Concession financial assets      
Energy distribution concessions (14.1) 1,370 684
Gas distribution concessions (14.1) 37 34
Indemnifiable receivable - Generation (14.2) 692 816
Concession grant fee - Generation concessions (14.3) 2,950 2,792
 

5,049

4,326

Sector financial assets      
Amounts receivable from Parcel A (CVA) and Other Financial Components  (14.4) 944 2,148
Total

5,993

6,474

     
Current assets 1,055 1,505
Non-current assets 4,938 4,969

 

  2022 2021
Sector financial liabilities    
Amounts receivable from Parcel A (CVA) and Other Financial Components (14.4) - (51)
Total

-

(51)

 

The changes in concession financial assets related to infrastructure are as follows:

       
  Distribution Generation Gas Total
Balance on December 31, 2019 460 3,284 24 3,768
Amounts received - (266) - (266)
Transfers from contract assets 60 - - 60
Transfers from (to) intangible assets (5) - - (5)
Monetary adjustment 15 347 5 367
Balance on December 31, 2020

530

3,365

29

3,924

Transfers of contract assets 110 - - 110
Transfers to intangible assets (9) - - (9)
Additions        
Interest 54 523 5 582
Disposals (1) - - (1)
Amounts received - (280) - (280)
Balance on December 31, 2021

684

3,608

34

4,326

Additions

-

-

-

-

Transfers of contract assets 670 - - 670
Transfers to intangible assets (22) - - (22)
Interest 39 514 3 556
Fair Value Adjustments - (171) - (171)
Disposals (1) - - (1)
Amounts received - (309) - (309)
Balance on December 31, 2022

1,370

3,642

37

5,049

 

a)Distribution - Financial assets

The energy and gas distribution concession contracts are within the scope of IFRIC 12. The financial assets under these contracts refer to the investments made in infrastructure that will be paid by grantor at the end of the concession period. The financial assets are measured at fair value through income or loss, in accordance with regulation of the energy segment and concession contracts executed by CEMIG and its subsidiaries and the granting authorities.

 

b)Generation - Indemnity receivable

These balances were recognized in financial assets, at fair value through income or loss.

On July 28, 2022 ANEEL revoked Normative Resolution (ReN) 942, by publication of ReN 1,027, establishing the general methodology and criteria for calculation of fair value - to be based on New Replacement Value.

The Valuation Report was concluded, with the following results:

           


Generation plant
Concession expiration date

Installed capacity (MW)

(information of MW not audited)

Net balance of assets based on historical cost Net balance of assets based on fair value - ReN 1,027/2022 Financial Update Net balance of assets on December 31, 2022
Lot D            
UHE Três Marias July 2015 396.00 71 167 12 179
UHE Salto Grande July 2015 102.00 12 86 6 92
UHE Itutinga July 2015 52.00 4 10 1 11
UHE Camargos July 2015 46.00 7 20 1 21
PCH Piau July 2015 18.01 2 4 - 5
PCH Gafanhoto July 2015 14.00 1 5 - 6
PCH Peti July 2015 9.40 1 6 - 6
PCH Dona Rita Sep. 2013 2.41 1 2 - 2
PCH Tronqueiras July 2015 8.50 2 9 1 9
PCH Joasal July 2015 8.40 2 6 - 7
PCH Martins July 2015 7.70 2 4 - 5
PCH Cajuru July 2015 7.20 4 19 1 20
PCH Paciência July 2015 4.08 1 4 - 4
PCH Marmelos July 2015 4.00 1 2 - 3
Others            
UHE Volta Grande Feb. 2017 380.00 - - - -
UHE Miranda Dec. 2016 408.00 35 91 7 97
UHE Jaguara Aug. 2013 424.00 46 138 10 148
UHE São Simão Jan. 2015 1,710.00 27 71 5 77
   

3,601.70

219

644

44

691

             

 

With the conclusion of the Valuation Report, the Company wrote off the financial asset in the amount of R$172, in June 2022. The remaining balance of R$691 represents management’s best estimate for the right to receive cash from the grantor related to the generation entities, based on the evaluation criteria set by grantor (ANEEL).

The Valuation Report on the assets is subject to inspection by ANEEL, which may request complementary documentation. As a result there may be adjustments to the amounts resulting from the valuation process - in which case the concession holder has the right of defense and reply.

The due date and form of payment of the investments made after entry into operation of the basic plant plans, which have not yet been amortized or depreciated, will be decided by the Grantor after inspection and ratification of the reimbursements amounts.

 

c)Concession grant fee - Generation concessions

The concession grant fee paid by the Company for a 30-year concession contracts No. 08 to 16/2016, related to 18 hydroelectric plants of Auction 12/2015, won by CEMIG GT, was an amount of R$2,216. The amount of the concession fee

was recognized as a financial asset measured at amortized cost, as CEMIG GT has an unconditional right to receive the amount paid, updated by the IPCA Index and remuneratory interest (the total amount of which is equal to the internal rate of return on the project), during the period of the concession.

 

The changes in concession financial assets are as follows:

         
SPC Plants 2021 Interest Amounts received 2022
CEMIG Geração Três Marias S.A. Três Marias 1,584 254 (166) 1,672
CEMIG Geração Salto Grande S.A. Salto Grande 497 80 (52) 525
CEMIG Geração Itutinga S.A. Itutinga 187 33 (22) 198
CEMIG Geração Camargos S.A. Camargos 140 25 (17) 148
CEMIG Geração Sul S.A. Coronel Domiciano, Joasal, Marmelos, Paciência and Piau 184 34 (23) 195
CEMIG Geração Leste S.A. Dona Rita, Ervália, Neblina, Peti, Sinceridade and Tronqueiras 125 26 (18) 133
CEMIG Geração Oeste S.A. Cajurú, Gafanhoto and Martins 75 15 (11) 79
Total  

2,792

467

(309)

2,950

 

SPC Plants 2020 Interest Amounts received 2021
CEMIG Geração Três Marias S.A. Três Marias 1,447 287 (150) 1,584
CEMIG Geração Salto Grande S.A. Salto Grande 454 90 (47) 497
CEMIG Geração Itutinga S.A. Itutinga 171 37 (21) 187
CEMIG Geração Camargos S.A. Camargos 128 27 (15) 140
CEMIG Geração Sul S.A. Coronel Domiciano, Joasal, Marmelos, Paciência and Piau 167 38 (21) 184
CEMIG Geração Leste S.A. Dona Rita, Ervália, Neblina, Peti, Sinceridade and Tronqueiras 114 27 (16) 125
CEMIG Geração Oeste S.A. Cajurú, Gafanhoto and Martins 69 17 (11) 75
Total  

2,550

523

(281)

2,792

 

SPC Plants 2019 Interest Amounts received 2020
CEMIG Geração Três Marias S.A. Três Marias 1,402 188 (143) 1,447
CEMIG Geração Salto Grande S.A. Salto Grande 440 59 (45) 454
CEMIG Geração Itutinga S.A. Itutinga 165 25 (19) 171
CEMIG Geração Camargos S.A. Camargos 124 18 (14) 128
CEMIG Geração Sul S.A. Coronel Domiciano, Joasal, Marmelos, Paciência and Piau 161 26 (20) 167
CEMIG Geração Leste S.A. Dona Rita, Ervália, Neblina, Peti, Sinceridade and Tronqueiras 110 19 (15) 114
CEMIG Geração Oeste S.A. Cajurú, Gafanhoto and Martins 66 12 (9) 69
Total  

2,468

347

(265)

2,550

 

Sector assets and liabilities

 

d)Account for compensation of variation of parcel A items (CVA) and Other financial components

As established in the amendment to the concession contract, there is a guarantee that in the event of termination of the concession contract, for any reason, the remaining balances (assets and liabilities) of any shortfall in payment or reimbursement through the tariff must also be paid by the grantor. The balances on (i) the CVA (Compensation for Variation of Parcel A items) Account, (ii) the account for Neutrality of Sector Charges and (iii) Other financial components in the tariff calculation, refer to the positive and negative differences between the estimate of the Company’s non-manageable costs and the payments actually made. The variations are subject to adjustment using the Selic rate and considered in the subsequent tariff adjustments.

The balance of these sector financial assets and liabilities, which are presented at net value, in assets or liabilities, in accordance with the tariff adjustments that have been authorized or are to be ratified, are as follows:

           
Financial position 2022 2021
Amounts ratified by ANEEL in the last tariff adjustment Amounts to be ratified by ANEEL in the next tariff adjustments Total Amounts ratified by ANEEL in the last tariff adjustment Amounts to be ratified by ANEEL in the next tariff adjustments Total
Assets

544

400

944

989

4,133

5,122

Current assets 544 202 746 989 2,397 3,386
Non-current assets - 198 198 - 1,736 1,736
             
Liabilities

-

-

-

(1,040)

(1,985)

(3,025)

Current liabilities - - - (1,040) (1,175) (2,215)
Non-current liabilities - - - - (810) (810)
             
Total current, net 544 202 746 (51) 1,222 1,171
Total non-current, net - 198 198 - 926 926
Total, net

544

400

944

(51)

2,148

2,097

 

Financial components 2022 2021
Amounts ratified by ANEEL in the last tariff adjustment Amounts to be ratified by ANEEL in the next tariff adjustments Total Amounts ratified by ANEEL in the last tariff adjustment Amounts to be ratified by ANEEL in the next tariff adjustments Total
Items of ‘Parcel A’            
Energy Development Account (CDE) quota 141 (140) 1 24 (91) (67)
Tariff for use of transmission facilities of grid participants 4 211 215 146 97 243
Tariff for transport of Itaipu supply - 18 18 13 (1) 12
Alternative power source program (Proinfa) 39 (8) 31 11 19 30
ESS/EER System Service/Energy Charges 378 205 583 31 953 984
Energy bought for resale 234 (1,322) (1,088) 390 1,178 1,568
             
Other financial components            
Over contracting of supply (1) 40 710 750 (68) 193 125
Neutrality of Parcel A (33) 236 203 24 73 97
Billing return - Covid Account (2) - - - (371) - (371)
Other financial items (236) 538 302 (230) (226) (68)
Excess demand and reactive power (23) (48) (71) (21) (47) (456)
Total

544

400

944

(51)

2,148

2,097

 

(1)CEMIG D was over contracted in 2017 and 2018 and the gain arising from the sale of the excess of energy in the spot market was provisionally passed through to customers by ANEEL in the tariff adjustments of 2018 and 2019, including the portion in excess of the limit of 105% of the regulatory load - thus reducing the tariff that was determined. To establish whether this is a voluntary over contracting, the Company considers that the portion above the regulatory limit will be recovered in the subsequent tariff adjustment. In 2020, ANEEL published the Dispatch 2,508, which set new amounts for distributors’ over contracting of 2017 in the amount of R$39, which was considered in the 2021 tariff process. Due to the administrative appeals submitted to ANEEL, the amounts of overcontracting had their values adjusted through ANEEL's dispatch 2.168, of 2022. With the publication of the order, and considering the current rules, the amount of R$219, pending transfer from 2017, will be considered in the next tariff process. Regarding the amount of R$27 related to the 2018 overcontracting, the Company continues to recognize the right and awaits publication of the respective order.
(2)This is a financial component created for return to customers of the amounts that were invoiced to them but received by CEMIG from the Covid Account in 2020. These amounts was returned to customers in the tariff process of 2021, updated by the Selic rate, ensuring of neutrality.

 

Changes in balances of sector financial assets and liabilities are as follow:

 
   
Balance on December 31, 2019

882

Additions 611
Amortization (156)
Payments from the Flag Tariff Centralizing Account (63)
Receipt funds of ‘Covid-account’ (1,404)
Updating - Selic rate (Note 29) 32
Balance on December 31, 2020

(98)

Additions 1,908
Amortization 238
Transfer of other liabilities (1) (15)
Updating - Selic rate (Note 29) 64
Balance on December 31, 2021

2,097

Additions (386)
Amortization (761)
(-) Proceeds from loan - Water scarcity account (191)
Updating - Selic rate (Note 29) 185
Balance on December 31, 2022

944

 

(1)Amounts relating to the reversal of the credits that could not be returned to customers in final billing, due to moderation of tariffs, as specified in §6 of Article 88 of REN 414/2010, included by REN 714/2016.

 

 

Tariff adjustment - CEMIG D

On June 22, 2022, after an extension of the previous tariffs for 25 days while decision at the federal level on measures for tariff mitigation were expected, ANEEL ratified the result of the CEMIG D’s Annual Tariff Adjustment, to be in effect until May 27, 2023, with average effect on customers of 8.80% - its components included average increases of 14.31% for high-voltage customers, and of 6.23% for customers connected at low voltage. For residential customers served at low voltage, the average increase was 5.22%.

This result arises from: (i) variation of 3.89% in the Portion B costs (manageable costs), due to the IPCA inflation index over the 12 prior months, and (ii) direct pass-throughs within the tariff, which had an impact of 4.91%, but which had no economic effect for the CEMIG D, not affecting its profitability, relating to the following items: (a) increase of 4.78% in non-manageable costs (Portion A), mainly related to purchase of energy supply, regulatory charges and transmission charges, including the reducing effect of the R$410 inclusion in pass-throughs from the CDE (Energy Development Account) arising from the process of capitalization of Eletrobras; (b) reduction of 9.32%, referring to the financial components of the current process, in which an important element is inclusion of R$2,811 referring to the PIS/Pasep and Cofins taxes credits reimbursement, which generated a negative variation in the tariff of 15.20%; and (c) an effect of 9.45% relating to the financial components of the previous process withdrawal. For more information on the PIS/Pasep and Cofins taxes credits, see Note 21.

Accounting policy

Energy Distribution and Gas segment

The portion of the infrastructure to be amortized during the concession period is recorded as an intangible asset, as provided for in IFRIC 12 - Concession contracts, and subsequently measured at cost less amortization. The amortization rates reflect the expected pattern of their consumption and are measured based on the asset carrying amount using the straight-line method, using the rates based on the expected useful life of the energy distribution assets, that are used by the grantor during the tariff process.

The portion of the value of the assets which will not be fully amortized by the end of the concession is reported as a financial asset because it is an unconditional right to receive cash or another financial asset directly from the grantor. This portion is subsequently measured at the estimated fair value, which represents the New Replacement Value (Valor Nove de reposição, or VNR), based on the Regulatory Remuneration Base of Assets ratified by the grantor (ANEEL) in the tariff processes.

 

Transmission segment

Only after the satisfaction of the performance obligation to operate and maintain the infrastructure, the contract asset is classified as a financial asset (accounts receivable - concessionaires - energy transport), considering that the receipt of the consideration only depends on the passage of time.

The discount rate related to the financial component of the concession contract asset represents the Company's best estimate for the financial remuneration of the investments in the transmission infrastructure, which represents the approximate percentage of what would be the cash price to be charged for the infrastructure built or improved by the concessionaire in a sale transaction. The implicit rate for pricing the financial component of the concession contract asset is established at the beginning of the investments and considers the credit risk of the counterparties.

 

Financial portion of the transmission concession contracts renewed in accordance with Law 12,783/2013

Corresponding to the financial portion of remuneration for the assets related to the Existing Basic System Network (RBSE), that represents the amount payable from the date of the extension of the concessions until it was incorporated into the tariff (January 1, 2013 until June 30, 2017), to be collected over a period of eight years.

The amounts to be received are subject to the applicable regulatory rules in the tariff process, including the mechanisms that monitor and measure efficiency. In this context, the unconditional right to consideration depends on the satisfaction of the performance obligation to operate and maintain, and is, thus, characterized as a contract asset. It is classified to financial assets only after an authorizing dispatch by ANEEL.

 

Generation segment

The concession fee right paid for the concession contracts granted by the Brazilian Grantor (ANEEL) in November 2015, has been classified as a financial asset, at amortized cost, as it represents an unconditional right to receive cash, adjusted by the IPCA index, and remuneratory interest, during the period of the concession.

For the extension of the concession of the hydroelectric plants participating in the MRE, relating to the compensation for non-hydrological risks specified in Law 14,052/2020, an intangible asset was recognized, considering the nature of the right, which enables, by provision of law, the plants to be used for a period longer than the one specified in their original contracts, during the contract extension, the Company is entitled to sell the energy generated without constraint. The asset was measured at fair value in the initial recognition. The asset is amortized by the straight-line method for the new remaining period of the concession. For more details see Note 18.

 

Impairment

In assessing impairment of financial assets, the Company and its subsidiaries use historical trends of the probability of default, timing of recovery and the amounts of loss incurred, adjusted to reflect management’s judgment as to whether current economic and credit conditions are such that the actual losses are likely to be greater or less than suggested by historical trends.