Contingent Liabilities and Commitments (Notes)
6 Months Ended
Jun. 30, 2014
Commitments and Contingencies Disclosure [Abstract]  
Contingent Liabilities and Commitments
CONTINGENT LIABILITIES AND COMMITMENTS
Environmental Matters
We are subject to the National Environmental Policy Act and other federal and state legislation regulating the environmental aspects of our business. Except as discussed below, our management believes that we are in substantial compliance with existing environmental requirements. Environmental expenditures are expensed or capitalized depending on their future economic benefit and potential for rate recovery. We believe that, with respect to any expenditures required to meet applicable standards and regulations, the Federal Energy Regulatory Commission (FERC) would grant the requisite rate relief so that substantially all of such expenditures would be permitted to be recovered through rates. As a result, we believe that compliance with applicable environmental requirements is not likely to have a material adverse effect upon our financial position or results of operations.
Beginning in the mid-1980s, we evaluated many of our facilities for the presence of toxic and hazardous substances to determine to what extent, if any, remediation might be necessary. We identified polychlorinated biphenyl (PCB) contamination in air compressor systems, soils, and related properties at certain compressor station sites. Similarly, we identified hydrocarbon impacts at these facilities due to the former use of earthen pits and mercury contamination at certain natural gas metering sites. The PCBs were remediated pursuant to a Consent Decree with the U.S. Environmental Protection Agency (EPA) in the late 1980s, and we conducted a voluntary clean-up of the hydrocarbon and mercury impacts in the early 1990s. In 2005, the Washington Department of Ecology required us to re-evaluate our previous clean-ups in Washington. As of June 30, 2014, all of our meter stations have been remediated to Washington's current environmental standards. In addition, assessments have been completed at twelve of our thirteen compressor stations in Washington. Remediation has been completed at seven of these compressor stations. On the basis of the findings to date, we estimate that environmental assessment and remediation costs will total approximately $8.4 million, measured on an undiscounted basis, and are expected to be incurred through 2019. At June 30, 2014 and December 31, 2013, we had accrued liabilities totaling approximately $8.4 million and $8.7 million, respectively, for these costs. We are conducting environmental assessments and implementing a variety of remedial measures that may result in increases or decreases in the total estimated costs.
In March 2008, the EPA promulgated a new, lower National Ambient Air Quality Standard (NAAQS) for ground-level ozone. However, in September 2009, the EPA announced it would reconsider the 2008 NAAQS for ground-level ozone to ensure that the standards were clearly grounded in science, and were protective of both public health and the environment. As a result, the EPA delayed designation of new eight-hour ozone non-attainment areas under the 2008 standards until the reconsideration is complete. In January 2010, the EPA proposed to further reduce the ground-level ozone NAAQS from the March 2008 levels. In September 2011, the EPA announced that it was proceeding with required actions to implement the 2008 ozone standard and area designations. In May 2012, the EPA completed designation of new eight-hour ozone non-attainment areas. Based on the published designations, no Northwest facilities are located within the non-attainment areas. At this time, it is unknown whether future state regulatory actions associated with implementation of the 2008 ozone standard will impact our operations and increase the cost of additions to property, plant and equipment. Until any additional state regulatory actions are proposed, we are unable to estimate the cost of additions that may be required to meet any such new regulation.
On January 22, 2010, the EPA set a new one-hour nitrogen dioxide (NO2) NAAQS. The effective date of the new NO2 standard was April 12, 2010. This standard is subject to challenges in federal court. On January 20, 2012, the EPA determined pursuant to available information that no area in the country is violating the 2010 NO2 NAAQS, and thus, designated all areas of the country as “unclassifiable/attainment.” Also, at that time, the EPA noted its plan to deploy an expanded NO2 monitoring network beginning in 2013. However, on October 5, 2012, the EPA proposed a graduated implementation of the monitoring network between January 1, 2014 and January 1, 2017. Once three years of data is collected from the new monitoring network, the EPA will reassess attainment status with the one-hour NO2 NAAQS. Until that time, the EPA or states may require ambient air quality modeling on a case by case basis to demonstrate compliance with the NO2 standard. Because we are unable to predict the outcome of the EPA’s or states’ future assessment using the new monitoring network, we are unable to estimate the cost of additions that may be required to meet this regulation.
Other Matters
Various other proceedings are pending against us and are considered incidental to our operations.
Summary
We estimate that for all matters for which we are able to reasonably estimate a range of loss, including those noted above and others that are not individually significant, our aggregate reasonably possible losses beyond amounts accrued for all of our contingent liabilities are immaterial to our expected future annual results of operations, liquidity and financial position.  These calculations have been made without consideration of any potential recovery from third-parties.  We have disclosed all significant matters for which we are unable to reasonably estimate a range of possible loss.