EX-2 4 exhibit2.htm MATERIAL CHANGE REPORT OF THE REGISTRANT DATED SEPTEMBER 9, 2010 Material Change Report of the Registrant dated, September 9, 2010


FORM 51-102F3

MATERIAL CHANGE REPORT



Item 1.

Name and Address of Company


CARDERO RESOURCE CORP. (the “Issuer”)

Suite 1901, 1177 West Hastings Street

Vancouver, B.C.

V6E 2K3


Item 2.

Date of Material Change


August 31, 2010


Item 3.

News Release


The date of the press release issued pursuant to section 7.1 of National Instrument 51-102 with respect to the material change disclosed in this report is August 31, 2010.  The material change report was issued in Vancouver, British Columbia through the facilities of the Toronto Stock Exchange, Marketwire, Canada Stockwatch and Market News Publishing.


Item 4.

Summary of Material Change


The Issuer reports drill results from its Ferro-Titanium TiTac and Longnose projects in northern Minnesota, USA.


Item 5.

Full Description of Material Change


The Issuer reports positive initial drill results from its Ferro-Titanium TiTac and Longnose projects in northern Minnesota, USA.  Initial results indicate the presence of semi-massive to massive iron and titanium oxide and associated copper mineralization over exceptionally broad intervals.  The Issuer has been aggresively drilling and evaluating potential resources at TiTac and Longnose - both projects previously having been subject to historical exploration with Longnose, according to BHP Minerals (now BHP Billiton) being “the largest known ilmenite (FeTiO3) resource in North America.”


The Issuer has completed a total of 36 diamond drill holes at the projects for a total of 11,506 metres with significant iron-titanium and copper mineralization being intersected in the majority of the holes at both projects.  Phase one drilling has been completed and SRK Consulting of Vancouver, Canada has been retained to prepare an independent NI 43-101 resource estimate upon receipt of all remaining assays.  Mineralization remains open for expansion and, contingent on results, it is anticipated that additional resource definition and expansion drilling will re-commence in late-2010.


Drilling Program


The Issuer initiated exploration and resource drilling in mid-February 2010, aiming to complete a maiden NI 43-101 compliant resource estimate on both projects.  Drilling in the Spring was hampered by unseasonably warm weather and early ground break-up.  As a result, drilling at the higher priority Longnose was severely curtailed with the drill moving to drier areas of the project.  Consequently, drilling has focussed on the lower priority TiTac project, while drilling at Longnose is now scheduled to recommence in late-2010 once the ground is frozen.


A total of 36 drillholes (including two abandoned) have been completed of which 6 provided an initial test of the Longnose project where the moderately dipping mineralized unit was intersected in all four holes.  The remaining 30 holes focused on the TiTac project.


A total of 17 drillholes were originally planned for TiTac and drilling commenced on TiTac North (total of 8 holes drilled).  Holes 3 to 8 intersected the main intrusion with oxide mineralization ranging from 5% to 60% total oxide mineralization (predominantly ilmenite and magnetite).  Due to spring breakup, additional drilling on TiTac North was deferred until the 2010-2011 winter drilling season.  Six drillholes were originally planned for TiTac South but, due to extensive mineralized oxide intersections, an additional 17 holes were drilled, for a total of 23 holes, on TiTac South.  The additional drillholes were targeted in consultation with resource specialists of SRK Consulting.  Highlights are reported here in Table 1.  Additional results are pending from holes 14 to 19, and the remainder of the holes are currently being sampled on site.


Future Work


Winter drilling, scheduled to commence in late 2010, will focus on completion of resource definition drilling at Longnose and TiTac North.  The program is expected to total 5,000-to-15,000 metres, in addition to the 11,506 metres already completed.  The resource estimate at TiTac South could be completed by the end of 2010.  Additional NI 43-101 compliant resource estimates will then be completed for Longnose and TiTac North as results become available.


Drill Results -- Highlights


Table 1: Drill results from TiTac and Longnose iron-titanium projects in Minnesota

DRILLHOLE

FROM

(metres)

TO

(metres)

WIDTH

(metres)

TiO2 %

Fe2O3 %

Cu %

TTC-003-10

TiTac North

interval

32.31

68.88

36.58

16.77%

45.85%

0.080%

 

including

39.93

62.79

22.86

19.01%

50.19%

0.068%

 

interval

94.18

103.94

9.76

18.76%

30.93%

0.228%

 

interval

142.04

151.18

9.14

15.09%

32.43%

0.212%

 

interval

251.76

278.13

26.37

13.81%

30.19%

0.258%

        

TCC-004-10

TiTac North

interval

72.15

97.84

25.69

15.03%

28.23%

0.227%

 

interval

206.35

226.92

20.57

18.26%

43.80%

0.226%

 

interval

235.76

253.59

17.83

14.90%

33.46%

0.241%

 

interval

259.99

287.12

27.13

17.43%

34.06%

0.230%

        

TTC-005-10

TiTac North

interval

128.23

140.51

12.28

16.77%

28.76%

0.288%

 

interval

207.87

244.75

36.88

16.45%

38.07%

0.260%

 

interval

263.96

278.13

14.17

18.00%

32.75%

0.272%

 

interval

297.48

469.70

172.22

12.88%

38.48%

0.152%

 

including

297.48

393.50

96.02

14.35%

43.06%

0.095%

 

including

306.63

358.44

51.82

16.84%

49.59%

0.070%

        

TTC-009-10

TiTac South

interval

44.35

275.84

231.50

11.44%

28.05%

0.160%

 

including

153.16

255.79

102.63

16.44%

32.91%

0.198%

 

including

153.16

235.00

81.84

17.72%

34.71%

0.222%

        

TTC-010-10

TiTac South

interval

282.24

391.97

109.73

13.49%

30.82%

0.159%

 

including

335.58

391.97

56.39

15.30%

31.51%

0.222%

 

including

366.06

391.97

25.91

19.77%

30.06%

0.319%

        

TTC-011-10

TiTac South

interval

104.85

168.86

64.01

15.91%

40.03%

0.211%

        

TTC-012-10

TiTac South

interval

84.12

115.70

31.58

12.85%

25.92%

0.165%

 

interval

258.47

363.02

104.55

14.66%

24.75%

0.193%

        

TTC-013-10

TiTac South

interval

94.49

144.78

50.29

16.30%

28.81%

0.240%

        

TTC-014-10

TiTac South

interval

33.83

566.62

532.79

14.85%

28.79%

0.203%

 

including

151.64

209.09

57.46

16.45%

31.37 %

0.180%

 

including

228.60

432.21

203.61

18.76%

29.34%

0.330%

 

including

228.60

373.68

145.08

20.19%

30.35%

0.397%

        

LNG-001-10

Longnose

interval

49.07

88.09

39.01

20.63%

35.78%

0.252%

 

interval

99.67

181.20

81.53

20.51%

43.51 %

0.102%

 

including

123.44

178.61

55.17

23.07%

47.13%

0.084%

        

LNG-003-10

Longnose

interval

5.18

73.21

68.03

17.47%

37.80%

0.104%

 

including

5.18

42.98

37.80

21.05%

38.79%

0.131%

        

LNG-004-10

Longnose

interval

1.22

39.93

38.71

17.89%

27.08%

0.069%


[exhibit2002.jpg]

Figure 1: Drilling completed on TiTac project – some platforms have multiple drillholes


Project Background


The Issuer has acquired and is exploring two iron-titanium projects on the edge of the Duluth Complex in north-eastern Minnesota.


The Longnose Project was first discovered in the 1950’s through aeromagnetic and gravity geophysical surveys, and was first drilled by Bear Creek Mining Company in 1958.  The Partridge River Intrusion (PRI) hosts the Longnose body, which dominantly consists of oxide-bearing peridotite, pyroxenite, and semi-massive and massive iron and titanium oxide.  BHP Minerals previously produced a historic (pre-NI 43-101 standards), “probable reserve” at Longnose, estimating 27.57 million tonnes at 21.3% TiO2, stating at the time that Longnose is “… the largest know ilmenite resource in North America.”  However, the Issuer cautions that both the BHP report and the included resource estimate were prepared before the introduction of NI 43-101, and are therefore historical in nature and the Issuer is not treating such resources as a current resource under NI 43-101.  Investors are further cautioned that a qualified person has not yet completed sufficient work to be able to verify the historical resources, and therefore they should not be relied upon.


The TiTac Project was first drilled by U.S. Steel Corporation after it discovered several magnetic highs in the area.  The TiTac body is hosted by anorthositic and troctolitic rocks of the Anorthositic Series, the Boulder Lake intrusion, and the Western Margin intrusion.  The TiTac body dominantly consists of oxide-bearing pyroxenite and peridotite, and massive and semi-massive Fe and Ti oxide.


Titanium dioxide (TiO2) is primarily used as a white powder pigment due to its brightness and very high refractive index.  It provides excellent opacity to products such as paints, coatings, plastics, paper, inks, fibres, food and cosmetics. Titanium metal is also used as a light, high-strength and corrosion-resistant material in the fabrication of specialized components in the aeronautical and aerospace industries, and in high-end sporting goods and medical components.


Recent North America contract prices for titanium dioxide have been in the range of US$1.17-1.34/lb.


Qualified Person


EurGeol Keith J. Henderson, P.Geo., The Issuer’s Vice-President Exploration and a qualified person as defined by National Instrument 43-101, has supervised the preparation of the scientific and technical information that forms the basis for this news release (other than historical data) and has approved the disclosure herein.  Mr. Henderson is not independent of the Issuer as he is an officer and a director and holds common shares and incentive stock options.


The analytical results were reviewed by Tansy O’Connor-Parsons, The Issuer’s Senior Geochemist.  The Issuer on-site personnel rigorously collect and track samples which are then security sealed and shipped to ALS Laboratory Group.  ALS Laboratory Group’s quality system complies with the requirements for the international standards ISO 9001:2000 and ISO 17025:1999.  Analytical accuracy and precision are monitored by the analysis of reagent blanks, reference material and replicate samples.  Quality control is further assured by the use of international and in-house standards.  Certified reference material, blank material, and quarter-core duplicates are inserted at regular intervals into the sample sequence by field personnel prior to shipping in order to independently assess analytical accuracy and precision.  In addition, representative blind duplicate samples are routinely forwarded an ISO-compliant third party laboratory for additional quality control.


ABOUT CARDERO RESOURCE CORP.


The Issuer's focus through 2010 is to realise the considerable value it believes is locked in its remaining iron ore assets in the Marcona District of southern Peru, and in Minnesota, USA while continuing to progress its base and precious metal exploration projects in Argentina and Mexico, and aggressively seek out and potentially acquire new advanced stage projects.  The common shares of the Issuer are currently listed on the Toronto Stock Exchange (symbol CDU), the NYSE-Amex (symbol CDY) and the Frankfurt Stock Exchange (symbol CR5).  For further details on the Issuer readers are referred to the Issuer’s web site (www.cardero.com), Canadian regulatory filings on SEDAR at www.sedar.com and United States regulatory filings on EDGAR at www.sec.gov.


Cautionary Note Regarding Forward-Looking Statements


This material change report contains forward-looking statements within the meaning of Section 27A of the Securities Act and Section 27E of the Exchange Act.  All statements, other than statements of historical fact, included herein including, without limitation, statements regarding the anticipated content, commencement and cost of exploration programs, anticipated exploration program results, the discovery and delineation of mineral deposits/resources/reserves, the delineation of NI 43-101 compliant estimated resources at TiTac and Longnose, business and financing plans and business trends, are forward-looking statements.  Although the Issuer believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct.  Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events.  The Issuer cautions investors that any forward-looking statements by the Issuer are not guarantees of future results or performance, and that actual results may differ materially from those in forward looking statements as a result of various factors, including, but not limited to, variations in the nature, quality and quantity of any mineral deposits that may be located, variations in the market for, and pricing of, any mineral products the Issuer may produce or plan to produce, the Issuer’s inability to obtain any necessary permits, consents or authorizations required for its activities, the Issuer’s inability to produce minerals from its properties successfully or profitably, to continue its projected growth, to raise the necessary capital or to be fully able to implement its business strategies, and other risks and uncertainties disclosed in the Issuer’s Annul Information Form filed with certain Canadian Securities Commissions and annual report on Form 40-F filed with the United States Securities and Exchange Commission, and other information released by the Issuer and filed with the appropriate regulatory agencies.  All of the Issuer’s Canadian public disclosure filings may be accessed via www.sedar.com and its United States public disclosure filings may be accessed via www.sec.gov, and readers are urged to review these materials, including the technical reports filed with respect to the Issuer’s mineral properties.


Item 6.

Reliance on subsection 7.1(2) or (3) of National Instrument 51-102


Not applicable


Item 7.

Omitted Information


No information has been omitted on the basis that it is confidential.


Item 8.

Senior Officer


The following senior officer of the Issuer is knowledgeable about the material change disclosed in this report.


Keith J. Henderson, Vice President-Exploration

Business Telephone No.:  (604) 408-7488 Ext. 229


Item 9.

Date of Report


September 9, 2010