Other Commitments And Contingencies
9 Months Ended
Sep. 30, 2018
Other Commitments and Contingencies [Abstract]  
Commitments and Contingencies
Other Commitments and Contingencies
A. Guarantees and Indemnities. We and certain of our subsidiaries enter into various agreements providing financial or performance assurance to third parties on behalf of certain subsidiaries as a part of normal business. Such agreements include guarantees and stand-by letters of credit. These agreements are entered into primarily to support or enhance the creditworthiness otherwise attributed to a subsidiary on a stand-alone basis, thereby facilitating the extension of sufficient credit to accomplish the subsidiaries’ intended commercial purposes. As of September 30, 2018 and December 31, 2017, we had issued stand-by letters of credit of $10.2 million and $11.1 million, respectively.  
 B. Legal Proceedings. On September 13, 2018, a series of fires and explosions occurred in Lawrence, Andover and North Andover, Massachusetts related to the delivery of natural gas by Columbia of Massachusetts (referred to herein as the “Greater Lawrence Incident”). The Greater Lawrence Incident resulted in one fatality and a number of injuries, damaged multiple homes and businesses, and caused the temporary evacuation of significant portions of each municipality. The Massachusetts Governor’s office declared a state of emergency, authorizing the Massachusetts DPU to order another utility company to coordinate the restoration of utility services in Lawrence, Andover and North Andover. The incident resulted in the interruption of gas and other utility service for approximately 8,500 gas meters, of which approximately 700 serve businesses. Columbia of Massachusetts is currently in the process of replacing the cast iron and bare steel gas pipeline system to restore service to these meters. See “ - D. Other Matters - Greater Lawrence Pipeline Replacement” below for more information.
The NTSB is investigating the Greater Lawrence Incident. The parties to the investigation include the PHMSA, the Massachusetts DPU, Columbia of Massachusetts, and police and fire first responders. The Company and Columbia of Massachusetts are cooperating with the NTSB and have provided information to assist in its ongoing investigation into relevant facts related to the event, the probable cause, and its development of safety recommendations. According to the preliminary public report that the NTSB issued on October 11, 2018, an over pressurization of a low pressure gas distribution system occurred which appears to have been related to work being done on behalf of Columbia of Massachusetts on a pipeline replacement project in Lawrence. In addition, according to the report, sensing lines detected a drop in pressure in a portion of mainline that was being abandoned, causing a regulator to open up and increase pressure in the system to a level that exceeded the maximum allowable operating pressure of the distribution system. While the NTSB investigation is pending, the Company and Columbia of Massachusetts are prohibited from disclosing information related to the investigation without approval from the NTSB.
The Massachusetts DPU has announced its intent to hire an independent evaluator to conduct a statewide examination of the safety of the natural gas distribution systems within the Commonwealth of Massachusetts. Through authority granted by the Massachusetts Governor under the state of emergency, the Chair of the Massachusetts DPU will direct all natural gas distribution companies operating in the Commonwealth to fund the statewide examination. The examination is expected to complement, but not duplicate, the NTSB’s investigation. Following the release of the NTSB's preliminary report, the Massachusetts DPU placed a moratorium on Columbia of Massachusetts, which prohibits the company from performing any work in the state through at least December 1, 2018. The ban does not apply to compliance and emergency work, including the restoration of service in Lawrence, Andover and North Andover.
Under Massachusetts law, the DPU is authorized to investigate potential violations of pipeline safety regulations and to assess a civil penalty of up to $209,000 for a violation of federal pipeline safety regulations. A separate violation occurs for each day of violation up to $2.1 million for a related series of violations. The Massachusetts DPU also is authorized to investigate potential violations of the Columbia of Massachusetts emergency response plan and to assess penalties of up to $250,000 per violation, or up to $20 million per related series of violations. Further, as a result of the declaration of emergency by the Governor, the DPU is authorized to investigate potential violations of the DPU's operational directives during the restoration efforts and assess penalties of up to $1 million per violation. The timing and outcome of any such investigations are uncertain at this time.
Various lawsuits, including several purported class action lawsuits, have been filed by various affected residents or businesses in Massachusetts state courts against the Company and/or Columbia of Massachusetts in connection with the Greater Lawrence Incident. The class action lawsuits allege varying causes of action, including those for strict liability for ultra-hazardous activity, negligence, private nuisance, public nuisance, premises liability, trespass, breach of implied warranty of merchantability, breach of contract and gross negligence, and seek punitive damages. Many residents and business owners have submitted individual damage claims to Columbia of Massachusetts. We also have received notice from two parties indicating an intent to assert wrongful death claims. In addition, the Commonwealth of Massachusetts and the municipalities of Lawrence, Andover and North Andover are seeking reimbursement from Columbia of Massachusetts for their respective expenses incurred in connection with the Greater Lawrence Incident.
The Company and Columbia of Massachusetts are subject to a criminal investigation being conducted under the supervision of the U.S. Attorney's Office for the District of Massachusetts. The initial grand jury subpoenas were served on the Company and Columbia of Massachusetts on September 24, 2018. The Company and Columbia of Massachusetts are cooperating with the investigation.
During the quarter ended September 30, 2018, Columbia of Massachusetts expensed approximately $415 million for estimated third-party claims related to the Greater Lawrence Incident, including personal injury and property damage claims, damage to infrastructure, and other damage claims, which include mutual aid payments to other utilities assisting with the restoration effort, gas-fueled appliance replacement and related services for impacted customers, temporary lodging for displaced customers, and claims-related legal fees. We estimate that total costs related to third-party claims resulting from the incident will range from $415 million to $450 million, depending on the final outcome of open investigations and the number, nature, and value of third-party claims. We also expect to incur losses for third party business interruption claims, the costs for which are not included in the amounts disclosed above due to insufficient information to reasonably estimate the damages from such claims. The amounts set forth above do not include non-claims related expenses resulting from the incident or the estimated capital cost of the pipeline replacement, which are set forth in " - D. Other Matters - Greater Lawrence Incident Restoration" and " - Greater Lawrence Pipeline Replacement," respectively, below.
The process for estimating costs associated with third-party claims relating to the Greater Lawrence Incident requires management to exercise significant judgment based on a number of assumptions and subjective factors. As more information becomes known, including information resulting from the NTSB investigation, management’s estimates and assumptions regarding the financial impact of the Greater Lawrence Incident may change.
Further, it is not possible at this time to reasonably estimate the amount of any fines, penalties or settlements with governmental authorities, including the Massachusetts DPU and other regulators, that the Company or Columbia of Massachusetts may incur in connection with the Greater Lawrence Incident. Therefore, the foregoing amounts do not include estimates for any such fines, penalties or settlements.
The current and noncurrent portions of the remaining liability as of September 30, 2018 are presented within “Claims accrued” and “Other noncurrent liabilities,” respectively, in the Company’s Condensed Consolidated Balance Sheets (unaudited). The expenses above are presented within “Operation and maintenance” in our Condensed Statement of Consolidated Income (unaudited).
The Company maintains liability insurance for damages in the approximate amount of $800 million. The Company and Columbia of Massachusetts believe that third-party claims related to the Greater Lawrence Incident will be substantially covered by this insurance, other than any fines, penalties or settlements with governmental authorities that the Company or Columbia of Massachusetts may incur. However, no amounts for insurance recoveries have been recorded as of September 30, 2018. The Company and Columbia of Massachusetts are currently unable to predict the amount and timing of insurance recoveries.
In addition, we are party to certain other claims and legal proceedings arising in the ordinary course of business, none of which are deemed to be individually material at this time.
Due to the inherent uncertainty of litigation, there can be no assurance that the resolution of any particular claim or proceeding would not have a material adverse effect on our results of operations, financial position or liquidity. If one or more of such matters were decided against us, the effects could be material to our results of operations in the period in which we would be required to record or adjust the related liability and could also be material to our cash flows in the periods that we would be required to pay such liability.
C. Environmental Matters. Our operations are subject to environmental statutes and regulations related to air quality, water quality, hazardous waste and solid waste. We believe that we are in substantial compliance with the environmental regulations currently applicable to our operations.
It is management's continued intent to address environmental issues in cooperation with regulatory authorities in such a manner as to achieve mutually acceptable compliance plans. However, there can be no assurance that fines and penalties will not be incurred. Management expects a significant portion of environmental assessment and remediation costs to be recoverable through rates for certain of our companies.
As of September 30, 2018 and December 31, 2017, we had recorded a liability of approximately $107.1 million and $111.4 million, respectively, to cover environmental remediation at various sites. The current portion of this liability is included in "Legal and environmental" in the Condensed Consolidated Balance Sheets (unaudited). The noncurrent portion is included in "Other noncurrent liabilities" in the Condensed Consolidated Balance Sheets (unaudited). We recognize costs associated with environmental remediation obligations when the incurrence of such costs is probable and the amounts can be reasonably estimated. The original estimates for remediation activities may differ materially from the amount ultimately expended. The actual future expenditures depend on many factors, including currently enacted laws and regulations, the nature and extent of impact and the method of remediation. These expenditures are not currently estimable at some sites. We periodically adjust our liability as information is collected and estimates become more refined.
Electric Operations' compliance estimates disclosed below are reflective of NIPSCO's Integrated Resource Plan submitted to the IURC on October 31, 2018. See section D, "Other Matters," below for additional information.
Air
The actions listed below could require further reductions in emissions from various emission sources. We will continue to closely monitor developments in these matters.
Future legislative and regulatory programs could significantly limit allowed GHG emissions or impose a cost or tax on GHG emissions. Additionally, rules that increase methane leak detection, require emission reductions or impose additional requirements for natural gas facilities could restrict GHG emissions and impose additional costs. We carefully monitor all GHG reduction proposals and regulations.
CPP and ACE Rules. On October 23, 2015, the EPA issued the CPP to regulate CO2 emissions from existing fossil-fuel EGUs under section 111(d) of the CAA. The U.S. Supreme Court has stayed implementation of the CPP until litigation is decided on its merits, and the EPA has proposed to repeal the CPP. On August 31, 2018, the EPA published a proposal to replace the CPP with the ACE rule, which establishes guidelines for states to use when developing plans to reduce CO2 emissions from existing coal-fired EGUs. The proposal would provide states three years after a final rule is issued to develop state-specific plans, and the EPA would have twelve months to act on a complete state plan submittal. Within two years after a finding of failure to submit a complete plan, or disapproval of a state plan, the EPA would issue a federal plan. NIPSCO will continue to monitor this matter and cannot estimate its impact at this time.
Waste
CERCLA. Our subsidiaries are potentially responsible parties at waste disposal sites under the CERCLA (commonly known as Superfund) and similar state laws. Under CERCLA, each potentially responsible party can be held jointly, severally and strictly liable for the remediation costs as the EPA, or state, can allow the parties to pay for remedial action or perform remedial action themselves and request reimbursement from the potentially responsible parties. Our affiliates have retained CERCLA environmental liabilities, including remediation liabilities, associated with certain current and former operations. These liabilities are not material to the Condensed Consolidated Financial Statements (unaudited).
MGP. A program has been instituted to identify and investigate former MGP sites where Gas Distribution Operations subsidiaries or predecessors may have liability. The program has identified 64 such sites where liability is probable. Remedial actions at many of these sites are being overseen by state or federal environmental agencies through consent agreements or voluntary remediation agreements.
We utilize a probabilistic model to estimate future remediation costs related to our MGP sites. The model was prepared with the assistance of a third party and incorporates our experience and general industry experience with remediating MGP sites. We complete an annual refresh of the model in the second quarter of each fiscal year. No material changes to the estimated future remediation costs were noted as a result of the refresh completed as of June 30, 2018. Our total estimated liability related to the facilities subject to remediation was $103.3 million and $106.9 million at September 30, 2018 and December 31, 2017, respectively. The liability represents our best estimate of the probable cost to remediate the facilities. We believe that it is reasonably possible that remediation costs could vary by as much as $25 million in addition to the costs noted above. Remediation costs are estimated based on the best available information, applicable remediation standards at the balance sheet date and experience with similar facilities.
CCRs. On April 17, 2015, the EPA issued a final rule for regulation of CCRs. The rule regulates CCRs under the RCRA Subtitle D, which determines them to be nonhazardous. The rule is implemented in phases and requires increased groundwater monitoring, reporting, recordkeeping and posting of related information to the Internet. The rule also establishes requirements related to CCR management and disposal. The rule will allow NIPSCO to continue its byproduct beneficial use program.
The publication of the CCR rule resulted in revisions to previously recorded legal obligations associated with the retirement of certain NIPSCO facilities. The actual asset retirement costs related to the CCR rule may vary substantially from the estimates used to record the increased asset retirement obligation due to the uncertainty about the compliance strategies that will be used and the preliminary nature of available data used to estimate costs. In addition, to comply with the rule, NIPSCO is incurring capital expenditures to modify its infrastructure and manage CCRs. Capital compliance costs are currently expected to total approximately $193 million. As allowed by the EPA, NIPSCO will continue to collect data over time to determine the specific compliance solutions and associated costs and, as a result, the actual costs may vary.
NIPSCO filed a petition on November 1, 2016 with the IURC seeking approval of the projects and recovery of the costs associated with CCR compliance. On June 9, 2017, NIPSCO filed with the IURC a settlement reached with certain parties regarding the CCR projects and treatment of associated costs. The IURC approved the settlement in an order on December 13, 2017.
Water
ELG. On November 3, 2015, the EPA issued a final rule to amend the ELG and standards for the Steam Electric Power Generating category. The final rule became effective January 4, 2016. The rule imposes new water treatment and discharge requirements on NIPSCO's electric generating facilities to be applied between 2018 and 2023. On April 25, 2017, the EPA published notice in the Federal Register that the EPA is reconsidering the ELG in response to several petitions for reconsideration. On September 18, 2017, the EPA postponed the earliest compliance dates for flue gas desulfurization wastewater and bottom ash transport water requirements from 2018 to 2020 to potentially consider revisions to technology and numeric limits achievable. NIPSCO is unable to estimate the financial impact of the EPA reconsideration at this time. Based upon a preliminary study of the November 3, 2015 final rule, capital compliance costs were expected to be approximately $170 million. However, NIPSCO does not anticipate material ELG compliance costs based on the most viable option for customers announced as part of NIPSCO's 2018 Integrated Resource Plan (discussed below).
D. Other Matters.
NIPSCO 2018 Integrated Resource Plan. Multiple factors, but primarily economic ones, including low natural gas prices, advancing cost effective renewable technology and increasing capital and operating costs associated with existing coal plants, have led NIPSCO to conclude in its Integrated Resource Plan submission that NIPSCO’s current fleet of coal generation facilities will be retired earlier than previous Integrated Resource Plan’s had indicated.
On October 31, 2018, NIPSCO submitted its 2018 Integrated Resource Plan to the IURC. The plan evaluated demand-side and supply-side resource alternatives to reliably and cost effectively meet NIPSCO customers' future energy requirements over the ensuing 20 years. The preferred option within the Integrated Resource Plan retires R.M. Schahfer Generating Station (Units 14, 15, 17, and 18) by 2023 and Michigan City Generating Station (Unit 12) by 2028. The replacement plan is still being defined, but currently points to renewable sources of energy, including wind, solar, and battery storage.
NIPSCO Pure Air. NIPSCO had a service agreement with Pure Air, a general partnership between Air Products and Chemicals, Inc. and First Air Partners LP, under which Pure Air provided scrubber services to reduce sulfur dioxide emissions for Units 7 and 8 at the Bailly Generating Station. Services under this contract commenced on July 1, 1992 and expired on June 30, 2012. The agreement was renewed effective July 1, 2012 for ten years, requiring NIPSCO to pay for the services under a combination of fixed and variable charges. We made an exhaustive effort to obtain information needed from Pure Air to determine the status of Pure Air as a VIE. However, NIPSCO was not able to obtain this information and, as a result, it was not determined whether Pure Air was a VIE and whether NIPSCO was the primary beneficiary. Payments under this agreement were $8.3 million and $16.5 million for the nine months ended September 30, 2018 and 2017, respectively. In accordance with GAAP, the renewed agreement was evaluated to determine whether the arrangement qualified as a lease. Based on the terms of the agreement, the arrangement qualified for capital lease accounting. As the effective date of the new agreement was July 1, 2012, we capitalized this lease beginning in the third quarter of 2012.
NIPSCO retired the generation station units serviced by Pure Air on May 31, 2018. In December 2016, as allowed by the provisions of the service agreement, NIPSCO provided Pure Air formal notice of intent to terminate the service agreement, effective May 31, 2018. Providing this notice to Pure Air triggered a contract termination liability of $16 million, which was recorded in fourth quarter of 2016. In connection with the closure of Bailly Units 7 and 8, NIPSCO paid the termination payment to Pure Air during the second quarter of 2018. Cash flows associated with this payment are presented within operating activities on the Condensed Statements of Consolidated Cash Flows (unaudited).
Greater Lawrence Incident Restoration. During the quarter ended September 30, 2018, Columbia of Massachusetts recorded a loss of approximately $460 million in connection with the Greater Lawrence Incident. This amount includes approximately $415 million for estimated third-party claims associated with the incident as described above in " - B. Legal Proceedings." The additional $45 million included in the loss recorded includes certain consulting costs, administration costs, charitable contributions, and other labor and related expenses in connection with the incident. We expect to incur a total of $180 million to $210 million in such incident-related costs, depending on the incurrence of future restoration work, substantially all of which we expect to incur by the end of 2018. The amounts set forth above do not include the estimated capital cost of the pipeline replacement, which is set forth below.
The Company maintains liability insurance for damages in the approximate amount of $800 million. The Company and Columbia of Massachusetts believe that third-party claims and other expenses related to the Greater Lawrence Incident will be substantially covered by insurance, other than any fines, penalties or settlements with governmental authorities that the Company or Columbia of Massachusetts may incur. However, no amounts for insurance recoveries have been recorded as of September 30, 2018. The Company and Columbia of Massachusetts are currently unable to predict the amount and timing of insurance recoveries.
The current and noncurrent portions of the remaining liability as of September 30, 2018 are presented within “Claims accrued” and “Other noncurrent liabilities,” respectively, in the Company’s Condensed Consolidated Balance Sheets (unaudited). Costs associated with charitable contributions are presented within “Other, Net” in our Condensed Statement of Consolidated Income (unaudited). All other losses incurred are presented within “Operation and maintenance.”
Greater Lawrence Pipeline Replacement. In connection with the Greater Lawrence Incident, Columbia of Massachusetts, in cooperation with the Massachusetts Governor’s office, replaced the entire affected 45-mile cast iron and bare steel pipeline system that delivers gas to approximately 8,500 gas meters, of which approximately 700 serve businesses impacted in the Greater Lawrence Incident. This system was replaced with plastic distribution mains and service lines, as well as enhanced safety features such as pressure regulation and excess flow valves at each premise. Columbia of Massachusetts is aiming to restore gas service to all homes and workplaces by December 16, 2018. At the request of the Massachusetts DPU, which was instructed by the Massachusetts Governor through his executive authority under a state of emergency, Columbia of Massachusetts has hired an outside contractor to serve as the Chief Recovery Officer for the Greater Lawrence Incident, responsible for command, control and communications. The estimated capital cost of the pipeline replacement is between $135 - $165 million. The recovery of this capital investment will be addressed in a future regulatory proceeding.