Regulation and Rates Disclosure Regulation and Rates
General Rate Case
PSE filed a general rate case (GRC) which includes a three year multiyear rate plan with the Washington Commission on January 31, 2022, requesting an overall increase in electric and natural gas rates of 13.6% and 13.0% respectively in 2023; 2.5% and 2.3%, respectively in 2024; and 1.2% and 1.8%, respectively, in 2025. PSE requested a return on equity of 9.9% in all three-rate years. PSE requested an overall rate of return of 7.39% in 2023; 7.44% in 2024; and 7.49% in 2025. The filing requested recovery of forecasted plant additions through 2022 as required by Revised Code of Washington 80.28.425 as well as forecasted plant additions through 2025, the final year of the multiyear rate plan. The Washington Commission issued a procedural schedule and the case is pending. In August 2022, three separate partial multiparty settlement agreements were reached. For further details regarding the partial settlement agreements, see Management's Discussion and Analysis, "Regulation and Rates" included in Item 2 of this report. The Company cannot predict the outcome of the case at this time.
PSE filed a GRC with the Washington Commission on June 20, 2019 requesting an overall increase in electric and natural gas rates of 6.9% and 7.9% respectively. On July 8, 2020, the Washington Commission issued its order on PSE’s 2019 GRC. The ruling provided for a weighted cost of capital of 7.39% or 6.8% after-tax, and a capital structure of 48.5% in common equity with a return on equity of 9.4%. The order also resulted in a combined net increase to electric of $29.5 million, or 1.6%, and to natural gas of $36.5 million, or 4.0%. However, the Washington Commission extended the amortization of certain regulatory assets, PSE’s electric decoupling deferral, and PSE’s PGA deferral to mitigate the impact of the rate increase in response to the economic instability created by the COVID-19 pandemic. This reduced the electric revenue increase to approximately $0.9 million, or 0.1%, and the natural gas increase to $1.3 million, or 0.2%, and became effective October 15, 2020 and October 1, 2020, respectively.
On July 30, 2021, the IRS issued a Private Letter Ruling (PLR) to PSE which concluded that in the 2019 GRC the Washington Commission’s methodology for reversing plant-related excess deferred income taxes was an impermissible methodology under the IRS normalization and consistency rules. The PLR required adjustments to PSE's rates to bring PSE back into compliance with IRS rules. Accordingly, on September 28, 2021, the Washington Commission issued an order amending their order previously issued on July 8, 2020, to correct for items which were determined to be impermissible under IRS normalization and consistency rules as detailed in the PLR. To reflect the impact of the PLR, PSE recorded a regulatory asset and additional revenues of $24.5 million in its operating results through December 31, 2021. The annualized overall rate impact was an increase of $15.8 million, or 0.7%, for electric and $3.1 million, or 0.3%, for natural gas for a total of $18.9 million with rates effective October 1, 2021. This led to a combined annualized net increase to electric rates of $77.1 million, or 3.7%, an increase of $17.5 million above the $59.6 million granted in the revised final order. The order also led to a combined annualized net increase to natural gas rates of $45.3 million, or 5.9%, an increase of $2.4 million above the $42.9 million granted in the revised final order. The Washington Commission maintained adjustments that mitigated the impacts of the rate increases in response to the economic instability created by the COVID-19 pandemic, which reduced the electric revenue increase to approximately $48.3 million, or 2.3%, and the natural gas increase to $4.9 million, or 0.6%.

Power Cost Only Rate Case
On December 9, 2020, PSE filed its 2020 power cost only rate case (PCORC). The filing proposed an increase of $78.5 million (or an average of approximately 3.7%) in the Company's overall power supply costs with an anticipated effective date in June 2021. On February 2, 2021, PSE supplemented the PCORC to update its power costs, leading to a requested increase from $78.5 million to $88.0 million (or an average of approximately 4.1%).
On March 2, 2021, several of the parties to the PCORC reached a multiparty settlement in principle, which was unopposed. The settlement resulted in an estimated revenue increase of $65.3 million or 3.1%. A term of the settlement requires PSE to include in its next GRC (or another proceeding in 2022) the issue of whether the PCORC should continue, and further prohibits PSE from filing another PCORC before this issue is litigated. On June 1, 2021, the Washington Commission issued its Final Order approving and adopting the settlement and authorizing and requiring a power cost update through a compliance filing. On June 17, 2021, PSE filed a compliance filing with the Washington Commission with a revenue increase of $70.9 million or 3.3% due to the update on power costs with rates effective July 1, 2021.

Decoupling Filings
On July 8, 2020, the Washington Commission issued the final order in Dockets UE-190529 and UG-190530, which instructed PSE to extend the collection of amortization balances for electric decoupling delivery and fixed power cost sections originally filed through the annual May 2020 decoupling filing. The extension requires PSE to move amortization balances for electric decoupling as of August 31, 2020 to be collected from customers for a two-year period, instead of the originally approved one-year period. Additionally, through approving the electric cost of service, the final order approved the re-allocation of decoupling balances from Schedule 40 to the remaining electric decoupling groups.
On December 23, 2020, the Washington Commission approved PSE’s filing to update Schedule 142 decoupling amortization rates, with an effective date of January 1, 2021, by zeroing out rates still effective past October 15, 2020 on tariff sheet Schedule 142-H, which was replaced by rates on tariff sheet Schedule 142-I effective October 15, 2020. PSE included a true up of the over-collection amounts for the period of October 15, 2020 through December 31, 2020 in PSE’s annual May 2021 decoupling filing.
On June 1, 2021, the Washington Commission approved the multi-party settlement agreement which was filed within PSE’s PCORC filing. As part of this settlement agreement, the electric annual fixed power cost allowed revenue was updated to reflect changes in the approved revenue requirement. The changes took effect on July 1, 2021.
On September 28, 2021, the Washington Commission approved 2019 GRC filing updated to PLR changes. As part of this filing, the annual electric and gas delivery cost allowed revenue was updated to reflect changes in the approved revenue requirement. The changes took effect on October 1, 2021.
On September 30, 2022, PSE performed an analysis to determine if electric and natural gas decoupling revenue deferrals would be collected from customers within 24 months of the annual period, per ASC 980.  If not, for GAAP purposes only, PSE would need to record a reserve against the decoupling revenue and corresponding regulatory asset balance.  Once the reserve is probable of collection within 24 months from the end of the annual period, the reserve can be recognized as decoupling revenue. The analysis indicated that electric and natural gas deferred revenue will be collected within 24 months of the annual period; therefore, no reserve adjustment was booked to 2022 electric or natural gas decoupling revenue. At September 30, 2021, the analysis estimated $2.0 million of electric deferred revenue not to be collected within 24 months of the annual period in 2021; therefore, a reserve adjustment was booked to 2021 electric decoupling revenue. At September 30, 2021, natural gas deferred revenue was estimated to be collected within 24 months of the annual period in 2021; therefore, no reserve adjustment was booked to 2021 natural gas decoupling revenue.
Power Cost Adjustment Mechanism
PSE currently has a PCA mechanism that provides for the deferral of power costs that vary from the “power cost baseline” level of power costs. The “power cost baseline” levels are set, in part, based on normalized assumptions about weather and hydroelectric conditions.  Excess power costs or savings are apportioned between PSE and its customers pursuant to the graduated scale set forth in the PCA mechanism and will trigger a surcharge or refund when the cumulative deferral trigger is reached.
Effective January 1, 2017, the following graduated scale is used in the PCA mechanism:

Company’s ShareCustomers' Share
Annual Power Cost VariabilityOverUnderOverUnder
Over or Under Collected by up to $17 million100 %100 %— %— %
Over or Under Collected by between $17 million - $40 million35 50 

65 50 
Over or Under Collected beyond $40 + million10 10 

90 90 

For the nine months ended September 30, 2022, in its PCA mechanism, PSE under recovered its allowable costs by $12.5 million of which zero was apportioned to customers and $1.0 million of interest was accrued on the deferred customer balance. This compares to an under recovery of allowable costs of $49.7 million for the nine months ended September 30, 2021, of which $20.3 million was apportioned to customers and accrued $1.2 million of interest on the total deferred customer balance.

Power Cost Adjustment Clause Filing
On July 8, 2020, the Washington Commission issued the final order in Dockets UE-190529 and UG-190530, which instructed PSE to remove Schedule 95 collection on decoupling allowed rates for Special Contracts, which will be included in allowed rates under the Decoupling Schedule 142 effective October 15, 2020.
PSE exceeded the $20.0 million cumulative deferral balance in its PCA mechanism in 2020. The surcharging of deferrals can be triggered by the Company when the balance in the deferral account is a credit of $20.0 million or more. During 2020, actual power costs were higher than baseline power costs; thereby, creating an under-recovery of $76.1 million. Under the terms of the PCA’s sharing mechanism for under-recovered power costs, PSE absorbed $32.1 million of the under-recovered amount, and customers were responsible for the remaining $44.0 million, or $46.0 million including interest. PSE filed to recover the deferred balance in Docket UE-210300, and the Washington Commission allowed the recovery effective December 1, 2021.
Additionally, PSE exceeded the $20.0 million cumulative deferral balance in its PCA mechanism in 2021. During 2021, actual power costs were higher than baseline power costs; thereby, creating an under-recovery of $68.0 million. Under the terms of the PCA’s sharing mechanism for under-recovered power costs, PSE absorbed $31.3 million of the under-recovered amount, and customers were responsible for the remaining $36.7 million, or $38.4 million including interest. On April 29, 2022, PSE filed a 2021 PCA report with the Washington Commission that proposes to recover the deferred balance for 2021 PCA period by keeping the current rates and allowing recovery from January 1, 2023 through November 30, 2023.

Purchased Gas Adjustment Mechanism
On October 28, 2021, the Washington Commission approved PSE's request for November 2021 PGA rates in Docket UG-210721, effective November 1, 2021. As part of that filing, PSE requested an annual revenue increase of $59.1 million; where PGA rates, under Schedule 101, increase annual revenue by $80.6 million, and the tracker rates under Schedule 106, decrease annual revenue by $21.5 million. Those annual 2021 PGA rate increases will be set in addition to continuing the collection on the remaining balance of $69.4 million under Supplemental Schedule 106B, which were set, in effect, through September 30, 2023 per the 2019 GRC.
On October 21, 2022, PSE filed with the Washington Commission to change PGA rates effective November 1, 2022. As part of that filing, PSE requested an annual revenue increase of $155.3 million; where PGA rates, under Schedule 101, increase annual revenue by $142.1 million, and the tracker rates under Schedule 106, increase annual revenue by $13.2 million.
The following table presents the PGA mechanism balances and activity at September 30, 2022 and December 31, 2021:
 
Puget Sound Energy
(Dollars in Thousands)At September 30,At December 31,
PGA receivable balance and activity20222021
PGA receivable beginning balance$57,935 $87,655 
Actual natural gas costs295,795 364,775 
Allowed PGA recovery(305,458)(396,236)
Interest1,154 1,741 
PGA receivable ending balance$49,426 $57,935 

Get to Zero Depreciation Deferral
On April 10, 2019, PSE filed an accounting petition with the Washington Commission, requesting authorization to defer depreciation expense associated with Get to Zero (GTZ) projects that were placed in service after June 30, 2018. The GTZ project consists of a number of short-lived technology upgrades. The depreciation expense associated with the GTZ projects with lives of 10 years or less that were placed in service after June 30, 2018, were deferred beginning May 1 per the petition request. At September 30, 2022 and December 31, 2021, PSE deferred $10.5 million and $6.6 million of depreciation expense for GTZ, respectively. In addition to the deferral of depreciation expense, PSE had also requested to defer carrying charges on the GTZ deferral, to be calculated utilizing the Company’s currently authorized after tax rate of return, or 6.89%. The ruling authorized PSE to amortize deferred GTZ expenses as proposed in the original GRC filing. The ruling also allows continued deferral of the depreciation expense associated with GTZ investments not already approved for recovery with a book life of 10 years or less, through PSE's then-next GRC, which PSE filed on January 31, 2022, and is currently pending. Finally, the final order set the rate at which PSE could defer and recover carrying charges from PSE’s authorized rate of return to the quarterly interest rate established by the Federal Energy Regulatory Commission (FERC).

Crisis Affected Customer Assistance Program
On April 6, 2020, PSE filed with the Washington Commission revisions to its currently effective electric and natural gas service tariffs. The purpose of this filing was to incorporate into PSE’s low-income tariff a new temporary bill assistance program, Crisis Affected Customer Assistance Program (CACAP-1) (Dockets UE-200331 and UG-200332), to mitigate the economic impact of the COVID-19 pandemic on PSE’s customers. CACAP-1 would allow PSE customers facing financial hardship due to COVID-19 to receive up to $1,000 in bill assistance. The program made available $11.0 million in unspent low income funds from prior years, therefore resulting in no rate impact, and supplemented other forms of financial assistance. CACAP-1 ran from April 13, 2020, to September 30, 2020.
On March 28, 2021, the Washington Commission approved PSE’s CACAP-2 (Dockets UE-210137 and UG-210138). With a program budget of $20.0 million for electric customers and $7.7 million for natural gas customers, CACAP-2, which ran from April 12, 2021, to March 29, 2022, provided up to $2,500 in bill assistance in arrearages per year for each qualifying low-income household.
On October 15, 2021, PSE submitted for the Washington Commission’s review and approval a Supplemental CACAP (Dockets UE-210792 and UG-210793) filing to continue assistance for PSE customers facing financial hardship due to COVID-19. The Washington Commission approved the Supplemental CACAP program to be effective on November 15, 2021. The Supplemental CACAP would utilize carry-over funds not expended in any prior years under PSE’s Schedule 129 Home Energy Lifeline Program (HELP), with a combined total budget of $34.5 million for both electric and natural gas residential customers (capped at $23.7 million and $10.8 million, respectively). Supplemental CACAP benefits offered to cover a qualifying residential customer’s past due balance, up to $2,500. PSE applied the Supplemental CACAP benefits automatically, with an opt-out option, in December 2021.
Storm Loss Deferral MechanismThe Washington Commission has defined deferrable weather-related events and provided that costs in excess of the annual cost threshold may be deferred for qualifying damage costs that meet the modified Institute of Electrical and Electronics Engineers outage criteria for system average interruption duration index. For the nine months ended September 30, 2022, PSE incurred $6.8 million in weather-related electric transmission and distribution system restoration costs, of which $0.2 million was deferred as regulatory assets related to storms that occurred in 2021. This compares to $29.0 million incurred in weather-related electric transmission and distribution system restoration costs for the nine months ended September 30, 2021, of which the Company deferred $19.0 million and $0.2 million as regulatory assets related to storms that occurred in 2021 and 2020, respectively. Under the 2017 GRC Order, the storm loss deferral mechanism approved the following: (i) the cumulative annual cost threshold for deferral of storms under the mechanism at $10.0 million; and (ii) qualifying events where the total qualifying cost is less than $0.5 million will not qualify for deferral and these costs will also not count toward the $10.0 million annual cost threshold.