Contingent Liabilities and Commitments (Notes)
9 Months Ended
Sep. 30, 2022
Commitments and Contingencies Disclosure [Abstract]  
Contingent Liabilities and Commitments [Text Block] Contingent Liabilities and Commitments
Environmental Matters
We are subject to the National Environmental Policy Act and other federal and state legislation regulating the environmental aspects of our business. Except as discussed below, our management believes that we are in substantial compliance with existing environmental requirements. Environmental expenditures are expensed or capitalized depending on their future economic benefit and potential for rate recovery. We believe that, with respect to any expenditures required to meet applicable standards and regulations, the FERC would grant the requisite rate relief so that substantially all of such expenditures would be permitted to be recovered through rates.
Beginning in the mid-1980s, we evaluated many of our facilities for the presence of toxic and hazardous substances to determine to what extent, if any, remediation might be necessary. We identified polychlorinated biphenyl (PCB) contamination in air compressor systems, soils, and related properties at certain compressor station sites. Similarly, we identified hydrocarbon impacts at these facilities due to the former use of earthen pits, lubricating oil leaks or spills, and excess pipe coating released to the environment. In addition, heavy metals have been identified at these sites due to the former use of mercury containing meters and paint and welding rods containing lead, cadmium, and arsenic. The PCBs were remediated pursuant to a Consent Decree with the U.S. Environmental Protection Agency (EPA) in the late 1980s, and we conducted a voluntary clean-up of the hydrocarbon and mercury impacts in the early 1990s. In 2005, the Washington Department of Ecology required us to re-evaluate our previous clean-ups in Washington. During 2006 to 2015, 129 meter stations were evaluated, of which 82 required remediation. As of September 30, 2022, two meter stations are still being remediated. During 2006 to 2018, 14 compressor stations were evaluated, of which 11 required remediation. As of September 30, 2022, five compressor stations are still being remediated. At September 30, 2022, we had accrued liabilities totaling approximately $1.0 million, $0.1 million of which is recorded in Accrued liabilities - Other and $0.9 million of which is recorded in Other Long-Term Liabilities - Other on the Balance Sheet. At December 31, 2021, we had accrued liabilities totaling approximately $1.0 million, $0.1 million of which is recorded in Accrued liabilities - Other and $0.9 million of which is recorded in Other Long-Term Liabilities - Other on the Balance Sheet. We are conducting environmental assessments and implementing a variety of remedial measures that may result in increases or decreases in the total estimated costs.
The EPA and various state regulatory agencies routinely propose and promulgate new rules, and issue updated guidance to existing rules. These rulemakings include, but are not limited to, rules for reciprocating internal combustion engine and combustion turbine maximum achievable control technology, review and updates to the National Ambient Air Quality Standards, and rules for new and existing source performance standards for volatile organic compounds and methane. We continuously monitor these regulatory changes and how they may impact our operations. Implementation of new or modified regulations may result in impacts to our operations and increase the cost additions to Total property, plant, and equipment, net on the Balance Sheet for both new and existing facilities in affected areas; however, due to regulatory uncertainty on final rule content and applicability timeframes, we are unable to reasonably estimate the cost of these regulatory impacts at this time.
Other Matters
Various other proceedings are pending against us and are considered incidental to our operations.
Summary
We have disclosed all significant matters for which we are unable to reasonably estimate a range of possible loss. We estimate that for all matters for which we are able to reasonably estimate a range of loss, including those noted above and others that are not individually significant, our aggregate reasonably possible losses beyond amounts accrued for all of our contingent liabilities are immaterial to our expected future annual results of operations, liquidity and financial position. These calculations have been made without consideration of any potential recovery from third parties.