XML 33 R22.htm IDEA: XBRL DOCUMENT v3.5.0.2
Commitments and Contingencies
6 Months Ended
Jun. 30, 2016
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Commitments and Contingencies
General
A description of environmental, asbestos and other legal matters relating to certain of our subsidiaries is included in this section. In addition to the matters noted herein, we are from time to time subject to, and are presently involved in, other litigation and legal proceedings arising in the ordinary course of business. We believe the outcome of such other litigation and legal proceedings will not have a material adverse effect on our financial condition, results of operations and cash flows. Expenses for administrative and legal proceedings are recorded when incurred.
Environmental
Our facilities and operations are subject to federal, state and local environmental and occupational health and safety requirements of the U.S. and foreign countries. We take a proactive approach in our efforts to comply with environmental, health and safety laws as they relate to our manufacturing operations and in proposing and implementing any remedial plans that may be necessary. We also regularly conduct comprehensive environmental, health and safety audits at our facilities to maintain compliance and improve operational efficiency.
Although we believe past operations were in substantial compliance with the then applicable regulations, we or one or more of our subsidiaries are involved with various remediation activities at 14 sites where the future cost per site for us or our subsidiary is expected to exceed $100,000. Investigations have been completed for 10 sites and are in progress at the other 4 sites. Our costs at a majority of these sites relate to remediation projects at former operating facilities that were sold or closed and primarily deal with soil and water contamination.
Our policy is to accrue environmental investigation and remediation costs when it is probable that a liability has been incurred and the amount can be reasonably estimated. The measurement of the liability is based on an evaluation of currently available facts with respect to each individual situation and takes into consideration factors such as existing technology, presently enacted laws and regulations and prior experience in remediation of contaminated sites. Liabilities are established for all sites based on these factors. As assessments and remediation progress at individual sites, these liabilities are reviewed periodically and adjusted to reflect additional technical data and legal information. As of June 30, 2016 and December 31, 2015, we had accrued liabilities of $20.0 million and $16.8 million, respectively, for estimated future expenditures relating to environmental contingencies. These amounts have been recorded on an undiscounted basis in the Consolidated Balance Sheets. Given the uncertainties regarding the status of laws, regulations, enforcement policies, the impact of other parties potentially being liable, technology and information related to individual sites, we do not believe it is possible to develop an estimate of the range of reasonably possible environmental loss in excess of our recorded liabilities.
Except as described below, we believe that our accruals for specific environmental liabilities are adequate for those liabilities based on currently available information. Actual costs to be incurred in future periods may vary from estimates because of the inherent uncertainties in evaluating environmental exposures due to unknown and changing conditions, changing government regulations and legal standards regarding liability.
Based on our prior ownership of Crucible Steel Corporation a/k/a Crucible, Inc. (“Crucible”), we may have additional contingent liabilities in one or more significant environmental matters. One such matter, which is included in the 14 sites referred to above, is the Lower Passaic River Study Area of the Diamond Alkali Superfund Site in New Jersey. Crucible operated a steel mill abutting the Passaic River in Harrison, New Jersey from the 1930s until 1974, which was one of many industrial operations on the river dating back to the 1800s. Certain contingent environmental liabilities related to this site were retained by Coltec when Coltec sold a majority interest in Crucible Materials Corporation (the successor of Crucible) in 1985. The United States Environmental Protection Agency (the “EPA”) notified Coltec in September 2003 that it is a potentially responsible party (“PRP”) for Superfund response actions in the lower 17-mile stretch of the Passaic River known as the Lower Passaic River Study Area. Coltec and approximately 70 of the numerous other PRPs, known as the Cooperating Parties Group, are parties to a May 2007 Administrative Order on Consent with the EPA to perform a Remedial Investigation/Feasibility Study (“RI/FS”) of the contaminants in the Lower Passaic River Study Area. The RI/FS was completed and submitted to the EPA in April 2015. The RI/FS recommends a targeted dredge and cap remedy with monitored natural recovery and adaptive management for the Lower Passaic River Study Area. The cost of such remedy is estimated to be $726 million. Previously, on April 11, 2014, the EPA released its Focused Feasibility Study (the “FFS”) with its proposed plan for remediating the lower eight miles of the Lower Passaic River Study Area. The FFS calls for bank-to-bank dredging and capping of the riverbed of that portion of the river and estimates a range of the present value of aggregate remediation costs of approximately $953 million to approximately $1.73 billion, although estimates of the costs and the timing of costs are inherently imprecise. On March 3, 2016, the EPA issued the final Record of Decision (ROD) as to the remedy for the lower 8 miles of the Lower Passaic River Study Area, with the maximum estimated cost being reduced by the EPA from $1.73 billion to $1.38 billion, primarily due to a reduction in the amount of cubic yards of material that will be dredged.
No final allocations of responsibility have been made among the numerous PRPs that have received notices from the EPA, there are numerous identified PRPs that have not yet received PRP notices from the EPA, and there are likely many PRPs that have not yet been identified. Based on our evaluation of the site, during 2014 we accrued a liability of $3.5 million related to environmental remediation costs associated with the lower eight miles of the Lower Passaic River Study Area, which is our estimate of the low end of a range of reasonably possible costs, with no estimate within the range being a better estimate than the minimum. Our actual remediation costs could be significantly greater than the $3.5 million we accrued. With respect to the upper nine miles of the Lower Passaic River Study Area, we are unable to estimate a range of reasonably possible costs.
Another such matter involves the Onondaga Lake Superfund Site (the “Onondaga Site”) located near Syracuse, New York. Crucible operated a steel mill facility adjacent to Onondaga Lake from 1911 to 1983. The New York State Department of Environmental Conservation (“NYSDEC”) has notified the Company and Coltec, as well as other parties, demanding reimbursement of unquantified environmental response costs incurred by NYSDEC and the EPA at the Onondaga Site. NYSDEC and EPA have alleged that contamination from the Crucible facility contributed to the need for environmental response actions at the Onondaga Site. In addition, Honeywell International Inc. (“Honeywell”), which has undertaken certain remediation activities at the Onondaga Site under the supervision of NYSDEC and the EPA, has informed the Company that it has claims against Coltec related to investigation and remediation at the Onondaga Site. We have entered into tolling agreements with NYSDEC, the EPA and Honeywell. On May 4, 2016, we received from Honeywell a summary of its claims. We have corresponded with Honeywell and agreed to begin discussions with them regarding their claims. In addition, the Company has received notice from the Natural Resource Trustees for the Onondaga Lake Superfund Site (which are the U. S. Department of Interior, NYSDEC, and the Onondaga Nation) alleging that Coltec is considered to be a potentially responsible party for natural resource damages at the Onondaga Site. At this time, based on limited information we have with respect to estimated remediation costs and the respective allocation of responsibility for remediation among potentially responsible parties, we cannot estimate a reasonably possible range of loss associated with Crucible’s activities that may have affected the Onondaga Site. We have reserved approximately $1.5 million for reimbursement of EPA response costs and certain costs associated with the remedial investigation.
Except with respect to specific Crucible environmental matters for which we have accrued a portion of the liability set forth above, including the Lower Passaic River Study Area, we are unable to estimate a reasonably possible range of loss related to any other contingent environmental liability based on our prior ownership of Crucible.
See the section entitled “Crucible Steel Corporation a/k/a Crucible, Inc.” in this footnote for additional information.
In addition to the Crucible environmental matters discussed above, Coltec has received a notice from the EPA asserting that Coltec is a potentially responsible party under CERCLA as the successor to a former operator in 1954 and 1955 of two uranium mines in Arizona. On October 15, 2015, Coltec received another notice from the EPA asserting that Coltec is a potentially responsible party as the successor to the former operator of six additional uranium mines in Arizona. At this time, although discussions with the EPA and other interested parties are ongoing, we have limited information regarding the sites and cannot estimate a reasonably possible range of loss associated with remediation or other costs at these sites. In 2015, we reserved $1.1 million for the minimum amount of probable loss associated with the first two sites identified by the EPA, including the cost of the investigative work to be conducted at such sites. During the second quarter of 2016, we reserved an additional $1.1 million for the minimum amount of probable loss associated with the six additional sites, which includes estimated costs of investigative work to be conducted at such sites, resulting in a total reserve of $2.2 million.
In connection with the former operation of a division of Colt Industries Inc, located in Water Valley, Mississippi, which Coltec divested to BorgWarner, Inc. in 1996, Coltec has been managing trichloroethylene soil and groundwater contamination at the site, which is included in the 14 sites referred to above. In February 2016, the Mississippi Department of Environmental Quality (MDEQ) issued an order against EnPro requiring evaluation of potential vapor intrusion into residential homes and commercial facilities located over the groundwater plume as well as requiring additional groundwater investigation and remediation. MDEQ performed the initial vapor intrusion investigations, with the findings all being below the applicable screening level. The parties have since entered into a new order stating that MDEQ will perform a second round of seasonable vapor intrusion testing in the summer of 2016 and including negotiated time frames for groundwater remediation. As a result of these recent developments, in the first quarter of 2016, we reserved an additional $1.3 million to account for the investigation, additional remediation and long-term active monitoring necessary to comply with the orders. In addition, it is our understanding that area homeowners, owners of commercial facilities and the local county government and possibly other private parties and individuals have engaged legal counsel to separately evaluate possible legal action relating to potential vapor intrusion and groundwater contamination.

Colt Firearms and Central Moloney
We may have contingent liabilities related to divested businesses for which certain of our subsidiaries retained liability or are obligated under indemnity agreements. These contingent liabilities include, but are not limited to, potential product liability and associated claims related to firearms manufactured prior to March 1990 by Colt Firearms, a former operation of Coltec, and for electrical transformers manufactured prior to May 1994 by Central Moloney, another former Coltec operation. We believe that these potential contingent liabilities are not material to our financial condition, results of operation and cash flows. Coltec also has ongoing obligations, which are included in other liabilities in our Consolidated Balance Sheets, with regard to workers’ compensation, retiree medical and other retiree benefit matters that relate to Coltec’s periods of ownership of these operations.
Crucible Steel Corporation a/k/a Crucible, Inc.
Crucible, which was engaged primarily in the manufacture and distribution of high technology specialty metal products, was a wholly owned subsidiary of Coltec until 1983 when its assets and liabilities were distributed to a new Coltec subsidiary, Crucible Materials Corporation. Coltec sold a majority of the outstanding shares of Crucible Materials Corporation in 1985 and divested its remaining minority interest in 2004. Crucible Materials Corporation filed for Chapter 11 bankruptcy protection in May 2009.
We have certain ongoing obligations, which are included in other liabilities in our Consolidated Balance Sheets, including workers’ compensation, retiree medical and other retiree benefit matters, related to Coltec’s period of ownership of Crucible. Based on Coltec’s prior ownership of Crucible, we may have certain additional contingent liabilities, including liabilities in one or more significant environmental matters included in the matters discussed in “Environmental” above. We are investigating these matters. Except with respect to those matters for which we have an accrued liability as discussed in "Environmental" above, we are unable to estimate a reasonably possible range of loss related to these contingent liabilities.
Warranties
We provide warranties on many of our products. The specific terms and conditions of these warranties vary depending on the product and the market in which the product is sold. We record a liability based upon estimates of the costs we may incur under our warranties after a review of historical warranty experience and information about specific warranty claims. Adjustments are made to the liability as claims data and historical experience necessitate.
Changes in the carrying amount of the product warranty liability for the six months ended June 30, 2016 and 2015 are as follows:
 
2016
 
2015
 
(in millions)
Balance at beginning of year
$
4.8

 
$
3.5

Net charges to expense
2.0

 
1.0

Settlements made
(2.8
)
 
(0.8
)
Balance at end of period
$
4.0

 
$
3.7


BorgWarner
A subsidiary of BorgWarner Inc. (“BorgWarner”) has asserted claims against GGB France E.U.R.L. (“GGB France”), with respect to certain bearings supplied by GGB France to BorgWarner and used by BorgWarner in manufacturing hydraulic control units included in motor vehicle automatic transmission units, that the bearings caused performance problems with the transmission units, leading to associated repairs and replacements. BorgWarner and GGB France are participating in a technical review before a panel of experts to determine, among other things, whether there were any defects in such bearings that were a cause of the damages claimed by BorgWarner, including whether GGB France was required to notify BorgWarner of a change in the source of a raw material used in the manufacture of such bearings. This technical review is a required predicate to the commencement of a legal proceeding for damages. In June 2016, the expert panel issued a preliminary report on technical matters considered by the experts. The preliminary report concluded that the change in the source of the raw material was a technical cause of the performance problems claimed by BorgWarner and that GGB France was obligated to notify BorgWarner regarding the change. A preliminary report of the expert panel on related financial matters is anticipated to be issued in or around the third quarter of 2016, which would be followed by a final report of the expert panel, which is anticipated to be issued later in 2016. We believe that GGB France has valid factual and legal defenses to these claims and we are vigorously defending these claims. Among GGB France’s legal defenses is a contractual disclaimer of consequential damages, which, if controlling, would limit GGB France’s liability to replacing the bearings at issue at a cost of approximately 0.4 million EUR, and that the determination of any duty to notify is a legal matter to be determined by the presiding court. We cannot estimate GGB France’s reasonably possible range of loss associated with this matter, but we estimate the minimum amount to be approximately 0.4 million EUR based on GGB's legal defenses described above. Accordingly, GGB France accrued $0.4 million during the second quarter of 2016 associated with this matter.

AVL
On December 17, 2014, AVL Powertrain Engineering, Inc. (“AVL”) filed a lawsuit against Fairbanks Morse alleging damages in connection with a contract dated August 28, 2008 between AVL and Fairbanks Morse pursuant to which AVL conducted engine testing services for certain AVL customers at certain of Fairbanks Morse’s facilities in Beloit, Wisconsin during the 2010 to 2012 time period. AVL claimed that it was unable to conduct its desired level of engine testing and asserted alternative damages theories based on rescission and lost profits. On April 21, 2016, Fairbanks Morse agreed to pay AVL $2.7 million to settle the lawsuit, in advance of a jury trial scheduled to begin on April 25, 2016 in the United States District Court for the Western District of Wisconsin.  Our settlement decision followed certain negative developments that occurred in the weeks prior to the scheduled trial, including adverse pre-trial rulings and information obtained during the latter stages of discovery. The $2.7 million settlement is reflected in selling, general and administrative expense in the first quarter of 2016 in the accompanying Consolidated Statements of Operations.
Asbestos
Background on Asbestos-Related Litigation. The historical business operations of GST LLC and Anchor resulted in a substantial volume of asbestos litigation in which plaintiffs alleged personal injury or death as a result of exposure to asbestos fibers in products produced or sold by GST LLC or Anchor, together with products produced and sold by numerous other companies. GST LLC and Anchor manufactured and/or sold industrial sealing products that contained encapsulated asbestos fibers. Other of our subsidiaries that manufactured or sold equipment that may have at various times in the past contained asbestos-containing components have also been named in a number of asbestos lawsuits, but neither we nor any of our subsidiaries other than GST LLC and Anchor have ever paid an asbestos claim.
Since the first asbestos-related lawsuits were filed against GST LLC in 1975, GST LLC and Anchor have processed more than 900,000 claims to conclusion, and, together with insurers, have paid over $1.4 billion in settlements and judgments and over $400 million in fees and expenses. Our subsidiaries’ exposure to asbestos litigation and their relationships with insurance carriers have been managed through Garrison.
Subsidiary Chapter 11 Filing and Effect. On the Petition Date, GST LLC, Garrison and Anchor filed voluntary petitions for reorganization under Chapter 11 of the United States Bankruptcy Code in the Bankruptcy Court. The filings were the initial step in a claims resolution process, which is ongoing. See Note 16, "Garlock Sealing Technologies LLC and Garrison Litigation Management Group, Ltd." for additional information about this process and its impact on us.
During the pendency of the Chapter 11 proceedings, certain actions proposed to be taken by GST not in the ordinary course of business are subject to approval by the Bankruptcy Court. As a result, during the pendency of these proceedings, we do not have exclusive control over these companies. Accordingly, as required by GAAP, GST was deconsolidated beginning on the Petition Date.
As a result of the initiation of the Chapter 11 proceedings, the resolution of asbestos claims is subject to the jurisdiction of the Bankruptcy Court. The filing of the Chapter 11 cases automatically stayed the prosecution of pending asbestos bodily injury and wrongful death lawsuits, and initiation of new such lawsuits, against GST. Further, the Bankruptcy Court issued an order enjoining plaintiffs from bringing or further prosecuting asbestos products liability actions against affiliates of GST, including EnPro, Coltec and all their subsidiaries, during the pendency of the Chapter 11 proceedings, subject to further order. As a result, except as a result of the resolution of appeals from verdicts rendered prior to the Petition Date and the elimination of claims as a result of information obtained in the Chapter 11 proceedings, the numbers of asbestos claims pending against our subsidiaries have not changed since the Petition Date, and those numbers continue to be as reported in our 2009 Form 10-K and our quarterly reports for the first and second quarters of 2010.
Pending Claims. On the Petition Date, according to Garrison's claim records, there were more than 90,000 total claims pending against GST LLC, of which approximately 5,800 were claims alleging the disease mesothelioma. Mesothelioma is a rare cancer of the protective lining of many of the body’s internal organs, principally the lungs. One cause of mesothelioma is believed to be exposure to asbestos. As a result of asbestos tort reform during the 2000s, most active asbestos-related lawsuits, and a large majority of the amount of payments made by our subsidiaries in the years immediately preceding the Petition Date, have been of claims alleging mesothelioma. In total, GST LLC has paid $563.2 million to resolve a total of 15,300 mesothelioma claims, and another 5,700 mesothelioma claims have been dismissed without payment.
In order to estimate the allowed amount for mesothelioma claims against GST, the Bankruptcy Court approved a process whereby all current GST LLC mesothelioma claimants were required to respond to a questionnaire about their claims. Questionnaires were distributed to the mesothelioma claimants identified in Garrison’s claims database. Many of the 5,800 claimants (over 500) did not respond to the questionnaire at all; many others (more than 1,900) clarified that: claimants do not have mesothelioma, claimants cannot establish exposure to GST products, claims were dismissed, settled or withdrawn, claims were duplicates of other filed claims, or claims were closed or inactive. Still others responded to the questionnaire but their responses were deficient in some material respect. As a result of this process, less than 3,300 claimants presented questionnaires asserting mesothelioma claims against GST LLC as of the Petition Date and many of them either did not establish exposure to GST products or had claims that are otherwise deficient.
Since the Petition Date, many asbestos-related lawsuits have been filed by claimants against other companies in state and federal courts, and many of those claimants might also have included GST LLC as a defendant but for the bankruptcy injunction.
Claims Filed in GST Chapter 11. Proofs of claim involving approximately 180,000 claims were filed on or prior to October 6, 2015, the claims bar date established in connection with the second amended plan of reorganization in GST's Chapter 11 proceedings. Many of the more than 90,000 pre-petition claims are likely among the approximately 180,000 claims filed in GST's Chapter 11 proceedings. Approximately 10,000 of the claims filed in GST's Chapter 11 proceedings allege mesothelioma, many of the pre-petition mesothelioma claims likely among those claims.
Based on its preliminary analysis, GST believes that a significant number of such claims were resolved and paid by GST prior to the Petition Date, had been dismissed with prejudice prior to the Petition Date or are time-barred under applicable statutes of limitations. The Joint Plan will provide for a new claims bar date by which proofs of claims for asbestos-related diseases allegedly caused by Coltec must be filed with the Bankruptcy Court or be subject to being forever barred by order of the Bankruptcy Court.
Product Defenses. We believe that the asbestos-containing products manufactured or sold by GST could not have been a substantial contributing cause of any asbestos-related disease. The asbestos in the products was encapsulated, which means the asbestos fibers incorporated into the products during the manufacturing process were sealed in binders. The products were also nonfriable, which means they could not be crumbled by hand pressure. The U.S. Occupational Safety and Health Administration, which began generally requiring warnings on asbestos-containing products in 1972, has never required that a warning be placed on products such as GST LLC’s gaskets. Even though no warning label was required, GST LLC included one on all of its asbestos-containing products beginning in 1978. Further, gaskets such as those previously manufactured and sold by GST LLC are one of the few asbestos-containing products still permitted to be manufactured under regulations of the U.S. Environmental Protection Agency. Nevertheless, GST LLC discontinued all manufacture and distribution of asbestos-containing products in the U.S. during 2000 and worldwide in mid-2001.
Appeals. GST LLC has a record of success in trials of asbestos cases, especially before the bankruptcies of many of the historically significant asbestos defendants that manufactured raw asbestos, asbestos insulation, refractory products or other dangerous friable asbestos products. However, it has on occasion lost jury verdicts at trial. GST has consistently appealed when it has received an adverse verdict and has had success in a majority of those appeals.
GST LLC won a reversal of an adverse verdict in one of three recent appellate decisions. In September 2011, the United States Court of Appeals for the Sixth Circuit overturned a $500,000 verdict against GST LLC that was handed down in 2009 by a Kentucky federal court jury. The federal appellate court found that GST LLC’s motion for judgment as a matter of law should have been granted because the evidence was not sufficient to support a determination of liability. The Sixth Circuit’s chief judge wrote that, “On the basis of this record, saying that exposure to Garlock gaskets was a substantial cause of [claimant’s] mesothelioma would be akin to saying that one who pours a bucket of water into the ocean has substantially contributed to the ocean’s volume.” In May 2011, a three-judge panel of the Kentucky Court of Appeals upheld GST LLC’s $700,000 share of a 2009 jury verdict, which included punitive damages, in a lung cancer case against GST LLC in Kentucky state court. This verdict, which was secured by a bond pending the appeal, was paid in June 2012. In a Kentucky appeal from a 2006 verdict against GST LLC, another Kentucky Court of Appeals panel upheld, in August 2014, GST LLC's share of the verdict and a $600,000 punitive damage award. The verdict against GST LLC totaled $874,000. This verdict and post-judgment interest were secured by a bond in the amount of $1.1 million. The plaintiff in the case agreed to resolve the case, including claims for post-judgment interest, for the amount of the bond and to forego additional accrued interest on the verdict, and GST LLC agreed to discontinue further appeals. Because we were responsible to the bonding company for the bond amount, our Coltec subsidiary purchased the verdict from the plaintiff in September 2014 for the amount of the $1.1 million bond. As a result, Coltec has a claim against GST LLC for the amount of the judgment, including post-judgment interest.
Insurance Coverage. At June 30, 2016 we had $62.0 million of insurance coverage we believe is available to cover current and future GST asbestos claims payments and certain expense payments. GST has collected insurance payments totaling $134.6 million since the Petition Date, including $18.0 million collected in the first six months of 2016. We consider the $62.0 million of available insurance coverage remaining to be of high quality because the insurance policies are written or guaranteed by U.S.-based carriers whose credit rating by S&P is investment grade (BBB-) or better, and whose AM Best rating is excellent (A-) or better. Of the $62.0 million, $25.9 million is allocated to claims that were paid by GST LLC prior to the initiation of the Chapter 11 proceedings and submitted to insurance companies for reimbursement, and the remainder is allocated to pending and estimated future claims. There are specific agreements in place with carriers covering $28.2 million of the remaining available coverage. Based on those agreements and the terms of the policies in place and prior decisions concerning coverage, we believe that all of the $62.0 million of insurance proceeds will ultimately be collected, although there can be no assurance that the insurance companies will make the payments as and when due. Based on those agreements and policies, some of which define specific annual amounts to be paid and others of which limit the amount that can be recovered in any one year, we anticipate that $38.0 million will become collectible at the conclusion of GST’s Chapter 11 proceeding and, assuming the insurers pay according to the agreements and policies, that the following amounts should be collected in the years set out below regardless of when the case concludes:
2017$13 million
2018$11 million
GST LLC has received $8.6 million of insurance recoveries from insolvent carriers since 2007, and may receive additional payments from insolvent carriers in the future. No anticipated insolvent carrier collections are included in the $62.0 million of anticipated collections. The insurance available to cover current and future asbestos claims is from comprehensive general liability policies that cover Coltec and certain of its other subsidiaries in addition to GST LLC for periods prior to 1985 and therefore could be subject to potential competing claims of other covered subsidiaries and their assignees.
Liability Estimate. Our recorded asbestos liability as of the Petition Date was $472.1 million. We based that recorded liability on an estimate of probable and estimable expenditures to resolve asbestos personal injury claims under generally accepted accounting principles, made with the assistance of Garrison and an estimation expert, Bates White, retained by GST LLC’s counsel. The estimate developed was an estimate of the most likely point in a broad range of potential amounts that GST LLC might pay to resolve asbestos claims (by settlement in the majority of the cases except those dismissed or tried) over the ten-year period following the date of the estimate in the state court system, plus accrued but unpaid legal fees. The estimate, which was not discounted to present value, did not reflect GST LLC’s views of its actual legal liability. GST LLC has continuously maintained that its products could not have been a substantial contributing cause of any asbestos disease. Instead, the liability estimate reflected GST LLC’s recognition that most claims would be resolved more efficiently and at a significantly lower total cost through settlements without any actual liability determination.
From the Petition Date through the first quarter of 2014, neither we nor GST endeavored to update the accrual except as necessary to reflect payments of accrued fees and the disposition of cases on appeal. In each asbestos-driven Chapter 11 case that has been resolved previously, the amount of the debtor’s liability has been determined as part of a consensual plan of reorganization agreed to by the debtor, its asbestos claimants and a legal representative for its potential future claimants. GST did not believe that there was a reliable process by which an estimate of such a consensual resolution could be made and therefore believed that there was no basis upon which it could revise the estimate last updated prior to the Petition Date.
Given the Bankruptcy Court's January 2014 decision estimating GST's liability for present and future mesothelioma claims at $125 million and GST's filing in May 2014 of its first amended proposed plan of reorganization setting out its intention to fund a plan with total consideration of $275 million, GST undertook to revise its estimate of its ultimate expenditures to resolve all present and future asbestos claims against it to be no less than the amounts required under its amended proposed plan. Similarly, while GST believed it to be an unlikely worst case scenario, GST believed its ultimate expenditures to resolve all asbestos claims against it could be no more than the total value of GST. As a result, GST believed that its ultimate asbestos expenditures would be somewhere in that range between those two values and therefore revised its estimate to the low end of the range. Accordingly, at June 30, 2014, GST revised its estimate of its ultimate expenditures to resolve all present and future asbestos claims to $280.5 million, the amount of expenditures necessary to resolve all asbestos claims under that amended plan.
In light of the filing of the second amended proposed plan of reorganization by GST on January 14, 2015, GST undertook to further revise its estimate of the ultimate costs to resolve all asbestos claims against it. Under the second amended plan, not less than $367.5 million would be required to fund the resolution of all GST asbestos claims, $30 million of which will be funded by Coltec. As a result, GST believed the low end of the range of values that would be necessary for it to resolve all present and future claims to be $337.5 million. Accordingly, GST revised its estimate of its ultimate asbestos expenditures to $337.5 million and had accrued its liability at December 31, 2015 at that amount and Coltec had accrued a liability of $30 million at December 31, 2015 in connection with its contribution to be made pursuant to the Parent Settlement included in the second amended plan. GST’s estimate of this $337.5 million amount did not include any amount with respect to the contingent supplementary contributions to the litigation fund contemplated by the second amended plan because GST believed that initial contributions to the litigation fund would likely be sufficient to fund the litigation and, accordingly, that the low end of a range of reasonably possible loss associated with these contingent supplementary contributions would be $0.
In light of the consensual settlement announced on March 17, 2016, GST further revised its estimate of the ultimate costs to resolve all asbestos claims against it. Under the Joint Plan contemplated by the settlement, $480 million will be required to fund the resolution of all asbestos claims against GST and Coltec, $370 million of which will be funded by GST LLC and Garrison and $110 million of which will be funded by Coltec (an aggregate of $50 million of value upon the effective date of consummation of the Joint Plan and $60 million one year after the effective date). In addition, GST has estimated the amount necessary to resolve all current and future Canadian asbestos claims alleging disease resulting in whole or in part from exposure to GST asbestos-containing products to be $17.0 million. As a result, GST believes the low end of the range of values that will be necessary for it to resolve all present and future asbestos claims is now $387.0 million. GST has revised its estimate of its ultimate asbestos expenditures to $387.0 million and has accrued its liability at June 30, 2016 at that amount and Coltec has accrued a liability of $110.0 million at June 30, 2016 in connection with its contributions to be made pursuant to the Joint Plan.
Proposed Plans of Reorganization. See Note 16, "Garlock Sealing Technologies LLC and Garrison Litigation Management Group, Ltd." for a description of the plans of reorganization filed and proposed to be filed in GST’s Chapter 11 proceedings, including the Joint Plan contemplated by the comprehensive consensual settlement reached with the Future Claimants’ Representative, the Current Asbestos Claimants’ Committee and the Coltec Representatives. The terms of the settlement are set forth in the Term Sheet for Permanent Resolution of All Present and Future GST Asbestos Claims and Coltec Asbestos Claims dated March 17, 2016 among EnPro, Coltec, GST, the Current Asbestos Claimants’ Committee, the Future Claimants’ Representative and the Coltec Representatives included as Exhibit 99.2 to our Form 8-K furnished to the Securities and Exchange Commission on March 18, 2016. Under the settlement, the Current Asbestos Claimants’ Committee, the Future Claimants’ Representative and the Coltec Representatives agreed to join GST and Coltec in proposing a Joint Plan for reorganization that incorporates the settlement and to ask asbestos claimants and the court to approve the plan. The Joint Plan is subject to approval by a vote of at least 75% of asbestos claimants in favor of the plan and by the Bankruptcy Court and the District Court and, if so approved and consummated, would permanently resolve all current and future asbestos claims against GST and Coltec, and would protect all of EnPro and its subsidiaries from those claims, under Section 524(g) of the U.S. Bankruptcy Code. The Joint Plan was filed with the Bankruptcy Court on May 20, 2016 and technical amendments to the Joint Plan were filed with the Bankruptcy Court on June 21, 2016 and July 29, 2016. On July 29, 2016, the Bankruptcy Court entered orders that, among other things, approved the disclosure statement for the Joint Plan, set December 9, 2016 as the deadline for asbestos claimants to vote on approving the Joint Plan, and scheduled the confirmation hearing on the Joint Plan to commence on May 15, 2017. The Joint Plan supersedes all prior plans of reorganization filed by GST in its Chapter 11 proceedings.
The confirmation and consummation of the Joint Plan, and accordingly the final resolution of asbestos claims against GST and Coltec in accordance with the Joint Plan, are subject to a number of risks and uncertainties, which could have the effect of delaying or preventing the confirmation and consummation of the Joint Plan, increasing our costs in connection with effecting the settlement and the consummation of the Joint Plan or reducing the benefit to us related to the consummation of the Joint Plan. In light of these risks and uncertainties, we cannot assure you that the Joint Plan will be consummated on the time schedule that we anticipate or at all, or if consummated that we will recognize all benefits from the consummation of the Joint Plan that we anticipate.