EX-99.1 2 ex991technicalreportfo.htm EX-99.1 Document





NI 43-101 Technical Report
for the
Island Gold Mine,
Dubreuilville, Ontario, Canada

Prepared for
alamos2.jpg
181 Bay Street, Suite 3910
Toronto, ON M5J 2T3, Canada





Prepared by

Nathan Bourgeault – P.Eng.
Raynald Vincent – P.Eng., M.G.P.
Colin Webster – P.Eng.






Effective Date: July 14, 2020
Issue Date: August 31, 2020



alamos2.jpg
TABLE OF CONTENTS
1Summary
1.1Introduction
1.2Property Description
1.3Accessibility, Climate, Local Resources, Infrastructure and Physiography
1.4History
1.5Geological Setting and Mineralization
1.6Deposit Types
1.7Exploration
1.8Drilling
1.9Sample Preparation, Analyses and Security
1.10.Data Verification
1.11Metallurgical Test Work
1.12Mineral Resource Estimates
1.13Mineral Reserve Estimate
1.14Mining Production Plan
1.15Processing
1.16Infrastructure
1.17Environmental Studies, Permitting and Social or Community Impact
1.18Capital and Operating Costs
1.19Economic Analysis
1.20.Interpretations and Conclusions
1.21Recommendations
2Introduction
2.1Terms of Reference
2.2List of Qualified Persons
2.3Site Visits
3Reliance on Other Experts
4Property Location and Mining Titles
4.1Location
4.2Description of Mining Titles and Recorded Interests
4.3Ownership of Mineral Rights
4.4Mining Royalties
4.5Other Mineral Royalties
5Accessibility, Climate, Local Resources, Infrastructure and Physiography
5.1Access
5.2Climate
5.3Local Resources
5.4Surface Infrastructure
5.5Physiography
6History
6.1Work History
6.2Historical and Island Gold Mine Mineral Resource Estimates
6.3Historical Production from the Island Gold Mine
7Geological Setting
7.1Regional Geology
7.2Geology of the Island Gold Mine Area
7.3Alteration and Mineralization
7.4Island Gold Deposit
7.5Other Gold Zones
Island Gold Mine – Ni 43-101 Technical Report  2
August 31, 2020



alamos2.jpg
8Deposit Types
9Exploration
9.1Introduction
9.22020 Exploration Drilling program
10Drilling
10.1Methodology and Planning
10.2Drill Hole Mark Up
10.3Collar Surveying
10.4Down-Hole Surveying
10.5Cementing of Drill Holes
10.6Drill Core Logging
10.7Geology and Analysis
11Sample Preparation, Analyses and Security
11.1Core Sampling and Collection
11.2Chip Sample Collection
11.3Laboratory Procedures
11.4Security
11.5Database Security
11.62019 Island Gold Internal Quality Assurance and Quality Control Program (QA-QC)
11.7Laboratory Cross Check Sampling (Pulp Samples)
11.8Core Duplicates
11.9Underground Muck Tracking
11.10.Summary and Comments
12Data Verification
13Mineral Processing and Metallurgical Testing
13.1Historical Metallurgical Testwork
13.2Confirmatory Metallurgical Testwork
13.3Thickening & Rheology Testing (2016)
14Mineral Resource Estimates
14.1Introduction
14.2Mineral Resources Classifications, Categories and Definitions
14.3Methodology
14.4Databases
14.5Gold Modeling
14.6Statistical Analysis and Grade Capping
14.7Compositing
14.8Density
14.9Variography
14.10.Block Modelling
14.11Block Model Validation
14.12Classification
14.13Mineral Resource Statement
15Mineral Reserve estimates
15.1Island Gold Mine – Total Mineral Reserves
15.2Reconciliation of the 2019 Production with Mineral Reserve Models
15.3Mineral Reserve Reconciliation 2018 vs 2019
16Mining Methods
16.1Overview
16.2Mine Access and Development
16.3General Design Considerations
Island Gold Mine – Ni 43-101 Technical Report  3
August 31, 2020



alamos2.jpg
16.4Stope Dimensions
16.5Stope Design
16.6Mining Methods
16.7Ground Control
16.8Backfill
16.9Stope Sequencing
16.10.Material Movement & Equipment
16.112019 Scoping Study
16.12Phase III Expansion Study Mineral Inventory
16.13Phase III Expansion Study Scenarios Examined
16.14Phase III Expansion Study Observations
16.15Phase III Expansion Study Conclusions
16.16Island Gold Life of Mine Plan
17Recovery Methods
17.1Expansion Considerations
17.2Selected Expansion Approach
17.3Process Flowsheet and Design Criteria
17.4Process Plant Layout
17.5Process Description
18Project Infrastructure
18.1Local Resources and Services
18.2Current Site Infrastructure
18.3Phase III Infrastructure Expansion
19Market Studies and Contracts
19.1Market studies
19.2Metal Pricing
20Environmental Studies, Permitting and Social or Community Impact
20.1Existing Conditions
20.2Anticipated Permitting Activities
20.3Environmental Emergency Response
20.4Social and Community Considerations
20.5Indigenous Engagement
21Capital and Operating Costs
21.1Capital Cost Estimate Input
21.2Capital Cost Estimate Summary
21.3Capital Expenditures
21.4Operating Expenses
22Economic Analysis
22.1Assumptions
22.2Revenue and Working Capital
22.3Summary of Operating Costs
22.4Summary of Capital Costs
22.5Reclamation and Mine Closure Plan
22.6Taxes
22.7Royalties
22.8Economic Analysis
22.9Sensitivities
23Adjacent Properties
23.1Magino Mine
23.2Edwards Mine and Cline Mines
Island Gold Mine – Ni 43-101 Technical Report  4
August 31, 2020



alamos2.jpg
23.3Goudreau Property
24Other Relevant Data and Information
25Interpretations and Conclusions
25.1Summary
25.2Geology and Mineral Resource Estimate
25.3Mining Methods and Reserves
25.4Processing
25.5Infrastructure
25.6Environmental Considerations
25.7Capital and Operating Costs
25.8Economic Analysis
26Recommendations
27References
28Units of Measure, Abbreviations, Acronyms
29Certificates of Qualified Persons
Island Gold Mine – Ni 43-101 Technical Report  5
August 31, 2020



alamos2.jpg

LIST OF TABLES
Table 1-1 Island Gold Mineral Resources as of Dec 31, 2019
Table 1-2 Mineral Reserve Estimation Parameters
Table 1-3 Island Gold – Mineral Reserve Estimate as of Dec 31, 2019
Table 1-4 Total Capital Costs
Table 1-5 Sustaining Capital Costs
Table 1-6 Growth Capital Costs
Table 1-7 Summary of Operating Costs
Table 1-8 Summary of Economic Results
Table 1-9 Gold Price Sensitivity on NPV and IRR
Table 2-1 Section Qualified Persons
Table 6-1 Work History
Table 6-2 Historical and Existing Island Gold Mine Mineral Resource Estimates
Table 6-3 Island Gold Mine Production per year
Table 9-1 2015 – 2019 Summary of Diamond Drilling
Table 9-2 Diamond Drilling Highlights Results – 2020 Exploration Program
Table 11-1 Island Gold Mine – 2019 Sample Volume
Table 11-2 Summary of Preparation and Assay Methods
Table 11-3 Island Gold Mine - QA-QC Program, Certified Reference Material Results (2019)
Table 11-4 Summary of 2019 Blank Performance
Table 11-5 QA-QC Program, Certified Reference Material Results (2017-2019)
Table 11-6 2019 Statistics of Duplicate Assays (Internal QA-QC)
Table 11-7 2019 Statistics of Duplicate Assays (External QA-QC)
Table 13-1 Drill Holes Head Assays (URSTM)
Table 13-2 ICP Analysis on Composite Head Sample (URSTM)
Table 13-3 Cyanidation Test Results (URSTM)
Table 13-4 Bond Ball Mill Work Index Test Results Summary (ALS)
Table 13-5 Chemical Content Summary (ALS)
Table 13-6 Mineral Content Summary (ALS)
Table 13-7 Cyanidation Tests Summary (ALS)
Table 13-8 Thickener Sizing and Operating Parameters
Table 14-1 Island Gold Drill Hole Database Summary (Dec 31, 2019)
Table 14-2 Island Gold Channel Sample Database Summary (Dec 2019)
Table 14-3 Summary Statistics of Original Assay Samples from Diamond Drill Holes and Faces
Table 14-4 Summary Statistic for 2 m Composites
Table 14-5 Specific Gravity Measurements
Table 14-6 Island Gold Deposit Variography Study
Table 14-7 Block Model Parameters, DEEPZONE Model
Table 14-8 Block Model Parameters, EXT2 Model
Table 14-9 Summary of Island Lower Zones Estimation Parameters
Table 14-10 Statistical Validation Block Models vs Composite Mean Grades (Faces and DDH)
Table 14-11 Comp. - Mean Sample Grade Within Block and Interpolated Grade for Same Block
Table 14-12 Island Gold Measured Mineral Resource Estimates as of Dec 31, 2019
Table 14-13 Island Gold Indicated Mineral Resource Estimates as of Dec 31, 2019
Table 14-14 Island Gold Inferred Mineral Resource Estimate as of Dec 31, 2019
Table 14-15 Island Gold Mineral Resource Estimate Summary as of Dec 31, 2019
Table 15-1 Mineral Reserve Estimation Parameters
Table 15-2 Island Gold – Proven Mineral Reserve Estimates as of Dec 31, 2019
Table 15-3 Island Gold – Probable Mineral Reserve Estimates as of Dec 31, 2019
Island Gold Mine – Ni 43-101 Technical Report  6
August 31, 2020



alamos2.jpg
Table 15-4 Island Gold – Combined Mineral Reserve Estimate as of Dec 31, 2019
Table 15-5 2019 Production Reconciliation with Dec 31, 2018 and Dec 31, 2019
Table 15-6 Mineral Reserve Reconciliation 2018 vs 2019 – Gains (losses) from Different Sectors
Table 16-1 Standard Excavation Dimensions
Table 16-2 Island Gold Current And Phase III Underground Equipment Fleet
Table 16-3 Phase III Expansion Study Minable Resource
Table 16-4 Extension 1/2 Zone Dilution and Recovery Factors
Table 16-5 C and D1 Zone Dilution and Recovery Factors
Table 16-6 Island Gold Cut-off Grades
Table 16-7 Life of Mine Production Physicals
Table 17-1 Process Plant Design Criteria
Table 18-1 Key Surface Ventilation Fans Data
Table 18-2 Hoisting Plant Key Data (Production and Service Hoists/Plants)
Table 18-3 TSF Dam Construction Timelines and Storage Capacity Summary
Table 18-4 Filtered Tailings Dry Stack Options – Storage Capacity and Annual Rate of Rise
Table 18-5 Summary of Island Gold Water Flows
Table 18-6 Water Balance Parameters for Water Treatment Design– Average Years
Table 18-7 Island Gold Mine Effluent Design Basis
Table 20-1 Identified Species at Risk (SAR)
Table 20-2 Acid Generation Criteria
Table 20-3 List of Permits to Take Water (PTTWs)
Table 21-1 Sustaining Capital Investment (2020 – 2036)
Table 21-2 Annual Sustaining Capital
Table 21-3 Growth Capital Investment
Table 21-4 Shaft Capital Including Indirects and Contingency
Table 21-5 Annual Growth Capital Expenditure
Table 21-6 R1200 versus S2000 Unit Mining Costs
Table 21-7 R1200 versus S2000 Unit Processing Costs
Table 21-8 R1200 versus S2000 General and Administrative Cost
Table 21-9 R1200 versus S2000 Life of Mine Operating Costs
Table 21-10 S2000 Scenario Annual Unit Mining Costs
Table 21-11 S2000 Scenario Annual Unit Processing Costs
Table 21-12 S2000 Scenario Annual Unit General and Administrative Costs
Table 22-1 Life of Mine Plan Summary
Table 22-2 NSR Assumptions Used in the Economic Analysis
Table 22-3 Summary of Operating Costs
Table 22-4 Total Capital Costs
Table 22-5 Sustaining Capital Costs
Table 22-6 Growth Capital Costs
Table 22-7 Summary of Economic Results
Table 22-8 After-Tax NPV5% Sensitivity Results
Table 22-9 Gold Price Sensitivity on NPV
Table 22-10 Island Gold Financial Model Summary
Table 25-1 Island Gold Mineral Resource Estimate Summary as of Dec 31, 2019
Table 25-2 Island Gold – Combined Mineral Reserve Estimate as of Dec 31, 2019
Table 25-3 Total Capital Costs
Table 25-4 Summary of Operating Costs

Island Gold Mine – Ni 43-101 Technical Report  7
August 31, 2020



alamos2.jpg
LIST OF FIGURES
Figure 1-1Mining Units Costs
Figure 4-1Island Gold Mine Location
Figure 4-2Mining Titles Map – Island Gold Mine Property
Figure 7-1Geological Map of the Western Part of the Wawa Subprovince
Figure 7-2Geological Map of the Island Gold Mine Area
Figure 7-3View of Domains and Mineral Resources and Reserves with Existing Infrastructure
Figure 7-4Section Showing the Inflection to the South of Mineralized Zones
Figure 9-1Diamond Drilling Highlights Results – 2020 Exploration Program
Figure 11-1Scatter Plot of Duplicate Assays vs Original Assays (Lab Expert)
Figure 11-2Scatter Plot of Duplicate Assays vs Original Assays (Wesdome Lab)
Figure 11-3Scatter Plot of Duplicate Assays (Actlabs) vs Original Assays (Lab Expert)
Figure 11-4Scatter Plot of duplicate assays (Actlabs) vs original assays (Wesdome lab)
Figure 13-1Mill Gold Recovery of Island Ore
Figure 13-2Mill Gold Recovery as a Function of Lower Zone Ore in the Feed
Figure 13-3Free Gold Evaluation Protocol (URSTM)
Figure 13-4Gold Recovery versus Particle Size
Figure 13-5Cyanide Leach Kinetics Curve for Lower Part Sample Ground to 63 Microns (ALS)
Figure 13-6Gravity Recovery Performance (ALS)
Figure 13-7Flux Testing (FLSmith)
Figure 13-8Underflow Retention Time versus Solids Concentration (FLSmith)
Figure 13-9Thickener Underflow Rheology Results (FLSmith)
Figure 14-1Surface Diamond Drilling – Island Gold Mine
Figure 14-2Underground Diamond Drilling – Island Gold Mine
Figure 14-3Cross-section 14780E Showing Island Gold Mineralized Zones
Figure 14-4Cross-Section 15040E Showing Island Gold Mineralized Zones
Figure 14-53D Mineralized Solid Island Gold Lower Zones
Figure 14-6Histogram Plot Zone EX-C (Island Lower)
Figure 14-7Probability Plot Zone EX-C (Island Lower)
Figure 14-8Search Ellipse Orientation Corresponding to Variography
Figure 14-9Longitudinal Lower C Zone and X2-E1E Zone showing Mineral Resource Classification
Figure 14-10
Change in Mineral Resources as of Dec 31st, 2019
Figure 14-11
Inferred Mineral Resource Waterfall Graph (Dec 31st, 2018 vs Dec 31st ,2019)
Figure 15-1Mineral Reserve Reconciliation Waterfall Graph Dec 31, 2018 vs Dec 31, 2019
Figure 16-1LOM Design Looking North
Figure 16-2Typical Level Design
Figure 16-3Drilling - Longhole Stope, Longitudinally Drilled and Mucked
Figure 16-4Blasting and Mucking - Longhole Stope, Longitudinally Drilled and Mucked
Figure 16-5UCF Backfilling - Longhole Stope, Longitudinally Drilled and Mucked
Figure 16-6Pull Void - Longhole Stope, Longitudinally Drilled and Mucked
Figure 16-7CRF or Paste Fill - Longhole Stope, Longitudinally Drilled and Mucked
Figure 16-8Transversal Mining Access
Figure 16-9Alimak Stoping
Figure 16-10Current Outside-In Mining Sequence
Figure 16-11Proposed Centre-Out Sequence
Figure 16-12Paste Backfill Underground Distribution System
Figure 16-13Example of Longitudinal Retreat Mining Sequence
Figure 16-14Reconciliation of Minable Resource to Dec 31, 2019 Mineral Reserve and Resources
Figure 16-15Mineable Resource Stoping Blocks Categorized by Grade
Figure 16-16R1200 and R1200NP Underground Development and Infrastructure
Island Gold Mine – Ni 43-101 Technical Report  8
August 31, 2020


alamos2.jpg
Figure 16-17R1200 Annual Extraction Sequence
Figure 16-18R1600 Underground Development and Infrastructure
Figure 16-19R1600 Annual Extraction Sequence
Figure 16-20S1600 and S2000 Underground Development and Infrastructure
Figure 16-21R2000 Annual Extraction Sequence
Figure 16-22Effective Time at the Face with 2020 as a Baseline
Figure 16-23Metres of Development per Employee
Figure 16-24Stope Tonnes per Employee
Figure 16-25Mine Staffing Requirements
Figure 16-26Mining Units Costs
Figure 16-27Underground trucking Hours
Figure 16-28Quantity of Primary Production Equipment Required
Figure 16-29Annual CO2 Emissions
Figure 16-30Life of Mine CO2 Emissions
Figure 17-1Simplified Process Flowsheet Changes for Expansion to 2,000 TPD Throughput
Figure 17-2Island Gold Process Plant Changes for Expansion to 2,000 TPD Throughput
Figure 18-1Island Gold Mine Site - Surface General Arrangement
Figure 18-2Underground Ventilation Distribution Network
Figure 18-3Phase III Expansion - Surface Infrastructure Location
Figure 18-4Phase III Expansion – Underground Development and Infrastructure
Figure 18-5Shaft Site General Arrangement
Figure 18-6Shaft Complex General Arrangement
Figure 18-7Headframe and Hoisting Plant Layout
Figure 18-8Headframe and Hoisting Plant Isometric
Figure 18-9Production Configuration Shaft cross Section
Figure 18-10Shaft Riser Diagram (Note: Shaft Bottom 1373 m and 1340 Level are Same Elevation)
Figure 18-11Underground Ore and Waste Handling System Process Flow Diagram
Figure 18-12 1871275 Level Rock Breaker Station – Section View
Figure 18-13Paste Plant General Arrangement Overview
Figure 18-14Paste Plant Process Flow Diagram
Figure 18-15Paste Backfill Plant Site Plan
Figure 18-16 Underground Distribution System (Long Section View)
Figure 18-17Ultimate Configuration of the Primary Pond TSF
Figure 20-1Island Gold Hydrologic System
Figure 22-1Annual and Cumulative Gold Production
Figure 22-2Annual and Cumulative After-Tax Cash Flow at USD $1,450 Gold
Figure 22-3
After-Tax NPV5% Sensitivity Results
Figure 22-4Annual and Cumulative After-Tax Cash Flow at USD $1,750 Gold
Island Gold Mine – Ni 43-101 Technical Report  9
August 31, 2020



alamos2.jpg

1. SUMMARY
1.1 Introduction
In a press release dated July 14, 2020, Alamos Gold Inc. (“Alamos” or “Alamos Gold” or the “Company”) announced the results of its Phase III Expansion Study (“Phase III”) completed on the Island Gold Mine (“Island Gold”), located in Northern Ontario, Canada. Having successfully completed expansions to 1,100 tpd and 1,200 tpd at Island Gold, the objective of Phase III was to consider the most cost and capital effective strategy to increase annual production and mine the current Mineral Reserves, and a portion of the Mineral Resources located to a depth of 1,500 metres. This report outlines the results of that study and conforms to National Instrument 43-101 Standards of Disclosure of Mineral Projects (“NI 43-101”).

The study involved the evaluation of five scenarios, which demonstrated that the Shaft Expansion at a new production profile of 2,000 tpd was the most economic, efficient, and productive alternative. This also best positions Island Gold to capitalize on further growth in Mineral Reserve and Resources. The Shaft Expansion will result in the construction of a new shaft amongst other infrastructure upgrades.

Island Gold utilized the services of several consulting firms to design and cost the components making up the various options. They included: Hatch Ltd., Cementation Canada Inc., Golder Associates Ltd., Halyard Inc., and Airfinders Inc.

All costs are in Q2 2020 Canadian dollars unless otherwise stated.

All units of measurement are in metric, unless otherwise stated.
1.2 Property Description
The Island Gold Mine and its surrounding project lands (collectively, the “Island Gold Property”) is situated 43 km northeast of Wawa, Ontario within the Sault Ste. Marie Mining Division. The town of Dubreuilville, a forestry center, is 10 km to the northwest of the mine site. The Island Gold Property, which is divided into nine (9) property areas, is comprised of 831 tenures consisting of patented fee simple and/or patented leasehold mining rights and surface rights claims, mining licences of occupation and unpatented cell claims covering approximately 9,511 hectares. Alamos holds 100% of all mining titles related to the Island Gold Property.
The following royalties apply to the currently defined Mineral Reserves and Mineral Resources:
The Lochalsh property area is subject to a 3% NSR payable to Osisko Gold Royalties
Ltd. (“Osisko”);
The Goudreau Lake property area is subject to a 1.38% NSR royalty payable to Osisko
and a 0.62% NSR royalty payable to Franco-Nevada Corporation, and a 10.35% net profit interest (“NPI”) royalty in favour of a private company; and
The Goudreau property area is subject to a 2% NSR payable to Osisko and a 15% NPI
royalty payable to a private company.

1.3 Accessibility, Climate, Local Resources, Infrastructure and Physiography
Access to the area is provided by the TransCanada Highway (Highway 17), which continues north from Wawa for 35 km, and Highway 519 to Dubreuilville which is 10 km to the northwest of the mine site. The Goudreau Road, an all-weather road, extends from east of Dubreuilville for 17 km to the mine site.
Island Gold Mine – Ni 43-101 Technical Report  10
August 31, 2020


alamos2.jpg
The Island Gold Property is contained within the Lake Superior Regional climatic zone is "modified continental”. The mean annual temperature is about 10C, with extremes of –51˚ C and 38˚ C being recorded. Precipitation is in the range of 980 mm per year, with about 600 mm as rainfall and evaporation at 517mm/year principally during the summer months.
Wawa has a population of approximately 3,500 inhabitants and, Dubreuilville, originally a forestry community, has a population of approximately 900 permanent residents and contains accommodations for mine personnel. The Island Gold Mine is also within a few kilometres of railway lines operated by Canadian National and Algoma Central Railways. A hydro-electric power substation, water supply, gravel roads, and living accommodations are all available within the general mine area. Power is connected to the provincial power grid and is supplied by Algoma Power Inc. (“API”).
The Island Gold Mine infrastructure includes a primary tailings pond, a secondary settling pond, the Kremzar mill (the “mill”), the Lochalsh ramp and portal, a mine access road, power lines, and an electrical substation. Offices, core logging and storage facilities, a fire hall and separate mine drys for men and women are also located at the mill site. The mill currently has a capacity off 1,200 tpd and the fully permitted tailings area is located at Miller Lake, west of the historic Kremzar Mine.
The Island Gold Property lies in the Superior Province of the Canadian Shield. Topography within the mine area varies from a high of 488 metres above sea level (masl) in the vicinity of Miller and Maskinonge Lakes to a low of 381 masl at Goudreau Creek. Periods of intense glacial activity have contributed to the hummocky, rock knelled and largely bedrock-controlled topography, characteristic of the region. Glacial advance from the north deposited a thin mantle of stony sand till over a scoured rock surface.
1.4 History
The Goudreau – Lochalsh Gold Camp area has been the subject of interest dating back to the early 1900’s and has attracted prospectors and mining companies in search of iron ore, gold, and base metal deposits. The Wawa – Michipicoten area has been recognized for its long history of iron exploration which has resulted in the development and production of several iron ore mining operations. Gold exploration followed shortly thereafter, resulting in several gold discoveries which were subsequently developed and brought into commercial production in the area which would later become the Island Gold property.
The initial discovery of gold was made by a group of prospectors at Emily Bay on Dog Lake in Riggs Township in 1900. Up to 1944, prospecting, geological mapping, trenching, shaft sinking, and 1,732 m of diamond drilling were completed to explore various gold prospects. Ultimately this period is marked principally by various exploration efforts by several companies carrying out surface trenching and diamond drilling on several gold prospects.
After an extended period of relatively little interest and activity in the area, exploration was resumed by Amax Inc. and its Canadian division, Canamax Resources Inc. (“Canamax”) in 1974. In 1985, drilling approximately two kilometers south of the Kremzar mine intersected a series of sub-parallel lenses containing gold mineralization within deformed rocks of the Goudreau Lake Deformation Zone (GLDZ). In December 1988, the Canamax Kremzar project began commercial production. From 1988 to 1990, production from the Kremzar mine was 306,000 tonnes grading 4.80 g/t Au. Over 1989 and 1990, underground access was established into the Island Gold deposit with an adit from the north shore of Goudreau Lake. A 4,167 tonne bulk sample was extracted and processed at the Kremzar Mill. At the end of 1990, Canamax suspended all operations at both the Kremzar and Island Gold projects.
In 1996 the Island Gold property was acquired from by Patricia Mining Corp. (“Patricia”). From 1996 to 2002, various exploration activities on the property included prospecting, surface
Island Gold Mine – Ni 43-101 Technical Report  11
August 31, 2020



alamos2.jpg
trenching, geological and geophysical surveys, and diamond drilling was carried out to explore for both Island Gold and Kremzar styles of gold bearing prospects and zones. In 2003, Patricia and Richmont Mines Inc. (“Richmont”), entered into a joint venture agreement. Work completed during the joint venture included 72,984 m of surface and underground diamond drilling to test the various zones. On January 1, 2005, Richmont became the operator of the project.
Commercial production at Island Gold began on October 1, 2007. Richmont acquired Patricia’s 45% interest in December 2008, becoming 100% owner of the property and operations. Exploration activities ramped up in 2009 with a minimum of 30,000 metres of drilling completed in each of the next several years, increasing sharply to more than 80,000 metres in 2012. This included drilling below the 400 metre level as part of the Island Gold deep exploration program, which was successful in extending the main C Zone at depth with an initial Inferred Mineral Resource being calculated on the high-grade deep C Zone in January 2013.
A large exploration program commenced at the end of 2015 to explore beneath the Island Gold Mine. Directional diamond drilling was used to reach targets at depth with allowed greater accuracy than conventional drilling techniques. As a result of this program, Mineral Resources were added in the C zone at depth and to the east in the E1E zone in Extension 2 area. A total of 161,446 m of directional drilling was completed between 2015-2019.
1.5 Geological Setting and Mineralization
The Island Gold Property is located in the Michipicoten Greenstone Belt (MGB) which is part of the Wawa Subprovince within the Archaean Superior Province. The MGB is approximately 140 km long and up to 45 km wide. The metamorphic grade of the subprovince is greenschist but amphibolite facies can be seen locally or proximal to intrusions. A major regional deformation zone called the Goudreau Lake Deformation Zone (GLDZ) is situated throughout the area. It is a north-easterly trending structure which has been traced along strike for 30 km with a width of 4.5 km and believed to be the main control of gold mineralization for the Project area. It is a high angle oblique-slip fault zone with an overall dextral movement cutting stratigraphy at a shallow angle. There are three main splays to the GLDZ in the area, the southernmost of which hosts the Island Gold Mine structure which contains a stacked sequence of east-northeast striking, steeply dipping, and subparallel zones of gold mineralization.
Lithologies appear to form a conformable homoclinal volcano-stratigraphic sequence, facing and younging to the north in the project area. Tight to isoclinal folds and local attenuation or boudinage of units along fold limbs appear to occur regionally. Fold axes are subparallel to the regional foliation at N070°E to N095°E.
The Island Gold Mine is stratigraphically positioned in the upper portion of the Wawa Assemblage, on the northern limb of the Goudreau Anticline. The hinge is south of the area displayed in Figure 7-2. This assemblage is mostly composed of felsic volcanic rocks of various facies of tuffs and lavas.
Quartz veins commonly bear visible gold in the form of aggregates, disseminated fine grains or along chlorite-sericite slickensides within the veins. The degree of veining appears to change at depth, transitioning from a stringer style quartz-carbonate vein on scales between millimeter to larger scale veins which can be over 4 metres in width.
The Island Gold deposit is composed of multiple, stacked, south dipping lenses. The mineralized corridor expands from 50 m wide in the upper levels to over 150 m wide at depth. The zone’s dip varies from sub-vertical to vertical from -50° to -90° south. Locally, north dip reversals occur but are not common. Rare instances of offset or folding have been seen. Around the 400 metre level there is a shallow dipping southern inflection of the mineralized zones. It is not yet clear if this inflection is related to a fault, a shear zone, or a fold. This
Island Gold Mine – Ni 43-101 Technical Report  12
August 31, 2020


alamos2.jpg
inflection point is the division of what is locally referred to as the Upper Island Gold Mine and the Lower Island Gold Mine.
1.6 Deposit Types
The Island Gold Mine is an Archean orogenic lode gold deposit. It is a structurally hosted quartz-carbonate vein system situated within the Goudreau Lake Deformation Zone (GLDZ), a major regional brittle-ductile structure. The host terrane is a sequence of felsic to intermediate volcanic rocks of the Wawa Assemblage which are in the greenschist metamorphic range as is common for this type of deposit. High strain zones associated with the GLDZ have the tendency to develop at variable scales along lithologic unit contacts where complex geology and related competency contrasts can control stress patterns and facilitate shearing and the consequent development of dilatancy zones and concomitant quartz carbonate vein formation. It is generally accepted that these Archean orogenic lode gold deposits are related to compressional and transpressional tectonics and the associated metamorphic dewatering and devolatization of magma processes from which the gold bearing fluids are derived.
1.7 Exploration
The deep directional diamond drilling program started in October 2015 and, at the end of 2019, a total of 132,917 metres were completed from underground diamond drilling and 225,190 metres were completed from surface diamond drilling.
The underground and surface exploration programs have added since 2015 close to 2.3 million ounces of gold to mineral inventory, net of depletion. Measured and Indicated Mineral Resources increased by 112,100 ounces of gold, Inferred Mineral Resources increased by 1,530,000 ounces of gold and Mineral Reserves increase by 653,000 ounces of gold, in the five year period. This includes the addition of nearly one million ounces of Mineral Reserves and Resources through the 2019 exploration program. The exploration cost has been approximately $25 per ounce during this period.
The results of these programs up to December 31, 2019 were used in the December 31, 2019 Mineral Resource estimate and have been incorporated into the Phase III Expansion Study.
1.8 Drilling
An optimal drilling pattern of 20 m by 20 m hole spacing is sought during the planning of the delineation-definition drilling. A 50 m to 100 m spacing pattern is used for the first phase of exploration drilling in new sectors. Island Gold employees use a Leica Global Positioning System to survey surface collar locations. Surveying of underground drill holes collars is performed using a Leica Total Station. Single shot Reflex down-hole survey measurements start at 15 m from the collar and are carried out at every 30 m thereafter along the hole. Surface exploration holes have used Reflex or a gyro to survey the hole and measurements are taken every 30 m in surface holes. Diamond drill holes are grouted at the collar once they are completed or abandoned.
A total of 831 holes representing 549,287 m have been drilled from surface and 5,580 holes totaling 814,063 m have been drilled from underground at the Island Gold Mine.
Under the direct supervision of Qualified Persons, geologists prepare a detailed description of the drill core. A computerized log is entered for each drill hole with the following basic information collar location, down hole surveys, rock quality designation (RQD), main and secondary geological units, texture and structure mineralization and alteration: mineralogy, thickness, type sample location, and core photos.
Island Gold Mine – Ni 43-101 Technical Report  13
August 31, 2020



alamos2.jpg
1.9 Sample Preparation, Analyses and Security
Most drill core samples are prepared and assayed by Lab Expert in Rouyn-Noranda, Quebec. which has been operating a fire assay laboratory for over 20 years. A small portion of the definition drill core as well as all underground production samples are assayed at the Wesdome laboratory, in Wawa, Ontario. Pulps and occasionally drill core are sent to Actlabs in Thunder Bay, Ontario. The laboratories use industry-standard sample preparation and assay methods.
Alamos maintains an internal QA-QC program at the Island Gold Mine which is used to validate core and production chip assay analyses. Certified Reference Materials (“CRMs”) are inserted with diamond drill core samples at a rate of 1 in 25 samples. In-house blank material is inserted in the core sample stream at a rate of 1 in 25 samples. In addition, pulps from Lab Expert and Wesdome are regularly sent to Actlabs.
Island Gold Mine’s QA-QC procedures were audited in 2019 by ASL Canada and they concluded that Island Gold’s assay quality control program meets or exceeds industry standards. In addition, ASL audited the Lab Expert and Wesdome laboratories in 2019 and made recommendations for improvements which have been completed or are being implemented.
1.10 Data Verification
The Qualified Person considers that the Island Gold Mine database is suitable for use in the Mineral Reserve and Resource estimation. The SQL database is adequate and acceptable for supporting Mineral Resource estimation. This database contains all the information related to drill holes, drift sampling, assay results and the laboratory certificates. Some verification of the original data was performed, and modifications were completed if needed prior to the calculation of any estimates. The verification of, and corrections to, the Island Gold database were done prior to the Mineral Resource and Mineral Reserve estimates of December 31, 2019.
1.11 Metallurgical Test Work
The mill has been processing Island Gold ore since 2008 and has consistently been achieving recoveries of greater than 96%. Since 2016, the ore feed has been almost exclusively from the Lower Island Gold Domain. Historical data shows that the Lower Zone ore behaves similarly to ore from the other zones and therefore has no significant effect on mill gold recoveries.
Testwork carried out in 2013 at URSTM on a Lower Mine composite confirmed that Lower Mine ore would continue to be recovered at, or greater than, 96% recovery with very low cyanide consumption.
1.12 Mineral Resource Estimates
The December 31, 2019 Mineral Resource and Mineral Reserve Estimation was carried out by the Island Gold Mine Technical Services department’s staff under the supervision of Raynald Vincent, P.Eng., M.G.P., Chief Geologist and Nathan Bourgeault, P.Eng., Chief Engineer of the Island Gold Mine. Both are considered Qualified Persons within the meaning of Canadian Securities Administrators’ National Instrument 43-101.
The Mineral Resource evaluation methodology involved the following procedures:
Database compilation and validation;
Construction of wireframe models for the boundaries of the gold mineralization;
Island Gold Mine – Ni 43-101 Technical Report  14
August 31, 2020


alamos2.jpg
Geostatistical analysis and variography;
Block modelling and grade interpolation;
Definition of Mineral Resource domains;
Assessment of “reasonable prospects for economic extraction” and selection of appropriate cut -off grades;
Preparation of the Mineral Resource Statement.
Mineral Resources as of December 31, 2019 are found in Table 1‑1.
Table 1-1  Island Gold Mineral Resources as of Dec 31, 2019
Mineral ResourceTonnesGrade (g/t Au)Ounces
Measured25,2004.523,700
Indicated853,4006.57180,300
Total Measured and Indicated878,6006.51184,000
Inferred5,392,30013.262,298,000

Notes:
CIM definitions of Mineral Resources were followed.
Mineral Resources are estimated at a cut-off grade of 4.03 g/t Au.
High-grade samples were capped at 75 g/t Au for most of the Upper Island Gold zones except IG-E1E and IG-C capped at 100 g/t Au, most of the Goudreau zones except for G2 and G6 capped at 100 g/t Au.
High-grade samples in Lochalsh were capped at 75 g/t Au for E1E, 45 g/t Au for D, 60 g/t Au for C and 55 g/t Au for E2.
In the Lower mine high-grade samples were capped at 90 g/t Au for B, 70 g/t Au for G and GNW, 45 g/t for G1, 50 g/t Au for D and STH, 40 g/t Au for D1, and 160 g/t Au for E1E zones.
Lower C zone has 2 capping grades, at 300 g/t Au inside the HG domain and at 225 g/t Au everywhere else.
Mineral Resources are estimated using a long-term gold price of $1,250 per ounce.
A minimum mining width of 2.00 m was used.
A specific gravity value of 2.78 t/m3 was used in the Lower Zones and 2.82 t/m3 otherwise.
Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.
Totals may not match due to rounding.
1.13 Mineral Reserve Estimate
The global Mineral Resource was reviewed by the Island Gold engineering department, with assistance from the geological staff, to define the Mineral Reserve blocks that could be economically extracted with a mining plan. The conversion of Mineral Resources into Mineral Reserves is based on the economic parameters detailed in Table 1‑2. Only Mineral Resources that are classified as Measured or Indicated Mineral Resource categories were used in the economic calculations to estimate Mineral Reserves as of December 31, 2019.
Island Gold Mine – Ni 43-101 Technical Report  15
August 31, 2020



alamos2.jpg
Table 1-2 Mineral Reserve Estimation Parameters
Mineral Reserves ParameterValue
Gold Price (USD)$1,250
Exchange Rate (USD/CAD)0.77
Stope Cut-off Grade (g/t Au)4.03
Development/Marginal Cut-off Grade (g/t Au)2.82
Stope Dilution1 (%)
15%-50%
Development1 Dilution (%)
20%-30%
Dilution Grade (g/t Au)0.5
Mining Recovery1 (%)
67%-95%
Process Recovery (%)96.5%
Ore Specific Gravity2 (t/m3)
2.78
Minimum Mining Width (m)2
Mining, Processing and G&A Cost (CAD $/t)203
Notes:
1.Dependant on sector and mining method.
2.2.82 t/m3 for Upper Mine.
Mineral Reserves as of December 31, 2019 are presented in Table 1‑3.
Table 1‑3 Island Gold – Mineral Reserve Estimate as of Dec 31, 2019
Mineral ReserveTonnesGrade (g/t Au)Ounces
Proven786,00013.48341,000
Probable2,857,0009.52874,000
Total Proven and Probable3,643,00010.371,215,000

Notes:
CIM definitions of Mineral Reserves were followed.
Mineral Reserves are estimated at a cut-off grade of 4.03 g/t Au.
High-grade samples were capped at 75 g/t Au for most of the Upper Island Gold zones except IG-E1E and IG-C capped at 100 g/t Au, most of the Goudreau zones except for G2 and G6 capped at 100 g/t Au.
High-grade samples in Lochalsh were capped at 75 g/t Au for E1E, 45 g/t Au for D, 60 g/t Au for C and 55 g/t Au for E2.
In the Lower mine high-grade samples were capped at 90 g/t Au for B, 70 g/t Au for G and GNW, 45 g/t for G1, 50 g/t Au for D and STH, 40 g/t Au for D1, and 160 g/t Au for E1E zones.
Lower C zone has 2 capping grades, at 300 g/t Au inside the HG domain and at 225 g/t Au everywhere else.
Mineral Reserves are estimated using a long-term gold price of $1,250 per ounce.
A minimum mining width of 2.00 m was used.
A specific gravity value of 2.78 t/m3 was used in the Lower Zones and 2.82 t/m3 otherwise.
Totals may not match due to rounding.
1.14 Mining Production Plan
The Island Gold deposit is accessed via a single decline from surface down to the 425 Level, at which point multiple ramps are utilized to access the main IG, IG West, Extension and East zones. These ramps are also connected at numerous points throughout the mine allowing for easy travel between mining zones.
The LOM plan includes the addition of a mine shaft which will be constructed between 2021 and 2025. Once commissioned, the shaft will be utilized to hoist ore and waste from the 1305
Island Gold Mine – Ni 43-101 Technical Report  16
August 31, 2020


alamos2.jpg
Level to surface. Additionally, the shaft will used to transport personnel and materials to any of the three shaft stations. From the shaft collar location ore and waste will be trucked to either the mill or the surface waste stockpile.
A total of 95 km of lateral and vertical development are planned as part of the life of mine. Of this total approximately 28% is operating development, 67% is capital development and 5% is planned to support exploration activities.
Presently, level accesses are designed towards the center of the ore vein and stopes are mined longitudinally from sill extremities towards the level intersection. As mining progresses deeper level accesses are designed to access the extents of the deposit with stopes being mined from the center towards the extremities to support improved mining stress management.
The mining method for a particular stope is selected based on a variety of factors such as overall geometry of the mineralization, width of the ore zone, local stresses, mapping and geotechnical data, spatial location of the stope, and existing nearby development and infrastructure. Other factors considered include equipment size and limitations as well as available fill type. Presently, stoping is undertaken with longitudinal open stoping (modified Avoca) and transverse open stoping. A limited amount of Alimak stoping will be undertaken, beginning in 2021.
Island Gold presently uses unconsolidated rockfill for most of the longitudinal stoping and cemented rockfill for transverse stoping. With the Phase III expansion a paste fill plant will be constructed and paste fill underground will be implemented.
An internal scoping in 2019 determined that expanding the mining rate beyond 1,200 tpd, to take advantage of the growing Mineral Resource, was viable. Furthermore, the scoping study concluded that two material transport options, continued truck haulage and a shaft for ore and waste, should be advanced to a pre-feasibility level of design and engineering.
In undertaking the Phase III Expansion Study, it was assumed that the Mineral Reserves and a significant portion of the Mineral Resource would ultimately be available for mining. Total Mineral Reserves and Mineral Resources included within the mine plans for the Study are 9.6 Mt at a gold grade of 10.45 g/t.
Three different mine capacity rates were examined, 1,200 tpd, 1,600 tpd, and 2,000 tpd. The current mill capacity of Island Gold is 1,200 tpd and this case was deemed the Basecase for the Study. Two material handling options were examined: ramp ore and waste haulage and skipping ore and waste with a shaft. In all five scenarios were developed: a ramp at 1,200 tpd (R1200) and at 1,600 tpd (R1600), and shaft at 1,600 tpd (S1600) and at 2,000 tpd (S2000). The ramp scenario at 1,200 tpd was evaluated with and without a paste plant (R1200NP), to assess the incremental economics of adding a paste plant on similar mining scenarios.
Detailed capital and operating costing models were developed for each of the five scenarios studied. Combining these models with the physicals, cash flow models were constructed that allowed for sensitivity analysis of costing and productivity input parameters. In comparing the five scenarios several observations were made that will focus on the R1200, R1600 and S2000 scenarios.
Capital costs increase moving from the R1200 scenario to the R1600 scenario to the S2000 scenario. The increase in capital from the R1200 to the R1600 is attributable to the increase in daily mining capacity requiring more trucks, ventilation infrastructure and an additional ramp to surface, in addition to the cost associated with expanding the milling capacity. The increase in capital from the R1600 scenario to S2000 scenario is attributable to construction of the shaft and hoisting facility and the capital required to expand the mill to 2,000 tpd, partially offset by less capital required for trucks, ventilation infrastructure and capital development.
Island Gold Mine – Ni 43-101 Technical Report  17
August 31, 2020



alamos2.jpg
Productivity levels between the R1200 scenario and R1600 are very similar and begin to drop as the mine gets deeper and it takes longer for employees to enter and leave the mine. Productivity levels dramatically increase with the use of the shaft to transport personnel. Using 2020 as a baseline, effective time at the face increases by 20% with the shaft. With additional time at the face, development metres per employee and stoping tonnes per employee increase. Increased productivity results in less personnel required to attain the same tonnage or alternatively the same number of personnel to achieve higher tonnage rates.
With the ramp scenarios mining costs increase over the mine life due to increased haulage cycle times from lower mine horizons (Figure 1-1). Mine unit operating costs decrease moving from the R1200 scenario to the R1600 scenario to the S2000 scenario. Annual mining costs decrease moving from the R1200 scenario to the R1600 scenario because of economies of scale, namely the sharing of fixed costs such as supervision, engineering, and geology, pumping etc. over more tonnes. Costs are further reduced moving to the S2000 scenario as a result of economies of scale, operating less trucks and reduced ventilation costs.
image44.jpg
Figure 1‑1 Mining Units Costs
The two primary conclusions from the Study were:
The paste plant should be built given:
The 100,000 additional ounces produced;
The increased geotechnical de-risking; and
Positive after-tax IRR of 32%.
In expanding the Island Gold Mine, the shaft at a 2,000 tpd mining rate (S2000) scenario should be adopted given that it:
Provides the strongest economics (free cash flow, after-tax NPV, and IRR) of all the scenarios studied;
Provides the highest annual gold production;
Island Gold Mine – Ni 43-101 Technical Report  18
August 31, 2020


alamos2.jpg
Has the lowest operating costs, as well as the lowest cash costs and mine-site all-in sustaining costs per ounce;
Has the lowest combined operating and capital costs;
Provides access to higher grade stopes sooner in the mine life
De-risks the lower mine operation;
Provides for reduced congestion and reduced personnel and mobile fleet requirement; and
Provides a significantly reduced carbon footprint and reduced exposure to diesel price and carbon tax increases.
Based upon these conclusions Island Gold is proceeding the permitting and construction of the paste plant, the shaft complex and mining at a rate of 2,000 tpd.
1.15 Processing
The current process plant at Island Gold is composed of a two-stage crushing circuit followed by a two-stage grinding circuit. The mill uses cyanide leaching and a carbon-in-pulp process to recover gold.
To determine the maximum throughput capability of the existing process plant equipment, and to provide several alternatives for additions to the grinding circuit and balance of plant, an assessment of the current plant flowsheet was undertaken. The major element effecting the throughput of the plant is the comminution circuit, specifically milling, therefore, the assessment of the current and recommended crushing and milling areas were completed first which lead into the assessment of the balance of the plant.
In all, six options for increasing the plant throughput were evaluated as part of this study, with two options considering an increase from 1,200 tpd to 1,600 tpd, two options considering a staged increase from 1,600 tpd to 2,000 tpd, and two options considering and increase directly from 1,200 tpd to 2,000 tpd.
The six options (Options “A” to “F”) were evaluated with consideration of their metallurgical performance (potential for gold loss mitigation), versatility (ability to cope with spikes in head grade, varying feed particle sizes, mitigation of bottlenecks), construction complexity (duration of downtime, tie-in points to the existing plant), equipment reliability and capital and operating costs.
Upon evaluation of each option, it was decided to proceed with a combination of Options A and C, which in summary involves upgrades to the crushing plant, changes to the fine ore storage arrangement, addition of a new ball mill, addition of a Pumpcell plant and a new elution circuit.
1.16 Infrastructure
1.16.1 Surface Site Infrastructure
The Island Gold Mine is accessed via a singular portal and decline. The ore stockpile pad and waste storage are located directly adjacent to the mine portal. The mill feed is hauled approximately 1 km from the stockpile to the mill complex. The maintenance facility, surface office and dry complex are located adjacent to the mill. The Kremzar Portal, accessing old mine workings, is detached from current underground mine, and is utilized to access the bottom of the surface ore bins, which are used to feed the crusher section of the mill.
Island Gold Mine – Ni 43-101 Technical Report  19
August 31, 2020



alamos2.jpg
The primary tailings pond is located approximately 500 m west of the mill and the secondary pond is located just west of the portal area. Mine ventilation is via two surface fresh air fans and raises located adjacent to Goudreau Road, approximately 2.5 km away from the main site along with one exhaust raise located across from the fresh air fans.
1.16.2 Tailings Management
The tailings management facility (TMF) represents the main water retention structures on the mine site. It consists of two ponds, the Primary Pond and the Secondary Pond which acts as a polishing pond in addition to water transfer systems via a siphon system. The Primary Pond (built in the former Miller Lake basin) occupies an area of 109 ha. The Secondary Pond has an area of 22 ha.
Tailings slurry is conveyed by a pressurized pipeline from the mill and spigotted around the inside perimeter of the Primary Pond. The surface of the tailings forms a sloped beach allowing for a pond to form at the lowest part. Water is reclaimed (pumped) from the Primary Pond to the mill. Both the primary tailings and reclaim pipes are placed in an engineered ditch, with drainage to an emergency catchment section (with an area of 0.8 ha) at its lowest points and reinforced by construction of earthen berms. The TMF also includes seepage collection and pump back systems at dykes Nos. 1 and 2 at the Primary Pond; these were built to prevent any migration of seepage to Maskinonge Lake.
Water treatment is managed through natural degradation in the Primary Pond and Secondary Pond. Natural degradation is primarily active during ice-free periods, and batch discharge cycles are timed to accommodate the natural processes. Cycle duration is typically 40 days:
10 days transfer from the Primary Pond to the Secondary Pond;
20 days of final polishing at the Secondary Pond; and
10 days discharge of treated water from the Secondary Pond to the receiving environment in a series of streams, wetlands, and ponds, eventually discharging into the central part of Goudreau Lake.
Water quality is routinely monitored in the Primary Pond and Secondary Pond, and in Goudreau Lake at the discharge point and downstream. A comprehensive water monitoring program has been implemented for the site, and includes twelve compliance sampling locations, and effluent limits as mandated by the MECP.
1.16.3 Phase III Infrastructure Expansion
Island Gold recently undertook an engineering and economics study on a possible Phase III Expansion to increase underground tonnage rates and implement associated infrastructure upgrades as required. The study involved the evaluation of five scenarios (reduced from 12 during the scoping study), which demonstrated that the Shaft Expansion at a new production profile of 2,000 tpd was the most economic, most efficient, and productive alternative. This also best positions Island Gold to capitalize on further growth in Mineral Reserve and Mineral Resources. The Phase III Expansion will result in the construction of a new shaft amongst many other infrastructure upgrades as listed below:
Development of a new production/service shaft down to 1,373 m in depth (initial depth);
Development/implementation of a new ore and waste handling system underground;
Upgrade to the main site power supply;
Construction of a paste plant and underground distribution system;
Upgrade of the existing mill from 1,200tpd to 2,000tpd;
Island Gold Mine – Ni 43-101 Technical Report  20
August 31, 2020


alamos2.jpg
Upgrade of the Tailings Management Facility to process higher and longer LOM production; and
Upgrade of the mine water treatment system.
1.17 Environmental Studies, Permitting and Social or Community Impact
From exploration to operations to closure, one of the goals at the Island Gold Mine is to safeguard the environment, educate its employees and the communities about the mine’s environmental programs and commitments, and apply best management practices to prevent or mitigate any potential environmental impacts. The operations at Island Gold use a range of materials and consumables that includes explosives, chemicals, and fuels.
The Island Gold Mine is located within the Maskinonge Lake and Goudreau Lake sub-watersheds (total area of 48.2 km2), approximately 40 km south of the Arctic drainage divide. Both sub-watersheds are part of the Michipicoten-Magpie watershed and Lake Superior Drainage Basin. Surface water drainage at the site is bedrock-controlled, generally flowing from northeast to southwest within the valleys between the elongated hills and ridges.
A comprehensive environmental monitoring program is in place at the Island Gold Mine. It includes inspections, sampling schedules, data management and reporting. Also included in the program are sampling frequency, various parameters of concern (for field and laboratory analyses) and QA-QC procedures. Key performance indicators are tracked, and any deviations from targets are addressed and corrected.
Tailings, water management and final effluent monitoring and quality requirements are regulated under an amended ECA (No. 9118-B9CM3R) which was issued in May 2019. This ECA also allows for a mill production rate of up to 38,480 tonnes per month. Final treated water from the mine flows into the upper portion of Goudreau Lake via Goudreau Creek, which flows into the Michipicoten River system, entering Lake Superior near Wawa.
Additional monthly surface water quality monitoring is conducted by Island Gold Mine at two locations in Goudreau Lake (the receiving water body), one on Maskinonge Lake and one on Pine Lake. Both Maskinonge Lake and the upper basins of Goudreau Lake would be characterized as meeting provincial objectives. For the most part, metal concentrations were below their respective Provincial Water Quality Objectives (PWQO), with levels of many metals below the Method Detection Limit (MDL). Annual results have been comparable from 2007 to 2019.
Air and noise discharges are regulated under an amended ECA, No. 1821 BAWLAC which was issued in May,2019 to the Island Gold Mine, allowing for an annual ore processing rate of 461,760 tonnes per year.
The ECA requires that the Island Gold Mine be in compliance with Ontario Regulation 419/05, applicable MECP Guidelines for Air and Noise, and other performance requirements as specified in their conditions. It allows modifications such as process changes, de-bottlenecking, or addition of new equipment subject to limits on operational flexibility.
Alamos Gold’s strategy is to reduce consumption, reuse any waste generated, and dispose final waste in a safe and responsible manner. A Waste Management Procedure (WMP) has been developed and implemented for the site; it provides guidance to site and non-site personnel on the handling, processing and disposal of waste, including hazardous waste and domestic materials generated during the normal operations of the facility.
Excess underground waste rock is transported to the surface and stockpiled for use as future backfill and/or maintaining site roads and future dam raise projects. In 2019, Golder was
Island Gold Mine – Ni 43-101 Technical Report  21
August 31, 2020



alamos2.jpg
subcontracted to conduct an assessment on the geochemistry of Island Gold tailings and waste rock. Historical documentation, from Wood PLC, (formerly AMEC) was also reviewed. Golder determined that the waste rock did not generate any acid-rock drainage (ARD) nor metal leaching and recommended reducing the sample analyses to monthly. Weekly analyses were conducted for tailings and waste for metal leaching and ARD and kinetic testing of these materials is underway.
Anticipated permitting activities identify and address the various municipal, provincial, and federal regulatory requirements applicable to the Island Gold Mine. Relevant agencies for Phase III permitting needs include Department of Fisheries and Oceans (DFO), Ministry of the Environment and Conservation and Parks (MECP), Ministry of Natural Resources and Forestry (MNRF), and Ministry of Energy, Northern Development and Mines (ENDM).
Island Gold’s philosophy is to maximize local hiring of employees from the labour pool in the surrounding communities. This has increased the economic stability of the local communities of Dubreuilville, Wawa and White River who have been hit hard by the downturn of the forestry industry.
To date the following Indigenous groups have been identified as having varying degrees of interest in the area of the Island Gold Mine: Michipicoten First Nation (MFN), Missanabie Cree First Nation (MCFN), Batchewana First Nation (BFN), the Garden River First Nation (GRFN). A Community Benefits Agreement (CBA) was signed with the Missanabie Cree First Nation in March 2017 and is valid until March 2024. Other Indigenous groups that may have interest in the mine are include the Métis Nation of Ontario (MNO).
The Island Gold Closure Plan (the “Closure Plan” details the decommissioning strategy for the Island Gold Mine. It reflects the current and expected site conditions and defines a program which ensures the long-term chemical and physical stability of the site. The goal of the Closure Plan is to ensure that chemical and physical impacts to the site are minimized during operations and that the site is returned as closely as possible to pre-development conditions at close-out. The Closure Plan has been developed using data collected during physical, chemical, and biological studies of the site (treated effluent, surface water, ground water, ore/waste rock) and the surrounding environment during advanced exploration and production phases.
1.18 Capital and Operating Costs
1.18.1 Capital Expenditures
As this report covers an expansion scenario at Island Gold, capital expenditures are divided into two distinct categories: growth capital and sustaining capital.
Growth capital expenses are defined as expenditures that allow the mine to expand from the current throughput of 1,200 tpd to 2,000 tpd. Once the Shaft Expansion is completed and production has sustainably reached the targeted tonnage for a period of three months, all further capital expenditures are classified as sustaining capital.
Sustaining capital expenditures are expenditures related to sustaining the existing production and operating plan and allow Island Gold to mine its current Mineral Reserves, and a portion of its Mineral Resources, during, and post, the project period. The project period is defined as 2020 to 2025 and the post project period is defined as 2026 to the end of the life of the mine. Table 1‑4 summarizes the total capital costs.

Island Gold Mine – Ni 43-101 Technical Report  22
August 31, 2020


alamos2.jpg
Table 1-4 Total Capital Costs
Total Capital CostLOM C$MLOM US$M
Sustaining Capital$736$552
Growth Capital$685$514
Total Capital Costs$1,421$1,066
The sustaining capital requirements reported in the Study for the Shaft Expansion total $736 million and include $6 million of reclamation costs, $29 million of contractor indirects, $27 million of contingency, and $26 million of delineation drilling. In the Shaft Expansion mine development will require the largest sustaining capital investment, totaling $373 million from 2020 to 2033. Table 1‑5 presents the life of mine sustaining capital expenditures for the S2000 (Shaft Expansion) scenario.
Table 1-5 Sustaining Capital Costs
Sustaining Capital CostLOM C$MLOM US$M
TSF Earthworks$13$10
Misc. U/G Infrastructure$14$10
U/G Mine Dewatering$23$17
U/G Power$58$43
General UG Facilities$24$18
Mobile Equipment$144$108
Sub-total Direct costs$276$207
Indirects$29$21
Contingency$27$21
Delineation Drilling$26$20
Capital Development$373$280
Total Sustaining Capital$730$548
Reclamation$6$4
Total Sustaining Capital (including Reclamation)$736$552
The Island Gold growth capital expenditures for the Shaft Expansion are estimated to be $685 million, including; $315 million of direct costs, $133 million of indirect costs (contractor indirects, EPCM, and owner’s costs), $70 million of contingency, and $166 million of capital development (Table 1‑6). This is expected to be spent between 2020 and 2025, until the completion of the shaft and mill expansion by 2025 with the bulk of this spending occurring between 2021 and 2024.
Island Gold Mine – Ni 43-101 Technical Report  23
August 31, 2020



alamos2.jpg
Table 1-6 Growth Capital Costs
Growth Capital CostLOM C$MLOM US$M
Site Wide Surface Works$41$31
Power Upgrade$18$14
Mill Expansion$36$27
Paste Plant$38$28
Shaft Surface Works$9$7
Headframe and Hoisting Plant$59$44
Shaft Sinking and Equipping$78$59
U/G Ore and Waste Handling$13$9
U/G Misc.$18$14
Other$6$5
Subtotal Direct Costs$315$236
Indirect Costs$104$78
EPCM$22$17
Owner's Costs$7$5
Contingency$70$52
Capital Development$166$125
Total Growth Capital$685$514
1.18.2 Operating Costs
Operating expenses were calculated using the Island Gold’s 2020 budget as a reference point where applicable and were developed from first principles when budgetary items were not available. The 2020 budget costs were adjusted to reflect increases related to mining at greater depths, increased operational efficiencies associated with shaft access and higher underground throughput. Fixed and variable components of cost centers were considered. Costs were adjusted to reflect the total volume of material moved (waste and ore) per year. Costs were also adjusted to reflect the reduction in labour related to the completion of capital development activities.
Total LOM operating costs, as presented in Table 1-7, amount to $1,747M (US $1,310M), including silver by-product credits, royalties and refining and transportation charges. This translates into an average cost of $182/t mill feed processed over the life of mine ($176/t from 2026 to 2035 when the mine is at 2,000 tpd).
Island Gold Mine – Ni 43-101 Technical Report  24
August 31, 2020


alamos2.jpg

Table 1‑7 Summary of Operating Costs
Operating CostC$/t ProcessedLOM C$MUS$/t ProcessedLOM US$M
Mining$98$936$73$702
Processing$31$300$24$225
G&A$39$377$29$283
Subtotal$168$1,613$126$1,210
Silver Credit-$1-$12-$1-$9
Royalties$15$146$11$109
TOTAL Operating Costs$182$1,747$137$1,310
1.19 Economic Analysis
1.19.1 Taxes
Island Gold will be subject to provincial, federal, and mining taxes as follows:
Ontario Mining Tax: 10%;
Ontario Provincial Income Tax: 10%; and
Federal Income Tax: 15%.
The rates above are current as of the date of this report and are subject to change in the future. Based on these rates and the financial assumptions used in this report, Island Gold is expected to have payable income and mining taxes of $620M (US$465M) over its 16-year life. Alamos has various Canadian tax pools that could be applied against future income from its Canadian operations, and 60% of the pools were used in this study to reduce taxes payable at Island Gold.
1.19.2 Royalties
Island Gold is subject to third-party royalties that range between 0.6% and 3.0% on certain claims, with an average royalty rate of 2.4% over the mine life. Total royalties included in the economic analysis of this report are $146M (US$109M).
1.19.3 Economic Analysis
Island Gold’s shaft expansion project is economically viable with an after-tax internal rate of return (IRR) of 17% over the Basecase ramp scenario, as demonstrated in Table 1‑8. The after-tax net present value at 5% (NPV5%) of the Island Gold mine for the shaft scenario is $1,359M (US$1,019M). Other economic factors used in the economic analysis include the following:
US $1,450/oz gold, US $16.00/oz silver and a $0.75 USD/CAD were used in the cash flow model;
Discount rate of 5%;
Closure cost of $5.7M (US $4.3M);
No salvage assumed at the end of mine life; and
Island Gold Mine – Ni 43-101 Technical Report  25
August 31, 2020



alamos2.jpg
Exclusion of all costs prior to 2020. However, 60% of Alamos’ Canadian tax pools as of December 31, 2019 are utilized in the tax calculations.
Table 1-8 Summary of Economic Results
CategoryUnitValue (C$)Value (US$)
Net Revenues$M$6,000$4,500
Operating Costs1
$M$1,747$1,310
Capital Costs & Closure Costs$M$1,421$1,066
Total Cash Cost
(over life of mine)
$/oz$563$422
Total Cash Cost
(post-shaft completion)
$/oz$537$403
Mine-Site All-In Sustaining Cost (over life of mine)$/oz$798$598
Mine-Site All-In Sustaining Cost (post-shaft completion)$/oz$713$534
Net After-Tax Cash Flow$M$2,212$1,659
After-Tax NPV5%$M$1,359$1,019
After-Tax IRR2
%17%17%
Notes:
1.Operating Costs and Cash Costs include mining, processing, G&A, royalties, transport & refining costs, and silver credit;
2.IRR is calculated on the differential after-tax cash flow between the shaft expansion scenario and the base case of continuing to mine at 1,200 tpd with ramp only access.
A sensitivity analysis of the after-tax results was performed using various gold prices. The results of this analysis are demonstrated in Table 1‑9.
Table 1-9 Gold Price Sensitivity on NPV and IRR
Gold PriceAfter-Tax NPV (C$M)After-Tax NPV (US$M)
After-Tax IRR1 (%)
$1,250$969$72714%
$1,350$1,165$87416%
$1,450$1,359$1,01917%
$1,550$1,552$1,16419%
$1,650$1,744$1,30820%
$1,750$1,934$1,45022%
$1,850$2,124$1,59324%
Notes:
1.IRR is calculated on the differential after-tax cash flow between the shaft expansion scenario and the base case of continuing to mine at 1,200 tpd with ramp only access
1.20 Interpretations and Conclusions
Alamos personnel reviewed and audited the historical exploration data available for the Island Gold Mine as well as the exploration methodologies adopted to generate the data. Exploration work is professionally managed, and procedures are adopted that meet accepted industry best practices. The author is of the opinion that the exploration data is sufficiently reliable to interpret
Island Gold Mine – Ni 43-101 Technical Report  26
August 31, 2020


alamos2.jpg
with confidence the boundaries of the gold mineralization and support evaluation and classification of Mineral Resources in accordance with generally accepted CIM Estimation of Mineral Resource and Mineral Reserve Best Practices Guidelines and CIM Definition Standards for Mineral Resources and Mineral Reserves.
The drilling database includes information from 6,411 drill holes (831 form surface and 5,580 from underground) comprising 1,363,350 m of drilling.
The mining methods used at Island Golf include longitudinal open stoping and transverse open stoping and are deemed suitable considering the geometry of the orebody.
Island Gold performs regular reconciliations between production and the reserve block model and results have generally been within industry acceptable ranges. Island Gold uses the reconciliation process to validate its Mineral Resource estimation parameters and procedures.
Island Gold has undertaken a detailed engineering and economic study of five possible scenarios to mine the Mineral Reserves and Mineral Resources. Island Gold has concluded that constructing a shaft to a depth of 1,373 m and expanding the mining and milling capacity to 2,000 tpd is the best way to proceed.
The current 1,200 tpd mill consistently achieves recoveries of greater than 96%. In undertaking the Shaft Expansion, the mill will be expanded to 2,000 tpd with the addition of an additional primary ball mill, modification to the crushing circuit and other upgrades, additions, and expansions within the circuit.
As part of the Shaft Expansion and to support sustainable development of mine going forward the following infrastructure upgrade will be undertaken:
Development of a new production/service shaft down to 1,373 m in depth (initial depth);
Development/implementation of a new ore and waste handling system underground;
Upgrade to the main site power supply;
Constructions of a paste plant and underground distribution system;
Upgrade to the Tailings Management Facility to suit longer LOM production; and
Upgrade to mine dewatering and water treatment system.
The Island Gold Mine is operating within environmental compliance.
A number of operational permits will need to be amended to allow for the expansion up to 2,000 tpd. In addition, a number of other permits will need to be acquired for construction activities. Permitting is expected to take between 18 and 24 months.
The Island Gold Mine has been and will continue to be major contributor to the local economy. Alamos will continue to engage and work with area Indigenous communities and other communities of interest.
The shaft expansion option is economically viable with an after-tax internal rate of return (IRR) of 17% IRR, which is calculated on the differential after-tax cash flow between the Shaft Expansion scenario and the Basecase scenario of continuing to mine at 1,200 tpd with ramp only access. After-tax net present value at 5% (NPV5%) is $1,359M (US $1,019M).


Island Gold Mine – Ni 43-101 Technical Report  27
August 31, 2020



alamos2.jpg
1.21 Recommendations
At the conclusion of the Phase III Expansion Study the following recommendations are being made:
Continue to invest in the surface exploration drilling program to potentially add to the Mineral Resource base;
Continue with the underground delineation drilling program to convert Inferred Mineral Resources to Indicated Mineral Resources;
Complete the geology model and deploy it to aid in identifying additional targets on the Island Gold Property;
Continue with the production to Mineral Reserve reconciliations to further refine Mineral Resource estimation parameters and methodologies;
Proceed with the paste fill plant construction;
Proceed with the Shaft Expansion project;
Start early works engineering as soon as possible to advance the procurement of long lead time items and help inform the permitting process;
Continue with the environmental baseline program to support the permitting program; and
Initiate the process of amending existing operational permits and acquire a series of new permits and/or authorizations for both future operational requirements and Phase III construction related activities.
Island Gold Mine – Ni 43-101 Technical Report  28
August 31, 2020


alamos2.jpg

2 INTRODUCTION
In a press release dated July 14, 2020, Alamos announced the results of its Phase III Expansion Study (“Phase III”) completed on the Island Gold Mine, located in Northern Ontario, Canada. Having successfully completed expansions to 1,100 tpd and 1,200 tpd at Island Gold, the objective of Phase III was to consider the most cost and capital effective strategy to increase annual production and mine the current Mineral Reserves, and the Mineral Resources located to a depth of 1,500 metres. This report outlines the results of that study and conforms to National Instrument 43-101 Standards of Disclosure of Mineral Projects (“NI 43-101”).
The study involved the evaluation of five scenarios, which demonstrated that the Shaft Expansion at a new production profile of 2,000 tpd was the most economic, most efficient, and productive alternative. This also best positions Island Gold to capitalize on further growth in Mineral Reserve and Resources. The Phase III Expansion will result in the construction of a new shaft amongst and other infrastructure upgrades.
Island Gold utilized the services of a several consulting firms to design and cost the components making up the various options. They included:
Hatch Ltd (“Hatch”) was commissioned to undertake the design and engineering of the overall surface infrastructure as well as the underground ore and waste handling system. Hatch also aided in generating the life mine mining costs (Hatch, 2020);
Cementation Canada Inc. (“Cementation” was commissioned to do the shaft sinking design and engineering;
Golder Associates Ltd. (“Golder”) was commissioned to evaluate the life of mine tailings requirements and water treatment options and develop the design and engineering around them (Golder 2020a). As well Golder, undertook the paste testwork and plant design and engineering (Golder 2020b). Golder is currently undertaking the environmental baseline monitoring and permitting;
Halyard Inc. (“Halyard”) developed various flowsheet options to expand the existing milling facility to 1,600 and/or 2,000 tpd and undertook the design and engineering for these options (Halyard, 2020);
Airfinders Inc. (“Airfinders”) undertook the ventilation network design and engineering;
All the consultants were engaged to provide input and contributed to the development of the Operating Cost (OPEX) and Capital and Sustaining Capital Expenditures (CAPEX); and
Island Gold reviewed and developed those elements of the Project relating to the geological setting and mineralization, Mineral Resources, mine plan, market studies and contracts and economic analysis. Island Gold and Alamos compiled the overall Technical Report.
2.1 Terms of Reference
All costs are in Q2 2020 Canadian dollars unless otherwise stated.
All units of measurement are in metric, unless otherwise stated.


Island Gold Mine – Ni 43-101 Technical Report  29
August 31, 2020



alamos2.jpg
2.2 List of Qualified Persons
Table 2-1 sets out the Qualified persons responsible person for each section of this Technical Report.
Table 2‑1 Section Qualified Persons
SectionDescriptionQualified PersonCompany
1SummaryAll in part
2IntroductionNathan Bourgeault &
Raynald Vincent
Island Gold
3Reliance on Other ExpertsNathan Bourgeault &
Raynald Vincent
Island Gold
4Property Description and LocationRaynald VincentIsland Gold
5Accessibility, Climate, Local Resources, Infrastructure and PhysiographyRaynald VincentIsland Gold
6HistoryRaynald VincentIsland Gold
7Geological Setting and MineralizationRaynald VincentIsland Gold
8Deposit TypesRaynald VincentIsland Gold
9ExplorationRaynald VincentIsland Gold
10DrillingRaynald VincentIsland Gold
11Sample Preparation, Analyses and SecurityRaynald VincentIsland Gold
12Data VerificationRaynald VincentIsland Gold
13Mineral Processing and Metallurgical TestingNathan BourgeaultIsland Gold
14Mineral Resource EstimatesRaynald VincentIsland Gold
15Mineral Reserve EstimatesRaynald Vincent &
Nathan Bourgeault
Island Gold
16Mining MethodsNathan BourgeaultIsland Gold
17Recovery MethodsNathan BourgeaultIsland Gold
18Project InfrastructureNathan BourgeaultIsland Gold
19Market Studies and ContractsNathan BourgeaultIsland Gold
20Environmental Studies, Permitting and Social or Community ImpactColin WebsterIsland Gold
21Capital and Operating CostsNathan BourgeaultIsland Gold
22Economic AnalysisNathan BourgeaultIsland Gold
23Adjacent PropertiesRaynald VincentIsland Gold
24Other Relevant Data and Informationn/a
25Interpretations and ConclusionsAll in part
26RecommendationsAll in part
27ReferencesAll in part
2.3 Site Visits
The following Qualified Persons (QPs) visited the Island Gold Site as indicated below:
Island Gold Mine – Ni 43-101 Technical Report  30
August 31, 2020


alamos2.jpg
Raynald Vincent, P.Eng., M.G.P., Chief Geologist, Island Gold Mine is employed at the site;
Nathan Bourgeault, P.Eng., Chief Engineer, Island Gold Mine is employed at the site; and
Colin Webster, P.Eng., Vice President – Sustainability and External Affairs, Alamos Gold Inc, has visited the site on numerous occasions during the previous year with his last site visit occurring February 10th to 12th, 2020.

Island Gold Mine – Ni 43-101 Technical Report  31
August 31, 2020



alamos2.jpg
3 RELIANCE ON OTHER EXPERTS
The Qualified Persons have relied on the input from Alamos and qualified independent consulting companies in preparing this report. This report was prepared using the reports and documents noted in Section 27 “References”.
The Qualified Persons responsibilities were to assure that this NI 43-101 Technical Report met the stipulated guidelines and standards considering that the designs, engineering, and costing in this Report were contributed by Hatch, Cementation, Golder, Halyard, Airfinders, Alamos, or other Alamos consultants.
The information, conclusions, opinions, and estimates contained herein are also based on data, reports, and other information supplied by Alamos and the other party sources.
Island Gold Mine – Ni 43-101 Technical Report  32
August 31, 2020


alamos2.jpg

4 PROPERTY LOCATION AND MINING TITLES
4.1 Location
The Island Gold Property is situated 43 km northeast of Wawa, Ontario within the Ontario Ministry of Energy, Northern Development and Mines (MENDM) Sault Ste. Marie Mining Division. The town of Dubreuilville, a forestry center, is 10 km to the northwest of the mine site. Access to the area is provided by the TransCanada Highway (Highway 17), which continues north from Wawa for 35 km then following Highway 519 to Dubreuilville. The Goudreau Road, an all-weather road, extends east from Dubreuilville for 17 km to the mine site (Figure 4-1).
image43.jpg
Figure 4-1 Island Gold Mine Location
4.2 Description of Mining Titles and Recorded Interests
The Island Gold Property (Figure 4-2), which is divided into nine (9) property areas, namely: Argonaut, Edwards, Ego, Goudreau, Goudreau Lake, Island Gold, Kremzar, Lochalsh and Salo is comprised of 831 tenures consisting of patented fee simple and/or patented leasehold mining rights and surface rights claims, mining licences of occupation and unpatented cell claims covering approximately 9,511 hectares. Alamos holds 100% of the title and/or interest in the afore mentioned tenures, with the exception of:
Part of one (1) mining lease, for which it holds 100% below 100 m in elevation, on the Lochalsh property;
Six (6) patented fee simple claims, for which it owns 100% below 400 m in elevation, and part of one patented fee simple claim for which it owns 100% below 100 m in elevation, both situated on the Goudreau property; and,
Three (3) patented fee simple claims, for which it owns 100% below 400 m in elevation, on the Argonaut property.
Island Gold Mine – Ni 43-101 Technical Report  33
August 31, 2020



alamos2.jpg
image29.jpg
Figure 4‑2 Mining Titles Map – Island Gold Mine Property

Notwithstanding the foregoing, while the Company has carried out reviews of the registered title and recorded interests to its patented fee simple and/or patented leasehold mining rights and surface rights claims, mining licences of occupation and unpatented cell claims, this should not be construed as a guarantee that such title and/or such interests will not be challenged or impugned. Said patented fee simple and/or patented leasehold mining rights and surface rights claims, mining licences of occupation and unpatented cell claims may be subject to prior unregistered agreements or transfers or native land claims, and therefore title and/or interests may be affected by undetected defects.
Collectively, the Island Gold Property is subject to eleven (11) separate agreements with different obligations and royalties for each agreement.
Each of the Patented Claims are surveyed and do not have annual assessment work obligations. Taxes covering provincial land tax levies and MENDM mining land taxes, along with Crown rents are paid annually to the provincial government to keep the Patented Claims in good standing. While Cell Claims are not surveyed but are staked, said Cell Claims do require that minimum assessment work be completed annually either by conducting exploration work or by distributing banked assessment work credit available from contiguous Patented Claims and/or Cell Claims, to facilitate renewal of the expiring Cell Claim on or before its anniversary date.
Alamos has a dedicated land and tenure manager, along with internal procedures and measure to ensure compliance, validity and good standing of its Patented Claims and Cell Claims.
The mineralized zones, including those containing the Mineral Resources and Mineral Reserves, are located on patented Crown leasehold claims SSM724370, SSM825287, SSM825288, SSM825290, SSM837118, SSM991852, SSM991853, SSM991854, SSM991855, SSM991856, and SSM991857, and on patented fee simple claims SSM2264, SSM2490, SSM2491, SSM2666, SSM2667, and SSM3817. The ramp and waste pad are on patented fee simple claims SSM1776 and SSM1710.
Island Gold Mine – Ni 43-101 Technical Report  34
August 31, 2020


alamos2.jpg
4.3 Ownership of Mineral Rights
All titles and interest pertaining to the patented fee simple claim, the patented leasehold claims, mining licences of occupation, and Cell Claims relating to the Island Gold Property are owned and/or held by Alamos.
4.4 Mining Royalties
The following royalties apply to the currently defined Mineral Reserves and Mineral Resources:
The Lochalsh property is subject to a 3% net smelter returns (NSR) payable to Osisko Gold Royalties Ltd. (“Osisko”);
The Goudreau Lake property is subject to a 1.38% NSR royalty payable to Osisko and a 0.62% NSR royalty payable to Franco-Nevada Corporation, and a 10.35% net profit interest (NPI) royalty in favour of a private company; and
The Goudreau property is subject to a 2% NSR royalty payable to Osisko and a 15% NPI royalty payable to a private company.
4.5 Other Mineral Royalties
In addition to the above-mentioned Mining Royalties set out in Section 4.4, the Island Gold Property is also subject to property specific royalties and financial contractual obligations. None of these following property areas currently contain a defined Mineral Resources or Mineral Reserves.
The Kremzar property is subject to a 4% NSR royalty payable to a private company pursuant to the underlying NSR royalty agreement;
The Kremzar property is also subject to a 3% NSR royalty payable to Osisko, which is payable until such time as the private company’s NSR royalty becomes payable. In the event that the private company’s NSR royalty becomes payable and is reduced below 4%, Osisko will then be entitled to receive a NSR royalty equal to 50% of the amount by which the private company’s NSR royalty is reduced, payable on the same terms as the private company’s NSR royalty;
The Salo property is subject to a 2% NSR royalty in favour of private individuals, as to their specified individual percentage interest;
The Edwards property is subject to a 2% NSR royalty in favour of Franco Nevada Corporation, and a 1.5% NSR royalty in favour of Skead Holdings Ltd.; and
There is a 10% NPI royalty in favour of Cavendish Investing Ltd. (“Cavendish”) on four claims comprising the Argonaut property.
Island Gold Mine – Ni 43-101 Technical Report  35
August 31, 2020



alamos2.jpg

5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE
AND PHYSIOLOGY
5.1 Access
Access to the area is provided by the TransCanada Highway (Highway 17), which continues north from Wawa for 35 km then following Highway 519 to Dubreuilville which is 10 km to the northwest of the mine site. The Goudreau Road, an all-weather road, extends from east Dubreuilville for 17 km to the mine site.
5.2 Climate
The Island Gold Property is contained within the Lake Superior Regional climatic zone. This area borders the north shore of Lake Superior from Sault Ste. Marie to Thunder Bay and extends inland approximately 40 to 80 km. The climate is described as "modified continental", the modification being due to impacts of Lake Superior. Climatologic records for temperature, precipitation and wind obtained from the Wawa weather station are considered to be representative of the actual conditions at the Island Gold Mine site.
The mean annual temperature is about 10C, with extremes of –51˚ C and 38˚ C being recorded. January is the coldest month and July the warmest.
Precipitation is in the range of 980 mm per year, with about 600 mm as rainfall and evaporation at 517mm/year principally during the summer months. Peak months for rainfall are August and September, with over 100 mm typically in September. Snow cover generally persists from late October to early May, with 50 to 60 mm (water equivalent) occurring monthly.
Approximately 45% of the annual precipitation is lost as runoff, with 50 to 60% of the total annual runoff occurring in April and May in association with spring melt and spring rains.
Average annual wind speeds are in the range of 7 to 15 km/hr. Winds from the northwest through north are most prevalent during the winter, while winds from the southwest through west dominate in the summer months. East winds are infrequent in all months. The percentage of calm is high at 21 to 36 %.
5.3 Local Resources
Wawa has a population of approximately 3,500 inhabitants and, Dubreuilville, originally a forestry community, has a population of approximately 900 permanent residents and contains accommodations for mine personnel. The Island Gold Mine is also within a few kilometres of railway lines operated by Canadian National and Algoma Central Railways. Sidings for each of these railway lines are in the villages of Goudreau and Lochalsh.
A hydro-electric power substation, water supply, gravel roads, offices, maintenance buildings, and living accommodations are all available within the mine’s general area. Power is connected to the provincial power grid and is supplied by Algoma Power Inc. “API”).
Island Gold offers temporary living accommodations and flexible schedules to its non-local employees. Training is offered to maintain a local qualified workforce.
5.4 Surface Infrastructure
The Island Gold Mine infrastructure includes a primary tailings pond, a secondary settling pond, the mill, the Lochalsh ramp and portal, a mine access road, power lines, and an electrical
Island Gold Mine – Ni 43-101 Technical Report  36
August 31, 2020


alamos2.jpg
substation. Offices, core logging and storage facilities, a fire hall and separate mine drys for men and women are also located on the mine site.
The mill, which was originally built in 1988, was designed to process 650 tpd. Since then, the milling capacity has been increased to 850 tpd in 2010, to 900 tpd in 2015, to 1100 tpd in 2018 and to 1200 tpd in 2020. The fully permitted tailings area is located at Miller Lake, west of the Kremzar Mine. The tailings and waste rock have been tested for acid mine drainage and are not acid generating. All permits for mining and milling operations are in good standing.
5.5 Physiography
The Project lies in the Superior Province of the Canadian Shield. Topography within the mine area varies from a high of 488 metres above sea level (masl) in the vicinity of Miller and Maskinonge Lakes to a low of 381 masl at Goudreau Creek. Land topographic variation is most strongly developed west and north of Miller Lake in an area of rock knob-controlled terrain. Extreme slopes in the area measure 30-49%. Elsewhere, particularly the south end east of Maskinonge Lake, the terrain is relatively flat.
Periods of intense glacial activity have contributed to the hummocky, rock knelled and largely bedrock-controlled topography, characteristic of the region. Glacial advance from the north deposited a thin mantle of stony sand till over a scoured rock surface (Boissonneau, 1966). The till is generally less than 1 metre thick on the crest of hills but can exceed 5 metres on some slopes and valleys (Gartner and McQuay, 1979).
Water depths in Goudreau Lake vary substantially. The deepest areas, up to 13 metres, occur in the northern portion of the lake, upstream of the first narrows. Downstream of the narrows, lake depths are shallow, generally being less than 2-3 metres. Considerable areas of marginal swamp are associated with the lower portions of Goudreau Lake.
Island Gold Mine – Ni 43-101 Technical Report  37
August 31, 2020



alamos2.jpg

6 HISTORY
The Goudreau – Lochalsh Gold Camp area has been the subject of interest dating back to the early 1900’s and has attracted prospectors and mining companies in search of iron ore, gold, and base metal deposits. The Wawa – Michipicoten area has been recognized for its long history of iron exploration which has resulted in the development and production of several iron ore mining operations.
Gold exploration followed shortly thereafter, resulting in several gold discoveries which were subsequently developed and brought into commercial production in the area which would later become the Island Gold Property.
6.1 Work History
Five distinct periods of exploration (Table 61) have been identified including:
Period 1: 1901 to 1954;
Period 2: 1974 to 1990;
Period 3: 1996 to 2002;
Period 4: 2003 to 2014; and
Period 5: 2015 to the present.
6.1.1 Period 1: 1901 to 1954
The initial discovery of gold was made by a group of prospectors at Emily Bay on Dog Lake in Riggs Township in 1900. Up to approximately 1944, prospecting, geological mapping, trenching, shaft sinking, and 1,732 m of diamond drilling were completed to explore various gold prospects. From 1916 to 1954, Algoma Ore Properties Limited carried out extensive exploration work on the Morrison No. 1 iron sulphide property in Finan Township, defining a sizable iron-bearing deposit. In the later years of this period the deposit was further explored for gold to define 491,000 tonnes grading 1.59 g/t Au. Ultimately this period is marked principally by various exploration efforts by several companies carrying out surface trenching and diamond drilling on several gold prospects. A total of 4,917 m of drilling was carried out to explore the various prospects. In the overall area during this period, a total of 12,065 m of diamond drilling was carried out, exploring for gold and iron.
6.1.2 Period 2: 1974 to 1990
After an extended period of relatively little interest and activity in the area, exploration was resumed by Amax Inc. and its Canadian division, Canamax. Canamax carried out assorted exploration efforts in Finan and Jacobson Townships, consisting of various types of geophysical and geological surveys followed up with diamond drilling.
In 1985, drilling approximately two kilometers south of the Kremzar Mine intersected a series of sub-parallel lenses containing gold mineralization within deformed rocks of the Goudreau Lake Deformation Zone (GLDZ). These lenses are known as the Lochalsh, Island Gold, Shore, and Goudreau Lake Zones.
In December 1988, Canamax’s Kremzar project began commercial production. From 1988 to 1990, production from the Kremzar mine was 306,000 tonnes grading 4.80 g/t Au.
Island Gold Mine – Ni 43-101 Technical Report  38
August 31, 2020


alamos2.jpg
Over 1989 and 1990, underground access was established into the Island Gold deposit with an adit from the north shore of Goudreau Lake. A 4,167 tonne bulk sample was extracted and processed at the Kremzar Mill. At the end of 1990, Canamax suspended all operations at both the Kremzar and Island Gold projects.
During this period, a total of 96,143 m of diamond drilling was completed on various parts of the Canamax property.
6.1.3 Period 3: 1996 to 2002
The Island Gold Property was acquired from Canada Tungsten Inc. by Patricia. From 1996 to 2002, various exploration activities on the property included prospecting, surface trenching, geological and geophysical surveys, and diamond drilling was carried out to explore for both Island Gold and Kremzar styles of gold bearing prospects and zones.
During this period of exploration, 26,685 m of coring was completed at various locations on the property.
In 2003, Patricia and Richmont Mines Inc. (“Richmont”), entered into a joint venture agreement. Work completed during the joint venture included 72,984 m of surface and underground diamond drilling to test the various zones. On January 1, 2005, Richmont became the operator of the project.
6.1.4 Period 4: 2003 to 2014
Commercial production at Island Gold began on October 1, 2007. Richmont acquired Patricia’s 45% interest in December 2008, becoming 100% owner of the property and operations. Subsequently Richmont completed an assortment of ground and airborne geophysical surveys, extensive exploration drilling, which included numerous surface and underground exploration holes, delineation, and definition diamond drilling with a total of 566,498 m of coring completed.
Exploration activities ramped up in 2009 with a minimum of 30,000 metres of drilling completed in each of the next several years, increasing sharply to more than 80,000 metres in 2012. This included drilling below the 400 metre level as part of the Island Gold Deep exploration program which was successful in extending the main C Zone at depth with initial Inferred Mineral Resource being calculated on the high-grade deep C Zone in January 2013. Over the next year, drilling in the Island Gold Deep sectors from the west, below Lochalsh, to the east and below Extension 1 confirmed the presence and continuity of the deep C Zone and some parallel zones. This drove a substantial increase in Inferred Mineral Resources to 3.6 million tonnes grading 9.07 g/t for 1.04 million ounces of gold as of April 2014. This represented an increase of nearly one million ounces at a 46% higher grade from the end of 2012.
6.1.5 Period 5: 2015 to Present
A large exploration program commenced at the end of 2015 to explore beneath the Island Gold Mine. Directional diamond drilling was used to reach targets at depth with allowed greater accuracy than conventional drilling techniques. As a result of this program, Mineral Resources were added in the C zone at depth and to the east in the E1E zone in Extension 2 area. A total of 161,446 m of directional drilling was completed between 2015-2019.
In 2016-2018 a drill program totalling 9,669 m was conducted to explore the Kremzar Mine. Further exploration was carried out along the GLDZ east and west of the Island Gold Mine along strike to test the extent of mineralization between 2016 and 2018. In addition to this exploration in 2017 a 3,302 m condemnation program was completed beneath the claims held by Argonaut Gold at the Magino Mine on the west of the Island Gold Mine to facilitate a claim trade.
Island Gold Mine – Ni 43-101 Technical Report  39
August 31, 2020



alamos2.jpg
Two master theses on Island Gold geology were completed in 2019 from the University of Waterloo focussing on structural geology (Jellicoe, 2019) and alteration (Cuifo, 2019).
Other exploration activities undertaken during this period include stripping a 145 m long trench along the GLDZ and 185 soil and gas hydrocarbon samples over the Island Gold property in 3 transects. Geophysical surveys and remote sensing such as LIDAR and VLF surveys were conducted as well.
In 2018, a 2,200 line-kilometre high-sensitivity aeromagnetic and HeliFALCON Airborne Gravity Gradiometer survey was completed over the Island Gold Property by CGG Canada Services Ltd.
A geological modelling project was recently initiated and is on-going. The project comprises targeted re-logging of drill core, collection and analysis of geochemical, spectral, and structural data sets, and 3D modelling. Project goals include generating a comprehensive understanding of the geological setting of the Island Gold deposit with emphasis on the controls on gold mineralization, a robust 3D geological model, and a property wide targeting framework for ongoing exploration.
In 2019 a regional mapping program on the Island Gold Property surrounding the mine mapped approximately 35 km2. During mapping 883 samples were collected of which 141 were sent for lithogeochemical analysis, 402 were sent for gold and metal assaying and 41 were sent for thin sections analysis.

Island Gold Mine – Ni 43-101 Technical Report  40
August 31, 2020


alamos2.jpg
Table 6-1 Work History
YearCompanyAreaDrilling, Other WorkQuantityComment
Period 11916Algoma Ore PropertiesMorrison #123 trenches, 19 holes1524 m277,000 tons pyrite 35% sulphur
1925Patrice KremzarKremzar PropertyProspecting and stakingStaking part of present mine property, first gold discovery
1925-1930Algoma Exploration & DevelopmentKremzar Property6 holes203 m#2, #7, #8 zone work
1930M.J. O'Brien Lmt.Kremzar Property10 holes1476 m#1, #2 zones, Tent vein
1935Cockshutt and HopkinsKremzar Property12 holes611 mLocal high grade Tent vein result
1940O'Brien Gold MinesKremzar Property24 holes1648 m#2, #7, and Tent veins, discovered New Vn = Kremzar deposit
1940O'Brien Gold MinesKremzar Property17 holes979 mDelineation of New Vein or present Kremzar deposit
1944Algoma Ore PropertiesEmily Bay38 Holes1732 mGold bearing iron formation
1953-1954Algoma Ore PropertiesMorrison #132 holes3892 mUp to 3.8 g/t over 30 meters intersected, BP series
TOTAL13912066 m
Period 21976-1979AmaxFinan, Jacobson, RiggsDrilling 10 holesn/aRegional targets
1983Canamax-AlgomaAlgoma propertyJoint venture117 patent claims
1983-1989Pine Zone area50 holes6500 mSmall tonnage sub economic resource
1987CanamaxKremzar deposit27 holes14,779 mInferred resource calculation 1.1 mil tons @ .235 opt Au.
1985-1986Canamax-Kremzar Gold MinesKremzar PropertyRamp driven and mill constructedRamp to 240L
1987CanamaxGoudreau Lake54 holes17,256 mIsland zone discovery
1987CanamaxGoudreau Lake33 holes9,218 mBreccia zone, #2, #8, Tent Vein, Pine Zone, Morrison #1, Portage Showing, Portal Zone
1987-1988CanamaxMorrison 1, Spring Lake4 holes791 mIndicated the continuance of the GLDZ
1988CanamaxPine Lake2 holes801 mNo encouraging results for gold
1988CanamaxKremzar MineProduction commencedProduction began in the 4th quarter
1988-1990CanamaxKremzar MineProduction46,798 oz.Mine shutdown 4th quarter 1990
1989-1990CanamaxIsland Gold ZoneRamp & drifts development1280 m, 782 m125L and 140L
1990CanamaxIsland zoneBulk sample4,167 tons6.5 g/t
TOTAL180 DH's49,345 m
Period 31996PatriciaIsland PropertyAcquisition from Canamax-Canada Tungsten / Aur ResourcesAcquired Kremzar, Lochalsh, Goudreau claim groups
1996-1997PatriciaIsland, Lochalsh zones42 holes15,545 mExploration drilling, surface holes, exploration, PL series
1997PatriciaKremzar propertyTrenching15 areasTo expand previously trenched historic showings
2000-2001PatriciaIsland Gold projectStripping, mapping, sampling, mag, IP, 6 holes2,059 mZone 8, 3, 2, NW extension, Pine, Breccia, Portal zones
2000-2001PatriciaNorth ShearDrilling 5 holes1,027 mConfirmed that North shear a major structure, PL-01 series
2002PatriciaIsland Gold projectRe-logging 24 holes8,054mExpand previous drilling data
TOTAL77 DH's26,685 m









Island Gold Mine – Ni 43-101 Technical Report  41
August 31, 2020



alamos2.jpg
Table 6-1 Work History (Cont.)
Period 4YearCompanyAreaDrilling, Other WorkQuantityComment
2003Richmont-PatriciaIsland Gold projectJoint venture agreementAcquired 55% interest
2004Richmont-PatriciaIsland Gold projectDevelopment, exploration, U/G-surface drilling, 10 holes3 million $ program
2004Richmont-PatriciaIsland Gold project10 holes6,119 mTesting North Shear zone, PR-04 series
2005-2008Richmont-PatriciaIsland Gold project/MineU/G and surface drilling, 423 holes56,312 mE1E and CD zone work
2006Richmont-PatriciaIsland Gold project/Mine25 holes10,553 mSurface exploration, PRS series
2007Richmont-PatriciaIsland Gold MineCommercial production began
2008RichmontIsland Gold MineAcquisition of Patricia’s 45%
2009RichmontIsland Gold MineU/G & surface drilling, 213 holes32,061 mDefinition, delineation, and exploration
2010RichmontIsland Gold MineU/G & surface drilling, 271 holes66,049 mDefinition, delineation, and exploration
2011RichmontIsland Gold MineU/G & surface drilling, 322 holes64,675 mDefinition, delineation and deep drilling the Island zone and peripheral areas
2012RichmontIsland Gold MineU/G & surface drilling, 440 holes96,074 mDefinition, delineation, and exploration
2013RichmontIsland Gold MineU/G & surface drilling, 390 holes98,882 mDefinition, delineation, and exploration
2014RichmontIsland Gold MineU/G & surface drilling, 349 holes42,035mDefinition, delineation, and exploration
TOTAL2124 DH's472,760
Period 52015RichmontIsland Gold Mine534 holes87,500 m80% of lower C resources converted to reserves
2016RichmontIsland Gold MineUG drilling, 643 holes98,467 mExploration drilling 26,311 m, definition/delineation 72,156 m
2016RichmontIsland Gold MineSurface drilling, 79 holes49,556 m25,070 m surface exploration, 24,486 exploration directional drilling
2017RichmontIsland Gold MineUG drilling, 756 holes87,392 mExploration drilling 31,347 m, definition/delineation 56,045 m
2017RichmontIsland Gold MineTrenching1 trench145m long trench
2018RichmontIsland Gold MineLidar survey~270 km2Lidar survey of the mine and surrounding area
2017RichmontIsland Gold MineSurface drilling, 79 holes43,259 m23,448 m surface exploration, 19,811 exploration directional drilling
2017Alamos GoldIsland Gold/KremzarAcquisitionAlamos Gold acquired Island Gold & Kremzar November 2017
2018Alamos GoldIsland Gold MineVLF survey4 lines4 transects over IGM were surveyed
2018Alamos GoldIsland Gold MineUG drilling, 649 holes83,198 mExploration drilling 28,013 m, definition/delineation 55,185 m
2018Alamos GoldIsland Gold MineSurface drilling, 66 holes57,725 m11,722 m surface exploration, 46,003 m exploration directional drilling
2018Alamos GoldIsland Gold MineGeologic modelling projectRelogging and analysis of IGM to create 3D geologic model; on going
2019Alamos GoldIsland Gold MineSoil and gas hydrocarbon sampling185 samples3 transects of samples on the IGM property
2019Alamos GoldIsland Gold MineUG drilling, 445 holes72,385 mExploration drilling 23,742 m, definition/delineation 48,643 m
2019Alamos GoldIsland Gold MineUG drilling directional drilling, 2 holes1,476 mTrialling directional drilling UG
2019Alamos GoldIsland Gold MineSurface drilling, 55 holes47,608 mDirectional drilling only
2019Alamos GoldIsland Gold Mine2 Masters thesesUniversity of Waterloo thesis topic: IGM geology
2019Alamos GoldIsland Gold MineMapping~35 km2Regional mapping surrounding IGM and GLDZ
TOTAL3308 DH's541,066 m

Island Gold Mine – Ni 43-101 Technical Report  42
August 31, 2020


alamos2.jpg
6.2 Historical and Island Gold Mine Mineral Resource Estimates
Several Mineral Resource and Mineral Reserve estimates were prepared over the years within the Island Gold Mine area. They are summarized in Table 6‑2.
Table 6-2 Historical and Existing Island Gold Mine Mineral Resource Estimates
Year EndCompanyType of Mineral Resource and ReserveTonnage (t)Grade (g/t)Gold (oz)
2001KallioInferred20,610,0002.351,557,173
Inferred4,210,0006812,128
Inferred2,034,0008.3542,775
2003RPA/Hubacheck Consulting Geologists (HCG)Measured and Indicated72,00012.3108,000
2006Genivar/HCGProven and Probable1,013,8548.55278,697
Measured and Indicated454,70510.26149,992
Inferred610,7289.96195,568
2007GenivarProven and Probable831,423799213,492
Measured and Indicated227,4589.8572,044
Inferred1,058,8818.39285,535
2008GenivarProven and Probable1,031,1878.72289,098
Measured and Indicated422,19710.77146,191
Inferred676,6089.65209,921
2009RichmontProven and Probable991,0877.9251,848
Measured and Indicated456,35310.55154,813
Inferred640,6149.69199,569
2010RichmontProven and Probable818,0666.13161,197
Measured and Indicated796,4757.36188,511
Inferred604,7297.14138,732
2011RichmontProven and Probable959,5235.57171,814
Measured and Indicated679,3597.05153,920
Inferred344,3826.0767,238
2012RichmontProven and Probable785,2215.6141,456
Measured and Indicated502,9106.86110,958
Inferred279,5696.255,744
2013RichmontProven and Probable733,3476.09143,506
Measured and Indicated739,7009.81233,330
Inferred3,558,9729.071,037,327
2014RichmontProven and Probable895,0006.39183,750
Measured and Indicated733,5009.29219,050
Inferred3,547,5008.791,002,750
2015RichmontProven and Probable2,115,6008.26561,700
Measured and Indicated348,2006.471,700
Inferred2,814,7008.49768,000
2016RichmontProven and Probable2,551,0069.17752,209
Measured and Indicated478,8115.9491,427
Inferred3,041,83610.18995,717
2017Alamos GoldProven and Probable2,702,85810.2886,773
Measured and Indicated590,5965.86111,253
Inferred2,958,2049.55908,478
July 2018Alamos GoldProven and Probable2,789,73110.69958,842
Measured and Indicated841,2448.18221,156
Inferred3,673,4269.991,179,810
2018Alamos GoldProven and Probable3,047,24910.281,007,274
Measured and Indicated696,2338.77196,213
Inferred4,178,07911.711,573,133

These “Mineral Resources” are historical in nature and should not be relied upon. Additionally, assumptions used to determine cut-off grades are likely to have changed since they were done. Consequently, these “Mineral Resources” cannot be considered as current. They are included in this section for illustrative purposes only and should not be disclosed out of context.
Island Gold Mine – Ni 43-101 Technical Report  43
August 31, 2020



alamos2.jpg
6.3 Historical Production from the Island Gold Mine
Since the beginning of underground mining in 2006, and up to December 31, 2019, the Island Gold Mine has produced 812,188 ounces of gold. Commercial production started in October 2007 and since then approximately 787,950 ounces of gold were produced. Details per year are given in Table 6‑3.
Table 6‑3 Island Gold Mine Production per year
YearTonnesHead grade
(g/t Au)
Gold Recovery
(%)
Ounces Produced
20061
41,5214.7993.453,255
20072
159,4936.0294.3629,281
2008162,1587.7495.8339,224
2009223,3455.8594.5239,794
2010246,7126.0395.4943,761
2011255,1036.0595.9149,443
2012247,8335.4796.4541,951
2013239,7664.5796.0634,690
2014230,8285.9196.2642,042
2015242,1377.3196.7552,835
2016297,7579.0296.5281,798
2017338,6039.3596.8297,931
2018369,7679.296.16105,822
2019401,27611.8597.05150,355
Total3,456,2997.6296.26812,188

Notes
1.Bulk sample.
2.20,983 ounces produced prior to commercial production (October 2007).
Island Gold Mine – Ni 43-101 Technical Report  44
August 31, 2020


alamos2.jpg

7 GEOLOGICAL SETTING
7.1 Regional Geology
The Island Gold Property is located in the Michipicoten Greenstone Belt (“MGB”) which is part of the Wawa Subprovince within the Archaean Superior Province (Figure 7‑1). The MGB is approximately 140 km long and up to 45 km wide. The metamorphic grade of the subprovince is greenschist but amphibolite facies can be seen locally or proximal to intrusions.
image82.jpg
Figure 7-1 Geological Map of the Western Part of the Wawa Subprovince
The MGB comprises three bimodal (rhyolite-basalt) volcanic cycles capped by iron formations. Rocks vary in age from 2,889 Ma for the Hawk Assemblage (Cycle 1), to 2,750 Ma for the Wawa Assemblage (Cycle 2), and to 2,700 Ma for the Catfish Assemblage (Cycle 3). Shearing along contacts has obscured the original relationship between the cycles.
A major regional deformation zone called the Goudreau Lake Deformation Zone (“GLDZ”) is situated throughout the area at the interface of the Wawa and Catfish Assemblage cycles. It is a north-easterly trending structure which has been traced along strike for 30 km with a width of 4.5 km and believed to be the main control of gold mineralization for the Project area. It is a high angle oblique-slip fault zone with an overall dextral movement cutting stratigraphy at a shallow angle.
There are three main splays to the GLDZ in the area, the southernmost of which hosts the Island Gold Mine structure which contains a stacked sequence of east-northeast striking, steeply dipping, and subparallel zones of gold mineralization.
7.2 Geology of the Island Gold Mine Area
Lithologies appear to form a conformable homoclinal volcano-stratigraphic sequence, facing and younging to the north in the project area. Tight to isoclinal folds and local attenuation or
Island Gold Mine – Ni 43-101 Technical Report  45
August 31, 2020



alamos2.jpg
boudinage of units along fold limbs appear to occur regionally. Fold axes are subparallel to the regional foliation at N070°E to N095°E.
The Island Gold Mine is stratigraphically positioned in the upper portion of the Wawa Assemblage, on the northern limb of the Goudreau Anticline. The hinge is south of the area displayed in Figure 7-2. This assemblage is mostly composed of felsic volcanic rocks of various facies of tuffs and lavas.
Around the periphery of the Island Gold Property area are felsic intrusions ranging in size from one to several kilometres across. The Webb Lake Stock lies to the north of the deposit (Figure 7-2). Narrow quartz-feldspar porphyry dykes and minor mafic volcanic rocks are present within the dominantly felsic volcanic sequence. North-trending diabase dykes crosscut all stratigraphy (in purple in Figure 7-2). The volcanic units generally strike at N70°E to N90°E strike with a subvertical dip.
The past producing Kremzar mine is hosted in the lower portion of the Catfish Assemblage (Figure 7-2), within a sequence of massive and pillowed magnesium and iron-rich tholeiitic flows. The mafic flows of the Catfish Assemblage face north and are cut by the Herman Lake nepheline-syenite intrusive complex in orange and the Maskinonge Lake granite in pink in Figure 7-2.
7.3 Alteration and Mineralization
Alteration within the Island Gold deposit is characterized by the presence of silicification, sericitization and carbonatization. Alteration minerals associated with the auriferous quartz veins are white mica, sulphides, quartz, plagioclase, chlorite, Ca-Mg-Fe carbonates, and biotite (Cuifo, 2019). Pyrite content ranges from 1% to 11% in disseminated form and less commonly as millimeter scale discontinuous stringers. Pyrrhotite and chalcopyrite can be present but is uncommon. Alteration minerals which are not associated with the ore body may include tourmaline, apatite, epidote, chloritoid and local garnets in the deeper levels. The alteration occurs primarily in linear south dipping envelopes which can pinch, swell, and vary in thickness between decimeter scale to over 15 m in thickness. There appears to be a gradual change in alteration with depth as silicification becomes more dominant. The alteration envelopes are termed Alteration Package Island in mine geology nomenclature.
The alteration envelopes generally possess a strong degree of deformation. Structural elements such as a deposit-wide strong penetrative foliation, schistosity-shear shear fabrics, boudinaged structures, crenulation cleavage, mylonitization and smaller scale thrust faults are noted to be present throughout the Island Gold Mine.
Quartz veins commonly bear visible gold in the form of aggregates, disseminated fine grains or along chlorite-sericite slickensides within the veins (Jellicoe, 2019). Metallurgical studies indicate that free gold flakes are typically less than 25 microns in diameter. The quartz veins host most of the gold however, the surrounding altered rock within the zone can also host gold mineralization. The degree of veining appears to change at depth, transitioning from a stringer style quartz-carbonate vein on scales between millimeter to larger scale veins which can be over 4 metres in width.
Island Gold Mine – Ni 43-101 Technical Report  46
August 31, 2020


alamos2.jpg
image56.jpg
Figure 7‑2 Geological Map of the Island Gold Mine Area

Island Gold Mine – Ni 43-101 Technical Report  47
August 31, 2020



alamos2.jpg
Five main types of quartz veining have been observed (Jellicoe, 2019) and are listed below in order of timing from oldest to youngest.
VGD veins occur exclusively in the Goudreau Domain and their timing relationship to the V1 - V4 veins is unknown. They are subhorizontal extensional veins composed of quartz-carbonate with minor sericite and frequently have tourmaline cores. The veins are often extremely folded and vary in thickness from 1 cm to 40 cm. Visible gold is common and is in the form of nuggets. The gold grade can be discontinuous and varies dramatically through out the vein. The very high grades produced in the Goudreau Domain are derived from the fold noses where the gold is concentrated. These veins have been found to crosscut all units in the Island Gold deposit.
V1 veins are parallel to foliation and are the dominant auriferous veins. They are smoky grey to milky white in colour and are most often laminated but can be massive. Wall rock strongly altered by sericite, silica and chlorite define the lamination within the quartz veins. The V1 veins are the primary host of visible gold. These veins can be folded, boudinaged or brittlely deformed.
V2 veins are found with the altered wall rock and range from millimeters to centimeters in thickness. They are discontinuous crack-seal veinlets closely spaced together. Most often they are parallel to the foliation of the ore body and host minor gold associated with pyrite.
V3 veins occur as boudin necks, extensional veins that crosscut the ore zones and as en echelon veins. They are most often noted within the V1 veins forming a “ladder appearance” within the vein but they may also extend past the vein boundary. The V3 veins are composed of white quartz, tourmaline and carbonate. Typically, they are unmineralized but in some rare cases have produced low grade gold values.
V4 veins crosscut all other vein sets and established fabrics. They are primarily composed of euhedral tourmaline needles with white quartz. These veins are always barren of gold.
7.4 Island Gold Deposit
The Island Gold deposit is composed of multiple, stacked, south dipping lenses. The mineralized corridor expands from 50 m wide in the upper levels to over 150 m wide at depth. The zone’s dip varies from sub-vertical to vertical from -50° to -90° south. Locally, north dip reversals occur but are not common. Rare instances of offset or folding have been seen. Around the 400 metre level there is a shallow dipping southern inflection of the mineralized zones. It is not yet clear if this inflection is related to a fault, a shear zone, or a fold. This inflection point is the division of what is locally referred to as the Upper Island Gold Mine and the Lower Island Gold Mine.
7.4.1 Upper Island Gold Mine
Three main domains are found in the Upper Island Gold Mine, the Upper Island Domain, the Lochalsh Domain, and the Goudreau Domain.
7.4.1.1 Upper Island Domain
Five mineralized zones have been recognized in the Upper Island Domain which include, from north to south; E2, E1E, D1, D and C. The relationship between the different zones in their respective domains can be complex, they pinch and swell, merge, and anastomose. The complexities of the zones are well documented by sill development and drilling. Most of the Upper Island Domain has been mined out. This domain also includes part of what is often referred to as Extension 1. A diabase dyke crosscuts the mineralized zones however, there is no offset therefore both sides of the dyke are grouped into the same domain.
Island Gold Mine – Ni 43-101 Technical Report  48
August 31, 2020


alamos2.jpg
7.4.1.2 Lochalsh Domain
The Lochalsh Domain has a 450 m strike length between depths of 100 m to 450 m below surface). The geology, mineralization and alteration of the Lochalsh Domain are similar to the Upper Island Domain. Four mineralized zones have been recognized in the Lochalsh Domain which include, from north to south, E2, E1E, D and C.
Drilling between the Upper Island Domain and Lochalsh Domain has shown that the zones reduce in thickness and in grade toward the west of the Island Gold deposit. Drilling at the same easting, lower in elevation, indicates economic mineralization in the area but at deeper levels that fall within the Lower Island Domain.
7.4.1.3 Goudreau Domain
The Goudreau Domain is situated between 15,600E and 15,900E approximately 200 m north of the main mine structure which hosts the other domains. There are seven zones in the Goudreau Domain GD2, GD3, GD6, GD7 and GD9 are vertical and GP2 and GP5 are horizontal. The vertical zones are stacked, steeply-dipping to vertical mineralized lenses consisting of quartz-sericite-carbonate-pyrite alteration envelopes and contain high-grade gold in quartz veining.
GP2 and GP5 are interpreted to be very folded flat lying gently east dipping zones which may link the vertical zones. The majority of the gold comes from decametric gold-bearing quartz veins. Alteration surrounding these flat lying zones is limited to a maximum of 0.5 m surrounding the quartz vein or is altogether absent. These veins are hosted within volcanics or a quartz diorite intrusion which they crosscut. The horizontal nature of GP2 and GP5 have been confirmed by mining development.
7.4.2 Lower Island Gold Mine
The majority of the Mineral Resource and Mineral Reserves are within the Lower Island Gold Mine in the Lower Island Domain and Extension 2 Domain.
7.4.2.1 Lower Island Domain
Nine mineralized zones have been recognized in the Lower Island Domain, they are, from north to south, E1E, D, D1, C, B, G, GNW, G1 and STH. The Lower Island Domain also includes the lower part of what was often referred to as Extension 1. A diabase dyke crosscuts the mineralized zones however, there is no offset, therefore both sides of the dyke are grouped into the same domain. It is bounded by a north-south trending vertical diabase dyke in the east and is open on the west.
The C zone is the most laterally and vertically continuous of the nine different zones of the Lower Island Domain. It contains by far the most Mineral Resources and Mineral Reserves in this domain and has been successfully mined since 2014. Other zones have been mined with some success but demonstrate significantly less lateral and vertical continuity. Only small portions of the other eight zones form part of the Mineral Reserves, with the remainder categorized as Inferred and Indicated Mineral Resources. The C Zone Mineral Resource currently being mined below the 450 metre level has a larger average width and a higher average grade than what was previously mined in the upper part of the mine. From the 760 metre level to 900 metre level the zone dramatically increases in width and grade. The width reaches a maximum of approximately 15 m with smoky grey quartz veins as large as approximately 5 m in width.
Within the domain is a thick assemblage of intermediate volcanic rocks (crystal tuff, lapilli tuff, ash tuff and possible flows) and often mineralized zones follow the contacts between these
Island Gold Mine – Ni 43-101 Technical Report  49
August 31, 2020



alamos2.jpg
units. Mafic dykes/plutons emplaced pre-mineralization are found throughout the mine and can be mineralized but it is rare. Several later mafic dykes of a different composition are present, usually between 0.1 m and 1 m wide and can conform to the stratigraphy and proliferate within the mineralized corridor. A dyke of uncertain composition ranging from 0.3 m to 2 m in width is observed in several locations in the mine and crosscuts the zone but does not seem to offset it.
7.4.2.2 Extension 2 Domain
Extension 2 Domain is composed of only one defined zone, the E1E. Other potential zones have been noted in this domain but have yet to demonstrate the continuity laterally or in elevation to be able to confirm their presence. The zone is open at depth and reaches as high as the 100 metre level. On the western limit of this domain is a north-south trending vertical diabase dyke however, it is still open to the east. Extension 2 domain is considered a different domain because the zone is offset approximately 10 to 30 m north from the Lower Island Domain across the diabase dyke. The zone also has differing geological characteristics, such as zone width and grade, from the Island C zone, which affirms the domain division. The E1E zone in Extension 2 Domain host the most Mineral Reserves and Mineral Resources at the Island Gold Mine and it is where most of the underground and surface diamond drilling is focused.
The extent of the E1E is confirmed for 1 km laterally. Above the 840 metre level the economically viable areas of the E1E are concentrated into corridors similar to the Lower Island domain that extend vertically but are rather short laterally. Below the 840 metre level the zone opens to become more laterally extensive and continuous as can be seen by the Mineral Reserve and Mineral Resource block shapes (Figure 7-3).
Alteration is similar between the Lower Island Domain and Extension 2 Domain however, in general there are fewer large veins. Veining above the 840 metre level remains at less than 1 m and more frequently centimeter to decimeter width. Below the 840 metre level in the E1E zone, the mineralized corridor increases in width and increases in the amount of visible gold, grade and quartz veining are observed.

Island Gold Mine – Ni 43-101 Technical Report  50
August 31, 2020


alamos2.jpg


image35.jpg
Figure 7‑3 View of Domains and Mineral Resources and Reserves with Existing Infrastructure

Island Gold Mine – Ni 43-101 Technical Report  51
August 31, 2020



alamos2.jpg
image86.jpg
Figure 7‑4 Section Showing the Inflection to the South of Mineralized Zones
7.5 Other Gold Zones
Several other gold zones and occurrences are the property area. These are described below.
7.5.1 North Shear Zone
The North Shear Zone is generally located along the northern contact of the Webb Lake Granodiorite Sill and has been traced over a 1 km strike length between sections 14,200E and 15,300E and continuing to a depth of 350 m below surface. The North Shear structure is marked by a persistent brittle to ductile deformation which dips from -75° to -80° north. The zone contains en-echelon quartz-tourmaline stringer veining, stockwork quartz which occurs within highly strained and crenulated felsic volcanic and Webb Lake granodiorite sill host rocks.
Island Gold Mine – Ni 43-101 Technical Report  52
August 31, 2020


alamos2.jpg
Alteration is characterized by strong silicification, sericitization and pyritization. The gold mineralization is hosted in chlorite-quartz-tourmaline stringer and stockwork veining containing visible gold, minor pyrite, and trace chalcopyrite. Mineralized zones can be up to 25 m wide in places. In 2005, the 140 Level vent drift development cut through the North Shear. The shear is observed dipping 65° to 70° north and is believed to follow the contact between the Webb Lake Granodiorite Sill and a massive feldspar porphyry unit.
In 2004, the Mineral Resource estimate of the North Shear zone is sited as 229,000 tonnes at 6.57 g/t Au totaling 48,429 ounces of gold (5 g/t Au cut-off) in the NI 43-101 RPA technical report on the Island Deposit (RPA, 2004).
7.5.2 Zone 21
In April 1997, Patricia intersected a series of gold-bearing, white quartz veins in drill hole PL-21 at a vertical depth of 250 m. The intersection averaged 52.2 g/t Au over 19 m with erratically distributed values and visible gold within a highly schisted chloritized dioritic intrusive rock. The veins exhibit a low core angle and may trend northeast. The drill hole is located approximately 300 m north of the Lochalsh Zone. The very high-grade results were followed up by additional drilling nearby, which did not succeed in defining the structure geometry of the high-grade veins.
7.5.3 Kremzar Mine Property
The Kremzar Deposit occurs 1,200 m to the north of the GLDZ on a northwest-trending fault structure at 120° azimuth that dips at -75° to the southwest in what has previously been termed the northern splay of the GLDZ on the mine property. The Kremzar Mine, which was in production from 1988 to 1990, produced 306,000 tonnes at a grade of 4.8 g/t totaling 47,000 ounces of gold. A historic Mineral Reserve at the time of mine closing estimated a Proven and Probable Mineral Reserve of 181,944 tonnes at a grade of 6.27 g/t Au (non NI 43-101 compliant). These “Mineral Resources” are historical in nature and should not be relied upon. Additionally, assumptions used to determine cut-off grades are likely to have changed since the estimate was done. Consequently, these “Mineral Resources” cannot be considered as current. They are included in this section for illustrative purposes only and should not be disclosed out of context.
The alteration style of the Kremzar zones is characterized by strong envelopes of biotitization, carbonatization and silicification in widths from 1 m to 3 m. Mineralization within the envelopes ranges generally from 2% to 5% disseminated pyrite/pyrrhotite. Quartz carbonate vein development is present as grey blueish cherty bands, sinuous lenses and broad pervasive silicification. The cherty bands can also extend into the footwall and hanging wall. Fourteen other historic mineralized zones (circa 1930) occur along this trend developing at or near the southern contact of an east-west trending gabbroic sill. Drilling in 2016 indicated that gold extends at deeper levels below the Kremzar Mine as a zone grading 9.71 g/t Au over 8 m was intersected in drill hole KZ-16-02 approximately 600 m below surface.
7.5.4 Portal Zone
In the collar of the Island Gold ramp, a series of east-west-striking quartz-ankerite veins were encountered in 2017. This area was named the Portal Zone. Locally, these veins assayed up to 20 g/t Au over 1 m and averaged 4.0 g/t Au over 11 m in ramp wall samples. A series of four short holes totaling 1,227 m were drilled along strike to the east and west of the ramp portal without extending the zone.
Island Gold Mine – Ni 43-101 Technical Report  53
August 31, 2020



alamos2.jpg
7.5.5 Portage Showing
The Portage showing occurs along the Bearpaw Lake portage and consists of a series of quartz veins which occur within deformed sericitic altered felsic tuffs. Quartz veins are present along the stream bed as well as in nearby trenches dating back to the 1920’s and 1930’s. Grab samples have averaged 2.3 g/t Au in past sampling. Limited shallow drilling to the north and northeast of the zone under Pine Lake encountered only weak alteration structures and negligible gold values. Canamax drilling encountered gold in the immediate area. Drill hole 061-02-23 east of north Bearpaw Lake intersected 95.9 g/t Au over 1.4 m, drill hole 061-03-24 intersected 9.9 g/t Au over 0.6 m north of Pine Lake in Jacobson Township and drill hole 061-02-66 intersected 1.7 g/t Au over 0.7 m.
7.5.6 Pine Zone and Breccia Zone
The Pine Zone and the Breccia Zone are located north-east of Bearpaw Lake in Jacobson Township and adjacent and east of the Maskinonge Lake Fault (MLF). The MLF a major structure trending north to northwest at 320˚ azimuth with a geophysical inferred sinistral strike slip movement of over a kilometer.
The Pine Zone is a folded sulphide-oxide iron formation which is part of the Goudreau Iron Range. It contains gold proximal to the MLF. Surface trenching and a 21 drill hole program have defined a small tonnage of sub-economic gold mineralization. Estimates in an internal Patricia report that the Pine zone contains a Mineral Resource of 70,000 tonnes at a grade of 7 g/t Au for a total of 14,293 ounces. These “Mineral Resources” are historical in nature and should not be relied upon. Additionally, assumptions used to determine cut-off grades are likely to have changed since they were done. Consequently, these “Mineral Resources” cannot be considered as current. They are included in this section for illustrative purposes only and should not be disclosed out of context.
The Breccia Zone is a silicic fault breccia to quartz stockwork zone which crosscuts the stratigraphy at right angles and can be traced over several kilometres along the MLF. Limited drilling on the showing has encountered 6.0 g/t Au over 1 m.
7.5.7 Morrison Number One Zone
The Morrison #1 iron deposit is an oxide-sulphide-carbonate iron formation which is part of the larger Goudreau Iron Range. In 1985, Canamax drilled a short four hole program totaling 375 m with the best gold value being 18.7 g/t Au over 1 m. In 1954, Algoma drilled a hole that returned 2.7 g/t Au over 30.5 m. Gold mineralization is related to quartz-carbonate fracture fillings within the carbonate facies of the iron formation in a hinge zone of a tight Z fold. An historic Algoma Mineral Resource calculation estimated the Morrison #1 zone to contain 541,000 tonnes at a grade of 1.59 g/t Au for a total of 30,360 ounces. These “Mineral Resources” are historical in nature and should not be relied upon. Additionally, assumptions used to determine cut-off grades are likely to have changed since they were done. Consequently, these “Mineral Resources” cannot be considered as current. They are included in this section for illustrative purposes only and should not be disclosed out of context.
Island Gold Mine – Ni 43-101 Technical Report  54
August 31, 2020


alamos2.jpg

8 DEPOSIT TYPES
The Island Gold Mine is an Archean orogenic lode gold deposit. It is a structurally hosted quartz-carbonate vein system situated within the Goudreau Lake Deformation Zone (“GLDZ”), a major regional brittle-ductile structure. The host terrane is a sequence of felsic to intermediate volcanic rocks of the Wawa Assemblage which are in the greenschist metamorphic range as is common for this type of deposit. High strain zones associated with the GLDZ have the tendency to develop at variable scales along lithologic unit contacts where complex geology and related competency contrasts can control stress patterns and facilitate shearing and the consequent development of dilatancy zones and concomitant quartz carbonate vein formation. It is generally accepted that these Archean orogenic lode gold deposits are related to compressional and transpressional tectonics and the associated metamorphic dewatering and devolatization of magma processes from which the gold bearing fluids are derived.
Gold mineralization in the Goudreau-Lochalsh area is not restricted to any rock type with the general exception of the late intruding north-west trending Matachewan diabase dykes which show no evidence of mineralization. Deposits may be hosted by one or several rock types, with past-producing mines and numerous other gold occurrences in the area exhibiting a close spatial association with felsic, intermediate, and even mafic intrusive rocks. East of the Island Gold Mine, in Jacobson Township, the past producing Edwards and Cline Lake gold mines are associated with felsic intrusive complexes and dykes. The past producing Magino Mine to the immediate west of the Island Gold property is hosted by the Webb Lake stock, a trondhjemite intrusive. The past producing Kremzar Mine, located on the Island Gold property, is hosted by a regional gabbroic sill.
Mineralization in the Goudreau Camp occurs along a 30 kilometre strike length of the GLDZ which transects the Island Gold property area in a roughly east-west direction. The GLDZ is a major regional deformation structure and it is believed to be the main control on gold mineralization for the area. The GLDZ and subsidiary splays have been subdivided into four structural domains (Southern, Northern, Eastern and Western) based on the style of deformation, lineation patterns, and the orientation and sense of shear displacement on sets of shear zones. The Island Gold mine mineralized zones are within the Southern domain of the GLDZ (Heather and Arias 1992). Most mineralization in this domain is hosted by quartz veining and/or shear zones with an orientation of 075°. The zones with this orientation are roughly parallel with the overall deformation zone and are considered to have formed along shear planes related to the dextral oblique slip movement of the GLDZ.
Typical alteration mineralogy associated with gold deposits of the Goudreau Camp includes variable amounts of carbonatization (Fe-carbonate ± calcite), silicification, sulphidization, biotitization, sericitization, feldspathization, and chloritization. Deposits and gold occurrences with a felsic rock association are generally associated with a quartz-sericite-pyrite ± pyrrhotite alteration package. Deposits and occurrences hosted by mafic host rocks, such as the Kremzar Mine and the historic showings along this trend are generally altered to biotite, Fe-carbonate, pyrrhotite ± pyrite, quartz, and minor K-feldspar. Chloritization is common throughout the belt. Gold presence in the Goudreau-Lochalsh area is primarily associated quartz stringers, fracture fillings and veins. Gold can be associated with pyrite disseminated in alteration envelopes but generally only in low grade levels.
Island Gold Mine – Ni 43-101 Technical Report  55
August 31, 2020



alamos2.jpg

9 EXPLORATION
9.1 Introduction
The deep directional diamond drilling program started in October 2015 and, at the end of 2019, a total of 132,917 metres were completed from underground diamond drilling and 225,190 metres were completed from surface diamond drilling (Table 9-1).
The underground and surface exploration programs have added since 2015 close to 2.3 million ounces of gold to the mineral inventory, net of depletion. Measured and Indicated Mineral Resources increased by 112,000 ounces of gold, Inferred Mineral Resources increased by 1,530,000 ounces of gold and Mineral Reserves increase by 653,000 ounces of gold in the five year period. This includes the addition of nearly one million ounces of Mineral Reserves and Mineral Resources through the 2019 exploration program. The exploration cost has been approximately $25 per ounce during this period.
The results of these programs up to December 31st, 2019 were used in the December 31, 2019 Mineral Resources estimate and have been incorporated into the Phase III Expansion Study. Drilling results have also been published on a regular basis since 2016 in press releases available on SEDAR.
Table 9‑1 2015 – 2019 Summary of Diamond Drilling
Type of Diamond Drilling2015
(metres)
2016
(metres)
2017
(metres)
2018
(metres)
2019
(metres)
Total
(metres)
U/G Exploration23,55228,71230,81325,37824,462132,917
Surface Exploration14,30654,39951,15257,72547,608225,190
TOTAL37,85883,11181,96583,10372,070358,107
9.2 2020 Exploration Drilling program
Exploration activities at Island Gold remain focused on continuing to define new near mine Mineral Resources. Exploration drilling programs at Island Gold were temporarily suspended on March 25, 2020 given the COVID-19 pandemic; however, drilling began ramping back up in May, with four underground diamond drill rigs in operating including two focused on underground directional drilling. The surface directional diamond drilling program resumed in early June with three drill rigs in operation.
A total of 11,886 m of surface directional diamond drilling and 9,169 m of underground exploration diamond drilling, from 620 and 840 Level exploration drifts, has been completed as of June 30, 2020 (Alamos Press Release, dated July 13th, 2020). Highlights from the 2020 exploration drilling program (Figure 9-1 and Table 9-2) include:
44.30 g/t Au (44.30 g/t cut) over 2.25 m (MH21-04);
25.41 g/t Au (23.07 g/t cut) over 5.58 m (MH22-04);
29.05 g/t Au (26.67 g/t cut) over 4.86 m (620-MH2-01);
21.30 g/t Au (15.52 g/t cut) over 2.24 m (620-616-02);
18.72 g/t Au (16.44 g/t cut) over 3.64 m (620-616-07);
52.10 g/t Au (22.54 g/t cut) over 10.31 m (840-566-01);
21.01 g/t Au (21.01 g/t cut) over 4.26 m (840-566-06); and
Island Gold Mine – Ni 43-101 Technical Report  56
August 31, 2020


alamos2.jpg
31.19 g/t Au (31.19 g/t cut) over 2.22 m (840-572-02).
This continues to confirm the E1E Zone extends vertically over 1.2 km, between a depth of 300 m and 1,500 m in the eastern part of the Island Gold deposit.
The results of the 2020 diamond drilling exploration program were not included to the Mineral Resources used for the Phase III Expansion Study.
Island Gold Mine – Ni 43-101 Technical Report  57
August 31, 2020



alamos2.jpg

Table 9‑2 Diamond Drilling Highlights Results – 2020 Exploration Program
Hole IDZoneDomainFrom (m)To (m)Core Length (m)True Width (m)Au Uncut (g/t)Au Cut (g/t)Vertical Depth (m)
MH22-04CLower Island1531.51546.414.95.5825.4123.071377
MH21-04D1Lower Island12991311.512.511.264.033.11120
MH25-01D1Lower Island1570.21576.56.36.083.823.821296
MH20-04E1ELower Island1174.71180.726.024.453.333.331111
MH20-05E1EExtension 21141.81145.843.734.224.221056
MH21-04E1ELower Island1288.71291.22.52.2544.344.31108
MH21-05E1ELower Island1280.61283.853.253.193.93.91079
MH23-01E1EExtension 210771079.42.42.0910.9810.981000
620-610-26E1EExtension 2318.6333.715.16.38.418.41808
620-616-01E1EExtension 214314852.946.286.28641
620-616-02E1EExtension 2267273.46.42.2421.315.52751
620-616-04E1EExtension 279.0683.14.043.838.158.15561
620-616-07E1EExtension 279.483.323.923.6418.7216.44532
620-MH2-01E1EExtension 2806.2812.264.8629.0526.671177
840-566-01E1ELower Island291.75310.218.4510.3152.122.541041
840-566-02E1EExtension 2260.35264.754.42.3613.5313.531002
840-566-05E1EExtension 2176.1185.59.47.964.484.48880
840-566-06E1ELower Island154.2159.95.74.2621.0121.01842
840-566-07E1ELower Island283.5292.69.13.736.96.91028
840-572-02E1ELower Island293.3297.654.352.2231.1931.191032
620-610-26UnknownExtension 2101.6110.28.6?3.93.9664
620-MH2-01UnknownExtension 2759.9762.652.75?40.3440.341164
840-572-03UnknownLower Island200202.22.2?6.336.33915

Notes:
Composite intervals greater than 3 g/t Au weighted average, capping values:
Lower Island Domain@ 225 g/t Au;
Extenson 2 Domain @ 160 g/t Au.
Unknown zone corresponds to gold intercepts outside known ore zones and for which continuity is not yet established and therefore true width has not been calculated.
These exploitation results were not included in Mineral Resources used for the Phase III Expansion Study.

Island Gold Mine – Ni 43-101 Technical Report  58
August 31, 2020


alamos2.jpg
image19.jpg
Figure 9‑1 Diamond Drilling Highlights Results – 2020 Exploration Program
Island Gold Mine – Ni 43-101 Technical Report  59
August 31, 2020



alamos2.jpg
10 DRILLING
10.1 Methodology and Planning
Drill hole planning begins by marking targets on longitudinal sections of the targeted zone. Cross sections are used to confirm the positioning of the drill targets and to ensure that the drilling can be executed safely without intersecting mine infrastructure.
An optimal drilling pattern of 20 m by 20 m hole spacing is sought during the planning of the delineation-definition drilling. The pattern can be decreased to 10 m by 15 m in geologically complex areas. A 50 m to 100 m spacing pattern is used for the first phase of exploration drilling in new sectors. Diamond drill holes are planned to intersect all the known zones. Holes are stopped 20 m to 30 m after the last mineralized zone are crossed.
10.2 Drill Hole Mark Up
For underground drill holes, back and foresight marks are indicated on drift walls by using a Leica Total Station surveying instrument. The drilling contractor sets the diamond drill onto the collar and aligns the drill along a string tied taut between the front and back sight pads. The dip of the drill is determined with an inclinometer. Surface drill hole locations are found and marked by using a GPS. The drill is aligned by using a compass or the Leica GPS.
10.3 Collar Surveying
Island Gold employees use a Leica Global Positioning System to survey surface collar locations. Drill hole coordinates are recorded in the local grid system of the Island Gold Mine which is rotated 22° to the west from the geographic north.
Most of the underground diamond drill holes from 2005 to 2009, and all the drill holes since 2009 have had their collar surveyed. Surveying of underground drill holes was performed by Island Gold surveyors using a Leica Total Station. The drill hole collar surveys are recorded in the drill hole database.
10.4 Down-Hole Surveying
Since 2009, underground drilling uses a 3-m hexagonal core barrel in combination with a 10-inch or 18-inch stabilizing shell. Single shot Reflex down-hole survey measurements start at 15 m from the collar and are carried out at every 30 m thereafter along the hole. An additional Reflex multi-shot survey is carried out upon completion of the hole over the entire length of the hole. All measurements are converted to the Island Gold Mine grid.
In 2013, down-hole surveys for a series of holes drilled into the Island Lower C Zone between the two major dykes had to be carried out with a gyroscope, because the high magnetism encountered in one of the two dykes disrupted the Reflex survey.
Surface exploration holes have used Reflex or a gyro to survey the hole. Surface directional drilling holes use a north seeking gyro and a PeeWee survey tool when drilling the cut. Measurements are taken every 30 m in surface holes.
10.5 Cementing of Drill Holes
Diamond drill holes are grouted at the collar once they are completed or abandoned. Cementation of drill holes is recorded in the database. Fifteen sticks of cement are used to cement the collar of underground holes. If the hole has intersected water, then a grout pump is used to pump cement into the hole until the water stops. Surface drill holes for the exploration
Island Gold Mine – Ni 43-101 Technical Report  60
August 31, 2020


alamos2.jpg
directional drilling program are cemented from the bottom of the hole until 100 m above the expected zone. Many surface exploration holes which are not immediately adjacent to the mine were left uncemented to provide an option for re-entry if desired or to complete downhole televiewer or geophysical surveys.
10.6 Drill Core Logging
Core logging is carried out by professional geologists or geologists in training under the supervision of the Qualified Person. Geovia’s Gemcom DDH Logger data entry software was used from 2004 to 2019. Island Gold transitioned to Acquire Logging in April 2019. Older paper logs were entered into the digital database manually and the old Patricia database was merged with the current one. The data entries follow a pre-established structure with consistent lithology codes and structural descriptions, creating uniformity in the geological description. With the Acquire logging program mandatory data such as lithology, sample lengths etc. are required fields that if not completed will alert the user and halt any further progress until the mandatory information is entered.
The drill hole database is managed using Acquire GIM Suite 4.0.3. All the Island Gold Mine drill holes are contained within one database. As of December 31, 2019, the database contained 6,411 holes totaling 1,363,350 m of surface and underground diamond drilling. Several surface holes were drilled prior to 1985 in programs coordinated by Canamax and previous owners. The remainder were drilled in later programs managed by Patricia, Richmont, and lastly by Alamos.
A total of 831 holes representing 549,287 m have been drilled from surface and 5,580 holes totaling 814,063 m have been drilled from underground at the Island Gold Mine. Underground drill holes are drilled from north to south because the mine infrastructure is in the footwall of the mineralized zone. Surface drill holes are drilled from south to north to drill perpendicular to the south dipping zones.
10.7 Geology and Analysis
Under the direct supervision of Qualified Persons, geologists prepare a detailed description of the drill core. A computerized log is entered for each drill hole with the following basic information:
collar location;
down hole surveys;
rock quality designation (RQD);
main and secondary geological units;
texture and structure;
mineralization and alteration: mineralogy, thickness, type;
sample location; and
core photos.

The length and limits of core samples are defined by the geology: (i.e., geological unit, alteration package, mineralized zone and deformation zone). In the case of exploration holes, the sampled intervals are sawed in two along the core length to keep half of the core on site as a reference sample. Since 2016, several definition and delineation holes are drilled from the same drill bays, one in five holes of these holes is sawn in two, with one half being kept as reference. For the four other holes, the entire core of mineralized zones is sent to the laboratory and the remaining non-mineralized core is discarded.
Island Gold Mine – Ni 43-101 Technical Report  61
August 31, 2020



alamos2.jpg
Assay results are plotted on sections and level plans at the appropriate scale. Nomenclature and symbols for the geological units follow an in-house legend which is modified from the legend prepared by the Ministère de l’Énergie et des Ressources naturelles du Québec. Horizontal thickness and true thickness of drill hole intercepts (composites) are computed in the GEMS software. True thickness and grade of composites are plotted on the vertical longitudinal sections.
Island Gold Mine – Ni 43-101 Technical Report  62
August 31, 2020


alamos2.jpg

11 SAMPLE PREPARATION, ANALYSES AND SECURITY
The Mineral Resource and Mineral Reserve estimates as of December 31, 2019 are supported by both diamond drill hole samples and underground chip sampling. Other sample types, including muck samples (rock fragments collected after an underground blast) and test holes (sludge from jack-leg drilling), help guide production decisions, but are not used in Mineral Resource estimates. The assays for these sample types are not discussed further in this report as the results do not impact Mineral Resource estimates.
Diamond drilling samples are sent to Laboratoire Expert Inc. (“Lab Expert”) located in Rouyn-Noranda, Quebec, and a small portion to the Wesdome Gold Mines Inc. (“Wesdome”) laboratory in Wawa, Ontario. All production samples (chip, mucks, and test-holes) were sent exclusively to the Wesdome laboratory. Sample volumes for 2019 are summarized in Table 11‑1. Activation Laboratories Ltd. (“Actlabs”) is only utilized for QA-QC pulp check assays.
Table 11‑1 Island Gold Mine – 2019 Sample Volume
Sample TypeLab Expert
Actlabs (Pulps)
Wesdome
Drill Core45,30269878
Underground Chips3612,642
Mucks12,538
Test Hole Sludges487

Notes:
Assays that were added since the last Mineral Resource estimation December 1st, 2018 to December 1st, 2019.
Includes pulps and rejects submitted for check assays.
11.1 Core Sampling and Collection
11.1.1 Drill Core Sampling
Intervals of core to be sampled for analysis are marked by the geologist. Sampling is done over the mineralized section along regular intervals. The sample lengths vary from 0.3 m to 1.5 m. When present, lithological boundaries such as geological units or alterations limit the sample intervals. Sample positions are identified on the core by the geologist while logging and sample tags are placed under the core in the core boxes at the end of each sample. Sample intervals, sample numbers, standards and blanks are manually entered into the database by Island Gold personnel.
Core recovery is considered excellent and is generally close to 100%. Very minor isolated centimetre-scale fault gouge and blocky core can be identified but do not impact the reliability of the analytical results of drill core samples.
The core is cut into two halves by the core shack technician using an electrical core saw equipped with a diamond tipped blade. For all of the surface drilling and approximately 20% of the definition and delineation drilling one half of the core is placed into a sample plastic bag for assaying, and the remaining half of the core is returned to the core box for future reference. For approximately 80% of the combined definition and delineation drill holes, the entire core is placed in the sample plastic bag. Island Gold routinely inserts quality control samples and tracks sample shipments to the commercial laboratories.
Island Gold Mine – Ni 43-101 Technical Report  63
August 31, 2020



alamos2.jpg
11.1.2 Core Size
The majority of the underground diamond drill holes were carried out using either BQ size coring with a small proportion being NQ or AQTK size. NQ size core is used for all surface drilling except when steering the directional drill holes, this is BQ size.
11.1.3 Core Storage
The core is stored outdoors in covered racks or as separate cross-piles on the mine site. The reference portions of the drill core were stored and catalogued for future reference purposes in the core library located at the Island Gold Mine site.
11.2 Chip Sample Collection
The chip sampling method consists of taking horizontal representative samples of the exposed ore zone either from the drift face or from the adjacent walls. The geological technician or the geologist takes a 1.5 to 2 kg sample which is chipped with a hammer horizontally across geological units on a 0.3 m to 1.0 m distance. The sampler notes the location and the lithology of each chip sample. Assays are then entered into a Promine module on the AutoCAD Software, and then transferred into the Gemcom software.
11.3 Laboratory Procedures
Most drill core samples are prepared and assayed by Lab Expert in Rouyn-Noranda, Quebec, which has been operating a fire assay laboratory for over 20 years. A small portion of the definition drill core as well as all underground production samples are assayed at the Wesdome laboratory, in Wawa, Ontario. This laboratory also processes assay samples from Wesdome’s Eagle River Mine.
Pulps and occasionally drill core are sent to Actlabs in Thunder Bay, Ontario. Actlabs is headquartered in Ancaster, Ontario. Actlabs is ISO/IEC 17025 accredited and has maintained its Certificate of Laboratory Proficiency for over 10 years.
The laboratories use industry-standard sample preparation and assay methods that are summarized in Table 11‑2.
Table 11‑2 Summary of Preparation and Assay Methods
AnalysesLab ExpertActlabsWesdome
Crushing80% - 2mm80% -2mmApprox. 1/4 inch
Splitting300 g350 g150 to 300 g
Pulverizing90% -200 mesh95% -105 microns~90% at 200 mesh (not measured)
Gold by Fire Assay
-sample weight
1 assay-ton (29.16 g)30 g30 g
-finishAA to 10 g/t; Detection limit: 5 ppbAA to 3.75 g/t; Detection limit: 5 ppb-
Gravimetric finish > 6.8 g/t Au1
Gravimetric finish >3.75 g/t AuGravimetric finish; detection limit 0.04 g/t Au
Internal Quality ControlRigorous (>10%)Rigorous (>10%; to ISO standards)5 to 10% (reliance on duplicates)

Notes:
Lab Expert prepared a second pulp of high grade samples and assayed by FA with a gravimetric finish.
Island Gold Mine – Ni 43-101 Technical Report  64
August 31, 2020


alamos2.jpg
All the laboratories mentioned have internal quality control (QC) programs that include insertion of reagent blanks, reference materials, and pulp duplicates. Actlabs also routinely participates in international round robins, monitors preparation of duplicates and maintains measurement systems as required by ISO 17025 accreditation. As typical of mining laboratories, Wesdome does not include QC materials with muck and test hole samples, and in general their QC protocols are less rigorous than those of commercial laboratories.
11.4 Security
Security personnel control access to the mine site at all times. Individual sample bags are sealed with zip ties. The samples are placed in large Fabrene bags identified and sealed before being placed on pallets. The core samples are picked-up and delivered to Lab Expert via transportation companies. The samples being sent to Wesdome Lab are bagged in the same manner and are delivered to the lab daily by an Island Gold employee. Both labs provide a letter upon reception of the samples detailing the shipment they received.
11.5 Database Security
The database which contains all diamond drilling assays, logging and surveys is stored on the Alamos private network which can only be accessed by employees. In 2016 the database was changed from a Microsoft Access database to a structured query language database (SQL) for improved security. Additional restrictions were put in place to limit the number of employees who have access to the database. Security groups are used to limit individuals to parts of the database that is needed for their work. Access must be granted by a supervisor in the Geology Department.
Sample intervals, sample numbers, standards and blanks are manually entered into the database by Island Gold Mine personnel. Once the assays are completed, they are sent via email to a list of Island Gold Mine personnel. They are received in an excel sheet directly from the lab and are uploaded electronically into the database by an in-house program. Automatically the assays are matched to the sample numbers in the database with no manual entry required. Standards and blanks are checked by the program and alert the user if they fall outside the 10% allowed variation. The user then must choose how to proceed with the batch of assays in one of several ways: ask to re-assay the batch, accept the batch after speaking to the lab or accept it. All actions taken are recorded in the database.
11.6 2019 Island Gold Internal Quality Assurance and Quality Control Program (QA-QC)
Alamos maintains an internal QA-QC program at the Island Gold Mine which is used to validate core and production chip assay analyses. Certified Reference Materials (CRMs) are purchased from Rocklabs (New Zealand) or from Ore Research & Exploration (“Oreas”) (Australia) and inserted with diamond drill core samples at a rate of 1 in 25 samples. In-house blank material is inserted in the core sample stream at a rate of 1 in 25 samples. The blanks consist of washed and cleaned diabase dyke core which is drilled from the Island Gold property.
Visible gold diamond drill core samples are shipped separately from the regular samples. One high grade standard and one blank are added to the shipment. This is done with the intent of minimizing the contamination by the visible gold samples to the other samples if they were kept in the same sample stream. The separate visible gold batch also indicates to the lab to take extra care to clean the crushers, pulverisers, and splitters diligently between samples.
In spring of 2019, the Island Gold QA/QC used for the Wesdome laboratory was improved based on the recommendations of ASL. Improvements include the insertion of blank material after high grade samples with an elevated tolerance, a minimum of 1 CRM every 25 chips or every outgoing shipment of chip samples, CRMs must have a grade higher than 4g/t which is the economic cut-off and flagging the sample bags containing visible gold. The insertion of
Island Gold Mine – Ni 43-101 Technical Report  65
August 31, 2020



alamos2.jpg
blanks after high grade chip samples was implemented to determine if the lab was cleaning the machines adequately between samples. These changes have been an overall improvement of the QA/QC program which previously required only 1 CRM inserted in every shipment regardless of how many samples were being shipped.
In 2019, twelve CRMs with different gold grades were used for the QA-QC program. The CRMs’ grades range from 1.58 g/t Au to 30.87 g/t Au and reflect expected gold grades within the mineralization found at the Island Gold deposit. The CRM used by Island Gold from Rocklabs consists of feldspar, basalt and iron pyrite mixed with fine gold. The CRM from Oreas is from orogenic lode gold deposits with primary gold and the matrix is greenstone. These CRMs have a similar composition to Island Gold mineralized zones that are mostly siliceous and pyritic rocks.
The criteria used by Island Gold to consider whether results are acceptable are based on a 5% standard deviation from the expected value.
A summary of results from the graphic data is presented in Table 11‑3 for all labs used by Island Gold in 2019.
11.6.1 Laboratory Performance Based on Certified Reference Materials (2019)
During 2019 a total of 1,725 CRMs were analyzed by Lab Expert and used for statistics. Mislabelled samples have been excluded. Lab Expert assays demonstrated good accuracy with the weighted average of the observed values of the 12 different CRM values falling between 98.3% and 101.5% of the expected value, with an average of 99.8%. A small number of QC failures triggered requests for re-assaying of the affected sample batch. Based on the insertion of CRMs as part of the QA-QC program, Lab Expert’s accuracy provided acceptable results for the Mineral Resource and Mineral Reserve estimates prepared for 2019.
A total of 202 CRMs were submitted to Wesdome in 2019 and retained for statistics. Ten different CRMs were analyzed by Wesdome with the weighted average of the observed values being between 97.0% and 107.5% of the expected value, with an average of 101.6%. The Wesdome Lab demonstrated some deficiencies in their assaying with a failure rate at 20%. However, there is no strong bias identified and the values of assays for chip samples are judged suitable for purposes of production and considered acceptable for grade interpolation.
In 2019 a total of 19 CRMs were submitted and analyzed by Actlabs or about 1% of the total number of CRMs submitted to Island Gold laboratories. CRM performance at Actlabs indicates a good degree of accuracy with the weighted average of the observed values, being between 99.3% and 100.8% of the expected value, with an average of 99.9%.
Actlabs has been used as a secondary laboratory to do pulp check assays and has provided reliable assay data for the rechecking program.
11.6.2 Blanks
Field blanks were included in the 2019 Island Gold drill program to monitor possible contamination during the sample preparation and analytical process. The field blank material used by Island Gold is made with drill core that has transected the Matachewan diabase dyke located on the mine property. Testing of the diabase dyke has indicated that the material is suitable as blank material. The blank is carefully selected to not include any veins, mineralization, or inclusions. Each submitted blank of cut core is washed and bagged before use. When new batches of blanks are prepared several samples are taken for assay to ensure the material is still acceptable. A blank is inserted at a rate of 1 in 25 samples. Assays higher than 10% the laboratory’s detection limit are considered as failures.
Island Gold Mine – Ni 43-101 Technical Report  66
August 31, 2020


alamos2.jpg
The 2019 Island Gold chip program has been improved with inserting same diabase dyke unit as field blanks. These blanks are chip samples from underground exposures of the diabase dyke. Blank assays with a value between 0.5ppm and 1ppm should be evaluated before being accepted or re-assayed. Every blank higher than 1 ppm is considered as failure and the rejects are automatically re-assayed.
Lab Expert tested 1,704 blanks and has a 0.12% failure rate. During Lab Expert’s pulverization process, the ring-and-puck crusher is cleaned with compressed air and undergoes a cycle of sand cleaning. A total of 99.88% of the blank assays returned less than 0.05 g/t Au and 100% reported values less than 0.10 g/t Au. Only two samples were higher than the tolerance with grades of 0.05g/t and 0.06g/t. Considering that these values are low and that Island Gold is using its own blanks, it there is no impact the Mineral Resource and Mineral Reserve estimates.
Wesdome tested only 159 blanks and saw 15.1% failure rate. 5.7% of the blanks re-assayed passed, no action was been taken for 4.4% and, 3.8% of the blanks could have been contaminated. This contamination was mainly due to outdated pulveriser equipment which is known for sample cross -contamination problems. In July 2019, Wesdome changed out the older pulverisers to the new style Essa LM2 Vibratory ones and only one contaminated blank has been determined after this change. A total of 84.9% of the blank assays returned less than 0.5 g/t Au and 93.1% reported values less than 1.0 g/t Au. From the 11 blanks with analytical values greater than 1.0g/t, five showed results greater than 1.4 g/t Au. There is evidence of a low-level sample cross-contamination in sample preparation. The mine operates with a cut-off grade of 4.03 g/t Au, an average Mineral Resource and Mineral Reserve grade of close to 12 g/t Au and the rare instances of contamination are not considered material. However, to further control the possibility of sample cross-contamination, Island Gold started to flag in the sample bags which contain visible gold to notify the laboratory about expected high grade.
Island Gold Mine – Ni 43-101 Technical Report  67
August 31, 2020



alamos2.jpg
Table 11‑3 Island Gold Mine - QA-QC Program, Certified Reference Material Results (2019)
Lab Expert Reference Material Results 2019
StandardNumber of SamplesExpected ValuesObserved Values for the Year
Mean (g/t Au)Standard Deviation (g/t Au)1 Relative Standard Dev.Mean (g/t Au)Standard Deviation (g/t Au)1 Relative Standard Dev.Within 3 SDWithin 2 SDWithin 1 SDFailure
SQ8711030.871.5445%30.640.2621%100%100%100%0
OREAS2391273.550.1785%3.60.44512%99%99%99%1
OREAS229b3311.950.5985%11.970.0961%100%100%100%0
OREAS22920312.110.6065%11.960.3953%100%100%100%1
OREAS228b1248.570.4295%8.540.5456%98%98%98%2
OREAS228108.730.4375%8.580.0591%100%100%100%0
OREAS226565.450.2735%5.460.0341%100%100%100%0
OREAS216b406.660.3335%6.60.0411%100%100%100%0
OREAS2162326.660.3335%6.610.0821%100%100%100%1
OREAS2152533.540.1775%3.560.0241%100%100%100%0
OREAS2101985.490.2755%5.470.0892%99%99%99%1
OREAS2093391.580.0795%1.580.0151%100%100%100%0
Blank1,704000.0032
Wesdome Reference Material Results 2019
StandardNumber of SamplesExpected ValuesObserved Values for the Year
Mean (g/t Au)Standard Deviation (g/t Au)1 Relative Standard Dev.Mean (g/t Au)Standard Deviation (g/t Au)1 Relative Standard Dev.Within 3 SDWithin 2 SDWithin 1 SDFailure
OREAS229b3111.950.5985%11.991.1269%97%97%77%1
OREAS2293112.110.6065%12.090.8737%94%84%74%5
OREAS228b288.570.4295%8.310.93911%79%75%57%7
OREAS22818.730.4375%9-100%100%100%0
OREAS22665.450.2735%5.640.4418%100%83%33%1
OREAS216b286.660.3335%6.820.5568%86%86%75%4
OREAS216326.660.3335%6.870.69310%88%81%72%6
OREAS215103.540.1775%3.680.38811%70%60%40%3
OREAS210285.490.2755%5.720.80914%79%71%68%8
OREAS20971.580.0795%1.70.38122%29%29%14%5
Blank159-0.290.65924
Actlabs Reference Material Results 2019
StandardNumber of SamplesExpected ValuesObserved Values for the Year
Mean (g/t Au)Standard Deviation (g/t Au)1 Relative Standard Dev.Mean (g/t Au)Standard Deviation (g/t Au)1 Relative Standard Dev.Within 3 SDWithin 2 SDWithin 1 SDFailure
OREAS229b511.950.5985%12.040.3783%100%100%100%0
OREAS228b38.570.4295%8.560.2963%100%100%100%0
OREAS22635.450.2735%5.430.0230%100%100%100%0
OREAS216b76.660.3335%6.610.1262%100%100%100%0
OREAS20911.580.0795%1.59-100%100%100%0

Island Gold Mine – Ni 43-101 Technical Report  68
August 31, 2020


alamos2.jpg
The number of drill core blanks submitted to each laboratory is summarized in Table 11‑4.
Table 11‑4 Summary of 2019 Blank Performance
DescriptionLab ExpertWesdome
Number of Blank Insertions1,704159
Maximum Grade for Failure0.05 g/t Au0.5 g/t Au
Number of Failures224
Percent of Failures0.12%15.1%
Maximum Value0.06 g/t Au6.30 g/t Au

11.6.3 Long Term QA-QC
Over the course of Island Gold’s drilling programs from 2017 to 2019, a total of 15 different CRMs were used. The grades of the CRMs ranged from 1.58 g/t Au to 30.87 g/t Au and reflected expected assay grades within the mineralization of the Island Gold deposit. During those years, a total of 7,262 CRMs were analyzed by three different laboratories and retained for statistics (mislabels are excluded). It is only in 2019 that CRMs started to be sent to the Actlabs Laboratory.
Table 11‑5 shows the results of the statistical analysis for each CRM and for each laboratory. The results of the CRMs show relatively good consistency compared to the expected values, and the warning and failure rates are low.
The Wesdome laboratory shows the highest rate of failure with 14.5% of failures for CRM and 10.1% of failures for Blanks. Issues that cause outliers mainly include transcription and calculation errors. The Wesdome laboratory is generally used by Island Gold for underground production samples. An external third-party audit of the Wesdome lab was done in June 2019. The replacement of an unsuitable pulveriser in July 2019, and increased communication between the Wesdome mine laboratory personnel and the Island Gold employees in charge of the QA/QC were some of the recommended solutions implemented, and have been found to improve the quality of the assays.
11.6.4 Pulp Duplicate Analysis (Original vs Duplicate Values)
Both Lab Expert and Wesdome are routinely verified by fire assay method second 30-g pulp aliquots from the original pulp samples. Such re-assays are carried out at a rate of 6% for Lab Expert and 8% for Wesdome. Results are presented in Table 11‑6. The mean grades of the re-assays are very close to the original assays with good correlation coefficients for both laboratories. These results demonstrate the ability of the labs to reproduce the global average of the first assays despite discrepancies in the individual assays. Means and standard deviations are high because of the presence of some very high grade samples and typically, the laboratories will re-assay high-grade samples.
Island Gold Mine – Ni 43-101 Technical Report  69
August 31, 2020



alamos2.jpg
Table 11‑5 QA-QC Program, Certified Reference Material Results (2017-2019)

Lab Expert Reference Material Results 2017-2019
StandardNumber of SamplesExpected ValuesObserved Values
Mean (g/t Au)Standard Deviation (g/t Au)1 Relative Standard Dev.Mean (g/t Au)Standard Deviation (g/t Au)1 Relative Standard Dev.Within 3 SDWithin 2 SDWithin 1 SDFailure
SQ8737030.871.5445%30.610.3291%100%100%100%0
SQ83130.641.5325%31.2--100%100%100%0
SQ71230.811.5415%30.810.5092%100%100%100%0
OREAS2391263.550.1785%3.560.0231%100%100%100%0
OREAS229b3311.950.5985%11.970.0961%100%100%100%0
OREAS22923312.110.6065%11.930.4314%99%99%98%2
OREAS228b1248.570.4295%8.540.5456%98%98%98%2
OREAS2289408.730.4375%8.730.1912%100%100%99%1
OREAS226565.450.2735%5.460.0341%100%100%100%0
OREAS216b406.660.3335%6.60.0411%100%100%100%0
OREAS2161,6246.660.3335%6.630.0741%100%100%100%1
OREAS2151,6933.540.1775%3.550.144%100%100%100%4
OREAS2102395.490.2755%5.470.0832%100%100%100%1
OREAS2095961.580.0795%1.580.0231%100%100%98%0
OREAS2082849.250.4625%9.280.081%100%100%100%0
Blank6,13100.010.12---17
Wesdome Reference Material Results 2017-2019
StandardNumber of SamplesExpected ValuesObserved Values
Mean (g/t Au)Standard Deviation (g/t Au)1 Relative Standard Dev.Mean (g/t Au)Standard Deviation (g/t Au)1 Relative Standard Dev.Within 3 SDWithin 2 SDWithin 1 SDFailure
SQ872230.871.5445%31.040.783%100%100%95%0
OREAS229b3111.950.5985%11.991.1269%97%97%77%1
OREAS2294312.110.6065%11.991.39412%93%86%74%6
OREAS228b288.570.4295%8.310.93911%79%75%57%7
OREAS2281328.730.4375%9.030.4575%98%95%64%6
OREAS22665.450.2735%5.640.4418%100%83%33%1
OREAS216b286.660.3335%6.820.5568%86%86%75%4
OREAS2162466.660.3335%6.830.3836%96%90%77%24
OREAS2152383.540.1775%3.660.39911%90%78%57%53
OREAS210405.490.2755%5.730.6812%85%78%63%9
OREAS209361.580.0795%1.720.2313%64%56%22%16
OREAS208329.250.4625%9.40.4565%97%97%72%1
Blank23800.290.65924
Actlabs Reference Material Results 2019
StandardNumber of SamplesExpected ValuesObserved Values
Mean (g/t Au)Standard Deviation (g/t Au)1 Relative Standard Dev.Mean (g/t Au)Standard Deviation (g/t Au)1 Relative Standard Dev.Within 3 SDWithin 2 SDWithin 1 SDFailure
OREAS229b511.950.5985%12.040.3783%100%100%100%0
OREAS228b38.570.4295%8.560.2963%100%100%100%0
OREAS22635.450.2735%5.430.0230%100%100%100%0
OREAS216b76.660.3335%6.610.1262%100%100%100%0
OREAS20911.580.0795%1.59-100%100%100%0

Island Gold Mine – Ni 43-101 Technical Report  70
August 31, 2020


alamos2.jpg
Table 11‑6 2019 Statistics of Duplicate Assays (Internal QA-QC)
Lab ExpertWesdome
First AssayDuplicateFirst AssayDuplicate
Number of Pairs4769205
Minimum (g/t)00.00250.0020.002
Maximum (g/t)2280.192094.841130.531403.33
Mean (g/t)13.27213.2242.41443.494
Median (g/t)0.0580.0591.61.67
Standard Deviation73.72272.208135.335146.319
Coefficient Correlation0.9990.993
Avg Absolute Value of Relative Difference9.53%10.68%
Figure 11‑1 and Figure 11‑2 are scatterplots of the two labs showing the duplicate assays plotted against the original assays for the year 2019. Results are reasonably distributed on both sides of the x=y line. Globally, the result does not show evidence of bias between the two assays.
image4.jpg
Figure 11‑1 Scatter Plot of Duplicate Assays vs Original Assays (Lab Expert)
Island Gold Mine – Ni 43-101 Technical Report  71
August 31, 2020



alamos2.jpg
image28.jpg

Figure 11‑2 Scatter Plot of Duplicate Assays vs Original Assays (Wesdome Lab)

11.7 Laboratory Cross Check Sampling (Pulp Samples)
Additional testing for accuracy is performed at a secondary or umpire laboratory. The CRMs monitor analytical accuracy but are not blind to the laboratory. To ensure that the laboratory gold assaying technique presents no problem or bias, a series of pulps from the primary laboratory are resubmitted to another laboratory for re-assay.
In 2019, 357 pulps assayed at Wesdome and 619 pulps assayed at Lab Expert were sent to Actlabs to be re-assayed (Table 11‑7). Scatterplots of the two labs showing the duplicate assays plotted against the original assays (Figure 11‑3 and Figure 11‑4). Ninety five percent of the pulps sent to Actlabs from Wesdome are from 2017-2018. Between Wesdome and Actlabs, only three outliers have been removed. These outliers were considered random errors, or blunders and not systematic in nature.
Results are reasonably distributed on both sides of the line of best fit. Globally, the statistics presented in the Table 11‑7 show no evidence of strong bias between laboratories. The maximum assays of both labs are roughly within the same range. The mean of the Wesdome samples show a small tendency for over estimation likely because of singular use of gravimetric finish (Figure 11‑4). The mean of Actlabs compared to Lab Expert is higher because of Lab Experts tendency to underestimates assays over 100g/t (Figure 11‑3).
Sixty one percent of the samples analyzed by Lab Expert are slightly lower than the values reported by Actlabs, meaning there is no risk of over evaluating the Mineral Resource grade. Wesdome shows the opposite trend with 65% of the assays returning with higher grades in comparison to Actlabs, especially for assays below the 2 g/t Au threshold.

Island Gold Mine – Ni 43-101 Technical Report  72
August 31, 2020


alamos2.jpg
Table 11‑7 2019 Statistics of Duplicate Assays (External QA-QC)
Lab Expert vs ActlabsWesdome vs Actlabs
Lab ExpertActlabsWesdomeActlabs
Number of Pairs619357
Minimum (g/t)0.002500.0020.0025
Maximum (g/t)2784.3331201610.361630
Mean (g/t)8488.2221.4321.29
Median (g/t)20.9821.21.281.11
Standard Deviation207.1215.8999.218101.135
Coefficient Correlation0.990.997

image27.jpg
Figure 11‑3 Scatter Plot of Duplicate Assays (Actlabs) vs Original Assays (Lab Expert)

Island Gold Mine – Ni 43-101 Technical Report  73
August 31, 2020



alamos2.jpg
image79.jpg

Figure 11‑4 Scatter Plot of duplicate assays (Actlabs) vs original assays (Wesdome lab)

11.8 Core Duplicates
Until 2015, drill core duplicates were sent to Lab Expert and Actlabs to be assayed. The audit conducted by ASL in November 2015 (Bloom, 2015), demonstrated that the core duplicates exhibit poorer reproducibility than the pulp duplicates. This data can not be used to improve or monitor the sampling procedures or assay quality. The precision for core duplicates is within the expected range for the deposit style. Following the recommendation from the audit, Island Gold reviewed the assay quality control program and decided to no longer assay core duplicate.
11.9 Underground Muck Tracking
Internal tracking of broken material underground, either ore or waste, is done using machine monitoring systems installed on haul trucks, coordinated by an underground dispatcher. This system ensures that all daily underground muck movement is accounted for.
11.10 Summary and Comments
Lab Expert is Island Gold Mine’s primary analytical laboratory for drill cores. The laboratory uses industry-standard sample preparation and assay methods to generate assays for the project. Island Gold has implemented a rigorous QA-QC program. The blanks and CRMs inserted with samples have not identified any systematic contamination or bias in assays. Check assays submitted to the accredited laboratory Actlabs showed good correspondence with Lab Expert assays.
The Island Gold Mine in house QA/QC program determined some contamination or systematic issues in the assaying process at Wesdome Lab during the first half of 2019. After the ASL audit and discussions with the chief assayer the lab performance has improved to be within acceptable limits. QA/QC is examined monthly to ensure assay quality issues are fixed rapidly as was demonstrated in 2019.
Island Gold Mine – Ni 43-101 Technical Report  74
August 31, 2020


alamos2.jpg
Island Gold Mine’s QA-QC procedures were audited in 2019 by ASL Canada and it was concluded that Island Gold’s assay quality control program meets or exceeds industry standards, and that the gold assays are considered to be reliable for the purpose of Mineral Resource estimates.
Island Gold Mine – Ni 43-101 Technical Report  75
August 31, 2020



alamos2.jpg

12 DATA VERIFICATION
The Qualified Person considers that the Island Gold Mine database is suitable for use in the Mineral Reserve and Mineral Resource estimation. The SQL database is adequate and acceptable for supporting Mineral Resource estimation. This database contains all the information related to drill holes, drift sampling, assay results and the laboratory certificates. Some verification of the original data was performed, and modifications were completed if needed prior to the calculation of any estimates. The verification of, and corrections to, the Island Gold database were done prior to the Mineral Resource and Mineral Reserve estimates of December 31, 2019.
An external Mineral Reserve and Mineral Resource audit (RPA, 2016) was completed in December 2016 by Roscoe Postle Associates Inc. (RPA) and based on a desktop review of the Island Gold Mine Mineral Resources, RPA was of the opinion that the Mineral Resource estimates were reasonable, had been adequately prepared using standard industry practices, and conformed to the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves (“CIM definitions”) as incorporated into National Instrument 43-101 (“NI 43-101”). Most of the methodologies and procedures utilized in the 2019 Mineral Resources and Mineral Reserves estimate are identical to those used in the 2016 estimate therefore, it is presumed that the methodologies used in 2019 are still adequate and acceptable.
In September 2019, the Lab Expert laboratory and the Wesdome laboratory were audited by Analytical Solutions LTD. (ASL). The audits were a thorough review of lab procedures, policies and methods which included on site observations and discussions of the processes involved in handling and processing the Island Gold Mine samples. ASL is under the opinion that Lab Experts sample processing, assaying and internal QA/QC is acceptable (Bloom 2019a). ASL’s audit of the Wesdome Lab (Bloom 2019b) demonstrated some deficiencies in their assaying of values lower than 2 g/t however, most samples sent to Wesdome are used for production only. Mineral Resource and Mineral Reserve cut off grade is over 4 g/t, therefore any inaccuracy below 2 g/t will not have an impact. The suggestions of ASL for both laboratories have been implemented or are in the process of being implemented.

Island Gold Mine – Ni 43-101 Technical Report  76
August 31, 2020


alamos2.jpg

13 MINERAL PROCESSING AND METALLURGICAL TESTING
The mill has been processing Island Gold ore since 2008 and has consistently been achieving recoveries of greater than 96% (Figure 13‑1). Since 2016, the ore feed has been almost exclusively from the Lower Island Gold Domain:
2016, 92% of the ore from Lower Zones, 8% Upper Zones;
2017, 97% of the ore from Lower Zones, 3% Upper Zones;
2018, 100% of the ore from Lower Zones; and
2019, 99% of the ore from Lower Zones (1% from reclaim the stockpile).
Historical data shows that the Lower Zone ore behaves similarly to ore from the other zones and therefore has no significant effect on mill gold recoveries, as presented in Figure 13‑2.
image3.jpg
Figure 13‑1 Mill Gold Recovery of Island Ore

Island Gold Mine – Ni 43-101 Technical Report  77
August 31, 2020



alamos2.jpg
image26.jpg
Figure 13‑2 Mill Gold Recovery as a Function of Lower Zone Ore in the Feed
13.1 Historical Metallurgical Testwork
The Island Gold mine has been in production since October 2007. The metallurgy is well understood, and average gold recovery achieved over the last 5 years is consistently around 96%, with 97% achieved in 2019.
Mineralogical and metallurgical characterization studies were performed in 2013 by the Unité de Recherche et de Service en Technologie Minérale (URSTM), a research unit affiliated to the Université du Québec en Abitibi-Témiscamingue. One set of samples from four different drill cores was selected and shipped to URSTM. The average gold grade was determined for each core sample. The samples were thereafter combined into a composite that was sent for metallurgical testwork.
The composite was characterized using Inductively Coupled Plasma (ICP) chemical analysis, Bond Ball Mill Work Index (BWI) determination, free gold evaluation, and response to cyanidation.
13.1.1 Head Assays
The drill core sample grades as well as the composite sample grades for the URSTM testwork are summarized in Table 13‑1. Significant grade variability within the sample set is noted, and this is typical of the deposit and others in the region. The composite head grade was roughly twice that of the average mill feed grade in 2019.

Island Gold Mine – Ni 43-101 Technical Report  78
August 31, 2020


alamos2.jpg
Table 13‑1 Drill Holes Head Assays (URSTM)
Drill Hole NumberAu (g/t)
400-514-16A17.24
GD-11-1540.49
GD-497-01W146.68
425-487-023,93
Composite23.65
An ICP multi-scan was performed on the composite sample. The ICP was conducted by Lab Expert and the results are presented in Table 13‑2. The results show that the composite sample does not contain any elements in sufficient concentration to be problematic for gold cyanidation.
Table 13‑2 ICP Analysis on Composite Head Sample (URSTM)
CodeZoneAgAsCaCoCuFeHgNiPbSSbZn
ppmppm%ppmppm%ppmppmppm%ppmppm
S-24Island Gold Composite Sample1.3992.716743.40.026222.1<1047
13.1.2 Grinding
The composite sample was tested at the Cégep de l’Abitibi-Témiscamingue for the BWI determination.
The BWI expresses the material’s resistance to ball milling. A high index value means the material is more difficult to grind. The BWI result was 12.6 kWh/t using the standard test procedure. A 12.6 kWh/t value is in the low to mid-range of most Canadian gold ores.
13.1.3 Free Gold Content Evaluation
A gravimetric concentration evaluation was carried out in two steps using a Knelson concentrator, followed by a cleaning stage using a Mozley table. The experimental procedure for free gold evaluation is presented in Figure 13‑3.
Island Gold Mine – Ni 43-101 Technical Report  79
August 31, 2020



alamos2.jpg
image85.jpg
Figure 13‑3 Free Gold Evaluation Protocol (URSTM)
The test results showed that the free gold content of the composite was estimated at 54.8 %. The coarsest gold particle was measured at 693 µm, but most of the free gold is in the finer fraction (< 25 µm).
13.1.4 Cyanidation
The standard method of recovering gold is through cyanidation and carbon absorption, where gold is dissolved in a cyanide solution and adsorbed onto activated carbon. Gold leaching of the composite sample was investigated at URSTM through a series of lab scale batch tests.
The tests were performed using standard baseline cyanidation conditions, with grinds varying from 80% passing minus 36 µm to 80% passing minus 101 µm being tested (Table 13‑3).
The results indicate a common grind versus gold recovery relationship, with leaching performance of 99 % for the finer grind (80% passing minus 36µm) and 96.8 % for the coarser grind (80% passing minus 101µm). Cyanide consumptions were observed to be very low, which is typical for this type of gold ore.
Island Gold Mine – Ni 43-101 Technical Report  80
August 31, 2020


alamos2.jpg
Table 13‑3 Cyanidation Test Results (URSTM)
DescriptionTestCyanide Duration (h)K80 (µm)% <200 MeshNaCN
Ca(OH)2
Au
ppm NaCN (end of test)kg NaCN/t of orepH Final
kg Ca(OH)2/t of ore
Rec. Au (%)Final Tail
g/t
Calc. Feed g/t
Cyanidation Test at Different GrindsCN-IG-12410168.26390.1111.21.696.80.8426.62
CN-IG-2247082.56530.1711.21.7697.90.5827.31
CN-IG-3244982.57310.1711.41.8698.40.4225.16
CN-IG-4243698.77570.3411.42.34990.2928.97
Average calc. feed:27.02
13.2 Confirmatory Metallurgical Testwork
13.2.1 ALS Testwork Program
A testwork program was carried out at ALS in December 2015 on three (3) different samples. One sample was designated “Concentrator Feed” and the other two samples were identified as Upper Part (from the Upper Zone) and Lower Part (from the Lower Zone).
The Concentrator Feed sample was comprised of several daily composites which in turn were made up of hourly samples of the mill feed. The sample was collected between December 3 and December 7, 2015 by a mill technician. The Lower Part and Upper Part samples come from stored half drill cores. These samples were prepared to be representative of the Upper and Lower zones of the entire mineral deposit, from surface down to a vertical depth of 1,000 m.
The objective of the testwork was to determine the following:
Composite Characterization:
Specific gravity;
BWI;
Chemical content of elements of interest; and
Mineral content, bulk mineral analysis and X-ray diffraction.
Metallurgical Performance:
Cyanide leaching; and
Gravity recoverable gold.
13.2.1.1 Composites Characterization
BWI determination tests were conducted in triplicate on each sample. A summary of the results is presented in Table 13‑4. The tests were conducted with a 106 µm closing screen.
Island Gold Mine – Ni 43-101 Technical Report  81
August 31, 2020



alamos2.jpg
Table 13‑4 Bond Ball Mill Work Index Test Results Summary (ALS)
Sample IDF80 (µm)P80 (µm)BWI (kWhr/t)
Upper Part2,1927613.7
Lower Part2,2697712.7
Concentrator Feed2,1077211

The ball milling results show that the ore can be considered soft to moderately soft. The results were consistent throughout the triplicate tests. The average BWI for the three samples is 12.5 kWh/t, which is consistent with the value of 12.6 kWh/t established by URSTM in the previous campaign.
The chemical content and mineral content results are summarized in Table 13‑5 and Table 13‑6. The gold grade ranged from 9.0 g/t to 14.3 g/t.
Table 13‑5 Chemical Content Summary (ALS)
SampleCuFeAuAgAs
%%g/tg/t%
Upper Part0.00538.9920.006
Lower Part0.0043.214.320.007
Concentrator Feed0.0073.313.620.02
Table 13‑6 Mineral Content Summary (ALS)
MineralMineral Content (%)
Concentrator FeedLower PartUpper Part
Chalcopyrite<0.1<0.1<0.1
Pyrite2.92.12.5
Quartz48.440.339.1
Micas15.218.318
Feldspars18.926.827.5
Kaolinite0.50.40.3
Chlorite5.45.35.8
Carbonates5.33.33.4
Other3.43.53.5
Total100100100
Most of the samples are silicate minerals (quartz, micas, feldspars, or chlorites). Carbonates and sulphides are also present. Minor amounts of copper in chalcopyrite were detected but at this concentration would not be expected to increase cyanide consumption in the leach process.
Given the fact that the Concentrator Feed composite appears from the ball mill work index tests to be less competent, or softer, than the upper and lower zone material, the mineral content
Island Gold Mine – Ni 43-101 Technical Report  82
August 31, 2020


alamos2.jpg
results suggest that this may be attributable to the concentration of feldspar minerals (<19% in the Concentrator Feed comp, but >26% in the upper and lower zone comps).
13.2.1.2 Metallurgical Performance
Cyanidation bottle roll tests were conducted on the three samples at three different grind sizes (80% passing 65µm, 100µm and 130µm). Tests were carried out with a cyanide concentration of 300 ppm, a pH level of 11, and over a 48-hour period. Results are summarized in Figure 13‑4.
image18.jpg
Figure 13‑4 Gold Recovery versus Particle Size
Overall gold recoveries ranged from 94 to 98%, with higher recoveries obtained at finer grind sizes. Gold leach kinetics were seen to be quite rapid, with most of the extraction occurring in the first 24 hours. Cyanide consumption was notably higher at finer grinds while lime consumption was unchanged. A summary of the results is presented in Table 13‑7. The leaching kinetics curve for the Lower Part sample tested at 63 microns is presented in Figure 13‑5.
Island Gold Mine – Ni 43-101 Technical Report  83
August 31, 2020



alamos2.jpg
Table 13‑7 Cyanidation Tests Summary (ALS)
SamplePrimary Grind µm K8048 hour Extraction (%)Grade g/tReagent Consumption kg/t
FeedResidueFeedResidue
AuAgAuAgAuAgNaCNLime
Upper Part12996.589.5112.90.490.30.20.7
10595.992.39.742.60.40.20.10.8
6397.792.912.42.80.290.20.40.8
Lower Part12593.782.8142.90.890.50.10.4
10095.389.213.72.80.640.30.20.4
6397.788.813.92.70.320.30.40.4
Concentrator Feed12196.381.611.92.70.560.50.10.4
9996.288.112.42.50.470.30.10.4
6497.792.112.42.50.290.20.30.4

image81.jpg

Figure 13‑5 Cyanide Leach Kinetics Curve for Lower Part Sample Ground to 63 Microns (ALS)
A single gravity recoverable gold test was completed by ALS using 30 kg of Concentrator Feed sample. The test was conducted using a lab scale Knelson concentrator fitted with a 100 g cone and consisted of three runs at sequentially finer grinds. The sample was first ground to 80% -743 µm and was run through the Knelson. Approximately 30% of the gold was recovered to the concentrate at this stage. The Knelson tailing was then reground to 80% -336µm and the gravity concentration process repeated. A further 21 % of the gold was recovered at this intermediate stage. Finally, the Knelson tailing was ground to 80% -112µm and fed back to the Knelson. At this grind, another 19 % of the gold was recovered to the concentrate. Results are presented in Figure 13‑6.
Island Gold Mine – Ni 43-101 Technical Report  84
August 31, 2020


alamos2.jpg
image2.jpg

Figure 13‑6 Gravity Recovery Performance (ALS)
The results indicate that the sample of Concentrator Feed was amenable to gravity separation as approximately 70% of the gold in the feed could be recovered to a low grade Knelson concentrate. The Island Gold processing operation does not currently have a gravity recovery circuit, but it may be considered in the future.
13.3 Thickening & Rheology Testing (2016)
FLSmith was contracted to conduct thickening and rheology testwork on cyclone overflow samples from the secondary mills at the Island Gold Mine. The objective of the testwork was to predict sizing and operating parameters for the pre-leach thickener, contemplated for the expansion to 1,100 tpd.. FLS carried out the testing in their Separation Laboratory located in Midvale, Utah in February 2016.
Flocculant screening tests evaluated the performance of five (5) flocculants with different characteristics (non-ionic, anionic, medium to high molecular weight and low to very high charge density). The best settling rate and supernatant clarity were obtained with the 913 VHM flocculant (anionic flocculant with high molecular weight and low charge density).
The results show that optimal flux rates should be achieved with a thickener feed solids density of about 10% (w/w). This feed density could be reached with the addition of an auto-dilution feedwell. Details are presented Figure 13‑7.
Island Gold Mine – Ni 43-101 Technical Report  85
August 31, 2020



alamos2.jpg
image8.jpg

Figure 13‑7 Flux Testing (FLSmith)
The underflow density achieved at various residence times is presented in Figure 13‑8.
The target underflow density for the current operation is 55% solids (w/w). Based on the testwork results, this density is achievable in less than one (1) hour. At this target density, the slurry has a yield stress of less than 20 Pa, which can be managed with standard raking mechanism drives. The underflow slurry rheology testing results are presented in Figure 13‑9.

Island Gold Mine – Ni 43-101 Technical Report  86
August 31, 2020


alamos2.jpg
image61.jpg

Figure 13‑8 Underflow Retention Time versus Solids Concentration (FLSmith)
image34.jpg
Figure 13‑9 Thickener Underflow Rheology Results (FLSmith)


Island Gold Mine – Ni 43-101 Technical Report  87
August 31, 2020



alamos2.jpg
A summary of the thickener sizing and operating parameters is presented in Table 13‑8 below.
Table 13‑8 Thickener Sizing and Operating Parameters
Thickener Parameters
Feedwell Suspended Solids Conc. (wt%)10
Recommended Total Dose (g/t)10-15
Design Unit Area (m2/tpd)
0.05
Design Overflow Clarity (ppm)<100
Rheological Characteristics
Est. Bed Solids at 0.5 hr Retention Time (wt%)/Est. Yield Stress (Pa)64.6/<20
Est. Bed Solids at 1 hr Retention Time (wt%)/Est. Yield Stress (Pa)66.8/20
Est. Bed Solids at 2 hr Retention Time (wt%)/Est. Yield Stress (Pa)68.0/25
Est. Bed Solids at 4 hr Retention Time (wt%)/Est. Yield Stress (Pa)70.1/60
Est. Bed Solids at 6 hr Retention Time (wt%)/Est. Yield Stress (Pa)70.8/90
Island Gold Mine – Ni 43-101 Technical Report  88
August 31, 2020


alamos2.jpg

14 MINERAL RESOURCE ESTIMATES
14.1 Introduction
The December 31, 2019 Mineral Resource and Mineral Reserve Estimation was carried out by the Island Gold Mine Technical Services department’s staff under the supervision of Raynald Vincent, P.Eng., M.G.P., Chief Geologist and Nathan Bourgeault, P.Eng., Chief Engineer of the Island Gold Mine. Both are considered Qualified Persons within the meaning of Canadian Securities Administrators’ National Instrument 43-101.
This section describes the Mineral Resource estimation methodology and summarizes the key assumptions considered by Island Gold personnel. In the opinion of the authors, the Mineral Resource evaluation reported herein is a reasonable representation of the gold Mineral Resources contained within the Island Gold property at the current level of sampling. The Mineral Resources have been estimated in conformity with generally accepted CIM Estimation of Mineral Resource and Mineral Reserves Best Practices Guidelines and are reported in accordance with the Canadian Securities Administrators’ National Instrument 43-101. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resources will be converted into Mineral Reserves.
Island Gold’s technical staff carried out geological interpretation of the mineralized zones according to local conventions used at the Island Gold Mine as follows:
C, D, D1, E2 and E1E for the Island Domain (IG) and Lochalsh Domain (LC);
GD2, GP2, GD3, GP5, GD6, GD7 and GD9 for the Goudreau Domain; and
E1E, B, D, D1, C, G, G1, GNW and STH for the Lower Island Domain (EX) and Extension 2 Domain (X2).
The zones are clearly defined on longitudinal sections.
Prior to outlining Mineral Resources on vertical longitudinal sections, a global Mineral Resource model was carried out to identify mineralized zones that meet technical parameters. The Mineral Resources presented here are exclusive of Mineral Reserves.
14.2 Mineral Resources Classifications, Categories and Definitions
Mineral Resources were classified according to the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards (May 10, 2014). A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated, or interpreted from specific geological evidence and knowledge, including sampling.
An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated based on limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
Island Gold Mine – Ni 43-101 Technical Report  89
August 31, 2020



alamos2.jpg
An Indicated Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Mineral Reserve.
A Measured Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation. A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral Resource. It may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve.
Modifying Factors are considerations used to convert Mineral Resources to Mineral Reserves. These include, but are not restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors.
14.3 Methodology
The Mineral Resource evaluation methodology involves the following procedures:
Database compilation and validation;
Construction of wireframe models for the boundaries of the gold mineralization;
Geostatistical analysis and variography;
Block modelling and grade interpolation;
Definition of Mineral Resource domains;
Assessment of “reasonable prospects for economic extraction” and selection of appropriate cut -off grades; and
Preparation of the Mineral Resource Statement.
The Qualified Person believe that the current drilling information is sufficiently reliable to interpret with confidence the boundaries for gold mineralization and that the assay data is sufficiently reliable to support Mineral Resource estimates. Gems software (version 6.8) was used to construct the geological solids, prepare assay data for geostatistical analysis, construct the block model, estimate metal grades, and tabulate Mineral Resources.
Mineralized intersections were determined for each drill hole and underground development face by the geology department. The diamond drill hole intersections were determined from interpretation on vertical cross-sections and horizontal plans while the development intersections were interpreted using face mapping and assay results of each development face. Each mineralized intersection is tagged in the database according to its respective zone name.


Island Gold Mine – Ni 43-101 Technical Report  90
August 31, 2020


alamos2.jpg
14.4 Databases
Within the Gems project, two different databases are used for Mineral Resource and Mineral Reserve estimates, through two different workspaces in Gems, one for surface and underground drill holes and a second one for channel sampling.
Table 14‑1 summarizes the drilling completed near the Island Gold deposit or on the property and Table 14‑2 the channel sampling.
Surface holes are usually oriented more or less perpendicular to the main trend of mineralization (Figure 14‑1). Conversely, the underground drill holes have highly variable azimuths and dips, as they were drilled in series of fans from individual drill stations, which creates a multitude of angles between drill holes and mineralization (Figure 14‑2). Some drill holes may then end up being more or less parallel to the mineralization and not be representative of true mineralized width. However, this impact is mitigated by the modeling technique limiting all intercepts within interpreted domains to those that comply with the true mineralized widths.
Table 14‑1 Island Gold Drill Hole Database Summary (Dec 31, 2019)
LocationNumber of HolesLength (metres)
Surface831549,287
Underground5,580814,063
Total6,4111,363,350
In addition to the drill holes, underground channel samples of the Island Gold mine were also used in Mineral Resource estimation. The channel samples were taken from the 125 metre level (Upper Mine) to the 900 metre level (Lower Zone).
Table 14‑2 Island Gold Channel Sample Database Summary (Dec 2019)
Sample typeNumber of ChannelsLength (metres)
Channel sampling9,14838,444

Island Gold Mine – Ni 43-101 Technical Report  91
August 31, 2020



alamos2.jpg
image42.jpg
Figure 14‑1 Surface Diamond Drilling – Island Gold Mine

image75.jpg
Figure 14‑2 Underground Diamond Drilling – Island Gold Mine
Island Gold Mine – Ni 43-101 Technical Report  92
August 31, 2020


alamos2.jpg
14.5 Gold Modeling
Island Gold personnel modeled the gold mineralization by interpreting mineral-domain polylines on west looking cross -sections (azimuth 270°) that are oriented almost perpendicular to the general strike of the Island Gold API Zone (100-105°) and span over 2.4 km along the deposit. Distances between cross -sections vary from 10 m in the core of the deposit to 40 m in the extensions where the drilling pattern is wider. Polylines drawn on sections were then joined by tie lines to produce 3D mineralized solids for the different domains. The minimum width for interpreted zones is set to 2.0 m (true width). Solids were validated in Gems to estimate volumes.
Representative cross sections showing gold mineral-domain interpretations of Island Gold Zones are shown in Figure 14‑3 and Figure 14‑4. while Figure 14‑5 shows the resulting 3D solids.
image80.jpg
Figure 14‑3 Cross-section 14780E Showing Island Gold Mineralized Zones


Island Gold Mine – Ni 43-101 Technical Report  93
August 31, 2020



alamos2.jpg
image74.jpg
Figure 14‑4 Cross-Section 15040E Showing Island Gold Mineralized Zones


Island Gold Mine – Ni 43-101 Technical Report  94
August 31, 2020


alamos2.jpg
image73.jpg
Figure 14‑5 3D Mineralized Solid Island Gold Lower Zones

14.6 Statistical Analysis and Grade Capping
Drill hole assay intervals that intersect interpreted domains were coded in the database and were used to analyse sample lengths, generate statistics, and for compositing and variography. Table 14‑3 summarizes some statistics drawn from the original (raw) assay data with the corresponding proposed grade capping value and the number of samples capped for the Island Gold Lower Zones. The statistics show that about 1.52% of the DDH samples and 3.66% of the chip samples were capped. All zone capping grades are displayed except for GP2, GP5, GD7 and GD9 which were not updated therefore, historic capping grades of 75g/t for DDH and Faces were used.
Island Gold Mine – Ni 43-101 Technical Report  95
August 31, 2020



alamos2.jpg
Table 14‑3 Summary Statistics of Original Assay Samples from Diamond Drill Holes and Faces
ZoneSample TypeNumber SamplesUncapped MeanC.V.Capping ValueNumber CappedCapped MeanCapped C.V.Apparent Loss% Capped
EX-C (without HG)730 DDH13,64813.347.3622512210.422.93-21.9%0.89%
EX-C HG730 DDH3,61933.332.753008428.932.16-13.2%2.32%
EX-D1725 DDH4836.063.24058.651.43-76.0%10.42%
EX-D720 DDH2,0184.545.4750473.042.87-33.0%2.33%
EX-G740 DDH2,9517.5210.6970444.052.72-46.1%1.49%
EX-G1745 DDH1,4337.247.5545283.352.47-53.7%1.95%
EX-GNW742 DDH5228.282.8870106.962.06-15.9%1.92%
EX-B760 DDH3,93412.0710.6990996.222.67-48.5%2.52%
EX-SHT750 DDH2517.562.5750210.341.41-41.1%8.00%
X2-E1E310 DDH9,87811.294.331601228.962.77-20.7%1.24%
LC-E1E410 DDH3,2076.454.9875514.712.55-27.0%1.59%
LC-D420 DDH1,6872.284.7645141.843-19.3%0.83%
LC-C430 DDH1,4854.988.4960212.893.03-42.0%1.41%
LC-E2450 DDH1,4503.84.9955132.962.52-22.1%0.90%
IG-E1E110 DDH4,1747.33.85100536.082.58-16.7%1.27%
IG-D120 DDH2,5456.875.5975454.642.53-32.5%1.77%
IG-C130 DDH2,4498.075.87100305.532.7-31.5%1.22%
IG-E2150 DDH5469.057.0275233.741.87-58.7%4.21%
IG-D1160 DDH1,4393.533.787583.152.78-10.8%0.56%
X1-E1E210 DDH1,3126.782.7175175.942.06-12.4%1.30%
GD-G2620 DDH48816.723.55100229.962.43-40.4%4.51%
GD-G3630 DDH61812.96.3875175.382.76-58.3%2.75%
GD-G6660 DHH43429.952.881003416.661.79-44.4%7.83%
All zonesDDH59,91011.079118.25-25.5%1.52%
ZoneSample TypeNumber SamplesUncapped MeanC.V.Capping ValueNumber CappedCapped MeanCapped C.V.Apparent Loss% Capped
EX-C (without HG)730 Faces8,55312.993.5212519910.012.39-22.9%2.33%
EX-C HG730 Faces2,20343.142.9319012630.271.74-29.8%5.72%
EX-D720 Faces9910.785.642063.131.77-70.9%6.06%
EX-G740 Faces536.11.833035.331.51-12.6%5.66%
EX-GNW742 Faces13412.633.1330116.031.61-52.2%8.21%
EX-B760 Faces51117.283.9560328.491.93-50.9%6.26%
X2-E1E310 Faces2,84312.14.7575937.762.11-35.9%3.27%
LC-E1E410 Faces2,46411.773.6875967.692.23-34.7%3.90%
LC-D420 Faces724.343.314523.482.77-19.8%2.78%
LC-C430 Faces1028.237.746012.472.83-70.0%0.98%
IG-E1E110 Faces6,99012.833.59752738.572.04-33.2%3.91%
IG-D120 Faces4,01812.693.76751398.092.03-36.2%3.46%
IG-C130 Faces4,53714.285.23751578.611.98-39.7%3.46%
IG-E2150 Faces3996.623.2830223.751.98-43.4%5.51%
IG-D1160 Faces1,3286.483.2275275.42.45-16.7%2.03%
X1-E1E210 Faces3,21618.173.49751369.521.87-47.6%4.23%
GD-G2620 Faces26481.94.09754218.81.52-77.0%15.91%
GD-G3630 Faces26418.323.9575188.132.46-55.6%6.82%
GD-G6660 DHH21537.115.61751813.541.72-63.5%8.37%
All zonesFaces38,26515.4814019.94-35.8%3.66%
Island Gold Mine – Ni 43-101 Technical Report  96
August 31, 2020


alamos2.jpg

Figure 14‑6 and Figure 14‑7 show an example of the histogram and the probability plot used for the grade capping study of the Zone EX-C (Island Lower C Zone – code 730).
image68.jpg

Figure 14‑6 Histogram Plot Zone EX-C (Island Lower)

image7.jpg
Figure 14‑7 Probability Plot Zone EX-C (Island Lower)
14.7 Compositing
Intervals within each interpreted zone were assigned a zone code. Capped assays were composited to achieve a uniform sample support for grade interpolation. To determine the optimal composite length, many factors were taken into consideration. Considering the relatively narrow nature of many of the mineralized domains (3 m to 8 m), the proposed block size (10 m x 10 m x 4 m), the original sample length (between 0.3 m to 1.5 m), the capped assays were composited over two-metre lengths, from drill hole collar to toe, within the interpreted zones.
Island Gold Mine – Ni 43-101 Technical Report  97
August 31, 2020



alamos2.jpg
The composite length avoids de-compositing samples, which occurs when the sample length exceeds the composite length and provides a reasonable reconciliation to the raw data mean grade while sufficiently reducing the variation coefficient. All intervals within solids that have no assays were given a value of zero during compositing. Composites of less than 0.75 m were discarded for grade interpolation.
Zones in the upper part of the mine including the Lochalsh, Goudreau and Upper Island domains are composited differently than the lower zones. The zones are typically thinner and therefore, a smaller block size is used for the estimation (5 m x 5 m x 2m). As a result of these differences the drill holes are composited over one-metre lengths, from drill hole collar to toe, within the interpreted zones. Composites of less than 0.3 m were discarded for grade interpolation.
Descriptive statistics of the composites used for the zones in Lower Island (EX) and Extension 2 (X2) domains are shown in Table 14‑4.
Table 14‑4 Summary Statistic for 2 m Composites
ZoneCodeNumber of CompositesMean Au Grade g/tStandard DeviationCoefficient of Variation
EX-C730 DDH49438.6917.732.04
EX-C HG730 DDH122125.1439.211.56
EX-D1725 DDH13052.074.332.09
EX-D720 DDH14981.743.932.26
EX-G740 DDH14312.946.352.16
EX-G1745 DDH6762.164.362.02
EX-GNW742 DDH2235.548.471.53
EX-B760 DDH17304.529.672.14
EX-SHT750 DDH128.236.440.78
X2-E1E310 DDH31247.3614.341.95
EX-C730 Faces32319.9115.521.56
EX-C HG730 Faces86330.9136.141.17
EX-G740 Faces215.785.810.96
EX-D1725 Faces68.236.440.98
EX-GNW742 Faces506.166.981.07
EX-B760 Faces2057.929.631.03
X2-E1E310 Faces10156.958.941.11
14.8 Density
A review of the zone density was conducted in 2016 for several different mineralized zones in the lower part of the mine. Results confirm figures that have been used in the past with density for ore zones established at 2.78 t/m³ (Table 14‑5). These densities have been used for the December 2019, Mineral Resource estimates.
Table 14‑5 Specific Gravity Measurements
Number of MeasurementsMeanMedianStandard DeviationCoefficient of Variation
4,8282.782.770.0780.028
Island Gold Mine – Ni 43-101 Technical Report  98
August 31, 2020


alamos2.jpg
14.9 Variography
Gemcom software is used to model the spatial continuity of the Island Gold deposit. Experimental variograms are generated from the composites within the zones.
The variography models the nugget effect and the spherical structures representing the larger scale spatial variability of the datasets. The modeled variograms for domains 730 and 310 (EX-C and X2 zones) are summarized in Table 14‑6. The resulting orientations were visualized in Gems to see if the directions of the axes were consistent with the solid orientations. The orientations usually fit well with the general orientations of the interpreted zones. Note that some reported rotations have been adjusted based on interpreted geological constraints. Search ellipse orientations are also shown overlain on a long section in Figure 14‑8.
The nugget effect which is determined by variography is moderate to high, around ~40-50 % of the total variance for EX-C and X2-E1E. Variography provided information relevant to the estimation parameters used for ordinary kriging, as well as a guide for Mineral Resource classification.
Table 14‑6 Island Gold Deposit Variography Study
Sector – ZoneNuggetRangesSearch Anisotropy
1st Structure2nd StructurePrincipal AzimuthPrincipal DipSecond Azimuth
Extension 2 Domain
up Zone E1E (310) Above 4500/4600
77X: 53X: 85155-6499
Y: 47Y: 76
Z: 4Z: 7
Sill: 22Sill: 77
Extension 2 Domain
East Zone E1E (310) East of 15700E
196X: 5X: 381065100
Y: 5Y: 37
Z: 5Z: 38
Sill: 38Sill: 40
Extension 2 Domain
Zone E1E (310) West of 15700E
336X: 38117-5991
Y: 31
Z: 17
Sill: 407
Lower Island Domain
EX-C (730)
375X: 38117-5991
Y: 29
Z: 17
Sill: 371


Island Gold Mine – Ni 43-101 Technical Report  99
August 31, 2020



alamos2.jpg
image60.jpg
Figure 14‑8 Search Ellipse Orientation Corresponding to Variography

14.10 Block Modelling
14.10.1 Upper Island Gold Mine
Block modelling consists of in a 3D array of cells (blocks) with specified dimensions and for which the grade of each block is determined by an interpolation method (algorithm). For the upper mine, four different models were produced between the 435 Level and the topographic surface. The models are for the Lochalsh, Island Gold, Extension 2, and Goudreau Domains.
The block dimensions for these sectors are 5 m along strike (east-west), 5 m in elevation, and 2 m across strike (north-south). The blocks are tagged to a specific rock code according to which mineralized zone they are fall within. A percentage inside the solid is given to each block.
Block grade interpolation was carried out using inverse distance squared (ID2) for the Goudreau Domain and ordinary kriging (OK) for the three other Domains. A minimum of 9 composites for the first pass, a minimum of 5 for the second pass, and a minimum of 1 for the third pass and a maximum of 16 composites for all passes were used to interpolate the grade of each block. The search ellipse dimensions used for grade interpolation are different for each sector.
Island Gold Mine – Ni 43-101 Technical Report  100
August 31, 2020


alamos2.jpg
14.10.2 Lower Island Mine
Two block models were defined to estimate Mineral Resources for the lower mine. One for the west side in the Lower Island Domain (DEEPZONE model) for the C zone and parallel smaller structures and the second for the E1E zone in Extension 2 Domain (EXT2 model).
Mineral Resources for the Lower Island Domain were estimated by block modelling with 10 m block dimensions along strike, 10 m in elevation, and 4 m across-strike in the GEMS software using two-metre composites. Composites shorter than 0.75 m were discarded. Block model parameters for the Lower Island Domain models are given in Table 14‑7.
Table 14‑7 Block Model Parameters, DEEPZONE Model
East (X)North (Y)Elevation (Z)
Origin14,0003,8805,500
Block Size10410
Number of Blocks260190172
Model Rotation

For the EXT2 model, block dimensions were changed to 10 m along strike, 5 m in elevation, and 2 m across-strike to reflect the thinner mineralized zone, and the shallower dip of approximately 65 degrees. Those dimensions fit better with the solids’ orientation and dimensions. Block model parameters for the EXT2 zone model are given in Table 14‑8.
Table 14‑8 Block Model Parameters, EXT2 Model
East (X)North (Y)Elevation (Z)
Origin15,2503,8505,450
Block Size1025
Number of Blocks140400325
Model Rotation
14.10.3 Grade Interpolation Methodology for Island Lower Zones
The grade interpolation for the Island Gold Lower Domain block models was completed using an ordinary kriging method. Anisotropic search ellipsoids were selected for the grade interpolation process based on the analysis of the spatial continuity of capped composites using variography (Table 14‑9). Minimum and maximum numbers of composites are set for interpolation and restrictions are placed on the number of composites used from each drill hole.
The grade estimates were generated using the 2 m composites. The blocks included in a zone are estimated only with the composites coded within this zone (hard boundary). The block models were estimated using the following parameters for both block models and all zones, except for some minor differences in the C zone estimate.
A new sub-domain called the High Grade Domain has been implemented for the zone EX-C. Inside this domain the capping grade is 300 g/t for DDH and 190 g/t for the chips. Consequently, there are five passes in the EX-C zone. It uses the same criteria as the first pass but only estimates blocks within the HG Sub-Domain boundary and uses the higher capping grades.
In addition to the capping of high-grade outliers in the EX-C zone, the spatial influence of high-grade assays was restricted in the 4th and 5th pass in the grade interpolation process.
Island Gold Mine – Ni 43-101 Technical Report  101
August 31, 2020



alamos2.jpg
Composites with grades higher than 125 g/t Au had their influence limited to a search ellipse of 15 m x 10 m x 5 m. This procedure is judged prudent to limit excessive smearing of high grade samples during interpolation of blocks in areas where drill spacing is wider for example, exploration holes beneath the mine.
First Pass (C zone only): minimum of 9 and maximum of 16 composites found within a search ellipse that has the longest axis close to the range of the first structure identified by variography. A maximum of four samples per drill hole from a minimum of three different drill holes, can be used for any block estimate. Samples in the High Grade Sub-Domain in the C zone are used for this pass. Those blocks are classified as Measured Mineral Resources.
Second Pass: minimum of 9 and maximum of 16 composites found within a search ellipse that has the longest axis close to the range of the first structure identified by variography. A maximum of four samples per drill hole from a minimum of three different drill holes, can be used for any block estimate. Samples from development are used for this pass; therefore, only blocks within 10 m of development are estimated. Those blocks are classified as Measured Mineral Resources.
Third Pass: minimum of 5 and maximum of 16 composites within a search ellipse with the longest axis that corresponds to the range of the second structure identified by variography. A maximum of four composites per drill hole from a minimum of two different drill holes, can be used for block estimates. Samples from development are used for this pass; therefore, only blocks within 10 m from development are estimated (corresponds to the Measured Mineral Resources).
Fourth Pass: minimum of 5 and maximum of 16 composites within a search ellipse with the longest axis that corresponds to the range of the second structure identified by variography. A maximum of four composites per drill hole from a minimum of two different drill holes, can be used for block estimates. Samples from development are not used for this pass; therefore, all blocks that have not been estimated in the previous interpolation passes can be estimated. Grades higher than 125g/t have a restricted ellipse (C zone only).
Fifth pass: minimum of 1 and maximum of 16 composites within a search ellipse with the longest axis that corresponds to 1.5X the range of the second structure identified by variography. A maximum of four composites per drill hole from a minimum of one drill hole, can be used for block estimates. Samples from development are not used in this pass; therefore, all blocks that have not been estimated in the previous interpolation passes can be estimated. Grades higher than 125g/t have a restricted ellipse (C zone only).

Island Gold Mine – Ni 43-101 Technical Report  102
August 31, 2020


alamos2.jpg
Table 14‑9 Summary of Island Lower Zones Estimation Parameters
ZonePassMethodSearch AnisotropySample SearchSampleData typeRestricted Ellipse
Primary AzimuthPrim DipInt. AzmthXYZMinMaxMax per Hole
EX-C1OK117-59902520109164DDH + FacesNo
EX-C2OK117-59902520109164DDH + FacesNo
EX-C3OK117-59904030105164DDH + FacesYes
EX-C4OK117-59904030105164DDH onlyYes
EX-C5OK117-59906045201164DDH onlyYes
X2-E1E UP1OK155-64903025109164DDH + FacesNo
X2-E1E UP2OK155-64905040155164DDH + FacesNo
X2-E1E UP3OK155-64905040155164DDH onlyNo
X2-E1E UP4OK155-64908575161164DDH onlyNo
X2-E1E WEST1OK117-59902520109164DDH onlyNo
X2-E1E WEST2OK117-59904030155164DDH onlyNo
X2-E1E WEST3OK117-59907055201164DDH onlyNo
X2-E1E EAST1OK10651002525109164DDH onlyNo
X2-E1E EAST2OK10651004040155164DDH onlyNo
X2-E1E EAST3OK10651006060251164DDH onlyNo
EX-B1OK117-59902520109164DDH + FacesNo
EX-B2OK117-59904030105164DDH + FacesNo
EX-B3OK117-59904030105164DDH onlyNo
EX-B4OK117-59906045151164DDH onlyNo
EX-D1OK117-59902520109164DDH + FacesNo
EX-D2OK117-59904030155164DDH + FacesNo
EX-D3OK117-59906045205164DDH onlyNo
EX-D4OK117-59906045201164DDH onlyNo
EX-D11OK117-59902520109164DDH + FacesNo
EX-D12OK117-59904030155164DDH + FacesNo
EX-D13OK117-59906045201164DDH onlyNo
EX-G1OK117-59902520109164DDH + FacesNo
EX-G2OK117-59904030105164DDH + FacesNo
EX-G3OK117-59904030105164DDH onlyNo
EX-G4OK117-59906045151164DDH onlyNo
EX-GNW1OK140-57922520109164DDH + FacesNo
EX-GNW2OK140-57924030105164DDH + FacesNo
EX-GNW3OK140-57924030105164DDH onlyNo
EX-GNW4OK140-57926045151164DDH onlyNo
EX-G11OK117-59902520109164DDH onlyNo
EX-G12OK117-59904030105164DDH onlyNo
EX-G13OK117-59906045151164DDH onlyNo
EX-STH1OK110-60852520109164DDH onlyNo
EX-STH2OK110-60854030105164DDH onlyNo
EX-STH3OK110-60856045151164DDH onlyNo
Note:
Restricted ellipse of 15m x 10m x 5m is applied for composites greater than 125 g/t for zone EX-C (730)


Island Gold Mine – Ni 43-101 Technical Report  103
August 31, 2020



alamos2.jpg
14.11 Block Model Validation
Validation of the interpolated model was undertaken to confirm estimation parameters, to verify that the model reflects the input data on both local and global scales and particularly to verify that the estimate is not biased. The validation was performed using a combination of different techniques, as follows:
Inspection of block grades in plans and sections and visual comparison with drill hole grades;
Statistical validation of sample means versus block estimates by zones; and
Mean sample grade within a block vs interpolated grade.
14.11.1 Visual Validation
Visual validation is a verification of the interpolated block model on a local block scale versus the composite grades. A visual inspection has been carried out on cross-sections and bench/level plans. Comparison between local block estimates and nearby composites is generally good and indicates that grade smoothing is not excessive in the block model.
14.11.2 Statistical Validation
Statistical validation of the block model estimates has also been done on the different Island Gold Lower Zones by comparing composite grades to interpolated block grades. Such validation has been done without an economic cut-off. Results indicate that, in general, the block models globally show lower grades than composites (see Table 14‑10).
Table 14‑10 Statistical Validation Block Models vs Composite Mean Grades (Faces and DDH)
ZoneCodificationComposite CountComposites Grade (g/t Au)Block CountOK Model Grade (g/t Au)Difference OK/CMP
EX-C7308,1749.1714,9589.473%
EX-C (HG Zone)7302,08427.531,30727.29-1%
EX-B7601,9354.886,7033.5-28%
EXT2-E1E3104,1397.26122,7007.787%
EX-G7401,4522.989,6612.33-22%
EX-G17456762.169,7501.87-13%
EX-GNW7422735.655235.03-11%
EX-STH750128.231468.432%

14.11.3 Mean Composite Grade within Blocks vs Interpolated Grade
A separate block model was done for the lower zones which interpolated only blocks that had a composite within it. The block was assigned the grade of that composite. The block grade from the new model is then compared to the original interpolated grade of the block. A successful grade interpolation protocol should result in block grade estimates that demonstrate a minimum amount of bias.
A total of 9,014 blocks with composites within the mineralized solids were identified in the block model. The average gold grade of the composites within those blocks is 6.75 g/t Au while the average interpolated grade is 6.33 g/t Au. The comparison shows that there is no bias between
Island Gold Mine – Ni 43-101 Technical Report  104
August 31, 2020


alamos2.jpg
the mean grade of the composites and the estimated grade. The analysis indicates that the Mineral Resource model provides a reasonable estimate of the Island Gold Mine deposit (see Table 14‑11).
Table 14‑11 Comp. - Mean Sample Grade Within Block and Interpolated Grade for Same Block
ZoneNumber of Blocks with CompositesGrade Assigned to Blocks from Composites Only (g/t Au)Interpolated Grade OK
(g/t Au)
Difference OK/CMP
EX-C High Grade69526.5626.31-0.9%
EX-C Regular Ore309910.499.56-8.9%
EX-D1107.516.82-9.2%
EX-D517.996.49-18.8%
EX-G7812.882.86-0.7%
EX-G13642.42.36-1.7%
EX-GNW1415.965.66-5.0%
EX-B9195.024.79-4.6%
EX-SHT88.588.25-3.8%
X2-E1E29437.197.15-0.6%
14.12 Classification
Block model tonnage and grade estimates for the Island Gold deposit were classified according to the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014).
A Mineral Resource classification is typically a subjective concept and industry best practices suggest that Mineral Resource classifications should consider the confidence in the geological continuity of the mineralized structures, the quality and quantity of exploration data supporting the estimates and the geostatistical confidence in the tonnage and grade estimates. Appropriate classification criteria should aim at integrating these concepts to delineate regular areas with similar Mineral Resource classifications.
The authors are satisfied that the geological modelling honours the current geological information and knowledge. The location of the samples and the assay data are sufficiently reliable to support Mineral Resource estimation.
The Mineral Resources at Island Gold Mine are classified into Measured, Indicated and Inferred Mineral Resource categories. The Mineral Resources were classified in two successive stages: automated classification followed by manual editing of the final Mineral Resource categories on longitudinal sections for each individual zone.
Mineral Resources are classified based on drilling density which are as follows:
Measured Mineral Resources: A maximum drill hole spacing of about 20 m and associated mining development completed. Mineralization must be exposed and continuity visually confirmed. Corresponds mainly to blocks estimated during the first pass.
Indicated Mineral Resources: A maximum drill hole spacing of 20 m to 25 m between drill holes if no lateral development is above or below the Mineral Resource outline. All Mineral Resources classified as Indicated Mineral Resources are within the blocks estimated in the second and third passes.
Island Gold Mine – Ni 43-101 Technical Report  105
August 31, 2020



alamos2.jpg
Inferred Mineral Resources: These blocks are represented mainly by areas where drill holes are spaced by more than 30 m (up to 75m) where the mineralization is interpreted to be the extension of known mineralized zones. Extension is limited to a maximum of 30 m from the last drill holes. Blocks classified as Inferred Mineral Resources are estimated mainly during the fourth pass and partly during the third pass.
Additional infill drilling is required to support classification from Inferred to Indicated Mineral Resources and from Indicated to Measured Mineral Resources. It cannot be assumed that all or any part of an Inferred Mineral Resource will be upgraded to an Indicated or Measured Mineral Resource because of additional drilling.
Figure 14‑9 is an illustration of the blocks estimated by different passes for Zone EX-C and E1E (EXT2). This information is used a guide for classification. Measured Resources (red polygons) are limited to the blocks estimated in the first pass. Indicated Mineral Resources (dark green polygons) are located well within the blocks estimated in the second and third passes. Inferred Mineral Resources (dark blue polygons) are estimated partly in the third pass or fourth pass.
image52.jpg
Figure 14‑9 Longitudinal Lower C Zone and X2-E1E Zone showing Mineral Resource Classification
14.13 Mineral Resource Statement
CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) defines a Mineral Resource as:
“[A] concentration or occurrence of diamonds, natural solid inorganic material, or natural solid fossilized organic material including base and precious metals, coal, and industrial minerals in or on the Earth’s crust in such form and quantity and of such a grade or quality that it has
Island Gold Mine – Ni 43-101 Technical Report  106
August 31, 2020


alamos2.jpg
reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge.”
The “reasonable prospects for economic extraction” requirement generally implies that the quantity and grade estimates meet certain economic thresholds and that the Mineral Resources are reported at an appropriate cut-off grade considering extraction scenarios and processing recoveries.
Mineral Resources were estimated using a general undiluted cut-off grade of 4.03 g/t Au. This cut-off is based on a gold price of $1,250 per ounce, an exchange rate of 0.77, a mill recovery of 96.5%, a production cost estimated at $203 per tonne. The details of the economic and mining factors are presented in Section 15, Mineral Reserve Estimates.
Once interpolation has been carried out, the Mineral Resource areas were outlined on the vertical longitudinal section of the zone to a maximum lateral and vertical distance of approximately 30 m from drill hole intercepts for the C and E1E zones while a maximum lateral and vertical distance of 20 m was applied to other zones. All blocks within the outlined Mineral Resource shapes are included in the estimation. Cut-off is applied to the overall Mineral Resource shapes and not to individual estimated blocks.
Island Gold Mine reports Mineral Resources exclusive of Mineral Reserves. The majority of Measured and Indicated Mineral Resources are at a higher grade than the economic cut-off and have been converted to Mineral Reserves (see Section 15). Therefore, the vast majority of Mineral Resources at Island Gold Mine are classified as Inferred Mineral Resources. The economic viability of Inferred Mineral Resources has not been demonstrated.
The estimation of Mineral Resources is a complex and subjective process and the accuracy of any such estimate is a function of the quantity and quality of available data and of the assumptions made and judgments used in geological interpretation. Figure 14‑10 shows the relative position of the Island Gold Mineral Resources to the underground infrastructure of the mine and the location of the gains and losses of Mineral Resource as of December 31, 2020.
14.13.1 Island Gold Mine - Mineral Resources
Island Gold Mine’s Measured and Indicated Mineral Resources are estimated at 878,650 tonnes at 6.51 g/t Au for 184,000 ounces. As a matter of comparison, the Measured and Indicated Mineral Resources as of December 31, 2018 totaled 696,250 tonnes at an average grade of 8.77 g/t Au for 196,200 ounces.
The Inferred Mineral Resources are estimated at 5,392,300 tonnes at 13.26 g/t Au for 2,298,000 ounces. As a matter of comparison, the Inferred Mineral Resources as of December 31, 2018 totaled 4,178,100 tonnes at an average grade of 11.71 g/t Au for 1,573,150 ounces.
Mineral Resources are presented exclusive of Mineral Reserves. The difference in grade between Measured and Indicated Mineral Resources and Inferred Mineral Resources is explained by the fact that the higher grade Measured and Indicated Mineral Resources have been converted to Mineral Reserves (after applying mining factors). The increase in Inferred Mineral Resources (more than 724,500 oz) is largely due to the new drilling at depth in 2019.
Tables Table 14‑12, Table 14‑13, and Table 14‑14 summarize the Mineral Resource by category, presented undiluted and in-situ. A combine Mineral Resource summary is presented in Table 14‑15 and notes for all four tables follow Table 14‑15.
A year over year reconciliation of Inferred Mineral Resources is presented in Figure 14‑11.
Island Gold Mine – Ni 43-101 Technical Report  107
August 31, 2020



alamos2.jpg
Table 14‑12 Island Gold Measured Mineral Resource Estimates as of Dec 31, 2019
ZoneTonnesGradeOunces
(g/t Au)
Upper Island Domain – Upper Mine (D, D1and E2 Zones)13,6004.612,000
Lower Island Domain - Lower C11,6004.411,700
Total25,2004.523,700
Table 14‑13 Island Gold Indicated Mineral Resource Estimates as of Dec 31, 2019
LocationZoneTonnesGrade (Au g/t)Ounces
Upper MineLochalsh Domain132,1506.5527,850
Goudreau Domain - G2, G3, G6 and G7 Zone59,80010.3819,950
Island Domain - Upper C, E1E, D1, D, E1D and E2 Zones74,8506.1714,850
Extension 2 Upper Domain - E1E Zone2,4009.29700
Lower MineIsland Domain - Lower C Zone213,0506.9347,450
Island Domain - Lower D, B, G Zones118,1006.6625,300
Extension 2 Lower Domain - E1E Zone253,0505.4444,200
TOTAL853,4006.57180,300
Table 14‑14 Island Gold Inferred Mineral Resource Estimate as of Dec 31, 2019
LocationZoneTonnesGrade (Au g/t)Ounces
Upper MineLochalsh Domain - E2, E1E, D and C Zone94,7006.2519,050
Goudreau Domain - G3, G7, G9 and GP2 Zone23,75011.819,050
Island Domain - Upper E1E, D1 and D Zones31,9007.577,750
Extension 1 Domain - Upper E1E Zone1,8004.85300
Lower MineIsland Domain - Lower C Zones890,70013.24379,150
Island Domain - Lower B, D1, G, STH and G1 Zones371,6508.1797,600
Extension 2 Domain - Lower E1E Zone3,977,80013.961,785,100
TOTAL5,392,30013.262,298,000

Island Gold Mine – Ni 43-101 Technical Report  108
August 31, 2020


alamos2.jpg
Table 14‑15 Island Gold Mineral Resource Estimate Summary as of Dec 31, 2019
Mineral ResourceTonnesGrade (g/t Au)Ounces
Measured25,2004.523,700
Indicated853,4006.57180,300
Total Measured and Indicated878,6006.51184,000
Inferred5,392,30013.262,298,000
Notes:
CIM definitions of Mineral Resources were followed.
Mineral Resources are estimated at a cut-off grade of 4.03 g/t Au.
High-grade samples were capped at 75 g/t Au for most of the Upper Island Gold zones except IG-E1E and IG-C capped at 100 g/t Au, most of the Goudreau zones except for G2 and G6 capped at 100 g/t Au.
High-grade samples in Lochalsh were capped at 75 g/t Au for E1E, 45 g/t Au for D, 60 g/t Au for C and 55 g/t Au for E2.
In the Lower mine high-grade samples were capped at 90 g/t Au for B, 70 g/t Au for G and GNW, 45 g/t for G1, 50 g/t Au for D and STH, 40 g/t Au for D1, and 160 g/t Au for E1E zones.
Lower C zone has 2 capping grades, at 300 g/t Au inside the HG domain and at 225 g/t Au everywhere else.
Mineral Resources are estimated using a long-term gold price of $1,250 per ounce.
A minimum mining width of 2.00 m was used.
A specific gravity value of 2.78 t/m3 was used in the Lower Zones and 2.82 t/m3 otherwise.
Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.
Totals may not match due to rounding.
Island Gold Mine – Ni 43-101 Technical Report  109
August 31, 2020



alamos2.jpg
image41.jpg
Figure 14‑10 Change in Mineral Resources as of Dec 31st, 2019


Island Gold Mine – Ni 43-101 Technical Report  110
August 31, 2020


alamos2.jpg
image48.jpg

Figure 14‑11 Inferred Mineral Resource Waterfall Graph (Dec 31st, 2018 vs Dec 31st ,2019)
Island Gold Mine – Ni 43-101 Technical Report  111
August 31, 2020



alamos2.jpg
15 MINERAL RESERVE ESTIMATES
Mineral Reserve calculations estimate the volume and grade of ore which can be mined and processed at a potential profit. The global Mineral Resource was reviewed by the Island Gold engineering department, with assistance from the geological staff, to define the Mineral Reserve blocks that could be economically extracted with a mining plan. The conversion of Mineral Resources into Mineral Reserves is based on the economic parameters detailed in Table 15‑1. Only Mineral Resources that are classified as Measured or Indicated Mineral Resource categories were used in the economic calculations to estimate Mineral Reserves as of December 31, 2019.
Table 15‑1 Mineral Reserve Estimation Parameters
Mineral Reserves ParameterValue
Gold Price (USD)$1,250
Exchange Rate (USD/CAD)0.77
Stope Cut-off Grade (g/t Au)4.03
Development/Marginal Cut-off Grade (g/t Au)2.82
Stope Dilution1 (%)
15%-50%
Development1 Dilution (%)
20%-30%
Dilution Grade (g/t Au)0.5
Mining Recovery1 (%)
67%-95%
Process Recovery (%)96.5%
Ore Specific Gravity2 (t/m3)
2.78
Minimum Mining Width (m)2
Mining, Processing and G&A Cost (CAD $/t)203
Notes:
1.Dependant on sector and mining method
2.2.82 t/m3 for Upper Mine
Mining costs and cut-off grades may vary depending on the mining method used and if the ore is already developed or not. The 4.03 g/t cut-off and $203/tonne operating cost are for undeveloped zones utilizing the long hole mining method. Mining recovery also depends on the mining method and the sector.
The economic viability of the Mineral Resources converted into Mineral Reserves was determined by Island Gold’s engineering department. Dilution, recovery rates and mining costs used in the Mineral Resource and Mineral Reserve calculations represent Island Gold’s best estimates as of December 31, 2019. These factors and parameters are revised each year to take into consideration actual or realized factors.
The following definitions detail the nomenclature of the Mineral Reserve estimates as of December 31, 2019:
Proven Mineral Reserves: Ore development has been completed above and below the mining block. A minimum drill spacing of 20 m is necessary to confirm vein continuity. Only Measured Mineral Resources can be transformed into Proven Mineral Reserves. Economic feasibility was estimated by Island Gold Mine’s engineering department to validate the block as Mineral Reserves.
Island Gold Mine – Ni 43-101 Technical Report  112
August 31, 2020


alamos2.jpg
Probable Mineral Reserves: No development was done, or development was done only above or below the mining block. Since the information from the ore development is lacking, a maximum drill hole spacing of 20 m to 25 m is necessary to validate vein continuity inside the mining block. Only Measured and Indicated Mineral Resources can be transformed into Probable Mineral Reserves.
15.1 Island Gold Mine – Total Mineral Reserves
Total Island Gold Proven and Probable Mineral Reserves as of December 31, 2019 stand at 3,643,000 tonnes at a grade of 10.37 g/t Au for 1,215,000 contained ounces. As a matter of comparison, the Proven and Probable Mineral Reserves as of December 31, 2018 totaled 3,047,000 tonnes at an average grade of 10.28 g/t Au for 1,007,000 contained ounces. Total underground production in 2019 was 380,264 tonnes at an average grade of 12.28 g/t Au for 150,167 contained ounces. Table 15‑2 and Table 15‑3 summarize the Proven and Probable Mineral Reserve estimates The combined Mineral Reserve estimate is presented in Table 15‑4 with notes applicable to all three tables following Table 15‑4.
Mineral Reserves include 15% to 50% dilution at a grade of 0.5 g/t Au with an estimated mining recovery of 67% to 95%. Mineral Reserves are reported before mill recovery.
Table 15‑2 Island Gold – Proven Mineral Reserve Estimates as of Dec 31, 2019
LocationZoneTonnesGrade (Au g/t)Ounces
Upper MineIsland Gold Domain23,9007.846,000
Goudreau Domain29,90012.5812,100
Lower MineBroken Tonnes (UG and Surface Inventory)12,2007.593,000
Island Domain Lower C638,20014.86305,000
Island Domain B & G225006.544700
Extension 2 Domain (Lower E1E Zone)59,3005.3710,200
Total Proven Mineral Reserves786,00013.48341,000

Table 15‑3 Island Gold – Probable Mineral Reserve Estimates as of Dec 31, 2019
LocationZoneTonnesGrade (Au g/t)Ounces
Upper MineIsland Domain67,8005.9212,900
Goudreau Domain55,6009.5917,100
Lochalsh Domain19,8007.544,700
Lower MineIsland Domain C Lower1,315,50010.44441,700
Island Domain B & G52,7006.3610,800
Extension 2 Domain (Lower E1E Zone)1,345,6008.94386,800
TOTAL Probable Mineral Reserves2,857,0009.52874,000


Island Gold Mine – Ni 43-101 Technical Report  113
August 31, 2020



alamos2.jpg
Table 15‑4 Island Gold – Combined Mineral Reserve Estimate as of Dec 31, 2019
Mineral ReserveTonnesGrade (g/t Au)Ounces
Proven786,00013.48341,000
Probable2,857,0009.52874,000
Total Proven and Probable3,643,00010.371,215,000

Notes:
CIM definitions of Mineral Reserves were followed.
Mineral Reserves are estimated at a cut-off grade of 4.03 g/t Au.
High-grade samples were capped at 75 g/t Au for most of the Upper Island Gold zones except IG-E1E and IG-C capped at 100 g/t Au, most of the Goudreau zones except for G2 and G6 capped at 100 g/t Au.
High-grade samples in Lochalsh were capped at 75 g/t Au for E1E, 45 g/t Au for D, 60 g/t Au for C and 55 g/t Au for E2.
In the Lower mine high-grade samples were capped at 90 g/t Au for B, 70 g/t Au for G and GNW, 45 g/t for G1, 50 g/t Au for D and STH, 40 g/t Au for D1, and 160 g/t Au for E1E zones.
Lower C zone has 2 capping grades, at 300 g/t Au inside the HG domain and at 225 g/t Au everywhere else.
Mineral Reserves are estimated using a long-term gold price of $1,250 per ounce.
A minimum mining width of 2.00 m was used.
A specific gravity value of 2.78 t/m3 was used in the Lower Zones and 2.82 t/m3 otherwise.
Totals may not match due to rounding.

Mineral Reserves presented herein are in large part estimates and production of the anticipated tonnages and grades may not be achieved or the indicated level of recovery may not be realized. The estimation of Mineral Reserves is a complex and subjective process and the accuracy of any such estimate is a function of the quantity and quality of available data and of the assumptions made and judgments used in engineering and geological interpretation. Mineral Reserve estimates may require revision based on various factors such as actual production experience, exploration results, fluctuations in the market price of gold, results of drilling, metallurgical testing, production costs or recovery rates. These factors may render the Proven and Probable Mineral Reserves unprofitable to develop. Also, the grade of ore mined may differ from that indicated by drilling results and this variation may have an adverse impact on production results.
15.2 Reconciliation of the 2019 Production with Mineral Reserve Models
The 2019 production tonnage and grades (stopes and development) have been reconciled to the December 31, 2018 and December 31, 2019 Mineral Reserves statements.
Total production reconciled to the mill was 380,264 tonnes at 12.28 g/t Au for 150,167 contained ounces of gold. Corresponding mining from Mineral Reserves was 339,973 tonnes at 11.77 g/t Au for 128,660 contained ounces for the December 31, 2018 model and 355,323 tonnes at 12.51 g/t Au for 142,864 contained ounces for the new December 31, 2019 model.
For the December 31, 2018 model, total reconciled production is 12% higher in tonnes, 4% higher in grade and 17% higher in gold ounces than Mineral Reserves (150,167 vs. 128,660 contained ounces).
For the December 31, 2019 model (current model), total reconciled production is 7% higher in tonnes, 2% lower in grade and 5% higher in gold ounces than Mineral Reserves (150,167 vs. 142,864 contained ounces).
Island Gold Mine – Ni 43-101 Technical Report  114
August 31, 2020


alamos2.jpg
Table 15‑5 summarizes the comparison between 2019 production and the corresponding Mineral Reserves as of December 31st, 2018 and 2019.
Table 15‑5 2019 Production Reconciliation with Dec 31, 2018 and Dec 31, 2019
SectorProduction 2019Model Dec 31, 2018Model Dec 31, 2019
ReconciledReserveReserve
TonnesGradeOuncesTonnesGradeOuncesTonnesGradeOunces
B6,7159.812,1175,6856.611,2085,6856.81,243
C-74079,88018.3347,08163,26817.7536,10163,68619.0839,057
C-760146,49313.8165,033148,47013.7765,748159,95914.5674,889
AL12,7065.082,0765,1745.469094,8737.971,249
West Ramp8,3935.951,6062,9214.374105,6628.721,587
D15930.61122,6885.464722182.3617
GNW2641.191942.21141942.2114
Stockpile Reclamation4,1354.25566
C-X1≤75051,6535.99,79853,0415.359,12852,3325.799,737
X2<75041,9719.4112,70134,4016.637,32834,0587.37,995
C-X1>75027,46210.389,16724,1319.467,34328,6567.687,076
2019 Total380,26412.28150,167339,97311.77128,660355,32312.51142,864
Production vs Dec 31st, 2018 Model112%104%117%
Production vs Dec 31st, 2019 Model107%98%105%
Based on this reconciliation, the new December 31, 2019 Mineral Resource and Mineral Reserve model is a good representation of what was mined in 2019 and an improvement compared to December 31, 2018 model. Comparison between actual production and the Mineral Reserve model will continue to be undertaken monthly going forward to confirm that geological interpretation, block model parameters and mining factors continue give a good estimation of future production.
15.3 Mineral Reserve Reconciliation 2018 vs 2019
Combined Proven and Probable Mineral Reserve estimates for December 31, 2019 are 1,215,000 contained ounces while the December 31, 2018 totaled 1,008,000 contained ounces. This represents an increase of 207,000 ounces. The gains are mainly attributed to definition drilling (transfer from Inferred Mineral Resources) for EXT2 area and adding the High Grade domain to the Main Zone C zone.
Table 15‑6 shows reconciliation of Proven and Probable Reserve estimates between the December 31, 2018 and the December 31, 2019 estimations, the gains and losses in different areas with their impact on the Mineral Reserve estimates. Figure 15‑1 shows the same information but in a graphic form. The table and graph include the 2019 production to show the gain in Mineral Reserves before depletion between the two years.
Island Gold Mine – Ni 43-101 Technical Report  115
August 31, 2020



alamos2.jpg
Table 15‑6 Mineral Reserve Reconciliation 2018 vs 2019 – Gains (losses) from Different Sectors
SectorDec 31, 2018 Reserves2019 ProductionDec 31, 2019 Reserves
Gain/ (loss)
Description
TonnesGradeOuncesTonnesGradeOuncesTonnesGradeOunces
Lochalsh (Upper Mine)58,1975.7910,83419,7587.454,730-6,105New interpretation, block model and review of blocks that qualify as reserves
Island Gold (Upper Mine)123,3115.8723,28480,1806.2616,145-7,139New interpretation, block model and review of blocks that qualify as reserves
Goudreau (Upper Mine)92,1639.6328,54185,53910.6429,256714Review of blocks that qualify as reserves
Alimak Sector139,9787.3933,27812,7065.082,076167,2007.2939,1857,983New drilling, mined drifts
B Zone27,6177.636,7796,7159.812,11735,4007.367,9873,325Added reserves in Ext 1
C>74093,93814.644,10379,88018.3347,08133,2919.4210,08213,061New capping grade in HG zone and positive reconciliation from reserves
C≤760681,26815.14331,698146,49313.8165,033559,46817.3311,12744,462New capping grade in HG zone and positive reconciliation from reserves
C-X1>750474,13712.54191,19723,37511.378,543428,90512.81176,583-6,071Mined stopes
C-X1≤750296,7445.4952,38255,7415.8210,423258,4325.3644,5462,586Mined stopes
W-Ramp515,2299.51157,4769,2075.51,628506,1839.86165,1449,296New drilling
G + GNW Zone39,6265.797,3792641.1939,8345.917,573203No changes
X1E1E16,8167.464,03511,5597.452,768-1,266Loss of 100 level
X2<750110,9506.1121,80341,9719.4112,701112,4665.7420,75611,654Added a new level
X2>750122,6036.1324,178619,7538.77174,679150,502New drilling
X2-East221,3909.0764,577672,7049.11201,583137,006New drilling
Other3,9144.42556556Stockpile reclamation
Inventory33,2805.365,73012,2607.592,990-2,740Depletion of the stockpile
Total3,047,24910.281,007,274380,26412.28150,1673,642,93310.371,215,135


Island Gold Mine – Ni 43-101 Technical Report  116
August 31, 2020


alamos2.jpg
image47.jpg
Figure 15‑1 Mineral Reserve Reconciliation Waterfall Graph Dec 31, 2018 vs Dec 31, 2019
Island Gold Mine – Ni 43-101 Technical Report  117
August 31, 2020



alamos2.jpg
16 MINING METHODS
16.1 Overview
There are currently four active mining areas at the Island Gold Mine: the West Zone, the Main IG Zone, the Extension Zone, and the East Zone. The overall mine configuration is shown in Figure 16‑1 below, which outlines the various mining zones as well as future stopes and development included in the Life of Mine plan (LOM).
image46.jpg
Figure 16‑1 LOM Design Looking North
16.2 Mine Access and Development
The Island Gold deposit is accessed via a single decline from surface down to the 425 Level, at which point multiple ramps are utilized to access the main IG, IG West, Extension and East zones. These ramps are also connected at numerous points throughout the mine allowing for easy travel between mining zones.
The LOM plan includes the addition of a mine shaft which will be constructed between 2021 and 2025. Once commissioned, the shaft will be utilized to hoist ore and waste from the 1305 Level to surface. Additionally, the shaft will used to transport personnel and materials to any of the three shaft stations. From the shaft collar location ore and waste will be trucked to either the mill or the surface waste stockpile.
Level accesses are typically developed at 20 m intervals (floor to floor) and are designed south of internal ramps providing access to the footwall of the deposit. Once the ore is reached, sills are developed along the ore contact, with their direction controlled by geology. Sill development is used as a drilling, mucking and backfilling platform for stope extraction. On some levels,
Island Gold Mine – Ni 43-101 Technical Report  118
August 31, 2020


alamos2.jpg
additional footwall and cross-cut development is required when the width of the mineralization exceeds 10 metres. Standard drift dimensions are shown in Table 16‑1.
Table 16‑1 Standard Excavation Dimensions
Excavation TypeDimensions
Lateral Development
Jumbo sill4.0mW x 4.0mH
Jumbo ramp4.75mW x 4.75mH (Arch)
Sump4.5mW x 4.0mH x 10.0mL
Secondary sump4.5mW x 4.0mH x 7.0mL
Electrical sub station6.5mW x 4.5mH x 13.0mL
Electrical bay6.0mW x 4.5mH x 6.0mL
Remuck in level5.0mW x 6.5mH x 13.5mL
Remuck in ramp5.0mW x 5.0mH x 13.5mL
Secondary remuck5.0mW x 4.5mH x 13.5mL
Vent raise access5mW x 4.5mH
Safety bay1.8mW x 2.0mH x 1.8mL
DDH bay5.0mW x 5.0mH x 10mL
DDH bay used as turn-out5.0mW x 5.0mH x 13.5mL
Minimum turning radius for jumbo corner3.5m
Minimum turning radius for truck corner5.0m
Turning radius in ramp20m
Level intersection in ramp5.5mW x 5.5mH x 12.5mL
Truck load out5.0mW x 6.5mH
Scoop load-out5.0mW x 5.5mH
Truck turn-out5.0mW x 4.5mH
Level entrance5.5mW x 5.5mH
Vertical Development
Alimak Raises4.0mW x 4.0mL
Drop Raise (Ventilation Raises)3.0mW x 3.0mL

A total of 95 km of lateral and vertical development are planned as part of the life of mine. Of this total approximately 28% is operating development, 67% is capital development and 5% is planned to support exploration activities.
Presently, level accesses are designed towards the center of the ore vein and stopes are mined longitudinally from sill extremities towards the level intersection. As mining progresses deeper level accesses are designed to access the extents of the deposit with stopes being mined from the center towards the extremities to support improved mining stress management.
A standard level configuration is shown in Figure 16‑2.
Island Gold Mine – Ni 43-101 Technical Report  119
August 31, 2020



alamos2.jpg
image33.jpg

Figure 16‑2 Typical Level Design
16.3 General Design Considerations
Island Gold has various tools and systems in place to gather and analyze geotechnical data for each new design. Underground geologists and ground control engineers perform regular mapping campaigns in order to keep the structural data up to date as mining advances deeper into the orebody. Face mapping and sampling is performed in all ore drives and major structures, quartz veining and shear zones are identified. This data is then digitized and shared with the planning team for future development and stoping designs. Each design is optimized by considering and mitigating risk with instability drivers such as faults, dykes, discontinuity families and changes in lithology.
In addition to mapping, Island Gold has also evaluated intact rock properties through several laboratory testing campaigns and has analyzed results from core samples at depth. In general, it was determined that the rock mass is considered blocky in nature, and can be rated as “Good” to “Very Good” (RMR = 75-83), with a Q’ range (at the 50th percentile) of 20 to 40 (MDEng, 2018a, 2018b).
As the mine progresses deeper and new mining horizons are met, new testing campaigns are planned to ensure designs are created with accurate geotechnical information. This ensures that the design shape or sequence of excavation is optimized without compromising safety or the integrity of future excavations.
Island Gold Mine – Ni 43-101 Technical Report  120
August 31, 2020


alamos2.jpg
16.4 Stope Dimensions
Several different empirical assessments are performed on a regular basis at Island Gold. Empirical assessments allow the ground control department to quickly reference industry standards and published literature to ensure the initial design is in line with past experiences. The Matthews Stability Graph is the main empirical tool used to determine optimal stope dimensions that will yield a stable shape.
Geotechnical parameters (Q’, N’) are calculated by using specific underground details of rock mass ratings or major geological intrusions. The N’ parameter is then plotted on the stability graph, where an approximation of the ideal hydraulic radius is obtained for each face of the excavation. From there, the strike length of the stope can be calculated by using the fixed dimensions of the shape (level spacing and ore width). Stopes at IGM are typically designed with an approximate strike length of 18m. This stope size has been proven to be successful in various zones throughout the mine, however this analysis is regularly performed to account for any new structures and geological features.
16.5 Stope Design
Mineral Resource shapes are created by geology then submitted to the production engineering team for design. A mineable stope shape is produced by engineering and is optimized by maximizing ore recovery and minimizing planned dilution. Recovery and external dilution factors are applied to the stope shape and its economic viability is evaluated. Stope shapes that have proven to be economically feasible are converted to Mineral Reserves and are mined using the most favorable mining method.
16.6 Mining Methods
The mining method for a particular stope is selected based on a variety of factors such as overall geometry of the mineralization, width of the ore zone, local stresses, mapping and geotechnical data, spatial location of the stope, and existing nearby development and infrastructure. Other factors considered include equipment size and limitations as well as available fill type. Ultimately, each stope is evaluated individually, and a stope package is produced to include detailed drilling plans, blast letters, ventilation, and gas check instructions, mucking plans as well as backfilling directives.
16.6.1 Longhole Open Stoping
The predominant mining method used at the Island Gold mine is longhole open stoping. This mining method is conducive to tabular, steeply dipping orebodies and is considered to be highly productive with low mining costs. The average dip of the orebody at Island Gold ranges from 75 to 85 degrees, making this a favorable mining method for ore extraction.
Longhole mining consists of drilling a series of sub-vertical down holes between two mining platforms, also known as the overcut and undercut sills. These holes are drilled with electric-hydraulic drill rigs. The top sill is typically used as the drilling and backfilling horizon, and the bottom sill is used as the mucking horizon. In some cases where there is no top sill development, up-holes are drilled from the bottom sill which acts as both the drilling and mucking platform. Once the stope is drilled, the ore is blasted in vertical slices towards an open void and retrieved from the bottom sill using remote LHDs. The material from the stope is trucked to surface, at which point the stope is then backfilled with unconsolidated rock fill (UCF), cemented rock fill (CRF) or paste fill. The backfilling process will be further discussed in Section 16.8.
There are two types of longhole stoping methods utilized at Island Gold: longitudinal open stoping and transverse open stoping. These two methods employ the same mining principles
Island Gold Mine – Ni 43-101 Technical Report  121
August 31, 2020



alamos2.jpg
mentioned above; however, they differ by the stope’s mining direction. Longitudinal stopes are mined along the strike of the ore vein and follow either a modified Avoca technique or a traditional blast hole stoping technique, whereas transverse stopes are mined perpendicular to the vein.
16.6.1.1 Longitudinal Open Stoping
Stopes are typically mined longitudinally when the ore width is narrow (usually under 10 m). For every first stope on a horizontal sublevel, a primary slot raise is drilled at the extremity of the ore contact. This raise is drilled using an in-the-hole (ITH) drill with a large reaming head that produces a large diameter hole. This large hole is used as a free face for the first blast. The stope is then fired towards the open void in several blasts (2-3 typically) which is achieved by retreating longitudinally towards the main level access (retreat is done in east/west direction). The broken ore is extracted after each blast is taken to ensure ample void for the following blast. Once the stope is empty, UCF, CRF or paste fill is placed in the void to fill the opened excavation. This is shown in Figures Figure 16‑3 through Figure 16‑5 below.
image12.jpg

Figure 16‑3 Drilling - Longhole Stope, Longitudinally Drilled and Mucked
To mine the adjacent stope, the UCF material from the first stope on the level is removed until an open brow and angle of repose of approximately 48 degrees is achieved. This creates a primary free face for blasting of the second stope, also known as a “pull void”. The second stope is then blasted, mucked, and backfilled. The process is repeated until the entire sublevel is mined out. Figure 16‑6 illustrates the concept of this mining method. This method is commonly known as Modified Avoca Mining. Cavity monitoring surveys (CMS) are performed regularly to distinguish the between the ore and backfill material. The cavity surveys along with the judgement of underground beat geologists help control grade dilution while mucking.

Island Gold Mine – Ni 43-101 Technical Report  122
August 31, 2020


alamos2.jpg
image65.jpg
Figure 16‑4 Blasting and Mucking - Longhole Stope, Longitudinally Drilled and Mucked

image32.jpg
Figure 16‑5 UCF Backfilling - Longhole Stope, Longitudinally Drilled and Mucked
Island Gold Mine – Ni 43-101 Technical Report  123
August 31, 2020



alamos2.jpg
image59.jpg

Figure 16‑6 Pull Void - Longhole Stope, Longitudinally Drilled and Mucked
When CRF or paste fill material is used as fill, the backfill material solidifies due to the cement which acts as a binding agent. Therefore, the adjacent stope requires a slot raise for blasting. In this case, the stope must be mined in the same fashion as the first stope on the level, and ultimately follows the same process until the entire level is mined out. This is shown in Figure 16‑7.

image45.jpg

Figure 16‑7 CRF or Paste Fill - Longhole Stope, Longitudinally Drilled and Mucked
Island Gold Mine – Ni 43-101 Technical Report  124
August 31, 2020


alamos2.jpg
16.6.1.2 Transverse Open Stoping
Stopes are typically mined transversely when the ore width is too wide to mine efficiently and safely using a longitudinal retreat method. Island Gold employs transversal mining where the mining direction runs perpendicular to the strike of the orebody (North/South). Stope mucking is done via multiple draw points that allow for line-of-sight mucking from the remote stand which optimizes mucking productivity. Furthermore, this method allows for production holes to be drilled parallel to the hanging wall and footwall and only requires fanning into the vertical stope ends which are inherently more stable. Each block is split into different panels employing a true primary/secondary sequence. Figure 16‑8 displays how each block is accessed by its own drawpoint or access. This mining method requires the use of a raise as initial void for blasting. This raise is typically designed in line with the drawpoint, which facilitates mucking as the material is blasted towards the drawpoint. Once the stope has been blasted and emptied, the void must be backfilled with UCF, CRF or paste fill. The primary stopes require a consolidated fill that creates solid end walls to withstand the blast energy while extracting adjacent stopes. The secondary stopes can be filled with UCF if there is no remnant mineralization nearby. One advantage of this method is it allows concurrent activities to take place on a single level improving mining cycle times.
image55.jpg

Figure 16‑8 Transversal Mining Access

16.6.2 Alimak Stoping
Alimak mining is planned to be utilized in a portion of the Island Gold West Zone. This method consists of using an Alimak climber as a means of development and production drilling instead of conventional horizontal development.
The process starts by driving a raise along the height of the stope that will serve for secondary support and production drilling access. The raise dimensions will typically be 3 m x 3 m.

Island Gold Mine – Ni 43-101 Technical Report  125
August 31, 2020



alamos2.jpg
Once the raise is completely driven, the raise screening is installed. Cable bolts are then drilled and installed as secondary support.
Production drilling is conducted on a horizontal axis on both sides of the raise. The blasting sequence consists of taking horizontal slices followed by void mucking only. Once the entire stope is blasted, continuous mucking can begin. Maintaining the stope filled with blasted material allows for better dilution control. Once mucking is completed, the Alimak stope will be backfilled with UCF. Pillars will be left between each stope. Figure 16‑9 shows the Alimak mining sequence.
image111.jpg

Figure 16‑9 Alimak Stoping
Alimak mining has not yet been employed at the Island Gold, however some Alimak accesses and raise nests have been developed. This mining method is part of the LOM design and production using this method is scheduled to begin in Q2 2021.
16.7 Ground Control
A geomechanical sampling campaign was completed in 2019 and results were used to build a stress model. An update to this model was completed in 2019 to incorporate updated geotechnical structural features and mine designs, with a full geomechanical study currently ongoing in 2020. This study involves the collection of new core samples underground, implementation of seismic data, as well the development of a new geomechanical model for the updated LOM and proposed underground infrastructure (shaft and ore/waste handling
Island Gold Mine – Ni 43-101 Technical Report  126
August 31, 2020


alamos2.jpg
systems). Computerized numerical modeling programs are being utilized as a tool to assist in determining ground control practices and risk management of possible ground failures.
Ground support standards are regularly reviewed and updated based on observations and communications between engineering and mine operations. A larger update of the ground support standard was implemented in 2019 to address the increased stress levels with depth and to add robustness to the ground support standards. The option to add arched backs in development was also implemented as a supplemental means of adding long term stability to Island Gold’s lateral excavations.
A microseismic system was implemented in 2017 and 2018 with full commissioning of the system in 2019. The microseismic system covers every zone of the mine with regular expansion programs happening as the mining front progresses deeper and laterally. A stope re-entry protocol was also implemented based on the micro seismic noise that stopes create after being blasted. The re-entry protocol limits access to areas deemed higher risk once a stope blast is taken (usually levels near the stope or sill levels), until the micro seismic activity returns to background noise. At this point, the “all clear” is given for workers to re-enter the barricaded levels to begin regular operations.
Stope ground support is used to control dilution. Dilution may come from a local structural failure or from inadequate drilling and blasting practices. Dilution control can be achieved, to a certain extent, by improving ground support. Cable bolts are used to limit stope wall dilution and this method has provided good results. Cable bolts are installed along the undercut and overcut. Cables being used range from 6 metres to 12 metres in length.
Level access and stoping sequence methodologies were investigated below the 920 meter level with a planned transition to a center out stope sequence (Figure 16‑11) from the current practice of outside in (Figure 16‑10). This is expected to improve mining stress management, as mining moves deeper, by shedding stress outward.

image67.jpg

Figure 16‑10 Current Outside-In Mining Sequence
Island Gold Mine – Ni 43-101 Technical Report  127
August 31, 2020



alamos2.jpg
image6.jpg

Figure 16‑11 Proposed Centre-Out Sequence
16.8 Backfill
Island Gold is currently using two types of backfill methods: unconsolidated rock fill (UCF) and cemented rock fill (CRF) with the addition of paste fill planned as part of the Phase III Expansion plan. Both USC and CRF fill methods are dumped from the top cut of a stope by an LHD. In the event of a hanging wall failure, a Rammer Jammer is employed to “ram” (push) muck tighter against the hanging wall to fill the voids.
16.8.1 Unconsolidated Fill (UCF)
Using UCF to fill empty stopes helps with mine waste management and minimizes stope wall failures by stabilizing them. UCF is not screened and comes directly from development faces. The angle of repose for UCF ranges between 45-54°, however 54°is usually used when modelling or estimating fill angles to remain conservative.
16.8.2 Consolidated Rock Fill (CRF)
CRF was implemented at the IGM in 2019, with placement focused on transverse mining zones, sill pillar recovery and problematic stopes that require CRF instead of UCF. Waste is hauled from development faces to the underground cement plant, where slurry is poured directly in the box of the haul trucks. The trucks then haul the CRF over to the top cut of the stope being backfilled, where it is dumped in a remuck. The LHD then picks up the CRF and dumps it into the stope.
It has been observed that the driving cycle from the cement plant to when the LHD picks up the muck and dumps is enough to mix the waste rock and slurry. BASF’s Masteroc MF 701 is being added into the slurry mixture to help stabilize the cement’s reactivity. This increases strength and increases workability time with the slurry to 4-6 hours.
When further qualitative and possibly quantitative testing can be performed underground, the binder content will be optimised.
Like the UCF, the CRF is still not considered an engineered product as there is limited quality control on the aggregates being used and no gradation curve can be obtained. However, samples of the cement slurry are sent out for analysis.
Island Gold Mine – Ni 43-101 Technical Report  128
August 31, 2020


alamos2.jpg
16.8.3 Paste Fill
Island Gold does not currently utilize paste fill onsite. The addition of a paste plant and an underground paste distribution system is included in the LOM plan which will be utilized for filling future stopes and improving sill pillar recovery.
Filtered tailings from the process plant will be used as aggregate for paste backfill. The paste plant is incorporated into the process tailings dewatering circuit and includes the thickening, filtration, mixing, and batching equipment. The delivery of paste will be gravity-fed to the stopes via the underground distribution system (UDS) as shown in Figure 16‑12.
image10.jpg

Figure 16‑12 Paste Backfill Underground Distribution System
16.9 Stope Sequencing
The Island Gold Mine has multiple active stoping horizons in the Main IG Zone, the Extension Zone and East Zone. This allows for flexibility in the production schedule as each mining horizon follow its own sequence to follow and is independent of mining activities in other zones or horizons.
In areas where longitudinal retreat with UCF is employed, stopes are blasted, mucked, and backfilled starting from the eastern or western most point of the sill on the bottom horizon. This process repeats itself until the last intersection stope (at the level access and sill intersection) is excavated. Figure 16‑13 show a typical longitudinal retreat mining sequence at Island Gold.
Once 3 stopes are taken on the bottom level of a horizon, production can begin on the level above, by retreating towards the level access. This process is repeated until the top horizon of the zone reached.
Island Gold Mine – Ni 43-101 Technical Report  129
August 31, 2020



alamos2.jpg
image31.jpg

Figure 16‑13 Example of Longitudinal Retreat Mining Sequence
Uphole stopes are taken on the top horizon where sill and rib pillars are left behind for stability purposes. With the addition of Paste Fill as a backfill method, future sill and rib pillars will be recovered by mining full uphole stopes to the Paste Fill. The addition of paste fill will allow for accelerated fill times, improved pillar recovery and concurrent activities (filling and drilling) resulting in improved cycle times.
In transverse mining zones typically include a mix of transverse and longitudinally accessed mining blocks. These zones follow a traditional primary-secondary mining sequence with primary stopes being filled with a consolidated fill such as CRF or Paste Fill and secondary stopes being able to be filled with either unconsolidated or consolidated fill as required.
16.9.1 Void Management Plan
Due to the nature of IGM’s mining sequence and use of UCF in many areas, backfill subsidence and backfill run of muck is possible. To mitigate this risk, a Void Management Plan has been developed. This plan helps to track and manage the voids as well as defines a series of steps to be taken when an unfillable or unexpected void occurs. A backfill action plan is developed and implemented, and a series of steps are taken afterwards to ensure the void is logged and considered during future designs.
16.10 Material Movement & Equipment
Island Gold Mine currently utilizes an internal ramp system to haul ore and waste to surface. The ore is brought to the surface by a combination of Epiroc MT-42 and Caterpillar AD-30 haul trucks using a ramp system. A detailed list of primary equipment was developed for each scenario and can be found in Table 16‑2. Capital cost for equipment was developed based on supplier quotes and include provisions for rebuilds and replacements throughout the Life of Mine.
Once on the surface, ore is hauled by surface trucks to the mill located at an approximate distance of 0.8 km from the portal of the ramp. As part of the study a mine shaft is includes the addition of a mine shaft which will be utilized to hoist ore and waste from the 1305L to surface. From the shaft collar location ore and waste will be trucked to either the mill or the surface waste stockpile.
Island Gold Mine – Ni 43-101 Technical Report  130
August 31, 2020


alamos2.jpg
Table 16‑2 Island Gold Current And Phase III Underground Equipment Fleet
Equipment TypeApplicationCurrent FleetAverage Post-Project
JumboDevelopment43
BolterGround Support04
Scissor LiftGround Support / Services1711
UG Haulage TruckOre/Waste Transport175
LHD 6 YardProduction / Development1215
LHD 3.5 YardU/G Maintenance44
GraderRamp Maintenance22
Lube Truck/Water TruckMaintenance33
Boom TruckMaterial Logistics63
U/G Personnel VehiclesPersonnel Transport3126
TractorMaintenance44
ExcavatorMaintenance11
LoaderSurface Works44
16.11 2019 Scoping Study
In mid 2019, with the expansion to 1,200 tpd underway, Island Gold undertook a scoping level study to give some insight into the possibility of expanding the mine capacity further, and what might be the best way to undertake such an expansion. As the Mineral Resource increases have been predominantly below the current mining horizons, and approaching up to 1,500 metres in depth, it was becoming increasingly clear that with the existing ramp haulage configuration of 1,200 tpd would limit further production growth. Therefore, two additional material handling systems were examined, as a means of overcoming potential trucking limitations: conveying and shaft hoisting. A combination of three different mine capacities and three material handling systems were examined to yield five scenarios. Mine plans, preliminary designs and layouts, and high-level costing were undertaken for each of the five scenarios. JDS Energy & Mining Inc. and Cementation Canada Inc. aided in the assessments.
The concepts are discussed below:
16.11.1 Ramp Haulage at 1,200 TPD and 1,500 TPD
Movement of ore and waste from the working levels to the surface is currently undertaken with truck haulage up a system of ramps to the mine portal. In addition, the ramp system is used to transport personnel and material to the working face. The ramp system as currently implemented is capable of handling 1,200 tpd of ore and the associated waste, and the ramp 1,200 scenario was considered the “Basecase” for the scoping study.
As the mine deepens the ramp will be extended. As the ramp is extended additional haulage trucks will be required which in turn requires additional ventilation capital infrastructure and incurs higher power costs. As the mine deepens it will take increased time for personnel to travel to their working areas and therefore reduces the amount time available to perform productive work. These factors were all incorporated into the Basecase economics.
The scoping study considered mining to a depth of 1,500 metres below surface. One conclusion from the study was that should additional Mineral Resources be found below 1,500 metres, a production rate of 1,200 tpd would be difficult to maintain.
Island Gold Mine – Ni 43-101 Technical Report  131
August 31, 2020



alamos2.jpg
To increase the mine capacity to 1,500 tpd, an additional ramp to surface would have to be developed from the 840 m Level. This was costed into scoping study ramp 1,500 tpd using Island Gold’s standard owner’s and contractor’s development costs. An advantage to the additional ramps its that there would be limited disruption to current production during development. However, the ramp 1,500 tpd option would still be subject to the reduced employee productivity with depth.
16.11.2 Conveyor at 1,500 TPD
The addition of conveyor from the 840 m Level to surface was also studied. This would require the installation of an underground crusher, the development of five conveyor ramp segments and the installation of five flights of conveyor. The last segment of conveyor would end at the mill’s coarse ore stockpile, removing the requirement for the surface haulage of ore from the portal stockpile to the mill. Any ore mined below the 840 m Level would still require trucking up to the crusher on the 840 m Level.
With the overall reduction in truck haulage, capital savings would be seen in reduced ventilation requirements and reduced truck requirement. With the reduced trucking and ventilation requirement the conveyor option also saw reduced operating costs. The conveyor drift, generally located to the east of existing Mineral Reserves, could also be used as potential platform for exploration and delineation drilling.
The conveyor would add significant lateral development capital and employees would still see reduced productivity as a result of having to use existing and future ramp systems for transport. In addition, there is increased operational risk associated with operating an extensive conveyor system underground, and increased maintenance costs would be incurred.
16.11.3 Shaft at 1,500 TPD and 2,000 TPD
Several options for the installation of a shaft system to the 1,500 m Level were evaluated. The primary option would be to raisebore from the 840 m Level and concurrently conventional sink from the 840 m Level to the 1,500 m Level. Other options investigated were a conventional blind sink from surface to the 1,500 m Level and a conveyor from the 840 m Level to surface combined with a winze from the 840 m Level to the 1,500 m Level.
Although the shaft options had the highest capital cost, they had the advantage of having the lowest operating costs of all option examined. This was due to:
The reduced ventilation requirement due to fewer trucks,
the use of the shaft as source of fresh air negating the requirement for additional raises to surface,
reduced underground trucking costs,
automation of ore handling,
and significantly increased personnel productivity over current and future expected rates.
The disadvantages to the shaft option would be its location away from the mill requiring surface ore trucking from the headframe to the mill, and the relatively higher power requirements,
Island Gold Mine – Ni 43-101 Technical Report  132
August 31, 2020


alamos2.jpg
16.11.4 Scoping Study Conclusions
The mine planning undertaken on the Mineral Reserves and a portion of the Mineral resources demonstrated that from a mining perspective, 2,000 tpd per day could be achieved due to the number of available ore horizons.
The conveyor option, although carrying favourable economics, was not deemed a viable option due to the inherent operational risks and higher maintenance associated with it.
Conventional shaft sinking from surface was determined to be preferable over the raisebore from the 840 m Level and shaft sinking from the 840 m Level to the 1,500 m Level. It became evident that the amount of cuttings produced from raiseboring and the amount of rock produced from the winze, both coming out at the 840 m Level, would overwhelm the ability of the mine to haul it to surface and still maintain a mining rate of 1,200 tpd.
The ramp and shaft options were selected for a more detailed level of evaluation in the Phase III Expansion Study.
16.12 Phase III Expansion Study Mineral Inventory
Island Gold in the past several years Island Gold has significantly increased its Mineral Reserve and Mineral Resources. For the purposes of the Study, it was assumed that the Mineral Reserves and a significant portion of the Mineral Resource would ultimately be available for mining. The bulk of Island Gold’s Mineral Resources are in the Inferred Mineral Resource category and require infill drilling to upgrade them to Indicated Mineral Resources. Infill drilling is usually undertaken from exploration drives driven eastward and westward as the ramp system develops at depth. Generally, this infill drilling has been successful, and Island has had a historical conversion rate of 83% over the last number of years.
Prior to the mine planning and sequencing process Island Gold’s geologists and engineers evaluated the December 31, 2019 Mineral Resource inventory (left hand side of Table 16‑3 ) on a block by block basis and determined which blocks would support being included into a potential stope. Stopes were evaluated for mining shape, continuity of mineralization, and whether they would support the development required to access them. The undiluted tonnes and grade of the Mineral Resources that made it into these stopes are found in the middle section of Table 16‑3. Island Gold’s standard dilution and factors (Table 16‑4 and Table 16‑5), which vary by zone and mining type, were them applied. If, after applying dilution the stoping shape made the cut-off grade (Table 16‑6), it was then deemed eligible for inclusion with the mine plan. These Mineral Resources appear on the right hand side of Table 16‑3. Total Mineral Reserves and Mineral Resources included within the mine plans for the Study are 9.6 Mt at a gold grade of 10.45 g/t. A reconciliation of the Minable Resource gold ounces to the Dec 31, 2019 Mineral Reserve and Mineral Resource gold ounces can be found in Figure 16‑14. A long section depicting the Mineable Resource stoping blocks categorized by grade is presented in Figure 16‑15.
Island Gold Mine – Ni 43-101 Technical Report  133
August 31, 2020



alamos2.jpg
Table 16‑3 Phase III Expansion Study Minable Resource
December 31 2019Undiluted Resource Used in Phase III StudyDiluted and Recovered Resource Used in Phase III Study
Tonnes (x1,000)Grade (g/t)Ounces (x1,000)Tonnes (x1,000)Grade (g/t)Ounces (x1,000)Tonnes (x1,000)Grade (g/t)Ounces (x1,000)
Mineral Reserves
Proven78613.4834178613.48341
Probable2,8579.528742,8579.52874
Total Mineral Reserves3,64310.371,2153,64310.371,215
Mineral Resources
Measured254.524214.523243.853
Indicated8536.571807246.571538075.6145
Total Measured and Indicated8796.511847466.511568315.55148
Inferred5,39213.262,2984,57613.261,9505,09911.31,853
Phase III Mine Plan9,57210.453,216
Table 16‑4 Extension 1/2 Zone Dilution and Recovery Factors
Stope TypeDilutionRecovery
Upper (>10m in height)40%85%
Upper (<10m in height)20-30%90%
Pillar stopes40%67%
Down30-50%92%
Table 16‑5 C and D1 Zone Dilution and Recovery Factors
Stope TypeDilutionRecovery
Upper (>10m in height)40%85%
Upper (<10m in height)20%90%
Pillar stopes40%67%
Transverse15%93%
Down26-28%93%
Table 16‑6 Island Gold Cut-off Grades
Areas of ApplicationReserve Cut-Off
Undeveloped areas4.03
Developed Stopes2.82
Alimak Stopes4.89
Island Gold Mine – Ni 43-101 Technical Report  134
August 31, 2020


alamos2.jpg
image25.jpg
Figure 16‑14 Reconciliation of Minable Resource to Dec 31, 2019 Mineral Reserve and Resources
image58.jpg
Figure 16‑15 Mineable Resource Stoping Blocks Categorized by Grade
Island Gold Mine – Ni 43-101 Technical Report  135
August 31, 2020



alamos2.jpg
16.13 Phase III Expansion Study Scenarios Examined
Three different mine capacity rates were examined, 1,200 tpd, 1,600 tpd, and 2,000 tpd. The current mill capacity of Island Gold is 1,200 tpd and this case was deemed the Basecase for the Study. Early in the Study, grinding simulation work indicated that the installed grinding capacity of the mill is 1,600 tpd, although downstream processes would require upgrading for the mill to operate at that rate. It was therefore decided that the mid-range capacity scenario would be at 1,600 tpd. After mine planning in the scoping study work indicated that a 2,000 tpd mining capacity was a viable option, this scenario was added to the Study.
Two material handling options were examined: ramp ore and waste haulage and skipping ore and waste with a shaft.
The ramp scenario at 1,200 tpd was evaluated with and without a paste plant, to assess the incremental economics of adding a paste plant on similar mining scenarios. Different Mineable Resources and mine plans were used with each as the paste plant allows for a higher mining recovery.
Multiple iterations of individual mine designs and sequences were undertaken for each scenario examined. Mine designs and resource levelled sequencing were undertaken with Deswik software. Mine designs were unique for each scenario as each scenario had different infrastructure requirements for material handling and ventilation. The mine design to some extent drove the sequence of development as some areas (i.e. shaft underground ore/waste handling system) required earlier access than would other wise be required for the Basecase. Development and stope sequencing were resource driven and generated the annual physicals and equipment requirements.
Mine costing was from first principles and was guided by actual site cost and productivities experience.
16.13.1 Ramp Haulage at 1,200 TPD with No Paste Plant (R1200NP)
The R1200NP scenario is a continuation of the current mining plan (prior to the Study) but with the addition of the Minable Resources, described earlier, and the additional development required to bring those Minable Resources into productions described earlier. Trucking would continue be used as the sole method of transporting ore and waste to the surface. As the mining horizons deepen the number of trucks required to meet a 1,200 tpd mining capacity increases. Currently (2020), eight 42 tonne haul trucks are required to support 1,200 tpd with a 1.7 hour cycle time. Truck requirements peak at 18 in the future in this scenario and require cycle times of up 3.3 hours. Similarly, personnel transportation time to the working faces increases significantly in the future, decreasing employee productivity.
With increasing trucking times, and more trucks, ventilation needs to be significantly upgraded. Approximately 900,000 cfm would be required, up from the current 470,000 cfm. To achieve this, an additional fresh air raise (FAR) and exhaust or return air raise (RAR), along with the associated fans and heater, would be required (Figure 16‑16).
The above increases in trucks, ventilation and the reduced productivity combine to increase capital and operating costs from their present levels. It should be noted that no material mill modifications are required with either ramp 1,200 scenarios, however. other infrastructure upgrades are required to sustain mining over the longer mine life. These upgrades are common to all the scenarios studied and are detailed in Section 18.
Mine life in the R1200NP scenario would be to 2041.
Island Gold Mine – Ni 43-101 Technical Report  136
August 31, 2020


alamos2.jpg
image62.jpg

Figure 16‑16 R1200 and R1200NP Underground Development and Infrastructure
16.13.2 Ramp Haulage at 1,200 TPD with a Paste Plant (R1200)
The R1200 scenario has a similar mine plan to the R1200NP scenario, but with a higher mining recovery, resulting from the incorporation of a paste fill plant and associated underground distribution system capable of delivering 1,200 tpd of paste. Incorporating paste fill into the mining sequence will provide several cost and operating efficiencies:
The increased mining recovery provides another 100,000 recovered ounces over the no paste fill alterative by:
Allowing mining of sills without the need for remnant pillar;
Reducing backfill dilution;
Faster stope cycling time which in turn supports higher mining rates;
Increased geotechnical stability, particularly important as the mine gets deeper; and
With 56% of the tailings going back underground as paste fill, the tailings dam required capacity is reduced, with two raises required rather than three, resulting in $17M life of mine capital savings.
The addition of paste fill has an after-tax Internal Rate of Return (IRR) of 32% at a $1,450 USD gold price. The IRR is calculated on the deltas of the annual after-tax free cash flows between the R1200NP and R1200 cases. Specifics of the paste fill plant are discussed in Section 18.3.3.
Island Gold Mine – Ni 43-101 Technical Report  137
August 31, 2020



alamos2.jpg
Mine life in the R1200 scenario would go to 2042, one year longer than R1200NP due to additional tonnage available with higher mining recovery with paste fill. The annual extraction sequence is presented in Figure 16‑17.
image24.jpg
Figure 16‑17 R1200 Annual Extraction Sequence
16.13.3 Ramp Haulage at 1,600 TPD with a Paste Plant (R1600)
The R1600 scenario anticipates increasing the mining rate to 1,600 tpd by 2026. With the increased mining rate and trucking requirements several significant capital investments would have to be made including:
A second ramp to surface is required. The current ramp system cannot handle the trucking volumes required for 1,600 tpd due traffic congestion in the ramp as was determined by simulations done on the haulage circuits;
Additional internal ramps connecting upwards to the ramp system accessing the eastern extension zone, which then connects to the new ramp to surface;
Additional ventilation infrastructure beyond that required for the R1200 and R1200NP scenarios (Figure 16‑18). The air requirements increase to 1.1 million cfm, as additional trucks and loaders are required to attain a 1,600 tpd mining rate. Truck requirements in this scenario peak at twenty five 42 tonne trucks comparted to the 8 that the mine is currently running. To cater to this a second FAR and fans, in addition to the new FAR required for R1200, would be added on the west end of the ore body and the new ramp to surface would used for exhaust;
A paste fill plant, and the associated underground distribution system, capable of delivering 1,600 tpd of paste; and
Island Gold Mine – Ni 43-101 Technical Report  138
August 31, 2020


alamos2.jpg
The mill capacity would be expanded to 1,600 tpd. This would require upgrades or additions to several of the areas of the process plant such as the fine ore stockpile capacity, pre-leach thickening, leaching, CIP, acid wash, process water management, and other equipment modifications. This is fully discussed in Section 17.
As in the R1200NP and R1200 scenarios, personnel transportation time to the working faces increases significantly in the future, decreasing employee productivity.
Mine life in the R1600 scenario would go to 2038 and the annual extraction sequence is shown in Figure 16-19.
image66.jpg

Figure 16‑18 R1600 Underground Development and Infrastructure
Island Gold Mine – Ni 43-101 Technical Report  139
August 31, 2020



alamos2.jpg
image72.jpg

Figure 16‑19 R1600 Annual Extraction Sequence
16.13.4 Shaft at 1,600 TPD with a Paste Plant (S1600)
The S1600 scenario anticipates sinking a 1,373 m deep shaft and increasing the mining rate to 1,600 tpd by 2025. Upon commissioning of the shaft and its associated infrastructure, all ore and waste transport would be via the shaft. In addition, the shaft would be used to transport personnel and materials to any of the three shaft station levels thereby decreasing travel time significantly. The scenario has several significant capital investments required including:
The sinking of a 1,373 m deep, 5 m diameter, concrete lined shaft;
Construction of a hosting plant and associated infrastructure. The design selected would be capable of hoisting 4,500 tpd or ore and waste from the 1,373 m elevation and 3,500 tpd of ore and waste from the 2,000 m elevation should the shaft be required to be deepened in the future to access new Mineral Resources. Details of the shaft and associated infrastructure are fully described in Section 18.3;
Construction of an ore and waste handling system underground consisting of ore and waste passes, a grizzly, coarse ore bin, and a loading pocket;
A paste fill plant, and the associated underground distribution system, capable of delivering 1,600 tpd of paste; and
The mill capacity would be expanded to 1,600 tpd. This would require upgrades or additions to several of the areas of the process plant such as the fine ore stockpile capacity, pre-leach thickening, leaching, CIP, acid wash, process water management, and other equipment modifications. This is fully discussed in Section 17.
Island Gold Mine – Ni 43-101 Technical Report  140
August 31, 2020


alamos2.jpg
As the shaft acts as fresh air way, the S1600 scenario does not require any additional ventilation raises to surface beyond what is currently in place at Island Gold. Ventilation fans and propane heaters will be required to be installed at the shaft plenum (Figure 16‑20).
Mine life in the S1600 scenario would go to 2037.
image78.jpg

Figure 16‑20 S1600 and S2000 Underground Development and Infrastructure
16.13.5 Shaft at 2,000 TPD with a Paste Plant (S2000)
The S2000 scenario anticipates sinking a 1,373 m deep shaft and increasing the mining rate to 2,000 tpd in 2026. Upon commissioning of the shaft and its associated infrastructure all ore and waste transport would be via the shaft. In addition, the shaft would be used to transport personnel and materials to any of the three shaft station levels thereby decreasing travel time significantly. The scenario has several significant capital investments including:
The sinking of a 1,373 m deep, 5 m diameter, concrete lined shaft;
Construction of a hosting plant and associated infrastructure. The design selected would be capable of hoisting 4,500 tpd or ore and waste from the 1,373 m elevation and 3,500 tpd of ore and waste from the 2,000 m elevation should the shaft be required to be deepened in the future to access new Mineral Resources. Details of the shaft and associated infrastructure are fully described in Section 18.3;
Construction of an ore and waste handling system underground consisting of ore and waste passes, a grizzly, coarse ore bins, and a loading pocket;
A paste fill plant, and the associated underground distribution system, capable of delivering 2,000 tpd of paste; and
Island Gold Mine – Ni 43-101 Technical Report  141
August 31, 2020



alamos2.jpg
The mill capacity would be expanded to 2,000 tpd. This would require upgrades or additions to several of the areas of the process plant such as the crushing circuit, fine ore stockpile capacity, primary grinding circuit, pre-leach thickening, leaching, CIP, acid wash, process water management, and other equipment modifications. This is fully discussed in Section 17.
Total ventilation requirements for S2000 are 750,000 cfm, significantly less than the requirement for the R1200 and R1600 scenarios. As the shaft acts as a fresh air way, the S2000 scenario does not require any additional ventilation raises to surface beyond what is currently in place at Island Gold. Ventilation fans and propane heaters will be required to be installed at the shaft plenum.
As most of the ore will be moved on the level to the ore passes, the truck requirements are significantly reduced from current (2020) requirement of eight 42 tonne trucks. Five 42 tonne trucks will be required when the shaft infrastructure is in place.
Mine life in the S2000 scenario would go to 2035 and the annual extraction sequence is shown in Figure 16‑21.

image9.jpg

Figure 16‑21 R2000 Annual Extraction Sequence
16.14 Phase III Expansion Study Observations
Detailed capital and operating costing models were developed for each of the five scenarios studied. Combining these models with the physicals, cash flow models were constructed that allowed for sensitivity analysis of costing and productivity input parameters. In comparing the
Island Gold Mine – Ni 43-101 Technical Report  142
August 31, 2020


alamos2.jpg
five scenarios several observations were made that will focus on the R1200, R1600 and S2000 scenarios.
16.14.1 Capital Requirements
Capital costs increase moving from the R1200 scenario to the R1600 scenario to the S2000 scenario. The increase in capital from the R1200 to the R1600 is attributable to the increase in daily mining capacity requiring more trucks, ventilation infrastructure and an additional ramp to surface, in addition to the cost associated with expanding the milling capacity. The increase in capital from the R1600 scenario to S2000 scenario is attributable to construction of the shaft and hoisting facility and the capital required to expand the mill to 2,000 tpd, partially offset by less capital required for trucks, ventilation infrastructure and capital development. Capital requirements are discussed in detail in Section 21.
16.14.2 Productivity
Productivity levels between the R1200 scenario and R1600 are very similar and begin to drop as the mine gets deeper and it takes longer for employees to enter and leave the mine. Productivity levels dramatically increase with the use of the shaft to transport personnel. Using 2020 as a baseline, effective time at the face increases by 20% with the shaft (Figure 16‑22). With additional time at the face, development metres per employee (Figure 16‑23) and stoping tonnes per employee increase (Figure 16‑24). Increased productivity results in less personnel required to attain the same tonnage or alternatively the same number of personnel to achieve higher tonnage rates as is the case with the mine staffing requirements in Figure 16‑25.



Island Gold Mine – Ni 43-101 Technical Report  143
August 31, 2020



alamos2.jpg
image30.jpg
Figure 16‑22 Effective Time at the Face with 2020 as a Baseline
image77.jpg
Figure 16‑23 Metres of Development per Employee
Island Gold Mine – Ni 43-101 Technical Report  144
August 31, 2020


alamos2.jpg
image40.jpg
Figure 16‑24 Stope Tonnes per Employee
image71.jpg
Figure 16‑25 Mine Staffing Requirements

Island Gold Mine – Ni 43-101 Technical Report  145
August 31, 2020



alamos2.jpg
16.14.3 Operating Costs
With the ramp scenarios mining costs increase over the mine life due to increased haulage cycle times from lower mine horizons Mine unit operating costs decrease moving from the R1200 scenario to the R1600 scenario to the S2000 scenario (Figure 16‑26). Annual mining costs decrease moving from the R1200 scenario to the R1600 scenario because of economies of scale, namely the sharing of fixed costs such as supervision, engineering, and geology, pumping etc. over more tonnes. Costs are further reduced moving to the S2000 scenario as a result of economies of scale, operating less trucks and reduced ventilation costs. Figure 16‑27 depicts the reduction in truck hours with the S2000 scenario and Figure 16‑28 depicts the reduction in primary production equipment (LHD’s, trucks, jumbos, bolters and scissor lifts). Operating costs are discussed in more detail in Section 21.
image38.jpg
Figure 16‑26 Mining Units Costs
Island Gold Mine – Ni 43-101 Technical Report  146
August 31, 2020


alamos2.jpg
image64.jpg
Figure 16‑27 Underground trucking Hours
image54.jpg
Figure 16‑28 Quantity of Primary Production Equipment Required


Island Gold Mine – Ni 43-101 Technical Report  147
August 31, 2020



alamos2.jpg
16.14.4 Economics
With the R1200 scenario considered as the Basecase, after-tax net present value (NPV) and IRR comparisons were undertaken with the other scenarios. It was determined that the R1200 scenario had the lowest NPV while the S2000 scenario had the highest NPV. The NPV’s of the R1600 and S1600 fell midway between R1200 and S2000. IRR’s were undertaken on the deltas of the annual after-tax cash flow between the Basecase and the R1600, S1600 and S2000 scenarios. The S2000 case has a 17% IRR at USD $1450 gold price. The R1600 and S1600 scenarios have lower, but still acceptable IRR’s.
Although the S2000 has a higher initial or growth capital, this is more than offset by lower sustaining capital and operating costs than the pother options. In addition, the impact of higher annual revenue from the increase in annual ounce production positively impacts the NPV and IRR. At higher gold prices than base case gold price of USD $1,450 the NPV and IRR increase. The economics are discussed in more detail in Section 22.
16.14.5 Other Considerations
Due to the lower number of trucks operated and the reduced ventilation requirements the S2000 option has the lowest greenhouse gas emissions both on an annual basis (Figure 16‑29) and a life mine basis (Figure 16‑30).
image37.jpg
Figure 16‑29 Annual CO2 Emissions

Island Gold Mine – Ni 43-101 Technical Report  148
August 31, 2020


alamos2.jpg
image70.jpg
Figure 16‑30 Life of Mine CO2 Emissions
In undertaking the mine planning exercise to generate the S2000 scenario it was once again demonstrated that a 2,000 tpd mine capacity is very viable. With the sinking of the shaft, the very high grade (+20 g/t) pods in east of the deposit, on the lower levels, are able to be brought into production much earlier in the mine life, as access to this area is obtained earlier than would otherwise be achieved with a ramp only system.
The S2000 option significantly de-risks the operation with reduced congestion and reduced personnel and mobile fleet requirements.
Should additional Mineral Resources be discovered below the 1,500 metre level, the shaft is the best positioned option to access those potential Mineral Resources. Ramp haulage below 1,500 m is not viable, and the shaft can be deepened, either during the initial sink, or after the shaft is in operation.
16.15 Phase III Expansion Study Conclusions
The two primary conclusions from the Study were:
The paste plant should be built given:
The 100,000 additional ounces produced;
The increased geotechnical de-risking; and
Positive after-tax IRR of 32%.
In expanding the Island Gold Mine, the shaft at a 2,000 tpd mining rate (S2000) scenario should be adopted given that it:
Provides the strongest economics (free cash flow, after-tax NPV, and IRR) of all the scenario studied;
Provides the highest annual gold production;
Has the lowest operating costs, as well as the lowest cash costs and mine-site all-in sustaining costs per ounce;
Has the lowest combined operating and capital costs;
Island Gold Mine – Ni 43-101 Technical Report  149
August 31, 2020



alamos2.jpg
Provides access to higher grade stopes sooner in the mine life;
De-risks the lower mine operation;
Provides for reduced congestion and reduced personnel and mobile fleet requirement; and
Provides a significantly reduced carbon footprint and reduced exposure to diesel price and carbon tax increases.
Based upon these conclusions Island Gold is proceeding the permitting and construction of the paste plant, the shaft complex and mining at a rate of 2,000 tpd.
16.16 Island Gold Life of Mine Plan
With the commitment to implement the S2000 scenario, the mine plan associated with that scenario has been adopted as the Life of Mine Plan for Island Gold and is presented in Table 16‑7.

Island Gold Mine – Ni 43-101 Technical Report  150
August 31, 2020


alamos2.jpg
Table 16‑7 Life of Mine Production Physicals
Units2020202120222023202420252026202720282029203020312032203320342035LOM
Stope Tonnes(kt)3023223843693394125856816456126076706637177212978,326
Stope Grade(g/t)11.5810.6210.59.9711.3510.0911.4711.3110.029.248.539.228.6813.7413.819.8910.69
Development Tonnes(kt)10811654691001451354987118123606913001,247
Development Grade(g/t)8.98.786.787.96.28.8110.28.669.1513.28.117.45.8512.48008.79
Total Tonnes(kt)4114384384384395577207307327307307307327307212979,572
Total Grade(g/t)10.8710.179.858.379.713.0811.419.2210.6213.918.819.3710.3211.099.69.7710.45
Total Waste Tonnes(kt)416440611688478317337471415372256190331005,025
Operating Development(m)2,2412,4831,2511,5632,2752,9392,9581,1161,8522,4982,5271,2311,4072610026,603
Capital Development(m)4,0525,6607,4277,0805,3304,4754,5366,7045,8385,1803,5292,68741800062,916
Exploration Development(m)7486487641,4047592900000000004,352
Total Development(m)7,0418,7919,44110,0468,3647,4447,4957,8207,6907,6786,0563,9171,8262610093,871
Alimak Raising(m)01964906671,0262151240000000002,719
Conventional Vent Raising(m)12361145203216158271221267243227116390002,290
Raisebore Vent Raising(m)000487000000000000487

Island Gold Mine – Ni 43-101 Technical Report  151
August 31, 2020



alamos2.jpg
17 RECOVERY METHODS
The current process plant at Island Gold is composed of a two-stage crushing circuit followed by a two-stage grinding circuit. The mill uses a cyanide leaching and a carbon-in-pulp (CIP) adsorption process to recover gold.
To determine the maximum throughput capability of the existing process plant equipment, and to provide several alternatives for additions to the grinding circuit and balance of plant, an assessment of the current plant flowsheet was undertaken by Orway Mineral Consultants. The major element effecting the throughput of the plant is the comminution circuit, specifically milling, therefore, the assessment of the current and recommended crushing and milling areas were completed first which lead into the assessment of the balance of the plant.
In all, six options for increasing the plant throughput were evaluated as part of this study, with two options considering an increase from 1,200 tpd to 1,600 tpd, two options considering a staged increase from 1,600 tpd to 2,000 tpd, and two options considering and increase directly from 1,200 tpd to 2,000 tpd.
Upon evaluation of each option, it was decided to proceed with a combination of Options A and C, which in summary involves upgrades to the crushing plant, changes to the fine ore storage arrangement, addition of a new ball milling circuit, addition of a Pumpcell CIP absorption plant and a new elution circuit. Details of these changes can be found in later sections of this report.
17.1 Expansion Considerations
To establish the throughput rate increase, the existing comminution circuit was assessed to identify its maximum capacity. In addition to this, alternatives to the existing crushing and grinding circuits were simulated at differing throughputs to determine which alternatives were available to increase the plant throughput.
The comminution assessment determined that that existing crushers and mills can handle a maximum throughput of approximately 1,600 tpd. This incremental change, however, requires upgrades or additions to several of the other areas of the process plant such as the fine ore stockpile capacity, pre-leach thickening, leaching, CIP, acid wash, process water management, and other equipment modifications.
After increasing the throughput to 1,600 tpd, the comminution assessment established options to further increase the throughput of the plant to approximately 2,000 tpd. These options included:
the addition of a ball milling circuit (equivalent to the existing primary ball mill) in a parallel configuration, and
the addition of a new primary ball milling circuit prior to the existing mill to create an in-series grinding configuration
This staged approach to achieve 2,000 tpd requires additional upgrades to the leaching area, pre-leach thickener including its underflow pumps, tailings pumps and process water management.
The comminution assessment also provided an option to increase the throughput of the process plant from 1,200 tpd to 2,000 tpd by way of utilizing an SAB comminution circuit design. This would entail installing a SAG milling circuit prior to the ball milling circuit (in-series grinding) as well as the upgrades or additions to several other areas of the process plant as indicated in the increase to 1,600 and 2,000 tpd descriptions above.
Island Gold Mine – Ni 43-101 Technical Report  152
August 31, 2020


alamos2.jpg
17.2 Selected Expansion Approach
In addition to the rate at which ore is delivered to the process plant from the mine, consideration of the following parameters were given when selecting an option to the throughput expansion: metallurgical performance (potential for gold loss mitigation), versatility (ability to cope with spikes in head grade, varying feed particle sizes, mitigation of bottlenecks), construction complexity (duration of downtime, tie-in points to the existing plant), equipment reliability and capital and operating costs for the process plant changes.
Based on the above criteria, the selected option was to combine the expansion plans from 1,200 tpd to 1,600 tpd with the parallel grinding expansion plan, to increase the throughput of the plant to 2,000 tpd. This entails the addition of a new ball milling circuit in parallel to the existing circuit as well as a new Pumpcell plant and elution circuit at the back end. The key advantage to utilizing a parallel milling circuit is it allows for a single milling stream to operate while the other stream is offline for maintenance. It should be noted that the downstream circuits would need to be managed at the lower throughput and may require modifications to allow the plant to run at the lower tonnage for an extended period.
17.3 Process Flowsheet and Design Criteria
The simplified process flowsheet for the Island Gold Mill expansion is presented in Figure 17‑1.
Table 17‑1 is a summary of the process design criteria for the expansion of the process plant.
17.4 Process Plant Layout
Figure 17‑2 shows the new equipment installations (in bold) and how they are arranged in relation to the existing process plant.
Island Gold Mine – Ni 43-101 Technical Report  153
August 31, 2020



alamos2.jpg
image17.jpg
Figure 17‑1 Simplified Process Flowsheet Changes for Expansion to 2,000 TPD Throughput
Island Gold Mine – Ni 43-101 Technical Report  154
August 31, 2020


alamos2.jpg
Table 17‑1 Process Plant Design Criteria
UnitsCurrent PlantExpansion to 2,000 tpd
General
Annual Production Ratet/y438,000730,000
Daily Production Ratetpd1,2002,000
Operating Days/Yeardays365365
Ore Parameters
ROM Feed Size, D100
Mm500500
ROM Feed Size, D80
Mm208208
Sec Crush Product Size, D80
Mm11.711.7
Grinding Final Product Size, P80
micron6464
Moisture%2.42.4
Head Gradeg/t10.512.5
Crushing
Annual Operating Hoursh/y5,8405,840
Operating Hoursh/d2424
Availability%6767
Grinding
Annual Operating Hoursh/y8,0008,000
Operating Hoursh/d2424
Availability%91.391.3
Thickener
Feed Flowrate
m3/h
258429
Rise Ratem/h0.731.21
Flux
tpd/m2
4.98.2
Underflow % solids%(w/w)5454
Leaching & CIL
No. of Tanks#4+16+1
Residence Timeh22.418.8
CIP
Configuration5 x 4.3 m tanks
8 x 60 m3 Pumpcell plant
Residence Timeh4.54.1
Carbon Concentrationg/L25-3535
Elution/Regeneration
Strip Circuit Capacitytonnes C1.53
Strips per Day#1.7 (max 2)1.5 (max 2)
Nominal Capacitytpd2.5-3.04.5-6.0
Gold Loading (typical)g/t6,000 – 8,0006,000 – 8,000

Island Gold Mine – Ni 43-101 Technical Report  155
August 31, 2020



alamos2.jpg
image23.jpg
Figure 17‑2 Island Gold Process Plant Changes for Expansion to 2,000 TPD Throughput
Island Gold Mine – Ni 43-101 Technical Report  156
August 31, 2020


alamos2.jpg
17.5 Process Description
17.5.1 Crushing Circuit Modifications
As part of the crushing circuit evaluation, several cases were simulated with varying run of mine particle size distributions in combination with two scenarios for the secondary crushing, namely a coarse closed side setting (CSS) of 75 mm and a fine CSS of 38-50 mm.
The outcome of the assessment recommended the installation of a new Metso TK9-42-2V vibrating grizzly feeder to relieve the load on the existing jaw crusher. Modelling was done with 56 mm slots, but 70 mm slots are suitable, as well. The oversize on the feeder will report to the jaw crusher, while the undersize will report directly to Conveyor #2 (100-CON-002) via new chute work, thus bypassing the jaw crusher.
The new jaw crusher (Metso C96 or equivalent) will be capable of operating at up to 125 tph (i.e. 2,000 tpd at 67% availability) with a CSS in the range of 38-75 mm which provides sufficient size reduction for the existing HP200 cone crusher to maintain a crushing circuit product size (D80) of less than 11.7 mm.
It was observed that according to 2019 operations data, the cone crusher average power is 71 kW or 54% power utilization. This indicates that the crusher is not power constrained given the current crushing rates and crusher CSS and is capable of higher tonnages.
The existing sizing screen (100-SCR-001) is overloaded at 1,200 tpd, therefore it is recommended to install a double deck RF1848-2 screen (1.8 m x 4.8 m) for the increased tonnage. Note that a secondary crushing circuit availability of greater than 70% is required to utilize this size of screen.
To cater for the installation of the bigger screen, Conveyor #3 (100-CON-003) needs to be modified to discharge at a slightly higher elevation. The screen oversize discharge remains the same and reports to Conveyor #4 to report to the cone crusher, while the screen undersize reports to Conveyor #5 towards the stockpile.
17.5.2 Ore Storage Modifications
Downstream of the sizing screen is the fine ore bin, which has a 500 tonne live capacity which is sufficient for 1,200 tpd, however, when operating at 1,600 tpd or higher, the surge capacity in this bin is insufficient. Therefore, it is recommended to implement a new stockpile with a 1,000 t live capacity prior to the grinding circuit which would be adequate for operating at up to 2,000 tpd. The stockpile would be fed via a new 24” Fine Ore Transfer Conveyor (100-CON-212) which will be fed from the existing Conveyor #5 (100-CON-005). Conveyor #5 presently feeds the transfer tower, however, during a planned shutdown, it will be redirected to feed the new Fine Ore Transfer Conveyor.
The stockpile would be housed within a fabric building, complete with a concrete slab on grade to mitigate gold losses into the ground, and overhead doors to allow access for mobile equipment. A corrugated steel tunnel under the stockpile cover would be installed to allow for the installation of two in-line belt feeders to withdraw ore from the stockpile to two new 24” Fine Ore Reclaim Conveyors (200-CON-213 and 200-CON-214). The tunnel will run the length of the stockpile cover with the back end opening to up to surface to provide a second means of egress out of the tunnel. Fine Ore Reclaim Conveyor #1 (200-CON-213) will exit the front end of the tunnel and discharge onto the existing Conveyor #6 (100-CON-006). The conveyor will proceed to discharge into the existing Fine Ore Bin (200-SIL-001). With a level of surge capacity in the new stockpile, it will not be necessary to keep the Fine Ore Bin full, however, the option to do so is still available. Fine Ore Reclaim Conveyor #2 (200-CON-214) will exit the tunnel and discharge onto a new Ball Mill Feed Conveyor (200-CON-215).
Island Gold Mine – Ni 43-101 Technical Report  157
August 31, 2020



alamos2.jpg
It should be noted that the existing 24” wide conveyors that are planned on being reused after the expansion can achieve up to 2,000 tpd throughput based on their belt width if they are sped up. Upon detailed design, a full assessment of the drive arrangement for each conveyor is recommended to ensure the gearboxes and motors are suitable for the new duty.
17.5.3 Grinding Circuit Modifications
To implement a parallel grinding circuit, a new, equivalent primary mill (3 m diameter x 5.79 m effective grinding length) is required. The grinding circuit makes use of the existing regrind mills.
The existing flat-bottomed cyclone should be replaced with screens since this unit is considered incapable of providing a 300 micron cut point without compromising its efficiency significantly. Installation of two Derrick high frequency screens, capable of a 310 micron cut point, is therefore recommended to replace the cyclone. As this replacement will also reduce the mill circulating load from over 200% to 65%, the tanks and pumps in that part of the circuit will not need upgrading.
The feed to the secondary mills is a 250 mm diameter gravity line with a 5-degree angle. This line will handle the additional flow; however, it will need to be carefully assessed given the coarser grind size.
The two parallel regrind circuits will operate simultaneously. The discharge tanks and pumps will be unchanged as the flow through each regrind mill does not increase.
The secondary classification circuit will require the installation of a second cyclone pack (one dedicated to each regrind mill).
The existing Trash Screen (300-SCR-110) needs to be upgraded. Assuming a 1,500 micron aperture, 65 m3/h/m2 flux would be appropriate, therefore a 5.2 m2 screen area is suitable. A 9’ x 12’ screen with a 1,500 micron mesh is recommended as the replacement.
The current pipeline to the thickener feed box is 100 mm diameter – this will be replaced with a larger diameter pipeline.
17.5.4 Pre-Leach Thickener Modifications
As part of the expansion, the thickener rake and rake drive unit should be inspected and refurbished during a scheduled shutdown during construction. Also, the thickener’s feed well will be inspected for potential modifications, and the underflow and overflow configuration will be modified.
The feed flow increases from 256 m3/h to 384 m3/h. The thickener’s feed launder is assumed to be insufficient at the increased flowrates and will be replaced as part of the expansion construction.
Feed well modifications will be required. These modifications are recommended to be undertaken with the assistance of the original thickener supplier. A high rate, auto-diluting design is also recommended to be installed.
The suction nozzles do not need to be replaced, as a 200 mm manifold is used prior to individual pump suctions.
Thickener rise rate increases from 0.73 m/h at 1,200 tpd to 1.21 m/h at 2,000 tpd, and the unit area increases from 4.9 t/d/m2 at 1,200 tpd to 8.2 t/d/m2 at 2,000 tpd. Previous testwork and
Island Gold Mine – Ni 43-101 Technical Report  158
August 31, 2020


alamos2.jpg
recent work on tailing slurry samples both suggest that these rates are acceptable, albeit with a requirement for extra flocculant dosage.
Thickener underflow slurry will continue to be drawn out at 54-55% solids. The increased underflow flowrate is discussed below.
Flocculant addition rates will increase at the higher throughput rate. It is assumed that the additional dosage of flocculant can be addressed by mixing solutions more frequently, and by dosing a higher strength solution to the thickener.
Thickener underflow flowrates increase from 63 m3/h at 1,200 tpd to 111 m3/h at 2,000 tpd. Pulp density is expected to remain the same at 54-55% solids.
Current thickener underflow pumps (500-PMP-007/008) will not have capacity for 111 m3/h, therefore, new 5x4-14 pumps with 22 kW motors will be required for the expansion.
The underflow pipeline and pump suction are will be changed to 150 mm diameters.
A second pipeline for the thickener overflow will be installed to cater for the flowrate increase from 192 m3/h to 275 m3/h.
A second process water tank will be installed for the additional process water.
17.5.5 Leach and CIL Modifications
The leach feed flowrate will increase from 66 m3/h at 1,200 tpd to 111 m3/h at 2,000 tpd. This will reduce leach and CIL residence time from 22.4 hours to 13.4 hours. The addition of two more tanks to the leach train will increase residence time to 19 hours which, although less than the initial conditions, is deemed sufficient given that over 50% of gold is leached within the milling and thickener circuits. Also, with the new Kemix Pumpcell CIP circuit installed, the overall residence time (thickener, leach, CIL, CIP) will be much closer to the original residence time.
Converting to a full CIL circuit for 2,000 tpd is possible but is not recommended, as carbon inventory requirements will increase significantly. Instead, the addition of a new Kemix Pumpcell CIP circuit is preferred for the 2,000 tpd option. The Pumpcell plant consists of eight 60 m3 tanks.
17.5.6 CIP Modifications
A new Kemix Pumpcell plant which is capable of efficient carbon handling and lower solution losses will replace the existing CIP tanks. Kemix recommended an 8 x 60 m3 Pumpcell plant to handle the higher plant throughput.
The Pumpcell plant will be located outside of existing process plant and will incorporate the new stripping/regeneration circuit.
This change will enable one of the old CIP tanks to be repurposed as a Process Water tank which will be required for the additional water flow.
The tailings flowrate will increase from 66 m3/h to 112 m3/h. The existing tailings tank has 2 m3 of capacity and can handle extra flow, therefore no change will be required. The tailings pumps will need to be replaced with 6 x 6 pumps with 55 kW motors to handle the extra flow in the tailings line.
Island Gold Mine – Ni 43-101 Technical Report  159
August 31, 2020



alamos2.jpg
17.5.7 Carbon Elution and Regeneration Modifications
A new 3 tonne capacity carbon stripping plant will be implemented as part of the expansion. The plant includes acid wash, carbon stripping, electrowinning, refining and carbon regeneration and handling. The package plant comes complete with interconnecting piping, valves, instrumentation, tanks as well as structural steel and platforms complete with stairs, grating and handrails.
The plant will be situated on the northeast side of the existing building. The final location of the plant will be detailed in the next phase of the project and take into consideration the Pumpcell Plant that will be housed within the same pre-engineered building.
The elution plant need only run once per day. If required, the plant can run more frequently than once per day, resulting in additional capacity
17.5.8 Reagents Modifications
Minor changes to reagents systems will be required for the higher throughput.
17.5.8.1 Lime System
The existing equipment is suitable, while the pumps will be sped up for the additional requirements.
17.5.8.2 Cyanide System
The existing equipment is suitable, while the pumps will be sped up for the additional requirements.
17.5.8.3 Caustic System
The existing equipment is suitable, while piping will need to be rerouted to new equipment.
17.5.8.4 Flocculant System
A new dosing pump will be required for the additional requirements.
17.5.9 Process Water Management Modifications
The existing process water tank is approximately 300 m3 which is too small for the higher throughput in the plant. Installation of a second process water tank of similar volume with a connecting balance line will be suitable for the increased throughput. The alternative to a new tank is the option to utilize a decommissioned CIP tank.
As the process water flow rate will be 330 m3/h, new pumps will be required. The velocity in the delivery pipeline is 5.2 m/s, so a new process water pipeline will be installed– either a 200 mm line to replace the 150 mm line, or by adding a parallel 150 mm line to the mill area.
The gland water pumps will remain unchanged as the duty does not increase significantly with the new equipment in the plant.
Island Gold Mine – Ni 43-101 Technical Report  160
August 31, 2020


alamos2.jpg

18 PROJECT INFRASTRUCTURE
18.1 Local Resources and Services
The Island Gold Mine is an established producer in a mining district that has been historically active since the early 1980s with the former Kremzar, Magino, Edwards and Cline mines. The nearest town is Dubreuilville, Ontario, approximately 17 km from the mine, accessed via Goudreau Road. Dubreuilville is located at the end of Highway 519, heading east off the Trans-Canada Highway, 72 km northwest of Wawa.
The town of Dubreuilville has an estimated population of 635 inhabitants and the main available services consist of an elementary school, a secondary school, a health centre, a motel, a restaurant and bar, a grocery store, a Canada Post outlet, the town hall, a hardware store, a gas station, a municipal library and an arena.
Over 50% of the mine’s employees are local from the surrounding region (Dubreuilville, Wawa, White River, etc.). Out of town workers live in camp accommodations (newly installed 2019/2020) near Dubreuilville, where they have individual rooms, recreational services, and a cafeteria. Chartered flights are provided from Sudbury and Rouyn-Noranda which fly into the Wawa airport daily.
18.2 Current Site Infrastructure
18.2.1 Surface Site Infrastructure
The Island Gold Mine is accessed via a singular portal (Main Portal) and decline. The ore stockpile pad and waste storage are located directly adjacent to the mine portal. The mill feed is hauled approximately 1 km from the stockpile to the mill complex. The maintenance facility, surface office and dry complex are located adjacent to the mill. The Kremzar Portal accessing old mine workings and detached from current underground mine, is utilized to access the bottom of the surface ore bins which are used to feed the crusher section of the mill.
The primary tailings pond is located approximately 500 m west of the mill and the secondary pond is located just west of the portal area. Mine ventilation is via two surface fresh air fans and raises located adjacent to Goudreau Road, approximately 2.5 km away from the main site along with one exhaust raise located across from the fresh air fans. Figure 1 displays the relative location of the surface infrastructure.
Island Gold Mine – Ni 43-101 Technical Report  161
August 31, 2020



alamos2.jpg
image22.jpg

Figure 18‑1 Island Gold Mine Site - Surface General Arrangement
18.2.2 Power Supply
Site power is supplied by Algoma Power Inc. (API) via one 44kV transmission line. Two 44kV/4160V transformers (7.5MVA each) are located at the Main Portal and mill complex, respectively. One 44kV/13.8kV (10MVA) transformer is located off the main site not far from the surface fans.
The Main Portal transformer (44kV/4160V, 7.5MVA) feeds the compressor room, fresh air raise (FAR) #1 fans and two underground feeders. The two underground feeders are 3C 4/0 AWG, 5kV and feed the upper portion of the mine down to the 620 Level and the new east ramp descending from 340 Level. The compressed air is backed up in the event of a power loss with a diesel compressor.
Island Gold Mine – Ni 43-101 Technical Report  162
August 31, 2020


alamos2.jpg
The mill transformer (44kV/4160V, 7.5MVA) feeds the mill, surface shops, warehouse, water treatment plant, dry complexes, fire hall, tailings pond, core shack and office complex. A portion of the mill (critical equipment) and the surface buildings are backed up with a 600V, 1MW diesel generator.
The 13.8kV skid transformer (44kV/13.8kV, 10MVA) feeds the FAR #2 fans and one 3C 350MCM, 15kV underground feeder that descends down a borehole to the 620 Level where it is distributed to the bottom portion of the mine (620 Level downwards)
18.2.3 Underground Ventilation
The primary ventilation system consists of a push type system served with two fresh air raises. FAR #1 currently supplies approximately140,000 cfm while FAR #2 supplies approximately 350,000 cfm, totalling 490,000 cfm. Return Air Raise (RAR) #2 and the Main Portal serve as the main exhaust routes for the return air. Table 18‑1 provides a summary of the surface fan arrangement at Island Gold.
Table 18‑1 Key Surface Ventilation Fans Data
ItemFAR #2FAR #1
Fan TypeCentrifugalAxial
Fan ArrangementParallelParallel
Total Horsepower2,400 HP400 HP
Variable Frequency DriveYesNo
FAR #2 serves to ventilate the Island Deep and West Zones, while FAR #1 serves in ventilating the Extension and East Zones of the deposit. FAR #1 is supplemented with an underground booster fan located at the 390/400 Level. An underground booster fan arrangement is also located on 660W Level to ventilate the West Zone. This fan arrangement serves to pull air from FAR #2 into the West Zone to ventilate during development. A fresh air transfer drift is planned to be established between the Island Deep and West Zone to improve air quality in the West Zone and provide enough ventilation for production when the zone’s production front comes online. Figure 18‑2 displays the primary ventilation distribution system.
Island Gold Mine – Ni 43-101 Technical Report  163
August 31, 2020



alamos2.jpg
image53.jpg
Figure 18‑2 Underground Ventilation Distribution Network
Island Gold Mine – Ni 43-101 Technical Report  164
August 31, 2020


alamos2.jpg
Propane powered mine air heaters are located on both surface fresh air fans. FAR #1 has a 30 MBTU heater while FAR #2 has 20 MBTU which serve to heat the air to 7 degree C during the winter months.
18.2.4 Mine Process & Domestic Water
Surface process and potable water is supplied via Maskinonge Lake. Water is pumped from the lake and distributed to the existing site and mill. The raw water is filtered via a 4-stage treatment process: multi-media filtration, reverse osmosis membrane filtration, chlorine injection and ultraviolet rays.
Underground process water is collected underground in a naturally filling cavity (via groundwater and diamond drill holes) near the 190 Level. Process water is distributed via pipeline down the ramp to working horizons via gravity employing pressure reducing valves (PRV) to control pressure. A process water reserve is employed in the cavity for the 315 Level underground maintenance facility fire suppression system.
18.2.5 Mine Dewatering
The Island Gold Mine employs a clean water dewatering system. Water cascades down level sumps, via boreholes or pumps, until it reaches an intermediate dewatering pump station, at which point all water is pumped via the ramp or boreholes to the main dewatering pump stations, located on the 425 Level and the 125 Level. The main pump stations pump the water directly to either the primary or secondary pond on surface depending on pond status and water quality. On average, Island Gold dewaters approximately 2,400 m3/day from the underground workings.
Island Gold is currently designing and implementing a new main dewatering station in the deep portion of the mine to sustain its operations at depth.
18.2.6 Mine Compressed Air
Island Gold’s underground mine operations are serviced via one surface compressed air plant. The plant is located adjacent to the portal and is composed of a series of 200, 300 and 600 hp compressors totalling 2100 hp and produces approximately 9,920 cfm. One backup diesel unit provides 1,600 cfm in case of emergency. Underground workings are fed via one 8” air line down the ramp, stepping down to 6” lines to deliver air to the mine’s auxiliary levels.
18.2.7 Miscellaneous Underground Infrastructure
There is currently one underground workshop located at the 315 Level underground. This workshop provides basic mechanical services to Island Gold’s primary production fleet as well as secondary vehicles. Construction of a new underground workshop located on the 620 Level is currently underway. The new shop will be substantially bigger and allow Island to perform major mechanical work underground, not having to bring equipment to surface or offsite. The new shop will be composed of two mechanical bays, a welding bay, a warehouse, a waste bin and hose bay, tire bay as well as a washbay. Construction of the new workshop is expected to be completed in 2021.
An underground cement plant is located on the 760 Level which provides cement to waste rock to produce cemented rockfill. The 760 Level was designed to facilitate the movement of cement and truck traffic on the level. Trucks pull onto the level loaded with waste and get backfilled with slurry, to then haul the cemented rock fill to the backfill site.

Island Gold Mine – Ni 43-101 Technical Report  165
August 31, 2020



alamos2.jpg
18.2.8 Automation, Communication and Controls
The primary means of communication underground is via a 16 channel leaky feeder system. Femco lines are also installed in every refuge station as a secondary communication system. Island Gold is currently in the process of installing LTE underground to increase wireless data capacity and coverage. On surface, leaky feeder, phone lines and Voice over Internet Protocol (VoIP) are utilized.
Island has a fibre-optic network installed underground (and on surface) servicing the main ramps, underground infrastructure and microseismic system. This system also serves as the backbone for the ventilation on demand (VOD) network, recently implemented in 2019. The blasting system is also routed via the fiber network with the leaky feeder network as backup.
Each truck operating underground is also configured with a remote system with the ability to track payload and cycle times allowing the proper management of the underground fleet. The system is planned to be deployed on all prime movers in the fleet in the near future.
Island Gold also has a comprehensive microseismic system installed throughout its underground workings. This allows for continuous monitoring of microseismic activity underground and the implementation of re-entry protocols based on seismicity intensity underground following blasts.
A central control room (CCR) was implemented in 2019, where all communication and automation reports to. The CCR is used as the heart of the operation through which all information flows. This allows for the optimization of traffic flow, monitoring of microseismic activity, monitoring the VOD system as well as to relay key information to underground workers as required.
18.2.9 Tailings Management
The tailings management facility (TMF) represents the main water retention structures on the mine site. It consists of two ponds, the Primary Pond and the Secondary Pond which acts as a polishing pond in addition to water transfer systems via a siphon system (see aerial view of site plan in Figure 18‑1).The Primary Pond (built in the former Miller Lake basin) occupies an area of 109 ha. The Secondary Pond has an area of 22 ha. The TMF is operated in accordance with ECA No. 5444-BNPL46 issued April 30, 2020, by the MECP.
Tailings slurry is conveyed by a pressurized pipeline from the mill and spigotted around the inside perimeter of the Primary Pond. The surface of the tailings forms a sloped beach allowing for a pond to form at the lowest part. Water is reclaimed (pumped) from the Primary Pond to the mill. Both the primary tailings and reclaim pipes are placed in an engineered ditch, with drainage to an emergency catchment section (with an area of 0.8 ha) at its lowest points and reinforced by construction of earthen berms. The TMF also includes seepage collection and pump back systems at dykes Nos. 1 and 2 at the Primary Pond; these were built to prevent any migration of seepage to Maskinonge Lake.
An Offline-Dyke Barrier (ODB) is currently being constructed downstream of Dyke 1 and 4 ensuring that the natural water features are not touching the toe of the TMF dykes. By constructing this dyke barrier Island Gold’s tailings facility is considered offline by the ministry of Energy, Northern Development and Mines (ENDM) and the approval process will go through ENDM for any future dam raises and not through the Ministry of Natural Resources and Forestry (MNRF),as was previously the case..
The initial TMF was constructed in 1988 under the direct supervision of engineers of Gibson and Associates Inc. (Gibson). The Primary Pond capacity was increased in 2011 by raising, expanding, and adding additional dams or dykes under the supervision of AMEC
Island Gold Mine – Ni 43-101 Technical Report  166
August 31, 2020


alamos2.jpg
Environmental. The capacity of the Primary Pond of the TMF was further augmented in November 2015 to provide an extra six years of tailings deposition by increasing the height of all existing dykes to an elevation of 424 masl, as well as by adding a new dyke, in order to accommodate an additional storage capacity of up to 2.5 Mm3. The maximum operating water level (OWL) is 422.5 masl, with the emergency spillway located 0.3 m metres above at an elevation of 422.8 masl. The minimum OWL is 417 masl to ensure enough water is present in the pond for reclaiming continuously throughout winter.
The Secondary Pond was initially constructed in 1988 alongside the Primary Pond and with Dam A built to capture tailings solution transferred from the Primary Pond and discharge as effluent to the environment pending passing water quality, A subsequent raise was done on the Secondary Pond in 2011 with Dam B and Dam C constructed to an elevation of 399 masl. A spillway was constructed at an elevation of 398.8 masl to convey any water during upset conditions. The minimum OWL is 396.4 masl while the maximum OWL is 398.8 masl. The dams at the Primary Pond have been designed and constructed using the downstream construction method. The body of the dam consists of engineered granular fill, placed in controlled lifts, and compacted. The embankment consists of a partially zoned construction, consisting of an exterior shell, an upstream membrane, a cut-off below grade, and filter systems. Annual inspections have been conducted by geotechnical specialists (WOOD group formerly AMEC Foster Wheeler), confirming overall good performance of the dykes. In 2019 a comprehensive Dam Safety Review (DSR) was completed by Golder Associates in conjunction with the annual Dam Safety Inspection (DSI) to review all phases of the construction, operations, and maintenance of the tailings facility. Nothing deficient was found of the tailings facility, but recommendations for minor improvements will be completed with the 2020 dam raise.
A 3 m tertiary dam raise is occurring in 2020 to bring the dam to elevation to 427 masl. All 5 dykes will be raised 3 metres by the modified downstream method. The spillway will also be raised to an elevation of 425.8 masl.
18.2.10 Water Treatment
Water treatment is managed through natural degradation in the Primary Pond and Secondary Pond. Natural degradation is primarily active during ice-free periods, and batch discharge cycles are timed to accommodate the natural processes. Cycle duration is typically 40 days:
10 days transfer from the Primary Pond to the Secondary Pond
20 days of final polishing at the Secondary Pond, and
10 days discharge of treated water from the Secondary Pond to the receiving environment in a series of streams, wetlands, and ponds, eventually discharging into the central part of Goudreau Lake.
This process can be expedited with the introduction of coagulant and flocculent in the transfer process to reduce total suspended solids (TSS) and metals levels. Total cyanide and ammonia naturally break down via sunlight which is enhanced by adding sulphuric acid to control pH levels and thus increasing microbial activity. Based on these processes, the water treatment is known to reduce site-wide water inventory all while meeting water quality limits prior to discharge.
Water quality is routinely monitored in the Primary Pond and Secondary Pond, and in Goudreau Lake at the discharge point and downstream. A comprehensive water monitoring program has been implemented for the site, and includes twelve compliance sampling locations, and effluent limits as mandated by the MECP. Limits have been established for TSS, total cyanide, copper, nickel, lead, zinc, unionized ammonia, oil, and grease, arsenic and pH. Effluent objectives have also been established for iron, phosphorus, total ammonia nitrogen, and oil and grease (daily).
Island Gold Mine – Ni 43-101 Technical Report  167
August 31, 2020



alamos2.jpg
Notwithstanding, Island Gold Mine also conducts sampling and analyses for other parameters of concerns, for example. metals, anions, hydrocarbons.
Water discharge and takings are recorded and kept in such a manner as to maintain compliance with the applicable regulations. Flow measurement devices have been installed to monitor the discharge of treated water from the Secondary Pond.
Under the previous 2012 ECA, discharge of treated water was seasonal, with the annual treatment and release window being from May 15 to December 31. However, with the amended ECA issued by MECP in November 2016, Island Gold can discharge treated water continuously, which allows increased operational flexibility. This operational flexibility is still maintained with the newly revised April 2020 ECA.
An Operations, Monitoring and Surveillance Manual (OMS Manual) has been prepared for the TMF, which includes operating procedures; inspection programs; repair and maintenance programs; contingency plans and procedures for dealing with potential spills, bypasses and any other abnormal situations and for notifying the MECP; and complaint procedures for receiving and responding to public complaints.
18.3 Phase III Infrastructure Expansion
Island Gold recently undertook a preliminary engineering study on a possible Phase III Expansion to increase underground tonnage rates and implement associated infrastructure upgrades as required. The study involved the evaluation of five scenarios (reduced from 12 during the scoping study), which demonstrated that the Shaft Expansion at a new production profile of 2,000 tpd was the most economic, most efficient, and productive alternative. This also best positions Island Gold to capitalize on further growth in Mineral Reserve and Mineral Resources. The Phase III Expansion will result in the construction of a new shaft amongst many other infrastructure upgrades as listed below:
Development of a new production/service shaft down to 1373 m in depth (initial depth);
Development/implementation of a new ore and waste handling system underground;
Upgrade to the main site power supply;
Construction of a paste plant and underground distribution system;
Upgrade of the existing mill from 1,200 tpd to 2,000 tpd;
Upgrade to the Tailings Management Facility to suit higher and longer LOM production; and
Upgrade to mine dewatering and water treatment system.

The location of the new planned infrastructure is found in Figure 18‑3.
Island Gold Mine – Ni 43-101 Technical Report  168
August 31, 2020


alamos2.jpg
image15.jpg
Figure 18‑3 Phase III Expansion - Surface Infrastructure Location
Island Gold Mine – Ni 43-101 Technical Report  169
August 31, 2020



alamos2.jpg
The new shaft is the foundation for accessing the orebodies at depth. This single plant is designed for future capability of a higher production duty and an increase in ultimate depth from the current plan of 1,373 m to 2,000 m. Figure 18‑4 displays the new mine design and underground infrastructure required to support the planned expansion (Orange is existing development; green is planned development).
The shaft location was chosen based on surface topography/bedrock profile along with optimal placement underground. The shaft will cut across the orebody near the 840 Level, within an area that has been delineated as an uneconomic zone. It is also positioned east of the centroid of the orebody once the shaft comes online, positioning in prime location based on the eastward trend of the deposit for any future Mineral Resources and Mineral Reserves that are added into the Life of Mine plan from exploration results.
18.3.1 Shaft Site
The shaft site is located approximately 2 km away from the existing mill complex and will be accessed via a 5 km access road (combination of existing roads and new access road). The site will house the required infrastructure to support operations and maintenance of the shaft, an ore and waste handling system as well as basic infrastructure to support a dry and possible office complex. Figure 18‑5 displays the planned infrastructure to be located on the shaft site.
The shaft site is composed of the shaft complex (hoist house, headframe, collar house) as well as a new substation and electrical supply, ventilation plenum and office/maintenance complex.
18.3.1.1 Shaft Complex
The shaft complex is composed of the headframe, hoist house and collar house. The hoist house will be composed of an insulated pre engineered building and will house the electrical room and two hoists (one production and one service hoist). The electrical room will not only feed the shaft complex, but also be the main underground feed for the deep portion of the mine, complementing the already existing electrical system underground. The production hoist will be centered square to the shaft whilst the service hoist will be flanked. Figure 18‑6 shows the general arrangement of the hoist house with respect to the shaft and collar house. Room has been allocated in the north end of the hoist house for temporary sinking compressors.
The hoisting/conveyance system will be designed for 2000m in depth operating at 3,500 tonnes per day (ore and waste). At the initial planned sinking depth of 1373m, it will have a 4,500 tpd operating capacity, more then enough to withstand peak mining rates. The service hoist will allow all underground mine personnel to access the underground workings in under 30 minutes, greatly increasing underground productivity when compared to the current ramp access system. Table 18‑2 presents key data on the hoisting plant.
Island Gold Mine – Ni 43-101 Technical Report  170
August 31, 2020


alamos2.jpg
image36.jpg

Figure 18‑4 Phase III Expansion – Underground Development and Infrastructure
Island Gold Mine – Ni 43-101 Technical Report  171
August 31, 2020



alamos2.jpg
image76.jpg
Figure 18‑5 Shaft Site General Arrangement
Island Gold Mine – Ni 43-101 Technical Report  172
August 31, 2020


alamos2.jpg
image16.jpg
Figure 18‑6 Shaft Complex General Arrangement
Island Gold Mine – Ni 43-101 Technical Report  173
August 31, 2020



alamos2.jpg
Table 18‑2 Hoisting Plant Key Data (Production and Service Hoists/Plants)
Hoisting Plant Key Data
Production Hoist
Maximum Hoisting Depth2,000 m
Maximum Hoisting Capacity at Depth:
Ore
2,000 tonnes/day
Waste
1,500 tonnes/day
Total
3,500 tonnes/day
Hoist Availability16 h/day. Dedicated production hoist in
shared-duty shaft.
Production Hoist5 m x 2 m double-drum, single clutch,
4,200 kW RMS.
Skips2 x 12 tonnes capacity
Hoisting Speed15 m/s
Hoisting Cycle and Capacity from 2,000 m198s, 3,500 tonnes/day
Hoisting Cycle and Capacity from 1505 Loading Pocket154s, 4,500 tonnes/day
Skip ChairingFixed chairs with buffers
Applicable Safety FactorsOntario standard (SANS exception not applied)
Service Hoist
Maximum Hoisting Depth2,000 m
Maximum Payload at Depth5 tonnes
Hoist Availability20 h/day. Bratticed shaft to allow concurrent production and service hoisting
Service Hoist Layout4 m x 1.8 m double-drum, single clutch,
1,200 kW RMS.
Cage1 x 5 tonnes double deck. 22 persons/deck
Counterweight1 x 7.5 tonnes
Hoisting Speed7.5 m/s
Trips per Hour to 1275 Level8 trip/hour
Cage CharingCage-mounted guide clamps
Applicable Safety FactorsOntario standard (SANS exception not applied)
The shaft will house two 12 tonne skips in dedicated compartments for ore and waste movement, along with a double deck service cage for the transport of personnel and materials.
The steel headframe will be erected at 59m in height, enough to for allow the addition of ore/waste bins in future design upgrades and will be insulated. It will have two sheave deck levels to serve the production and service hoists, as well as the sinking winches with one set of rear structural supports. The service hoist sheave deck will be located at 42m in elevation while the production hoist sheave deck will be located at 53m in elevation. Modularization of the headframe is being investigated to improve schedule and decrease on site construction/congestion during the construction phase. Figure 18‑7 and Figure 18‑8 display plan and isometric views of the headframe and hoist house.

Island Gold Mine – Ni 43-101 Technical Report  174
August 31, 2020


alamos2.jpg
image84.jpg
Figure 18‑7 Headframe and Hoisting Plant Layout

Island Gold Mine – Ni 43-101 Technical Report  175
August 31, 2020



alamos2.jpg
image83.jpg Figure 18‑8 Headframe and Hoisting Plant Isometric
The concrete shaft sub collar will be primarily used for routing services in and out of the shaft, as well as for the ventilation plenum. The collar house will be constructed with metal cladding and will be insulated. It will be located on the cage side of the shaft and will be the primary access point for personnel and material.
18.3.1.2 Shaft and Shaft Stations
The shaft layout is shown in Figure 18-9. The shaft will be concrete lined, measuring 5 m internal finished diameter. The shaft size has been determined based on several parameters including ore and waste production requirements, intake ventilation, installed permanent services, service hoisting and constructability during shaft sinking.
The shaft will have three shaft stations (840 Level, 1060 Level, 1275 Level) as well as a Loading Pocket on 1305L. Each shaft station will be utilized to access the main mine horizons and coincide with the main exploration drifts underground. Figure 18‑10 displays a shaft riser diagram.


Island Gold Mine – Ni 43-101 Technical Report  176
August 31, 2020


alamos2.jpg
image51.jpg
Figure 18‑9 Production Configuration Shaft cross Section

Island Gold Mine – Ni 43-101 Technical Report  177
August 31, 2020



alamos2.jpg
image14.jpg
Figure 18‑10 Shaft Riser Diagram (Note: Shaft Bottom 1373 m and 1340 Level are Same Elevation)
All shaft stations will have an electrical substation as well as other main mine services. The shaft will have a single loading pocket located on 1305L and the shaft bottom will be accessed via a ramp.
The initial sinking depth will be set at 1,373 m from the collar, with the loading pocket set at the 1305 Level. It is important to note that Island Gold is not limited to this initial sinking depth and has the option of extending the shaft bottom to as deep as 2,000 m, with the possibility of repositioning the loading pocket/bin arrangement to a deeper level, should the orebody prove out at depth (beyond 1,500 m).
Island Gold Mine – Ni 43-101 Technical Report  178
August 31, 2020


alamos2.jpg
A conventional blind sinking method was chosen to minimize any negative impact the project would have on Island Gold’s current operations. Options such as raise boring and/or internal winzes were examined but were deemed to risky to current operations and would result in a lowered mining rate to accommodate any extra waste or raise bore cuttings requiring trucking to surface from underground.
18.3.1.3 Ore & Waste Handling System
The underground ore and waste handling system is designed to accommodate 2,000 tpd of ore and an additional 1,500 tpd of waste for any future mine expansion. This system is designed to transport the mine ore and waste rock from all underground mining zones to one common rock breaking station. In general, the material will be moved through the respective passes with dump access and finger raises (intermediate station) to the rock breaker station.
The underground ore and waste handling system will be composed of one loading pocket, one underground bin arrangement and three primary dump points in ore and waste passes. The ore and waste passes will be excavated between the main exploration levels. Figure 18‑11 depicts the process flow diagram for the system.
The ore and waste handling system will be sized for hoisting at the 1275 Level rock breaker station. This will be fed directly by the ore pass system above the level and will be located above the bin. The bin collar will be on the 1275 Level and the bin bottom on the 1305 Level. The rock breaker station will consist of a recessed grizzly, scalping bars, rock breaker and picking arm, with a feed chute complete with press frame and control chains (Figure 18‑12).
The material sized through the rock breaker station will be dropped into the underground bins to then discharge onto the 1305 Level apron feeder. This will then discharge onto the loadout conveyor and subsequently to the loading pocket. The grizzly will be sized to 400 mm x 400 mm.
The loading pocket will be a conventional design, similar to those in use at Alamos’ other Ontario operation Young-Davidson. The conveyor will discharge to a transfer car to alternatively divert material to one of two measuring flasks. Each measuring box discharges into the parked skip in the shaft via dedicated discharge gates and arc gate controls.
Both the ore/waste bin and the loading pockets will have load cells and volumetric measurements to ensure optimal loading of skips that will be monitored remotely and locally.

Island Gold Mine – Ni 43-101 Technical Report  179
August 31, 2020



alamos2.jpg
image5.jpg
Figure 18‑11 Underground Ore and Waste Handling System Process Flow Diagram

Island Gold Mine – Ni 43-101 Technical Report  180
August 31, 2020


alamos2.jpg
image88.jpg
Figure 18‑12 1275 Level Rock Breaker Station – Section View
Island Gold Mine – Ni 43-101 Technical Report  181
August 31, 2020



alamos2.jpg
The material sized through the rock breaker station will be dropped into the underground bins to then discharge onto the 1305 Level apron feeder. This will then discharge onto the loadout conveyor and subsequently to the loading pocket. The grizzly will be sized to 400 mm x 400 mm.
The loading pocket will be a conventional design, similar to those in use at Alamos’ other Ontario operation Young-Davidson. The conveyor will discharge to a transfer car to alternatively divert material to one of two measuring flasks. Each measuring box discharges into the parked skip in the shaft via dedicated discharge gates and arc gate controls.
Both the ore/waste bin and the loading pockets will have load cells and volumetric measurements to ensure optimal loading of skips that will be monitored remotely and locally.
18.3.1.4 Electrical Upgrades
A new 15 kV substation as well as a pole line tying into the Algoma Power supply will be installed and commissioned on the new shaft site. The substation will provide power to the surface infrastructure on the shaft site, as well as provide power underground to the deeper portion of the mine. The substation will be designed in such a way as to not only provide power to the deep portions of the mine, but also to support existing operations if the existing substation would fail, by back feeding the underground circuit. This provides redundancy to the underground 15 kV supply, thereby de-risking the underground operation substantially.
An emergency diesel generator will also be installed to supply power to the service hoist for emergency back up power, should the mine site loser power and need to power up the hoist to bring the cage to surface.
18.3.1.5 Ventilation Upgrades
The shaft will also be a new source of fresh air for the deep portion of the mine. A plenum will be driven from surface to tie into the shaft just beneath the sub collar. Two axial fans in parallel will be used to supply approximately 300,000 cfm to the bottom of the shaft. An underground booster fan station will also be commissioned to help overcome the shaft and mine resistance. Direct fired propane burners will also be installed on the intake portion of the fans to heat the air during winter months.
A new series of internal return/fresh air raises will be driven to accommodate the new influx of fresh air from the shaft. These raises will tie together the main exploration drifts, reducing the air velocities in the ramp, mitigating dust related issues in the ramp.
18.3.2 Site Power Transmission Upgrade
Island Gold is currently tied into API’s 44 kV powerline running from Hawk Junction to site. This line currently supplies power to a neighbouring project (Magino), as well as a limited amount to back country residential properties.
Island Gold is currently allocated approximately 12 MW and utilizes 9.5 MW on average per year. With the Phase III Expansion, Island is expecting to draw an additional 17.5 MW, totaling 27 MW at its peak productive years. The existing transmission line does not have sufficient capacity to supply the additional 17.5 MW required for the project.
Island Gold has provided API with its forecasted load demand (connected and average) and is in the process of discussing the power upgrade alternatives and execution schedule to meet expected power demand at site.
Island Gold Mine – Ni 43-101 Technical Report  182
August 31, 2020


alamos2.jpg
18.3.3 Paste Backfill
As a result of the study carried out for establishing stope stability, it was demonstrated that backfilling was necessary as mining of different zones will be performed on several levels. The recommended backfill is paste backfill.
Filtered tailings from the process plant will be used as aggregate for paste backfill. The paste plant is incorporated into the process tailings dewatering circuit and includes thickening, filtration, mixing, and batching equipment. Paste will be gravity-fed to the stopes via the underground distribution system (UDS).
The following factors were considered when selecting the type of paste backfill circuit suitable for the mine:
testwork results for material characterization, dewatering, rheological characterization, flow loop testing and unconfined compressive strength (UCS) testing,
tailings production will be nominally 88 tph based on a 2,000 average tpd ore processing rate with 94.5% Mill availability,
the average stope size is 6 m wide, 25 m high and 28 m long,
the backfill UCS required for mining was estimated based on the average stope dimensions and using the Mitchell Equation, and
mining will be longitudinal retreat in a bottom-up sequence, with only sill extraction mining occurring under backfill.
18.3.3.1 Filtration and Mixing
Filtering tailings and mixing the constituents of paste are critical stages in the production of paste backfill. These stages affect the strength and quality of the paste produced, therefore, several options for filtering and mixing were studied. Testwork was performed to determine the most suitable method for filtration and mixing for this application.
Results from testwork determined that a paste backfill plant with a pressure filter and batch mixer are most suitable for this application. The principal reason pressure filtration is preferred to vacuum filtration has to do with the filter cake solids content and the effect it has on the paste slump. The key reasons batch mixing is preferred to continuous mixing has to do with the tailings’ sensitivity to water content, the friction factors in the UDS from the slump variability, precision of slump control and the relatively low throughput which lends itself to a batch mixing process.
Filter cake solids content (75.8 – 78.2 wt% solids) from vacuum disc filtration is close to that of the solids content of 254 mm (10-inch) slump paste (75.5 wt% solids). This facilitates little room for accurate slump control with vacuum filtration, considering the possible variability associated with the moisture content of the filter cake. Pressure filtration results indicated filter cake solids content can achieve 86.6 – 91.7 wt% solids with air drying, which allows an acceptable buffer to the paste slump and will allow for adequate process control. It is also important to note that to maintain a gravity UDS, inadequate process control will affect the friction factors of the system. The flow model indicates that, especially during delivery to the extremities of the mining area, an increase in the friction factor associated with the paste slump, could inevitably result in system blockage. This makes the solids content in the filter cake a critical consideration when selecting a paste flowsheet.
Island Gold Mine – Ni 43-101 Technical Report  183
August 31, 2020



alamos2.jpg
Results from testwork show that the tailings are sensitive to water content. The high level of sensitivity effects the consistency of the paste produced and will potentially cause significant friction losses in the delivery pipelines. Mixing in batches allows for a greater degree of accuracy when measuring the quantity of tailings, water, and binder in each batch. This permits more accurate slump control compared to continuous mixing.
Batch mixing mitigates off-spec paste from entering the UDS, while continuous mixing has a period of adjustment where some off-spec paste may enter the UDS before the system corrects the slump, and/or operators stop the system.
At the relatively low throughput of 88 dry tonnes per hour, mixing in batches is a suitable method for this application.
18.3.3.2 Paste Plant Process Overview
An overview of the process components of the paste plant follows (Figure 18‑13 and Figure 18‑14):
Tailings from the mill will be pumped to the thickener feed box at the paste plant. Thickened tailings from the thickener are pumped to the filter feed tank, which acts as a buffer between the thickener and the filter. The filter feed tank will normally be full prior to the start of production of backfill and effectively acts as a storage tank. During paste production, the filter feed tank continues to be fed with the thickener underflow to extend paste production operation time.
From the filter feed tank, a portion of tailings will be pumped to the pressure filter to produce a high-density filter cake with the remaining portion sent directly to the batch mixer. The proportion of thickened tailings sent to the filter and bypass sent to the mixer is determined based on the desired backfill slump and target solids content. The filter cake is then transported to a hopper located on top of a live bottom feeder via a filter cake conveyor. There is approximately 40 minutes of storage capacity in the hopper above the live bottom feeder.
The live bottom feeder is intended to break up the chunks of filter cake and prevent bridging. The discharge rate of the live bottom feeder will be measured and controlled by a weightometer on the mixer conveyor, which will increase or decrease the motor speed of the live bottom feeder to maintain a constant mass flowrate of tailings on the conveyor.
A batch mixer is used to combine the various batch constituents into the final paste product where the filter cake is mixed with a set ratio of ground iron blast furnace slag, Portland cement and tailings slurry, to produce a consistent paste slump. The batch mixer power draw is constantly measured, and tailings slurry is added to the mixer to adjust the actual power draw required to obtain the desired slump.
The paste is then discharged from the batch mixer to a paste hopper. The paste hopper provides surge capacity for the discharge of the batch mixer to keep paste continuously entering the UDS, thereby ensuring the underground system does not run empty. Load cells on the paste hopper ensure that the material in the hopper is maintained above a minimum level to prevent the risk of air entering the distribution system.
A mixer dust collector attached to the batch mixer will prevent the release of any cement dust from the mixer, with the dust falling into a binder screw conveyor to be re-used in the process.
Three binder silos have been included adjacent to the paste plant, allowing for the storage of 750 tonnes of binder. The 750 tonnes capacity offer approximately seven days of storage when the plant is operating continuously at 2,000 tpd, with a nominal 4 wt% binder addition rate.
Island Gold Mine – Ni 43-101 Technical Report  184
August 31, 2020


alamos2.jpg
To ensure paste quality and strengths are consistent and meet the required strength targets, quality assurance and control functions will include periodic slump, filter cake moisture content and UCS cylinders testing at set intervals.
Island Gold Mine – Ni 43-101 Technical Report  185
August 31, 2020



alamos2.jpg
image13.jpg
Figure 18‑13 Paste Plant General Arrangement Overview

Island Gold Mine – Ni 43-101 Technical Report  186
August 31, 2020


alamos2.jpg
image87.jpg
Figure 18‑14 Paste Plant Process Flow Diagram
Island Gold Mine – Ni 43-101 Technical Report  187
August 31, 2020



alamos2.jpg
18.3.3.3 Paste Plant Location
Locating the paste plant near the existing 13.8 kV substation was determined to be the most suitable position for the plant (Figure 18‑15). The key elements for selecting this site include the proximity to an electrical supply, the surface paste boreholes will be directly adjacent to the paste plant, the surface borehole target level on the 340 Level and the associated lower capital and operating costs.
The nearby electrical substation will supply the required 2,200 kW (connected power) to operate the paste plant. The proximity to the substation mitigates the cost of overhead powerlines and/or long cables between the substation and the paste plant’s motor control centre.
The paste plant will be located next to the surface paste boreholes which allows for approximately 64° to 65° dip on the holes which is closer to the ideal angle for paste backfill (70°) than other options that were studied.
The selected location for the paste plant is advantageous as it allows for filling the stopes to the 340 Level level which offers greater coverage than other options considered without the use of a booster station.
image63.jpg
Figure 18‑15 Paste Backfill Plant Site Plan
18.3.3.4 Underground Distribution System (UDS)
The UDS has been designed to accommodate the current and future mine design (Figure 18‑16).
The system will operate by gravity using 150 mm (6”) boreholes and pipelines. The paste will be delivered at a 254 mm (10-inch) slump and a nominal 4 wt% binder addition rate. The
Island Gold Mine – Ni 43-101 Technical Report  188
August 31, 2020


alamos2.jpg
design flow rate for the system is based on 92 tph (2,000 tpd) of solids (tailings and binder combined) reporting the UDS.
The UDS will be composed of permanent main line sections, which include the main borehole from surface, piping on the main levels, interconnecting underground boreholes, sub-level piping and semi-permanent branch lines, which extend from a main line to the stopes.
The main boreholes will be routed from surface to 340 Level. The main surface boreholes will be provided with two additional standby boreholes, while the reticulation underground will consist of one operating borehole. The boreholes will not be cased since they are assumed to be geotechnically stable and not subject to stresses that would result in deformation or irreparable damage.
It was determined that the most effective means of delivering paste to the stopes would be to maximize the number of interconnecting boreholes between levels. The boreholes were kept at an angle between 60° and 70° from the horizontal.
The longest distribution system route to the bottom of the mine in the flow model is about 3,435 m, resulting in a paste transit time of about 60 minutes to travel from the paste plant to the stope. This is at the upper recommended cemented paste residence time in a UDS. Should the paste residence time increase beyond this point, consideration should be given to the introduction of a hydration retarder to the paste mixture.

Island Gold Mine – Ni 43-101 Technical Report  189
August 31, 2020



alamos2.jpg
image50.jpg

Figure 18‑16 Underground Distribution System (Long Section View)


Island Gold Mine – Ni 43-101 Technical Report  190
August 31, 2020


alamos2.jpg
18.3.4 Tailings Management under Phase III Expansion
This section summarizes the work undertaken to analyze and compare the potentially viable tailings disposal options for Island Gold as part of the Phase III Expansion project. The tailings disposal options considered included the following:
Conventional disposal within the Primary Pond with no cemented paste backfill
Conventional disposal within the Primary Pond with cemented paste backfill
Thickened tailings disposal within the Primary Pond with no cemented paste backfill
Thickened / Filtered tailings disposal within the Primary Pond with cemented paste backfill
Filtered tailings disposal within a new “dry-stack” facility with no cemented paste backfill
Filtered tailings disposal within a new “dry-stack” facility with cemented paste backfill
For the purposes of this study, it was assumed that the earliest the cemented paste backfill plant would start operation would be at the beginning of 2024. Therefore, with respect to Primary Pond construction, it was assumed that dyke raises to elevation 427 m would be required in 2020 and that a dyke raise to elevation 430 m will be required sometime between 2023 and 2025 depending on the disposal option considered. For the cases that consider the use of cemented paste backfill, the average percentage tailings reporting to surface versus underground (beginning in 2024) varied depending on the production rate, as follows:
1,200 TPD maximum – 42% to underground
1,600 TPD maximum – 48% to underground
2,000 TPD maximum – 48% to underground
No changes to the Secondary Pond capacity and general water management strategy were considered with respect to its use as a secondary clarifier of tailings pond water prior to discharge to the environment.
A summary of the dyke raising requirements for each of the disposal options within the Primary Pond are provided in Table 18‑3. Table 18‑4 summarizes general characteristics of the filtered tailings dry stack option.
Based on a comparison of each option against various technical, environmental, and socio-economic criteria, the option involving conventional disposal within the Primary Pond in combination with cemented paste backfill underground was chosen as the preferred option. For the conventional disposal with cemented paste backfill option, only two additional dam raises above elevation 427 m would be required (Stages 5 and 6a) to an ultimate crest elevation of 432 m to store the projected life of mine tailings. Figure 18‑17 provides the ultimate configuration of the Primary Pond TSF for the preferred option. Dykes 1, 3 and 4 would be raised via the downstream method of construction, while Dykes 2 and 5 would be raised via the centre-line method. In general, it was determined that this option would be the simplest of the technologies to implement and requires the least intensive effort from an operational oversight perspective. Raising of Dykes 2 and 5 by the centre-line method would also save on some earthworks quantities as compared with downstream raising, while satisfying stability requirements.

Island Gold Mine – Ni 43-101 Technical Report  191
August 31, 2020



alamos2.jpg
Table 18‑3 TSF Dam Construction Timelines and Storage Capacity Summary
Construction StageMaximum Daily Production Rate (tpd)Average Daily Production Rate (tpd)Maximum Dam Crest Elevation (m)
Storage Capacity for Tailings above Elev. 424 m (M-m3)
Dyke Raise Timelines
Conventional Disposal with No Paste BackfillConventional Disposal with Paste BackfillThickened Tailings Disposal with No Paste BackfillThickened Tailings Disposal with Paste Backfill
Stage 41,2001,2004271.472020
Stage 51,2001,2004303.122023202420242025
1,6001,400
2,0001,478
Stage 6a1,2001,2004324.12N/A2033N/A2036
1,6001,40020302033
2,0001,47820292032
Stage 6b1,2001,2004334.6220282031N/A
1,6001,40020272029
2,0001,47820272029
Stage 7a1,2001,2004355.62N/AN/A2036N/A
1,6001,4002033
2,0001,4782032
Stage 7b1,2001,200436.56.322033N/AN/AN/A
1,6001,4002031
2,0001,4782030

Table 18‑4 Filtered Tailings Dry Stack Options – Storage Capacity and Annual Rate of Rise

Maximum Daily Production Rate (tpd)Average Daily Production Rate (tpd)
Total Volume to be Deposited (M-m3)
Average Rate of Rise (m/yr)Maximum Height (m)Maximum Elevation (masl)
No Paste BackfillWith Paste BackfillNo Paste BackfillWith Paste BackfillNo Paste BackfillWith Paste BackfillNo Paste BackfillWith Paste Backfill
1,2001,2004.12.510.941615409408
1,6001,4001.231.15
2,0001,4781.331.25
Island Gold Mine – Ni 43-101 Technical Report  192
August 31, 2020


alamos2.jpg
image21.jpg
Figure 18‑17 Ultimate Configuration of the Primary Pond TSF
Island Gold Mine – Ni 43-101 Technical Report  193
August 31, 2020



alamos2.jpg
18.3.5 Water Treatment
This section describes the water treatment plan for the Phase III Expansion. Golder Associates Ltd. (“Golder”) conducted an alternatives assessment to select a preferred water treatment alternative as part of a pre-feasibility level study for tailings and water management (Golder 2020a). This section describes what was considered for the water treatment alternatives assessment and what alternative was selected.
18.3.5.1 Design Flow and Water Management Options
Water and mass balances were prepared for each of the following production cases:
1,200 tpd (current production)
1,600 tpd
2,000 tpd
For the assessment, mine production was assumed to be level on a monthly average basis. The analysis considered both seasonal treatment, reflecting the existing operations, and continuous treatment of pond water.
A summary of the annual pond transfer flows is provided in Table 18‑5.
Table 18‑5 Summary of Island Gold Water Flows
ParameterUnits1,200 TPD Case1,600 TPD Case2,000 TPD Case
Total annual transfer flows from Primary Pond to Secondary Pond (average year)
m3/yr
1,310,0001,295,0001,285,000
Total annual environmental discharge flows from Secondary Pond (average year)
m3/yr
2,506,0002,478,0002,471,000
Notes:
Annual transfer flows include approximately 650,000 m3/yr of mine water discharged to the Primary Pond. In the selected alternative, this flow will be eliminated.
Water treatment scenarios were developed using current and predicted loadings from operations to develop mass balances for key constituents of potential concern at a conceptual level. Key flow parameters from the water balance are provided in Table 18‑6.
Table 18‑6 Water Balance Parameters for Water Treatment Design– Average Years
ParameterUnits1,200 TPD Case1,600 TPD Case2,000 TPD Case
Mine annual dewatering flows
m3/yr
651,525651,525651,525
Total discharge from mill to tailings facility
m3/yr
446,837522,923551,945
Reclaim water volume
m3/yr
455,885535,090565,861
Precipitation inputs to Primary Pond, net of evaporation
m3/yr
484,080484,080484,080
Precipitation inputs to Secondary Pond, net of evaporation
m3/yr
1,184,1511,184,1511,184,151
Ammonia sources were based on the mine dewatering flow and historical water quality, combined with the ammonia generated from cyanide destruction. Cyanide sources were based on historical values in tailings and estimates of the residual after the cyanide destruction process. Cyanide destruction was applied selectively if applicable.
Island Gold Mine – Ni 43-101 Technical Report  194
August 31, 2020


alamos2.jpg
18.3.5.2 Design Effluent Design Basis
The values shown in Table 18‑7 illustrate the water quality targets for the water being discharged into the environment from the Secondary Pond under the existing authorization. The treatment systems are designed to meet the effluent targets for water entering the Secondary Pond, thus this pond is used for polishing and as a buffer. Work is under way to update the discharge permit.
Table 18‑7 Island Gold Mine Effluent Design Basis
ParametersEffluent Design Basis
DailyMonthly
Total Ammonia (TAN)10 mg/L
Free Ammonia0.20.1
pH6.0–9.5
Total Cyanide2 mg/L1 mg/L
Total Phosphorus1 mg/L
Total Copper0.6 mg/L0.3 mg/L
Total Iron1 mg/L
Total Suspended Solids30 mg/L15 mg/L
Acute Toxicity (daphnia magna and rainbow trout)
Non-toxicNon-toxic
18.3.5.3 Water Treatment Alternatives
Based on the evaluation of historical water quality for the Primary and Secondary Ponds, the removal of cyanide and nitrogen species is expected to be the principal driver for the selection of treatment technologies, with a secondary emphasis on removal of Total Suspended Solids (TSS) and trace metals. The following constituents were considered in the selection of treatment technologies:
Nitrogen species, including ammonia (NH3/NH4+), nitrite (NO2-) and nitrate (NO3-); and
Cyanide species, broadly classified as free cyanide, weak-acid-dissociable (WAD) cyanide, and total cyanide.
Screening of alternatives considered a range of factors including seasonality, mill throughput, type of tailings management and the effects on the site water balance, tailings solid content, impact on water quality of cyanide detox, and seasonal natural degradation effects. The screening matrix of options considered whether a cyanide detox process would be implemented, and whether a paste backfill plant would be implemented and whether discharge to the environment is seasonal or continuous. The current operation discharges seasonally. The screening process consisted of:
Initially fourteen water treatment scenarios were considered, and mass balances were developed for each of three production cases (1,200, 1,600, 2,000 tpd) resulting in 42 mass balances;
Mass balances were used to reject options that represent the highest loading (and highest cost) for water treatment systems;
At a secondary level, twelve options were considered with the three production cases and were subjected to peer review, considering: interface with production, complexity, operability and other measures; and
Island Gold Mine – Ni 43-101 Technical Report  195
August 31, 2020



alamos2.jpg
Finally, four options focusing on the 1600 production case were carried forward to Class 4 cost estimates.
For example, if a paste backfill plant were selected, then the paste thickener provides an opportunity to recycle post-leach cyanide values and will reduce loading in ponds or treatment systems. Screening led to selection of four water treatment options to be carried forward. Capital and operating cost estimates were prepared to a Class 4 level for treatment systems needed under these options.
Option 1A Conventional Tailings with Continuous Mine Water Treatment and without Paste Backfill Thickener, without Detox. This reflects the tailings management system and water balance that is currently practiced, considering increased mill throughput, and with a new treatment plant for underground mine water. This option reduces the inflows to the Primary Pond, and therefore increases retention time in that pond.
Option 1B Conventional Tailings with Paste Backfill Thickener, Mine Water Treatment, without Detox. This option is the same as Option 1A, but with the addition of the thickener (assumed to be part of a paste backfill plant). The capital cost is similar to Option 1A, but with the addition of an allowance for pumping. This option is applicable to conventional tailings and does not consider a cyanide detox system. The implementation of paste backfill without the implementation of cyanide detox is subject to further work.
Option 2A Seasonal Treatment with Paste Backfill Thickener, and Detox, and Primary Pond Water Treatment. This option considered the case that paste backfill and detox of tailings is implemented for the proportion of tailings used in backfill. This option assumes a portion of the post-leach cyanide can be recovered, upstream of detox. This option considers providing seasonal treatment, at a higher capacity. Seasonal treatment assumes natural degradation of cyanides and ammonia can take place in the Primary Pond within the ice-free periods. Seasonal treatment therefore considers a higher flow and a lower complexity of treatment.
Option 2B Continuous Primary Pond Treatment with Paste Backfill Thickener, with Detox. This option is similar to Option 2A, but treatment systems are sized to run year round, without reliance on natural degradation.
18.3.5.4 Water Treatment Upgrades
Option 1B was selected by Island Gold as the preferred option for the water treatment plant (WTP) upgrades, with the assumption that the mine will continue to use conventional tailings, with paste backfill for 48% of the tailings, and assuming cyanide detox upstream of paste will not be required. These assumptions will be validated through further work prior to being implemented. The treatment plant capacity is assumed to be up to 1,800 m3/d, based on historical flows in the mine water. The capacity of the WTP will be reviewed with hydrogeological predictions for the future mine water production, since as the underground mine deepens and expands, flows could increase. The treatment plant is not sized to manage loadings in the Primary Pond, and natural degradation in that pond will continue to be relied on. The proposed WTP consists of:
Slimes removal pond for underground mine water, using an existing bermed area, insulated to retain heat for subsequent treatment;
Physical-Chemical pre-treatment plant, consisting of a reactor tank with iron salt addition and pH control, sludge recycle, and a compact clarifier;
Plant makeup water storage tank and pump package;
Island Gold Mine – Ni 43-101 Technical Report  196
August 31, 2020


alamos2.jpg
Reagent makeup systems including: sodium hydroxide tank, bulk bag handler, mixer, pump, polymer make-up and dosing unit, phosphoric acid dosing pump, and storage tote; and
A Submerged, Aerobic, Gravel Bed Reactor (SAGR) for continuous year-round biological oxidation of ammonia and nitrite to nitrate in underground mine water, including: feed pump, recycle pump, effluent pump, inlet distribution gallery, blowers, manifold piping and fine bubble diffuser distribution piping.
Island Gold Mine – Ni 43-101 Technical Report  197
August 31, 2020



alamos2.jpg

19 MARKET STUDIES CONTRACTS
19.1 Market studies
No market studies were conducted by Alamos. Gold is a freely traded commodity on the world market for which there is a steady demand from numerous buyers.
19.2 Metal Pricing
Revenues were calculated using a gold price of USD$1,450 per ounce at an exchange rate of $0.75 USD/CAD.
Island Gold Mine – Ni 43-101 Technical Report  198
August 31, 2020


alamos2.jpg

20 ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL OR COMMUNITY
IMPACT
From exploration to operations to closure, one of the goals at the Island Gold Mine is to safeguard the environment, educate its employees and the communities about the mine’s environmental programs and commitments, and apply best management practices to prevent or mitigate any potential environmental impacts. The operations at Island Gold use a range of materials and consumables that includes explosives, chemicals, and fuels.
This section will provide a description of the environmental, permitting, social and community, and sustainability components relating to the Island Gold Mine operations, and will also cover mine closure and reclamation at Island Gold.
20.1 Existing Conditions
20.1.1 Past and Current Land Use
The Goudreau area has a history of mining dating back to the discovery of gold in the early 1900s. Several small gold mines and open pit pyrite mines have been active in the area in the past. Between the late 1920s and early 1940s, the area was also subjected to intensive prospecting for gold. There had been historic mining operations discharging tailings into lakes including Goudreau Lake, resulting in an alteration of water and sediment quality.
Current land use in the Island Gold Mine area consists primarily of forestry operations, mining and exploration activities, tourism, and recreation. The project area is occupied and surrounded by historically and periodically harvested forest lands.
Exploration programs have periodically occurred throughout the region’s past to support potential future mining operations.
Recreational activity consists primarily of fishing, hunting, and snowmobiling. A hunting/fishing camp, for summer cottagers, is in the Lochalsh town site, approximately 15 km north east of the project site. Summer cottage homes also exist approximately 8 km west of the mine site.
There are no permanent residences located in proximity to the mine area.
20.1.2 Topography and Soils
The site is located within a physiographical region described as a bedrock-drift complex. Regional topography is bedrock-controlled and is characterized by a sequence of east-northeast trending rounded hills and ridges. The valleys and low-lying areas between ridges are generally characterized by the presence of interconnected wetlands, streams, and lakes (such as Maskinonge Lake and Goudreau Lake). Site relief is generally low, with low to moderate surface slopes and elevation differentials typically in the range of 5 m to 10 m. The site’s highest elevations are encountered north of the primary pond area (approximately 470 masl) and the site’s lowest elevation is at Goudreau Lake (381 masl).
Overburden soils are relatively uniform with types generally being topsoil, sand, and till. These overlay bedrock at greater depths.
20.1.3 Climate
The Wawa region climate is humid continental. Temperature extremes are moderated and precipitation patterns are altered by its proximity to Lake Superior. 2019’s average annual
Island Gold Mine – Ni 43-101 Technical Report  199
August 31, 2020



alamos2.jpg
temperature was 1.1 °C with a monthly average minimum temperature of -16.5°C recorded in January and a monthly average maximum temperature of 15.2 °C recorded in July, respectively. Daily extreme temperatures of -40.8 °C and 27.4 °C were recorded at Environment Canada’s Wawa A station (ID 6059413).
Average total annual precipitation is estimated around 980 mm, of which approximately 70% falls as rain and 30% as snow. Total average evaporation is projected to be approximately 520mm. The precipitation and evaporation vary year-over-year and can fluctuate based on numerous factors. Nearly half of the annual snowfall occurs in December and January, while maximum rainfall occurs from June to October. Snow is generally present on the ground from November to April. Ice on Primary and Secondary Ponds do not completely dissipate until Mid-May.
20.1.4 Water
The Island Gold Mine is located within the Maskinonge Lake and Goudreau Lake sub-watersheds (total area of 48.2 km2), approximately 40 km south of the Arctic drainage divide. Both sub-watersheds are part of the Michipicoten-Magpie watershed and Lake Superior Drainage Basin. Surface water drainage at the site is bedrock-controlled, generally flowing from northeast to southwest within the valleys between the elongated hills and ridges.
The Maskinonge Lake catchment covers the northwest part of the mine site. Drainage from the northeast part of the mine site reports to this catchment, including drainage north of the mill and the wetland area to the northeast of the primary pond. The water flows in a southerly direction through the upper stretches of Goudreau Creek via meandering stream and wetland, eventually reporting to Bearpaw Lake and, ultimately, to Goudreau Lake. The Goudreau Lake catchment covers the entire site, including both the tailings management facility and Maskinonge Lake catchments, and drainage areas to the east of the site. Goudreau Lake outflows to a creek in a southerly direction towards the Michipicoten river and ultimately discharges to Lake Superior.
Water depths in Goudreau Lake vary substantially. A 2019 bathymetry was conducted on the Goudreau Lake. Goudreau Lake can be divided into two distinct sections based on its bathymetry; an upstream basin, where depths between 14 m and 23 m are observed in deeper pool sections, and a second, much shallower basin, where depths do not exceed 2 m. The second basin is connected to the lake discharge and to the first deeper basin by a narrow and shallow corridor.
Water quality studies have been conducted since 1985 and they show some alteration in water quality in Goudreau Lake as a result of the impact of two historical mining operations in the area. Historically, sampling at stations upstream of Goudreau Lake (i.e., Maskinonge Lake, Miller Lake and Goudreau Creek) showed lower background levels of pH, conductivity, and alkalinity similar to the Goudreau lake downstream stations. Additionally, the former Magino Gold mine discharged tailings directly to the west of the upper basin of Goudreau Lake during the middle to late 1930s. Sediments in this portion of the lake are composed of natural sediments and historic tailings. Despite these increased loadings, data has indicated that the water quality in the upper basin of Goudreau Lake was quite good. Historic tailings have been also deposited into Pine Lake from the operations of the Edwards Mine.
The mine is required to have an on-going water balance model which tracks all inputs and outputs out of the system on a monthly basis.
Final treated effluent from the mine flows into the upper portion of Goudreau Lake via Goudreau Creek. Fresh water is taken from Maskinonge Lake, which is then treated via a domestic water treatment plant (WTP) to provide water for the mine and makeup water for processing. Water for mill use is reclaimed from the Primary Pond of the Tailings Management Facility. Water in the mine is currently reused, any excess is pumped, via a multi-stage pumping
Island Gold Mine – Ni 43-101 Technical Report  200
August 31, 2020


alamos2.jpg
system (comprised of sumps/pumps at various levels in the mine) to the Primary Pond on the surface. Underground water from the Lochalsh is pumped to either the Primary or Secondary Pond. A visual representation of the site’s hydrologic system site is shown in Figure 20‑1.
Tailings, water management and final effluent monitoring and quality requirements are regulated under an amended ECA (No. 9118-B9CM3R) which was issued in May 2019. This ECA also allows for a mill production rate of up to 38,480 tonnes per month.
Additional monthly surface water quality monitoring is conducted by Island Gold Mine at two locations in Goudreau Lake (the receiving water body), one on Maskinonge Lake and one on Pine Lake. Both Maskinonge Lake and the upper basins of Goudreau Lake would be characterized as meeting provincial objectives. For the most part, metal concentrations were below their respective Provincial Water Quality Objectives (PWQO), with levels of many metals below the Method Detection Limit (MDL). Annual results have been comparable from 2007 to 2019.
In addition to the monitoring completed in conjunction with Environmental Compliance Approval (ECA) requirements, the site is subject to the Federal Metal and Diamond Mining Effluent Regulations (MDMER). As required under MDMER, Environmental Effects Monitoring (EEM), studies started in 2005 and have continued since then, with the most recent field program for the Cycle 5 EEM study completed in the fall of 2019 (final report is expected in late 2020).

Island Gold Mine – Ni 43-101 Technical Report  201
August 31, 2020



alamos2.jpg
image39.jpg
Figure 20‑1 Island Gold Hydrologic System
Island Gold Mine – Ni 43-101 Technical Report  202
August 31, 2020


alamos2.jpg
20.1.5 Groundwater
The site is located within a bedrock-drift complex physiographical region characterized by thin overburden or exposed bedrock in the highland areas and waterlogged wetlands in low-lying areas. There are no known or potential groundwater users within several kilometres of the site. There is no current usage of groundwater resources on site.
A hydrogeological study of the Island Gold Mine site was conducted by Exp Services Inc. (“Exp”) in 2013 with additional monitoring wells drilled in 2017. This included installation of ten groundwater monitoring wells across the site. Depth to groundwater ranged from 1.32 m to 11.7 m below ground surface. Regional groundwater flow direction in both overburden and bedrock is southward toward Goudreau Lake.
A groundwater monitoring program has been in place since 2013 with regular monitoring of groundwater levels and quality. Samples from the groundwater wells have been tested for various parameters including metals, cyanide, hydrocarbons, and anions, with no exceedances of the Ontario drinking water quality guidelines.
20.1.6 Air
Air and noise discharges are regulated under an amended ECA, No. 1821 BAWLAC which was issued in May 2019 to the Island Gold Mine, allowing for an annual ore processing rate of 461,760 tonnes per year.
The ECA requires that the Island Gold Mine be in compliance with Ontario Regulation 419/05, applicable MECP Guidelines for Air and Noise, and other performance requirements as specified in their conditions. It allows modifications such as process changes, de-bottlenecking, or addition of new equipment subject to limits on operational flexibility.
Emission Summary and Dispersion Modelling (ESDM) reports have been prepared in accordance with Section 26 of Ontario Reg. 419/05 in 2009 by Blue Heron Environmental (“Blue Heron”) and in 2014 and annually thereafter by Golder Associates Ltd (“Golder”). These ESDM reports were prepared to support applications for the Air ECA and to demonstrate ongoing compliance. ESDM considers the potential contaminants from the various air emission sources generated at site, modelled downstream effects along the Island Gold property boundary and is updated annually to include additions/deletions of equipment across the site. The potential contaminants included ammonia, carbon monoxide (CO), copper, lead, nickel, nitrogen oxides (NOx), sulphur dioxides (SOx) and total suspended particulates (TSP). All modelled potential contaminants were compared against MECP criteria, with all below their respective limits.
The Province of Ontario and Federal government have released different GHG management programs; Ontario with the Emission Performance Standards and Federal government with the Output Based Pricing system (OPBS) with the goal to encourage industries to transition from high-intensity to low-intensity GHG emissions generation. The goal is to tax all carbon-based fuels the facility will consume based on their annual GHG emissions levels either opting in (if generation is greater than 10,000 tonnes CO2e but less than 50,000 tonnes CO2e ) or mandatory participation (emissions generation greater than 50 000 tonnes CO2e ). In 2019 Island Gold mine generated 12,740 tonnes CO2e, and qualifies for opting-in, which Island Gold is in the process of registering to remove the carbon tax from its invoices.
20.1.7 Terrestrial Plant and Animal Life
The area is largely composed of trembling aspen, white birch, balsam poplar, black spruce, white spruce, balsam fir, and jack pine.
Island Gold Mine – Ni 43-101 Technical Report  203
August 31, 2020



alamos2.jpg
Wildlife populations in the area are regionally typical with the noted presence of moose, wolves, foxes, black bears, beavers, otters, muskrats, mink, snowshoe hares and red squirrels.
Habitats are generally favourable to moose because of past and ongoing forestry operations. Local moose populations are subject to considerable hunting pressure because of easy road access. Black bears and moose are prominent in the mine area and are sighted regularly. The beaver, otter and mink that inhabit the local area are the focus of trapping activity. Other organisms like owls have been reported.
Tree clearing occurred in 2018 around the footprint of the tailings area in preparation of the 2019 and 2020 tailings dam expansions. Blue Heron and Golder completed the Species at Risk (“SAR”) screening survey in June 2015, with a desktop review to compile data from the area to assess the potential for SAR to utilize the habitat. Based on the desktop review, there was a potential for thirty-four designated species to occur within the Wawa District. Seven of these species have a moderate potential to inhabit the study area and twenty-seven species have a low potential to inhabit the site. Three of the species with moderate potential to occur on site have been listed as either endangered or threatened under both the Species at Risk Act (SARA) and the Endangered Species Act (ESA). These species are Whip-Poor-Will, Northern Myotis and Little Brown Myotis bats, with field surveys conducted by Golder and Blue Heron at the Island Gold Mine site in June and July 2015. Northern Myotis and Little Brown Myotis were introduced onto the SAR list both federally and provincially in 2014.
Results for the Whip-Poor-Will surveys indicated that these birds were not heard at the site during the time of the survey. Results from the acoustic bat surveys indicated the presence of the Little Brown Myotis, but no Northern Myotis were detected. Although the presence of the Little Brown Myotis was detected, biologists concluded it is unlikely these bats are using the habitat for roosting since their activity was very low (Golder, 2015).
An expanded desktop study was conducted by Golder in 2020 as part of the Phase III Expansion Study. Golder’s study area covers approximately 3,800 ha. During this study and from a review of historical information for neighbouring mines the potential habitat areas for Species at Risk were identified. The potential SARS are found in Table 20‑1.Further fieldwork will follow to assess the potential habitat if SARS are found within the area.

Table 20‑1 Identified Species at Risk (SAR)
Species at Risk ObservedOntario ESA StatusFederal SARA Status
Bald eagleSpecial concernNot listed
Canada warblerSpecial concernThreatened
Chimney swiftThreatenedThreatened
Common nighthawkSpecial concernSpecial concern
Eastern whip-poor-willThreatenedThreatened
Little brown batEndangeredEndangered
Northern long-eared batEndangeredEndangered
Olive-sided flycatcherSpecial concernSpecial concern
20.1.8 Aquatic Life
Lake trout are restricted to Mountain Lake, where a self-sustaining population exists. Walleye has been introduced into both Pine and Goudreau Lakes. Goudreau Lake, which constitutes the receiving water body for the treated effluent discharge from the Secondary Pond, supports
Island Gold Mine – Ni 43-101 Technical Report  204
August 31, 2020


alamos2.jpg
northern pike, white suckers, and various minnow species. Perch occur in Pine Lake. Maskinonge Lake supports a northern pike population.
Fish surveys have been conducted as part of on-going EEM studies, in Goudreau Lake, Maskinonge Lake and Pine Lake. Based on the field program conducted in 2019 the most abundant species found in Goudreau Lake was the common shiner and secondly was the yellow perch. Occasional white sucker, walleye and pike were collected. In Maskinonge Lake, yellow perch was the most abundant fish species and secondly was the common shiner. Occasional white suckers, pike and walleye were collected.
20.1.9 Waste Management
Alamos Gold’s strategy is to reduce consumption, reuse any waste generated, and dispose final waste in a safe and responsible manner. A Waste Management Procedure (“WMP”) has been developed and implemented for the site; it provides guidance to site and non-site personnel on the handling, processing and disposal of waste, including hazardous waste and domestic materials generated during the normal operations of the facility.
The WMP is consistent with the requirements of Reg. 347 (Waste Management), Reg. 207/96 (burning of domestic waste), and Dubreuilville By-Law No. 2012-44 (domestic waste produced by the mine site and the camp).
20.1.10 Geochemistry of Waste Rock and Tailings
Excess underground waste rock is transported to the surface and stockpiled for use as future backfill and for constructing site roads and ongoing/future dam raise projects for the tailings facility.
In 2019, Golder was subcontracted to conduct an assessment on the geochemistry of Island Gold tailings and waste rock. Historical documentation, from Wood PLC, (formerly AMEC) was also reviewed. Golder determined that the waste rock did not generate any ARD nor metal leaching and recommended reducing the sample analyses to monthly.
Weekly analyses were conducted for tailings and ore for metal leaching and acid-rock drainage (“ARD”). The tailings did not generate any mobile metals, but results show an unknown potential to generate acid due to static Neutralization Potential Ratio (NPR) testing. The NPR is a ratio of the Neutralizing Potential (NP) to Acid Potential (AP) driven by the concentration of sulphides. Acid generation criteria are discussed in Table 20‑2.
Table 20‑2 Acid Generation Criteria
Acid Generation PotentialCriteriaComments
Potentially Acid Generating (PAG)NPR<1Potentially acid generating, unless sulphide minerals are non-reactive
Uncertain1<NPR<2Possibly acid generating, if NP is insufficiently reactive or is depleted at a rate faster than sulphides
Non-Potentially Acid Generating (non-PAG)NPR>2Not expected to generate acidity.
From the 75 results analyzed, 54% of the samples are classified as non-PAG while 46% are classified as uncertain or PAG. Therefore Golder recommended to continue weekly analysis of tailings static geochemistry and initiate four 60-week humidity cells, two if NPR less than 1 and two when NPR is between 1 and 2. Two humidity cell tests have started with one on week 20 and the second on week 15. Preliminary results indicate that no acid generation has been observed. This may change as the humidity cell tests continue.
Island Gold Mine – Ni 43-101 Technical Report  205
August 31, 2020



alamos2.jpg
20.2 Anticipated Permitting Activities
Relevant regulatory agencies for the anticipated Phase III permitting needs include the Federal Department of Fisheries and Oceans (DFO), the provincial Ministry of the Environment and Conservation and Parks (MECP), Ministry of Natural Resources and Forestry (MNRF), and Ministry of Energy, Northern Development and Mines (ENDM).
All permitting activities will cover modifications and/or additions to the site including but not limited to: increased production rates, updated water management and effluent discharge strategies, new air and noise discharges, infrastructure additions/modifications related to the paste fill plant and new shaft area, new access roads, aggregate sources and potential impacts to terrestrial habitats and natural water bodies including related fisheries resources.
In order to facilitate the Phase III expansion, Alamos would be required to amend some existing operational permits and acquire a series of new permits and/or authorizations for both future operational requirements and Phase III construction related activities.
Currently, Island Gold is fully permitted to be operated at a production rate of 461,760 tonnes per year (not to exceed 38,480 tonnes per month) of gold-bearing ore. An amended ECA for Air & Noise (No. 1821 BAWLAC) was issued in May 2019 allowing for an annual ore processing rate of 461,760 tonnes per year. The ECA requires that the Island Gold Mine be in compliance with Ontario Regulation 419/05, applicable MECP Guidelines for Air and Noise, and other performance requirements as specified in permit conditions. It also allows modifications such as process changes, de-bottlenecking, or addition of new equipment subject to limits on operational flexibility.
An amended ECA for Industrial Sewage Works (No. 9118-B9CM3R) was also issued in May 2019 and recently amended in April 2020 to allow for a mill production rate of up to 38,480 tonnes per month. This permit includes all components for site water management, tailings management and domestic sewage treatment. (Note: The April 2020 amendment was considered administrative in nature to reflect the 2020 dam raise project to a crest elevation of 427masl)
In addition to ECA’s the site is permitted for water taking activities under various Permits to Take Water (PTTW). Table 20‑3 lists the PTTWs for the various locations.
Table 20‑3 List of Permits to Take Water (PTTWs)
Permit IdLocationMaximum Allowable Water Taking
(litres/day)
Expiry
8571-8PENN8Lochalsh10,000,000September 8, 2027
6138-9ABJ9ZKremzar1,500,000August 7, 2023
4231-A8BNM7Maskinonge Lake434,500April 5, 2026
6551-8U3H95Exploration Drills280,000December 20, 2021

Within Ontario, both ECA’s and PTTW’s fall under the regulatory mandate of the Ministry of Environment, Conservation and Parks (MECP). Environmental Compliance Approvals (ECAs) are issued under the Environmental Protection Act. Permits to Take Water (PTTW) are issued under the Ontario Water Resources Act.
Proponents in Ontario are required to file and maintain an updated Closure Plan under the authority of the Mining Act, which falls under the mandate of the Ministry of Energy, Northern
Island Gold Mine – Ni 43-101 Technical Report  206
August 31, 2020


alamos2.jpg
Development & Mines. The latest version of the complete and consolidated Island Gold Mine Closure Plan (“Closure Plan”) was filed in February 2020 with a more recent amendment in May 2020 to append the technical supporting information for the 2020 Dam Raising Project. he
The current Closure Plan details the decommissioning strategy for the Island Gold Mine. It reflects the current and expected site conditions and defines a program which ensures the long-term chemical and physical stability of the site. The goal of the Closure Plan is to ensure that chemical and physical impacts to the site are minimized during operations and that the site is returned as closely as possible to pre-development conditions at close-out. The Closure Plan has been developed using data collected during physical, chemical, and biological studies of the site (treated effluent, surface water, ground water, ore/waste rock characterization, etc) and the surrounding environment during the production phases. As detailed in the Closure Plan the total cost estimate for remediation of the Island Gold Mine in its current state stands at $6,345,369 CAD.
As part of the Phase III expansion, Alamos will be required to amend both Island Gold ECA’s and complete a comprehensive update of the Island Gold Closure Plan.
In addition to amending these operational permits, Alamos will likely be required to acquire new permits or authorizations for future operations and to support construction activities outside the scope of operational permits.
Alamos would be required to obtain a new Permit to Take Water for any domestic water supply needed to service the shaft surface facilities and potentially a new Permit to Take Water for dewatering of the shaft during construction. In addition, given the potential for new disturbance associated with the shaft area, access roads, and aggregate sources there may be permits required under the Ontario Endangered Species Act. These permitting activities fall under the regulatory authority of the Ministry of Environment, Conservation and Parks (MECP).
Additional permits or authorizations would also need to be acquired through the different legislative requirements that fall under the mandate of the ministry of Natural Resources and Forestry (MNRF). Included within the MNRF mandate would be aggregate permits for materials such as sand for ongoing maintenance of Goudreau Road and till for tailings dam lifts. These types of materials would typically be reserved to the Crown (i.e. Ontario) and their use is regulated under the Aggregate Resources Act. Other approvals include Forest Resource Licenses (tree clearing activities) issued under the Crown Forest Sustainability Act, Work Permits issued under the Public Lands Act for activities such as culvert installations or repair or constructing portions of the new access road where it crosses public lands. There may also be a requirement for Land Use Permits under the Public Lands Act to allow temporary occupation of Crown Land for site development activities.
Alamos may also require an authorization issued under Section 35 the Federal Fisheries Act from the Federal Department of Fisheries and Oceans (DFO). It is not confirmed at this time whether this authorization is needed for Phase III as design details for project development activities that may have impacts to fisheries resources have not been advanced sufficiently. Submission of a formal “request for review” to DFO will initiate this process.
The Phase III expansion as proposed is expected to be permitted within a 24-month timeframe once formally initiated.
20.3 Environmental Emergency Response
Island Gold’s environmental programs are designed with the goal of preventing all environmental incidents. However, in the event of unplanned incidents, the mine maintains a high degree of emergency preparedness with appropriate plans, resources, and training to minimize the impact on workers, operations, the environment, and the community should an
Island Gold Mine – Ni 43-101 Technical Report  207
August 31, 2020



alamos2.jpg
unplanned incident occur. A Spill Prevention and Control Plan (SPCP) is mandated under the regulatory requirements of Ontario Reg. 224/07 Spill Prevention and Contingency Plans, the primary purpose of which is to prevent and reduce the risk of spills of pollutants, and to prevent, eliminate or ameliorate any adverse effects that result from spills of pollutants.
A SPCP, as part of the environmental emergency response program, is in place for the overall Island Gold site. It outlines/mandates response to a leak or spill, to limit effects on employees, the community, and the environment.
It also includes roles and responsibilities of all employees, containment procedures, reporting aspects (both to internal management and external agencies), and follow-up/close-out procedures. Additional steps are taken to complete remediation and clean-up of a spill once the emergency containment has been completed.
20.4 Social and Community Considerations
20.4.1 Communities
The two most significant communities in the vicinity of the Island Gold Mine are the Town of Dubreuilville (closest to the mine) and the Municipality of Wawa, both in the Algoma District. Two other communities situated in the Algoma District include the Township of White River, which is 93 km north of Wawa, and the small community of Hawk Junction, which is approximately 30 km northeast of Wawa.
The Mine is located 17km from the Town of Dubreuilville which has a population of approximately 635 permanent residents. The Island Gold site is accessible from Dubreuilville by an all-weather road from Highway 519. The town contains accommodations for some mine personnel. Dubreuilville is accessible by car or train.
Historically, forestry and to a lesser degree mining have been major contributors to Dubreuilville’s economy. In November 2007, Dubreuil Lumber Inc. (“Dubreuil”) filed for bankruptcy protection and ceased its logging operations. In 2008, Dubreuil was reduced to four employees. The collapse of the forestry industry dramatically impacted the town, leaving hundreds without work.
Statistics Canada data shows that Dubreuilville’s population steadily decreased from 990 people in 1996 to 613 people in 2011 (a decline of 38%). The median age of the total population in 2016 was 42 years. The majority of the Town’s citizens are bilingual and speak French as their primary language.
Educational facilities include a Catholic elementary school and a public high school, both of which are francophone and have small class sizes. Students must travel to Wawa for English education. Daycare services are also offered. Residents have access to Contact North, which offers access to university and college courses through distance learning and online education.
The Dubreuilville Health Centre has two full-time registered nurses and receives six physician visits per month. The community also offers homecare, tele-health video consultations and mental health referrals. Dubreuilville provides community support services such as a food bank. The nearest hospital is the Lady Dunn Health Centre, approximately 75 km away by road in Wawa.
20.4.2 Industry
The Island Gold Mine is the primary mining operation in the area. but other junior exploration programs are on-going. Previous operations include the Kremzar, the Magino, the Edwards, and the Cline Lake Gold mines.
Island Gold Mine – Ni 43-101 Technical Report  208
August 31, 2020


alamos2.jpg
The Island Gold Mine is in the southeast corner of the timber management area controlled by Dubreuil Forest Products, of Dubreuilville. No forestry operations are taking place in the mine area at present and none are expected un the near term as the area has been extensively harvested. There is a local sawmill located in Dubreuilville which has been closed since 2008.
20.4.3 Recreation
Within 100km of the Town of Dubreuilville there are numerous lakes that provide for recreational boating and fishing opportunities. Locally, fishing has been restricted on Goudreau Lake in recent years following the stocking of the lake with walleye by local conservation organizations, limiting fishing in the immediate mine area to Pine Lake, which has reasonable public access. Maskinonge Lake is restricted by access through the mine site. All three lakes support northern pike, white sucker, common shiner, and a variety of minnow species. Yellow perch also occur in Pine Lake, as well as walleye. Relatively easy access has resulted in intense fishing pressure by residents, as well as the presence of some non-resident anglers who return to the area annually.
Moose and partridge are the primary game animals and hunting pressure is considerable by both residents of Dubreuilville and non-residents. A grouse population also attracts hunters. Black bear hunting is popular in the area with a local outfitter operating out of Dubreuilville.
The project area is adjacent to a provincial snowmobile trail route, with lodging in Dubreuilville, resulting in increased traffic in the area during winter.
20.4.4 Community and Benefits
Island Gold’s philosophy is to maximize local hiring of employees from the labour pool in the surrounding communities. This has increased the economic stability of the local communities of Dubreuilville, Wawa and White River who have been hit hard by the downturn of the forestry industry.
As of end of June 2020 there were 416 employees and approximately 100 contractors employed by Island Gold. Island Gold’s employees have significantly augmented the local economy by living locally or supporting the local businesses when residing in at the mine workforce accommodation facilities in Dubreuilville for approximately six months out of the year.
Island Gold supports the local businesses and various non-profit organizations through its substantial local donations, purchase of goods, services, and materials, use of area motels and many home and apartment rentals for workforce accommodations. Support is also reflected through company programs such as the health and wellness program which provides yearly funds to encourage employees to join a fitness centre along with rental of local facilities such as the arena and school gym for employee activities or events. The recreational committee’s various activities with the local communities (weekly sport night events, curling & golfing tournaments) aid in developing relations with the town and supporting their economic developments.
Island Gold encourages employees to relocate to the local communities by offering a moving and a house purchase program. Island Gold helps to supplement the local health care system by securing the services of a registered nurse on-site to provide health care services and health and wellness programs onsite for our employees to promote a healthy lifestyle. The services include health care, referrals to local doctors, awareness training and a vaccination program (that includes hepatitis, twinRix and flu shots).
The mine has made donations to various initiatives in the communities, most recently with support for meals-on wheels and funding and providing supplies during the COVID-19 pandemic.
Island Gold Mine – Ni 43-101 Technical Report  209
August 31, 2020



alamos2.jpg
Public consultation activities are ongoing. Several information sessions are held in Dubreuilville, to provide updates of mine activities and to outline any proposed changes to the mine. Feedback garnered from consultation activities have been incorporated into the decision-making processes. Primary feedback has been related to employment opportunities at the mine for residents of Dubreuilville.
There have also been regular meetings with the Dubreuilville Town Council to discuss common interests such as the Town’s land fill and incentives to Island Gold’s employees to buy a house in Dubreuilville
The construction of a 98-unit bunkhouse complex within the community was undertaken in the fall of 2015. A further expansion in bunkhouse access is partially complete and it includes adding four 44 bed-bunkhouses and one 38 bed bunkhouse with a new kitchen and recreational facility. Phase I was completed in December 2019 which included commissioning one half of the bunkhouse capacity and a fully operational kitchen. The Phase II expansion will continue in 2020 and finish in 2021 which will include the final phase of the bunkhouses and removal of old facilities.
20.5 Indigenous Engagement
Aboriginal engagement initiatives for Island Gold were initiated in December 2003 by Patricia and continued with Richmont Mines. Alamos has increased Indigenous engagement efforts since acquiring the mine in 2017. The corporation’s site and executive management team is actively engaged with all Indigenous engagement initiatives.
To date the following Indigenous groups have been identified as having varying degrees of interest in the area of the Island Gold Mine: Michipicoten First Nation (MFN), Missanabie Cree First Nation (MCFN), Batchewana First Nation (BFN), the Garden River First Nation (GRFN). Other Indigenous groups that may have interest in the mine include the Métis Nation of Ontario (MNO).
There have also been engagement activities to outline any proposed significant changes to the project. Discussions have centered on the opportunities for employment, contracting, training, environmental effects of the project, and community development.
Alamos is committed to working with all affected Indigenous groups as Island Gold operations progress with the objective of arriving at mutually beneficial arrangements with appropriate Indigenous communities. A Community Benefits Agreement (CBA) was signed with the Missanabie Cree First Nation in March 2017 and is valid until March 2024. Alamos will renegotiate a new CBA prior to its expiry. Alamos is currently working towards a similar Benefits Agreement with Michipicoten First Nation.
Island Gold Mine – Ni 43-101 Technical Report  210
August 31, 2020


alamos2.jpg

21 CAPITAL AND OPERATING COSTS
21.1 Capital Cost Estimate Input
The capital costs for the Study have been estimated based on the scope of work defined in the sections below. The parties below have contributed to the preparation of the capital cost estimate in specific areas, as listed.
Hatch:
Administration building, warehouse, and mine dry;
Shaft headframe and hoist house;
Underground ore and waste handling system;
Underground infrastructure, including dewatering and electrical;
Mobile equipment requirements;
EPCM; and
Contingency.
Cementation
Shaft sinking, support and lining.
Halyard
Process plant expansion.
Golder
Tailings management facility expansion;
Mine water treatment plant; and
Paste fill plant.
Alamos
Camp and kitchen;
Powerline upgrade;
Delineation drilling; and
Underground capital development.
21.2 Capital Cost Estimate Summary
The capital estimates conform, unless otherwise noted, to AACE Class 3 guidelines for a PFS Estimate with a -10% to +30% accuracy. The estimate is based on an EPCM execution approach.
The following parameters and qualifications were considered:
The estimate was based on Q2 2020 pricing;
All mining equipment would be purchased;
A $0.75 USD/CAD exchange rate was assumed, and no allowance has been made for exchange rate fluctuations; and
There is no escalation added to the estimate.
Island Gold Mine – Ni 43-101 Technical Report  211
August 31, 2020



alamos2.jpg

Data for the estimates have been obtained from numerous sources, including:
Pre-feasibility level engineering design;
Mine schedules;
Topographical information obtained from site survey;
Budgetary equipment quotes;
Budgetary unit costs from local contractors for civil, concrete, steel, electrical and mechanical works; and
Data from similar recently completed studies and projects.
Major cost categories (permanent equipment, material purchase, installation, subcontracts, indirect costs, and Owner’s costs) were identified and analyzed. To each of these categories on a line item basis, a contingency was allocated based on the accuracy of the data, and an overall contingency amount was derived in this fashion.
21.3 Capital Expenditures
As this report covers an expansion scenario at Island Gold, capital expenditures are divided into two distinct categories: growth capital and sustaining capital.
Growth capital expenses are defined as expenditures that allow the mine to expand from the current throughput of 1,200 tpd to 2,000 tpd. Once the Shaft Expansion is completed and production has sustainably reached the targeted tonnage for a period of three months, all further capital expenditures are classified as sustaining capital.
Sustaining capital expenditures are expenditures related to sustaining the existing production and operating plan and allow Island Gold to mine its current Mineral Reserves, and a portion of its Mineral Resources, during, and post, the project period. The project period is defined as 2020 to 2025 and the post project period is defined as 2026 to the end of the life of the mine.
As the Life of Mine plan detailed in this study incorporates Mineable Resources, which is 165% larger than the current Mineral Reserve, the life of mine has grown significantly from the current 8 year Mineral Reserves life to a 16 year mine life with a substantially deeper mine. As a result, Island Gold will be required to invest in certain key areas to allow sustained production through 2035.
21.3.1 Sustaining Capital Investment
The sustaining capital requirements reported in the Study for the Shaft Expansion total $736 million and include $6 million of reclamation costs, $29 million of contractor indirects, $27 million of contingency, and $26 million of delineation drilling. In the Shaft Expansion mine development will require the largest sustaining capital investment, totaling $373 million from 2020 to 2033. Table 21‑1 presents the life of mine sustaining capital expenditures for the R1200 (Basecase) and S2000 (Shaft Expansion) scenarios. The Shaft Expansion has $268 million less sustaining capital principally due the purchase of less mobile equipment (trucks) and less capital development.
Island Gold Mine – Ni 43-101 Technical Report  212
August 31, 2020


alamos2.jpg
Table 21‑1 Sustaining Capital Investment (2020 – 2036)
Sustaining Costs (C$ million)R1200S2000Difference
TSF Earthworks$13$13$0
Miscellaneous U/G Infrastructure$17$14-$3
U/G Mine Dewatering$23$23$0
U/G Power$58$58$0
General UG Facilities$35$24-$11
Mobile Equipment$234$144-$90
Subtotal Direct Costs$379$276-$104
Indirect Costs$29$29$0
Contingency$20$27$7
Delineation Drilling$29$26-$3
Capital Development$541$373-$168
Total Sustaining Capital$998$730-$268
Reclamation$6$6$0
Total (including Reclamation, C$ millions)$1,004$736-$268
Total (including Reclamation, US$ millions)$753$552-$201
Annual sustaining capital is detailed in Table 21‑2.
Island Gold Mine – Ni 43-101 Technical Report  213
August 31, 2020



alamos2.jpg
Table 21‑2 Annual Sustaining Capital
Sustaining Capital Expenditure20202021202220232024202520262027202820292030203120322033203420352036Total
TSF6---4--------3---13
General Underground33534225312222---38
UG Dewatering43222411111111---23
UG Power44444444444444---58
Mobile Equipment71318141110911119101065---144
Subtotal2422292226201521201517171215---276
Indirects22224322222222---29
Contingency255555-------1---27
Delineation Drilling433211111111111--26
Capital Development2323242628303545413827214----373
Total Sustaining Capital55576460665953706456474118201--730
Reclamation66
Total (including Reclamation, C$ millions)55576460665953706456474018201-6736
Total (including Reclamation, US$ millions)41434845494440524842353014151-4552
Island Gold Mine – Ni 43-101 Technical Report  214
August 31, 2020


alamos2.jpg
21.3.2 Growth Capital Investment
The Island Gold growth capital expenditures for the Shaft Expansion are estimated to be $685 million, including; $315 million of direct costs, $133 million of indirect costs (contractor indirects, EPCM, and owner’s costs), $70 million of contingency, and $166 million of capital development (Table 21‑3). This is expected to be spent between 2020 and 2025, until the completion of the shaft and mill expansion by 2025 with the bulk of this spending occurring between 2021 and 2024.
The $315 million of direct costs are associated with common infrastructure projects, mill expansion and shaft installation. The $204 million of indirect costs and contingency are comprised of contractor indirect costs, EPCM, Owner’s Cost and contingency applied on a package by package basis. The $166 million of capital development is associated with shaft installation specific lateral & vertical development (shaft stations, ore/waste pass, bin, etc.) and accelerated development required to support the higher throughput.
Total growth capital for the Shaft Expansion includes $139 million of capital, including contingency and indirects, for infrastructure projects that would be required under all mining scenarios including the base case scenario of maintaining the current 1,200 tpd operation. These common infrastructure projects include the following;
Addition of a paste plant;
Power line upgrade;
Surface infrastructure upgrades including, an employee camp expansion, a kitchen replacement, and a new administration building and warehouse; and
Tailings expansion.
Other significant capital items include $53 million, including contingency and indirects, for the mill expansion and $310 million, including contingency and indirects, for shaft sinking and shaft infrastructure (Table 21‑4). Annual growth capital expenditures for the project period, 2020 to 2025 are presented in Table 21‑5.
Island Gold Mine – Ni 43-101 Technical Report  215
August 31, 2020



alamos2.jpg
Table 21‑3 Growth Capital Investment
Growth Capital (C$ millions)R1200S2000Difference
Site Wide Surface Works$43$41-$2
Power Upgrade$18$18$0
Mill Expansion$36$36
Paste Plant$38$38$0
Shaft Surface Works$9$9
Headframe and Hoisting Plant$59$59
Shaft Sinking and Equipping$78$78
U/G Ore and Waste Handling$13$13
U/G Misc.$16$18$2
Other$6$6$0
Subtotal Direct Costs$121$315$194
Indirect Costs$21$104$83
EPCM$4$22$18
Owner's Costs$1$7$6
Contingency$8$70$62
Capital Development$105$166$61
Total Costs (C$ millions)$260$685$425
Total Costs (US$ millions)$195$514$319
Table 21‑4 Shaft Capital Including Indirects and Contingency
Shaft Capital (C$ millions)
Shaft Surface Works$9
Headframe & Hoist House$59
Shaft Sinking & Equipping$78
UG Ore/Waste Handling$13
Subtotal Direct Costs$159
Indirect Costs$72
EPCM$22
Owner's Costs$5
Contingency$53
Total Costs (C$ millions)$310
Total Costs (US$ millions)$232

Island Gold Mine – Ni 43-101 Technical Report  216
August 31, 2020


alamos2.jpg
Table 21‑5 Annual Growth Capital Expenditure
Growth Capital Expenditure (C$ millions)202020212022202320242025Total
Site Wide Surface Works10811111141
Power Supply Upgrades-514---18
Mill Expansion----36-36
Paste Plant (incl. UG Network)--235--38
Shaft Surface Works-1233-9
Headframe and Hoisting Plant-183910159
Shaft Sinking & Equipping114152321478
Underground Ore and Waste Handling---57113
Underground Miscellaneous82212418
Other6-----6
Subtotal Direct Costs244785688011315
Indirects7233830306133
Contingency112211121370
Capital Development16264247287166
Total Growth Capital (C$, millions)4810918515616028685
Total Growth Capital (US$, millions)368213911712021514
21.4 Operating Expenses
Operating expenses were calculated using the Island Gold’s 2020 budget as a reference point where applicable and were developed from first principles when budgetary items were not available. The 2020 budget costs were adjusted to reflect increases related to mining at greater depths, increased operational efficiencies associated with shaft access and higher underground throughput. Fixed and variable components of cost centers were considered. Costs were adjusted to reflect the total volume of material moved (waste and ore) per year. Costs were also adjusted to reflect the reduction in labour related to the completion of capital development activities. This approach was developed by Hatch and Island Gold.
The summarized cost structure consists of the following categories and sub-categories:
Mining
Administration and Haulage;
Ore Development;
Stoping;
Geology;
Engineering;
Maintenance;
Mechanical/Electrical; and
Engineering/Geology.
Milling
G&A
Administration;
Human Resources;
IT;
Island Gold Mine – Ni 43-101 Technical Report  217
August 31, 2020



alamos2.jpg
Environment;
Heath and Safety;
Lodging and Transportation;
Warehouse and Purchasing; and
Surface Maintenance.
Royalty
21.4.1 Mining Costs
Mining costs were generated on a departmental basis. Table 21‑7 summarize the underground departmental mining costs for the R1200 and S2000 scenario in project and post project periods. In the R1200 scenario, it is evident that haulage costs increase over time as the mine deepens. Maintenance costs also increase as more trucks are added to the fleet due to the increased cycle times. In the S2000 scenario, haulage and maintenance costs remain relatively flat lined after the commissioning of the shaft.
Some of the fixed costs, on a unit cost basis, increase toward the end of the mine as less capital development is undertaken. Island Gold uses an allocation system to allocate a portion of overheads to capital costs, and as capital development decreases, more of these costs stay with operating costs.
Table 21‑6 R1200 versus S2000 Unit Mining Costs
DepartmentR1200S2000
2020 - 20252026 - 2042LOM2020 - 20252026 -2035LOM
Overhead and Haulage29.5941.6738.3925.5723.7524.27
Development14.817.649.5916.685.578.73
Stoping33.8939.4437.9333.334.3734.07
Geology5.567.466.944.55.855.46
Engineering5.87.036.74.85.115.02
Maintenance23.4529.5627.920.4720.1520.24
Total ($/t mined)113.08132.8127.45105.3194.8197.79

21.4.2 Processing Cost
The mill expansion from 1,200 tpd to 2,000 tpd in the Shaft Expansion mainly benefits the labour unit costs as labour is predominantly a fixed cost. Most consumables are utilized at approximately the same rate post and pre project completion. Table 21‑7 presents a comparison of the R1200 and S2000 processing costs.
Island Gold Mine – Ni 43-101 Technical Report  218
August 31, 2020


alamos2.jpg
Table 21‑7 R1200 versus S2000 Unit Processing Costs
R1200S2000
2020-20252026-2042LOM2020-20252026-2035LOM
Labour13.9914.3814.2813.269.0510.25
Electricity2.422.532.52.492.822.73
Reagents3.693.683.683.693.683.68
Propane0.360.360.360.350.330.34
Balls and Liners1.41.391.391.451.621.57
Maintenance8.0588.018.128.368.29
Mill Haulage4.54.54.54.54.54.5
Total ($/t milled)34.4134.8434.7233.8530.3631.36
21.4.3 General and Administrative Costs
As many general and administrative (G&A) costs are fixed costs, the G&A unit costs tend to decrease with an increase in tonnage rates. As well, with the mine life reduced by seven years with the higher extraction rate under the S2000 scenario, total life of mine G&A costs drop significantly. Table 21‑8 presents a comparison of the R1200 and S2000 processing costs.
Table 21‑8 R1200 versus S2000 General and Administrative Cost
R1200S2000
2020-20252026-2042LOM2020-20252026-2035LOM
Administration8.29.969.487.237.67.5
Human Resources2.312.442.42.331.611.82
IT3.463.793.73.182.312.56
Health and Safety8.719.499.288.195.816.49
Lodging and Transportation11.0812.6712.2411.257.118.28
Warehouse and Purchasing2.142.352.32.062.392.29
Surface Maintenance7.858.788.537.365.996.38
Environmental5.055.585.444.643.653.93
Total ($/t milled)48.855.0653.3646.2336.4739.24
21.4.4 Total LOM Operating Costs
Total life of mine operating costs of $1,747 million with the Shaft Expansion are significantly lower than all the other scenarios evaluated (Table 21‑9). Total operating costs are expected to average $176 per tonne of mill feed post completion of the shaft and mill expansion by 2025. This includes average mining costs of $95 per tonne. Both are the lowest of any scenario evaluated. This becomes even more significant as mining moves deeper with unit mining costs remaining relatively stable under the Shaft Expansion, while steadily increasing with the ramp scenarios
Island Gold Mine – Ni 43-101 Technical Report  219
August 31, 2020



alamos2.jpg
Table 21‑9 R1200 versus S2000 Life of Mine Operating Costs
Operating CostR1200S2000
LOM
$/t
2026-2042
$/t
Total LOM
C$M
LOM
$/t
2026-2035 $/tTotal LOM C$M
Mining1271331,2209895936
Processing35353323130300
General and Administrative53555113936377
Royalties15151461515146
Silver Credit-1-1-12-1-1-12
Total Operating Cost2292372,1971821761,747
Annual mining, process and G&A costs are presented in Table 21‑10, Table 21‑11,and Table 21‑12.

Island Gold Mine – Ni 43-101 Technical Report  220
August 31, 2020


alamos2.jpg
Table 21‑10 S2000 Scenario Annual Unit Mining Costs
LOM2020202120222023202420252026202720282029203020312032203320342035
Overhead and Haulage24.2728.7424.9323.6422.6828.5925.1420.919.1419.8521.7423.5524.527.6728.1426.6227.77
Development8.7319.4218.3810.2714.7521.1516.3512.14.156.929.329.364.555.031.0400
Stoping34.0732.229.2234.9134.0935.3433.833.7635.0933.4232.2932.1534.8234.5336.7337.2132.89
Geology5.465.354.63.853.594.415.15.084.54.724.95.485.877.077.47.456.23
Engineering5.025.6554.193.94.795.24.53.974.164.334.845.186.246.536.64.15
Maintenance20.2422.6520.4818.6617.6421.1521.9619.2816.917.5318.0819.7520.5222.9423.0123.2120.64
Total ($/t mined)97.79114.02102.6295.5196.65115.43107.5595.6283.7486.5990.6795.1295.44103.48102.85101.0991.68
Table 21‑11 S2000 Scenario Annual Unit Processing Costs
LOM2020202120222023202420252026202720282029203020312032203320342035
Labour10.2516.4112.7912.7912.7913.6811.729.078.948.928.948.948.948.928.949.0511
Electricity2.732.12.482.482.482.472.82.832.792.782.792.792.792.782.792.823.43
Reagents3.683.723.683.683.683.683.683.683.683.683.683.683.683.683.683.683.68
Propane0.340.360.360.360.360.360.330.330.330.330.330.330.330.330.330.330.33
Balls and Liners1.571.451.391.391.391.391.621.621.621.621.621.621.621.621.621.621.62
Maintenance8.298.388888.368.368.368.368.368.368.368.368.368.368.36
Mill Haulage4.54.54.54.54.54.54.54.54.54.54.54.54.54.54.54.54.5
Total ($/t milled)31.3636.8433.233.233.234.0833.0130.3930.2230.1930.2230.2230.2230.1930.2230.3732.92

Table 21‑12 S2000 Scenario Annual Unit General and Administrative Costs
LOM2020202120222023202420252026202720282029203020312032203320342035
Administration7.58.147.866.986.867.236.547.016.586.696.817.147.278.058.268.3713.12
Human Resources1.822.252.182.432.392.552.211.691.571.591.611.661.691.591.611.611.28
IT2.563.43.293.23.143.332.842.212.072.12.132.232.292.492.552.572.71
Health and Safety6.498.58.218.318.178.677.485.765.385.465.545.765.76.166.266.315.83
Lodging and Transportation8.2811.4511.0611.6211.5312.0910.057.76.956.987.057.147.137.377.37.224.93
Warehouse and Purchasing2.292.112.041.971.942.042.222.232.132.172.22.312.382.612.672.672.67
Surface Maintenance6.387.887.627.427.317.646.535.645.325.45.495.735.896.416.576.658.05
Environmental3.934.964.794.634.564.84.233.423.223.273.333.493.63.944.044.084.65
Total ($/t milled)39.2448.6947.0446.5645.9148.3542.1135.6533.2233.6634.1635.4635.9538.6339.2539.4943.23
Island Gold Mine – Ni 43-101 Technical Report  221
August 31, 2020



alamos2.jpg
22 ECONOMIC ANALYSIS
An engineering economic model was developed to estimate annual cash flows and sensitivities for Island Gold. After-tax estimates were developed to approximate the true investment value.
Sensitivity analyses were performed for variation in metal prices, foreign exchange rate, operating costs, capital costs, and discount rates to determine their relative importance as value drivers.
The estimates of capital and operating costs have been developed specifically for Island Gold and are summarized in Section 21 of this report. They are presented in Q2, 2020 Canadian dollars unless otherwise stated. The economic analysis has been run with no inflation (constant dollar basis).
22.1 Assumptions
All costs and economic results are reported as CAD$, unless otherwise noted. Table 22‑1 outlines the planned LOM tonnage and grade estimates.
Table 22‑1 Life of Mine Plan Summary
ParametersUnitValue
Mine Life1
Years16
Total Mill FeedKt9,572
Processing Rate2
tpd2,000
Average Au Head Gradeg/t10.45
Total Au Production over Life of Minekoz3,104
Au Production (Years 2020 to 2034)Average koz/a201
Au Production (Years 2026 to 2034)3
Average koz/a237
Notes:
1.2020 to 2035
2.1,200 tpd from 2020 until shaft completion in 2025, after which the mill ramps up to 2,000 tpd by 2026
3.Post-shaft completion in 2025
Other economic factors and assumptions used in the economic analysis include the following:
US $1,450/oz gold, US $16.00/oz silver and a $0.75 USD/CAD were used in the cash flow model;
Discount rate of 5%;
Closure cost of $5.7M (US $4.3M);
No salvage assumed at the end of mine life; and
Exclusion of all costs prior to 2020. However, 60% of Alamos’ Canadian tax pools at December 31, 2019 are utilized in the tax calculations.
22.2 Revenue and Working Capital
Working capital assumptions were not included in the economic analysis as the mine is currently operating with adequate working capital.
Island Gold Mine – Ni 43-101 Technical Report  222
August 31, 2020


alamos2.jpg
Mine revenue is derived from the sale of gold doré into the international marketplace. The mine has contractual arrangements for refining. The parameters used in the economic analysis are consistent with current agreements, as shown in Table 22‑2.
Figure 22‑1 illustrates the annual recovered gold and cumulative recovered gold by project year.
Table 22‑2 NSR Assumptions Used in the Economic Analysis
AssumptionsUnitValue
Au Payable%99.96%
Au Refining and Transportation Charge$/oz3.25

image20.jpg
Figure 22‑1 Annual and Cumulative Gold Production
22.3 Summary of Operating Costs
Total LOM operating costs, as presented in Table 22‑3, amount to $1,747M (US $1,310M), including silver by-product credits, royalties and refining and transportation charges. This translates into an average cost of $182/t processed over the life of mine ($176/t from 2026 to 2035 when the mine is at 2,000 tpd). A detailed analysis of the operating costs can be found in Section 21.4 of this report.
Island Gold Mine – Ni 43-101 Technical Report  223
August 31, 2020



alamos2.jpg
Table 22‑3 Summary of Operating Costs
Operating CostC$/t ProcessedLOM C$MUS$/t ProcessedLOM US$M
Mining$98$936$73$702
Processing$31$300$24$225
G&A$39$377$29$283
Subtotal$168$1,613$126$1,210
Silver Credit-$1-$12-$1-$9
Royalties$15$146$11$109
TOTAL Operating Costs$182$1,747$137$1,310
22.4 Summary of Capital Costs
The capital costs used for the economic analysis are set out below. Table 22‑4 summarizes the capital costs used in the economic analysis, and Table 22‑5 and Table 22‑6 show a breakdown by sustaining and growth capital. Detailed information can be found in Section 21 of this report.
Table 22‑4 Total Capital Costs
Total Capital CostLOM C$MLOM US$M
Sustaining Capital$736$552
Growth Capital$685$514
Total Capital Costs$1,421$1,066


Table 22‑5 Sustaining Capital Costs
Sustaining Capital CostLOM C$MLOM US$M
TSF Earthworks$13$10
Misc. U/G Infrastructure$14$10
U/G Mine Dewatering$23$17
U/G Power$58$43
General UG Facilities$24$18
Mobile Equipment$144$108
Sub-total Direct costs$276$207
Indirects$29$21
Contingency$27$21
Delineation Drilling$26$20
Capital Development$373$280
Total Sustaining Capital$730$548
Reclamation$6$4
Total Sustaining Capital (including Reclamation)$736$552
Island Gold Mine – Ni 43-101 Technical Report  224
August 31, 2020


alamos2.jpg
Table 22‑6 Growth Capital Costs
Growth Capital CostLOM C$MLOM US$M
Site Wide Surface Works$41$31
Power Upgrade$18$14
Mill Expansion$36$27
Paste Plant$38$28
Shaft Surface Works$9$7
Headframe and Hoisting Plant$59$44
Shaft Sinking and Equipping$78$59
U/G Ore and Waste Handling$13$9
U/G Misc.$18$14
Other$6$5
Subtotal Direct Costs$315$236
Indirect Costs$104$78
EPCM$22$17
Owner's Costs$7$5
Contingency$70$52
Capital Development$166$125
Total Growth Capital$685$514
22.5 Reclamation and Mine Closure Plan
The Closure Plan anticipates a cost of $5.7M (US $4.3M) for reclamation and closure. The bulk of the closure costs and reclamation activity will occur beyond 2035, after mining and processing have been completed at Island Gold.
22.6 Taxes
Island Gold will be subject to provincial, federal, and mining taxes as follows:
Ontario Mining Tax: 10%;
Ontario Provincial Income Tax: 10%; and
Federal Income Tax: 15%.
The rates above are current as of the date of this report and are subject to change in the future. Based on these rates and the financial assumptions used in this report, Island Gold is expected to have payable income and mining taxes of $620M (US$465M) over its 16-year life. Alamos has various Canadian tax pools that could be applied against future income from its Canadian operations, and 60% of the tax pools as of December 31, 2019 were used in this study to reduce taxes payable at Island Gold in the economic analysis.
22.7 Royalties
Island Gold is subject to third-party royalties that range between 0.6% and 3.0% on certain claims, with an average royalty rate of 2.4% over the mine life. Total royalties included in this report are $146M (US$109M).
Island Gold Mine – Ni 43-101 Technical Report  225
August 31, 2020



alamos2.jpg
22.8 Economic Analysis
The Shaft Expansion option is economically viable with an after-tax internal rate of return (IRR) of 17% IRR which is calculated on the differential after-tax cash flow between the Shaft Expansion scenario and the Basecase scenario of continuing to mine at 1,200 tpd with ramp only access. After-tax net present value at 5% (NPV5%) is $1,359M (US $1,019M).
Figure 22‑2 shows the projected cash flows used in the economic analysis and based on the assumptions in Section 22.1.Table 22-7 shows the detailed results of this evaluation.
image11.jpg
Figure 22‑2 Annual and Cumulative After-Tax Cash Flow at USD $1,450 Gold
Table 22‑7 Summary of Economic Results
CategoryUnitValue (C$)Value (US$)
Net Revenues$M$6,000$4,500
Operating Costs1
$M$1,747$1,310
After-Tax Cash Flow from Operations2
$M$4,253$3,190
Total Capital & Closure Costs$M$1,421$1,066
Total Cash Cost (2020-2035)$/oz$562$422
Mine Site All-In Sustaining Cost (2020-2035)$/oz$798$598
Total Cash Cost (2026-2035)3
$/oz$542$406
Mine Site All-In Sustaining Cost (2026-2035)3
$/oz$708$531
Net After-Tax Cash Flow$M$2,212$1,659
After-Tax NPV5%
$M$1,359$1,019
After-Tax IRR4
%17%17%
Notes:
1.Operating Costs include mining, processing, G&A, royalties, transport & refining costs, and silver credit.
2.Cash Flow from Operations includes payable taxes.
3.Post-shaft completion in 2025.
4.IRR is calculated on the differential after-tax cash flow between the Shaft Expansion scenario and the Basecase of continuing to mine at 1,200 tpd with ramp only access.
Island Gold Mine – Ni 43-101 Technical Report  226
August 31, 2020


alamos2.jpg
22.9 Sensitivities
A sensitivity analysis was performed to test value drivers on Island Gold’s NPV using a 5% discount rate. The results of this analysis are demonstrated in Table 22‑8 and Table 22‑9 and illustrated in Figure 22‑3. Island Gold proved to be most sensitive to changes in metal price followed by foreign exchange, capital costs and operating costs. A sensitivity analysis of the after-tax results was performed using various gold prices.
Figure 22‑4 represents the annual after-tax cash flow and cumulative cash flow at a gold price of USD $1,750.
Table 22‑8 After-Tax NPV5% Sensitivity Results
($M of CAD)-10%-5%100%5%10%
Gold Price$1,078$1,218$1,359$1,499$1,638
Canadian Dollar$1,502$1,431$1,359$1,286$1,213
Capital Costs$1,445$1,402$1,359$1,317$1,273
Operating Costs$1,436$1,398$1,359$1,321$1,282
($M of USD)-10%-5%100%5%10%
Gold Price$808$914$1,019$1,124$1,228
Canadian Dollar$1,127$1,073$1,019$964$910
Capital Costs$1,083$1,051$1,019$988$954
Operating Costs$1,077$1,048$1,019$991$961
Island Gold Mine – Ni 43-101 Technical Report  227
August 31, 2020



alamos2.jpg


image69.jpg

image49.jpg

Figure 22‑3 After-Tax NPV5% Sensitivity Results
Island Gold Mine – Ni 43-101 Technical Report  228
August 31, 2020


alamos2.jpg

Table 22‑9 Gold Price Sensitivity on NPV
Gold PriceAfter-Tax NPV (C$M)After-Tax NPV (US$M)
After-Tax IRR1 (%)
$1,250$969$72714%
$1,350$1,165$87416%
$1,450$1,359$1,01917%
$1,550$1,552$1,16419%
$1,650$1,744$1,30820%
$1,750$1,934$1,45022%
$1,850$2,124$1,59324%
Notes:
1.IRR is calculated on the differential after-tax cash flow between the Shaft Expansion scenario and the Basecase of continuing to mine at 1,200 tpd with ramp only access
image57.jpg
Figure 22‑4 Annual and Cumulative After-Tax Cash Flow at USD $1,750 Gold

A summary of the Island Gold financial model is shown in Table 22‑10.

Island Gold Mine – Ni 43-101 Technical Report  229
August 31, 2020



alamos2.jpg
Table 22‑10 Island Gold Financial Model Summary
2020202120222023202420252026202720282029203020312032203320342035Total
Mill Feed Mined (tonnes)410,593438,000437,999437,994439,198557,150719,805730,000731,957729,934729,951730,000731,947730,000721,154296,6549,572,336
Waste Mined (tonnes)342,999440,063611,313688,082478,034317,066336,839471,093414,888371,636255,838190,33732,774571--4,951,533
Total Tonnes mined753,592878,0631,049,3121,126,076917,233874,2161,056,6431,201,0931,146,8451,101,570985,789920,337764,721730,571721,154296,65414,523,869
Grades (g/t Au)10.8710.179.858.379.713.0811.419.2210.6213.918.819.3710.3211.099.69.7710.45
Gold Production (oz)137,720138,231133,802113,743132,131226,081254,866208,849241,279314,971199,445212,271234,370251,179214,71589,9253,103,578
Operating Costs
Unit Mining Costs (C$/tonne)$114$103$96$97$115$108$96$84$87$91$95$95$103$103$101$92$98
Unit Milling Costs (C$/tonne)$37$33$33$33$34$33$30$30$30$30$30$30$30$30$30$33$31
Unit G&A Costs (C$/tonne)$49$47$47$46$48$42$36$33$34$34$35$36$39$39$39$43$30
Total Unit Operating Costs1 (C$/tonne)
$214$195$188$188$211$200$177$159$165$175$173$174$187$187$183$179$182
Total Cash Costs (US$/oz)$478$464$460$542$527$370$375$418$375$304$475$449$438$408$460$442$422
Mine-site AISC (US$/oz)$779$771$818$941$899$566$531$668$573$437$651$592$497$469$465$442$598
Capital Expenditures
Sustaining Capex (US$ M)$41$43$48$45$49$44$40$52$48$42$35$30$14$15$1-$548
Growth Capex (US$ M)$36$82$139$117$120$21----------$514

Notes:
1.Total unit costs are inclusive of royalties and silver credits.


Island Gold Mine – Ni 43-101 Technical Report  230
August 31, 2020


alamos2.jpg
23 ADJACENT PROPERTIES
23.1 Magino Mine
The first discovery of gold in the area was in 1918 by J. W. Webb on what is now referred to as the Magino deposit, located about 1 km to the southwest of Island Gold’s western property boundary. The deposit is reported to be hosted in the Webb Lake Stock, a quartz porphyritic granodiorite, which intrudes mafic volcanic rocks. Both lithologies occur within the GLDZ and have been highly altered as a result of deformation associated with this structure. Gold is present within subparallel grey quartz veins and in silicified wall rocks of east-west striking shear zones in granodiorite within the GLDZ. According to public records, the Magino mine operated intermittently between 1933 and 1939 during which time 105,792 tonnes of ore at a grade of 2.57 g/t Au were mined producing approximately 8,700 ounces. The mine was closed from 1940 until 1988, when it was reopened by McNellen Resources Inc. (“McNellen”) and Muscocho Exploration Ltd. (“Muscocho”). During the 1988 to 1992 period, a total of 696,413 tonnes of ore averaging 4.56 g/t Au was mined using bulk mining methods, producing 105,543 ounces of gold. Golden Goose Resources Inc. (“Golden Goose”) acquired the Magino mine property in 1996. In April 2004, Golden Goose filed a Mineral Resource estimate to verify the potential for a large tonnage low grade gold mineralization amenable to open pit mining.
This property was later acquired by Prodigy Gold Inc. (“Prodigy Gold”, formed through a union between Golden Goose and Kodiak Exploration Ltd.), which did further exploration and defined an open pit Mineral Resource of 223 million tonnes averaging 0.87 g/t Au for 6.25 million ounces of gold.
In 2012, Argonaut Gold acquired 100% of all issued and outstanding shares of Prodigy Gold. On December 2013, Argonaut announced pre-feasibility study results for the Magino project with after-tax IRR of 18% and total cash flow of US$350 million.
In February 2016, Argonaut announced pre-feasibility study results for the Magino project with after-tax IRR of 22.9% (at a foreign exchange rate (US$: CAD$) of 0.78) and total cash flow of US$715 million. As of February 22, 2016, the Probable Mineral Reserves were 105.4 million tonnes at 0.89 g/t Au for 3.019 million ounces of gold. (JDS Energy & Mining Inc., 2016).
In December 2017, Argonaut released the results of a feasibility study for the Magino Project with after-tax IRR of 19.5% (at a foreign exchange rate (US$: CAD$) of 0.78) and total cash flow of US$540 million. As of December 21, 2017, the Total Proven and Probable Mineral Reserves were 59.0 million tonnes at 1.13 g/t Au for 2.137 million ounces of gold. (JDS Energy & Mining Inc., 2017).
Argonaut is currently conducting an exploration drilling program at Magino focused on targeting high-grade mineralization below the proposed open pit. As of July 28, 2020, Argonaut had completed 34,852 m of drilling as part of the Phase 1 and Phase 2 drill programs (Argonaut Press release dated July 28, 2020).
Argonaut’s Magino Property consists of seven patented mining claims, four leases claims, and 69 unpatented mining claims totalling 2,204.5 hectares (Argonaut Gold, https://www.argonautgold.com/English/assets/development/magino/default.aspx).
23.2 Edwards Mine and Cline Mines
The Edwards and Cline Mines are currently owned by Trillium Mining as part of a 5,700 hectare property to the east of the Island Gold Property. No recent work has been reported by Trillium.
Island Gold Mine – Ni 43-101 Technical Report  231
August 31, 2020



alamos2.jpg
23.2.1 Edwards Mine
The Edwards mine property is located to the northeast of Island Gold’s eastern boundary and is currently owned by Trillium Mining. The property was originally staked in 1924 by Peter Edwards. In 1933 Gold Lands Syndicate optioned the property and sunk an inclined shaft to a depth of 105 feet. In 1935 Edwards Gold Mines Ltd. acquired the property and deepened the shaft to 300 feet and erected a 75 ton per day mill. During this period 1,573 tons of ore were milled producing 435 ounces of gold (at a recovered grade of 0.31 ounces per ton). Between 1939 and 1960 the property laid dormant, until staked by A. Paquette followed by a number of other company options, until 1986 when it was acquired by Spirit Lake Explorations Ltd. (“Spirit Lake”). In late 1996, River Gold Mines Ltd. (“River Gold”) agreed to purchase the two leasehold mining claims comprising the Edwards mine from VenCan Gold Corporation (“VenCan Gold” was formerly Spirit Lake). From 1996 to 2001, River Gold exploited three zones on which VenCan Gold had concentrated its drilling. River Gold ramped down to a depth of 300 m extracting 144,000 ounces of gold. The Edwards mine zones consist of a series of steeply dipping, sub-parallel, mineralized shoots hosted within deformed rocks of the GLDZ. The zones vary in width from 1 m to 5 m and are reported to extend to depth. The deposit was being mined as a low tonnage, high grade operation by River Gold. Ore was stockpiled on site and trucked to River Gold’s mill located to the west of Wawa. In July 2001, River Gold closed the Edwards mine and put it on care and maintenance.
In July 2002, The Edwards mine was sold to Strike Minerals Inc. (“Strike”). Strike conducted more than 40,000 feet of drilling on the property that delineated several parallel auriferous quartz vein systems in addition to the vein systems mined in early 2000.
In 2012, Strike dewatered the mine and did some development in the upper portion of the deposit. The deposit has been dewatered to the 140 metre level. Development of the cross-cut on the 60 metre level intersected the Edwards #1 and Edwards #5 zones and Strike planned to continue development on the 60 metre level past the Rusty Weathered Zone to the Plowman #1 and #3 zones. On the 90 metre level, Strike planned to develop the cross-cut through the New North 2, New North 1, Edwards #1, Edwards #5, Rusty Weathered, Plowman #1 and Plowman #3 zones.
In March 2013, Strike announced sampling results from the first lift on the Edwards #1 zone above the 60 metre level. The lift created approximately 225 tonnes of mineralized material. Muck samples at 8 foot intervals from the first lift returned an average grade of 38.98 g/t Au over a 1.5 m width for a length of 24 m. Chip samples taken across the back after removal of the first lift returned a weighted average grade of 15.39 g/t Au over 1.5 m for a length of 24 m. Initial back sampling of the Edwards #1 zone on the 60 metre level returned a weighted average grade of 25.45 g/t Au over 1.5 m for a length of 21 m.
23.2.1.1 Cline Mine
The Cline mine, currently owned by Trillium Mining, is located approximately two kilometres northeast of Island Gold’s eastern boundary and is northeast of the Edwards mine. The Cline mine zones comprise a series of steeply dipping quartz veins that are hosted by highly carbonated and silicified sheared granodiorite, felsic porphyry, and intermediate volcanic rocks. Deformation is related to splays developing off the of east-west trending Edwards-Cline shear. The gold bearing zone has been identified along a strike length of 150 m and to vertical depths exceeding 200 m. Gold bearing mineralization was discovered on the Cline property in 1918 and extensively explored during the 1920’s via two openings. During this period, the No. 1 vertical shaft was sunk to a depth of approximately 45 m and the No. 2 inclined shaft to a depth of approximately 60 m. During the period from 1936 to 1942, additional works on the Cline deposit included development and mining from the No. 4 shaft, sunk to a depth of approximately 360 m. During 1965-1966, a shallower shaft, No. 3, was sunk to a depth of
Island Gold Mine – Ni 43-101 Technical Report  232
August 31, 2020


alamos2.jpg
approximately 35 m to complete further exploration. Production from the property is reported at 63,328 ounces of gold and 10,598 ounces of silver from 301,000 tonnes of ore.
23.3. Goudreau Property
The Goudreau property is owned by Manitou Gold Inc. (“Manitou”), and consists of 22,500 hectares consolidated prospective gold properties (Manitou Gold, https://www.manitougold.com/projects/goudreau-property/overview/). The Goudreau Property is located to the east of Trillium Mining’s property and extends approximately 37km east towards the past producing Renabie Mine.

Island Gold Mine – Ni 43-101 Technical Report  233
August 31, 2020



alamos2.jpg
24 OTHER RELEVANT DATA AND INFORMATION
There is no other relevant data or information that is material to this report.

Island Gold Mine – Ni 43-101 Technical Report  234
August 31, 2020


alamos2.jpg
25 INTERPRETATIONS AND CONCLUSIONS
25.1 Summary
The completion of the Phase III Shaft Study confirms the technical feasibility and economic viability of the Shaft Expansion.
25.2 Geology and Mineral Resource Estimate
Alamos personnel reviewed and audited the historical exploration data available for the Island Gold Mine as well as the exploration methodologies adopted to generate the data. Exploration work is professionally managed, and procedures are adopted that meet accepted industry best practices. The author is of the opinion that the exploration data is sufficiently reliable to interpret with confidence the boundaries of the gold mineralization and support evaluation and classification of Mineral Resources in accordance with generally accepted CIM Estimation of Mineral Resource and Mineral Reserve Best Practices Guidelines and CIM Definition Standards for Mineral Resources and Mineral Reserves.
The drilling database includes information from 6,411 drill holes (831 form surface and 5,580 from underground) comprising 1,363,350 m of drilling. The Mineral Resource statement effective December 31, 2019 is provided in Table 25‑1.
Table 25‑1 Island Gold Mineral Resource Estimate Summary as of Dec 31, 2019
Mineral ResourceTonnesGrade
(g/t Au)
Ounces
Measured25,2004.523,700
Indicated853,4006.57180,300
Total Measured and Indicated878,6006.51184,000
Inferred5,392,30013.262,298,000
Notes:
CIM definitions of Mineral Resources were followed.
Mineral Resources are estimated at a cut-off grade of 4.03 g/t Au.
High-grade samples were capped at 75 g/t Au for most of the Upper Island Gold zones except IG-E1E and IG-C capped at 100 g/t Au, most of the Goudreau zones except for G2 and G6 capped at 100 g/t Au.
High-grade samples in Lochalsh were capped at 75 g/t Au for E1E, 45 g/t Au for D, 60 g/t Au for C and 55 g/t Au for E2.
In the Lower mine high-grade samples were capped at 90 g/t Au for B, 70 g/t Au for G and GNW, 45 g/t for G1, 50 g/t Au for D and STH, 40 g/t Au for D1, and 160 g/t Au for E1E zones.
Lower C zone has 2 capping grades, at 300 g/t Au inside the HG domain and at 225 g/t Au everywhere else.
Mineral Resources are estimated using a long-term gold price of $1,250 per ounce.
A minimum mining width of 2.00 m was used.
A specific gravity value of 2.78 t/m3 was used in the Lower Zones and 2.82 t/m3 otherwise.
Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.
Totals may not match due to rounding.
25.3 Mining Methods and Reserves
The mining methods used at Island Golf include longitudinal open stoping and transverse open stoping and are deemed suitable considering the geometry of the orebody. The summary of Mineral Reserves is contained in Table 25‑2.
Island Gold Mine – Ni 43-101 Technical Report  235
August 31, 2020



alamos2.jpg
Table 25‑2 Island Gold – Combined Mineral Reserve Estimate as of Dec 31, 2019
Mineral ReserveTonnesGrade
(g/t Au)
Ounces
Proven786,00013.48341,000
Probable2,857,0009.52874,000
Total Proven and Probable3,643,00010.371,215,000
Notes:
CIM definitions of Mineral Reserves were followed.
Mineral Reserves are estimated at a cut-off grade of 4.03 g/t Au.
High-grade samples were capped at 75 g/t Au for most of the Upper Island Gold zones except IG-E1E and IG-C capped at 100 g/t Au, most of the Goudreau zones except for G2 and G6 capped at 100 g/t Au.
High-grade samples in Lochalsh were capped at 75 g/t Au for E1E, 45 g/t Au for D, 60 g/t Au for C and 55 g/t Au for E2.
In the Lower mine high-grade samples were capped at 90 g/t Au for B, 70 g/t Au for G and GNW, 45 g/t for G1, 50 g/t Au for D and STH, 40 g/t Au for D1, and 160 g/t Au for E1E zones.
Lower C zone has 2 capping grades, at 300 g/t Au inside the HG domain and at 225 g/t Au everywhere else.
Mineral Reserves are estimated using a long-term gold price of $1,250 per ounce.
A minimum mining width of 2.00 m was used.
A specific gravity value of 2.78 t/m3 was used in the Lower Zones and 2.82 t/m3 otherwise.
Totals may not match due to rounding.
Island Gold performs regular reconciliations between production and the reserve block model and results have generally been within industry acceptable ranges. Island Gold uses the reconciliation process to validate its Mineral Resource estimation parameters and procedures.
Island Gold has undertaken a detailed engineering and economic study of five possible scenarios to mine the Mineral Reserves and Mineral Resources. Island Gold has concluded that constructing a shaft to a depth of 1,373 m and expanding the mining and milling capacity to 2,000 tpd is the best way to proceed.
25.4 Processing
The current 1,200 tpd mill consistently achieves recoveries of greater than 96%. In undertaking the Shaft Expansion, the mill will be expanded to 2,000 tpd with the addition of an additional primary ball mill, modification to the crushing circuit and other upgrades, additions, and expansions within the circuit.
25.5 Infrastructure
As part of the Shaft Expansion and to support sustainable development of mine going forward the following infrastructure upgrade will be undertaken:
Development of a new production/service shaft down to 1,373 m in depth (initial depth);
Development/implementation of a new ore and waste handling system underground;
Upgrade to the main site power supply;
Constructions of a paste plant and underground distribution system;
Upgrade to the Tailings Management Facility to suit longer LOM production; and
Island Gold Mine – Ni 43-101 Technical Report  236
August 31, 2020


alamos2.jpg
Upgrade to mine dewatering and water treatment system.
25.6 Environmental Considerations
The Island Gold Mine is operating within environmental compliance.
A number of operational permits will need to be amended to allow for the expansion up to 2,000 tpd. In addition, a number of other permits will need to be acquired for construction activities. Permitting is expected to take between 18 and 24 months.
The Island Gold Mine has been and will continue to be major contributor to the local economy. Alamos will continue to engage and work with area Indigenous communities and other communities of interest.
25.7 Capital and Operating Costs
Capital and operating costs have been undertaken to a pre-feasibility study level of detail. LOM capital costs for the Shaft Expansion are summarized in Table 25‑3. LOM unit operating costs are summarized in Table 25‑4.
Table 25‑3 Total Capital Costs
Total Capital CostLOM C$MLOM US$M
Sustaining Capital$736$552
Growth Capital$685$514
Total Capital Costs$1,421$1,066
Table 25‑4 Summary of Operating Costs
Operating CostC$/t ProcessedLOM C$MUS$/t ProcessedLOM US$M
Mining$98$936$73$702
Processing$31$300$24$225
G&A$39$377$29$283
Silver Credit$168$1,613$126$1,210
Silver Credit-$1-$12-$1-$9
Royalties$15$146$11$109
TOTAL Operating Costs$182$1,747$137$1,310


Island Gold Mine – Ni 43-101 Technical Report  237
August 31, 2020



alamos2.jpg
25.8 Economic Analysis
The Shaft Expansion option is economically viable with an after-tax internal rate of return (IRR) of 17% IRR, which is calculated on the differential after-tax cash flow between the Shaft Expansion scenario and the Basecase scenario of continuing to mine at 1,200 tpd with ramp only access. After-tax net present value at 5% (NPV5%) is $1,359M (US $1,019M).


Island Gold Mine – Ni 43-101 Technical Report  238
August 31, 2020


alamos2.jpg
26 RECOMMENDATIONS
At the conclusion of the Phase III Expansion Study the following recommendations are being made:
Continue to invest in the surface exploration drilling program to potentially add to the Mineral Resource base.
Continue with the underground delineation drilling program to convert Inferred Mineral Resources to Indicated Mineral Resources.
Complete the geology model and deploy it to aid in identifying additional targets on the Island Gold Property.
Continue with the production to Mineral Reserve reconciliations to further refine Mineral Resource estimation parameters and methodologies.
Proceed with the paste fill plant construction
Proceed with the Shaft Expansion project
Start early works engineering as soon as possible to advance the procurement of long lead time items and help inform the permitting process.
Continue with the environmental baseline program to support the permitting program.
Initiate the process of amending existing operational permits and acquire a series of new permits and/or authorizations for both future operational requirements and Phase III construction related activities.


Island Gold Mine – Ni 43-101 Technical Report  239
August 31, 2020



alamos2.jpg
27 REFERENCES
Bloom, L., 2015, ASL Canada, 2015 Review of the Island Gold Project Assay Quality Control Program (January – December 2015), January 2016.
Bloom, L. 2019a, Lab Expert Review, internal report, Island Gold, September 2019
Bloom, L. and Jolette, C, 2019b, Wesdome Mine Laboratory Review, internal report, Island Gold, July 2019
Boissonneau, A.N, Glacial History of Northeastern Ontario. The Cochrane-Hearst Area. Canadian Journal of Earth Sciences, 3, 559 -578, 1966.
Cuifo, T, Hydrothermal Alteration and Exploration Vectors at the Island Gold Deposit, Michipicoten Greenstone Belt, Wawa, Ontario. University of Waterloo Master’s Thesis, 2019.
Gartner, J.F. and McQuay, D.F, Northern Ontario Engineering Geology Terrain Study 73, Goudreau Area (NTS 42C/SE) District of Algoma, Ontario Geological Survey, 1979
Golder, 2015, Summary Report on the Results of the Species at Risk Surveys, Island Gold Mine Dam Raise Project, Dubreuilville, Ontario. Jennifer Braun, Golder Associates, Dec 8, 2015.
Golder, 2020a, Report: Phase III Expansion Pre-Feasibility Study / Tailings and Water Management, prepared for Alamos Gold Inc., Report by Golder Associates Ltd, April 13, 2020.
Golder, 2020b, Report: Paste Backfill Pre-Feasibility Study, prepared for Alamos Gold Inc., Report by Golder Associates Ltd, May 6, 2020.
Heather K.B and Arias Z., 1992, Geological and Structural Setting of Gold Mineralization if the Goudreau-Lochalsh Area, Wawa Gold Camp, Ontario Geological Survey Open File Report, 5832, 159p.
Halyard, 2020, Process Plant Throughput Expansion Report (H19140-PM-RPRT-002) Prepared for Alamos Gold Inc., Report by Manoj Patel, Louis Ventier, Halyard Inc., May 22, 2020
Hatch, 2020, Preliminary Engineering Study Report Prepared for Island Gold Mine – Mine Expansion Project, Alamos Gold Inc., Report by S. Ball, Hatch Ltd., June 22, 2020.
JDS Energy & Mining Inc., 2016 Pre - Feasibility Study Technical Report on the Magino Project, Wawa, Ontario, Canada, February 22, 2016
JDS Energy & Mining Inc., 2017, Feasibility Study Technical Report on the Magino Project, Ontario, Canada. December 21, 2017
Jellicoe, K, Structural Controls and Deformation History of the Orogenic Island Gold Deposit, Michipicoten Greenstone Belt Ontario, University of Waterloo Master’s Thesis, 2019.
MDEng, 2018a Technical Memo #17044-103: Geomechanical Characterization of Island Gold Mine, Prepared for Island Gold Operations, Alamos Gold Inc., Report by Cortney Palleske, Mine Design Engineering, June 4, 2018.

Island Gold Mine – Ni 43-101 Technical Report  240
August 31, 2020


alamos2.jpg
MDEng, 2018b, Technical Memo #18057-101: Re: Geotechnical Review of Proposed Transverse Stoping Block at the Island Gold Mine, Prepared for Island Gold Operations, Alamos Gold Inc., Report by Dr. William Bawden, Mine Design Engineering, September 14, 2018.
RPA and W.A. Hubacheck Consultants, 2005, Technical Report on the Island Deposit Mineral Resource Estimate, Ontario, Prepared for Patricia Mining Corp, Like Evans, Peter C. Hubacheck, January 26, 2005
RPA 2016, Mineral Resource and Mineral Reserve Audit for the Island Gold Mine, by Jason J. Cox and Wayne W Valliant, February 3, 2016.


Island Gold Mine – Ni 43-101 Technical Report  241
August 31, 2020



alamos2.jpg
28 UNITS OF MEASURE, ABBREVIATIONS, AND ACRONYMS
Abbreviations and Acronyms
AACEAssociation for the Advancement of Cost Engineering International
AASAtomic Adsorption Spectroscopy
AEPAnnual Exceedance Probability
AgSilver
AiAbrasion Index
ALSALS Global
APAcid Potential
APAcid Potential
APIAlgoma Power Inc.
AQTKDrill Core Size (35.5 mm diameter)
ARDAcid Rock Drainage
ASLAnalytical Solutions Ltd.
AuGold
BQDrill Core Size (36.4 mm diameter)
BWIBall Mill Work Index
CADCanadian dollars
CAPEXCapital and Sustaining Capital Expenditure
CCRCentral Control Room
CILCarbon-In-Leach
CILCarbon in Leach
CIMCanadian Institute of Mining, Metallurgy and Petroleum
CIPCarbon-In-Pulp
CIPCarbon in Pulp
CNCyanide
CO2e
Carbon Dioxide Equivalent
CRFCemented Rock Fill
CRMCertified Reference Materials
CSSClose Size Setting
CVCoefficient of Variation
DFOFisheries and Oceans Canada
ECAEnvironmental Compliance Approval
EEMEnvironmental Effects Monitoring
ENDMMinistry of Energy, Northern Development and Min
EPCMEngineering Procurement and Construction Management
ESAEndangered Species Act
FARFresh Air Raise
FeIron
G&AGeneral and Administrative
G&AGeneral and Administrative
Island Gold Mine – Ni 43-101 Technical Report  242
August 31, 2020


alamos2.jpg
GHGGreen House Gases
GLDZGoudreau Lake Deformation Zone
GPSGlobal Positioning System
ICPInductively Coupled Plasma
ID2Inverse Distance Weighting Method
IRRInternal Rate of Return
ISOInternational Standards Organization
LHDLoad Haul Dump
LiDARLight Detection and Ranging
LOMLife of Mine
MDLMethod Detection Limit
MDLMethod Detection Limit
MECPMinistry of the Environment and Conservation and Parks
MENDMMinistry of Energy, Northern Development and Mines
MGBMichipicoten Greenstone Belt
MLFMaskinonge Lake Fault
MNRFMinistry of Natural Resources and Forestry
N’Geotechnical Parameter
NaCNSodium Cyanide
Non-PAGNot-Potentially Acid Generating
NPNeutralizing Potential
NPINet Profit Interest
NPRNeutralization Potential Ratios
NPVNet Present Value
NQDrill Core Size (47.6 mm diameter)
NSRNet Smelter Return
OKOrdinary Kriging
OPEXOperating Expenditure
OREASOre Research and Exploration Pty Ltd Assay Standards
OWLOperating Water Level
PAGPotentially Acid Generating
PRProvincial Road
PTTWPermit to Take Water
PWQOProvincial Water Quality Objectives
PWQOProvincial Water Quality Objectives
Q’Geotechnical Parameter
QAQuality Assurance
QCQuality Control
QPQualified Person
RARReturn Air Raise
RMRRock Mass Rating
ROMRun of Mine
RPARoscoe Postle Associates
Island Gold Mine – Ni 43-101 Technical Report  243
August 31, 2020



alamos2.jpg
RQDRock Quality Designation
SABSAG and Ball Mill
SAGSemi-Autogenous Grinding (mills)
SARSpecies at Risk
SARASpecies at Risk Act
SDStandard Deviation
SQLStructured Query Language
TMFTailings Management Facility
TSPTotal Suspended Particulates
TSSTotal Suspended Solids
UCFUnconsolidated Rock Fill
UCSUniaxial Compressive Strength
UDSUnderground Distribution System
URSTMUnité de Recherche et de Service en Technologie Minérale
USDUnited States Dollars
VLDVery Low Frequency
VODVentilation on Demand
vs.Versus
WIWork Index
WMPWaste Management Procedure
WTPWater Treatment Plant

Units of Measure
˚Degrees
˚CDegrees Celsius
cfmCubic feet per minute
µg/m3
Microgram per cubic metre
µmMicrometer
µmMicrometre (Micron)
ggram
g/LGrams per litre
g/tGrams per tonne
hHours
haHectare
hpHorsepower
KThousand
kgKilogram
kmKilometre
km2
Square kilometre
ktThousand tonnes
kWKilowatt
Island Gold Mine – Ni 43-101 Technical Report  244
August 31, 2020


alamos2.jpg
KWhKilowatt hour
LLitre
mMetre
MMillion
m3
Cubic metre
MaMillions of Years Before Present
maslMetres above sea level
mg/LMilligram per litre
minMinute
mLMillilitre
mmMillimetre
MVAMegavolt amperes
MWMega Watt
MWhMegawatt-hours
ozTroy ounce
ozOunce
PaPascal
pHMeasure of a solution’s acidity
ppbParts per billion
ppmParts per million
tTonne
t/m3
Tonne per cubic metre
tpdTonne per day
VVolt
w/wWeight for weight
wt%Weight percent
yYear
Island Gold Mine – Ni 43-101 Technical Report  245
August 31, 2020



alamos2.jpg

29 CERTIFICATES OF QUALIFIED PERSONS

Island Gold Mine – Ni 43-101 Technical Report  246
August 31, 2020


alamos2.jpg
CERTIFICATE OF QUALIFIED PERSON
I, Raynald Vincent, P.Eng., M.G.P., as an author of this report entitled “NI 43-101 Technical Report for the Island Gold Mine, Dubreuilville, Ontario, Canada” prepared for Alamos Gold Inc. and dated August 31, 2020, do hereby certify that:
1.I am a Geological Engineer employed as Chief Geologist of the Island Gold Mine by Alamos Gold Inc., located at Goudreau Road, Dubreuilville, Ontario.
2.I received a bachelor in Geological Engineering from the University of Laval (Quebec, Canada) in 1983 and a Master’s in Project Management from the University of Quebec in Abitibi-Témiscamingue (Quebec, Canada) in 2002;
3.I am a registered member of the Ordre des Ingénieurs du Québec (OIQ licence no 42761) and a member of the Professional Engineers of Ontario (PEO licence no 100210071). I have worked as an Engineer for more than 30 years since my graduation. I have worked mainly in exploration and production geology in the mining industry for different companies with increasing levels of responsibilities.
4.I have read the definition of “qualified person” set out in National Instrument 43-101 (“NI 43‑101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43‑101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43‑101.
5.I have worked at the Island Gold Mine for the last six years.
6.I am the author of Sections 4 to 12, 14, and 23, and co-author of Sections 1, 2, 3, 15 and 24 to 27 of the NI 43‑101 report entitled “NI 43-101 Technical Report for the Island Gold Mine, Dubreuilville, Ontario, Canada " dated August 31, 2020.
7.I have no personal knowledge, as of the date of this certificate, of any material fact or change, which is not reflected in this report;
8.I have been an employee of Alamos Gold Inc. since January 2009, first as Senior Geologist and later as Chief Geologist;
9.I have prepared this Technical Report in compliance with National Instrument 43-101 and in conformity with generally accepted Canadian mining industry practices. As of the date of the certificate, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.
10.I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them for regulatory purposes, including electronic publication in the public company files on their websites accessible by the public.

Dated this 31st day of August 2020
(Signed & Sealed) “Raynald Vincent”
(Original signed and sealed)
Raynald Vincent, P.Eng. M.G.P. (OIQ no. 42761, PEO no 100210071)




Island Gold Mine – Ni 43-101 Technical Report  247
August 31, 2020



alamos2.jpg
CERTIFICATE OF QUALIFIED PERSON
I, Nathan Eugene Gerard Bourgeault, M.Eng, P.Eng., PMP as an author of this report entitled “NI 43-101 Technical Report for the Island Gold Mine, Dubreuilville, Ontario, Canada” prepared for Alamos Gold Inc. and dated August 31, 2020, do hereby certify that:
1.I am a licensed Mining Engineer employed as Chief Engineer of the Island Gold Mine, located at Goudreau Road, Dubreuilville, Ontario.
2.I received a Bachelor of Engineering in Mining Engineering from Laurentian University (Ontario, Canada) in 2007 and a Master of Engineering with a specialization in Natural Resources Engineering from Laurentian University (Ontario, Canada) in 2014;
3.I am a registered member of the Professional Engineers of Ontario (PEO licence no 100149936). I have worked as an Engineer for more than 13 years since my graduation. I have worked mainly in project development and operations in the mining industry for different companies with increasing levels of responsibilities.
4.I have read the definition of “qualified person” set out in National Instrument 43-101 (“NI 43‑101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43‑101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43‑101.
5.I have worked at the Island Gold Mine for the last three years.
6.I am the author of Sections 13, 16, 17, 18, 19, 21 and 22 and co-author of Sections 1, 2, 3, 15 and 24 to 27 of the NI 43‑101 report entitled “NI 43-101 Technical Report for the Island Gold Mine, Dubreuilville, Ontario, Canada " dated August 31, 2020.
7.I have no personal knowledge, as of the date of this certificate, of any material fact or change, which is not reflected in this report;
8.I have been an employee of Alamos Gold Inc. since November 2017, first as Senior Production Engineer and later as Chief Engineer;
9.I have prepared this Technical Report in compliance with National Instrument 43-101 and in conformity with generally accepted Canadian mining industry practices. As of the date of the certificate, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.
10.I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them for regulatory purposes, including electronic publication in the public company files on their websites accessible by the public.

Dated this 31st day of August 2020
(Signed & Sealed) “Nathan Eugene Gerard Bourgeault”
(Original signed and sealed)
Nathan Eugene Gerard Bourgeault, P.Eng. (PEO no 100149936)





Island Gold Mine – Ni 43-101 Technical Report  248
August 31, 2020


alamos2.jpg
CERTIFICATE OF QUALIFIED PERSON

I, Colin Webster, P. Eng., as an author of this report entitled “NI 43-101 Technical Report for the Island Gold Mine, Dubreuilville, Ontario, Canada” prepared for Alamos Gold Inc. and dated August 31, 2020, do hereby certify that:
1.I am an Environmental Engineer employed as Vice President Sustainability & External Affairs for Alamos Gold Inc. located at 181 Bay Street, Suite 3910, Toronto, Ontario, M5J 2T3;
2.I received a Bachelor of Science in Mining Engineering from in Queen’s University (Kingston, Ontario) in 1990 and a diploma in Environmental Technology from Fanshawe College (London, Ontario) in 1994;
3.I am a registered member of the Professional Engineers of Ontario (PEO licence no 90498825). I have worked as an Engineer for more than 23 years since my graduation. I have worked mainly in environmental management and sustainability within the mining and consulting industries for different companies with increasing levels of responsibilities.
4.I have read the definition of “qualified person” set out in National Instrument 43-101 (“NI 43‑101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43‑101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43‑101.
5.I have worked at Alamos Gold Inc. for the last four years.
6.I am the author of Section 20 of the NI 43‑101 report entitled “NI 43-101 Technical Report for the Island Gold Mine, Dubreuilville, Ontario, Canada " dated August 31, 2020.
7.I have no personal knowledge, as of the date of this certificate, of any material fact or change, which is not reflected in this report;
8.I have been an employee of Alamos Gold Inc. since January 2016 as Vice President Sustainability & External Affairs;
9.I have prepared this Technical Report in compliance with National Instrument 43-101 and in conformity with generally accepted Canadian mining industry practices. As of the date of the certificate, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.
10.I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them for regulatory purposes, including electronic publication in the public company files on their websites accessible by the public.

Dated this 31st day of August 2020
(Signed & Sealed) “Colin Webster”
(Original signed and sealed)
Colin Webster, P.Eng. (PEO no 90498825)
Island Gold Mine – Ni 43-101 Technical Report  249
August 31, 2020