General Rate Case
PSE filed a general rate case (GRC) with the Washington Commission on June 20, 2019 requesting an overall increase in electric and natural gas rates of 6.9% and 7.9% respectively. PSE requested a return on equity of 9.8% with an overall rate of return of 7.62%. In addition to the traditional areas of focus (revenue requirements, cost allocation, rate design and cost of capital), the Company completed an attrition study and included a portion of the attrition revenue requirement in the overall request in order to address the expected regulatory lag in the rate year. Additionally, as the non-plant related excess deferred taxes that resulted from the Tax Cuts and Jobs Act (TCJA) remained outstanding from PSE’s Expedited Rate Filing (ERF) as discussed below, PSE requested in its GRC to pass back the amounts over four years. On September 17, 2019, PSE filed supplemental testimony, which provided certain updates to the original filing, but did not impact the requested overall electric and natural gas rate increases, return on equity or overall rate of return as originally filed. On January 15, 2020, PSE filed rebuttal testimony which included a reduction to the requested return on equity to 9.5%, which decreased the rate of return to 7.48%. The requested rate increase for both electric and natural gas remained at 6.9% and 7.9%, respectively. For both electric and natural gas PSE did not originally request its full attrition adjustment; therefore, the decrease in return on equity led to a reduction in the electric rate increase of only $1.5 million and did not have an impact on the natural gas rate increase.
On July 8, 2020, the Washington Commission issued its order on PSE’s GRC. The ruling provided for a weighted cost of capital of 7.39% or 6.8% after-tax, and a capital structure of 48.5% in common equity with a return on equity of 9.4%. The order also resulted in a combined net increase to electric of $29.5 million, or 1.6%, and to natural gas of $36.5 million, or 4.0%. However, the Washington Commission extended the amortization of certain regulatory assets, PSE’s electric decoupling deferral, and PSE’s PGA deferral to mitigate the impact of the rate increase in response to the economic instability created by the COVID-19 pandemic, which reduced the electric revenue increase to approximately $0.9 million, or 0.05% and the natural gas increase to $1.3 million, or 0.15%. The Washington Commission also determined that the Company’s proposed attrition adjustment of $23.9 million for electric and $16.2 million for natural gas was not in the public interest at this time. The order also effectively ends the deferral of PSE’s advanced metering infrastructure (AMI) investment while allowing the deferral on the return on AMI investments through December 31, 2019. Additional AMI investments will be evaluated in future proceedings for deferrals of return until the AMI project is complete. On July 17, 2020, PSE filed a motion for clarification with the Washington Commission seeking clarification on several items. On July 31, 2020, the Washington Commission issued an order granting PSE’s motion for clarification. The ruling adjusted certain items from the final order issued on July 8, 2020, which led to a combined net increase to electric of $59.6 million, or 2.9%, an increase of $30.1 million above the $29.5 million granted in the final order. The order also led to a combined net increase to natural gas of $42.9 million, or 5.6%, an increase of $6.4 million above the $36.5 million granted in the final order. The Washington Commission maintained adjustments which mitigated the impacts of the rate increases in response to the economic instability created by the COVID-19 pandemic, which reduced the electric revenue increase to approximately $31.0 million, or 1.5% and the natural gas increase to $7.7 million, or 1.0%. PSE continues to review the original Commission order including the ramifications of certain tax issues and the order for clarification and expects to file a Compliance Filing to amend electric and natural gas tariffs and, upon approval of this filing, rates will go into effect.

Expedited Rate Filing
On November 7, 2018, PSE filed an ERF with the Washington Commission. The filing requested to change rates associated with PSE’s delivery and fixed production costs. It did not include variable power costs, purchased gas costs or natural gas pipeline replacement program costs, which are recovered in separate mechanisms. The filing was based on historical test year costs and rate base, and followed the reporting requirements of a Commission Basis Report, as defined by the Washington Administrative Code, but used end of period rate base and certain annualizing adjustments. It did not include any forward-looking or pro-forma adjustments. Included in the filing was a reduction to the overall authorized rate of return from 7.6% to 7.49% to recognize a reduction in debt costs associated with recent debt activity. PSE requested an overall increase in electric rates of $18.9 million annually, which is a 0.9% increase, and an overall increase in natural gas rates of $21.7 million annually, which is a 2.7% increase.
On January 22, 2019, all parties in the proceeding reached an agreement on settlement terms that resolved all issues in the filing. The settlement agreement was filed on January 30, 2019. The parties agreed to a $21.5 million rate increase for natural gas and no rate increase for electric which became effective March 1, 2019. As is discussed below, these rates include the offsetting effect of passing back to customers plant related excess deferred income taxes that resulted from the TCJA, using the average rate assumption method (ARAM) amounts to arrive at the settlement rate changes.
The settlement agreement provides for the pass back of plant related excess deferred income taxes that resulted from the TCJA using the ARAM methodology based on 2018 amounts beginning March 1, 2019, in the amount of $6.1 million for
natural gas customers and $25.9 million for electric customers. The settlement agreement left the determination for the regulatory treatment of the remaining items related to the TCJA, listed below, to PSE’s GRC that was filed June 20, 2019:
1)excess deferred taxes for non-plant-related book/tax differences for periods prior to March 1, 2019,
2)the deferred balance associated with the over-collection of income tax expense for the period January 1 through April 30, 2018, (the time period that encompasses the effective date of the TCJA to May 1, 2018, the effective date of the TCJA rate change); and
3)the turnaround of plant related excess deferred income taxes using the ARAM method for the period from January 2018 through February 2019, the rate effective date for the ERF.
The settlement agreement provides that PSE may defer the depreciation expense associated with PSE’s ongoing investment in its AMI investment and may defer the return on the AMI investment that was included in the test year of the filing. As noted above, the 2019 GRC effectively ends all deferrals of AMI depreciation expense and deferrals of return on additional AMI investments will be evaluated in future proceedings. The rate of return adopted in the settlement for reporting and deferral purposes is 7.49%. On February 21, 2019, the Washington Commission approved the settlement with one condition: PSE passed back the deferred balance associated with the tax over-collection of $34.6 million for the period from January 1, 2018, through April 30, 2018, over a one-year period which ended May 1, 2020.

Washington Commission Tax Deferral Filing
The TCJA was signed into law in December 2017. As a result of this change, PSE re-measured its deferred tax balances under the new corporate tax rate.  PSE filed an accounting petition on December 29, 2017, requesting deferred accounting treatment for the impacts of tax reform.  The requested deferral accounting treatment resulted in the tax rate change being captured in the deferred income tax balance with an offset to the regulatory liability for deferred income taxes for GAAP purposes.  Additionally, on March 30, 2018, PSE filed for a rate change for electric and natural gas customers associated with TCJA to reflect the decrease in the federal corporate income tax rate from 35.0% to 21.0%. The overall impact of the rate change, based on the annual period from May 2018 through April 2019, is a revenue decrease of $72.9 million, or 3.4% for electric and $23.6 million, or 2.7% for natural gas and became effective May 1, 2018, by operation of law.
The March 30, 2018, rate change filing did not address excess deferred taxes or the deferred balance associated with the over-collection of income tax expense of $34.6 million for the period January 1 through April 30, 2018, (the time period that encompasses the effective date of the TCJA through May 1, 2018, the effective date of the rate change). The $34.6 million tax over-collection decreased PSE's revenue and increased the regulatory liability for a refund to customers.
As a result of the Washington Commission's final order in the ERF, the excess deferred taxes associated with non-plant-related book/tax differences and the treatment of the excess deferred taxes associated with plant related book/tax differences from January 1, 2018, through February 28, 2019, was addressed in PSE’s GRC, which was filed on June 20, 2019. The Washington Commission also required in the ERF order that PSE pass back the deferred balance associated with the tax over-collection for the period from January 1, 2018, through April 30, 2018, as discussed above, over a one-year period which began May 1, 2019. Per PSE’s Schedule 141Y tariff, following the May 2019 through April 2020 refund period, if the residual balance of credit owed to customers will be greater than $0.1 million, PSE will submit a filing no later than July 31, 2020 with a proposal of passing back the residual balance effective September 1, 2020 through August 31, 2021. Finally, the GRC final order determined that PSE is required to pass back 2019 and 2020 protected excess deferred tax reversals totaling $70.8 million over the period July 2020 through July 2021. As noted above, PSE filed a motion for clarification with the Washington Commission seeking clarification on several items including administration of the required pass back of excess deferred tax reversals. On July 31, 2020, PSE received an order granting PSE’s motion for clarification which adjusted certain items within the final order, including treatment of protected excess deferred taxes. PSE is currently reviewing the order granting the motion for clarification.

Decoupling Filings
While fluctuations in weather conditions will continue to affect PSE's billed revenue and energy supply expenses from month to month, PSE's decoupling mechanisms assist in mitigating the impact of weather on operating revenue and net income. Since 2013, the Washington Commission has allowed PSE to record a monthly adjustment to its electric and natural gas operating revenues related to electric transmission and distribution, natural gas operations and general administrative costs from most residential, commercial and industrial customers to mitigate the effects of abnormal weather, conservation impacts and changes in usage patterns per customer. As a result, these electric and natural gas revenues are recovered on a per customer basis regardless of actual consumption levels. PSE's energy supply costs, which are part of the PCA and PGA mechanisms, are not included in the decoupling mechanism. The revenue recorded under the decoupling mechanisms will be affected by customer growth and not actual consumption. Following each calendar year, PSE will recover from, or refund to, customers the
difference between allowed decoupling revenue and the corresponding actual revenue during the following May to April time period.
On December 5, 2017, the Washington Commission approved PSE’s request within the 2017 GRC to extend the decoupling mechanism with several changes to the methodology that took effect on December 19, 2017. Electric and natural gas delivery revenues continue to be recovered on a per customer basis and electric fixed production energy costs are now decoupled and recovered on the basis of a fixed monthly amount. The allowed decoupling revenue for electric and natural gas customers will no longer increase annually each January 1 as occurred prior to December 19, 2017. Approved revenue per customer costs can only be changed in a GRC or ERF. Approved electric fixed production energy costs can also be changed in a power cost only rate case (PCORC). Other changes to the decoupling methodology approved by the Washington Commission include regrouping of electric and natural gas non-residential customers and the exclusion of certain electric schedules from the decoupling mechanism going forward. The rate test, which limits the amount of revenues PSE can collect in its annual filings, increased from 3.0% to 5.0% for natural gas customers but will remain at 3.0% for electric customers. The decoupling mechanism will be reviewed again in PSE’s first rate case filed in or after 2021, or in a separate proceeding, if appropriate. PSE’s decoupling mechanism over- and under- collections will still be collectible or refundable after this effective date even if the decoupling mechanism is not extended.
On February 21, 2019, the Washington Commission approved the multi-party settlement agreement which was filed within PSE’s ERF filing. As part of this settlement agreement, electric and natural gas allowed delivery revenue per customer was updated to reflect changes in the approved revenue requirement. For electric, there were no changes to the annual allowed fixed power cost revenue. The changes took effect on March 1, 2019.
On June 30, 2020, PSE performed an analysis to determine if electric and natural gas decoupling revenue deferrals would be collected from customers within 24 months of the annual period, per ASC 980.  If not, for GAAP purposes only, PSE would need to record a reserve against the decoupling revenue and a corresponding regulatory asset balance.  Once the reserve is probable of collection within 24 months from the end of the annual period, the reserve can be recognized as decoupling revenue. The analysis indicated that $2.1 million of electric deferred revenue will not be collected within 24 months of the annual period; therefore an adjustment was booked to 2020 electric decoupling revenue. Natural gas deferred revenue will be collected within 24 months of the annual period; therefore, no adjustment was booked to 2020 natural gas decoupling revenue.

Power Cost Adjustment Mechanism
PSE currently has a PCA mechanism that provides for the deferral of power costs that vary from the “power cost baseline” level of power costs. The “power cost baseline” levels are set, in part, based on normalized assumptions about weather and hydroelectric conditions.  Excess power costs or savings are apportioned between PSE and its customers pursuant to the graduated scale set forth in the PCA mechanism and will trigger a surcharge or refund when the cumulative deferral trigger is reached.
Effective January 1, 2017, the following graduated scale is used in the PCA mechanism:

Company’s ShareCustomers' Share
Annual Power Cost VariabilityOverUnderOverUnder
Over or Under Collected by up to $17 million100 %100 %— %— %
Over or Under Collected by between $17 million - $40 million35  50  

65  50  
Over or Under Collected beyond $40 + million10  10  

90  90  

For the six months ended June 30, 2020, in its PCA mechanism, PSE under recovered its allowable costs by $48.8 million of which $19.5 million was apportioned to customers and $1.1 million of interest was accrued on the deferred customer balance. This compares to an under recovery of allowable costs of $46.4 million for the six months ended June 30, 2019, of which $17.3 million was apportioned to customers and accrued $0.2 million interest on the total deferred customer balance. The under recovery in 2020 led to an increase in the PCA deferral, and was a higher under recovery compared to the same period in 2019. The under recovery was due to power costs that were higher than what was collected in the allowed baseline for the six months ended June 30, 2020. Power costs have increased due to a number of factors such as the addition of new resources, increased rates on purchase power agreements and higher transmission costs. Also contributing to the under recovery in 2020 was a reduced load, used to calculate the baseline amount, which was due to warmer than normal weather in the first half of 2020 and to the effects of COVID-19 on energy usage and the economy. Contributing to the under recovery in 2019 were high power prices in the first quarter of 2019 due to cold weather in February and early March of 2019, which drove regional loads and demand for power up resulting in higher prices, and Westcoast pipeline capacity limitations, which contributed to higher natural gas and power prices.
Purchased Gas Adjustment Mechanism
On April 25, 2019, the Washington Commission approved PSE’s request for an out-of-cycle change to PGA rates with the rate change taking effect May 1, 2019. The out-of-cycle PGA filing was needed to begin amortizing a large PGA commodity deferral balance that had grown due to higher than projected commodity costs during the 2018/19 winter. These higher than projected commodity costs were primarily due to an October 9, 2018, rupture and subsequent explosion on Westcoast Pipeline which is one of the major pipelines feeding PSE’s distribution system. The pipeline was repaired in October 2018, however supply capacity on the pipeline was limited over the 2018/19 winter leading to higher prices. February weather was also much colder than normal which also increased the demand for natural gas. The out-of-cycle PGA rates were effective from May 1, 2019 through April 30, 2020 and on May 1, 2020 the rates were set to zero. At the end of the recovery period, an unamortized balance of $4.9 million remains which PSE will request to be amortized in its upcoming annual PGA filing for rates effective November 1, 2020.
On October 24, 2019, the Washington Commission approved PSE’s request for November 2019 PGA rates, with the rate change taking effect on November 1, 2019. As part of that filing, PSE requested PGA rates increase annual revenue by $17.8 million, while the new tracker rates increased by annual revenue of $100.6 million; this was in addition to continuing the collection on the remaining balance of $54.0 million from the out-of-cycle PGA. The tracker rates include deferral balances for the three separate amounts: (i) $114.4 million of under collected commodity balances deferred in February and March; (ii) a $10.8 million balance of over-collected commodity costs for the 2018 PGA, and (iii) a $4.1 million remaining balance from the $54.7 million credit to customers, caused by the 2017 over-collection, established in the 2018 tracker. The high commodity deferral balances for winter months through March 2019 were the result of three noteworthy events last winter experienced by PSE: the Enbridge pipeline rupture, unusually low temperatures in February and March, and a compressor failure in February at the Jackson Prairie storage facility. Additionally, to reduce customer impact, as part of the approved PGA filing, PSE was approved to collect $114.4 million commodity deferrals and related interest over a two year period, instead of the historic one year period, from November 2019 through October 2021. Finally, as part of the GRC final order, collection of the $114.4 million commodity deferrals and related interest was further lengthened to be collected over three years instead of two.

The following table presents the PGA mechanism balances and activity for six months ended June 30, 2020 and 2019:
Puget Energy and
Puget Sound Energy
(Dollars in Thousands)At June 30,At December 31
PGA receivable balance and activity20202019
PGA receivable beginning balance$132,766  $9,922  
Actual natural gas costs169,697  406,162  
Allowed PGA recovery(217,916) (289,876) 
Interest2,385  6,558  
PGA receivable ending balance$86,932  $132,766  

Get to Zero Depreciation Deferral
On April 10, 2019, PSE filed an accounting petition with the Washington Commission, requesting authorization to defer depreciation expense associated with Get To Zero (GTZ) projects that were placed in service after June 30, 2018. The GTZ project consists of a number of short-lived technology upgrades. The depreciation expense associated with the GTZ projects with lives of 10 years or less that were placed in service after June 30, 2018, were deferred beginning May 1 per the petition request. As of June 30, 2020, and December 31, 2019, PSE had deferred GTZ depreciation expense balances of $41.1 million and $21.7 million, respectively. In addition to the depreciation expense deferral, PSE requested to defer carrying charges on the GTZ deferral, to be calculated utilizing the Company’s currently authorized after tax rate of return, or 6.89% per the 2018 ERF. As of June 30, 2020, and December 31, 2019, PSE has a deferred carrying charge balance of $2.0 million and $0.5 million, respectively. The GTZ accounting petition was consolidated with PSE’s 2019 GRC and on July 8, 2020, the Washington Commission issued its order in PSE’s 2019 GRC. The ruling authorized PSE to amortize deferred GTZ expenses as proposed in the original general rate case filing. The ruling also allows continued deferral of the depreciation expense associated with GTZ investments not already approved for recovery with a book life of 10 years or less, through its next GRC. Finally, the final order changed the rate at which PSE could defer and recovery carrying charges from PSE’s authorized rate of return to the quarterly interest rate established by the FERC.
Crisis Affected Customer Assistance Program
On April 6, 2020, PSE filed with the Washington Commission revisions to its currently effective Tariff WN U-60. The purpose of this filing is to incorporate into PSE’s low-income tariff a new temporary bill assistance program, Crisis Affected Customer Assistance Program (CACAP), to mitigate the economic impact of the COVID-19 pandemic on PSE’s customers. CACAP would allow PSE customers facing financial hardship due to COVID-19 to receive up to $1,000 in bill assistance. The program puts to immediate use $11.0 million in unspent low income funds from prior years, and supplements other forms of financial assistance. The program does not require an increase to rates and is fully compatible with other low income programs. PSE made an additional filing on July 21, 2020 to increase the amount of electric funds available for distribution by $4.5 million under the CACAP program. The program will automatically end when all of the funds are disbursed or September 30, 2020 whichever is soonest. Based on the COVID-19 pandemic and resulting state of emergency, the Washington Commission allowed the tariff revisions to become effective on April 13, 2020.

Storm Damage Deferral Accounting
The Washington Commission issued a GRC order that defined deferrable storm events and provided that costs in excess of the annual cost threshold may be deferred for qualifying storm damage costs that meet the modified Institute of Electrical and Electronics Engineers outage criteria for system average interruption duration index. For the six months ended June 30, 2020, PSE incurred $9.9 million in storm-related electric transmission and distribution system restoration costs, of which no amount was deferred as a regulatory asset. This compares to $39.2 million incurred in storm-related electric transmission and distribution system restoration costs for the six months ended June 30, 2019, of which the Company deferred $0.4 million and $28.3 million as regulatory assets related to storms that occurred in 2018 and 2019, respectively. Under the December 5, 2017, Washington Commission order regarding PSE’s GRC, the following changes to PSE’s storm deferral mechanism were approved: (i) the cumulative annual cost threshold for deferral of storms under the mechanism increased from $8.0 million to $10.0 million effective January 1, 2018; and (ii) qualifying events where the total qualifying cost is less than $0.5 million will not qualify for deferral and these costs will also not count toward the $10.0 million annual cost threshold.