XML 17 R7.htm IDEA: XBRL DOCUMENT v3.10.0.1
Contingent Liabilities and Commitments (Notes)
6 Months Ended
Jun. 30, 2018
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies Disclosure [Text Block]
CONTINGENT LIABILITIES AND COMMITMENTS
Environmental Matters
We are subject to the National Environmental Policy Act and other federal and state legislation regulating the environmental aspects of our business. Except as discussed below, our management believes that we are in substantial compliance with existing environmental requirements. Environmental expenditures are expensed or capitalized depending on their future economic benefit and potential for rate recovery. We believe that, with respect to any expenditures required to meet applicable standards and regulations, the Federal Energy Regulatory Commission would grant the requisite rate relief so that substantially all of such expenditures would be permitted to be recovered through rates.
Beginning in the mid-1980s, we evaluated many of our facilities for the presence of toxic and hazardous substances to determine to what extent, if any, remediation might be necessary. We identified polychlorinated biphenyl (PCB) contamination in air compressor systems, soils, and related properties at certain compressor station sites. Similarly, we identified hydrocarbon impacts at these facilities due to the former use of earthen pits, lubricating oil leaks or spills, and excess pipe coating released to the environment. In addition, heavy metals have been identified at these sites due to the former use of mercury containing meters and paint and welding rods containing lead, cadmium, and arsenic. The PCBs were remediated pursuant to a Consent Decree with the U.S. Environmental Protection Agency (EPA) in the late 1980s, and we conducted a voluntary clean-up of the hydrocarbon and mercury impacts in the early 1990s. In 2005, the Washington Department of Ecology required us to re-evaluate our previous clean-ups in Washington. During 2006 to 2015, 129 meter stations were evaluated, of which 82 required remediation. As of June 30, 2018, all of the meter stations have been remediated. Initial assessments have been completed at all thirteen compressor stations in Washington. Additional assessments are ongoing at two of these compressor stations. Remediation has been completed at eleven of the thirteen compressor stations. On the basis of the findings to date, we estimate that environmental assessment and remediation costs will total approximately $2.9 million, measured on an undiscounted basis, and are expected to be incurred through 2022. At June 30, 2018 and December 31, 2017, we had approximately $2.9 million and $3.0 million, respectively, accrued for these costs, $1.3 million recorded in Accrued liabilities-Other in both periods and $1.6 million and $1.7 million, respectively in Other noncurrent liabilities-Other in the accompanying Balance Sheet. We are conducting environmental assessments and implementing a variety of remedial measures that may result in increases or decreases in the total estimated costs.
The EPA and various state regulatory agencies routinely promulgate and propose new rules, and issue updated guidance to existing rules. More recent rules and rulemakings include, but are not limited to, rules for reciprocating internal combustion engine maximum achievable control technology, air quality standards for one hour nitrogen dioxide emissions, and volatile organic compound and methane new source performance standards impacting design and operation of storage vessels, pressure valves, and compressors. On October 1, 2015, the EPA issued its rule regarding National Ambient Air Quality Standards for ground-level ozone, setting a stricter standard of 70 parts per billion. We are monitoring the rule’s implementation as the reduction will trigger additional federal and state regulatory actions that may impact our operations. Implementation of the regulations is expected to result in impacts to our operations and increase the cost of additions to Total property, plant and equipment, net in the Balance Sheet for both new and existing facilities in affected areas. We are unable to reasonably estimate the cost of additions that may be required to meet the regulations at this time due to uncertainty created by various legal challenges to these regulations and the need for further specific regulatory guidance.
Other Matters
Various other proceedings are pending against us and are considered incidental to our operations.
Summary
We estimate that for all matters for which we are able to reasonably estimate a range of loss, including those noted above and others that are not individually significant, our aggregate reasonably possible losses beyond amounts accrued for all of our contingent liabilities are immaterial to our expected future annual results of operations, liquidity, and financial position.  These calculations have been made without consideration of any potential recovery from third parties.  We have disclosed all significant matters for which we are unable to reasonably estimate a range of possible loss.