EX-99.1 2 thirdquarter2006earningsrele.htm NEWS RELEASE NEWS RELEASE



NEWS RELEASE

 

November 9, 2006

Trading Symbol: TSX: RNG

Amex: RNO


Rio Narcea Reports Record Net Income and

Record Cash Flow from Nickel Operations

for the Third Quarter 2006

Net Income of $15.6 million on Revenues of $59.1 million

Cash Flow from Nickel of $23.6 million

 (All amounts are reported in U.S. dollars unless otherwise indicated)


Toronto, Ontario  – Rio Narcea Gold Mines, Ltd. (“Rio Narcea” or “the Company”) today announced its results for the third quarter ended September 30, 2006.


Third Quarter Highlights


§

Record net income of $15.6 million after derivative loss of $8.4 million arising from compulsory hedging instruments associated with project debt financing

§

Record quarterly cash flow from Aguablanca operation of $23.6 million

§

Production from Aguablanca of 3.4 million pounds of nickel and 3.7 million pounds of copper. Sales of 3.2 million pounds of nickel at a cash cost of $4.84 per pound (a).

§

Buy back of Aguablanca nickel royalty from Atlantic Copper, S.A. for $6 million.

§

Aguablanca project finance fully repaid ($22.0 million paid in 2006).

§

Construction of Tasiast gold project on schedule for completion by mid-2007.  Total capital expenditures estimated at $73 million.

§

$53.2 million held in cash and cash equivalents.

§

Closure of El Valle and Carlés gold operations on target for mid-December.


Subsequent Events


§

18% increase in open pit gold reserves at Tasiast.  Site exploration underway.

§

Completed acquisition of 16.4% strategic shareholding in Chariot Resources Limited (17.5% including warrants).  

§

October throughput at Aguablanca of 140,000 tonnes per month (“tpm”).

§

Water reserve at Aguablanca exceeds 500,000 m3.



Third Quarter Financial Results


For the third quarter ended September 30, 2006, Rio Narcea reported net income of $15.6 million or $0.10 per share on total revenues of $59.1 million.  This compares to a net loss of $9.1 million and $0.06 per share on revenues of $30.1 million in the same period in 2005.   Revenues from nickel operations




totalled $37.3 million for the third quarter of 2006, compared with $11.5 million in the same period of 2005.  Revenues from gold operations for the third quarter of 2006 were $21.8 million, of which $13.9 million were sales from Nalunaq ore, compared with $18.6 million, of which $10.1 million was from Nalunaq ore, during the third quarter of 2005.


Operating cash flow provided by the Aguablanca operation was $23.6 million in the third quarter of 2006, while consolidated operating cash flow amounted to $18.5 million for the quarter compared to $6.3 million in the same period of the prior year.  


Net income for the third quarter of 2006 includes derivative losses of $8.4 million arising from the effect of the higher copper and gold prices on the hedging instruments that were required to be entered into by the Company for the project finance of its Aguablanca and Tasiast projects.


For the nine months ended September 30, 2006, the Company reported net income of $24.1 million or $0.15 per share on total revenues of $159.8 million.  This compares to a net loss of $ 29.8 million or $0.19 per share on total revenues of $71.4 million for the same period in 2005.  Operating cash flow was positive $35.0 million for the first nine months of 2006, compared with ($2.6) million in the corresponding period in 2005.


The positive operating cash flow during the first nine months of 2006 was mainly attributable to the increase in nickel sales from Aguablanca.  Cash provided by operating activities before changes in components of working capital amounted to $54.0 million in the first nine months of 2006, compared to ($1.7) million in the same period of 2005. (a)


“We are extremely pleased to report this record net income for the Company.  The fact that our operating cash flow has increased 25% over the previous quarter is not only a function of higher nickel prices, but also the effectiveness of the technical initiatives we have implemented at Aguablanca,” said Chris von Christierson, Chairman and Chief Executive Officer.  “We are delighted with the strong revenue generation from Aguablanca and the progress being made by the construction team at Tasiast.”  



Selected Quarterly Information

($000 except where stated)



 

 

Three Months Ended

September 30,

Nine Months Ended

September 30,

 

2006

2005

2006

2005

Revenues

59,087

30,070

159,776

71,369

Net income (loss)

15,612

(9,050)

24,141

(29,758)

Net  income (loss) per share – basic

0.10

(0.06)

0.15

(0.19)

Net  income (loss) per share – diluted

0.10

(0.06)

0.15

(0.19)

Cash provided by (used in) operating

  activities

18,454

6,253

35,040

(2,565)

Cash provided by (used in) operating

  activities before changes in components

  of working capital (a)

18,851

1,184

54,015

(1,657)

(a) Refer to Non-GAAP measures section of the MD&A.


A complete set of Rio Narcea’s Quarterly Report to Shareholders with Management Discussion and Analysis for the third quarter-ended September 30, 2006 will be posted on our website at www.rionarcea.com  and has been filed with Sedar at www.sedar.com.










September 30, 2006

December 31, 2005

Cash and cash equivalents

53,173

53,624

Total assets

328,692

249,217

Long-term debt

45,004

15,982

Dividends declared per share

-

-


  

Review of Operations


Aguablanca nickel operation


The Company produced 3.4 million pounds of nickel and 3.7 million pounds of copper during the third quarter of 2006, from processing 375,000 tonnes of ore. Head grades during the quarter were 0.60% and 0.51% for nickel and copper, respectively.  This compares with 258,100 tonnes of ore processed in the third quarter of 2005 which produced 3.7 million pounds of nickel and 2.9 million pounds of copper..  Recoveries amounted to 68.0% and 88.2%, respectively.


While nickel head grades were above the reserve head grade and what the ore block model was predicting during 2005, the opposite has occurred in 2006.  A new ore block model is being prepared and is scheduled for completion by year end. The lower nickel recovery during the third quarter of 2006 was a function of both lower nickel head grades in this section of the orebody and poor operating performance while testing the production of separate nickel and copper concentrates during the months of July and August. This test has been discontinued.


Throughput improved 4.3% during the third quarter of 2006 compared to the second quarter of 2006 and 19.1% compared to the first quarter of this year.  Throughput was up 36.6% when compared to the fourth quarter of 2005.



Operating Results


 

Three Months Ended

September 30,

Nine Months Ended

September 30,

 

2006

2005

2006

2005

Ore milled (tonnes)

375,000

258,100

1,049,400

722,800

Nickel head grade (%)

0.60

0.83

0.63

0.72

Copper head grade (%)

0.51

0.58

0.51

0.54

Nickel recovery (%)

68.0

76.8

72.1

67.8

Copper recovery (%)

88.2

88.5

90.1

88.4

Nickel production (000 lb)

3,399

3,654

10,498

7,778

Copper production (000 lb)

3,740

2,946

10,667

7,552

Cash cost ($/lb) (a)

4.84

2.68

3.39

3.46

(a) Includes smelting, refining and transportation expenses and is net of by-products. Refer to Non-GAAP measures section of the MD&A.


During the third quarter of 2006, the plant treated an average of 125,000 tonnes per month (“tpm”).  This compares to an average of 112,400 tpm during the first six months of 2006 and an average of 83,100 tpm during 2005. This improved mill rate is due to the installation of a new conveyor system enabling crushed pebbles to bypass the SAG mill and feed directly into the ball mill, as well as the installation of a new secondary crusher that was commissioned during the quarter. Further increases in throughput should be achievable in the near term.


Grades of nickel and copper in the bulk concentrate during the third quarter of 2006 were 6.3% nickel and 7.0% copper, compared to 6.8% nickel and 6.7% copper during the first six months of 2006. The reasons




for this temporary decline in concentrate grades are the same as those given for the lower recoveries above.


Mine production has performed well during the quarter, with mining rates conforming to plant production.



Acquisition of Royalty


On July 5, 2001, the Company acquired from Atlantic Copper, S.A. (“AC”) participation rights in a consortium with the Spanish state.  The consortium is the holder of 100% of certain mineral rights located in southern Spain, which included the Aguablanca mine property.  The original acquisition price payable to AC for these participation rights included a production royalty in respect of the mineral rights held by the consortium. In the agreement with AC, the Company had the option to pay a sum of $6.0 million to AC in exchange for all future royalty payments. This option was exercised on August 2, 2006.  The royalty payable to AC would have been applicable to Aguablanca mine production from August 2006 onward and comprised variable payments dependent on combined nickel and copper prices.  A royalty amounting to 1% of the net smelter return (“NSR”) was also applicable to production from any other future project within the various mineral rights areas held by the consortium. This 1% NSR obligation has now also ceased as a result of the Company exercising its option with AC.



Aguablanca News Subsequent to the Close of the Third Quarter


During October, plant throughput at Aguablanca was 140,000 tpm.  This is the highest throughput level to date reported by the Company.  In addition, the water reserve at Aguablanca has risen to 500,000 m3, due to the amount of rainfall in October and thus far in November.




Tasiast gold project


Construction of the project continues to be on time and it is expected to be completed during the first half of 2007, with first gold production expected in 2007. Highlights of the construction progress, as at September 30, 2006, are as follows:


§

SENET:

o

All engineering has been completed.

o

All orders have been procured.

o

Shipping is 64% complete with crushers and ball mill now at site.

o

Civil construction is 89% complete.

o

Structure and mechanical erection is 39% complete.


§

Other:

o

Access road is complete.

o

Tailings facility, paddock 1 stage 1 is 49% complete and completely lined.

o

The water line has been tested to kilometre 60, where water is currently being received. Water is expected to reach site by the end of November.

o

Power plant expected to be installed and operational in December.

o

Mining contractor has started at site.


Total budget for construction of the project, including working capital and owner’s costs, amounts to $73 million, of which $42 million had been spent as at September 30, 2006.


Remaining project expenditures will be financed from the Company’s existing cash resources. On June 29, 2006, the Company concluded a project debt agreement with Macquarie Bank Ltd. (“Macquarie”) to




finance the construction of the Tasiast project. Under this agreement, the Company has a term loan of $42.5 million that was fully drawn down on June 30, 2006.



Tasiast News Subsequent to the Close of the Third Quarter


In October 2006, the Company received a revised resource and open-pit reserve calculation for its Tasiast project. The new estimate incorporated a revised gold price and revised cost inputs, which together have increased the proven and probable reserves to 1,040,000 ounces of gold, an increase of 18% over the 885,000 ounces of gold previously estimated.


Tasiast Gold Project - Mineral Reserves and Resources (@0.8 g/t gold cut-off) (a)


 

Tonnes

(000)

Grade

(g/t)

Contained

Gold

(ounces)

Mineral reserves

 

 

 

  Proven

761

3.24

79,000

  Probable

11,223

2.66

960,000

Total proven and

  probable reserves

11,984

2.70

1,040,000

Mineral resources

 

 

 

  Measured

874

3.17

89,000

  Indicated

13,840

2.60

1,159,000

Total measured and

  indicated resources

14,714

2.64

1,248,000

Inferred resources

12,393

2.17

864,000

(a) Mineral resources included mineral reserves.


These estimates were prepared under the supervision of David A. Orava, M. Eng., P. Eng., Associate Mining Engineer of A.C.A. Howe International, who is a Qualified Person independent of Rio Narcea for the purposes of National Instrument 43-101.



On November 3, 2006 the Company announced the arrival of the Ball Mill on site at Tasiast.  This was the last critical path item remaining to be delivered to the project site.




El Valle and Carlés gold operations


During the third quarter of 2006, the Company’s own gold operations in northern Spain produced 10,800 ounces of gold as compared with 20,700 ounces of gold in the same period of 2005. Sales from the Company’s own gold operations amounted to $7.9 million in the third quarter of 2006, while cost of sales for those operations were $6.5 million ($8.5 million and $9.2 million, respectively, in the same period of 2005). The El Valle plant processed 80,000 tonnes of the Company’s own ore at an average gold grade of 4.6 g/t, compared with 99,400 tonnes with an average grade of 6.7 g/t gold in the prior year period. Recoveries averaged 91.2% in the third quarter of 2006 compared to 95.4% a year earlier.  In addition, the plant processed 41,100 tonnes of Nalunaq ore during the third quarter of 2006 compared with 28,100 tonnes during the same period of 2005.


During the first nine months of 2006, the Company’s own gold operations produced 40,400 ounces of gold as compared with 57,600 ounces of gold in the same period of 2005. Sales from the Company’s own gold operations amounted to $28.1 million in the first nine months of 2006, while cost of sales for those operations were $22.6 million ($26.4 million and $26.0 million, respectively, in the same period of 2005).




The El Valle plant processed 302,700 tonnes of the Company’s own ore at an average gold grade of 4.5 g/t, compared with 329,000 tonnes with an average grade of 5.8 g/t gold in the prior year period. Recoveries averaged 91.6% in the first nine months of 2006 compared to 94.0% a year earlier. In addition, the plant processed 75,100 tonnes of Nalunaq ore during the first nine months of 2006, compared to 76,343 tonnes treated in the same period of 2005.


In February 2006, after a thorough performance review of the El Valle and Carlés operations, the Company took the decision to close these operations.  Closure of both the El Valle and Carlés mines will take place at the end of 2006. As a result, remaining mining is being concentrated in developed areas with better rock conditions and higher grades.  There has been no further investment in underground development since February 2006. On June 22, 2006, the Company reached a collective redundancy agreement with the local unions and mine workers with respect to the closure of the El Valle and Carlés gold operations. Subsequently, on July 5, 2006, that agreement received the approval of the Spanish labour authorities, a requirement when redundancy affects more than 10% of the workforce. As a result of this agreement, closure costs are now estimated at $4.6 million as at September 30, 2006.


In reaching this decision, the Company was significantly influenced by the decision of the Regional Authorities of Asturias, not to approve the “change of land use” required to develop the Salave gold project located some 70 km west of the El Valle. The concentrates that were planned to be produced from Salave were expected to be processed at the El Valle plant, resulting in improved economics for both projects.


On March 9, 2006, the Company gave notice to Nalunaq that the existing milling agreement will terminate on September 30, 2006. The last shipment of ore from Nalunaq arrived in October 2006 and will be treated by the end of November 2006.  The Company is reviewing possibilities for the disposal of the El Valle and Carlés facilities.



Summary of El Valle and Carlés Gold Operations


 

Three Months Ended September 30,

 

2006

2005

 

Rio Narcea’s operations

Nalunaq ore

Total

Rio Narcea’s operations

Nalunaq ore

Total

Tonnes of ore milled

80,000

41,100

121,100

99,400

28,100

127,500

Grade (g/t)

4.6

17.5

9.0

6.7

16.6

8.9

Recovery (%)

91.2

97.2

95.1

95.4

96.7

95.9

Gold production (oz)

10,800

22,400

33,200

20,700

14,600

35,300




 

Nine Months Ended September 30,

 

2006

2005

 

Rio Narcea’s operations

Nalunaq ore

Total

Rio Narcea’s operations

Nalunaq ore

Total

Tonnes of ore milled

302,700

75,100

377,800

329,000

76,300

405,300

Grade (g/t)

4.5

19.4

7.5

5.8

15.8

7.7

Recovery (%)

91.6

96.6

94.2

94.0

96.6

95.0

Gold production (oz)

40,400

45,200

85,600

57,600

37,400

95,000






Salave gold project


In August 2005, the regional Government of Asturias rejected the application for “change of land use” required to develop the project. The Company has commenced legal proceedings in the Spanish courts seeking reversal of the decision and/or monetary compensation. In the event that the decision of the Government of Asturias is maintained, the independent legal advisors of the Company believe Rio Narcea should succeed in obtaining significant monetary compensation. However, the outcome and timing of any legal action are presently uncertain.



Acquisition of strategic shareholding in Chariot Resources Limited


During the three months ended September 30, 2006, the Company purchased 6,259,500 common shares and 1,780,000 warrants of Chariot Resources Limited (“Chariot”) in the market for $3.9 million.  In early October the Company acquired an additional 48,500 common shares and 118,000 warrants.  On October 5, 2006 the Company agreed to purchase an additional stake in Chariot from Amerigo Resources Limited for $21.5 million.  The Company now holds a total of 38,120,500 common shares and 13,430,000 warrants of Chariot. This represents 16.4% of the common shares and 17.4% of the common shares and warrants outstanding of Chariot, and cost a total of $25.5 million.


Chariot’s Marcona copper project is located in Southern Peru on the same Iron Oxide Copper Gold (IOCG) belt which hosts Mantos Blancos and Candelaria. The Company believes the Marcona project has potential for significant low cost copper production and through its important stake in Chariot, Rio Narcea will support sound and effective management to unlock this potential.



Exploration


The Company has active exploration projects on both the Iberian Peninsula and in Mauritania.  The following is a brief update of each project:



Aguablanca


Step out underground drilling conducted to the West of the Aguablanca orebody intersected a large interval of patchy and disseminated sulfide mineralization hosted by irregular and porphyritic gabbronorites. Results from one hole, located 225 meters to the West of the closest mineralization, returned 15.6 meters at 0.45% nickel and 0.21% copper, including a higher grade interval of 5.3 meters at 0.93% nickel and 0.41% copper.


The exploration implications of this particular intersection are encouraging because surface mapping in this zone only showed the presence of marbles and skarns cut by a few, narrow and barren gabbroic dikes. This confirms the possibility of finding additional subsurface magmatic sulfide mineralization at depth in these peripheral zones.


Two rigs will be devoted to exploration in this area.



Ossa Morena (Spain and Portugal)


Regional exploration was focused on the evaluation of several recently delineated nickel and gold stream sediment anomalies.


In addition, a preliminary and shallow drilling program was completed on the Guijarro–Chocolatero gold target. The program comprised 1,148 meters in 8 holes. These holes were testing the Guijarro soil anomaly, directly related to silicified acid volcanics of Upper Precambrian–Lower Cambrian age with




minor disseminated pyrite. Five of those holes returned low grade gold values over significant widths. The best results were 21 meters at 3.6 g/t gold in DDH GUI-1 and 38 meters at 0.7 g/t gold in DDH GUI-3.


Guijarro–Chocolatero forms part of the Bodonal–Cala gold belt where the Company is now evaluating several gold soil anomalies related to the same horizon of volcanic rocks, as well as copper–gold mineralized systems with iron–oxide–copper–gold (“IOCG”) affinities.



Mauritania


The Company is planning to commence active exploration on its Mauritanian land holdings in the fourth quarter of this year. The main focus will be the evaluation of geochemical and geophysical targets that show potential for gold and nickel deposits. One rig has commenced drilling and a second is being mobilized to site.



El Valle (Spain)


All exploration has been suspended on account of the planned closure of mining operations.  



Exploration Agreements


The Company has exploration agreements on its properties with Kinbauri Gold Corp. (for gold in Corcoesto , Galicia, Spain), C2C Inc. (for gold in Portugal) and Ventura Gold Corp. (for gold in the Navelgas belt, Asturias, Spain). The exploration results arising from these agreements are reported by each partner.



Other


Carl Hering (Senior Vice President Exploration and Business Development) is leaving the employ of the Company effective December 31, 2006 for personal reasons. The Company is evaluating various alternatives for his replacement. In the interim, Luis Pevida, Exploration Manager and Senior Geologist, will assume Mr. Hering’s role.



Conference Call and Webcast


On Friday, November 10, 2006 at 9:00 a.m. (EST) management will host a conference call and webcast to discuss the Company’s third quarter results.   In order to join the conference call, in North America please dial 1-877-461-2816 and outside North America please dial 1-416- 695-5261. The conference call will be broadcast live as well as recorded and archived on the web at www.rionarcea.com .  You can access this webcast by signing in directly through the Rio Narcea Website or by clicking on the following link:


http://events.onlinebroadcasting.com/rionarcea/111006/index.php.  In order to access this service, you will need to have Windows Media Player installed on your computer.


A replay of the call will be available until November 17, 2006 by dialing 1 (416) 695-5275 or 1 (888) 509-0081, passcode 632593. If you would like to listen to a replay of our conference call on the web, go to the home page at www.rionarcea.com  and click on the link under Investor Centre - Events & Webcast.



Rio Narcea Gold Mines, Ltd. is a growing Canadian mineral resource company with operations, development projects and exploration activities in Spain, Portugal and Mauritania.  The Company




currently produces nickel at its Aguablanca nickel-copper-platinum group metals (PGM) mine in southern Spain and gold at it’s at El Valle and Carlés projects in northern Spain.  Closure of the northern Spanish gold mines is planned for the end of 2006.  Construction of its new Tasiast gold project in Mauritania, West Africa, is underway, with production expected in 2007.  



Forward-looking Statements

This press release may contain certain “forward looking statements” within the meaning of the United States securities laws. Forward-looking statements include statements concerning plans, objectives, goals, strategies, future events, capital expenditures, exploration efforts, financial needs, and other information that is not historical information. The forward-looking statements contained herein are based on Rio Narcea’s current expectations and various assumptions as of the date such statements are made. Rio Narcea cannot give assurance that such statements will prove to be correct.


Factors that could cause Rio Narcea's actual results to differ materially from these statements include, but are not limited to, changes in gold and nickel prices, the timing and amount of estimated future production, unanticipated grade changes, unanticipated recovery problems, mining and milling costs, determination of reserves, costs and timing of the development of new deposits, metallurgy, processing, access, transportation of supplies, water availability, results of current and future exploration activities, results of pending and future feasibility studies, changes in project parameters as plans continue to be refined, political, economic and operational risks of foreign operations, joint venture relationships, availability of materials and equipment, the timing of receipt of governmental approvals, capitalization and commercial viability, the failure of plant, equipment or processes to operate in accordance with specifications or expectations, accidents, labour disputes, delays in start-up dates, environmental costs and risks, local and community impacts and issues, and general domestic and international economic and political conditions.


Rio Narcea undertakes no obligation to publicly update these forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.  The reader is cautioned not to place undue reliance on forward looking statements.




CONSOLIDATED BALANCE SHEETS

(stated in U.S. dollars) (unaudited)

September 30,

December 31,

2006

2005

$

$

 

ASSETS

Current

Cash and cash equivalents

53,172,700

53,623,700

Restricted cash

2,044,300

2,191,100

Inventories

13,404,600

10,075,400

Stockpiled ore

1,505,800

4,167,700

Accounts receivable

Government grants

2,932,900

3,521,200

VAT and other taxes

6,450,500

3,831,800

Trade receivables

15,134,600

2,982,000

Other current assets

6,056,200

5,484,700

Current portion of deferred derivative loss

819,700

2,339,200

Total current assets

101,521,300

88,216,800

Mineral properties, net

206,663,800

157,147,600

Other assets

20,506,900

3,852,700

328,692,000

249,217,100

 

LIABILITIES AND SHAREHOLDERS' EQUITY

Current

Short-term bank indebtedness and accrued interest

1,600

4,799,700

Accounts payable and accrued liabilities

61,188,100

51,368,100

Current portion of long-term debt

4,853,700

13,122,900

Total current liabilities

66,043,400

69,290,700

Other long-term liabilities

39,123,300

14,538,500

Long-term debt

45,003,800

15,982,100

Deferred income tax liabilities

3,552,200

7,179,300

Total liabilities

153,722,700

106,990,600

 

Non-controlling interest

347,600

332,600

 

Shareholders' equity

Common shares

239,905,500

237,001,700

Contributed surplus

5,868,500

3,538,600

Employee stock options

7,385,000

8,422,800

Non-employee stock options and warrants

10,386,700

10,386,700

Defiance warrants

1,786,200

Common share purchase options related to debt

3,154,500

3,154,500

Deficit

(98,528,900)

(122,669,900)

Cumulative foreign exchange translation adjustment

6,450,300

273,300

Total shareholders' equity

174,621,700

141,893,900

328,692,000

249,217,100






CONSOLIDATED STATEMENTS OF OPERATIONS AND DEFICIT

(stated in U.S. dollars) (unaudited)

Three months ended

Nine months ended

September 30,

September 30,     

2006

2005

2006

2005

$

$

$

$


REVENUES

Sales – Gold operations

7,871,800

8,547,200

28,127,600

26,417,800

Sales – Gold operations – Nalunaq ore

13,921,700

10,056,700

30,291,500

16,241,500

Sales – Nickel operations

37,293,500

11,466,000

101,357,100

28,710,100

59,087,000

30,069,900

159,776,200

71,369,400

 

EXPENSES

Cost of sales – Gold operations (a)

(6,522,700)

(9,205,700)

(22,643,500)

(26,037,900)

Cost of sales – Gold operations –

  Nalunaq ore (a)

(14,117,500)

(10,112,600)

(30,588,400)

(15,995,300)

Cost of sales – Nickel operations (a)

(9,890,900)

(4,623,000)

(27,381,700)

(15,095,400)

Depreciation and amortization expenses

(3,262,400)

(2,467,200)

(9,414,400)

(5,329,700)

Exploration costs

(1,104,100)

(900,900)

(3,562,700)

(4,496,100)

Administrative and corporate expenses

(2,375,800)

(1,585,600)

(6,065,100)

(6,150,700)

Accrual for closure of El Valle and Carlés

(864,500)

Other income (expenses)

(237,700)

(565,100)

(796,300)

(443,200)

Interest income

539,200

187,100

849,400

776,900

Gains on disposal of traded securities

1,261,300

Foreign currency exchange gain (loss)

(630,300)

(253,400)

706,100

(10,247,500)

Interest expense and amortization

  of financing fees

(1,543,000)

(272,900)

(1,750,000)

(805,900)

Derivatives loss

(8,362,200)

(7,776,900)

(38,900,000)

(15,441,600)

(47,507,400)

(37,576,200)

(139,149,800)

(99,266,400)

Income (loss) before income tax

11,579,600

(7,506,300)

20,626,400

(27,897,000)

Income tax (expense) benefit

4,027,200

(1,558,900)

3,497,900

(2,100,900)

Net income (loss) before

  non-controlling interest

15,606,800

(9,065,200)

24,124,300

(29,997,900)

Non-controlling interest

5,100

15,200

16,700

239,500

Net income (loss)

15,611,900

(9,050,000)

24,141,000

(29,758,400)

 

Deficit, beginning of period

(114,140,800)

(101,253,700)

(122,669,900)

(80,545,300)

Deficit, end of period

(98,528,900)

(110,303,700)

(98,528,900)

(110,303,700)

 

Net income (loss) per share – basic

0.10

(0.06)

0.15

(0.19)

Net income (loss) per share – diluted

0.10

(0.06)

0.15

(0.19)

Weighted average common shares

  outstanding – basic

160,829,263

157,967,785

160,442,359

157,781,633

Weighted average common shares

  outstanding – diluted

163,641,218

157,967,785

162,719,541

157,781,633


The accompanying notes are an integral part of these consolidated financial statements.

(a) Exclusive of items shown separately below.





CONSOLIDATED STATEMENTS OF CASH FLOWS

(stated in U.S. dollars) (unaudited)

Three months ended

Nine months ended

September 30,

September 30,

2006

2005

2006

2005

$

$

$

$


OPERATING ACTIVITIES

Net income (loss)

15,611,900

(9,050,000)

24,141,000

(29,758,400)

Add (deduct) items not requiring cash

  Depreciation and amortization

3,262,400

2,467,200

9,414,400

5,329,700

  Amortization of deferred financing fees and

    prepaid expenses

36,900

36,200

107,900

112,400

  Accretion of provision for site restoration

58,100

54,900

169,900

170,500

  Foreign exchange

801,500

(436,500)

(542,400)

7,822,900

  Non-cash derivatives loss

2,887,000

6,516,700

24,905,200

12,759,200

  Shared-based compensation

425,400

332,400

975,500

865,400

  Non-controlling interest

5,100

(13,800)

16,700

(267,100)

  Income taxes (expenses) recovery

(4,156,400)

1,558,900

(3,627,100)

2,100,900

  Gains on disposal of traded securities

(1,261,300)

Restoration expenditures

(81,200)

(281,700)

(284,900)

(792,600)

Changes in components of working capital

  Inventories

(2,133,500)

711,300

(2,553,100)

(3,095,600)

  Stockpiled ore

341,900

908,000

2,807,800

1,518,600

  Government grants

(104,700)

110,400

  VAT and other taxes

(1,353,900)

(681,900)

(3,019,000)

(6,729,800)

  Trade receivables

1,937,300

(985,000)

(12,151,500)

(1,034,300)

  Other current assets

174,500

(357,400)

(334,200)

215,600

  Accounts payable and accrued liabilities

742,000

5,473,500

(3,835,100)

8,217,200

Cash provided by (used in)

  operating activities

18,454,300

6,252,800

35,040,200

(2,565,400)

 

INVESTING ACTIVITIES

Expenditures on mineral properties

(14,401,500)

(7,190,000)

(48,960,400)

(18,691,800)

Grants received (reimbursed)

(124,300)

215,100

7,142,600

Restricted cash

263,600

(824,000)

302,300

(697,600)

Long-term deposits and restricted investments

251,200

(415,200)

630,900

111,800

Long-term investments in traded securities

(3,926,900)

(3,926,900)

Disposal of traded securities

2,411,200

Cash provided by (used in)

  investing activities

(17,813,600)

(8,553,500)

(49,327,800)

(12,135,000)

 

FINANCING ACTIVITIES

Proceeds from issue of common shares

133,400

29,000

1,434,200

695,900

Proceeds from bank loans and other

  long-term liabilities

6,299,500

6,358,900

56,020,800

8,940,900

Financing fees on bank loans

(813,400)

3,400

(1,932,200)

(44,000)

Repayment of bank loans

(24,255,600)

(10,076,800)

(42,409,500)

(12,352,700)

Cash provided by (used in)

  financing activities

(18,636,100)

(3,685,500)

13,113,300

(2,759,900)

Foreign exchange gain (loss) on cash and cash

  equivalents held in foreign currency

(1,035,200)

269,300

723,300

(6,824,500)

Net decrease in cash and cash equivalents

  during the period

(19,030,600)

(5,716,900)

(451,000)

(24,284,800)

Cash and cash equivalents,

  beginning of period

72,203,300

63,320,900

53,623,700

81,888,800

Cash and cash equivalents, end of period

53,172,700

57,604,000

53,172,700

57,604,000

Supplemental cash flow information

Interest paid in cash

1,240,900

742,500

3,631,400

1,661,700

Income taxes paid in cash





For further information please contact:

Chris von Christierson
Chairman & CEO
Tel: + (44) 207 629 2252
E-Mail: cvc@sprospecting.com


Omar Gomez
C.F.O.

Tel: + (34) 98 573 3300
E-Mail: omar.gomez@rngm.es


David Baril

C.O.O.

Tel: +(34) 98-573-3300

E-Mail: david.baril@rngm.es


Michelle Roth

Roth Investor Relations, Inc.

Tel. +1 732 792 2200

Email: michelleroth@rothir.com


Web Site: www.rionarcea.com