Land, Initial Cost to Company $ 183,196        
Buildings and Improvements, Initial Cost to Company 2,182,242        
Cost Capitalized Subsequent to Acquisition 1,022,039        
Land and Land Improvements, Gross Amount 229,222        
Buildings and Leasehold Improvements, Gross Amount 3,123,720        
Total Gross Amount 3,352,942 [1] $ 3,595,278 $ 3,605,137 $ 3,697,160  
Accumulated Depreciation $ (1,194,051) [2] $ (1,128,563) $ (1,053,670)   $ (1,075,389)
Adams County Correctional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Adams County, Mississippi        
Land, Initial Cost to Company $ 874        
Buildings and Improvements, Initial Cost to Company 119,565        
Cost Capitalized Subsequent to Acquisition 4,234        
Land and Land Improvements, Gross Amount 1,104        
Buildings and Leasehold Improvements, Gross Amount 123,569        
Total Gross Amount [1] 124,673        
Accumulated Depreciation [2] $ (32,947)        
Constructed/Acquired Date 2008        
Adams Transitional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Denver, Colorado        
Land, Initial Cost to Company $ 6,090        
Buildings and Improvements, Initial Cost to Company 853        
Cost Capitalized Subsequent to Acquisition 597        
Land and Land Improvements, Gross Amount 6,347        
Buildings and Leasehold Improvements, Gross Amount 1,193        
Total Gross Amount [1] 7,540        
Accumulated Depreciation [2] $ (199)        
Constructed/Acquired Date 2017        
Arapahoe Community Treatment Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Englewood, Colorado        
Land, Initial Cost to Company $ 3,760        
Buildings and Improvements, Initial Cost to Company 1,239        
Cost Capitalized Subsequent to Acquisition 795        
Land and Land Improvements, Gross Amount 3,760        
Buildings and Leasehold Improvements, Gross Amount 2,034        
Total Gross Amount [1] 5,794        
Accumulated Depreciation [2] $ (368)        
Constructed/Acquired Date 2017        
Augusta Transitional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Augusta, Georgia        
Land, Initial Cost to Company $ 1,281        
Buildings and Improvements, Initial Cost to Company 2,674        
Cost Capitalized Subsequent to Acquisition 160        
Land and Land Improvements, Gross Amount 1,281        
Buildings and Leasehold Improvements, Gross Amount 2,834        
Total Gross Amount [1] 4,115        
Accumulated Depreciation [2] $ (317)        
Constructed/Acquired Date 2017        
Austin Residential Reentry Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Del Valle, Texas        
Land, Initial Cost to Company $ 4,190        
Buildings and Improvements, Initial Cost to Company 1,058        
Cost Capitalized Subsequent to Acquisition 385        
Land and Land Improvements, Gross Amount 4,215        
Buildings and Leasehold Improvements, Gross Amount 1,418        
Total Gross Amount [1] 5,633        
Accumulated Depreciation [2] $ (448)        
Constructed/Acquired Date 2015        
Austin Transitional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Del Valle, Texas        
Land, Initial Cost to Company $ 19,488        
Buildings and Improvements, Initial Cost to Company 4,607        
Cost Capitalized Subsequent to Acquisition 1,043        
Land and Land Improvements, Gross Amount 19,500        
Buildings and Leasehold Improvements, Gross Amount 5,638        
Total Gross Amount [1] 25,138        
Accumulated Depreciation [2] $ (1,492)        
Constructed/Acquired Date 2015        
Bent County Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Las Animas, Colorado        
Land, Initial Cost to Company $ 550        
Buildings and Improvements, Initial Cost to Company 13,115        
Cost Capitalized Subsequent to Acquisition 68,749        
Land and Land Improvements, Gross Amount 1,601        
Buildings and Leasehold Improvements, Gross Amount 80,813        
Total Gross Amount [1] 82,414        
Accumulated Depreciation [2] $ (31,603)        
Constructed/Acquired Date 1992        
Bridgeport Pre-Parole Transfer Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Bridgeport, Texas        
Land, Initial Cost to Company $ 70        
Buildings and Improvements, Initial Cost to Company 291        
Land and Land Improvements, Gross Amount 70        
Total Gross Amount [1],[3] $ 70        
Constructed/Acquired Date 1995        
CAI - Boston Avenue          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location San Diego, California        
Land, Initial Cost to Company $ 800        
Buildings and Improvements, Initial Cost to Company 11,440        
Cost Capitalized Subsequent to Acquisition 1,296        
Land and Land Improvements, Gross Amount 845        
Buildings and Leasehold Improvements, Gross Amount 12,691        
Total Gross Amount [1] 13,536        
Accumulated Depreciation [2] $ (3,757)        
Constructed/Acquired Date 2013        
California City Correctional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location California City, California        
Land, Initial Cost to Company $ 1,785        
Buildings and Improvements, Initial Cost to Company 125,337        
Cost Capitalized Subsequent to Acquisition 17,561        
Land and Land Improvements, Gross Amount 3,103        
Buildings and Leasehold Improvements, Gross Amount 141,580        
Total Gross Amount [1] 144,683        
Accumulated Depreciation [2] $ (62,041)        
Constructed/Acquired Date 1999        
Centennial Community Transition Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Englewood, Colorado        
Land, Initial Cost to Company $ 4,905        
Buildings and Improvements, Initial Cost to Company 1,256        
Cost Capitalized Subsequent to Acquisition 399        
Land and Land Improvements, Gross Amount 5,021        
Buildings and Leasehold Improvements, Gross Amount 1,539        
Total Gross Amount [1] 6,560        
Accumulated Depreciation [2] $ (372)        
Constructed/Acquired Date 2016        
Central Arizona Florence Correctional Complex          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Florence, Arizona        
Land, Initial Cost to Company $ 1,298        
Buildings and Improvements, Initial Cost to Company 133,531        
Cost Capitalized Subsequent to Acquisition 53,146        
Land and Land Improvements, Gross Amount 4,626        
Buildings and Leasehold Improvements, Gross Amount 183,349        
Total Gross Amount [1] 187,975        
Accumulated Depreciation [2] $ (86,198)        
Central Arizona Florence Correctional Complex | Minimum          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Constructed/Acquired Date 1994        
Central Arizona Florence Correctional Complex | Maximum          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Constructed/Acquired Date 1999        
Cheyenne Transitional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Cheyenne, Wyoming        
Land, Initial Cost to Company $ 5,567        
Buildings and Improvements, Initial Cost to Company 2,092        
Cost Capitalized Subsequent to Acquisition 1,013        
Land and Land Improvements, Gross Amount 5,567        
Buildings and Leasehold Improvements, Gross Amount 3,105        
Total Gross Amount [1] 8,672        
Accumulated Depreciation [2] $ (799)        
Constructed/Acquired Date 2015        
Cibola County Corrections Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Milan, New Mexico        
Land, Initial Cost to Company $ 444        
Buildings and Improvements, Initial Cost to Company 16,215        
Cost Capitalized Subsequent to Acquisition 33,496        
Land and Land Improvements, Gross Amount 1,446        
Buildings and Leasehold Improvements, Gross Amount 48,709        
Total Gross Amount [1] 50,155        
Accumulated Depreciation [2] $ (24,170)        
Constructed/Acquired Date 1994        
Cimarron Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Cushing, Oklahoma        
Land, Initial Cost to Company $ 250        
Buildings and Improvements, Initial Cost to Company 71,303        
Cost Capitalized Subsequent to Acquisition 46,599        
Land and Land Improvements, Gross Amount 879        
Buildings and Leasehold Improvements, Gross Amount 117,273        
Total Gross Amount [1] 118,152        
Accumulated Depreciation [2] $ (47,672)        
Constructed/Acquired Date 1997        
Coffee Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location [4] Nicholls, Georgia        
Constructed/Acquired Date [4] 1998        
Columbine Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Denver, Colorado        
Land, Initial Cost to Company $ 1,414        
Buildings and Improvements, Initial Cost to Company 488        
Cost Capitalized Subsequent to Acquisition 230        
Land and Land Improvements, Gross Amount 1,438        
Buildings and Leasehold Improvements, Gross Amount 694        
Total Gross Amount [1] 2,132        
Accumulated Depreciation [2] $ (186)        
Constructed/Acquired Date 2016        
Commerce Transitional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Commerce City, Colorado        
Land, Initial Cost to Company $ 5,166        
Buildings and Improvements, Initial Cost to Company 1,758        
Cost Capitalized Subsequent to Acquisition 414        
Land and Land Improvements, Gross Amount 5,166        
Buildings and Leasehold Improvements, Gross Amount 2,172        
Total Gross Amount [1] 7,338        
Accumulated Depreciation [2] $ (303)        
Constructed/Acquired Date 2017        
Corpus Christi Transitional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Corpus Christi, Texas        
Buildings and Improvements, Initial Cost to Company $ 1,886        
Cost Capitalized Subsequent to Acquisition 559        
Land and Land Improvements, Gross Amount 2        
Buildings and Leasehold Improvements, Gross Amount 2,443        
Total Gross Amount [1] 2,445        
Accumulated Depreciation [2] $ (1,517)        
Constructed/Acquired Date 2015        
Crossroads Correctional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Shelby, Montana        
Land, Initial Cost to Company $ 413        
Buildings and Improvements, Initial Cost to Company 33,196        
Cost Capitalized Subsequent to Acquisition 44,470        
Land and Land Improvements, Gross Amount 1,629        
Buildings and Leasehold Improvements, Gross Amount 76,450        
Total Gross Amount [1] 78,079        
Accumulated Depreciation [2] $ (44,757)        
Constructed/Acquired Date 1999        
Crowley County Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Olney Springs, Colorado        
Land, Initial Cost to Company $ 211        
Buildings and Improvements, Initial Cost to Company 46,845        
Cost Capitalized Subsequent to Acquisition 34,283        
Land and Land Improvements, Gross Amount 2,574        
Buildings and Leasehold Improvements, Gross Amount 78,765        
Total Gross Amount [1] 81,339        
Accumulated Depreciation [2] $ (31,689)        
Constructed/Acquired Date 2003        
Dahlia Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Denver, Colorado        
Land, Initial Cost to Company $ 6,788        
Buildings and Improvements, Initial Cost to Company 727        
Cost Capitalized Subsequent to Acquisition 292        
Land and Land Improvements, Gross Amount 6,835        
Buildings and Leasehold Improvements, Gross Amount 972        
Total Gross Amount [1] 7,807        
Accumulated Depreciation [2] $ (266)        
Constructed/Acquired Date 2016        
Dallas Transitional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Hutchins, Texas        
Buildings and Improvements, Initial Cost to Company $ 3,852        
Cost Capitalized Subsequent to Acquisition 1,753        
Buildings and Leasehold Improvements, Gross Amount 5,605        
Total Gross Amount [1] 5,605        
Accumulated Depreciation [2] $ (1,992)        
Constructed/Acquired Date 2015        
Davis Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Holdenville, Oklahoma        
Land, Initial Cost to Company $ 250        
Buildings and Improvements, Initial Cost to Company 66,701        
Cost Capitalized Subsequent to Acquisition 43,059        
Land and Land Improvements, Gross Amount 1,367        
Buildings and Leasehold Improvements, Gross Amount 108,643        
Total Gross Amount [1] 110,010        
Accumulated Depreciation [2] $ (44,293)        
Constructed/Acquired Date 1996        
Diamondback Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Watonga, Oklahoma        
Land, Initial Cost to Company $ 208        
Buildings and Improvements, Initial Cost to Company 41,677        
Cost Capitalized Subsequent to Acquisition 26,373        
Land and Land Improvements, Gross Amount 1,361        
Buildings and Leasehold Improvements, Gross Amount 66,897        
Total Gross Amount [1] 68,258        
Accumulated Depreciation [2] $ (31,341)        
Constructed/Acquired Date 1998        
Eden Detention Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Eden, Texas        
Land, Initial Cost to Company $ 925        
Buildings and Improvements, Initial Cost to Company 27,645        
Cost Capitalized Subsequent to Acquisition 34,972        
Land and Land Improvements, Gross Amount 5,552        
Buildings and Leasehold Improvements, Gross Amount 57,990        
Total Gross Amount [1] 63,542        
Accumulated Depreciation [2] $ (28,858)        
Constructed/Acquired Date 1995        
El Paso Multi Use Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location El Paso, Texas        
Land, Initial Cost to Company $ 14,936        
Buildings and Improvements, Initial Cost to Company 4,536        
Cost Capitalized Subsequent to Acquisition 1,864        
Land and Land Improvements, Gross Amount 14,973        
Buildings and Leasehold Improvements, Gross Amount 6,363        
Total Gross Amount [1] 21,336        
Accumulated Depreciation [2] $ (1,642)        
Constructed/Acquired Date 2015        
El Paso Transitional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location El Paso, Texas        
Land, Initial Cost to Company $ 10,325        
Buildings and Improvements, Initial Cost to Company 4,198        
Cost Capitalized Subsequent to Acquisition 868        
Land and Land Improvements, Gross Amount 10,400        
Buildings and Leasehold Improvements, Gross Amount 4,991        
Total Gross Amount [1] 15,391        
Accumulated Depreciation [2] $ (1,304)        
Constructed/Acquired Date 2015        
Eloy Detention Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Eloy, Arizona        
Land, Initial Cost to Company $ 498        
Buildings and Improvements, Initial Cost to Company 33,308        
Cost Capitalized Subsequent to Acquisition 18,873        
Land and Land Improvements, Gross Amount 2,304        
Buildings and Leasehold Improvements, Gross Amount 50,375        
Total Gross Amount [1] 52,679        
Accumulated Depreciation [2] $ (27,561)        
Constructed/Acquired Date 1995        
Fort Worth Transitional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Fort Worth, Texas        
Land, Initial Cost to Company $ 3,251        
Buildings and Improvements, Initial Cost to Company 334        
Cost Capitalized Subsequent to Acquisition 362        
Land and Land Improvements, Gross Amount 3,266        
Buildings and Leasehold Improvements, Gross Amount 681        
Total Gross Amount [1] 3,947        
Accumulated Depreciation [2] $ (587)        
Constructed/Acquired Date 2015        
Fox Facility and Training Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location [5] Denver, Colorado        
Land, Initial Cost to Company [5] $ 3,038        
Buildings and Improvements, Initial Cost to Company [5] 1,203        
Cost Capitalized Subsequent to Acquisition [5] 732        
Land and Land Improvements, Gross Amount [5] 3,180        
Buildings and Leasehold Improvements, Gross Amount [5] 1,793        
Total Gross Amount [1],[5] 4,973        
Accumulated Depreciation [2],[5] $ (502)        
Constructed/Acquired Date [5] 2016        
Houston Processing Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Houston, Texas        
Land, Initial Cost to Company $ 2,250        
Buildings and Improvements, Initial Cost to Company 53,373        
Cost Capitalized Subsequent to Acquisition 41,693        
Land and Land Improvements, Gross Amount 3,909        
Buildings and Leasehold Improvements, Gross Amount 93,407        
Total Gross Amount [1] 97,316        
Accumulated Depreciation [2] $ (44,861)        
Constructed/Acquired Date 1984        
Huerfano County Correctional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Walsenburg, Colorado        
Land, Initial Cost to Company $ 124        
Buildings and Improvements, Initial Cost to Company 26,358        
Cost Capitalized Subsequent to Acquisition 5,053        
Land and Land Improvements, Gross Amount 1,116        
Buildings and Leasehold Improvements, Gross Amount 30,419        
Total Gross Amount [1] 31,535        
Accumulated Depreciation [2] $ (16,305)        
Constructed/Acquired Date 1997        
James River Residential Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Newport News, Virginia        
Land, Initial Cost to Company $ 800        
Buildings and Improvements, Initial Cost to Company 501        
Cost Capitalized Subsequent to Acquisition 68        
Land and Land Improvements, Gross Amount 804        
Buildings and Leasehold Improvements, Gross Amount 565        
Total Gross Amount [1] 1,369        
Accumulated Depreciation [2] $ (31)        
Constructed/Acquired Date 2019        
Jenkins Correctional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location [4] Millen, Georgia        
Constructed/Acquired Date [4] 2012        
Kit Carson Correctional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Burlington, Colorado        
Land, Initial Cost to Company $ 432        
Buildings and Improvements, Initial Cost to Company 35,978        
Cost Capitalized Subsequent to Acquisition 44,462        
Land and Land Improvements, Gross Amount 1,051        
Buildings and Leasehold Improvements, Gross Amount 79,821        
Total Gross Amount [1] 80,872        
Accumulated Depreciation [2] $ (29,922)        
Constructed/Acquired Date 1998        
La Palma Correctional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Eloy, Arizona        
Land, Initial Cost to Company $ 283        
Buildings and Improvements, Initial Cost to Company 183,155        
Cost Capitalized Subsequent to Acquisition 14,427        
Land and Land Improvements, Gross Amount 486        
Buildings and Leasehold Improvements, Gross Amount 197,379        
Total Gross Amount [1] 197,865        
Accumulated Depreciation [2] $ (57,802)        
Constructed/Acquired Date 2008        
Lake Erie Correctional Institution          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Conneaut, Ohio        
Land, Initial Cost to Company $ 2,871        
Buildings and Improvements, Initial Cost to Company 69,779        
Cost Capitalized Subsequent to Acquisition 6,843        
Land and Land Improvements, Gross Amount 4,087        
Buildings and Leasehold Improvements, Gross Amount 75,406        
Total Gross Amount [1] 79,493        
Accumulated Depreciation [2] $ (17,606)        
Constructed/Acquired Date 2011        
Laredo Processing Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Laredo, Texas        
Land, Initial Cost to Company $ 788        
Buildings and Improvements, Initial Cost to Company 26,737        
Cost Capitalized Subsequent to Acquisition 3,664        
Land and Land Improvements, Gross Amount 986        
Buildings and Leasehold Improvements, Gross Amount 30,203        
Total Gross Amount [1] 31,189        
Accumulated Depreciation [2] $ (14,743)        
Constructed/Acquired Date 1985        
Leavenworth Detention Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Leavenworth, Kansas        
Land, Initial Cost to Company $ 130        
Buildings and Improvements, Initial Cost to Company 44,970        
Cost Capitalized Subsequent to Acquisition 46,104        
Land and Land Improvements, Gross Amount 1,082        
Buildings and Leasehold Improvements, Gross Amount 90,122        
Total Gross Amount [1] 91,204        
Accumulated Depreciation [2] $ (37,042)        
Constructed/Acquired Date 1992        
Lee Adjustment Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Beattyville, Kentucky        
Land, Initial Cost to Company $ 500        
Buildings and Improvements, Initial Cost to Company 515        
Cost Capitalized Subsequent to Acquisition 18,713        
Land and Land Improvements, Gross Amount 1,285        
Buildings and Leasehold Improvements, Gross Amount 18,443        
Total Gross Amount [1] 19,728        
Accumulated Depreciation [2] $ (9,693)        
Constructed/Acquired Date 1998        
Leo Chesney Correctional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Live Oak, California        
Land, Initial Cost to Company $ 250        
Buildings and Improvements, Initial Cost to Company 4,774        
Cost Capitalized Subsequent to Acquisition 1,862        
Land and Land Improvements, Gross Amount 265        
Buildings and Leasehold Improvements, Gross Amount 6,621        
Total Gross Amount [1] 6,886        
Accumulated Depreciation [2] $ (3,773)        
Constructed/Acquired Date 1989        
Long Beach Community Corrections Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Long Beach, California        
Land, Initial Cost to Company $ 5,038        
Buildings and Improvements, Initial Cost to Company 2,413        
Land and Land Improvements, Gross Amount 5,038        
Buildings and Leasehold Improvements, Gross Amount 2,413        
Total Gross Amount [1] 7,451        
Accumulated Depreciation [2] $ (337)        
Constructed/Acquired Date 2016        
Longmont Community Treatment Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Longmont, Colorado        
Land, Initial Cost to Company $ 3,364        
Buildings and Improvements, Initial Cost to Company 582        
Cost Capitalized Subsequent to Acquisition 204        
Land and Land Improvements, Gross Amount 3,363        
Buildings and Leasehold Improvements, Gross Amount 787        
Total Gross Amount [1] 4,150        
Accumulated Depreciation [2] $ (164)        
Constructed/Acquired Date 2016        
Marion Adjustment Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location St. Mary, Kentucky        
Land, Initial Cost to Company $ 250        
Buildings and Improvements, Initial Cost to Company 9,994        
Cost Capitalized Subsequent to Acquisition 9,011        
Land and Land Improvements, Gross Amount 925        
Buildings and Leasehold Improvements, Gross Amount 18,330        
Total Gross Amount [1] 19,255        
Accumulated Depreciation [2] $ (8,512)        
Constructed/Acquired Date 1998        
McRae Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location McRae, Georgia        
Land, Initial Cost to Company $ 462        
Buildings and Improvements, Initial Cost to Company 60,396        
Cost Capitalized Subsequent to Acquisition 21,778        
Land and Land Improvements, Gross Amount 1,099        
Buildings and Leasehold Improvements, Gross Amount 81,537        
Total Gross Amount [1] 82,636        
Accumulated Depreciation [2] $ (28,773)        
Constructed/Acquired Date 2000        
Mineral Wells Pre-Parole Transfer Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Mineral Wells, Texas        
Land, Initial Cost to Company $ 176        
Buildings and Improvements, Initial Cost to Company 22,589        
Land and Land Improvements, Gross Amount 100        
Total Gross Amount [1],[3] $ 100        
Constructed/Acquired Date 1995        
Nevada Southern Detention Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Pahrump, Nevada        
Land, Initial Cost to Company $ 7,548        
Buildings and Improvements, Initial Cost to Company 64,362        
Cost Capitalized Subsequent to Acquisition 10,729        
Land and Land Improvements, Gross Amount 8,421        
Buildings and Leasehold Improvements, Gross Amount 74,218        
Total Gross Amount [1] 82,639        
Accumulated Depreciation [2] $ (20,484)        
Constructed/Acquired Date 2010        
North Fork Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Sayre, Oklahoma        
Buildings and Improvements, Initial Cost to Company $ 42,166        
Cost Capitalized Subsequent to Acquisition 64,091        
Land and Land Improvements, Gross Amount 694        
Buildings and Leasehold Improvements, Gross Amount 105,563        
Total Gross Amount [1] 106,257        
Accumulated Depreciation [2] $ (41,602)        
Constructed/Acquired Date 1998        
Northeast Ohio Correctional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Youngstown, Ohio        
Land, Initial Cost to Company $ 750        
Buildings and Improvements, Initial Cost to Company 39,583        
Cost Capitalized Subsequent to Acquisition 14,295        
Land and Land Improvements, Gross Amount 2,009        
Buildings and Leasehold Improvements, Gross Amount 52,619        
Total Gross Amount [1] 54,628        
Accumulated Depreciation [2] $ (26,239)        
Constructed/Acquired Date 1997        
Northwest New Mexico Correctional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Grants, New Mexico        
Land, Initial Cost to Company $ 142        
Buildings and Improvements, Initial Cost to Company 15,888        
Cost Capitalized Subsequent to Acquisition 21,119        
Land and Land Improvements, Gross Amount 1,050        
Buildings and Leasehold Improvements, Gross Amount 36,099        
Total Gross Amount [1] 37,149        
Accumulated Depreciation [2] $ (18,839)        
Constructed/Acquired Date 1989        
Oklahoma City Transitional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Oklahoma City, Oklahoma        
Land, Initial Cost to Company $ 1,114        
Buildings and Improvements, Initial Cost to Company 2,626        
Cost Capitalized Subsequent to Acquisition 1,654        
Land and Land Improvements, Gross Amount 1,144        
Buildings and Leasehold Improvements, Gross Amount 4,250        
Total Gross Amount [1] 5,394        
Accumulated Depreciation [2] $ (842)        
Constructed/Acquired Date 2017        
Oklahoma Reentry Opportunity Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Oklahoma City, Oklahoma        
Land, Initial Cost to Company $ 8,562        
Buildings and Improvements, Initial Cost to Company 4,631        
Cost Capitalized Subsequent to Acquisition 1,510        
Land and Land Improvements, Gross Amount 8,599        
Buildings and Leasehold Improvements, Gross Amount 6,104        
Total Gross Amount [1] 14,703        
Accumulated Depreciation [2] $ (1,590)        
Constructed/Acquired Date 2015        
Otay Mesa Detention Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location San Diego, California        
Land, Initial Cost to Company $ 28,845        
Buildings and Improvements, Initial Cost to Company 114,411        
Cost Capitalized Subsequent to Acquisition 47,575        
Land and Land Improvements, Gross Amount 37,104        
Buildings and Leasehold Improvements, Gross Amount 153,727        
Total Gross Amount [1] 190,831        
Accumulated Depreciation [2] $ (18,191)        
Otay Mesa Detention Center | Minimum          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Constructed/Acquired Date 2015        
Otay Mesa Detention Center | Maximum          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Constructed/Acquired Date 2019        
Prairie Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Appleton, Minnesota        
Land, Initial Cost to Company $ 100        
Buildings and Improvements, Initial Cost to Company 22,306        
Cost Capitalized Subsequent to Acquisition 11,133        
Land and Land Improvements, Gross Amount 1,068        
Buildings and Leasehold Improvements, Gross Amount 32,471        
Total Gross Amount [1] 33,539        
Accumulated Depreciation [2] $ (19,123)        
Constructed/Acquired Date 1991        
Recovery Monitoring Solutions          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Dallas, Texas        
Land, Initial Cost to Company $ 1,152        
Buildings and Improvements, Initial Cost to Company 1,979        
Cost Capitalized Subsequent to Acquisition 829        
Land and Land Improvements, Gross Amount 1,280        
Buildings and Leasehold Improvements, Gross Amount 2,680        
Total Gross Amount [1] 3,960        
Accumulated Depreciation [2] $ (440)        
Constructed/Acquired Date 2018        
Red Rock Correctional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location [4] Eloy, Arizona        
Constructed/Acquired Date [4] 2006        
Roth Hall Residential Reentry Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Philadelphia, Pennsylvania        
Land, Initial Cost to Company $ 654        
Buildings and Improvements, Initial Cost to Company 2,693        
Cost Capitalized Subsequent to Acquisition 2        
Land and Land Improvements, Gross Amount 654        
Buildings and Leasehold Improvements, Gross Amount 2,695        
Total Gross Amount [1] 3,349        
Accumulated Depreciation [2] $ (432)        
Constructed/Acquired Date 2015        
Saguaro Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Eloy, Arizona        
Land, Initial Cost to Company $ 193        
Buildings and Improvements, Initial Cost to Company 98,903        
Cost Capitalized Subsequent to Acquisition 2,882        
Land and Land Improvements, Gross Amount 486        
Buildings and Leasehold Improvements, Gross Amount 101,492        
Total Gross Amount [1] 101,978        
Accumulated Depreciation [2] $ (29,917)        
Constructed/Acquired Date 2007        
South Raleigh Reentry Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Raleigh, North Carolina        
Land, Initial Cost to Company $ 277        
Buildings and Improvements, Initial Cost to Company 663        
Cost Capitalized Subsequent to Acquisition 54        
Land and Land Improvements, Gross Amount 277        
Buildings and Leasehold Improvements, Gross Amount 717        
Total Gross Amount [1] 994        
Accumulated Depreciation [2] $ (53)        
Constructed/Acquired Date 2019        
Southeast Kentucky Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Wheelwright, Kentucky        
Land, Initial Cost to Company $ 500        
Buildings and Improvements, Initial Cost to Company 24,487        
Cost Capitalized Subsequent to Acquisition 13,833        
Land and Land Improvements, Gross Amount 2,399        
Buildings and Leasehold Improvements, Gross Amount 36,421        
Total Gross Amount [1] 38,820        
Accumulated Depreciation [2] $ (18,248)        
Constructed/Acquired Date 1998        
Stewart Detention Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Lumpkin, Georgia        
Land, Initial Cost to Company $ 143        
Buildings and Improvements, Initial Cost to Company 70,560        
Cost Capitalized Subsequent to Acquisition 22,495        
Land and Land Improvements, Gross Amount 1,629        
Buildings and Leasehold Improvements, Gross Amount 91,569        
Total Gross Amount [1] 93,198        
Accumulated Depreciation [2] $ (34,217)        
Constructed/Acquired Date 2004        
Stockton Female Community Corrections Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Stockton, California        
Land, Initial Cost to Company $ 692        
Buildings and Improvements, Initial Cost to Company 788        
Land and Land Improvements, Gross Amount 692        
Buildings and Leasehold Improvements, Gross Amount 788        
Total Gross Amount [1] 1,480        
Accumulated Depreciation [2] $ (97)        
Constructed/Acquired Date 2017        
T. Don Hutto Residential Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Taylor, Texas        
Land, Initial Cost to Company $ 183        
Buildings and Improvements, Initial Cost to Company 13,418        
Cost Capitalized Subsequent to Acquisition 5,764        
Land and Land Improvements, Gross Amount 812        
Buildings and Leasehold Improvements, Gross Amount 18,553        
Total Gross Amount [1] 19,365        
Accumulated Depreciation [2] $ (9,708)        
Constructed/Acquired Date 1997        
Tallahatchie County Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Tutwiler, Mississippi        
Buildings and Improvements, Initial Cost to Company $ 44,638        
Cost Capitalized Subsequent to Acquisition 108,290        
Land and Land Improvements, Gross Amount 2,120        
Buildings and Leasehold Improvements, Gross Amount 150,808        
Total Gross Amount [1] 152,928        
Accumulated Depreciation [2] $ (60,053)        
Constructed/Acquired Date 2000        
Torrance County Detention Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Estancia, New Mexico        
Land, Initial Cost to Company $ 511        
Buildings and Improvements, Initial Cost to Company 52,599        
Cost Capitalized Subsequent to Acquisition 11,449        
Land and Land Improvements, Gross Amount 1,994        
Buildings and Leasehold Improvements, Gross Amount 62,565        
Total Gross Amount [1] 64,559        
Accumulated Depreciation [2] $ (30,787)        
Constructed/Acquired Date 1990        
Turley Residential Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Tulsa, Oklahoma        
Land, Initial Cost to Company $ 421        
Buildings and Improvements, Initial Cost to Company 4,105        
Cost Capitalized Subsequent to Acquisition 1,174        
Land and Land Improvements, Gross Amount 421        
Buildings and Leasehold Improvements, Gross Amount 5,279        
Total Gross Amount [1] 5,700        
Accumulated Depreciation [2] $ (1,406)        
Constructed/Acquired Date 2015        
Trousdale Turner Correctional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Hartsville, Tennessee        
Land, Initial Cost to Company $ 649        
Buildings and Improvements, Initial Cost to Company 135,412        
Cost Capitalized Subsequent to Acquisition 5,624        
Land and Land Improvements, Gross Amount 1,950        
Buildings and Leasehold Improvements, Gross Amount 139,735        
Total Gross Amount [1] 141,685        
Accumulated Depreciation [2] $ (17,462)        
Constructed/Acquired Date 2015        
Tulsa Transitional Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Tulsa, Oklahoma        
Land, Initial Cost to Company $ 8,206        
Buildings and Improvements, Initial Cost to Company 4,061        
Cost Capitalized Subsequent to Acquisition 658        
Land and Land Improvements, Gross Amount 606        
Buildings and Leasehold Improvements, Gross Amount 2,766        
Total Gross Amount [1],[3] 3,372        
Accumulated Depreciation [2] $ (1,044)        
Constructed/Acquired Date 2015        
Ulster Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location [5] Denver, Colorado        
Land, Initial Cost to Company [5] $ 4,068        
Buildings and Improvements, Initial Cost to Company [5] 441        
Cost Capitalized Subsequent to Acquisition [5] 212        
Land and Land Improvements, Gross Amount [5] 2,100        
Buildings and Leasehold Improvements, Gross Amount [5] 595        
Total Gross Amount [1],[5] 2,695        
Accumulated Depreciation [2],[5] $ (170)        
Constructed/Acquired Date [5] 2016        
Wheeler Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location [4] Alamo, Georgia        
Constructed/Acquired Date [4] 1998        
Walker Hall Residential Reentry Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Philadelphia, Pennsylvania        
Land, Initial Cost to Company $ 654        
Buildings and Improvements, Initial Cost to Company 2,692        
Cost Capitalized Subsequent to Acquisition 23        
Land and Land Improvements, Gross Amount 654        
Buildings and Leasehold Improvements, Gross Amount 2,715        
Total Gross Amount [1] 3,369        
Accumulated Depreciation [2] $ (434)        
Constructed/Acquired Date 2015        
Webb County Detention Center          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Laredo, Texas        
Land, Initial Cost to Company $ 498        
Buildings and Improvements, Initial Cost to Company 20,161        
Cost Capitalized Subsequent to Acquisition 6,740        
Land and Land Improvements, Gross Amount 2,206        
Buildings and Leasehold Improvements, Gross Amount 25,193        
Total Gross Amount [1] 27,399        
Accumulated Depreciation [2] $ (13,993)        
Constructed/Acquired Date 1998        
West Tennessee Detention Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Mason, Tennessee        
Land, Initial Cost to Company $ 538        
Buildings and Improvements, Initial Cost to Company 31,931        
Cost Capitalized Subsequent to Acquisition 8,585        
Land and Land Improvements, Gross Amount 2,174        
Buildings and Leasehold Improvements, Gross Amount 38,880        
Total Gross Amount [1] 41,054        
Accumulated Depreciation [2] $ (20,432)        
Constructed/Acquired Date 1990        
Whiteville Correctional Facility          
SEC Schedule III, Real Estate Assets and Accumulated Depreciation [Line Items]          
Location Whiteville, Tennessee        
Land, Initial Cost to Company $ 303        
Buildings and Improvements, Initial Cost to Company 51,694        
Cost Capitalized Subsequent to Acquisition 8,860        
Land and Land Improvements, Gross Amount 1,671        
Buildings and Leasehold Improvements, Gross Amount 59,186        
Total Gross Amount [1] 60,857        
Accumulated Depreciation [2] $ (29,503)        
Constructed/Acquired Date 1998        
[1] The aggregate cost of properties for federal income tax purposes is approximately $3.7 billion at December 31, 2021.
[2] Depreciation is calculated using estimated useful lives of depreciable assets up to 50 years for prison facilities.
[3] CoreCivic recorded non-cash impairments during the fourth quarter of 2014 to write down the book value of the Mineral Wells facility, during the third quarter of 2017 to write down the book value of the Bridgeport facility, during the second quarter of 2020 to write down the book value of the Tulsa Transitional Center, and during the fourth quarter of 2021 to write down the book value of the Ulster Facility to the estimated fair values assuming uses other than correctional or residential reentry facilities.
[4] CoreCivic retains title to this asset, which is classified under other real estate assets on the Company's consolidated balance sheets in accordance with ASC 853.
[5] Held for Sale.