rain or snow, and any fresh water (makeup water) added to the system from outside the lined limits of the pad. System losses are a bit more complicated and include three basic categories of loss.

  • Evaporative losses

  • Losses due to surface tension

  • Extraction losses

   

18-20

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

In the case of an operating heap leach pad, the area under active leach is assumed to be continuously wetted by sprinklers or emitters with a limitless supply of water. Therefore, the full potential depth of evapotranspiration is applied to that area. Outside of the area under active leach, the ore surface is assumed to be dry, except for that fraction of the month’s rainfall events that coated the soil particles or infiltrated into the soil and did not run off. This volume of water is assumed to be available during that month for evapotranspiration. Any portion of the infiltrated water volume that is not lost to evapotranspiration during the same month it falls is assumed to be beyond the reach of evapotranspiration in the following month and is routed into the solution collection system along with the other applied solution. Therefore, during months where evaporation/evapotranspiration greatly exceeds rainfall, rain events add nothing to the water volume stored in the system. However, during months where rainfall greatly exceeds evaporation/ evapotranspiration, a significant volume of water may be added to storage.

Environments like the S RR Project site where snowfall is a substantial part of the precipitation regime create a special case. During much of the year, a snowpack will exist on the surface of the HLF which will significantly hinder evaporative loss but create a new opportunity for “sublimation” loss (which is a phase change where water goes directly from the solid phase to the gas phase without passing through a liquid state).

Losses to surface tension involve changes in the water content of the ore during operations. The ore is not delivered to the heap leach pad in a truly dry condition, but rather contains some relatively small amount of moisture in the pore spaces that is held in place by surface tension. This delivered water content is typically less than the “specific retention” of the ore. The specific retention is a threshold moisture content that marks the position on the soil water characteristic curve where the soil begins refusing to release its water to gravity (i.e., below that moisture content it simply will not readily drain). Therefore, for ore to release the applied solution carrying the dissolved precious metals to the solution collection system, it is necessary to raise the moisture content of the soil to a level above the specific retention. The moisture content of the ore must be increased to a level that allows the water to be passed through the ore at the same rate that it is being applied so that the system is in equilibrium or in balance. Once an area is no longer actively being leached (i.e., no new solution is being applied), then the ore would drain back down to its specific retention moisture content and release the difference back into the solution collection system. The water balance model tracks these changes in moisture content in the ore and accounts for the addition and subtraction of water volume in the system. Once all additions and losses to the volume of water stored in the system have been estimated and accounted for at the end of the month, the model evaluates whether or not there is sufficient water available in storage to maintain the solution application rate for the next month. Heap leach pads are designed as fully lined containment systems that in theory release nothing back into the environment. Solutions that are not stored within the ore itself are routed through the system and stored in various lined ponds. However, should extreme events exceed the storage capacity of the system, then the excess must be extracted from the system.

Precipitation was studied by Stantec and utilized multiple regional sources of data including the site-specific Dark Star climate station. The site-specific data has a record length of only about two (2) years. Available regional meteoric records included data sets as long as 130 years. Details on the development of a representative meteoric record for the project site can be found in a report from Stantec dated April 19, 2019.

Given the location of the site in mountainous terrain at elevations well above 6000 ft above mean sea level (amsl) and the existence of sub-freezing temperatures from late October through April each year, a significant percentage of the precipitation at site occurs as snow. The accumulation of water as the snow water equivalent (SWE) in a growing snowpack over the winter months has an impact on the hydrology of the site by storing water from November through March or early April, then rapidly releasing that stored water over the months of April and May. The water balance model controls the accumulation of SWE in the snowpack as a function of precipitation and temperature using a monthly series of snowpack factors. The monthly snowpack factors were selected to mimic as closely as possible the behavior observed at Snotel sites in the region (the snowpack growing rapidly from November through February, leveling out from March through early April, and declining rapidly from April through May. The snowpack algorithms affect the routing and the timing of the winter precipitation and spring melt, but they have no impact on the net water balance.

   

18-21

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Results of the deterministic modeling are as follows. In general, outside makeup water is required from startup through the end of the facility life which is anticipated to be on the order of 9 years (7 years of ore stacking and leaching and up to two years of additional leaching and gold production after ore stacking operations end). Modeling disclosed no significant trend toward accumulation of water in the system over time during normal operations. However, water does begin to accumulate in the pond system after ore stacking ends due to the elimination of the ore wetting component of total system loss. The model assumes that concurrent reclamation consisting of the placement of a low permeability cover will begin by Operating Year 5 as areas become available on the pad where no further irrigation will occur and that cover placement will continue from May through October each year at an average rate of 20,000 m2/month. Reclamation sheds clean runoff to the environment and helps reduce the risk of the accumulation of water in the system as the lined footprint grows over time.

The water balance model covers the period of leach pad operation that includes startup and Phase 1 through Phase 5 which includes up to two (2) years of post-mining leaching. Operations effectively end with the termination of gold production late in Year 9. Upon completion of active leaching operations, solution management will be required until such time as the closure cover is established and clean runoff is diverted off the facility. Once the solution draindown rate falls to a level that can be safely and passively contained in the post-closure Event Pond(s), active solution management can cease (i.e., no pumping). The current water balance model does not address these post-closure conditions (which will need to be addressed in a separate draindown model at some later time).

Detailed phasing and scheduling of the liner deployment is beyond the scope of this pre-feasibility study. However, the following assumptions were made to approximate a reasonable schedule of liner deployment over time. Phase 1 is assumed to begin with an initial lined footprint of 376,238 m2 accommodating approximately 10 million tonnes (MT) of ore. Three (3) additional phases (Phase 2 through 4) are approximately equally spaced in time reaching a final, maximum lined footprint of 922,511 m2 during Phase 4 (see Table 18-3). Phase 5 consists of post-operations gold production with no additional liner deployment.

Table 18-3: Summary of Phased Liner Deployment

Phase Lined Surface Area (m2)
1 376,238
2 558,329
3 740,420
4 922,511
5 922,511

Table 18-4 summarizes results from the deterministic modeling using the typical/average range cycle of the meteoric record. Mean values reported in the table are averaged over each stage of operations. Simple volumes reported as m3 are the totals over the duration of a one (1) month timestep. It should be noted that modeling of water storage in system ponds assumes no specific day to day management/mitigation. Facilities are commonly operated with ponds in an empty or near empty state and maintained that way through modest adjustments to pumping rate and/or area under leach to move water in and out of dynamic storage. Reported pond levels do not reflect that level of day to day management.

   

18-22

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 18-4: Results Summary from the Deterministic Model - Typical/Average Range Cycle

Parameter Phase Max Mean Min
Water Stored in Event Ponds (m3) 1 35,371 3531 0
2 29,608 2428 0
3 43,189 3805 0
4 41,719 9753 0
5 51,738 9710 0
 
Runoff from Reclaimed Areas
(m3/month)
1 0 0 0
2 0 0 0
3 26,134 3704 0
4 30,332 9941 0
5 42,079 10,483 0
 
Outside Makeup Water (m3/month) 1 54,671 25,477 0
2 55,439 28,778 0
3 55,130 22,934 0
4 52,257 26,590 0
5 41,524 12,208 0
 
Outside Makeup Water (liters/s) 1 20.80 9.69 0
2 21.09 10.95 0
3 20.98 8.73 0
4 19.88 10.12 0
5 15.80 4.64 0
 
Outside Makeup Water
(liters/tonne of ore)
1 98.8 46.2 0
2 81.0 42.0 0
3 80.5 33.5 0
4 76.3 38.8 0
5 0 0 0
 
% of Time Makeup Water Demand
is Zero
1 --- 13.0% ---
2 --- 8.3% ---
3 --- 16.7% ---
4 --- 28.6% ---
5 --- 40.5% ---

Preliminary pond sizing is based on a hydrologic analysis and the results of the deterministic water balance modeling.

The HLF design team for the GSV S RR Project has adopted the following minimum pond sizing design criteria:

  • The immediate runoff from the 100-yr 24-hr storm event over the area of the ore stack and any additional exposed liner (with or without liner cover) over the full lined footprint of the HLF.

  • The average expected volume in storage in the pond system plus the larger volume of the storm surge (the infiltration portion from the 100-yr 24-hr design storm) or the maximum expected increase in pond volume for any single time step (i.e., 1 month) based on the deterministic HLF water balance model.

  • 24 hrs. of draindown at the full pumping rate (backup power with backup pumps are to be provided).

  • 2 ft of pond freeboard.

   

18-23

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Given that the lined footprint of the HLF will change over time, the volume requirements of the design criteria will also change over time. Table 18-5 will summarize the development of the required emergency storage volume for pond design by phase (although the constructed pond volume does not necessarily have to be phased).

Table 18-5: Summary of Total Required Emergency Storage Volume for Pond Sizing by Phase

Phase 100-Yr 24-
Hr Runoff
(m3)
Larger of Storm
Surge or
Snowmelt (m3)
Mean Volume
in Pond
Storage (m3)
24 Hrs of
Draindown
(m3)
2 ft of
Freeboard
(m3)*
Total Required
Emergency Storage
Volume (m3)
1 20,539 20,061 5254 24,000 12,000 81,854
2 25,000 24,129 5254 24,000 13,000 91,383
3 33,154 29,653 5254 24,000 13,500 105,561
4 41,307 36,946 5254 24,000 14,000 121,507
5 41,307 38,718 5254 24,000 14,500 123,779
*- Approximate estimate in the absence of an actual pond design      

18.8 SEISMIC HAZARD ANALYSIS

The site resides in the Basin and Range physiographic province which consists of a region of crustal extension (spreading) that began approximately 17 million years ago during the Miocene Epoch. The province extends from southern Oregon and Idaho southeastward penetrating well into Mexico. Its westernmost extent is the range front fault(s) of the eastern Sierra Nevada Range and its easternmost extent the range front fault(s) of the Wasatch Range. The southern projection of the province is bounded on the west by the gulf of California and the Baja Peninsula and on the east by the Laramide aged thrust front of the Sierra Madre Occidental Range. The spreading and thinning of the crust in the Nevada portion of the province is dominated by listric normal faulting that bounds the mountain ranges and flattens out with depth, even joining opposing faults at times. This pattern has resulted in what is described as “horst and graben topography” where the horsts are the uplifted areas (mountain ranges) and the grabens are the down-dropped blocks (alluvial valley floors) between ranges.

The identification of representative seismic source zones for a project of this type requires a review of the patterns revealed in a plot of the mapped earthquake epicenter locations classed by magnitude, and a review of the patterns revealed in a plot of the mapped young, potentially active fault locations. We have identified eight (8) seismic source zones which (proceeding from southwest to northeast) are as follows:

  1.     

Sierra Range-front Zone

  2.     

Walker Lane Zone

  3.     

Shoshone Mountains Zone

  4.     

Southern Nevada Zone

  5.     

Nevada Great Basin Zone

  6.     

Idaho Mountains Zone

  7.     

Salt Lake Zone

  8.     

Wasatch Front - Hurricane Fault Zone

The purpose of identifying discrete seismic source zones is to characterize and quantify the nature of the largest earthquake that is likely to occur within the zone. This information can be utilized in either a deterministic seismic hazard analysis (DSHA) or a probabilistic seismic hazard analysis (PSHA). Although different in approach, they probably have more in common than they have differences. Of interest is the largest earthquake that could reasonably be expected to occur within the zone, the mean rate of occurrence or recurrence interval, and the location of the earthquake. Seismic source zones come in two (2) varieties:

   

18-24

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

  1.     

An Aerial Seismic Source where earthquakes are uniformly distributed throughout the area and assumed to be equally likely to occur anywhere within the area.

  2.     

A Linear Seismic Source where earthquakes occur along a narrow linear band (fault) but are again assumed to be equally likely to occur anywhere along the fault line.

Figure 18-8: Plot of Historic Earthquake Events and Selected Seismic Source Zones within a 500 km Radius

   

18-25

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Ground motion response to earthquakes depends not just on the character of the earthquake, but also the character of the subsurface conditions at the site. Of concern is the nature of the soil/rock in the upper 30 m of soil/rock profile. Test pits and drilling at the site indicate that the soil cover is of moderate thickness (typically 6 m to 14 m thick) and the underlying rock moderately to highly weathered. Therefore, for the purpose of this investigation, the site was assigned to Site Class D (stiff soil) with an assumed representative shear velocity (Vs30) of 365 m/s (1200 ft/s) consistent with the recommendations in the ASCE 7-16 design standard.

The steps involved in a DSHA analysis are as follows:

  1.     

Using information derived from geologic maps, fault maps, and plots of historic earthquake events, identify discrete seismic source zone polygons.

  2.     

Extract “clipped” data sets lying within each seismic source zone that represent the nature of the seismicity within the zone.

  3.     

Estimate the Maximum Considered Earthquake (“MCE”) associated with each seismic source.

  4.     

Estimate the closest point of approach to the site of interest for the selected MCE in each seismic source zone.

  5.     

Estimate site specific ground motions by attenuating motions over the distance between the earthquake epicenter and the site.

A review of the mapped USGS faults revealed a maximum surface rupture length within the Nevada Great Basin Zone on the order of 29 km at a location approximately 42.5 km south of the site. Using the criteria of Wells and Coppersmith (1994), and assuming the maximum surface fault rupture for a single event to be half of the mapped length, the maximum expected event magnitude would be 6.4.The closest location of a mapped active fault is 5.3 km from the site and the fault has a total surface rupture length of 5.55 km. Conservatively assuming this fault rupture to represent a single event, the 5.55 km length corresponds an event magnitude of 5.9. Therefore, for the Nevada Great Basin Zone containing the site, three (3) ground motion attenuation profiles were developed; one for the MCE of magnitude 6.4 at a distance of 42.5 km, one for a magnitude 5.9 event at a distance of 5.3 km, and a magnitude 4.5 event at a distance of 1 km.

Results of analyses for all seismic source zones are summarized in Table 18-6 and Table 18-7. Most building codes (including ASCE 7-16 and IBC 2018) allow for either a site-specific deterministic design approach or a probabilistic approach. For the site specific DSHA procedure the estimated spectral acceleration values at the various natural periods are used to develop a mean spectral acceleration response spectrum and an 84th percentile response spectrum. These accelerations are then used to develop design response spectra for estimating seismic loads used for structural design (which will also vary as a function of occupancy and use) and for geotechnical analysis.

The PSHA analysis can be performed using the same seismic source zones and by replacing the maximum credible earthquake with the probability distribution of earthquake events, the site distance with the probability distribution of site distances and adding a random component to the attenuated spectral acceleration values, then using a Monte Carlo type sampling model to compile a new distribution of spectral accelerations associated with an exceedance probability. However, some developed countries, including the U.S. and Canada, have their own web-based PSHA programs that use regionally based maps of seismic source zones (similar, but not the same as those used in our DSHA analysis), and compute site distances by asking you to enter a specific geographic site location using latitude and longitude.

A deterministic approach to seismic hazard analysis or DSHA and a probabilistic approach or PSHA have produced similar design pseudo-acceleration response spectra with the DSHA results being the larger of the two (see Figure 18-9). Per ASCE 7-16 guidelines, the lesser of the two or the PSHA results for a maximum considered earthquake having a 2% probability of exceedance in 50 yrs. was selected as the Site-Specific Design Response Spectra (see Figure 18-10).

   

18-26

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 18-9: Plot of PSHA Results and Comparison with DSHA Results

Geotechnical design procedures often involve estimates of the Peak Ground Acceleration (“PGAm”) or a reduced/scaled version of the ground acceleration referred to as the pseudostatic acceleration coefficient. The design PGAm value for the site is 0.294 g.

For seismic slope stability analyses in soil and rock, a hierarchy of analysis methods should be implemented with progression to the next method in the hierarchy required only in the event of failure to satisfy the requirements of the previous method. Recommended methods in the order of their application are as follows:

  • Pseudostatic stability analysis using a pseudostatic acceleration coefficient of 0.06 g (to be used only at sites with no liquefaction potential).

  • Seismic displacement analysis using the procedures of Newmark, 1965, Makdisi and Seed, 1978, or Bray and Travasarou, 2007 showing acceptably small displacements.

  • Full dynamic analysis of soil-structure interaction coupled with continuum modeling showing acceptably small displacements.

   

18-27

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 18-6: Mean Deterministic Pseudo-Acceleration Response Spectrum by Seismic Source Zone

Table 18-7: 84th Percentile Deterministic Pseudo-Acceleration Response Spectrum by Seismic Source Zone


   

18-28

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Figure 18-10: PSHA Results and Design Response Spectra

   

18-29

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 19 TABLE OF CONTENTS

SECTION   PAGE
19 MARKET STUDIES AND CONTRACTS 19-1
  19.1 METAL PRICING 19-1

SECTION 19 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 19-1: Bloomberg Consensus Pricing for Gold 19-1
Table 19-2: Bloomberg Consensus Pricing for Silver 19-2

 

   

19-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

19 MARKET STUDIES AND CONTRACTS

Gold doré bullions will be the commercial product from the South Railroad operation. Gold doré is readily sold on the global market to commercial smelters and refineries, and it is reasonable to assume that doré from the South Railroad property will also be saleable.

19.1 METAL PRICING

In determining the appropriate and reasonable gold and silver prices to use for the economic analysis, under the current estimated project schedule, long term lead items are expected to be committed to in 2020 and construction is intended to commence in 2021, with potential commercial production in 2022.

Reviewing the Bloomberg Consensus price for gold in the years 2020, 2021, and 2022, which was respectively $1,500, $1,500, and $1,600, the average of the gold price for these three years was calculated and amounted to $1,533. The trailing three average gold price is $1,276. Then averaging the trailing three-year average gold price and the three-year average Bloomberg consensus price noted above of $1,533, the average gold price is $1,404.50 per gold ounce. For purposes of this study, the base case gold price was rounded to $1,400/oz with sensitivity from $1,200-$1,600/oz also evaluated.”

Table 19-1: Bloomberg Consensus Pricing for Gold

  2019 2020 2021 2022 2023 2024 LT
Broker (US$/oz) (US$/oz) (US$/oz) (US$/oz) (US$/oz) (US$/oz) (US$/oz)

ABN AMRO Bank NV

1,371 1,500          

Australia & New Zealand Banking Group Ltd

1,271 1,367 1,425 1,463      

Baillieu Holst

             

Barclays

             

BMO

1,293 1,306 1,265 1,200 1,200 1,200 1,200

BNP Paribas SA

1,400 1,560          

Canaccord

1,366 1,444 1,468 1,530 1,530 1,530 1,530

Cantor Fitzgerald

1,365 1,475 1,500 1,325 1,325 1,325 1,325

Capital Economics Ltd

1,400 1,425 1,325        

CIBC

1,366 1,500 1,500 1,450 1,400 1,400 1,300

Citigroup Inc

1,415            

Commerzbank AG

1,400 1,500          

Cormark

1,350 1,350 1,350 1,350 1,350 1,350 1,350

Credit Suisse

             

Desjardins

1,335 1,350 1,300 1,300 1,300 1,300 1,300

Deutsche Bank AG

1,321 1,375 1,430 1,450 1,453    

DZ Bank AG

1,213            

Eight Capital

1,323 1,350 1,300 1,300 1,300 1,300 1,300

Emirates NBD PJSC

1,346 1,383          

Fitch Solutions

1,375 1,450 1,500        

GMP

1,366 1,400 1,400 1,400 1,400 1,400 1,400

H.C. Wainwright

1,300 1,300 1,300 1,300 1,300 1,300 1,300

Hartleys

             

Haywood

1,360 1,425 1,425 1,425 1,425 1,425 1,425

HSBC

             

Incrementum AG

1,389 1,450 1,800 2,100 2,300    

ING

1,600 1,700          

Intesa Sanpaolo SpA

1,396 1,505 1,575 1,600 1,500    

Itau Unibanco Holding SA

1,283 1,315 1,323 1,331 1,339    

Jefferies

1,304 1,300 1,300 1,300 1,300 1,300 1,300

JP Morgan

1,400 1,400 1,400 1,400 1,400 1,400 1,400

Landesbank Baden-Wuerttemberg

1,400 1,560 1,600        

 

   

19-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

  2019 2020 2021 2022 2023 2024 LT
Broker (US$/oz) (US$/oz) (US$/oz) (US$/oz) (US$/oz) (US$/oz) (US$/oz)

Laurentian

             

M Partners

             

Market Risk Advisory Co Ltd

1,334 1,319 1,275 1,300 1,325    

Morgan Stanley

             

MPS Capital Services Banca per le Imprese SpA

  1,625 1,800        

National Bank

1,403 1,520 1,465 1,410 1,350 1,350 1,350

Natixis SA

1,330 1,395          

Numis

1,350 1,400 1,400 1,400 1,400 1,400 1,400

Oxford Economics Ltd

1,238 1,247 1,254 1,262      

Panmure Gordon & Co PLC

1,275 1,250 1,250        

Peel Hunt

             

Promsvyazbank PJSC

1,220 1,250 1,263 1,251 1,255    

Raymond James

1,353 1,400 1,400 1,300 1,300 1,300 1,300

RBC

1,400 1,500 1,450 1,450 1,400 1,400 1,400

Renaissance Capital

             

Scotiabank

1,353 1,300 1,300 1,300 1,300 1,300 1,300

Societe Generale SA

1,500 1,575 1,600 1,650      

Stonegate

             

Swedbank

             

Toronto-Dominion Bank

1,360 1,425 1,350 1,350 1,350 1,350 1,350

UBS

1,350 1,350 1,350 1,350 1,350 1,350 1,350

Westpac Banking Corp

1,393 1,412 1,439        
               
               

High

1,600 1,700 1,800 2,100 2,300 1,530 1,530

Median

1,360 1,400 1,400 1,350 1,350 1,350 1,350

Average

1,355 1,416 1,414 1,402 1,394 1,352 1,346

Low

1,213 1,247 1,250 1,200 1,200 1,200 1,200
Bloomberg Consensus 1,393 1,500 1,500 1,600 1,325    
Median 1,393 1,500 1,500 1,600 1,325    
Mean 1,376 1,466 1,485 1,517 1,375    
High 1,500 1,625 1,800 1,650 1,500    
Low 1,265 1,250 1,250 1,300 1,300    
Forward 1,411 1,534 1,561 1,581 1,599    

Table 19-2: Bloomberg Consensus Pricing for Silver

  2019 2020 2021 2022 2023 2024 LT
Broker (US$/oz) (US$/oz) (US$/oz) (US$/oz) (US$/oz) (US$/oz) (US$/oz)

ABN AMRO Bank NV

15.70 16.60          

Australia & New Zealand Banking Group Ltd

15.88 17.86 19.46 20.72      

Barclays

             

BMO

15.89 17.00 17.25 17.50 18.25 18.25 18.25

BNP Paribas SA

15.95 17.95          

Canaccord

15.30 15.64 15.98 16.76 16.76 16.76 16.76

Cantor Fitzgerald

15.75 17.00 18.50 17.50 17.50 17.50 17.50

Capital Economics Ltd

16.45 15.95 15.40        

CIBC

15.62 16.50 17.00 17.00 16.50 16.50  

Citigroup Inc

16.40 18.00          

Commerzbank AG

16.50 18.25          

Cormark

16.00 16.00 16.00 16.00 16.00 16.00 15.00

Credit Suisse

             

Desjardins

15.50 16.00 16.50        

Deutsche Bank AG

17.70 19.50 20.50 21.90 22.41    

DZ Bank AG

15.25            

Eight Capital

15.99 17.50 17.00 17.00 17.00 17.00 17.00

 

   

19-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

  2019 2020 2021 2022 2023 2024 LT
Broker (US$/oz) (US$/oz) (US$/oz) (US$/oz) (US$/oz) (US$/oz) (US$/oz)

Emirates NBD PJSC

15.33 15.56          

GMP

15.49 16.50 16.50 16.50 16.50 16.50 16.50

Haywood

15.75 17.00 17.00 17.00 17.00 17.00 17.00

H.C Wainwright

            15.00

HSBC

             

Incrementum AG

20.54 22.43 28.33 30.45 46.00    

Intesa Sanpaolo SpA

16.66 19.00 19.00 19.00 18.00    

JP Morgan

17.00 17.00 17.00 17.00 17.00 17.00 17.00

Landesbank Baden-

             

Wuerttemberg

16.50 18.00 18.50        

M Partners

             

Market Risk Advisory Co Ltd

15.44 15.81 15.95 16.75 17.30    

Mitsubishi Corp International

             

Europe PLC

18.50            

Morgan Stanley

             

MPS Capital Services Banca

             

per le Imprese SpA

16.00   22.00        

National Bank

16.52 18.40 18.40 18.45 18.50 18.50 18.50

Natixis SA

16.20 17.60          

Numis

15.50 16.00          

Panmure Gordon & Co PLC

15.50 15.50 15.00        

Promsvyazbank PJSC

16.90 17.40 17.50        

Raymond James

15.49 16.50 17.00 17.00 17.00 17.00 17.00

RBC

16.28 17.50 17.50 17.50 17.50 17.50 17.50

Renaissance Capital

             

Scotiabank

15.37 15.00 15.00 15.00 15.00 15.00 15.00

Societe Generale SA

15.30 16.20 15.80 15.80 15.60    

Stonegate

             

Swedbank

             

TD

15.44 18.00 18.00 18.00 18.00 18.00 18.00

Toronto-Dominion

             

Bank/Toronto

16.18 17.88          

UBS

             

Westpac Banking Corp

16.33 16.95 17.28        
               
               

High

20.54 22.43 28.33 30.45 46.00 18.50 18.50

Median

15.95 17.00 17.00 17.00 17.00 17.00 17.00

Average

16.16 17.18 17.75 18.14 18.83 17.04 16.86

Low

15.25 15.00 15.00 15.00 15.00 15.00 15.00
Bloomberg Consensus 15.97 16.60 16.62 16.75 17.30    
Median 15.97 16.60 16.62 16.75 17.30    
Mean 15.96 16.89 17.37 17.18 16.97    
High 16.66 19.00 22.00 19.00 18.00    
Low 15.30 15.50 15.00 15.80 15.60    
Forward 16.48 18.19 18.59 18.95 19.25    

 

   

19-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 20 TABLE OF CONTENTS

SECTION     PAGE
20 ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT 20-1
  20.1 INTRODUCTION 20-1
  20.2 ENVIRONMENTAL BASELINE STUDIES 20-2
  20.3 BUREAU OF LAND MANAGEMENT PLAN OF OPERATIONS / NEVADA BUREAU OF MINING REGULATION AND
    RECLAMATION, NEVADA RECLAMATION PERMIT 20-2
    20.3.1 Bureau of Land Management Pre-Application Planning 20-2
    20.3.2 Plan of Operations Processing 20-3
  20.4 UNITED STATES ARMY CORPS OF ENGINEERS SECTION 404 PERMIT 20-3
  20.5 NATIONAL ENVIRONMENTAL POLICY ACT 20-4
  20.6 STATE OF NEVADA PERMITS 20-4
    20.6.1 Water Pollution Control Permit 20-4
    20.6.2 Air Quality Operating Permit 20-5
    20.6.3 Water Rights 20-5
  20.7 OTHER PERMITS 20-5
  20.8 ENVIRONMENTAL STUDY RESULTS AND KNOWN ISSUES 20-6
  20.9 WASTE DISPOSAL AND MONITORING 20-6
  20.10 SOCIAL AND COMMUNITY ISSUES 20-7
  20.11 MINE CLOSURE 20-7

SECTION 20 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 20-1: Ministerial Permits, Plans, and Notifications 20-6

 

   

20-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

20 ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT

EM Strategies, Inc. (“EMS”), a permit acquisition strategy and government relations consulting firm, provided the following information on environmental considerations, permitting, and social and community impacts.

20.1 INTRODUCTION

As environmental consultants to Gold Standard, and at the request of Gold Standard, EMS has completed the following assessment of environmental studies, permitting, and social or community impacts for the proposed Gold Standard’s South Railroad Mine Project (“SRMP”), which is located within South Railroad portion of the Railroad-Pinion property. The SRMP has been defined for permitting purposes and is currently approximately 2,693.3 hectares in size. The SRMP is a hard rock precious-metal development project. Gold Standard is planning to submit a PoO (under 43 Code of Federal Regulations [CFR] 3809) and an RP Application (under Nevada Administrative Code [NAC] 519A) (Plan Application) to the BLM Tuscarora Field Office and the NDEP’s Bureau of Mining Regulation and Reclamation (“BMRR”) in the near future.

The SRMP is located on public lands administered by the BLM and private lands controlled by Gold Standard in Sections 13 through 16, and 19 through 29, Township 30 North, Range 53 East (T30N, R53E), and Sections 24 through 28, T30N, R52E, Mount Diablo Base and Meridian. In general, the proposed mine operations will consist of two open pit mines and rock storage areas, and the processing of the ore will use a heap leaching method. Gold Standard plans the construction, operation, reclamation, and closing of this mining operation. Major components include:

  • Two areas of open pits (Pinion and Dark Star deposits);

  • Three rock storage areas;

  • Crushing and conveying system;

  • One heap leach processing facility;

  • Reagent area;

  • Exploration;

  • Laydown areas;

  • A water delivery and distribution system;

  • A power delivery and distribution system;

  • Excess water management system;

  • Storm water diversion ditches and storm water sediment basins; and

  • Haul and access roads.

Gold Standard proposes to mine approximately 47.3 million tonnes of heap-leach mineralized material and 147.3 million tonnes of waste rock (total of 194.6 million tonnes). The mineralized material and waste would be extracted from the open pits using conventional surface mining methods of drilling, blasting, loading, and hauling. Gold Standard would use hydraulic shovels or front-end loaders to load the blasted mineralized material and waste into the haul trucks. The haul trucks would transport the waste rock to the rock disposal area near the open pit and transport the mineralized material either directly to the heap leach pad as ROM ore, or to the crushing system where the mineralized material would be crushed to a nominal size between ¼ and ¾ inch. The crushed mineralized material would be conveyed to the heap leach pad. The heap leach would use a dilute NaCN solution to liberate the precious metals. A carbon absorption desorption process would be used to precipitate the precious metals. The precipitate would then be refined in a furnace to produce doré bars for shipment off site. The project facilities would disturb approximately 642.8 hectares. There is an existing PoO which covers planned mining facilities and authorizes up to 101.2 hectares of exploration surface disturbance within the SRMP. Exploration activities, estimated to disturb up to 20.2 additional hectares, would also occur within the SRMP and incorporate the existing Plan level disturbance. The current exploration Plan would continue to be used for exploration outside of the Plan Application boundary. The project would therefore include 663 hectares of authorized and proposed surface disturbance associated with exploration and mining activities in the

   

20-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SRMP. The exploration activities would be based on work plans submitted to the BLM for review and concurrence that the activities are consistent with the Plan.

The review and approval process for the Plan Application by the BLM constitutes a federal action under the NEPA and BLM regulations. Thus, for the BLM to process the Plan Application the BLM is required to comply with the NEPA and prepare either an EA, or an EIS. Gold Standard anticipates that the BLM will require an EIS, due to the mine dewatering and potential pit lake.

The Department of Interior (“DOI”) issued an order (Secretarial Order 3355) on August 31, 2017. This order directed the bureaus under DOI to implement page and time limits on EISs. The order set a one-year time limit. Subsequently, DOI issued directives on April 27, 2018, and August 6, 2018, that provide additional guidance. The BLM in Nevada is implementing a new permitting and NEPA process to further address the requirements of the order and directives. The process commences with the submittal of a brief project description and map and then a meeting to discuss the scope of necessary baseline data collection. Following the completion of the baseline reports the BLM reviews and approves them. The Plan Application is then completed and submitted to the BLM for review and a determination by the BLM that it is complete. If the Plan Application is determined to be complete, the BLM will make a decision whether an EA or EIS will need to be prepared to comply with NEPA. Prior to initiating the NEPA document (EA or EIS), the NEPA contractor will prepare Resource Reports for each environmental resource, which will evaluate the potential effect of the project on each environmental resource. Each Resource Report is then reviewed and approved by the BLM. The NEPA contractor then uses the Resource Reports to complete the NEPA document.

The following sections provide additional detailed information on the principal permits necessary to develop each phase of the project and the NEPA process, as well as the status relative to each permit process.

20.2 ENVIRONMENTAL BASELINE STUDIES

Gold Standard has been conducting environmental baseline studies over the past several years as part of their ongoing permitting efforts and in preparation for the submittal of permit applications for conduct mining operations. The main portion for the Project Area has been surveyed for surface water resources, including WOTUS, biological resources, and cultural resources. The SRMP access road remain to be surveyed for cultural resources. In 2018, Gold Standard commenced material characterization testing of the mineralized material and waste rock to determine the metal leaching and acid generation potential. In addition, an evaluation of the groundwater resources was commenced to determine groundwater supply potential, as well as the potential impacts from groundwater pumping and pit lake development. Gold Standard had a meeting with the BLM in January 2019 to determine any additional baseline data collection needs for the permitting process.

Within and adjacent to the Project Area there are Greater Sage Grouse and Golden Eagles. These species will have an effect on how the SRMP is permitted and what mitigation in required or proposed.

20.3 BUREAU OF LAND MANAGEMENT PLAN OF OPERATIONS / NEVADA BUREAU OF MINING REGULATION AND RECLAMATION, NEVADA RECLAMATION PERMIT

The BLM and the BMRR have implemented a process for the Plan Application that commences prior to the submittal and continues through the review and approval process for the Plan Application. Gold Standard will submit a Plan Application for the project and BLM approval of this Plan Application will likely occur in the fourth quarter of 2020, assuming the BLM uses the EIS process.

20.3.1 Bureau of Land Management Pre-Application Planning

As part of the pre-Plan Application planning process with the BLM, an initial meeting is scheduled between the proponent and the BLM to discuss the anticipated scope of the mining operation and review the likely environmental

   

20-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

resource baseline data needs required for the processing of the Plan Application by the BLM. This initial meeting generally occurs some time prior to the submittal of the Plan Application, depending on the anticipated complexity of the mining operations and baseline data needs, which varies for each project. Several meetings between Gold Standard and the BLM Tuscarora Field Office have occurred over the last year.

The process for collecting baseline data generally includes the development of baseline data collection work plans, which are submitted to the BLM for review and approval prior to initiating the baseline data collection. Following approval, field surveys are carried out to collect relevant baseline data. Depending on the environmental resource to be evaluated, desktop studies may be utilized in lieu of field surveys. Findings of the field surveys are then summarized in a report that documents the data collected. This Technical Report is then submitted to the BLM for review and approval. In some cases, the baseline data collection process will also involve the State of Nevada, depending on the resource being assessed, particularly for geochemical and hydrological surveys. Baseline data for the project is being collected and the reports have yet to be submitted and reviewed or accepted by the BLM. The required environmental baseline data include the following: mineralized material and waste rock geochemical characterization; hydrogeological characterization; a pit lake evaluation; an assessment of ecological risk; air quality modeling; and cultural and biological resources.

Cultural resource and biology surveys have been completed over the SRMP and for cultural resources will be completed over the access road route in 2020. Sample collection for the characterization of the mineralized material and waste has been completed and analysis of those samples is underway. The characterization report will be completed in the first half of 2020. The hydrogeologic evaluation commenced in the third quarter of 2018 and the report will be completed in the second quarter of 2020.

20.3.2 Plan of Operations Processing

The Plan Application is submitted to the BLM and the BMRR for any surface disturbance in excess of five acres. The single application utilizes the format of the Plan Application document accepted by the BLM and the BMRR. The Plan Application describes the operational procedures for the construction, operation, and closure of the project. As required by the BLM and BMRR, the Plan Application includes a waste rock management plan, quality assurance plan, a storm water plan, a spill prevention plan, reclamation plan, a monitoring plan, and an interim management plan. In addition, a reclamation report with a Reclamation Cost Estimate (“RCE”) for the closure of the project is required. The content of the Plan Application is based on the mine plan design and the data gathered as part of the environmental baseline studies. The Plan Application includes all mine and processing design information and mining methods. The BLM determines the completeness of the Plan Application and, when the completeness letter is submitted to the proponent, the NEPA process begins. The RCE is reviewed by both agencies and the bond is determined prior to the BLM issuing a decision record on the Plan Application and BMRR issuing the RP.

The Plan Application will be submitted for the project when operational and baseline surveys are complete and operations and design for the project are at a level where a Plan Application can be developed to the necessary level of detail. Submittal of the Plan Application is likely to occur in the third quarter of 2020. Key baseline reports for the project will be included in the Plan Application submittal to the BLM and NDEP/BMRR. These reports have yet to be reviewed by the agencies.

The BLM will need to complete their review of the baseline reports in the Plan Application and approve the final version of the reports prior to moving on to the NEPA process.

20.4 UNITED STATES ARMY CORPS OF ENGINEERS SECTION 404 PERMIT

Gold Standard has delineated and the United States Army Corps of Engineers (“USACE”) has determined that there are WOTUS, including wetlands, within the Project Area. Based on the current design of the SRMP, the SRMP will likely have impacts to WOTUS, which will require an individual permit under Section 404 of the Clean Water Act. As

   

20-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

part of their Section 404 permit application review process, the USACE looks at an avoid, minimize, mitigate process as part of their assessment. GSV is unable to avoid all the WOTUS in the SRMP design; however, Gold Standard has designed the SRMP to avoid as much of the WOTUS as is reasonably possible. Gold Standard will need to then mitigate for the WOTUS that is affected by the SRMP design.

20.5 NATIONAL ENVIRONMENTAL POLICY ACT

The NEPA process is triggered by a federal action. In this case, the issuance of a completeness letter for the Plan Application and the submittal of the Section 404 permit application triggers the federal action. The NEPA review process is completed with either an EA or an EIS. GSV anticipates that the BLM and the USACE will require an EIS for this project. In addition, Gold Standard anticipates that the BLM will be the lead federal agency for the completion of the NEPA process and the USACE will a cooperating agency under NEPA.

The EIS process is conducted in accordance with NEPA regulations (40 CFR 1500 et. seq.), BLM, as lead federal agency, guidelines for implementing the NEPA in BLM Handbook H-1790-1 (updated January 2008), and BLM Washington Office Bulletin 94-310. The intent of the EIS is to assess the direct, indirect, residual, and cumulative effects of the project and to determine the significance of those effects. Scoping is conducted by the BLM and includes a determination of the environmental resources to be analyzed in the EIS, as well as the degree of analysis for each environmental resource. The scope of the cumulative analysis is also addressed during the scoping process. Following scoping and baseline information collection, the Draft EIS is prepared for the BLM by a third-party contractor. When the BLM determines the Draft EIS is complete, it would be submitted to the public for review. Comments received from the public would be incorporated into a Final EIS, which would in turn be reviewed by the BLM and the public prior to a record of decision (“ROD”). Under an EIS there can be significant impacts. The preparation of an EIS is a lengthier and more expensive process than an EA. The project proponent pays for the third-party contractor to prepare the EIS, and also pays recovery costs to the BLM for any work on the project by BLM specialists.

If the BLM requires the preparation of an EIS to comply with the NEPA for the SRMP, then under the new Secretarial Order 3355 the EIS has to be completed in 365 days (from the Notice of Intent publication in the Federal Register to the signing of the Record of Decision) and must be less than 150 pages (unless a DOI waiver is obtained, which then allows for 300 pages).

20.6 STATE OF NEVADA PERMITS

There are a number of environmental permits issued by the NDEP that are necessary to develop the SRMP and which Gold Standard needs to permit the SRMP etc. The NDEP issues permits that address water and air pollution, as well as land reclamation. The Nevada Division of Water Resources (“NDWR”) issues water rights for the use and management of water.

20.6.1 Water Pollution Control Permit

A WPCP from the BMRR is needed to construct, operate, and close a mining facility in the State of Nevada. The contents of the application are prescribed in the NAC Section 445A.394 through 445A.399. A WPCP application for the project will be prepared and will be based on the following:

  • Open pit mining, with an anticipated post-mining pit lake formation;

  • Storage of non-acid and acid generating waste rock;

  • Exploration;

  • Dewatering and water management;

  • Heap leach and process plant management; and

  • Ancillary facilities that include storm water diversions, and sediment control basin.

   

20-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

WPCP applications will include an engineering design for waste rock storage areas and mill/tailings facilities, waste rock characterization reports, hydrogeological summary reports, engineering design for process components including methods for the control of storm water runoff, and containment reports detailing specifications for containment of process fluids. Applications will also contain the appropriate WPCP plans, including a process fluid management plan, a monitoring plan, an emergency response plan, a temporary closure plan, and a tentative plan for permanent closure of the mine.

20.6.2 Air Quality Operating Permit

Gold Standard will need an air quality operating permit from the Nevada Bureau of Air Pollution Control (“BAPC”). The permit will likely be a Class II permit, where the emissions of each criteria pollutant would be less than 90.7 tonnes per year. The application would include specifics on each process component that could emit air pollutants and a detailed emissions inventory, as well as air quality modeling. The application preparation and processing time frame would be approximately three months.

20.6.3 Water Rights

Gold Standard will need to obtain water rights from the NDWR. Water and water rights will have to come from either Pine Valley or the Dixie Creek - Ten Mile Creek designated hydrologic basins. These basins are essentially over appropriated. The likelihood of obtaining new water rights is low and the purchase or leasing of existing rights will likely be necessary. Elko County

Gold Standard will need a Special Use Permit issued by Elko County. This permit will need to include a road maintenance agreement for any county road to be used to access the project.

20.7 OTHER PERMITS

In addition to the principal environmental permits outlined above, Table 20-1 lists other notifications or ministerial permits that may likely be necessary to operate the project.

   

20-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 20-1: Ministerial Permits, Plans, and Notifications

Notification/Permit Agency Timeframe Comments
Plan of Operations Bureau of Land Management Dependent on NEPA  
Nevada Reclamation Permit Nevada Bureau of Mining
Regulation and Reclamation
Four Months  
Water Pollution Control Permit Nevada Bureau of Mining
Regulation and Reclamation
Eight Months  
Air Quality Operating Permit Nevada Bureau of Air Pollution
Control
Three Months  
Industrial Artificial Pond Permit Nevada Department of Wildlife Three weeks  
Water Rights Nevada Division of Water
Resources
   
Mine Registry Nevada Division of Minerals 30 days after mine operations
begin
 
Mine Opening Notification State Inspector of Mines Before mine operations begin  
Solid Waste Landfill Nevada Bureau of Waste
Management
180 days prior to landfill
operations
 
Hazardous Waste
Management Permit
Nevada Bureau of Waste
Management
Prior to the management or
recycling of hazardous waste
 
General Storm Water Permit Nevada Bureau of Water
Pollution Control
Prior to construction activities  
Hazardous Materials Permit State Fire Marshall 30 days after the start of
operations
 
Fire and Life Safety State Fire Marshall Prior to construction  
Explosives Permit Bureau of Alcohol, Tobacco,
and Firearms
Prior to purchasing
explosives
Mining contractor may be
responsible for permit
Mine Identification Number MSHA Prior to start-up  
Notification of Commencement
of Operation
MSHA Prior to start-up  
Radio License Federal Communications
Commission
Prior to radio use  

20.8 ENVIRONMENTAL STUDY RESULTS AND KNOWN ISSUES

As previously outlined, the SRMP is a previously explored minerals property with exploration related disturbance. However, there have been very long periods of non-operation. There are no known ongoing environmental issues with any of the regulatory agencies. Gold Standard has been conducting baseline data collection for a couple of years for environmental studies required to support the Plan Application and permitting process. The waste and mineralized material characterization and the hydrogeologic evaluation are currently in their latter stages of development. Material characterization indicates the need to manage a significant portion of the waste rock as potentially acid generating in engineered facilities. Additional results to date indicate limited cultural issues, air quality impacts appear to be within State of Nevada standards, traffic and noise issues are present but at low levels, and socioeconomic impacts are positive. There are golden eagle and Greater sage-grouse in the SRMP and the vicinity, which will need to be addressed in the permitting of the project. Gold Standard is working with the BLM on the management of these species.

20.9 WASTE DISPOSAL AND MONITORING

Waste rock characterization is being conducted and it is anticipated that the results will indicate that a portion of the waste rock and mineralized material are likely to be reactive, acid generating, and would leach metals. As a result, a detailed waste rock management plan and waste rock management strategy will need to be developed. This strategy and plan will be developed once the characterization work is completed.

   

20-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

20.10 SOCIAL AND COMMUNITY ISSUES

Social and community impacts have been and are being considered and evaluated for the Plan Amendment and Plan Application performed for the project in accordance with the NEPA and other federal laws. Potentially affected Native American tribes, tribal organizations, and/or individuals are consulted during the preparation of all plan amendments to advise on the proposed projects that may have an effect on cultural sites, resources, and traditional activities.

Potential community impacts to existing population and demographics, income, employment, economy, public finance, housing, community facilities, and community services are evaluated for potential impacts as part of the NEPA process. There are no known social or community issues that would have a material impact on the project’s ability to extract mineral resources. Identified socioeconomic issues (employment, payroll, services and supply purchases, and state and local tax payments) are anticipated to be positive.

20.11 MINE CLOSURE

A Tentative Plan for Permanent Closure (“TPPC”) for the project would be submitted to the BMRR with the WPCP application. In the TPPC, the proposed heap leach closure approach would consist of fluid management through evaporation, covering the heap leach growth media, and then revegetating. The design of the process components is not sufficiently advanced to determine the closure costs. Any residual heap leach drainage will be managed with evaporation cells.

The current bond for the SRMP is approximately $1,135,693 to reclaim the exploration related disturbance.

   

20-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 21 TABLE OF CONTENTS

SECTION     PAGE
21 CAPITAL AND OPERATING COSTS 21-1
  21.1 MINING CAPITAL 21-2
    21.1.1 Primary Equipment 21-2
    21.1.2 Support Equipment 21-2
    21.1.3 Blasting Equipment 21-3
    21.1.4 Mine Maintenance Capital 21-3
    21.1.5 Other Capital 21-3
    21.1.6 Mine Pre-production 21-3
    21.1.7 Mine Equipment Salvage 21-3
  21.2 PROCESS CAPITAL 21-4
    21.2.1 Process Capital Cost Summary 21-4
    21.2.2 Freight 21-6
    21.2.3 Construction Support 21-6
    21.2.4 EPCM 21-6
    21.2.5 Vendor Support 21-6
    21.2.6 Spare Parts 21-6
  21.3 OWNER’S COSTS 21-6
    21.3.1 Land Purchases 21-6
  21.4 MINE OPERATING COST 21-7
    21.4.1 Mine General Services 21-7
    21.4.2 Mine Maintenance 21-8
    21.4.3 Drilling 21-9
    21.4.4 Blasting 21-9
    21.4.5 Loading 21-10
    21.4.6 Hauling 21-11
    21.4.7 Mine Support 21-11
    21.4.8 Leasing and Rental Costs 21-12
  21.5 PROCESS OPERATING COST SUMMARY 21-13
    21.5.1 Personnel and Staffing 21-15
    21.5.2 Power 21-15
    21.5.3 Consumable Items 21-15
    21.5.4 General Facilities (Process Equipment Costs) 21-17
    21.5.5 Process Operating Cost Exclusions 21-17
    21.5.6 Generator Lease Costs 21-17
  21.6 G&A COSTS   21-18

 

   

21-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 21 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 21-1: Capital Cost Summary 21-1
Table 21-2: Operating Cost Summary 21-1
Table 21-3: Mining Capital Cost by Year 21-2
Table 21-4: Salvage Value Estimate 21-4
Table 21-5: Initial Capital Process Plant Cost Summary 21-5
Table 21-6: Expansion Capital Process Plant Cost Summary 21-5
Table 21-7: Yearly Mine Operating Cost Estimate 21-7
Table 21-8: Mine General Services Costs 21-8
Table 21-9: Yearly Mine Maintenance Costs 21-8
Table 21-10: Yearly Drilling Costs 21-9
Table 21-11: Yearly Blasting Costs 21-10
Table 21-12: Yearly Loading Costs 21-10
Table 21-13: Yearly Haulage Costs 21-11
Table 21-14: Yearly Mine Support Costs 21-11
Table 21-15: Lease and Rental Operating Costs 21-13
Table 21-16: LOM Operating Costs by Process Type, US$/tonne ore 21-13
Table 21-17: Life of Mine Average Process Operating Cost by Year 21-14
Table 21-18: Power Requirements Summary 21-15
Table 21-19: Process Consumables Average Annual Consumptions 21-16
Table 21-20: Yearly G&A Costs 21-18

 

   

21-ii

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

21 CAPITAL AND OPERATING COSTS

Capital and operating costs were estimated for the PFS by MDA (mining and infrastructure), KCA (process plant), Stantec (waters systems and storm water diversion), The MINES Group (heap leach facilities), and M3 (site development and ancillaries). Table 21-1 shows the estimated capital costs for the project. This includes $132.9 million dollars in Year -1, $64.8 million in Year 3 and $87.9 million for sustaining capital. Total capital costs are estimated at $285.6 million.

Table 21-1: Capital Cost Summary

Category Units Initial Expansion Sustaining Total
Site General (incl. Roads, Water Systems) K USD $16,375 $3,747 $7,908 $28,039
Crush, Agglomeration, & Stacking K USD $2,046 $32,191 $1,400 $35,638
Heap Leach Pad (including Liners) K USD $10,775 - $11,539 $22,315
Process Plant (ADR, Refinery, Reagents) K USD $16,798 - - $16,798
Power Supply & Distribution K USD $6,409 $1,500 - $7,909
ADR & Refinery Building K USD $3,376 $730 - $4,106
Ancillaries (Warehouse, Maint, Admin, Fuel) K USD $7,615 - - $7,615
Freight K USD $2,097 $2,084 - $4,181
Sub-Total Direct Cost (Process Plant) K USD $65,503 $40,252 $20,847 $126,602
Construction Support (incl. Mobilization) K USD $1,813 $1,079 - $2,892
Engineering, Procurement, Const. Mgmt. K USD $8,012 $7,423 - $15,435
Vendor Support K USD $1,967 $414 - $2,381
Spare Parts K USD $770 $910 - $1,681
Contingency K USD $11,710 $8,613 - $20,323
Owner's Cost K USD $4,160 $2,971 - $7,131
Taxes (County) K USD $1,861 $1,849 - $3,711
Generator Lease K USD $979 $1,332 $8,353 $10,664
Sub-Total Indirect Cost K USD $31,273 $24,591 $8,353 $64,217
Mine Capital Equipment K USD $15,542 - $58,654 $74,196
Preproduction Costs K USD $20,559 - - $20,559
Sub-Total Mine Capital K USD $36,101 - $58,654 $94,755
TOTAL CAPITAL COST K USD $132,877 $64,844 $87,853 $285,573

Table 21-2 shows the estimated operating costs for the LOM project. Operating costs were estimated at $545 million for the LOM. This is $11.54 per tonne processed or $593 per ounce of gold produced.

Table 21-2: Operating Cost Summary

    Production Cost
Category K USD $/ ton $/ Au oz $/ Au oz*
Mining Costs $336,365 $7.13 $366.47 -
Process Plant $157,412 $3.34 $171.50 -
G&A $33,120 $0.70 $ 36.08 -
Toll Processing $13,063 $0.28 $ 14.23 -
Refining $4,612 $0.10 $5.03 -
TOTAL OPERATING COST $544,573 $ 11.54 $593.31 $582.30

* Including Silver Credit as a Reduction to Total Operating

   

21-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

21.1 MINING CAPITAL

Mining capital estimates for this PFS assume owner operations of mining equipment and were based on the equipment and facilities required to achieve the production schedule shown in Table 16-4. Capital costs were estimated based on vendor quotations, estimation guides, and benchmarks of recent costs for similar projects. Mining capital includes assumptions for leased-to-own equipment along with equipment purchases. These assumptions include terms of 15% down and 5.5% annual effective interest rates on remaining principal based on vendor inputs. The down payments and principal portions of quarterly payments have been applied to capital while quarterly interest payments are applied to operating costs.

Leased-to-own equipment includes production drills, large loaders, hydraulic shovels, haul trucks (except for rented haul trucks), dozers, graders, water trucks, lube and fuel trucks, mechanics trucks, and tire trucks. In addition, some equipment is assumed to be rented. The rented equipment includes pioneering drills and some haul trucks. This is further discussed in the mine operating costs section (Section 21.4).

The mining capital estimate is summarized by year in Table 21-3.

Table 21-3: Mining Capital Cost by Year

Total Mining Capital Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10 Total
Primary Equipment KUSD $6,941 $6,127 $5,408 $5,396 $5,699 $6,019 $6,357 $6,714 $5,297 $1,127 $329 $55,413
Support Equipment KUSD $2,766 $967 $1,021 $1,078 $1,139 $1,203 $1,270 $1,341 $699 $ - $ - $11,483
Blasting Equipment KUSD $409 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $409
Mine Maintenance Equipment KUSD $327 $152 $160 $169 $179 $189 $199 $211 $110 $ - $ - $1,695
Other Mine Capital KUSD $5,099 $6 $6 $85 $ - $ - $ - $ - $ - $ - $ - $5,196
Mine Preproduction KUSD $20,559 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $20,559
Mining Equipment Salvage KUSD $ - $ - $ - $ - $ - $ - $(1,713) $(17,116) $ - $ - $ - $(18,829)
Total Mine Capital KUSD $36,101 $7,251 $6,596 $6,728 $7,016 $7,410 $6,113 $(8,851) $6,106 $1,127 $329 $75,926

21.1.1 Primary Equipment

Primary equipment purchases refer to the purchase of drills, loading equipment, and haul trucks. The total LOM primary equipment cost estimate is $55.4 million which includes:

  • $13.7 million for production drills;

  • $5.0 million for a large loader;

  • $14.2 million for hydraulic shovels; and

  • $22.6 million for 136-tonne capacity haul trucks.

Note that for 136-tonne capacity haul trucks, 9 are leased with option to purchase for the life of mine, and 8 are rented during high haulage requirements of North Dark Star deep material.

21.1.2 Support Equipment

Support equipment includes the equipment required to support the primary mining equipment. This includes dozers to manage dumping locations and cleanup of benches for drilling and loading equipment. This also includes road maintenance equipment such as water trucks and graders. The total estimated capital for support equipment is $11.5 million and includes:

  • $4.5 million for dozers of various sizes;

  • $2.8 million for motor graders;

  • $3.6 million for water trucks;

   

21-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT
  • $61,000 for in-pit pumps to control runoff water;

  • $505,000 for a 50-ton capacity crane (to be shared between mining and process); and

  • $116,000 for a flatbed truck used for moving maintenance items within the mine.

21.1.3 Blasting Equipment

Blasting equipment includes explosives trucks for use in loading blast holes and a skid loader to be used for stemming holes. The cost estimate for blasting equipment is $409,000 which includes $280,000 for one explosives truck and $129,000 for a skid loader.

21.1.4 Mine Maintenance Capital

Mine maintenance capital includes one large lubrication truck at $1,017,000; two mechanic’s trucks totaling $321,000, and two tire trucks totaling $356,000.

21.1.5 Other Capital

Other capital includes an assortment of equipment and facilities totaling $5.2 million. This includes:

  • $81,000 for light plants;

  • $80,000 for ANFO storage bins;

  • $12,000 for powder magazines to store boosters;

  • $7,000 for a cap magazine;

  • $64,000 for mobile radios in equipment and assorted handheld radios;

  • $750,000 for general shop equipment including hoists and other tooling;

  • $105,000 for engineering computers, plotters, and other office equipment;

  • $20,000 for dust suppression storage bladders;

  • $150,000 for surveying equipment and GPS base stations;

  • $53,000 for fuel island facilities;

  • $3.5 million for shop and office facilities;

  • $225,000 in access roads to each deposit and site preparation; and

  • $150,000 for ambulance and firefighting equipment.

Note that the access roads to each deposit and site preparations are estimated for each deposit with $150,000 applied to the development of Dark Star; $75,000 applied for the preparation of Pinion. These amounts do not include the estimate for the main access road from Highway 278.

21.1.6 Mine Pre-production

Mine pre-production is considered as the cost of all mining prior to the start of gold production from the ROM leach pad. For the PFS, this is a 10-month period from the start of mining operations. The total mining costs during preproduction are estimated at $20.6 million.

21.1.7 Mine Equipment Salvage

Mine equipment salvage has been estimated and applied at the end of the equipment useful life. The estimate assumes that the equipment value would depreciate immediately once placed into service by 10%. An assumed life-of-equipment hours were also assumed based on experience in operations. The life of equipment was compared to the equipment hours used by fleet or unit and the percent remaining was calculated. The percent remaining was then multiplied by

   

21-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

the value of the equipment after the initial depreciation. Where the percent of remaining life was less than zero, no salvage was considered.

Table 21-4 shows the value estimate used for salvage. The last column in Table 21-4 shows the period when the salvage is applied. Total salvage value credited at the end of the mine life is $18.8 million.

Table 21-4: Salvage Value Estimate

            Initial
Depreciation
After Initial
Depreciation
  Capex
Consumed
Period for
Salvage
Primary Equipment Units Hrs Used Life Hrs % Remaining Cost Salvage
Production Drill #1 1 44,614 40,000 -12% $ 3,186 $319 $2,868 $- $3,186 38
Production Drill #2 1 38,990 40,000 3% $ 3,186 $319 $2,868 $72 $3,114 77
Production Drill #3 1 22,353 40,000 44% $ 3,186 $319 $2,868 $1,265 $1,921 86
Production Drill #4 1 8,816 40,000 78% $ 3,186 $319 $2,868 $2,236 $951 93
PC4000 - 23 cu m Hyd. Shovel #1 1 36,235 50,000 28% $ 6,622 $662 $5,959 $1,641 $4,981 79
PC4000 - 23 cu m Hyd. Shovel #2 1 38,537 50,000 23% $ 6,622 $662 $5,959 $1,366 $5,255 93
21.5-yrd Loader 1 20,908 30,000 30% $ 4,690 $469 $4,221 $1,279 $3,411 93
Haul Truck Fleet #1 7 48,708 60,000 19% $ 46,351 $4,635 $ 41,716 $7,851 $38,500 93
Haul Truck Fleet #2 2 52,345 60,000 13% $ 13,243 $1,324 $ 11,919 $1,521 $11,723 93
Haul Truck Fleet #3 This fleet is rented                
Explosives Truck 1 15,530 20,000 22% $ 262 $26 $236 $53 $209 93
Water Truck - 20,000 Gallon #1 1 31,973 50,000 36% 1,657 $166 $1,492 $538 $1,120 93
Water Truck - 20,000 Gallon #2 1 31,973 50,000 36% 1,657 $166 $1,492 $538 $1,120 93
430 Kw Dozer (D375A-8) #1 1 47,959 40,000 -20% 1,141 $114 $1,027 $- $1,141 93
430 Kw Dozer (D375A-8) #1 1 47,959 40,000 -20% 1,141 $114 $1,027 $- $1,141 93
300 Kw Dozer (D9) #1 1 31,973 30,000 -7% 1,200 $120 $1,080 $- $1,200 93
230 Kw Dozer (D8) #1 1 31,973 30,000 -7% 688 $69 $619 $- $688 93
18’ Motor Grader (18M) #1 1 31,973 40,000 20% 1,300 $130 $1,170 $235 $1,065 93
18’ Motor Grader (18M) #1 1 31,973 40,000 20% 1,300 $130 $1,170 $235 $1,065 93

21.2 PROCESS CAPITAL

21.2.1 Process Capital Cost Summary

The process plant costs are comprised of costs for the process facilities, as well as costs for site access, heap leach pad and ponds construction, infrastructure development, power generation and distribution, and ancillaries. These direct costs are developed from labor, materials, plant equipment, construction equipment, and freight. Indirect costs are applied to the direct costs to account for items such as: construction support; engineering, procurement, and construction management (EPCM); vendor support during specialty construction and commissioning; spare parts; contingency; owner’s costs; and taxes. Together, the direct and indirect costs form the capital costs.

The direct process plant cost for this PFS has multiple contributors. Stantec developed the direct costs for the water systems and storm water diversion system. KCA developed the costs for the process plant, including crushing, agglomeration, stacking, the adsorption, desorption, recovery plant, refinery, and reagents. The Mines Group developed the costs for the heap leach facility. M3 developed the costs for site access, site layout, and several ancillaries, such as the laboratory, warehouse and maintenance, including the truck shop, administration building, and the fuel station.

Indirect costs were then calculated following industry accepted methodologies, including contingency at 15% of total contracted cost. Total contracted costs include all process plant direct costs, plus construction support costs, EPCM costs, vendor support costs, and spare parts costs. First fills were calculated by KCA. Owner’s Costs were added at 8% of total contracted costs. Elko County Sales taxes are included at 7.10% of plant equipment and material costs.

Process plant capital costs were independently developed for the initial phase of the project and well as for the expansion phase. All capital cost estimates are based on the purchase of new equipment.

   

21-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

The total evaluated project cost is projected to be in the accuracy range of +/-20%.

Table 21-5: Initial Capital Process Plant Cost Summary

Category (all costs are in USD$000) Labor Plant
Equip.
Material Sub
Contract
Const.
Equip.
Total
Site General (incl. Roads, Water Systems) $8,568 - $3,949 - $3,867 $16,385
Crush, Agglomeration, & Stacking $793 $87 $524 - $642 $2,046
Heap Leach Pad (including Liners) $3,902 - $3,007 - $3,866 $10,775
Process Plant (ADR, Refinery, Reagents) $6,375 $7,421 $1,542 - $1,460 $16,798
Power Generation & Distribution $888 $4,867 $531 - $124 $6,409
ADR & Refinery Building $1,373 $123 $1,486 $90 $306 $3,376
Ancillaries (Warehouse, Maint, Admin, Fuel) $1,693 $1,510 $1,167 $3,071 $175 $7,615
Freight - $1,121 $977 - - $2,097
Sub-Total Direct Cost (Process Plant) $23,592 $15,127 $13,183 $3,160 $10,440 $65,503
Construction Support (including Mobilization)           $1,813
Engineering, Procurement, Construction Management           $8,012
Vendor Support           $1,967
Spare Parts           $770
Contingency           $11,710
Owner's Cost           $4,160
Taxes (County)           $1,861
Generator Lease (Capitalized Portion)           $979
Sub-Total Indirect Cost           $31,273
TOTAL CAPITAL COST           $96,775

Table 21-6: Expansion Capital Process Plant Cost Summary

Category (all costs are in US$000) Labor Plant
Equip.
Material Sub
Contract
Const.
Equip.
Total
Site General (incl. Roads, Water Systems) $2,344 - $877 - $526 $3,747
Crush, Agglomeration, & Stacking $9,171 $15,233 $6,149 $161 $1,478 $32,191
Heap Leach Pad (including Liners) - - - - - -
Process Plant (ADR, Refinery, Reagents) - - - - - -
Power Generation & Distribution $164 $1,318 - - $18 $1,500
ADR & Refinery Building $214 - $515 - - $730
Ancillaries (Warehouse, Maint, Admin, Fuel) - - - - - -
Freight - $1,324 $760 - - $2,084
Sub-Total Direct Cost (Process Plant) $11,894 $17,875 $8,301 $161 $2,022 $40,252
Construction Support (including Mobilization)           $1,079
Engineering, Procurement, Construction Management           $7,423
Vendor Support           $414
Spare Parts           $910
Contingency           $8,613
Owner's Cost           $2,971
Taxes (County)           $1,849
Generator Lease (Capitalized Portion)           $1,332
Sub-Total Indirect Cost           $24,591
TOTAL CAPITAL COST           $64,844

 

   

21-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

21.2.2 Freight

Estimates for equipment and material freight costs are based on bulk freight loads and have been estimated at 8% of the equipment cost.

21.2.3 Construction Support

Mobilization is included as an indirect cost at 3.5% of civil and concrete total commodity direct costs and at 1% of the balance of the other commodity direct costs.

Temporary construction facilities are included at 0.5% of total direct field cost (TDFC). Temporary construction power is included at 0.1% of TDFC.

21.2.4 EPCM

Engineering is included at 6.0% of total constructed cost (TCC), excluding KCA turn-key scope items, which are detailed in the vendor support section. Project services are included at 1.0% of TCC, excluding KCA turn-key scope items. Project controls are included at 0.75% of TCC, excluding KCA turn-key scope items. Construction Management is included at 6.5% of TCC, excluding KCA turn-key scope items.

An EPCM Fee has been excluded.

EPCM construction trailers are included at 0.25% of TCC, excluding KCA turn-key scope items.

21.2.5 Vendor Support

Supplier engineering for the ADR and associated facilities is quoted at $1,967,000 as part of the turn-key ADR proposal. The turn-key scope includes design and supply of the pregnant and barren solution handling system, the ADR facility, the refinery, and the plant reagents systems.

Vendor supervision of specialty construction is included at 1.5% of plant equipment supply costs. Vendor pre-commissioning is included at 0.5% of plant equipment supply costs. Vendor commissioning is included at 0.5% of plant equipment supply costs.

21.2.6 Spare Parts

Capital spare parts are included at 5.0% of plant equipment supply costs. Commissioning spare parts are included at 0.5% of plant equipment supply costs. Two-year operating spare parts are excluded.

21.3 OWNER’S COSTS

Owner’s costs were added at 8% of total contracted costs. Total contracted costs include all process plant direct costs, plus construction support costs, EPCM costs, vendor support costs, and spare parts costs. The initial phase capital and the expansion phase capital each includes an allocation for the owner’s costs.

21.3.1 Land Purchases

At total of $3,860,000 is estimated for surface estate purchase obligations based on amounts provided by Gold Standard. This includes costs for mining leases and surface use agreements.

   

21-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

21.4 MINE OPERATING COST

Mine operating costs were estimated using first principals. This was done using estimated hourly costs of equipment and personnel against the anticipated hours of work for each. The equipment hourly costs were estimated for fuel, oil and lubrication, tires, under-carriage, repair and maintenance costs, and special wear items.

The largest consumable costs are tires, fuel, and explosives. Tire costs vary by equipment and assumed hours per tire. Fuel cost were assumed to be $0.66 per liter ($2.50 per gallon). ANFO and emulsion blend is assumed to be $700 per tonne which includes transportation costs.

Personnel costs include supervision, operating labor, and maintenance labor. The mine operating costs are summarized by year in Table 21-7. The LOM operating costs before capitalization of preproduction costs are $356.9 million and average $1.86 per tonnes. After capitalization of pre-stripping, the LOM mine operating cost is estimated to be $336.4 million or $1.75 per tonne mined.

Table 21-7: Yearly Mine Operating Cost Estimate

Mine Op Cost Summary Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Total
Mine General Service K USD $670 $844 $844 $844 $844 $844 $844 $844 $563 $ - $ 7,139
Mine Maintenance K USD $1,661 $ 2,491 $ 2,491 $ 2,491 $ 2,492 $ 2,491 $ 2,491 $ 2,491 $ 1,662 $ - $ 20,761
Engineering K USD $505 $716 $716 $716 $716 $716 $716 $716 $478 $ - $ 5,998
Geology K USD $297 $414 $414 $414 $414 $414 $414 $414 $276 $ - $ 3,470
Drilling K USD $1,890 $ 3,724 $ 4,838 $ 6,820 $ 4,565 $ 3,837 $ 3,629 $ 2,498 $ 1,051 $ - $ 32,852
Blasting K USD $2,484 $ 5,118 $ 6,700 $ 9,114 $ 6,003 $ 5,196 $ 5,113 $ 3,501 $ 1,596 $ - $ 44,825
Loading K USD $2,357 $ 5,990 $ 7,119 $ 9,409 $ 6,024 $ 5,404 $ 5,759 $ 3,401 $ 1,421 $ - $ 46,884
Hauling K USD $5,502 $ 14,436 $ 18,342 $ 29,526 $ 17,382 $ 12,903 $ 12,677 $ 8,163 $ 3,136 $ - $ 122,068
Mine Support K USD $4,047 $ 6,048 $ 6,048 $ 6,048 $ 6,057 $ 6,048 $ 6,048 $ 6,048 $ 4,038 $ - $ 50,427
Total Mining Cost K USD $ 19,412 $ 39,781 $ 47,512 $ 65,383 $ 44,499 $ 37,853 $ 37,690 $ 28,075 $ 14,219 $ - $ 334,424
Leased Equipment Interest K USD $915 $ 2,567 $ 2,552 $ 2,324 $ 1,951 $ 1,557 $ 1,141 $702 $252 $46 $ 14,017
Rental Equipment Charges K USD $232 $ - $ 1,654 $ 5,846 $752 $ - $ - $ - $ - $ - $ 8,483
Total Additional Operating Costs K USD $1,147 $ 2,567 $ 4,206 $ 8,170 $ 2,703 $ 1,557 $ 1,141 $702 $252 $46 $ 22,500
Net Total Mining Cost K USD $ 20,559 $ 42,348 $ 51,718 $ 73,552 $ 47,202 $ 39,410 $ 38,831 $ 28,777 $ 14,471 $46 $ 356,924
Prestrip Mining Capital K USD $ 20,559 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 20,559
Net Mine Operating Cost K USD $ - $ 42,348 $ 51,718 $ 73,552 $ 47,202 $ 39,410 $ 38,831 $ 28,777 $ 14,471 $46 $ 336,365
Cost per Ton                        
Mine General Service $/t $0.06 $ 0.04 $ 0.03 $ 0.02 $ 0.03 $ 0.04 $ 0.04 $ 0.06 $ 0.11 $ - $ 0.04
Mine Maintenance $/t $0.15 $ 0.12 $ 0.09 $ 0.06 $ 0.10 $ 0.11 $ 0.11 $ 0.18 $ 0.33 $ - $ 0.11
Engineering $/t $0.05 $ 0.03 $ 0.03 $ 0.02 $ 0.03 $ 0.03 $ 0.03 $ 0.05 $ 0.09 $ - $ 0.03
Geology $/t $0.03 $ 0.02 $ 0.01 $ 0.01 $ 0.02 $ 0.02 $ 0.02 $ 0.03 $ 0.05 $ - $ 0.02
Drilling $/t $0.18 $ 0.18 $ 0.17 $ 0.16 $ 0.18 $ 0.18 $ 0.15 $ 0.18 $ 0.21 $ - $ 0.17
Blasting $/t $0.23 $ 0.24 $ 0.24 $ 0.22 $ 0.23 $ 0.24 $ 0.22 $ 0.26 $ 0.32 $ - $ 0.23
Loading $/t $0.22 $ 0.29 $ 0.25 $ 0.22 $ 0.23 $ 0.25 $ 0.25 $ 0.25 $ 0.28 $ - $ 0.24
Hauling $/t $0.51 $ 0.69 $ 0.65 $ 0.70 $ 0.67 $ 0.59 $ 0.54 $ 0.60 $ 0.62 $ - $ 0.64
Mine Support $/t $0.38 $ 0.29 $ 0.21 $ 0.14 $ 0.23 $ 0.28 $ 0.26 $ 0.45 $ 0.80 $ - $ 0.26
Total Mining Cost $/t $1.80 $ 1.90 $ 1.68 $ 1.54 $ 1.72 $ 1.73 $ 1.61 $ 2.08 $ 2.81 $ - $ 1.74
Leased Equipment Interest $/t $0.09 $ 0.12 $ 0.09 $ 0.05 $ 0.08 $ 0.07 $ 0.05 $ 0.05 $ 0.05 $ - $ 0.07
Rental Equipment Charges $/t $0.02 $ - $ 0.06 $ 0.14 $ 0.03 $ - $ - $ - $ - $ - $ 0.04
Total Additional Operating Costs $/t $0.11 $ 0.12 $ 0.15 $ 0.19 $ 0.10 $ 0.07 $ 0.05 $ 0.05 $ 0.05 $ - $ 0.12
Net Total Mining Cost $/t $1.91 $ 2.02 $ 1.82 $ 1.74 $ 1.83 $ 1.80 $ 1.66 $ 2.13 $ 2.86 $ - $ 1.86
Prestrip Mining Capital $/t $1.91 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 0.11
Net Mine Operating Cost $/t $ - $ 2.02 $ 1.82 $ 1.74 $ 1.83 $ 1.80 $ 1.66 $ 2.13 $ 2.86 $ - $ 1.75

21.4.1 Mine General Services

Mine general services includes mining supervision along with engineering and geology services. Supervision allows for a mine superintendent, mine general foreman and mine shift foremen. Engineering personnel include a chief engineer along with engineers and surveying crew to support mine planning and operations. Geology is intended to support ore control, geological mapping, and sampling requirements.

Table 21-8 shows the yearly cost estimate for the mine general services.

   

21-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 21-8: Mine General Services Costs

Mine General Services Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Total
Supervision K USD $ 564 $676 $676 $676 $676 $676 $676 $676 $451 $ - $ 5,748
Hourly Personnel K USD $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Total K USD $ 564 $676 $676 $676 $676 $676 $676 $676 $451 $ - $ 5,748
Engineering                        
Salaried Personnel K USD $ 322 $442 $442 $442 $442 $442 442 $442 $294 $ - $ 3,708
Hourly Personnel K USD $ 163 $244 $244 $244 $244 $244 $244 $244 $163 $ - $ 2,037
Total K USD $ 485 $686 $686 $686 $686 $686 $686 $686 $457 $ - $ 5,744
Mine Geology                        
Salaried Personnel K USD $ 104 $124 $124 $124 $124 $124 $124 $124 $83 $ - $ 1,056
Hourly Personnel K USD $ 168 $253 $253 $253 $253 $253 $253 $253 $168 $ - $ 2,106
Total K USD $ 272 $377 $377 $377 $377 $377 $377 $377 $251 $ - $ 3,162
Supplies & Other                        
Mine General Services Supplies K USD $8 $12 $12 12 $12 $12 $12 $12 $8 $ - $ 102
Engineering Supplies K USD $20 $30 $30 $30 $30 $30 $30 $30 $20 $ - $ 253
Geology Supplies K USD $25 $37 $37 $37 $37 $37 $37 $37 $25 $ - $ 308
Outside Services K USD $50 $75 $75 $75 $75 $75 $75 $75 $50 $ - $ 625
Office Power K USD $7 $11 $11 $11 $11 $11 $11 $11 $7 $ - $ 91
Light Vehicles K USD $41 $69 $69 $69 $70 $69 $69 $69 $46 $ - $ 573
Total K USD $ 170 $264 $264 $264 $264 $264 $264 $264 $176 $ - $ 2,195
Totals - Mining General                        
Mine General K USD $ 689 $873 $873 $873 $873 $873 $873 $873 $582 $ - $ 7,381
Engineering K USD $ 505 $716 $716 $716 $716 $716 $716 $716 $478 $ - $ 5,998
Geology K USD $ 297 $414 $414 $414 $414 $414 $414 $414 $276 $ - $ 3,470
Totals K USD $ 1,491 $2,003 $2,003 $2,003 $2,003 $2,003 $2,003 $2,003 $1,336 $ - $ 16,849
Cost per Ton Mined                        
Mine General $/t $ 0.06 $0.04 $0.03 $0.02 $0.03 $0.04 $0.04 $0.06 $0.12 $ - $ 0.04
Engineering $/t $ 0.05 $0.03 $0.03 $0.02 $0.03 $0.03 $0.03 $0.05 $0.09 $ - $ 0.03
Geology $/t $ 0.03 $0.02 $0.01 $0.01 $0.02 $0.02 $0.02 $0.03 $0.05 $ - $ 0.02
Totals $/t $ 0.14 $0.10 $0.07 $0.05 $0.08 $0.09 $0.09 $0.15 $0.26 $ - $ 0.09

21.4.2 Mine Maintenance

Mine maintenance costs include the cost of personnel for maintenance, supervision, and planning, along with shop support personnel, including light vehicle mechanics, welders, servicemen, tire men, and maintenance labor.

The estimated mine maintenance costs are shown in Table 21-9. Note that these costs do not include the maintenance labor directly allocated to the various equipment, which is accounted for in the other mining cost categories.

Table 21-9: Yearly Mine Maintenance Costs

Wages & Salaries Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Total
Supervision K USD $340 $511 $511 $511 $511 $511 $511 $511 $340 $ - $ 4,255
Planners K USD $103 $155 $155 $155 $155 $155 $155 $155 $103 $ - $ 1,289
Hourly Personnel K USD $787 $1,181 $1,181 $1,181 $1,181 $1,181 $1,181 $1,181 $787 $ - $ 9,843
Total K USD $1,231 $1,846 $1,846 $1,846 $1,846 $1,846 $1,846 $1,846 $1,231 $ - $ 15,387
Other Costs                        
Supplies K USD $96 $144 $144 $144 $144 $144 $144 $144 $96 $ - $ 1,200
Light Vehicles K USD $13 $21 $21 $21 $21 $21 $21 $21 $14 $ - $ 176
Total K USD $109 $165 $165 $165 $165 $165 $165 $165 $110 $ - $ 1,376
                         
Consumables & Other Costs K USD $362 $543 $543 $543 $544 $543 $543 $543 $363 $ - $ 4,528
Parts / MARC Cost K USD $68 $101 $101 $101 $102 $101 $101 $101 $68 $ - $ 846
Wages & Salaries K USD $1,231 $1,846 $1,846 $1,846 $1,846 $1,846 $1,846 $1,846 $1,231 $ - $ 15,387
Total K USD $1,661 $2,491 $2,491 $2,491 $2,492 $2,491 $2,491 $2,491 $1,662 - $ 20,761
                         
Consumables $/t $0.03 $0.03 $0.02 $0.01 $0.02 $0.02 $0.02 $0.04 $0.07 $ - $ 0.02
Parts / MARC Cost $/t $0.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.01 $0.01 $ - $ 0.00
Maintenance Labor $/t $0.11 $0.09 $0.07 $0.04 $0.07 $0.08 $0.08 $0.14 $0.24 $ - $ 0.08
Total $/t $0.15 $0.12 $0.09 $0.06 $0.10 $0.11 $0.11 $0.18 $0.33 $ - $ 0.11

 

   

21-9

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

21.4.3 Drilling

Drilling cost estimates are shown in Table 21-10. The LOM drilling costs are estimated to be $32.8 million or $0.17 per tonne including pre-production.

Table 21-10: Yearly Drilling Costs

Drilling Operating Costs Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Total
Prod Drill Fuel Consumption K Liters 406 915 1,228 1,700 1,117 941 935 596 248 - 8,086
Prod Drill Fuel Cost K USD $ 268 $604 $811 $ 1,123 $738 $621 $618 $394 $164 $ - $ 5,341
Prod Drill Lube & Oil K USD $ 138 $312 $418 $579 $381 $320 $319 $203 $84 $ - $ 2,755
Prod Drill Undercarriage K USD $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Prod Drill Drill Bits & Steel K USD $ 445 $1,002 $ 1,344 $ 1,862 $1,224 $ 1,030 $ 1,024 $653 $271 $ - $ 8,855
Prod Drill Total Consumables K USD $ 851 $1,918 $ 2,573 $ 3,564 $2,342 $ 1,972 $ 1,960 $1,250 $519 $ - $ 16,950
Prod Drill Parts K USD $ 156 $351 $470 $652 $428 $361 $358 $229 $95 $ - $ 3,099
Prod Drill Maintenance Labor K USD $ 204 $472 $582 $757 $582 $488 $425 $330 $142 $ - $ 3,982
Pioneer Drill Fuel Consumption K Liters 52 - - 64 - - - - - - 116
Pioneer Drill Fuel Cost K USD $34 $ - $ - $42 $ - $ - $ - $ - $ - $ - $76
Pioneer Drill Lube & Oil K USD $10 $ - $ - $12 $ - $ - $ - $ - $ - $ - $22
Pioneer Drill Undercarriage K USD $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Pioneer Drill Drill Bits & Steel K USD $26 $ - $ - $32 $ - $ - $ - $ - $ - $ - $58
Pioneer Drill Total Consumables K USD $70 $ - $ - $86 $ - $ - $ - $ - $ - $ - $ 157
Pioneer Drill Parts / MARC Cost K USD $36 $ - $ - $45 $ - $ - $ - $ - $ - $ - $81
Pioneer Drill Maintenance Labor K USD $48 $ - $ - $45 $ - $ - $ - $ - $ - $ - $93
Total Drill Fuel Consumption K Liters 458 915 1,228 1,764 1,117 941 935 596 248 - 8,202
Total Drill Fuel Cost K USD $ 302 $604 $811 $ 1,165 $738 $621 $618 $394 $164 $ - $ 5,417
Total Drill Lube & Oil K USD $ 148 $312 $418 $591 $381 $320 $319 $203 $84 $ - $ 2,776
Total Drill Undercarriage K USD $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Total Drill Drill Bits & Steel K USD $ 471 $1,002 $ 1,344 $ 1,894 $1,224 $ 1,030 $ 1,024 $653 $271 $ - $ 8,913
Total Drill Total Consumables K USD $ 921 $1,918 $ 2,573 $ 3,650 $2,342 $ 1,972 $ 1,960 $1,250 $519 $ - $ 17,107
Total Drill Parts / MARC Cost K USD $ 192 $351 $470 $696 $428 $361 $358 $229 $95 $ - $ 3,180
Total Drill Maintenance Labor K USD $ 252 $472 $582 $802 $582 $488 $425 $330 $142 $ - $ 4,075
Total Drill Maintenance Allocation K USD $ 444 $823 $ 1,053 $ 1,499 $1,010 $848 $783 $559 $237 $ - $ 7,255
Total Operator Wages & Burden K USD $ 524 $983 $ 1,213 $ 1,672 $1,213 $ 1,016 $885 $688 $295 $ - $ 8,490
Total Drilling Cost K USD $ 1,890 $3,724 $ 4,838 $ 6,820 $4,565 $ 3,837 $ 3,629 $2,498 $1,051 $ - $ 32,852
Drilling Cost per Tonne Mined by Item                        
Fuel Cost $/t $ 0.03 $0.03 $ 0.03 $ 0.03 $0.03 $ 0.03 $ 0.03 $0.03 $0.03 $ - $ 0.03
Lube & Oil $/t $ 0.01 $0.01 $ 0.01 $ 0.01 $0.01 $ 0.01 $ 0.01 $0.02 $0.02 $ - $ 0.01
Undercarriage $/t $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Drill Bits & Steel $/t $ 0.04 $0.05 $ 0.05 $ 0.04 $0.05 $ 0.05 $ 0.04 $0.05 $0.05 $ - $ 0.05
Total Consumables $/t $ 0.09 $0.09 $ 0.09 $ 0.09 $0.09 $ 0.09 $ 0.08 $0.09 $0.10 $ - $ 0.09
Parts / MARC Cost $/t $ 0.02 $0.02 $ 0.02 $ 0.02 $0.02 $ 0.02 $ 0.02 $0.02 $0.02 $ - $ 0.02
Maintenance Labor $/t $ 0.02 $0.02 $ 0.02 $ 0.02 $0.02 $ 0.02 $ 0.02 $0.02 $0.03 $ - $ 0.02
Total Maintenance Allocation $/t $ 0.04 $0.04 $ 0.04 $ 0.04 $0.04 $ 0.04 $ 0.03 $0.04 $0.05 $ - $ 0.04
Operator Wages & Burden $/t $ 0.05 $0.05 $ 0.04 $ 0.04 $0.05 $ 0.05 $ 0.04 $0.05 $0.06 $ - $ 0.04
Total Drilling Cost $/t $ 0.18 $0.18 $ 0.17 $ 0.16 $0.18 $ 0.18 $ 0.15 $0.18 $0.21 $ - $ 0.17

21.4.4 Blasting

LOM blasting costs, including pre-production, are shown in Table 21-11. These costs are based on owner operations for blasting and assume heavy ANFO costs of $700/tonne, including transportation costs, for blasting agents. Blasting accessories costs of $26.00 per hole were also included into the blasting cost estimate.

   

21-9

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 21-11: Yearly Blasting Costs

Blasting Costs Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Total
Fuel K Liters 62 93 93 93 93 93 93 93 62 - 774
Blasting Consumables K USD $ 2,184 $4,669 $6,251 $8,666 $5,555 $4,748 $4,664 $3,052 $1,297 $- $ 41,087
Equipment Consumables K USD $ 48 $71 $71 $71 $71 $71 $71 $71 $47 $- $ 590
Equipment Maintenance Allocations K USD $ 10 $15 $15 $15 $15 $15 $15 $15 $10 $- $ 129
Personnel K USD $ 226 $338 $338 $338 $338 $338 $338 $338 $226 $- $ 2,819
Supplies K USD $ 8 $12 $12 $12 $12 $12 $12 $12 $8 $- $ 100
Outside Services K USD $ 8 $12 $12 $12 $12 $12 $12 $12 $8 $- $ 100
Total Blasting Costs K USD $ 2,484 $5,118 $6,700 $9,114 $6,003 $5,196 $5,113 $3,501 $1,596 $- $ 44,825
Cost per Ton                        
Blasting Consumables $/t $ 0.20 $0.22 $0.22 $0.20 $0.21 $0.22 $0.20 $0.23 $0.26 $- $ 0.21
Equipment Consumables $/t $ 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.01 $0.01 $- $ 0.00
Equipment Maintenance Allocations $/t $ 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $- $ 0.00
Personnel $/t $ 0.02 $0.02 $0.01 $0.01 $0.01 $0.02 $0.01 $0.03 $0.04 $- $ 0.01
Supplies $/t $ 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $- $ 0.00
Outside Services $/t $ 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $- $ 0.00
Total $/t $ 0.23 $0.24 $0.24 $0.22 $0.23 $0.24 $0.22 $0.26 $0.32 $- $ 0.23

21.4.5 Loading

Loading costs are based on operation of two hydraulic shovels with 22 cubic meter buckets for all primary production. In addition, a 21 cubic yard front-end-loader is assumed to be used for stockpile management and re-handling as well as backup for production during shovel maintenance. The yearly loading cost estimate is shown in Table 21-12.

Table 21-12: Yearly Loading Costs

Loading Costs Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Total
Fuel Consumption K Liters 985 1,728 2,335 3,155 2,100 1,804 1,930 1,112 416 - 15,567
Fuel Cost K USD $ 651 $ 1,141 $ 1,542 $2,084 $1,387 $1,191 $1,275 $735 $275 $- $ 10,281
Lube & Oil K USD $ - $- $- $- $- $- $- $- $- $- $ -
Tires / Under Carriage K USD $ - $- $- $- $- $- $- $- $- $- $ -
Wear Items & GET K USD $ 213 $374 $505 $682 $454 $390 $417 $240 $90 $- $ 3,365
Total Consumables K USD $ 863 $ 1,515 $ 2,047 $2,766 $1,841 $1,581 $1,692 $975 $365 $- $ 13,646
Parts / MARC Cost K USD $ 917 $ 1,609 $ 2,174 $2,937 $1,955 $1,679 $1,796 $1,035 $387 $- $ 14,488
Total Equip. Allocation (no labor) K USD $ 1,780 $ 3,123 $ 4,221 $5,703 $3,796 $3,260 $3,488 $2,010 $752 $- $ 28,134
Loader Cost                        
Fuel Consumption K Liters $- 660 681 1,185 373 336 384 163 57 - 3,840
Fuel Cost K USD $ - $436 $450 $782 $247 $222 $254 $108 $38 $- $ 2,536
Lube & Oil K USD $ - $136 $140 $244 $77 $69 $79 $34 $12 $- $ 791
Tires / Under Carriage K USD $ - $198 $204 $355 $112 $101 $115 $49 $17 $- $ 1,150
Wear Items & GET K USD $ - $43 $45 $77 $24 $22 $25 $11 $4 $- $ 251
Total Consumables K USD $ - $813 $839 $1,459 $460 $413 $473 $201 $70 $- $ 4,728
Parts / MARC Cost K USD $ - $246 $254 $442 $139 $125 $143 $61 $21 $- $ 1,433
Total Equip. Allocation (no labor) K USD $ - $ 1,060 $ 1,093 1,901 $599 $538 $616 $262 $92 $- $ 6,161
Total Loading Cost                        
Fuel Consumption K Liters 985 2,389 3,017 4,340 2,474 2,140 2,314 1,276 473 - 19,407
Fuel Cost K USD $ 651 $ 1,577 $ 1,992 $2,866 $1,634 $1,413 $1,528 $842 $313 $- $ 12,817
Lube & Oil K USD $ - $136 $140 $244 $77 $69 $79 $34 $12 $- $ 791
Tires / Under Carriage K USD $ - $198 $204 $355 $112 $101 $115 $49 $17 $- $ 1,150
Wear Items & GET K USD $ 213 $417 $549 $759 $478 $412 $442 $251 $94 $- $ 3,616
Total Consumables K USD $ 863 $ 2,328 $ 2,886 $4,225 $2,301 $1,995 $2,165 $1,176 $435 $- $ 18,374
Parts / MARC Cost K USD $ 917 $ 1,855 $ 2,428 $3,379 $2,094 $1,804 $1,940 $1,096 $409 $- $ 15,922
Total Equip. Allocation (no labor) K USD $ 1,780 $ 4,183 $ 5,314 $7,604 $4,395 $3,799 $4,104 $2,272 $844 $- $ 34,295
Maintenance Labor K USD $ 181 $566 $566 $566 $511 $503 $519 $354 $181 $- $ 3,949
Operator Wages & Burden K USD $ 396 $ 1,239 $ 1,239 $1,239 $1,118 $1,101 $1,136 $774 $396 $- $ 8,638
Total Loading Costs K USD $ 2,357 $ 5,988 $ 7,119 $9,409 $6,024 $5,404 $5,759 $3,401 $1,421 $- $ 46,882
Cost per Ton                        
Fuel Cost $/t $ 0.06 $ 0.08 $ 0.07 $0.07 $0.06 $0.06 $0.07 $0.06 $0.06 $- $ 0.07
Lube & Oil $/t $ - $ 0.01 $ 0.00 $0.01 $0.00 $0.00 $0.00 $0.00 0.00 $- $ 0.00
Tires / Under Carriage $/t $ - $ 0.01 $ 0.01 $0.01 $0.00 $0.00 $0.00 $0.00 $0.00 $- $ 0.01
Wear Items & GET $/t $ 0.02 $ 0.02 $ 0.02 $0.02 $0.02 $0.02 $0.02 $0.02 $0.02 $- $ 0.02
Total Consumables $/t $ 0.08 $ 0.11 $ 0.10 $0.10 $0.09 $0.09 $0.09 $0.09 $0.09 $- $ 0.10
Parts / MARC Cost $/t $ 0.09 $ 0.09 $ 0.09 $0.08 $0.08 $0.08 $0.08 $0.08 $0.08 $- $ 0.08
Total Equip. Allocation (no labor) $/t $ 0.17 $ 0.20 $ 0.19 $0.18 $0.17 $0.17 $0.18 $0.17 $0.17 $- $ 0.18
Maintenance Labor $/t $ 0.02 $ 0.03 $ 0.02 $0.01 $0.02 $0.02 $0.02 $0.03 $0.04 $- $ 0.02
Operator Wages & Burden $/t $ 0.04 $ 0.06 $ 0.04 $0.03 $0.04 $0.05 $0.05 $0.06 $0.08 $- $ 0.04
Total Loading Cost $/t $ 0.22 $ 0.29 $ 0.25 $0.22 $0.23 $0.25 $0.25 $0.25 $0.28 $- $ 0.24

 

   

21-10

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

21.4.6 Hauling

Haulage cost was estimated using the truck hour estimates discussed in Section 16.5.3. The yearly haulage cost estimate is shown in Table 21-13.

Table 21-13: Yearly Haulage Costs

Total Truck Hours Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Total
Productive Hours Prod Hrs 16,674 44,248 56,879 93,840 54,442 39,418 39,245 21,916 9,122 - 375,783
Operating Efficiency % 83% 83% 83% 83% 83% 83% 83% 83% 83% 83% 83%
Operating Hours Op Hrs 20,090 53,310 68,529 113,060 65,593 47,491 47,284 26,404 10,991 - 452,751
Equipment Hours Eq Hrs 22,960 60,926 78,318 129,211 74,963 54,276 54,038 30,176 12,561 - 517,430
Number of Trucks # 7 7 7 7 8 8 9 9 9 9 9
Truck Availability % 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%
Available Equipment Hours Op Hrs 22,548 57,171 70,335 106,758 63,840 49,175 46,733 38,467 13,066 - 468,094
Use of Available Hours % 89% 93% 97% 106% 103% 97% 101% 69% 84% 0% 97%
Haulage Cost                        
Fuel Consumption K Liters 2,409 6,392 8,217 13,556 7,865 5,694 5,669 3,166 1,318 - 54,285
Fuel Cost K USD $ 1,591 $ 4,221 $ 5,426 $ 8,953 $ 5,194 $ 3,761 $ 3,744 $ 2,091 $870 $- $ 35,851
Lube & Oil K USD $ - $ - $ - $ - $ - $ - $ - $- $- $- $ -
Tires K USD $ 735 $ 1,950 $ 2,506 $ 4,135 $ 2,399 $ 1,737 $ 1,729 $966 $402 $- $ 16,558
Wear Items & GET K USD $ 57 $ 152 $ 196 $ 323 $ 187 $ 136 $ 135 $75 $31 $- $ 1,294
Total Consumables K USD $ 2,383 $ 6,323 $ 8,128 $ 13,411 $ 7,780 $ 5,633 $ 5,609 $ 3,132 $1,304 $- $ 53,703
Parts / MARC Cost K USD $ 1,278 $ 3,392 $ 4,361 $ 7,194 $ 4,174 $ 3,022 $ 3,009 $ 1,680 $699 $- $ 28,810
Total Equip. Allocation (no labor) K USD $ 3,661 $ 9,716 $ 12,489 $ 20,605 $ 11,954 $ 8,655 $ 8,617 $ 4,812 $2,003 $- $ 82,513
Maintenance Labor K USD $ 614 $ 1,573 $ 1,951 $ 2,974 $ 1,809 $ 1,416 $ 1,353 $ 1,117 $378 $- $ 13,185
Operator Wages & Burden K USD $ 1,227 $ 3,147 $ 3,902 $ 5,947 $ 3,619 $ 2,832 $ 2,706 $ 2,234 $755 $- $ 26,370
Total Haulage Costs K USD $ 5,502 $ 14,436 $ 18,342 $ 29,526 $ 17,382 $ 12,903 $ 12,677 $ 8,163 $3,136 $- $ 122,068
Cost per Tonne Moved                        
Fuel Cost $/t $ 0.15 $ 0.20 $ 0.19 $ 0.21 $ 0.20 $ 0.17 $ 0.16 $ 0.15 $0.17 $- $ 0.19
Lube & Oil $/t $ - $ - $ - $ - $ - $ - $ - $- $- $- $ -
Tires $/t $ 0.07 $ 0.09 $ 0.09 $ 0.10 $ 0.09 $ 0.08 $ 0.07 $ 0.07 $0.08 $- $ 0.09
Wear Items & GET $/t $ 0.01 $ 0.01 $ 0.01 $ 0.01 $ 0.01 $ 0.01 $ 0.01 $ 0.01 $0.01 $- $ 0.01
Total Consumables $/t $ 0.22 $ 0.30 $ 0.29 $ 0.32 $ 0.30 $ 0.26 $ 0.24 $ 0.23 $0.26 $- $ 0.28
Parts / MARC Cost $/t $ 0.12 $ 0.16 $ 0.15 $ 0.17 $ 0.16 $ 0.14 $ 0.13 $ 0.12 $0.14 $- $ 0.15
Total Equip. Allocation (no labor) $/t $ 0.34 $ 0.46 $ 0.44 $ 0.49 $ 0.46 $ 0.40 $ 0.37 $ 0.36 $0.40 $- $ 0.43
Maintenance Labor $/t $ 0.06 $ 0.07 $ 0.07 $ 0.07 $ 0.07 $ 0.06 $ 0.06 $ 0.08 $0.07 $- $ 0.07
Operator Wages & Burden $/t $ 0.11 $ 0.15 $ 0.14 $ 0.14 $ 0.14 $ 0.13 $ 0.12 $ 0.17 $0.15 $- $ 0.14
Total Haulage Costs $/t $ 0.51 $ 0.69 $ 0.65 $ 0.70 $ 0.67 $ 0.59 $ 0.54 $ 0.60 $0.62 $- $ 0.64

21.4.7 Mine Support

Yearly mine support cost estimates are shown in Table 21-14 including pre-production costs. These costs assume the hourly costs for required support equipment and personnel as discussed in Sections 16.5 and 16.6 respectively.

Table 21-14: Yearly Mine Support Costs

Total Mine Support Costs Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Total
Consumables K USD $1,233 $ 1,837 $ 1,837 $ 1,837 $ 1,842 $ 1,837 $ 1,837 $ 1,837 $ 1,228 $- $ 15,324
Parts / MARC Cost K USD $1,020 $ 1,520 $ 1,520 $ 1,520 $ 1,524 $ 1,520 $ 1,520 $ 1,520 $ 1,016 $- $ 12,682
Maintenance Labor K USD $598 $ 897 $ 897 $ 897 $ 897 $ 897 $ 897 $ 897 $ 598 $- $ 7,473
Operating Labor K USD $1,196 $ 1,794 $ 1,794 $ 1,794 $ 1,794 $ 1,794 $ 1,794 $ 1,794 $ 1,196 $- $ 14,947
Total K USD $4,047 $ 6,048 $ 6,048 $ 6,048 $ 6,057 $ 6,048 $ 6,048 $ 6,048 $ 4,038 $- $ 50,427
Cost per Tonne Mined                        
Consumables $/t $0.11 $ 0.09 $ 0.06 $ 0.04 $ 0.07 $ 0.08 $ 0.08 $ 0.14 $ 0.24 $- $ 0.08
Maintenance Allocations $/t $0.09 $ 0.07 $ 0.05 $ 0.04 $ 0.06 $ 0.07 $ 0.06 $ 0.11 $ 0.20 $- $ 0.07
Maintenance Labor $/t $0.06 $ 0.04 $ 0.03 $ 0.02 $ 0.03 $ 0.04 $ 0.04 $ 0.07 $ 0.12 $- $ 0.04
Operating Labor $/t $0.11 $ 0.09 $ 0.06 $ 0.04 $ 0.07 $ 0.08 $ 0.08 $ 0.13 $ 0.24 $- $ 0.08
Total Costs $/t $0.38 $ 0.29 $ 0.21 $ 0.14 $ 0.23 $ 0.28 $ 0.26 $ 0.45 $ 0.80 $- $ 0.26

 

   

21-11

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

21.4.8 Leasing and Rental Costs

Leasing and rental costs were assumed for specific equipment based on vendor inputs as to typical leasing rates. The leasing of equipment was assumed to be “lease to own” terms where GSV would own the equipment at the end of the lease terms. Leased equipment assumed 15% down payment of the equipment value, including taxes, erecting, and commissioning. An annual percentage rate (APR) of 5.5% was assumed with equipment amortized over a period of eight years. Leased equipment was broken down by period in which it was placed into service for the purpose of amortization and includes:

Primary Mining Equipment

  • Four production drills put into service between second quarter of Year -1 and third quarter of Year 2;

  • One 21.5 cubic meter loader put into service in the first quarter of Year 1;

  • Two 22 cu meter hydraulic shovels put into service in the second and third quarters of Year -1; and

  • Nine 136-tonne capacity (150-ton) haul trucks put into service between second quarter Year -1 and the second quarter of Year 1.

Support equipment

  • Two 430 kW size dozers put into service in second quarter of Year -1;

  • One 300 kW size dozer put into service in second quarter of Year -1;

  • One 230 kW size dozer put into service in second quarter of Year -1;

  • Two 18’ motor graders both put into service in second quarter of Year -1; and

  • Two 20,000-gallon water trucks both put into service in second quarter of Year -1.

Maintenance Equipment

  • One lube and fuel truck put into service in second quarter of Year -1;

  • Two mechanic trucks put into service in second quarter of Year -1; and

  • Two tire trucks put in service into second quarter of Year -1.

Equipment rental was assumed for short term equipment requirements for pioneer drills and peak requirements for haul trucks. One pioneer drill is assumed to be rented during the first two months of Dark Star mining with another drill rented during the first two months of Pinion mining.

In all a total of eight haul trucks are to be rented, with three of the trucks put in service in the third quarter of Year 2, and additional three in service in the first quarter of Year 3, and one more each in the second and third quarter in Year 3. In the first quarter of Year 4 the total rental fleet is reduced to five and then all rental trucks are removed in the second quarter of Year 4.

Rental terms are assumed to require 10% down payment of the equipment value, included taxes, erecting, and commissioning along with 6% rental payments. This is assumed to cover mobilization and demobilization. The rental payments are applied directly to operating costs.

Table 21-15 shows the total estimated leasing and rental costs applied to operating costs. These costs are on top of the leasing costs that are capitalized and represent the leasing interest and all rental costs. In all this adds around $0.19/tonne for operations in Year 3, which is the heaviest year for rental equipment due to the need for haul trucks.

   

21-12

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 21-15: Lease and Rental Operating Costs

Leasing Interest Payments Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10 Total
Primary Equipment K USD $ 627 $2,035 $ 2,083 $ 1,921 $1,619 $1,299 $961 $604 $235 $46  $9 $11,438
Support Equipment K USD $ 249 $460 $405 $348 $288 $224 $156 $85 $14 $- $- $2,229
Maintenance Equipment K USD $ 39 $72 $64 $55 $45 $35 $25 $13 $2 $- $- $350
Total Leased Equipment Interest K USD $ 915 $2,567 $ 2,552 $ 2,324 $1,951 $1,557 $ 1,141 $702 $252 $46  $9 $14,017
Total Leased Equipment Interest $/t Mined $ 0.06 $0.08 $ 0.10 $ 0.10 $0.07 $0.05 $ 0.04 $0.08 $0.10 $- $- $0.07
Rental Equipment Costs                          
Down Payments and Mob/DeMob K USD $ 145 $- $752 $ 1,398 $- $- $- $- $- $- $- $2,295
Rental Interest Charge K USD $ 87 $- $902 $ 4,448 $752 $- $- $- $- $- $- $6,189
Total Rental Equipment Costs K USD $ 232 $- $ 1,654 $ 5,846 $752 $- $- $- $- $- $- $8,483
  $/t Mined $ 0.01 $- $ 0.07 $ 0.25 $0.03 $- $- $- $- $- $- $0.04
Total Addition to Operating Costs K USD $ 1,147 $2,567 $ 4,206 $ 8,170 $2,703 $1,557 $ 1,141 $702 $252 $46  $9 $22,500
  $/t Mined $ 0.11 $0.12 $ 0.15 $ 0.19 $0.10 $0.07 $ 0.05 $0.05 $0.05 $- $- $0.12

21.5 PROCESS OPERATING COST SUMMARY

Process operating costs have been estimated by KCA from first principles. Labor costs were estimated using project specific staffing, salary and wage, and benefit requirements. Unit consumptions of materials, supplies, power, and delivered supply costs were also estimated. LOM overall average processing costs are estimated at $3.34 per tonne ore with average costs of $1.83 per tonne for ROM ore and $4.87 per tonne for crushed ore. Process operating costs by pit and process type are shown in Table 21-16.

Table 21-16: LOM Operating Costs by Process Type, US$/tonne ore

Type Operating Cost
(US$/Tonne)
ROM $1.83
Crushed $4.87
Total $3.34

Operating costs were estimated based on 3rd quarter 2019 US dollars and are presented with no added contingency based upon the design and operating criteria present in this Technical Report. Operating costs are considered to have an accuracy of +/- 25%.

The process operating costs presented are based upon the ownership of all process production equipment and site facilities. The owner will employ and direct all operating maintenance and support personnel for all site activities.

Operating costs estimates have been based upon information obtained from the following sources:

  • Project metallurgical test work and process engineering;

  • Supplier quotes for reagents and fuel

  • Recent KCA project file data; and

  • Experience of KCA staff with other similar operations.

Where specific data do not exist, cost allowances have been based upon consumption and operating requirements from other similar properties for which reliable data exist. Freight costs have been estimated where delivered prices were not available. Overall LOM operating costs by year and process type are presented in Table 21-17.

   

21-13

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 21-17: Life of Mine Average Process Operating Cost by Year

Category Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 LOM Total
Total Tonnes
ROM Ore (000's) 7,618 8,213 7,728 2,540 1,746 593 1,310 945     30,691
Crushed Ore (000's) 0 0 0 3,052 3,650 3,650 3,642 2,140     16,133
TOTAL Process Plant Ore 7,618 8,213 7,728 5,592 5,396 4,243 4,952 3,084     46,825
 
Operating Costs (US$000's)
TOTAL ROM Ore $14,310 $15,428 $14,517 $4,771 $3,279 $1,114 $2,462 $1,774     $57,655
TOTAL Crushed Ore       $16,466 $19,692 $19,692 $19,648 $11,544     $87,043
TOTAL Water Management Systems $3,826 $826 $826 $826 $826 $826 $826 $826   $1,000 $10,607
TOTAL Generator Lease (Interest) $319 $279 $470 $388 $301 $209 $111 $30     $2,108
GRAND TOTAL (US$000's) $18,455 $16,532 $15,813 $22,451 $24,099 $21,841 $23,047 $14,174   $1,000 $157,412
Fixed Costs (US$000's) $3,137 $3,097 $3,288 $6,032 $5,945 $5,853 $5,755 $5,674   $1,000 $39,781
Variable Costs (US$000's) $15,318 $13,435 $12,525 $16,419 $18,154 $15,988 $17,292 $8,500     $117,631

 

   

21-14

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

21.5.1 Personnel and Staffing

Staffing requirements for process personnel have been estimated by KCA based on experience with similar sized operations. Total process personnel requirements are estimated at 32 persons for the initial ROM operation and 67 persons once crushing and conveyor stacking begins. Personnel requirements and costs are estimated at $2.8 million per year for the initial ROM operation and $5.6 million for the ROM and crushing operations.

21.5.2 Power

Power usage for the process and process-facilities was derived from estimated connected loads assigned to powered equipment from the mechanical equipment list. Equipment power demands under normal operation were assigned and coupled with estimated on-stream times to determine the average energy usage and cost. Power requirements for the project are presented in Table 21-18.

Table 21-18: Power Requirements Summary

  ROM Process Only ROM & Crushing Expansion
Area Description Attached Demand Annual Attached Demand Annual
Power (kW) (kW) (kW) Power (kW) (kW) (kW)
Area 113 - Primary Crushing       445 254 2,224,263
Area 114 - Secondary Crushing 0 0 0 2,260 1,151 10,080,364
Area 115 - Tertiary Crushing 0 0 0 2,244 1,596 13,977,869
Area 116 - Agglomeration 11 6 55,065 420 217 1,902,877
Area 120 - Conveying & Stacking 0 0 0 954 644 5,643,042
Area 250 - Heap Leach System 2,224 503 4,407,112 2,210 1,001 8,766,920
Area 420 - Recovery 374 99 422,845 444 139 694,098
Area 510 - Electrowinning & Smelting 146 49 238,156 146 49 238,156
Area 650 - Water Mgmt. Systems 1,295 842 7,373,730 1,295 842 7,373,730
Area 800 - Reagents & Air 27 2 13,057 3 2 21,891
Area 900 - Ancillaries and Buildings 0 0 0 100 56 246,375
Total 2,782 1,501 12,509,965 10,521 5,951 51,169,585

The total attached power for the process and process infrastructure is estimated at 4.1 MW for the initial ROM operation, with an average draw of 1.5 MW at start up increasing to 10.5 MW attached with a demand of 6.0 MW once crushing and conveyor stacking begins. Power will be generated via LNG generators on the project site at an estimated cost of $0.112/kWh.

21.5.3 Consumable Items

Operating supplies have been estimated based upon unit costs and consumption rates predicted by metallurgical tests and have been broken down by area. Freight costs are included in all operating supply and reagent estimates. Reagent consumptions have been derived from test work and from design criteria considerations. Other consumable items have been estimated by KCA based on KCA’s experience with other similar operations. Table 21-19 presents average consumptions for major consumables.

   

21-15

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 21-19: Process Consumables Average Annual Consumptions

Item Form Average Annual Consumption
Y1
Average Annual Consumption
Y4+
Sodium Cyanide Liquid at 33% NaCN by Weight 925 tonnes 1,900 tonnes
Lime Bulk Delivery (20 tonne) 4,500 tonnes 6,300 tonnes
Cement Bulk Delivery (20 tonne) N/A 20,800 tonnes
Antiscalant Liquid Tote 1 m3 Bins 39 tonnes 60 tonnes
Carbon 500 kg Supersacks 20 tonnes 72 tonnes
Hydrochloric Acid Liquid at 32% HCl by weight 99 m3 360 m3
Caustic Liquid at 50% NaOH by Weight 33 tonnes 120 tonnes
Silica Dry Solid Sacks 0.6 tonnes 2.8 tonnes
Borax Dry Solid Sacks 1.0 tonnes 4.4 tonnes
Niter Dry Solid Sacks 0.5 tonnes 2.2 tonnes
Soda Ash Dry Solid Sacks 0.4 tonnes 1.7 tonnes

Operating costs for consumable items have been distributed based on tonnage and gold/silver production or smelting batches, as appropriate.

21.5.3.1 Heap Leach Consumables

Pipes, Fittings and Emitters - The heap pipe costs include expenses for broken pipe, fittings and valves, and abandoned tubing. The heap pipe costs are estimated to be $0.03/t ore and are based on previous detailed studies conducted by KCA on similar projects.

Sodium Cyanide (NaCN) - Delivered sodium cyanide is estimated $2.90/kg based on recent supplier quotes. Cyanide is primarily consumed in the heap leach at 0.22 to 0.25 kg/t ore depending on the ore type.

Pebble Lime (CaO) - Pebble lime is consumed at an average rate of 1.00 kg/t ROM ore and 0.5 kg/t for Pinion crushed ore for pH control at the heap. A delivered price of $239/t has been quoted for the project.

Cement - Portland Type II cement is used as a binder for agglomeration to maintain the heap permeability as well as for pH control at the heap. Cement is consumed at an average rate of 42.0 kg/t ore for crushed Pinion ore and 7.0 kg/t for crushed Dark Star ore. A delivered price of $198/t has been estimated based on recent supplier quotes.

Antiscale Agent (Scale Inhibitor) - Antiscalant consumption is based on a dosage range of 6 ppm to the suctions of the barren and pregnant pumps. A delivered price of $6.42 per kg has been quoted for this project.

21.5.3.2 Recovery Plant Consumables

Carbon - Carbon is used for the adsorption of gold and silver from pregnant solution for the heap circuit. Carbon consumption is estimated at 4% per strip batch due to attrition. Carbon supply cost is quoted at $2.31 per kg.

HCl - Hydrochloric acid is used in the acid wash circuit to remove scale from the carbon which inhibits the adsorption of gold and silver. Hydrochloric acid consumption is estimated at 200 liters per tonne of carbon stripped with a quoted supply cost of $0.51 per kg.

Caustic - Caustic is delivered to site as a liquid at 50% concentration by weight. Caustic is used in the ADR and is consumed in the strip and acid wash circuits. Caustic consumption is based on a 2% caustic strip solution with approximately one third of the solution being discarded each strip. Caustic supply cost is quoted at $0.54 per kg.

   

21-16

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Smelting Fluxes - It has been estimated that 1.0 kg of mixed fluxes per kg of precious metal produced will be required. The estimated delivered cost of these fluxes, which includes borax, silica, niter, and soda ash, is $2.45 per kg, which is based on recent quotes in KCA’s database.

21.5.3.3 Laboratory

Operating costs in the laboratory area include power, facilities support, operating and maintenance supplies, and processing of an average of 100 fire assays per day, plus supporting solution assays.

21.5.3.4 Propane

Propane is consumed by the boiler, kiln and smelting furnace during operations. Propane costs are estimated at $1.23 per gallon ($0.33 per L) based on recent project costs.

21.5.3.5 Miscellaneous Operating & Maintenance Supplies

Overhaul and maintenance of equipment along with miscellaneous operating supplies for each area have been estimated as allowances based on tonnes of ore processed. The allowances for each area were developed based on published data as well as KCA’s experience with similar operations.

21.5.4 General Facilities (Process Equipment Costs)

Operating costs in the general facilities area include the operating costs of two D7 dozers, two forklifts, one skid-steer, and a maintenance truck. These are assigned to crushed material. No costs are assigned to ROM material for this area.

Operating costs for other facilities and support, such as site buildings and site maintenance, are excluded from KCA’s costs.

21.5.5 Process Operating Cost Exclusions

The following operating costs are excluded from KCA’s estimate:

  • G&A costs;

  • Site maintenance including access roads and internal roads;

  • Maintenance and operation costs of site utilities and infrastructure including power supply and distribution, water supply and distribution, emergency backup power, administrative facilities, warehousing and storage, septic, waste storage and disposal, and communications;

  • Any operating costs related to mining and the truck stacking fleet;

  • Operating cost contingency;

  • Escalation costs;

  • Currency exchange fluctuations.

21.5.6 Generator Lease Costs

Leasing costs were assumed for the LNG Generators based on vendor inputs as to typical lending rate. The leasing of equipment was assumed to be “lease to own” terms where GSV would own the equipment at the end of the lease terms. Leased generators assumed 20% down payment of the equipment value. An annual percentage rate (APR) of 6% was assumed with equipment amortized over a period of eight years for the three generators leased as part of initial capital expenditures and over a period of six years for the two generators leased as part of the expansion capital. Leased equipment was broken down by period in which it was placed into service for the purpose of amortization.

   

21-17

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

21.6 G&A COSTS

G&A costs were estimated based on personnel requirements for administrative, accounting, safety and security, and environmental departments to support mining and processing activities. Costs are also included for legal, land, permit bonding, power, etc. Table 21-20 shows the yearly G&A cost estimate.

Table 21-20: Yearly G&A Costs

Personnel Costs Units Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10 Total
Admin Salaried Personnel K USD $504 $504 $504 $504 $504 $504 $504 $504 $252 $252 $4,536
Admin Hourly Personnel K USD $276 $276 $276 $276 $276 $276 $276 $276 $138 $138 $2,484
Safety & Security Salaried Personnel K USD $90 $90 $90 $90 $90 $90 $90 $90 $45 $45 $810
Safety & Security Hourly Personnel K USD $162 $162 $162 $162 $162 $162 $162 $162 $81 $81 $1,458
Environmental Salaried Personnel K USD $110 $110 $110 $110 $110 $110 $110 $110 $55 $55 $990
Total Personnel Costs K USD $1,142 $1,142 $1,142 $1,142 $1,142 $1,142 $1,142 $1,142 $560 $560 $10,278
General G&A Costs                        
Supplies & General Maintenance K USD $288 $288 $288 $288 $288 $288 $288 $288 $144 $144 $2,592
Land Holdings K USD $240 $240 $240 $240 $240 $240 $240 $240 $120 $120 $2,160
Off Site Overhead K USD $120 $120 $120 $120 $120 $120 $120 $120 $60 $60 $1,080
Legal, Audits, Consulting, MSHA K USD $250 $250 $250 $250 $250 $250 $250 $250 $125 $125 $2,250
Computers, IT, Internet, Software, Hardware K USD $75 $75 $75 $75 $75 $75 $75 $75 $38 $38 $675
Environmental, Monitoring Wells, Reporting K USD $250 $250 $250 $250 $250 $250 $250 $250 $125 $125 $2,250
Bond Carry Cost - Pinion K USD $96 $96 $96 $96 $96 $96 $96 $96 $48 $48 $864
Bond Carry Cost - Dark Star K USD $96 $96 $96 $96 $96 $96 $96 $96 $48 $48 $864
Donations, Dues, PR K USD $30 $30 $30 $30 $30 $30 $30 $30 $15 $15 $270
Fees, Licenses, Misc Taxes, Insurance K USD $480 $480 $480 $480 $480 $480 $480 $480 $240 $240 $4,320
Travel, Lodging, Meals, Entertainment K USD $100 $100 $100 $100 $100 $100 $100 $100 $50 $50 $900
Telephones, Computers, Cell Phones K USD $75 $75 $75 $75 $75 $75 $75 $75 $38 $38 $675
Light Vehicle Maintenance, Fuel K USD $43 $43 $43 $43 $43 $43 $43 $43 $22 $22 $387
Small Tools, Janitorial, Safety Supplies K USD $85 $85 $85 $85 $85 $85 $85 $85 $42 $42 $765
Equipment Rentals K USD $100 $100 $100 $100 $100 $100 $100 $100 $50 $50 $900
Access Road Maintenance K USD $150 $150 $150 $150 $150 $150 $150 $150 $75 $75 $1,350
Office Power K USD $60 $60 $60 $60 $60 $60 $60 $60 $30 $30 $540
Total General G&A Costs K USD $2,538 $2,538 $2,538 $2,538 $2,538 $2,538 $2,538 $2,538 $1,269 $1,269 $22,842
                         
Total G&A K USD $3,680 $3,680 $3,680 $3,680 $3,680 $3,680 $3,680 $3,680 $1,840 $1,840 $33,120

 

   

21-18

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 22 TABLE OF CONTENTS

SECTION   PAGE
22 ECONOMIC ANALYSIS 22-1
  22.1 MINING PHYSICALS 22-1
  22.2 PROCESS PLANT PRODUCTION STATISTICS 22-1
  22.3 SMELTER RETURN FACTORS 22-3
  22.4 CAPITAL EXPENDITURE 22-3
  22.5 REVENUE 22-3
  22.6 TOTAL PRODUCTION COST 22-3
  22.7 DEPRECIATION 22-4
  22.8 ROYALTIES 22-4
  22.9 GOVERNMENT FEES 22-4
  22.10 INCOME TAX 22-4
  22.11 NET INCOME AFTER-TAX 22-4
  22.12 PROJECT FINANCING 22-4
  22.13 ECONOMIC INDICATORS 22-4
  22.14 SENSITIVITY ANALYSIS 22-5
  22.15 DETAILED FINANCIAL MODEL 22-5
  22.16 PURCHASED MINE EQUIPMENT ALTERNATIVE 22-9

SECTION 22 LIST OF TABLES

TABLE DESCRIPTION PAGE
Table 22-1: Yearly Mine & Process Physicals 22-2
Table 22-2: Life of Mine Process Statistics 22-3
Table 22-3: Capital Expenditure Schedule 22-3
Table 22-4: LOM Operating Costs 22-4
Table 22-5: Key Economic Results 22-5
Table 22-6: Sensitivity Analysis 22-5
Table 22-7: Detailed Financial Model 22-6
Table 22-8: Capital Expenditure Schedule - Purchased Mine Equipment Alternative 22-9
Table 22-9: LOM Operating Costs - Purchased Mine Equipment Alternative 22-9
Table 22-10: Key Economic Results - Purchased Mine Equipment Alternative 22-9

 

   

22-i

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

22 ECONOMIC ANALYSIS

The economic analysis in this study includes a preliminary feasibility study-compliant modeling of the annual cash flows based on projected production volume, sales revenue, initial capital, operating cost, and sustaining capital with resulting evaluation of the key economic indicators such as the internal rate of return (IRR), the net present value (NPV), and payback period (time in years to recapture the initial capital investment) for the Project. The sales revenue is based on the production of gold and silver in doré bullion. The estimates of the capital expenditures and site production costs have been developed specifically for this project and have been presented in the previous section of this Technical Report.

22.1 MINING PHYSICALS

The cash-flow model uses the mining and production schedules as discussed in Section 16 and summarized in Table 22-1.

22.2 PROCESS PLANT PRODUCTION STATISTICS

Ore will be processed by cyanide heap leaching as ROM or after HPGR crushing and agglomeration. A small fraction of sulfide ore will be sent out to a third-party operation for toll milling. Overall production over the life of mine is summarized in Table 22-2.

   

22-1

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 22-1: Yearly Mine & Process Physicals

  Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Total
Material Mined                      
Total Ore K Tonnes   7,618 8,236 7,766 5,763 5,537 4,243 4,952 3,084 47,198
Au g/t   0.98 0.71 0.49 1.34 1.20 0.64 0.55 0.60 0.82
Ag g/t   - - 0.00 1.14 3.31 5.29 5.06 3.80 1.78
K oz Au   240 188 123 248 213 88 87 60 1,246
K oz Ag   - - 1 212 589 722 805 377 2,705
Total Waste K Tonnes 9,641 14,036 19,440 35,693 19,520 15,842 20,176 8,644 1,969 144,962
Total Mined K Tonnes 10,762 20,980 28,350 42,342 25,840 21,900 23,430 13,502 5,053 192,160
Strip Ratio W : O 8.60 2.02 2.18 5.37 3.09 2.62 6.20 1.78 0.64 3.07
ROM Process Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Total
Total ROM K Tonnes - 7,618 8,213 7,728 2,540 1,746 593 1,310 945 30,691
Au g/t - 0.98 0.71 0.49 0.40 0.44 0.36 0.29 0.33 0.64
Ag g/t - - - 0.00 0.66 2.14 3.06 3.05 2.54 0.44
Total Placed K oz Au - 240 187 121 33 25 7 12 10 634
Total Recovered K oz Au - 84 130 110 66 32 14 8 7 455
Total Placed K oz Ag - - - 1 54 120 58 129 77 439
Total Recovered K oz Ag - - - - 8 21 19 19 18 96
Cumulative Recovery % Au - 35% 50% 59% 67% 70% 71% 71% 71% 72%
% Ag -     0% 15% 17% 21% 19% 20% 22%
HPGR Process Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Total
Total HPGR Ore K Tonnes - -     3,052 3,650 3,650 3,642 2,140 16,133
Au g/t - -     2.04 1.49 0.69 0.64 0.72 1.12
Ag g/t - -     1.60 4.00 5.66 5.78 4.36 4.37
Total Placed K oz Au - -     200 174 81 75 50 579
Total Recovered K oz Au - -     117 162 66 49 43 440
Total Placed K oz Ag - - - - 157 469 664 676 300 2,267
Total Recovered K oz Ag - - - - 50 154 288 285 178 965
Cumulative Recovery % Au - -     59% 75% 76% 74% 75% 76%
% Ag - - - - 32% 33% 38% 40% 42% 43%
Sulfide Toll Process Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Total
Total Toll Ore K Tonnes - - 23 38 171 141 - - - 373
Au g/t - - 1.55 1.62 2.79 3.05 - - - 2.7
Ag g/t - - - - - - - - - -
Total Placed K oz Au - - 1.1 2 15 14 - - - 32
Total Recovered K oz Au - - 0.33 1.91 11 15 - - - 27
Total Placed K oz Au - - - - - - - - - -
Total Recovered K oz Au - - - - - - - - - -
Cumulative Recovery % Au - - 29% 72% 70% 85%       85%
% Ag - - - - - - - - - -
Total Ore Processed Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Total
Total Ore Processed K Tonnes - 7,618 8,236 7,766 5,763 5,537 4,243 4,952 3,084 47,198
Au g/t - 0.98 0.71 0.49 1.34 1.20 0.64 0.55 0.60 0.82
Ag g/t - - - 0.00 1.14 3.31 5.29 5.06 3.80 1.78
Total Placed K oz Au - 240 188 123 248 213 88 87 60 1,246
Total Recovered K oz Au - 84 131 112 194 209 79 57 50 936
Total Placed K oz Ag - - - - 0.7 212 589 722 805 2,705
Total Recovered K oz Ag - - - - 58 175 308 304 196 1,061
Cumulative Recovery % Au - 34.9% 50% 59% 65% 72% 74% 73% 73% 74%
% Ag -       27% 29% 35% 36% 38% 39%

 

   

22-2

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 22-2: Life of Mine Process Statistics

Total Ore (kt) 47,198
Gold (g/t) 0.82
Silver (g/t), Pinion only 1.78
Contained Gold (kozs) 1,246
Contained Silver (kozs) 2,705
Gold Recovery % 74.0%
Silver Recovery % 39.2%
Recovered Gold (kozs) 922
Recovered Silver (kozs) 1,061

22.3 SMELTER RETURN FACTORS

No contractual payable metal rates have yet been negotiated with smelters. M3 used typical rates based on industry experience or published guidelines. Payable rates for metals used were 99.5% for gold and 98.0% for silver. A bullion refining, transportation and insurance charge of $5 per troy ounce of gold was applied.

22.4 CAPITAL EXPENDITURE

The capital expenditure schedule for the life of mine is shown in Table 22-3 below.

Table 22-3: Capital Expenditure Schedule

Capital
Expenditure, $000
Initial Expansion Sustaining
Year -1 Year 3 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Pre-stripping $20,559                      
Mine $15,542   $7,251 $6,596 $6,728 $7,016 $7,410 $7,826 $8,265 $6,106 $1,127 $329
Process $92,615 $61,873 $12,678 $6,031 $0 $4,912 $1,501 $1,593 $1,691 $793 $0 $0
Owner's Cost $4,160 $2,971                    
Total $132,877 $64,844 $19,930 $12,627 $6,728 $11,928 $8,911 $9,419 $9,956 $6,899 $1,127 $329

22.5 REVENUE

Annual revenue is determined by applying metal prices to the annual payable metal estimated for each operating year. Sales prices have been applied to all life-of-mine production without escalation or hedging. Gold bullion revenue is based on the gross value of the payable metals sold before refining and transportation charges. Gold and silver metal pricing are based on a market study by the Owner as presented in Section 19:

Gold   $1,400 per troy ounce
Silver $17.11 per troy ounce

22.6 TOTAL PRODUCTION COST

The total production cost includes mine operations, process plant operations, general administration, reclamation and closure, and government fees. Table 22-4 shows the estimated operating costs by area based on payable metals for the life of mine.

   

22-3

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 22-4: LOM Operating Costs

LOM Operating Cost ($000)
Mining $336,365
Process Plant $157,412
G&A $33,120
Toll Processing $13,063
Refining $4,612
Total Operating Cost $544,573
Royalty $20,149
Salvage Value -$20,329
Reclamation/Closure $33,094
Total Production Cost $577,487

22.7 DEPRECIATION

The depreciation cost was calculated using a 7-year modified accelerated cost recovery system (MACRS) depreciation method following both initial and sustaining capital.

22.8 ROYALTIES

As discussed in Section 4.2 to this Technical Report, portions of the unpatented and private lands are encumbered with royalties predominantly in the form of standard NSR or GSR and MP royalty agreements, or NPI agreements. GSV intends to buy down certain existing NSR royalties prior to production. As a result of the buy downs, the NSR royalties upon production are assumed to be approximately 1.24% and this has been reflected in the PFS.

22.9 GOVERNMENT FEES

No government fees have been applied to the financial model.

22.10 INCOME TAX

A net proceeds tax of 5% is applied to revenue minus operating cost and depreciation. Regular corporate tax of 21% is applied to taxable corporation income after adjustments for state tax, if any, and net proceeds tax. No state income tax was applied.

22.11 NET INCOME AFTER-TAX

The net income after-taxes is $357.6 Million.

22.12 PROJECT FINANCING

It is assumed that the project will be all equity financed.

22.13 ECONOMIC INDICATORS

The economic analyses for the project are summarized in Table 22-5 below.

   

22-4

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 22-5: Key Economic Results

Indicators Before-Tax After-Tax
LOM Cash Flow ($000) $439,733 $357,611
NPV @ 5% ($000) $331,423 $265,045
NPV @ 10% ($000) $249,453 $195,068
IRR 46.1% 40.0%
Payback (years) 3.2 3.3

22.14 SENSITIVITY ANALYSIS

Table 22-6 below shows the sensitivity analysis of the key economic indicators (cash flow, NPV, IRR, and payback) to changes in the gold and silver prices.

Table 22-6: Sensitivity Analysis

Financial Indicators Base +200 Base +$100 Base Case Base -100 Base -200
Gold Price (per troy oz) $1,600 $1,500 $1,400 $1,300 $1,200
Silver Price (per troy oz) $19.56 $18.33 $17.11 $15.89 $14.67
Pre-tax Cash Flow, $M $623.0 $531.3 $439.7 $348.1 $256.5
Pre-tax Net Present Value (5%) in $M $481.2 $406.3 $331.4 $256.5 $181.6
Pre-tax Internal Rate of Return (IRR) 61.3% 53.8% 46.1% 38.1% 29.6%
Pre-tax Payback (Years) 1.8 1.9 3.2 3.4 3.7
After-tax Cash Flow, $M $506.3 $432.1 $357.6 $282.9 $207.6
After-tax Net Present Value (5%) in $M $386.5 $325.9 $265.0 $204.0 $142.4
After-tax Internal Rate of Return (IRR) 53.3% 46.8% 40.0% 33.0% 25.4%
After-tax Payback (Years) 1.9 3.1 3.3 3.5 3.8

22.15 DETAILED FINANCIAL MODEL

The detailed financial model, shown in Table 22-7 below, was developed in compliance with the PFS requirement. This model has captured all the parameters of the mine production volume, annual sales revenue, and all the associated costs. This model was used calculate to the economics of the project, as well as for the sensitivity analysis.

   

22-5

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Table 22-7: Detailed Financial Model

GSV South Railroad PFS-Financial Model                                
M3-PN185074 LOM Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15
Mine                                  

Ore (kt)

47,198 1,121 6,944 8,910 6,649 6,320 6,058 3,254 4,858 3,084 - - - - - - -

Gold (g/t)

0.82 0.72 1.00 0.70 0.48 1.29 1.10 0.69 0.55 0.60 - - - - - - -

Silver (g/t)

1.78 - - - 0.00 1.36 3.61 5.32 5.06 3.80 - - - - - - -

Contained Gold (kozs)

1,246 25.98 222.94 200.24 101.77 262.65 214.66 72.34 85.64 59.94 - - - - - - -

Contained Silver (kozs)

2,705 - - - 0.86 276.35 703.84 556.97 790.29 377.09 - - - - - - -

Waste (kt)

144,962 9,641 14,036 19,440 35,693 19,520 15,842 20,176 8,644 1,969 - - - - - - -

Total Material Mined

192,160 10,762 20,980 28,350 42,342 25,840 21,900 23,430 13,502 5,053 - - - - - - -
Process Plant                                  
ROM Processing                                  

Dark Star (kt)

25,556   7,618 8,213 7,709 1,750 267 - - - - - - - - - -

Gold (g/t)

0.70   0.98 0.71 0.49 0.43 0.49 - - - - - - - - - -

Silver (g/t)

    - - - - - - - - - - - - - - -

Contained Gold (kozs)

576   240 187 121 24 4 - - - - - - - - - -

Contained Silver (kozs)

-   - - - - - - - - - - - - - - -

Gold Recovery %

72.7%                                

Silver Recovery %

0.0%                                

Recovered Gold (kozs)

418   84 130 110 63 24 7 1 0 - - - - - - -

Recovered Silver (kozs)

-   - - - - - - - - - - - - - - -

Pinion (kt)

5,136   - - 19 790 1,479 593 1,310 945 - -          

Gold (g/t)

0.36   - - 0.77 0.34 0.43 0.36 0.29 0.33 - -          

Silver (g/t)

    - - 1.15 2.13 2.52 3.06 3.05 2.54 - - - - - - -

Contained Gold (kozs)

59   - - 0 9 20 7 12 10 - - - - - - -

Contained Silver (kozs)

439   - - 1 54 120 58 129 77 - - - - - - -

Gold Recovery%

62.3%                                

Silver Recovery%

21.9%                                

Recovered Gold (kozs)

37   - - - 3 8 7 7 7 3 1 - - - - -

Recovered Silver (kozs)

96   - - - 8 21 19 19 18 7 3 - - - - -

Total ROM (kt)

30,691   7,618 8,213 7,728 2,540 1,746 593 1,310 945 - - - - - - -

Gold (g/t)

0.64   0.98 0.71 0.49 0.40 0.44 0.36 0.29 0.33 - - - - - - -

Silver (g/t)

0.44   - - 0.00 0.66 2.14 3.06 3.05 2.54 - - - - - - -

Contained Gold (kozs)

634   240 187 121 33 25 7 12 10 - - - - - - -

Contained Silver (kozs)

439   - - 1 54 120 58 129 77 - - - - - - -

Gold Recovery %

71.7%                                

Silver Recovery %

21.9%                                

Recovered Gold (kozs)

455   84 130 110 66 32 14 8 7 3 1 - - - - -

Recovered Silver (kozs)

96   - - - 8 21 19 19 18 7 3 - - - - -
HPGR Processing                                  

Dark Star (kt)

3,382   - - - 2,066 1,316 - - - - - - - - - -

Gold (g/t)

2.53   - - - 2.60 2.41 - - - - - - - - - -

Silver (g/t)

    - - - - - - - - - - - - - - -

Contained Gold (kozs)

275   - - - 173 102 - - - - - - - - - -

Contained Silver (kozs)

-   - - - - - - - - - - - - - - -

Gold Recovery %

83.3%                                

Silver Recovery %

0.0%                                

Recovered Gold (kozs)

229   -   - 102 121 6 - - - - - - - - -

Recovered Silver (kozs)

-   - - - - - - - - - - - - - - -

Pinion(kt)

12,752   - - - 986 2,334 3,650 3,642 2,140 - - - - - - -

Gold (g/t)

0.74   - - - 0.85 0.97 0.69 0.64 0.72 - - - - - -  

Silver (g/t)

5.53   - - - 4.97 6.25 5.66 5.78 4.36 - - - - - - -

Contained Gold (kozs)

305   - - - 27 73 81 75 50 - - - - - - -

Contained Silve r(kozs)

2,267   - - - 157 469 664 676 300 - - - - - - -

Gold Recovery %

69.3%                                

Silver Recovery %

42.6%                                

Recovered Gold (kozs)

211   - - - 15 41 60 49 43 3 - - - - - -

Recovered Silver (kozs)

965   - - - 50 154 288 285 178 10 - - - - - -

Total HPGR (kt)

16,133   - 2,993 3,650 3,660 3,638 3,650 3,650 1,534 - - - - - - -

Gold (g/t)

1.12   - - - 3,052 3,650 3,650 3,642 2,140 - - - - - - -

Silver (g/t)

4.37   - - - 2.04 1.49 0.69 0.64 0.72 - - - - - - -

Contained Gold (kozs)

579   - - - 1.60 4.00 5.66 5.78 4.36 - - - - - - -

 

   

22-6

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

GSV South Railroad PFS-Financial Model                                
M3-PN185074 LOM Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15

Contained Silver (kozs)

2,267   - - - 200 174 81 75 50 - - - - - - -

Gold Recovery %

75.9%         157 469 664 676 300 -            

Silver Recovery %

42.6%                                

Recovered Gold (kozs)

440   - - -             - - - - - -

Recovered Silver (kozs)

965   - - - 117 162 66 49 43 3 - - - - - -
Toll Processing                                  

Dark Star (kt)

373   - 23 38 171 141 - - - - - - - - - -

Gold (g/t)

2.70   - 1.55 1.62 2.79 3.05 - - - - - - - - - -

Silver (g/t)

-   - - - - - - - - - - - - - - -

Contained Gold (kozs)

32   - 1 2 15 14 - - - - - - - - - -

Contained Silver (kozs)

-   - - - - - - - - - - - - - - -

Gold Recovery %

85.0%                                

Silver Recovery %

0.0%                                

Recovered Gold (kozs)

28   - 0 2 11 15 - - - - - - - - - -

Recovered Silver (kozs)

-   - - - - - - - - - - - - - - -
Total Processing                                  

Total Ore (kt)

47,198   7,618 8,236 7,766 5,763 5,537 4,243 4,952 3,084 - - - - - - -

Gold (g/t)

0.82   0.98 0.71 0.49 1.34 1.20 0.64 0.55 0.60 - - - - - - -

Silver (g/t)

1.78   - - 0.00 1.14 3.31 5.29 5.06 3.80 - - - - - - -

Contained Gold (kozs)

1,246   240 188 123 248 213 88 87 60 - - - - - - -

Contained Silver (kozs)

2,705   - - 1 212 589 722 805 377 - - - - - - -

Gold Recovery %

74.0%   34.9% 69.5% 91.0% 78.2% 98.3% 90.7% 65.2% 83.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Silver Recovery %

39.2%   0.0% 0.0% 0.0% 27.3% 29.7% 42.6% 37.8% 52.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Recovered Gold (kozs)

922   84 131 112 194 209 79 57 50 6 1 - - - - -

Recovered Silver (kozs)

1,061   - - - 58 175 308 304 196 17 3 - - - - -
Payable Metals                                  

Gold (kozs)

918   83 130 111 193 208 79 56 50 6 1 - - - - -

Silver (kozs)

1,040   - - - 57 171 301 298 192 17 3 - - - - -
Metal Prices                                  

Gold ($/oz)

$1,400.00   $1,400.00 $1,400.00 $1,400.00 $1,400.00 $1,400.00 $1,400.00 $1,400.00 $1,400.00 $1,400.00 $1,400.00 $0.00 $0.00 $0.00 $0.00 $0.00

Silver ($/oz)

$17.11   $17.11 $17.11 $17.11 $17.11 $17.11 $17.11 $17.11 $17.11 $17.11 $17.11 $0.00 $0.00 $0.00 $0.00 $0.00
Revenues ($000)                                  

Gold

$1,284,999   $116,572 $181,802 $156,087 $270,219 $291,400 $110,728 $78,894 $69,398 $7,919 $1,980 $0 $0 $0 $0 $0

Silver

$17,794   $0 $0 $0 $969 $2,930 $5,158 $5,099 $3,289 $289 $58 $0 $0 $0 $0 $0

Total Revenues

$1,302,793   $116,572 $181,802 $156,087 $271,189 $294,330 $115,887 $83,993 $72,687 $8,209 $2,038 $0 $0 $0 $0 $0
Operating Cost($000)                                  

Mining

$336,365   $42,348 $51,718 $73,552 $47,202 $39,410 $38,831 $28,777 $14,471 $46 $9 $0 $0 $0 $0 $0

Process Plant

$157,412   $18,455 $16,532 $15,813 $22,451 $24,099 $21,841 $23,047 $14,174 $0 $1,000 $0 $0 $0 $0 $0

G&A

$33,120   $3,680 $3,680 $3,680 $3,680 $3,680 $3,680 $3,680 $3,680 $1,840 $1,840 $0 $0 $0 $0 $0

Toll Processing

$13,063   $0 $805 $1,324 $6,002 $4,932 $0 $0 $0 $0 $0          

Refining

$4,612   $418 $653 $560 $970 $1,046 $397 $283 $249 $28 $7 $0 $0 $0 $0 $0

Total Operating Cost

$544,573   $64,901 $73,388 $94,929 $80,306 $73,167 $64,750 $55,787 $32,574 $1,914 $2,856 $0 $0 $0 $0 $0

Royalty

$20,149   $1,803 $2,812 $2,414 $4,194 $4,552 $1,793 $1,299 $1,124 $127 $32 $0 $0 $0 $0 $0

Salvage Value

-$20,329   $0 $0 $0 $0 $0 -$1,713 -$17,116 $0 $0 -$1,500 $0 $0 $0 $0 $0

Reclamation/Closure

$33,094   $2,183 $2,183 $3,876 $3,876 $3,422 $3,422 $1,729 $1,729 $0 $10,674 $0 $0 $0 $0 $0

Total Production Cost

$577,487   $68,887 $78,383 $101,219 $88,376 $81,141 $68,251 $41,699 $35,427 $2,041 $12,062 $0 $0 $0 $0 $0

Operating Income

$725,306   $47,685 $103,420 $54,867 $182,813 $213,189 $47,636 $42,294 $37,260 $6,167 -$10,024 $0 $0 $0 $0 $0
Depreciation($000)                                  

Initial Capital

$132,877   $18,988 $32,541 $23,240 $16,596 $11,866 $11,853 $11,866 $5,926 $0 $0 $0 $0 $0 $0 $0

Sustaining Capital

$152,697   $2,848 $6,685 $16,806 $23,930 $20,069 $17,459 $16,075 $15,650 $13,583 $8,666 $4,196 $2,941 $2,066 $1,190 $532

Total Depreciation

$285,574   $21,836 $39,227 $40,046 $40,526 $31,935 $29,312 $27,941 $21,577 $13,583 $8,666 $4,196 $2,941 $2,066 $1,190 $532

Net Income after Depreciation

$439,733   $25,849 $64,193 $14,822 $142,286 $181,254 $18,324 $14,353 $15,683 -$7,416 -$18,690 -$4,196 -$2,941 -$2,066 -$1,190 -$532
Taxes ($000)                                  

Net Proceeds Tax

$25,017 $0 $1,492 $3,459 $1,056 $7,518 $9,461 $1,091 $13 $927 $0 $0 $0 $0 $0 $0 $0

Income Tax

$57,104 $0 $0 $4,554 $1,335 $19,759 $26,805 $1,695 $1,504 $1,452 $0 $0 $0 $0 $0 $0 $0

Total Taxes

$82,121   $1,492 $8,014 $2,390 $27,277 $36,266 $2,786 $1,518 $2,379 $0 $0 $0 $0 $0 $0 $0
Net Income After-Taxes ($000) $357,611   $24,357 $56,179 $12,431 $115,009 $144,987 $15,538 $12,836 $13,304 -$7,416 -$18,690 -$4,196 -$2,941 -$2,066 -$1,190 -$532
Cash Flow ($000)                                  

Net Income Before-Taxes

$439,733 $0 $25,849 $64,193 $14,822 $142,286 $181,254 $18,324 $14,353 $15,683 -$7,416 -$18,690 -$4,196 -$2,941 -$2,066 -$1,190 -$532

Add back Depreciation

$285,574 $0 $21,836 $39,227 $40,046 $40,526 $31,935 $29,312 $27,941 $21,577 $13,583 $8,666 $4,196 $2,941 $2,066 $1,190 $532

Operating Cash Flow

$725,306 $0 $47,685 $103,420 $54,867 $182,813 $213,189 $47,636 $42,294 $37,260 $6,167 -$10,024 $0 $0 $0 $0 $0

 

   

22-7

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

 

GSV South Railroad PFS-Financial Model                                
M3-PN185074 LOM Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15
Working Capital ($000)                                  

Accounts Receivable

$0   -$3,194 -$1,787 $705 -$3,153 -$634 $4,889 $874 $310 $1,767 $169 $56 $0 $0 $0 $0

Accounts Payable

$0   $5,334 $698 $1,771 -$1,202 -$587 -$692 -$737 -$1,908 -$2,520 $77 -$235 $0 $0 $0 $0

Inventory (parts)

$0 $0                              

Total Working Capital

$0 $0 $2,141 -$1,090 $2,475 -$4,355 -$1,221 $4,197 $137 -$1,598 -$753 $246 -$179 $0 $0 $0 $0
Initial Capital Expenditures ($000)                                  

Pre-stripping

$20,559 $20,559 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Mining

$15,542 $15,542 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Process

$92,615 $92,615 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Owner's Cost

$4,160 $4,160 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Expansion Capital Expenditures ($000)                                  

Mining

$0   $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Process

$61,873   $0 $0 $61,873 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Owner's Cost

$2,971   $0 $0 $2,971 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Sustaining Capital Expenditures ($000)                                  

Mining

$58,654   $7,251 $6,596 $6,728 $7,016 $7,410 $7,826 $8,265 $6,106 $1,127 $329 $0 $0 $0 $0 $0

Process

$29,200   $12,678 $6,031 $0 $4,912 $1,501 $1,593 $1,691 $793 $0 $0 $0 $0 $0 $0 $0

Owner's Cost

$0   $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total Capital

$285,574 $132,877 $19,930 $12,627 $71,571 $11,928 $8,911 $9,419 $9,956 $6,899 $1,127 $329 $0 $0 $0 $0 $0
Cash Flow Before-Taxes ($000) $439,733 -$132,877 $29,896 $89,703 -$14,229 $166,529 $203,057 $42,414 $32,475 $28,763 $4,287 -$10,106 -$179 $0 $0 $0 $0
Cumulative Cash Flow Before-Taxes ($000) -$132,877 -$102,981 -$13,277 -$27,506 $139,023 $342,079 $384,493 $416,968 $445,731 $450,018 $439,912 $439,733 $439,733 $439,733 $439,733 $439,733

Taxes

$82,121 $0 $1,492 $8,014 $2,390 $27,277 $36,266 $2,786 $1,518 $2,379 $0 $0 $0 $0 $0 $0 $0
Cash Flow After-Taxes ($000) $357,611 -$132,877 $28,404 $81,689 -$16,619 $139,252 $166,791 $39,627 $30,958 $26,384 $4,287 -$10,106 -$179 $0 $0 $0 $0
Cumulative Cash Flow After-Taxes ($000) -$132,877 -$104,472 -$22,783 -$39,402 $99,850 $266,641 $306,268 $337,226 $363,609 $367,896 $357,790 $357,611 $357,611 $357,611 $357,611 $357,611
Financial Indicators Before-Taxes                                  

NPV @0%

$439,733                                

NPV @5%

$331,423                                

NPV @10%

$249,453                                

IRR

46.1%                                

Payback (years)

3.2   1.0 1.0 1.0 0.2 - - - - - - - - - - -
Financial Indicators After-Taxes                                  

NPV @0%

$357,611                                

NPV @5%

$265,045                                

NPV @10%

$195,068                                

IRR

40.0%                                

Payback (years)

3.3   1.0 1.0 1.0 0.3 - - - - - - - - - - -
Payable Au (kozs) 918 - 83 130 111 193 208 79 56 50 6 1 - - - - -
Mining $336,365 $0 $42,348 $51,718 $73,552 $47,202 $39,410 $38,831 $28,777 $14,471 $46 $9 $0 $0 $0 $0 $0
Process Plant $157,412 $0 $18,455 $16,532 $15,813 $22,451 $24,099 $21,841 $23,047 $14,174 $0 $1,000 $0 $0 $0 $0 $0
G&A $33,120 $0 $3,680 $3,680 $3,680 $3,680 $3,680 $3,680 $3,680 $3,680 $1,840 $1,840 $0 $0 $0 $0 $0
Refining $4,612 $0 $418 $653 $560 $970 $1,046 $397 $283 $249 $28 $7 $0 $0 $0 $0 $0
Royalty $20,149 $0 $1,803 $2,812 $2,414 $4,194 $4,552 $1,793 $1,299 $1,124 $127 $32 $0 $0 $0 $0 $0
Cash Cost before By-Product Credit $551,659 $0 $66,704 $75,394 $96,019 $78,498 $72,787 $66,543 $57,086 $33,698 $2,041 $2,888 $0 $0 $0 $0 $0
$/Au oz $601 $0 $801 $581 $861 $407 $350 $841 $1,013 $680 $361 $2,042 $0 $0 $0 $0 $0
Silver Credit $17,794 $0 $0 $0 $0 $969 $2,930 $5,158 $5,099 $3,289 $289 $58 $0 $0 $0 $0 $0
Cash Cost after By-Product Credit $533,865 $0 $66,704 $75,394 $96,019 $77,528 $69,857 $61,384 $51,987 $30,409 $1,752 $2,829 $0 $0 $0 $0 $0
$/oz Au $582 $0 $801 $581 $861 $402 $336 $776 $923 $613 $310 $2,001 $0 $0 $0 $0 $0
Sustaining Capital Expenditures                                  

Mining

$58,654 $0 $7,251 $6,596 $6,728 $7,016 $7,410 $7,826 $8,265 $6,106 $1,127 $329 $0 $0 $0 $0 $0

Process

$29,200 $0 $12,678 $6,031 $0 $4,912 $1,501 $1,593 $1,691 $793 $0 $0 $0 $0 $0 $0 $0

Owner’s Cost

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Salvage Value -$20,329 $0 $0 $0 $0 $0 $0 -$1,713 -$17,116 $0 $0 -$1,500 $0 $0 $0 $0 $0
Reclamation/Closure $22,420 $0 $2,183 $2,183 $3,876 $3,876 $3,422 $3,422 $1,729 $1,729 $0 $0 $0 $0 $0 $0 $0
Net Proceeds Tax $25,017 $0 $1,492 $3,459 $1,056 $7,518 $9,461 $1,091 $13 $927 $0 $0 $0 $0 $0 $0 $0
AISC $648,826 $0 $90,308 $93,664 $107,679 $100,850 $91,651 $73,603 $46,569 $39,964 $2,879 $1,658 $0 $0 $0 $0 $0
$/oz Au $707 $0 $1,085 $721 $966 $523 $440 $931 $826 $806 $509 $1,173 $0 $0 $0 $0 $0

 

   

22-8

 





SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

22.16 PURCHASED MINE EQUIPMENT ALTERNATIVE

The alternative case of purchasing mine equipment instead of leasing them was studied. The results are shown in Table 22-8 through Table 22-10. This alternative lowers the overall operating cost by 2.3%. However, it increases the initial capital by 31%, from $132.9 M to $173.7 M. The net effect is a reduction of the after-tax IRR from 40% to 32.9%.

Table 22-8: Capital Expenditure Schedule – Purchased Mine Equipment Alternative

Capital
Expenditure $000
Initial Expansion Sustaining
Year -1 Year 3 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Pre-stripping $19,644                      
Mine $57,236   $13,455 $3,414 $75              
Process $92,615 $61,873 $12,678 $6,031   $4,912 $1,501 $1,593 $1,691 $793    
Owner's Cost $4,160 $2,971                    
Total $173,656 $64,844 $26,133 $9,446 $75 $4,912 $1,501 $1,593 $1,691 $793    
 
Leased Equipment Option (Base Case)
Total $132,877 $64,844 $19,930 $12,627 $6,728 $11,928 $8,911 $9,419 $9,956 $6,899 $1,127 $329

Table 22-9: LOM Operating Costs – Purchased Mine Equipment Alternative

LOM Operating Cost ($000)
  Purchased Equip Leased Equip (Base Case)
Mining $323,118 $336,365
Process Plant $157,412 $157,412
G&A $33,120 $33,120
Toll Processing $13,063 $13,063
Refining $4,612 $4,612
Total Operating Cost $531,326 $544,573
Royalty $20,149 $20,149
Salvage Value -$20,329 -$20,329
Reclamation/Closure $33,094 $33,094
Total Production Cost $564,240 $577,487

Table 22-10: Key Economic Results – Purchased Mine Equipment Alternative

Indicators Purchased Mine Equipment Leased Mine Equipment
Before-Tax After-Tax Before-Tax After-Tax
LOM Cash Flow ($000) $453,911 $373,484 $439,733 $357,611
NPV @ 5% ($000) $332,952 $268,421 $331,423 $265,045
NPV @ 10% ($000) $241,837 $189,345 $249,453 $195,068
IRR 37.7% 32.9% 46.1% 40.0%
Payback (years) 3.3 3.4 3.2 3.3

 

 

22-9

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 23 TABLE OF CONTENTS

SECTION PAGE
23 ADJACENT PROPERTIES 23-1
  23.1 RAIN 23-1
  23.2 EMIGRANT 23-2
  23.3 PONY CREEK PROPERTY 23-2

 

 

23-i

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

23 ADJACENT PROPERTIES

The Railroad- Pinion property is situated along the southeastern portion of the Carlin Gold Trend. The Rain Mining District, which is largely controlled by Nevada Gold Mines, is located 2 to 3 km (1.2 to 2 miles) north of the Railroad-Pinion property. The Rain District has been an active exploration and mining area for several decades and is the location for current and past mining activities by Nevada Gold Mines and Newmont Mining at the Rain open pit and underground mine and Emigrant open pit mine. To the south of the Railroad-Pinion property, several exploration areas have received sporadic exploration over the past three to four decades including Pony Creek. Adjacent properties with bearing or influence on the Railroad-Pinion property are described below. The authors of this Technical Report have not visited or worked at any of these projects and where references are made to past production and/or historic or current mineral resources the authors have not verified the information.

23.1 RAIN

Rain is a Carlin-style, sedimentary rock-hosted gold deposit that is located approximately four miles (seven kilometers) north of Gold Standard’s North Bullion mineral resource. Newmont operated the Rain open pit mine, the Rain underground mine and the SMZ open pit mine from 1988 to 2000; and produced approximately 1.24 million ounces (Ressel et al., 2015. Longo et al. (2002) summarized a number of mineral resources for the three deposits as follows: Rain open pit 15.5 million tons (14.1 million tonnes) at 0.066 opt (2.3 g/t) Au for a total of 1,017,300 ounces of gold; Rain Underground 1.154 million tons (1.04 million tonnes) at 0.23 opt (7.9 g/t) Au for a total of 265,000 ounces of gold and the SMZ open pit 1.5 million tons (1.4 million tonnes) at 0.019 opt (0.65 g/t) Au for a total of 30,000 ounces of gold. The mineral resources pre-date NI 43-101 and little or no detailed information such as potential mineral resource category or number of drill holes is presented for the estimates or how the mineral resources were arrived at. Therefore, the estimates are considered historic in nature and should not be relied upon. The authors of this Technical Report have been unable to verify this and this information is not necessarily indicative of the mineralization of the Railroad-Pinion property.

Along strike to the northwest of the Rain Project and likely on the same structure are the Saddle and Tess gold deposits. The mineralized zones are roughly 3.5 km (2 miles) north of the Railroad-Pinion Project and 10 km (6 miles) northwest of the North Bullion mineral resource. Longo et al. (2002) states that Newmont identified a primarily underground high sulphide mineral resource of 1.37 million tons (1.23 million tonnes) at 0.572 opt (19.6 g/t) Au for a total of 782,000 ounces of gold at Saddle and 3.99 million tons (3.59 million tonnes) at 0.37 opt (12.7 g/t) Au for a total of 1,475,000 ounces of gold at Tess. The project was part of the Newmont South Area of operations but has recently been consolidated under the Newmont/Barrick Joint Venture (Nevada Gold Mines). No mining has been conducted at the two deposits. The mineral resources pre-date NI 43-101 and little or no detailed information such as potential mineral resource category or number of drill holes etc. is presented for the estimates or how the mineral resources were arrived at, therefore, the estimates are considered historic in nature and should not be relied upon. The authors of this Technical Report have not visited the Rain property, nor have they verified the historic estimates provided by Longo et al. (2002).

The Rain trend of mineralization is characterized by disseminated gold mineralization hosted in dominantly oxidized, silicified, dolomitized, and barite rich collapse breccia with rare sulfides, developed along the Webb Formation mudstone/Devils Gate Formation calcarenite contact and along the Rain Fault. Ore-controlling features at Rain include the west-northwest striking Rain fault, the Webb/Devils Gate contact, collapse breccia and northeast striking cross faults. Shallow oxide zones at the Rain deposit give way along the west-northwest trend to deeper sulphide- and carbon-bearing zones of substantial size and grade at the Saddle and Tess deposits.

 

23-1

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

23.2 EMIGRANT

Emigrant is a Carlin-style, sedimentary rock-hosted gold deposit that is located approximately four miles (seven kilometers) north-northeast of the North Bullion mineral deposits. Until recently Newmont/Nevada Gold Mines has been mining the deposit through open pit methods and processing the ore at an onsite, run of mine heap leach operation with some crushing. The operation currently appears to be shut down. Disseminated gold mineralization is hosted in oxidized, silicified, dolomitized, and barite rich collapse breccia developed within the Webb Formation mudstone. Important ore-controlling features at Emigrant include the north-south-striking Emigrant Fault, collapse breccia and the Northeast Fault.

Open pit, oxide mineral resource and mineral reserve calculations for Newmont’s Carlin Trend operations are typically commingled into a single heading of “Carlin open pits, Nevada” category. In 2003, mineral reserves at Emigrant were published at 1,220,000 ounces (Newmont, 2012). No details were provided by Newmont as to the quality of the mineral reserves. The mine is expected to produce roughly 800,000 ounces of gold over a ten plus year mine life and has recently commenced production (Harding, 2012). The authors of this Technical Report have been unable to verify this and this information is not necessarily indicative of the mineralization on the Railroad-Pinion property.

23.3 PONY CREEK PROPERTY

Pony Creek is located approximately six miles (10 kilometers) south of the Pinion deposit. Gold mineralization is hosted in north to northeast-trending shears in rhyolite intrusive and Mississippian to Permian age sediments proximal to the intrusive (Russell, 2006).

 

23-2

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

24 OTHER RELEVANT DATA AND INFORMATION

There are no additional data for the Railroad Pinion property beyond that discussed in the preceding sections.

 

24-1l

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 25 TABLE OF CONTENTS

SECTION PAGE
25 INTERPRETATION AND CONCLUSIONS 25-1
  25.1 PROJECT RISKS 25-1
    25.1.1 Excess Mine Dewatering Water Disposal 25-1
    25.1.2 Geotechnical Characterization 25-2
    25.1.3 Pit Lake Geochemistry 25-2
  25.2 PROJECT OPPORTUNITIES 25-2
  25.3 EXPLORATION AND MINERAL RESOURCE EXPANSION 25-2

 

 

25-i

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

25 INTERPRETATION AND CONCLUSIONS

The authors of this Technical Report believe that South Railroad is a project of merit and warrants advancing the study to feasibility level.

The authors have reviewed the project data, including the drill-hole database and available metallurgical information, and have visited the project site. The authors believe that the data provided by Gold Standard, as well as the geological interpretations Gold Standard has derived from the data, are generally an accurate and reasonable representation of the Railroad-Pinion property. Based on the positive results of this PFS, the project should continue on a path to a production decision.

Presently there are 1.25 million proven and probable ounces of gold and 2.7 million ounces of silver in the Dark Star and Pinion deposits estimated mineral reserves combined, 1.55 million measured and indicated ounces of gold in the Dark Star, Pinion and North Bullion deposits estimated mineral resources combined, inclusive of mineral reserves in the Dark Star and Pinion deposits, and there are 1.20 million inferred ounces of gold in the Dark Star, Pinion, Jasperoid Wash and North Bullion deposits estimated mineral resources combined. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Results of historical metallurgical tests and those commissioned by Gold Standard indicate there are multiple metallurgical material types within the Pinion and Dark Star gold deposits. Due to the multiple material types and the dependence of gold recoveries on head grades, 54 different gold recovery equations are used to project the processing and gold and silver production estimates presented in this Technical Report.

The process selected for recovery of gold and silver from the Pinion and Dark Star mineralized material is a conventional heap-leach recovery circuit. The material will be mined by standard open-pit mining methods and trucked from each deposit to a centralized area of heap-leach pads and processing facilities. Based on material grades within the Pinion and Dark Star mineable mineral resources, approximately 30.7 million tonnes will be selected for ROM processing and 16.1 million tonnes will be selected for HPGR crushing. The nominal processing rate through the crushing circuit will be 10,000 tonnes per day, and the design ROM processing rate (for the leaching and adsorption design basis) is 12,500 tonnes per day.

Over the LOM of 8 years, the PFS indicates gold production of about 114,420 ounces per year, with peak production in Year 5 of 209,189 ounces of gold. Cash costs are estimated to be $582 per ounce of gold and total costs are estimated to be $707 per ounce of gold. The resulting after-tax cash flow is $357.6 million, for an after-tax NPV (5%) of $265.0 million and an estimated IRR of 40.0% and payback period of 3.3 years.

25.1 PROJECT RISKS

25.1.1 Excess Mine Dewatering Water Disposal

  • The current PFS plans and financials call for utilizing a rapid infiltration basin (RIB) for excess water disposal from dewatering activity. At present a suitable RIB location has not been identified on the project. If a RIB location cannot be identified, an alternative for water disposal, such as surface water discharge and injection wells, would be considered. Both alternatives require water treatment, which is not being considered in the PFS plan and financials. Should water treatment be required, a coagulation and filtration treatment system would be built to bring water to state required standards. The water treatment system would increase both capital and operating costs of the project.

 

25-1

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

25.1.2 Geotechnical Characterization

  • At the date of this Technical Report, the location of major facilities is based on assumed good foundation material, which needs to be verified in future studies. Costs in the PFS assume average ground conditions and that no additional major engineering will be required. Surface geotechnical work is currently ongoing for proposed surface dumps and heap leach facilities with Golder. Worse than assumed ground conditions may increase the cost of foundations or require shifting or relocation of process facilities.

25.1.3 Pit Lake Geochemistry

  • The ground water hydrology model is currently under development. At present no major risks were identified related to ground water considerations.

  • At the date of this Technical Report, the pit lake geochemistry and ground water model are still under development. At present, the PFS financials assumes that no water treatment is required for final pit lakes.
    Pit lake geochemistry and ground water modeling is currently in progress. Results of this work could indicate the need for water treatment and/or other closure requirements to meet state water standards. Water treatment of pit lakes may increase the closure cost of the project.

25.2 PROJECT OPPORTUNITIES

1. The full installation costs for the Process and HPGR plants were based on price quotations from a single source. Both plants should be competitively bid, after feasibility study-level engineering, to reduce to develop optimal estimates of the initial and expansion capital requirements for the project.
 
2. Pinion deposit currently contains a large increase in gold ounces within the quoted mineral resource ($1,500 Au) compared to the mineral reserve ($1,275 Au). Drilling, metallurgy, and hydrology should be evaluated to determine if additional work can bring these mineral resources into the mine reserves.
 
3. Oxide mineral resources ($1,500 Au) are currently drilled to Inferred (Jasperoid Wash and Pod) and Indicated (Pod) status. These mineral resources are not included in the current mine plan and should be evaluated for impacts to the project and work required to bring forward.
 
4. Mine plans should undergo various iterations to

 

a. Evaluate opportunity for utilizing surface exposed mineralization at Dark Star Main and Pinion for placement as crushed over-liner.
 
b. Evaluate recently discovered mineralized gravels east of the Dark Star Main pit for potential inclusion in the mine design or utilization as heap leach gravel liner cover.

 

5. Pit designs should undergo various iterations to

 

a. Investigate opportunities to utilize limestone material in the Pinion deposit for naturalization capacity of PAG material which may reduce waste rock storage facility construction.
 
b. Investigate opportunities to utilize limestone sources for construction and construction cement requirements, as well as lime to be used for leaching

25.3 EXPLORATION AND MINERAL RESOURCE EXPANSION

Dark Star remains open to exploration and expansion in all directions and requires additional drilling to define the economic edges to mineralization. The Pinion deposit contains a significant mineral resource of Measured and

 

25-2

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

Indicated ounces (180,000 oz Au) and Inferred (224,000 oz) that is exclusive of the current mineral reserves. This material floats cones at the $1,400 gold price. The potential expansion of Pinion to the southwest with the known mineral resources should be evaluated in a rising gold price environment. Jasperoid Wash and oxide mineralization at North Bullion contain oxide mineral resources at $1,500 gold price. Current classification of mineral resources as Inferred at Jasperoid Wash and portions of North Bullion prevent this material from consideration within the PFS and mineral reserves. Additionally, Jasperoid Wash is open along strike and mineral resources can potentially be increased with expansion drilling. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Gold Standard’s Railroad-Pinion property is centered on another window of the Carlin trend. The property has all the promising geologic characteristics of other productive districts of the Carlin trend, including carbonate host rocks, older thrust faults and folds, younger extensional faults and an Eocene (Carlin age) magmato-thermal event. Deposits at Railroad-Pinion are hosted both in collapse breccia developed along the Devonian Devils Gate limestone/Mississippian Tripon Pass micrite contact and within highly permeable Pennsylvanian-Permian carbonate units. These units are common hosts for Carlin-type gold deposits throughout north-central Nevada. The structural setting with north-, northeast- and northwest-striking Tertiary extensional faults overprinted on earlier compressional structures is a classic Carlin framework. There are numerous un-drilled targets along prospective structural corridors.

 

25-3

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

SECTION 26 TABLE OF CONTENTS

SECTION PAGE
26 RECOMMENDATIONS 26-1
  26.1 EXPLORATION 26-1
  26.2 INFILL DRILLING 26-1
  26.3 EXPLORATION AND EXPANSION DRILLING 26-1
  26.4 CONDEMNATION DRILLING 26-1
  26.5 METALLURGICAL TEST WORK 26-1
  26.6 PERMITTING AND BASELINE STUDIES 26-2
  26.7 ENGINEERING STUDIES AT FEASIBILITY LEVEL 26-2
  26.8 HYDROLOGY 26-2
  26.9 GEOTECHNICAL SURVEY 26-2
  26.10 TOTAL COST OF RECOMMENDED STUDY PROGRAM 26-2

 

 

26-i

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

26 RECOMMENDATIONS

To advance the study to feasibility level, the authors recommend a study program and level of expenditures outlined below, focused on the gold deposits in the South Railroad portion of the property.

Based on the results of the preliminary feasibility work the authors believe that the Railroad-Pinion property is a project of merit and warrants the proposed program and level of expenditures outlined below, focused on the gold deposits in the South Railroad portion of the property.

The total cost of recommendations is expected to reach $21 million for a multi-faceted program including exploration, permitting, development, metallurgical testing and engineering. The subsection describes the recommended program.

26.1 EXPLORATION

The Railroad-Pinion property is large, and merits continued exploration outside of the immediate deposit areas. Recommended exploration includes mapping and sampling within under-explored portions of the property. Exploration would include mapping, sampling, and 2D seismic to help define faults, and exploration/reconnaissance initial drilling of 10,000 m in about 20 drill holes ($1,700,000).

26.2 INFILL DRILLING

Infill drilling is justified to potentially upgrade the Inferred mineral resources within the Pinion mineral resource to Measured or Indicated mineral resource classification. This mineral resource is currently within $1400 Au ounce shells based on LG Cones. This should be further evaluated at current gold prices >$1,450/ounce. This drilling will total 16,150 m and can be done with RC and core methods at an estimated cost of $3.0 million.

Infill drilling (10,800 m) and metallurgy at Jasperoid Wash is warranted because of the potential to contribute to the property mineral resources and mineral reserves. This can be done with RC methods at an estimated cost of $2.5 million.

Oxide mineralization and mineral resources at POD and Sweet Hollow are generally known from historical drilling. These should be evaluated metallurgically with core drilling and metallurgical testing. Estimated costs are $1.5 million.

26.3 EXPLORATION AND EXPANSION DRILLING

Dark Star mineralization is not closed off around/near the current pit designs, and additional exploration and expansion drilling is merited to determine the ultimate footprint of this deposit. Additional core and RC drilling is recommended. The total for this task is $1.5 million.

26.4 CONDEMNATION DRILLING

Condemnation drilling of 3,300 m in ten drill holes is recommended within and near the footprints of the planned facilities. The estimated total cost is $500,000.

26.5 METALLURGICAL TEST WORK

Metallurgical work requirements for advancing the Pinion and Dark Star deposits to feasibility study level are estimated at $2.05 million, which includes additional metallurgical test work, engineering and trade-off studies, material-fracture characterization, metallurgical consulting and a 10% contingency as described below.

  • HPGR Design and Costing: Metallurgical testwork has demonstrated that HPGR crushing in the tertiary circuit provides the best recovery option for the Dark Star and Pinion material. Additional testwork to finalize HPGR

 

26-1

 



SOUTH RAILROAD PROJECT
FORM 43-101F1 TECHNICAL REPORT

    design, evaluate wear and materials use, and ultimately operating costs should be conducted through Thyssen-Krupp and KCA. Cost for this include

    • PQ Core drilling to provide adequate material for test work: 17 holes, 1,137m, $600,000

    • Material preparation and analysis by KCA $200,000

    • Material testing by Thyssen Krupp $500,000

  • Material Flow Characterization: To facilitate design of primary and secondary crusher, conveyor drop boxes, chutes, and stockpile reclaim equipment selections. $100,000

  • Metallurgical testwork on additional mineral resources identified at Pinion, Jasperoid Wash, and POD. Mineral resources have an opportunity to impact future mine plans. Preliminary metallurgical testwork to establish recoveries and material characterization should be undertaken during next stages of testing. $500,000

  • Contingency: $146K; 10% on vendor testing/characterization, data gap filling identified by the preliminary feasibility engineering contractors and any missing scope of work items.

26.6 PERMITTING AND BASELINE STUDIES

It is recommended that Gold Standard initiate permitting and NEPA activities in support of open-pit mining at Dark Star and Pinion. The estimated cost is estimated at $2.0 million, including an EIS contractor.

26.7 ENGINEERING STUDIES AT FEASIBILITY LEVEL

The current PFS considers the Pinion and Dark Star mineral reserves as potentially minable. Additional work is required to optimize the mineral resources and mineral reserves, including trade off studies, engineering to feasibility level, and geotechnical work in support of facilities. It is expected that the work to progress to a feasibility level will be approximately $3.0 million.

26.8 HYDROLOGY

Additional testing and monitoring wells maybe required by the state and federal agencies as part of the EIS process. This is anticipated in the form of drilling and installation of additional piezometer wells, water sampling and analysis, and pump testing. Projected costs are $2.0 million.

26.9 GEOTECHNICAL SURVEY

Geotechnical studies are recommended for assessing pit designs at a feasibility level. All-in costs, including drilling, field work, and reporting are estimated to be $1.1 million.

Geotechnical study of the mill site is also recommended to determine geotechnical parameters to be used for structural design. Estimated cost is $110,000.

26.10 TOTAL COST OF RECOMMENDED STUDY PROGRAM

Table 26-1 is a summary of the costs of the recommended work to advance the study to feasibility level.

 

26-2

 



    SOUTH RAILROAD PROJECT
    FORM 43-101F1 TECHNICAL REPORT

    Table 26-1: Cost Estimate for the Recommended Study Program

    Exploration Cost Sub-total
    Mapping and Sampling $50,000  

    Seismic

    $500,000  

    Drilling

    $1,150,000 $1,700,000
    Infill and Expansion Drilling    

    Pinion mineral resource Infill

    $3,000,000  

    Jasperoid Wash Infill

    $2,500,000  

    POD Metallurgy and Infill Drilling

    $1,500,000  

    Dark Star Development/Step-out Drilling

    $1,500,000  

    Facility Condemnation Drilling

    $500,000 $9,000,000
    Metallurgical Test work    

    HPGR Design Work (Thyssen-Krupp

    $1,300,000  

    Material Flow

    $100,000  

    Pinion, POD, JW Metallurgy (columns and BR)

    $500,000  

    Contingency (10%)

    $146,000 $2,046,000
    Permitting and Baseline Studies   $2,000,000
    Engineering and Feasibility Study   $3,000,000
    Hydrology   $2,000,000
    Geotechnical   $1,210,000
    Grand Total (rounded to x,000s)   $20,956,000

     

     

    26-3

     



    SOUTH RAILROAD PROJECT
    FORM 43-101F1 TECHNICAL REPORT

    27 REFERENCES

    American Selco Incorporated, 1970, Review of Field Investigations, 1968, and Proposed Exploration Program for 1969 in the Railroad Mining District Elko County, Nevada: document prepared for the Directors of Aladdin Sweepstake Consolidated Mining Company.

    AMTEL, 2018 (September), Abbreviated Gold Deportment Analysis of Milled Column Residues: unpublished report to Gold Standard Ventures Inc., AMTEL Ltd. Report 18/46, no author, 13p.

    Arthur, B., 2013, Roaster Tests on Rail Road Ore 2013-OP-003, Newmont Mining Corporation memo.

    Barr Engineering, 2019, Fragmentation Study Dark Star & Pinion Deposits, Design Basis, Prepared for Gold Standard Ventures.

    Bartels, E., 1999, Railroad Project, Pod Area Sectional Resource Calculation: internal company memorandum prepared for Kinross Gold U.S.A, Inc.

    Bettles, K., 2002, Exploration and Geology, 1962-2002, at the Goldstrike Property: in Thompson, T.B., Teal, L., and Meeuwig, R., eds., Gold Deposits of the Carlin Trend: Nevada Bureau of Mines and Geology Bulletin 111, p. 54-75.

    Bharti Engineering, 1996, Preliminary Assessment of the South Bullion Deposit: confidential internal report, 5p.

    Bloomberg Consensus Precious Metals Pricing, 2019 (September 30), www.bloomberg.com.

    Calloway, V., 1992, Exploration Summary, Results and Recommendations for the Cord Ranch Lease, Elko County, Nevada: Crown Resources internal report, 78p.

    Cline, J.L., 2004. Controversies on the origin of world-class gold deposit, Part 1: Carlin-type gold deposits in Nevada. Introduction to Carlin-type deposits. SEG Newsletter no. 59, pp. 1,11-12.

    Cline, J.L., 2005. Carlin-type gold deposits in Nevada: critical geologic characteristics and viable models: Economic Geology 100th Anniversary Volume, pp. 451-484.

    Clode, C.H., Grusing, S.R., Johnston, I.M., and Heitt, D.G., 2002, Geology of the Deep Star Gold Deposit: in Thompson, T.B., Teal, L., and Meeuwig, R., eds., Gold Deposits of the Carlin Trend: Nevada Bureau of Mines and Geology Bulletin 111, p. 76-90.

    Crafford, A.E.J., 2007, Geologic Map of Nevada: U.S. Geological Survey Data Series 249.

    DeMatties, T.A., 2003 (January), NI 43-101 Technical Report: An Evaluation of the Pinion Gold Property, Elko County, Nevada, USA: prepared for Royal Standard Minerals Inc.

    Dufresne, M.B. and Koehler, S.R., 2016 (March), Technical Report on the Railroad – Pinion Project, Elko County, Nevada USA: unpublished technical report (NI43-101 compliant) prepared for Gold Standard Ventures Corp., 471 p.

    Dufresne, M.B., and Nicholls, S.J., 2016 (April), Technical Report Resource Estimate Update Pinion Project Elko County, Nevada USA: NI 43-101 technical report prepared by APEX Geoscience Ltd., 220 p.

     

    27-1

     



    SOUTH RAILROAD PROJECT
    FORM 43-101F1 TECHNICAL REPORT

    Dufresne, M.B., and Nicholls, S.J., 2017a (August), Technical Report Resource Estimate Update Dark Star Project, Elko County, Nevada USA: NI 43-101 technical report prepared by APEX Geoscience Ltd., 220 p.

    Dufresne, M.B., and Nicholls, S.J., 2017b (November), Technical Report Maiden Resource Estimate North Bullion and Railroad Project, Elko County, Nevada, USA: unpublished technical report (NI43-101 compliant) prepared for Gold Standard Ventures Corp., 258 p.

    Dufresne, M.B., and Nicholls, S.J., 2018 (February), Technical Report Maiden Resource Estimate North Bullion and Railroad Project, Elko County, Nevada, USA Amended and Restated: unpublished technical report (NI43-101 compliant) prepared for Gold Standard Ventures Corp., 292 p.

    Dufresne, M.B., Nicholls, S.J., and Turner, A, 2014 (October), Technical Report Maiden Resource Estimate Pinion Project, Elko County, Nevada USA: unpublished technical report (NI43-101 compliant) prepared for Gold Standard Ventures Corp., 141 p.

    Dufresne, M.B., Nicholls, S.J., and Turner, A.J., 2015 (April), Technical Report Maiden Resource Estimate Dark Star Deposit Elko County, Nevada USA: NI 43-101 technical report prepared by APEX Geoscience Ltd., 179 p.

    Dufresne, M.B., Koehler, S.R., and Jackson, M.R., 2017 (March), Technical Report on the Railroad – Pinion Project, Elko County, Nevada USA: unpublished technical report (NI43-101 compliant) prepared for Gold Standard Ventures Corp., 259p.

    Emmons, W.H., 1910, A Reconnaissance of Some Mining Camps in Elko, Lander and Eureka Counties, Nevada: U.S. Geological Survey Bulletin 408.

    Galey, J.T., 1983, Appraisal, Railroad Project, Elko County, Nevada, internal company report of AMAX Exploration, Inc.

    Golder Associates, Inc, 2019 (July 10, by R. Browne), Geotechnical Testing of TIW Deposists from Corehole DS17-02, South Railroad Project, Nevada.

    Harp, M.T., Edie, R.J., Jackson, M.R., Koehler, S.R., Norby, J.W., Whitmer, N.E., Moore, S., and Wright, J.L., 2016, New Discovery within the Dark Star Corridor, Railroad-Pinion District, Elko County, Nevada: Association for Mineral Exploration British Columbia, Mineral Exploration Roundup 2016, Vancouver, abstract volume, p. 44.

    Henry, C.D., Jackson, M.R., Mathewson, D.C., Koehler, S.R., and Moore, S.C., 2015, Eocene Igneous Geology and Relation to Mineralization: Railroad District, Southern Carlin Trend, Nevada: in Pennell, W.M., and Garside, L.J., eds., New Concepts and Discoveries, Geological Society of Nevada 2015 Symposium, Reno, Nevada, p. 939-965.

    Hofstra, A.H., and Cline, J.S., 2000. Characteristics and models for Carlin-type gold deposits: in Society of Economic Geologists Reviews vol. 13, pp. 163-220.

    Hunsaker III, E.L., 2010 (May), Technical Report on the Railroad Project, Elko County, Nevada, USA: unpublished Technical Report prepared for Gold Standard Ventures Corp (NI43-101 compliant), 67p.

    Hunsaker III, E.L., 2012a (February), Technical Report on the Railroad Project, Elko County, Nevada, USA: unpublished Technical Report prepared for Gold Standard Ventures Corp (NI43-101 compliant), 78p.

      

    27-2

     



    SOUTH RAILROAD PROJECT
    FORM 43-101F1 TECHNICAL REPORT

    Hunsaker III, E.L., 2012b (April), Amended and Restated Technical Report on the Railroad Project, Elko County, Nevada, USA: unpublished Technical Report prepared for Gold Standard Ventures Corp (NI43-101 compliant), 82p.

    Jackson, M.R., Lane, M., and Leach, B., 2002, Geology of the West Leeville Deposit: in Thompson, T.B., Teal, L., and Meeuwig, R., eds., Gold Deposits of the Carlin Trend: Nevada Bureau of Mines and Geology Bulletin 111, p. 106-114.

    Jackson, M.R. and Koehler, S.R., 2014, Carlin-style Gold and Polymetallic Targets within a Large Eocene, Magmato-thermal System on the Carlin Trend, Nevada: Abstract for the AMEBC Mineral Exploration Roundup 2014, Vancouver, British Columbia.

    Jackson, M.R., Mathewson, D.C., Koehler, S.R., Harp, M.T., Edie, R.J., Whitmer, N.E., Norby, J.W., and Newton, M.N., 2015, Geology of the North Bullion Gold Deposit: Eocene Extension, Intrusion and Carlin-style Mineralization, the Railroad District, Carlin Trend, Nevada: in Pennell, W.M., and Garside, L.J., eds., New Concepts and Discoveries, Geological Society of Nevada 2015 Symposium, Reno, Nevada, p. 313-331.

    Jones, W.C., and Postlethwaite, C., 1992, Pieretti Land Block, Pieretti Ranch and Pinon Projects, Elko and Eureka Counties, Nevada: internal company report dated April, 1991, 148p.

    Jones, M., Thomas, D., Shabestari, P. and Babcock, J., 1999 (October), Railroad Project 1999 Summary Report: ed. Cupp, B.L., unpublished report prepared for Kinross Gold U.S.A., Inc., 55p.

    Kappes, Cassiday & Associates, 2004 (March), Pinion & Railroad Project - Report on Metallurgical Testwork, Project No. 126C, File 7355, unpublished report prepared for Royal Standard Minerals, by Kappes, Cassiday and Associates, 130p.

    Kappes, Cassiday & Associates, 2006, Pinion Railroad Project Report of Metallurgical Test Work, March 2006, Project 126C, File 7355. Unpublished confidential report prepared on behalf of Royal Standard Minerals, 146p.

    Kappes, Cassiday & Associates, 2016a (April), Pinion Project Bottle Roll Leach Testing on Sample Received 08 March 2016, Report on Metallurgical Testwork, April 2016, Project No. 7355C, File 7355, Report I.D.:KCA0160038_PIN04_01. Unpublished report prepared for Gold Standard Ventures Corp., by Kappes, Cassiday and Associates, 99p.

    Kappes, Cassiday & Associates, 2016b (June), Pinion Project Bottle Roll Leach Check Test Work, Report on Metallurgical Testwork, June 2016, Project No. 7355C, File 7355, Report I.D.: KCA0160059_PIN06_02, unpublished report prepared for Gold Standard Ventures Corp., by Kappes, Cassiday and Associates, 45p.

    Kappes, Cassiday & Associates, 2016c (June), Pinion Project Coarse Crushed and Milled Bottle Roll Leach Testing, Report on Metallurgical Testwork, June 2016, Project No. 7355C, File 7355, Report I.D.:KCA0150075_PIN01_04, unpublished report prepared for Gold Standard Ventures Corp., by Kappes, Cassiday and Associates, 283p.

    Kappes, Cassiday & Associates, 2017a (June), Pinion Project Column Leach Tests, Report on Metallurgical Testwork, June 2017, Project No. 7355C, File 7355, Report I.D.: KCA0160137 _PIN07_02. Unpublished report prepared for Gold Standard Ventures Corp., by Kappes, Cassiday and Associates, 855p.

     

    27-3

     



    SOUTH RAILROAD PROJECT
    FORM 43-101F1 TECHNICAL REPORT

    Kappes, Cassiday & Associates, 2017b (November), Dark Star Project, Bottle Roll and Column Leach Tests, Report of Metallurgical Test Work, November 2017. Project No. 9108C, File 9108, Report I.D.: KCA0170014_DKST_01. Unpublished report prepared for Gold Standard Ventures Corp., by Kappes Cassiday and Associates, 1180p.

    Kappes, Cassiday & Associates, 2018a (June), Pinion Project HPGR Test Work, Report of Metallurgical Test Work, June 2018. Project No.7355C, File 7355, Report I.D.: KCA0170101_PIN08-01. Unpublished report prepared for Gold Standard Ventures Corp., by Kappes Cassiday and Associates, 115p.

    Kappes, Cassiday & Associates, 2018b (June), Dark Star Project HPGR Test Work – Report of Metallurgical Test Work, June 2018. Project No. 9108C, File 9108, Report ID: KCA0170085_DKST02_01. Unpublished report prepared for Gold Standard Ventures Corp., by Kappes, Cassiday and Associates.

    Kappes, Cassiday & Associates, 2018c (October), Jasperoid Wash Project, Report of Metallurgical Test Work: Unpublished report prepared for Gold Standard Ventures Corp., by Kappes, Cassiday and Associates.

    Kappes, Cassiday & Associates, 2019a (July), Pinion Project Phase 3 Metallurgical Program – Report of Metallurgical Test Work, July 2019. Project No. 7355 C, File 7355, Report ID: KCA0180061_PIN09_03. Unpublished report prepared for Gold Standard Ventures Corp., by Kappes, Cassiday and Associates, 1182p.

    Kappes, Cassiday & Associates, 2019b, (July), Dark Star Project Phase 3 Metallurgical Program – Report of Metallurgical Test Work, July 2019. Project No. 9108 C, File 9108, Report ID: KCA0180065_DKST03_01. Unpublished report prepared for Gold Standard Ventures Corp., by Kappes, Cassiday and Associates, 2047p.

    Ketner, K.B. and Smith Jr., J.F., 1963, Geology of the Railroad mining district, Elko County, Nevada: U.S. Geological Survey Bulletin 106.

    Koehler, S.R., Dufresne, M.B. and Turner, A., 2014 (March), Technical Report on the Railroad and Pinion Projects, Elko County, Nevada USA: unpublished Technical Report prepared for Gold Standard Ventures Corp. (NI43-101 compliant), 158p.

    Koehler, S.R., Edie, R.J., Harp, M.T., Henry, C., Jackson, M.R., Mathewson, D.C., Norby, J.W., and Whitmer, N.E., 2015, Precious and Base Metal Mineralization Within a Large Eocene, Magmato-Thermal System, Railroad District, Carlin Trend, Nevada: in Pennell, W.M., and Garside, L.J., eds., New Concepts and Discoveries, Geological Society of Nevada 2015 Symposium, Reno, Nevada, p. 1229-1242.

    Kuehn, C.A. and Rose, A.W., 1992, Geology and geochemistry of wall-rock alteration at the Carlin gold deposit, Nevada: Economic Geology, v. 87, p. 1697–1721.

    Kuhl, T.F., 1985, Geological Ore Reserves, Railroad Project, Elko County, Nevada: internal company memorandum prepared for NICOR Mineral Ventures.

    LaPointe, Daphne, D., Tingley, Joseph V., and Jones, Richard B., 1991, Mineral Resources of Elko County, Nevada: Nevada Bureau of Mines and Geology Bulletin 106.

    Longo, A.A., Thompson, T.B., and Harlan J. B., 2002, Geologic Overview of the Rain Subdistrict: in Thompson, T.B, Teal, L., and Meeuwig, R.O., eds., Gold Deposits of the Carlin Trend, edited by, Nevada Bureau of Mines and Geology Bulletin 111.

      

    27-4

     



    SOUTH RAILROAD PROJECT
    FORM 43-101F1 TECHNICAL REPORT

    Lund, K., 2008. Geometry of the Neoproterozoic and Paleozoic rift margin of western Laurentia: Implications for mineral deposit settings: Geosphere, v. 4, pp. 429-4440

    M3 Engineering & Technology Corp., Gold Standard Ventures South Railroad Project Electric Service Study Rev. P2, January 14, 2020.

    Macy, F.A., 1991 (September), Report on Preliminary Cyanidation Testwork – Cord Ranch Cuttings Composites, MLI Job No. 1666, September 5, 1991, unpublished report by McClelland Laboratories Inc. to Crown Resources Corporation, 15p.

    Masters, T.D., 2003a (February), Gold mineral resource Calculations of the POD Gold Zone at Railroad Bullion: unpublished report prepared for Royal Standard Minerals Inc., 8p.

    Masters, T.D., 2003b (July), History, Geology, Resources, Discovery Potential and proposed Exploration Drilling Program for the Pinion – Railroad Project, Nevada: unpublished report prepared for Royal Standard Minerals Inc., 38p.

    Mathewson, D.C., 2002, Carlin Gold Trend, Nevada Longitudinal Section – The “Four Windows”: unpublished cross section, files of Gold Standard Ventures Corp.

    McClelland Laboratories Inc., 1995, Report on Cyanidation Testwork – South Bullion Samples. MLI Job No. 2136 -June 9, 1995: unpublished report prepared for Cypress Metals Company,

    McComb, M., 2016 (May), Petrographic Examination of Fourteen Core Samples from the Dark Star Project, Nevada, internal company report prepared for Gold Standard Ventures.

    McCusker, R. and Drobeck, P., 2012, Piñon Project Summary: unpublished report prepared for Royal Standard Minerals Inc.

    Muntean, J.L., Coward, M.P. and Tarnocai, C.A., 2011. Reactivated Paleozoic normal faults: controls on the formation of Carlin-type gold deposits in north-central Nevada: in Ries, A.C., Butler, R.W.H., and Graham, R.R. (eds), Deformation of the Continental Crust: The Legacy of Mike Coward. Geological Society, London, Special Publications, no. 272, pp. 571-587.

    Muntean, J.L., and Cline, J.S., 2018, Introduction, Diversity of Carlin-style Gold Deposits: in Muntean, J.L., ed., Diversity of Carlin-style Gold Deposits, Reviews in Economic Geology, v. 20, Society of Economic Geologists, p. 1-5.

    Norby, J.W. and Orobona, M.J.T., 2002, Geology and Mineral Systems of the Mike Deposit: in Thompson, T.B., Teal, L., and Meeuwig, R., eds., Gold Deposits of the Carlin Trend: Nevada Bureau of Mines and Geology Bulletin 111, p. 143-167.

    Norby, J.W., Edie, R.J., Harp, M.T., Jackson, M.R., Koehler, S.R., Mathewson, D.C., Moore, S., Whitmer, N.E., and Wright, J.L., 2015, Pinion Gold Deposit, Elko County, Nevada: in Pennell, W.M., and Garside, L.J., eds., New Concepts and Discoveries, Geological Society of Nevada 2015 Symposium, Reno, Nevada, p. 169-189.

    Nordquist, W.A., 1992, Railroad Project, Elko County Nevada 1991 Annual Report: Westmont Gold Inc., internal company report.

     

    27-5

     



    SOUTH RAILROAD PROJECT
    FORM 43-101F1 TECHNICAL REPORT

    Oversby, B., 1973, New Mississippian formation in northeast Nevada, and its possible significance: American Association of Petroleum Geologists Bulletin, v. 57, p. 1779-1783.

    Parr, A.J., 1998, Pinon Project, Elko County Nevada, 1997 Exploration Report: internal company report prepared for Cameco (US) Inc.

    Parr, A.J., 1999, Pinon and Jasperoid Wash Projects, Elko County Nevada, 1999 Exploration Report: internal company report prepared for Cameco (US) Inc.

    Peek, B.C., 1994 (February), Dark Star Project, Elko County, Nevada, Geologic Resource Estimate: internal report prepared for Crown Resources Corp., 4 p.

    Rayias, A.C., 1999, Stratigraphy, Structural Geology, Alteration, and Geochemistry of the Northeastern Railroad District, Elko County, Nevada: unpublished M.Sc. thesis, University of Nevada, Reno.

    Redfern, R. R., 2002, Geological Report on the Dixie Creek Property: unpublished report for Frontier Pacific Mining Corporation, 34p.

    Ressel, M.W., 2000, Summary of Research on Igneous Rocks and Gold Deposits on the Carlin Trend, Nevada: Ralph J. Roberts Center for Research in Economic Geology Annual Research Meeting 1999, Program and Reports, 38p.

    Shaddrick, D.R., 2012, Technical Report on the Railroad Project, Elko County, Nevada, USA: Technical Report prepared for Gold Standard Ventures Corp (NI43-101 compliant).

    Smith, J.F., and Ketner, K.B., 1975, Stratigraphy of Paleozoic Rocks, Carlin-Piñon Range area, Nevada: U.S. Geological Survey Professional Paper 867-A.

    Smith, J.F., and Ketner, K.B., 1978, Geologic Map of the Carlin-Pinon Range Area, Elko and Eureka Counties, Nevada: United States Geological Survey, Map I-1028, 1:62,500.

    Steffen Robertson and Kirsten (B.C.) Inc., 1989 (August), Draft Acid Rock Drainage Technical Guide Volume 1: Norecol Environmental Consultants, and Gormely Process Engineering, British Columbia Acid Mine Drainage Task Force Report, 274p.

    Stepperud, 2017a, Pinion Project Comminution Testing, Hazen Project 12352 Report – February 1, 2017. Unpublished letter report to Kappes, Cassiday & Associates.

    Stepperud, 2017b, Comminution Testing, Hazen Project 12391 Report and Appendices A and B – July 5, 2017. Unpublished letter report to Kappes, Cassiday & Associates.

    Stepperud, 2017c, Comminution Testing, Hazen Project 12514, Report and Appendices A and B – April 9, 2017. Unpublished letter report to Kappes, Cassiday & Associates.

    Steperud, 2019a, Comminution Testing, Hazen Project 12635 Report and Appendices A and B, March 6, 2019, 73p. Unpublished letter report to Kappes, Cassiday & Associates.

    Stepperud, 2019b, Comminution Testing, Hazen Project 12620, Report and Appendices A and B – February 2019, 63p. Unpublished letter report to Kappes, Cassiday & Associates.

     

    27-6

     



    SOUTH RAILROAD PROJECT
    FORM 43-101F1 TECHNICAL REPORT

    Stewart, J.H., 1980, Geology of Nevada: Nevada Bureau of Mines and Geology Special Publication 4, 136p.

    Teal, L., and Jackson, M., 1997, Geologic Overview of the Carlin Trend Gold Deposits and Description of Recent Deep Discoveries: in Vikre, P., Thompson, T.B., Bettles, K., Christensen, O., and Parratt, R., eds., Carlin-Type Gold Deposits Field Conference, Society of Economic Geologists Guidebook Series, Volume 28, p. 3-37.

    Teal, L. and Jackson, M., 2002: Geologic Overview of the Carlin Trend Gold Deposits: in Thompson, T.B., Teal, L., and Meeuwig, R., eds., Gold Deposits of the Carlin Trend: Nevada Bureau of Mines and Geology Bulletin 111, p. 9-19.

    Turner, A., Dufresne, M.B. and Koehler, S.R., 2015 (March), Technical Report on the Railroad and Pinion Projects, Elko County, Nevada USA: unpublished Technical Report prepared for Gold Standard Ventures Corp. (NI43-101 compliant), 196p.

    US Climate Data, https://www.usclimatedata.com/climate/carlin/nevada/united-states/usnv0107.

    Wells, R.A., 1995, Pinion/South Bullion Deposit Resource Estimates: Cyprus Metals Exploration Corporation internal memorandum.

    Western Regional Climate Center Historic Climate Information, Carlin Newmont Mine, Nevada, 2011: Administered by N.O.A.A. http://www.wrcc.dri.edu/Climsumetershtml.

    Wood, J., 1995, South Bullion/Dark Star Resource Estimates: Cyprus Metals Exploration Corporation internal memorandum.

    Wright, J.L., 2013, Railroad Property Gravity Survey – IV. internal company report prepared for Gold Standard Ventures.

    Wright, J.L., 2016a, Railroad Property CSAMT Survey – Phase VI GIS Compilation: internal company report prepared for Gold Standard Ventures.

    Wright, J.L., 2016b, Railroad Property Pearson, Deritter and Johnson Airborne Magnetic Survey GIS Database: internal company report prepared for Gold Standard Ventures.

     

    27-7

     



    SOUTH RAILROAD PROJECT
    FORM 43-101F1 TECHNICAL REPORT

    APPENDIX A – PRELIMINARY FEASIBILITY STUDY CONTRIBUTORS AND PROFESSIONAL
    QUALIFICATIONS – CERTIFICATES OF QUALIFIED PERSONS

     

    A-1

     



    CERTIFICATE OF QUALIFIED PERSON

    Art S. Ibrado

    I, Art S. Ibrado, PhD, PE, do hereby certify that:

    1.     

    I am employed as a process engineer at M3 Engineering & Technology Corp., 2051 W Sunset Rd, Suite 101, Tucson, AZ 85704, USA.

     

    2.     

    I hold the following academic degrees:

    Bachelor of Science in Metallurgical Engineering, University of the Philippines, 1980
    Master of Science (Metallurgy), University of California at Berkeley, 1986
    Doctor of Philosophy (Metallurgy), University of California at Berkeley, 1993

     

    3.     

    I am a registered professional engineer in the State of Arizona (No. 58140) and a Qualified Professional (QP) member of the Mining and Metallurgical Society of America (MMSA).

     

    4.     

    I have worked as a metallurgist in the academic and research setting for five years, excluding graduate school research, and in the mining industry for 13 years, before joining M3 Engineering in July 2009.

     

    5.     

    I have read the definition of “qualified person” set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43-101.

     

    6.     

    I am the principal author and contributing author for the preparation of the technical report titled “South Railroad Project NI 43-101 Technical Report, Updated Preliminary Feasibility Study, Carlin Trend, Nevada, USA” dated March 23, 2020, with an effective date of February 13, 2020 (the “Technical Report”), prepared for Gold Standard Ventures Corp. I am responsible for the preparation of Sections 1.1 to 1.3, 1.15, 2 to 5, 21.5.3.3, 21.5.4, 23 to 26. I have visited the project site on September 25, 2019, for a period of one day.

     

    7.     

    I have prior involvement with the project or property that is the subject of the Technical Report. I was involved in the preparation of the South Railroad Project NI 43-101 Technical Report, Preliminary Feasibility Study, Carlin Trend, Nevada, USA, dated October 24, 2019, with an effective date of September 9, 2019.

     

    8.     

    As at the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

     

    9.     

    I am independent of the issuer applying all of the tests in Section 1.5 of NI 43-101.

     

    10.     

    I have read NI 43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form.

     

    11.     

    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

    Signed and dated this 23rd day of March 2020.

    (Signed) “Art S. Ibrado
    Signature of Qualified Person

    Art S. Ibrado, PE
    Print Name of Qualified Person



    CERTIFICATE OF QUALIFIED PERSON

    Matthew Sletten

    I, Matthew Sletten, PE, do hereby certify that:

    1.     

    I am a Project Manager of:

    M3 Engineering & Technology Corp.
    2175 W. Pecos Rd. Suite 3
    Chandler, AZ 85224

    2.     

    I graduated with a BS in Civil Engineering and an MS in Civil Engineering from the South Dakota School of Mines and Technology in 2004 and 2006, respectively.

     

    3.     

    I am a Professional Engineer in good standing in the State of Arizona in the area of Civil Engineering.

     

    4.     

    I have worked as an engineer and project manager in the base metals and precious metals industry for a total of 15 years. My experience includes detailed engineering, engineering management, project management, corporate management, capital and operating cost development and report development for major mining projects throughout the world.

     

    5.     

    I have read the definition of “qualified person” set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43-101.

     

    6.     

    I am a contributing author for the preparation of the technical report titled “South Railroad Project NI 43-101 Technical Report, Updated Preliminary Feasibility Study, Carlin Trend, Nevada, USA” dated March 23, 2020, with an effective date of February 13, 2020 (the “Technical Report”), prepared for Gold Standard Ventures Corp. I am responsible for the preparation of Sections 1.10, 1.12 to 1.14, 17.11, 18.1 to 18.5, 19, 21.3, 21.5.4, 21.6 & 22. I have not visited the project site.

     

    7.     

    I have prior involvement with the project or property that is the subject of the Technical Report. I was involved in the preparation of the South Railroad Project NI 43-101 Technical Report, Preliminary Feasibility Study, Carlin Trend, Nevada, USA, dated October 24, 2019, with an effective date of September 9, 2019.

     

    8.     

    As at the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

     

    9.     

    I am independent of the issuer applying all the tests in Section 1.5 of NI 43-101.

     

    10.     

    I have read NI 43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form.

     

    11.     

    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

    Signed and dated this 23rd day of March 2020.

    (Signed) “Matthew Sletten
    Signature of Qualified Person

    Matthew Sletten, PE



    CERTIFICATE OF QUALIFIED PERSON

    Steven J. Ristorcelli, C.P.G.

    I, Steven J. Ristorcelli, C.P.G., do hereby certify that:

    1.     

    I am a Principal Geologist of Mine Development Associates, Inc. (a Division of RESPEC), 210 South Rock Blvd., Reno, Nevada, 89502.

     

    2.     

    I graduated with a Bachelor of Science degree in Geology from Colorado State University in 1977 and a Master of Science degree in Geology from the University of New Mexico in 1980.

     

    3.     

    I am a Certified Professional Geologist (#10257) in good standing with the American Institute of Professional Geologists. I am also registered as Professional Geologist in the state of California (#3964).

     

    4.     

    I have worked as geologist for over 40 years. I have conducted exploration, definition, modeling, and estimation of sediment-hosted epithermal gold-silver deposits in the Western US and Canada.

     

    5.     

    I have read the definition of “qualified person” set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43-101.

     

    6.     

    I am a contributing author for the preparation of the technical report titled “South Railroad Project NI 43-101 Technical Report, Updated Preliminary Feasibility Study, Carlin Trend, Nevada, USA”, dated March 23, 2020, with an effective date of February 13, 2020 (the “Technical Report”), prepared for Gold Standard Ventures Corp. I am responsible for the preparation of Sections 1.4, 1.5, 1.8, 6, 7, 8, 9, 10, 11, 12, 14.1, 14.3, and 14.4. I have visited the project site on November 18, 2016 for a period of two days.

     

    7.     

    I have prior involvement with the property that is the subject of the Technical Report. I was involved in the preparation of the South Railroad Project NI 43-101 Technical Report, Preliminary Feasibility Study, Carlin Trend, Nevada, USA, dated October 24, 2019, with an effective date of September 9, 2019.

     

    8.     

    As at the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

     

    9.     

    I am independent of the issuer applying all of the tests in Section 1.5 of NI 43-101.

     

    10.     

    I have read NI 43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form.

     

    11.     

    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

    Signed and dated this 23rd day of March 2020.

    (Signed) “S Ristorcelli
    Signature of Qualified Person

    Steven J. Ristorcelli
    Print Name of Qualified Person



    CERTIFICATE OF QUALIFIED PERSON

    Michael S. Lindholm, C.P.G.

    I, Michael S. Lindholm, C.P.G., do hereby certify that:

    1.     

    I am a Senior Geologist of Mine Development Associates, Inc. (a Division of RESPEC), 210 South Rock Blvd., Reno, Nevada, 89502.

     

    2.     

    I graduated with a Bachelor of Science degree in Geology from Stephen F. Austin State University in 1984 and with a Master of Science degree in Geology from Northern Arizona University in 1989.

     

    3.     

    I am a Certified Professional Geologist (#11477) in good standing with the American Institute of Professional Geologists. I am also registered as Professional Geologist in the state of California (#8152).

     

    4.     

    I have worked as geologist for 32 years. I have conducted exploration, definition, modeling, and estimation of sediment-hosted epithermal gold-silver deposits in the Western US.

     

    5.     

    I have read the definition of “qualified person” set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43-101.

     

    6.     

    I am a contributing author for the preparation of the technical report titled “South Railroad Project NI 43-101 Technical Report, Updated Preliminary Feasibility Study, Carlin Trend, Nevada, USA”, dated March 23, 2020, with an effective date of February 13, 2020 (the “Technical Report”), prepared for Gold Standard Ventures Corp. I am responsible for the preparation of Sections 1.4, 1.5, 1.8, 6, 7, 8, 9, 10, 11, 12, 14.1 and 14.2. I have visited the project site on September 19, 2018 for a period of one day.

     

    7.     

    I have prior involvement with the project or property that is the subject of the Technical Report. I was involved in the preparation of the South Railroad Project NI 43-101 Technical Report, Preliminary Feasibility Study, Carlin Trend, Nevada, USA, dated October 24, 2019, with an effective date of September 9, 2019.

     

    8.     

    As at the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

     

    9.     

    I am independent of the issuer applying all of the tests in Section 1.5 of NI 43-101.

     

    10.     

    I have read NI 43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form.

     

    11.     

    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

    Signed and dated this 23rd day of March 2020.

    (Signed) “Michael S. Lindholm
    Signature of Qualified Person

    Michael S. Lindholm
    Print Name of Qualified Person



    CERTIFICATE OF QUALIFIED PERSON

    Michael B. Dufresne, M.Sc., P.Geol., P.Geo.

    I, Michael B. Dufresne, M.Sc., P.Geol., P.Geo., do hereby certify that:

    1. I am President and Senior Partner of:
     
      APEX Geoscience Ltd. (APEX)
    Suite 110, 8429 – 24th Street NW
    Edmonton, Alberta T6P 1L3
    Phone: 780-467-3532
     
    2. I graduated with a B.Sc. in Geology from the University of North Carolina at Wilmington in 1983 and with a M.Sc. in Economic Geology from the University of Alberta in 1987.
     
    3. I am and have been registered as a Professional Geologist with the Association of Professional Engineers and Geoscientists of Alberta since 1989. I have been registered as a Professional Geoscientist with the Association of Professional Engineers and Geoscientists of BC since 2011, and the Association of Professional Engineers and Geoscientists of Northwest Territories and Nunavut since 2016.
     
    4. I have worked as a geologist for more than 30 years. My experience includes exploration for, and the evaluation of, gold deposits of various types, including sediment-hosted (Carlin-type) mineralization. I have conducted and supervised numerous resource estimates, including disseminated sediment hosted gold deposits, over the last 17 years.
     
    5. I have read the definition of “qualified person” set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43-101.
     
    6. I am a contributing author for the preparation of the technical report titled “South Railroad Project NI 43-101 Technical Report, Updated Preliminary Feasibility Study, Carlin Trend, Nevada, USA” dated March 23, 2020, with an effective date of February 13, 2020 (the “Technical Report”), prepared for Gold Standard Ventures Corp. I am solely responsible for the preparation of sections 10.2, 10.6.1, 10.6.3, 11.1, 11.2, 12.3, 12.8 and 14.5. I am jointly responsible for the preparation of sections 1.4, 1.5, 10.8, 11.5 and 12.9. I have visited the project site on a number of occasions, with my most recent visit on June 7, 2017 for a period of three days.
     
    7. I have have had prior involvement with the project or property that is the subject of the Technical Report. I have been employed as an independent qualified person through APEX by Gold Standard Ventures since 2014 and have been a contributing author on a number of technical reports from 2014 to 2018 that are all available on sedar. I was involved in the preparation of the South Railroad Project NI 43-101 Technical Report, Preliminary Feasibility Study, Carlin Trend, Nevada, USA, dated October 24, 2019, with an effective date of September 9, 2019.
     
    8. As at the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.
     
    9. I am independent of the issuer and the property applying all of the tests in Section 1.5 of NI 43-101.

     



    10.     

    I have read NI 43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form.

     

    11.     

    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

    Signed and dated this 23rd day of March 2020.

    (Signed) “Michael B. Dufresne
    Signature of Qualified Person

    Michael B. Dufresne, M.Sc., P.Geol., P.Geo.
    Print Name of Qualified Person



    CERTIFICATE OF QUALIFIED PERSON

    Thomas L. Dyer, PE

    I, Thomas L. Dyer, PE, do hereby certify that:

    1.     

    I am a Principal Engineer of Mine Development Associates, Inc. (a Division of RESPEC), 210 South Rock Blvd., Reno, Nevada, 89502.

     

    2.     

    I graduated with a Bachelor of Science degree in Mine Engineering from South Dakota School of Mines and Technology in 1996.

     

    3.     

    I am a Registered Professional Engineer in the state of Nevada (#15729) and a Registered Member (#4029995RM) of the Society of Mining, Metallurgy and Exploration.

     

    4.     

    I have worked as a mining engineer for more than 22 years. Relevant experience includes mine design, reserve estimation and economic analysis of precious-metals deposits in the United States and various countries in the world. I worked as Chief Engineer of an operating heap leach and mill gold mine in Nevada.

     

    5.     

    I have read the definition of “qualified person” set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43-101.

     

    6.     

    I am a contributing author for the preparation of the technical report titled “South Railroad Project NI 43-101 Technical Report, Updated Preliminary Feasibility Study, Carlin Trend, Nevada, USA”, dated March 23, 2020, with an effective date of February 13, 2020 (the “Technical Report”), prepared for Gold Standard Ventures Corp. I am responsible for the preparation of Sections 1.8, 1.9, 15, 16, 21.1, and 21.4. I visited the project site on November 18, 2016 for a period of two days.

     

    7.     

    I have prior involvement with the project or property that is the subject of the Technical Report. I was involved in the preparation of the South Railroad Project NI 43-101 Technical Report, Preliminary Feasibility Study, Carlin Trend, Nevada, USA, dated October 24, 2019, with an effective date of September 9, 2019. Through Mine Development Associates Inc., I have completed internal mining and economic studies for Gold Standard Ventures Corp. since 2016.

     

    8.     

    As at the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

     

    9.     

    I am independent of the issuer applying all of the tests in Section 1.5 of NI 43-101.

     

    10.     

    I have read NI 43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form.

     

    11.     

    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

    Signed and dated this 23rd day of March 2020.

    (Signed) Thomas L. Dyer
    Signature of Qualified Person

    Thomas L. Dyer, PE
    Print Name of Qualified Person



    CERTIFICATE OF QUALIFIED PERSON

    Gary L. Simmons

    I, Gary L Simmons, Qualified Professional (QP), do hereby certify that:

    1.     

    I am the Principal Owner of:

    GL Simmons Consulting, LLC
    15293 Shadow Mountain Ranch Road
    Larkspur, CO 80118

    2.     

    I graduated with a Bachelor of Science Degree in Metallurgical Engineering from the Colorado School of Mines, Golden, Colorado, USA, in 1973.

     

    3.     

    I am a Professional Metallurgical Engineer, registered with the Mining and Metallurgical Society of America, Qualified Professional (QP) Member in Metallurgy, Member Number – 01013QP, in good standing in the USA.

     

    4.     

    I have practiced in my profession since 1973. My relevant experience includes mine site and corporate level process development, project engineering, operations supervision and as a mineral processing project development consultant, in the base metals and gold/silver mining business, for a total of 45 years.

     

    5.     

    I have read the definition of “qualified person” set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43-101.

     

    6.     

    I am a contributing author for the preparation of the technical report titled “South Railroad Project NI 43-101 Technical Report, Updated Preliminary Feasibility Study, Carlin Trend, Nevada, USA” dated March 23, 2020, with an effective date of February 13, 2020 (the “Technical Report”), prepared for Gold Standard Ventures Corp. I am a contributing author for Sections 1.6 and 13. I have visited the project site on June 22, 2017 for period of one day.

     

    7.     

    I have been involved with this project since 2016 as a metallurgical consultant and have authored internal reports and have been a contributing qualified person for press releases and regulatory filings relating to metallurgy. I was involved in the preparation of the South Railroad Project NI 43-101 Technical Report, Preliminary Feasibility Study, Carlin Trend, Nevada, USA, dated October 24, 2019, with an effective date of September 9, 2019.

     

    8.     

    As at the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

     

    9.     

    I am independent of the issuer applying all of the tests in Section 1.5 of NI 43-101.

     

    10.     

    I have read NI 43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form.

     

    11.     

    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

    Signed and dated this 23rd day of March 2020.

    (Signed) “Gary L. Simmons
    Signature of Qualified Person

    Gary L. Simmons
    Print Name of Qualified Person



    CERTIFICATE OF QUALIFIED PERSON

    I, Carl E. Defilippi, RM-SME, do hereby certify that:

    1.     

    I am a Project Manager of:

    Kappes, Cassiday & Associates
    7950 Security Circle
    Reno, Nevada 89506

    2.     

    I graduated with a BS in Chemical Engineering and an MS in Metallurgical Engineering from the Mackay School of Mines, University of Nevada, in 1978 and 1981, respectively.

     

    3.     

    I am a Registered Member of SME in good standing.

     

    4.     

    I have worked in the precious metals industry for a total of 38 years. My experience includes all aspects of cyanide processing: operations, project management, construction, commissioning, recovery plant fabrication, metallurgical audits and reviews of numerous operating heap leach and milling facilities throughout the world.

     

    5.     

    I have read the definition of “qualified person” set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43-101.

     

    6.     

    I am a contributing author for the preparation of the technical report titled “South Railroad Project NI 43-101 Technical Report, Updated Preliminary Feasibility Study, Carlin Trend, Nevada, USA” dated March 23, 2020, with an effective date of February 13, 2020 (the “Technical Report”), prepared for Gold Standard Ventures Corp. I am responsible for the preparation of Sections 1.6.5, 1.7, 13.10, 17.1 to 17.7, 17.9, 17.10, 21.2, and 21.5, except Sections 21.5.3.3 and 21.5.4. I have visited the project site on August 28, 2019 for a period of one day.

     

    7.     

    I have prior involvement with the project or property that is the subject of the Technical Report. I participated in scoping and pre-feasibility level studies for Royal Standard Minerals Inc. in 2003 through 2005. The project was called Pinion-Railroad at that time. I was involved in the preparation of the South Railroad Project NI 43- 101 Technical Report, Preliminary Feasibility Study, Carlin Trend, Nevada, USA, dated October 24, 2019, with an effective date of September 9, 2019.

     

    8.     

    As at the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

     

    9.     

    I am independent of the issuer applying all of the tests in Section 1.5 of National Instrument 43-101.

     

    10.     

    I have read NI 43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form.

     

    11.     

    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

    Signed and dated this 23rd day of March 2020.

    (Signed) “Carl E. Defilippi”
    Signature of Qualified Person

    Carl E. Defilippi
    Print Name of Qualified Person



    CERTIFICATE OF QUALIFIED PERSON

    Richard DeLong

    I, Richard DeLong, M.S., P.G., do hereby certify that:

    1.     

    I am President of:

    EM Strategies, Inc.
    1650 Meadow Wood Lane,
    Reno, Nevada 89502

    2.     

    I graduated with a Masters Degree in Geology and a Masters Degree in Resource Management from the University of Idaho.

     

    3.     

    I am a Professional Geologist in good standing in the State of Idaho in the area of Geology (No. 727). I am also recognized as a Qualified Person Member with special expertise in Environmental Permitting and Compliance with the Mining and Metallurgical Society of America (No. 01471QP).

     

    4.     

    I have worked as an environmental permitting and compliance specialist for a total of 31 years. My experience includes permit acquisition of sate and federal permits and baseline data acquisition programs for mining and exploration operations.

     

    5.     

    I have read the definition of “qualified person” set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43-101.

     

    6.     

    I am a contributing author for the preparation of the technical report titled “South Railroad Project NI 43-101 Technical Report, Updated Preliminary Feasibility Study, Carlin Trend, Nevada, USA” dated March 23, 2020, with an effective date of February 13, 2020 (the “Technical Report”), prepared for Gold Standard Ventures Corp. I am responsible for the preparation of Sections 1.11 and 20. I have not visited the project site.

     

    7.     

    I have prior involvement with the project or property that is the subject of the Technical Report. My involvement with the property is the ongoing work associated with environmental baseline data collection and the acquisition of the necessary state and federal permits for the development of the mining operation. I was involved in the preparation of the South Railroad Project NI 43-101 Technical Report, Preliminary Feasibility Study, Carlin Trend, Nevada, USA, dated October 24, 2019, with an effective date of September 9, 2019.

     

    8.     

    As at the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

     

    9.     

    I am independent of the issuer applying all of the tests in Section 1.5 of NI 43-101.

     

    10.     

    I have read NI 43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form.

     

    11.     

    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

    Signed and dated this 23rd day of March 2020.

    (Signed) “Richard DeLong
    Signature of Qualified Person

    Richard DeLong
    Print Name of Qualified Person



    CERTIFICATE OF QUALIFIED PERSON

    Kenneth L. Myers

    I, Kenneth L. Myers, P.E. do hereby certify that:

    1.     

    I am President/Principal of:

    The MINES Group, Inc.
    1325 Airmotive Way
    Reno, NV 89502

    2.     

    I graduated with a Bachelor of Science Degree in Civil Engineering from the University of Cincinnati, and a Master of Science Degree in Geological Engineering from the University of Missouri-Rolla.

     

    3.     

    I am a Professional Engineer in good standing in the State of Nevada in the areas of Civil Engineering, No. 10254. I am also registered as a Professional Engineer in the States of Alaska, California, Idaho, New Mexico, South Dakota, and Wyoming .

     

    4.     

    I have worked as an engineer for a total of 46 years. My experience includes mine facility design, seismic hazard analysis, surface and groundwater hydrology, site investigation and gepotechnical engineering, slope stability analysis, and water balance analysis

     

    5.     

    I have read the definition of “qualified person” set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43-101.

     

    6.     

    I am a contributing author for the preparation of the technical report titled “South Railroad Project NI 43-101 Technical Report, Updated Preliminary Feasibility Study, Carlin Trend, Nevada, USA” dated March 23, 2020, with an effective date of February 13, 2020 (the “Technical Report”), prepared for Gold Standard Ventures Corp. I am responsible for the preparation of Sections 17.8, 18.6, 18.7, and 18.8. I have visited the project site on October 22, 2019 for a period of one day.

     

    7.     

    I have prior involvement with the project or property that is the subject of the Technical Report. I was involved in the preparation of the South Railroad Project NI 43-101 Technical Report, Preliminary Feasibility Study, Carlin Trend, Nevada, USA, dated October 24, 2019, with an effective date of September 9, 2019.

     

    8.     

    As at the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

     

    9.     

    I am independent of the issuer applying all of the tests in Section 1.5 of NI 43-101.

     

    10.     

    I have read NI 43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form.

     

    11.     

    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

    Signed and dated this 23rd day of March 2020.

    (Signed) “Kenneth L Myers
    Signature of Qualified Person

    Kenneth L. Myers, P.E.
    Print Name of Qualified Person



    SOUTH RAILROAD PROJECT
    FORM 43-101F1 TECHNICAL REPORT

    APPENDIX B – CLAIMS LIST

     

    B-1

     



    APPENDIX B

    Railroad-Pinion Property of Gold Standard Ventures

    Listing of Patented and Unpatented Federal Lode Claims
    Owned or Controlled by Gold Standard Ventures



    Appendix B

    Patented Claims Owned and Leased by Gold Standard Ventures

    Elko County, Nevada

    Patent Name  MS ID  Assessed Owner Controlled By  Property
    Bald Eagle  4592  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Blue Jay  4592  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Bullion  1487  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Cleveland  1498  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Grey Eagle  4592  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Hecla  1491  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Hoffman  1500  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Kansas City  4592  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Lucky Boy  4592  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Mounted Ledge  1499  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Safety Pin  4592  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Silver King  1492  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Sky Blue  1495  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Standing Elk Lode  1486  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Standing Elk MS  1486  Gold Standard Ventures (US) Gold Standard Ventures (US) Mill Site
    Tom Boy  4592  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Tripoli  1497  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Webfoot  1488  Gold Standard Ventures (US) Gold Standard Ventures (US) Lode Lode
    Kenilworth  4608  Sylvania Resources LLC Sylvania Lease  Lode
    Sylvania  4608  Sylvania Resources LLC Sylvania Lease  Lode
    Valley View  4608  Sylvania Resources LLC Sylvania Lease  Lode
    Victor Fraction  4608  Sylvania Resources LLC Sylvania Lease  Lode
    Vindicator Fraction  4608  Sylvania Resources LLC Sylvania Lease  Lode
    Wide West  4608  Sylvania Resources LLC Sylvania Lease  Lode
    Bald Mountain Chief  1489  Victory Exploration   ANv  ANv Lease  Lode
    Copper Bell  1490  Victory Exploration   ANv  ANv Lease  Lode
    Sun Lode  1494  Sun Lode Company LLC Sun Lode Lease  Lode
    Androsa  3382  Canadian American Mining Comp. L.L.C. Gold Standard Ventures (US) Lode
    Gladstone  3365  Canadian American Mining Comp. L.L.C. Gold Standard Ventures (US)  Lode

     

    Gold Standard Ventures Appendix C Page 2 of 44

     



    Appendix B

    Unpatented Lode Claims Owned by Gold Standard

    Elko County, Nevada, Mount Diablo Base and Meridian

    North Railroad Portion of the Property

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    B 1  138543 313/159 131352   
    B 2  138544 313/160 131353   
    B 3  138545 313/161 131354   
    B 4  138546 313/162 131355   
    B 5  138547 313/163 131356   
    BARDY  75877 98/350 38115   
    BLACK  75973 45/154 15175   
    BLUE  75974 45/159 15180   
    BURKE FRACTION  75975 8/300 n/a 21/94
    CANARY  75976 39/366 5371   
    CISS 1  407849 560/304 228452   
    CISS 2  407850 560/305 228453   
    CISS 3  407851 560/306 228454   
    CISS 4  407852 560/307 228455   
    CISS 5  407853 560/308 228456   
    CISS 6  407854 560/309 228457   
    CISS 7  407855 560/310 228458   
    CISS 8  407856 560/311 228459   
    CISS 9  407857 560/312 228460   
    CISS 10  407858 560/313 228461   
    CISS 11  407859 560/314 228462   
    CISS 12  407860 560/315 228463   
    CISS 13  407861 560/316 228464   
    CISS 14  407862 560/317 228465   
    CISS 15  407863 560/318 228466   
    CISS 16  407864 560/319 228467   
    CISS 17  407865 560/320 228468   
    CISS 18  407866 560/321 228469   
    CISS 19  407867 560/322 228470   
    CISS 20  407868 560/323 228471   
    CISS 21  407869 560/324 228472   
    CISS 22  407870 560/325 228473   
    CISS 23  407871 560/326 228474   
    CISS 24  407872 560/327 228475   
    CISS 25  407873 560/328 228476   
    CISS 26  407874 560/329 228477   
    CISS 27  407875 560/330 228478   
    CISS 28  407876 560/331 228479   
    CISS 29  407877  560/332  228480    
    CISS 30  407878  560/333  228481    
    CISS 31  407879  560/334  228482    
    CISS 32  407880  560/335  228483    

     

    Gold Standard Ventures Appendix C Page 3 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    CISS 33  407881  560/336  228484   
    CISS 34  407882  560/337  228485   
    CISS 35  407883  560/338  228486   
    CISS 36  407884  560/339  228487   
    CISS 106  407954  560/409  228557   
    CISS 107  407955  560/410  228558   
    CISS 108  407956  560/411  228559   
    CISS 109  407957  560/412  228560   
    CISS 110  407958  560/413  228561   
    CISS 111  407959  560/414  228562   
    CISS 112  407960  560/415  228563   
    CISS 113  407961  560/416  228564   
    CISS 114  407962  560/417  228565   
    CISS 115  407963  560/418  228566   
    CISS 116  407964  560/419  228567   
    CISS 117  407965  560/420  228568   
    CISS 118  407966  560/421  228569   
    CISS 119  407967  560/422  228570   
    CISS 124  407968  560/423  228571   
    CISS 125  407969  560/424  228572   
    CISS 126  407970  560/425  228573   
    CISS 127  407971  560/426  228574   
    CISS 128  407972  560/427  228575   
    CISS 129  407973  560/428  228576   
    CISS 130  407974  560/429  228577   
    CISS 131  407975  560/430  228578   
    CISS 132  407976  560/431  228579   
    CISS 133  407977  560/432  228580   
    CISS 134  407978  560/433  228581   
    CISS 135  407979  560/434  228582   
    CISS 136  407980  560/435  228583   
    CISS 137  407981  560/436  228584   
    DIKE NO. 1  75977  21/534  44926   
    DIKE NO. 2  75978  21/535  44927   
    DIKE NO. 3  75979  21/535  44928   
    DIKE NO. 4  75980  21/536  44929   
    DIKE NO. 6  75981  21/536  44930   
    DIKE NO. 7  75982  21/537  44931   
    DIKE NO. 8  75983  21/537  44932   
    DIKE NO. 9  75984  21/538  44933   
    DIKE NO. 11  75985  21/538  44934   

     

    Gold Standard Ventures Appendix C Page 4 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    EAGLE  75986  Jul 86  n/a  7/596
    GOLD  75987  45/161  15182    
    GREEN  75988  45/160  15181    
    HANNAH  75880  98/353  38118    
    HOFFMAN FRACTION 75989  7/598  n/a  17/101
    HOLD UP  75990  17/5  8002    
    HOME 1  164143  326/659  136567    
    HOME 2  164144  326/660  136568    
    HOME 3  164145  326/661  136569    
    HOME 4  164146  326/662  136570    
    HOME 5  164147  326/663  136571    
    HOME 6  164148  326/664  136572    
    HOME 7  164149  326/665  136573    
    HOME 8  164150  326/666  136574    
    HOME 9  164151  326/667  136575    
    HOME 10  164152  326/668  136576    
    HOME 11  164153  326/669  136577    
    HOME 12  164154  326/670  136578    
    HOME 13  164155  326/671  136579    
    HOME 14  164156  326/672  136580    
    HOME 15  164157  326/673  136581    
    HOME 16  164158  326/674  136582    
    HOME 17  164159  326/675  136583    
    HOME 18  164160  326/676  136584    
    HOME 19  190211  350/307  146804    
    HOME 20  190212  350/308  146805    
    HOME 21  190213  350/309  146806    
    HOME 22  190214  350/310  146807    
    HOME 23  190215  350/311  146808    
    HOME 24  190216  350/312  146809    
    HOME 25  190217  350/313  146810    
    HOME 26  190218  350/314  146811    
    HOME 27  190219  350/315  146812    
    HOME 28  190220  350/316  146813    
    HOME 29  190221  350/317  146814    
    HOME 30  190222  350/318  146815    
    HOME 31  190223  350/319  146816    
    HOME 42  227247  378/289  158546    
    HOME 43  227248  378/290  158547    
    HOME 44  227249  378/291  158548    

     

    Gold Standard Ventures Appendix C Page 5 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    HOME 45  227250  378/292  158549   
    HOME 46  227251  378/293  158550   
    HOME 47  227252  378/294  158551   
    HOME 48  227253  378/295  158552   
    HOME 49  227254  378/296  158553   
    HOME 50  227255  378/297  158554   
    HOME 51  227256  378/298  158555   
    HOME 52  227257  378/299  158556   
    HOME STAKE  75991  17/6  8003   
    JKR 1  1025800    627853   
    JKR 2  1025801    627854   
    JKR 3  1025802    627855   
    JKR 4  1025803    627856   
    JKR 5  1025804    627857   
    JKR 6  1025805    627858   
    JKR 7  1025806    627859   
    JKR 8  1025807    627860   
    JKR 9  1025808    627861   
    JKR 10  1025809    627862   
    JKR 11  1025810    627863   
    JKR 12  1025811    627864   
    JKR 13  1025812    627865   
    JKR 14  1025813    627866   
    JKR 15  1025814    627867   
    JKR 16  1025815    627868   
    JKR 17  1025816    627869   
    JKR 18  1025817    627870   
    JKR 19  1025818    627871   
    JKR 20  1025819    627872   
    JKR 21  1025820    627873   
    JKR 22  1025821    627874   
    JKR 23  1025822    627875   
    JKR 24  1025823    627876   
    JKR 25  1025824    627877   
    JKR 26  1025825    627878   
    JMD 1  1013878    620141   
    JMD 2  1013879    620142   
    JMD 3  1013880    620143   
    JMD 4  1013881    620144   
    JMD 5  1013882    620145   
    JMD 6  1013883    620146   

     

    Gold Standard Ventures Appendix C Page 6 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    JMD 7  1013884    620147    
    JMD 8  1013885    620148    
    JMD 9  1013886    620149    
    JMD 10  1013887    620150    
    JMD 11  1013888    620151    
    JMD 12  1013889    620152    
    JMD 13  1013890    620153    
    JOHN  75876  98/349  38114    
    KEN  75881  98/356  38121    
    KEY  75992  8/377  n/a  20/694
    LARK  75993  7/603  n/a    
    LAST CHANCE  75994  20/413  35070    
    LT 1  504170  629/422  257084    
    LT 2  504171  629/423  257085    
    LT 3  504172  629/424  257086    
    LT 4  504173  629/425  257087    
    LT 5  504174  629/426  257088    
    LT 6  504175  629/427  257089    
    LT 7  504176  629/428  257090    
    LT 8  504177  629/429  257091    
    LT 9  504178  629/430  257092    
    LT 10  504179  629/431  257093    
    LT 11  504180  629/432  257094    
    LT 12  504181  629/433  257095    
    LT 13  504182  629/434  257096    
    LT 14  504183  629/435  257097    
    LT 15  504184  629/436  257098    
    LT 16  504185  629/437  257099    
    LT 17  504186  629/438  257100    
    LT 18  504187  629/439  257101    
    LT 19  504188  629/440  257102    
    LT 20  504189  629/441  257103    
    LT 21  504190  629/442  257104    
    LT 22  504191  629/443  257105    
    LT 23  504192  629/444  257106    
    LT 24  504193  629/445  257107    
    LT 25  504194  629/446  257108    
    LT 26  504195  629/447  257109    
    LT 27  504196  629/448  257110    
    MAGGIE  75878  98/351  38116    
    MAHOGANY  75995  8/308  n/a  21/95 

     

    Gold Standard Ventures Appendix C Page 7 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    MENDOTA  75996  16/452  6593  17/102
    MOON  75997  45/156  15177    
    MOON NO. 1  75998  45/157  15178    
    MOON NO. 2  75999  45/158  15179    
    NEVADA  76000  7/85  n/a  7/597
    NEW 56  202156  357/213  149637    
    NEW 57  202157  357/214  149638    
    NEW 58  202158  357/215  149639    
    NEW 59  202159  357/216  149640    
    NEW 60  202160  357/217  149641    
    NEW 61  202161  357/218  149642    
    NEW 62  202162  357/219  149643    
    NEW 63  202163  357/220  149644    
    NEW 65  202165  357/222  149646    
    NEW 66  202166  357/223  149647    
    NEW 67  202167  357/224  149648    
    NEW 68  202168  357/225  149649    
    NEW 69  202169  357/226  149650    
    NEW 70  202170  357/227  149651    
    NEW 71  202171  357/228  149652    
    NEW 72  202172  357/229  149653    
    NEW 135  227243  378/300  158558    
    NEW 136  227244  378/301  158559    
    NEW 137  227245  378/302  158560    
    NEW 138  227246  378/303  158561    
    OWL  76001  7/604  n/a    
    PAM  75883  98/354  38119    
    PETER  75882  98/355  38120    
    PIN 1  698494  854/764  352404    
    PIN 2  698495  854/765  352405    
    PIN 3  698496  854/766  352406    
    PIN 4  698497  854/767  352407    
    PIN 5  698498  854/768  352408    
    PIN 6  698499  854/769  352409    
    PIN 7  698500  854/770  352410    
    PIN 8  698501  854/771  352411    
    PIN 9  698502  854/772  352412    
    PIN 10  698503  854/773  352413    
    PIN 11  698504  854/774  352414    
    PIN 12  698505  854/775  352415    
    PINE 1  407779  560/234  228381    

     

    Gold Standard Ventures Appendix C Page 8 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    PINE 2  407780  560/235  228382   
    PINE 3  407781  560/236  228383   
    PINE 4  407782  560/237  228384   
    PINE 5  407783  560/238  228385   
    PINE 6  407784  560/239  228386   
    PINE 7  407785  560/240  228387   
    PINE 8  407786  560/241  228388   
    PINE 9  407787  560/242  228389   
    PINE 10  407788  560/243  228390   
    PINE 11  407789  560/244  228391   
    PINE 12  407790  560/245  228392   
    PINE 13  407791  560/246  228393   
    PINE 14  407792  560/247  228394   
    PINE 15  407793  560/248  228395   
    PINE 16  407794  560/249  228396   
    PINE 17  407795  560/250  228397   
    PINE 18  407796  560/251  228398   
    PINE 58  407836  560/291  228438   
    PINE 59  407837  560/292  228439   
    PINE 60  407838  560/293  228440   
    PINE 61  407839  560/294  228441   
    PINE 62  407840  560/295  228442   
    PINE 63  407841  560/296  228443   
    PINE 64  407842  560/297  228444   
    PINE 65  407843  560/298  228445   
    PINE 66  407844  560/299  228446   
    PINK  76002  45/162  15183   
    PORTAL  76003  8/262  n/a   
    PORTAL FRACTION R  1013877   620139  
    RED R  1013875    620137   
    RED WEST  1013876    620138   
    RF 1  403753  558/437  227904   
    RF 2  403754  558/438  227905   
    RF 3  403755  558/439  227906   
    RF 4  403756  558/440  227907   
    RF 5  403757  558/441  227908   
    RF 6  403758  558/442  227909   
    RF 7  403759  558/443  227910   
    RF 8  403760  558/444  227911   
    RN 1  602676  727/444  293981   
    RN 2  602677  727/445  293982   

     

    Gold Standard Ventures Appendix C Page 9 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    RN 3  602678  727/446  293983   
    RN 4  602679  727/447  293984   
    RN 5  602680  727/448  293985   
    RN 6  602681  727/449  293986   
    RN 7  602682  727/450  293987   
    RN 8  602683  727/451  293988   
    RN 9  602684  727/452  293989   
    RN 10  602685  727/453  293990   
    RN 11  602686  727/454  293991   
    RN 12  602687  727/455  293992   
    RN 13  602688  727/456  293993   
    RN 14  602689  727/457  293994   
    RN 15  602690  727/458  293995   
    RN 16  602691  727/459  293996   
    RN 17  602692  727/460  293997   
    RN 18  602693  727/461  293998   
    RN 19  602694  727/462  293999   
    RN 20  602695  727/463  294000   
    RN 21  602696  727/464  294401   
    RN 22  602697  727/465  294402   
    RN 23  602698  727/466  294403   
    RN 24  602799  727/467  294004   
    RN 25  602700  727/468  294005   
    ROB  75879  98/352  38117   
    RR 1  320216  473/538  197675   
    RR 2  320217  473/539  197676   
    RR 3  320218  473/540  197677   
    RR 4  320219  473/541  197678   
    RR 5  320220  473/542  197679   
    RR 6  320221  473/543  197680   
    RR 7  320222  473/544  197681   
    RR 8  320223  473/545  197682   
    RR 9  320224  473/546  197683   
    RR 10  320225  473/547  197684   
    RR 11  320226  473/548  197685   
    RR 12  320227  473/549  197686   
    RR 13  320228  473/550  197687   
    RR 14  320229  473/551  197688   
    RR 15  320230  473/552  197689   
    RR 16  320231  473/553  197690   
    RR 17  320232  473/554  197691   

     

    Gold Standard Ventures Appendix C Page 10 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    RR 18  320233  473/555  197692   
    RR 19  320234  473/556  197693   
    RR 20  320235  473/557  197694   
    RR 21  320236  473/558  197695   
    RR 22  320237  473/559  197696   
    RR 23  320238  473/560  197697   
    RR 24  320239  473/561  197698   
    RR 25  320240  473/562  197699   
    RR 26  320241  473/563  197700   
    RR 27  320242  473/564  197701   
    RR 28  320243  473/565  197702   
    RR 29  320244  473/566  197703   
    RR 30  320245  473/567  197704   
    RR 31  320246  473/568  197705   
    RR 32  320247  473/569  197706   
    RR 33  320248  473/570  197707   
    RR 34  320249  473/571  197708   
    RR 35  320250  473/572  197709   
    RR 36  320251  473/573  197710   
    RR 37  320252  473/574  197711   
    RR 38  320253  473/575  197712   
    RR 39  320254  473/576  197713   
    RR 40  426606  572/466  233143   
    RR 41  426607  572/467  233144   
    RR 42  426608  572/468  233145   
    RR 43  426609  572/469  233146   
    RR 44  426610  572/470  233147   
    RR 45  426611  572/471  233148   
    RR 46  426612  572/472  233149   
    RR 47  426613  572/473  233150   
    RR 48  426614  572/474  233151   
    RR 49  426615  572/475  233152   
    RR 50  426616  572/476  233153   
    RR 51  426617  572/477  233154   
    RR 52  426618  572/478  233155   
    RR 53  426619  572/479  233156   
    RR 54  426620  572/480  233157   
    RR 55  466934  605/248  247268   
    RR 56  466935  605/249  247269   
    RR 57  466936  605/250  247270   
    RR 58  466937  605/251  247271   

     

    Gold Standard Ventures Appendix C Page 11 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    RR 59  466938  605/252  247272   
    RR 60  466939  605/253  247273   
    RR 61  466940  605/254  247274   
    RR 62  466941  605/255  247275   
    RR 63  466942  605/256  247276   
    RR 64  466943  605/257  247277   
    RRW 1  1055758    647488   
    RRW 2  1055759    647489   
    RRW 3  1055760    647490   
    RRW 4  1055761    647491   
    RRW 5  1055762    647492   
    RRW 6  1055763    647493   
    RRW 7  1055764    647494   
    RRW 8  1055765    647495   
    RRW 9  1055766    647496   
    RRW 10  1055767    647497   
    RRW 11  1055768    647498   
    RRW 12  1055769    647499   
    RRW 13  1055770    647500   
    RRW 14  1055771    647501   
    RRW 15  1055772    647502   
    RRW 16  1055773    647503   
    RRW 17  1055774    647504   
    RRW 18  1055775    647505   
    RRW 19  1055776    647506   
    RRW 20  1055777    647507   
    RRW 21  1055778    647508   
    RRW 22  1055779    647509   
    RRW 23  1055780    647510   
    RRW 24  1055781    647511   
    RRW 25  1055782    647512   
    RRW 26  1055783    647513   
    RRW 27  1055784    647514   
    RRW 28  1055785    647515   
    RRW 29  1055786    647516   
    RRW 30  1055787    647517   
    RRW 31  1055788    647518   
    RRW 32  1055789    647519   
    RRW 33  1055790    647520   
    RRW 34  1055791    647521   
    RRW 35  1055792    647522   

     

    Gold Standard Ventures Appendix C Page 12 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    RRW 36  1055793    647523   
    RRW 37  1055794    647524   
    RRW 38  1055795    647525   
    RRW 39  1055796    647526   
    RRW 40  1055797    647527   
    RRW 41  1055798    647528   
    RRW 42  1055799    647529   
    RRW 43  1055800    647530   
    RRW 44  1055801    647531   
    RRW 45  1055802    647532   
    RRW 46  1055803    647533   
    RRW 47  1055804    647534   
    RRW 48  1055805    647535   
    RRW 49  1055806    647536   
    RRW 50  1055807    647537   
    RRW 51  1055808    647538   
    RRW 52  1055809    647539   
    RRW 53  1055810    647540   
    RRW 54  1055811    647541   
    RRW 55  1055812    647542   
    RRW 56  1055813    647543   
    RRW 57  1055814    647544   
    RRW 58  1055815    647545   
    RRW 59  1055816    647546   
    RRW 60  1055817    647547   
    RRW 61  1055818    647548   
    RRW 62  1055819    647549   
    RRW 63  1055820    647550   
    RRW 64  1055821    647551   
    RRW 65  1055822    647552   
    RRW 66  1055823    647553   
    RRW 67  1055824    647554   
    RRW 68  1055825    647555   
    RRW 69  1055826    647556   
    RRW 70  1055827    647557   
    RRW 71  1055828    647558   
    RRW 72  1055829    647559   
    RRW 73  1055830    647560   
    RRW 74  1055831    647561   
    RRW 75  1055832    647562   
    RRW 76  1055833    647563   

     

    Gold Standard Ventures Appendix C Page 13 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    RRW 77  1055834    647564   
    RRW 78  1055835    647565   
    RRW 79  1055836    647566   
    RRW 80  1055837    647567   
    RRW 81  1055838    647568   
    RRW 82  1055839    647569   
    RRW 83  1055840    647570   
    RRW 84  1055841    647571   
    RRW 85  1055842    647572   
    RRW 86  1055843    647573   
    RRW 87  1055844    647574   
    RRW 88  1055845    647575   
    RRW 89  1055846    647576   
    RRW 90  1055847    647577   
    RRW 91  1055848    647578   
    RRW 92  1055849    647579   
    RRW 93  1055850    647580   
    RRW 94  1055851    647581   
    RRW 95  1055852    647582   
    RRW 96  1055853    647583   
    RRW 97  1055854    647584   
    RRW 98  1055855    647585   
    RRW 99  1055856    647586   
    RRW 100  1055857    647587   
    RRW 101  1055858    647588   
    RRW 102  1055859    647589   
    RRW 103  1055860    647590   
    RRW 104  1055861    647591   
    RRW 105  1055862    647592   
    RRW 106  1055863    647593   
    RRW 107  1055864    647594   
    RRW 108  1055865    647595   
    RRW 109  1055866    647596   
    RRW 110  1073755    658461   
    SELCO 1  75884  98/339  38104  
    SELCO 2  75885  98/340  38105  
    SELCO 3  75886  98/341  38106  
    SELCO 4  75887  98/342  38107  
    SELCO 5  75888  98/343  38108  
    SELCO 6  75889  98/344  38109  
    SELCO 7  75890  98/345  38110   

     

    Gold Standard Ventures Appendix C Page 14 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    SELCO 8  75891  98/346  38111  
    SELCO 9  75892  98/347  38112  
    SELCO 10  75893  98/348  38113  
    SELCO 12  75895  98/509  38207  
    SELCO 13  75896  98/510  38208  
    SELCO 14  75897  98/511  38209  
    SELCO 19  75902  98/516  38214    
    SELCO 20  75903  98/517  38215    
    SELCO 21  75904  98/518  38216    
    SELCO 22  75905  98/519  38217    
    SELCO 23  75906  98/520  38218    
    SELCO 24  75907  98/521  38219    
    SELCO 25  75908  98/522  38220    
    SELCO 26  75909  98/523  38221    
    SELCO 27  75910  98/224  38023    
    SELCO 28  75911  98/225  38024    
    SELCO 29  75912  98/226  38025    
    SELCO 30  75913  98/524  38222    
    SELCO 31  75914  98/525  38223    
    SELCO 32  75915  101/56  39393    
    SELCO 33  75916  101/57  39394    
    SELCO 34  75917  101/58  39395    
    SELCO 35  75918  101/59  39396    
    SELCO 36  75919  101/60  39397    
    SELCO 37  75920  101/61  39398    
    SELCO 38  75921  114/400  45258  115/665
    SELCO 39  75922  114/401  45259    
    SELCO 40  75923  114/402  45260    
    SELCO 41  75924  114/403  45261    
    SELCO 42  75925  114/404  45262    
    SELCO 43  75926  114/405  45263    
    SELCO 44  75927  114/406  45264    
    SELCO 45  75928  114/407  45265    
    SELCO 46  75929  114/408  45266    
    SELCO 47  75930  114/409  45267    
    SELCO 48  75931  114/410  45268    
    SELCO 49  75932  114/411  45269    
    SELCO 50  75933  114/412  45270    
    SELCO 51  75934  114/413  45271    
    SELCO 52  75935  114/414  45272    
    SELCO 53  75936  114/415  45273    

     

    Gold Standard Ventures Appendix C Page 15 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    SELCO 54  75937  116/55  46003    
    SELCO 55  75938  116/56  46004    
    SELCO 56  75939  116/57  46005    
    SELCO 57  75940  116/58  46006    
    SELCO 58  75941  116/59  46007    
    SELCO 59  75942  116/60  46008    
    SELCO 60  75943  116/61  46009    
    SELCO 61  75944  116/62  46010    
    SELCO 63  75946  115/667  45941    
    SELCO 65  75948  115/669  45943    
    SELCO 67  75950  115/671  45945    
    SELCO 69  75952  115/673  45947    
    SELCO 70  75953  115/674  45948    
    SELCO 71  75954  115/675  45949    
    SELCO 72  75955  115/676  45950    
    SELCO 73  75956  115/677  45951    
    SELCO 74  75957  115/678  45952    
    SELCO 75  75958  115/679  45953    
    SELCO 76  75959  115/680  45954    
    SELCO 77  75960  115/681  45955    
    SELCO 78  75961  115/682  45956    
    SELCO 79  75962  115/683  45957    
    SELCO 80  75963  115/684  45958    
    SELCO 81  75964  115/685  45959    
    SELCO 84  75967  115/688  45962    
    SELCO 85  75968  115/689  45963    
    SELCO 86  75969  115/690  45964    
    SELCO 87  75970  115/691  45965    
    SELCO 88  75971  115/692  45966    
    SELCO 89  75972  115/693  45967    
    SNOWBIRD  76006  7/597  n/a    
    SPRING  76007  17/101  8688    
    STAR  76008  45/155  15176    
    STORM KING  76009  5/294  n/a  17/102
    UHALDE BORNE  76010  40/110  5925    
    UHALDE BORNE NORTH 76011  39/47  4812  
    WCS 1  1073756    658463    
    WCS 2  1073757    658464    
    WCS 3  1073758    658465    
    WCS 4  1073759    658466    

     

    Gold Standard Ventures Appendix C Page 16 of 44

     



      Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    WCS 5  1073760    658467   
    WCS 6  1073761    658468   
    WCS 7  1073762    658469   
    WCS 8  1073763    658470   
    WCS 9  1073764    658471   
    WCS 10  1073765    658472   
    WCS 11  1073766    658473   
    WCS 12  1073767    658474   
    WCS 13  1073768    658475   
    WCS 14  1073769    658476   
    WCS 15  1073770    658477   
    WCS 16  1073771    658478   
    WCS 17  1073772    658479   
    WCS 18  1073773    658480   
    WCS 19  1073774    658481   
    WCS 20  1073775    658482   
    WCS 21  1073776    658483   
    WCS 22  1073777    658484   
    WCS 23  1073778    658485   
    WCS 24  1073779    658486   
    WCS 25  1073780    658487   
    WCS 26  1073781    658488   
    WRN 1  602701  727/469  294007   
    WRN 2  602702  727/470  294008   
    WRN 3  602703  727/471  294009   
    WRN 4  602704  727/472  294010   
    WRN 5  602705  727/473  294011   
    WRN 6  602706  727/474  294012   
    WRN 7  602707  727/475  294013   
    WRN 8  602708  727/476  294014   
    WRN 9  602709  727/477  294015   
    WRN 10  602710  727/478  294016   
    WRN 11  602711  727/479  294017   
    WRN 12  602712  727/480  294018   
    JMD 14  1098808    682367   
    JMD 15  1098809    682368   
    JMD 16  1098810    682369   
    JMD 17  1098811    682370   
    JMD 18  1098812    682371   
    JMD 19  1098813    682372   
    JMD 20  1098814    682373   

     

    Gold Standard Ventures Appendix C Page 17 of 44

     



    Appendix B

     

    County
    Claim Name 
    NMC #  Book/Page  Doc #  Amended
    JMD 21  1098815    682374   
    JMD 22  1098816    682375   
    JMD 23  1098817    682376   
    JMD 24  1098818    682377   
    JMD 25  1098819    682378   
    JMD 26  1098820    682379   
    JMD 27  1098821    682380   
    JMD 28  1098822    682381   
    JMD 29  1098823    682382   
    JMD 30  1098824    682383   
    JMD 31  1098825    682384   
    JMD 32  1098826    682385   
    JMD 33  1098827    682386   
    JMD 34  1098828    682387   
    JMD 35  1098829    682388   
    JMD 36  1098830    682389   
    JMD 37  1098831    682390   
    JMD 38  1098832    682391   
    JMD 39  1098833    682392   
    JMD 40  1098834    682393   
    JMD 41  1098835    682394   
    JMD 42  1098836    682395   
    JMD 43  1102648    687332   
    JMD 44  1102649    687333   
    JMD 45  1102650    687334   

     

    Claim Name  NMC #  Book/Page  County #
    PF 1  NMC1116606     706340
    PF 2  NMC1116607     706341
    PF 3  NMC1116608     706342
    PF 4  NMC1116609     706343
    PF 5  NMC1116610     706344
    PF 6  NMC1116611     706345
    PF 7  NMC1116612     706346
    PF 8  NMC1116613     706347
    PF 9  NMC1116614     706348
    PF 10  NMC1116615     706349
    PF 11  NMC1116616     706350
    PF 12  NMC1116617     706351
    PF 13  NMC1116618     706352
    PF 14  NMC1116619     706353 

     

    Gold Standard Ventures Appendix C Page 18 of 44

     



    Appendix B

     

    Claim Name  NMC #  Book/Page  County #
    PF 15  NMC1116620     706354
    PF 16  NMC1116621     706355
    PF 17  NMC1116622     706356
    PF 18  NMC1116623     706357
    PF 19  NMC1116624     706358
    PF 20  NMC1116625     706359
    PF 21  NMC1116626     706360
    PF 22  NMC1116627     706361
    PF 23  NMC1116628     706362
    PF 24  NMC1116629     706363
    PF 25  NMC1116630     706364
    PF 26  NMC1124620     712260
    PF 27  NMC1124621     712261
    PF 28  NMC1124622     712262
    PF 29  NMC1124623     712263
    PF 30  NMC1124624     712264
    PF 31  NMC1124625     712265
    PF 32  NMC1124626     712266
    PF 33  NMC1124627     712267
    PF 34  NMC1124628     712268
    PF 35  NMC1124629     712269
    PF 36  NMC1124630     712270
    PF 37  NMC1124631     712271
    PF 38  NMC1124632     712272
    PF 39  NMC1124633     712273
    PF 40  NMC1124634     712274
    PF 41  NMC1124635     712275
    PF 42  NMC1124636     712276
    PF 43  NMC1124637     712277
    PF 44  NMC1124638     712278
    PF 45  NMC1124639     712279
    PF 46  NMC1124640     712280
    PF 47  NMC1124641     712281
    PF 48  NMC1124642     712282
    PF 49  NMC1124643     712283
    PF 50  NMC1124644     712284
    PF 51  NMC1124645     712285
    PF 52  NMC1124646     712286 

     

    Gold Standard Ventures Appendix C Page 19 of 44

     



    Appendix B

    South Railroad Portion of the Property

    Claim
    Name 
    NMC # Book/Page Document
    #
    CISS 37  407885 560/340 228488
    CISS 38  407886 560/341 228489
    CISS 39  407887 560/342 228490
    CISS 40  407888 560/343 228491
    CISS 41  407889 560/344 228492
    CISS 42  407890 560/345 228493
    CISS 43  407891 560/346 228494
    CISS 44  407892 560/347 228495
    CISS 45  407893 560/348 228496
    CISS 46  407894 560/349 228497
    CISS 47  407895 560/350 228498
    CISS 48  407896 560/351 228499
    CISS 49  407897 560/352 228500
    CISS 50  407898 560/353 228501
    CISS 51  407899 560/354 228502
    CISS 52  407900 560/355 228503
    CISS 53  407901 560/356 228504
    CISS 54  407902 560/357 228505
    CISS 55  407903 560/358 228506
    CISS 56  407904 560/359 228507
    CISS 57  407905 560/360 228508
    CISS 58  407906 560/361 228509
    CISS 59  407907 560/362 228510
    CISS 60  407908 560/363 228511
    CISS 61  407909 560/364 228512
    CISS 62  407910 560/365 228513
    CISS 63  407911 560/366 228514
    CISS 64  407912 560/367 228515
    CISS 65  407913 560/368 228516
    CISS 66  407914 560/369 228517
    CISS 67  407915 560/370 228518
    CISS 68  407916 560/371 228519
    CISS 69  407917 560/372 228520
    CISS 70  407918 560/373 228521
    CISS 71  407919 560/374 228522
    CISS 72  407920 560/375 228523
    CISS 73  407921 560/376 228524
    CISS 74  407922 560/377 228525
    CISS 75  407923 560/378 228526
    CISS 76  407924 560/379 228527
    CISS 77  407925 560/380 228528
    CISS 78  407926 560/381 228529
    CISS 79  407927 560/382 228530
    CISS 80  407928 560/383 228531
    CISS 81  407929 560/384 228532

     

    Gold Standard Ventures Appendix C Page 20 of 44

     



    Appendix B

     

    Claim
    Name 
     NMC # Book/Page Document
    #
    CISS 82  407930 560/385 228533
    CISS 83  407931 560/386 228534
    CISS 84  407932 560/387 228535
    CISS 85  407933 560/388 228536
    CISS 86  407934 560/389 228537
    CISS 87  407935 560/390 228538
    PP 1  829752 2/22680 484937
    PP 2  829753 2/22681 484938
    PP 3  829754 2/22682 484939
    PP 4  829755 2/22683 484940
    PP 5  829756 2/22684 484941
    PP 6  829757 2/22685 484942
    PP 7  829758 2/22686 484943
    PP 8  829759 2/22687 484944
    PP 9  829760 2/22688 484945
    PP 10  829761 2/22689 484946
    PP 11  829762 2/22690 484947
    PP 12  829763 2/22691 484948
    PP 13  829764 2/22692 484949
    PP 14  829765 2/22693 484950
    PP 15  829766 2/22694 484951
    PP 16  829767 2/22695 484952
    PP 17  829768 2/22696 484953
    PP 18  829769 2/22697 484954
    PP 19  829770 2/22698 484955
    PP 20  829771 2/22699 484956
    PP 21  829772 2/22700 484957
    PP 22  829773 2/22701 484958
    PP 23  829774 2/22702 484959
    PP 24  829775 2/22703 484960
    PP 25  829776 2/22704 484961
    PP 26  829777 2/22705 484962
    PP 27  829778 2/22706 484963
    PP 28  829779 2/22707 484964
    PP 29  829780 2/22708 484965
    PP 30  829781 2/22709 484966
    PP 31  829782 2/22710 484967
    PP 32  829783 2/22711 484968
    PP 33  829784 2/22712 484969
    PP 34  829785 2/22713 484970
    PP 35  829786 2/22714 484971
    PP 36  829787 2/22715 484972
    PP 37  829788 2/22716 484973
    PP 38  829789 2/22717 484974
    PP 39  829790 2/22718 484975
    PP 40  829791 2/22719 484976
    PP 41  829792 2/22720 484977

     

    Gold Standard Ventures Appendix C Page 21 of 44

     



    Appendix B

     

    Claim
    Name
    NMC #  Book/Page Document
    #
    PP 42  829793 2/22721 484978
    PP 43  829794 2/22722 484979
    PP 44  829795 2/22723 484980
    PP 45  829796 2/22724 484981
    PP 46  829797 2/22725 484982
    PP 59  829810 2/22738 484995
    PP 60  829811 2/22739 484996
    PP 61  829812 2/22740 484997
    PP 62  829813 2/22741 484998
    PP 63  829814 2/22742 484999
    PP 64  829815 2/22743 485000
    PP 65  829816 2/22744 485001
    PP 66  829817 2/22745 485002
    PP 67  829818 2/22746 485003
    PP 68  829819 2/22747 485004
    PP 69  829820 2/22748 485005
    PP 70  829821 2/22749 485006
    PP 71  829822 2/22750 485007
    PP 72  829823 2/22751 485008
    PP 73  829824 2/22752 485009
    PP 74  829825 2/22753 485010
    PP 75  829826 2/22754 485011
    PP 76  829827 2/22755 485012
    PP 77  881622 4/57463 526778
    PP 78  881623 4/57464 526779
    PP 79  881624 4/57465 526780
    PR 1  881625 4/57466 526762
    PR 2  881626 4/57467 526763
    PR 3  881627 4/57468 526764
    PR 4  881628 4/57469 526765
    PR 5  881629 4/57470 526766
    PR 6  881630 4/57471 526767
    PR 7  881631 4/57472 526768
    PR 8  881632 4/57473 526769
    PR 9  881633 4/57474 526770
    PR 10  881634 4/57475 526771
    PR 11  881635 4/57476 526772
    PR 12  881636 4/57477 526773
    PR 13  881637 4/57478 526774
    PR 14  881638 4/57479 526775
    PR 15  881639 4/57480 526776
    TC 1  125639 304/6 127282
    TC 2  125640 304/7 127283
    TC 3  125641 304/8 127284
    TC 4  125642 304/9 127285
    TC 5  125643 304/10 127286
    TC 6  125644 304/11 127287

     

    Gold Standard Ventures Appendix C Page 22 of 44

     



    Appendix B

     

    Claim
    Name
    NMC # Book/Page Document
    #
    TC 7  125645 304/12 127288
    TC 8  125646 304/13 127289
    TC 9  125647 304/14 127290
    TC 10  125648 304/15 127291
    TC 11  133862 309/184 129702
    TC 12  148871 329/58 137481
    TC 13  148872 329/59 137482
    TC 14  148873 329/60 137483
    TC 15  148874 329/61 137484
    TC 16  148875 329/62 137485
    TC 17  148876 329/63 137486
    TC 18  148877 329/64 137487
    TC 19  148878 329/65 137488
    TC 20  148879 329/66 137489
    TC 21  148880 329/67 137490
    TC 22  148881 329/68 137491
    TC 23  148882 329/69 137492
    TC 24  148883 329/70 137493
    TC 25  148884 329/71 137494
    TC 26  148885 329/72 137495
    TC 27  148886 329/73 137496
    TC 28  148887 329/74 137497
    TC 29  403761 558/426 227892
    TC 30  403762 558/427 227893
    TC 31  403763 558/428 227894
    TC 32  403764 558/429 227895
    TC 33  403765 558/430 227896
    TC 34  403766 558/431 227897
    TC 35  403767 558/432 227898
    TC 36  403768 558/433 227899
    TC 37  403769 558/434 227900
    TC 38  403770 558/435 227901
    TC 39  403771 558/436 227902
    TC 37R  1102651   687335
    TC 38R  1102652   687336

     

    Claim Name  NMC #  Book/Page  County Document
    # 
    WC 1  1117619   707289
    WC 2  1117620   707290
    WC 3  1117621   707291
    WC 4  1117622   707292
    WC 5  1117623   707293
    WC 6  1117624   707294
    WC 7  1117625   707295
    WC 8  1117626   707296
    WC 9  1117627   707297

     

    Gold Standard Ventures Appendix C Page 23 of 44

     



    Appendix B

     

    Claim Name  NMC #  Book/Page County Document
    #
    WC 10  1117628   707298
    WC 11  1117629   707299
    WC 12  1117630   707300
    WC 13  1117631   707301
    WC 14  1117632   707302
    WC 15  1117633   707303
    WC 16  1117634   707304
    WC 17  1117635   707305
    WC 18  1117636   707306
    WC 19  1117637   707307
    WC 20  1117638   707308
    WC 21  1117639   707309
    WC 22  1117640   707310
    WC 23  1117641   707311
    WC 24  1117642   707312
    WC 25  1117643   707313
    WC 26  1117644   707314
    WC 27  1117645   707315
    WC 28  1117646   707316
    WC 29  1117647   707317
    WC 30  1117648   707318
    WC 31  1117649   707319
    WC 32  1117650   707320
    WC 33  1117651   707321
    WC 34  1117652   707322
    WC 35  1117653   707323
    WC 36  1117654   707324
    WC 37  1117655   707325
    WC 38  1117656   707326
    WC 39  1117657   707327
    WC 40  1117658   707328
    WC 41  1117659   707329
    WC 42  1117660   707330
    WC 43  1117661   707331
    WC 44  1117662   707332
    WC 45  1117663   707333
    WC 46  1117664   707334
    WC 47  1117665   707335
    WC 48  1117666   707336
    WC 49  1117667   707337
    WC 50  1117668   707338
    WC 51  1117669   707339
    WC 52  1117670   707340
    WC 53  1117671   707341
    WC 54  1117672   707342
    WC 55  1117673   707343
    WC 56  1117674   707344
    WC 57  1117675   707345 

     

    Gold Standard Ventures Appendix C Page 24 of 44

     



    Appendix B

     

    Claim Name  NMC #  Book/Page  County Document
    # 
    WC 58  1117676   707346
    WC 59  1117677   707347
    WC 60  1117678   707348
    WC 61  1117679   707349
    WC 62  1117680   707350
    WC 63  1117681   707351
    WC 64  1117682   707352
    WC 65  1117683   707353
    WC 66  1117684   707354
    WC 67  1117685   707355
    WC 68  1117686   707356
    WC 69  1117687   707357
    WC 70  1117688   707358
    WC 71  1117689   707359
    WC 72  1117690   707360
    WC 73  1117691   707361
    WC 74  1117692   707362
    WC 75  1117693   707363
    WC 76  1117694   707364
    WC 77  1117695   707365
    WC 78  1117696   707366
    WC 79  1117697   707367
    WC 80  1117698   707368
    WC 81  1117699   707369
    WC 82  1117700   707370
    WC 83  1117701   707371
    WC 84  1117702   707372
    WC 85  1117703   707373
    WC 86  1117704   707374
     
    Claim Name  Book/Page Document No. BLM
    NMC No.
    TM 1    709568 1120097
    TM 2    709569 1120098
    TM 3    709570 1120099
    TM 4    709571 1120100
    TM 5    709572 1120101
    TM 6    709573 1120102
    TM 7    709574 1120103
    TM 8    709575 1120104
    TM 9    709576 1120105
    TM 10    709577 1120106
    TM 11    709578 1120107
    TM 12    709579 1120108
    TM 13    709580 1120109
    TM 14    709581 1120110
    TM 15    709582 1120111

     

    Gold Standard Ventures Appendix C Page 25 of 44

     



    Appendix B

     

    Claim Name  Book/Page  Document No.  BLM
    NMC No. 
    TM 16    709583 1120112
    TM 17    709584 1120113
    TM 18    709585 1120114

     

    County Claim
    Name 
    Location Date  Recorded  Document No.  BLM
    NMC No. 
    WX 1  11/19/2016 2/13/2017 721913 1139466
    WX 2  11/19/2016 2/13/2017 721914 1139467
    WX 3  11/19/2016 2/13/2017 721915 1139468
    WX 4  11/19/2016 2/13/2017 721916 1139469
    WX 5  11/19/2016 2/13/2017 721917 1139470
    WX 6  11/19/2016 2/13/2017 721918 1139471
    WX 7  11/19/2016 2/13/2017 721919 1139472
    WX 8  11/19/2016 2/13/2017 721920 1139473
    WX 9  11/19/2016 2/13/2017 721921 1139474
    WX 10  11/19/2016 2/13/2017 721922 1139475
    WX 11  11/19/2016 2/13/2017 721923 1139476
    WX 12  11/19/2016 2/13/2017 721924 1139477
    WX 13  11/19/2016 2/13/2017 721925 1139478
    WX 14  11/19/2016 2/13/2017 721926 1139479
    WX 15  11/19/2016 2/13/2017 721927 1139480
    WX 16  11/19/2016 2/13/2017 721928 1139481
    WX 17  11/19/2016 2/13/2017 721929 1139482
    WX 18  11/19/2016 2/13/2017 721930 1139483
    WX 19  11/19/2016 2/13/2017 721931 1139484
    WX 20  11/19/2016 2/13/2017 721932 1139485
    WX 21  11/19/2016 2/13/2017 721933 1139486
    WX 22  11/19/2016 2/13/2017 721934 1139487
    WX 23  11/19/2016 2/13/2017 721935 1139488
    WX 24  11/19/2016 2/13/2017 721936 1139489
    WX 25  11/19/2016 2/13/2017 721937 1139490
    WX 26  11/19/2016 2/13/2017 721938 1139491
    WX 27  11/19/2016 2/13/2017 721939 1139492
    WX 28  11/19/2016 2/13/2017 721940 1139493
    WX 29  11/19/2016 2/13/2017 721941 1139494
    WX 30  11/19/2016 2/13/2017 721942 1139495
    WX 31  11/19/2016 2/13/2017 721943 1139496
    WX 32  11/19/2016 2/13/2017 721944 1139497
    WX 33  11/19/2016 2/13/2017 721945 1139498
    WX 34  11/19/2016 2/13/2017 721946 1139499
    WX 35  11/19/2016 2/13/2017 721947 1139500
    WX 36  11/19/2016 2/13/2017 721948 1139501
    WX 37  11/19/2016 2/13/2017 721949 1139502
    WX 38  11/19/2016 2/13/2017 721950 1139503
    WX 39  11/19/2016 2/13/2017 721951 1139504
    WX 40  11/19/2016 2/13/2017 721952 1139505
    WX 41  11/19/2016 2/13/2017 721953 1139506 

     

    Gold Standard Ventures Appendix C Page 26 of 44

     



    Appendix B

     

    County Claim
    Name 
    Location Date  Recorded  Document No.  BLM
    NMC No. 
    WX 42  11/19/2016 2/13/2017 721954 1139507
    WX 43  11/19/2016 2/13/2017 721955 1139508
    WX 44  11/19/2016 2/13/2017 721956 1139509
    WX 45  11/19/2016 2/13/2017 721957 1139510
    WX 46  11/19/2016 2/13/2017 721958 1139511
    WX 47  11/19/2016 2/13/2017 721959 1139512
    WX 48  11/19/2016 2/13/2017 721960 1139513
    WX 49  11/19/2016 2/13/2017 721961 1139514
    WX 50  11/19/2016 2/13/2017 721962 1139515
    WX 51  11/19/2016 2/13/2017 721963 1139516
    WX 52  11/19/2016 2/13/2017 721964 1139517
    WX 53  11/19/2016 2/13/2017 721965 1139518
    WX 54  11/19/2016 2/13/2017 721966 1139519
    WX 55  11/20/2016 2/13/2017 721967 1139520
    WX 56  11/20/2016 2/13/2017 721968 1139521
    WX 57  11/20/2016 2/13/2017 721969 1139522
    WX 58  11/20/2016 2/13/2017 721970 1139523
    WX 59  11/20/2016 2/13/2017 721971 1139524
    WX 60  11/20/2016 2/13/2017 721972 1139525
    WX 61  11/20/2016 2/13/2017 721973 1139526
    WX 62  11/20/2016 2/13/2017 721974 1139527
    WX 63  11/20/2016 2/13/2017 721975 1139528
    WX 64  11/20/2016 2/13/2017 721976 1139529
    WX 65  11/20/2016 2/13/2017 721977 1139530
    WX 66  11/20/2016 2/13/2017 721978 1139531
    WX 67  11/20/2016 2/13/2017 721979 1139532
    WX 68  11/20/2016 2/13/2017 721980 1139533
    WX 69  11/20/2016 2/13/2017 721981 1139534
    WX 70  11/20/2016 2/13/2017 721982 1139535
    WX 71  11/20/2016 2/13/2017 721983 1139536
    WX 72  11/20/2016 2/13/2017 721984 1139537
    WX 73  11/18/2016 2/13/2017 721985 1139538
    WX 74  11/18/2016 2/13/2017 721986 1139539
    WX 75  11/18/2016 2/13/2017 721987 1139540
    WX 76  11/18/2016 2/13/2017 721988 1139541
    WX 77  11/18/2016 2/13/2017 721989 1139542
    WX 78  11/18/2016 2/13/2017 721990 1139543
    WX 79  11/18/2016 2/13/2017 721991 1139544
    WX 80  11/18/2016 2/13/2017 721992 1139545
    WX 81  11/18/2016 2/13/2017 721993 1139546
    WX 82  11/18/2016 2/13/2017 721994 1139547
    WX 83  11/18/2016 2/13/2017 721995 1139548
    WX 84  11/18/2016 2/13/2017 721996 1139549
    WX 85  11/18/2016 2/13/2017 721997 1139550
    WX 86  11/18/2016 2/13/2017 721998 1139551
    WX 87  11/18/2016 2/13/2017 721999 1139552
    WX 88  11/18/2016 2/13/2017 722000 1139553
    WX 89  11/18/2016 2/13/2017 722001 1139554

     

    Gold Standard Ventures Appendix C Page 27 of 44

     



    Appendix B

     

    County Claim
    Name 
    Location Date  Recorded  Document No.  BLM
    NMC No. 
    WX 90  11/18/2016 2/13/2017 722002 1139555
    WX 91  11/18/2016 2/13/2017 722003 1139556
    WX 92  11/18/2016 2/13/2017 722004 1139557
    WX 93  11/18/2016 2/13/2017 722005 1139558
    WX 94  11/18/2016 2/13/2017 722006 1139559
    WX 95  11/18/2016 2/13/2017 722007 1139560
    WX 96  11/18/2016 2/13/2017 722008 1139561
    WX 97  11/18/2016 2/13/2017 722009 1139562
    WX 98  11/18/2016 2/13/2017 722010 1139563
    WX 99  11/18/2016 2/13/2017 722011 1139564
    WX 100  11/18/2016 2/13/2017 722012 1139565
    WX 101  11/18/2016 2/13/2017 722013 1139566
    WX 102  11/18/2016 2/13/2017 722014 1139567
    WX 103  11/18/2016 2/13/2017 722015 1139568
    WX 104  11/18/2016 2/13/2017 722016 1139569
    WX 105  11/18/2016 2/13/2017 722017 1139570
    WX 106  11/18/2016 2/13/2017 722018 1139571
    WX 107  11/18/2016 2/13/2017 722019 1139572
    WX 108  11/18/2016 2/13/2017 722020 1139573
    WX 109  11/18/2016 2/13/2017 722021 1139574
    WX 110  11/18/2016 2/13/2017 722022 1139575
    WX 111  11/18/2016 2/13/2017 722023 1139576
    WX 112  11/18/2016 2/13/2017 722024 1139577
    WX 113  11/20/2016 2/13/2017 722025 1139578
    WX 114  11/20/2016 2/13/2017 722026 1139579
    WX 115  11/20/2016 2/13/2017 722027 1139580
    WX 116  11/20/2016 2/13/2017 722028 1139581
    WX 117  11/20/2016 2/13/2017 722029 1139582
    WX 118  11/20/2016 2/13/2017 722030 1139583
    WX 119  11/20/2016 2/13/2017 722031 1139584
    WX 120  11/20/2016 2/13/2017 722032 1139585
    WX 121  11/20/2016 2/13/2017 722033 1139586
    WX 122  11/20/2016 2/13/2017 722034 1139587
    WX 123  11/20/2016 2/13/2017 722035 1139588
    WX 124  11/20/2016 2/13/2017 722036 1139589
    WX 125  11/20/2016 2/13/2017 722037 1139590
    WX 126  11/20/2016 2/13/2017 722038 1139591
    WX 127  12/1/2016 2/13/2017 722039 1139592
    WX 128  12/1/2016 2/13/2017 722040 1139593
    WX 129  12/1/2016 2/13/2017 722041 1139594
    WX 130  12/1/2016 2/13/2017 722042 1139595
    WX 131  12/1/2016 2/13/2017 722043 1139596
    WX 132  12/1/2016 2/13/2017 722044 1139597
    WX 133  12/1/2016 2/13/2017 722045 1139598
    WX 134  12/1/2016 2/13/2017 722046 1139599
    WX 135  12/1/2016 2/13/2017 722047 1139600
    WX 136  12/1/2016 2/13/2017 722048 1139601
    WX 137  12/1/2016 2/13/2017 722049 1139602

     

    Gold Standard Ventures Appendix C Page 28 of 44

     



    Appendix B

     

    County Claim
    Name 
    Location Date  Recorded  Document No.  BLM
    NMC No. 
    WX 138  12/1/2016 2/13/2017 722050 1139603
    WX 139  12/1/2016 2/13/2017 722051 1139604
    WX 140  12/1/2016 2/13/2017 722052 1139605
    WX 141  12/1/2016 2/13/2017 722053 1139606
    WX 142  12/1/2016 2/13/2017 722054 1139607
    WX 143  12/1/2016 2/13/2017 722055 1139608
    WX 144  12/1/2016 2/13/2017 722056 1139609
    WX 145  12/1/2016 2/13/2017 722057 1139610
    WX 146  12/1/2016 2/13/2017 722058 1139611
    WX 147  12/1/2016 2/13/2017 722059 1139612
    WX 148  12/1/2016 2/13/2017 722060 1139613
    WX 149  12/1/2016 2/13/2017 722061 1139614
    WX 150  12/1/2016 2/13/2017 722062 1139615
    WX 151  12/1/2016 2/13/2017 722063 1139616
    WX 152  12/1/2016 2/13/2017 722064 1139617
    WX 153  12/1/2016 2/13/2017 722065 1139618
    WX 154  12/1/2016 2/13/2017 722066 1139619
    WX 155  12/1/2016 2/13/2017 722067 1139620
    WX 156  12/1/2016 2/13/2017 722068 1139621

     

    Claim Name  NMC #
    PBX 1  1139714
    PBX 2  1139715
    PBX 3  1139716
    PBX 4  1139717
    PBX 5  1139718
    PBX 6  1139719
    PBX 7  1139720
    PBX 8  1139721
    PBX 9  1139722
    PBX 10  1139723
    PBX 11  1139724
    PBX 12  1139725
    PBX 13  1139726
    PBX 14  1139727
    PBX 15  1139728
    PBX 16  1139729
    PBX 17  1139730
    PBX 18  1139731
    PBX 19  1139732
    PBX 20  1139733
    PBX 21  1139734
    PBX 22  1139735
    PBX 23  1139736 

     

    Gold Standard Ventures Appendix C Page 29 of 44

     



    Appendix B

     

    Claim Name  NMC #
    PBX 24  1139737
    PBX 25  1139738
    PBX 26  1139739
    PBX 27  1139740
    PBX 28  1139741
    PBX 29  1139742
    PBX 30  1139743
    PBX 31  1139744
    PBX 32  1139745
    PBX 33  1139746
    PBX 34  1139747
    PBX 35  1139748
    PBX 36  1139749
    PBX 37  1139750
    PBX 38  1139751
    PBX 39  1139752
    PBX 40  1139753
    PBX 41  1139754
    PBX 42  1139755
    PBX 43  1139756
    PBX 44  1139757
    PBX 45  1139758
    PBX 46  1139759
    PBX 47  1139760
    PBX 48  1139761
    PBX 49  1139762
    PBX 50  1139763
    PBX 51  1139764
    PBX 52  1139765
    PBX 53  1139766
    PBX 54  1139767
    PBX 55  1139768
    PBX 56  1139769
    PBX 57  1139770
    PBX 58  1139771
    PBX 59  1139772
    PBX 60  1139773
    PBX 61  1139774
    PBX 62  1139775
    PBX 63  1139776
    PBX 64  1139777
    PBX 65  1139778

     

    Gold Standard Ventures Appendix C Page 30 of 44

     



    Appendix B

     

    Claim Name  NMC #
    PBX 66  1139779
    PBX 67  1139780
    PBX 68  1139781
    PBX 69  1139782
    PBX 70  1139783
    PBX 71  1139784
    PBX 72  1139785
    PBX 73  1139786
    PBX 74  1139787
    PBX 75  1139788
    PBX 76  1139789
    PBX 77  1139790
    PBX 78  1139791
    PBX 79  1139792
    PBX 80  1139793
    PBX 81  1139794
    PBX 82  1139795
    PBX 83  1139796
    PBX 84  1139797
    PBX 85  1139798
    PBX 86  1139799
    PBX 87  1139800
    PBX 88  1139801
    PBX 89  1139802
    PBX 90  1139803
    PBX 91  1139804
    PBX 92  1139805
    PBX 93  1139806
    PBX 94  1139807
    PBX 95  1139808
    PBX 96  1139809
    PBX 97  1139810
    PBX 98  1139811
    PBX 99  1139812
    PBX 100  1139813
    PBX 101  1139814
    PBX 102  1139815
    PBX 103  1139816
    PBX 104  1139817
    PBX 105  1139818
    PBX 106  1139819
    PBX 107  1139820

     

    Gold Standard Ventures Appendix C Page 31 of 44

     



    Appendix B

     

    Claim Name  NMC #
    PBX 108  1139821
    PBX 109  1139822
    PBX 110  1139823
    PBX 111  1139824
    PBX 112  1139825
    PBX 113  1139826
    PBX 114  1139827
    PBX 115  1139828
    PBX 116  1139829
    PBX 117  1139830
    PBX 118  1139831
    PBX 119  1139832
    PBX 120  1139833
    PBX 121  1139834
    PBX 122  1139835
    PBX 123  1139836
    PBX 124  1139837
    PBX 125  1139838
    PBX 126  1139839
    PBX 127  1139840
    PBX 128  1139841
    PBX 129  1139842
    PBX 130  1139843
    PBX 131  1139844
    PBX 132  1139845
    PBX 133  1139846
    PBX 134  1139847
    PBX 135  1139848
    PBX 136  1139849
    PBX 137  1139850
    PBX 138  1139851
    PBX 139  1139852
    PBX 140  1139853
    PBX 141  1139854
    PBX 142  1139855
    PBX 143  1139856
    PBX 144  1139857
    PBX 145  1139858
    PBX 146  1139859
    PBX 147  1139860
    PBX 148  1139861
    PBX 149  1139862

     

    Gold Standard Ventures Appendix C Page 32 of 44

     



    Appendix B

     

    Claim Name  NMC #
    PBX 150  1139863
    PBX 151  1139864
    PBX 152  1139865
    PBX 153  1139866
    PBX 154  1139867
    PBX 155  1139868
    PBX 156  1139869
    PBX 157  1139870
    PBX 158  1139871
    PBX 159  1139872
    PBX 160  1139873
    PBX 161  1139874
    PBX 162  1139875
    PBX 163  1139876
    PBX 164  1139877
    PBX 165  1139878
    PBX 166  1139879
    PBX 167  1139880

     

    Count Claim Name Location Date  County BLM
    NMC No.
    Recording Date  Document No.
    PBG 1  3/14/2017  6/5/2017  725624  1144005
    PBG 2  3/14/2017  6/5/2017  725625  1144006
    PBG 3  3/14/2017  6/5/2017  725626  1144007
    PBG 4  3/14/2017  6/5/2017  725627  1144008
    PBG 5  3/14/2017  6/5/2017  725628  1144009
    PBG 6  3/14/2017  6/5/2017  725629  1144010
    PBG 7  3/14/2017  6/5/2017  725630  1144011
    PBG 8  3/14/2017  6/5/2017  725631  1144012
    PBG 9  3/14/2017  6/5/2017  725632  1144013
    10  PBG 10  3/14/2017  6/5/2017  725633  1144014
    11  PBG 11  3/14/2017  6/5/2017  725634  1144015
    12  PBG 12  3/14/2017  6/5/2017  725635  1144016
    13  PBG 13  3/21/2017  6/5/2017  725636  1144017
    14  PBG 14  3/21/2017  6/5/2017  725637  1144018
    15  PBG 15  3/21/2017  6/5/2017  725638  1144019
    16  PBG 16  3/21/2017  6/5/2017  725639  1144020
    17  PBG 17  3/21/2017  6/5/2017  725640  1144021
    18  PBG 18  3/25/2017  6/5/2017  725641  1144022
    19  PBG 19  3/25/2017  6/5/2017  725642  1144023 

     

    Gold Standard Ventures Appendix C Page 33 of 44

     



    Appendix B

     

    Count Claim Name Location Date  County BLM
    NMC No.
    Recording Date  Document No.
    20  PBG 20  3/25/2017  6/5/2017  725643  1144024
    21  PBG 21  3/25/2017  6/5/2017  725644  1144025
    22  PBG 22  3/25/2017  6/5/2017  725645  1144026
    23  PBG 23  3/25/2017  6/5/2017  725646  1144027
    24  PBG 24  3/25/2017  6/5/2017  725647  1144028
    25  PBG 25  3/21/2017  6/5/2017  725648  1144029
    26  PBG 26  3/21/2017  6/5/2017  725649  1144030
    27  PBG 27  3/21/2017  6/5/2017  725650  1144031
    28  PBG 28  3/21/2017  6/5/2017  725651  1144032
    29  PBG 29  3/21/2017  6/5/2017  725652  1144033
    30  PBG 30  3/21/2017  6/5/2017  725653  1144034
    31  PBG 31  3/21/2017  6/5/2017  725654  1144035
    32  PBG 32  3/25/2017  6/5/2017  725655  1144036
    33  PBG 33  3/25/2017  6/5/2017  725656  1144037
    34  PBG 34  3/25/2017  6/5/2017  725657  1144038
    35  PBG 35  3/25/2017  6/5/2017  725658  1144039
    36  PBG 36  3/25/2017  6/5/2017  725659  1144040
    37  PBG 37  3/25/2017  6/5/2017  725660  1144041
    38  PBG 38  3/25/2017  6/5/2017  725661  1144042
    39  PBG 39  3/25/2017  6/5/2017  725662  1144043
    40  PBG 40  3/25/2017  6/5/2017  725663  1144044
    41  PBG 41  3/25/2017  6/5/2017  725664  1144045
    42  PBG 42  3/25/2017  6/5/2017  725665  1144046
    43  PBG 43  3/25/2017  6/5/2017  725666  1144047
    44  PBG 44  3/25/2017  6/5/2017  725667  1144048
    45  PBG 45  3/25/2017  6/5/2017  725668  1144049
    46  PBG 46  3/22/2017  6/5/2017  725669  1144050
    47  PBG 47  3/22/2017  6/5/2017  725670  1144051
    48  PBG 48  3/22/2017  6/5/2017  725671  1144052
    49  PBG 49  3/22/2017  6/5/2017  725672  1144053
    50  PBG 50  3/22/2017  6/5/2017  725673  1144054
    51  PBG 51  3/22/2017  6/5/2017  725674  1144055
    52  PBG 52  3/22/2017  6/5/2017  725675  1144056
    53  PBG 53  3/22/2017  6/5/2017  725676  1144057
    54  PBG 54  3/22/2017  6/5/2017  725677  1144058
    55  PBG 55  3/22/2017  6/5/2017  725678  1144059
    56  PBG 56  3/22/2017  6/5/2017  725679  1144060 

     

    Gold Standard Ventures Appendix C Page 34 of 44

     



    Appendix B

     

    Count  Claim Name Location Date  County

    BLM
    NMC No.

    Recording Date  Document No. 
    57  PBG 57  3/22/2017  6/5/2017  725680  1144061
    58  PBG 58  3/22/2017  6/5/2017  725681  1144062
    59  PBG 59  3/22/2017  6/5/2017  725682  1144063
    60  PBG 60  3/22/2017  6/5/2017  725683  1144064
    61  PBG 61  3/22/2017  6/5/2017  725684  1144065
    62  PBG 62  3/22/2017  6/5/2017  725685  1144066
    63  PBG 63  3/22/2017  6/5/2017  725686  1144067
    64  PBG 64  3/22/2017  6/5/2017  725687  1144068
    65  PBG 65  3/22/2017  6/5/2017  725688  1144069
    66  PBG 66  3/22/2017  6/5/2017  725689  1144070
    67  PBG 67  3/22/2017  6/5/2017  725690  1144071
    68  PBG 68  3/22/2017  6/5/2017  725691  1144072
    69  PBG 69  3/22/2017  6/5/2017  725692  1144073
    70  PBG 70  3/22/2017  6/5/2017  725693  1144074
    71  PBG 71  3/22/2017  6/5/2017  725694  1144075
    72  PBG 72  3/22/2017  6/5/2017  725695  1144076
    73  PBG 73  3/22/2017  6/5/2017  725696  1144077
    74  PBG 74  3/22/2017  6/5/2017  725697  1144078
    75  PBG 75  3/22/2017  6/5/2017  725698  1144079
    76  PBG 76  3/22/2017  6/5/2017  725699  1144080
    77  PBG 77  3/22/2017  6/5/2017  725700  1144081
    78  PBG 78  3/22/2017  6/5/2017  725701  1144082
    79  PBG 79  3/22/2017  6/5/2017  725702  1144083
    80  PBG 80  3/22/2017  6/5/2017  725703  1144084
    81  PBG 81  3/22/2017  6/5/2017  725704  1144085
    82  PBG 82  3/22/2017  6/5/2017  725705  1144086
    83  PBG 83  3/15/2017  6/5/2017  725706  1144087
    84  PBG 84  3/15/2017  6/5/2017  725707  1144088
    85  PBG 85  3/15/2017  6/5/2017  725708  1144089
    86  PBG 86  3/15/2017  6/5/2017  725709  1144090
    87  PBG 87  3/15/2017  6/5/2017  725710  1144091
    88  PBG 88  3/15/2017  6/5/2017  725711  1144092
    89  PBG 89  3/15/2017  6/5/2017  725712  1144093
    90  PBG 90  3/15/2017  6/5/2017  725713  1144094
    91  PBG 91  3/15/2017  6/5/2017  725714  1144095
    92  PBG 92  3/15/2017  6/5/2017  725715  1144096
    93  PBG 93  3/15/2017  6/5/2017  725716  1144097

     

    Gold Standard Ventures Appendix C Page 35 of 44

     



    Appendix B

     

    Count  Claim Name  Location Date  County BLM
    NMC No. 
    Recording Date  Document No.
    94  PBG 94  3/15/2017  6/5/2017  725717  1144098
    95  PBG 95  3/15/2017  6/5/2017  725718  1144099
    96  PBG 96  3/15/2017  6/5/2017  725719  1144100
    97  PBG 97  3/15/2017  6/5/2017  725720  1144101
    98  PBG 98  3/15/2017  6/5/2017  725721  1144102
    99  PBG 99  3/15/2017  6/5/2017  725722  1144103
    100  PBG 100  3/15/2017  6/5/2017  725723  1144104
    101  PBG 101  3/15/2017  6/5/2017  725724  1144105
    102  PBG 102  3/15/2017  6/5/2017  725725  1144106
    103  PBG 103  3/15/2017  6/5/2017  725726  1144107
    104  PBG 104  3/15/2017  6/5/2017  725727  1144108
    105  PBG 105  3/15/2017  6/5/2017  725728  1144109
    106  PBG 106  3/15/2017  6/5/2017  725729  1144110
    107  PBG 107  3/15/2017  6/5/2017  725730  1144111
    108  PBG 108  3/15/2017  6/5/2017  725731  1144112
    109  PBG 109  3/15/2017  6/5/2017  725732  1144113
    110  PBG 110  3/15/2017  6/5/2017  725733  1144114
    111  PBG 111  3/15/2017  6/5/2017  725734  1144115
    112  PBG 112  3/15/2017  6/5/2017  725735  1144116
    113  PBG 113  3/15/2017  6/5/2017  725736  1144117
    114  PBG 114  3/15/2017  6/5/2017  725737  1144118
    115  PBG 115  3/15/2017  6/5/2017  725738  1144119
    116  PBG 116  3/15/2017  6/5/2017  725739  1144120
    117  PBG 117  3/15/2017  6/5/2017  725740  1144121
    118  PBG 118  3/15/2017  6/5/2017  725741  1144122
    119  PBG 119  3/15/2017  6/5/2017  725742  1144123
    120  PBG 120  3/15/2017  6/5/2017  725743  1144124
    121  PBG 121  3/15/2017  6/5/2017  725744  1144125
    122  PBG 122  3/15/2017  6/5/2017  725745  1144126
    123  PBG 123  3/15/2017  6/5/2017  725746  1144127
    124  PBG 124  3/20/2017  6/5/2017  725747  1144128
    125  PBG 125  3/20/2017  6/5/2017  725748  1144129
    126  PBG 126  3/20/2017  6/5/2017  725749  1144130
    127  PBG 127  3/20/2017  6/5/2017  725750  1144131
    128  PBG 128  3/20/2017  6/5/2017  725751  1144132
    129  PBG 129  3/20/2017  6/5/2017  725752  1144133
    130  PBG 130  3/20/2017  6/5/2017  725753  1144134

     

    Gold Standard Ventures Appendix C Page 36 of 44

     



    Appendix B

     

    Count  Claim Name Location Date  County BLM
    NMC No.
    Recording Date  Document No. 
    131  PBG 131  3/20/2017  6/5/2017  725754  1144135
    132  PBG 132  3/20/2017  6/5/2017  725755  1144136
    133  PBG 133  3/20/2017  6/5/2017  725756  1144137
    134  PBG 134  3/20/2017  6/5/2017  725757  1144138
    135  PBG 135  3/20/2017  6/5/2017  725758  1144139
    136  PBG 136  3/20/2017  6/5/2017  725759  1144140
    137  PBG 137  3/20/2017  6/5/2017  725760  1144141
    138  PBG 138  3/20/2017  6/5/2017  725761  1144142
    139  PBG 139  3/20/2017  6/5/2017  725762  1144143
    140  PBG 140  3/20/2017  6/5/2017  725763  1144144
    141  PBG 141  3/20/2017  6/5/2017  725764  1144145
    142  PBG 142  3/20/2017  6/5/2017  725765  1144146
    143  PBG 143  3/20/2017  6/5/2017  725766  1144147
    144  PBG 144  3/20/2017  6/5/2017  725767  1144148
    145  PBG 145  3/20/2017  6/5/2017  725768  1144149
    146  PBG 146  3/20/2017  6/5/2017  725769  1144150
    147  PBG 147  3/20/2017  6/5/2017  725770  1144151
    148  PBG 148  3/20/2017  6/5/2017  725771  1144152
    149  PBG 149  3/20/2017  6/5/2017  725772  1144153
    150  PBG 150  3/20/2017  6/5/2017  725773  1144154
    151  PBG 151  3/20/2017  6/5/2017  725774  1144155
    152  PBG 152  3/20/2017  6/5/2017  725775  1144156
    153  PBG 153  3/20/2017  6/5/2017  725776  1144157
    154  PBG 154  3/20/2017  6/5/2017  725777  1144158
    155  PBG 155  7/9/2017  9/26/017  730923  1149827
    156  PBG 156  7/9/2017 9/26/017 730924  1149828
    157  PBG 157  7/9/2017 9/26/017 730925  1149829
    158  PBG 158  7/9/2017 9/26/017 730926  1149830
    159  PBG 159  10/18/2017  1/10/2018  735553  1163261
    160  PBG 160  10/18/2017 1/10/2018 735554  1163262
    161  PBG 161  10/18/2017 1/10/2018 735555  1163263
    162  PBG 162  10/18/2017 1/10/2018 735556  1163264
    163  PBG 163  10/18/2017 1/10/2018 735557  1163265
    164  PBG 164  5/14/2018  8/8/2018  744728  1177559
    165  PBG 165  5/14/2018  8/8/2018  744729  1177560
    166  PBG 166  5/14/2018  8/8/2018  744730  1177561
    167  PBG 167  5/14/2018  8/8/2018  744731  1177562 

     

    Gold Standard Ventures Appendix C Page 37 of 44

     



    Appendix B

     

    Count  Claim Name  Location Date  County BLM
    NMC No. 
    Recording Date  Document No. 
    168  PBG 168  5/14/2018  8/8/2018  744732  1177563
    169  PBG 169  5/14/2018  8/8/2018  744733  1177564

     

    Gold Standard Ventures Appendix C Page 38 of 44

     



    Appendix B

    Unpatented Lode Claims Leased by Gold Standard

    Elko County, Nevada, Mount Diablo Base and Meridian

    North Railroad Portion of the Property

    Claim Name  NMC #  County
    Book/Page  Document #
    GUTSY 1203  399864  553/106  226058
    GUTSY 1204  399865  553/107  226059
    GUTSY 1205  399866  553/108  226060
    GUTSY 1206  399867  553/109  226061
    GUTSY 1207  399868  553/110  226062
    GUTSY 1208  399869  553/111  226063
    GUTSY 1209  399870  553/112  226064
    GUTSY 1210  399871  553/113  226065
    GUTSY 1211  399872  553/114  226066
    GUTSY 1212  399873  553/115  226067
    GUTSY 1213  399874  553/116  226068
    GUTSY 1214  399875  553/117  226069
    GUTSY 1215  399876  553/118  226070
    GUTSY 1216  399877  553/119  226071
    GUTSY 1217  399878  553/120  226072
    GUTSY 1218  399879  553/121  226073
    GUTSY 1219  399880  553/122  226074
    GUTSY 1220  399881  553/123  226075
    GUTSY 1221  399882  553/124  226076
    GUTSY 1222  399883  553/125  226077
    GUTSY 1223  399884  553/126  226078
    GUTSY 1224  399885  553/127  226079
    GUTSY 1225  399886  553/128  226080
    GUTSY 1226  399887  553/129  226081
    GUTSY 1227  399888  553/130  226082
    GUTSY 1228  399889  553/131  226083
    GUTSY 1229  399890  553/132  226084
    GUTSY 1230  399891  553/133  226085
    GUTSY 1231  399892  553/134  226086
    GUTSY 1232  399893  553/135  226087
    GUTSY 1233  399894  553/136  226088
    GUTSY 1234  399895  553/137  226089
    GUTSY 1235  399896  553/138  226090
    GUTSY 1236  399897  553/139  226091
    GUTSY 1237  399898  553/140  226092

     

    Gold Standard Ventures Appendix C Page 39 of 44

     



    Appendix B

     

     Claim Name NMC # County
    Book/Page   Document #
    GUTSY 1238  399899  553/141  226093
    GUTSY 1239  399900  553/142  226094
    GUTSY 1240  399901  553/143  226095
    GUTSY 1241  399902  553/144  226096
    GUTSY 1242  399903  553/145  226097
    GUTSY 1243  399904  553/146  226098
    GUTSY 1244  399905  553/147  226099
    GUTSY 1245  399906  553/148  226100
    GUTSY 1246  399907  553/149  226101
    GUTSY 1247  399908  553/150  226102
    GUTSY 1248  399909  553/151  226103
    GUTSY 1249  399910  553/152  226104
    GUTSY 1250  399911  553/153  226105
    GUTSY 1251  399912  553/154  226106
    GUTSY 1252  399913  553/155  226107
    GUTSY 1253  399914  553/156  226108
    GUTSY 1254  399915  553/157  226109
    GUTSY 1255  399916  553/158  226110
    GUTSY 1256  399917  553/159  226111
    GUTSY 1257  399918  553/160  226112
    GUTSY 1258  399919  553/161  226113
    GUTSY 1259  399920  553/162  226114
    GUTSY 1260  399921  553/163  226115
    GUTSY 1261  399922  553/164  226116
    GUTSY 1262  399923  553/165  226117
    GUTSY 1263  399924  553/166  226118
    GUTSY 1264  399925  553/167  226119
    GUTSY 1265  399926  553/168  226120
    GUTSY 1266  399927  553/169  226121
    GUTSY 1267  399928  553/170  226122
    GUTSY 1268  399929  553/171  226123
    GUTSY 1269  399930  553/172  226124
    GUTSY 1270  399931  553/173  226125
    GUTSY 1271  399932  553/174  226126
    GUTSY 1272  399933  553/175  226127
    GUTSY 1273  399934  553/176  226128
    GUTSY 1274  399935  553/177  226129 

     

    Gold Standard Ventures Appendix C Page 40 of 44

     



    Appendix B

    South Railroad Portion of the Property

    Claim Name  NMC # Book/Page County
    Document #
    Joe PP 56  898185 5/20346 534020
    Joe PP 58  898186 5/20348 534022
    Joe PP 56A  1104555   691029
    Joe PP 58A  1104556   691030
     
    Claim Name NMC # Book/Page County
    Document # 
    DIX 1  825914   476602
    DIX 2  825915   476603
    DIX 3  825916   476604
    DIX 4  825917   476605
    DIX 5  825918   476606
    DIX 6  825919   476607
    DIX 7  825920   476608
    DIX 8  825921   476609
    DIX 9  825922   476610
    DIX 10  825923   476611
    DIX 11  825924   476612
    DIX 12  825925   476613
    DIX 13  825926   476614
    DIX 14  825927   476615
    DIX 15  825928   476616
    DIX 16  825929   476617
    DIX 17  825930   476618
    DIX 18  825931   476619
    DIX 19  825932   476620
    DIX 20  825933   476621
    DIX 21  825934   476622
    DIX 22  825935   476623
    DIX 23  825936   476624
    DIX 24  825937   476625
    DIX 25  825938   476626
    DIX 26  825939   476627
    DIX 27  825940   476628
    DIX 28  825941   476629
    DIX 29  825942   476630
    DIX 30  825943   476631
    DIX 31  825944   476632
    DIX 32  825945   476633
    DIX 33  825946   476634
    WMH 131  831193   487250
    WMH 132  831194   487251
    WMH 133  831195   487252
    WMH 134  831196   487253
    WMH 135  831197   487254

     

    Gold Standard Ventures Appendix C Page 41 of 44

     



    Appendix B

     

    Claim Name NMC # Book/Page County
    Document # 
    WMH 136  831198   487255
    WMH 137  831199   487256
    WMH 138  831200   487257
    WMH 139  831201   487258
    WMH 140  831202   487259
    WMH 141  831203   487260
    WMH 142  831204   487261
    WMH 143  831205   487262
    WMH 144  831206   487263
    WMH 145  831207   487264
    WMH 146  831208   487265
    WMH 147  831209   487266
    WMH 148  831210   487267
    WMH 151  831211   487268
    WMH 152  831212   487269
    WMH 153  831213   487270
    WMH 154  831214   487271
    WMH 155  831215   487272
    WMH 156  831216   487273
    WMH 157  831217   487274
    WMH 158  831218   487275
    WMH 159  831219   487276
    WMH 160  831220   487277
    WMH 161  831221   487278
    WMH 162  831222   487279
    WMH 163  831223   487280
    WMH 164  831224   487281
    WMH 165  831225   487282
    WMH 166  831226   487283
    WMH 167  831227   487284
    WMH 168  831228   487285
    TF 1  831229   487286
    TF 2  831230   487287
    TF 3  831231   487288
    TF 4  831232   487289
    TF 5  831233   487290
    TF 6  831234   487291
    TF 7  831235   487292
    TF 8  831236   487293
    TF 9  831237   487294
    TF 10  831238   487295
    TF 11  831239   487296
    TF 12  831240   487297
    TF 13  831241   487298
    TF 14  831242   487299
    TF 15  831243   487300
    TF 16  831244   487301
    TF 17  831245   487302

     

    Gold Standard Ventures Appendix C Page 42 of 44

     



    Appendix B

     

    Claim Name  NMC #  Book/Page  County
    Document # 
    TF 18  831246   487303
    TF 19  831247   487304
    TF 20  831248   487305
    TF 21  831249   487306
    TF 22  831250   487307
    TF 23  831251   487308
    TF 24  831252   487309
    TF 25  831253   487310
    TF 26  831254   487311
    TF 27  831255   487312
    TF 28  831256   487313
    TF 29  831257   487314
    TF 30  831258   487315
    TF 31  831259   487316
    TF 32  831260   487317
    TF 33  831261   487318
    TF 34  831262   487319
    TF 35  831263   487320
    TF 36  831264   487321
    Calavera 6  276106   179214
    Calavera 21  276121   179229

     

    Claim Name  Location Date  Recorded  County Document
    No. 
    BLM No. 
    WMH 9  9/8/2001  12/5/2001 477034 NMC826307
    WMH 10  9/8/2001  12/5/2001 477035 NMC826308
    WMH 11  9/8/2001  12/5/2001 477036 NMC826309
    WMH 12  9/8/2001  12/5/2001 477037 NMC826310
    WMH 13  9/8/2001  12/5/2001 477038 NMC826311
    WMH 14  9/8/2001  12/5/2001 477039 NMC826312
    WMH 17  9/8/2001  12/5/2001 477042 NMC826315
    WMH 19  9/8/2001  12/5/2001 477044 NMC826317
    WMH 31  9/8/2001  12/5/2001 477046 NMC826319
    WMH 32  9/8/2001  12/5/2001 477047 NMC826320
    WMH 33  9/8/2001  12/5/2001 477048 NMC826321
    WMH 34  9/8/2001  12/5/2001 477049 NMC826322
    WMH 38  9/8/2001  12/5/2001 477053 NMC826326
    WMH 40  9/8/2001  12/5/2001 477055 NMC826328
     
    Claim Name  Location Date   County BLM
    NMC No. 
    Recording Date  Document No. 
    Pine 1  6/9/2006  8/3/2006  557790  932037
    Pine 2  6/9/2006  8/3/2006  557791  932038
    Pine 3  6/9/2006  8/3/2006  557792  932039
    Pine 4  6/9/2006  8/3/2006  557793  932040
    Pine 5  6/9/2006  8/3/2006  557794  932041 

     

    Gold Standard Ventures Appendix C Page 43 of 44

     



    Appendix B

     

    Pine 6  6/9/2006  8/3/2006  557795  932042
    Pine 7  6/9/2006  8/3/2006  557796  932043
    Pine 8  6/9/2006  8/3/2006  557797  932044
    Pine 9  6/9/2006  8/3/2006  557798  932045
    Pine 10  6/9/2006  8/3/2006  557799  932046

     

    Gold Standard Ventures Appendix C Page 44 of 44

     



    SOUTH RAILROAD PROJECT
    FORM 43-101F1 TECHNICAL REPORT

    APPENDIX C – BREAKDOWN OF MINERAL RESOURCES BY AREA AND OXIDATION STATE

     

    C-1

     



    Appendix C
     
    Resource Tabulations

     

    Dark Star Measured Oxide   Dark Star Measured Transitional
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au 
    0.100  4,582,000  1.37  201,000    0.100  2,150,000  0.69  48,000 
    0.120  4,301,000  1.45  200,000    0.120  1,926,000  0.76  47,000 
    0.140  4,100,000  1.51  200,000    0.140  1,757,000  0.82  46,000 
    0.160  3,945,000  1.57  199,000    0.160  1,640,000  0.87  46,000 
    0.180  3,835,000  1.61  198,000    0.180  1,538,000  0.91  45,000 
    0.200  3,745,000  1.64  198,000    0.200  1,444,000  0.96  45,000 
    0.220  3,672,000  1.67  197,000    0.220  1,379,000  0.99  44,000 
    0.240  3,600,000  1.70  197,000    0.240  1,287,000  1.05  43,000 
    0.260  3,535,000  1.73  196,000    0.260  1,220,000  1.09  43,000 
    0.280  3,483,000  1.75  196,000    0.280  1,155,000  1.14  42,000 
    0.300  3,420,000  1.77  195,000    0.300  1,110,000  1.17  42,000 
    0.400  3,052,000  1.95  191,000    0.400  887,000  1.38  39,000 
    0.500  2,785,000  2.09  187,000    0.500  725,000  1.59  37,000 
    0.600  2,489,000  2.27  182,000    0.600  621,000  1.77  35,000 
    0.700  2,256,000  2.44  177,000    0.700  537,000  1.94  34,000 
    0.800  2,087,000  2.58  173,000    0.800  451,000  2.17  31,000 
    0.900  1,958,000  2.69  169,000    0.900  397,000  2.35  30,000 
    1.000  1,842,000  2.80  166,000    1.000  355,000  2.51  29,000 
     
    Dark Star Refractory Measured          
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au           
    0.000   -  0.000           
    0.000   -   0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.000           
    0.000  0.00           

     



    Appendix C

     

    Dark Star Indicated Oxide   Dark Star Indicated Transitional
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au 
    0.100  16,696,000  0.80  431,000    0.100  13,480,000  0.50  217,000 
    0.120  15,574,000  0.85  427,000    0.120  12,465,000  0.53  214,000 
    0.140  14,638,000  0.90  423,000    0.140  11,682,000  0.56  210,000 
    0.160  13,966,000  0.93  420,000    0.160  10,963,000  0.59  207,000 
    0.180  13,376,000  0.97  416,000    0.180  10,359,000  0.61  204,000 
    0.200  12,862,000  1.00  413,000    0.200  9,806,000  0.64  200,000 
    0.220  12,456,000  1.03  411,000    0.220  9,272,000  0.66  197,000 
    0.240  11,976,000  1.06  407,000    0.240  8,827,000  0.68  193,000 
    0.260  11,618,000  1.08  404,000    0.260  8,465,000  0.70  190,000 
    0.280  11,295,000  1.11  401,000    0.280  8,059,000  0.72  187,000 
    0.300  10,968,000  1.13  398,000    0.300  7,676,000  0.74  183,000 
    0.400  9,277,000  1.27  379,000    0.400  5,740,000  0.88  162,000 
    0.500  7,814,000  1.42  358,000    0.500  4,185,000  1.03  139,000 
    0.600  6,532,000  1.60  335,000    0.600  3,020,000  1.22  119,000 
    0.700  5,451,000  1.79  313,000    0.700  2,315,000  1.40  104,000 
    0.800  4,631,000  1.97  293,000    0.800  1,827,000  1.57  92,000 
    0.900  4,032,000  2.14  277,000    0.900  1,499,000  1.73  83,000 
    1.000  3,565,000  2.29  263,000    1.000  1,267,000  1.88  76,000 
     
    Dark Star Indicated Refractory          
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au           
    0.100  1,990,000  0.905  58,000           
    0.120  1,828,000  0.976  57,000           
    0.140  1,733,000  1.022  57,000           
    0.160  1,659,000  1.061  57,000           
    0.180  1,583,000  1.104  56,000           
    0.200  1,518,000  1.143  56,000           
    0.220  1,454,000  1.184  55,000           
    0.240  1,391,000  1.228  55,000           
    0.260  1,344,000  1.262  55,000           
    0.280  1,294,000  1.300  54,000           
    0.300  1,252,000  1.334  54,000           
    0.400  1,027,000  1.551  51,000           
    0.500  860,000  1.764  49,000           
    0.600  749,000  1.945  47,000           
    0.700  690,000  2.057  46,000           
    0.800  632,000  2.175  44,000           
    0.900  586,000  2.279  43,000           
    1.000  540,000  2.39  42,000           

     

    Mine Development Associates Appendix C Page 1 of 9

     



    Appendix C

     

    Dark Star Measured and Indicated Oxide  Dark Star Measured and Indicated Transitional
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au  Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au 
    0.100  21,278,000  0.92  632,000  0.100  15,630,000  0.53  265,000 
    0.120  19,875,000  0.98  627,000  0.120  14,391,000  0.56  261,000 
    0.140  18,738,000  1.03  623,000  0.140  13,439,000  0.59  256,000 
    0.160  17,911,000  1.07  619,000  0.160  12,603,000  0.62  253,000 
    0.180  17,211,000  1.11  614,000  0.180  11,897,000  0.65  249,000 
    0.200  16,607,000  1.14  611,000  0.200  11,250,000  0.68  245,000 
    0.220  16,128,000  1.17  608,000  0.220  10,651,000  0.70  241,000 
    0.240  15,576,000  1.21  604,000  0.240  10,114,000  0.73  236,000 
    0.260  15,153,000  1.23  600,000  0.260  9,685,000  0.75  233,000 
    0.280  14,778,000  1.26  597,000  0.280  9,214,000  0.77  229,000 
    0.300  14,388,000  1.28  593,000  0.300  8,786,000  0.80  225,000 
    0.400  12,329,000  1.44  570,000  0.400  6,627,000  0.94  201,000 
    0.500  10,599,000  1.60  545,000  0.500  4,910,000  1.11  176,000 
    0.600  9,021,000  1.78  517,000  0.600  3,641,000  1.32  154,000 
    0.700  7,707,000  1.98  490,000  0.700  2,852,000  1.51  138,000 
    0.800  6,718,000  2.16  466,000  0.800  2,278,000  1.68  123,000 
    0.900  5,990,000  2.32  446,000  0.900  1,896,000  1.85  113,000 
    1.000  5,407,000  2.47  429,000  1.000  1,622,000  2.01  105,000 
     
    Dark Star Measured and Indicated Refractory         
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au         
    0.100  1,990,000  0.907  58,000         
    0.120  1,733,000  1.023  57,000         
    0.140  1,659,000  1.069  57,000         
    0.160  1,583,000  1.100  56,000         
    0.180  1,518,000  1.147  56,000         
    0.200  1,454,000  1.177  55,000         
    0.220  1,391,000  1.230  55,000         
    0.240  1,344,000  1.273  55,000         
    0.260  1,294,000  1.298  54,000         
    0.280  1,252,000  1.342  54,000         
    0.300  1,027,000  1.545  51,000         
    0.400  860,000  1.772  49,000         
    0.500  749,000  1.952  47,000         
    0.600  690,000  2.074  46,000         
    0.700  632,000  2.165  44,000         
    0.800  586,000  2.282  43,000         
    0.900  586,000  2.282  43,000         
    1.000  540,000  2.42  42,000         

     

    Mine Development Associates Appendix C Page 2 of 9

     



    Appendix C

     

    Dark Star Inferred Oxide   Dark Star Inferred Transitional
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au 
    0.100  1,098,000  0.57  20,000    0.100  1,544,000  0.49  24,000 
    0.120  1,031,000  0.60  20,000    0.120  1,436,000  0.52  24,000 
    0.140  976,000  0.63  20,000    0.140  1,356,000  0.54  24,000 
    0.160  936,000  0.65  19,000    0.160  1,291,000  0.56  23,000 
    0.180  911,000  0.66  19,000    0.180  1,220,000  0.59  23,000 
    0.200  868,000  0.68  19,000    0.200  1,142,000  0.61  22,000 
    0.220  843,000  0.70  19,000    0.220  1,074,000  0.64  22,000 
    0.240  809,000  0.72  19,000    0.240  1,007,000  0.67  22,000 
    0.260  775,000  0.74  18,000    0.260  957,000  0.69  21,000 
    0.280  742,000  0.76  18,000    0.280  922,000  0.70  21,000 
    0.300  706,000  0.78  18,000    0.300  878,000  0.72  20,000 
    0.400  569,000  0.88  16,000    0.400  681,000  0.83  18,000 
    0.500  454,000  0.99  15,000    0.500  518,000  0.95  16,000 
    0.600  360,000  1.11  13,000    0.600  324,000  1.20  12,000 
    0.700  290,000  1.22  11,000    0.700  233,000  1.42  11,000 
    0.800  238,000  1.33  10,000    0.800  177,000  1.63  9,000 
    0.900  199,000  1.42  9,000    0.900  148,000  1.79  8,000 
    1.000  150,000  1.57  8,000    1.000  133,000  1.88  8,000 
     
    Dark Star Inferred Refractory          
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au           
    0.100  259,000  1.606  13,000           
    0.120  252,000  1.647  13,000           
    0.140  247,000  1.682  13,000           
    0.160  244,000  1.697  13,000           
    0.180  239,000  1.733  13,000           
    0.200  239,000  1.733  13,000           
    0.220  237,000  1.744  13,000           
    0.240  228,000  1.806  13,000           
    0.260  220,000  1.857  13,000           
    0.280  219,000  1.871  13,000           
    0.300  211,000  1.927  13,000           
    0.400  196,000  2.045  13,000           
    0.500  176,000  2.226  13,000           
    0.600  169,000  2.300  12,000           
    0.700  167,000  2.319  12,000           
    0.800  156,000  2.431  12,000           
    0.900  152,000  2.471  12,000           
    1.000  147,000  2.53  12,000           

     

    Mine Development Associates Appendix C Page 3 of 9

     



    Appendix C

     

    Pinion Measured Oxide
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au  g Ag/t  oz Ag 
    0.100  1,196,000  0.60  23,000  4.93  190,000 
    0.120  1,175,000  0.61  23,000  5.00  189,000 
    0.140  1,144,000  0.62  23,000  5.09  187,000 
    0.160  1,127,000  0.63  23,000  5.15  187,000 
    0.180  1,098,000  0.64  22,000  5.22  184,000 
    0.200  1,065,000  0.65  22,000  5.33  182,000 
    0.220  1,015,000  0.67  22,000  5.47  179,000 
    0.240  971,000  0.69  22,000  5.64  176,000 
    0.260  932,000  0.71  21,000  5.67  170,000 
    0.280  886,000  0.73  21,000  5.77  164,000 
    0.300  851,000  0.75  21,000  5.88  161,000 
    0.400  680,000  0.85  19,000  6.18  135,000 
    0.500  513,000  0.99  16,000  6.73  111,000 
    0.600  399,000  1.11  14,000  7.23  93,000 
    0.700  312,000  1.24  12,000  7.74  78,000 
    0.800  258,000  1.35  11,000  7.68  64,000 
    0.900  208,000  1.47  10,000  7.87  53,000 
    1.000  171,000  1.58  9,000  8.15  45,000 
     
    Pinion Measured Transitional
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au  g Ag/t  oz Ag 
    0.100  172,000  0.67  4,000  5.32  29,000 
    0.120  166,000  0.69  4,000  5.46  29,000 
    0.140  160,000  0.71  4,000  5.61  29,000 
    0.160  147,000  0.76  4,000  5.93  28,000 
    0.180  141,000  0.78  4,000  6.10  28,000 
    0.200  132,000  0.83  3,000  6.46  27,000 
    0.220  124,000  0.87  3,000  6.55  26,000 
    0.240  118,000  0.90  3,000  6.74  26,000 
    0.260  112,000  0.93  3,000  6.96  25,000 
    0.280  110,000  0.94  3,000  7.05  25,000 
    0.300  108,000  0.95  3,000  7.02  24,000 
    0.400  85,000  1.12  3,000  7.34  20,000 
    0.500  72,000  1.24  3,000  6.91  16,000 
    0.600  61,000  1.37  3,000  7.42  15,000 
    0.700  51,000  1.51  2,000  7.62  12,000 
    0.800  45,000  1.61  2,000  7.27  11,000 
    0.900  39,000  1.72  2,000  7.81  10,000 
    1.000  34,000  1.85  2,000  8.15  9,000 

     

    Mine Development Associates Appendix C Page 4 of 9

     



    Appendix C

     

    Pinion Indicated Oxide
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au  g Ag/t  oz Ag 
    0.100  27,064,000  0.54  474,000  3.99  3,476,000 
    0.120  26,190,000  0.56  471,000  4.08  3,437,000 
    0.140  25,375,000  0.57  467,000  4.17  3,400,000 
    0.160  24,577,000  0.59  463,000  4.26  3,363,000 
    0.180  23,843,000  0.60  459,000  4.34  3,329,000 
    0.200  23,035,000  0.61  454,000  4.44  3,288,000 
    0.220  22,306,000  0.63  449,000  4.53  3,246,000 
    0.240  21,584,000  0.64  444,000  4.60  3,194,000 
    0.260  20,913,000  0.65  439,000  4.68  3,146,000 
    0.280  20,047,000  0.67  431,000  4.77  3,073,000 
    0.300  19,292,000  0.68  424,000  4.84  3,004,000 
    0.400  15,495,000  0.77  382,000  5.24  2,610,000 
    0.500  12,061,000  0.86  332,000  5.57  2,161,000 
    0.600  9,024,000  0.96  278,000  5.89  1,708,000 
    0.700  6,654,000  1.07  229,000  6.09  1,302,000 
    0.800  4,885,000  1.19  186,000  6.10  958,000 
    0.900  3,679,000  1.30  153,000  6.26  741,000 
    1.000  2,723,000  1.42  124,000  6.43  563,000 
     
    Pinion Indicated Transitional
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au  g Ag/t  oz Ag 
    0.100  2,432,000  0.65  50,000  4.10  321,000 
    0.120  2,328,000  0.67  50,000  4.23  317,000 
    0.140  2,246,000  0.69  50,000  4.33  313,000 
    0.160  2,174,000  0.71  49,000  4.44  310,000 
    0.180  2,116,000  0.72  49,000  4.52  308,000 
    0.200  2,077,000  0.73  49,000  4.57  305,000 
    0.220  1,989,000  0.75  48,000  4.67  299,000 
    0.240  1,918,000  0.77  48,000  4.76  294,000 
    0.260  1,861,000  0.79  47,000  4.82  288,000 
    0.280  1,791,000  0.81  47,000  4.82  277,000 
    0.300  1,723,000  0.83  46,000  4.87  270,000 
    0.400  1,402,000  0.94  42,000  5.13  231,000 
    0.500  1,115,000  1.07  38,000  5.20  187,000 
    0.600  835,000  1.24  33,000  4.91  132,000 
    0.700  664,000  1.39  30,000  4.66  100,000 
    0.800  536,000  1.55  27,000  4.45  77,000 
    0.900  452,000  1.68  24,000  4.21  61,000 
    1.000  380,000  1.81  22,000  3.86  47,000 

     

    Mine Development Associates Appendix C Page 5 of 9

     



    Appendix C

     

    Pinion Measured and Indicated Oxide
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au  g Au/t  oz Au 
    0.100  28,260,000  0.55  497,000  229.43  3,666,000 
    0.120  27,365,000  0.56  494,000  228.30  3,626,000 
    0.140  26,519,000  0.57  490,000  227.69  3,587,000 
    0.160  25,704,000  0.59  486,000  227.20  3,550,000 
    0.180  24,941,000  0.60  481,000  227.17  3,513,000 
    0.200  24,100,000  0.61  476,000  226.74  3,470,000 
    0.220  23,321,000  0.63  471,000  226.18  3,425,000 
    0.240  22,555,000  0.64  466,000  224.93  3,370,000 
    0.260  21,845,000  0.65  460,000  224.22  3,316,000 
    0.280  20,933,000  0.67  452,000  222.75  3,237,000 
    0.300  20,143,000  0.69  445,000  221.22  3,165,000 
    0.400  16,175,000  0.77  401,000  212.92  2,745,000 
    0.500  12,574,000  0.86  348,000  203.07  2,272,000 
    0.600  9,423,000  0.96  292,000  191.84  1,801,000 
    0.700  6,966,000  1.08  241,000  178.10  1,380,000 
    0.800  5,143,000  1.19  197,000  161.36  1,022,000 
    0.900  3,887,000  1.30  163,000  151.51  794,000 
    1.000  2,894,000  1.43  133,000  142.19  608,000 
     
    Pinion Measured and Indicated Transitional
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au  g Au/t  oz Au 
    0.100  2,604,000  0.65  54,000  201.60  350,000 
    0.120  2,494,000  0.67  54,000  199.29  346,000 
    0.140  2,406,000  0.70  54,000  196.99  342,000 
    0.160  2,321,000  0.71  53,000  198.36  338,000 
    0.180  2,257,000  0.73  53,000  197.18  336,000 
    0.200  2,209,000  0.73  52,000  198.58  332,000 
    0.220  2,113,000  0.75  51,000  198.21  325,000 
    0.240  2,036,000  0.78  51,000  195.16  320,000 
    0.260  1,973,000  0.79  50,000  194.71  313,000 
    0.280  1,901,000  0.82  50,000  187.86  302,000 
    0.300  1,831,000  0.83  49,000  186.62  294,000 
    0.400  1,487,000  0.94  45,000  173.49  251,000 
    0.500  1,187,000  1.07  41,000  154.00  203,000 
    0.600  896,000  1.25  36,000  127.01  147,000 
    0.700  715,000  1.39  32,000  108.86  112,000 
    0.800  581,000  1.55  29,000  94.38  88,000 
    0.900  491,000  1.65  26,000  84.94  71,000 
    1.000  414,000  1.80  24,000  72.57  56,000 

     

    Mine Development Associates Appendix C Page 6 of 9

     



    Appendix C

     

    Pinion Inferred Oxide
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au  g Ag/t  oz Ag 
    0.100  9,922,000  0.60  192,000  3.71  1,182,000 
    0.120  9,617,000  0.62  190,000  3.79  1,171,000 
    0.140  9,221,000  0.64  189,000  3.88  1,150,000 
    0.160  8,912,000  0.65  187,000  3.96  1,136,000 
    0.180  8,591,000  0.67  186,000  4.06  1,121,000 
    0.200  8,323,000  0.69  184,000  4.13  1,106,000 
    0.220  8,046,000  0.70  182,000  4.22  1,091,000 
    0.240  7,764,000  0.72  180,000  4.31  1,076,000 
    0.260  7,509,000  0.74  178,000  4.39  1,059,000 
    0.280  7,260,000  0.75  176,000  4.46  1,041,000 
    0.300  7,004,000  0.77  173,000  4.54  1,022,000 
    0.400  5,863,000  0.85  161,000  4.85  914,000 
    0.500  4,867,000  0.93  146,000  5.06  791,000 
    0.600  3,915,000  1.03  129,000  5.18  652,000 
    0.700  3,088,000  1.13  112,000  5.20  516,000 
    0.800  2,412,000  1.23  96,000  5.20  403,000 
    0.900  1,804,000  1.37  79,000  5.11  296,000 
    1.000  1,381,000  1.49  66,000  5.06  225,000 
     
    Pinion Inferred Transitional
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au  g Ag/t  oz Ag 
    0.100  1,685,000  0.66  36,000  3.24  176,000 
    0.120  1,637,000  0.68  36,000  3.31  174,000 
    0.140  1,589,000  0.69  35,000  3.37  172,000 
    0.160  1,540,000  0.71  35,000  3.44  170,000 
    0.180  1,500,000  0.73  35,000  3.49  168,000 
    0.200  1,446,000  0.75  35,000  3.52  164,000 
    0.220  1,408,000  0.76  34,000  3.55  161,000 
    0.240  1,370,000  0.77  34,000  3.59  158,000 
    0.260  1,307,000  0.80  34,000  3.61  152,000 
    0.280  1,252,000  0.82  33,000  3.59  145,000 
    0.300  1,199,000  0.85  33,000  3.48  134,000 
    0.400  967,000  0.97  30,000  3.38  105,000 
    0.500  757,000  1.11  27,000  3.23  79,000 
    0.600  610,000  1.24  24,000  3.02  59,000 
    0.700  521,000  1.34  23,000  2.99  50,000 
    0.800  459,000  1.43  21,000  2.96  44,000 
    0.900  383,000  1.54  19,000  2.79  34,000 
    1.000  316,000  1.67  17,000  2.57  26,000 

     

    Mine Development Associates Appendix C Page 7 of 9

     



    Appendix C

     

    Jasperoid Wash Inferred Oxide Jasperoid Wash Inferred Transitional
    Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au  Cutoff
    g Au/t 
    Tonnes  g Au/t  oz Au 
    0.100  12,438,000  0.29  116,000  0.100  517,000  0.26  4,000 
    0.120  11,207,000  0.31  111,000  0.120  430,000  0.29  4,000 
    0.140  10,188,000  0.33  107,000  0.140  381,000  0.31  4,000 
    0.160  9,341,000  0.34  103,000  0.160  340,000  0.33  4,000 
    0.180  8,911,000  0.35  101,000  0.180  326,000  0.34  4,000 
    0.200  8,529,000  0.36  99,000  0.200  296,000  0.35  3,000 
    0.220  7,878,000  0.37  94,000  0.220  261,000  0.37  3,000 
    0.240  6,432,000  0.40  83,000  0.240  195,000  0.42  3,000 
    0.260  5,171,000  0.44  73,000  0.260  159,000  0.46  2,000 
    0.280  4,444,000  0.47  67,000  0.280  136,000  0.49  2,000 
    0.300  3,903,000  0.49  62,000  0.300  121,000  0.51  2,000 
    0.400  2,135,000  0.62  43,000  0.400  84,000  0.59  2,000 
    0.500  1,470,000  0.70  33,000  0.500  59,000  0.65  1,000 
    0.600  971,000  0.78  24,000  0.600  39,000  0.69  1,000 
    0.700  626,000  0.85  17,000  0.700  0.00 
    0.800  322,000  0.95  10,000  0.800  0.00 
    0.900  154,000  1.06  5,000  0.900  0.00 
    1.000  80,000  1.16  3,000    1.000  0.00 

     

    Mine Development Associates Appendix C Page 8 of 9