EX-99.1 2 ex99_1.htm EXHIBIT 99.1 ex99_1.htm

Exhibit 99.1
 
 
NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - June 23, 2009
   
 
   
Approximate actual and estimated unpaid down time days *
 
RIG
RIG DESIGN
YEAR BUILT / REBUILT
WATER DEPTH
LOCATION
OPERATOR
ESTIMATED CONTRACT START DATE
ESTIMATED CONTRACT EXPIRATION DATE
FULL CONTRACT DAYRATE ($000)
COMMENTS
 
2Q-09
2Q-09
3Q-09
4Q-09
                       
A
E
E
E
 
The information contained in this fleet status report is as of the date of the report only and is subject to change without notice to the recipient, and we assume no duty to update any portion of the information contained herein.  This fleet status report contains statements that are not historical facts, which are “forward-looking statements” within the meaning of the U.S. federal securities laws.  Forward-looking statements include, but are not limited to, statements about estimated duration of client contracts, contract dayrate amounts, future contract commencement dates, shipyard projects, our business, financial performance and prospects.  Although we believe that the expectations reflected in such forward-looking statements are reasonable, we cannot assure you that such expectations will prove to have been correct.  Various factors could cause actual results to differ materially.  We discuss these factors, including risks, uncertainties and assumptions concerning actions by our clients, governments and other third parties, drilling activity levels, market conditions, operational difficulties, weather related events and other matters, from time to time in our filings with the U.S. Securities and Exchange Commission (“SEC”), which are available free of charge on the SEC’s Web site at www.sec.gov.
 
Full Contract Dayrate reflects the full daywork operating rate payable to the Company by the operator as provided in the applicable drilling contract unless otherwise specified.  The average dayrate over the term of the contract will be lower and could be substantially lower.  The actual average dayrate will depend upon a number of factors (rig downtime, suspension of operations, etc.) including some beyond our control.  Our client contracts and operations are generally subject to a number of risks and uncertainties, and we urge you to review the description and explanation of such risks and uncertainties in our filings with the Securities and Exchange Commission (SEC), which are available free of charge on the SEC’s Web site at www.sec.gov.
 
                                                                                
 
U.S. Gulf of Mexico Semisubmersibles (5)
                 
                       
A
E
E
E
 
Noble Clyde Boudreaux (a, b)
F&G 9500 Enhanced Pacesetter
1987/2007
10,000'
US GOM
Shell
6/09/2007
6/27/2009
243-245
   
11
     
         
US GOM
Shell
6/28/2009
09/27/2009
604-606
           
         
US GOM
Shell
9/28/2009
11/11/2009
244-246
           
         
US GOM
Noble Energy
11/12/2009
11/11/2011
604-606
           
                               
 
Noble Amos Runner (a)
Noble EVA 4000™
1982/1999
8,000'
US GOM
Anadarko
4/25/2008
3/08/2011
439-441
           
                               
 
Noble Jim Thompson (a)
Noble EVA 4000™
1984/1999
6,000'
US GOM
Shell
3/02/2009
3/01/2011
504-506
           
               
 
             
 
Noble Paul Romano (a)
Noble EVA 4000™
1981/1998
6,000'
US GOM
Marathon
2/17/2009
2/16/2010
481-483
           
                               
 
Noble Lorris Bouzigard (b)
Pentagone 85
1975/2003
4,000'
US GOM
LLOG
6/23/2008
6/24/2010
269-271
 
         
         
US GOM
LLOG
6/25/2010
6/24/2011
334-336
           
                               
 
U.S. Gulf of Mexico Submersibles (2)
                         
 
Noble Joe Alford
Pace Marine 85G
1982/2006
70’-C
US GOM
Mariner
3/14/2009
9/13/2009
67-69
           
                               
 
Noble Lester Pettus
Pace Marine 85G
1982/2007
70’-C
US GOM
LLOG/Hunt Oil
9/27/2008
6/09/2009
57-59
           
         
US GOM
Shipyard
6/10/2009
 
-
Cold Stacked.
 
14
8
91
92
                               
 
Mexico Semisubmersible (1) (c)
                         
 
Noble Max Smith
Noble EVA 4000™
1980/1999
7,000'
Bay of Campeche
Pemex
8/01/2008
7/31/2011
483-485
   
7
     
                               
 
Mexico Jackups (12) (c, d)
                         
 
Noble Bill Jennings
MLT Class 84-E.R.C.
1975/1997
390’-IC
Bay of Campeche
Pemex
12/18/2008
6/17/2009
149-151
This contract commenced 6/18/2008.  This contract reprices every three months based on an index of jackup rates in seven international regions.  During the period from 3/18/2009 until 6/17/2009, the rate was fixed at a dayrate of $149k-$151k.
         
         
Bay of Campeche
Pemex
6/18/2009
6/17/2010
121-123
On 6/18/2009, the contract repriced at a new dayrate of $121k-$123k.   The next date on which the contract is expected to reprice is 9/18/2009.
         
                               
 
Noble Eddie Paul
MLT Class 84-E.R.C.
1976/1995
390’-IC
Bay of Campeche
Pemex
6/05/2007
12/03/2009
177-179
     
8
   
                               
 
Noble Leonard Jones
MLT Class 53-E.R.C.
1972/1998
390’-IC
Bay of Campeche
Pemex
6/24/2007
12/22/2009
185-187
   
14
     
                               
 
Noble Roy Butler
F&G L-780 MOD II
1982/1998
  300’-IC (f)
Bay of Campeche
Pemex
3/06/2009
4/23/2010
167-169
   
14
   
7
                               
 
Noble Johnnie Hoffman
Baker Marine BMC 300
1976/1993
300’-IC
Bay of Campeche
Pemex
10/31/2007
4/14/2010
170-172
           
                               
 
Noble Gene Rosser
Levingston Class 111-C
1977/1996
300’-IC
Bay of Campeche
Pemex
12/21/2007
6/20/2010
170-172
         
10
                               
 
Noble John Sandifer
Levingston Class 111-C
1975/1995
300’-IC
Bay of Campeche
Pemex
9/24/2007
3/20/2010
170-172
           
                               
 
Noble Lewis Dugger
Levingston Class 111-C
1977/1997
300’-IC
Bay of Campeche
Pemex
6/18/2008
6/17/2009
144-146
This contract commenced 6/18/2008.  The contract reprices every three months based on an index of jackup rates in seven international regions.   During the period from 3/18/2009 until 6/17/2009, the rate was fixed at a dayrate of $144k-$146k.
       
21
         
Bay of Campeche
Pemex
6/18/2009
1/31/2010
122-124
On 6/18/2009, the contract repriced at a new dayrate of $122k-$124k.   The next date on which the contract is expected to reprice is 9/18/2009.
         
                               
 
Noble Sam Noble
Levingston Class 111-C
1982
300’-IC
Bay of Campeche
Pemex
9/22/2007
3/21/2010
170-172
   
9
     
                               
 
Noble Earl Frederickson
MLT Class 82-SD-C
1979/1999
250’-IC
Bay of Campeche
Pemex
1/13/2009
4/12/2009
138-140
This contract commenced 7/13/2008.  The contract reprices every three months based on an index of jackup rates in seven international regions.    During the period from 1/13/2009 until 4/12/2009, the rate was fixed at a dayrate of $138k-$140k.
       
21
         
Bay of Campeche
Pemex
4/13/2009
8/25/2010
121-123
On 4/13/2009, the contract repriced at a new dayrate of $121k-$123k.   The next date on which the contract is expected to reprice is 7/13/2009.
         
                               
 
Noble Tom Jobe
MLT Class 82-SD-C
1982
250’-IC
Bay of Campeche
Pemex
8/07/2008
2/06/2009
154-156
This contract commenced 8/07/2008.  The contract reprices every three months based on an index of jackup rates in seven international regions.  During the period from 2/07/2009 until 5/06/2009, this contract was fixed at a dayrate of $157k-$159k.
       
8
         
Bay of Campeche
Pemex
2/07/2009
5/06/2009
157-159
   
5
     
         
Bay of Campeche
Pemex
5/07/2009
12/06/2011
132-134
On 5/07/2009, the contract repriced at a new dayrate of $132k-$134k.   The next date on which the contract is expected to reprice is 8/07/2009.
         
                               
 
Noble Carl Norberg
MLT Class 82-C
1976/2003
250'-IC
Bay of Campeche
Pemex
3/02/2009
3/02/2011
154-156
This 731 day contract is fixed at a dayrate of $154k-$156k until 9/02/2009 after which time the contract reprices every three months based on an index of jackup rates in seven international regions.
 
2
     
                               
 
Changes from last Fleet Status Report denoted by Red, Bold, Underlined type.
         
 
 
Page 1 of 4

 
 
 
 
NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - June 23, 2009
   
.
   
Approximate actual and estimated unpaid down time days *
 
RIG
RIG DESIGN
YEAR BUILT / REBUILT
WATER DEPTH
LOCATION
OPERATOR
ESTIMATED CONTRACT START DATE
ESTIMATED CONTRACT EXPIRATION DATE
FULL CONTRACT DAYRATE ($000)
COMMENTS
 
2Q-09
2Q-09
3Q-09
4Q-09
                       
A
E
E
E
 
 
Brazil Semisubmersibles (3) (c )
                                                                          
 
Noble Dave Beard - Newbuild
F&G 9500 Enhanced Pacesetter
1986/2008
10,000'-DP
Customs/testing
Shipyard
3/29/2009
12/31/2009
-
The drilling contract for the Noble Dave Beard gives the customer the right to terminate the contract if the rig did not commence operations by December 2008 and also gives the customer the right to apply a penalty for delay beyond the date upon which it had the right to cancel. We continue to discuss an extension for purposes of the late delivery penalty for this rig whereby we would provide additional equipment in exchange for reduced penalties. We believe we will come to an accommodation with the client that is acceptable to us. Install thrusters, commission dynamic positioning and drilling systems.
         
         
Brazil
Petrobras
1/01/2010
12/31/2014
219-221
 
         
                               
                               
 
Noble Paul Wolff
Noble EVA 4000™
1981/1999/
2006
9,200'-DP
Brazil
Petrobras
1/01/2006
6/03/2009
163-165
Eligible for a maximum 20% performance bonus.
         
         
Brazil
Shipyard
6/04/2009
7/15/2009
-
Regulatory inspection.
 
20
8
15
 
         
Brazil
Petrobras
7/16/2009
11/03/2009
163-165
Eligible for a maximum 20% performance bonus.
         
         
Brazil
Petrobras
11/04/2009
11/03/2014
427-429
Eligible for a maximum 15% performance bonus.  Petrobras has an option to convert this to a 6-year term at $416k/day plus a maximum 18% performance bonus; option must be exercised by 11/01/2009.
         
                               
 
Noble Therald Martin (b)
Pentagone 85
1977/2004
4,000'
Brazil
Petrobras
4/11/2007
10/17/2010
113-115
Eligible for a maximum 15% performance bonus.
 
3
     
         
Brazil
Petrobras
10/18/2010
10/17/2015
269-271
Eligible for a maximum 10% performance bonus.
         
                               
 
Brazil Drillships (3) (c )
                           
 
Noble Roger Eason (b)
NAM Nedlloyd-C
1977/2005
7,200'-DP
Brazil
Downtime/Shipyard
11/29/2007
6/07/2009
-
Commissioning systems to prepare for return to work following the repairs related to the fire reported on November 29, 2007.
 
69
     
         
Brazil
Petrobras
6/08/2009
3/14/2010
136-138
Eligible for a maximum 15% performance bonus.
         
         
Brazil
Petrobras
3/15/2010
4/30/2011
346-348
Eligible for a maximum of 15% performance bonus.
         
         
Brazil
Petrobras
5/01/2011
9/28/2011
89-91
Anticipate to enter the shipyard for +/- 150 days for rig modifications and regulatory inspection.
         
         
Brazil
Petrobras
9/29/2011
8/12/2016
346-348
Eligible for a maximum of 15% performance bonus.
         
                               
 
Noble Leo Segerius (b)
Gusto Engineering Pelican Class
1981/2002
5,600’-DP
Brazil
Chevron
8/14/2008
4/30/2009
524-526
           
         
Brazil
Shell
5/01/2009
6/26/2009
524-526
     
4
4
15
         
Brazil
Petrobras
6/27/2009
3/31/2010
300-302
Eligible for a maximum of 15% performance bonus.
         
         
Brazil
Petrobras
4/01/2010
8/29/2010
89-91
Anticipate to enter the shipyard for +/- 150 days for rig modifications and regulatory inspection.
         
         
Brazil
Petrobras
8/30/2010
1/23/2016
300-302
Eligible for a maximum of 15% performance bonus.
         
                               
 
Noble Muravlenko
Gusto Engineering Pelican Class
1982/1997
4,900’-DP
Brazil
Shipyard
2/04/2009
5/09/2009
-
           
         
Brazil
Petrobras
5/10/2009
5/20/2009
119-121
Eligible for a maximum 15% performance bonus.
 
40
     
         
Brazil
Petrobras
5/21/2009
10/31/2010
289-291
Eligible for a maximum of 15% performance bonus.
         
         
Brazil
Petrobras
11/01/2010
3/31/2011
89-91
Anticipate to enter the shipyard for +/- 150 days for rig modifications and regulatory inspection.
         
         
Brazil
Petrobras
4/01/2011
8/14/2015
289-291
Eligible for a maximum of 15% performance bonus.
         
                               
 
North Sea Semisubmersible (1)
                         
 
Noble Ton van Langeveld
Offshore Co. SCP III Mark 2
1979/2000
1,500'
United Kingdom
Venture
6/30/2008
6/29/2009
359-361
           
         
United Kingdom
Venture
6/30/2009
6/30/2010
379-381
Plus a six month priced option at a dayrate of $380k to be declared before 12/31/2009.
         
                               
 
North Sea Jackups (8)
                           
 
Noble Hans Deul
F&G JU-2000E
2008
400'-IC
Netherlands
Shell
2/06/2009
2/05/2011
127-129
           
                               
 
Noble Julie Robertson
Baker Marine Europe Class
1981/2001
 390'-IC (e)
United Kingdom
Venture
9/15/2008
9/14/2009
197-199
       
4
 
         
United Kingdom
Venture
9/15/2009
9/14/2010
211-213
           
         
 
                   
 
Noble Al White
CFEM T-2005-C
1982/2005
360’-IC
Netherlands
Total
10/08/2008
10/07/2009
207-209
           
                               
 
Noble Byron Welliver
CFEM T-2005-C
1982
300’-IC
Denmark
Maersk
9/04/2008
9/03/2009
209-211
       
16
 
                               
 
Noble Lynda Bossler
MSC/CJ-46
1982
250’-IC
Netherlands
Wintershall
3/02/2009
8/01/2009
219-221
           
         
Netherlands
Cirrus Energy
8/02/2009
10/01/2009
219-221
           
                               
 
Noble Piet van Ede
MSC/CJ-46
1982
250’-IC
Netherlands
Gaz de France
1/01/2009
12/31/2009
211-213
           
                               
 
Noble Ronald Hoope
MSC/CJ-46
1982
250’-IC
Netherlands
Gaz de France
1/01/2009
12/31/2009
211-213
           
                               
 
Noble George Sauvageau
NAM Nedlloyd-C
1981
250’-IC
Netherlands
Wintershall
1/01/2009
12/31/2009
219-221
   
1
     
 
Changes from last Fleet Status Report denoted by Red, Bold, Underlined type.
             
 
 
Page 2 of 4

 
 
 
 
NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - June 23, 2009
   
.
   
Approximate actual and estimated unpaid down time days *
 
RIG
RIG DESIGN
YEAR BUILT / REBUILT
WATER DEPTH
LOCATION
OPERATOR
ESTIMATED CONTRACT START DATE
ESTIMATED CONTRACT EXPIRATION DATE
FULL CONTRACT DAYRATE ($000)
COMMENTS
 
2Q-09
2Q-09
3Q-09
4Q-09
                       
A
E
E
E
 
 
West Africa Semisubmersible (1) (c )
                                                                        
 
Noble Homer Ferrington
F&G 9500 Enhanced Pacesetter
1985/2004
6,000'
Cote d'lvoire
CNR International
4/13/2008
4/17/2009
433-435
           
         
Malta/Libya
ExxonMobil
4/18/2009
4/17/2012
536-538
Uplift in dayrate for operations in Libya from contract dayrate of $505k-$507k per day included.
   
10
   
                               
 
West Africa Jackups (5) (c )
                         
 
Noble Percy Johns
F&G L-780 MOD II
1981/1995
300’-IC
Nigeria
ExxonMobil
3/28/2009
3/27/2010
182-184
   
2
     
                               
 
Noble Tommy Craighead
F&G L-780 MOD II
1982/2003
300’-IC
Cameroon
Shipyard
2/03/2009
5/18/2009
-
Upgrades and regulatory inspection.
         
         
Cameroon
Shipyard
5/19/2009
 
-
Available.
 
84
8
   
                               
 
Noble Ed Noble
MLT Class 82-SD-C
1984/2003
250’-IC
Nigeria
ExxonMobil
9/03/2008
7/15/2009
172-174
           
                               
 
Noble Lloyd Noble
MLT Class 82-SD-C
1983/1990
250’-IC
Cameroon
Shipyard
2/01/2009
5/18/2009
-
Upgrades and regulatory inspection.
         
         
Cameroon
Shipyard
5/19/2009
 
-
Available.
 
84
8
   
                               
 
Noble Don Walker
Baker Marine BMC 150-SD
1982/1992
150’-IC
Cameroon
Shipyard
3/11/2009
 
-
Available.
 
84
8
   
                               
 
Arabian Gulf Jackups (14) (c )
                         
 
Noble Roger Lewis
F&G JU-2000E
2007
400'-IC
Qatar
Shell
2/03/2008
2/02/2010
104-106
           
                               
 
Noble Jimmy Puckett
F&G L-780 MOD II
1982/2002
300'-IC
Qatar
RasGas
11/29/2007
6/18/2009
59-61
Exercised seven option wells.
         
           
RasGas - Options
6/19/2009
TBA
59-61
Exercised one well @ $59k-$61k (9th of 9 option wells).  Estimated time to complete this well is between 65 and 120 days.
         
           
RasGas - Options
TBA
TBA
65-73
Exercise one well @ $65k-$67k (1st of nine option wells).  Remaining options but not yet exercised:  Eight wells @ $65k-$67k/day and nine wells @ $71k-$73k/day.  Estimated time to complete each well is +/- 65 days.
         
                               
 
Noble Kenneth Delaney
F&G L-780 MOD II
1983/1998
300'-IC
Qatar
QatarGas 3 & 4
8/01/2008
6/07/2009
198-199
           
         
Qatar
QatarGas 3 & 4
6/08/2009
3/31/2010
162-164
Received contract customer projects length is +/- 10 months, however, contract is subject to a 90-day notice of cancellation or extension.
         
                               
 
Noble Gus Androes
Levingston Class 111-C
1982/2004
300'-IC
UAE (Abu Dhabi)
Total ABK - Extension
4/01/2009
4/29/2009
108-110
           
         
UAE (Hamriyah)
Shipyard
4/30/2009
 
-
Available.
 
54
     
                               
 
Noble Harvey Duhaney
Levingston Class 111-C
1976/2001
300'-IC
Qatar
Total
3/25/2008
4/04/2009
98-100
           
         
Qatar
Total
4/05/2009
4/04/2010
84-86
Contract is subject to a 60-day notice of cancellation.
         
                               
 
Noble Mark Burns
Levingston Class 111-C
1980/2005
300'-IC
UAE (Dubai)
Dubai Petroleum
10/12/2007
10/11/2009
#
Rate withheld at request of operator.
         
                               
 
Noble Roy Rhodes
MLT Class 116-C
1979
300’-IC (g)
UAE (Dubai)
Dubai Petroleum
3/25/2009
4/15/2009
39-41
Rig will serve as an accomodation.
         
         
UAE (Sharjah)
Shipyard
4/16/2009
9/14/2009
-
Upgrades and regulatory inspection.
 
69
8
45
 
                               
 
Noble Cees van Diemen
Modec 300C-38
1981/2004
300'-IC
Qatar
Anadarko
3/07/2009
5/13/2009
169-171
           
         
UAE (Hamriyah)
Shipyard
5/14/2009
 
-
Available.
 
41
     
                               
 
Noble David Tinsley
Modec 300C-38
1981/2004
300'-IC
UAE (Sharjah)
Shipyard
3/10/2009
4/30/2009
-
Upgrades and regulatory inspection.
         
         
Qatar
Maersk Oil Qatar
5/01/2009
5/08/2009
51-53
Received contract for rig to serve as an accommodation.
         
         
UAE (Hamriyah)
Shipyard
5/09/2009
TBA
-
Leg repair.
 
76
8
91
92
                               
 
Noble Gene House
Modec 300C-38
1981/1998
300'-IC
Qatar
QatarGas 3 & 4
1/01/2009
5/20/2009
162-164
Received contract customer projects length is +/- 10 months, however, contract is subject to a 90-day notice of cancellation or extension.
 
3
     
         
Qatar
Maersk Oil Qatar
5/21/2009
2/19/2010
47-49
Received Contract for rig to serve as an accommodation.  Contract is for a minimum of six months firm and is subject to a  three month cancellation notice.
         
                               
 
Noble Charles Copeland
MLT Class 82-SD-C
1979/2001
280’-IC
UAE (Hamriyah)
Shipyard
2/15/2009
6/15/2009
-
Upgrades and regulatory inspection.
 
84
     
         
UAE (Hamriyah)
Shipyard
6/16/2009
 
-
Available.
         
                               
 
Noble Chuck Syring
MLT Class 82-C
1976/1996
250’-IC
Qatar
Maersk
11/12/2007
11/11/2009
162-163
         
50
                               
 
Dhabi II
Baker Marine BMC 150
1982/2006
150'-IC
UAE (Abu Dhabi)
ADOC
7/15/2008
7/14/2011
91-93
           
                               
 
Noble Dick Favor
Baker Marine BMC 150
1982/2004
150’-IC
UAE (Sharjah)
Shipyard
10/21/2008
 
-
Available.
 
84
8
   
                               
 
Changes from last Fleet Status Report denoted by Red, Bold, Underlined type.
         
 
 
Page 3 of 4

 
 
 
 
NOBLE CORPORATION AND SUBSIDIARIES FLEET STATUS REPORT - June 23, 2009
   
.
   
Approximate actual and estimated unpaid down time days *
 
RIG
RIG DESIGN
YEAR BUILT / REBUILT
WATER DEPTH
LOCATION
OPERATOR
ESTIMATED CONTRACT START DATE
ESTIMATED CONTRACT EXPIRATION DATE
FULL CONTRACT DAYRATE ($000)
COMMENTS
 
2Q-09
2Q-09
3Q-09
4Q-09
                       
A
E
E
E
 
 
India Jackups (3) (c, d)
                                                                          
 
Noble Ed Holt
Levingston Class 111-C
1981/2003
300’-IC
India
Jindal/ONGC
1/15/2007
9/30/2009
82-83
Rig bareboat chartered to Jindal which is contracted with ONGC.
       
31
                               
 
Noble George McLeod
F&G L-780 MOD II
1981/1995
300’-IC
In-transit
Jindal/ONGC
12/18/2008
1/04/2009
-
Anticipate lump sum fee will offset mobilization costs.
         
         
India
Jindal/ONGC
1/05/2009
1/04/2012
132-134
Rig bareboat chartered to Jindal which is contracted with ONGC.
         
                               
 
Noble Charlie Yester
MLT Class 116-C
1980
300’-IC
India
Jindal/ONGC
1/30/2007
1/29/2010
130-131
Rig bareboat chartered to Jindal which is contracted with ONGC.
         
                               
 
Far East Semisubmersibles (2)
                         
                               
 
Noble Danny Adkins - Newbuild
Bingo 9000
1999/2009
12,000'-DP
Singapore - Jurong
Shipyard
 
9/30/2009
-
           
         
In-transit & acceptance testing
Shell
10/01/2009
1/31/2010
424-426
Prior to rig delivery, the Noble Danny Adkins' contract is subject to a 90-day notice of cancellation (after 4/30/2009) which we have not received.  We continue to discuss an agreement with the client which would extend the rig delivery date.  We believe we will come to an accomodation with the client that is acceptable to us.  The rig is expected to experience approximately 21 days of downtime in 1Q 2010 for contract preparation.
         
         
US GOM
Shell
2/01/2010
10/31/2013
446-448
           
                               
 
Noble Jim Day -
Newbuild
Bingo 9000
1999/2009
12,000'-DP
Singapore - Jurong
Shipyard
 
4/30/2010
-
           
         
In-transit & acceptance testing
Marathon
5/01/2010
8/14/2010
-
Lump sum fee will offset mobilization costs.  The drilling contract for the Noble Jim Day contains a termination right in the event the rig is not ready to commence operations by December 31, 2010.
         
         
US GOM
Marathon
8/15/2010
8/14/2014
514-516
           
                               
 
Far East Drillship (1)
                           
 
Globetrotter - Newbuild
Globetrotter Class
2011
10,000'-DP
Dalian, China - STX / Netherlands - Huisman
Shipyard
 
9/30/2011
-
 
         
         
In-transit & acceptance testing
TBA
10/01/2011
12/31/2011
             
         
TBA
TBA
1/01/2012
TBA
TBA
Available.
         
                               
 
Far East Jackups (1)
                           
 
Noble Scott Marks - Newbuild
F&G JU-2000E
2009
400'-IC
Dalian, China - DSIC
Shipyard
 
6/24/2009
-
           
         
In-transit
Venture
6/25/2009
8/24/2009
44-46
The Noble Scott Marks must be provided by September 30, 2009 or our customer has the right to terminate the contract.
         
         
North Sea
Venture
8/25/2009
8/24/2011
209-211
           
                       
874
86
266
347
 
 
         
 
 
 
2009 Total (includes: shipyard, stacked, and downtime days.
2306
 
 
(a)
Unit has been upgraded to the NC-5SM mooring standard.
(b)
Rig utilizes the Aluminum Alloy Riser technology.
(c)
In various market segments, the Company contracts with certain parties for the provision of certain local services and advice.  Compensation paid to such parties by the Company typically is based on a percentage of the drilling contract’s daywork operating rate, and the Company accounts for such payments in its financial statements in the contract drilling services operating costs and expenses line item.
(d)
Listed rigs are modified bareboat charter; cost structure varies by region.
(e)
Leg extensions fabricated to enable the rig to operate in up to 390' of water in a non-harsh environment.
(f)
Rig is currently equipped to operate in 250' of water.  Leg extensions fabricated to enable the rig to operate in up to 300' of water.
(g)
Rig is currently equipped to operate in 250' of water.
           
   
   
*
A = Actual approximate downtime incurred during the quarter indicated as of the report date;  E = Estimated additional downtime days expected to occur as of the report date.
   
 #
 = Rate withheld at request of operator.
   
 
Changes from last Fleet Status Report denoted by Red, Bold, Underlined type.
 
 
Page 4 of 4