XML 118 R15.htm IDEA: XBRL DOCUMENT v3.22.4
GOODWILL, INTANGIBLE AND TANGIBLE ASSETS
12 Months Ended
Dec. 31, 2022
Intangible Assets [Abstract]  
GOODWILL, INTANGIBLE AND TANGIBLE ASSETS NOTE 5: GOODWILL, INTANGIBLE AND TANGIBLE ASSETS
5.1 Goodwill and intangible assets
The carrying amounts of goodwill and intangible assets are summarized as follows:
 December 31,
 20222021
Goodwill on acquisitions3,767 3,931 
Concessions, patents and licenses208 195 
Customer relationships and trade marks133 80 
Emission rights1
748 167 
Other47 52 
Total4,903 4,425 
1.Including 671 at December 31, 2022 delivered from forward purchases at maturity (see note 6.1.5).
Goodwill
Goodwill arising on an acquisition is recognized as previously described within the business combinations section in note 2.2.3. Goodwill is allocated to those groups of cash-generating units that are expected to benefit from the business combination in which the goodwill arose and in all cases is at the operating segment level, which represents the lowest level at which goodwill is monitored for internal management purposes.
Goodwill acquired in business combinations for each of the Company’s operating segments is as follows:
 December 31, 2021
Acquisitions1
Foreign exchange differences and other movementsDecember 31, 2022
NAFTA1,576 — (36)1,540 
Brazil1,010 — 60 1,070 
Europe499 55 (31)523 
ACIS846 — (212)634 
Total3,931 55 (219)3,767 
1. See note 2.2.4
 December 31, 2020AcquisitionsForeign exchange differences and other movementsDecember 31, 2021
NAFTA1,566 — 10 1,576 
Brazil1,069 — (59)1,010 
Europe540 — (41)499 
ACIS817 — 29 846 
Total3,992 — (61)3,931 
Intangible assets are recognized only when it is probable that the expected future economic benefits attributable to the assets will accrue to the Company and the cost can be reliably measured. Intangible assets acquired separately by ArcelorMittal are initially recorded at cost and those acquired in a business combination are initially recorded at fair value at the date of the business combination. These primarily include the cost of technology and licenses purchased from third parties and operating authorizations granted by governments or other public bodies (concessions). Intangible assets are amortized on a straight-line basis over their estimated economic useful lives, which typically do not exceed five years. Amortization is included in the consolidated statements of operations as part of cost of sales.
ArcelorMittal’s industrial sites which are regulated by the European Directive 2003/87/EC of October 13, 2003 on carbon dioxide (“CO2”) emission rights, effective as of January 1, 2005, are located primarily in Belgium, France, Germany, Luxembourg, Poland and Spain. In Ontario, Canada, ArcelorMittal's operations have been subject to output based pricing system regulations since January 1, 2019 but effective January 1, 2022, they are regulated on carbon pricing under the Ontario Emissions Performance System (“OEPS”). In South Africa, a CO2 tax system was introduced in 2019.
Emission rights allocated to the Company on a no-charge basis pursuant to the annual national allocation plan are recorded at nil value and purchased emission rights are recorded at cost.
Other intangible assets are summarized as follows:
 Concessions, patents and licensesCustomer relationships and trade marksOtherTotal
Cost    
At December 31, 2020400 1,148 180 1,728 
Acquisitions1
35 — 210 245 
Disposals(6)— — (6)
Foreign exchange differences(54)(69)(21)(144)
Transfers from assets held for sale12 — 11 23 
Transfers and other movements30 10 42 
At December 31, 2021417 1,081 390 1,888 
Acquisitions1
54 — 743 797 
Acquisitions through business combination (note 2.2.4)11 70 — 81 
Disposal— — (3)(3)
Foreign exchange differences(43)(60)(12)(115)
Transfers and other movements— (128)(121)
At December 31, 2022446 1,091 990 2,527 
Accumulated amortization and impairment losses
At December 31, 2020210 1,058 140 1,408 
Disposal(5)— — (5)
Amortization charge50 33 90 
Foreign exchange differences(44)(64)(13)(121)
Transfers from assets held for sale— 18 
Transfers and other movements— 
At December 31, 2021222 1,001 171 1,394 
Amortization charge50 31 87 
Impairment charge (note 5.3)— — 
Foreign exchange differences(33)(50)(7)(90)
Transfers and other movements(7)— (6)
At December 31, 2022238 958 195 1,391 
Carrying amount
At December 31, 2021195 80 219 494 
At December 31, 2022208 133 795 1,136 
1.Acquisitions in 'other' mainly relate to CO2 emission rights.
Research and development costs not meeting the criteria for capitalization are expensed as incurred. These costs amounted to 286, 270 and 245 for the years ended December 31, 2022, 2021 and 2020, respectively and were recognized in selling, general and administrative expenses.
5.2 Property, plant and equipment and biological assets
Property, plant and equipment is recorded at cost less accumulated depreciation and impairment. Cost includes all related costs directly attributable to the acquisition or construction of the asset. Except for land and assets used in mining activities, property, plant and equipment is depreciated
using the straight-line method over the useful lives of the related assets as presented in the table below.
Asset Category Useful Life Range
LandNot depreciated
Buildings
10 to 50 years
Property plant & equipment
15 to 64 years
Auxiliary facilities
15 to 60 years
Other facilities
5 to 20 years
The Company’s annual review of useful lives leverages on the experience gained from an in-depth review performed every five years, any significant change in the expected pattern of consumption embodied in the asset, and the specialized
knowledge of ArcelorMittal’s network of chief technical officers. The chief technical officer network includes engineers with facility-specific expertise related to plant and equipment used in the principal production units of the Company’s operations. The most recent in-depth review took place in 2019, during which the Company performed a review of the useful lives of its fixed assets and determined there were no material changes to the useful lives of property, plant and equipment. In performing this review, the Company gathered and evaluated data, including commissioning dates, designed capacities, maintenance records and programs, and asset performance history, among other attributes. In accordance with IAS 16, Property, Plant and Equipment, the Company considered this information at the level of components significant in relation to the total cost of the item of plant and equipment. Other factors the Company considered in its determination of useful lives included the expected use of the assets, technical or commercial obsolescence, and operational factors. In addition, the Company considered the accumulated technical experience and knowledge sharing programs that allowed for the exchange of best practices within the chief technical officer network and the deployment of these practices across the Company’s principal production units.
Major improvements, which add to productive capacity or extend the life of an asset, are capitalized, while repairs and maintenance are expensed as incurred. Where a tangible fixed asset comprises major components having different useful lives, these components are accounted for as separate items.
Property, plant and equipment under construction is recorded as construction in progress until it is ready for its intended use; thereafter it is transferred to the related class of property, plant and equipment and depreciated over its estimated useful life. Interest incurred during construction is capitalized if the borrowing cost is directly attributable to the construction. Gains and losses on retirement or disposal of assets are recognized in cost of sales.
The residual values and useful lives of property, plant and equipment are reviewed at each reporting date and adjusted if expectations differ from previous estimates. Depreciation methods applied to property, plant and equipment are reviewed at each reporting date and changed if there has been a significant change in the expected pattern of consumption of the future economic benefits embodied in the asset. In the context of the 2021 annual review of useful lives and considering the expected date of retirement of certain assets in particular blast furnaces, basic oxygen furnaces, sinter plants and coke plants following the implementation of the Company's decarbonization strategy involving the construction of DRI - EAF facilities, the Company decreased estimates of residual useful lives of such items of property, plant and equipment for its flat carbon operations in the EU and in Canada.
Mining assets comprise:
Mineral rights acquired;
Capitalized developmental stripping (as described below in “—Stripping and overburden removal costs”).
Property, plant and equipment used in mining activities is depreciated over its useful life or over the remaining life of the mine, if shorter, and if there is no alternative use. For the majority of assets used in mining activities, the economic benefits from the asset are consumed in a pattern which is linked to the production level and accordingly, assets used in mining activities are primarily depreciated on a units-of-production basis. A unit-of-production is based on the available estimate of proven and probable reserves.  
Capitalization of pre-production expenditures ceases when the mining property is capable of commercial production as it is intended by management. General administration costs that are not directly attributable to a specific exploration area are charged to the consolidated statements of operations.
Mineral Reserves and resources
Mineral Reserves are estimates of the amount of product that can be economically and legally extracted from the Company’s properties. Furthermore, mineral resource estimates constitute the part of a mineral deposit that have the potential to be economically and legally extracted or produced at the time of the resource determination. In order to estimate mineral reserves, estimates are required for a range of geological, technical and economic factors, including quantities, grades, production techniques, recovery rates, production costs, transport costs, commodity demand, commodity prices and exchange rates. The potential for economic viability and estimate of mineral resources is established through high level and conceptual engineering studies.
Estimating the quantity and/or grade of mineral reserves requires the size, shape and depth of ore bodies to be determined by analyzing geological data such as drilling samples. This process may require complex and difficult geological judgments to interpret the data. The estimation of mineral resource is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.
Because the economic assumptions used to estimate mineral reserves and mineral resources change from period to period, and because additional geological data is generated during the course of operations, estimates of mineral reserves and mineral resources may change from period to period. Changes in reported mineral reserves and mineral resources may affect the
Company’s financial results and financial position in a number of ways, including the following:
Asset carrying amounts may be affected due to changes in estimated future cash flows.
Depreciation, depletion and amortization charged in the consolidated statements of operations may change where such charges are determined by the units of production basis, or where the useful economic lives of assets change.
Overburden removal costs recognized in the consolidated statements of financial position or charged to the consolidated statements of operations may change due to changes in stripping ratios or the units of production basis of depreciation.
Decommissioning, site restoration and environmental provisions may change where changes in estimated reserves affect expectations about the timing or cost of these activities.
Stripping and overburden removal costs
In open pit and underground mining operations, it is often necessary to remove overburden and other waste materials to access the deposit from which minerals can be extracted. This process is referred to as stripping. Stripping costs can be incurred before the mining production commences (“developmental stripping”) or during the production stage (“production stripping”).
A mine can operate several open pits that are regarded as separate operations for the purpose of mine planning and production. In this case, stripping costs are accounted for separately, by reference to the ore extracted from each separate pit. If, however, the pits are highly integrated for the purpose of mine planning and production, stripping costs are aggregated.
The determination of whether multiple pit mines are considered separate or integrated operations depends on each mine’s specific circumstances. The following factors would point towards the stripping costs for the individual pits being accounted for separately:
If mining of the second and subsequent pits is conducted consecutively with that of the first pit, rather than concurrently.
If separate investment decisions are made to develop each pit, rather than a single investment decision being made at the outset.
If the pits are operated as separate units in terms of mine planning and the sequencing of overburden and ore mining, rather than as an integrated unit.
If expenditures for additional infrastructure to support the second and subsequent pits are relatively large.
If the pits extract ore from separate and distinct ore bodies, rather than from a single ore body.
The relative importance of each factor is considered by local management to determine whether the stripping costs should be attributed to the individual pit or to the combined output from several pits.
Developmental stripping costs contribute to the future economic benefits of mining operations when the production begins and so are capitalized as tangible assets (construction in progress), whereas production stripping is a part of on-going activities and commences when the production stage of mining operations begins and continues throughout the life of a mine.
Capitalization of developmental stripping costs ends when the commercial production of the minerals commences.
Production stripping costs are incurred to extract the ore in the form of inventories and/or to improve access to an additional component of an ore body or deeper levels of material. Production stripping costs are accounted for as inventories to the extent the benefit from production stripping activity is realized in the form of inventories. Production stripping costs are recognized as a non-current asset (“stripping activity assets”) to the extent it is probable that future economic benefit in terms of improved access to ore will flow to the Company, the components of the ore body for which access has been improved can be identified and the costs relating to the stripping activity associated with that component can be measured reliably.
All stripping costs assets (either stripping activity assets or capitalized developmental stripping costs) are presented within a specific “mining assets” class of property, plant and equipment and then depreciated on a units-of-production basis.
Exploration and evaluation expenditure
Exploration and evaluation activities involve the search for iron ore and coal resources, the determination of technical feasibility and the assessment of commercial viability of an identified resource. Exploration and evaluation activities include:
researching and analyzing historical exploration data;
conducting topographical, geological, geochemical and geophysical studies;
carrying out exploratory drilling, trenching and sampling activities;
drilling, trenching and sampling activities to determine the quantity and grade of the deposit;
examining and testing extraction methods and metallurgical or treatment processes; and
detailed economic feasibility evaluations to determine whether development of the reserves is commercially justified and to plan methods for mine development.
Exploration and evaluation expenditure is charged to the consolidated statements of operations as incurred except in the following circumstances, in which case the expenditure is capitalized: (i) the exploration and evaluation activity is within an area of interest which was previously acquired in a business combination and measured at fair value on acquisition; or (ii) when management has a high degree of confidence in the project’s economic viability and it is probable that future economic benefits will flow to the Company.
Capitalized exploration and evaluation expenditures are generally recorded as a component of property, plant and equipment at cost less impairment charges, unless their nature requires them to be recorded as an intangible asset. As the asset is not available for use, it is not depreciated and all capitalized exploration and evaluation expenditure is monitored for indications of impairment. To the extent that capitalized expenditure is not expected to be recovered, it is recognized as an expense in the consolidated statements of operations.
Cash flows associated with exploration and evaluation expenditure are classified as operating activities when they are related to expenses or as an investing activity when they are related to a capitalized asset in the consolidated statements of cash flows.
Development expenditure
Development is the establishment of access to the mineral reserve and other preparations for commercial production. Development activities often continue during production and include:
sinking shafts and underground drifts (often called mine development);
making permanent excavations;
developing passageways and rooms or galleries;
building roads and tunnels; and
advance removal of overburden and waste rock.
Development (or construction) also includes the installation of infrastructure (e.g., roads, utilities and housing), machinery, equipment and facilities.
When reserves are determined and development is approved, expenditures capitalized as exploration and evaluation are reclassified as construction in progress and are reported as a component of property, plant and equipment. All subsequent development expenditures are capitalized and classified as construction in progress. On completion of development, all assets included in construction in progress are individually reclassified to the appropriate category of property, plant and equipment and depreciated accordingly.
Biological assets
Biological assets are part of the Brazil operating segment and consist of eucalyptus forests located in the Brazilian state of Minas Gerais exclusively from renewable plantations and intended for the production of charcoal to be utilized as fuel and a source of carbon in the direct reduction process of pig iron production in some of the Company’s blast furnaces in Brazil.
Biological assets are measured at their fair value, net of estimated costs to sell at the time of harvest. The fair value (Level 3 in the fair value hierarchy) is determined based on the discounted cash flow method, taking into consideration the cubic volume of wood, segregated by plantation year, and the equivalent sales value of standing trees. The average sales price was estimated based on domestic market prices. In determining the fair value of biological assets, a discounted cash flow model was used, with a harvest cycle of 6 to 7 years.
Property, plant and equipment and biological assets are summarized as follows: 
 Land, buildings and
Improvements
Machinery,  equipment and other2
Construction in progressRight-of-use assetsMining
 Assets
Total
Cost     
At December 31, 202010,738 36,599 3,963 1,598 3,284 56,182 
Additions16 239 2,416 313 11 2,995 
Acquisitions through business combinations (note 2.2.4)34 — — — 39 
Foreign exchange differences(910)(3,311)(97)(104)(14)(4,436)
Disposals(66)(553)(2)— (5)(626)
Transfers from assets held for sale156 827 14 — 999 
Other movements 1
153 1,542 (1,761)(59)131 
At December 31, 202110,121 35,348 4,533 1,750 3,407 55,159 
Additions34 220 3,533 381 33 4,201 
Acquisitions through business combinations (note 2.2.4)193 742 70 37 — 1,042 
Foreign exchange differences(811)(3,344)(109)(124)(87)(4,475)
Disposals(137)(545)(4)— (18)(704)
Other movements 1
76 1,712 (2,136)(41)105 (284)
At December 31, 20229,476 34,133 5,887 2,003 3,440 54,939 
Accumulated depreciation and impairment
At December 31, 20203,808 18,136 994 559 2,063 25,560 
Depreciation charge for the year320 1,801 — 190 122 2,433 
Impairment reversal (note 5.3)(37)(181)— — — (218)
Disposals(49)(517)— — (5)(571)
Foreign exchange differences(546)(2,459)(10)(37)(13)(3,065)
Transfers from assets held for sale154 804 — — 965 
Other movements 1
(7)12 (34)(20)
At December 31, 20213,643 17,596 999 678 2,168 25,084 
Depreciation charge for the year283 1,893 — 193 124 2,493 
Impairment (note 5.3)146 688 155 10 21 1,020 
Disposals(109)(502)(1)— (18)(630)
Foreign exchange differences(496)(2,403)(9)(59)(68)(3,035)
Other movements 1
(19)(71)(17)(29)(24)(160)
At December 31, 20223,448 17,201 1,127 793 2,203 24,772 
Carrying amount
At December 31, 20216,478 17,752 3,534 1,072 1,239 30,075 
At December 31, 20226,028 16,932 4,760 1,210 1,237 30,167 
1.Other movements predominantly represent transfers from construction in progress to other categories and retirement of fully depreciated assets.
2.Machinery, equipment and other includes biological assets of 47 and 38 as of December 31, 2022 and 2021, respectively, and bearer plants of 37 and 29 as of December 31, 2022 and 2021, respectively.

The carrying amount of temporarily idle property, plant and equipment at December 31, 2022 and 2021 was 380 and 8 including 39 and nil in Brazil, 6 and 4 in NAFTA, 89 and 4 in the Europe segment and 246 and nil in the ACIS segment, respectively.
The carrying amount of property, plant and equipment retired from active use and not classified as held for sale was nil and 11 at December 31, 2022 and 2021 respectively. Such assets are carried at their recoverable amount.
Assets pledged as security
See note 9.4 for information about assets pledged as security by the Company.
Capital commitments
See note 9.4 for information about contractual commitments for acquisition of property, plant and equipment by the Company.
5.3 Impairment of intangible assets, including goodwill, and tangible assets
Net impairment charges/(reversals) were as follows:
 Year ended December 31,
Type of asset202220212020
Intangible assets— — 
Tangible assets1,020 (218)(133)
Total1,026 (218)(133)
Impairment test of goodwill
Goodwill is tested for impairment annually, as of October 1 or whenever changes in circumstances indicate that the carrying amount may not be recoverable, at the level of the groups of cash-generating units (“GCGU”) which correspond to the operating segments representing the lowest level at which goodwill is monitored for internal management purposes. Whenever the cash-generating units comprising the operating segments are tested for impairment at the same time as goodwill, the cash-generating units are tested first and any impairment of the assets is recorded prior to the testing of goodwill.
The recoverable amounts of the GCGUs are mainly determined based on their value in use. The value in use of each GCGU is determined by estimating future cash flows. The 2022 impairment test of goodwill did not include the GCGU corresponding to the Mining segment (as from April 1, 2021, ArcelorMittal implemented changes to its organizational structure - see note 1.1) as goodwill allocated to this GCGU was fully impaired in 2015. The key assumptions for the value in use calculations are primarily the discount rates, growth rates, expected changes to average selling prices, shipments and direct costs during the period. Assumptions for average selling prices and shipments are based on historical experience and expectations of future changes in the market. In addition, with respect to raw material price assumptions, the Company applied a range of $70 per tonne to $110 per tonne for iron ore ($71 per tonne to $112 per tonne in 2021) and $170 per tonne to $268 per tonne ($144 per tonne to $240 per tonne in 2021) for coking coal. Cash flow forecasts adjusted for the risks specific to the tested assets are derived from the most recent financial plans approved by management for the next five years. Beyond the specifically forecasted period, the Company extrapolates cash flows for the remaining years based on an estimated growth rate of 2%. This rate does not exceed the average long-term growth rate for the relevant markets.
The Company considered its exposure to certain climate-related risks which could affect its estimates of future cash flow projections applied for the determination of the recoverable amount of its GCGUs and CGUs. With the switch to electric
vehicles and the move to wind and solar power generation, the Company sees additional opportunities as customers deepen their understanding of embedded and lifecycle emissions of the materials where steel compares favorably. ArcelorMittal's most substantial climate-related policy risk is the EU Emissions Trading scheme ("'ETS"), which applies to all its European plants. The risk concerns the Company's primary steelmaking plants which are exposed to this regulation and yet unprotected against competition from imported steel. The Company is committed to the objectives of the Paris agreement and announced its ambition to reduce carbon emissions by 35% in Europe and 25% group-wide by 2030 and achieve group-wide carbon neutrality by 2050. These announced goals will require significant long-term investments which require global level playing field, access to abundant and affordable clean energy, facilitating necessary energy infrastructure, access to sustainable finance for low-emissions steelmaking and accelerated transition to a circular economy. In addition, the Company considered the legal obligation of carbon neutrality by 2050 effective within the EU and in Canada following adoption of the Climate Law and the Net Zero Emission Accountability Act, respectively. Accordingly, with respect to its flat steel operations in the EU and in Canada, ArcelorMittal concluded that future decarbonization capital expenditures, which correspond essentially to the construction of DRI-EAF facilities, are necessary to maintain the level of economic benefits expected to arise from the assets in their current condition and should therefore be included in the Company’s assumptions for future cash flows of the recoverable amount of the respective GCGUs and CGUs. At the same time, the Company is engaged in developing in the near to medium term a range of innovative low-emission technologies for the transition to decarbonized steel including the Smart Carbon route and the Hydrogen-DRI route and required investments are considered either in the Company's future cash flow projections or in the context of joint ventures, as an element of the Company's best estimate of capital expenditures which are committed and/or being implemented. The Company acknowledged that CGUs and GCGUs applying the blast furnace basic oxygen furnace "BF-BOF" route in other jurisdictions than the EU and Canada will apply decarbonization at a different pace. They may also not yet be subject to a legal obligation of carbon neutrality, as a result of which future decarbonization capital expenditures may not be included in their value in use calculations. Accordingly, the Company increased risk premiums included in their discount rates until they are able to accelerate their decarbonization strategy to meet the 2050 carbon neutrality objective and a legal obligation arises in the relevant jurisdiction. Additionally, the Company’s assumptions for future cash flows include an estimate for costs that the Company expects to incur to acquire emission allowances, which primarily impacts the flat steel operations in the EU and in Canada. The assumption for carbon emission cost is based on historical experience, implementation
of decarbonization strategies to mitigate or otherwise offset such future costs and information available of future regulatory or operational changes. Due to economic developments, uncertainties over the pace of transition to low-emission technologies, political and environmental actions that will be taken to meet the carbon reduction goals, regulatory changes and emissions activity arising from climate-related matters, the Company’s assumptions used in the recoverable amount calculations, such as capital expenditure, carbon emission costs and other assumptions are inherently uncertain and may ultimately differ from actual amounts.
The assumptions used in the value in use calculations are inherently uncertain and require management judgment. The Company's process includes specific consideration given to the most recent short, medium and long-term price forecasts and discount rates consistent with external information, expected production and shipment volumes and updated development plans, operating costs and capital expenditure plans. While in the first half of 2022, operating margins, supported by a
continuation of the buoyant market conditions in which the Company was operating throughout 2021, benefited from a continuing strong price environment and favorable supply demand balance following a prolonged period of destocking, in the second half of 2022, operating margins were significantly lower as a result of negative price-cost effect, elevated energy costs and lower steel shipments. Due to the non-recurrence of the destocking effects that weighed on demand particularly in the final months of 2022, apparent steel consumption is expected to recover in 2023 and the Company expects growth in steel shipments.
Management estimates discount rates using pre-tax rates that reflect current market rates for investments of similar risk. The rate for each CGU, including beta, cost of debt and capital structure was estimated from the weighted average cost of capital of producers, which operate a portfolio of assets similar to those of the Company’s assets and CGU specific country risk premiums were applied. GCGU weighted average pre-tax discount rates were as follows in 2022 and 2021:
 NAFTABrazilEuropeACIS
GCGU weighted average pre-tax discount rate used in 2022 (in %)13.318.710.618.4
GCGU weighted average pre-tax discount rate used in 2021 (in %)11.315.68.614.7
Once recognized, impairment losses for goodwill are not reversed.
There were no impairment charges recognized with respect to goodwill following the Company’s impairment tests as of October 1, 2022 and October 1, 2021. The total value in use calculated for all GCGUs decreased overall in 2022 as compared to 2021 primarily as a result of higher discount rates.
In validating the value in use determined for the GCGUs, the Company performed a sensitivity analysis of key assumptions used in the discounted cash-flow model (such as discount rates, average steel selling prices and shipments). As of December 31, 2022, the Company believes that reasonably possible changes in key assumptions could cause an impairment loss to be recognized in respect of the ACIS segment.
ACIS produces a combination of flat and long products. Its facilities are located in Africa, Ukraine and the Commonwealth of Independent States. ACIS is significantly sufficient in raw materials. The Company believes that sales volumes, prices and discount rates are the key assumptions most sensitive to change. ACIS is also exposed to export markets and international steel prices which are volatile, reflecting the cyclical nature of the global steel industry, developments in particular steel consuming industries and macroeconomic trends of emerging markets, such as economic growth. Discount rates may be affected by changes in countries’ specific risks; such risk premium increased significantly in 2022 in Ukraine in the context
of the war with Russia. The latter also led to substantially lower levels of production, shipments and revenue at ArcelorMittal Kryvyi Rih and such conditions are expected to continue throughout 2023. The ACIS value in use model anticipates a limited increase in sales volumes in 2023 (8.3 million tonnes) as compared to 2022 (6.4 million tonnes) with stable shipments after 2024. Average selling prices in the model are expected to decrease steadily over time. The table below describes the amount by which the value assigned to a key assumption must change in order for the recoverable amount to equal the carrying amount.
ACIS
Excess of recoverable amount over carrying amount276 
Increase in pre-tax discount rate (change in basis points)80 
Decrease in average selling price (change in %) 1.4 %
Decrease in shipments (change in %)3.7 %
Impairment test of property, plant and equipment and intangibles (excluding goodwill)
At each reporting date, ArcelorMittal reviews the carrying amounts of its intangible assets (excluding goodwill) and tangible assets to determine whether there is any indication that the carrying amount of those assets may not be recoverable through continuing use. If any such indication exists, the recoverable amount of the asset (or cash generating unit) is
reviewed in order to determine the amount of the impairment, if any. The recoverable amount is the higher of its fair value less cost of disposal and its value in use.
In estimating its value in use, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the asset (or cash-generating unit). For an asset that does not generate cash inflows largely independent of those from other assets, the recoverable amount is determined for the cash-generating unit to which the asset belongs. The cash-generating unit is the smallest identifiable group of assets corresponding to operating units that generate cash inflows. If the recoverable amount of an asset (or cash-generating unit) is estimated to be less than its carrying amount, an impairment loss is recognized. An impairment loss is recognized as an expense immediately as part of cost of sales (see note 4.2) in the consolidated statements of operations.
In the case of permanently idled assets, the impairment is measured at the individual asset level. Otherwise, the Company’s assets are measured for impairment at the cash-generating unit level. In certain instances, the cash-generating unit is an integrated manufacturing facility which may also be an operating subsidiary. Further, a manufacturing facility may be operated in concert with another facility with neither facility generating cash inflows that are largely independent from the cash inflows of the other. In this instance, the two facilities are combined for purposes of testing for impairment. As of December 31, 2022, the Company determined it has 46 cash-generating units as compared to 58 as of December 31, 2021 mainly as a result of the amalgamation of certain CGUs in Europe).
An impairment loss, related to intangible assets other than goodwill and tangible assets recognized in prior years is reversed if, and only if, there has been a change in the
estimates used to determine the asset’s recoverable amount since the last impairment loss was recognized. However, the increased carrying amount of an asset due to a reversal of an impairment loss will not exceed the carrying amount that would have been determined (net of amortization or depreciation) had no impairment loss been recognized for the asset in prior years. A reversal of an impairment loss is recognized immediately as part of operating income in the consolidated statements of operations.
Impairment charges and reversals relating to property, plant and equipment and intangibles (excluding goodwill) were as follows for the years ended December 31, 2022, 2021 and 2020:
2022
In 2022, the Company recognized a 1,026 impairment charge related to property, plant and equipment (1,020) and intangibles (6) with respect to ArcelorMittal Kryvyi Rih (Ukraine) in the ACIS segment as a result of the ongoing conflict in Russia, which resulted in low level of production, sales and net income and created significant uncertainty about the timing and ability of operations to return to a normal level of activity. Adverse geopolitical conditions, which resulted in a substantial increase in the discount rate applied by the Company in its recoverable amount (value in use) calculation, deteriorated further during the fourth quarter of 2022 following attacks against Ukrainian power infrastructures causing additional operational issues for ArcelorMittal Kryvyi Rih and the concerns about an intensification of the conflict in connection with the announcements of delivery of heavy military equipment by western countries. The Company applied separate discount rates over the discrete projections period, including a higher country risk premium for 2023 cash flow projections and a return to pre-war country risk premium in the course of 2024 and for the terminal value calculation as value in use is sensitive to a difference in country risk for different periods.
Cash-Generating UnitRegionOperating SegmentRecoverable Amount (Value in Use)Total Impairment Recorded2022 Pre-Tax Discount Rates2021 Pre-Tax Discount RateCarrying amount of property, plant and equipment as of December 31, 2022
 Applied to 2023 projectionsApplied to subsequent projections
ArcelorMittal Kryvyi RihUkraineACIS1,003 1,026 47.1 %20.0 %16.9 %655 
2021
In the second half of 2021, in connection with the Company’s annual test for impairment of goodwill, property, plant and equipment was also tested for impairment at that date. The Company reversed 218 of impairment charges which had been recognized in 2015 for the Sestao facility in Spain following
idling for an indefinite timing. The impairment reversal results from improved future cash flow projections following restart of operations and the Company's decarbonization strategy in Spain.
Cash-Generating UnitRegionOperating SegmentImpairment Reversed2021 Pre-Tax Discount Rate2020 Pre-Tax Discount RateCarrying amount of property, plant and equipment as of December 31, 2021
Europe flat productsEuropeEurope218 8.5 %8.5 %11,005 
2020
In 2020, the Company recognized a 133 net reversal of impairment including impairment charges of 92 and 104 related to the permanent closure of the coke plant in Florange (France) and the permanent closure of part of a blast furnace and steel plant in Krakow (Poland), respectively. In addition, the Company recognized an impairment loss of 331 relating to its plate business in the Europe segment classified as held for sale at December 31, 2020 and for which the held for sale classification was discontinued in 2021 following the termination of the divestment process.
In the third quarter of 2020, the Company reversed 660 of impairment charges of property, plant and equipment previously recognized for ArcelorMittal USA as a result of the increase in the recoverable amount. The Company calculated the fair value less cost of disposal using a market approach with market multiples derived from comparable transactions, a Level 3 unobservable input. ArcelorMittal USA was sold to Cleveland-Cliffs as described in note 2.3.1.