XML 14 R48.htm IDEA: XBRL DOCUMENT v2.4.0.8
COMMITMENTS AND CONTINGENCIES - ENVIRONMENTAL MATTERS (Details) (USD $)
In Millions, unless otherwise specified
1 Months Ended
Mar. 31, 2013
Weston and Pulliam plants
Electric Utility
Jun. 30, 2013
Columbia and Edgewater jointly-owned plants
Electric Utility
Mar. 31, 2014
Mercury emission
Electric Utility
MW
Mar. 31, 2014
Manufactured gas plant remediation
Natural Gas Utility
site
Air Permitting Violation Claims        
Beneficial environmental project amount $ 6.0 $ 1.3    
Civil penalty and/or legal fees 1.2 0.4    
Mercury and Interstate Air Quality Rules        
Percentage mercury reduction required by the State of Wisconsin's mercury rule through 2014     40.00%  
Level of electric generating units above which a 90% reduction in mercury emissions is required by 2015 (in MW)     150  
Percentage mercury reduction by 2015 required by the State of Wisconsin's mercury rule, for electric generating units above 150 MW     90.00%  
Level of electric generating units above which a reduction in mercury emissions is required by the Best Available Control Technology rule (in MW)     25  
Highest level for electric generating units for which a reduction in mercury emissions is required by the Best Available Control Technology rule (in MW)     150  
Estimated capital cost to achieve required emission reduction     8  
Manufactured Gas Plant Remediation        
Number of environmental remediation sites       10
Number of environmental remediation sites transferred to the EPA Superfund Alternative Sites Program       7
Liabilities estimated and accrued for future undiscounted investigation and cleanup costs for all sites       64.1
Cash expenditures for environmental remediation not yet recovered in rates       12.0
Regulatory assets recorded for cash and estimated future remediation expenditures, net of insurance recoveries received       $ 76.1